Draft v1.0 prepared by NEER. Not adopted by the Government of Assam, any Autonomous Council, authority or local body, and has no legal force. About this draft

Annexes to Chapter 1Policy, Applicability and Adoption

These annexes support Chapter 1. They hold the lists and maps that define where the Manual applies, the model text of the Policy Supplement and of the legal instruments that would give the Manual effect, and the two forms an Applicant files under Chapter 1. The Manual is a draft; it is not adopted by any government or agency: model legal text is offered for consideration by a competent authority and is not in force, and the forms are draft forms. An annex marked "To be prepared" states the data it needs and the rule to use until it is published (Clause 1.11.5).


Annex 1A — List of Tier A authorities, with the boundaries of the Guwahati Metropolitan Area of the Master Plan for Guwahati 2025 and of the Dibrugarh and Silchar Municipal Corporations and their Master Plan areas

Supports Clauses 1.6.1 to 1.6.5 of Chapter 1.

1A.1 Clause 1.6.1 defines Tier A by class of authority. Table 1A.1 sets out the classes, and the authorities named in the clause, as Chapter 1 defines them. Every authority not in Table 1A.1 is Tier B (Clause 1.6.2).

Table 1A.1 — Tier A authorities as defined in Clause 1.6.1

Item Tier A authority Clause
(a) The Guwahati Municipal Corporation (GMC) 1.6.1(a)
(b) GMDA and every other Approving Authority within the Guwahati Metropolitan Area, the area of the Master Plan for Guwahati 2025 (328 km²), whichever has jurisdiction over a site 1.6.1(b)
(c) The Dibrugarh Municipal Corporation, with the Development Authority of the Dibrugarh Master Plan area, and the Silchar Municipal Corporation, with the Development Authority of the Silchar Master Plan area (the names of the two Development Authorities are to be confirmed [TBC]) 1.6.1(c)
— A Tier B authority that opts into Tier A by council resolution, or that the Government notifies as Tier A 1.6.4

1A.2 Whatever the tier, the design-aid route and the alternatives of Clause 1.7 are not available in a flood-sensitive catchment (Clause 1.6.5; Annex 1B).

To be prepared. This annex will contain the full list, by name, of every Approving Authority within the Guwahati Metropolitan Area and the Master Plan areas of Dibrugarh and Silchar, with the date from which each is Tier A, and the boundaries of those areas and of the three Municipal Corporations as a map and as a GIS layer. It needs the notified Master Plan for Guwahati 2025 and its modifications, with Schedule I of the 328 km² area (GMDA); the Master Plans of Dibrugarh and Silchar and the names and areas of their Development Authorities (T&CP, DoHUA) [TBC]; the limits of the GMC and of the Dibrugarh and Silchar Municipal Corporations, whose dates of constitution are to be confirmed (DoHUA) [TBC]; the Gaon Panchayats and other local bodies that fall within those Master Plan areas; and the district, mouza and revenue village boundaries (Revenue and Disaster Management Department, Survey of India). Until it is published, the tier is decided by the classes in Clause 1.6.1 and recorded on Form 1-1, and the Authority confirms it at the pre-application stage (Clause 1.5.9).

Table 1A.2 — Register of Tier A authorities (layout)

No. Authority Class (Municipal Corporation / Municipal Board / GMDA / Development Authority / Gaon Panchayat / District Council / other) District Basis (Clause 1.6.1(a), (b), (c) or 1.6.4) Tier A from (date) Notification or resolution reference
1            
2            
3            

1A.3 The Municipal Corporation, Municipal Board and Master Plan area boundary map shall be published as open data in a machine-readable format (Clause 10.17.4), with the date of the notification it shows.


Annex 1B — Maps of flood-sensitive catchments

Supports Clauses 1.4, 1.6.5 and 1.10.3(d) of Chapter 1, and Clauses 4.5.3 and 4.5.4 of Chapter 4.

