Annexes to Chapter 5Downstream and Tailwater Analysis
These annexes support Chapter 5. Annex 5C is a worked example of the outfall-closed check of Clause 5.10, for the illustrative facility of Annex 4C. Annexes 5A and 5B need tidal, surge, survey and river data that this draft does not yet contain; each lists what the chapter already sets, gives the intended layout and states the interim rule of Chapter 5 that applies until it is published. Forms 5-1 and 5-2 are the submittal forms required by Clause 5.14. They are draft forms and have no statutory status.
Annex 5A — Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
Supports Clauses 5.7, 5.9, 5.10, 5.11 and 5.12 of Chapter 5.
5A.1 Table 5A.1 shows how the values of this annex enter the design tailwater levels of Table 5.1. The sea-level allowance is set by Clause 5.7.4 and does not depend on this annex.
Table 5A.1 — Use of the Annex 5A values in the design tailwater (Table 5.1)
| Design case | Tailwater | Annex 5A values used | Chapter value |
|---|---|---|---|
| Minor-system design | MHWS + SLA | MHWS | SLA ≥ +0.3 m (Clause 5.7.4) |
| Major-system and storage design | HAT + surge + SLA | HAT; 10% AEP surge (Clause 5.7.3(a)) | SLA ≥ +0.3 m |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA | 1% AEP still-water level (Clause 5.7.3(b)) | SLA ≥ +0.3 m |
| Datum conversion | Chart datum to project datum | Offset from chart datum to the Survey of India datum (Clause 5.7.2(b)) | — |
Not prepared for Chhattisgarh. Chhattisgarh has no coast, so no outfall in the State has a tidal tailwater, and this annex has no Chhattisgarh content (Clause 5.1.4). Its tables are kept, empty, so that the annex and table numbers match the other editions of this Manual. Rows F1 to F7 of Form 5-1 are entered as "not applicable", and the tailwater is derived under rows F8 to F10; for an outfall in the Hirakud backwater, row F10 records the levels of Clause 5.8.5(d), and for an outfall to a mine void, pit lake or ash pond, the consents and the survey of Clause 5.8.5(e).
Table 5A.2 — Tidal datums, surge and still-water levels by coastal segment (layout)
| Coastal segment | Reference port and tide-table edition | MSL (m CD) | MHWS (m CD) | HAT (m CD) | CD to Survey of India datum (m) | 10% AEP surge (m) | 1% AEP still-water level (m CD) | Wave set-up (m), open-sea outfalls | Sources |
|---|---|---|---|---|---|---|---|---|---|
Annex 5B — Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
Supports Clauses 5.2, 5.3, 5.8 and 5.13 of Chapter 5.
5B.1 Table 5B.1 lists the water bodies that Chapter 5 already names. It is not complete: the annex will add the extents of each reach, the other rivers, canals and mouths of the State, and a map.
Table 5B.1 — Water bodies named in Chapter 5
| Water body | Region | Listed as | Clause |
|---|---|---|---|
| Kharun at Raipur, past Mahadev Ghat and the Pathardihi gauge to the Seonath; the nalas of Raipur, among them the Goverdhan nala | Raipur | Riverine outfall reach and major drains; design river level not below the transferred 281.68 m (Pathardihi, 29 August 2020; 279.21 m of 12 July 1994 before it); no CWC danger or warning level found [TBC]; flood marks at Mahadev Ghat (September 2024 and 2026) to be surveyed; datum [TBC] | 5.2, 5.8.1, 5.8.5 |
| Seonath at Rajnandgaon, Durg and Bhilai below the Mongra barrage; the Shankar and Pulgaon nalas of Durg; the Hamp at Andhiyar Khore | Rajnandgaon, Durg, Bemetara | Riverine outfall reaches and major drains; no CWC level found on the Seonath near the towns [TBC]; modelled or surveyed level required; Hamp at Andhiyar Khore not below the transferred 260.2 m (12 August 2022); Mongra releases included | 5.2, 5.8.1, 5.8.3, 5.8.5 |
| Mongra barrage on the Seonath | Rajnandgaon | Barrage-pond outfalls; tailwater 337.65 m (FRL 337.150 m + 0.5 m), or the river level at the barrage if higher, until WRD confirms [TBC] | 5.8.3, 5.8.5 |
| Arpa at Bilaspur below the Arpa Bhaisajhar barrage; the nalas of Bilaspur | Bilaspur | Riverine outfall reach and major drains; no CWC level found [TBC]; modelled or surveyed level required (flood marks of July 2026); Bhaisajhar releases included | 5.2, 5.8.1, 5.8.3, 5.8.5 |
