Chapter 1Policy, Applicability and Adoption
1.1 Purpose and objectives
1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Assam. It applies to private development and to public works, as set out in Clause 1.5.
1.1.2 The Manual has the following objectives:
- (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
- (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
- (c) to size storage for the long-duration storms of the monsoon season, which bring several hundred millimetres in a day (479.3 mm at Dhubri (Rupsi) on 28 May 1989 and 410.0 mm at Lumding on 3 August 1981, IMD) and fall for days on flood plains already saturated, while the Brahmaputra and the Barak stand high and the sluices of the embanked towns are shut, from the pre-monsoon storms of April and May to the October storms about the withdrawal of the south-west monsoon, as well as for short-duration intensities;
- (d) to design outfalls for the rivers and beels into which the towns drain, which in the monsoon stand above the towns behind about 4,474 km of embankments, so that most outfalls pass through sluices that close when the river is high: the Brahmaputra at every riverside town, where at Guwahati it reaches its danger level in most monsoons and the Bharalu's gated outfall at Bharalumukh carries 72 m³/s with its gates open but only about 7 m³/s by pumps when they are shut (2008, as reported); the drain of Dibrugarh, a town "1.5 m below the bed level of Bramhaputra", which runs behind the DTP dyke to the Sessa through Larua Jamira beel (ADB); the Barak round the bowl of Silchar, and the Barak and the Kushiyara at Badarpur and Karimganj; the beels that store a town's water while its sluice is shut, among them Deepor Beel and Silsako; the reaches below the dams on the Ranganadi, the Subansiri and the Kopili and the Umtru below Byrnihat, into which the operators release floods; and the hill streams of the Guwahati fringe and the hill districts, which rise within the hour, including the case where the outfall is closed;
- (e) to protect tanks (pukhuris), marshes, rivers, supply channels and surplus courses as part of the drainage system;
- (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
- (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
- (h) to make sure that facilities, once built, are maintained and remain effective.
1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building byelaws made by the Government under section 4 of the Assam Building Construction (Regulation) Act, 2010 (the Assam Unified Building Construction (Regulation) Byelaws 2022), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).
1.2 Stormwater management hierarchy
1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.
- Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
- Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
- Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
- Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).
1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.
1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.
Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).
Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Assam, the top two layers have a particular meaning. Much of the State's natural storage lies in its beels (beel: Assamese বিল, a natural floodplain lake or wetland), which with other wetlands cover about 764,372 ha, 9.74% of the State (National Wetland Atlas, 2011, as quoted; the counts of wetlands conflict and are not used); in Deepor Beel, the Ramsar site of Guwahati (No. 1207, designated 19 August 2002, as quoted), which holds about 10.1 km² of water in winter and up to about 40.1 km² in floods (as reported); in the jans (jan: Assamese জান, a stream or natural drainage channel, often the outlet of a beel, as in Bondajan, Lakhimijan and Khanajan) and juris (juri: Assamese জুৰি, a small hill stream) that connect them; in the town pukhuris; and in the char and chapori lands of the rivers. "The wetlands and other water bodies in GMA collectively act as the receptors of storm water during the monsoons" (ADB, IEE, 2017). The law treats some of this as drainage. The Guwahati Waterbodies (Preservation and Conservation) Act, 2008 defines "Waterbodies" as "the area or areas of land where the rain water accumulates and act as natural or storm water reservoir and shall include wetland" (s.2(e)) and forbids filling and building on four scheduled areas in Guwahati, among them land near Deepor Beel; the Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024, passed on 29 August 2024, repeals that Act (s.22(1)) and keeps the same definition for every notified Master Plan area, adding "all natural water channels (that are inflow or out flow channels into or from the waterbody)" and ponds and tanks "irrespective of its size" (s.2(d)); the enacted text, its gazette date and the Rules of 2025 were not read [TBC]. The Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 makes "a drainage system, feeding channel, any water body" an ecological site in a Designated Area (s.2(d)(ii)), but no designated area was found [TBC]. The beels are being lost all the same: Deepor Beel is reported to have shrunk by "about 35% since 1991" (as reported; other figures conflict), Urpad Beel in Goalpara from 4.84 km² to 3.38 km² between 2003 and 2023 (as reported), and the High Court has upheld evictions from Silsako ("Once it is a water body you have to move out", 2023, as reported). On the plains the second layer changes. Groundwater is shallow: in March 2022 most of CGWB's wells in Assam read 2–5 m below ground and in November 2022 within 5 m (0–2 m in 45.96% of them), and in Kamrup (Metro) the range was 1.39–4.08 m in March and 1.29–2.64 m in November 2022 (CGWB, Ground Water Year Book, North Eastern Region, 2022-23); the ADB notes that the rising Brahmaputra "reduces the rate of percolation" (ADB, IEE, 2017). A soakaway or recharge pit on the flood plain therefore sits in saturated ground when the storm comes. This Manual bars deliberate infiltration on char and chapori land, below the 1% AEP flood level, inside an embankment-protected area that ponds when its sluices close, on beel and pukhuri margins and wherever the seasonal high water table is less than 2.0 m below ground (Clause 4.11, floodplain rule); bars it on natural slopes of more than 10° and on cut, filled or slipped ground in the Guwahati hills and the hill districts without a geotechnical certificate (Clause 4.11, hill rule); and allows recharge only on tested ground outside those, on the bhabar fans of the northern foothills, river terraces above the 1% AEP level and Guwahati's hill-foot colluvium, and never by recharge well in the districts where arsenic or fluoride exceeds the limits (Clause 4.11, recharge rule) (all set by this Manual). Groundwater is not short (CGWB put the stage of development at 22% in 2007 with no over-exploited unit), so rainwater harvesting on most sites is storage for reuse, not recharge. Losing the beels and jans cannot be offset by pipes, and a town that drains through a closed sluice has nothing but its beels, pukhuris and ponds to hold the water until the river falls.
1.3 Legal basis and status
1.3.1 Notification. This Manual shall be given statutory effect by the Government of Assam through:
- (a) an amendment to the Assam Unified Building Construction (Regulation) Byelaws 2022 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
- (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.
1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.
1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.
1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.
Commentary. In Assam the building rules are the Assam Unified Building Construction (Regulation) Byelaws, 2022 (Assam Gazette Extraordinary No. 688, 15.10.2022, notification No. DoHUA/ECF No. 236697/2), as amended by the Assam Unified Building Construction (Regulation) (Amendment) Byelaws, 2024 (Gazette No. 667, 20.11.2024, No. DoHUA/ECF No. 420084/34), made by the Governor under section 4 of the Assam Building Construction (Regulation) Act, 2010 (Assam Act XVI of 2010), as amended by Assam Act XXVII of 2022, which renamed the Guwahati Building Construction (Regulation) Act and extended it "to the whole of the State of Assam" (assent 26 September 2022; Gazette Extraordinary No. 655, 29 September 2022). The commencement notification of the 2022 amendment was not seen [TBC]. A further amendment was reported approved by the Cabinet on 14 August 2025, but no gazette of it was found, and this Manual does not cite it. The Unified Byelaws 2022 "extend to the master Plan areas or notified Planning areas of whole of Assam except for areas under Autonomous Districts", with a proviso that "if any District Council desires that all or any of the provisions of this byelaws shall apply to the Autonomous District concerned, a notification may be issued to that effect" (byelaw 1(2)). Their "Authority" is, by the 2022 amending Act, GMDA, the Guwahati Municipal Corporation, the Municipal Corporations under the Assam Municipal Corporation Act, 2022, the Municipal Boards under the Assam Municipal Act, 1956, the Development Authorities under the Assam Town and Country Planning Act, 1959 "and other local bodies or Panchayats falling under the notified Master Plan areas" (s.6). The planning permit is given by GMDA or a Development Authority under the Master Plan and Zoning Regulations, and the building permit by the GMC, a Municipal Corporation, a Municipal Board or a Gaon Panchayat under the Unified Byelaws 2022. They replaced the Guwahati Building Construction (Regulation) Byelaws, 2014, which already held the same setback, plinth, basement, flood-site, hill, green-area and rainwater-harvesting rules, but the repeal clause names "The Guwahati Building Construction (Regulation) Byelaws, 2010" (byelaw 131(1)), a year printed "2010" on the page; no byelaws of 2010 were found (the 2010 instrument is the Act), and the compounding appendix refers to permissions "prior to byelaws of 2014". This Manual states the conflict: the 2014 byelaws are superseded in practice, but the repeal clause names 2010. The Unified Byelaws 2022 carry drainage hooks: building setbacks from natural drainage channels and water bodies of 15 m, 10 m and 6 m (byelaw 26(ix), repeated as 44(ix) [TBC: sub-item numbers read from the OCR layout; confirm against a clean copy]); refusal of sites near a water body or water course that would be contaminated, divert the channel or be inundated without satisfactory drainage, or that are "a filled up tank or low lying" (byelaw 44(iii) [TBC: confirm against a clean copy]); a plinth "0.3 m higher than the highest recorded flood level as fixed by the local authority for ordinary buildings and 0.6 higher for lifeline buildings" (byelaw 45(c)); no basement "in low-lying areas and areas without adequate drainage facilities" (byelaw 66(3)); on sites liable to flood and in hilly areas, roof-water harvesting, a silt fence and a "dry sump (including design calculation) in all individual plots, capable of holding rain water during peak monsoon" (byelaws 74 and 110(g)–(i)); special protection on slopes greater than 10° and cuts generally of 4 m to 6 m (byelaw 110(d), (e)); a drainage plan "upto the available permanent/pucca drain of municipal/other authority" (byelaw 94) and the improvement of drains to the nearest outlet as directed, with a penalty of 25% of the cost at PWD rates where it is not done (byelaw 101(vi)); and rainwater harvesting for every building (byelaw 114). They set no design storm, return period, release rate or detention volume, and no rule found in them limits peak runoff or asks for storm-water detention. The route of Clause 1.3.1(a) therefore runs through an amendment to the Unified Byelaws 2022 under section 4 of the Act, which DoHUA, the department that makes them, could prepare. It reaches only the notified Master Plan areas. Outside them, the Manual reaches development only through public works (Clause 1.5.1(b)) and through any body that adopts it. In the Autonomous Districts of the Sixth Schedule to the Constitution, the Bodoland Territorial Region (Bodoland Territorial Council, BTC; Kokrajhar, Chirang, Baksa, Udalguri and Tamulpur districts [TBC: confirm the list]), Karbi Anglong and West Karbi Anglong (Karbi Anglong Autonomous Council, KAAC) and Dima Hasao (North Cachar Hills Autonomous Council, NCHAC), the Unified Byelaws 2022 apply only where the District Council has notified that they do; no such notification and no building rules of any of the three Councils were found [TBC]. Diphu and Kokrajhar have Master Plans of the Directorate of Town and Country Planning (publication notices listed, as quoted), but whether the Unified Byelaws 2022 apply there depends on an opt-in that was not found (NEER reading). In an Autonomous District the Manual could take effect only through the District Council: the Council could notify under byelaw 1(2) that the byelaws, as amended to include the Manual, apply in its district, or adopt the Manual in its own rules (Annex 1D). This Manual is a draft; neither the Government, DoHUA, GMDA, the GMC, any District Council nor any other authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.