1B.1 The flood-sensitive catchments are listed in Clause 4.5.3.2. Table 1B.1 repeats that list. The maps of this annex and the boundaries of Annex 4A are the same data set and shall be issued together.

Table 1B.1 — Flood-sensitive catchments listed in Clause 4.5.3.2

Item Catchment Extent as described in Chapter 4
(a) Guwahati's Bharalu–Bahini basin to Bharalumukh, with the Noonmati–Bondajan diversion The catchment of the Bahini, which rises at Umtyrnga in Meghalaya and becomes the Bharalu at Jonali, and of the Bharalu down to its gated outfall to the Brahmaputra at Bharalumukh, about 120 km², about half of it hills (PCBA, as quoted), with the diversion from Noonmati to the Bondajan. The localities inundated in June 2022 lie here, among them Anil Nagar, Nabin Nagar, Rajgarh Link Road, Rukminigaon, Hatigaon and Krishna Nagar (as reported), with the 14 waterlogging points that the CAG found flooding six or seven times a year (CAG, Report No. 4 of 2019). "The natural discharge capacity of the Bharalu is 72 Cumecs when its Bharalumukh sluice gates are kept open, while the pumps fitted to its sluice gates can discharge only seven Cumecs" (2008, as reported; present capacity [TBC])
(b) The Mora Bharalu–Deepor Beel–Khanajan system, with the Basistha and the Kalmani, and the Silsako basin The land that drains by the Mora Bharalu, the Basistha and the Kalmani to Deepor Beel and from it by the Khanajan to the Brahmaputra, and the basin of Silsako, the retention basin to which part of the Bahini's runoff is to be diverted (ADB, RRP, 2025). Deepor Beel holds about 10.1 km² of water in winter and up to about 40.1 km² in floods (as reported); its stage–storage relation was not found [TBC]
(c) The hill streams of the Guwahati fringe from Meghalaya The catchments of the streams that come down from the hills of Meghalaya to Khanapara, Jorabat and Basistha, where Plate 9 of the 2(b) report reads about 280–320 mm at 50 years against about 200–240 mm in the city (Clause 2.3.6(c)(i)) and SIRD Khanapara recorded 215.9 mm on the night of 19–20 April 2026 (as reported)
(d) Dibrugarh behind the DTP dyke The town behind the 8.62 km DTP dyke of 1955, which "closed all the drainage channels", "1.5 m below the bed level of Bramhaputra", and its drain of 32.053 km past Larua Jamira beel to the Sessa, whose outfall sluice is designed for a flood level of 97.50 m with "the beel … full and the drain … also flowing full" (ADB, IEE, 2017)
(e) Silchar behind the Barak embankment The bowl of Silchar inside the Barak embankment, flooded from 19 June 2022 for about 11 days after the cut at Bethukandi (as reported); the Barak at Annapurnaghat has a danger level of 19.83 m and a highest level of 21.84 m (1 August 1989) (CWC data as transcribed by SANDRP). Its outfall channels were not researched [TBC]
(f) Karimganj on the Kushiyara, with Hailakandi and Badarpur The towns of the lower Barak valley on the Kushiyara and the Barak; the Kushiyara at Karimganj has a danger level of 14.94 m and a highest level of 16.57 m (10 June 2010), and the Barak at Badarpurghat 16.85 m and 18.48 m (11 September 2007) (CWC data as transcribed by SANDRP)
(g) Palasbari–Mirza The land of the Palasbari–Mirza area, where builders blocked channels and filled wetland, causing "artificial floods" (Gauhati High Court, PIL/53/2023, order of 06.09.2024)
(h) The north-bank towns on dam-release and flash-flood reaches North Lakhimpur on the Ranganadi, below the NEEPCO project that released 1,412.57 m³/s in 2017 (as quoted); Dhemaji; the reach of the Subansiri below the Lower Subansiri project (release rules [TBC]); and Tezpur on the Jia Bharali
(i) Dhubri and Goalpara on the lower Brahmaputra The towns of the lower Brahmaputra, where the river has a danger level of 28.62 m at Dhubri and 36.27 m at Goalpara (CWC data as transcribed by SANDRP) and Dhubri (Rupsi) recorded 479.3 mm in 24 hours on 28 May 1989, the largest qualifying day in the State (IMD; Clause 2.3.6(h))
(j) Majuli and the char lands Majuli and every char and chapori in the Brahmaputra and the Barak, where Clause 2.3.6(i) makes the design hazard-first and the floodplain rule of Clause 4.11 bars infiltration; Majuli's area is given as 733.79 km² in 1940 and 524.29 km² in 2016 (as quoted), and as 1,246 km² in 1951 and 487 km² in 2024 in another source (conflict)
(k) Haflong and Diphu The hill towns of Dima Hasao and Karbi Anglong, where slopes, slides and debris govern (Clause 2.3.6(i))
(l) Notified catchments Any catchment notified under Clause 4.5.4

