About this draft
Status. This is Draft v1.0 of the Chhattisgarh Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Chhattisgarh.
Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Chhattisgarh or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Urban Administration and Development Department (UADD), the Housing and Environment Department or its Directorate of Town and Country Planning (T&CP), the Water Resources Department (WRD), the Nava Raipur Atal Nagar Vikas Pradhikaran (NRDA), the Raipur Development Authority (RDA), any Municipal Corporation, Nagar Palika Parishad, Nagar Panchayat or other local body, or any other agency. Where it names a body, such as the Revenue and Disaster Management Department, the General Administration Department, the Public Health Engineering Department (PHED), the Forest and Climate Change Department, the Chhattisgarh State Wetland Authority, the Chhattisgarh Environment Conservation Board (CECB), the Chhattisgarh State Disaster Management Authority (CGSDMA), the State Ground Water Management and Regulatory Authority, the Arpa Special Area Development Authority, the Chhattisgarh Housing Board, the Raipur Municipal Corporation (RMC), the Town Services of the Bhilai Steel Plant (SAIL), a coal or power company such as South Eastern Coalfields Limited (SECL), NTPC, the Chhattisgarh State Power Generation Company (CSPGCL) or Bharat Aluminium Company (BALCO), a district administration, or a body of the Union, such as the Central Water Commission (CWC), the Central Ground Water Board (CGWB) or the Directorate General of Mines Safety (DGMS), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.
No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The Chhattisgarh Bhumi Vikas Niyam, 1984 as amended, the development plans, including the Naya Raipur Development Plan-2031, and their approval conditions, drainage schemes, the conditions of environmental clearances and mining plans, the Coal Mines Regulations, 2017, orders of courts and tribunals and approval conditions in force continue to apply.
Names. Some places, rivers and gauges have more than one name or spelling in statutes, sources and on IMD and CWC stations:
- Chhattisgarh was part of Madhya Pradesh until November 2000, and older sources, including the CWC flood estimation reports and IMD's older tables, name its districts as districts of "Madhya Pradesh" (one annex of a CWC report spells it "Madhaya Pradesh"). The district map has also changed. Before 2012 Raipur district included today's Baloda Bazar and Gariaband, and before 1998 Mahasamund and Dhamtari; Durg included Balod and Bemetara; before 1998 Bilaspur included Korba and Janjgir-Champa, and Pendra Road has been in Gaurela-Pendra-Marwahi district since 2020; before 2022 Rajnandgaon included Khairagarh-Chhuikhadan-Gandai and Mohla-Manpur-Ambagarh Chowki, and Raigarh included Sarangarh-Bilaigarh; the old Bastar district included today's Kanker, Kondagaon, Narayanpur, Dantewada, Bijapur and Sukma; and Surguja (also Sarguja or Sirguja) included Balrampur and Surajpur, and before 1998 Koriya. Kabirdham district is also called Kawardha. IMD and CWC sources, and the rainfall data in this Manual, use the districts of their time, and a clause that names a district must be checked against the current list;
- the Seonath is also written Sheonath and Shivnath, the form of many State and court documents; Katghora is written Kathghora or Kathgora, Seorinarayan Sheorinarayan, Wadrafnagar Wardafnagar, Jashpur Nagar Jashpurnagar, Manendragarh Mahendragarh in IMD's tables, and the Maniari Maniyari. The Gangrel dam on the Mahanadi forms the Ravishankar Sagar (R.S. Sagar), the dam on the Hasdeo is the Minimata Bango (Hasdeo Bango) dam and the barrage below it at Korba the Darri (Hasdeo) barrage, and the Seonath barrage at Mongra is written Mogra in WRD's gauge report;
- Nava Raipur Atal Nagar is the new capital, called Naya Raipur in its development plan of 2008 and in most sources, Nava Raipur in others and Atal Nagar since 2018. Its authority, called NRDA in this Manual, now names itself the Nava Raipur Atal Nagar Vikas Pradhikaran (NRANVP). It is a special area development authority under the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973: its notification No. 4066 of 23 May 2022 delegates to its Chief Executive Officer the powers of a special area development authority under ss.69 to 69-ग of that Act, with some exceptions. No separate Act for NRDA was found;
- where a shared clause names the State's main city or its municipal corporation, this Manual names Raipur, the capital, and the Raipur Municipal Corporation (RMC). RDA is the Raipur Development Authority, which carries out development schemes in and around the city; the law under which it was constituted was not verified for this Manual;
- Raipur has two IMD observatories about 15 km apart: Raipur (Obsy) (42875) in the city, with records from 1901, and Mana (A) (11203) at the airport, also called Raipur (Mana), from 1979. The 370.3 mm of 4 August 1910 is a Raipur (Obsy) record; on 30 June 2007 Raipur (Obsy) recorded 297.0 mm and Mana (A) 273.0 mm. Durg also has two gauges, Durg and Durg (Obsy), whose records differ (337.0 mm on 15 June 2004 and 260.4 mm on 13 August 2006). This Manual names the station each figure comes from;
- Jagdalpur has two systems of river marks, which must not be mixed. CWC's flood forecasting site on the Indravati at Jagdalpur has a warning level of 539.49 m (539.50 m in one advisory) and a danger level of 540.80 m, and its highest flood level, 544.68 m of 9 July 1973, was exceeded on 26 September 2026, when the river was reported at 544.891 m, as transcribed from CWC's data. The press reports the river against a local gauge (12.56 m, "4.26 metres above the danger mark", on the same day). This Manual uses CWC's levels for design and treats the local gauge as an alert level only. No source read states the datum of either set, and levels are quoted as reported [TBC];
