Annexes to Chapter 3Hydrologic Methods
These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.
Annex 3A — Chhattisgarh soil series to HSG lookup; seasonal high water table map
Supports Clauses 3.7 and 3.10 of Chapter 3.
To be prepared. This annex will contain (a) a lookup from each soil series mapped in Chhattisgarh to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the south-west monsoon (June–September). It needs NBSS&LUP and Chhattisgarh Department of Agriculture (soil survey, with Indira Gandhi Krishi Vishwavidyalaya, Raipur) [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the Water Resources Department, supplemented by piezometers in the kanhar and dorsa paddy lowlands of the Chhattisgarh plain, the floodplains of the Kharun, the Seonath, the Arpa, the Hasdeo, the Kelo, the Mahanadi and the Indravati at the cities, the land round the talabs of Raipur and the lakes and reservoirs of Nava Raipur, and the Hirakud backwater at Raigarh and Sarangarh. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).
Table 3A.1 — Soil series to HSG lookup (layout)
| Soil series | District(s) | Taxonomic class | Surface texture | Saturated hydraulic conductivity (mm/h) | Depth to impermeable layer (m) | HSG, drained | HSG, undrained | Source map and scale |
|---|---|---|---|---|---|---|---|---|
Table 3A.2 — Seasonal high water table, by mapping unit (layout)
| Mapping unit or grid cell | Observation wells used | Years of June–September record | Highest June–September level below ground (m) | Within 0.6 m of ground (Clause 3.10.1)? | Data source |
|---|---|---|---|---|---|
Annex 3B — Chhattisgarh CN calibration and supplementary land covers (cracked kanhar fallow, bunded paddy, talab and reservoir beds, bhata and laterite crust, overburden dumps and ash ponds, Bastar and northern forest and scrub)
Supports Clauses 3.8 and 3.15 of Chapter 3.
To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Chhattisgarh catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the kanhar of the lowlands of the Chhattisgarh plain while it is still dry and cracked early in the monsoon; the bunded paddy fields of the kanhar and dorsa lowlands, whose bunds hold water on the field until they overtop; the beds of talabs, dabris and reservoirs, such as the talabs of Raipur and the reservoirs of Nava Raipur, that are dry or cultivated at the start of a storm; the bare bhata uplands, with their thin soil over murram or ferricrete, and the laterite crust and rock outcrop of the Bastar plateau and the northern hills; the overburden dumps, backfilled mine land, compacted mine benches and haul roads of the Korba, Raigarh and northern coalfields, and the ash ponds and ash dykes of the power stations, which shed water fast and carry heavy sediment; and the sal forest, scrub and grassland of the Bastar plateau and of the hills of Surguja, Koriya and Jashpur. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).
Table 3B.1 — Supplementary land covers, AMC II (layout)
| Cover type | HSG A | HSG B | HSG C | HSG D | Ia ratio | Basis (catchments, events, years) |
|---|---|---|---|---|---|---|
| Kanhar fallow of the plain lowlands, dry and cracked at the start of the storm (before 15 July) | ||||||
| Bunded paddy field (kanhar or dorsa), with the bund height recorded | ||||||
| Talab, dabri or reservoir bed, dry or cultivated at the start of the storm | ||||||
| Bare bhata upland, thin soil over murram or ferricrete | ||||||
| Laterite crust and rock outcrop, Bastar plateau and northern hills | ||||||
| Overburden dump, backfilled mine land, compacted bench or haul road (Korba, Raigarh and northern coalfields) | ||||||
| Ash pond or ash dyke of a power station | ||||||
| Sal forest, scrub and grassland of the Bastar plateau and the hills of Surguja, Koriya and Jashpur | ||||||
| Other (state) |
Table 3B.2 — CN calibration catchments (layout)
| Catchment | District | Area (km²) | Dominant HSG and cover | Events used | Table 3.5 CN | Calibrated CN | Calibrated ÷ Table 3.5 |
|---|---|---|---|---|---|---|---|
Annex 3C — Benchmark test problems for software acceptance
Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.
Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.
Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.
Problem 3C-1 — Rational Method peak (Clause 3.5)
Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.
Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.
Table 3C.1 — Problem 3C-1 solution
| Step | Calculation | Result |
|---|---|---|
| Composite C (Clause 3.5.4) | (1.2 × 0.90 + 0.8 × 0.15) / 2.0 | 0.60 |
| Frequency factor (Table 3.3) | 1% AEP | Cf = 1.25 |
| C · Cf (≤ 1.0) | 0.60 × 1.25 | 0.75 |
| Peak flow (Clause 3.5.1) | 0.75 × 120 × 2.0 / 360 | Q = 0.500 m³/s |
| Part (b): C · Cf | 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) | 1.00 |
| Part (b): peak flow | 1.00 × 150 × 0.5 / 360 | Q = 0.208 m³/s |
Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)
Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).