To be prepared. This annex will contain a map of each catchment in Table 1B.1 at a scale fit for deciding whether a plot lies inside it, and the same boundaries as a GIS layer. It needs catchment boundaries drawn from a digital elevation model and the drain network (the GMC, GMDA, PWD, the Dibrugarh and Silchar Municipal Corporations and the Municipal Boards, Survey of India), including the parts of the Guwahati catchments that lie in Meghalaya; the drains with their outfalls, the sluices, flap gates and pumping stations with their sills, closing levels and capacities, and the dry-weather interceptions on them, with levels on a stated datum (the WRD, GMDA, the Corporations); the flood marks of June 2014, June 2022, 31 May 2025 and 20 April 2026 in Guwahati and of June 2022 in Silchar, and the waterlogging points recorded by the CAG (the GMC, GMDA, ASDMA, the Deputy Commissioners); the stage records of the CWC sites at Guwahati (DC Court), Dibrugarh, Tezpur, Goalpara, Dhubri, Annapurnaghat, Badarpurghat and Karimganj with their datum (CWC); the release records of the Ranganadi, Lower Subansiri and Kopili projects (NEEPCO, NHPC); the stage–storage relations of Deepor Beel, Silsako and Larua Jamira beel [TBC]; and the char and chapori lands as mapped (the Directorate of Char Areas Development, WRD). Jorhat, Nagaon, Tezpur town, Tinsukia, Bongaigaon and the other Master Plan towns are candidates for notification under Clause 4.5.4 once their catchment boundaries and flood record are documented [TBC]. The setbacks of the Unified Byelaws 2022 from rivers, channels and water bodies, and the corridors of Chapter 7, are governed by Chapter 7 and by the instruments that bind there rather than by this list. Until it is published, the Authority decides at the pre-application stage whether a site lies in a listed catchment, from the best boundary available, and the decision and its basis are recorded on Form 1-1 and in the drainage report (Clauses 1.5.9 and 1.11.5).

Table 1B.2 — Attributes of the flood-sensitive catchment layer (layout)

Field Content Unit or format
catchment_id Unique identifier text
name Catchment name text
basis Clause 4.5.3.2 item (a) to (k), or the notification under Clause 4.5.4 text
notification_ref Gazette notification number, where notified text
notified_on Date of notification date
applies_from Date from which the rule applies to applications (Clause 4.5.4.2, step 5) date
boundary_source Source and date of the boundary text
area_km2 Catchment area km²

Annex 1C — Policy Supplement: text of alternatives S-1 to S-5 and model council resolution

Supports Clauses 1.6.3, 1.6.5 and 1.7.1 to 1.7.3 of Chapter 1.

Model text for consideration by a competent authority. Not in force. The text below shows how the Policy Supplement of Clause 1.7 could be written. It has no effect unless and until it is issued by the Government and adopted by an Approving Authority under Clause 1.7.3.

