Annexes to Chapter 5Downstream and Tailwater Analysis
These annexes support Chapter 5. Annex 5C is a worked example of the outfall-closed check of Clause 5.10, for the illustrative facility of Annex 4C. Annexes 5A and 5B need tidal, surge, survey and river data that this draft does not yet contain; each lists what the chapter already sets, gives the intended layout and states the interim rule of Chapter 5 that applies until it is published. Forms 5-1 and 5-2 are the submittal forms required by Clause 5.14. They are draft forms and have no statutory status.
Annex 5A — Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
Supports Clauses 5.7, 5.9, 5.10, 5.11 and 5.12 of Chapter 5.
5A.1 Table 5A.1 shows how the values of this annex enter the design tailwater levels of Table 5.1. The sea-level allowance is set by Clause 5.7.4 and does not depend on this annex.
Table 5A.1 — Use of the Annex 5A values in the design tailwater (Table 5.1)
| Design case | Tailwater | Annex 5A values used | Chapter value |
|---|---|---|---|
| Minor-system design | MHWS + SLA | MHWS | SLA ≥ +0.3 m (Clause 5.7.4) |
| Major-system and storage design | HAT + surge + SLA | HAT; 10% AEP surge (Clause 5.7.3(a)) | SLA ≥ +0.3 m |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA | 1% AEP still-water level (Clause 5.7.3(b)) | SLA ≥ +0.3 m |
| Datum conversion | Chart datum to project datum | Offset from chart datum to the Survey of India datum (Clause 5.7.2(b)) | — |
Not prepared for Meghalaya. Meghalaya has no coast, so no outfall in the State has a tidal tailwater, and this annex has no Meghalaya content (Clause 5.1.4). Its tables are kept, empty, so that the annex and table numbers match the other editions of this Manual. Rows F1 to F7 of Form 5-1 are entered as "not applicable", and the tailwater is derived under rows F8 to F10; for an outfall to the Umkhrah, the Umshyrpi or a jhora, row F10 records the model, the flood marks and the bed survey of Clause 5.8.5(a) or (c), and for an outfall to a MePGCL reservoir, the conversion of its levels from feet, where they are given in feet, of Clause 5.8.5(d).
Table 5A.2 — Tidal datums, surge and still-water levels by coastal segment (layout)
| Coastal segment | Reference port and tide-table edition | MSL (m CD) | MHWS (m CD) | HAT (m CD) | CD to Survey of India datum (m) | 10% AEP surge (m) | 1% AEP still-water level (m CD) | Wave set-up (m), open-sea outfalls | Sources |
|---|---|---|---|---|---|---|---|---|---|
Annex 5B — Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
Supports Clauses 5.2, 5.3, 5.8 and 5.13 of Chapter 5.
5B.1 Table 5B.1 lists the water bodies that Chapter 5 already names. It is not complete: the annex will add the extents of each reach, the other rivers, canals and mouths of the State, and a map.
Table 5B.1 — Water bodies named in Chapter 5
| Water body | Region | Listed as | Clause |
|---|---|---|---|
| Umkhrah (Wah Umkhrah) and Umshyrpi (Wah Umshyrpi) through Shillong, with their jhoras, to the Wah Roro and Umiam lake | Khasi Hills (Shillong) | Major drains and city streams; ungauged, no published flood level [TBC]; 1% AEP model with bulking and blockage and surveyed flood marks; valley floors of Polo, Pynthorbah, Nongmynsong, Forest Colony, Mawlai, Dhankheti and Nongrim Hills outfall-closed, lock not less than 24 hours; reaches divided between the Shillong Municipal Board and the KHADC; 32 outfalls carrying sewage (Clause 8.9) | 5.2, 5.8.1, 5.8.5 |
| Umngot at Dawki | Jaintia Hills (East Khasi Hills as listed by CWC) | Riverine outfall reach; design river level not below the transferred 73.47 m (Dawki, 28 May 2006) and the surveyed flood mark of June 2026 [TBC]; no warning or danger level; datum [TBC]; runs into Bangladesh | 5.8.1, 5.8.5 |
| Umnohryngkew at Therriaghat | Khasi Hills, foot of the escarpment | Riverine outfall reach; design river level not below the transferred 20.62 m (15 June 1995); datum [TBC] | 5.8.1, 5.8.5 |
| Myntdu at Jowai and at Kharkhana; the Myntdu–Leshka dam and its release reach to the Bangladesh border | Jaintia Hills | Riverine outfall reach and release reach; 47.0 m at Kharkhana (23 April 1995) far downstream of Jowai, so a modelled or surveyed level at Jowai [TBC]; two Stage-II sites with no level; reservoir tailwater 618.50 m (FRL and MWL 618.00 m + 0.5 m) [TBC]; release of 12,000 m³/s (spillway capacity) until MePGCL gives a recorded release [TBC] | 5.8.1, 5.8.3, 5.8.5 |
| Bugi at Dimapara and Dareng at Sibbari; the south Garo rivers at Baghmara and Dalu | Garo Hills (south) | Riverine outfall reaches; design river level not below the transferred 29.75 m (Dimapara, 27 July 2007) and 20.34 m (Sibbari, 12 August 2017) where the outfall is on those rivers; surveyed flood levels elsewhere, among them the floods of October 2024 at Dalu [TBC]; datum [TBC] | 5.8.1, 5.8.5 |