Table 3C.2 — Problem 3C-2 solution
| Segment | Calculation | Travel time |
|---|---|---|
| Sheet flow (Clause 3.6.2(a)) | 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h | 12.83 min |
| Shallow concentrated (Clause 3.6.2(c)) | V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h | 6.78 min |
| Channel (Clause 3.6.2(d)) | 400 / (3,600 × 1.0) = 0.1111 h | 6.67 min |
| Tc (Clause 3.6.1; ≥ 10 min) | 12.83 + 6.78 + 6.67 | 26.27 min |
| Lag (Clause 3.6.5) | 0.6 × 26.27 | 15.76 min |
Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)
Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.
Table 3C.3 — Problem 3C-3 solution
| Case | S (mm) | Ia (mm) | Runoff Q (mm), P = 100 mm | Runoff Q (mm), P = 25 mm |
|---|---|---|---|---|
| (a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 | 89.24 | 17.85 | 39.38 | 0.53 |
| (b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 | 38.80 | 7.76 | 64.93 | — |
| (c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 | 143.31 | 7.17 | 36.49 | 1.97 |
Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.
Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)
Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.
Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.
Table 3C.4 — Problem 3C-4 solution
| Step | Calculation | Result |
|---|---|---|
| (a) Impervious half (Clause 3.9.2) | S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) | 19.70 mm |
| (a) Pervious half | S = 162.39 mm, Ia = 32.48 mm > P | 0 mm |
| (a) Area-weighted runoff, separate sub-areas | 0.5 × 19.70 + 0.5 × 0 | 9.85 mm |
| (a) Composite CN (Clause 3.9.4) | 61 + 0.50 × (98 − 61) | 79.5 |
| (a) Runoff with composite CN | S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) | 1.83 mm |
| (b) Interval check (Clause 3.11.3(a)) | 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h | satisfied |
| (b) Lag and time to peak (Clause 3.11.2) | tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 | tp = 0.65 h |
| (b) Unit hydrograph peak, Q = 1 mm | 0.208 × 2.5 × 1 / 0.65 | qp = 0.800 m³/s per mm |
Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).
Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)
Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.
Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship
| Stage (m) | Storage S (m³) | Outflow O (m³/s) |
|---|---|---|
| 0.0 | 0 | 0.00 |
| 0.5 | 250 | 0.05 |
| 1.0 | 500 | 0.10 |
| 1.5 | 750 | 0.15 |
| 2.0 | 1,000 | 0.20 |
| 2.5 | 1,250 | 0.25 |
Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.
Table 3C.6 — Problem 3C-5 routed outflow
| Time (min) | Inflow I (m³/s) | Outflow O (m³/s) | Storage (m³) | Stage (m) |
|---|---|---|---|---|
| 0 | 0.0000 | 0.0000 | 0.0 | 0.000 |
| 10 | 0.1667 | 0.0094 | 47.2 | 0.094 |
| 20 | 0.3333 | 0.0367 | 183.3 | 0.367 |
| 30 | 0.5000 | 0.0797 | 398.4 | 0.797 |
| 40 | 0.4167 | 0.1226 | 612.8 | 1.226 |
| 50 | 0.3333 | 0.1511 | 755.7 | 1.511 |
| 60 | 0.2500 | 0.1670 | 835.2 | 1.670 |
| 70 | 0.1667 | 0.1717 | 858.6 | 1.717 |
| 80 | 0.0833 | 0.1664 | 832.1 | 1.664 |
| 90 | 0.0000 | 0.1523 | 761.5 | 1.523 |
| 120 | 0.0000 | 0.1062 | 531.1 | 1.062 |
| 180 | 0.0000 | 0.0517 | 258.3 | 0.517 |
Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.
Table 3C.7 — Benchmark results to be reported by the applicant
| Problem | Result | Benchmark | Software result | Difference (%) | Within ±5%? |
|---|---|---|---|---|---|
| 3C-1 | Q, main case (m³/s) | 0.500 | |||
| 3C-1 | Q, part (b) (m³/s) | 0.208 | |||
| 3C-2 | Tc (min) | 26.27 | |||
| 3C-3 | Q, case (a), P = 100 mm (mm) | 39.38 | |||
| 3C-3 | Q, case (b), P = 100 mm (mm) | 64.93 | |||
| 3C-3 | Q, case (c), P = 100 mm (mm) | 36.49 | |||
| 3C-3 | Q, case (c), P = 25 mm (mm) | 1.97 | |||
| 3C-4 | Runoff, separate sub-areas (mm) | 9.85 | |||
| 3C-4 | Runoff, composite CN (mm) | 1.83 | |||
| 3C-4 | qp (m³/s per mm) | 0.800 | |||
| 3C-5 | Peak outflow (m³/s) | 0.172 | |||
| 3C-5 | Peak storage (m³) | 859 |
Annex 3D — Peak rate factor study for flat coastal land
Supports Clauses 3.11.5 and 3.15 of Chapter 3.