- dam releases, like most river flows in Chhattisgarh's sources, are given in cusecs (cubic feet a second; 1 cusec = 0.0283 m³/s). This Manual quotes them as given and adds the metric value where it matters for design;
- the Chhattisgarh plain is the basin of the upper Mahanadi and the Seonath around Raipur, Durg–Bhilai, Bilaspur and Rajnandgaon; the Bastar plateau is the south, the Bastar division on the Indravati and the Sabari; and the northern hills are Surguja, Koriya and Jashpur, on the Rihand, the Kanhar and the headwaters of the Hasdeo and the Brahmani. The Maikal range bounds the plain on the west. The names describe regions, not administrative units, except where a district bears the same name;
- the plain's farmers name four classes of soil, from the ridges to the valley floors: bhata (भाठा), thin gravelly soil, often less than 30 cm deep over murram or laterite; matasi (मटासी), a sandy or silty loam of the upper slopes; dorsa (डोरसा), a clay loam of the lower slopes; and kanhar (कन्हार), a deep black clay of the lowest land that cracks when dry. The names come from agronomy papers; no dictionary source was found for matasi, dorsa or kanhar in this sense, and bhata is given only as stony ground. Local names do not map one-to-one onto soil taxonomy; and
- in the coalfields of Korba, Raigarh and Surguja a mine void is the pit left by opencast mining, a pit lake a void that has filled with water, and an overburden dump (OB dump) the heap of rock and soil removed to reach the coal. An ash pond is the pond in which a power station stores its fly ash as slurry, held by an ash dyke. SECL is the subsidiary of Coal India that holds most of the State's coal mines; DGMS regulates mine safety, including the danger of inundation, under the Coal Mines Regulations, 2017.
This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:
- the Chhattisgarh Bhumi Vikas Niyam, 1984 (CGBVN 1984) are the land development rules of 1984 that Chhattisgarh inherited from Madhya Pradesh in 2000 and has amended many times since, by notifications of the Housing and Environment Department under s.85(1) read with s.24(3) of the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973. Madhya Pradesh replaced its own 1984 rules with the Madhya Pradesh Bhumi Vikas Rules, 2012, which do not apply in Chhattisgarh. No consolidated text of the Chhattisgarh rules was found; where this Manual relies on the wording of the 1984 rules as Madhya Pradesh published them, it says so;
- a Municipal Corporation (Nagar Palik Nigam) is constituted under the Chhattisgarh Municipal Corporation Act, 1956, and a Nagar Palika Parishad (Municipal Council) or Nagar Panchayat under the Chhattisgarh Municipalities Act, 1961; both are Madhya Pradesh Acts as adapted by Chhattisgarh, and their Chhattisgarh texts were not read for this Manual. All three are urban local bodies (ULBs) under UADD. The State has 14 Municipal Corporations, nine of which, Raipur, Bhilai, Durg, Bilaspur, Korba, Rajnandgaon, Raigarh, Jagdalpur and Ambikapur, were chosen for AMRUT; the other five are taken to be Bhilai-Charoda, Risali, Birgaon, Dhamtari and Chirmiri [TBC];
- Bhilai has two drainage regimes: the township of the Bhilai Steel Plant, whose drains are kept by the plant's Town Services, and the areas of the Bhilai and Risali Municipal Corporations. In July 2025 the Commissioner of the Bhilai Municipal Corporation was reported to have warned the plant over uncleaned township drains, whose water hyacinth had blocked culverts downstream;
- the Housing and Environment Department issues the Bhumi Vikas Niyam, approves development plans under s.19 of the 1973 Adhiniyam and oversees the special area development authorities; T&CP, its Directorate, prepares development plans and grants development permission, and the ULB grants building permission. Works of Union and State departments, and of local authorities, need the concurrence of T&CP under ss.27–28 of the Adhiniyam. Bilaspur's Arpa Special Area Development Authority had a development plan for 2033, approved on 10 February 2014, but after orders of the High Court of 22 January 2019 the State decided that its permission was no longer needed to sell, build on or develop land in its area;
- WRD (Jal Sansadhan Vibhag) holds the State's rivers, dams, barrages and reservoirs, including Gangrel, Bango and Kopra Jalashay, and is named in this Manual as the State groundwater agency. The Chhattisgarh Ground Water (Management and Regulation) Act, 2022 provides for a State Ground Water Management and Regulatory Authority, but no notification bringing the Act into force was found;
- CECB, under the Housing and Environment Department, reports to the National Green Tribunal (NGT) on sewage and treatment plants. The Chhattisgarh State Wetland Authority, whose nodal department is Forest and Climate Change, was reported to have been reconstituted in December 2021 under the Wetlands (Conservation and Management) Rules, 2017; no wetland notified under those Rules was found. CGSDMA was reported to have been constituted in 2007; no State disaster management plan or urban flood plan of it was found;
- nistar (निस्तार) is the community's right of use over village land and tanks. Tanks over which a village exercised rights of irrigation or nistar vested in the State on 6 April 1959 (Chhattisgarh Land Revenue Code, 1959, s.251), and unauthorised occupation of them can be proceeded against under s.248; and
- a tehsil is the revenue subdivision of a district, under a Tahsildar, who hears cases of encroachment on public land and tanks.