| Simsang at Williamnagar; Kynshi | Garo Hills; Khasi Hills (west) | Riverine outfall reaches; no CWC site; modelled or surveyed flood level required [TBC]; run into Bangladesh | 5.8.1, 5.8.5 |
| Kopili, Digaru, Kulsi and Krishnai (Dudhnai) where they leave the State | Eastern and northern fringes | Riverine outfall reaches; no site in Meghalaya; the Assam edition governs the plains reaches; the Kopili at Kampur (warning 59.5 m, danger 60.5 m, highest 61.79 m, 20 July 2004) and Dharamtul (warning 55.0 m, danger 56.0 m, highest 58.09 m, 21 July 2004) bound the model's downstream boundary only; Kopili project of NEEPCO, levels not obtained [TBC] | 5.8.1, 5.8.3, 5.8.5 |
| Jhoras and hill streams of the towns: the Umkhen and Wah Tamdong at Shillong; the Ganol and the Ringrey and Rongkhon streams at Tura; the Umlew at Nongpoh–Umling; the streams of Sohra, Mawsynram, Shella and Pynursla | Statewide | Jhoras and major drains; ungauged; 1% AEP study with bulking and blockage and flood marks; in ML-C and ML-C1 the site-specific study of the ML-Z3 rule with the 24- to 72-hour storms; outfall at least 0.5 m above the highest surveyed bed level; no outfall into a sinkhole, cave or mine pit | 5.2, 5.8.1, 5.8.5 |
| Umiam (Barapani) reservoir and its shore | Ri-Bhoi and Khasi Hills | Reservoir outfalls; no MePGCL guideline found; press level 3,220 ft (981.46 m), releases from 3,216.15 ft (980.28 m) in August 2024, crest EL 969.5 m, no datum (all as reported) [TBC]; not design levels: MePGCL's FRL, MWL and rating, or the higher of the surveyed shore line and the surveyed top of the closed spillway gates + 0.5 m; MePGCL's consent; the Waterbodies Guidelines' lake setback and regulated zone (Chapter 7) | 5.8.3, 5.8.5 |
| Kyrdemkulai (Stage III) and Nongkhyllem (Stage IV) reservoirs and their release reaches | Ri-Bhoi | Reservoir outfalls and release reaches; Stage III tailwater 681.23 m (MWL 2,235 ft; FRL 2,230 ft = 679.70 m), Stage IV 503.50 m (FRL and MWL 503.00 m + 0.5 m) [TBC]; releases of about 1,699 and 2,124 m³/s (spillway capacities) until MePGCL gives recorded releases [TBC] | 5.8.3, 5.8.5 |
| New Umtru reservoir and the Umtru to the Byrnihat bridge | Ri-Bhoi | Reservoir outfalls and release reach (9.80 km); tailwater 132.78 m (MWL; FRL 130.10 m) [TBC]; release of 3,820 m³/s (spillway capacity) until MePGCL gives a recorded release [TBC]; the Umtru runs into Assam below Byrnihat | 5.8.1, 5.8.3, 5.8.5 |
| Ward's Lake (Nan Polok), Thadlaskein (Pung Sajar Nangli) and other lakes and pungs | Statewide | Lake and pung outfalls; no level found [TBC]; spill level plus head; custodian [TBC]; debris, waste and sediment traps; no sewage; no sacred or community pung used as a detention pond | 5.8.5 |
| Jinjiram and Krishnai on the Garo foothill plains at Phulbari and Tikrikilla | Garo Hills (north-west plains) | Riverine outfall reaches under the backwater of the Brahmaputra (Assam edition); no CWC site in Meghalaya; modelled level and the flood marks of September 2012 and September 2014; lock not less than 72 hours | 5.8.1, 5.8.5 |
| Drains of the Municipal Boards, the Shillong Cantonment Board, NSTDA, Shillong Smart City Ltd, PWD (Roads), NHAI and NHIDCL 1.0 m wide or more; village drains and jhoras under the District Councils' rules | Meghalaya | Major drains; owner's consent (the Board's under s.204 of the Municipal Act within municipal limits), design water level and flap gate | 5.2, 5.8.5 |
| Umiam, Kyrdemkulai, Nongkhyllem, New Umtru and Myntdu–Leshka dams; the Kopili project | Umiam, Umtru, Myntdu, Kopili | Releases and gate operation to be included in river levels (release records and operating rules [TBC]); warnings by siren, telephone or SMS, not notices | 5.8.3, 5.8.5 |
| River mouths subject to sand-bar closure | None in Meghalaya | Not applicable (Clause 5.1.4) | 5.13.1 |