Not required in Chhattisgarh. Chhattisgarh is landlocked and has no flat coastal plain, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The kanhar and dorsa paddy lowlands of the plain, the river floodplains and the margins of the talabs and reservoirs are flat in places but are not coastal plain; their slow response is represented by storage, bunded fields and backwater (Clauses 3.10.4 and 3.12.4), not by a lower peak rate factor, while the Bastar plateau and the northern hills respond fast. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.
Table 3D.1 — Calibrated peak rate factors (layout)
| Catchment | Area (km²) | Mean slope (m/m) | Drainage condition | Events used | Calibrated PRF (US customary) | PRF′ (SI) | Range of applicability |
|---|---|---|---|---|---|---|---|
Annex 3E — CWC SUH parameters for subzones 3(d), 3(g), 3(f), 1(d) and 3(c), with worked example
Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.
To be prepared. This annex will tabulate, for CWC subzones 3(d) (Mahanadi), 3(g) (Indravati), 3(f) (Lower Godavari), 1(d) (Sone) and 3(c) (Upper Narmada and Tapi), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the five CWC Flood Estimation Reports that cover Chhattisgarh: the Mahanadi subzone 3(d) (revised, M-3(d)/R-3/25/1996, February 1997), which covers the Mahanadi basin, about 56% of the State, and the Brahmani headwaters in Jashpur, including Raipur, Nava Raipur, Durg, Bhilai, Rajnandgaon, Bilaspur, Korba, Janjgir–Champa, Raigarh, Dhamtari, Mahasamund, Kanker, Kawardha and Jashpur Nagar; the Indravati subzone 3(g) (I/21/1992, whose cover reads I-21/1993), which covers the Indravati on the Bastar plateau, including Jagdalpur, Kondagaon, Narayanpur, Dantewada and Bijapur; the Lower Godavari subzone 3(f) (revised, LG-3(f)/R-2/24/1995), which covers the Sabari and the Godavari frontage, including Sukma and Konta, and the Wainganga fringe of Rajnandgaon district; the Sone subzone 1(d) (S/15/1987), which covers the Rihand, the Kanhar river and the Gopad in the north, including Ambikapur, Bishrampur, Surajpur and Balrampur; and the Upper Narmada and Tapi subzone 3(c) (revised, UNT-3(c)/R-6/46/2002), which covers only a fringe of about 744 km² in Kawardha and Rajnandgaon districts with no town (see the References of Chapter 3); with the plates and annexes of the 3(f) report, which were missing from the copy read, the 3(g) unit hydrograph relationships, read by optical character recognition only, the 3(f) loss rate, printed as 2 mm/h in the 3(f) report but quoted as 5 and 2 mm/h in the 3(g) report, the 1(d) loss rate and time-to-peak exponent, the 3(d) loss-rate curve, read only by eye, the areal reduction and time-distribution tables of all five, and the subzone boundaries within Chhattisgarh, including those at Jagdalpur (3(g)/3(f)), Ambikapur (1(d)/3(d)), Kanker (3(d)/3(g)) and Rajnandgaon–Khairagarh (3(d)/3(f)), still to be confirmed on the reports' page images and index maps [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).
Table 3E.1 — SUH relationships by subzone (layout)
| Parameter | Symbol | Unit | Subzone 3(d) relationship | Subzone 3(g) relationship (unit hydrograph relationships by optical character recognition only) [TBC] | Subzone 3(f) relationship |
|---|---|---|---|---|---|
| Time from centre of unit rainfall to peak | tp | h | tp = 1.757 (L·Lc/√S)^0.261 | tp = 0.353 (L·Lc/√S)^0.45 | tp = 0.348 (L·Lc/√S)^0.454 (the table of the report prints L·Lc/S; see the note) [TBC] |
| Peak discharge per unit area | qp | m³/s per km² | qp = 1.260 tp^−0.725 | qp = 1.968 tp^−0.842 | qp = 1.842 tp^−0.804 |
| Width of UH at 50% of peak | W50 | h | W50 = 1.974 qp^−1.104 | W50 = 2.30 qp^−1.018 | W50 = 2.353 qp^−1.005 |
| Width of UH at 75% of peak | W75 | h | W75 = 0.961 qp^−1.125 | W75 = 1.356 qp^−1.007 | W75 = 1.351 qp^−0.992 (exponent hand-corrected in the scan) [TBC] |
| Width of rising limb at 50% of peak | WR50 | h | WR50 = 1.150 qp^−0.829 | WR50 = 0.954 qp^−1.078 | WR50 = 0.936 qp^−1.047 |
| Width of rising limb at 75% of peak | WR75 | h | WR75 = 0.527 qp^−0.932 | WR75 = 0.581 qp^−1.035 | WR75 = 0.579 qp^−1.004 |
