Chapter 7Waterbodies, Talabs (Ponds) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (talab) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Chhattisgarh, with no coast and no tidal water, means Kopra Jalashay near Bilaspur, the State's first Ramsar site, any wetland notified under the 2017 Rules (no notified wetland was found), the talabs and wetlands of more than 2.25 ha that the Chhattisgarh State Wetland Authority treats as protected, such as Karbala Talab and Narhaiya Talab at Raipur and the Jhanjh wetland at Nava Raipur Atal Nagar (as reported), the city talabs and the lakes and reservoirs of Nava Raipur Atal Nagar, the floodplain wetlands and depressions of the rivers, mine pit lakes, and the talabs, bandhs and dabris recorded in the Revenue records;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Chhattisgarh Land Revenue Code, 1959 (sections 237, 248 and 251), the Municipal Corporation Act, 1956 and the Municipalities Act, 1961 as adapted in Chhattisgarh, the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973 and the CGBVN 1984 made under it, the Chhattisgarh Act of 2002 on the regularisation of unauthorised development (section 7(1)(iv)), the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (such as the Mahanadi, the Seonath, the Kharun, the Arpa, the Hasdeo, the Mand, the Kelo, the Maniyari, the Indravati and the Sabari), natural drain or nala (narwa), canal, reservoir, jalashay or barrage pond (such as Gangrel (Ravishankar Sagar), Minimata Bango, Kharang, Maniyari, the Kelo dam and Kopra Jalashay, and the ponds of the barrages at Darri, Mongra and Bhaisajhar), lake (such as the lakes and reservoirs of Nava Raipur Atal Nagar, among them Jhanjh), talab or pond (such as Budha Talab, Telibandha, Karbala Talab and Narhaiya Talab at Raipur), bandh (a tank held by an earthen bund, such as Maharajbandh at Raipur), dabri (a small dug pond), kund (a small walled or embanked tank), marsh or low wet land, floodplain wetland or depression, mine void or pit lake, ash pond, abandoned quarry or borrow pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (talab) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder channel, nala, narwa or canal) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, sluice gate or regulator) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Chhattisgarh terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Talab (तालाब) | A natural or excavated depression that stores rainfall runoff: "Pond, pool, tank, reservoir of water" in Platts, and "जलाशय । सरोवर । पोखरा" in the Shabdasagara (Annex 7E). A talab is a tank or pond under Clause 7.2, such as Budha Talab, Karbala Talab and Narhaiya Talab at Raipur. Many talabs have no surplus weir or sluice; where a talab has none, its FTL is the level at which it spills to a nali, a nala or low ground, found by survey. A village tank vested in the State under section 251 of the Chhattisgarh Land Revenue Code, 1959, and a public tank vested in a local body under the Municipal Acts as adapted in Chhattisgarh, are talabs for this chapter. |
| Recorded talab | A talab, bandh, dabri, kund, lake or reservoir shown in the Revenue records (as land "recorded as a pond, a water body" or otherwise), the local body's records, a Development Plan, a T&CP site report, a list of the Chhattisgarh State Wetland Authority, or a list filed before a court or the National Green Tribunal. A recorded talab is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, including under a sanitary power of a Municipal Act, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual. |
| Monsoon water line | The outer edge of a talab's, lake's, reservoir's or wetland's water in the monsoon: the larger of the edge shown by dated imagery or survey of the monsoon (July to September) in recent years and the edge recorded in the Revenue records, and where neither is available, the MWL contour. The boundary of a talab or lake under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and its monsoon water line, and setbacks are measured from that boundary. This definition is set by this Manual. |
| Highest water mark; high flood mark; highest flood level | The inherited 1984 text of Rule 50(b) of the CGBVN 1984 measures its distances from "the highest water mark" and, for a major watercourse, from the "average high flood mark" (Chhattisgarh text not read [TBC]); the Chhattisgarh State Wetland Authority measures its 50 m from the highest flood level (as reported); and none of these is defined. For this Manual, the highest water mark, high flood mark or highest flood level of a talab, lake, reservoir or wetland is taken to be no lower than the higher of its FTL and its monsoon water line, and that of a channel no lower than its top of bank; where WRD has given a high flood point for the site under the T&CP checklist of 2011, the line is no lower than that point. This reading is set by this Manual; it is not a statutory interpretation, and a court or the State Government may read the rule otherwise. |
| City talab cluster; talab-locked outfall | A city talab cluster is a group of talabs within or next to a town, linked by colony nalas, overflow channels and the low ground between them, that drains by a nala to a river, such as the talabs of Raipur, which drain to the Kharun (Figure 7.3). The talabs of a cluster are modelled together as a cascade (Clause 7.7.2). A talab-locked outfall is a drain outfall into a talab, lake or reservoir that cannot discharge freely while the water is at or above its FTL or spill level. Its tailwater is the water level: the MWL, or the FTL plus the surcharge of the design flood, as the custodian records them, or, where neither is recorded, FTL + 0.5 m, a value set by this Manual (Chapter 5). |
| Dabri; bandh; kund | A dabri (डबरी) is "छोटा गड्ढा या ताल", a small pit or pond, in the Shabdasagara (Annex 7E); in this Manual it is a small dug pond of a farm or village, such as those dug under the State's rural schemes. A dabri is a waterbody for Clause 7.3 and a tank in a cascade for Clause 7.7.2, but its storage is never counted as design storage, because it is not surveyed, has no outlet and is usually full by the time of the peak storm. A bandh (बाँध) is an embankment or dam (Annex 7E), and in Raipur the name of embanked tanks such as Maharajbandh and Telibandha; a bandh is a tank under Clause 7.2 and its bund a tank bund (Clause 7.14.2). A kund (कुंड) is a small embanked or walled tank (Annex 7E); it is a waterbody for Clause 7.3, and a tank or pond where it receives runoff. |
| Nala; narwa; nali | A nala is a channel that runs a long way across the land, by which rainwater goes to a river (Annex 7E), such as the Shankar and Pulgaon nalas of Durg; narwa (नरवा) is given by the Shabdasagara as the same word, and is the stream word of the State's Narwa–Garuwa–Ghuruwa–Bari programme (as reported); a nali is a small street or house drain. Every nala or narwa that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it and whether or not it is lined, piped or covered. No rule dividing natural nalas from municipal drains was found; Chapter 6 gives this Manual's working assignment, and the definition, not the owner or the name, decides which clauses apply. |
| Nistar | The rights of common use of village land and water by the village community, which the vesting of a tank in the State does not take away (Chhattisgarh Land Revenue Code, 1959, s. 251), and for which the Collector may set land apart, including tanks (s. 237) (Annex 7E). Bathing and washing at a talab's ghats, and watering cattle, are nistar uses. Nistar and irrigation rights in a talab are uses of it that Clause 7.8.2(d) protects, and the ghats are part of the talab for this chapter. |
| Kanhar; dorsa; matasi; bhata | The four traditional land and soil classes of the Chhattisgarh plain, from the lowest ground to the highest: kanhar, deep black cracking clay (Vertisol); dorsa, clay loam, vertic in places (Alfisol); matasi, sandy loam to silt loam (Inceptisol); and bhata, thin gravelly soil less than 30 cm deep over murram or ferricrete (Entisol) (agronomy papers; Annex 7E). The city talabs and the paddy land lie on kanhar and dorsa. Kanhar and puddled paddy lowland within the 1% AEP extent are flood storage under Clause 7.6, and no infiltration facility is placed on kanhar (Clause 8.8.1). |