| Arpa Bhaisajhar barrage; Kharang (Khutaghat) reservoir; Kopra Jalashay | Bilaspur | Barrage-pond and reservoir outfalls; tailwaters 302.50 m (Bhaisajhar, FRL 302.000 m + 0.5 m) and 294.61 m (Kharang, FRL 294.110 m + 0.5 m) until WRD confirms [TBC]; Kopra Jalashay a Ramsar site (8 August 2025), no level on a stated datum found [TBC], WRD's FTL or a surveyed crest required | 5.8.3, 5.8.5 |
| Maniari at Maniyari below the Maniyari dam | Mungeli | Riverine outfall reach; design river level not below the transferred 236.23 m (13 August 2022); reservoir tailwater 358.64 m (FRL 358.140 m + 0.5 m) [TBC] | 5.8.1, 5.8.3, 5.8.5 |
| Hasdeo at Korba below the Minimata Bango dam and the Hasdeo barrage at Darri; the nalas of Korba | Korba | Riverine outfall reach and major drains; design river level not below the transferred 313.58 m (Katghora, 20 July 2026) and 303.5 m (Bangodam, 17 August 2026); no danger level found [TBC]; Bango and Darri releases included (about 30,000 and 20,000 cusec, 26 August 2024, as reported) | 5.2, 5.8.1, 5.8.3, 5.8.5 |
| Minimata Bango reservoir; Hasdeo barrage at Darri | Korba | Reservoir and barrage-pond outfalls; tailwater 360.16 m (Bango, FRL 359.660 m + 0.5 m) until WRD confirms [TBC]; no level found for Darri [TBC], WRD's pond level or a surveyed crest required | 5.8.3, 5.8.5 |
| Mahanadi below the Gangrel dam at Dhamtari and Rajim, past the barrages from Samoda to Kalma, at Kalma and Surajgarh; the Pairi at Malgaon | Dhamtari, Gariaband, Raipur, Janjgir-Champa, Raigarh | Riverine outfall reaches; design river level not below the transferred 202.43 m (Kalma) and 201.06 m (Surajgarh) (both 29 August 2020) and 329.33 m (Malgaon, 30 July 2026); no danger level found [TBC]; no level found at Rajim, Seorinarayan or Basantpur [TBC]; lock of at least 120 hours below Rajim; Gangrel and barrage releases included | 5.8.1, 5.8.3, 5.8.5 |
| Ravishankar Sagar (Gangrel) reservoir; barrages on the Mahanadi (Samoda, Seorinarayan, Basantpur, Mirauni, Saradiha, Kalma) | Dhamtari; Mahanadi reach | Reservoir and barrage-pond outfalls; tailwater 349.20 m (Gangrel, FRL 348.700 m + 0.5 m) until WRD confirms [TBC]; barrage crest and pond levels not found [TBC] | 5.8.3, 5.8.5 |
| Mand at Kurubhata | Raigarh | Riverine outfall reach; design river level not below the transferred 220.4 m (28 August 2020); lock of at least 120 hours | 5.8.1, 5.8.5 |
| Kelo at Raigarh below the Kelo dam | Raigarh | Riverine outfall reach; no CWC level found [TBC]; modelled or surveyed level required; reservoir tailwater 233.50 m (FRL 233.000 m + 0.5 m) [TBC]; Kelo dam releases included | 5.8.1, 5.8.3, 5.8.5 |
| Backwater of the Hirakud reservoir (Odisha) | Raigarh, Sarangarh-Bilaigarh | Reservoir backwater outfalls; tailwater the higher of the river level and the reservoir level (MWL, FRL + surcharge or FRL + 0.5 m) carried up the backwater; Hirakud's levels to be obtained through WRD from Odisha [TBC]; not below 628.5 ft (about 191.6 m, as reported) until they are; outfall below it closed for the whole storm | 5.8.5 |
| Indravati at Jagdalpur and Chindnar, below the dams in Odisha; the Narangi at Sonarpal | Bastar, Dantewada | Riverine outfall reaches; design river level not below the transferred 544.891 m (Jagdalpur, 26 September 2026; 544.68 m of 9 July 1973 before it), 340.49 m (Chindnar) and 543.43 m (Sonarpal) (both 26 September 2026); danger 540.80 m, warning 539.49 m at Jagdalpur (CWC); local-gauge readings not used for design [TBC]; Odisha dam releases to be obtained through WRD [TBC] | 5.8.1, 5.8.3, 5.8.5 |
| Sabari at Talnar and Odinaguda (Konta) | Sukma | Riverine outfall reaches; design river level not below the transferred 213.81 m (Talnar, 26 September 2026) and 71.64 m (Odinaguda, 10 September 2024); Godavari backwater at Konta (2022, as reported) | 5.8.1, 5.8.5 |
| Talabs of Raipur (among them Budha Talab, Telibandha, Kankali, Maharajbandh, Karbala and Narhaiya) and of the other towns | Raipur and other towns | Talab outfalls; no level found [TBC]; spill level plus head; custodian's consent (custodian [TBC]); State Wetland Authority's 50 m line where it applies; tanks vested under s.251 of the Land Revenue Code to the Collector | 5.8.5 |
| Lakes and reservoirs of Nava Raipur Atal Nagar (among them Sendh, Jhanjh and Khandawa) and the four major streams that link them | Raipur | Lake outfalls and major drains; no level found [TBC]; NRDA's consent; spill level plus head; no storage credited below the spill level without NRDA's records; Jhanjh a deemed wetland for the State Wetland Authority (as reported) | 5.2, 5.8.5 |
