Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Chhattisgarh. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration south-west monsoon storms of July–September, brought by depressions and lows from the Bay of Bengal, which fall on kanhar and dorsa paddy land already saturated and puddled, on talabs and reservoirs at their full levels and often on rivers raised by releases from Gangrel, Minimata Bango and the barrages upstream, as well as for short-duration intensities;
  • (d) to design outfalls for the stage of the rivers into which the towns drain, the Kharun at Raipur, the Seonath at Durg, the Arpa at Bilaspur, the Hasdeo at Korba, the Kelo and the Mahanadi at Raigarh and the Indravati at Jagdalpur, raised by the releases of Gangrel, Minimata Bango, the Hasdeo barrage at Darri and the barrages above the towns; the backwater of the Hirakud reservoir on the low outfalls of Raigarh and Sarangarh; and the levels of the talabs, reservoirs, nalas and mine voids into which local drains discharge, including the case where the outfall is closed;
  • (e) to protect tanks (talabs), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the land development rules made by the State Government under section 85(1) read with section 24(3) of the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973 (the Chhattisgarh Bhumi Vikas Niyam 1984), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Chhattisgarh's floods come from three sources, often together. The first is the heavy storm of a Bay of Bengal depression. Raipur recorded 370.3 mm on 4 August 1910, its highest day and the highest of any IMD observatory in the State, while Kurud recorded 381.0 mm and Arang 318.0 mm on the same day; Raipur recorded 297.0 mm on 30 June 2007, when more than 6,000 people were moved from its low-lying areas (IMD; as reported); and records of 337.0 mm at Durg (15 June 2004), 358.0 mm at Korba (12 August 2004) and 365.0 mm at Jashpurnagar (30 June 2001) have been set since the CWC isopluvial plates were drawn (IMD). In July 2026 Bilaspur was flooded by a fall reported as 28 cm in 24 hours, which another report gives as 415.6 mm; the conflict is not resolved (as reported). The second is the rivers and the dams and barrages on them. On 28–29 August 2020 the Kharun at Pathardihi, below Raipur, rose to 281.68 m, 2.47 m above the 279.21 m of 1994 quoted as its previous highest level, and the Mahanadi at Kalma and Surajgarh and the Mand at Kurubhata set new highest levels (CWC data as transcribed by SANDRP), while 11,942 houses were reported damaged in the State (as reported). In August 2025 floods in the Bastar division killed eight people (as reported). On 24–27 September 2026 all 14 gates of Gangrel were open, the Kharun overflowed at Mahadev Ghat in Raipur, the Indravati at Jagdalpur rose to 544.891 m, above its highest level of 1973, and eight people died and thousands were rescued across the State (as reported; the reported numbers differ). The Hasdeo at Korba rises with the releases of Minimata Bango and Darri, which flooded parts of the town in August 2024, and the low outfalls of Raigarh and Sarangarh lie within the backwater of the Hirakud reservoir (as reported). The third is the city drainage that fails in a fall that is not extreme. RMC recorded in 2015 that its drains covered 49% of the city, that "most of the drains are overflowed" in the rains and that 11 road stretches flooded two or three times a year (RMC, AMRUT plan), and in July 2026 colonies, underpasses and the railway station of Raipur were waterlogged in a storm for which no rainfall was reported (as reported).