| Base width of UH | TB | h | TB = 5.411 tp^0.826 | TB = 4.572 tp^0.90 | TB = 4.589 tp^0.894 |
| Unit duration | tr | h | 1 | 1 | 1 |
| Design storm duration | TD | h | TD = 1.1 tp (it gave a higher 50-yr peak than TD = TB on all 16 catchments of the report) | TD = 1.1 tp [TBC] | TD = 1.1 tp |
| Design loss rate | — | mm/h | Falls with the duration of the storm (Fig. 13 of the report): about 3.5 for a 3-hour storm, falling to 1.5 for storms of about 13 hours or more, read by eye from the curve [TBC]; the worked example uses 2.1 for an 8-hour storm | 5 on catchments larger than 75 km² and 2 on smaller ones (printed "0.5 cm/hr" and "0.2 cm/hr"), quoted by the report as the values of subzone 3(f); see the note | 2 (printed "0.2 cm/hr"); see the note [TBC] |
| Design base flow | — | m³/s per km² | 0.10 | 0.06 | 0.05 |
| Ratio of t-hour to 24-hour rainfall | — | — | 10-yr, from 6 self-recording gauges: 1 h 0.390; 3 h 0.610; 6 h 0.760; 9 h 0.820; 12 h 0.860; 15 h 0.880; 18 h 0.920; 24 h 1.000 | 10-yr, from 11 self-recording gauges: 1 h 0.320; 3 h 0.500; 6 h 0.635; 9 h 0.730; 12 h 0.800; 15 h 0.864; 18 h 0.917; 24 h 1.000 | 10-yr: 1 h 0.32; 3 h 0.52; 6 h 0.65; 9 h 0.73; 12 h 0.79; 15 h 0.85; 18 h 0.91; 24 h 1.00 |
| Time distribution of 24-hour rainfall | — | cumulative fraction | Derived in the report from 2,688 storms at 28 self-recording gauges; not transcribed [TBC] | [TBC] | [TBC] |
| Conversion of 1-day to 24-hour rainfall | — | factor | 1.15 | 1.15 | 1.15 |
| Areal reduction factor | ARF | — | Not transcribed; the worked example uses 0.9144 for an 8-hour storm on 194 km² [TBC] | [TBC] | In an annex missing from the copy read [TBC] |
| 50-yr 24-hour point rainfall at Chhattisgarh towns (100-yr in brackets) | — | mm | Plate 9 (Plate 10): Bilaspur about 200–240 (240–280); Durg, Bhilai and Korba about 240–280 (280–320); Raipur and Nava Raipur about 280–320 (320–360); Rajnandgaon about 280 (about 320); Kanker about 280–320; Dhamtari about 320; Raigarh about 320, inferred from the 360 line of Plate 10 through the Kelo bridge (about 360); Mahasamund and Rajim about 320–360, with a closed ">440" cell on the Gariaband–Nuapada border; Manendragarh and Jashpur Nagar about 200–280, unresolved [TBC] | Plate 10 (Plate 11): Jagdalpur about 240–280 (240–280, near 280), with a "<200" cell over the Indravati valley west of the city and the lines rising towards Koraput | Plates not in the copy read; Sukma about 200–240 at the edge of the 3(g) plate [TBC] |
| Gauged catchments in Chhattisgarh | — | — | 5 of the 16 used: the Kelo at Raigarh (bridge 121, 1,150 km²), the Lilagar near Akaltara (bridge 12, 666 km²), the Parri near Rajnandgaon (bridge 332(ii), 225 km²), the Borai (bridge 69, 173 km²) and the Karwar (bridge 59(b), 136 km²); four more listed but not used | None: the report had no gauged catchment of its own | Not known from the copy read [TBC] |
| Catchment area for which the relationships apply | A | km² | 25–1,000; up to 5,000 with judgement | [TBC] | 25–1,000, with judgement above that |
| Report reference | — | — | Table 3.3 (p. 13), §3.5 (p. 14), §3.6 (p. 15), Annex 3.1 (p. 49), Annexes 4.3 and 4.4 (pp. 58–60), Annex 5.2 and Fig. 13 | §3.3 to §3.5 (pp. 12–13), Annex 4.4 (p. 50) | [TBC] |
| Parameter | Symbol | Unit | Subzone 1(d) relationship | Subzone 3(c) relationship |
|---|---|---|---|---|
| Time from centre of unit rainfall to peak | tp | h | tp = 0.314 (L/√S)^1.012 (the exponent is printed 1.102 in the relationship table and 1.012 in the worked example and the design-storm formula; see the note) [TBC] | tp = 0.995 (L·Lc/√S)^0.2654 |
| Peak discharge per unit area | qp | m³/s per km² | qp = 1.664 tp^−0.965 | qp = 1.665 tp^−0.71678 |
| Width of UH at 50% of peak | W50 | h | W50 = 2.534 qp^−0.976 | W50 = 1.9145 qp^−1.2582 |
| Width of UH at 75% of peak | W75 | h | W75 = 1.478 qp^−0.860 | W75 = 1.1102 qp^−1.2088 |
| Width of rising limb at 50% of peak | WR50 | h | WR50 = 1.091 qp^−0.750 | WR50 = 0.7060 qp^−1.3859 |
| Width of rising limb at 75% of peak | WR75 | h | WR75 = 0.672 qp^−0.719 | WR75 = 0.45314 qp^−1.3916 |
| Base width of UH | TB | h | TB = 5.526 tp^0.866 | TB = 5.04537 tp^0.71637 |
