Annexes to Chapter 11Basin and City Stormwater Master Plans
These annexes support Chapter 11. They give a terms of reference template for a Basin Stormwater Master Plan (BSMP), the layout of the basin list and boundary layer, the layout and method for depth–damage curves, the standard for publishing BSMP data and models, and the annual implementation report form. Annexes 11B and 11C need data that are not yet available; they say so and give the rule to use in the meantime. The template and the form are a model and a draft form for consideration by a competent authority, and are not in force.
Annex 11A — BSMP terms of reference template
Supports Clauses 11.1 to 11.12 of Chapter 11.
Model text for consideration by a competent authority. Not in force. The Lead Authority adapts this template for each basin. Items in "[ ]" are for the Lead Authority to complete. Clause references are to this Manual, which the consultant shall follow in full.
11A.1 Background and purpose
- The [Lead Authority] intends to prepare a Basin Stormwater Master Plan for the [name] basin under Chapter 11 of the Meghalaya Stormwater Design Manual.
- The BSMP shall (Clause 11.1.2):
- (a) map flood hazard for the basin under existing and future conditions;
- (b) set the level of service for each part of the drainage system;
- (c) identify, cost and rank the works, storage and land needed to reach that level of service;
- (d) identify land to be reserved in the statutory land-use plan for regional storage, pung and tank restoration and major flow paths;
- (e) set the basin inputs for site design: regional facilities, the fee-in-lieu unit rate, and any basin release rate stricter than Chapter 4; and
- (f) recommend catchments for notification as flood-sensitive.
- The BSMP may make the site criteria of Chapters 4 to 8 stricter for the basin. It shall not relax them, except through the regional detention and fee-in-lieu routes of Clauses 4.13 and 4.5.6 (Clause 11.1.3).
11A.2 Client, partners and study area
- Client: [Lead Authority] (Clause 11.4.1).
- Partners: Water Resources Department, wherever the basin includes a river, canal or tank under its control, and [other local bodies, MUDA or Urban Affairs, MSDMA] (Clause 11.4.1).
- Study area: the whole of the [name] basin, draining to [outfall], as delineated under Clause 11.3, including the parts outside the client's limits (Clause 11.3.1). The provisional boundary is in [Annex 11B / attached map]. The consultant shall confirm it in Task 2.
- Links to other basins: [for example the receiving river, stream, jhora, reservoir or pung corridor]. Diversions between basins by canal, drain or surplus course shall be mapped and represented in the model (Clause 11.3.2).
11A.3 Team
- The study shall be led by an engineer empanelled as a Stormwater Design Professional with the basin modelling endorsement of Annex 10E (Clause 11.4.3).
- The team shall include at least: [a hydrologist; a hydraulic modeller; a coastal or tidal specialist where the basin has a tidal outfall; a GIS and survey lead; a planner; a cost engineer; a community engagement lead]. The client sets the minimum qualifications and experience of each.
11A.4 Tasks
Task 1 — Inception. Review existing studies, data and projects in the basin. Prepare a data inventory against Table 11.1, a gap list, a survey plan, a consultation plan, and the work programme. Deliver the inception report.