To be prepared. This annex will list and map (a) the major drains of each basin plan, (b) the riverine outfall reaches where backwater shall be modelled, with their upstream and downstream limits and the source of their design flood levels, and (c) the river mouths and creek inlets subject to seasonal sand-bar closure, with the most recent pre-monsoon bar crest levels and any Water Resources Department mouth-maintenance programme. It needs Water Resources Department river and canal records, design and recorded flood levels, reservoir operating rules, mouth-condition, dredging and bar-cutting records and pre-monsoon bar surveys (Water Resources Department), the drain inventories of SMB and other local bodies, basin stormwater master plans (Chapter 11), and base mapping from the Survey of India and NRSC. Until it is published: every river, Water Resources Department canal, the Umkhrah (Wah Umkhrah) and the Umshyrpi (Wah Umshyrpi) through Shillong and the Wah Roro that they form, the Umkhen and the Wah Tamdong, the Myntdu at Jowai, the Ganol and the Ringrey and Rongkhon streams at Tura, the Simsang at Williamnagar, the Umngot at Dawki, the Umtru below the New Umtru dam, the Jinjiram and the Krishnai on the Garo foothill plains, any drain built or held by a Municipal Board, the Shillong Cantonment Board, NSTDA, Shillong Smart City Ltd, PWD (Roads), NHAI or NHIDCL with an internal width of 1.0 m or more, and every jhora or other natural stream that drains 8 ha or more, whether or not the Waterbodies Guidelines treat it as a waterbody and every tidal creek is a major drain (Clause 5.2); the water bodies of Table 5B.1 are riverine outfall reaches (Clause 5.8.1); and the mouths of the coastal States' rivers (there is none in Meghalaya) are assumed closed at the start of the monsoon unless the Water Resources Department certifies otherwise (Clause 5.13.2).
Table 5B.2 — Attributes of the Annex 5B layers (layout)
| Field | Content | Unit or format |
|---|---|---|
| feature_id | Unique identifier | text |
| name | Name of the drain, river, canal, creek or mouth | text |
| category | Major drain; riverine outfall reach; mouth subject to sand-bar closure | text |
| clause | Clause of Chapter 5 under which it is listed | text |
| reach_limits | Upstream and downstream limits of the reach | text |
| design_flood_level_source | Water Resources Department design or highest recorded flood level, or hydraulic model (Clause 5.8.2) | text |
| reservoir_release | Upstream reservoir or tank and its operating rule, where any (Clause 5.8.3) | text |
| bar_crest_level | Most recent pre-monsoon bar crest level, for mouths | m (Survey of India datum) |
| mouth_programme | Water Resources Department mouth-maintenance programme and certification (Clause 5.13.2) | text |
| source | Source agency and date | text |
| geometry | Line (drains and reaches) or point (mouths) | line / point |
Annex 5C — Worked example: outfall-closed check for a site on a jhora draining to the Umkhrah in Shillong
Supports Clauses 5.9, 5.10, 5.11 and 5.12 of Chapter 5 and Clause 4.6.6 of Chapter 4.
Illustrative — not design values. This example applies the outfall-closed check of Clause 5.10 to the revised detention facility of Annex 4C. The site, its levels and its receiving drain are invented to show the method. No tidal level is used: the tide enters only through the illustrative statements in Table 5C.1 about whether the receiving drain is above or below the site outlet.
Inputs
5C.1 The site is the 2.0 ha flood-sensitive site of Annex 4C. It discharges through its own outlet chamber and a flap gate to a public storm drain that joins a jhora running to the Umkhrah in Shillong, whose level rises when the jhora runs full and when the Umkhrah overflows onto its valley floor, as it does "with nearly every heavy downpour" at Polo and Pynthorbah (as reported), so Clause 5.10.1 applies to the facility. To show the method, this example uses the two 6-hour lock windows of Clause 5.10.3, as the coastal editions of this Manual do. In Meghalaya an outfall on the valley floors of the Umkhrah and Umshyrpi is closed for the design storm and the stream's recession, and for not less than 24 hours; an outfall to a jhora whose invert is below its design level is closed for as long as the computed level of the stream stays above it, or for the whole storm where no hydrograph of the stream has been computed; a river-locked outfall, an outfall to a release reach and an outfall on the Garo plains have a single lock of at least 72 hours; and an outfall below the design level of a reservoir, lake or pung is closed for the whole storm, under Clause 5.8.5. In each of those cases that lasts longer than the windows used here, the facility must store or pump the volume of the longer closure, up to the whole storm volume (Clause 5.9.4); that needs more storage, or pumping, than this example shows. The routing, the volume balance of Clause 5.10.4 and the assessment are the same. The public drain's own outfall to the jhora would also need the debris rack, the bulking factor and the solid-waste trap of Clause 6.3.6 and an invert above the range of bed movement of Clause 5.8.5(c); and on a slope in Shillong the facility itself would be a lined tank, not an infiltrating basin (Clause 4.11 (hill rule)).