| Mine void; pit lake | A mine void is an opencast excavation left open in a coal or mineral lease, worked out or not; a pit lake is a void that holds water. A mine void or pit lake is a waterbody for Clause 7.3 and is recorded in the inventory with its lessee as custodian. It is not a design outfall, and its storage is never counted under Clause 7.7, unless the lessee and the DGMS consent in writing and its water level, spill level and spill path are surveyed; even then it is treated as a tank under Clauses 7.7, 7.8 and 7.14, with a stability check of its benches and highwalls and a water-quality plan. No development shall drain into an active mine or working (Coal Mines Regulations, 2017, reg. 149, as reported). A fenced pit lake to which the public has no access is not subject to Clause 7.9.4, but its fence and warning signs are maintained by the lessee. This definition and rule are set by this Manual. |
| Ash pond; ash dyke | An ash pond is a pond, held by an earthen ash dyke, into which a thermal power plant discharges its ash as slurry, such as the ash ponds of NTPC at Dhanras, of CSPGCL at Korba West and of BALCO near Korba. An ash pond is a waterbody for Clause 7.3, recorded with its operator as custodian; it is never a design outfall or design storage, no drain under this Manual discharges to it, and the path of a breach of its dyke is a hazard to be mapped (Chapter 5), not a design inflow. Ash dykes in the Korba area are reported to have breached, or to have released slurry to nalas and the Hasdeo, in 2024 to 2026 (Clause 7.14, Commentary). This definition and rule are set by this Manual. |
| Overburden dump; mine-disturbed ground | An overburden dump is a heap of the rock and soil removed to reach a mineral. Mine-disturbed ground is overburden dumps, backfilled or reclaimed mine land, compacted mine benches and haul roads, and subsidence ground; ground filled with ash is treated in the same way. For this Manual it is HSG D for every storm, with no infiltration credit (Chapter 3); runoff from it passes a sediment basin and stable toe drains (garland drains) before it reaches any urban drain, talab or outfall (Clause 8.12); and no overburden, spoil, ash or silt is placed in the setback of any waterbody (Clause 7.5.1). |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with WRD and the Revenue and Disaster Management Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Municipal Corporation, Nagar Palika Parishad or Nagar Panchayat (in which public tanks, streams, drains and watercourses vest under the Municipal Corporation Act, 1956 and the Municipalities Act, 1961, as adapted in Chhattisgarh; section 82 of the 1956 Act in its Madhya Pradesh text, the Chhattisgarh text not read [TBC]), NRDA (for the lakes, reservoirs, streams and drains of Nava Raipur Atal Nagar), RDA, the Chhattisgarh Housing Board or a colony developer (for the ponds and drains of its scheme until they are handed over), the Bhilai Steel Plant (SAIL) (for the tanks and drains of its township), WRD (for its rivers, dams, reservoirs, barrages, irrigation tanks and canals, such as Gangrel, Minimata Bango, the Hasdeo barrage at Darri, Kharang and Kopra Jalashay), the State Government through the Collector and the Tehsildar (for a tank vested in the State under section 251 of the Chhattisgarh Land Revenue Code, 1959, or land set apart for nistar under section 237), the Gram Panchayat, a mine lessee, such as SECL (for a mine void, pit lake, settling pond or garland drain within its lease), a power company, such as NTPC, CSPGCL or BALCO (for an ash pond or ash dyke), the Chhattisgarh State Wetland Authority (for a notified wetland, or a wetland it treats as protected), a private owner, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records (khasra) and village maps of the Revenue Department, in which talabs, dabris, nalas and land covered by water are recorded, including the tanks vested in the State under section 251 of the Chhattisgarh Land Revenue Code, 1959 and the land set apart for nistar under section 237, and land "recorded as a pond, a water body" whose unauthorised occupation is proceeded against under section 248 (as at Baloda, NGT O.A. 78/2024); the public tanks, streams, drains and watercourses vested in a Municipal Corporation or other local body under the Municipal Acts as adapted in Chhattisgarh; the water bodies, rivers and nalas shown in a Development Plan under the 1973 Adhiniyam, such as the Raipur Development Plan (Revised) 2021, the Naya Raipur Development Plan-2031 and the Arpa Special Area Development Plan 2033, and the waterlogging areas, nalas and areas left for nalas recorded in the T&CP site reports and checklists (2011), with the high flood points supplied by WRD; the boundary of Kopra Jalashay as designated under the Ramsar Convention, of any wetland notified under the Wetlands (Conservation and Management) Rules, 2017, and of the talabs and wetlands that the Chhattisgarh State Wetland Authority treats as protected, with the survey of the water bodies of Raipur district that it directed on 8 May 2023; the mining plans and mine closure plans of mine lessees, which show voids, pit lakes, settling ponds and garland drains; and the ash pond and ash dyke layouts of the power plants;
- (b) WRD and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. No 1% AEP flood map of any Chhattisgarh city was found, and no design return period for urban drains has been published for any city except Nava Raipur, whose development plan asks for a 5-year intensity (Naya Raipur Development Plan-2031, §10.3.1.1). No State law, rule or WRD order zoning the floodplains of the rivers was found, and Chhattisgarh is not among the States reported to have enacted the model floodplain zoning bill (as reported). The planning process asks for flood information but supplies none. For land next to a nala, canal, river or watercourse, the T&CP checklist of 2011 asks for "जल संसाधन विभाग से उच्च बाढ़ बिन्दु की जानकारी", the high flood point from WRD, and for the no-objection of WRD or the Revenue Department (No. 1569/स्टेनो/नग्रानि./2011); it is the only flood-level requirement found in the planning process. The T&CP site-report format of the same year asks whether the land is a waterlogging area and whether it lies beside a canal, nala or river, and at what distance, and records the area left for nalas (No. 1680/TCR-2/नग्रानि./2011); and the site-inspection form of the amendment of 6 October 2018 asks whether a major nala is adjacent to the plot and its nearest distance, to comply with a rule of the CGBVN 1984 whose number the Gazette leaves blank (Appendix Q, item 9). The inherited 1984 text asks that a site plan show "the approximate location and size of any water body, flood affected areas and contours at an interval of 0.3 meters" where the site is steeper than 1 in 20 (r. 17(4)(j), as extracted; Chhattisgarh text [TBC]), but "flood affected areas" are mapped by no agency. Few rivers that receive the cities' drains have a published flood level: the CWC gives warning and danger levels in Chhattisgarh only for the Indravati at Jagdalpur, and the highest levels recorded at its other sites, such as 281.68 m on the Kharun at Pathardihi on 29 August 2020, are known only through transcriptions (as reported; Chapter 5). The survey of all the water bodies of Raipur district that the State Wetland Authority directed on 8 May 2023 was reported in 2025 to have been carried out only at Karbala Talab (as reported), and no level, area or capacity of any of Raipur's talabs or of the lakes of Nava Raipur Atal Nagar was found on an official record. Clause 7.3.4 lets the Authority adopt flood maps once they are issued; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and the high flood point that WRD gives under the checklist is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Levels shall be stated to one datum (Clause 7.3.5), because no source read for this Manual states the datum of the CWC levels or of the full reservoir levels in WRD's tank gauge reports. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (no statutory distance from water was read in the Chhattisgarh text of the CGBVN 1984: its Rule 50 on unsuitable sites is inherited from a 1984 text that sets 9 m from the highest water mark and, for a major watercourse, 9 m from the average high flood mark or 15 m from the defined boundary, whichever is more, and whether the Chhattisgarh text keeps these distances is to be confirmed [TBC]; the Chhattisgarh State Wetland Authority applies 50 m from the highest flood level around the talabs and wetlands it treats as protected (as reported); this Manual applies 15 m to every waterbody; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval of WRD for a work on or next to one of its rivers, dams, reservoirs, barrages or canals, or the high flood point and no-objection of WRD or the Revenue Department that the T&CP checklist of 2011 asks for land next to a nala, canal, river or watercourse, the views or permission of the Chhattisgarh State Wetland Authority for a work within 50 m of the highest flood level of a talab or wetland that it treats as protected, or for a regulated activity at Kopra Jalashay or in a notified wetland, the consent of the mine lessee and of the DGMS for a work that drains to, or lies next to, a mine void, pit lake or working, the consent of the operator for a work next to an ash pond or ash dyke, or a direction of the High Court of Chhattisgarh or the National Green Tribunal (such as the order on the ponds of Baloda listed in the Disclosure to Clause 7.4) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual. No statutory distance from water was read in the Chhattisgarh text of the CGBVN 1984, whose base or consolidated text was not found. Rule 50 is still the State's rule on the unsuitability of a building site: the T&CP Directorate's report format of 2011 asks whether a site is unsuitable under it, whether the land is a waterlogging area, and whether it lies beside a canal, nala or river and at what distance (letter No. 1680/TCR-2/नग्रानि./2011 of 23 June 2011). The 1984 text inherited from Madhya Pradesh bars a building site within 9 m of the highest water mark and, for a major watercourse, within "9 meters from average high flood mark or 15 meters from the defined boundary of water course, whichever is more" (r. 50(b), as extracted); whether the Chhattisgarh text keeps these distances is to be confirmed [TBC]. For land next to a nala, canal, river or watercourse, the T&CP checklist of 2011 asks for the high flood point from WRD and the no-objection of WRD or the Revenue Department, but sets no distance (No. 1569/स्टेनो/नग्रानि./2011). Around the talabs and wetlands it treats as protected, among them Karbala Talab and Narhaiya Talab at Raipur and the Jhanjh wetland at Nava Raipur Atal Nagar, the Chhattisgarh State Wetland Authority applies the bar of the Wetlands (Conservation and Management) Rules, 2017 on work within 50 m of the highest flood level (as reported). No distance from a nala as such was found, and Chhattisgarh has no floodplain zoning law. This Manual's 15 m, the greater distance of the inherited Rule 50(b) applied to every talab, nala and watercourse, gives every waterbody a hydraulic corridor, and is this Manual's proposal, not a statutory width (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Chhattisgarh flood maps are mostly coarser than US maps, the kanhar and dorsa lowlands around the city talabs of the Chhattisgarh plain, where Raipur, Durg–Bhilai and Bilaspur are growing, are flat, with slopes of less than 2 to 3% (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Chhattisgarh's building rules are still the 1984 rules inherited from Madhya Pradesh in 2000, retitled the Chhattisgarh Bhumi Vikas Niyam 1984 and amended since by the Housing and Environment Department under s.85(1) read with s.24(3) of the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam 1973; no base or consolidated Chhattisgarh text was found, in print or in the archived pages of the T&CP Directorate. Rule 50 is still the State's rule on the unsuitability of a building site: the Directorate's site-report format asks "नियम 50 के अंतर्गत अनुपयुक्तता तो नहीं है", whether the land is unsuitable under Rule 50 (letter No. 1680/TCR-2/नग्रानि./2011 of 23 June 2011). In the inherited 1984 text, the rule bars a site "within a distance of 9 meters of the highest water mark" and, for a major watercourse, within "9 meters from average high flood mark or 15 meters from the defined boundary of water course, whichever is more" (r. 50(b), as extracted from the Madhya Pradesh text); whether the Chhattisgarh text keeps these distances was not confirmed [TBC], and no amendment from 2008 to 2023 read for this Manual changes Rule 50. The rules show that a nala distance exists without showing it: the site-inspection form of the amendment of 6 October 2018 asks "Is Nalah (Major Drain) adjacent to plot or not. If yes, then nearest distance of nalas from plot. (Proposal should comply with in rule of Chhattisgarh Bhumi Vikas Niyam, 1984)", with the rule number left blank (No. F 7-27/2017/32, Appendix Q, item 9). The other lines in the planning law have no width. For land next to a nala, canal, river or watercourse, T&CP asks for the no-objection of WRD or the Revenue Department and the high flood point from WRD (checklist No. 1569/स्टेनो/नग्रानि./2011); integrated townships may not be laid out on land beside a perennial river (Appendix ण(2)(iii), 17 December 2008), nor may permission be given on such land for agricultural land in a planning area without a development plan (Housing and Environment Department order No. F 7-35/2012/32 of 2 January 2013, para 2.4(iii)); and construction on the bed or edge of a reservoir or tank, or on a natural drain, may not be regularised (Chhattisgarh Act of 2002 on the regularisation of unauthorised development, s. 7(1)(iv)). The Municipal Corporation Act, 1956 as adapted in Chhattisgarh was not read; its Madhya Pradesh text adds no width, but lets the Commissioner have a building over a drain vested in the Corporation pulled down if it was built without permission (s. 198) and keeps drains and latrines a hundred feet from a tank used for public water supply (s. 199) [TBC]. The widest line in use is the wetland line. Around the talabs and wetlands of more than 2.25 ha that it treats as "deemed" wetlands under the Supreme Court's rulings in M.K. Balakrishnan (2017) and Anand Arya (2024), the Chhattisgarh State Wetland Authority applies the bar of rule 4 of the Wetlands (Conservation and Management) Rules, 2017 on work within 50 m of the highest flood level: it halted works of about ₹1.5 crore at Karbala Talab in Raipur on 30 September 2025 because paver blocks had been laid within 50 m of the highest flood level; a plan for a toy train in the buffer of Narhaiya Talab at Tikrapara led to an inquiry by the Collector as chair of the District Wetland Conservation Committee (2025); and on 3 March 2025 it directed NRDA to withdraw two tenders for plotted development, floating recreation and branded residences next to the Jhanjh wetland at Nava Raipur Atal Nagar, which NRDA had said was not a protected zone (all as reported). Mining leases carry their own lines: the appraisal record of the environmental clearance of 13 August 2024 for a coal mine in Chhattisgarh records a DGMS distance of 15 m from a river bank against a 100 m buffer required by the appraisal committee (as recorded in the clearance). Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Chhattisgarh has no confirmed statutory setback in metres from water. Rule 50 of the CGBVN 1984 is the State's rule on unsuitable building sites, but its Chhattisgarh text was not found; the 1984 text it inherits from Madhya Pradesh sets 9 m from the highest water mark and, for a major watercourse, 9 m from the average high flood mark or 15 m from the defined boundary, whichever is more, and whether the Chhattisgarh text keeps these distances is to be confirmed [TBC]. The one distance applied in practice is the 50 m from the highest flood level that the Chhattisgarh State Wetland Authority applies, under the Wetlands (Conservation and Management) Rules, 2017, to the talabs and wetlands it treats as protected (as reported). No floodplain zoning law, no notified flood zone and no WRD demarcation of a river's floodplain was found, and no distance from a nala as such. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, to give every talab, nala and watercourse the greater width of the inherited Rule 50(b). So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's readings of the "highest water mark", "high flood mark" and "highest flood level" and of the monsoon water line, and the conditions on mine voids, pit lakes and ash ponds (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body has adopted or endorsed them. The setback is applied as the larger of the corridor and any statutory, plan, wetland or court line, so the Manual is stricter than statute along talabs, nalas and watercourses, and no less strict anywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- Rule 50 of the CGBVN 1984 (inherited text; Chhattisgarh text [TBC]). No building site within 9 m of the highest water mark, or, along a major watercourse, within 9 m of the average high flood mark or 15 m of its defined boundary, whichever is more, and no building on a site that is not properly drained or cannot be well drained. Where the Chhattisgarh text confirms these distances, the 15 m equals Zone 1's floor and the 9 m is narrower and never governs alone; a wider distance in the Chhattisgarh text or in a development plan governs where it applies.