Missing design makes all three worse. The only design storm found for a town's drains in the State is the 5-year intensity of the Naya Raipur Development Plan-2031; RMC's plan for ₹1,191 crore of storm-drain works states no return period, and the CAG's audit of AMRUT in the State, which funded water supply, sewerage and parks in nine Municipal Corporations, does not mention drains at all (CAG, year ended March 2022). The CGBVN 1984 control rainwater harvesting systems, not runoff. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Chhattisgarh Bhumi Vikas Niyam 1984 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Chhattisgarh, the top layer has a particular meaning. Much of the State's flood storage lies in its talabs, dabris (small dug ponds) and bandhas, in the bunded paddy fields of the plain, and in the reservoirs and barrage ponds on its rivers. Raipur was a city of tanks: it is reported to have had about 130 ponds, of which some 37–40 remain, over about 69 ha, most of them silted and polluted (as reported). Nava Raipur Atal Nagar was planned on a network of some 55 lakes and reservoirs, among them Sendh, Jhanjh and Khandawa, with its four major streams to be preserved and its parks acting as "storm water carriers" to the lakes (NRDA, Naya Raipur Development Plan-2031; as reported). Kopra Jalashay near Bilaspur, a 210 ha reservoir built in 1993, became the State's first Ramsar site, designated on 8 August 2025 and announced in December 2025 (Ramsar Information Sheet; as reported). The law protects some of this storage. Village tanks over which the community exercised rights of irrigation or nistar vest in the State (Chhattisgarh Land Revenue Code, 1959, s.251), and encroachment on ponds recorded in the revenue record is proceeded against as unauthorised occupation (s.248), as at Baloda after an order of the NGT (O.A. 78/2024); the Chhattisgarh Act of 2002 on the regularisation of unauthorised development bars the regularisation of construction on the bed or edge of a reservoir or on a natural drain (s.7(1)(चार)); the inherited text of the CGBVN 1984 bars a building within 9 m of the highest water mark of a water body and within 9 m of the average high flood mark or 15 m of the boundary of a major watercourse (Rule 50(b)), a distance whose Chhattisgarh text is to be confirmed [TBC]; and the State Wetland Authority has applied the bar of the Wetlands Rules 2017 on works within 50 m of the highest flood level to Raipur's talabs and to the Jhanjh wetland (as reported). The Municipal Corporation Act 1956, in its Madhya Pradesh text, vests public tanks, streams and drains in the Corporation and forbids any other use of a vested tank (s.82); its Chhattisgarh text was not read [TBC]. No floodplain zoning law protects the rivers. Losing that storage cannot be offset economically by pipes and pumps.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Chhattisgarh through:

  • (a) an amendment to the Chhattisgarh Bhumi Vikas Niyam 1984 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. In Chhattisgarh the building rules are still the Bhumi Vikas Niyam of 1984 that the State inherited from Madhya Pradesh in 2000, retitled the Chhattisgarh Bhumi Vikas Niyam 1984 and amended since by the Housing and Environment Department, under section 85(1) read with section 24(3) of the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam 1973; unlike Madhya Pradesh, which replaced its 1984 rules in 2012, Chhattisgarh has not made new rules. Neither the base text nor a consolidated text of the Niyam was found, so the Chhattisgarh text of Rules 2 (definitions), 50, 51, 73 and 78(4) was not read [TBC]; this Manual cites the amendments it read. The amendment of 17 December 2008 (No. एफ 7-26/32/2008) provides for integrated townships, makes a sewage treatment plant and rainwater harvesting compulsory in them and bars them beside a perennial river (Rule 94-क and Appendix ण); that of 17 February 2009 (No. 318/1193/32/2006) substitutes the figures "500" and "300" in Rule 78(4), the rainwater harvesting rule, without saying which figures they replace, adds a penalty of up to ₹1,000 a year for every 100 m² of built-up area where the system is not built and maintained, and adds a storage tank to the systems of Appendix ढ (N); that of 6 October 2018 (No. F 7-27/2017/32) sets basement setbacks of 3 m and 6 m from the plot boundary (Rule 73(3)(क)), introduces a plinth certificate (Rule 96), and adds a site-inspection form that asks whether a major nala adjoins the plot and at what distance, under a rule whose number the Gazette leaves blank; and that of 29 April 2020 (No. F 07-24/2019/32) has no water, drainage, basement or rainwater content. Drafts of September and December 2025 and a reclassification of land uses in October 2026 are reported, none of them on drainage (as reported). Rule 50 is still the Chhattisgarh rule on the unsuitability of a site, as the Directorate of Town and Country Planning's report format of 2011 shows; in the inherited 1984 text it bars a building within 9 m of the highest water mark and, for a major watercourse, within 9 m of the average high flood mark or 15 m of its defined boundary, whichever is more, and on a site that is not properly drained (Rule 50(b) and (f)), but whether the Chhattisgarh text keeps those distances is to be confirmed [TBC]. The rules set no design storm, return period, release rate or detention volume, and no "zero runoff" rule. The route of Clause 1.3.1(a) therefore runs through the State Government, which would amend the Niyam under section 85 of the Adhiniyam. This Manual is a draft; neither the Government nor any authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the Directorate of Town and Country Planning, or an officer authorised by it, which grants permission for the development of land in a planning area under the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973; the Municipal Corporation, Nagar Palika Parishad or Nagar Panchayat that grants building permission under the CGBVN 1984; NRDA, the Special Area Development Authority of Nava Raipur Atal Nagar, in its special area; or RDA or another authority constituted under the 1973 Adhiniyam in its scheme area, where it grants such permission (the division of these powers, and the bodies that grant permission outside planning areas, are to be confirmed [TBC]), or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the Chhattisgarh Bhumi Vikas Niyam 1984 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The catchments of the nalas and drains of Raipur and Birgaon that discharge to the Kharun, with the talabs on them and the low-lying colonies that drain to them; the land of Bilaspur that drains to the Arpa below the Arpa Bhaisajhar barrage; the land of Durg, Bhilai, Bhilai-Charoda and Risali that drains to the Seonath (Shivnath) through the Shankar and Pulgaon nalas and the other nalas of the twin cities; the land of Korba that drains to the Hasdeo below the Minimata Bango dam and the Hasdeo barrage at Darri; the land of Raigarh and Sarangarh that drains to the Kelo, the Mand or the Mahanadi within reach of the backwater of the Hirakud reservoir; and the land of Jagdalpur that drains to the Indravati, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (talab), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the Chhattisgarh Bhumi Vikas Niyam 1984 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Chhattisgarh Gazette (Rajpatra).