1.4 Definitions
1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).
| Term | Meaning in this Manual |
|---|---|
| Approving Authority (the Authority) | The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the competent authority for the area: in a notified Master Plan area, the Development Authority (GMDA in the Guwahati Metropolitan Area) for the planning permit and the Municipal Corporation, Municipal Board or Gaon Panchayat for the building permit, each under the Unified Byelaws 2022 (Assam Building Construction (Regulation) Act, 2010, s.2 as amended in 2022); the local body for its own drains and works under the Gauhati Municipal Corporation Act, 1969, the Assam Municipal Corporation Act, 2022 or the Assam Municipal Act, 1956; the Water Resources Department (WRD), through its Embankment Officer, for any work that cuts, crosses, alters or discharges through an embankment, sluice or drain under the Assam Embankment and Drainage Act, 1953 (ss.4, 15 and 16); the District Level Committee and the State Level Committee for scheduled water bodies under the Assam Urban Water Bodies (Preservation and Conservation) Act, 2024 (Bill, ss.4–8); the Advisory Committee under section 14 of the Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 in a Designated Area; the State Ground Water Authority in a notified groundwater area (none has been found); and, in an Autonomous District, the District Council or the authority it designates, only where the Council has notified that the byelaws or this Manual apply (none has), or a department for its own works. |
| Applicant | The owner, developer or department that seeks approval, and its successors in title. |
| Development | Any building, layout, sub-division, road, paving or land-use change that requires approval under the Assam Unified Building Construction (Regulation) Byelaws 2022 or that is executed as a public work. |
| Redevelopment | Development on a site where impervious cover already exists. |
| Land disturbance | Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5). |
| Impervious area | Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats. |
| New or replaced impervious area | Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced". |
| Retention | Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4). |
| Detention | Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4). |
| Rainwater harvesting (RWH) | Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it. |
| Minor system | Drains, pipes and inlets designed for the minor-system AEP of Chapter 6. |
| Major system | The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6). |
| Pre-development condition | Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3). |
| Flood-sensitive catchment | The catchments of Guwahati's Bharalu–Bahini basin to Bharalumukh, with the Noonmati–Bondajan diversion; of the Mora Bharalu–Deepor Beel–Khanajan system, with the Basistha and the Kalmani, and the Silsako basin; of the hill streams of the Guwahati fringe that come down from Meghalaya at Khanapara and Jorabat; of Dibrugarh behind the DTP dyke and its drain to the Sessa; of Silchar behind the Barak embankment; of Karimganj on the Kushiyara, with Hailakandi and Badarpur; of Palasbari–Mirza; of the north-bank towns on dam-release and flash-flood reaches, North Lakhimpur on the Ranganadi, Dhemaji, the Subansiri reach and Tezpur on the Jia Bharali; of Dhubri and Goalpara on the lower Brahmaputra; of Majuli and the char lands; and of Haflong and Diphu, and any catchment the Authority notifies (Chapter 4; Annex 1B). |
| Waterbody | A river, stream, canal, tank (pukhuri), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7). |
| Regional facility | A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4). |
| Tier A / Tier B authority | An Approving Authority classed under Clause 1.6. |
| Policy supplement | The set of adoptable alternative clauses in Clause 1.7 and Annex 1C. |
| Drainage report | The preliminary or final report required by Chapter 10. |
| Registered professional | A person registered under the Assam Unified Building Construction (Regulation) Byelaws 2022 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6. |
| Compliance calculator | The State-issued tool for computing and reporting compliance (Clause 10.5). |
| Maintenance declaration | The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10). |
| Variance | Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10). |
| Waiver | Approval that a requirement does not apply to a site, on the grounds in Clause 1.10. |
| Notified | Published by the Government or the State Stormwater Technical Committee in the Assam Gazette. |
| Competent authority for the area | The body that grants permission for the site, or consents to the work, under the instrument that applies there: in a notified Master Plan area, the Development Authority (GMDA in the Guwahati Metropolitan Area) for the planning permit and the Municipal Corporation, Municipal Board or Gaon Panchayat for the building permit, each under the Unified Byelaws 2022; the local body for its own drains and works under the Gauhati Municipal Corporation Act, 1969, the Assam Municipal Corporation Act, 2022 or the Assam Municipal Act, 1956; the WRD, through its Embankment Officer, for any work that cuts, crosses, alters or discharges through an embankment, sluice or drain under the Assam Embankment and Drainage Act, 1953; the District Level Committee and the State Level Committee for scheduled water bodies under the water-bodies law of 2024; the Advisory Committee under the Hill Land Act in a Designated Area; the State Ground Water Authority in a notified groundwater area (none found); and, in an Autonomous District, the District Council or the authority it designates, only where the Council has notified that the byelaws or this Manual apply (none has). Where this Manual says "the Authority", the competent authority for the area is meant. |
| Planning permit; building permit | The permission given by GMDA or a Development Authority under the Master Plan and Zoning Regulations (planning permit), and the permission given by the GMC, a Municipal Corporation, a Municipal Board or a Gaon Panchayat under the Unified Byelaws 2022 (building permit), as defined in the Assam Building Construction (Regulation) Act, 2010, as amended in 2022. The occupancy certificate follows the building permit. |
| Notified Master Plan area | An area for which a Master Plan has been notified under the GMDA Act, 1985 or the Assam Town and Country Planning Act, 1959; the Unified Byelaws 2022 and the water-bodies law of 2024 apply only in such areas. The Guwahati Metropolitan Area of the Master Plan for Guwahati 2025 covers 328 km². |
| Autonomous District, District Council | The Bodoland Territorial Region (Bodoland Territorial Council, BTC), Karbi Anglong and West Karbi Anglong (Karbi Anglong Autonomous Council, KAAC) and Dima Hasao (North Cachar Hills Autonomous Council, NCHAC), under the Sixth Schedule to the Constitution. The Unified Byelaws 2022 and the water-bodies law apply there only where the District Council has notified that they do; no such notification and no Council building rules were found [TBC]. This Manual reaches an Autonomous District only through its District Council. |
| Embankment, sluice, drain (1953 Act) | As defined in section 2 of the Assam Embankment and Drainage Act, 1953: an embankment includes sluices and appurtenant land, but not field ridges (ali) or roads; a drain includes "dongs", culverts, ditches, canals, sluices and any device for "excluding, regulating or retaining" rain, flood or subsoil water. A river embankment is a mothauri (Assamese মথাউৰি) and a sluice a pani-duwar (পানী-দুৱাৰ); this Manual uses the English words. |
| Beel; jan; juri | Beel (Assamese বিল): a natural floodplain lake or wetland. Jan (Assamese জান): a stream or natural drainage channel, often the outlet of a beel. Juri (Assamese জুৰি): a small hill stream. A jan or juri draining 8 ha or more is a natural channel under Chapter 7. |
| Char; chapori | Land formed in or beside a river by the deposit of its sand and silt (char, Assamese চৰ; chapori, চাপৰি, the higher such land), which the river builds and removes. |
| Patta land; khas land | Land held privately under a patta and recorded by district, mouza, revenue village and dag number (patta land), and land of the Government (khas land). Most land in the State is patta land. Where this Manual reserves a drainage corridor, an easement or a regional facility site on patta land, it is reserved in a Master Plan or secured by agreement, not taken (set by this Manual); in the Autonomous Districts, land is held under the Councils' land law [TBC: not researched]. |
Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).
1.5 Applicability
1.5.1 Who is covered. This Manual applies to:
- (a) all development requiring planning permission, building permit or layout approval under the Assam Unified Building Construction (Regulation) Byelaws 2022;
- (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
- (c) works executed by Central agencies or their contractors within Assam, to the extent that the Authority's approval or no-objection is required.
1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:
- (a) land disturbance of 0.1 ha or more; or
- (b) new or replaced impervious area of 500 m² or more.
1.5.3 RWH. The existing RWH mandate continues to apply under byelaw 114 of the Unified Byelaws 2022 to every building in the notified Master Plan areas, with recharging or percolating pits or trenches of at least 5 m³ for every 100 m² of roof, under Appendix VI with percolation pits of 1.2 × 1.2 × 1.5 m for every 100 m² of plot, grass paving on the paved areas of the larger categories and "rain water harvesting storage and reuse" on plots of 134 m² and above, and under byelaw 111 with 20% of every plot for trees and greenery; and, in an area notified under section 19 of the Assam Ground Water Control and Regulation Act, 2012, to premises of 100 m² or more (no notified area has been found), as now. This Manual does not change it.
1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:
- (a) no sewage connection to a storm drain (Chapter 8);
- (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
- (c) waterbody setbacks and the no-fill zone (Chapter 7); and
- (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).
1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.
1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.
1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.
1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:
- (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
- (b) linear road resurfacing that adds no impervious area.
Exempt development remains subject to the RWH mandate and to Clause 1.5.4.
1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.
Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.
Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:
- Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
- Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
- The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
- MBBL 2016 makes recharge mandatory for buildings over 500 m².
