Draft v1.0 prepared by NEER. Not adopted by the Government of Chhattisgarh or any authority or local body, and has no legal force. About this draft

Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Chhattisgarh. Chhattisgarh is landlocked: it has no coast, no tide and no Coastal Regulation Zone. A Bay of Bengal depression or cyclone reaches the State only as rainfall, and that rainfall is dealt with in Chapter 2, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Chhattisgarh: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Chhattisgarh the receiving water is one of four kinds: a river, reached directly, through a gate in a bank or embankment or through a pumping station, whose level is often set by the releases of a dam or barrage upstream, as on the Mahanadi below Gangrel, the Hasdeo at Korba below the Minimata Bango dam and the Darri barrage, and the Arpa at Bilaspur below the Bhaisajhar barrage, or by a flood from a catchment that lies partly in Odisha, as on the Indravati at Jagdalpur; a reservoir, barrage pond, lake or talab held at its full level, such as the talabs of Raipur, the lakes and reservoirs of Nava Raipur Atal Nagar, the Kelo dam above Raigarh and the barrage ponds of the Mahanadi and the Seonath; the backwater of the Hirakud reservoir in Odisha, which reaches the low land of Raigarh and Sarangarh-Bilaigarh districts; or, in the coalfields and around the power plants of Korba, Raigarh and Surguja, a mine void, pit lake or ash pond, which is not a design outfall at all unless its operator, and for a mine DGMS, agree in writing and its level and spill are surveyed; and:

  • (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river, a reservoir, barrage pond or talab, the Hirakud backwater, a mine void or ash pond or a receiving drain, with the river lock of Clause 5.8.5(a) and the closures of Clause 5.8.5(b), (d), (e) and (g) in place of the tidal lock windows.

Commentary. The drains of Chhattisgarh's towns fail in places that site design does not see, and in four different ways. The first is the river, often below a dam. Raipur drains to the Kharun, which set its highest recorded level at Pathardihi, 281.68 m, on 29 August 2020, 2.47 m above the record of 1994 (CWC data, as copied by SANDRP), and cut the Raipur–Bhilai road at Mahadev Ghat in September 2024 and overflowed there again in September 2026 (as reported). Dhamtari, Rajim and the towns down the Mahanadi lie below the Gangrel dam, all 14 of whose gates were opened in September 2026 (as reported); Korba lies on the Hasdeo below the Minimata Bango dam and the Darri barrage, whose releases of August 2024 were followed by flooding in the low parts of the town (as reported), and the Hasdeo set new highest levels at Katghora and Bangodam in July and August 2026; Bilaspur lies on the Arpa below the Bhaisajhar barrage; and Jagdalpur lies on the Indravati, which rises in Odisha and set a new highest level at Jagdalpur, 544.891 m, on 26 September 2026, 0.21 m above that of 1973 (CWC data, as copied by SANDRP). The second is the reservoir, barrage pond or talab. Raipur grew around its talabs, of which about 130 are reported to have existed and about 40 to remain (as reported), and on 5–6 July 2026 five ponds in Chaubey Colony overflowed into homes (as reported); Nava Raipur Atal Nagar was planned around a network of lakes and reservoirs, reported as 55, into which its parks and channels carry storm water (as reported); and a reservoir, barrage pond or talab at its full level holds every drain that ends in it. The third is the Hirakud reservoir in Odisha, whose submergence partly takes in villages in Chhattisgarh, 33 of 174 by one count (as reported), and whose backwater sets the level of the low outfalls of Raigarh and Sarangarh-Bilaigarh districts. The fourth is the coalfield and the power plant. In Korba and Raigarh a drain can end in a mine void or run towards a working mine, and the ash dykes of the power plants have breached: at NTPC's Dhanras dyke in July 2024, and at the Korba West dyke of CSPGCL near Jhabu on 19 April 2026, where one person died (as reported). The outfalls also belong to one body while the drains above them belong to others: the rivers, dams and barrages are held by WRD and Hirakud by the Government of Odisha, the drains by the Municipal Corporations, RDA, NRDA, the Bhilai Steel Plant and the coal and power companies, and no rule divides them (Chapter 6, Clause 6.9). No document found during research sets a design level for any river, reservoir, talab, void or ash-pond outfall in the State, and the Indravati at Jagdalpur is the only gauge in the State for which a CWC warning and danger level were found. A detention basin that meets every release rate in Chapter 4 still fails if the river it drains to stands above its outfall for days, if the reservoir or talab is full, or if the void it ends in has no outlet. This chapter makes these failure modes part of the design. Chhattisgarh has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the Kharun at Raipur and the nalas of the city that run to it, among them the Goverdhan nala at Mahadev Ghat, the streams and channels that link the lakes and reservoirs of Nava Raipur Atal Nagar, the Seonath and the Shankar and Pulgaon nalas of Durg, the nalas of Bhilai and of its steel-plant township, the Arpa at Bilaspur and the nalas that run to it, the Hasdeo and the nalas of Korba, the Kelo at Raigarh, the Indravati at Jagdalpur, any drain or canal of WRD, any drain built or held by a Municipal Corporation, a Nagar Palika Parishad, a Nagar Panchayat, RDA, NRDA, the Chhattisgarh Housing Board or the Bhilai Steel Plant with an internal width of 1.0 m or more, the garland drains and diversion channels of a mine, the drains of an ash pond, any irrigation canal that receives storm water, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, talab or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or talab under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, RMC, CGSDMA or WRD; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next talab or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Chhattisgarh. In Raipur, where the nalas of the city run past and through its talabs to the Kharun, to which the city's sewage network is reported to be linked through eight big canals (as reported), and the Kharun runs on below the city to the Seonath, and in Nava Raipur Atal Nagar, where four major streams divide the area into four catchments and link a network of lakes and reservoirs into which the parks and channels carry storm water (NRDA, Naya Raipur Development Plan-2031; as reported), the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the river towns of Chhattisgarh, whose outfalls lie below rivers held up for days by floods and by the releases of dams and barrages: on 28–29 August 2020 the Mahanadi at Kalma rose above its previous highest level and stayed above it for about 110 hours, and the Kharun at Pathardihi for about 46 hours (CWC data, as copied by SANDRP); from 24 to 27 September 2026 all 14 gates of the Gangrel dam were open, the Kharun overflowed at Mahadev Ghat and the Indravati set a new highest level at Jagdalpur (as reported); and in Raipur on 5–6 July 2026 five ponds in Chaubey Colony overflowed into homes and sewage entered houses (as reported). Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Chhattisgarh, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, RDA or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Chhattisgarh has no coast, and the surge term does not arise in the State, which a Bay of Bengal depression or cyclone reaches only as rainfall (Chapter 2).