| Unit duration | tr | h | 1 | 1 |
| Design storm duration | TD | h | TD = 1.1 tp = 0.345 (L/√S)^1.012, rounded to the nearest hour | TD = 1.1 tp, rounded to the hour |
| Design loss rate | — | mm/h | 2.5 (printed "modal loss rate of 0.25 cm/hr"; one passage reads "0.45cm/hr" by optical character recognition, to be checked against the page image [TBC]) | 1 (printed "1 mm/hr") |
| Design base flow | — | m³/s per km² | Not located in the copy read; the worked example's 15.33 m³/s on 340.64 km² implies about 0.045 [TBC] | 0.05 |
| Ratio of t-hour to 24-hour rainfall | — | — | 50-yr: 1 h 0.37; 3 h 0.58; 6 h 0.70; 9 h 0.80; 12 h 0.89; 15 h 0.94; 18 h 0.98 (read by optical character recognition only [TBC]); 24 h 1.00 | 10-yr: 1 h 0.34; 3 h 0.50; 6 h 0.63; 9 h 0.72; 12 h 0.79; 15 h 0.86; 18 h 0.91; 24 h 1.00 |
| Time distribution of 24-hour rainfall | — | cumulative fraction | Average curves of Fig. 12(a)–(e) for storms of 2–3, 4–6, 7–12, 13–18 and 19–24 hours, and coefficients of Table A-2; not transcribed [TBC] | Annexure 4.3 of the report; not transcribed [TBC] |
| Conversion of 1-day to 24-hour rainfall | — | factor | 1.15 | 1.15 |
| Areal reduction factor | ARF | — | Table 6 (p. 70), by optical character recognition: 50 km², 80% at 1 h, 88% at 3 h, 93% at 6 and 12 h and 97% at 24 h; 100 km², 73, 82, 88, 90 and 95%; from catchments with data up to 800 km², to be used with caution above that [TBC] | Annexure 4.4 and Fig. 12(a) of the report; not transcribed [TBC] |
| 50-yr 24-hour point rainfall at Chhattisgarh towns (100-yr in brackets) | — | mm | Plate 9 (Plate 10): Ambikapur and Bishrampur about 280, in a ">280" cell (about 320, in a ">320" cell), with the bounding line just east of Ambikapur; lower towards Surajpur and Manendragarh | Not read: no town of the State lies in the subzone |
| Catchment area for which the relationships apply | A | km² | Recommended for 25–1,500, usable to 5,000 with judgement | [TBC] |
| Report reference | — | — | Relationship table (p. 40), worked example (pp. 15–23), design storm (p. 49), rainfall ratios (p. 50), loss rate (pp. 84–88) | Worked example for Railway Bridge No. 930; Plates 9 and 10 |
Note: relationships as printed in the five CWC reports that cover Chhattisgarh (References of Chapter 3); L is the length of the main stream in km, Lc the length to the point nearest the catchment centroid in km, S the equivalent slope in m/km and A the catchment area in km². The subzone 3(d) relationships, loss curve, base flow and rainfall ratios, and the 3(g) loss rates, base flow and rainfall ratios, were read from scanned copies and checked against the page images for the edition of this Manual that covers the rest of those subzones; the 3(g) unit hydrograph relationships were read by optical character recognition only and are to be confirmed against the page images [TBC]; the 1(d) and 3(c) entries were read for the edition that covers the rest of those subzones; and the 3(f) entries are from the main text of the revised report of 1995, whose annexes and plates were missing from the copy read. The 50-yr and 100-yr point rainfalls were read by eye from the isopluvial plates, re-rendered for Chhattisgarh, and are good to about one contour; the 50-yr contours near Raigarh are unlabelled on Plate 9 of the 3(d) report. Several printing problems are to be resolved before use [TBC]. The 3(g) report had no gauged catchment of its own and adopted the relationships and loss rates of subzone 3(f) as they stood before the revision of 1995; that is why its column differs from the 3(f) column, and why its quoted "3(f)" loss rates of 5 and 2 mm/h differ from the 2 mm/h of the revised 3(f) report. Each column shall be used only in its own subzone. In subzone 3(f) the table of the report prints the tp term as L·Lc/S, while its text uses L·Lc/√S, which is the form given here. In subzone 1(d) the relationship table prints tp = 0.314 (L/√S)^1.102, but the worked example computes "0.314 (34.94/√3.70)^1.012 = 5.90 hrs" and the design-storm formula is TD = 0.345 (L/√S)^1.012; this Manual uses 1.012 and treats 1.102 as a misprint until the report is