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the Chhattisgarh Bhumi Vikas Niyam 1984;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Chhattisgarh, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply under Rule 78(4) of the CGBVN 1984, as amended on 17 February 2009, to buildings on plots above a threshold reported as 500 m² (the Chhattisgarh text of the rule was not read, and the amendment substitutes the figures "500" and "300" [TBC]), by the systems of Appendix ढ (N), with a penalty of up to ₹1,000 a year for every 100 m² of built-up area where the system is not built and maintained; and, under the General Administration Department order of 31 May 2016, to government buildings with roofs of more than 1,500 sq ft (new) or 5,000 sq ft (existing), as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Chhattisgarh plots are small and the cumulative effect of many small plots is what fills Raipur's drains. For small buildings in Chhattisgarh, Rule 78(4) of the CGBVN 1984 requires rainwater harvesting on plots above a threshold reported as 500 m² (Rajya Sabha answer of 8 July 2019); the amendment of 17 February 2009 substitutes the figures "500" and "300" in the rule without saying what they replace, so the threshold is to be confirmed from the Chhattisgarh text [TBC]. The systems are fixed recipes in Appendix ढ (N), among them a filter bed of fine stone and fine sand (ढ-2) and an underground storage tank whose water is used in the house and garden (ढ-4); none is sized to a runoff volume, and none limits what leaves the plot. Plots below the threshold have no rule at all. On the kanhar soils of the plain, pits that take water while the clay is cracked in June stand full once the cracks have closed. The plinth certificate introduced in 2018 (Rule 96 and Appendix Q1) checks the location, setbacks and deviations of a building, but has no item for its plinth level or for drainage, and a draft of 2017 that would have required rainwater harvesting on plots above 100 m² and kept 20% of recreational open space unpaved was not found in final form [TBC]. Clause 1.5.4(b) applies to every building whatever its size for this reason.

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) Raipur Municipal Corporation (RMC);
  • (b) every Approving Authority within the planning area of Raipur under the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973, as that area is notified from time to time, including the Directorate of Town and Country Planning where it grants development permission, RDA in its scheme areas, and the Municipal Corporations, Nagar Palika Parishads and Nagar Panchayats in that area; and NRDA, the Special Area Development Authority of Nava Raipur Atal Nagar, in its special area; and
  • (c) every other Municipal Corporation (Nagar Palik Nigam) constituted under the Municipal Corporation Act, 1956 as adapted in Chhattisgarh, as constituted from time to time, among them Bilaspur, Durg, Bhilai, Bhilai-Charoda, Risali, Birgaon, Rajnandgaon, Korba, Raigarh, Jagdalpur, Ambikapur, Dhamtari and Chirmiri, and the Directorate of Town and Country Planning and every development authority constituted under the 1973 Adhiniyam where it grants development permission within the planning area of a Municipal Corporation.