- The WRD high flood point and no-objection. For land next to a nala, canal, river or watercourse, T&CP asks for the high flood point from WRD and the no-objection of WRD or the Revenue Department (checklist No. 1569/स्टेनो/नग्रानि./2011). It sets no width, but the high flood point is a level below which Zone 2 never ends (definitions after Clause 7.2).
- Rivers, reservoirs and natural drains in the planning law. No integrated township on land beside a perennial river (Appendix ण, 17 December 2008), and no permission on such land for agricultural land in a planning area without a development plan (order of 2 January 2013); and no regularisation of construction on the bed or edge of a reservoir or tank or on a natural drain (Chhattisgarh Act of 2002 on the regularisation of unauthorised development, s. 7(1)(iv)).
- Wetlands and Kopra. No work within 50 m of the highest flood level of a talab or wetland that the Chhattisgarh State Wetland Authority treats as protected, applied at Karbala Talab and Narhaiya Talab in Raipur and at the Jhanjh wetland in Nava Raipur Atal Nagar (2025, as reported); no Chhattisgarh wetland was found notified under the Rules. Kopra Jalashay, the State's first Ramsar site (210 ha), is protected to its Ramsar boundary.
- Tanks in the Revenue records. Village tanks with rights of irrigation or nistar vest in the State (Chhattisgarh Land Revenue Code, 1959, s. 251), the Collector may set land apart for tanks for nistar (s. 237), and occupation of a pond recorded in the land records is removed as unauthorised occupation (s. 248), as at Baloda on the order of the National Green Tribunal (O.A. 78/2024, order of 14 November 2024). These protect the waterbody, not a flood corridor; the whole recorded and monsoon extent is a waterbody for this chapter.
- WRD, mine and ash-dyke lines. Works on or next to WRD rivers, dams, reservoirs, barrages and canals need its approval; works next to a mine void, pit lake or working need the lessee's and the DGMS's consent, and an environmental clearance may set a wider buffer from a river (as in a clearance of 2024 for a coal mine in the State, which records a DGMS distance of 15 m and a 100 m buffer required by the appraisal committee); works next to an ash pond or ash dyke need its operator's consent.
This Manual sets 15 m as the floor because no width has been confirmed for talabs and nalas in the Chhattisgarh text of the rules; because 15 m is the greater distance of the inherited Rule 50(b); because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that the nalas need. The reasons for the corridor are the record: Raipur, reported to have had about 130 talabs, is reported to keep about 37 to 40, "all … polluted and heavily silted" (as reported; the counts conflict); in July 2026 five ponds overflowed into homes at Chaubey Colony in Raipur, and drains were reported narrowed from seven or eight feet to four or five by encroachment (as reported); the Raipur Municipal Corporation recorded in 2015 that its storm drains covered 49% of the city, that "Capacity of drain is not sufficient", and that 11 road stretches flooded two or three times a year (AMRUT service-level improvement plan); and the State Wetland Authority found works within the 50 m line at Karbala Talab and at the Jhanjh wetland (2025, as reported). Until a statute, rule, notification, development plan or court adopts it, the 15 m minimum is this Manual's recommended standard, and the statutory, plan, wetland and court controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the community open space required by the Chhattisgarh Bhumi Vikas Niyam 1984, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Chhattisgarh practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The kanhar and dorsa lowlands and paddy land of the Chhattisgarh plain, the margins of its city talabs and the floodplains of the Seonath, the Kharun and the Arpa are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Chhattisgarh the lines around talabs and wetlands are measured from a high level, not from the dry-season water line: the inherited text of Rule 50(b) of the CGBVN 1984 measures from "the highest water mark" and the "average high flood mark" (Chhattisgarh text [TBC]), the State Wetland Authority measures its 50 m from the highest flood level, and T&CP asks WRD for the high flood point of land beside a nala or river. The difference matters on the plain, where a talab's dry-season pool can be much smaller than its monsoon spread: Raipur's remaining talabs are reported to cover about 69 ha together, and to be heavily silted (as reported), and no authoritative area was found even for Budha Talab, reported at about 30 ha (as reported), so a line drawn from the shrunken summer edge would leave much of a talab's own storage open to building. This Manual gives the same rule a level for every talab, bandh and lake: its monsoon water line, and its FTL, are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL, often kanhar paddy land, is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Raipur, such as the colonies around its talabs, where five ponds overflowed into homes at Chaubey Colony in July 2026, and the low ground along the Kharun at Mahadev Ghat, overtopped in September 2026 (both as reported), of Bilaspur along the Arpa, and of Korba along the Hasdeo below the barrage at Darri, where houses at Motisagarpada, Seetamani and Imliduggu were flooded when the Bango and Darri gates were opened in August 2024 (as reported) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Chhattisgarh has no tank Act, and its storages range from village dabris a few metres across to river reservoirs held by gated dams. The storages that matter for urban drainage are of five kinds. The first is the urban and village talab, bandh, dabri or kund of the plain, usually with no outlet structure, recorded in the Revenue records and vested in the State (Chhattisgarh Land Revenue Code, 1959, s. 251) or, in a town, in the local body. Raipur's are the clearest case: a cluster of talabs, such as Budha Talab (Vivekananda Sarovar, reported at about 30 ha), Telibandha, Kankali, Maharajbandh, Karbala and Narhaiya, linked by colony nalas that drain to the Kharun (all as reported), with a storm-drain project for Raja Talab among the works of the Municipal Corporation's plan of 2015 (AMRUT service-level improvement plan). These are the tanks for which Figure 7.3 and Clause 7.7.2 matter most, and no level, capacity or operating rule for any of them was found. The second is the network of lakes and reservoirs of Nava Raipur Atal Nagar, reported to number 55, among them the Sendh, Jhanjh and Khandawa lakes, into which the development plan makes the parks "storm water carriers" and asks that rainwater be stored "into dug up or natural lakes/ depressions, from the storm water drainage system" (Naya Raipur Development Plan-2031, §10.3.2; the count as reported); they are held by NRDA, and the Jhanjh wetland among them is treated by the State Wetland Authority as protected (as reported). The third is WRD's reservoirs and barrages, such as Gangrel (Ravishankar Sagar), Minimata Bango, the Hasdeo barrage at Darri, Kharang, Maniyari, the Kelo dam, Mongra and the Arpa barrage at Bhaisajhar, and the smaller tanks near Raipur, such as Kumhari and Pendrawan, whose full reservoir levels WRD reports (tank gauge report of 10 October 2024); their releases enter a design as inflow and tailwater (Chapter 5), and they are not tanks for these clauses unless their storage is counted. Kopra Jalashay near Bilaspur, built by WRD in 1993 and the State's first Ramsar site, overflows to the Ghonga, which joins the Maniyari and the Seonath (Ramsar Information Sheet). The fourth is the dabris and farm ponds of the villages on the urban fringe, modelled as existing features of a catchment but not counted as storage (definitions after Clause 7.2). The fifth is the mine voids, pit lakes and ash ponds of the coalfields and power plants of Korba, Raigarh and Surguja; no inventory of the voids of the Hasdeo-Arand and other coalfields was found, and they are treated under the definitions after Clause 7.2. Clauses 7.7 and 7.8 apply to any of these whose storage is counted; any city talab, Nava Raipur lake, reservoir or pit lake whose storage is to be counted is subject to Clause 7.7.1 in full, with the local body, NRDA, WRD, the lessee or other custodian, and the custodian of each talab and lake shall be confirmed for the inventory (Annex 7A).