| Mine voids, pit lakes and working mines of the Korba, Mand–Raigarh and Surguja coalfields; ash ponds and ash dykes of the power plants of Korba and Raigarh | Korba, Raigarh, Surguja | Not a design outfall without the written consent of the lessee and DGMS, or of the ash-pond operator, and a survey of level, spill and spill path; no drainage into a working mine or an ash pond; ash-dyke breach path mapped as a hazard | 5.8.5 |
| Irrigation canals of WRD; drains of Municipal Corporations and other urban local bodies, RDA, NRDA, the Chhattisgarh Housing Board and the Bhilai Steel Plant township 1.0 m wide or more; garland drains of mines; drains of ash ponds | Chhattisgarh | Major drains; owner's consent, design water level and flap gate | 5.2, 5.8.5 |
| Gangrel, Minimata Bango, Kharang, Maniyari and Kelo dams; the Hasdeo barrage at Darri, the Mongra and Arpa Bhaisajhar barrages and the barrages on the Mahanadi; the dams on the Indravati in Odisha; Hirakud (Odisha) | Mahanadi, Hasdeo, Arpa, Seonath, Kelo and Maniari; Indravati | Releases and gate operation to be included in river levels (operating rules and release records [TBC]) | 5.8.3, 5.8.5 |
| River mouths subject to sand-bar closure | None in Chhattisgarh | Not applicable (Clause 5.1.4) | 5.13.1 |
To be prepared. This annex will list and map (a) the major drains of each basin plan, (b) the riverine outfall reaches where backwater shall be modelled, with their upstream and downstream limits and the source of their design flood levels, and (c) the river mouths and creek inlets subject to seasonal sand-bar closure, with the most recent pre-monsoon bar crest levels and any WRD mouth-maintenance programme. It needs WRD river and canal records, design and recorded flood levels, reservoir operating rules, mouth-condition, dredging and bar-cutting records and pre-monsoon bar surveys (WRD), the drain inventories of RMC and other local bodies, basin stormwater master plans (Chapter 11), and base mapping from the Survey of India and NRSC. Until it is published: every river, WRD canal, the Kharun at Raipur and the nalas of the city that run to it, among them the Goverdhan nala at Mahadev Ghat, the streams and channels that link the lakes and reservoirs of Nava Raipur Atal Nagar, the Seonath and the Shankar and Pulgaon nalas of Durg, the nalas of Bhilai and of its steel-plant township, the Arpa at Bilaspur and the nalas that run to it, the Hasdeo and the nalas of Korba, the Kelo at Raigarh, the Indravati at Jagdalpur, any drain or canal of WRD, any drain built or held by a Municipal Corporation, a Nagar Palika Parishad, a Nagar Panchayat, RDA, NRDA, the Chhattisgarh Housing Board or the Bhilai Steel Plant with an internal width of 1.0 m or more, the garland drains and diversion channels of a mine, the drains of an ash pond, any irrigation canal that receives storm water and every tidal creek is a major drain (Clause 5.2); the water bodies of Table 5B.1 are riverine outfall reaches (Clause 5.8.1); and the mouths of the coastal States' rivers (there is none in Chhattisgarh) are assumed closed at the start of the SW monsoon unless WRD certifies otherwise (Clause 5.13.2).
Table 5B.2 — Attributes of the Annex 5B layers (layout)
| Field | Content | Unit or format |
|---|---|---|
| feature_id | Unique identifier | text |
| name | Name of the drain, river, canal, creek or mouth | text |
| category | Major drain; riverine outfall reach; mouth subject to sand-bar closure | text |
| clause | Clause of Chapter 5 under which it is listed | text |
| reach_limits | Upstream and downstream limits of the reach | text |
| design_flood_level_source | WRD design or highest recorded flood level, or hydraulic model (Clause 5.8.2) | text |
| reservoir_release | Upstream reservoir or tank and its operating rule, where any (Clause 5.8.3) | text |
| bar_crest_level | Most recent pre-monsoon bar crest level, for mouths | m (Survey of India datum) |
| mouth_programme | WRD mouth-maintenance programme and certification (Clause 5.13.2) | text |
| source | Source agency and date | text |
| geometry | Line (drains and reaches) or point (mouths) | line / point |
Annex 5C — Worked example: outfall-closed check for a site on a nala draining to the Kharun in Raipur
Supports Clauses 5.9, 5.10, 5.11 and 5.12 of Chapter 5 and Clause 4.6.6 of Chapter 4.
