Chapter 6Minor and Major Drainage Systems
6.1 Purpose and scope
6.1.1 This chapter sets the level of service and the hydraulic criteria for the conveyance system that carries runoff from a development, a road or a public drainage scheme to a receiving waterway, tank or outfall. It covers:
- (a) the dual drainage concept: a minor system and a major system (Clause 6.3);
- (b) design return periods by land use and road class (Clause 6.4);
- (c) street hydraulics: spread, depth and flow hazard (Clause 6.5);
- (d) inlets, including clogging (Clause 6.6);
- (e) pipes and open and covered drains (Clause 6.7);
- (f) hydraulic grade line analysis (Clause 6.8);
- (g) overland flow paths, ponding at sags and building floor levels (Clauses 6.9 to 6.11);
- (h) culverts and road crossings (Clause 6.12); and
- (i) Meghalaya construction-practice requirements for covered drains, silt, solid waste, utilities and desilting access (Clause 6.13).
6.1.2 The detailed hydraulic design of individual structures (culverts, channels, energy dissipators, screens, pumps, gates, manholes) is in Chapter 9. Rainfall is in Chapter 2, runoff methods in Chapter 3, on-site storage in Chapter 4, tailwater in Chapter 5, waterbodies in Chapter 7 and water quality in Chapter 8.
6.1.3 This chapter applies to all public drains, all roads with kerbs or roadside drains, and all private drainage systems in developments that meet the applicability thresholds of Chapter 1. In Tier B local bodies, the simplified procedures and design aids referred to in Chapter 1 may be used for elements serving ≤ 16 ha, but the criteria of this chapter still apply.
6.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Minor system | Inlets, pipes, covered drains and open drains that carry runoff up to the minor design AEP of Table 6.1 without surcharge above the limits of Clause 6.8. |
| Major system | The surface flow paths (streets, overland flow paths, open channels, floodways and storage) that carry flow above the capacity of the minor system, up to the 1% AEP (100-yr) event. |
| Overland flow path | A defined surface route, in public land or a recorded easement, that carries major-system flow to a receiving waterway. |
| Spread (T) | Width of flow in the gutter and carriageway, measured from the face of the kerb. |
| Sag | A low point on a road or flow path from which water can leave only through an inlet or by ponding to an overflow level. A trapped sag has no surface overflow route. |
| Clogging factor | The fraction of an inlet's clean hydraulic capacity assumed lost to debris (Clause 6.6.3). |
| Hydraulic grade line (HGL) | The line joining the free-surface levels in a conduit system, or the piezometric levels where the system is under pressure. |
| Covered drain | A rectangular drain, usually beside a road, closed by cast-in-situ or precast cover slabs that form a footpath. |
| Sediment allowance | The depth or area of a drain or pipe assumed filled with silt when its design capacity is computed (Clause 6.7.8). |
| Check event | An AEP rarer than the design AEP at which the combined minor and major system must still meet the limits of Table 6.2. |
| High-density area | An area notified as such by the approving authority under Clause 6.4.4. |
| Class I area | An urban local body with a population of 1 lakh or more (the CPHEEO definition). |
6.3 The dual drainage concept
6.3.1 Every drainage system shall be designed as two systems that work together:
- (a) a minor system that carries the minor design flow of Table 6.1 below ground or in drains, keeping streets usable and spread within Table 6.2; and
- (b) a major system that carries all flow above the minor-system capacity, up to the 1% AEP (100-yr) flow, on the surface without entering buildings and within the depth and hazard limits of Clause 6.5.
6.3.2 Every element has a 1% path. Every inlet, sag, pipe, drain, culvert and storage element shall have an identified 1% AEP overland flow path to a receiving waterway, tank or outfall. The path shall be shown on the drainage plan (Clause 6.15).
6.3.3 Major-system design flow. The major system at any point shall carry the 1% AEP peak flow less the minor-system capacity at that point. The minor-system capacity used in this subtraction is the capacity of the inlets after the clogging factors of Clause 6.6.3, or the pipe capacity, whichever is less. At sags and at any location used to set building floor levels, the major system shall also be checked with the minor system fully blocked (Clause 6.10.3).
6.3.4 Rainfall and method. Design flows shall use the rainfall of Chapter 2 (including the climate factor of Clause 2.8) and the methods of Chapter 3:
- (a) the Rational Method only for catchments ≤ 16 ha and a single conveyance element. It shall not be used to accumulate flows down a network whose total catchment exceeds 16 ha;
- (b) a hydrograph method with hydraulic routing (for example SWMM, HEC-HMS with a hydraulic model, or an equivalent 1D/2D model) for networks above 16 ha and for any network with storage, pumping or a tidal outfall;
- (c) a minimum time of concentration of 10 minutes.
6.3.5 No transfer between catchments. Neither the minor nor the major system shall divert flow from one natural catchment to another unless the approving authority accepts a catchment-wide study showing no adverse effect.
6.3.6 Hill catchments: debris, garbage, sediment, steep drains and streets, hill roads, sloping sites and long storms. This clause applies to every element of the minor and major systems that receives runoff from a hill catchment, which in this Manual means land in sub-area ML-A, ML-B, ML-B1, ML-C, ML-C1 or ML-D of Annex 2A, any catchment whose natural ground slopes more than 10% on average, and any jhora or other stream that comes down from the hills, including where it runs out across the Garo foothill plains of sub-area ML-A1. Such elements shall meet Clauses 6.4 to 6.14 and, in addition (all set by this Manual):
- (a) Debris racks and traps. Every inlet, drain or pipe entrance and culvert that receives flow from 1 ha or more of unbuilt hill land (forest, scrub, cultivated or bare slope, a quarry or mine spoil, or a slide scar), or from a jhora or other hill stream whatever its catchment, shall have a debris rack or a debris trap upstream of it, designed under Chapter 9 (Clause 9.8), with machine access and a stable place to stockpile what it catches, which shall not be a slope, a jhora or a stream. With 50% of the rack blocked, the element it protects shall still pass its design flow, and the overflow route shall not send the flow onto a building or an unprotected slope. Racks and traps shall be cleared by 31 March, again by 31 May after the April–May storms, and after the season by 15 November (Chapter 10). The volume of a debris basin is to be set in Chapter 9 [TBC].