Task 2 — Data and surveys. Assemble, survey where missing, and quality-check every item of Table 11.1 (Clause 11.5.1):
- (a) terrain: DEM from LiDAR or photogrammetry with vertical accuracy of 0.15 m RMSE or better in urban areas, tied to the Survey of India datum, with the accuracy test reported;
- (b) drain network: every public drain, culvert and outfall, with invert levels, sizes, condition and silt depth; private drains above 600 mm;
- (c) waterbodies: every tank, pung, pond and marsh under Chapter 7: FTL, MWL, bund level, stage–storage, sluices, surplus weirs, supply channels and encroachment, in the fields of Annex 7A;
- (d) rivers and canals: cross-sections at no more than 200 m spacing and at every structure;
- (e) outfalls, rivers, streams, jhoras, reservoirs, pungs and lakes: outfall invert levels, on a named datum, against the high flood level of the receiving river at the nearest CWC level-monitoring site (none in the State has a warning or danger level), with any local gauge kept as a separate series and any conflict between published values stated; for ungauged streams and jhoras, the Umkhrah and the Umshyrpi among them, surveyed flood marks and the 1% AEP level with its sediment, debris and garbage; for outfalls to reservoirs, the maximum water level, full reservoir level and spillway and gate data from MePGCL, converted from feet where so published, and pungs and lakes at their surveyed spill levels; the release records of the dams that set the receiving levels; the landslide, flash-flood, karst, mine-void and mine-spoil hazards above the basin; and sluices, flap gates, debris racks, solid-waste traps, sediment traps, debris basins and pumping stations on the outfalls, with their capacities and operating rules;
- (f) rainfall and water levels: all available records (IMD, including its observatories at Cherrapunji and Shillong (C.S.O.) and the gauges reported by the Meteorological Centre Shillong, among them Tikrikilla, Resubelpara, Barapani, MeECL Lumjingshai, Shillong, Williamnagar, Nongstoin, Tura, Mawphlang, Mawkyrwat, Mawsynram, Sohra, RKM Sohra, Khliehriat, Baghmara, Shella and Ratacherra (types and record lengths [TBC]); the Shillong self-recording gauge and the ordinary gauges at Shillong (Obsy), Upper Shillong and Dalu used for the CWC Flood Estimation Report for subzone 2(b); the river gauges of CWC; the agro-meteorological station of the ICAR Research Complex for NEH Region at Umiam [TBC]; the rain and reservoir records of MePGCL at its dams [TBC]; and any gauges or sensors kept by the Municipal Boards, Shillong Smart City Ltd, MSDMA and the Water Resources Department [TBC]), including the 15–17 June 2022 (1,003.6 mm at Mawsynram in the 24 hours to 08:30 on 17 June, IMD, with 811.6 or 811.2 mm and 972 mm reported at Sohra and NH-6 cut by slides, as reported), 9 July 2019 (more than 72.2 mm at Shillong, with the flash floods of Polo, Forest Colony and Mawlai, as tabulated in the IRADe/NMHS plan), 21–22 September 2014 (the floods and landslides of the Garo Hills after the rain of the night of 21 September, with 52 deaths reported by 28–29 September and more than 60 in a later account, and more than 200 villages under the Brahmaputra and the Jinjiram, as reported, for which no rainfall measurement was found), 4–6 October 2024 (the floods at Dalu and the landslide at Hatiasia Songma in the Garo Hills, as reported, with no rainfall value found), 30–31 May 2025 (the flash flood at Sumer Latara and the landslides of the Umling block near NH-6, as reported, with no rainfall value found) and June 2026 (the collapse of the Shillong–Dawki road at Laitlyngkot and the Umngot flood at Dawki, as reported, with no rainfall value found) events;
- (g) flood evidence: surveyed flood marks and mapped extents of past events, including public reports, photographs and residents' records;
- (h) land use: existing land use and imperviousness; future land use from the statutory master plan;
- (i) soils and groundwater: HSG map (Annex 3A or Clause 3.7.2), seasonal high groundwater, aquifer and recharge zones; and
- (j) sewer interaction: known cross-connections, dry-weather flow in drains, solid-waste hotspots.
Confirm the basin boundary and the inter-basin diversions (Clause 11.3.2). Deliver the data report and the data in the formats of Annex 11D.
Task 3 — Model build. Build a coupled 1D–2D hydraulic model of the minor system, the major (overland) system, rivers, canals and tanks, and the outfalls (Clause 11.7.1; Figure 11.2). Use the methods of Chapter 3 and the tidal and river boundaries of Chapter 5. Run the design storms of Chapter 2, including the 24-, 48- and 72-hour storms, for at least the 50%, 10%, 1% and 0.2% AEPs, with areal reduction under Clause 2.7.3 (Clause 11.7.2). Where the basin has tank cascades, run continuous simulation under Clause 3.13 with the full IMD gridded daily record where available, and at least 30 years, disaggregated by the temporal patterns of Annex 2D. The two-step approach of Clause 3.13.5 may be used: starting tank levels and antecedent conditions from the continuous run are passed to the design-storm runs (Clause 11.7.3).