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, on the Chhattisgarh plain, every talab of a city cluster such as Raipur's that the colony nalas and overflow channels link, with its FTL or spill level, MWL and overflow, the nala it overflows to and the river that nala reaches, such as the Kharun at Raipur, the river level being the tailwater of the nala, and the paddy lowland on the cluster's fringe, which stores flood water and is not to be filled, as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Chhattisgarh's worst floods have come when the reservoirs and talabs were already full. On 4 and 5 July 2026 five ponds overflowed into homes at Chaubey Colony in Raipur, with water standing in Adarsh Nagar, DD Nagar, Shankar Nagar and Tatibandh (as reported); in the statewide flood of 24 to 27 September 2026, with all 14 gates of Gangrel open, the Kharun overflowed at Mahadev Ghat, Amleshwar and Khudmuda and about 2,000 people were shifted at Abhanpur (as reported); about 3 October 2025 Gangrel, at 348.68 m and 99.49% full, released about 55,000 cusec through 8 gates and 72 riverside villages were alerted (as reported); and on 24 to 26 August 2024 Minimata Bango released about 30,000 cusec through 6 gates and the Darri barrage about 20,000 cusec, and houses were flooded in Korba (as reported). No record of how long Raipur's talabs or Nava Raipur's lakes stay at or above their spill level in a wet spell was obtained for this Manual. While a talab is full, it stores nothing more below FTL, the colony drains and nalas that flow into it discharge against its spill level, and its overflow adds to the flow in the nala below it, which itself discharges against the river. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A city talab cluster on the Chhattisgarh plain (schematic, not to scale; Raipur-type, but no particular talab, nala or colony is shown). A: in plan, the colony drains (nali) and colony nalas lead into a ring of talabs on the low kanhar and dorsa ground; the talabs spill one to another through overflow channels, and the lowest overflows to a nala that runs past a paddy-lowland fringe to the river, such as the Kharun at Raipur. The talabs, the nalas and the river are modelled together as a cascade (Clause 7.7.2); each talab's FTL or spill level and monsoon water line are part of its boundary, from which Zone 1 (at least 15 m, this Manual's proposal) and, where it binds, the State Wetland Authority's 50 m line from the highest flood level are measured (definitions after Clause 7.2). The ghats used for bathing and washing (nistar) stay part of the talab. The paddy lowland is flood storage and is not filled (Clause 7.6). B: in section, a full talab stores nothing more below its spill level, its inflow nalas discharge against that level, and the nala below it discharges against the river; while the river is high the nala's outfall is river-locked (Chapter 5). No infiltration facility is placed on kanhar. On the matasi or bhata upland above the limestone of the Raipur–Durg–Rajnandgaon belt, which is karstified and cavernous (CGWB), a recharge well takes filtered roof water only, and only after a cavity check (Clause 8.8.1). The cluster, the 15 m minimum and the cavity check are this Manual's proposals; the inherited Rule 50(b) distances, once confirmed for Chhattisgarh, the State Wetland Authority's line and the WRD high flood point govern where they say more. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, CGSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.
Commentary. No operating rule for a Chhattisgarh talab, city lake or Nava Raipur reservoir that keeps a flood cushion was found, and most talabs have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter in the towns are the releases of WRD's reservoirs and barrages. WRD reports the full reservoir level, live storage and spillway release of its reservoirs and barrages in a daily tank gauge report (as on 10 October 2024), but no rule fixing the levels, dates and rates at which their gates are opened was found. Gangrel was at 99.49% of its storage, and about 0.02 m below its full reservoir level of 348.70 m, when it released about 55,000 cusec in October 2025, and its 14 gates were all open in the flood of September 2026; Minimata Bango and the Darri barrage released together in August 2024 and flooded houses in Korba (all as reported). Without an agreed rule with dates, levels, release rates and a named operator, storage in a talab or reservoir cannot be relied on, and a release made without warning to the colonies downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July to September monsoon depression from the Bay of Bengal. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Most talabs have other users. The vesting of a village tank in the State leaves the rights of irrigation and nistar in it with the village (Chhattisgarh Land Revenue Code, 1959, s. 251), and those uses, such as bathing, washing and watering cattle at a talab's ghats, continue wherever a talab serves them. Drawing a talab down before a storm has a cost to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Chhattisgarh Environment Conservation Board (CECB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).
Commentary. No statewide order of the Urban Administration and Development Department for the pre-monsoon desilting of nalas or talabs, and no dated order of the Raipur Municipal Corporation, was found. After the Raipur flooding of July 2026, residents blamed inadequate desilting, and drains were reported narrowed from seven or eight feet to four or five by encroachment (as reported); at Bhilai, the Commissioner of the Municipal Corporation warned the Bhilai Steel Plant in July 2025 that the drains of its township had not been cleaned by the deadline of 15 June, and water hyacinth from them had blocked the culverts at Junwani and Kosanala (as reported). The date of 31 May in this Manual (25 May in the Bastar division) is set by this Manual, before the monsoon's normal onset in the State (about 11 to 13 June at Jagdalpur, 16 June at Raipur and 17 June at Bilaspur, IMD new normal dates, 2020; IMD's Meteorological Centre at Raipur uses 10 June). Excavation to "increase capacity" is governed by Clause 7.9.3; on the limestone of the Raipur–Durg–Rajnandgaon belt, which the CGWB describes as karstified and cavernous, deepening a talab can also open its bed to the cavities below (Clause 8.8.1). The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Chhattisgarh precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Chhattisgarh the town nalas vest in the local body, but the split between natural nalas and municipal drains has not been written down. The Municipal Corporation Act, 1956 and the Municipalities Act, 1961, as adapted in Chhattisgarh, were not read in their Chhattisgarh text; in the Madhya Pradesh text of the 1956 Act, public streams, drains and watercourses vest in the Corporation (s. 82), the Commissioner may "enlarge, arch over, discontinue or close up" a drain, with a substitute for lawful users (s. 193), and a building put up over a drain vested in the Corporation without permission may be pulled down (s. 198) [TBC]. No rule or order dividing natural nalas from municipal drains, or the local bodies' drains from WRD's rivers and canals, was found for this Manual; Chapter 6 gives this Manual's working assignment, under which the rivers, dams, reservoirs, barrages and canals lie with WRD, the nalas and drains within a town with its local body, the streams and drains of Nava Raipur Atal Nagar with NRDA, the drains of the Bhilai Steel Plant's township with the plant, the drains of a scheme with its builder until they are handed over, and the mine and ash-pond drains with the lessee or operator. The planning law knows the nala but gives it no width: the T&CP site report records "नाला क्षेत्र में छोड़ा गया क्षेत्र", the area left for nalas (2011), the site-inspection form asks for the distance of a major nala from the plot (amendment of 6 October 2018, Appendix Q, item 9), and construction on a natural drain may not be regularised (Chhattisgarh Act of 2002 on the regularisation of unauthorised development, s. 7(1)(iv)). The record shows nalas being lost. Raipur's storm drains covered 49% of the city in 2015, and "Capacity of drain is not sufficient In rainy season most of the drains are overflowed" (Raipur Municipal Corporation, AMRUT service-level improvement plan, 2015); in July 2026 drains in Raipur were reported narrowed from seven or eight feet to four or five by encroachment (as reported); Raipur's domestic sewage is reported to reach the Kharun through eight large nalas (as reported), which are therefore sewers as well as drains (Clause 8.9); and at Bhilai water hyacinth from the township drains blocked the Junwani and Kosanala culverts in 2025 (as reported). The inherited Rule 50 keeps a building off an undrained site, and the 2018 form records the nala distance; neither keeps a nala at its recorded width once it has been piped, narrowed or covered, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored talab or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Chhattisgarh no shared form of storage is required by the building rules: the rainwater harvesting of the CGBVN 1984 is plot-level (rule 78(4)) or, in an integrated township, township-level (Appendix ण), and the rules have no detention, peak-flow or "zero runoff" rule. The nearest existing form of shared storage is the lake network of Nava Raipur Atal Nagar, into which the development plan asks that rainwater be stored "into dug up or natural lakes/ depressions, from the storm water drainage system" (Naya Raipur Development Plan-2031, §10.3.2), and, in Raipur, the city talabs themselves, with the water-body rejuvenation reported among the components of the urban flood risk management project approved for Raipur in October 2025 (as reported). None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Chhattisgarh State Wetland Authority;