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Chhattisgarh, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • the Kharun at Raipur, past Mahadev Ghat and the Pathardihi gauge, with the nalas of the city that end in it, and on to its confluence with the Seonath (Clause 5.8.5(a));
  • the Seonath at Rajnandgaon, Durg and Bhilai below the Mongra barrage, with the Shankar and Pulgaon nalas of Durg, and the Hamp at Andhiyar Khore (Clauses 5.8.3 and 5.8.5(a) and (c));
  • the Arpa at Bilaspur below the Arpa Bhaisajhar barrage, and the Maniari at Maniyari below the Maniyari dam (Clauses 5.8.3 and 5.8.5(a) and (c));
  • the Hasdeo at Korba below the Minimata Bango dam and the Hasdeo barrage at Darri, with the Katghora and Bangodam gauges and the nalas of Korba (Clauses 5.8.3 and 5.8.5(a) and (c));
  • the Mahanadi below the Gangrel dam at Dhamtari and Rajim, with the Pairi at Malgaon, past the barrages from Samoda to Kalma and the gauges at Kalma and Surajgarh, and the Mand at Kurubhata, to the head of the Hirakud reservoir (Clauses 5.8.3 and 5.8.5(a), (c) and (d));
  • the Kelo at Raigarh below the Kelo dam (Clauses 5.8.3 and 5.8.5(a) and (c));
  • the Indravati at Jagdalpur and Chindnar, below the dams in Odisha, with the Narangi at Sonarpal, and the Sabari at Talnar and Konta (Clauses 5.8.3 and 5.8.5(a) and (c));
  • the backwater of the Hirakud reservoir in Raigarh and Sarangarh-Bilaigarh districts (Clause 5.8.5(d));
  • the Gangrel, Minimata Bango, Kharang, Maniyari, Kelo and Kopra reservoirs, the ponds of the Mongra, Arpa Bhaisajhar and Darri barrages and of the barrages on the Mahanadi, the lakes and reservoirs of Nava Raipur Atal Nagar (among them Sendh, Jhanjh and Khandawa), the talabs of Raipur (among them Budha Talab, Telibandha, Kankali, Maharajbandh, Karbala and Narhaiya) and the talabs of the other towns that receive their drains (Clause 5.8.5(b));
  • the mine voids, pit lakes and working mines of the Korba, Mand–Raigarh and Surguja coalfields, and the ash ponds and ash dykes of the power plants of Korba and Raigarh (Clause 5.8.5(e));
  • any irrigation canal of WRD, and any drain or channel of another body that receives storm water (Clause 5.8.5(g)); and
  • elsewhere: any river or WRD channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Ravishankar Sagar (Gangrel) dam on the Mahanadi above Dhamtari and Rajim, the Minimata Bango dam and the Hasdeo barrage at Darri above Korba, the Arpa Bhaisajhar barrage above Bilaspur, the Mongra barrage on the Seonath above Durg, the Kelo dam above Raigarh, the Maniyari dam on the Maniari, the barrages on the Mahanadi from Samoda to Kalma, and the dams in Odisha on the Indravati above Jagdalpur), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 River-locked outfalls, reservoir, barrage and talab outfalls, rivers below dams and barrages, the Hirakud backwater, mine voids and ash ponds, WRD consent, and discharges to canals and the drains of other bodies.

  • (a) River-locked outfalls. For an outfall to a river directly, through a gate in a bank or embankment or through a pumping station, or into a drain that itself discharges in one of those ways, the designer shall identify the body that operates each gate and pumping station, and obtain the sill of each gate, the crest of the bank or embankment, the installed pumping capacity and the operating levels, including the river level at which each gate is closed. Every level shall state its datum and its connection to the gauge datum of the nearest CWC or WRD gauge.
    • Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall: the 100-year level of a flood-frequency study or floodplain delineation that gives a level at the outfall, or a level from a hydraulic model under Clause 5.8.2(b), with the dam and barrage releases of item (c). No floodplain of any river in the State has been demarcated, and no flood line of WRD was found for any river [TBC]. The level shall in no case be less than the highest recorded level at the nearest CWC gauge on the same river, transferred to the outfall. The highest levels found during research (Table 5B.1), from SANDRP's copies of CWC data and extracts of CWC advisories, none read in a CWC site sheet [TBC], are: the Indravati at Jagdalpur 544.891 m (26 September 2026; 544.68 m, of 9 July 1973, before it) and at Chindnar 340.49 m (26 September 2026); the Kharun at Pathardihi 281.68 m (29 August 2020); the Mahanadi at Kalma 202.43 m and at Surajgarh 201.06 m (both 29 August 2020); the Mand at Kurubhata 220.4 m (28 August 2020); the Hasdeo at Katghora 313.58 m (20 July 2026) and at Bangodam 303.5 m (17 August 2026); the Maniari at Maniyari 236.23 m (13 August 2022); the Hamp at Andhiyar Khore 260.2 m (12 August 2022); the Pairi at Malgaon 329.33 m (30 July 2026); the Narangi at Sonarpal 543.43 m (26 September 2026); and the Sabari at Talnar 213.81 m (26 September 2026) and at Odinaguda (Konta) 71.64 m (10 September 2024). Where a later flood has exceeded the listed level, the later level governs; seven of these levels were set in 2026. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC and WRD gauge records, or from the model. Until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, except that where the outfall lies between two gauges on the same river, with no tributary joining between them, the level may be interpolated linearly by river distance between the highest recorded levels of the two gauges (set by this Manual).
    • Rivers with no gauge level. No CWC level was found for the Seonath at Simga or at any point near Rajnandgaon, Durg or Bhilai, the Arpa at Bilaspur, the Kelo at Raigarh, the Mahanadi at Rajim, Seorinarayan or Basantpur, or the nalas of Raipur, Durg–Bhilai, Bilaspur and Korba [TBC]. On such a reach, and for an outfall upstream of every gauge on its reach, the river level shall be the higher of the level from a model under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks, including those of the Kharun at Mahadev Ghat in September 2024 and September 2026 and of the Arpa at Bilaspur in July 2026, and from the records of WRD, the local body or the Collector, with its source stated. Where a level is known only as a gauge reading, the designer shall tie the gauge zero to the project datum and a Survey of India benchmark by levelling. No outfall shall be designed on such a reach without one of these levels (set by this Manual).
    • The local gauge at Jagdalpur. The readings reported in the press for the Indravati at Jagdalpur, such as 12.56 m, "4.26 metres above the danger mark", on 26 September 2026 (as reported), belong to a gauge whose location, zero and datum have not been reconciled with those of the CWC gauge, whose danger level is 540.80 m [TBC]. They are alert levels for operations only. They shall not be used as a design level, compared with a CWC level or transferred to an outfall, until the zeros of both gauges are tied by levelling to a Survey of India benchmark and the tie is confirmed by CWC or WRD (set by this Manual).
    • 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the gauge record, and not less than the danger level at the nearest CWC gauge, transferred in the same way: 540.80 m at Jagdalpur (warning level 539.49 m; 539.50 m in one advisory), from extracts of CWC advisories of 2019 [TBC]. No danger level was found for any other gauge in the State; there, the 10% AEP case shall use the design river level of this item until a frequency analysis is accepted (all set by this Manual). The datum of every level is to be confirmed for each gauge [TBC].
    • Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the gate, bank or embankment, and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, encroachment, solid waste and weed, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the gate only while the river is lower than the level behind it. Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5).
    • River lock. Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, or above the level at which its gate is closed if that is lower, taken from the river model or from the stage record of the nearest CWC or WRD gauge in the flood that set the highest recorded level or in a comparable flood, with the releases of item (c), and not less than: 120 hours (5 days) on the Mahanadi from Rajim to the Hirakud backwater, on the Mand below Kurubhata and on the low ground that drains to them; and elsewhere 72 hours, or, on a river below a dam or barrage, the time for which the largest recorded release of the dams and barrages above stayed above the flow at which the outfall is closed, from WRD's records, if that is longer (set by this Manual). Either lock covers the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4) and the drawdown of Clause 5.10.5 is met by pumping until the lock ends. A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where a gauge analysis under Clause 5.10.6, including the releases of the dams and barrages above, shows it and the Authority approves it.
    • Gate failure and breach. Floor levels and pumped outfalls behind a gate, bank or embankment shall also be checked for the failure of the gate and for a breach of the bank or embankment, with the land and drains behind it filled to the river level beyond it. Below a dam or barrage they shall also be checked for the release that results from a gate failing open.
  • (b) Reservoir, barrage-pond and talab outfalls. For an outfall to a reservoir, barrage pond, lake, talab or pond, directly or through a nala that ends in it, such as the talabs of Raipur, the lakes and reservoirs of Nava Raipur Atal Nagar, the Gangrel, Minimata Bango, Kharang, Maniyari, Kelo and Kopra reservoirs, and the ponds of the Mongra, Arpa Bhaisajhar and Darri barrages and of the barrages on the Mahanadi:
    • Consent. Storm water shall not be discharged to a reservoir, barrage pond, lake, talab or pond without the written consent of its custodian, the body that holds and operates it: WRD for its reservoirs and barrages; NRDA for the lakes and reservoirs of Nava Raipur Atal Nagar; the Municipal Corporation, Nagar Palika Parishad or Nagar Panchayat for a tank vested in it (Municipal Corporation Act 1956 and Municipalities Act 1961, as adapted; the Chhattisgarh texts were not read [TBC]); the Collector for a tank vested in the State under s.251 of the Chhattisgarh Land Revenue Code 1959; or another custodian that the State names (the custodian of each talab of Raipur and of each lake of Nava Raipur was not confirmed during research [TBC]). Where the waterbody is a Ramsar site (Kopra Jalashay, designated on 8 August 2025) or a wetland to which the State Wetland Authority applies the Wetlands (Conservation and Management) Rules 2017, as it has to the Karbala and Narhaiya talabs in Raipur and the Jhanjh wetland in Nava Raipur (as reported), any permission that the Authority requires shall also be obtained (Chapter 7). An outfall that carries dry-weather flow is dealt with under Clause 8.9.