Table 5C.1 — Inputs (Illustrative — not design values)
| Item | Value | Basis |
|---|---|---|
| Facility | Revised facility of Annex 4C: 2,500 m² plan area, vertical walls; 170 mm orifice at the floor; 460 mm orifice, invert 0.53 m | Annex 4C, Table 4C.14 |
| Storm | 1% AEP, 48 h, peak day last, AMC III; 72 h also run | Clause 5.10.2 |
| Inflow | Post-development 1% AEP hydrographs of Annex 4C (48 h: 8,420 m³; 72 h: 9,468 m³) | Annex 4C |
| Receiving drain levels at the connection, J1, J2 and J3 | Below the site outlet invert (from the drain owner's model) | Illustrative input |
| Receiving drain during each lock window | Backs up above the site outlet invert, so the site cannot discharge | Illustrative input; Clause 5.10.3(b) |
| Flap gate on the site outlet | Set 0.15 m below the orifice inverts in the outlet chamber, so that outside the lock windows its opening head and head loss do not affect the orifice control | Illustrative input; to be confirmed from the certified curve (Clause 5.11.2) |
| Lock windows | Two of 6 h each, starts 12.4 h apart (semi-diurnal tide) | Clause 5.10.3(a) |
| Pumps | None | — |
5C.2 Cases of Table 5.2. Because the receiving drain stays below the site outlet in J1, J2 and J3 (Table 5C.1), those cases give the free-outfall results of Annex 4C: in J2 the 1% AEP maximum water level is 1.17 m (2,913 m³), and in J3 (10% AEP, 48 h) it is 0.77 m. R1 and R2 do not apply, because the site does not drain to a river. J4, the outfall-closed check, is worked below.
Lock windows (Clause 5.10.3)
5C.3 The peak 1-hour block of the final 24 hours of the 48-hour storm is 35:35–36:35 h, with 98.2 mm (the 1-hour depth of Table 4C.2). Two runs are made:
- Run A: the first window is centred on that block: 33:05–39:05 h; the second starts 12.4 h later: 45:29–51:29 h.
- Run B: the first window starts at that block: 35:35–41:35 h; the second: 47:59–53:59 h.
For the 72-hour storm, every time is 24 h later.
5C.4 Gravity discharge is zero inside each window. Outside the windows the outlet discharges through the orifices of Table 4C.10. The routing is the same level-pool routing as in Annex 4C.
Results
Table 5C.2 — Outfall-closed check results (Illustrative — not design values)
| Storm | Run | Lock windows (h:min) | Maximum stage (m) | Maximum storage (m³) | Time of maximum (h:min) | Largest release after a window (L/s) |
|---|---|---|---|---|---|---|
| 1% AEP, 48 h | A | 33:05–39:05; 45:29–51:29 | 2.01 | 5,019 | 39:05 | 566 |
| 1% AEP, 48 h | B | 35:35–41:35; 47:59–53:59 | 2.10 | 5,238 | 41:35 | 584 |
| 1% AEP, 72 h | A | 57:05–63:05; 69:29–75:29 | 2.00 | 5,012 | 63:05 | 565 |
| 1% AEP, 72 h | B | 59:35–65:35; 71:59–77:59 | 2.09 | 5,233 | 65:35 | 584 |
Run B of the 48-hour storm governs. The first window closes the outlet just as the storm peak arrives, so the whole peak is stored. The second window arrives when the facility has drained to about 0.7 m, below the Stage 2 orifice, and adds little.
5C.5 Volume balance (Clause 5.10.4). Table 5C.3 gives the balance for Run B. The outflow in each period is found by continuity: outflow = storage at start + inflow − storage at end.
Table 5C.3 — Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Period (h:min) | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| 0:00–35:35, before window 1 | 3,817 | 2,213 | 0 | 0 | 1,604 |
| 35:35–41:35, window 1 | 3,634 | 0 | 0 | 1,604 | 5,238 |
| 41:35–47:59, between windows | 941 | 4,423 | 0 | 5,238 | 1,756 |
| 47:59–53:59, window 2 | 28 | 0 | 0 | 1,756 | 1,784 |
| After 53:59 | 0 | 1,784 | 0 | 1,784 | 0 |
| Total | 8,420 | 8,420 | 0 | — | — |
Check for window 1: V_inflow = 3,634 m³ ≤ V_storage available + V_pumped + V_gravity = (5,238 − 1,604) + 0 + 0 = 3,634 m³. The facility therefore needs 5,238 m³ of storage, which the routing confirms.