Some abbreviations have more than one meaning:
- AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
- RMC is the Raipur Municipal Corporation, not ready-mixed concrete; RDA is the Raipur Development Authority;
- NRDA is used for the authority of Nava Raipur Atal Nagar under both its old and new names;
- HFL is the highest flood level recorded at a gauge, as CWC uses it. It is not a design level, and sources sometimes give different values for the same gauge. The local gauge at Jagdalpur is not a CWC level. WL and DL are CWC's warning and danger levels;
- FRL (full reservoir level) is the term of WRD's gauge reports for its dams and barrages; FTL (full tank level) is used for talabs and small tanks; MWL is the maximum water level of a reservoir;
- NGT CZ is the Central Zone bench of the National Green Tribunal, at Bhopal, which hears cases from Chhattisgarh;
- OB is overburden in the coalfields; and
- SWD is a storm water drain.
The sense is clear from the context. Hindi and Chhattisgarhi terms used in the text, such as talab (तालाब, a pond or tank that holds rainwater, as in Raipur's Budha Talab), dabri (डबरी, a small dug pond, of a farm or village), kund (कुंड, a small walled tank), bandh (बाँध, an embankment or dam, and the tank it forms, as in Telibandha), nala (नाला, a natural drain or large storm drain; in Chhattisgarhi also narwa, नरवा), nali (नाली, a small street drain), anicut (a weir across a river), nistar and the soil names bhata, matasi, dorsa and kanhar, are explained where they first appear.
Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.
Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.
Comments. Comments and corrections are welcome at info@neer.ai.
Preface
Chhattisgarh's cities flood for three reasons. Raipur showed the first on 4 August 1910, when its observatory recorded 370.3 mm in a day, more than the 100-year day on the national maps, and on a city whose drains have still no published design storm; it showed the second in early July 2026, when five ponds in one colony overflowed into homes and sewage entered houses, as reported; and Korba and Jagdalpur show the third, where rivers raised by dam releases, ash dykes and mine voids, and in Bastar an Indravati at a new record level, decide what happens at the outfalls.
- Bay depressions that bring days above the national maps, on a flat paddy plain whose clay seals once wet, with no design storm. The State's heaviest rain comes from low-pressure systems and depressions that form over the Bay of Bengal and cross it westward; IMD counts 100 storms and depressions that affected the State from 1891 to 2014. Their days exceed the 100-year values that the CWC flood estimation reports map for the State: Raipur (Obsy) 370.3 mm on 4 August 1910, against about 320–360 mm on the map; a raingauge at Rajnandgaon 392.0 mm on 21 September 1965, against about 320 mm; Korba 358.0 mm on 12 August 2004 and Durg 337.0 mm on 15 June 2004, against about 280–320 mm. In September 2026 a statewide flood followed such a system: eight people were reported dead, about 16,000 rescued and more than 22,000 affected in 571 villages, all 14 gates of Gangrel were opened, and the Kharun overflowed at Mahadev Ghat in Raipur, as reported. In July 2026 Bilaspur was reported to have received 28 cm in a day; another report put it at 415.6 mm, and IMD has confirmed neither. The rain falls on a plain of gentle slopes (0–5% at Naya Raipur), laid out in bunded paddy fields and dotted with talabs, where the lowland kanhar clay, 40–50% clay by the CGWB's account, cracks when dry but has low permeability once wet. The drains built against such storms were sized for no stated storm. Raipur's plan for AMRUT in 2015 put the city's storm drain coverage at 49%, about 480 km of pucca drains, recorded 11 road stretches that flood two or three times a year and found that "Capacity of drain is not sufficient In rainy season most of the drains are overflowed", and proposed a drainage project of ₹1,191 crore; it states no return period, design rainfall or runoff coefficient. The only explicit design storm found in the State is in the Naya Raipur Development Plan-2031 of 2008: "5 years Maximum rainfall intensity should be taken for design of system", for the new capital only.
- Cities of talabs that have lost most of them, and nalas that carry sewage to the rivers. Raipur is reported to have had about 130 ponds, of which 37 to 40 remain, about 69 ha in all; the counts conflict. Its nalas carry the city's sewage as well as its rain: Raipur's domestic sewage is linked to the Kharun "through eight big canals", as reported, and the city's new treatment plants at Chandanidih, Kara and Nimora draw it off through diversion weirs built on the nalas. In January 2021 CECB told the NGT that only Bilaspur had a sewerage system, and in January 2025 the High Court was told that about 40% of Bilaspur's sewage would still reach the Arpa untreated, as reported. In January 2026 the NGT ordered Durg's treatment plants on the Shankar and Pulgaon nalas, which carry most of the city's sewage to the Seonath, finished within six months, as reported. In Raipur the floods of July 2026 filled the Fafadih and Gudhiyari underpasses and pushed sewage into homes, as reported, and the residents blamed drains narrowed by encroachment and inadequate desilting.