Part 1 — General provisions

P1.1 Scope. This Supplement sets out alternatives S-1 to S-5 to the requirements of the Assam Stormwater Design Manual (the Manual) named in each alternative. An alternative applies within the area of an Approving Authority (the Authority) only from the date on which the Authority adopts it under P1.3.

P1.2 No lower criterion. No alternative lowers any criterion of the Manual. S-1 and S-2 are simplified methods for meeting the same criterion (Clause 1.7.3(a)).

P1.3 Adoption.

  • (a) A Tier B authority adopts an alternative by council resolution in the form of Part 3, and sends a copy to the State Stormwater Technical Committee (the Committee) within 30 days of the resolution.
  • (b) A Tier A authority adopts an alternative only after the Committee has concurred in writing.
  • (c) The Authority publishes the alternatives it has adopted on its website and in the register of Clause 10.17.

P1.4 Retention. No alternative replaces the retention requirement (Annex 2E depth), except where fee-in-lieu under S-5 funds equivalent retention in the same basin (Clause 1.7.3(d)).

P1.5 Tables. The tables used by S-1, S-2 and S-3 are those issued by the Committee, and are reviewed with Chapter 2 of the Manual (Clauses 1.7.3(e) and 2.14). An alternative that depends on a table cannot be used until that table is issued.

P1.6 Record. An Applicant who uses an alternative states it on Form 1-1 and in the drainage report, with the resolution or concurrence under which it was adopted.

Part 2 — The alternatives

S-1 — Design-aid route for storage

S-1.1 Replaces: storage sized by a hydrograph method under Chapter 3.

S-1.2 Alternative: retention and detention volumes may be taken from the unit-storage tables issued for Annex 4B (m³ per ha, by rainfall zone, hydrologic soil group and impervious fraction) and the compliance calculator, by the method of Clause 4.14.2.

S-1.3 Eligibility: sites of 2 ha or less outside flood-sensitive catchments, and of 0.5 ha or less within them (Table 1.2; Clause 4.14.1).

S-1.4 Conditions: the post-development imperviousness used shall be that shown on the approved plans; the outlet, spillway, RWH accounting and safety provisions of Clause 4.14.2 apply; the compliance calculator may be the sole calculation (Table 1.1).

S-2 — Permissible site discharge (PSD)

S-2.1 Replaces: the release rate Q_post(T) ≤ 0.9 × Q_pre(T) computed for the site (Clause 2.11.2).

S-2.2 Alternative: the release rate for each AEP may be taken as the tabulated unit-area release rate for the site's zone and AEP, multiplied by the site area. The tabulated rates are derived from the 0.9 × Q_pre rule (Table 1.2).

S-2.3 Eligibility: any site outside a flood-sensitive catchment.

S-2.4 Conditions: storage is then sized to hold every duration of Clause 2.5.2 at the PSD; drawdown, minimum orifice and spillway rules of Chapter 4 apply unchanged.

S-3 — Fixed-width waterbody setback

S-3.1 Replaces: the waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7).

S-3.2 Alternative: where no 1% AEP extent is mapped, the setback shall be the fixed width for the class of waterbody in the table of Clause 7.4.6 (and Annex 7B), measured as in Clause 7.4.3.

S-3.3 Eligibility: waterbodies with no mapped 1% AEP extent.

S-3.4 Conditions: no setback under this alternative is less than the Zone 1 minimum of Clause 7.4.7 (Clause 1.10.3(c)); the no-fill zone of Chapter 7 applies; where a 1% AEP extent is later mapped and adopted, the mapped setback applies to new applications.

S-4 — Downstream screening checklist

S-4.1 Replaces: downstream analysis by hydraulic model under Chapter 5.

S-4.2 Alternative: the Applicant completes a screening checklist of downstream capacity and known flooding, covering at least the conditions of Clause 5.3.4: that the receiving public drain has documented capacity for its minor-system design flow (Chapter 6), and that no flood-prone location is recorded within 500 m downstream. A hydraulic model under Chapter 5 is required only where the screen fails.