Illustrative — not design values. This example applies the outfall-closed check of Clause 5.10 to the revised detention facility of Annex 4C. The site, its levels and its receiving drain are invented to show the method. No tidal level is used: the tide enters only through the illustrative statements in Table 5C.1 about whether the receiving drain is above or below the site outlet.
Inputs
5C.1 The site is the 2.0 ha flood-sensitive site of Annex 4C. It discharges through its own outlet chamber and a flap gate to a public storm drain that joins a nala running to the Kharun in Raipur, whose level rises when the nala runs full and when the Kharun is high, as it was at Pathardihi in August 2020 and at Mahadev Ghat in September 2026, so Clause 5.10.1 applies to the facility. To show the method, this example uses the two 6-hour lock windows of Clause 5.10.3, as the coastal editions of this Manual do. In Chhattisgarh a river-locked outfall has a single lock of at least 72 hours, or 120 hours on the Mahanadi, and an outfall below the design level of a reservoir, barrage pond, talab or the Hirakud backwater is closed for the whole storm, under Clause 5.8.5, so in each of those cases the facility must store or pump the whole storm volume (Clause 5.9.4); that needs more storage, or pumping, than this example shows. The routing, the volume balance of Clause 5.10.4 and the assessment are the same.
Table 5C.1 — Inputs (Illustrative — not design values)
| Item | Value | Basis |
|---|---|---|
| Facility | Revised facility of Annex 4C: 2,500 m² plan area, vertical walls; 170 mm orifice at the floor; 460 mm orifice, invert 0.53 m | Annex 4C, Table 4C.14 |
| Storm | 1% AEP, 48 h, peak day last, AMC III; 72 h also run | Clause 5.10.2 |
| Inflow | Post-development 1% AEP hydrographs of Annex 4C (48 h: 8,420 m³; 72 h: 9,468 m³) | Annex 4C |
| Receiving drain levels at the connection, J1, J2 and J3 | Below the site outlet invert (from the drain owner's model) | Illustrative input |
| Receiving drain during each lock window | Backs up above the site outlet invert, so the site cannot discharge | Illustrative input; Clause 5.10.3(b) |
| Flap gate on the site outlet | Set 0.15 m below the orifice inverts in the outlet chamber, so that outside the lock windows its opening head and head loss do not affect the orifice control | Illustrative input; to be confirmed from the certified curve (Clause 5.11.2) |
| Lock windows | Two of 6 h each, starts 12.4 h apart (semi-diurnal tide) | Clause 5.10.3(a) |
| Pumps | None | — |
5C.2 Cases of Table 5.2. Because the receiving drain stays below the site outlet in J1, J2 and J3 (Table 5C.1), those cases give the free-outfall results of Annex 4C: in J2 the 1% AEP maximum water level is 1.17 m (2,913 m³), and in J3 (10% AEP, 48 h) it is 0.77 m. R1 and R2 do not apply, because the site does not drain to a river. J4, the outfall-closed check, is worked below.
Lock windows (Clause 5.10.3)
5C.3 The peak 1-hour block of the final 24 hours of the 48-hour storm is 35:35–36:35 h, with 98.2 mm (the 1-hour depth of Table 4C.2). Two runs are made:
- Run A: the first window is centred on that block: 33:05–39:05 h; the second starts 12.4 h later: 45:29–51:29 h.
- Run B: the first window starts at that block: 35:35–41:35 h; the second: 47:59–53:59 h.
For the 72-hour storm, every time is 24 h later.
5C.4 Gravity discharge is zero inside each window. Outside the windows the outlet discharges through the orifices of Table 4C.10. The routing is the same level-pool routing as in Annex 4C.
Results
Table 5C.2 — Outfall-closed check results (Illustrative — not design values)
| Storm | Run | Lock windows (h:min) | Maximum stage (m) | Maximum storage (m³) | Time of maximum (h:min) | Largest release after a window (L/s) |
|---|---|---|---|---|---|---|
| 1% AEP, 48 h | A | 33:05–39:05; 45:29–51:29 | 2.01 | 5,019 | 39:05 | 566 |
| 1% AEP, 48 h | B | 35:35–41:35; 47:59–53:59 | 2.10 | 5,238 | 41:35 | 584 |
| 1% AEP, 72 h | A | 57:05–63:05; 69:29–75:29 | 2.00 | 5,012 | 63:05 | 565 |
| 1% AEP, 72 h | B | 59:35–65:35; 71:59–77:59 | 2.09 | 5,233 | 65:35 | 584 |
Run B of the 48-hour storm governs. The first window closes the outlet just as the storm peak arrives, so the whole peak is stored. The second window arrives when the facility has drained to about 0.7 m, below the Stage 2 orifice, and adds little.