    • Design level. The tailwater for the major-system and storage cases shall be the waterbody's maximum water level (MWL) as WRD or the custodian publishes it, or, where only the full tank or reservoir level (FTL) is published, FTL plus the surcharge in its design flood, computed from the rating of its spillway, weir and gates with the gates operated only as the custodian's written rule provides. Where neither the MWL nor the surcharge has been published, or where the published MWL is not above the FTL, the tailwater is FTL + 0.5 m (set by this Manual) [TBC]. For a talab or pond with no published level, the tailwater is the level at which it spills to the next drain or onto land, from its overflow sill or, where it has none, the lowest point of its rim, plus the head over that point needed to pass the 1% AEP inflow (set by this Manual). For a barrage pond, the tailwater is the higher of that level and the river level of item (a) at the barrage with its gates as operated. In every case it shall be not less than the highest level recorded at the waterbody. The minor-system tailwater is the FTL or the spill level, or the level at which the custodian's rule opens the gates if that is higher. The project's discharge shall be included in the level (Clauses 5.3.2 and 5.12.3).
    • The named reservoirs and barrages. The full reservoir levels of WRD's daily tank gauge report of 10 October 2024, which gives no MWL, give the following tailwaters (FTL + 0.5 m) until WRD confirms the MWL or the design-flood surcharge and the datum (set by this Manual) [TBC]: Ravishankar Sagar (Gangrel), FRL 348.700 m, 349.20 m; Minimata Bango, FRL 359.660 m, 360.16 m; Kharang, FRL 294.110 m, 294.61 m; Maniyari, FRL 358.140 m, 358.64 m; Kelo, FRL 233.000 m, 233.50 m; the Arpa Bhaisajhar barrage, FRL 302.000 m, 302.50 m; and the Mongra barrage on the Seonath, FRL 337.150 m, 337.65 m. No level on a stated datum was found for the Hasdeo barrage at Darri, the barrages on the Mahanadi, Kopra Jalashay (whose Ramsar information sheet gives an elevation of 287–295 m), the lakes and reservoirs of Nava Raipur Atal Nagar or any talab of Raipur [TBC]; no outfall to any of them shall be designed without the custodian's FTL and spillway or weir rating in writing, or, until the custodian gives them, a survey of the spillway, weir or overflow crest tied to a Survey of India benchmark, taken as the FTL (set by this Manual).
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall shall be treated as closed for the whole storm (Clause 5.9.4), with storage and pumping handling the full storm volume, unless the custodian's stage record shows the waterbody below the invert at the start of comparable storms and the Authority accepts it. Every reservoir, barrage pond, lake, talab and pond starts every design storm at its FTL or spill level (Clause 7.7.3). No lowering of a reservoir, barrage pond or talab before a storm and no early or additional gate opening shall be assumed unless the custodian's written operating rule and records show it, and no storage shall be credited below its spill level in a lake or talab that a drainage scheme uses as storage, such as the lakes of Nava Raipur Atal Nagar that its parks and channels feed, unless the custodian's records show that storage available at the start of comparable storms.
  • (c) Rivers below dams and barrages. For an outfall to a river below a dam or barrage, such as the Mahanadi below the Gangrel dam and its barrages, the Hasdeo below the Minimata Bango dam and the Darri barrage, the Arpa below the Bhaisajhar barrage, the Seonath below the Mongra barrage, the Kelo below the Kelo dam, the Maniari below the Maniyari dam and the Indravati below the dams in Odisha:
    • in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) shall be run with the river at the level that results from the largest recorded release of the dams and barrages above, routed to the outfall, with the flow of the catchment below them as it occurred in the same event (set by this Manual), until WRD publishes an operating rule that bounds the release [TBC]. As reported, all 14 gates of Gangrel were open from 24 to 27 September 2026 and it released about 55,000 cusec through eight gates on about 3 October 2025, and on 26 August 2024 Bango released about 30,000 cusec through six gates and the Darri barrage about 20,000 cusec. The design spillway capacities, 17,230 m³/s at Gangrel, 24,000 m³/s at Bango, 19,820 m³/s at Darri and 994 m³/s at Kharang (CWC, National Register of Large Dams 2009), bound what each structure can pass, not what it has passed. The largest recorded release of each dam and barrage and its duration shall be obtained from WRD and stated [TBC];
    • a release, or a release rule, alone shall not be taken to bound the river level: the level shall also be checked for the largest recorded event at the nearest gauge, with the local inflows as they occurred;
    • the river level shall not be reduced on the ground that the flood comes from rain that falls outside the town or outside the State, as on the Indravati, which rises in Odisha, or that the site storm is small, and the release shall be placed before, during and after the site storm;
    • no dam or barrage gate shall be assumed to open earlier or wider than the operator's records show; the release rules and records of the dams on the Indravati in Odisha shall be obtained through WRD from the Government of Odisha [TBC], and until they are, an outfall to the Indravati at Jagdalpur shall take the level of item (a), not less than 544.891 m at Jagdalpur transferred to the outfall; and
    • an outfall in Korba to the Hasdeo, or to a nala or drain that ends in it, shall be designed with the releases of Bango and Darri placed together with the site storm, and an outfall to the Mahanadi between Rajim and the Hirakud backwater with the releases of Gangrel and of the barrages on the river.