Table 5C.4 — Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Time (h) | Inflow (L/s) | Outlet | Outflow (L/s) | Stage (m) | Storage (m³) |
|---|---|---|---|---|---|
| 24 | 20 | Open | 18 | 0.18 | 445 |
| 28 | 39 | Open | 24 | 0.25 | 621 |
| 32 | 59 | Open | 32 | 0.36 | 906 |
| 34 | 85 | Open | 37 | 0.47 | 1,166 |
| 36 | 286 | Closed | 0 | 0.78 | 1,944 |
| 38 | 106 | Closed | 0 | 1.73 | 4,321 |
| 40 | 66 | Closed | 0 | 1.96 | 4,904 |
| 42 | 51 | Open | 529 | 1.79 | 4,472 |
| 44 | 42 | Open | 204 | 0.87 | 2,181 |
| 46 | 37 | Open | 49 | 0.74 | 1,854 |
| 48 | 33 | Open | 47 | 0.70 | 1,756 |
| 50 | 0 | Closed | 0 | 0.71 | 1,784 |
| 54 | 0 | Closed | 0 | 0.71 | 1,784 |
| 56 | 0 | Open | 43 | 0.58 | 1,459 |
| 60 | 0 | Open | 32 | 0.37 | 921 |
| 66 | 0 | Open | 16 | 0.16 | 397 |
| 72 | 0 | Open | 7 | 0.06 | 162 |
Assessment
5C.6 Clause 5.10.4(a). The facility of Annex 4C reaches 1.17 m in J2, and its spillway crest is at 1.35 m (Annex 4C). In the outfall-closed check the stage reaches 2.10 m, so the spillway would operate. The facility of Annex 4C fails the check.
5C.7 Remedy. Pumping (Clause 5.12) does not help here: during the lock windows the receiving drain is itself closed, and pumping into it would raise its level, which Clause 5.12.3 does not permit. The remedy is more storage. Keeping the plan area of 2,500 m² and the outlets of Annex 4C:
- the facility must hold 5,238 m³, to a stage of 2.10 m;
- the spillway crest is set above that stage, with the 0.15 m clearance recommended in Clause 4.9.3: 2.25 m;
- with the 4.0 m spillway of Annex 4C (head 0.30 m), the maximum level with the spillway flowing is 2.55 m, and with 0.3 m freeboard the top of the walls is at least 2.85 m above the floor.
The outfall-closed check therefore governs the storage: 5,238 m³ against 2,913 m³ from the release-rate checks, about 80% more. A larger plan area would make the facility shallower; the outlet, caps and drawdown would then have to be re-checked, because the stage–discharge relationship changes.
5C.8 Release after the lock. When the first window ends, the stored water is released under a head of about 2 m, at up to 584 L/s. This is above the 100-yr cap of 356 L/s. Clause 5.10.4 allows this, because the release reaches a drain that has itself just reopened, and requires it to be included in the J4 run of the downstream analysis (Clauses 5.4 and 5.9) and reported on Form 5-1, Section H.
5C.9 Drawdown after the storm (Clause 5.10.5). The J1 tidal curve stays below the site outlet (Table 5C.1), so the drawdown of Annex 4C applies: 45.3 h for 90% of the 10-yr storage with the low-flow orifice 50% blocked, within the 48-hour limit of Clause 4.7. In Run B, 90% of the maximum J4 storage is released 22.6 h after the maximum.
5C.10 Other requirements.
- The flap gate on the site outlet is inspected and operated before 31 March each year and after every event in which it closed against a storm flow (Clause 5.11.5).
- The deeper facility is checked for flotation with groundwater at the design groundwater level; in the alluvium of the Garo foothill plains and the Jinjiram valley, the valley fills of Ri-Bhoi, the river terraces and floodplains, and the pung, lake and reservoir margins without piezometer readings that level is existing ground level (Clauses 4.12.1 and 4.12.3).
- The fence and signs of Annex 4C apply to the deeper facility (Clause 4.15).
Table 5C.5 — Summary (Illustrative — not design values)
| Item | Value |
|---|---|
| Governing case | J4, 1% AEP 48-hour storm, Run B (first window starting at the peak 1-hour block) |
| Storage required | 5,238 m³ (Annex 4C release-rate design: 2,913 m³) |
| Maximum stage | 2.10 m, with 2,500 m² plan area |
| Spillway crest | 2.25 m |
| Top of walls | ≥ 2.85 m above the floor |
| Largest release after a lock window | 584 L/s, to be included in the downstream J4 run |
| Drawdown | Annex 4C result applies: 45.3 h with the low-flow orifice 50% blocked |
Form 5-1 — Downstream and Tailwater Report
Supports Clauses 5.3 to 5.14 of Chapter 5.
Draft form — Meghalaya Stormwater Design Manual, Draft v1.0. One report for each project. Sites of less than 0.5 ha that meet Clause 5.3.4 may submit Form 5-2 instead, where the Authority accepts it. Attach the plans, model files and hydrographs referred to.