5C.5 Volume balance (Clause 5.10.4). Table 5C.3 gives the balance for Run B. The outflow in each period is found by continuity: outflow = storage at start + inflow − storage at end.
Table 5C.3 — Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Period (h:min) | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| 0:00–35:35, before window 1 | 3,817 | 2,213 | 0 | 0 | 1,604 |
| 35:35–41:35, window 1 | 3,634 | 0 | 0 | 1,604 | 5,238 |
| 41:35–47:59, between windows | 941 | 4,423 | 0 | 5,238 | 1,756 |
| 47:59–53:59, window 2 | 28 | 0 | 0 | 1,756 | 1,784 |
| After 53:59 | 0 | 1,784 | 0 | 1,784 | 0 |
| Total | 8,420 | 8,420 | 0 | — | — |
Check for window 1: V_inflow = 3,634 m³ ≤ V_storage available + V_pumped + V_gravity = (5,238 − 1,604) + 0 + 0 = 3,634 m³. The facility therefore needs 5,238 m³ of storage, which the routing confirms.
Table 5C.4 — Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Time (h) | Inflow (L/s) | Outlet | Outflow (L/s) | Stage (m) | Storage (m³) |
|---|---|---|---|---|---|
| 24 | 20 | Open | 18 | 0.18 | 445 |
| 28 | 39 | Open | 24 | 0.25 | 621 |
| 32 | 59 | Open | 32 | 0.36 | 906 |
| 34 | 85 | Open | 37 | 0.47 | 1,166 |
| 36 | 286 | Closed | 0 | 0.78 | 1,944 |
| 38 | 106 | Closed | 0 | 1.73 | 4,321 |
| 40 | 66 | Closed | 0 | 1.96 | 4,904 |
| 42 | 51 | Open | 529 | 1.79 | 4,472 |
| 44 | 42 | Open | 204 | 0.87 | 2,181 |
| 46 | 37 | Open | 49 | 0.74 | 1,854 |
| 48 | 33 | Open | 47 | 0.70 | 1,756 |
| 50 | 0 | Closed | 0 | 0.71 | 1,784 |
| 54 | 0 | Closed | 0 | 0.71 | 1,784 |
| 56 | 0 | Open | 43 | 0.58 | 1,459 |
| 60 | 0 | Open | 32 | 0.37 | 921 |
| 66 | 0 | Open | 16 | 0.16 | 397 |
| 72 | 0 | Open | 7 | 0.06 | 162 |
Assessment
5C.6 Clause 5.10.4(a). The facility of Annex 4C reaches 1.17 m in J2, and its spillway crest is at 1.35 m (Annex 4C). In the outfall-closed check the stage reaches 2.10 m, so the spillway would operate. The facility of Annex 4C fails the check.
5C.7 Remedy. Pumping (Clause 5.12) does not help here: during the lock windows the receiving drain is itself closed, and pumping into it would raise its level, which Clause 5.12.3 does not permit. The remedy is more storage. Keeping the plan area of 2,500 m² and the outlets of Annex 4C:
- the facility must hold 5,238 m³, to a stage of 2.10 m;
- the spillway crest is set above that stage, with the 0.15 m clearance recommended in Clause 4.9.3: 2.25 m;
- with the 4.0 m spillway of Annex 4C (head 0.30 m), the maximum level with the spillway flowing is 2.55 m, and with 0.3 m freeboard the top of the walls is at least 2.85 m above the floor.
The outfall-closed check therefore governs the storage: 5,238 m³ against 2,913 m³ from the release-rate checks, about 80% more. A larger plan area would make the facility shallower; the outlet, caps and drawdown would then have to be re-checked, because the stage–discharge relationship changes.
5C.8 Release after the lock. When the first window ends, the stored water is released under a head of about 2 m, at up to 584 L/s. This is above the 100-yr cap of 356 L/s. Clause 5.10.4 allows this, because the release reaches a drain that has itself just reopened, and requires it to be included in the J4 run of the downstream analysis (Clauses 5.4 and 5.9) and reported on Form 5-1, Section H.
5C.9 Drawdown after the storm (Clause 5.10.5). The J1 tidal curve stays below the site outlet (Table 5C.1), so the drawdown of Annex 4C applies: 45.3 h for 90% of the 10-yr storage with the low-flow orifice 50% blocked, within the 48-hour limit of Clause 4.7. In Run B, 90% of the maximum J4 storage is released 22.6 h after the maximum.
5C.10 Other requirements.
- The flap gate on the site outlet is inspected and operated before 10 June each year and after every event in which it closed against a storm flow (Clause 5.11.5).
- The deeper facility is checked for flotation with groundwater at the design groundwater level; in the kanhar and dorsa paddy lowlands, the talab and river floodplain margins and the Hirakud backwater without piezometer readings that level is existing ground level (Clauses 4.12.1 and 4.12.3).