1.6.2 Tier B authorities. All other Nagar Palika Parishads and Nagar Panchayats are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with T&CP regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the planning area of Raipur under the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973, or the special area of Nava Raipur Atal Nagar, or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Raipur Municipal Corporation, with its engineering wing and a city whose nalas, talabs and some 480 km of pucca drains discharge to the Kharun, and a small Nagar Panchayat with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Raipur.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
Chhattisgarh Bhumi Vikas Niyam, 1984, as amended (the rules of 1984 inherited from Madhya Pradesh in 2000; amendments read: No. एफ 7-26/32/2008 of 17 December 2008, No. 318/1193/32/2006 of 17 February 2009, No. F 7-27/2017/32 of 6 October 2018 and No. F 07-24/2019/32 of 29 April 2020; base and consolidated text not read [TBC]) Continue. Rule 50 is the rule on the unsuitability of a site, which the Directorate of Town and Country Planning applies in its site reports (letter No. 1680/TCR-2/नग्रानि./2011 of 23 June 2011); in the inherited 1984 text it bars a building within 9 m of the highest water mark and, for a major watercourse, within 9 m of the average high flood mark or 15 m of its defined boundary, whichever is more, and on a site not properly drained or incapable of being well drained (Rule 50(b) and (f)), and Rule 51 requires surface water drains in the curtilage where the Authority so requires; whether the Chhattisgarh text keeps these words and distances is to be confirmed [TBC]. The amendment of 2018 adds a site-inspection form that records the distance of a major nala from the plot under a rule whose number the Gazette leaves blank, a completion form that asks whether rainwater harvesting has been installed and the drainage line connected, a plinth certificate (Rule 96) with no level item, and basement setbacks of 3 m and 6 m (Rule 73(3)(क)); integrated townships must have a sewage treatment plant and rainwater harvesting, may not be laid out beside a perennial river, and do not count water sources in their area (Appendix ण, 2008, and its amendments). The Niyam define no water body, watercourse, nala or highest flood level in any amendment read, and set no design storm, release rate or detention volume. The distances of Rule 50 are the only metre values found for water; the design criteria of Chapters 2–6 and the hydraulic corridor and setbacks of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the Niyam, a development plan or a statute are stricter, they govern (Clause 1.3.3).
Rainwater harvesting: CGBVN 1984, Rule 78(4) and Appendix ढ (N); General Administration Department order No. F 9-22/2016/1/5 of 31 May 2016; Chhattisgarh Ground Water (Management and Regulation) Act, 2022 Continue unchanged. Rule 78(4), as amended on 17 February 2009, makes rainwater harvesting compulsory on plots above a threshold reported as 500 m² (Rajya Sabha answer of 8 July 2019; the amendment substitutes the figures "500" and "300" [TBC]), by the systems of Appendix ढ, with a penalty of up to ₹1,000 a year for every 100 m² of built-up area where the system is not built and maintained. The General Administration Department requires rainwater harvesting on government and public-sector buildings with roofs of more than 1,500 sq ft (new) and 5,000 sq ft (existing), and the Naya Raipur Development Plan-2031 makes it mandatory for every development there. The Ground Water Act of 2022 would let the State enforce rainwater harvesting and recharge in notified over-exploited and critical blocks and stressed urban areas (s.7), but it comes into force only on a date notified by the State, and no such notification, and no notified area, was found [TBC]; five blocks were critical in 2024, among them Dharsiwa in Raipur district (CGWB). None of these gives an outlet rule or a storage that is empty when a storm arrives. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). Recharge structures may count toward retention only where they meet Chapters 4 and 8, which give recharge priority in the critical and semi-critical urban blocks, with pre-treatment, a cavity check in the karstified limestone of the Raipur–Durg–Rajnandgaon belt and fluoride and arsenic checks where the groundwater carries them, and allow no infiltration credit on kanhar, on mine-disturbed ground or on ash ponds.
Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973 (No. 23 of 1973) and the Chhattisgarh Nagar Tatha Gram Nivesh Niyam, 1975 The Adhiniyam provides for development plans (s.19), for Special Area Development Authorities (ss.64–69) and for the concurrence of the Directorate of Town and Country Planning before State departments and local authorities build or develop land (ss.27 and 28, as a Housing and Environment Department letter of 23 November 2009 reminded every department), and it is the parent Act of the CGBVN 1984; its sections were read only as cited in notifications and letters [TBC]. Raipur is planned under its Development Plan (Revised) 2021, approved on 5 April 2008, and a draft plan for 2031 was discussed in 2022 but its approval was not found [TBC]; NRDA, the Special Area Development Authority of Nava Raipur Atal Nagar, exercises the Adhiniyam's powers there (notification No. 4066 of 23 May 2022). The Directorate's checklist of 2011 asks, for land next to a nala, canal, river or watercourse, for the no-objection of WRD or the Revenue Department and for the high flood point from WRD (No. 1569/स्टेनो/नग्रानि./2011), the only flood-level requirement found in the planning process. This Manual does not decide zoning; the drain reserves and regional facility sites of Chapters 4 and 7 are meant to be shown in the development plans, and its checks are meant to be made at the Directorate's site report and checklist.
Chhattisgarh Act on the regularisation of unauthorised development, 2002, s.7(1)(चार) Continues. No unauthorised development may be regularised where it stands on the bed or the edge of a reservoir or on a natural drain (CG Rajpatra, 26 April 2002); whether the later Acts and Rules of regularisation keep this bar is to be confirmed [TBC]. Chapter 7 relies on it to keep drain and tank reserves out of regularisation.