- A north and east reshaped by coal and power and governed by dam releases, and a south where the Indravati set a new record. The Hasdeo at Korba runs below the Minimata Bango dam and the Darri barrage, whose spillways were designed for 24,000 m³/s and 19,820 m³/s; in August 2024 Bango released about 30,000 cusecs (850 m³/s) through six gates and Darri about 20,000 cusecs, and houses in Korba were flooded, as reported, and in 2026 the Hasdeo set new highest levels at Katghora (313.58 m, 20 July) and Bangodam (303.5 m, 17 August), as transcribed from CWC's data. Around Korba and Raigarh the coal mines draw water from the ground, about 7,500–13,700 m³ a day across six of Korba's mines, with drawdown cones about 1.2 km wide in one study, and power stations store their ash behind dykes that have breached: NTPC's Dhanras dyke at Korba in July 2024, damaging about 16 ha of paddy, a dyke of CSPGCL's station at Korba West in April 2026, when one person died, and an ash dam of BALCO, whose slurry reached a nala and the Hasdeo, as reported. On the Mahanadi the outfalls of Rajim, Janjgir-Champa and Raigarh depend on releases from Gangrel, whose spillway was designed for 17,230 m³/s, and in the east on the backwater of the Hirakud reservoir in Odisha, which partly submerges 33 villages in Chhattisgarh, as reported; in August 2020 the Mahanadi rose above its danger level in Janjgir-Champa, the Hirakud gates were opened at the State's request and the Kharun set its highest level at Pathardihi, 281.68 m on 29 August, as reported. In the south the Indravati at Jagdalpur rose on 26 September 2026 to 544.891 m, 4.1 m above CWC's danger level and above its record of 1973, as transcribed, after the Bastar floods of August 2025 had killed eight people, as reported.
Behind all three lies lost storage. Village tanks vest in the State under the Land Revenue Code (s.251), and in 2024, on the orders of the NGT, the Tahsildar at Baloda proceeded under s.248 against those who had encroached on its ponds. Around the talabs the only buffer enforced is the Wetlands Rules' bar on construction within 50 m of the highest flood level, which the State Wetland Authority has applied to wetlands of more than 2.25 ha as "deemed" wetlands, citing judgments of the Supreme Court: in 2025 it halted works at Karbala Talab in Raipur, a probe was ordered at Narhaiya Talab, and the Authority directed NRDA to withdraw tenders for plots and residences beside the Jhanjh wetland in Nava Raipur, as reported. A State directive of May 2023 to survey every water body in Raipur district was reported not to have been carried out, and no wetland in the State has been notified under the Rules. Nava Raipur was planned around a network of lakes and reservoirs, 55 of them as reported, with parks designed to carry storm water to them. Kopra Jalashay near Bilaspur, a WRD reservoir of 210 ha built in 1993, is the State's first Ramsar site, with a designation date of 8 August 2025 on its Ramsar information sheet (it was announced in December 2025). Raipur is still planned under its Development Plan (Revised) 2021, approved in 2008; a draft for 2031 that emphasises water bodies was discussed in 2022, and its approval was not found.
Design for Chhattisgarh therefore has to cover a monsoon that comes first to Bastar and lingers into October, on a plain of paddy clays, limestone and talabs, a plateau of granite and laterite and northern hills of coal, in cities that drain to rivers held up by dams and barrages and, in places, to mine voids. Under IMD's new normals the monsoon sets in at Jagdalpur about 11–13 June, at Raipur and Pendra Road about 16 June and at Bilaspur about 17 June, and withdraws between 7 October at Pendra Road and 12–14 October at Jagdalpur; IMD's Raipur centre uses 10 June and 15 October. About 90% of the year's rain falls from June to September, and July and August bring nearly 58%; annual normals run from 1,011.2 mm in Kabirdham and 1,061.5 mm in Durg to 1,129.3 mm in Raipur, 1,575.7 mm in Bastar and 1,839.3 mm in Dantewada. Of the 100 storms and depressions that affected the State from 1891 to 2014, 27 came in July, 19 in August and 21 in October, and large days fall outside the season: Pendra Road recorded 228.1 mm on 8 October 1994, Ambikapur 206.0 mm on 1 October 1961 and Bailadila 207.0 mm on 11 May 1990. Underground, the State draws less than half of its extractable groundwater (47.32% in 2024), but five blocks of the plain around Raipur, Balod and Bemetara are critical, among them Dharsiwa in Raipur district at 93.51%; after the monsoon the water stood within 5 m of the surface in about 76% of the observation wells in 2023; the Chandi and Charmuria limestones under Raipur, Durg and Rajnandgaon are described by CGWB as "Karstified and Cavernous"; and arsenic at Ambagarh Chowki and fluoride in eight districts limit what may be recharged.
National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:
- hold frequent rainfall on site;
- release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
- show that its outfall still works when the receiving nala, river, talab or reservoir is high, when a dam or barrage upstream is releasing, or when the gate on its outfall is shut.
The Manual also sets how public drains, roads, nalas, talabs, reservoirs and other water bodies, gated outfalls and basin-wide master plans are designed, and how runoff is handled where it meets a mine void, an overburden dump or an ash pond, so that private sites and public works aim at the same standard.