- (b) Bulking factor. The design flow of every channel, drain, pipe, culvert and crossing that receives flow from a hill catchment shall be the clear-water peak flow of Chapter 3 multiplied by a bulking factor of 1.25, for the minor design flow, the check event and the 1% AEP flow; elsewhere the factor is 1.0. The factor applies to capacity, freeboard and velocity; it does not apply to the runoff volume used for storage (Chapter 4). A larger factor shall be used where a sediment study of the catchment gives one. A catchment that the screening of Clause 2.3.6(i) shows to be prone to debris flow, or that drains a mapped debris fan, landslide, slide scar or mine-spoil dump, is not designed by a bulking factor: no building, outfall, pumping station or storage shall be placed in the debris-flow path, and the drains are designed for the bulked flow only [TBC].
- (c) Blockage. The blockage check of Clause 6.12.4 shall assume 50% of the inlet area blocked for every culvert and pipe entrance with a span or diameter below 3.0 m, and 20% for larger ones, whether or not a debris rack is provided. Grate inlets keep the clogging factor of Table 6.5, and kerb openings on grade take the sag value of 20%.
- (d) Sediment and minimum velocity. Drains and pipes that receive flow from a hill catchment, or that run across the foothill fans and valley fills of Ri-Bhoi and the Garo foothill plains, shall reach a velocity of at least 1.0 m/s at the minor design flow, in place of the minimum of Clause 6.7.3(a). Where the gradient does not allow it, a sediment trap shall be provided upstream and the sediment allowance of Clause 6.7.8 doubled (Clause 6.7.4).
- (e) Steep drains and energy dissipation. Where the gradient of a drain gives a velocity above the limits of Clause 6.7.3(b), or a Froude number above 0.8, at the design flow, the drain shall be a lined chute, a stepped channel or a series of drop structures designed under Chapter 9 for the bulked flow of item (b), with the freeboard of Table 6.7 for steep channels and an energy dissipator at every change to a flatter gradient and at the outlet. No unlined drain shall be laid on a gradient on which the velocity exceeds the limit of Chapter 9 for its bed material, and no drain shall be unlined on limestone or in a coal-mining area (Clause 4.11 (karst and mine rule)).
- (f) Steep streets. On a street steeper than 5%, grate-only inlets shall not be used, and inlets shall be placed by the calculation of Clause 6.6.4 with the bypass flows of a steep gutter. On a street steeper than 10%, the flow shall be intercepted by transverse grated channels or kerb inlets at a spacing that keeps the street flow within the limits of Table 6.3 in the check and 1% AEP events. Where the 1% AEP flow cannot be kept within those limits on the carriageway, the excess shall be carried in a lined side channel or stepped drain under item (e), and the street, unless it is a notified evacuation route, is treated as closed in that event. Steps and footpaths that carry flow shall have a lined side channel.
- (g) Hill roads as the minor system. On every road and street in a hill catchment as this clause defines it, and on any road elsewhere that crosses one, the drainage of a road is the minor system for the land above it as well as for the road. Every such road and street shall have, as works of the road's owner, PWD (Roads), NHAI, NHIDCL, the Municipal Board or the District Council:
- (i) a lined catch-water drain above every cut slope where the land above drains towards the road, discharging to a natural channel or a cross-drainage work and not over the cut;
- (ii) lined side drains on the hill side (IRC:SP:42-2014, cl. 8.5.1);
- (iii) a cross-drainage work at every jhora and stream, and culverts or scuppers at intervals such that no side drain exceeds its capacity at the design AEP of Table 6.1 with the factors of items (b), (c) and (i);
- (iv) at the outlet of every scupper, culvert and side drain on the valley side, a lined chute, cascade or pipe carrying the flow to a stable natural channel, with an energy dissipator, so that road runoff is never discharged onto an unprotected slope, fill, retaining wall or the land of a building below, by PWD (Roads), NHAI, NHIDCL or any other owner of a road;
- (v) culverts of at least the size of Clause 6.12.5, designed under Clause 6.12 and not less than IRC:SP:42-2014 cl. 7.1.4 requires for the road; where the drainage provisions of IRC:SP:48-1998, the Hill Road Manual, which were not read for this Manual [TBC], are stricter than this item, they apply; and
- (vi) no muck, spoil or excavated material from the construction, widening or maintenance of the road, or from hill cutting beside it, placed in or beside a jhora, stream or other line of natural drainage, or on a slope from which a storm can carry it into one, and every natural drain or stream that such material has blocked cleared by 31 March so that the runoff of its catchment reaches the nearest stream or river.
- (h) Sloping sites. On a site where the land above drains towards a building, its cut or its retaining wall, the runoff of that land shall be intercepted above them by a lined diversion drain sized for the minor design flow of Table 6.1 from the land above it, with the factors of items (b), (c) and (i), with a 1% AEP flow path that does not pass through or against the building. The space between a building and the cut or retaining wall above it shall be paved or lined and drained so that water does not stand against the building or soak into the foot of the cut. Both shall discharge to a public drain or a stable natural channel as item (g)(iv) requires, not onto the slope below. Roof and paved-area runoff on such a site follows the hill rule and the karst and mine rule of Clause 4.11. During construction, runoff shall be kept off the existing drainage courses and led through diversion ditches and swales to sediment basins, with silt fences round the works, as Section I(b) of the Bye-Laws 2021 already asks in natural hazard prone areas (Chapter 8).