A. Project
Table 5F.1 — Form 5-1: project
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Project type: site under Chapter 4; drainage project under Chapter 6; regional detention or tank restoration (Clause 5.1.2) | |
| A3. Site or project area (ha) and outfalls | |
| A4. Site Runoff Control Report reference (Form 4-1), where applicable |
B. Extent of the analysis (Clause 5.3; Clause 5.14, item 1)
Table 5F.2 — Form 5-1: analysis points
| Point | Location | Type (Clause 5.3.3 (a) to (e)) | Contributing catchment (ha) | Project area as % of it |
|---|---|---|---|---|
Table 5F.3 — Form 5-1: end point
| Field | Entry |
|---|---|
| B1. End point and reason: 10% point, tank or pung, or major drain or the sea (Clause 5.3.1 (a) to (c)) | |
| B2. Where the end point is a tank or pung: change in maximum water level (m) and in surplus-weir discharge (m³/s); continuation below the weir if the level rises (Clause 5.3.2) | |
| B3. Plan of the analysis extent, showing the site, each point with its contributing area and percentage, and the end point (attach) |
C. Model (Clause 5.4.4; Clause 5.14, item 2)
Table 5F.4 — Form 5-1: model
| Field | Entry |
|---|---|
| C1. Software and version; hydrologic and hydraulic methods (Clause 5.4.4) | |
| C2. Network schematic, with the survey sources for drains and crossings (attach) | |
| C3. Land use and CN of off-site areas (present land use) | |
| C4. Upstream detention included, with evidence that it is built, maintained and documented | |
| C5. Calibration or validation evidence, where available | |
| C6. Scenarios run: existing, with project, and future where the Authority requires it (Clause 5.4.1) | |
| C7. Storms run: AEPs and durations, AMC and areal reduction (Clause 5.4.3) |
D. Results at each analysis point (Clause 5.4.2; Clause 5.14, item 3)
Complete one row for each analysis point, AEP and duration. E = existing; P = with project.
Table 5F.5 — Form 5-1: results by analysis point
| Point | AEP | Duration (h) | Peak flow E / P (m³/s) | Time to peak E / P (h) | Maximum water level E / P (m) | Peak velocity E / P (m/s) | Duration of inundation E / P (h) |
|---|---|---|---|---|---|---|---|
E. Acceptance (Clause 5.5; Clause 5.14, item 4)
Table 5F.6 — Form 5-1: acceptance criteria
| Criterion | Met at every point? | Where not met, the remedy adopted (Clause 5.5.3) |
|---|---|---|
| E1. 1% AEP water level rise ≤ 10 mm at buildings, lowest openings and carriageways (Clause 5.5.1(a)) | ||
| E2. No building newly flooded; no building or road newly failing the Chapter 6 limits (Clause 5.5.1(b)) | ||
| E3. Peak flow not above existing at the minor-system AEP of each element or at 1% AEP (Clause 5.5.1(c)) | ||
| E4. Velocity in lined channels within the lining limit, 3.0 m/s maximum (Clause 5.5.1(d)) | ||
| E5. Velocity in unlined channels, 50% and 10% AEP, not increased by more than 10% (Clause 5.5.1(e)) | ||
| E6. Change in duration of road closure on arterial or emergency routes (Clause 5.5.2) | ||
| E7. Timing exception requested (Clause 5.5.4)? Give the conditions met |
F. Tailwater derivation (Clauses 5.6 to 5.8; Clause 5.14, item 5)
Table 5F.7 — Form 5-1: tailwater derivation
| Field | Entry |
|---|---|
| F1. Tide-table edition and port, or port authority source (Clause 5.7.2(a)) | |
| F2. MHWS, HAT and MSL (m above chart datum) | |
| F3. Connection from chart datum to the Survey of India benchmark and the project datum: offset (m) and source (Clause 5.7.2(b)) | |
| F4. Estuary, creek or canal outfall: levels used and any evidence for a departure from open-coast levels (Clause 5.7.2(c)) | |
| F5. 10% AEP surge and 1% AEP still-water level: values, source, method and record length (Clause 5.7.3) | |
| F6. Wave set-up, for outfalls facing the open sea (Clause 5.7.3(d)) | |
| F7. SLA (m), at least +0.3 m; design life; sensitivity run at twice the SLA for design lives over 50 years (Clause 5.7.4) | |
| F8. Non-tidal tailwater: receiving-system level and source (Clauses 5.6.2, 5.6.3) | |
| F9. River levels and sources; reservoir or tank releases included (Clauses 5.8.2, 5.8.3) | |