- (b) Kopra Jalashay near Bilaspur, the State's first Ramsar site (Site No. 2583; 210 ha; designated on 8 August 2025 according to the Ramsar Information Sheet, and announced in December 2025), to its Ramsar boundary, and any wetland notified under the 2017 Rules;
- (c) the talabs and wetlands of more than 2.25 ha that the Chhattisgarh State Wetland Authority treats as protected, such as Karbala Talab and Narhaiya Talab at Raipur and the Jhanjh wetland at Nava Raipur Atal Nagar (as reported), the lakes and reservoirs of Nava Raipur Atal Nagar, and the marshy low land and depressions of the river floodplains, such as those of the Mahanadi, the Seonath, the Kharun, the Arpa and the Indravati, within the 1% AEP extent of Clause 7.3.4 (the river channel itself is a waterbody under the rest of this chapter); and
- (d) any other marsh, wetland, talab, lake or pit lake that the Authority notifies, that the wetland authority lists, or that the High Court of Chhattisgarh or the National Green Tribunal directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Chhattisgarh's wetlands are the concern of the Chhattisgarh State Wetland Authority, reconstituted by an order of the General Administration Department of 17 December 2021 according to its report to the National Green Tribunal in O.A. 351/2019 (another source gives its establishment as 1 July 2020), with the Forest and Climate Change Department as its nodal department and the State Biodiversity Board as its secretariat (as seen in an extract of that report); in each district the Collector chairs a District Wetland Conservation Committee (as reported). No wetland notified under rule 7 of the 2017 Rules and no published inventory of wetlands was found; the Authority treats talabs and wetlands of more than 2.25 ha as "deemed" wetlands under the Supreme Court's rulings (as reported). It is the working regulator of Raipur's talabs: it halted works at Karbala Talab on 30 September 2025, ordered an inquiry over a plan for a toy train in the buffer of Narhaiya Talab (2025), and directed NRDA on 3 March 2025 to withdraw two tenders next to the Jhanjh wetland at Nava Raipur Atal Nagar; a Forest Division inquiry report of July 2023 on Karbala Talab is reported never to have reached the Authority, with similar findings on Budha Talab, Telibandha and Maharajbandh, and its directive of 8 May 2023 to survey every water body in Raipur district is reported to have been carried out only at Karbala (all as reported). Kopra Jalashay, a reservoir of 210 ha in Takhatpur block of Bilaspur district, about 10 km west of Bilaspur, built in 1993 and managed by WRD, is the State's first Ramsar site (Site No. 2583): its designation date is 8 August 2025 in the Ramsar Information Sheet, and it was announced on 12 December 2025 (as reported); the Sheet lists agricultural runoff and the growing urbanisation and development of the surrounding area among its threats, and the State is reported to aim at 20 Ramsar sites by 2030 (as reported). A drain outfall, desilting, diversion or gate operation in or near Kopra Jalashay, a notified wetland or a talab that the Authority treats as protected therefore needs the Authority's permission or views where the Rules or its directions reach it, as well as compliance with this chapter; for the talabs and lakes it does not reach, this chapter and the revenue and municipal law are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Chhattisgarh's talabs and rivers through the nalas (Clause 8.9, Commentary). Budha Talab in Raipur is reported to be polluted by "several drain lines", Raipur's remaining talabs are reported to be "polluted and heavily silted", and the city's domestic sewage is reported to reach the Kharun through eight large nalas (all as reported); in January 2021 the CECB told the National Green Tribunal that only Bilaspur had a sewerage system; the High Court heard in January 2025 that about 40% of Bilaspur's sewage would still reach the Arpa untreated (as reported); and the National Green Tribunal ordered in January 2026 that the treatment plants on the Shankar and Pulgaon nalas, which carry most of Durg's sewage to the Seonath, be finished within six months (as reported). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Chhattisgarh they apply in full to every new outfall, and every existing outfall to a talab, lake, wetland or river that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Chhattisgarh's main controls on filling and building in tanks are revenue law, the planning law and the courts. Village tanks vest in the State, with the rights of irrigation and nistar preserved (Chhattisgarh Land Revenue Code, 1959, s. 251), and a person who occupies land without authority is penalised and may be evicted summarily by the Tehsildar (s. 248). The route works when a court or tribunal drives it: in Nagar Panchayat Baloda (Janjgir-Champa district), on land "recorded as a pond, a water body", among them the Babu, Noni and Ramsagar ponds and Andhari Talab, the National Green Tribunal (Central Zone) directed the Collector on 14 November 2024 "to ensure the removal of encroachments within the reasonable time", and the Tahsildar reported that "legal proceedings have been initiated under Section 248 of the Chhattisgarh Land Revenue Code, 1959, against individuals who have unlawfully encroached upon ponds" (O.A. 78/2024, report of 27 December 2024). Construction on the bed or edge of a reservoir or tank, or on a natural drain, may not be regularised (Chhattisgarh Act of 2002 on the regularisation of unauthorised development, s. 7(1)(iv)); whether the later regularisation Acts and rules of 2016 and 2022 keep this bar was not checked. In the towns, public tanks vest in the local body under the Municipal Acts as adapted (Chhattisgarh texts not read [TBC]). The losses are reported, not measured: Raipur is reported to have had about 130 ponds, of which half had gone by 2001 and about 37 to 40 remain (as reported; the counts conflict, and a figure of about 200 is also reported); a petition on the encroachment of Madho Talab at Tifra in Bilaspur was before the High Court (W.P.(PIL) No. 135 of 2017, as reported); and in April 2026 the High Court dismissed a petition on the pollution of a Raipur pond with costs of ₹50,000 as privately motivated (as reported). The Chhattisgarh State Wetland Authority has stopped works within 50 m of the highest flood level at Karbala Talab and next to the Jhanjh wetland (2025, as reported), but its survey of Raipur district's water bodies was not carried out (as reported). The Municipalities Act, 1961, which governs the smaller towns, and the other encroachment sections of the Land Revenue Code were not read for this Manual. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The banks of most talabs and dabris are low and are not expected to make them specified dams, but each bund shall be screened under Clause 7.14.1. The bunds of the larger city talabs and bandhs, such as Budha Talab, Telibandha and Maharajbandh at Raipur, and the dams of the Nava Raipur lakes, are of heights that were not found for this Manual; each shall be screened. Where the storage of a talab, bandh, lake or pit lake is counted under Clause 7.7, its bund, dam or retaining bench is a tank bund for Clause 7.14.2 unless the Act applies; the highwall and benches of a pit lake are checked for stability as well (definitions after Clause 7.2). An ash dyke is never counted as storage, but where it lies upstream of a drain, nala or colony that a design relies on, its breach path is mapped as a hazard (definitions after Clause 7.2; Chapter 5). Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Chhattisgarh the embankments that matter to the towns are the dams and barrages of WRD's reservoirs and the ash dykes of the power plants. In September 2026 all 14 gates of Gangrel were open in a statewide flood in which eight people died and about 16,000 were rescued (as reported); in October 2025 Gangrel released about 55,000 cusec and 72 riverside villages were alerted (as reported); and in August 2024 the releases of Minimata Bango and the Darri barrage flooded houses in Korba (as reported). The ash dykes have failed: the NTPC ash dyke at Dhanras near Korba is reported to have breached in July 2024, damaging about 16 ha of paddy; the dyke of CSPGCL's Korba West plant near Jhabu and Nawagaon breached on 19 April 2026, with one death; and slurry from BALCO's ash dam is reported to have reached the Belgari nala and the Hasdeo (all as reported; to be verified with the CECB). No breach map or emergency action plan for a talab bund, a city reservoir or an ash dyke was found, and no State disaster management plan for urban floods was found. A failed or overtopped bund floods the colonies below it, a breached ash dyke sends slurry down the nalas, and an unannounced release floods the colonies too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Chhattisgarh, Housing and Environment Department. Chhattisgarh Bhumi Vikas Niyam, 1984 (as amended), made under section 85(1) read with section 24(3) of the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973. The base and consolidated Chhattisgarh text was not found; Rules 17, 50 and 51 are cited in their inherited 1984 text, read only through a legal-database extract of the Madhya Pradesh rules (https://www.legitquest.com/act/madhya-pradesh-bhumi-vikas-rules-1984/D2B8), and are to be confirmed for Chhattisgarh. Amendments read from archived copies of the T&CP Directorate's site: No. एफ 7-26/32/2008 of 17 December 2008 (integrated townships, Appendix ण), CG Rajpatra (Asadharan) of that date, pp. 782(3)–782(9); No. 318/1193/32/2006 of 17 February 2009 (rule 78(4) and Appendix ढ); No. F 7-27/2017/32 of 6 October 2018 (rule 73(3), plinth certificate, inspection forms, Appendix Q), Gazette pp. 820(1)–820(35); and No. F 07-24/2019/32 of 29 April 2020. https://web.archive.org/web/20160806135310id_/http://tcp.cg.gov.in:80/Circular/Bhoomi_Vikas_Niyam%20_1984_Amendment/dt-17-12-2008.PDF ; https://web.archive.org/web/20240302142422id_/https://tcp.cg.gov.in/Circular/Bhoomi_Vikas_Niyam%20_1984_Amendment/cg-BVN-amendment-6-10-2018.pdf
- Directorate of Town and Country Planning, Chhattisgarh. Report format under section 16, letter No. 1680/TCR-2/नग्रानि./2011 of 23 June 2011 (Rule 50 unsuitability; waterlogging; distance from a canal, nala or river; area left for nalas), https://web.archive.org/web/20160806081555id_/http://tcp.cg.gov.in:80/Circular/CG_TCP_ACT_1973/T_48.PDF ; and checklist No. 1569/स्टेनो/नग्रानि./2011, Appendix 01, item 15 (WRD or Revenue no-objection and WRD high flood point for land next to a nala, canal or river; the letter is dated 16 June 2010 but cites a meeting of 7 June 2011), https://web.archive.org/web/20160806082300id_/http://tcp.cg.gov.in:80/Circular/CG_TCP_ACT_1973/T_90.PDF
- Government of Chhattisgarh, Housing and Environment Department. Order No. F 7-35/2012/32 of 2 January 2013 under section 73(2) of the 1973 Adhiniyam, para 2.4(iii) (no permission beside a perennial river). https://web.archive.org/web/20160806081823id_/http://tcp.cg.gov.in:80/Circular/CG_TCP_ACT_1973/02-1-2013.PDF
- Government of Chhattisgarh. Act of 2002 on the regularisation of unauthorised development (छत्तीसगढ़ अनधिकृत विकास का नियमितिकरण), CG Rajpatra of 26 April 2002, p. 210(2), section 7(1)(iv) (चार). https://web.archive.org/web/20160806081528id_/http://tcp.cg.gov.in:80/Circular/CG_TCP_ACT_1973/T_191.PDF
- Government of Chhattisgarh. Chhattisgarh Land Revenue Code, 1959 (sections 237, 248 and 251), read only in a third-party Hindi copy. https://vidhijudicial.com/धारा-233-से-254-अध्याय-18-छत्तीसगढ़-भू-राजस्व-संहिता,-1959.html
- Government of Chhattisgarh. Municipal Corporation Act, 1956 and Municipalities Act, 1961, as adapted (Chhattisgarh texts not read; sections cited from the Madhya Pradesh text of the 1956 Act, https://prsindia.org/files/bills_acts/acts_states/madhya-pradesh/1956/1956MP23.pdf ; the adaptation as recorded by the CAG, https://cag.gov.in/webroot/uploads/download_audit_report/2020/8_Chapter-I_CG_PA_74_CAA_5-04-22-062df9e9a9b08a7.59481257.pdf ).
- Nava Raipur Atal Nagar Vikas Pradhikaran (NRDA). Naya Raipur Development Plan-2031 (2008), §§10.3, 10.3.1.1 and 10.3.2. Archived at https://web.archive.org/web/20150807050828/http://nayaraipur.gov.in/sites/default/files/Chapter_10-12.pdf ; NRDA letter No. 4808/5(1)/BPS/NRANVP/2022 of 21 June 2022 forwarding notification No. 4066 of 23 May 2022, https://web.archive.org/web/20240304202809id_/https://tcp.cg.gov.in/Circular/CG_TCP_ACT_1973/nava%20raipur-%2021-6-22.pdf
- Raipur Municipal Corporation. Sector-wise SLIP template: Storm Water Drainage (AMRUT, 4 November 2015), read in an archived copy from the Corporation's website (Wayback capture of 26 October 2017).
- National Green Tribunal (Central Zone). O.A. 78/2024, Jagdish Prasad Devangan v. State of Chhattisgarh (Baloda ponds), order of 14 November 2024 and factual and action-taken report of the District Magistrate, Janjgir-Champa. https://www.greentribunal.gov.in/sites/default/files/news_updates/13.1.25%20OA%2078-24-REPORT.pdf
- Chhattisgarh State Wetland Authority. Report in NGT O.A. 351/2019 (constitution; seen only in a search extract). https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20CHHATISGARH%20WETLAND%20AUTH%20IN%20OA%20NO.%20351%20of%202019%20(RAJA%20MUZAFFAR%20BHAT%20VS%20STATE%20OF%20JAMMU%20&%20KASHMIR).pdf
- Ramsar Convention. Ramsar Information Sheet, Site No. 2583, Kopra Jalashay, India. https://rsis.ramsar.org/RISapp/files/RISrep/IN2583RIS_2512_en.pdf
- Water Resources Department, Chhattisgarh. Daily Tank Gauge Report, 10 October 2024. https://cgwrd.in/phocadownload/userupload/eedd4/Tank%20Gauge%2010-10-2024.pdf
- Ministry of Environment, Forest and Climate Change. Environmental clearance of 13 August 2024, File No. J-11015/72/2016-IA.II(M), for a coal mine in Chhattisgarh (standard conditions on garland drains, settling sumps and water channels; the DGMS and appraisal-committee river distances recorded in it). https://mahagenco.in/Content/File_pdf/EnvClearance/2.EC_Gare%20Palma%20Sector%20II%20Coal%20Mine%20Project_13.08.2024.pdf
- India Meteorological Department (2020). New normal dates of onset and withdrawal of the southwest monsoon (Table 2). https://internal.imd.gov.in/press_release/20200515_pr_804.pdf
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Reports of talabs, wetlands and the State Wetland Authority (secondary): The Hitavada on Karbala Talab (12 October 2025), https://www.thehitavada.com/Encyc/2025/10/12/wetland-authority-halts-rs-15-cr-work-at-karbala-talab-over-rule-violations.html ; on Narhaiya Talab (27 July 2025), https://www.thehitavada.com/Encyc/2025/7/27/toy-train-plan-in-narhaiya-talab-buffer-sparks-probe-by-cswa.html ; on the Jhanjh wetland (4 March 2025), https://www.thehitavada.com/Encyc/2025/3/4/CGSWA-intervenes-directs-NRANVP-to-withdraw-Jhanjh-Wetland-tenders.html ; Down To Earth on Raipur's lakes (15 January 2015), https://www.downtoearth.org.in/coverage/in-srinagars-footsteps-48224 ; a study of the lakes of Raipur (India Water Portal), https://oldiwp.indiawaterportal.org/sites/default/files/iwp2/ninad_bodhankar_study_on_lakes_in_raipur.pdf ; YourStory on the Kharun (February 2017), https://yourstory.com/2017/02/kharun-river-raipur/ ; reports of the announcement of Kopra Jalashay as a Ramsar site (The Hitavada, 13 December 2025) and of the High Court petitions on Madho Talab, Tifra (W.P.(PIL) No. 135 of 2017) and on a Raipur pond (April 2026) (seen only in search extracts); Indian Bureaucracy on the States that have enacted floodplain zoning laws, https://www.indianbureaucracy.com/?p=367158
- Reports of floods, releases and drains (secondary): The Hitavada on Raipur in July 2026, https://www.thehitavada.com/Encyc/2026/7/6/heavy-monsoon-spell-exposes-civic-flaws-waterlogging-disrupts-traffic-sewage-enters-homes.html ; Daily Pioneer on the flood of September 2026, https://dailypioneer.com/india/chhattisgarh-floods-eight-killed-16000-rescued ; NewKerala.com on the Kharun in September 2026, https://www.newkerala.com/news/a/heavy-rain-triggers-flood-like-situation-chhattisgarh-kharun-river-839.htm ; Patrika on the Gangrel release of October 2025, https://www.patrika.com/dhamtari-news/55000-cusecs-of-water-released-from-gangrel-into-the-mahanadi-river-19996945 ; The Hitavada on Minimata Bango and the Darri barrage (26 August 2024), https://www.thehitavada.com/Encyc/2024/8/26/Hasdeo-Bango-Dam-projectin-Korba-put-on-high-alert.html ; The Hitavada on the drains of the Bhilai township (13 July 2025), https://www.thehitavada.com/Encyc/2025/7/13/Commissioner-issues-warning-to-BSP-over-poor-drain-cleaning-in-Township.html ; Patrika on Raipur's drains (11 July 2026, seen only in a search extract); reports of the ash-dyke breaches at Dhanras (2024), Korba West (19 April 2026) and BALCO (2025–2026) (SANDRP and The Hitavada; to be verified with the CECB); and of the urban flood risk management project for Raipur (October 2025, seen only in a search extract).