- (i) Garbage-laden flows. Every drain outfall to the Umkhrah, the Umshyrpi, the Wah Roro or the Umiam reservoir, and every public drain or culvert where a jhora below a settlement enters it, shall have a solid-waste trap or screen designed under Chapter 9 (Clause 9.8), with access for cleaning by hand or machine and a place to store what it catches that is not a jhora, a stream or a slope, cleared on the dates of item (a) and after every heavy-rainfall day (Chapter 10). The blockage of item (c) shall be taken to include solid waste whether or not a trap is provided, and the capacity of an existing drain or channel shall be taken net of the silt and waste surveyed in it (Clause 6.7.8). A trap, screen or stone bund placed in a stream or jhora shall not raise its 1% AEP level at any outfall (Clause 5.8.5(a) and (c)) and shall be designed to be overtopped without damage. A trap is not a treatment work: dry-weather flow is intercepted under Clause 8.9.
- (j) Long storms in ML-Z3. In sub-areas ML-C and ML-C1, where the 24-hour totals are long orographic falls, every culvert, cross-drainage work, chute and outfall shall also be checked for the 24-, 48- and 72-hour storms of the ML-Z3 rule of Clause 2.3.6, routed through it with no storage credit in the catchment above it (no detention, infiltration or loss to karst voids or mine workings), for the sustained flow near its peak for the whole duration of each storm, with the blockage of item (c) in place from the start: for the stability of its apron, the bed below it and the slope it discharges to under flow lasting many hours, for the abrasion of its lining, and for the volume that reaches its outfall. Every cross-drainage work and outfall that drains more than 1 km² there has the site-specific hydrology study of the ML-Z3 rule of Clause 2.3.6.
Commentary. The CPHEEO (2019) manual defines major and minor systems in its glossary but gives no return period for the major system. APWA 5600 (2006, 5601.8) requires the system to convey the 1% peak and, where in-system capacity is less, an overflow system to carry the remainder. Clause 6.3.3 subtracts only the clogged inlet capacity, not the full pipe capacity, because in practice the pipes cannot take more water than the inlets admit. The fully-blocked check at sags has no direct precedent; this Manual sets it because of the Shillong experience that drains under footpaths are often silted or blocked by solid waste when the heaviest rain arrives (CPHEEO 2019 Part A, Ch 1 and 2, Figures 1.2 and 2.1 on solid waste dumping in drains). The prohibition on inter-catchment transfer follows the DID Malaysia 2008 submission checklist, which prohibits inter-catchment diversion. Clause 6.3.6 is set by this Manual for Meghalaya, as for the mountain editions of this series, because the criteria of this chapter assume clear water on gentle ground. In the hills of Meghalaya the water is not clear and the ground is not gentle. The towns are built on slopes: the Shillong Planning Area has 102.05 km² between 15° and 30°, 17.75 km² between 30° and 40°, 3.2 km² of "Regulated Slope" between 40° and 50° and 0.53 km² of "Restricted Slope/No Construction Zone" above 50° (NESAC, 2023), and the Bye-Laws 2021 forbid building above 50° (Section I(a), 2024). The slopes fail: the IRADe/NMHS plan names landslides at Laitumkhrah (2008), Lawsohtun, Happy Valley (2007), Mccabe Road, Bethesda and Arbuthnot in Shillong and very high susceptibility along NH-40 and near the Umshyrpi, records about 22 deaths in landslides in the State in 2014 (citing the Revenue and Disaster Management Department), and finds that "due to increasing levels of urbanization and unregulated construction work the natural drainage system is blocked" (IRADe/NMHS plan, 2020). The streams that the drains end in have been narrowed: NESAC found that "the water tops the banks along most of the streams", aggravated "by a drastic reduction in channel capacities in most streams due to encroachments along their banks by buildings" (NESAC, 2023). No Meghalaya allowance for debris, bulking or blockage was found during research [TBC], and no Indian guidance on bulking factors, debris racks or debris basins [TBC], so each number in Clause 6.3.6 is an interim value with a stated reason, the same as in the mountain editions. The 1 ha trigger for a debris rack reflects the time of concentration on hill slopes, a few minutes, so that even a small unbuilt slope delivers stones, gravel and leaves to an inlet in the first burst of a storm. The bulking factor of 1.25 is the factor for a flow that carries a fifth of its volume as sediment (bulking factor = 1 / (1 − sediment fraction by volume)): about the most that a drain can carry and still behave as a water flood. A flow with more sediment than that behaves as a debris flow, which no drain can be sized for; that is why item (b) keeps buildings and outfalls out of a debris-flow path, among them the mine-spoil dumps of the coal belt, rather than sizing a drain for it, and why the factor is to be replaced by a sediment study as soon as one is made [TBC]. The 3.0 m limit in item (c) doubles the core's 1.5 m because boulders, timber and waste block openings that leaves alone do not. The 1.0 m/s minimum in item (d) replaces the 0.6 m/s of CPHEEO, which is based on carrying fine sand of 0.09 mm, because hill drains carry gravel. On a 10% street, the hazard limit of 2.0 m/s is reached when sheet flow on a concrete surface is only about 30 mm deep, which is why item (f) takes the flow off steep carriageways. IRC:SP:42-2014 (cl. 8.5.1) already treats hill roads differently: their side drains are "normally restricted to 60 cm" in width and lined because "rolling stones cause high friction", "culverts are required at closer intervals compared to those in plain areas", and "stepped chutes/baffles are to be provided where the longitudinal bed slope exceeds critical". Items (g) and (h) keep road and site runoff off