- The fence and signs of Annex 4C apply to the deeper facility (Clause 4.15).
Table 5C.5 — Summary (Illustrative — not design values)
| Item | Value |
|---|---|
| Governing case | J4, 1% AEP 48-hour storm, Run B (first window starting at the peak 1-hour block) |
| Storage required | 5,238 m³ (Annex 4C release-rate design: 2,913 m³) |
| Maximum stage | 2.10 m, with 2,500 m² plan area |
| Spillway crest | 2.25 m |
| Top of walls | ≥ 2.85 m above the floor |
| Largest release after a lock window | 584 L/s, to be included in the downstream J4 run |
| Drawdown | Annex 4C result applies: 45.3 h with the low-flow orifice 50% blocked |
Form 5-1 — Downstream and Tailwater Report
Supports Clauses 5.3 to 5.14 of Chapter 5.
Draft form — Chhattisgarh Stormwater Design Manual, Draft v1.0. One report for each project. Sites of less than 0.5 ha that meet Clause 5.3.4 may submit Form 5-2 instead, where the Authority accepts it. Attach the plans, model files and hydrographs referred to.
A. Project
Table 5F.1 — Form 5-1: project
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Project type: site under Chapter 4; drainage project under Chapter 6; regional detention or tank restoration (Clause 5.1.2) | |
| A3. Site or project area (ha) and outfalls | |
| A4. Site Runoff Control Report reference (Form 4-1), where applicable |
B. Extent of the analysis (Clause 5.3; Clause 5.14, item 1)
Table 5F.2 — Form 5-1: analysis points
| Point | Location | Type (Clause 5.3.3 (a) to (e)) | Contributing catchment (ha) | Project area as % of it |
|---|---|---|---|---|
Table 5F.3 — Form 5-1: end point
| Field | Entry |
|---|---|
| B1. End point and reason: 10% point, tank or talab, or major drain or the sea (Clause 5.3.1 (a) to (c)) | |
| B2. Where the end point is a tank or talab: change in maximum water level (m) and in surplus-weir discharge (m³/s); continuation below the weir if the level rises (Clause 5.3.2) | |
| B3. Plan of the analysis extent, showing the site, each point with its contributing area and percentage, and the end point (attach) |
C. Model (Clause 5.4.4; Clause 5.14, item 2)
Table 5F.4 — Form 5-1: model
| Field | Entry |
|---|---|
| C1. Software and version; hydrologic and hydraulic methods (Clause 5.4.4) | |
| C2. Network schematic, with the survey sources for drains and crossings (attach) | |
| C3. Land use and CN of off-site areas (present land use) | |
| C4. Upstream detention included, with evidence that it is built, maintained and documented | |
| C5. Calibration or validation evidence, where available | |
| C6. Scenarios run: existing, with project, and future where the Authority requires it (Clause 5.4.1) | |
| C7. Storms run: AEPs and durations, AMC and areal reduction (Clause 5.4.3) |
D. Results at each analysis point (Clause 5.4.2; Clause 5.14, item 3)
Complete one row for each analysis point, AEP and duration. E = existing; P = with project.
Table 5F.5 — Form 5-1: results by analysis point
| Point | AEP | Duration (h) | Peak flow E / P (m³/s) | Time to peak E / P (h) | Maximum water level E / P (m) | Peak velocity E / P (m/s) | Duration of inundation E / P (h) |
|---|---|---|---|---|---|---|---|
E. Acceptance (Clause 5.5; Clause 5.14, item 4)
Table 5F.6 — Form 5-1: acceptance criteria
| Criterion | Met at every point? | Where not met, the remedy adopted (Clause 5.5.3) |
|---|---|---|
| E1. 1% AEP water level rise ≤ 10 mm at buildings, lowest openings and carriageways (Clause 5.5.1(a)) | ||
| E2. No building newly flooded; no building or road newly failing the Chapter 6 limits (Clause 5.5.1(b)) | ||
| E3. Peak flow not above existing at the minor-system AEP of each element or at 1% AEP (Clause 5.5.1(c)) | ||
| E4. Velocity in lined channels within the lining limit, 3.0 m/s maximum (Clause 5.5.1(d)) | ||
| E5. Velocity in unlined channels, 50% and 10% AEP, not increased by more than 10% (Clause 5.5.1(e)) | ||
| E6. Change in duration of road closure on arterial or emergency routes (Clause 5.5.2) | ||
| E7. Timing exception requested (Clause 5.5.4)? Give the conditions met |
F. Tailwater derivation (Clauses 5.6 to 5.8; Clause 5.14, item 5)
Table 5F.7 — Form 5-1: tailwater derivation
| Field | Entry |
|---|---|
| F1. Tide-table edition and port, or port authority source (Clause 5.7.2(a)) | |
| F2. MHWS, HAT and MSL (m above chart datum) | |
| F3. Connection from chart datum to the Survey of India benchmark and the project datum: offset (m) and source (Clause 5.7.2(b)) | |
| F4. Estuary, creek or canal outfall: levels used and any evidence for a departure from open-coast levels (Clause 5.7.2(c)) | |