S-4.3 Eligibility: sites of less than 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall.

S-4.4 Conditions: the checklist is signed by the registered professional who signs the drainage report (Clause 10.6); flood-prone locations are those recorded by the local body, the Deputy Commissioner and the District Disaster Management Authority, ASDMA, the Water Resources Department or GMDA (Clause 5.3.3(d)).

S-5 — Fee-in-lieu toward regional storage

S-5.1 Replaces: on-site detention under Chapter 4.

S-5.2 Alternative: all or part of the detention requirement may be met by a fee-in-lieu toward a regional detention facility or restored pukhuri or tank storage identified in the basin plan (Clause 4.13.1).

S-5.3 Eligibility: sites in a basin for which a basin plan has been notified (Table 1.2).

S-5.4 Conditions:

  • (a) the conditions of Clause 4.13.2 apply, including interim on-site detention until the regional facility or restored tank is operational, and retention and WQv treatment on site;
  • (b) the fee is computed under Clause 4.13.3 and held in the ring-fenced basin account;
  • (c) the volume credited and the fee are entered in the public ledger of Clause 4.13.4; and
  • (d) in a flood-sensitive catchment, fee-in-lieu is available only as allowed by Clause 1.10.3(d).

Part 3 — Model council resolution

Model text for consideration by a competent authority. Not in force.

Resolution No. ______ of ______ (name of Municipal Corporation / Municipal Board), dated ______

Subject: Adoption of alternatives under the Policy Supplement to the Assam Stormwater Design Manual.

The Council, having considered the report of the Commissioner / Executive Officer dated ______, and noting that:

  • (i) the Assam Stormwater Design Manual and its Policy Supplement have been given effect by ______ (instrument and date);
  • (ii) this local body is a Tier B / Tier A authority under Clause 1.6 of the Manual; and
  • (iii) for a Tier A authority, the State Stormwater Technical Committee concurred on ______ (reference ______),

resolves:

  1. to adopt the following alternatives of the Policy Supplement within its area, under the conditions of Clause 1.7.3 of the Manual:

Table 1C.1 — Alternatives adopted by this resolution

Alternative Adopted (Yes / No) Area to which it applies (whole area, or wards / zones) Applies from (date)
S-1 Design-aid route      
S-2 Permissible site discharge      
S-3 Fixed-width setback      
S-4 Downstream screening checklist      
S-5 Fee-in-lieu      
  1. that no adopted alternative shall apply within a flood-sensitive catchment except as the Manual allows (Clause 1.6.5);
  2. that a copy of this resolution be sent to the State Stormwater Technical Committee within 30 days;
  3. that the adopted alternatives be published on the local body's website and entered in the register of Clause 10.17; and
  4. that this resolution be reviewed when the tables of Clause 1.7.3(e) are revised.

Mayor / Chairperson: ______ Commissioner / Executive Officer: ______ Date: ______


Annex 1D — Model Unified Byelaws 2022 amendment and model ULB bye-law

Supports Clauses 1.3.1, 1.3.4, 1.11 and 1.12 of Chapter 1.

Model text for consideration by a competent authority. Not in force. The text shows one way the instruments of Clause 1.3.1 could be drafted. Rule and section numbers are left blank.

Drafting note D1D.1. The rule numbers of the Assam Unified Building Construction (Regulation) Byelaws 2022 at which the new rule and the conditions would be inserted, and the enabling sections of the Assam Town and Country Planning Act, 1959 and the municipal and panchayat Acts, are to be confirmed by the Government's legal advisers. None is stated here.

Part A — Model amendment to the Assam Unified Building Construction (Regulation) Byelaws 2022

A.1 Short title and commencement.

  • (1) These rules may be called the Assam Unified Building Construction (Regulation) (Stormwater Management) (Amendment) Byelaws, ______.
  • (2) They shall come into force on the date six months after their publication in the Assam Gazette (Clause 1.11.1).