The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Chhattisgarh's south-west monsoon from mid-June to mid-October, with the Bay depressions that set most of its records; the Mahanadi and its tributaries, the Seonath, the Kharun, the Arpa, the Hasdeo, the Mand and the Kelo, under the dams and barrages of Gangrel, Bango, Darri, Mongra and the Arpa, and the Hirakud backwater downstream; the Indravati and the Sabari in Bastar, and the Rihand and the Kanhar in the north; the bhata, matasi, dorsa and kanhar soils of the plain, the cavernous limestone under its cities, the granite, gneiss and laterite of Bastar and the coal measures and their mine-disturbed ground in the north and east; the talabs, dabris and bandhs and the lakes of Nava Raipur; and cities whose new colonies, underpasses and roads lie across the natural lines of drainage.
- National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
- Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
- Design rainfall. The CWC Flood Estimation Reports for the subzones that divide the State by basin, as the interim source: subzone 3(d) Mahanadi, for the Mahanadi basin, 56% of the State, with Raipur, Durg–Bhilai, Bilaspur, Korba and Raigarh; 3(g) Indravati, for Jagdalpur and the Bastar plateau; 3(f) Lower Godavari, for Sukma and Konta; 1(d) Sone, for Ambikapur and the north; and a small fringe of 3(c) Upper Narmada, with no city. The ratios of those reports give 1-hour storms larger than any hourly fall recorded in the State, so this Manual sets no floor on short storms; it does check the design day against the largest reliable days recorded nearby where those exceed the maps. IMD's national set of rainfall intensity curves (Das et al., 2022) has no station in Chhattisgarh; the chart of rainfall intensity in the Naya Raipur Development Plan-2031 gives no equation or record length and is used only as a cross-check in Nava Raipur; a set of constants for Raipur from 1979 was seen only in an extract and is not used; and frequency analysis of gridded rainfall by the National Institute of Hydrology (NIH), Roorkee, is used for comparison only.
- Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
- Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
- Local rules. The Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973; the Chhattisgarh Bhumi Vikas Niyam, 1984 as amended, applied by T&CP, NRDA and every urban local body; the Chhattisgarh Municipal Corporation Act, 1956 and the Chhattisgarh Municipalities Act, 1961; the Chhattisgarh Land Revenue Code, 1959; the Chhattisgarh Ground Water (Management and Regulation) Act, 2022; the Raipur Development Plan (Revised) 2021 and the Naya Raipur Development Plan-2031; the order of the General Administration Department of 31 May 2016 on rainwater harvesting in government buildings; the Wetlands (Conservation and Management) Rules, 2017; the Coal Mines Regulations, 2017 and the conditions of environmental clearances for mines and power stations; and the orders of the High Court of Chhattisgarh and the NGT on water bodies, rivers and sewage. This Manual follows them or, where disclosed, makes them stricter. No base or consolidated text of the Bhumi Vikas Niyam was found. Amendments of 17 December 2008, 17 February 2009, 6 October 2018 and 29 April 2020 and a draft of 31 March 2017 were read; others were read only in machine transcription, drafts of 12 September and 1 December 2025 and a reclassification of land uses in October 2026 were seen only in summaries, and none of them adds a rule on detention, drainage design or flood-prone land. The Municipal Acts were not read in their Chhattisgarh form, and the Land Revenue Code was read in a third-party copy. Every rule cited must be checked against the current text.
Why this Manual is needed
India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.
The national documents leave key values open, or give different answers.
- Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in Chhattisgarh can cite 1, 2, 5 or 25 years, depending on the code chosen.
- Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
- Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
- Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has no panel for any station in Chhattisgarh. The CWC reports that cover the State's cities date from 1987 (subzone 1(d)) to 1997 (3(d)); they take the 1-hour rain as 0.39 (3(d)), 0.37 (1(d)) and 0.32 (3(g) and 3(f)) of the 24-hour rain, which gives a 50-year hour of about 80–140 mm in the State's cities, while no hourly fall recorded on the self-recording gauges of those reports exceeds about 80 mm (79 mm at Kanker on 26 June 1974). At the other end their maps are exceeded at gauges: Raipur (Obsy) recorded 370.3 mm on 4 August 1910 where the map gives a 100-year day of about 320–360 mm, and Rajnandgaon 392.0 mm on 21 September 1965 against about 320 mm. The reanalysis grids of NIH-DHAARA give a 50-year hour of 59–85 mm, closer to the records, but err both ways on the day: 349 mm at Nava Raipur and 380 mm at Mahasamund, above the maps' 280–320 and 320–360 mm, and 217 mm at Bilaspur and 249 mm at Ambikapur, against about 200–240 and 280 mm.