| F5. 10% AEP surge and 1% AEP still-water level: values, source, method and record length (Clause 5.7.3) | |
| F6. Wave set-up, for outfalls facing the open sea (Clause 5.7.3(d)) | |
| F7. SLA (m), at least +0.3 m; design life; sensitivity run at twice the SLA for design lives over 50 years (Clause 5.7.4) | |
| F8. Non-tidal tailwater: receiving-system level and source (Clauses 5.6.2, 5.6.3) | |
| F9. River levels and sources; reservoir or tank releases included (Clauses 5.8.2, 5.8.3) | |
| F10. River-locked outfalls, reservoir, barrage and talab outfalls, rivers below dams and barrages, the Hirakud backwater, mine voids, ash ponds and canals or drains of other bodies: operator of each gate and pumping station identified, gate sills, bank or embankment crest, installed capacity, operating levels and gate-closing level obtained, with every level tied to the datum of the nearest CWC or WRD gauge; 1% AEP river level at the outfall from a published study or a model, with the dam and barrage releases, and not below the highest recorded level at the nearest CWC gauge transferred to the outfall (544.891 m at Jagdalpur, 281.68 m at Pathardihi on the Kharun, 202.43 m at Kalma, and the other levels of Clause 5.8.5(a)), with the profile used, or, where no gauge level exists (the Seonath near Durg and Bhilai, the Arpa at Bilaspur, the Kelo at Raigarh, the nalas of the towns), a modelled or surveyed flood level and its source; no local gauge reading (Indravati at Jagdalpur) used as a design level; 10% AEP river level, not below the CWC danger level transferred where one exists (540.80 m at Jagdalpur); drain behind the gate routed with its whole catchment and present storage, pumping confirmed available (permanent pumps only, not more than installed capacity less the largest pump), pumps operable at the design river level; single river lock of not less than 72 hours, or 120 hours on the Mahanadi from Rajim to the Hirakud backwater and on the Mand below Kurubhata, or the duration of the largest recorded release below a dam or barrage if longer, and its source; gate-failure and breach checks; for a reservoir, barrage-pond or talab outfall, custodian's consent, State Wetland Authority permission where required, MWL or FTL plus design-flood surcharge (FTL + 0.5 m where neither is published, as for Gangrel 349.20 m, Bango 360.16 m, Arpa Bhaisajhar 302.50 m and Mongra 337.65 m; spill level plus head for a talab or lake; the river level at a barrage if higher), outfall below it treated as closed for the whole storm, waterbody starting at FTL or spill level, no gate operation credited without the custodian's written rule; for an outfall below a dam or barrage, the design storm with the largest recorded release, placed before, during and after the storm; for an outfall in the Hirakud backwater, the higher of the river level and the reservoir level obtained through WRD from Odisha, and not below 628.5 ft (about 191.6 m) until it is; for a mine void, pit lake or ash pond, the written consent of the lessee and DGMS or of the ash-pond operator, the surveyed level, spill level and spill path, the stability statement, a statement that no part of the site drains to a working mine or an ash pond, and the mapped path of an ash-dyke breach; WRD consent and the building-rule, wetland, revenue-record and court lines checked; owner's consent, permitted rate, design water level or computed channel level, and flap gate (Clause 5.8.5) |
G. Joint cases (Clause 5.9; Clause 5.14, item 6)
Table 5F.8 — Form 5-1: joint-case results
| Case | Rainfall | Tailwater used (m, project datum) | Applies? | Governing result (storage, level, pipe size or pump capacity) |
|---|---|---|---|---|
| J1 | ||||
| J2 | ||||
| J3 | ||||
| J4 | ||||
| R1 | ||||
| R2 |
H. Outfall-closed check (Clause 5.10; Clause 5.14, item 7)
Table 5F.9 — Form 5-1: outfall-closed check
| Field | Entry |
|---|---|
| H1. Reason the check applies (Clause 5.10.1) | |
| H2. Storm: AEP, 48 h and 72 h, AMC III (Clause 5.10.2) | |
| H3. Lock duration and basis: default of two 6-hour windows, or site study (Clause 5.10.6); extension for sand-bar closure (Clause 5.13.5) | |
| H4. Lock windows of the two runs (start and end times) (Clause 5.10.3(d)) | |
| H5. Maximum stage in each facility, against its 1% AEP maximum water level (Clause 5.10.4(a)) | |
| H6. Maximum stage in the minor and major systems, against the Chapter 6 limits (Clause 5.10.4(b)) | |