Municipal Corporation Act, 1956 and Municipalities Act, 1961, as adapted in Chhattisgarh (the Chhattisgarh Nagar Palik Nigam Adhiniyam and Nagar Palika Adhiniyam) Continue. Their Chhattisgarh texts were not read for this Manual [TBC]. In their Madhya Pradesh form, from which they were adapted, drains, sewers and culverts are among the Corporation's duties; public tanks, streams, drains and watercourses vest in the Corporation, and a vested tank shall not be used for any other purpose (s.82); no building may be erected over a drain vested in the Corporation without permission (s.198); and the Commissioner may require separate drains for sewage and for rain water (s.204). Whether the Chhattisgarh Acts keep these sections and numbers is to be confirmed [TBC]. A memo of RMC of 2011 cites the colonisers' rules made under them for the sewage treatment, rainwater harvesting and waste arrangements of new colonies (read from a poor scan [TBC]). This Manual does not change those powers; Chapter 7 treats tanks as drainage assets.
Chhattisgarh Land Revenue Code, 1959, ss.248 and 251 Continue. Tanks on unoccupied land over which the village community exercised rights of irrigation or nistar vest in the State from 6 April 1959 (s.251), and unauthorised occupation of land, including a pond recorded in the revenue record, is met by eviction and penalty (s.248), as at Baloda in Janjgir-Champa district after the NGT directed the Collector to remove encroachments (O.A. 78/2024, order of 14 November 2024). Chapter 7 relies on these sections, and on the land records of the tehsil, for the recorded extent of village talabs.
Wetlands (Conservation and Management) Rules, 2017; the Chhattisgarh State Wetland Authority; Kopra Jalashay, Ramsar Site No. 2583 Continue. The Rules bar construction of a permanent nature within 50 m of the mean high flood level of a notified wetland. The State Wetland Authority, whose reconstitution is reported as by an order of 17 December 2021 [TBC], has applied that bar, with the Supreme Court's rulings on wetlands of more than 2.25 ha, to halt works at the Karbala Talab in Raipur in September 2025, to order a probe at the Narhaiya Talab and to direct NRDA in March 2025 to withdraw tenders beside the Jhanjh wetland (as reported); no list of notified wetlands was found [TBC]. Kopra Jalashay (210 ha), managed by WRD, was designated a Ramsar site on 8 August 2025. Where a notification or an order is wider than the setback of Chapter 7, it governs (Clause 1.3.3).
Orders of the National Green Tribunal (Central Zone) and the High Court of Chhattisgarh on ponds and rivers Apply where they bind. The NGT has directed the removal of encroachments from the ponds of Baloda (O.A. 78/2024) and, in January 2026, the completion within six months of Durg's treatment plants on the Shankar and Pulgaon nalas, which carry the city's sewage to the Seonath (as reported). The High Court has heard the pollution of the Arpa at Bilaspur (2025) and of the Kharun, the Seonath and the Arpa (May 2026), and its orders of 22 January 2019 (W.P.(C) 25/2016 and 2696/2016) led the State to stop requiring the permission of the Arpa special-area authority for land in its area (Housing and Environment Department letter of 14 February 2019). No floodplain zoning law or order, and no demarcation of a floodplain by WRD, was found [TBC]. Where the 1% AEP extent of Chapter 7 is mapped and wider, it governs.
Naya Raipur Development Plan-2031 (NRDA, preface of 17 June 2008) Continues for Nava Raipur Atal Nagar. It takes "5 years Maximum rainfall intensity" for the design of the drain system, asks that any river embankment be safe against a 100-year flood and that roads be kept 0.5–1.0 m above the observed high flood level, applies IRC:SP:50 to road drainage, preserves the four major streams of the area and makes rainwater harvesting mandatory for every development (§10.3 and Chapters 7–9). It is a city plan, not a State standard. Where this Manual is stricter, as in the return periods of Table 2.1, this Manual applies under Clause 1.3.3; where the plan is stricter, as in its road levels above the high flood level, the plan applies.
Mining and power: the environmental clearances of coal mines and power plants; Coal Mines Regulations, 2017; the Directorate General of Mines Safety (DGMS) Continue; they govern the leasehold and the plant, not the town. Coal-mine clearances require garland drains, settling ponds and no alteration of major water channels, and the Coal Mines Regulations are reported to govern the danger of surface water entering a mine (reg. 149, as reported; Gazette text not read [TBC]). The ash dykes of the power plants at Korba have breached several times in 2024–2026, the slurry reaching paddy land, a nala and the Hasdeo (as reported). No mine void, pit lake or ash pond is an outfall or a storage of this Manual without the consent of its operator and, for a mine, DGMS (Chapter 5).