Task 4 — Calibration and validation. Calibrate and validate the model under Clause 3.15, using at least two of the 15–17 June 2022 (1,003.6 mm at Mawsynram in the 24 hours to 08:30 on 17 June, IMD, with 811.6 or 811.2 mm and 972 mm reported at Sohra and NH-6 cut by slides, as reported), 9 July 2019 (more than 72.2 mm at Shillong, with the flash floods of Polo, Forest Colony and Mawlai, as tabulated in the IRADe/NMHS plan), 21–22 September 2014 (the floods and landslides of the Garo Hills after the rain of the night of 21 September, with 52 deaths reported by 28–29 September and more than 60 in a later account, and more than 200 villages under the Brahmaputra and the Jinjiram, as reported, for which no rainfall measurement was found), 4–6 October 2024 (the floods at Dalu and the landslide at Hatiasia Songma in the Garo Hills, as reported, with no rainfall value found), 30–31 May 2025 (the flash flood at Sumer Latara and the landslides of the Umling block near NH-6, as reported, with no rainfall value found) and June 2026 (the collapse of the Shillong–Dawki road at Laitlyngkot and the Umngot flood at Dawki, as reported, with no rainfall value found) events where data exist (Clause 11.7.5). Report the performance measures of Clause 3.15.4 and the reasonableness check of Clause 3.15.6.
Task 5 — Scenarios and hazard maps. Model the scenarios of Clause 11.7.4: (a) existing; (b) future, uncontrolled; (c) future, controlled; (d) future, with plan; and (e) climate, applied to (a) and (d). Produce flood hazard maps of extent, depth, velocity and hazard class (H1–H6, Chapter 6) for the 10%, 1% and 0.2% AEPs, existing and future-with-plan (Clause 11.8.4(a)).
Task 6 — Level-of-service assessment. Compare scenarios (a), (c) and (d) with the levels of service of Table 11.2 and any stricter levels the client adopts (Clause 11.6.1). Map every shortfall.
Task 7 — Options. Develop options in the order of Clause 11.8.1: protect and restore storage; regional retention and detention, sited by modelling; conveyance; outfall works; property-level protection; non-structural measures. Assess each option for the criteria of Clause 11.8.2: reduction in flood risk (buildings and people flooded, and expected annual damage using Annex 11C); capital and 30-year maintenance cost; land required; effect on the springs and streams that supply most towns by gravity, and their recharge areas above the town intakes, which this Manual keeps free of paving and of infiltrated road runoff, the sacred groves at the heads of perennial streams, the stability of hill slopes, where water put into colluvium, fill or slide debris raises the pore pressure, as in the landslide localities of Shillong, the cavernous limestones and coal-mine voids of the escarpment and the Jaintia hills, where water put into the ground may go anywhere and no infiltration is allowed (Clause 4.11, karst and mine rule), recharge on the alluvium of the Garo foothill plains and the valley fills of Ri-Bhoi, the only ground where it is allowed, although every assessment unit in the State is safe (stage of extraction 3.55%, CGWB, 2022), and the quality of the groundwater, which carries iron above the drinking-water limit at Shillong and other places, and of the streams, reservoirs, pungs and lakes that the runoff reaches; effect on downstream basins and the receiving river, stream, jhora, reservoir or pung; and who benefits.
Task 8 — Basin inputs for site design. Where scenario (c) does not meet the level of service, propose basin release rates (m³/s/ha) by AEP and sub-catchment (Clause 11.8.3). Recommend catchments for notification as flood-sensitive, with the evidence of Clause 4.5.4.1. Identify regional facility sites, with storage volumes, land needs and the sites they serve, and compute the fee-in-lieu unit rate, including land, construction and 10 years of maintenance (Clauses 4.13.3, 11.8.4(c), (d)).
Task 9 — Capital Improvement Programme. Rank the works by risk reduction per rupee, with cost, phasing and responsible agency (Clause 11.8.4(e)).
Task 10 — Maintenance and monitoring. Prepare the pre-monsoon maintenance programme: desilting, gate and pump testing, and tank operating rules (Clause 11.8.4(f); Chapters 7 and 10). Specify monitoring needs: new rain gauges, level sensors and flood-mark survey points (Clause 11.8.4(g); Clause 10.16.1).
Task 11 — Land-use integration. Prepare the material for the statutory land-use plan required by Clause 11.9.1: sites to be reserved; the 1% AEP hazard map with the Chapter 7 setbacks; land in hazard classes H5–H6 in the 1% AEP event; and open space locations that can form part of flow paths or regional storage.