| H7. Property connections: surcharge level, or non-return valves fitted (Clause 5.10.4(c)) | |
| H8. Stage hydrographs (attach) | |
| H9. Drawdown after the storm under the J1 tidal curve, and pumping where needed (Clause 5.10.5) |
Table 5F.10 — Form 5-1: volume balance for each lock window (Clause 5.10.4)
| Period | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| Before window 1 | |||||
| Window 1 | |||||
| Between windows | |||||
| Window 2 | |||||
| After window 2 |
I. Gates and valves (Clause 5.11; Clause 5.14, item 8)
Table 5F.11 — Form 5-1: schedule of flap gates, tide gates and non-return valves
| Location | Type | Size (mm) | Invert (m, project datum) | Certified head–discharge data (reference) | Stop-log or penstock (outfalls > 600 mm) |
|---|---|---|---|---|---|
J. Pumped outfalls (Clause 5.12; Clause 5.14, item 9)
Table 5F.12 — Form 5-1: pumped outfalls
| Field | Entry |
|---|---|
| J1. Reason pumping is needed (Clause 5.12.1) | |
| J2. Duty capacity (m³/s) at the static head for the J2 tailwater; standby capacity (Clause 5.12.2) | |
| J3. Effect on the receiving water level (Clause 5.12.3) | |
| J4. Power supply: two independent supplies, or standby generation with 72 h of fuel; automatic changeover (Clause 5.12.4) | |
| J5. Level of electrical panels, controls, generators and fuel, against the higher of the 1% AEP flood level + 0.5 m and HAT + surge + SLA + 0.5 m (Clause 5.12.5) | |
| J6. Discharge arrangement (Clause 5.12.6); controls, alarms and logging (Clause 5.12.7); screens (Clause 5.12.8) |
K. Sand bar (Clause 5.13; Clause 5.14, item 10)
Table 5F.13 — Form 5-1: sand-bar assumption
| Field | Entry |
|---|---|
| K1. River mouth or creek inlet concerned | |
| K2. Mouth assumed closed, or open with WRD certification attached (Clause 5.13.2) | |
| K3. Bar crest level from the most recent pre-monsoon survey (m) and the closed-mouth tailwater (Clause 5.13.3) | |
| K4. Extension of the lock duration, where required (Clause 5.13.5) |
L. Inspection and maintenance (Clause 5.14, item 11)
Table 5F.14 — Form 5-1: inspection and maintenance
| Field | Entry |
|---|---|
| L1. Gate and valve inspection before 10 June and after closure events (Clause 5.11.5) | |
| L2. Pump test runs before 10 June (Clause 5.12.9) | |
| L3. Other requirements for the maintenance plan (Chapter 10) |
M. Statement by the registered professional (Clause 10.6)
I state that this report has been prepared under Chapter 5 of the Chhattisgarh Stormwater Design Manual (Draft v1.0), that the results reported are reproduced by the models submitted, and that every departure from Chapter 5 is listed with its reason. The Professional Design Certificate (Form 10-3) is attached.
Table 5F.15 — Form 5-1: statement by the registered professional
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Empanelment number, where Clause 10.6.1 requires it | |
| Organisation | |
| Signature | |
| Date |
Draft form — Chhattisgarh Stormwater Design Manual, Draft v1.0.
Form 5-2 — Simplified Downstream Statement (small sites)
Supports Clause 5.3.4 of Chapter 5.
Draft form — Chhattisgarh Stormwater Design Manual, Draft v1.0. For sites of less than 0.5 ha. The Authority may accept this statement in place of the full analysis only where every answer in Section B is "Yes". Otherwise submit Form 5-1.
A. Site
Table 5F.16 — Form 5-2: site
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Site area (ha), less than 0.5 ha | |
| A3. Receiving public drain: name or reference, type and size | |
| A4. Site Runoff Control Report reference (Form 4-1) |
B. Conditions (Clause 5.3.4)
Table 5F.17 — Form 5-2: conditions
| Condition | Yes / No | Evidence |
|---|---|---|
| B1. The receiving public drain has documented capacity for its minor-system design flow (Chapter 6) | ||
| B2. No flood-prone location is recorded within 500 m downstream of the site outfall. Records checked: local body, RMC, CGSDMA, WRD (Clause 5.3.3(d)) | ||
| B3. The site does not drain to a tidal or backwater-affected outfall |
C. Route plan
Table 5F.18 — Form 5-2: attachments
| Attachment | Attached? |
|---|---|
| C1. Plan of the drainage route from the site outfall for 500 m downstream, with the receiving drain and any recorded flood-prone locations | |
| C2. Copy or reference of the drain capacity record |
D. Statement
I state that the site meets the conditions of Clause 5.3.4 as shown above, and that the records listed have been checked.
Table 5F.19 — Form 5-2: statement
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Chhattisgarh Stormwater Design Manual, Draft v1.0.