Chhattisgarh has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of UADD, T&CP, WRD, RMC or any other Municipal Corporation that fixes a return period or a design rainfall for city storm drains. Raipur's AMRUT plan of 2015 records the failures of its drains but states no design basis, and the CAG's audit of AMRUT in the State, for the year ended March 2022, covers water supply, sewerage and parks and never mentions drains. The one exception is the new capital: the Naya Raipur Development Plan-2031 takes a 5-year intensity for its drain system, 100 years for any river embankment and road levels "at least 0.5 to 1.0 m above the observed high flood level", and follows IRC:SP:50 for road drainage. It is a plan for one city, not a State standard. This Manual is offered as a technical companion to the Bhumi Vikas Niyam, the Municipal Acts and the development plans: it supplies the design storm, detention, water-level and buffer values that they leave open. It has not been adopted by UADD, the Housing and Environment Department or any other body. In particular:
- The building rules require rainwater harvesting and a suitable site, but not detention. Rule 78(4) of the Bhumi Vikas Niyam requires rainwater harvesting by the recipes of Appendix ढ (N), which include a filter bed of fine stone and sand and, since 2009, an underground storage tank, with a penalty of up to ₹1,000 a year for every 100 m² of built-up area where the system is not built or kept. A Rajya Sabha answer of 2019 gave its threshold as plots of more than 500 m²; the amendment of 17 February 2009 substitutes the figures "500" and "300" in the rule without saying what they replace, and the rule itself was not read, so the threshold is not confirmed [TBC]. Government buildings with roofs of more than 1,500 sq ft (new) or 5,000 sq ft (existing) must harvest rainwater under an order of the General Administration Department of 31 May 2016. Rule 50 is the rule on unsuitable sites, which T&CP's report format of 2011 asks its officers to check. No rule requires on-site detention, limits peak runoff or sets "zero runoff", and the green-building draft of 2017, which would have required harvesting on plots from 100 m² and unpaved ground in open spaces, was not found in final form;
- The waterway line was never confirmed. In the 1984 rules as Madhya Pradesh published them, rule 50(b) bars building within 9 m of the highest water mark and, along a major watercourse, within 9 m of the average high flood mark or 15 m of its defined boundary, whichever is more. Rule 50 is still the Chhattisgarh rule on unsuitable sites, but whether Chhattisgarh kept those distances was not confirmed [TBC]. The inspection form of 2018 asks the distance from the plot to the nearest major nala "in compliance with" the Bhumi Vikas Niyam, and leaves the rule number blank. T&CP's checklist of 2011 asks, for land next to a nala, canal or river, for a no-objection of WRD or the Revenue Department and the "high flood point" from WRD; integrated townships may not be sited on the bank of a perennial river (2008); and the State's Act of 2002 on the regularisation of unauthorised development bars regularising a building on the bed or edge of a reservoir or on a natural drain;
- No floodplain is zoned. Chhattisgarh has no floodplain zoning law, no notified flood zone and no demarcation by WRD of the floodplain of any river. The only buffer enforced is the 50 m from the highest flood level of the Wetlands Rules, applied by the State Wetland Authority to talabs and wetlands of more than 2.25 ha; it does not reach the nalas, the rivers or the smaller talabs inside the cities. Apart from Naya Raipur's 100 years for embankments, no design return period was found for any river or nala corridor in the State. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); it does not replace any line that the State notifies or a court draws, and where such a line binds and is wider, it governs;
- Basements and plinths are inspected, but not for floods. The amendment of 2018 sets basements back 3 m or 6 m from the plot boundary (rule 73(3)(क)) and adds a plinth certificate (rule 96), whose form checks location, orientation and setbacks but no level. No minimum plinth height, flood bar on basements or level for the crest of a basement ramp was found in any amendment read; and
- No document sets the river or reservoir level for which an outfall is designed. Of the CWC sites in the State, warning and danger levels were found only for the Indravati at Jagdalpur; on the Kharun at Pathardihi, Raipur's river, only a highest flood level of 281.68 m (2020) was found; no source read states the datum of these levels; and the levels of the Mahanadi barrages and the reach of the Hirakud backwater inside the State were not found. Danger levels and highest flood levels are flood-warning levels and records, not design levels.
So each agency and each local body interprets the central manual its own way. RMC and the other Municipal Corporations, the Nagar Palika Parishads and Nagar Panchayats, RDA, NRDA, T&CP, the Town Services of the Bhilai Steel Plant, WRD, PHED, Smart City companies, the coal and power companies, road agencies, their consultants and funding agencies fill the gaps differently. Two drains on the same road, built by different agencies, can be sized for different storms from different rainfall sources. No rule divides natural nalas from municipal drains: in Raipur a nala is a storm drain, a sewer and a feeder to a treatment plant at once, and in Bhilai the plant's township and the Municipal Corporations each keep their own drains, which empty into the same nalas. And a reviewer has no common basis against which to check a design.