  • (d) The Hirakud backwater. For an outfall in the low land of Raigarh and Sarangarh-Bilaigarh districts that drains to the Mahanadi, the Mand or another river within the reach of the Hirakud reservoir in Odisha, directly or through a nala:
    • the tailwater for the major-system and storage cases shall be the higher of the river level of item (a) at the outfall, not less than 201.06 m at Surajgarh and 220.4 m at Kurubhata transferred to the outfall, and the level of the reservoir under item (b): its MWL, or its FRL plus the surcharge in its design flood, or, where neither is published, its FRL + 0.5 m (set by this Manual), carried up the backwater profile from the dam to the outfall with the inflow of the Mahanadi and its tributaries in the same event;
    • Hirakud is held by the Government of Odisha. Its FRL, its MWL, its operating rule and its backwater levels in Chhattisgarh were not obtained during research [TBC]; the reservoir is reported to have stood at 628.5 ft (about 191.6 m) when its gates were opened on 9 September 2011 (as reported), a level whose datum was not found. They shall be obtained through WRD from the Government of Odisha, with the levels and extent of the land acquired or submerged in Chhattisgarh. Until they are, no outfall in the reach shall be designed with its invert below the higher of 628.5 ft (about 191.6 m) and the highest flood level surveyed at the outfall from flood marks and from the records of WRD and the Collector (set by this Manual) [TBC];
    • an outfall below the design level of this item shall be treated as closed for the whole storm (Clause 5.9.4); the reservoir starts every design storm at its FRL, and no drawdown or gate opening at Hirakud shall be credited; and
    • no outfall structure, gate or pumping station shall be built in the reach without the consent of WRD, which shall obtain any consent that the Government of Odisha requires [TBC].
  • (e) Mine voids, ash ponds and working mines. For a site in or near a coalfield or a thermal power plant, such as the Korba, Mand–Raigarh and Surguja coalfields and the power plants of Korba and Raigarh, whose drainage could reach a mine void, a pit lake, a working mine, an ash pond or an ash dyke:
    • Not a design outfall. A mine void or pit lake, working or abandoned, is not a design outfall or storage unless the lessee and DGMS consent in writing and its water level, spill level and spill path are surveyed and tied to a Survey of India benchmark; where the lease has ended, the body that holds the land shall consent in place of the lessee [TBC]. An ash pond is not a design outfall or storage unless its operator consents in writing, its water level, dyke crest, spillway and spill path are surveyed and tied to a Survey of India benchmark, and the consent states the stability of the dyke with the design inflow, as assessed for the operator. Neither is ever assumed to have free storage (set by this Manual).
    • No drainage into a working mine. No development shall drain, directly or through a drain, nala or overland flow path, into a working mine, its workings, its pit or the area inside its garland drain. The Coal Mines Regulations 2017 require the lowest point at which surface water could enter a mine to stand at least 1.5 m above the highest flood level at that point (reg. 149, as reported; the Gazette text was not read [TBC]), and a drain that raises the flood level at a mine opening works against that.
    • Where consent is given. The tailwater is the surveyed spill level plus the head over the spill needed to pass the 1% AEP inflow from all the land that drains to the void or pond, and not less than the highest level recorded in it, from the operator's records; the void or pond starts every design storm full to its spill level; an outfall below that level is treated as closed for the whole storm (Clause 5.9.4); and the downstream analysis continues along the surveyed spill path to the next end point of Clause 5.3.1. The consent shall state the stability of the void's sides and benches, or of the pond's dyke, with the design inflow, and the water-quality conditions (Chapter 8).
    • Ash-dyke breach. The breach of an ash dyke is a hazard to map, not a design inflow. A site below or beside an ash pond shall show on its plans the path and extent of a breach flow, from the operator's breach study where one exists and otherwise from the ground levels, and shall keep buildings, basements, pumping stations and outfalls out of it, or set their floor and opening levels above it, as the Authority directs (set by this Manual). No storm drain shall discharge into an ash pond or the drains of an ash pond, and no storm drain shall be used to carry ash-pond water.
    • Mine-disturbed ground. Mine-disturbed ground is overburden dumps, backfilled or reclaimed mine land, compacted mine benches and haul roads, and ground filled with ash. Runoff from it is treated as high in volume and in sediment (Chapter 3), and runoff from an overburden dump or ash fill shall pass a sediment basin and stable toe (garland) drains before it reaches any town drain or outfall (Chapter 8). No outfall, drain or storage shall be placed on a dump or dyke slope or in ground declared unstable. The levels of every outfall, drain and floor on mine-disturbed ground shall come from a level survey made for the design.