Task 12 — Consultation. Publish the draft BSMP for public comment for at least 60 days, with public meetings in each affected local body (Clause 11.10.1). Keep a log of comments and responses.
Task 13 — Final BSMP and publication. Revise the BSMP after consultation. Prepare the package for approval by the State Stormwater Technical Committee, including the model for review (Clause 11.11.1). Publish the data, models, maps and CIP under Annex 11D (Clause 11.10.2).
11A.5 Deliverables
Table 11A.1 — Deliverables
| No. | Deliverable | Task | Due (months from start) |
|---|---|---|---|
| D1 | Inception report, data inventory and survey plan | 1 | [ ] |
| D2 | Data report and data sets (Annex 11D) | 2 | [ ] |
| D3 | Model build report and model files | 3 | [ ] |
| D4 | Calibration and validation report | 4 | [ ] |
| D5 | Scenario results, hazard maps and level-of-service assessment | 5, 6 | [ ] |
| D6 | Options report, with basin inputs for site design | 7, 8 | [ ] |
| D7 | Draft BSMP with draft CIP, for consultation | 9–12 | [ ] |
| D8 | Final BSMP, consultation log, approval package and open-data release | 13 | [ ] |
11A.6 Ownership and publication
All data, models, maps and reports produced under these terms are owned by the Lead Authority and shall be published under Annex 11D. The consultant shall not use any software licence, data licence or format that prevents publication, or that prevents a third party from re-running the model with the stated software version.
Annex 11B — Basin lists and boundaries for Tier A bodies
Supports Clauses 11.3 and 11.4 of Chapter 11.
To be prepared. This annex will contain the list of basins for every Tier A body, with a GIS layer of basin boundaries delineated under Clause 11.3.2. It needs the list of Tier A bodies (Annex 1A), a DEM of the accuracy of Clause 11.5.1, flown again over the valley floors, the foothill plains and the slide-prone slopes after any large flood or landslide, the drain network of every drain-owning body (the Municipal Boards, the Shillong Cantonment Board, NSTDA, Shillong Smart City Ltd, PWD (Roads), NHAI and NHIDCL, and the District Councils and Dorbar Shnongs for the village drains and jhoras), a drain-and-jhora register giving every reach its owner, its land status (community, clan, private or State) and whether it is a waterbody under the Waterbodies Guidelines, the 32 outfalls of the Umkhrah and the Umshyrpi, the rivers and flood works of the Water Resources Department, the reservoirs of MePGCL with their levels, spillways, gates and release rules on a stated datum, the pungs and lakes with their spill levels, the springs and their recharge areas and the sacred groves above the towns, the karst, cave and coal-mine void areas, and the landslide, flash-flood and debris hazards mapped by NESAC, the IRADe/NMHS plan and MSDMA (other likely sources: Survey of India, CWC, CGWB, NIH, the Urban Affairs Department's master-plan maps and the District Councils' land records). No basin map of any Meghalaya town was found. Until the annex is published, the basins of Shillong (the Umkhrah and the Umshyrpi to the Wah Roro and Umiam lake; the Umkhen and the Wah Tamdong), the Umiam lake shore and the Umiam–Umtru reaches to Byrnihat, Jowai, the escarpment settlements of Sohra, Mawsynram and Shella, Dawki, Tura, Williamnagar, Baghmara and Dalu, the Garo foothill plains and Nongpoh–Umling named in Clause 11.3.3 are at least those named there; other Tier A bodies define their basins in their first BSMP (Clause 11.3.3); in sub-areas ML-C and ML-C1 the hazard screening of Clause 11.3.3 comes first; and the interim arrangements of Clause 11.12 apply in every basin without an approved BSMP.