What this Manual does about it. It turns those open choices into one State standard:
- one source and method for design rainfall across the State, in three rainfall zones and six hydrologic sub-areas, with a checked station analysis to govern where one exists, no floor on short storms where the records show the CWC ratios overstate them, and a check of the design day against the largest reliable days recorded nearby, such as Raipur's 370.3 mm and Rajnandgaon's 392.0 mm (Chapter 2);
- named return periods for every drainage element (Chapters 2 and 6);
- a required pre- versus post-development rule for private sites (Chapter 4);
- a required tailwater check for outfalls to nalas, rivers, talabs and reservoirs, gated, flap-gated or free, against a design river or reservoir level, using CWC's levels rather than local gauges and allowing for releases from Gangrel, Bango and the barrages and for the Hirakud backwater (Chapter 5);
- a design flood line, and corridors and setbacks along rivers and nalas and around talabs and reservoirs, which no rule now sizes, proposed by this Manual for use with the inherited waterway line of rule 50, once confirmed, and the 50 m wetland buffer wherever those are wider (Chapter 7);
- recharge first where the water table is drawn down, as in Dharsiwa (Raipur) and Durg–Bhilai, with pre-treatment, but no infiltration devices on kanhar clay, a check for cavities in the limestone under Raipur, Durg and Rajnandgaon, none on mine-disturbed ground or ash ponds, checks for fluoride and arsenic, and treatment where drains carry sewage (Chapter 8);
- rules for runoff that meets a mine void, an overburden dump or an ash pond: a void is not a design outfall unless the mine's lessee and DGMS consent and its level and spill are surveyed, dumps and ash ponds are treated as land that sheds water and sediment fast, and the flow from a breached ash dyke is a hazard to be mapped, not a design inflow (Chapters 3, 5 and 8); and
- basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).
It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a development authority, NRDA or UADD can still adopt a stricter standard (Chapter 1).
Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Government of Chhattisgarh, Housing and Environment Department, amendments to the Chhattisgarh Bhumi Vikas Niyam, 1984: No. एफ 7-26/32/2008 of 17 December 2008 (Appendix ण), No. 318/1193/32/2006 of 17 February 2009 (Gazette p. 124(10), items 25–28), draft No. F 7-15/2016/32 of 30 March 2017 (rules 79-C to 79-G), No. F 7-27/2017/32 of 6 October 2018 (rules 73(3)(क) and 96, Appendices Q, Q1 and Q2) and No. F 07-24/2019/32 of 29 April 2020, from archived copies of the T&CP website; other amendments of 2010–2023 (machine transcription only) and the drafts RULE/170/2025-HOUSING of 12 September and 1 December 2025 and the land-use amendment of October 2026 (summaries only); Madhya Pradesh Bhumi Vikas Rules, 1984, rules 17, 50, 51 and 78 (third-party copy of the Madhya Pradesh text); Rajya Sabha answer of 8 July 2019 on rainwater harvesting (as summarised); Housing and Environment Department letter No. 2940/1445/32/2009 of 23 November 2009; General Administration Department order No. F 9-22/2016/1/5 of 31 May 2016; T&CP Directorate checklist No. 1569/स्टेनो/नग्रानि./2011, Appendix 01, item 15, and letter No. 1680/TCR-2/नग्रानि./2011 of 23 June 2011; Housing and Environment Department order No. F 7-35/2012/32 of 2 January 2013; the Chhattisgarh Act of 2002 on the regularisation of unauthorised development (CG Rajpatra, 26 April 2002), s.7(1); Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973, ss.19, 24, 27–28, 30, 64–69 and 85; Chhattisgarh Land Revenue Code, 1959, ss.237, 248 and 251 (third-party copy); Chhattisgarh Ground Water (Management and Regulation) Act, 2022; notification No. 706/2286/32/2007 of 5 April 2008 (approval of the Raipur Development Plan (Revised) 2021), first page only; notification No. F 7-3/2014/32 of 10 February 2014 (Arpa Special Area Development Plan 2033) and letter No. F 07-02/2019/32 of 14 February 2019; NRANVP letter No. 4808/5(1)/BPS/NRANVP/2022 of 21 June 2022, forwarding notification No. 4066 of 23 May 2022; NRDA, Naya Raipur Development Plan-2031 (2008), Chapters 1–3, 7–9 and 10–12, §10.3 and Fig. 10.1; Raipur Municipal Corporation, Sector-wise SLIP template: Storm Water Drainage (AMRUT, 4 November 2015); CAG, Audit Report (Performance and Compliance Audit) for the year ended 31 March 2022, Government of Chhattisgarh, Chapter II (AMRUT); CECB report in NGT O.A. 593/2017, with the monthly progress report of January 2021 in O.A. 673/2018; NGT (Central Zone), O.A. 78/2024, order of 14 November 2024 and the Collector's action-taken report; reports of the NGT order of 16 January 2026 on Durg's nalas and of High Court orders on the Arpa (2025) and on the rivers (2026); Ramsar Information Sheet, site 2583, Kopra Jalashay; CWC, Flood Estimation Reports for Mahanadi subzone 3(d) (M-3(d)/R-3/25/1996), Indravati subzone 3(g) (I/21/1992), Lower Godavari subzone 3(f) (LG-3(f)/R-2/24/1995) and Sone subzone 1(d) (S/15/1987), plates read by eye; CWC, National Register of Large Dams (2009); CWC flood advisories (2019, 2020) and highest flood levels as transcribed by SANDRP (2020–2026); WRD, Daily Tank Gauge Report of 10 October 2024; IMD, Climate of Chhattisgarh (Climatological Summaries of States Series No. 22, 2015); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Pai et al. (2020), new normal dates of onset and withdrawal of the south-west monsoon, Table 2; IMD Meteorological Centre Raipur, monsoon reports 2020, 2023 and 2024; Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (accessed 7 November 2026); CGWB, Dynamic Ground Water Resources of Chhattisgarh 2024 and factsheet (December 2024); CGWB district brochures for Raipur, Durg and Rajnandgaon; Mandal et al. (2018) and Ranjan and Singh (2018), Journal of Pharmacognosy and Phytochemistry 7(4); Singh et al. (2023), Environment, Development and Sustainability (as summarised); reports of the floods of 2020, 2024, 2025 and 2026, of the dam releases at Gangrel and Bango, of the ash-dyke breaches at Korba (2024–2026), of the State Wetland Authority's actions at Raipur and Nava Raipur (2025), of Raipur's ponds and of the sewage reaching the Kharun (press and secondary sources).