checked. The 3(d) report of 1997 kept the loss curve of its 1982 edition, although 28 new events it examined lie considerably outside the curve, and the curve was read by eye [TBC]. The rainfall annexes have their own problems: in the 3(d) Annex 4.4 the Champa row is printed with its durations out of order (a 12-hour value below the 1-hour and 6-hour values, and a February date), and is not used; in the 3(g) Annex 4.4 the Jagdalpur 1-hour and 3-hour maxima are both printed as 80.0 mm, on a date that reads as February; and Kanker's 1-hour maximum of 26 June 1974 is 79 mm in the 3(d) annex and 75.3 mm in the 3(g) annex. The 3(d) worked example (railway bridge 385 near Sondur, 194 km², L = 39.36 km, Lc = 15.13 km, S = 4.36 m/km) lies just across the border in Odisha, on a river that rises in Chhattisgarh; the relationships give tp = 7.68 h, which the report rounds to 7.5 h, and with a 50-yr 24-hour point rainfall of 32.0 cm, an 8-hour ratio of 0.780, an ARF of 0.9144, a loss of 0.21 cm/h and a base flow of 19.40 m³/s the report gives a 50-yr peak of 1,086.5 m³/s, about 5.6 m³/s per km². The 1(d) and 3(c) worked examples lie outside the State. The design loss rates, the 3(d) curve of 3.5 to 1.5 mm/h, 5 and 2 mm/h in 3(g), 2 mm/h in 3(f), 2.5 mm/h in 1(d) and 1 mm/h in 3(c), are φ-indices fitted to the floods of whole rural catchments; they are not soil infiltration capacities and are not used to assign HSG (Clause 3.7) or to size infiltration practices (Chapter 4). The 3(d) curve is two to five times below the basic infiltration rate of 7.3–7.6 mm/h measured on a matasi-type sandy loam at Raipur (Commentary to Clause 3.7), because it was fitted to monsoon floods on catchments whose kanhar and dorsa paddy lowlands were already wet. The reports were derived from gauged rural catchments at railway and road bridges, none of them urban. In Chhattisgarh they apply to the rural nalas and rivers that enter city limits, such as the Kharun and its tributary nalas above Raipur, the streams of Nava Raipur, the Arpa above Bilaspur, the Kelo above Raigarh, which is itself one of the 3(d) gauged catchments, the Parri near Rajnandgaon, the nalas that reach Durg and Bhilai from the Seonath plain, the streams that reach Korba from the coalfield, and the nalas that reach Jagdalpur and Ambikapur from the plateau; they are not a model of city catchments. Where a city catchment lies within 25–5,000 km², the SUH is computed only as the benchmark of its natural condition (Clause 3.11.4), and the catchment itself is designed by the methods of Clause 3.4 with the design rainfall of Chapter 2. The Mahanadi at Rajim and below, the Seonath at Durg, the Hasdeo at Korba and the Indravati at Jagdalpur may be near or above 5,000 km² at the cities [TBC]; reaches above 5,000 km² are outside Clause 3.11.4 (Clause 3.4.5), and below Gangrel, Bango, Darri, the Bhaisajhar and Mongra barrages and the dams on the Indravati in Odisha the flood is set by releases (Chapter 5). The ratios are not to be used to derive intensities for durations shorter than the TD of the SUH (Chapter 2): with the 3(d) ratios the 50-yr 1-hour depth at Raipur is about 109–125 mm, while the largest reliable 1-hour falls recorded by self-recording gauges in the State are 79 mm at Kanker and 80 mm at Jagdalpur (Annex 4.4 of the 3(d) and 3(g) reports), and Chapter 2 deals with the difference. At 24 hours the opposite holds: Raipur (370.3 mm on 4 August 1910), Rajnandgaon (392.0 mm on 21 September 1965), Korba (358.0 mm on 12 August 2004) and Durg (337.0 mm on 15 June 2004) have recorded more than the 100-yr plate values (IMD), so the plate values are a floor under Clause 2.3.3, not a ceiling. Subzone by basin, read from the plates by eye and to be confirmed on the index maps of the reports [TBC]: 3(d), the Mahanadi with the Seonath, the Kharun, the Arpa, the Hasdeo, the Mand and the Kelo, and the Brahmani headwaters in Jashpur (Raipur, Nava Raipur, Durg, Bhilai, Rajnandgaon, Bilaspur, Korba, Janjgir, Champa, Raigarh, Dhamtari, Mahasamund, Rajim, Kanker, Kawardha, Mungeli, Bemetara, Balod, Manendragarh and most of Jashpur district); 