Table 11B.1 — Basins named in Clause 11.3.3 (provisional)
| Tier A body or area | Basin | Note from Chapter 11 |
|---|---|---|
| Shillong Planning Area (SMB, MUDA; the KHADC for its parts, if adopted) | Catchments of the Umkhrah and the Umshyrpi to the Wah Roro and Umiam lake | Valley floors outfall-closed (Clause 5.8.5(a)); five drains and 32 outfalls in the 1D network; Board and KHADC stretches marked; surveyed flood marks and 1% AEP level with debris and garbage as boundary |
| Shillong Planning Area (as above) | Catchments draining to the Umkhen and the Wah Tamdong | As above |
| Umiam lake shore and the Umiam–Umtru reaches | Catchments draining to Umiam lake and to the reaches below Stages III and IV and New Umtru, to Byrnihat | Lake level from MePGCL on a named datum [TBC]; largest recorded releases as boundary |
| Jowai (Municipal Board) | Catchments draining to the Myntdu headwaters | Limestone, cave and mine-void areas mapped; local flood-mark survey as boundary; Myntdu–Leshka release reach downstream |
| Sohra, Mawsynram and Shella | Catchments of the escarpment settlements (sub-area ML-C) | Hazard screening first; site-specific hydrology; duration check of Clause 6.3.6(j) |
| Dawki | Catchments draining to the Umngot | CWC Dawki high flood level (73.47 m, 2006) and June 2026 flood mark as boundary; outfall-closed case a design case |
| Tura (Municipal Board, MUDA) | Catchments draining to the Ganol and the Ringrey and Rongkhon streams | Surveyed flood marks as boundary |
| Williamnagar (Municipal Board) | Catchments draining to the Simsang | Surveyed river level as boundary |
| Baghmara and Dalu | Catchments draining to the south Garo rivers | Bugi (Dimapara) and Dareng (Sibbari) high flood levels where they apply; Simsang survey; in sub-area ML-C1, hazard screening first |
| Garo foothill plains (Phulbari, Tikrikilla) | Catchments draining to the Jinjiram and the Krishnai | River backwater for at least the 72-hour storm; the Assam edition for the Brahmaputra |
| Nongpoh–Umling | Catchments along NH-6 draining to the Umlew and the streams of Ri-Bhoi | Slides of the hill cuts mapped |
| Other Tier A bodies and Municipal Boards, including Resubelpara | To be defined in the first BSMP | Clause 11.3.3 |
Table 11B.2 — Attributes of the basin boundary layer (layout)
| Field | Type | Content |
|---|---|---|
| BASIN_ID | Text | Basin identifier |
| NAME_EN, NAME_LOC | Text | Basin name in English and Khasi or Garo |
| TIER_A | Text | Tier A body or bodies in the basin |
| OUTFALL | Text | Outfall to the sea, river or major waterbody (Clause 11.2) |
| AREA_KM2 | Real | Basin area, km² |
| LEAD_AUTH | Text | Lead Authority (Clause 11.4.1) |
| PARTNERS | Text | Partners, including Water Resources Department where it applies |
| LINKS | Text | Diversions to and from other basins (Clause 11.3.2) |
| BSMP_STAT | Text | None / in preparation / draft published / approved |
| BSMP_DATE | Date | Date of approval of the current BSMP |
| REVIEW_DUE | Date | Date of the next review (Clause 11.11.2) |
Annex 11C — Depth–damage curves for Meghalaya building types
Supports Clause 11.8.2 of Chapter 11.
To be prepared. This annex will contain depth–damage curves for the main building types of Meghalaya cities, for structure and contents, for use in computing expected annual damage under Clause 11.8.2. It needs a building-type classification and building stock data (Census housing tables, property-tax records, Lead Authority GIS), damage surveys and claims from the 15–17 June 2022 (1,003.6 mm at Mawsynram in the 24 hours to 08:30 on 17 June, IMD, with 811.6 or 811.2 mm and 972 mm reported at Sohra and NH-6 cut by slides, as reported), 9 July 2019 (more than 72.2 mm at Shillong, with the flash floods of Polo, Forest Colony and Mawlai, as tabulated in the IRADe/NMHS plan), 21–22 September 2014 (the floods and landslides of the Garo Hills after the rain of the night of 21 September, with 52 deaths reported by 28–29 September and more than 60 in a later account, and more than 200 villages under the Brahmaputra and the Jinjiram, as reported, for which no rainfall measurement was found), 4–6 October 2024 (the floods at Dalu and the landslide at Hatiasia Songma in the Garo Hills, as reported, with no rainfall value found), 30–31 May 2025 (the flash flood at Sumer Latara and the landslides of the Umling block near NH-6, as reported, with no rainfall value found) and June 2026 (the collapse of the Shillong–Dawki road at Laitlyngkot and the Umngot flood at Dawki, as reported, with no rainfall value found) floods (Revenue and Disaster Management Department and MSDMA damage assessments, insurers), and replacement costs (Public Works Department schedules of rates). Until it is published, each BSMP shall state the depth–damage relations it uses and their source, and shall report the reduction in buildings and people flooded for every option (Clause 11.8.2), which does not depend on the curves.