The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Assam plots are small and the cumulative effect of many small plots is what fills Guwahati's drains. For small buildings in Assam, the Unified Byelaws 2022 already reach every building in the notified Master Plan areas with rainwater harvesting: recharging or percolating pits or trenches of "at least 5 cubic metres dimension for every 100 sq. metres. of roof area" (byelaw 114), percolation pits of 1.2 × 1.2 × 1.5 m for every 100 m² of plot, and "rain water harvesting storage and reuse" on plots of 134 m² and above (Appendix VI); 20% of every plot for trees and greenery (byelaw 111); and, on sites liable to flood and in hilly areas, a dry sump "capable of holding rain water during peak monsoon", with its design calculation (byelaws 74(ii) and 110(h)). None of these sets a design storm, and the byelaw's dry sump has no stated volume or outlet, so none of it yet limits what leaves the plot in a design storm; Chapter 4 supplies the calculation the byelaw asks for. Appendix VI also requires that "All Rain water outlets/drains and waste water drains shall be connected to the roadside side through the percolation pit only": on a floodplain site, with grey water mixed in and the water table near the surface, that pit is a soakaway in saturated ground. This Manual states the conflict with its floodplain rule (Clause 4.11) and requires storage in place of the pit there; the applicant seeks the Authority's relaxation of the pit, and the Manual does not override the byelaw. Clause 1.5.4(b) applies to every building whatever its size, because the plinth rule of byelaw 45(c) is tied to a "highest recorded flood level as fixed by the local authority" that no local authority was found to have fixed for any town [TBC], and a small house on the flood plain or behind an embankment is where a floor level does most good. An Authority may make the floodplain rule and the hill rule of Clause 4.11 a condition of every building permit in its area, whatever the size of the site (a recommendation of this Manual, not a requirement of Clause 1.5.4). Outside the notified Master Plan areas, and in the Autonomous Districts unless a District Council opts in, small buildings follow no State building rule that this Manual can reach.
Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.
1.6 Tiered adoption
1.6.1 Tier A authorities. The following are Tier A:
- (a) the Guwahati Municipal Corporation (GMC);
- (b) GMDA and every other Approving Authority within the Guwahati Metropolitan Area, the area of the Master Plan for Guwahati 2025 (328 km²), as that area is notified from time to time, whichever has jurisdiction over a site; and
- (c) the Dibrugarh Municipal Corporation, with the Development Authority of the Dibrugarh Master Plan area, and the Silchar Municipal Corporation, with the Development Authority of the Silchar Master Plan area (the names of the two Development Authorities are to be confirmed [TBC]).
1.6.2 Tier B authorities. All other Municipal Corporations, Municipal Boards, Development Authorities and other local bodies and Panchayats in notified Master Plan areas are Tier B.
1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:
Table 1.1 — Differences between Tier A and Tier B authorities
| Item | Tier A | Tier B |
|---|---|---|
| Performance criteria (Chapters 2–9) | Apply in full | Apply in full |
| Hydrologic method for storage | Hydrograph method (Chapter 3) | Hydrograph method, or the design-aid route of Clause 1.7 where eligible |
| Compliance calculator (Clause 10.5) | Required as a summary | Required; may be the sole calculation on the design-aid route |
| Policy supplement alternatives (Clause 1.7) | Only with State Stormwater Technical Committee concurrence | May be adopted by council resolution |
| Technical review | By the Authority | By the Authority, with T&CP regional support or an empanelled reviewer (Clause 10.7) |
| Flood-sensitive catchment rule | Applies | Applies |
1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the Guwahati Metropolitan Area of the Master Plan for Guwahati 2025, or the Master Plan area of a Municipal Corporation, or is found by a post-event review (Clause 10.16) to need the full methods.
1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.
Commentary. Guwahati Municipal Corporation, with storm-water drainage data that the CAG could not obtain because the Corporation "was involved with works of drain desilting only", although it spent ₹32.57 crore on desilting from 2013–14 to 2017–18, in a State whose urban local bodies cover only "3 to 37 per cent" of their areas with storm drains (CAG, Report No. 4 of 2019), about 550 drains to clean before each season (2026, as reported) and only 17 km of planned drains built between 1973 and 1997 in the whole metropolitan area (as reported), and a small Municipal Board with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Guwahati.
1.7 Policy supplement: adoptable alternatives
1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.
1.7.2 The alternatives are:
Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5
| No. | Main-text requirement | Adoptable alternative | Eligibility |
|---|---|---|---|
| S-1 | Storage sized by hydrograph method (Chapter 3) | Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator | Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1) |
| S-2 | Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site | Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule | Any site outside flood-sensitive catchments |
| S-3 | Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) | Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 | Waterbodies with no mapped 1% AEP extent |
| S-4 | Downstream analysis by hydraulic model (Chapter 5) | Screening checklist of downstream capacity and known flooding, with a model only where the screen fails | Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall |
| S-5 | On-site detention | Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) | Where a basin plan has been notified |
1.7.3 Conditions on adoption.
- (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
- (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
- (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
- (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
- (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).
Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.
1.8 Relationship with other instruments
1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.
Table 1.3 — Relationship with other instruments
| Instrument | Relationship |
|---|---|
| Assam Building Construction (Regulation) Act, 2010 (Assam Act XVI of 2010; assent 29 April 2010; notification No. LGL.7/2010/10 of 12 May 2010, Gazette Extraordinary No. 135), as amended by Assam Act XXVII of 2022 (assent 26 September 2022; notification No. LGL.7/2010/70 of 28 September 2022, Gazette Extraordinary No. 655 of 29 September 2022) | Continue. The 2022 Act renamed the Guwahati Building Construction (Regulation) Act and extended it "to the whole of the State of Assam", with "different dates" for different areas; it defines the "Authority", the "Building permit" given by the Corporations, Municipal Boards and Panchayats under the byelaws, the "Planning Permit" given by GMDA and the Development Authorities under the Master Plan and Zoning Regulations, and the "Notified Master Plan areas" (s.6). The 2010 Act defines a "drain-surface water" as "a drain used or constructed to use solely for conveying to any drain any rain water but shall not include any rainwater pipe" (s.2(20)), asks plans to show the drains and an "arrangement for proper drainage" (section number not confirmed [TBC]), and lets the byelaws cover "drainage, water supply/sewerage, rainwater harvesting". The commencement notification of the 2022 amendment was not seen [TBC]. |
| the Assam Unified Building Construction (Regulation) Byelaws 2022 (Assam Gazette Extraordinary No. 688, 15.10.2022, notification No. DoHUA/ECF No. 236697/2), as amended by the (Amendment) Byelaws, 2024 (Gazette No. 667, 20.11.2024, No. DoHUA/ECF No. 420084/34), made under section 4 of the Act (both read); the Guwahati Building Construction (Regulation) Byelaws, 2014 (number and date not seen [TBC]); the Assam Notified Urban Areas (other than Guwahati) Building Rules, 2014 (title and a setback passage only, as quoted) | Continue. They apply to the notified Master Plan areas and planning areas of the State, and in an Autonomous District only where its District Council has notified that they do (byelaw 1(2)); none has been found [TBC]. They set building setbacks "from the edge of natural drainage channels": 15 m from a river "as marked in the plan", 10 m from the Bharalu, the Mora Bharalu and the Bondajan, 6 m from other channels, 15 m from the notified water bodies Deepar Beel and Silsako, 6 m from other notified water bodies (Sarusola, Barsola), 10 m from other large ponds and water bodies marked in the plan, and the ordinary building setbacks from minor drains and small ponds (byelaw 26(ix), repeated as 44(ix) [TBC: sub-item numbers from the OCR layout]); let the Authority refuse a site near a water body or water course, a site likely to be inundated without satisfactory drainage, or "a filled up tank or low lying" site (byelaw 44(iii) [TBC]); set the plinth "0.3 m higher than the highest recorded flood level as fixed by the local authority" for ordinary buildings and 0.6 m for lifeline buildings (byelaw 45(c)); bar basements in low-lying and undrained areas (byelaw 66(3)) and keep surface drainage out of them (byelaw 67(c)); on sites liable to flood and in hilly areas require roof-water harvesting, a silt fence and a "dry sump (including design calculation) in all individual plots, capable of holding rain water during peak monsoon" (byelaws 74 and 110(g)–(i)); require special protection on slopes greater than 10°, cuts generally of 4–6 m and 30% vegetation on hill plots (byelaw 110(d), (e), (k)); require a drainage plan "upto the available permanent/pucca drain" (byelaw 94) and the improvement of drains to the nearest outlet, with a 25% penalty where it is not done (byelaw 101(vi)); exclude multistoreyed buildings from areas "on or abutting natural drainage channels" and wetlands (byelaw 117); and, since 2024, require Master Plans to map natural-hazard areas "where construction is not permitted" (byelaw 120), forbid C&D waste in "Nalas, Rivers and other water bodies" (byelaw 120A) and leave half of the landscaped open space unpaved (byelaw 92). The 2014 byelaws held the same drainage rules; the repeal clause of the 2022 byelaws names "The Guwahati Building Construction (Regulation) Byelaws, 2010" (byelaw 131(1)), a conflict this Manual states (Commentary to Clause 1.3). An amendment of 2025 was reported but no gazette was found, and it is not cited. They set no design storm, release rate or detention volume, and no rule on infiltration in high groundwater. The design criteria of Chapters 2–6, the floodplain, hill and recharge rules of Clause 4.11 and the corridors of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the Unified Byelaws 2022, a Master Plan or a statute are stricter, they govern (Clause 1.3.3). |