A.2 Insertion of a new rule. After rule [______] of the building byelaws made by the Government under section 4 of the Assam Building Construction (Regulation) Act, 2010, the following rule shall be inserted:

Rule [______]. Stormwater management.

(1) Definitions. In this rule, "the Manual" means the Assam Stormwater Design Manual as notified by the Government, with its annexes and amendments; other words have the meanings given in Clause 1.4 of the Manual.

(2) Application. This rule applies to every development for which planning permission, building permit or layout approval is required under these rules.

(3) Runoff control. Where a development, over its common plan of development, involves land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, the development shall comply with Chapters 4 and 5 of the Manual (retention, detention, downstream and tailwater analysis).

(4) Provisions for every development. Every development, whatever its size, shall comply with Clause 1.5.4 of the Manual: no sewage connection to a storm drain; floor levels; waterbody setbacks and the no-fill zone; and no obstruction of a drainage path.

(5) Exemptions. A single dwelling on its own plot below the thresholds of sub-rule (3), and linear road resurfacing that adds no impervious area, are exempt from sub-rule (3) but not from sub-rule (4) or the rainwater harvesting provisions of these rules.

(6) Conditions of approval. The competent authority shall not grant:

  • (a) planning permission or layout approval, unless a preliminary drainage report under the Manual has been accepted;
  • (b) a building permit, or permission to commence, unless the final drainage design has been accepted; or
  • (c) a completion certificate, unless the as-built certificate has been accepted and the maintenance declaration has been registered, or the public assets have been handed over,

for a development to which sub-rule (3) applies (Manual, Clause 10.3).

(7) Certification. Drainage reports and designs shall be signed by a registered professional, and, where Clause 10.6.1 of the Manual so requires, by an empanelled Stormwater Design Professional.

(8) Rainwater harvesting. Nothing in this rule alters the rainwater harvesting provisions of these rules.

(9) Variances and waivers. The competent authority may grant a variance or waiver only on the grounds and by the procedure of Clause 1.10 of the Manual, and shall publish each decision.

(10) Transition. Applications filed complete before the commencement of this rule, and Tier B authorities, are governed by Clause 1.11 of the Manual.

Part B — Model ULB bye-law

B.1 Title and commencement. These bye-laws may be called the ______ (name of local body) Stormwater Management Bye-laws, ______. They come into force on ______.

B.2 Adoption of the Manual. The Assam Stormwater Design Manual, as notified by the Government, applies to:

  • (a) every development approved by the local body; and
  • (b) every drainage, road, culvert, waterbody and flood-mitigation work executed by the local body, including its own drains and roads (Clause 1.3.1(b)).

B.3 Public works. Every detailed project report and contract for a work under B.2(b) shall require compliance with the Manual, from the dates in Clause 1.11 (Clause 1.3.4).

B.4 Tier and alternatives. The local body is a Tier ______ authority under Clause 1.6 of the Manual. The alternatives of the Policy Supplement adopted by the local body are listed in the Schedule, with the resolution under which each was adopted.

B.5 Submittals and review. Submittals shall be made in the stages of Clause 10.3 of the Manual and reviewed within the periods of Clause 10.7.

B.6 Maintenance, inspection and enforcement. Maintenance declarations, inspections, handover of public assets and enforcement shall follow Clauses 10.10 to 10.15 of the Manual.

B.7 Publication. The local body shall publish the registers and reports of Clause 10.17 of the Manual.

B.8 Review. These bye-laws shall be reviewed whenever the Manual is amended under Clause 1.12.

Table 1D.1 — Schedule: alternatives adopted (layout)

Alternative Resolution number and date Committee concurrence (Tier A only) Applies from Area
         
         

Form 1-1 — Applicability Determination

Supports Clauses 1.5.1 to 1.5.9 and 1.6 of Chapter 1, and Clause 10.3 of Chapter 10.