Table 11C.1 — Depth–damage curve (layout, one table per building type)
| Depth of water above floor level (m) | 0 | 0.25 | 0.5 | 1.0 | 1.5 | 2.0 | 3.0 |
|---|---|---|---|---|---|---|---|
| Structure damage (% of replacement cost) | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Contents damage (% of contents value) | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Building type, source and year of costs | ______ |
11C.1 Use in option assessment
Expected annual damage (EAD) is computed for each scenario from the damages at the modelled AEPs. With damages D_1, D_2, … at annual exceedance probabilities P_1 > P_2 > …, using at least the 50%, 10%, 1% and 0.2% AEP results of Clause 11.7.2:
EAD ≈ Σ ½ × (D_i + D_(i+1)) × (P_i − P_(i+1))
The reduction in EAD between scenario (c) and scenario (d), or between options, is the risk-reduction benefit used to rank works per rupee (Clause 11.8.4(e)). The BSMP shall state how damages beyond the 0.2% AEP and below the 50% AEP were treated.
Annex 11D — BSMP data and model publication standard
Supports Clauses 11.5.1 and 11.10 of Chapter 11, and Clause 10.17 of Chapter 10.
11D.1 What is published, and when
Table 11D.1 — Items to be published
| Item | Format | At draft (Clause 11.10.1) | At approval (Clause 11.10.2) |
|---|---|---|---|
| BSMP report, with the level-of-service assessment and options | Searchable PDF | Yes | Yes, final |
| Flood hazard maps: extent, depth, velocity, hazard class, for each AEP and scenario of Clause 11.8.4(a) | GeoTIFF rasters; extents also as GeoPackage polygons | Yes | Yes |
| Capital Improvement Programme | CSV and PDF | Draft | Yes |
| Basin release rates, recommended flood-sensitive catchments, regional facility sites, fee-in-lieu unit rate | GeoPackage and CSV | Yes | Yes |
| Data of Table 11.1 (terrain, drains, waterbodies, cross-sections, river, reservoir, pung and lake levels, slope, debris and garbage hazards and outfall structures, rainfall and levels, flood evidence, land use, soils and groundwater, sewer interaction) | GeoTIFF (terrain); GeoPackage (features); CSV (tables and time series) | Summary | Yes, except security-sensitive asset details |
| Model files: native, runnable, with all boundary-condition, rainfall and control files, the software name and version, and a run log | Native format, zipped | No | Yes |
| Calibration and validation report | Searchable PDF | Yes | Yes |
| Consultation log of comments and responses | PDF or CSV | — | Yes |
11D.2 Formats and references
- (a) Raster data shall be GeoTIFF, preferably cloud-optimised, with the cell size stated. Vector data shall be GeoPackage. Tables and time series shall be CSV in UTF-8, with a header row and units in the column names.
- (b) Horizontal and vertical references shall be as in Annex 10B.1(b) and (c). The vertical datum and its relationship to the Chapter 5 river datums of the CWC level-monitoring sites on the receiving rivers (not stated in any source found), of the reservoir levels of MePGCL (published in metres for Myntdu–Leshka, New Umtru and Umiam–Umtru Stage IV, and in feet for Umiam–Umtru Stage III, converted at 0.3048 m per foot), and of the flood marks surveyed on ungauged streams, jhoras, pungs and lakes shall be stated in every data set that carries levels.
- (c) Times shall be in Indian Standard Time, written as ISO 8601 (yyyy-mm-ddThh:mm+05:30). Units shall be SI.
- (d) Hazard map files shall be named
<basin>_<scenario>_<AEP>_<variable>.tif, where scenario is a to e of Clause 11.7.4, AEP is written as 50, 10, 1 or 0p2, and variable is depth, velocity, hazard or extent; for exampleumkhrah_d_1_depth.tif. - (e) Waterbody data shall use the fields of Annex 7A. Facility and outfall data shall use the fields of Annex 10B.