| Rainwater harvesting: Unified Byelaws 2022, byelaws 38(i), 104(i), 111 and 114 and Appendix VI; byelaw 92 (2024); Assam Ground Water Control and Regulation Act, 2012, s.19 | Continue unchanged. Byelaw 114 requires every building to "provide one or more rainwater harvesting structures to collect the roof top run-off", with recharging or percolating pits or trenches of "at least 5 cubic metres dimension for every 100 sq. metres. of roof area"; Appendix VI asks for percolation pits of 1.2 × 1.2 × 1.5 m for every 100 m² of plot, through which "All Rain water outlets/drains and waste water drains" are to be connected to the road drain, grass paving on the paved areas of the larger categories, and storage and reuse on plots of 134 m² and above; the pit rate gives 2.16 m³ per 100 m² of plot and byelaw 114 asks for 5 m³ per 100 m² of roof, which the text does not reconcile (NEER reading). Byelaw 111 keeps 20% of every plot for trees and greenery (10% where at least 25% of the FAR is affordable housing). Section 19 of the 2012 Act lets the State Ground Water Authority direct rainwater harvesting on premises of 100 m² or more in a notified area, and local authorities impose it on building plans there; no notified area was found, so the 100 m² threshold is not a byelaw rule and does not apply anywhere at present. This Manual counts stored water against its retention requirement only as reuse (Clause 4.4.3), never as detention. Where the floodplain rule or the hill rule of Clause 4.11 bars the percolation pit of Appendix VI, the two conflict: this Manual requires storage in its place, and the applicant seeks the Authority's relaxation of the pit; the Manual does not override the byelaw. |
| Guwahati Metropolitan Development Authority Act, 1985 (Assam Act No. XX of 1987, as cited in the margins of the Acts of 2008 and 2022; text not read [TBC]); the Master Plan for Guwahati 2025 and Zoning Regulation 2025 (Assam Gazette Extraordinary No. 198, 9 July 2009, published under s.21(1) of the GMDA Act as approved under s.19 by Govt order No. GDD.91/1997/395 of 09/06/2009, "for operation with effect from 07/07/2009"; corrigenda No. 199 of 10 July 2009 and No. 62 of 16 March 2010), as modified, including by ECF No. 630736/4 of 25 March 2025 (as quoted; not read); the draft Master Plan for Guwahati 2045 | Continue. The plan covers 328 km², the old Guwahati Metropolitan Area of 262 km² and 66 km² added (Schedule I). The GMDA report gives the notification as "GMDA/MP/1/98/Part-I/103 dated 7th July, 2009", while the gazette heading reads "The 9th July, 2009"; this Manual states both dates. Its zoning puts "All notified forest, water bodies, rivers etc." in an Eco-Sensitive Zone; a modification forbids construction within 15 m of the Brahmaputra bank on the riverfront from Sonaram High School to the foothills of Kamakhya and recasts the Eco-Friendly zone as a Hilly Area Zone that takes in "all the hilly areas and also to some adjoining plain areas prone to land slide and soil erosion", including areas declared hazard-prone by the District Disaster Management Authority or GMDA, with slope classes "derived from a study by IIT(G) in the planning and design of drainage in hilly areas" (study not seen [TBC]). No general drainage buffer is set in the plan; the numbered buffers are those of the Unified Byelaws 2022. The draft Master Plan for Guwahati 2045, released early in 2024, has not been finally notified (as reported) and is not cited as in force. Master Plans would show the flood-sensitive catchments, drainage reserves and regional facility sites of this Manual (Chapter 11). |
| Assam Town and Country Planning Act, 1959 (Assam Act II of 1960; President's assent 6 February 1960; Assam Gazette, 17 February 1960), as amended by Act 17 of 2012 and Act XXVI of 2022 (notification No. LGL.175/2022/3; Gazette No. 662, 30 September 2022); the Master Plans and Zoning Regulations of the other towns; the town drainage master plans of DoHUA and T&CP | Continue. The Act provides for Development Authorities (Chapter IIA) and Master Plans and Zoning Regulations (Chapter III); 24 Development Authorities are reported (as quoted). Final Master Plan notices are listed for 28 towns, among them Dibrugarh, Silchar, Jorhat, Tezpur, Nagaon, Tinsukia, Dhubri, Diphu and Kokrajhar (T&CP listing, as quoted; not opened). The town drainage master plans found were "prepared before 2015 as per previous FPS system" and await revision; a status sheet lists drafts for Tinsukia (11 May 2015), Silapathar and Margherita, Sonari finalised, Dibrugarh delayed by "shortage of fund", Goalpara with "Final hydraulic design work … in progress", and Barpeta Road not completed for want of a land-use plan (DoHUA, c. 2016); a later sheet puts Dibrugarh and Silchar at the "final stage" and Jorhat "prepared" (as quoted). No design criteria appear in any of them. |
| Gauhati Municipal Corporation Act, 1969 (Assam Act I of 1973), Part V, the chapter on water supply, drainage and sewage disposal (ss.231–252, read from the Legislative Department's scans; amendments of 1976–2021 not checked against these sections [TBC]) | Continue. The municipal drains are to be kept "free from public nuisance" and "properly flushed, cleaned and emptied", and the Commissioner may build "reservoirs, sluices, engines and other works" (s.231); may empty them into any place within or outside the city, but not into a new place without the Corporation's sanction (s.232: a power, not a duty, and no storm-water outfall duty like that of the 2022 Act was found); may alter, enlarge or close them (s.234); may direct an occupier to make "an entirely distinct private drain" for rain water and unpolluted subsoil water (s.237(1)); may pull down a building over a drain vested in the Corporation (s.239); and no one may make or alter a drain into a municipal drain without permission (s.242). No building within one hundred feet of a municipal drain may be built or occupied until it is drained into it (s.244), and the connecting drain vests in the Corporation (s.250(2)). GMC's notice of 2025 cites a "Guwahati Municipal Corporation Act, 1971", a mis-citation (as reported); this Manual cites the Act by its printed title. |
| Assam Municipal Corporation Act, 2022 (Assam Act VIII of 2022; assent 27 April 2022; Gazette Extraordinary, 4 May 2022), Chapter XXII; Assam Municipal Act, 1956 (Municipal Boards; as cited, not read) | Continue. The Act extends to the whole of the State except cantonments. Each Corporation shall "construct and maintain drains and sewers, and provide a safe and sufficient outfall, in or outside the Municipal Corporation area, for effectual drainage and proper discharge of storm-water and sewage … in such manner as may not cause any nuisance, whether by flooding any part of the Municipal Corporation area, or of the areas surrounding the outfall", and from a notified date "no sewage shall be discharged into any watercourse until it has been so treated" (s.171); public drains vest in the Corporation (s.173) and may be handed over to or taken over from another authority (s.174); the Commissioner may require "an entirely separate drain for rain water or unpolluted sub-soil water" (s.176); and may alter, flush and restrict discharges into municipal drains (s.177). Dibrugarh's Corporation was notified on 20 November 2023, and Silchar's dates conflict (a gazette of 28 November 2024 per one report, effective 2 September; a High Court case cites 28.11.2022) (as reported). The Municipal Boards act under the 1956 Act. |
| Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954; replaces Assam Act VI of 1941; whole of Assam; read by OCR; later amendments not checked [TBC]) | Continue. An "embankment" includes sluices and appurtenant land, but not field ridges (ali) or roads, and a "drain" includes "dongs", culverts, ditches, canals, sluices and any device for "excluding, regulating or retaining" rain, flood or subsoil water (s.2). The Embankment Officer may remove or alter an embankment, drain or obstruction that endangers a town or interferes with drainage (s.4); no compensation is due for changes in "percolation or floods" (s.10); the works vest in the State (s.14); damaging or obstructing an embankment or drain is punishable (s.15(i)), and cutting through one, or opening, shutting or obstructing a sluice without authority, with up to three years and ₹1,000 (s.15(ii)) — the cut at Bethukandi in May 2022 is such an offence (NEER reading); and in a notified area no building on, or removal or alteration of, an embankment or drain may be made without the permission of the Deputy Commissioner or the Embankment Officer (s.16). PWD and the Public Health Department must be consulted (s.18). No setback distance from an embankment was found [TBC]. Every outfall of this Manual through an embankment or sluice needs the WRD's permission under this Act (Chapter 5). |
| Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Assam Act XX of 2008; Gazette Extraordinary No. 243, 8 August 2008; notification No. LGL.103/2008/14, dated 7 August in one scan and 9 August in another; conflict), and its amendment of 2010 (Assam Act 14 of 2010, as quoted); the Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 (passed on 29 August 2024; the Act is cited as Assam Act XXV of 2024, as quoted; the Bill as introduced read; the enacted text, its gazette date and the Rules of 2025 not read [TBC]) | The 2008 Act, which the 2024 Bill repeals (s.22(1), with a saving clause; the enacted text is to be confirmed [TBC]), defined "Waterbodies" as land "where the rain water accumulates and act as natural or storm water reservoir and shall include wetland" (s.2(e)), forbade filling, building and dumping in four scheduled areas of Guwahati, listed by mouza, revenue village and dag number — Sarusola (heading read from a garbled scan), Borsola, Silsako and land near Deepor Beel, not the beel itself (Schedules I–IV) — with up to three years' imprisonment or ₹50,000 (s.6), and set no buffer distance. The Bill keeps the definition for every notified Master Plan area except the Autonomous Districts, unless a District Council opts in (s.1(2)); adds the inflow and outflow channels and ponds and tanks "irrespective of its size", but excludes private water bodies of less than 2 acres, those in reserved forests, sanctuaries and national parks and the ponds of Government fish farms (s.2(d)); sets up District Level Committees, chaired by the Deputy Commissioner and in the GMDA area by GMDA's Chief Executive Officer, with the Deputy or Assistant Director, T&CP as Member Secretary, to prepare schedules by dag number and "ensure no construction zone within a buffer around the Water Bodies as prescribed in the Notified Master Plan and Assam Unified Building Construction (Regulation) Bye law, 2022" (ss.4–5) — the buffer of byelaw 26(ix) — and a State Level Committee chaired by the DoHUA Minister to approve them, after which the State publishes them in the Gazette (ss.6–7); forbids filling, structures other than "nature based solutions" and obstruction of inflow and outflow (s.15), with up to three years or ₹1 lakh and restoration (s.16). Because the law already treats beels as storm-water reservoirs, Chapter 7's rule that counts their storage and forbids its loss restates the law. Section numbers are those of the Bill until the Act is read. |
| Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 (Assam Act V of 2007; assent 16 January 2007; Gazette Extraordinary No. 20, 20 January 2007; No. LGL.169/2005/13) | Applies in a Designated Area once one is notified under s.4; no notification of a designated area, and no commencement notification, was found [TBC]. Ecological sites include "a drainage system, feeding channel, any water body having and potentiality of becoming water source" and marshy land, ponds, lakes and swamps (s.2(d)); no earth cutting that damages a hill and no alteration of an ecological site (s.3); in a Designated Area the owner of hill land takes the Advisory Committee's prior approval for a guard wall and for any house (s.14) — in Kamrup (Metro) a committee chaired by the Commissioner of the Lower Assam Division with GMDA's Chief Executive Officer and the GMC's Commissioner among its members (s.5); penalty up to six months or ₹5,000 (s.19). In the four scheduled areas of the 2008 Act, that Act overrode this one (2008 Act, s.11). Hill-site drainage duties come from byelaw 110, not from this Act. The High Court recorded on 26.05.2025 that "hill cutting is still going on" (PIL/14/2024). |
| Assam Ground Water Control and Regulation Act, 2012 (Assam Act XVI of 2012; assent 14 May 2012; Gazette Extraordinary No. 226, 19 May 2012; No. LGL.64/2002/71); the Rules of 2022 (notified 18.05.2022, as stated in an affidavit, as quoted) | Continue. The State Ground Water Authority, chaired by the Secretary, Irrigation, with Zonal Authorities by the jurisdictions of the Irrigation Superintending Engineers (s.3), may have areas declared "notified areas" (s.5(2)), where wells need permits (s.6) and rainwater harvesting can be directed (s.19); "rain water harvesting" includes storage "at surface or in sub-surface aquifer" (s.2(f)). The High Court directed the Authority's constitution by 31.01.2023 (as reported); its constitution was not confirmed [TBC], and no notified area was found. Applicants abide by its restrictions under byelaw 101(iv). Groundwater is shallow and not over-drawn (CGWB), so recharge is not a design objective of this Manual (Clause 4.11). |
| Wetlands (Conservation and Management) Rules, 2017; the Assam State Wetlands Authority (Notification No. FRM.10/2010/Pt/16 of 01.11.2018, as quoted); Deepor Beel (Ramsar site No. 1207, 19 August 2002, as quoted; wildlife sanctuary, 2009) | Continue. No wetland of the State was found notified under rule 4. Deepor Beel is the State's only Ramsar site (as reported). Its sanctuary notification of 2009 was restored on appeal, and on 05.04.2024 the High Court directed the State "not to issue any notification de-notifying" it after the Cabinet had decided to (PIL 18/2023, I.A.(C) 924/2024); its eco-sensitive zone exists only in drafts, of about 148.9 km² (2021) and about 38.84 km² (2025) (as reported), and is not final. Beels, pukhuris and other water bodies are governed by Chapter 7. |
| Floodplain zoning: no Act | Assam has not enacted the Model Flood Plain Zoning Bill (PIB, as quoted). A proposed Assam Flood Plain Zoning Bill, with prohibited and restricted zones and Flood Zoning Authorities, was reportedly reviewed by the Chief Minister on 5 November 2026 (single source, unverified); it is not law. The "Natural Hazard Prone Areas" of the Unified Byelaws 2022, to be notified "based on Hazard Studies viz. … Flood zonation" (definition 2), and the hazard maps that byelaw 120 asks Master Plans to carry are the nearest hooks; the 1% AEP maps of Chapters 6 and 7 are offered as an input to them, not as such a notification. |
| Gauhati High Court: PIL/14/2024, North East Eco Development Society v. State of Assam (orders of 23.09.2024, 17.03.2025 (as quoted) and 26.05.2025; February 2026, as reported); PIL/53/2023, Khanindra Kalita & 8 Ors (06.09.2024); PIL 18/2023, Pramod Kalita & 2 Ors (I.A.(C) 924/2024, 05.04.2024); the Silsako writ appeals (2023, as reported); PILs 34 or 36 and 42 of 2026 (as reported; the number of the first conflicts) | Apply where they bind; they are court directions, not design standards. In PIL/14/2024 the Court recorded the engagement of Haskoning DHV for the drainage master plan and DPR of Guwahati and, on 26.05.2025, that "hill cutting is still going on"; in PIL/53/2023 it appointed an Advocate Commissioner on builders blocking channels and filling wetland at Palasbari, causing "artificial floods"; in PIL 18/2023 it stopped the denotification of the Deepor Beel sanctuary; and the 2026 petitions on open drains and urban flood policy are pending (as reported). None sets a setback or a design storm. |
| National Green Tribunal: OA 472/2018, Rohit Chowdhury v. Union of India (order of 11.02.2020, Deepor Beel and the Boragaon dump); OA 673/2018 (polluted river stretches; the State's progress report of August 2020); OA 606/2018 (solid and liquid waste; State report of 09.10.2024, as quoted); OA 219/2025, renumbered 99/2025/EZ (Deepor Beel, suo motu; outcome not found, as reported) | Apply where they bind. The State's report in OA 673/2018 lists the Bharalu, Borsola Beel and Silsako Beel as Priority I polluted stretches, Sorusola Priority II and Deepar Beel Priority III, the last polluted by the "Mora Bharalu channel"; in OA 606/2018 the State reported 338.5 MLD of sewage treatment planned against a need of 435.5 MLD (as quoted). Sewage in storm drains is dealt with in Chapter 8 (Clause 8.9). |
| Environment (Protection) Act, 1986; Water (Prevention and Control of Pollution) Act, 1974; the Pollution Control Board, Assam | Continue. PCBA's action plan for the Bharalu finds that it "has no natural flow … only the domestic sewage and commercial sewage are being carried" and that the Bahini "now becomes a sewerage drain" (PCBA, as quoted). Chapter 8 governs sewage in storm drains. |
| Disaster Management Act, 2005; ASDMA, the Revenue and Disaster Management Department, the Deputy Commissioners and the District Disaster Management Authorities | Continue. No urban flood plan or standard operating procedure of ASDMA was read for this Manual [TBC], and no order of the State fixing a date for pre-monsoon desilting was found; the works calendar of Chapter 10 sets this Manual's dates, beginning with 31 March, for drains, sluice gates, flap gates and pumps. The WRD's calendar for embankment works remains its own. |
| IRC:SP:42-2014, IRC:SP:48 (Hill Road Manual) and the practice of the Public Works Department and NHAI on road drainage in the Guwahati hills and the hill districts | Apply to road drainage, cross-referenced from Chapter 6, where they do not conflict with it; the drainage clauses of IRC:SP:48 were not read for this Manual [TBC]. |
| CPHEEO Manual on Storm Water Drainage Systems (2019) | Engineering reference. This Manual sets higher return periods under Clause 1.3.2. |
| NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) | This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF. |
| NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 | Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create. |
| IRC:SP:42-2014 and IRC:SP:50-2013 | Apply to road drainage only where they do not conflict with Chapter 6. |
| MBBL 2016, Chapter 9 | Model for RWH and for the inspection regime in Chapter 10. |
Commentary. RWH in Assam is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the monsoon, because RWH sumps are usually full or the ground saturated by the time a June to August monsoon storm, such as those of June 2022, arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.
Assam is spending on its town drains, but with little stated design basis. In Guwahati, GMDA engaged Haskoning DHV by an order of 21.08.2024 to prepare a "GIS-based Comprehensive Drainage Master Plan and Detailed Project Report (DPR) for Guwahati City" within nine months, under the supervision of the Gauhati High Court (PIL/14/2024, order of 23.09.2024); the State told the Court in February 2026 that it was "expected to be completed by April 2026", and the minister has since directed that the plan and the DPR for the Bahini–Bharalu basin be revised (as reported), so in November 2026 it is under revision and not final. An earlier storm-water drainage report of 2008 was not built (as reported), and the CAG found no action taken against the consultants for "defective DPRs for Storm Water Drainage Project for Guwahati City" (CAG, Report No. 2 of 2024). The ADB's Assam Urban Sector Development Project (57262-001) funds the first works in the Bahini basin: 4.1 km of flood diversion channels, 4.7 km of drains, 7.8 m³/s of added pumping in three stations and a nature-based retention pond of 59,000 m³ with a 1.6 m³/s pump station, with part of the runoff "diverted to a retention basin in the nearby Silsako Basin and gradually pumped out to the Brahmaputra River" (ADB, RRP, 2025); its target is to avoid inundation "from a 1-in-5-year storm or lower return period" in 434 ha of the basin, with a "design storm of 65.72 mm hour" whose duration and return period are not stated (ADB, PAM, 2025, design and monitoring framework). A ₹1,459 crore Guwahati project for the Bahini and the Bharalu, with an automated pumping station at Bharalumukh, was announced in May 2026 (as reported). The Directorate of Town and Country Planning "has started preparing drainage master plans for all major towns in the state" (ADB, RRP, 2025), but the town plans found were prepared under the "previous FPS system" before CPHEEO's guideline of 2015 (DoHUA, status sheet). None of the documents found states a design return period for town drains other than the ADB's Bahini target, and no development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.