3(g), the Indravati (Jagdalpur, Kondagaon, Narayanpur, the Indravati side of Dantewada, Bijapur and the Kotri side of Kanker district); 3(f), the Sabari and the Godavari frontage (Sukma, Konta and the south of Bijapur district) and the Wainganga fringe of Rajnandgaon and Khairagarh; 1(d), the Rihand, the Kanhar river and the Gopad (Ambikapur, Bishrampur, Surajpur, Balrampur, Ramanujganj and Wadrafnagar); and 3(c), the Narmada fringe of Kawardha and Rajnandgaon districts. No part of the State lies in subzone 3(e). The subzone is chosen by the catchment's outfall, not by its district: Jagdalpur lies on the 3(g)/3(f) line and drains to the Indravati, so its catchments are in 3(g), while the land south of the city that drains to the Sabari is in 3(f); Ambikapur lies just inside 1(d), and catchments that drain south to the Mand or the Hasdeo are in 3(d); and Kanker is in 3(d), with the Kotri side in 3(g). Where a catchment drains across the boundary between two subzones, or its outfall lies near one, as at Jagdalpur, Ambikapur, Kanker and Rajnandgaon–Khairagarh, this Manual requires the SUH to be computed with the parameters of each subzone and the higher 1% AEP peak to be adopted, unless calibration under Clause 3.15 supports the other.
Table 3E.2 — Worked example outline (layout)
| Step | Content | Clause |
|---|---|---|
| 1 | Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM | 3.11.4(a) |
| 2 | SUH parameters from Table 3E.1 and the plotted unit hydrograph | 3.11.4(a) |
| 3 | Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution | 3.11.4(a), (b) |
| 4 | Effective rainfall after the design loss rate; convolution with the SUH; base flow added | 3.11.4(a) |
| 5 | 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition | 3.11.4(c), (d) |
Form 3-1 — Hydrologic Calculation Summary
Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.
Draft form — Chhattisgarh Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.
A. Project
Table 3F.1 — Form 3-1: project
| Field | Entry |
|---|---|
| A1. Project name and applicant | |
| A2. Location (village or ward, survey numbers, district) | |
| A3. Site area (ha) and number of points of comparison (POCs) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Design Rainfall Sheet reference (Form 2-1) |
B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)
Table 3F.2 — Form 3-1: method and software
| Field | Entry |
|---|---|
| B1. Purpose of each calculation (conveyance, storage, comparison, catchment study) | |
| B2. Contributing area for each purpose (ha or km²) | |
| B3. Method used and the row of Table 3.1 that permits it | |
| B4. Reason for the choice of method | |
| B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2) | |
| B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2 | |
| B7. Runoff transform (Clause 3.11.1) | |
| B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a)) | |
| B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2) | |
| B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4 | |
| B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference | |
| B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5) | |
| B13. Calibration required (Clause 3.15.1)? Calibration report reference |
C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)
Table 3F.3 — Form 3-1: soils and groundwater
| Field | Entry |
|---|---|
| C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2) | |
| C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3) | |
| C3. Seasonal high water table: depth below ground and source (Clause 3.10.2) | |
| C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1) | |
| C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b)) |
D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)
Table 3F.4 — Form 3-1: parameters by sub-area and condition
| Sub-area | Condition (pre / post) | Area (ha) | Impervious: roofs / paved / roads (ha) | DCIA (ha) | Disconnected (ha) | HSG | CN, AMC II | CN, AMC III (pervious part) | C and Cf (if Rational) | Tc (min) |
|---|---|---|---|---|---|---|---|---|---|---|
E. Time of concentration worksheet (Clause 3.6)
One worksheet per sub-area and condition.