Disaster Management Act, 2005; CGSDMA; the district flood control rooms Continue. CGSDMA is reported to have been constituted in 2007; no State disaster management plan, urban flood plan or SOP of it was found [TBC]. Chapter 10 links its pre-monsoon checks to the dates of the monsoon in the State.
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Chhattisgarh is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July to September monsoon depression from the Bay of Bengal arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

Chhattisgarh is beginning to spend on its city drains and nalas. RMC's plan under AMRUT proposed ₹1,191 crore of storm-drain works in 2015 to raise drain coverage from 49% (RMC); Raipur's Smart City company is reported to have proposed about ₹150 crore for "smart drainage" in 2019; and Raipur is reported to have been allotted about ₹222 crore under Phase II of the NDMA's Urban Flood Risk Management Programme in October 2025, for storm-drain improvement, rainwater harvesting and waterbody works and early warning (as reported). Much of the money for the nalas has gone to sewage: the treatment plants of Raipur at Chandanidih, Kara and Nimora intercept the city's nalas with diversion weirs, and in January 2021 Bilaspur was the only town of the State with a sewerage system (CECB report to the NGT). None of the storm-drainage works found has a published design return period, and AMRUT in the State funded none (CAG). No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.

The State's law already holds many of the tools. It treats the unsuitability of a site as a question for every development permission (Rule 50 of the CGBVN 1984), asks for WRD's high flood point for land next to a nala or river (the Directorate's checklist of 2011), records the distance of a major nala at the site inspection (2018), vests village tanks in the State and evicts encroachers on recorded ponds (Land Revenue Code, ss.251 and 248), bars the regularisation of construction on a reservoir bed or a natural drain (Act of 2002, s.7(1)(चार)), and, through the State Wetland Authority, keeps works 50 m back from the highest flood level of a wetland. What it lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how the highest water level of a nala or a talab is to be fixed, or how much storage a filled talab or a paved plot removes; the distances of Rule 50 are, as far as could be found, the inherited 9 m and 15 m, whose Chhattisgarh text has not been confirmed [TBC]. This Manual's checks are framed as part of the development permission of the Directorate of Town and Country Planning, the special-area permission of NRDA and the building and colony permissions of the local bodies, not as a separate NOC. This Manual is offered as a technical companion to these instruments, to the orders of the NGT and the High Court on the ponds and rivers and to the drainage works of the Municipal Corporations: it supplies the design storm, detention and buffer numbers they do not set, as a proposal for the Government and the authorities to consider. Neither the Urban Administration and Development Department, the Housing and Environment Department nor any other body has adopted it.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Urban Administration and Development Department (UADD) Oversees the urban local bodies and is the State's nodal department for AMRUT. Would issue the model ULB bye-law of Clause 1.3.1(b), apply this Manual to the drainage works of the Municipal Corporations and other local bodies that it funds, and, with T&CP, give regional support to Tier B authorities (Table 1.1) and maintain the empanelled reviewer list (Clause 10.7).
Housing and Environment Department Makes the amendments to the CGBVN 1984 under section 85 of the 1973 Adhiniyam, approves development plans and oversees the Directorate of Town and Country Planning and the Special Area Development Authorities. Would prepare the amendment of Clause 1.3.1(a) for the State Government.
State Stormwater Technical Committee (Clause 1.3.2) Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12).
Directorate of Town and Country Planning (T&CP) Prepares development plans under the 1973 Adhiniyam and grants development permission in planning areas through its regional offices at Raipur, Bilaspur, Durg, Korba, Jagdalpur, Rajnandgaon, Dhamtari, Raigarh and Ambikapur; its site reports ask whether a site is unsuitable under Rule 50 and its checklist asks for WRD's high flood point for land next to a nala or river; it concurs in the works of State departments and local authorities (ss.27 and 28). Would show flood-sensitive catchments, drain reserves and regional facility sites in development plans, and require the drainage report of Chapter 10 with each layout.
Raipur Municipal Corporation (RMC) and the other Municipal Corporations (Bilaspur, Durg, Bhilai, Bhilai-Charoda, Risali, Birgaon, Rajnandgaon, Korba, Raigarh, Jagdalpur, Ambikapur, Dhamtari and Chirmiri); Nagar Palika Parishads and Nagar Panchayats Hold the public drains, nalas and tanks of their areas under the Municipal Corporation Act 1956 and the Municipalities Act 1961 as adapted (Chhattisgarh texts not read [TBC]), clean and maintain them, and grant building permission under the CGBVN 1984; RMC prepared the city's storm-drain plan under AMRUT (2015). Would apply this Manual to their works, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15).