unprotected slopes, because water discharged onto a slope raises its pore pressure (Chapter 4, Clause 4.11): on 30–31 May 2025 landslides in 15 villages of Umling block near NH-6 were linked to hill cutting along the highway (as reported); the NH-6 tunnel at Sonapur, along a stream feeding the Lubha, was closed by mudslides in August 2023 and reopened only in May 2024 (as reported); and in June 2026 the Shillong–Dawki road collapsed at Laitlyngkot, at chainage 25+200, while the Umngot at Dawki rose (as reported). The Bye-Laws 2021 already reach towards these rules without numbers: steep slopes are to be stabilised "by ensuring good drainage of water so that the saturation of the hill slope is avoided" (C12.1(iv)), flood protection includes the "Clearing of clogged cross drainage works" (C12.3), and in natural hazard prone areas "Construction should not obstruct existing surface drainage courses" and builders shall "Construct diversion ditches and swales to direct runoff away from sensitive areas and into designated sediment basins" and "Install silt fences" (Section I(b), 2024); item (h) gives them a design standard of this Manual's own and Chapter 8 the construction-stage detail. Two items are added for Meghalaya. Item (i) deals with garbage, because in Shillong the drains and jhoras carry the town's waste as well as its water: 49,612 m³ of waste was removed from the Wahumkhrah under the 15th Finance Commission for ₹7.9 crore, and stone bunds and solid-waste traps were built for ₹3.60 crore (State action-taken report to the National Green Tribunal, 21 March 2023), and drains blocked by waste are reported to raise the susceptibility of the slopes to landslides (ICLEI, as reported). A trap catches waste only if it is placed where the waste arrives and cleared when it fills, and a trap or bund built in a stream must not raise the stream at the outfalls it protects. Item (j) deals with duration, because on the escarpment the rain does not stop: Cherrapunji's wettest month brought 6,667.4 mm (July 1974) (IMD Extremes), 2,493 mm is reported to have fallen there in 48 hours on 15–16 June 1995 (as reported), and the spillway of the Myntdu–Leshka dam is built for 12,000 m³/s from 350 km², about 34 m³/s per km², against about 3.7 m³/s per km² at New Umtru on the northern slope (MePGCL guidelines; NEER arithmetic). A culvert there sees near-peak flow for hours or days, so its apron, its outlet and the slope below must survive the duration as well as the peak, and no storage, infiltration or loss to karst can be counted on to shorten it. The clause deals with debris and garbage at the drain; it does not ask for the concrete channelisation of the streams, whose capacity has been lost to encroachment, not to roughness.
6.4 Design return periods
6.4.1 The minor system, roads and crossings shall be designed for the AEPs of Table 6.1. Where both a land-use row and a road-class row apply to an element, the rarer AEP (longer return period) governs.
Table 6.1 — Design AEPs for conveyance (matches Clause 2.4)
| Element | Design AEP (return period) | Check event | Basis |
|---|---|---|---|
| Minor system: Shillong, Tura and Jowai core and other high-density areas | 10% (10-yr) | 1% (100-yr) overland path | This Manual (see Commentary) |
| Minor system: other Class I areas | 20% (5-yr) | 1% overland path | This Manual; CPHEEO Table 4.1 |
| Minor system: other areas | 50% (2-yr) | 1% overland path | This Manual; CPHEEO Table 4.1 |
| Arterial road drainage and crossings | 2% (50-yr) for arterials that are notified evacuation or emergency routes; 4% (25-yr) for other arterials | Next higher AEP: 1% for a 2% design; 2% for a 4% design | This Manual (25–50-yr); split set by this Manual |
| Collector road drainage and crossings | 4% (25-yr) | 2% (50-yr) | This Manual |
| Local road drainage and crossings | 10% (10-yr) | 4% (25-yr) | This Manual |
| Road underpasses and other trapped sags on public roads | 2% (50-yr) | 1% (100-yr) | This Manual (Clause 6.10.5) |
| Airports, railway stations, power stations and other critical infrastructure | 1% (100-yr) in Class I areas; 2% (50-yr) elsewhere | — | CPHEEO 2019 Table 4.1 |
| Major (overland) system, every element | 1% (100-yr) | — | This Manual |
| Building floor levels | 1% level + 0.5 m freeboard | — | This Manual (Clause 6.11) |
6.4.2 Check events. At the check event of Table 6.1, the combined minor and major system shall carry the check-event flow within the 1% AEP limits of Table 6.2 and without water entering any building. The 1% overland path requirement of Clause 6.3.2 applies in addition to the check event.
6.4.3 Higher standards. An approving authority may adopt a rarer AEP for any element, including through the high-powered committee route in Note 2 of CPHEEO Table 4.1. It shall not adopt a more frequent AEP than Table 6.1.
6.4.4 High-density areas. The approving authority shall notify, by map, the high-density areas to which the 10% AEP minor-system standard applies. Until it does, the 10% AEP standard applies to:
- (a) in Shillong, the valley floors and localities that the sources name for flooding, Polo, Pynthorbah, Nongmynsong, Mawlai, Laitumkhrah and Dhankheti, and the older, densely built area within the Shillong Municipal Board's area that the Shillong Master Plan 2041 identifies as the core area or central business district; and the old towns of Tura and Jowai; with the boundary of each to be confirmed by the Municipal Board, MUDA and, for the parts under a District Council, its building authority [TBC];
- (b) in every other Municipal Board area and in the area of every Town Committee, the area that the applicable master plan identifies as the core area, old town or central business district, the main market of a hill town, and the old village settlements that have been taken into the built-up area; and
- (c) any area in a Tier A body where the master plan permits a floor space index above the base value for the zone.