Draft form — Assam Stormwater Design Manual, Draft v1.0. Lodged at the pre-application meeting (Stage 0) or with the preliminary drainage report (Stage 1), as Clause 10.3.2 requires.

Table 1F.1 — Form 1-1: Applicability Determination

No. Item (clause) Entry
A. Applicant and site
A1 Applicant (owner, developer or department) ______
A2 Site address and survey numbers ______
A3 Site coordinates (latitude, longitude) ______
A4 Approving Authority (Clause 1.4) ______
A5 Tier of the Authority: A / B (Clause 1.6; Annex 1A) ______
A6 Approval sought: planning permission / building permit / layout approval / public work (DPR) ______
A7 Type of development: building / layout / sub-division / road / paving / land-use change / other (Clause 1.4) ______
A8 Stage at which this form is lodged: Stage 0 / Stage 1 (Clause 10.3) ______
B. Coverage (Clause 1.5.1)
B1 Development requiring approval under the Assam Unified Building Construction (Regulation) Byelaws 2022 — 1.5.1(a): Yes / No ______
B2 Public work by a ULB, State department, board or State undertaking — 1.5.1(b): Yes / No ______
B3 Work by a Central agency needing the Authority's approval or no-objection — 1.5.1(c): Yes / No ______
C. Areas over the common plan of development (Clauses 1.4, 1.5.5)
C1 Phases, plots and sub-divisions included (one layout approval or one ownership) ______
C2 Total site area (ha) ______
C3 Land disturbance (ha) ______
C4 Existing impervious area (m²) ______
C5 New impervious area (m²) ______
C6 Replaced impervious area, removed to subgrade and rebuilt (m²) ______
C7 New plus replaced impervious area, C5 + C6 (m²) ______
C8 Plot area for the RWH mandate (m²) (Clause 1.5.3) ______
D. Thresholds and exemptions
D1 Land disturbance 0.1 ha or more — 1.5.2(a): Yes / No ______
D2 New or replaced impervious area 500 m² or more — 1.5.2(b): Yes / No ______
D3 Redevelopment (existing impervious cover on the site) — 1.5.6: Yes / No ______
D4 Constrained redevelopment route of Clause 4.5.6 proposed: Yes / No ______
D5 Linear public work: added impervious area per drainage catchment crossed given in Table 1F.2 — 1.5.7: Yes / No / not applicable ______
D6 Exemption claimed — 1.5.8(a) single dwelling below the thresholds / 1.5.8(b) resurfacing with no added impervious area / none ______
D7 RWH mandate applies (Unified Byelaws 2022, byelaw 114 and Appendix VI: every building in a notified Master Plan area, with storage and reuse on plots of 134 m² and above; Assam Ground Water Control and Regulation Act, 2012, s.19: premises of 100 m² or more in a notified area (none found)) — 1.5.3: Yes / No ______
E. Site conditions
E1 Site in a flood-sensitive catchment (Annex 1B; Clause 4.5.3): No / Yes — name ______
E2 Source of the catchment boundary used ______
E3 1% AEP level mapped or determinable for the site (Clause 1.5.4(b)): Yes / No; source ______
E4 Waterbody on or adjoining the site (Clause 1.5.4(c); Chapter 7): No / Yes — name ______
E5 Natural drainage path or major-system flow path crossing the site (Clause 1.5.4(d)): No / Yes ______
E6 Site drains to a tidal outfall (Clause 10.3.2(d)): Yes / No ______
E7 Variance, waiver, regional facility or fee-in-lieu proposed (Clause 10.3.2(c)): No / Yes — Form 1-2 attached ______
F. Determination
F1 Result: (i) Chapters 4 and 5 apply, with Clause 1.5.4 and the RWH mandate; (ii) Clause 1.5.4 and the RWH mandate only (below thresholds); (iii) exempt under 1.5.8, Clause 1.5.4 and the RWH mandate still apply ______
F2 Stage 0 mandatory under Clause 10.3.2: Yes (state item (a) to (d)) / No ______
F3 Storage method: hydrograph method (Chapter 3) / design-aid route S-1 (Clause 1.7, where adopted and eligible) ______
F4 Other Policy Supplement alternatives relied on (S-2 to S-5), with the adopting resolution ______
F5 Tier B phased start applies (Clause 1.11.3): Yes / No ______
G. Declaration
G1 I declare that the information above is correct and covers the whole common plan of development. Applicant: name, signature, date ______
G2 Prepared by (registered professional, Clause 1.4): name, registration number, signature, date ______
H. For the Authority (Clause 1.5.9)
H1 Determination confirmed / corrected ______
H2 Corrections and reasons ______
H3 Officer: name, designation, signature, date ______