- Platts, J. T. (1884). A Dictionary of Urdu, Classical Hindi, and English. London: W. H. Allen; and Dasa, Syamasundara (1965–1975). Hindi Shabdasagara. Kashi: Nagari Pracarini Sabha; both online at the Digital South Asia Library, University of Chicago (accessed 7 November 2026). https://dsal.uchicago.edu/dictionaries/platts/ ; https://dsal.uchicago.edu/dictionaries/dasa-hindi/
- Soil classes of the Chhattisgarh plain: Mandal et al. (2018), Journal of Pharmacognosy and Phytochemistry 7(4): 2208–2214 (Durg district), https://phytojournal.com/archives/2018/vol7issue4/PartAK/7-3-513-438.pdf ; Wakode et al. (2017), Agropedology 27(2): 167–176 (Raipur toposequence), https://krishi.icar.gov.in/jspui/bitstream/123456789/36673/1/99_Minerology%20of%20soils.pdf ; and Mandal et al., Journal of Soil and Water Conservation, https://epubs.icar.org.in/index.php/JSWC/article/view/120633
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Hindi and Chhattisgarhi waterbody and soil terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Chhattisgarh has no Act for the protection of lakes, tanks or ponds as such. Its talabs, dabris and reservoirs are protected instead by revenue law, municipal law, the planning law and the building rules made under it, the wetland rules and the courts. In the villages, every tank on unoccupied land over which the village community exercised rights of irrigation or nistar vested in the State "6 अप्रैल 1959 से राज्य सरकार में पूर्णरूपेण" (absolutely, from 6 April 1959), without taking away those rights (Chhattisgarh Land Revenue Code, 1959, s. 251, read in a third-party copy); the Collector may set land apart for the exercise of nistar, tanks among it (s. 237); and a person who occupies such land without authority is penalised and may be evicted summarily by the Tehsildar (s. 248). That route has been used: on the order of the National Green Tribunal (Central Zone) of 14 November 2024 directing the Collector to remove the encroachments on land "recorded as a pond, a water body" in Nagar Panchayat Baloda, proceedings were begun under section 248 against those who had encroached on the ponds (O.A. 78/2024, Tahsildar's report of 27 December 2024). In the towns, public tanks, streams and drains vest in the local body under the Municipal Corporation Act, 1956 and the Municipalities Act, 1961, Madhya Pradesh Acts adapted by Chhattisgarh. Their Chhattisgarh texts were not read for this Manual; the Madhya Pradesh text of the 1956 Act vests public tanks, streams and drains in the Corporation and bars a vested tank from "any other purpose" (s. 82), keeps drains and latrines a hundred feet from a tank used for public water supply (s. 199), and keeps an older sanitary power that runs the other way, under which an owner may be required to fill up or drain off a private tank that is injurious to health (s. 202), and whether the Chhattisgarh text is the same is to be confirmed [TBC]. This Manual treats every recorded talab as drainage infrastructure. A talab is storage and conveyance in the drainage system, and filling one, under a sanitary power or otherwise, removes that storage; no design under this Manual shall assume or rely on the filling of a recorded talab unless a drainage assessment under Chapters 3 to 5 shows where its storage goes, and the lost storage is replaced under Clause 7.6.4 (see "Recorded talab" in the definitions after Clause 7.2). A pond that is a health risk is to be treated (desilting, inlet screening and exclusion of sewage, Clauses 7.9 and 8.9), not filled. The planning law adds three bars. The Chhattisgarh Act of 2002 on the regularisation of unauthorised development forbids the regularisation of construction that stands "जलाशय के तल या जलाशय के किनारे या किसी प्राकृतिक जल निकास पर", on the bed or the edge of a reservoir or tank or on a natural drain (s. 7(1)(iv)); the CGBVN 1984 refuse a building site that is unsuitable under Rule 50, which in the inherited 1984 text covers sites near water and sites that are not properly drained (Chhattisgarh text [TBC]; Clause 7.4, Disclosure); and integrated townships may not be laid out on land beside a perennial river (Appendix ण, 17 December 2008). Wetlands are the concern of the Chhattisgarh State Wetland Authority, reconstituted by an order of the General Administration Department of 17 December 2021 according to its report to the National Green Tribunal (another source gives 1 July 2020), with the Forest and Climate Change Department as its nodal department; it has stopped works within 50 m of the highest flood level of Raipur's talabs and next to the Jhanjh wetland at Nava Raipur Atal Nagar (as reported). Kopra Jalashay near Bilaspur is the State's first Ramsar site. No State law or order zoning the floodplains of the rivers was found for this Manual, and no demarcation by WRD of any river's floodplain (Clause 7.4, Disclosure). Two features set Chhattisgarh apart. The first is the city talab cluster of the plain: Raipur is a city of talabs, reported to have had about 130 of them, of which about 37 to 40 remain (as reported; the counts conflict), linked by colony nalas and overflows that run to the Kharun, and its smaller towns and villages keep the same pattern of talabs, bandhs and dabris on the low kanhar and dorsa ground. The second is the coalfield and the power plants of Korba, Raigarh and Surguja, where mine voids and pit lakes are waterbodies held by a lessee under the mining rules and the environmental clearance, overburden dumps are among the heaviest sources of runoff and sediment, and the ash ponds of the power plants are held behind dykes that have breached (as reported); this chapter brings them into the inventory and sets the conditions on which they may be treated as receiving water (definitions after Clause 7.2). This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the revenue, municipal, planning, mining and wetland procedures that record and protect waterbodies in law, or the directions of the High Court of Chhattisgarh and the National Green Tribunal.