6.4.5 Retrofit. Where an existing drain cannot practicably be enlarged to the Table 6.1 AEP, the shortfall shall be made good by upstream storage (Chapter 4), regional storage (Chapter 7) or an improved major-system path. The approving authority shall record the residual level of service.
Commentary. The values in Table 6.1 match the Clause 2.4 summary and add rows for underpasses and critical infrastructure. They exceed the CPHEEO (2019) national advisory minimums of 5-yr for Class I cities and 2-yr elsewhere (CPHEEO Part A, Table 4.1). Note 2 of that table allows a State committee to adopt higher values. The 10-yr tier for high-density areas follows Gupta (IIT Bombay), who recommends "1 in 10 year for residential-high density", and Malaysia's MSMA 2, which uses 10-yr minor and 100-yr major systems for link houses, apartments, commercial and industrial land. The road values resolve a conflict in Indian codes. IRC:SP:50-2013 recommends 1–2 years for urban road drains. IRC:SP:42-2014 suggests 25 years for urban roadside drains and a check flood at the next higher return period. APWA 5600 (2006) uses 50-yr for arterial, 25-yr for collector and 10-yr for residential street crossings. Table 6.1 adopts the APWA tiers and the IRC:SP:42 check-flood concept. Splitting arterials into 50-yr evacuation routes and 25-yr others has no direct precedent and is set by this Manual. The 50-yr standard for underpasses is likewise set by this Manual, because an underpass is a trapped sag where the failure mode is deep water on a live carriageway. The default high-density areas in Clause 6.4.4 are set by this Manual and apply until the approving authority notifies a map.
6.5 Street hydraulics: spread, depth and flow hazard
6.5.1 Gutter flow. Flow in a triangular kerb-and-gutter section shall be computed with the modified Manning (Izzard) equation:
Q = (Ku / n) · Sx^(5/3) · SL^(1/2) · T^(8/3)
where Q is the gutter flow (m³/s), Ku = 0.376 (SI), n is the Manning roughness of the gutter (Table 6.6), Sx is the cross slope (m/m), SL is the longitudinal slope (m/m) and T is the spread (m). Composite and depressed gutter sections shall be analysed by the methods of FHWA HEC-22 (4th edition, 2024).
6.5.2 Spread and depth limits. Street flow shall not exceed the limits of Table 6.2.
Table 6.2 — Street flow limits
| Road class | Minor design event (Table 6.1) | Check event and 1% AEP event |
|---|---|---|
| Arterial | Spread shall leave at least one through lane in each direction clear of water. No flow across the crown. | Depth ≤ 150 mm at the crown and ≤ 350 mm at the deepest point; hazard limits of Clause 6.5.3 |
| Collector | Spread T ≤ 3 m. No flow across the crown except at a sag intersection. | As above |
| Local | Spread T ≤ 3 m. Flow shall not overtop the kerb. | As above |
| All classes, at intersections | Cross-flow over the crown ≤ 0.03 m³/s at sag intersections and superelevation transitions; none at mid-block sags. | As above |
6.5.3 Flow hazard limits. In the check event and the 1% AEP event, the product of depth (D, m) and velocity (V, m/s) of street and overland flow shall not exceed the limits of Table 6.3.
Table 6.3 — Flow hazard limits for streets and overland flow paths
| Location | Required hazard class (Table 6.4) | Limits |
|---|---|---|
| Carriageways of all roads | H2 or better | D·V ≤ 0.6 m²/s; D ≤ 0.35 m (Table 6.2); V ≤ 2.0 m/s |
| Footpaths, pedestrian crossings, school, hospital and transit-stop frontages | H1 | D·V ≤ 0.3 m²/s; D ≤ 0.3 m; V ≤ 2.0 m/s |
| Notified evacuation and emergency routes | H1 | D·V ≤ 0.3 m²/s; D ≤ 0.3 m; V ≤ 2.0 m/s |
| Overland flow paths in public open space or easements, away from roads | H3 or better, with warning signs | D·V ≤ 0.6 m²/s; D ≤ 1.2 m; V ≤ 2.0 m/s |
Table 6.4 — Combined flood hazard vulnerability classes (reproduced for reference)
| Class | Description | D·V limit (m²/s) | Depth limit D (m) | Velocity limit V (m/s) |
|---|---|---|---|---|
| H1 | Generally safe for vehicles, people and buildings | ≤ 0.3 | 0.3 | 2.0 |
| H2 | Unsafe for small vehicles | ≤ 0.6 | 0.5 | 2.0 |
| H3 | Unsafe for vehicles, children and the elderly | ≤ 0.6 | 1.2 | 2.0 |
| H4 | Unsafe for vehicles and people | ≤ 1.0 | 2.0 | 2.0 |
| H5 | Unsafe for vehicles and people; buildings vulnerable to structural damage | ≤ 4.0 | 4.0 | 4.0 |
| H6 | Unsafe for vehicles and people; all buildings vulnerable to failure | > 4.0 | — | — |
Source: AIDR Guideline 7-3, Technical flood risk management guideline: Flood hazard (2014), Tables 1 and 2, modelled after Smith and Wasko (2012).
6.5.4 Depth and velocity for Clause 6.5.3 shall be taken from the gutter-flow calculation for simple sections, or from a 1D or 2D hydraulic model where flow leaves the kerb-and-gutter section.