Raipur Development Authority (RDA) and the other development authorities Develop schemes and colonies in their scheme areas; RDA's constitution and its drainage functions were not verified for this Manual [TBC]. Would apply this Manual to their schemes and hand over drains and storage to the local body under Clause 10.14.
NRDA (Nava Raipur Atal Nagar Vikas Pradhikaran), the Special Area Development Authority of Nava Raipur Atal Nagar Exercises the powers of a Special Area Development Authority under the 1973 Adhiniyam (notification No. 4066 of 23 May 2022); planned the new capital's roads, drains, streams and network of lakes and reservoirs under the Naya Raipur Development Plan-2031, which sets a 5-year design intensity for its drains. Would apply this Manual to its works and permissions, treat its lakes, among them Jhanjh, as protected waterbodies under Chapter 7, and hand over drains to the body that maintains them under Clause 10.14.
Arpa special-area authority, Bilaspur Constituted for the Arpa riverfront, with a development plan approved in 2014; since 2019 its permission is no longer needed for the sale, construction or development of land in its area (Housing and Environment Department letter of 14 February 2019), and its present role is not known [TBC]. No duty is assigned to it under this Manual.
Chhattisgarh Housing Board Builds housing schemes and colonies; its drainage practice was not researched for this Manual [TBC]. Would apply this Manual to its schemes and hand over drains and storage under Clause 10.14.
Bhilai Steel Plant (SAIL), Town Services Maintains the drains of the steel plant's township at Bhilai, outside the regime of the Bhilai Municipal Corporation, which warned it over uncleaned township drains in July 2025 (as reported); the formal division of drains between the plant and the Corporations was not found [TBC]. Would apply this Manual to the township's drains and outfalls.
WRD Holds the rivers, dams, reservoirs, barrages and canals of the State and their gates, among them Gangrel, Minimata Bango, the Hasdeo barrage at Darri, Kharang, the Arpa Bhaisajhar and Mongra barrages and the Kelo dam, and manages Kopra Jalashay; issues the daily tank gauge reports and gives the high flood point for land next to a river or nala. Also the State's groundwater agency for this Manual, with the State Ground Water Management and Regulatory Authority under the Ground Water Act of 2022 when that Act is brought into force [TBC]. Would provide design river and reservoir levels, maximum water levels and gate-operation rules for Chapter 5, obtain the Hirakud levels from Odisha, consent to outfalls into its works, and supply groundwater levels for Chapters 4 and 8 with CGWB.
Public Health Engineering Department (PHED) Water supply outside the larger cities; its role in urban drainage was not researched [TBC]. Would apply Chapter 8 to the protection of supply sources from storm runoff.
Chhattisgarh Environment Conservation Board (CECB) Monitors the rivers and drains and reports to the NGT on sewage and its treatment, including the interception of Raipur's nalas for its new treatment plants (2021). Supports the removal of sewage from storm drains (Chapter 8) and the control of runoff from industry, mines and ash ponds (Chapter 8).
Chhattisgarh State Wetland Authority Constituted under the Wetlands Rules 2017, with the Forest and Climate Change Department as its nodal department (as reported); applies the 50 m line from the highest flood level to Raipur's talabs and the Jhanjh wetland (as reported). Would keep the list of wetlands and Ramsar sites and permit regulated activities in their zones (Chapter 7).
CGSDMA and the District Disaster Management Authorities Approve the State and district disaster management plans; no urban flood plan of CGSDMA was found [TBC]. Would recommend flood-sensitive catchments, hold the record of flood-prone locations with the Collectors, and lead the post-event review (Clause 10.16).
Revenue and Disaster Management Department: the Collectors and the tehsil offices Keep the land records in which talabs, nalas and their nistar rights are recorded; administer the village tanks vested in the State (Land Revenue Code, s.251) and evict encroachers on recorded ponds (s.248); lead flood relief. Would certify the recorded extent of a talab for Chapter 7.
Coal and power companies (SECL and the other mining lessees; NTPC, CSPGCL and BALCO) and the Directorate General of Mines Safety (DGMS), a body of the Union The lessees build and maintain the garland drains, settling ponds and toe drains that their clearances require, and hold the mine voids, pit lakes and overburden dumps; the power companies hold the ash ponds and ash dykes of their plants; DGMS regulates the danger of inundation of mines. Their consent is needed before any mine void or ash pond is used as an outfall or as storage (Chapters 5 and 7), and the breach of an ash dyke is mapped as a hazard (Chapter 5).