| F10. City streams, gauged and border rivers, jhoras, reservoirs and release reaches, lakes and pungs, the Garo plains, and drains of other bodies: for the Umkhrah or Umshyrpi, the body that holds the reach (Shillong Municipal Board or KHADC), the 1% AEP model with the Shillong rainfall of Clause 2.3.6(c)(i), AMC, bulking and blockage, the channel as surveyed net of encroachment, waste and interception works, the surveyed flood marks and their sources, whether the outfall is on a valley floor (Polo, Pynthorbah, Nongmynsong, Forest Colony, Mawlai, Dhankheti, Nongrim Hills), and the lock (storm plus recession, not less than 24 hours); for a river, the operator of each gate and pumping station identified, gate sills, bank, wall or embankment crest, installed capacity, operating levels and gate-closing level obtained, with every level tied to the datum of the nearest CWC gauge or of the named gauge used; 1% AEP river level at the outfall from a model, with the dam releases, and not below the highest recorded level at the nearest CWC gauge transferred to the outfall (73.47 m at Dawki, with the surveyed flood mark of June 2026; 20.62 m at Therriaghat; 47.0 m at Kharkhana; 29.75 m at Dimapara; 20.34 m at Sibbari), with the profile or flood-mark survey used, or, where no gauge level exists (the Myntdu at Jowai, the Simsang, the Kynshi, the Ganol and other reaches), a modelled or surveyed flood level and its source; for a river leaving the State, the Assam-edition or Assam-site level used only as the model's downstream boundary; 10% AEP river level (no CWC danger level exists in the State: the design river level until a frequency analysis is accepted); drain behind the gate routed with its whole catchment and present storage, pumping confirmed available (permanent pumps only, not more than installed capacity less the largest pump), pumps operable at the design river level; single river lock of not less than 72 hours, or the duration of the largest release below a dam if longer, and its source; gate-failure and breach checks; for a jhora or hill stream, the 1% AEP study with the bulking, blockage and solid-waste rules of Clause 6.3.6 (in ML-C and ML-C1 the site-specific study of the ML-Z3 rule and the 24- to 72-hour storms), the surveyed flood marks and their sources, the bed survey and range of bed movement, the invert at least 0.5 m above the highest surveyed bed level, the scour depth of the foundation, and confirmation that no outfall discharges to a spring, a sinkhole, a cave or a mine pit; for a MePGCL reservoir, MePGCL's consent, MWL or FRL plus design-flood surcharge (FRL + 0.5 m where neither is published or the MWL equals the FRL: Myntdu–Leshka 618.50 m, New Umtru 132.78 m, Stage III 681.23 m, Stage IV 503.50 m), every level in feet converted at 1 ft = 0.3048 m with its datum stated, not below the highest recorded level, for the Umiam reservoir MePGCL's levels in writing or the higher of the surveyed shore line and the surveyed top of the closed spillway gates + 0.5 m, with the reported levels recorded, outfall below the tailwater treated as closed for the whole of the 72-hour storm, reservoir starting at FRL, no gate operation, drawdown, release notice or reservoir attenuation credited; for a release reach, the design storm and the 72-hour storm with the largest recorded release, or the spillway capacity until MePGCL gives one, placed before, during and after the storm; for Ward's Lake, Thadlaskein or another lake or pung, the custodian's consent (and the Municipal Board's or the landholding institution's), the surveyed spill level plus head, and the debris, waste and sediment traps before it; for the Garo plains, the model with the Brahmaputra boundary of the Assam edition, the flood marks of September 2012 and September 2014, and a lock of not less than 72 hours; Water Resources Department and MePGCL consent; owner's consent (s.204 of the Municipal Act within municipal limits; PWD, NHAI or NHIDCL; the Cantonment Board; NSTDA; the District Council and Dorbar Shnong), permitted rate, design water level or computed channel level, and flap gate; and the Waterbodies Guidelines' setback and regulated zone, any flood zone notified under the 2026 Act, the Bye-Laws' Highest Flood Level and the KHADC Regulation's s.15 duty checked (Clause 5.8.5) |
G. Joint cases (Clause 5.9; Clause 5.14, item 6)
Table 5F.8 — Form 5-1: joint-case results
| Case | Rainfall | Tailwater used (m, project datum) | Applies? | Governing result (storage, level, pipe size or pump capacity) |
|---|---|---|---|---|
| J1 | ||||
| J2 | ||||
| J3 | ||||
| J4 | ||||
| R1 | ||||
| R2 |
H. Outfall-closed check (Clause 5.10; Clause 5.14, item 7)
Table 5F.9 — Form 5-1: outfall-closed check
| Field | Entry |
|---|---|
| H1. Reason the check applies (Clause 5.10.1) | |
| H2. Storm: AEP, 48 h and 72 h, AMC III (Clause 5.10.2) | |
| H3. Lock duration and basis: default of two 6-hour windows, or site study (Clause 5.10.6); extension for sand-bar closure (Clause 5.13.5) | |
| H4. Lock windows of the two runs (start and end times) (Clause 5.10.3(d)) | |
| H5. Maximum stage in each facility, against its 1% AEP maximum water level (Clause 5.10.4(a)) | |