11D.3 Metadata
Every published data set shall carry: title; description; Lead Authority; source and method; date of capture; accuracy (for the DEM, the measured vertical RMSE); horizontal and vertical reference; scenario and AEP, where relevant; BSMP version; licence; and a contact.
11D.4 Withholding and personal data
- (a) Security-sensitive details of critical assets may be withheld, with the reason recorded and published (Clauses 10.17.3, 11.10.2). The flood hazard maps and the model shall still be published; only the sensitive attributes are removed.
- (b) Personal data shall not be published (Clause 10.17.3). Flood evidence collected from residents shall be published without names or contact details unless the person consents.
11D.5 Licence, viewer and versions
- (a) Published data and models shall be released under the Government Open Data Licence – India or an equivalent open licence (Clause 10.17.4).
- (b) The hazard maps, regional facility sites and CIP shall also be shown on a public map viewer (Clause 11.10.2).
- (c) Each approved BSMP shall carry a version number and date. Superseded versions shall stay available, marked as superseded, so that designs approved under them can be checked.
- (d) The published model package shall allow a third party with the stated software version to reproduce the published results. Designers may use its boundary conditions for site designs in the basin (Clause 11.10, Commentary).
Form 11-1 — Annual implementation report
Supports Clause 11.11.3 of Chapter 11, with Clauses 4.5.6.3 and 4.13.4 of Chapter 4.
Draft form — Meghalaya Stormwater Design Manual, Draft v1.0. Published by the Lead Authority for each basin with an approved BSMP before each monsoon season, by 31 March (Clause 11.11.3).
Table 11F.1 — Form 11-1, Section A: Basin and plan
| No. | Field | Entry |
|---|---|---|
| A1 | Basin; Lead Authority; partners | ______ |
| A2 | BSMP version and date of approval | ______ |
| A3 | Reporting year (1 April to 31 March) | ______ |
| A4 | Date of publication (by 31 March) and web address | ______ |
Table 11F.2 — Form 11-1, Section B: CIP progress
| CIP rank | Work | Agency | Cost in CIP (₹) | Spent this year (₹) | Spent to date (₹) | Status | Expected completion |
|---|---|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
Table 11F.3 — Form 11-1, Section C: Fee-in-lieu ledger (Clauses 4.5.6.3(c) and 4.13.4)
| Regional facility or tank | Volume credited to sites (m³) | Volume delivered (m³) | Fees received (₹) | Fees spent (₹) | Fees held, with year received |
|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ |
| Basin total: volume owed and delivered | ______ | ______ | ______ | ______ | ______ |
Table 11F.4 — Form 11-1, Section D: Maintenance completed (Clause 11.8.4(f))
| No. | Item | Planned | Done | Date completed |
|---|---|---|---|---|
| D1 | Desilting of drains and canals (length, km; volume, m³) | ______ | ______ | ______ |
| D2 | Tank and pung desilting and restoration (tanks, number; storage restored, m³) | ______ | ______ | ______ |
| D3 | Gate tests (number of gates) | ______ | ______ | ______ |
| D4 | Pump station duty tests (number of stations) | ______ | ______ | ______ |
| D5 | Tank operating rules reviewed with the custodian (number) | ______ | ______ | ______ |
| D6 | Monitoring added: rain gauges, level sensors, flood-mark points (Clause 11.8.4(g)) | ______ | ______ | ______ |
Table 11F.5 — Form 11-1, Section E: Flooding against the levels of service
| Event (dates) | Rainfall compared with the design depths (Clause 10.16.2(a)) | Level-of-service element (Table 11.2) | Location | Met (yes / no) | Event report reference (Clause 10.16.2) |
|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ |
Table 11F.6 — Form 11-1, Section F: Review triggers and sign-off
| No. | Field | Entry |
|---|---|---|
| F1 | Event exceeding the 1% AEP design depth in the basin this year (yes / no). If yes, review due within 2 years (Clause 11.11.2) | ______ |
| F2 | Statutory land-use plan revised this year (yes / no) (Clause 11.11.2) | ______ |
| F3 | Next 10-year review due (date) | ______ |
| F4 | Officer of the Lead Authority: name, designation, signature, date | ______ |