Central Water Commission (CWC), a body of the Union Publishes the Flood Estimation Reports for subzones 3(d), 3(g), 3(f), 1(d) and 3(c) used in Chapters 2 and 3, and the river levels at its sites, such as the Indravati at Jagdalpur, the only site in the State with published warning and danger levels found for this Manual. Would supply river stage records and forecasts for Chapter 5.
Central Ground Water Board (CGWB), a body of the Union Assesses the groundwater units of the State and their categories (five critical blocks in 2024). Would supply groundwater levels and quality with WRD.
National Institute of Hydrology (NIH), Roorkee Runs NIH-DHAARA (Chapter 2).
IMD (Meteorological Centre Raipur), and road and rail owners (the Public Works Department, NHAI, Indian Railways) IMD's stations supply the rainfall records of Chapter 2. Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7).

Commentary. Stormwater in Chhattisgarh is split between the Housing and Environment Department and T&CP, through the CGBVN 1984, development plans and development permission; UADD and the Municipal Corporations and other local bodies, through building permission and the drains vested in them; NRDA in Nava Raipur Atal Nagar, and RDA and the Chhattisgarh Housing Board in their schemes; the Bhilai Steel Plant in its township; WRD, through the rivers, dams, barrages and their gates; the Revenue and Disaster Management Department, through the village tanks and land records; the State Wetland Authority, with the NGT and the High Court setting lines around ponds and rivers; and, in the coalfields, the mining lessees, the power companies and DGMS. Raipur shows why the split matters. The city's nalas carry both storm water and sewage to the Kharun, now through the diversion weirs of new treatment plants; its talabs vest variously in the Corporation and, where they are village tanks, in the State; and the river below them is WRD's. The Municipal Corporation Act is understood to vest public drains, streams and tanks in the Corporation, as its Madhya Pradesh text does (s.82; Chhattisgarh text not read [TBC]), but no rule or order found divides the natural nalas from the municipal drains, or the township drains of Bhilai from those of its Corporations, between the bodies concerned [TBC]. Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5, as Chapter 6 does for the drains themselves. The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers.

Table 1.5 — Working assignment of drainage elements under this Manual

Element Assigned to
Rivers and their beds, banks and floodplains; dams, reservoirs and barrages with their gates and spillways (such as Gangrel, Minimata Bango, the Hasdeo barrage at Darri, Kharang, Maniyari, the Kelo dam, Kopra, and the Mongra, Arpa Bhaisajhar and Mahanadi barrages); flood embankments and irrigation canals WRD
Natural nalas, public drains and tanks within the limits of a local body, other than those assigned to WRD The Municipal Corporation, Nagar Palika Parishad or Nagar Panchayat (in Raipur, RMC)
Roads, drains, streams, lakes and reservoirs of Nava Raipur Atal Nagar NRDA
Drains and storage within a scheme of RDA, the Chhattisgarh Housing Board or a colony developer, until handed over in writing The body that built the scheme
Drains of the township of the Bhilai Steel Plant The Bhilai Steel Plant (SAIL); drains of Bhilai outside the township to the Bhilai and Risali Municipal Corporations [TBC]
Village tanks with rights of irrigation or nistar, vested in the State The Revenue and Disaster Management Department (Collector), with those rights preserved
Sewers, interceptors and the interception and diversion of nalas, and sewage treatment plants The Municipal Corporation or the body executing the work for it
Garland drains, settling ponds, toe drains, mine voids and pit lakes within a mining lease; ash ponds, ash dykes and plant drains of a power plant The lessee, under its environmental clearance and DGMS; the operator of the plant
Drains of State and national highways The Public Works Department or NHAI
Wetlands and Ramsar sites The Chhattisgarh State Wetland Authority, with the owner of the land (Kopra Jalashay: WRD)

This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Chhattisgarh has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a river raised by dam or barrage releases, as the Mahanadi below Gangrel and the Hasdeo below Minimata Bango and Darri, to the backwater of the Hirakud reservoir, to a reservoir, barrage pond or talab, or to a mine void, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Chhattisgarh, Raipur is reported to keep only about 37–40 of the 130 or so ponds it once had, residents reported after the waterlogging of July 2026 that drains had been narrowed by encroachment from seven or eight feet to four or five, and the State Wetland Authority has had to halt works within 50 m of the highest flood level of the Karbala Talab in Raipur and direct NRDA to withdraw tenders beside the Jhanjh wetland in Nava Raipur Atal Nagar (all as reported).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the boundaries of the Municipal Corporations, of the planning area of Raipur and of the special area of Nava Raipur Atal Nagar
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model CGBVN 1984 amendment and model ULB bye-law
Form 1-1 Applicability Determination
Form 1-2 Variance / Waiver Request