Figure 6.1 — Minor and major drainage in a kerbed street. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 (2006, 5601.8) and FHWA, HEC-22 Urban Drainage Design Manual (4th ed., 2024).
Commentary. The Izzard form of Manning's equation with Ku = 0.376 is used both in FHWA HEC-22 and in the CPHEEO (2019) manual (Part A, Example 5.5, where the constant is written Kc = 0.376). The arterial spread rule (one lane clear) and the 3 m spread for local and collector streets are close to the APWA 5600 (2006, 5604.2) limit of 12 ft (3.66 m) from the back of kerb in each outside lane. The cross-flow limit of 0.03 m³/s is the SI equivalent of the APWA limit of 1.0 cfs at intersection sumps and superelevation transitions, with no cross-flow at mid-block sumps. The 150 mm and 350 mm depth limits are close to the APWA 5600 limits for 1% overflow at road crossings (7 in, about 180 mm, at the crown; 14 in, about 360 mm, at the deepest point). Mumbai's criterion of no flooding above 15 cm (IRC:SP:50-2013, §6.4.1) is a local precedent for the 150 mm crown value.
The hazard classes of Table 6.4 are the combined hazard curves published by the Australian Institute for Disaster Resilience (AIDR Guideline 7-3, 2014), which are modelled after Smith and Wasko (2012). Requiring H2 or better on carriageways means the 1% depth limit of 350 mm (Table 6.2) governs the depth, and the D·V product controls fast, shallow flow on steep streets. H2 is described as "unsafe for small vehicles". Two-wheelers are the dominant vehicles on Meghalaya streets, so the 1% event must be treated as a road-closure event on all roads except notified evacuation routes, which must meet H1. The assignment of hazard classes to locations in Table 6.3 has no direct precedent and is set by this Manual.
6.6 Inlets
6.6.1 Inlet types. Inlets may be kerb-opening inlets, grate inlets, combination inlets (a grate with a kerb opening) or slotted and trench drains. On public streets:
- (a) kerb-opening or combination inlets shall be used, unless the approving authority accepts grate-only inlets for a specific location;
- (b) inlet openings shall be set at road level, with a gutter depression where practicable, so that water is not held on the carriageway by a raised kerb or footpath;
- (c) grates in carriageways, cycle lanes and footpaths shall be of a bicycle- and pedestrian-safe pattern (Chapter 9, Clause 9.11).
6.6.2 Inlet capacity. The clean capacity of inlets on grade and in sags shall be computed by the methods of FHWA HEC-22 (4th edition, 2024), or from tested ratings published by the manufacturer for the exact grate and kerb-opening geometry. The empirical kerb-inlet equations of CPHEEO (2019) Part A §5.6.2 may be used as a cross-check only.
6.6.3 Clogging factors. The design capacity of every inlet shall be its clean capacity reduced by the clogging factors of Table 6.5:
Table 6.5 — Inlet clogging factors (share of clean capacity assumed lost)
| Inlet type | On grade | In a sag |
|---|---|---|
| Grate | 50% | 50% |
| Kerb opening | 10% | 20% |
| Combination | Apply the grate and kerb factors to each part separately | Apply the grate and kerb factors to each part separately |
Design capacity = (1 − clogging factor) × clean capacity.
6.6.4 Inlet spacing. Inlets shall be located by a sequential calculation that starts at the top of each gutter run. At each inlet, the intercepted flow is computed, and the bypass flow is added to the gutter flow arriving at the next inlet. Spacing shall be such that the spread limits of Table 6.2 are met everywhere in the minor design event. In addition:
- (a) inlet spacing shall not exceed 30 m on kerbed roads, whatever the calculation gives;
- (b) inlets shall be provided at every sag, immediately upstream of pedestrian crossings and intersections, upstream of bridge decks and superelevation transitions, and at the end of every gutter run;
- (c) bypass flow from the last inlet of a run shall not be passed onto a road of a higher class or into private land.
6.6.5 Sag inlets. At a sag on a kerbed road:
- (a) the sag inlet's design capacity (after clogging) shall be not less than the total minor design flow arriving at the sag;
- (b) flanking inlets shall be placed on each side of a sag on any road where ponding could spread beyond the Table 6.2 limits, and at every underpass;
- (c) the ponding at the sag shall comply with Clause 6.10.
6.6.6 Inlet connections. The pipe connecting an inlet to the main drain shall have a diameter of at least 300 mm and shall be laid at a gradient that gives at least 0.9 m/s at the inlet's design flow.
6.6.7 Silt sumps. Every inlet chamber on a public road shall have a silt sump at least 300 mm deep below the invert of its outlet pipe, accessible for cleaning from the surface.
Figure 6.2 — Gutter spread, inlet interception and clogging. Original drawing for this Manual, adapted from FHWA, HEC-22 Urban Drainage Design Manual (3rd ed., 2009; 4th ed., 2024) and CPHEEO, Manual on Storm Water Drainage Systems (2019).