  • (f) WRD consent; plan, wetland and court lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of a river, or in a reservoir, barrage, dam, embankment or canal of WRD, without the consent of WRD; the procedure for that consent was not found during research [TBC]. The designer shall also check the outfall against the lines that the building rules, the wetland rules, the revenue record and the courts have set, as they stand at the time of design (Chapter 7): the distances from water bodies and watercourses of the Chhattisgarh Bhumi Vikas Niyam 1984, which in the inherited 1984 text are 9 m from the highest water mark and, for a major watercourse, 9 m from the average high flood mark or 15 m from the defined boundary, whichever is more (r.50; Chhattisgarh text to be confirmed [TBC]), and the high flood point that the T&CP Directorate's checklist of 2011 requires from WRD, with the no-objection of WRD or the Revenue Department, for land next to a nala, canal or river; the bar on regularising construction on the bed or edge of a reservoir or on a natural drain (Chhattisgarh regularisation Act of 2002, s.7(1)(चार)); the 50 m from the highest flood level of a wetland that the State Wetland Authority applies under the Wetlands (Conservation and Management) Rules 2017 (as reported); the tanks vested in the State under s.251 of the Chhattisgarh Land Revenue Code 1959 and the land recorded as a pond in the revenue record, from which encroachments have been removed under s.248 after orders of the NGT (O.A. 78/2024); and Kopra Jalashay, a Ramsar site. The State has no floodplain zoning law and no notified flood zone. Whether a drain outfall is permitted within each line is to be confirmed with the authority concerned before design [TBC].
  • (g) WRD channels, irrigation canals and the drains of other bodies. Storm water shall not be discharged to a drain or canal of WRD, or to another irrigation canal, without the consent of WRD or the canal's owner, or to a drain of another body, such as a drain of a Municipal Corporation or other urban local body, RDA, NRDA, the Chhattisgarh Housing Board, the township of the Bhilai Steel Plant, an industrial area, a mine or a power plant, without the written consent of that body. Where consent is given:
    • the discharge shall not exceed the rate the consent allows;
    • the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives, including the drains of other bodies, and with its downstream boundary at the river, reservoir, talab or backwater level of items (a), (b) and (d); until a design water level is published for a channel, the computed level governs [TBC];
    • the channel shall be taken in its present condition, net of silt, encroachment, solid waste, weed and obstruction by crossing services and culverts, and with its narrowest section as surveyed, and with any weir that intercepts its dry-weather flow (Clause 8.9) at its crest level; a widening, lining, remodelling or diversion that has been proposed but not completed shall not be counted, and a channel designed for a stated return period shall not be taken to carry more than its surveyed section carries; and
    • the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.

No pump, gate, sluice, barrage or dam operation that helps drainage, such as pumping a drain down before a storm, lowering a reservoir, barrage pond or talab before a storm, closing a gate late or opening dam or barrage gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the waterbody or the river (Clause 5.12.3). Pumping shall not be used to move water into a mine void, a working mine, an ash pond or another catchment.

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Chhattisgarh's rivers break that assumption, because the monsoon depressions from the Bay of Bengal that fill them cross the State and fall on its towns at the same time. On 4 August 1910 Raipur recorded 370.3 mm in a day, its highest, with 381.0 mm at Kurud and 318.0 mm at Arang in the same storm (IMD); on 28–29 August 2020, when Akaltara recorded 282.7 mm (IMD), the Kharun at Pathardihi, the Mahanadi at Kalma and Surajgarh and the Mand at Kurubhata all set new highest levels (CWC data, as copied by SANDRP); and between 24 and 27 September 2026 the Indravati set a new highest level at Jagdalpur in the same days in which all 14 gates of the Gangrel dam were open and the Kharun overflowed at Mahadev Ghat in Raipur (as reported). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the dams and barrages above the State's towns, all of which WRD holds except those in Odisha. The Ravishankar Sagar (Gangrel) dam on the Mahanadi has a spillway designed for 17,230 m³/s, the Minimata Bango dam on the Hasdeo 24,000 m³/s, the Hasdeo barrage at Darri 19,820 m³/s and the Kharang dam 994 m³/s (CWC, National Register of Large Dams 2009). Gangrel was reported to release about 10,000 cusec through all 14 gates in 2022, 25,000 cusec through nine in 2024 and 55,000 cusec through eight on about 3 October 2025, when it stood at 348.68 m, 99.49% full, and 72 riverside villages were alerted; all 14 gates were open again from 24 to 27 September 2026. Bango released about 30,000 cusec through six gates and the Darri barrage about 20,000 cusec on 26 August 2024 (all as reported). WRD's daily tank gauge report gives the full reservoir level of each reservoir and barrage and the day's release over its spillway (WRD, 10 October 2024). Below Gangrel the Mahanadi passes the barrages at Samoda, Seorinarayan, Basantpur, Mirauni, Saradiha and Kalma, whose crest and pond levels were not found [TBC]; in August 2022 Odisha said that they had been opened before it was told, and that the flow into Hirakud then rose suddenly (as reported). The Indravati comes down to Jagdalpur from Odisha, and the dams above it there are operated by that State. No operating rule or release record for any of these dams and barrages, and no hourly stage record for any gauge in the State, was obtained during research [TBC]. Until they are, the largest recorded release applies, with the flow of the catchment below the dam as it occurred in the same event (Clause 5.8.5(c)). The river levels used in this Manual come from SANDRP's copies of CWC data and from extracts of CWC advisories, which could not be downloaded during research, and their datum and gauge zero are to be confirmed with CWC [TBC].