How to use this Manual
Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.
Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.
Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.
Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.
Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.
Where to start.
| If you are… | Read first |
|---|---|
| A developer or architect | Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit) |
| A design engineer | Chapters 2–6, then 8 and 9 |
| A local body or approving authority | Chapters 1, 10 and 11 |
| A planner or waterbody manager | Chapters 7 and 11 |
Contents
List of tables
List of figures
Abbreviations
| Abbreviation | Meaning |
|---|---|
| AEP | Annual exceedance probability |
| AMC | Antecedent moisture condition |
| AMRUT | Atal Mission for Rejuvenation and Urban Transformation |
| APWA | American Public Works Association |
| ARF | Areal reduction factor |
| AWS | Automatic weather station |
| BALCO | Bharat Aluminium Company Limited, Korba |
| BOD | Biochemical oxygen demand |
| BSMP | Basin Stormwater Master Plan |
| BSP | Bhilai Steel Plant, of the Steel Authority of India (SAIL) |
| CAG | Comptroller and Auditor General of India |
| CECB | Chhattisgarh Environment Conservation Board |
| CGBVN 1984 | The Chhattisgarh Bhumi Vikas Niyam, 1984, as amended |
| CGSDMA | Chhattisgarh State Disaster Management Authority |
| CGWA | Central Ground Water Authority |
| CGWB | Central Ground Water Board |
| CN | Curve number (SCS/NRCS method) |
| CPCB | Central Pollution Control Board |
| CPHEEO | Central Public Health and Environmental Engineering Organisation |
| CSE | Centre for Science and Environment |
| CSPGCL | Chhattisgarh State Power Generation Company Limited |
| CWC | Central Water Commission |
| DGMS | Directorate General of Mines Safety |
| DPR | Detailed project report |
| DWF | Dry-weather flow |
| EC | Environmental clearance (of a mine, power station or project) |
| EIA | Environmental impact assessment |
| ESC | Erosion and sediment control |
| FAR | Floor area ratio |
| FER | Flood Estimation Report (CWC) |
| FRL / FTL / MWL | Full reservoir level / full tank level / maximum water level |
| GAD | General Administration Department, Chhattisgarh |
| HAT / MHWS | Highest astronomical tide / mean high water springs (coastal terms; not applicable in Chhattisgarh) |
| HFL | High flood level (the highest level recorded at a gauge) |
| HGL | Hydraulic grade line |
| HSG | Hydrologic soil group |
| IDF | Intensity–duration–frequency |
| IGKV | Indira Gandhi Krishi Vishwavidyalaya, Raipur |
| IMD | India Meteorological Department |
| IRC | Indian Roads Congress |
| MLD | Million litres a day |
| MoEF&CC | Ministry of Environment, Forest and Climate Change |
| MoHUA | Ministry of Housing and Urban Affairs |
| NDMA | National Disaster Management Authority |
| NGT | National Green Tribunal (NGT CZ: its Central Zone bench, Bhopal) |
| NIH | National Institute of Hydrology, Roorkee |
| NOC | No-objection certificate |
| NRANVP | Nava Raipur Atal Nagar Vikas Pradhikaran (the present name of NRDA) |
| NRDA | Naya Raipur Development Authority, now NRANVP |
| NTPC | NTPC Limited (formerly National Thermal Power Corporation) |
| OB | Overburden (the rock and soil removed to reach coal) |
| PHED | Public Health Engineering Department, Chhattisgarh |
| PSD | Permissible site discharge |
| RDA | Raipur Development Authority |
| RMC | Raipur Municipal Corporation |
| RRV | Required retention volume |
| RWH | Rainwater harvesting |
| SADA | Special area development authority (under the 1973 Adhiniyam) |
| SANDRP | South Asia Network on Dams, Rivers and People |
| SECL | South Eastern Coalfields Limited, a subsidiary of Coal India |
| SLA | Sea-level allowance (coastal term; not applicable in Chhattisgarh) |
| SLIP | Service level improvement plan (AMRUT) |
| SoI | Survey of India |
| SRRG | Self-recording rain gauge |
| STP | Sewage treatment plant |
| SUDA | State Urban Development Agency, Chhattisgarh |
| SUH | Synthetic unit hydrograph (CWC) |
| SW monsoon / JJAS | South-west monsoon, June–September |
| SWD | Storm water drain |
| T&CP | Directorate of Town and Country Planning, Chhattisgarh |
| UADD | Urban Administration and Development Department, Chhattisgarh |
| ULB | Urban local body (a Municipal Corporation, Nagar Palika Parishad or Nagar Panchayat) |
| UTM | Universal Transverse Mercator |
| WL / DL | Warning level / danger level (CWC) |
| WQv | Water quality volume |
| WRD | Water Resources Department, Chhattisgarh |
| WSUD | Water-sensitive urban design |