Commentary. The clogging factors are more severe than the APWA 5600 (2006, 5604.2) rating of sump inlets at 80% of theoretical capacity (a 20% reduction), because grates in Meghalaya streets are routinely blinded by plastic and leaves. CPHEEO (2019) Part A shows solid waste dumped in drains as a primary cause of drain failure (Figures 1.2 and 2.1). APWA 5600 (2006) allows only kerb-opening inlets on public streets; Clause 6.6.1(a) is less strict because combination inlets are useful on flat roads. No standard inlet, kerb-channel or covered-drain detail of PWD, of the Shillong Municipal Board or of any other Municipal Board in the State was found during research [TBC]; the Bye-Laws 2021 ask that a site plan show its "Surface drains" and refer the requirements of drainage to the National Building Code 2016 (D4.2, D5.6). The 30 m maximum spacing and the treatment of combination inlets in Table 6.5 have no direct precedent and are set by this Manual. Roads on the Garo foothill plains of Phulbari and Tikrikilla and on the valley floors of Ri-Bhoi are flat, which shortens the calculated spacing anyway; on the steep streets of Shillong, Jowai and Tura gutter flow runs fast and passes inlets by, which Clause 6.3.6(f) deals with. A fixed cap stops a single blocked inlet from leaving a long dry gutter run. The 300 mm silt sump is set by this Manual. It matches the 0.3 m sump shown on the CPHEEO catch-basin detail (CPHEEO 2019, Figure 5.9).
6.7 Pipes and open and covered drains
6.7.1 Uniform flow. Pipe and drain capacity shall be computed with Manning's equation:
V = (1/n) · R^(2/3) · S^(1/2); Q = A · V
where V is the mean velocity (m/s), n is the Manning roughness (Table 6.6), R is the hydraulic radius (m), S is the friction slope (m/m), A is the flow area (m²) and Q is the discharge (m³/s). Where backwater from a tailwater, a junction or a structure affects the water level, a gradually varied flow (standard step) or hydraulic network model shall be used, and the HGL requirements of Clause 6.8 apply.
6.7.2 Manning roughness. Design values of n shall be taken from Table 6.6. For concrete pipes and masonry or concrete drains, the design value shall be not less than the "fair" or "rough" condition value listed, to allow for sediment, biofilm and ageing.
Table 6.6 — Manning's n for design (from CPHEEO 2019)
| Material | Condition | n (CPHEEO) | Minimum design n in this Manual |
|---|---|---|---|
| Cement concrete pipe (collar joints) | Good / fair | 0.013 / 0.015 | 0.015 |
| Spun concrete pipe (RCC, PSC) with S/S joints | Manufacturer's design value | 0.011 | 0.013 |
| HDPE / uPVC pipe | — | 0.010 | 0.011 |
| Plastic (smooth), asbestos cement | — | 0.011 | 0.011 |
| Concrete drain, steel trowelled / wood trowelled | — | 0.014 / 0.015 | 0.015 |
| Sand and cement plaster | — | 0.015 | 0.015 |
| Brick masonry | Good / rough | 0.015 / 0.017 | 0.017 |
| Masonry | Bad condition | 0.020 | 0.020 |
| Rubble set in cement | — | 0.017 | 0.017 |
| Earth channel | Regular, good / ordinary | 0.020 / 0.025 | 0.025 |
| Earth channel | With stones and weeds / poor | 0.030 / 0.035 | 0.035 |
| Earth channel | Partly obstructed by debris or weeds | 0.050 | 0.050 |
| Gutter: concrete | — | 0.013 | 0.013 |
| Gutter: hot-mix asphalt | — | 0.015 | 0.015 |
| Gutter: sprayed seal | — | 0.018 | 0.018 |
Source of the CPHEEO column: CPHEEO (2019) Part A, Table 5.1 (itself from the CPHEEO Manual on Sewerage and Sewage Treatment Systems, 2013) and Table 5.8 (gutters).
6.7.3 Velocity limits. At the minor design flow:
- (a) minimum (self-cleansing) velocity: 0.6 m/s in open and covered drains and 0.9 m/s in pipes;
- (b) maximum velocity: 3.0 m/s in lined drains and in pipes, unless the drain or pipe is designed as a chute under Chapter 9. CPHEEO permits up to 6.0 m/s in plastic or plastic-lined pipes in hilly regions; this may be used in Shillong, Jowai, Tura, Nongpoh, Nongstoin, Mairang, Williamnagar, Sohra, Mawsynram, Khliehriat and Mawkyrwat and other hill towns with the approving authority's agreement;
- (c) maximum velocity in unlined and vegetated channels: Chapter 9, Table 9.2;
- (d) the Froude number of flow in open and covered drains shall not exceed 0.8 at the design flow, unless the drain is designed for supercritical flow under Chapter 9.
6.7.4 Gradient. Each pipe and drain shall be laid at a gradient that achieves Clause 6.7.3(a). Where flat terrain or a fixed outfall level makes this impossible, the designer shall:
- (a) report the velocity achieved;
- (b) double the sediment allowance of Clause 6.7.8; and
- (c) provide access for mechanical desilting at the spacing of Clause 6.13.2.
6.7.5 Pipe flow condition. Pipes shall be sized so that the minor design flow does not exceed the pipe-full capacity. The greater discharge that a circular pipe carries at about 0.95 of its depth shall not be relied on.
6.7.6 Minimum sizes.
- (a) Pipes: 300 mm internal diameter; 450 mm for public mains.
- (b) Open drains: bed width 0.3 m.
- (c) Covered public drains (drains closed by cover slabs): clear internal width 0.6 m and clear internal depth 0.6 m.
6.7.7 Cover to pipes. Pipes shall have at least 0.6 m of cover to finished level, and at least 0.9 m under carriageways unless a structural design for the traffic load is submitted. Where the seasonal high groundwater table is within 1 m of the pipe crown, the pipe shall be checked for flotation with the pipe empty (CPHEEO 2019, Table 11.2) and anchored where necessary.
6.7.8 Sediment allowance. The design capacity of open drains, covered drains and pipes of 600 mm diameter or more shall be computed with the following depth of sediment at the invert:
- (a) open and covered drains: the greater of 75 mm and 10% of the clear internal depth;
- (b) pipes of 600 mm diameter or more: 5% of the internal diameter;
- (c) pipes below 600 mm: no allowance, but Clause 6.7.3(a) shall be met.