Clause 5.8.5 is set by this Manual. In Chhattisgarh the tailwater at a town outfall is set not by the tide but by a river held high by a flood or by the releases of the dams and barrages above it, by a reservoir, barrage pond or talab at its full level, by the backwater of a reservoir in another State, or, in the coalfields, by a mine void or ash pond whose level no one has surveyed, and no document found during research gives a design level for any of them. The State's municipal law was not read in its Chhattisgarh form: the Municipal Corporation Act 1956, as it stands in Madhya Pradesh, lets the drains of the Corporation empty "into any place, whether within or without the limits of the Corporation" (s.191), but does not say against which level [TBC]. The State has no floodplain zoning law and no notified flood zone (Chapter 7).

The first is the river. Most of the State's towns stand on rivers of the Mahanadi basin below a dam or barrage, and a dam spills when it is full and goes on spilling while the inflow lasts. The records found show how long the rivers stay up: in August 2020 the Mahanadi at Kalma stood above its previous highest level for about 110 hours and the Kharun at Pathardihi for about 46 hours, and in September 2026 the Indravati stood above its level of 1973 at Jagdalpur for about 15 hours (CWC data, as copied by SANDRP), while all 14 gates of Gangrel were open from 24 to 27 September (as reported). No hourly stage record for any gauge in the State was obtained during research [TBC]. The single lock of at least 72 hours therefore covers the whole of the longest design storm of Clause 2.5.2, so that the site does not rely on the river falling during the storm, and below a dam or barrage it is lengthened to the duration of the largest recorded release, which WRD's records show and research did not find [TBC]. On the Mahanadi below Rajim, where the river collects the releases of Gangrel and its barrages and the flows of the Seonath, the Hasdeo and the Mand, and where it stood above a previous record at Kalma for about 110 hours, the lock is set at 120 hours, the next whole day above that record. The levels listed in item (a) come from SANDRP's copies of CWC data and from extracts of CWC advisories, which could not be downloaded; their datum and gauge zero are to be confirmed [TBC]. Seven of them were set in 2026, which is why a later flood that exceeds a listed level governs. The danger level is used as the floor of the 10% AEP level at Jagdalpur because the river has crossed it in recent floods, to 541.65 m between 29 July and 8 August 2019 (CWC advisories, as seen in extracts) and to a new highest level in 2026, so a level reached about once in ten years is unlikely to lie below it; it is to be replaced by a frequency analysis of the CWC record [TBC]. Elsewhere no danger level was found, and the design level is used instead. At Jagdalpur the press reports a local gauge, on which the river stood "4.26 metres above the danger mark" on 26 September 2026 (as reported), while CWC's danger level is 540.80 m; the two have never been reconciled in any source found, and item (a) keeps them apart, because a design level built from one and a reading from the other could be wrong by metres in either direction. Item (a) counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump.

The second is the reservoir, barrage pond and talab. A reservoir at its full level does not fall for the rest of the season, but passes its inflow over its spillway, and its level rises above FTL by whatever head the flood needs: Gangrel stood at 348.68 m, 99.49% full, on about 3 October 2025 (as reported), against an FRL of 348.700 m (WRD, 2024). Item (b) therefore takes the MWL, or FTL plus the design-flood surcharge, as the tailwater, and treats an outfall below it as closed for the whole storm, which is what Clause 5.9.4 already requires when the tailwater stays above the outfall. WRD's tank gauge report gives an FRL for each reservoir and barrage but no MWL, so FTL + 0.5 m is set as the interim value: it is the freeboard that this Manual uses for floor levels (Clause 6.11.1), and it is a floor, not an estimate of the surcharge, which depends on the spillway and the flood [TBC]. A barrage pond is held at its level by gates that open in a flood, after which the pond follows the river, so item (b) takes the higher of the two. The talabs of Raipur and the lakes of Nava Raipur Atal Nagar have no published level at all, so item (b) uses their spill level and the head over it, and does not count the storage of a lake that a drainage plan already uses. The custodian's consent is required because a storm drain added to a reservoir or talab raises its level for every other outfall, and because the talabs also receive the city's sewage, which is the subject of Clause 8.9; the State Wetland Authority has applied the 50 m line of the Wetlands Rules to Raipur's talabs and halted works at Karbala Talab in September 2025 (as reported).

The third is the coincidence of the release and the storm. Item (c) runs the design storm on the town with the river at the largest recorded release because the rain that fills a reservoir and the rain on the town below come from the same monsoon spell or the same Bay depression (see the Commentary to Clause 5.8.4): in September 2026 Gangrel was releasing through all 14 gates while the Kharun overflowed at Raipur (as reported). The spillway capacities of the National Register of Large Dams are listed only to show the size of the structures; they are not releases. The Indravati's dams lie in Odisha, so their releases are decided outside the State; item (c) asks WRD to obtain their rules and records and, until then, uses the river's highest recorded level.

The fourth is the Hirakud reservoir. The Mahanadi leaves the State into the reservoir of the Hirakud dam in Odisha, and its submergence takes in part of 33 villages of Chhattisgarh (as reported). An outfall in that reach drains not to a river that falls after a flood but to a reservoir that is held up through the later monsoon, at a level set by another State. In August 2022 the two States disagreed over the timing of the releases from the barrages on the Mahanadi (as reported). Item (d) therefore takes the higher of the river level and the reservoir level, treats an outfall below it as closed, and requires Odisha's levels through WRD. Until they are obtained, the 628.5 ft at which the reservoir stood when its gates were opened in September 2011, as reported and recorded in the Odisha edition of this Manual, is used as a floor, because a level that the reservoir has reached cannot be below its design level [TBC].