| H6. Maximum stage in the minor and major systems, against the Chapter 6 limits (Clause 5.10.4(b)) | |
| H7. Property connections: surcharge level, or non-return valves fitted (Clause 5.10.4(c)) | |
| H8. Stage hydrographs (attach) | |
| H9. Drawdown after the storm under the J1 tidal curve, and pumping where needed (Clause 5.10.5) |
Table 5F.10 — Form 5-1: volume balance for each lock window (Clause 5.10.4)
| Period | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| Before window 1 | |||||
| Window 1 | |||||
| Between windows | |||||
| Window 2 | |||||
| After window 2 |
I. Gates and valves (Clause 5.11; Clause 5.14, item 8)
Table 5F.11 — Form 5-1: schedule of flap gates, tide gates and non-return valves
| Location | Type | Size (mm) | Invert (m, project datum) | Certified head–discharge data (reference) | Stop-log or penstock (outfalls > 600 mm) |
|---|---|---|---|---|---|
J. Pumped outfalls (Clause 5.12; Clause 5.14, item 9)
Table 5F.12 — Form 5-1: pumped outfalls
| Field | Entry |
|---|---|
| J1. Reason pumping is needed (Clause 5.12.1) | |
| J2. Duty capacity (m³/s) at the static head for the J2 tailwater; standby capacity (Clause 5.12.2) | |
| J3. Effect on the receiving water level (Clause 5.12.3) | |
| J4. Power supply: two independent supplies, or standby generation with 72 h of fuel; automatic changeover (Clause 5.12.4) | |
| J5. Level of electrical panels, controls, generators and fuel, against the higher of the 1% AEP flood level + 0.5 m and HAT + surge + SLA + 0.5 m (Clause 5.12.5) | |
| J6. Discharge arrangement (Clause 5.12.6); controls, alarms and logging (Clause 5.12.7); screens (Clause 5.12.8) |
K. Sand bar (Clause 5.13; Clause 5.14, item 10)
Table 5F.13 — Form 5-1: sand-bar assumption
| Field | Entry |
|---|---|
| K1. River mouth or creek inlet concerned | |
| K2. Mouth assumed closed, or open with Water Resources Department certification attached (Clause 5.13.2) | |
| K3. Bar crest level from the most recent pre-monsoon survey (m) and the closed-mouth tailwater (Clause 5.13.3) | |
| K4. Extension of the lock duration, where required (Clause 5.13.5) |
L. Inspection and maintenance (Clause 5.14, item 11)
Table 5F.14 — Form 5-1: inspection and maintenance
| Field | Entry |
|---|---|
| L1. Gate and valve inspection before 31 March and after closure events (Clause 5.11.5) | |
| L2. Pump test runs before 31 March (Clause 5.12.9) | |
| L3. Other requirements for the maintenance plan (Chapter 10) |
M. Statement by the registered professional (Clause 10.6)
I state that this report has been prepared under Chapter 5 of the Meghalaya Stormwater Design Manual (Draft v1.0), that the results reported are reproduced by the models submitted, and that every departure from Chapter 5 is listed with its reason. The Professional Design Certificate (Form 10-3) is attached.
Table 5F.15 — Form 5-1: statement by the registered professional
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Empanelment number, where Clause 10.6.1 requires it | |
| Organisation | |
| Signature | |
| Date |
Draft form — Meghalaya Stormwater Design Manual, Draft v1.0.
Form 5-2 — Simplified Downstream Statement (small sites)
Supports Clause 5.3.4 of Chapter 5.
Draft form — Meghalaya Stormwater Design Manual, Draft v1.0. For sites of less than 0.5 ha. The Authority may accept this statement in place of the full analysis only where every answer in Section B is "Yes". Otherwise submit Form 5-1.
A. Site
Table 5F.16 — Form 5-2: site
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Site area (ha), less than 0.5 ha | |
| A3. Receiving public drain: name or reference, type and size | |
| A4. Site Runoff Control Report reference (Form 4-1) |
B. Conditions (Clause 5.3.4)
Table 5F.17 — Form 5-2: conditions
| Condition | Yes / No | Evidence |
|---|---|---|
| B1. The receiving public drain has documented capacity for its minor-system design flow (Chapter 6) | ||
| B2. No flood-prone location is recorded within 500 m downstream of the site outfall. Records checked: local body, SMB, MSDMA, Water Resources Department (Clause 5.3.3(d)) | ||
| B3. The site does not drain to a tidal or backwater-affected outfall |
C. Route plan
Table 5F.18 — Form 5-2: attachments
| Attachment | Attached? |
|---|---|
| C1. Plan of the drainage route from the site outfall for 500 m downstream, with the receiving drain and any recorded flood-prone locations | |
| C2. Copy or reference of the drain capacity record |
D. Statement
I state that the site meets the conditions of Clause 5.3.4 as shown above, and that the records listed have been checked.
Table 5F.19 — Form 5-2: statement
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Meghalaya Stormwater Design Manual, Draft v1.0.