The State's law holds many of the tools. The Unified Byelaws 2022 set setbacks from rivers, named channels and notified water bodies, a plinth above the highest recorded flood level, a designed dry sump on flood-liable and hilly plots, rules for slopes and cuts, and rainwater harvesting on every building; the Gauhati Municipal Corporation Act, 1969 and the Assam Municipal Corporation Act, 2022 vest public drains in the Corporations and let the Commissioner require "an entirely distinct" or "entirely separate" drain for rain water (GMC Act s.237(1); AMC Act s.176), and the 2022 Act puts on each Corporation a duty to "provide a safe and sufficient outfall … for effectual drainage and proper discharge of storm-water and sewage" (s.171); the Assam Embankment and Drainage Act, 1953 protects embankments, sluices and drains, including "dongs", and makes cutting through an embankment or opening or obstructing a sluice without authority an offence punishable with up to three years' imprisonment (s.15(ii)); the water-bodies law defines a water body as a storm-water reservoir; the Hill Land Act protects drainage channels in Designated Areas; and the Assam Ground Water Control and Regulation Act, 2012 provides for rainwater harvesting in notified areas. The courts and tribunals have acted too: the High Court on Guwahati's drainage (PIL/14/2024), on the "artificial floods" of Palasbari (PIL/53/2023) and on Deepor Beel (PIL 18/2023), and the National Green Tribunal on the dumping at Boragaon (OA 472/2018) and on the polluted Bharalu (OA 673/2018). What the law lacks is a design standard. None of these instruments says which storm a drain must carry, how large a dry sump must be, how long a sluice may be assumed closed, how the "highest recorded flood level" of byelaw 45(c) is to be fixed, or how much storage a paved plot removes; and no floodplain zoning law exists, the reported Assam Flood Plain Zoning Bill of November 2026 being a proposal from a single unverified source, not law. This Manual's checks are framed as part of the planning permit and the building permit given by the competent authority for the area, not as a separate no-objection certificate. This Manual is offered as a technical companion to these instruments, to the orders of the courts and to the drainage works of the towns: it supplies the design storm, detention, outfall-closed, infiltration and corridor numbers they do not set, as a proposal for the Government, the District Councils and the other authorities to consider. Neither DoHUA, T&CP, GMDA, the GMC, any other Municipal Corporation or Municipal Board, the WRD, any District Council nor any other body has adopted it.
1.9 Roles and responsibilities
1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.
Table 1.4 — Roles and responsibilities under this Manual
| Agency | Role under this Manual |
|---|---|
| Department of Housing and Urban Affairs (DoHUA) and the Directorate of Town and Country Planning (T&CP) | DoHUA, formed by merging the Guwahati Development Department and the Urban Development Department (Governor's order of 20.07.2021, as quoted), makes the Unified Byelaws 2022 under section 4 of the Assam Building Construction (Regulation) Act, 2010 and administers GMDA, the GMC and the other urban local bodies. T&CP, under DoHUA, prepares the Master Plans of the towns outside GMDA, "has started preparing drainage master plans for all major towns" (ADB, RRP, 2025) and provides the Member Secretaries of the District Level and State Level Committees under the water-bodies law. If the Manual were adopted, DoHUA would prepare the amendment of Clause 1.3.1(a) and the model bye-law of Clause 1.3.1(b), and T&CP would show flood-sensitive catchments, drainage reserves and regional facility sites in the Master Plans (Chapter 11) and give regional support to Tier B authorities (Table 1.1). |
| Guwahati Metropolitan Development Authority (GMDA) and the Development Authorities | Give the planning permit under the Master Plan and Zoning Regulations (GMDA in the Guwahati Metropolitan Area under the GMDA Act, 1985; the 24 Development Authorities under the Assam Town and Country Planning Act, 1959, as quoted). GMDA is the Competent Authority for the scheduled water bodies of Guwahati, the project implementation unit of the ADB's Bahini works and the client of the drainage master plan of Guwahati, and excavates Silsako. Would require the drainage report of Chapter 10 with each planning permit, write drainage reserves, water-body buffers and basin storage into the Master Plans and Zoning Regulations, and record drainage reserves and easements in the permits they grant. The CAG found GMDA "not functioning as per the spirit" of its Act, with "very few technical staff" (CAG, Report No. 2 of 2024). |
| State Stormwater Technical Committee (Clause 1.3.2) | Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12). |
| Guwahati Municipal Corporation (GMC), the Dibrugarh and Silchar Municipal Corporations, the Municipal Boards and the Gaon Panchayats in notified Master Plan areas | Give the building permit under the Unified Byelaws 2022 and hold the municipal drains: the GMC under the Gauhati Municipal Corporation Act, 1969 (ss.231–252), the other Corporations under the Assam Municipal Corporation Act, 2022 (ss.171–177), the Municipal Boards under the Assam Municipal Act, 1956. The GMC desilts the Bharalu, the Mora Bharalu, the Basistha, the Bahini and the Lakhimijan and their feeder drains (as reported) and checks rainwater harvesting at the occupancy certificate (as reported). Would apply this Manual at the building permit and the occupancy certificate and to their own works, keep the drain register of their area, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15). |
| Water Resources Department (WRD) and its Embankment Officers | Build and maintain the embankments, sluices and drainage schemes, among them the Bharalumukh sluice and the dewatering pumps on the Bharalu, the Mora Bharalu and the Bondajan (as reported), and give permission for works on embankments and drains under the Assam Embankment and Drainage Act, 1953 (ss.4, 15, 16). Would set outfall and sluice conditions under that Act, supply sluice sills, closing levels, operating rules and river levels for Chapter 5, and apply this Manual to its drainage schemes. Its calendar for embankment works remains its own; the dates of Chapter 10 cover the drains, sluice gates, flap gates and pumps of the drainage system. |
| FREMAA | Carries out the ADB-funded Assam Integrated Flood and Riverbank Erosion Risk Management programme (as quoted). Would apply this Manual to the drainage elements of its works. |
| Public Works Department (PWD) and NHAI | Build and maintain roads and their drains, among them about 260–263 drains in Guwahati (as reported). Would apply Chapter 6 and the hill-road rules to them and never discharge a road drain onto an unprotected slope. |
| District Level Committees and the State Level Committee under the water-bodies law; the Advisory Committees under the Hill Land Act | The District Level Committees, chaired by the Deputy Commissioner or, in the GMDA area, GMDA's Chief Executive Officer, prepare the schedules of water bodies and "ensure no construction zone within a buffer" around them, and the State Level Committee, chaired by the DoHUA Minister, approves them (Bill of 2024, ss.4–8); the Advisory Committees approve guard walls and houses on hill land in a Designated Area (Hill Land Act, s.14). Would be the competent authority for the area for those matters and could use the corridors and storage rules of Chapter 7 in their decisions. |
| Irrigation Department and the Assam State Ground Water Authority | The Authority, chaired by the Secretary, Irrigation, may have areas notified under the Assam Ground Water Control and Regulation Act, 2012 (none found), and applicants abide by its restrictions (byelaw 101(iv)). Would supply groundwater levels with CGWB and be the competent authority for recharge in a notified area. Whether the Department keeps observation wells is not known [TBC]. |
| ASDMA, the Revenue and Disaster Management Department, the Deputy Commissioners and the District Disaster Management Authorities | Prepare for and respond to floods and landslides, publish the daily flood reports and keep the land records (district, mouza, revenue village, dag and patta). The District Disaster Management Authorities ran 21 committees to monitor desilting in Guwahati in March 2025 (as reported). Would supply the flood and landslide inventories used in the screening of Clause 2.3.6(i) and lead post-event reviews with the Authority (Clause 10.16). |
| Environment and Forest Department and the Assam State Wetlands Authority; the Pollution Control Board, Assam (PCBA) | Administer the Deepor Beel sanctuary and Ramsar site and the Wetlands Rules, 2017; PCBA prepares the action plans for the polluted stretches of the Bharalu, Borsola, Silsako, Sorusola and Deepor Beel. Would be consulted before a notified wetland is used for storage or as an outfall (Chapter 7) and receive the records of sewage found in storm drains under Chapter 8. |
| Guwahati Jal Board, the Guwahati Metropolitan Drinking Water and Sewerage Board (GMDW&SB), the Assam Urban Water Supply and Sewerage Board (AUWSSB) and Guwahati Smart City Ltd | The Jal Board executes the JICA-assisted sewerage project of Guwahati (loan agreement of 27.02.2015) and has taken over water supply from the GMC from 1 July 2025 (as reported); the role of Guwahati Smart City Ltd in drainage was not researched [TBC]. Would keep sewage out of storm drains as the sewers are built (Chapter 8) and design their own drainage works to this Manual from the dates of Clause 1.11. |
| Bodoland Territorial Council (BTC), Karbi Anglong Autonomous Council (KAAC) and North Cachar Hills Autonomous Council (NCHAC) | Govern the Autonomous Districts under the Sixth Schedule to the Constitution. The Unified Byelaws 2022 and the water-bodies law apply there only where the District Council notifies that they do (byelaw 1(2); Bill of 2024, s.1(2)); no notification and no Council building rules were found [TBC]. The Manual has no force in their areas unless a Council adopts it. A Council could notify under byelaw 1(2) or adopt the Manual in its own rules; if it did, it, or the authority it designated, would be the competent authority for the area. |
| NEEPCO, NHPC and the other dam operators | Operate the Ranganadi and the Kopili projects (NEEPCO) and the Lower Subansiri project (NHPC), whose releases flood the reaches below them (2017: a release of 1,412.57 m³/s from the Ranganadi, as quoted). Would supply reservoir levels, release rules and release records for Chapter 5 and the screening of Clause 2.3.6(i). |
| Brahmaputra Board | Prepared the basin master plans for the Brahmaputra (Part I) and the Barak (Part II), approved in 1997 (as quoted). Its plans would be read with the basin plans of Chapter 11. |
| Central Water Commission (CWC), Brahmaputra and Barak Basin Organisation, Shillong, a body of the Union | Publishes the Flood Estimation Reports for subzones 2(a) and 2(b) used in Chapters 2 and 3 and runs the flood-forecasting sites on the Brahmaputra, the Barak, the Kushiyara and their tributaries. Would supply river stage records with their datum for Chapter 5 and confirm whether any study for subzone 2(c) exists. |
| Central Ground Water Board (CGWB), North Eastern Region, Guwahati, a body of the Union | Holds the observation wells (381 in 2007) and publishes the depths to water. Would supply groundwater levels and quality for Clause 4.11 and Chapter 8. |
| IMD (Regional Meteorological Centre, Guwahati), and road, rail and other owners | IMD's stations supply the rainfall records of Chapter 2; Guwahati (Borjhar) (42410), Dibrugarh (Mohanbari) (42314) and the two Silchar stations (42619, 42620) are the first data requests of Clause 2.3.6(a). The Railways, OIL, NHAI, CPWD, the Army and BSNL hold their own drains (as reported) and would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7). |
Commentary. Stormwater in Assam is split, first, by the river. The towns drain through sluices in the embankments of the WRD, so the body that holds a town's drains is not the body that decides when its outfall opens. It is split, second, by the Sixth Schedule: the Unified Byelaws 2022 and the water-bodies law reach the notified Master Plan areas outside the Autonomous Districts, and inside them only where a District Council opts in, which none has been found to do. And it is split, third, among the bodies that drain Guwahati. The ADB names "fragmented institutional responsibilities involving multiple institutions, such as the Guwahati Metropolitan Development Authority (GMDA), Public Works Department, and Water Resources Department" as the reason "sustainable management of stormwater drainage remains a challenge" (ADB, RRP, 2025). The GMC desilts the city's rivers and drains; GMDA plans, protects the scheduled beels and builds new drainage; PWD holds the roadside drains; the WRD runs the sluices and pumps at the Brahmaputra and desilts the Bondajan; and the Railways, OIL, NHAI, CPWD, the Army and BSNL hold their own drains (as reported). The Guwahati Metropolitan Area of the Master Plan, 328 km², is also wider than the GMC's area. The Bharalu shows why the split matters. It is at once the trunk storm drain of the city, its sewer, since "No ULB in the state has a centralized sewerage system, including Guwahati" (ADB, RRP, 2025) and the river "has no natural flow … only the domestic sewage and commercial sewage are being carried" (PCBA), and a channel whose outfall the WRD closes against the Brahmaputra. No notification was found that assigns the Bharalu, the Mora Bharalu or the Bahini to one owner (NEER reading) [TBC]. Until the State issues such a rule, this Manual assigns the drainage elements as in Table 1.5, as Chapter 6 does for the drains themselves, and recommends that each town keep a drain register giving every reach its owner, its land status (patta, khas or government, or Council land), whether it is a scheduled water body or an inflow or outflow channel of one, whether it is an embankment drain under the Assam Embankment and Drainage Act, 1953, and its outfall (set by this Manual). The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers, and on patta land it is put into effect by reservation in the Master Plan or by agreement, not by acquisition.