The fifth is the mine void and the ash pond. A void or pit lake looks like free storage, but its level, spill point and spill path are not surveyed for drainage, its sides can fail, it may be connected to workings, and its water may be acid or laden with sediment. Around Korba the mines are dewatered, with inflows of about 7,500 to 13,700 m³ a day across six mines and the water table drawn down for about 1.2 km around Kusmunda and Gevra (Singh et al., 2023, as summarised), and the Hasdeo has been found to be connected to mine water through a fault (2018, as summarised). The standard condition of the environmental clearances for coal mines sizes the garland drains "keeping at least 50% safety margin over and above the peak sudden rainfall", which is not a return period (environmental clearance of 13 August 2024 for the Gare Palma Sector II mine), and the Coal Mines Regulations 2017 require mine openings to stand at least 1.5 m above the highest flood level (reg. 149, as reported). Ash ponds are storages behind dykes that have failed: NTPC's Dhanras dyke at Korba in July 2024, damaging about 16 ha of paddy; the Korba West dyke of CSPGCL near Jhabu and Nawagaon on 19 April 2026, where one person died; and slurry from BALCO's ash dam into the Belgari (Rukbahari) nala and the Hasdeo (as reported; to be confirmed with CECB). Item (e) therefore treats a void as an outfall only with the lessee's and DGMS's written consent and a survey, and an ash pond only with its operator's consent and a stability statement; it never lets a town drain into a working mine or an ash pond, and it treats a breach as a hazard to keep out of, because a breach flow is a slurry released by a structural failure, not a flood that drainage can be sized for.

The sixth is the body that owns the receiving water. The rivers, dams and barrages of the State are WRD's; Hirakud and the dams on the Indravati are Odisha's; the public drains and tanks vest in the urban local bodies or, for village tanks, in the State (Land Revenue Code s.251); the lakes of Nava Raipur Atal Nagar are planned and held by NRDA; the voids and ash ponds are the coal and power companies'; and no rule dividing the natural nalas from the municipal drains was found (Chapter 6, Clause 6.9). Items (b), (f) and (g) ask for the owner's consent and design level because a design that discharges to a channel, a reservoir, a talab or a void cannot be checked without them. The lines of item (f) decide where an outfall can be built, not its level; their status is set out in Chapter 7.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Chhattisgarh requirement in this Manual. In Chhattisgarh it applies where an outfall is shut not by the tide but by a river held high by a flood or by the releases of a dam or barrage, by a reservoir, barrage pond or talab at its full level, by the backwater of Hirakud, or by a mine void or ash pond with no outlet. In August 2020 the Mahanadi at Kalma stood above its previous highest level for about 110 hours and the Kharun at Pathardihi for about 46 hours (CWC data, as copied by SANDRP), and all 14 gates of the Gangrel dam were open from 24 to 27 September 2026 (as reported). A river below a spilling dam stays high for as long as the dam spills, a reservoir or talab at its full level stays there for the rest of the monsoon, and a void with no outlet does not drain at all, which is why Clause 5.8.5 replaces the two 6-hour windows described below with a single river lock of at least 72 hours, or 120 hours on the Mahanadi, and a closure for the whole storm at a reservoir, talab, Hirakud backwater, void or ash-pond outfall below its design level. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 10 June each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Chhattisgarh the outfalls do not cross a beach, but many of them end in a river whose level is set by the gates of a dam or barrage upstream, or in a reservoir, barrage pond or talab held at its full level. All 14 gates of the Gangrel dam were opened in September 2026; on 26 August 2024 the Minimata Bango dam released about 30,000 cusec through six gates and the Darri barrage about 20,000 cusec, and houses in the low parts of Korba were flooded; and in August 2022 the State's barrages on the Mahanadi were opened ahead of a sudden rise at Hirakud in Odisha, which said it was told only afterwards (all as reported). A gate opened in a hurry raises the river below; a gate held shut raises the reservoir and every outfall that drains to it. The dams and barrages of the State are held by WRD, while Hirakud and the dams on the Indravati above Jagdalpur lie in Odisha, and the drains that reach the rivers belong to the Municipal Corporations, NRDA, the Bhilai Steel Plant and the coal and power companies; no rule linking the operation of any of these gates to the levels of the drains was found during research [TBC], so a gate and the drains behind it can belong to different bodies. The 10 June inspection date is set ahead of the SW monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 10 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Chhattisgarh: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless WRD certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless WRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Chhattisgarh has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the silt, weed, waste and ash that rivers and drains leave at an outfall. In Bhilai water hyacinth from the drains of the steel-plant township blocked the Junwani and Kosanala culverts in July 2025; in Raipur, drains reported to have been narrowed by encroachment from seven or eight feet to four or five overflowed in July 2026; and at Korba slurry from the ash dam of BALCO has reached the Belgari (Rukbahari) nala and the Hasdeo (all as reported). A flap gate held open or shut by silt, ash or weed, or a gate that cannot be moved, turns a designed outfall into a dead end or a back-flow path. No written gate-operation rule for the gates of any dam, barrage or talab outlet in the State was found during research [TBC]. Clause 5.8.5 deals with both by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a site on a nala draining to the Kharun in Raipur
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)