Table 1F.2 — Form 1-1: added impervious area by drainage catchment, linear works (Clause 1.5.7)

Drainage catchment crossed Chainage from – to Added impervious area (m²) 500 m² or more (Yes / No) Storage location: right of way / regional facility
         
         
         

Form 1-2 — Variance / Waiver Request

Supports Clause 1.10 of Chapter 1.

Draft form — Assam Stormwater Design Manual, Draft v1.0. Lodged with the preliminary drainage report (Clause 1.10.4(a)), with one form for each requirement concerned.

Table 1F.3 — Form 1-2: Variance / Waiver Request

No. Item (clause) Entry
A. Applicant and site
A1 Applicant ______
A2 Site address and coordinates ______
A3 Form 1-1 reference and date ______
A4 Tier of the Authority: A / B ______
A5 Site area (ha) ______
A6 Site in a flood-sensitive catchment: Yes / No ______
B. Request
B1 Type: variance from a numeric requirement (1.10.1) / waiver of Chapter 4 detention (1.10.2) ______
B2 Clause of the Manual concerned ______
B3 Value required by the Manual ______
B4 Value or arrangement proposed ______
C. Matters that cannot be varied or waived (Clause 1.10.3) — confirm that the request does not concern any of them
C1 (a) a sewage connection to a storm drain Not concerned: ______
C2 (b) the lowest habitable floor level of Chapter 6 Not concerned: ______
C3 (c) a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or fill or construction in the no-fill zone of Chapter 7 Not concerned: ______
C4 (d) retention in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7 Not concerned: ______
D. Variance: grounds (Clause 1.10.1(a))
D1 Site condition: high groundwater table / contaminated soil / rock / site too small for the required facility / other ______
D2 Evidence (tests, surveys, plans), with references ______
D3 Options assessed and why each is impracticable ______
E. Variance: equal performance or make-up (Clause 1.10.1(b))
E1 Downstream point used (Chapter 5) ______
E2 Performance at that point with full compliance and with the variance (peak flows, water levels) ______
E3 Or: shortfall made up by fee-in-lieu or off-site works in the same catchment — volume (m³), works or fee ______
F. Waiver of detention: grounds (Clause 1.10.2)
F1 Site discharges directly to the sea / to a tidal reach with no flood-prone property downstream ______
F2 Analysis showing that undetained flow does not worsen the outfall-closed condition of Chapter 5 — reference ______
F3 Retention still provided in full: Yes ______
G. Attachments (Clause 1.10.4(a))
G1 Report certified under Clause 10.6 ______
G2 Preliminary drainage report ______
H. Certification and declaration
H1 Certified by (registered professional; empanelled professional where Clause 10.6.1 applies): name, registration or empanelment number, signature, date ______
H2 Applicant: name, signature, date ______
I. For the Authority (Clause 1.10.4)
I1 Referred to the State Stormwater Technical Committee (Tier B, site 1 ha or more): Yes / No; date ______
I2 Decision: granted / granted with conditions / refused ______
I3 Reasons and conditions ______
I4 Entry number in the public register (Clause 10.17) ______
I5 Note: a variance runs with the approval and lapses if the approval lapses (Clause 1.10.4(d)) —
I6 Officer: name, designation, signature, date ______