Table 3F.5 — Form 3-1: time of concentration worksheet
| Segment | Flow type | Surface and n (Table 3.4) | L (m) | S (m/m) | P2 (mm) | V (m/s) | Tt (min) |
|---|---|---|---|---|---|---|---|
| 1 | Sheet | — | |||||
| 2 | Shallow concentrated | — | |||||
| 3 | Channel or pipe | — | |||||
| Tc (not less than 10 min) |
E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______
F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)
Table 3F.6 — Form 3-1: rainfall, losses and starting levels
| Field | Entry |
|---|---|
| F1. AEPs and durations run; climate factor applied (Chapter 2) | |
| F2. AMC used for each duration (Clause 3.8.4) | |
| F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5) | |
| F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5) | |
| F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5) | |
| F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5) | |
| F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3) |
G. Departures
Table 3F.7 — Form 3-1: departures from Chapter 3
| No. | Clause departed from | Value used in place of the Chapter 3 value | Justification |
|---|---|---|---|
| 1 | |||
| 2 |
H. Attachments (Clause 3.17)
Table 3F.8 — Form 3-1: attachments
| Item | Attached (yes / no / not applicable) | Reference |
|---|---|---|
| H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on | ||
| H2. HSG map, water-table data and infiltration test results | ||
| H3. Parameter tables (Section D) and Tc worksheets (Section E) | ||
| H4. Design Rainfall Sheet (Form 2-1) and hyetographs | ||
| H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels | ||
| H6. Form 3-2 for each POC | ||
| H7. Calibration report (Clause 3.15) | ||
| H8. Native model input and output files (Clause 3.16.4) |
I. Statement by the responsible engineer (Clause 3.17 item 10)
I state that the methods and parameters of Chapter 3 of the Chhattisgarh Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.
Table 3F.9 — Form 3-1: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Organisation | |
| Signature | |
| Date |
Draft form — Chhattisgarh Stormwater Design Manual, Draft v1.0.
Form 3-2 — Pre- vs Post-Development Comparison
Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.
Draft form — Chhattisgarh Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.
A. Point of comparison (Clause 3.14.2)
Table 3F.10 — Form 3-2: point of comparison
| Field | Entry |
|---|---|
| A1. POC identifier and location | |
| A2. Area draining to the POC: site (ha) and off-site run-on (ha) | |
| A3. Off-site run-on passes through site storage? (Clause 3.14.2(c)) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c)) | |
| A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7) | |
| A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3) |
B. Peak flows (Clauses 3.14.7–3.14.10)
Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).
Table 3F.11 — Form 3-2: peak flows by AEP and duration
| AEP | Duration (h) | AMC | Q_pre | Q_post, uncontrolled | Q_post, routed | Limit | Met? |
|---|---|---|---|---|---|---|---|
| 50% (2-yr) | 1 | II | |||||
| 50% (2-yr) | 2 | II | |||||
| 50% (2-yr) | 3 | II | |||||
| 50% (2-yr) | 6 | II | |||||
| 50% (2-yr) | 12 | III | |||||
| 50% (2-yr) | 24 | III | |||||
| 50% (2-yr) | 48 | III | |||||
| 50% (2-yr) | 72 | III | |||||
| 10% (10-yr) | 1 | II | |||||
| 10% (10-yr) | 2 | II | |||||
| 10% (10-yr) | 3 | II | |||||
| 10% (10-yr) | 6 | II | |||||
| 10% (10-yr) | 12 | III | |||||
| 10% (10-yr) | 24 | III | |||||
| 10% (10-yr) | 48 | III | |||||
| 10% (10-yr) | 72 | III | |||||
| 1% (100-yr) | 1 | II | |||||
| 1% (100-yr) | 2 | II | |||||
| 1% (100-yr) | 3 | II | |||||
| 1% (100-yr) | 6 | II | |||||
| 1% (100-yr) | 12 | III | |||||
| 1% (100-yr) | 24 | III | |||||
| 1% (100-yr) | 48 | III | |||||
| 1% (100-yr) | 72 | III |
C. Volumes and storage (Clauses 3.14.8–3.14.10)
Table 3F.12 — Form 3-2: volumes and storage
| AEP | Governing duration (h) | Runoff volume, pre | Runoff volume, post uncontrolled | Retention volume | Detention storage required | Peak water level in storage (m) |
|---|---|---|---|---|---|---|
| 50% (2-yr) | ||||||
| 10% (10-yr) | ||||||
| 1% (100-yr) |
C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______
D. Sensitivity runs (Clauses 3.8.5, 3.14.11)
Table 3F.13 — Form 3-2: sensitivity runs
| Run | Governing storm (AEP, duration) | Change in Q_post, routed (%) | Change in required storage (%) | Retention volume or WQv governing (Clause 3.8.5(c)) |
|---|---|---|---|---|
| Ia = 0.05S | ||||
| Standard peak rate factor (only where a lower factor is used) | — |
E. Associated checks (Clause 3.14.12)
Table 3F.14 — Form 3-2: associated checks
| Check | Result | Reference in submittal |
|---|---|---|
| Drawdown times (Chapter 4) | ||
| Minimum orifice and trash screen (Chapter 4) | ||
| Emergency spillway (Chapter 4) | ||
| Outfall-closed storage check (Chapter 5) | ||
| Downstream analysis (Chapter 5) |
F. Statement by the responsible engineer
I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).
Table 3F.15 — Form 3-2: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Chhattisgarh Stormwater Design Manual, Draft v1.0.