Table 1.5 — Working assignment of drainage elements under this Manual
| Element | Assigned to |
|---|---|
| Municipal drains in Guwahati; desilting of the Bharalu, the Mora Bharalu, the Basistha, the Bahini and the Lakhimijan and their feeder drains | The GMC (Gauhati Municipal Corporation Act, 1969, ss.231–252: cleansing s.231, outfalls s.232 (a power, not a duty), alteration s.234, private drains s.237(1), connections s.242, the 100-ft rule s.244, vesting of connecting drains s.250); desilting by the 2022 split (as reported) |
| Municipal drains in Dibrugarh, Silchar and the other Municipal Corporations | The Corporation (Assam Municipal Corporation Act, 2022: outfall duty s.171, vesting s.173, transfer s.174, separate rain-water drains s.176, alteration s.177) |
| Municipal drains of a Municipal Board | The Board (Assam Municipal Act, 1956) |
| Roadside drains of State roads; drains of national highways | PWD (about 260–263 drains in Guwahati, as reported); NHAI |
| Embankments, sluices and drainage schemes; the Bharalumukh sluice and pumps; the dewatering pumps on the Bharalu, the Mora Bharalu and the Bondajan; desilting of the Bondajan | The WRD (Assam Embankment and Drainage Act, 1953) |
| New drainage works in the Guwahati Metropolitan Area, the ADB Bahini works, the excavation of Silsako and the scheduled water bodies of the GMDA area | GMDA (the project implementation unit of the ADB works) |
| Drains of the Railways, OIL, NHAI, CPWD, the Army and BSNL | Their owners (as reported) |
| Drains in the Autonomous Districts outside any area where the byelaws apply | The District Council or the body it designates [TBC] |
This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.
1.10 Variances and waivers
1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:
- (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
- (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.
1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Assam has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to the Brahmaputra, the Barak or a tributary through an embankment sluice, to a beel behind a sluice, to a gated and pumped outfall such as Bharalumukh, or to a reach below a dam, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it; nor is it waived for a site because it drains to a large river.
1.10.3 No variance or waiver. No variance or waiver shall be granted for:
- (a) a sewage connection to a storm drain;
- (b) the lowest habitable floor level of Chapter 6;
- (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
- (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.
1.10.4 Procedure.
- (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
- (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
- (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
- (d) A variance runs with the approval. It lapses if the approval lapses.
Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Assam the State Cabinet decided on 27.03.2024 to denotify the Deepor Beel sanctuary, which the High Court stopped (PIL 18/2023, order of 05.04.2024); builders blocked channels and filled wetland at Palasbari, causing "artificial floods" (PIL/53/2023, order of 06.09.2024); the High Court recorded on 26.05.2025 that "hill cutting is still going on" in Guwahati (PIL/14/2024); and the ADB names among the causes of waterlogging in Guwahati the "construction of buildings and roads over the manmade drains" and the "indiscriminate cutting and quarrying of hill slopes for filling up of low lying areas" (ADB, IEE, 2017).
1.11 Transition provisions
1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).
1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.
1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.
1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.
1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.
Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).
1.12 Review and amendment
1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.
1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.
1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.
References (chapter)
- Government of Assam. Assam Building Construction (Regulation) Act, 2010 (Assam Act XVI of 2010; notification No. LGL.7/2010/10 of 12 May 2010, Gazette Extraordinary No. 135), as amended by Assam Act XXVII of 2022 (notification No. LGL.7/2010/70 of 28 September 2022, Gazette Extraordinary No. 655 of 29 September 2022). https://prsindia.org/files/bills_acts/acts_states/assam/2010/ActNo16of2010Assam.pdf
- Government of Assam, Department of Housing and Urban Affairs. Assam Unified Building Construction (Regulation) Byelaws, 2022, Assam Gazette Extraordinary No. 688, 15.10.2022, notification No. DoHUA/ECF No. 236697/2; Assam Unified Building Construction (Regulation) (Amendment) Byelaws, 2024, Gazette No. 667, 20.11.2024, No. DoHUA/ECF No. 420084/34 (GMDA copies, Wayback Machine captures of 3 and 4 April 2025). https://gmda.assam.gov.in/
- Guwahati Metropolitan Development Authority. Guwahati Building Construction (Regulation) Byelaws, 2014 (GMDA copy; notification number and date not seen [TBC]).
- Guwahati Metropolitan Development Authority. Master Plan for Guwahati 2025 and Zoning Regulation 2025, Assam Gazette Extraordinary No. 198, 9 July 2009; Report Part II, Land Use Zoning and Development Control Regulation; Schedule of Modification of Master Plan 2025 (undated, before July 2022). https://gmda.assam.gov.in/
- Government of Assam. Assam Town and Country Planning Act, 1959 (Assam Act II of 1960), with amendments of 2012 and 2022 (Act XXVI of 2022, Gazette No. 662, 30 September 2022). https://prsindia.org/files/bills_acts/acts_states/assam/1960/1960Assam2.pdf
- Government of Assam. Gauhati Municipal Corporation Act, 1969 (Assam Act I of 1973), chapters on water supply, drainage and sewage disposal (Legislative Department scans). https://legislative.assam.gov.in/
- Government of Assam. Assam Municipal Corporation Act, 2022 (Assam Act VIII of 2022). https://prsindia.org/files/bills_acts/acts_states/assam/2022/ActNo.8of2022Assam.pdf
- Government of Assam. Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954). https://www.ielrc.org/content/e5303.pdf
- Government of Assam. Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Assam Act XX of 2008), Assam Gazette Extraordinary No. 243, 8 August 2008. https://www.ielrc.org/content/e0845.pdf
- Assam Legislative Assembly. Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 (as introduced), and business bulletin of 29 August 2024 (passage); the Act (Assam Act XXV of 2024) and the Rules of 2025 not read [TBC]. https://prsindia.org/files/bills_acts/bills_states/assam/2024/Assam_Urban_Water_Bodies_Bill_2024.pdf
- Government of Assam. Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 (Assam Act V of 2007), Assam Gazette Extraordinary No. 20, 20 January 2007. https://legislative.assam.gov.in/
- Government of Assam. Assam Ground Water Control and Regulation Act, 2012 (Assam Act XVI of 2012), Assam Gazette Extraordinary No. 226, 19 May 2012. https://legislative.assam.gov.in/
- Government of Assam, Environment and Forest Department. Notification No. FRM.10/2010/Pt/16 of 01.11.2018 (Assam State Wetlands Authority; listing title only). https://forest.assam.gov.in/
- Gauhati High Court. PIL/14/2024, North East Eco Development Society v. State of Assam, orders of 23.09.2024 and 26.05.2025. https://livelaw.in/pdf_upload/gau-hc-water-logging-562406.pdf ; https://www.livelaw.in/pdf_upload/gau-hc-hill-cutting-601951.pdf
- Gauhati High Court. PIL/53/2023, Khanindra Kalita & 8 Ors v. State of Assam, order of 06.09.2024. https://livelaw.in/pdf_upload/gau-hc-artificial-flood-560072.pdf
- Gauhati High Court. PIL 18/2023, Pramod Kalita & 2 Ors, I.A.(C) 924/2024, order of 05.04.2024. https://www.livelaw.in/pdf_upload/gau-hc-deepor-beel-denotification-532923.pdf
- National Green Tribunal. OA 472/2018, Rohit Chowdhury v. Union of India, order of 11.02.2020; OA 673/2018, monthly progress report of the State of Assam, August 2020; OA 606/2018, State report of 09.10.2024 (as quoted). https://www.greentribunal.gov.in/
- Comptroller and Auditor General of India. Report No. 5 of 2018 (Government of Assam), para 2.2, Flood Control in Assam; Report No. 4 of 2019, para 1.2, Delivery of Core Basic Services by ULBs; Report No. 2 of 2024, para 3.2, Functioning of GMDA. https://cag.gov.in/
- Pollution Control Board, Assam. Action Plan for the Bharalu River (Priority I) (undated; data to April 2019). https://www.pcbassam.org/RRC%20Action%20Plan%20Final/Priority%20I/Action%20plan_Bharalu.pdf
- Central Ground Water Board (2023). Ground Water Year Book 2022-23, North Eastern Region (Technical Series D No. 12/2022-23); Assam State Profile (2007). https://cgwb.gov.in/
- Press reports of the drain-cleaning split of 2022 in Guwahati, the desilting committees of 2025, GMC's rainwater-harvesting drive of 2025, the Silchar and Dibrugarh Municipal Corporations, the Assam Flood Plain Zoning Bill (November 2026), the draft Master Plan for Guwahati 2045 and the Silsako evictions (secondary sources). https://www.sentinelassam.com/
- Indian Roads Congress. IRC:SP:48, Hill Road Manual (drainage clauses not read [TBC]).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
- Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
- National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
- MoHUA (2016). Model Building Bye-Laws, Chapter 9.
- Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): the 17 Assam stations, among them Guwahati (Borjhar) (42410), Dibrugarh (Mohanbari) (42314), Silchar (42619) and Silchar (Kumbhigram) (42620). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- India Meteorological Department. Monthly Climate Summary, June 2022 (the rainfall of June 2022 over Assam and Meghalaya). https://imdpune.gov.in/cmpg/Product/Monthly_Climate_Summary/Monthly_Clim_Summary_6_2022.pdf
- Cachar District Administration. Flood Management 2022 (Barak at Annapurnaghat; rainfall of 19 June 2022) (as quoted). https://cachar.assam.gov.in/
- IIT Guwahati, for ASDMA (2018). Final report with annexures (the Ranganadi release of 2017) (as quoted). https://www.asdma.gov.in/
- US Geological Survey. The Assam–Tibet earthquake of 15 August 1950 (archived event page, as quoted).
- South Asia Network on Dams, Rivers and People (2019). Overview of CWC's flood forecasting sites, North East India (transcriptions of CWC data; secondary source). https://sandrp.in/2019/10/02/overview-of-cwcs-flood-forecasting-sites-2019-north-east-india/
- Press reports of the floods of 2004, 2017, 2020, 2022 (Guwahati and Silchar), 2024, 2025 and 2026, the Guwahati storms of 31 May 2025 and 20 April 2026 and the landslides of 14 June 2022 and 31 May 2025 (secondary sources). https://www.sentinelassam.com/ ; https://assamtribune.com/
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
- PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
- Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
- Asian Development Bank (2025). Assam Urban Sector Development Project (57262-001): Report and Recommendation of the President (August 2025) and Project Administration Manual (July 2025), with the design and monitoring framework. https://www.adb.org/sites/default/files/project-documents/57262/57262-001-pam-en.pdf
- Asian Development Bank (2017). Assam Urban Infrastructure Investment Program, Tranche 2 (42265-025): Initial Environmental Examinations for the Guwahati drainage subprojects and the Dibrugarh DTP drain outfall. https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42265-025_D6ieyPo.pdf
- Department of Housing and Urban Affairs, Assam. Town-wise status of fund release for preparation of Drainage Master Plans (c. 2016; Wayback Machine copy). https://dohua.assam.gov.in/
- Japan International Cooperation Agency (2015). Ex-ante evaluation, Guwahati Sewerage Project. https://www.jica.go.jp/english/our_work/evaluation/oda_loan/economic_cooperation/c8h0vm000001rdjt-att/india_150227_01.pdf
- Guwahati Metropolitan Development Authority. GIS-based Comprehensive Drainage Master Plan and DPR for Guwahati City (Haskoning DHV, work order of 21.08.2024; under revision, not final; not read [TBC]); draft Master Plan for Guwahati 2045 (not finally notified).
Annexes and forms
| Annex / Form | Content |
|---|---|
| 1A | List of Tier A authorities, with the boundaries of the Guwahati Metropolitan Area of the Master Plan for Guwahati 2025 and of the Dibrugarh and Silchar Municipal Corporations and their Master Plan areas |
| 1B | Maps of flood-sensitive catchments |
| 1C | Policy Supplement: text of alternatives S-1 to S-5 and model council resolution |
| 1D | Model Unified Byelaws 2022 amendment and model ULB bye-law |
| Form 1-1 | Applicability Determination |
| Form 1-2 | Variance / Waiver Request |
Commentary. Assam's floods come from four sources, often together. The first is the river. About 40% of the State is flood-prone: 31.50 lakh ha by the figure of the Rashtriya Barh Ayog as quoted by the CAG, and 31.05 lakh ha (39.58%) on the WRD website, two figures in circulation (CAG, Report No. 5 of 2018; WRD, as quoted; conflict); the WRD gives "reasonable protection" to 16.50 lakh ha (CAG). The towns lie behind embankments (mothauri, the Assamese word for a river embankment), whose length is given as 4,474.42 km (CAG, to March 2017), 4,473.82 km (WRD, as quoted) and about 4,800 km in a later ministerial reply (as reported; conflict). The great earthquake of 15 August 1950 (magnitude 8.6) killed 1,526 people in Assam and eroded Dibrugarh, which led to the town's protection dyke of 1955 (USGS, as quoted; ADB). The highest recorded levels of the Brahmaputra date the main-stem floods: 27–28 August 1988 at Tezpur and Dhubri, when about 62% of the Brahmaputra valley was reported inundated; 3 September 1998 at Dibrugarh; and 21 July 2004 at Guwahati, 51.46 m (CWC data as transcribed by SANDRP; ICIMOD, 1997). The flood of 2004 is reported to have affected 12.4 million people and killed 251 (as reported; not checked against ASDMA). The second is drainage congestion. In the WRD's words, as quoted by the CAG, "High stages of river Brahmaputra and Barak obstruct free discharge of tributaries causing back flow and congestion near outfalls. Inadequate countryside drainages through sluices in embankment system … cause prolonged inundation" (CAG, Report No. 5 of 2018), and in Guwahati "the water level of the Brahmaputra River sometimes, is higher than the ground level of the city areas" (ADB, IEE, 2017). In June 2022, when IMD found the month's rainfall over Assam and Meghalaya, 858.1 mm, the highest since 1901 (IMD, Monthly Climate Summary, June 2022), more than 88 lakh people were affected in the season and 54.57 lakh in 32 districts on 23 June alone; the season's toll is given as about 181 (ASDMA, as reported), 195 and 197 (as reported; conflict). Silchar was flooded from 19 June 2022 after the Barak entered the town through a cut in its embankment at Bethukandi; the police registered an FIR over a breach of 23 May and one person was arrested, the Chief Minister called the flood "man-made" and an official said the breach made little difference given the river level; the town was under water for about 11 days, up to about 4 m deep in places, or for "about a week" in another account (all as reported; conflict). The Barak at Annapurnaghat peaked at 21.59 m on 21 June 2022, 1.76 m above its danger level and 0.25 m below its highest level of 1989 (Cachar district report, as quoted; differences a NEER reading): a flood of a ponded bowl inside the embankment, not a record river stage. Cachar recorded 251.20 mm on 19 June 2022 (district report, as quoted). The third is the urban flash flood of Guwahati, from short bursts on the hill fringe while the Bharalu outfall is gated against a high Brahmaputra. In June 2014 seven people died in flash floods in Guwahati and four by electrocution (CAG, Report No. 4 of 2019). On 14 June 2022 the WRD gauges at Chandmari and Beltola recorded 84.6 mm and 88 mm against about 10 mm at the airport (Borjhar) and 46 mm for the city, four people were killed in a landslide at Nizarapar (Boragaon), and Anil Nagar, Nabin Nagar, Rajgarh Link Road, Rukminigaon, Hatigaon and Krishna Nagar were inundated (as reported). On 31 May 2025 the airport recorded 111 mm in the 24 hours to 08:30, its highest May day, which IMD said was "nothing abnormal", and three people died in a landslide at Bonda (as reported; 120 mm and 99.6 mm in other outlets, conflict). On the night of 19–20 April 2026 the airport recorded 117.4 mm, beating its April record of 116.5 mm (6 April 2004, IMD), with 215.9 mm at SIRD Khanapara the same night, and a woman died after falling into an open roadside drain (as reported). The fourth is the dam release and the embankment breach. In 2017, when 156 people had died in the State's floods by late August, 8 of them in Guwahati (as reported), the Ranganadi project released 1,412.57 m³/s into the Ranganadi in Lakhimpur district (IIT Guwahati report for ASDMA, as quoted); 71 embankment breaches were reported between mid-June and 20 July 2024 (as reported). The seasons since have been severe: 149 deaths to 14 October 2020 with 57.7 lakh affected; a peak about 5 July 2024 with 24,20,722 people affected in 30 districts and 117 deaths to 27 July; 880 flood deaths reported since 2019 (Rajya Sabha reply, as quoted); 111 deaths by 30 August 2025; and floods in Upper Assam in July 2026, with 11,45,109 people affected in 25 districts between 29 April and 3 August and 105 deaths by 17 August (all as reported). The tolls differ in whether landslides, storms and lightning are counted; ASDMA's official tolls were not obtained [TBC]. In the hill districts and on the Guwahati hills, slides and debris add a fifth source that no drain is sized for.
Missing design makes all four worse. No design storm, return period or drain standard was found in any drainage master plan of the State's towns: the town plans of the Department of Housing and Urban Affairs (DoHUA) were "prepared before 2015 as per previous FPS system" and await revision to the CPHEEO guideline of 2015 (DoHUA, status sheet, c. 2016). The CAG found storm-water drainage in the urban local bodies it test-checked covering "3 to 37 per cent only" of their areas, and that the "natural drainage systems of the cities carried the sewage" (CAG, Report No. 4 of 2019); the ADB puts the coverage at "only about 30% of the required areas" (ADB, RRP 57262-001, 2025); and "Apart from 17 kilometres of drains built between 1973 and 1997, no other extensive and planned drainage network exists in the Guwahati Metropolitan Area" (as reported). The Unified Byelaws 2022 set setbacks from rivers and beels, a plinth above the highest recorded flood level and a designed dry sump on flood-liable and hilly plots, but no design storm, release rate or storage method, and outside the notified Master Plan areas and in the Autonomous Districts they do not apply at all unless a District Council opts in. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix; the closed outfall of the second source is the design case of Chapter 5, not an exception; and the breaches, chars and slides are answered by the siting, setback and floor-level rules of Chapters 2, 6 and 7, because no drain is sized to carry a river through a breach.
No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Assam Unified Building Construction (Regulation) Byelaws 2022 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.