The Manning n for the reduced section shall be that of the drain material in Table 6.6.
6.7.9 Freeboard in open and covered drains. At the minor design flow, the water surface (computed with the sediment allowance) shall be below the top of the drain wall, or below the soffit of the cover slab in a covered drain, by at least the freeboard of Table 6.7.
Table 6.7 — Minimum freeboard in open and covered drains
| Drain | Minimum freeboard | Source |
|---|---|---|
| Bed width up to 300 mm | 100 mm | CPHEEO 2019 Table 5.3 (from IRC:SP:50-2013) |
| Bed width 300–900 mm | 150 mm | CPHEEO 2019 Table 5.3 |
| Bed width 900–1,500 mm | 300 mm | CPHEEO 2019 Table 5.3 |
| Wider drains and engineered channels, Q < 3 m³/s | 450 mm | CPHEEO 2019 Table 5.12 (from IS 7784 (Part 1): 1993) |
| Q 3 to < 30 m³/s | 600 mm | As above |
| Q 30 to < 300 m³/s | 900 mm | As above |
| Q 300 to < 3,000 m³/s | 1,200 mm | As above |
| Q ≥ 3,000 m³/s | 1,500 mm | As above |
| Any roadside drain | Not less than 150 mm | IRC:SP:42-2014 |
| Steep (supercritical) channels | Equal to the flow depth | CPHEEO 2019 §5.3.2 |
At bends, the freeboard shall be measured from the water level on the outside of the bend, including the superelevation Δy = V²T / (2 g rc), where T is the top width and rc the centreline radius (CPHEEO 2019, Eq. 5.29).
6.7.10 Bends and junctions.
- (a) The centreline radius of a bend in a drain shall be at least 3 times the drain width (CPHEEO 2019 §5.3.3). In engineered channels it shall be at least 2 times the top width and not less than 30 m (CPHEEO 2019 Table 5.11).
- (b) Where drains meet, a junction sump shall be provided with an internal width of at least twice the width of the outgoing drain. Incoming drains shall enter at less than a right angle to the outgoing flow, and the outgoing invert shall be below the sump floor so that water does not stand in the sump (CPHEEO 2019 §5.3.4).
6.7.11 Manholes and access chambers on pipes. Manholes shall be provided at every junction, change of size, alignment or gradient, and at the head of every pipe. Spacing on straight runs shall not exceed Table 6.8.
Table 6.8 — Maximum spacing of manholes on straight pipe runs
| Pipe diameter | Maximum spacing |
|---|---|
| 300–600 mm | 40 m |
| 700–1,000 mm | 100 m |
| 1,050–1,400 mm | 150 m |
| 1,500 mm and above | 300 m |
Source: CPHEEO 2019 Table 11.5. Manhole sizes, drops and covers: Chapter 9, Clause 9.12.
Figure 6.3 — Drain sections: freeboard, sediment allowance and access. Original drawing for this Manual, adapted from CPHEEO, Manual on Storm Water Drainage Systems (2019), Tables 5.3 and 5.12, and IRC:SP:50-2013.
Commentary. The n values are those of CPHEEO (2019) Table 5.1. The higher minimum design values have no direct precedent; this Manual sets them because CPHEEO notes that the 0.011 value for spun pipes "may be taken as given by the manufacturer". That is a clean-pipe value, and Meghalaya drains carry heavy silt and solid waste. The 0.6 m/s minimum velocity is CPHEEO's (Table 5.2), based on carrying 0.09 mm sand (§5.3.1). The 0.9 m/s value for pipes is stricter, because a silted pipe cannot be cleaned as easily as an open drain. The 3.0 m/s maximum is from CPHEEO Table 5.2 (WPCF/ASCE 1982). The Froude limit of 0.8 is from CPHEEO §5.3, which advises avoiding critical flow because the water surface becomes unstable.
The 0.6 m × 0.6 m minimum for covered drains has no direct precedent and is set by this Manual. A covered drain narrower than this cannot be desilted by hand or by small machines through a cover opening, and silted, inaccessible drains were a recurring finding after the flash floods of Shillong, where the master-plan study found that "Encroachment and clogging of channels are the main causes of flooding" (NESAC, 2023) and 49,612 m³ of waste was removed from the Wahumkhrah alone (State action-taken report to the National Green Tribunal, 2023), and in a city whose drains carry its sullage, with "the incidence of sewerage mixing in drains … almost 100%" (Smart City Proposal 2016-17, as quoted in the IRADe/NMHS plan, 2020). The 0.6 m minimum cover is the value used in the CPHEEO (2019) worked pipe-design computation sheet (Part A, Chapter 5). The 0.9 m cover under carriageways is set by this Manual.
The sediment allowance values (75 mm or 10% for drains, 5% for large pipes) are set by this Manual. No Indian standard sets a sediment allowance for design. Shillong's experience is that drains run partly full of silt for much of the year, so a capacity computed for a clean section overstates the real capacity.
The CPHEEO freeboard table (Table 5.3) prints the first row as "Beyond 300 mm bed width". Read with the second row ("Beyond 300 mm & up to 900 mm"), the first row must mean "up to 300 mm"; Table 6.7 is written that way. The CPHEEO manhole spacing table (Table 11.5) gives overlapping ranges (700–1,050 mm and 1,000–1,400 mm); Table 6.8 removes the overlap by assigning 1,050 mm to the 150 m class.
6.8 Hydraulic grade line
6.8.1 HGL analysis. For every pipe and covered-drain network, the designer shall compute the HGL for the minor design event and for the check event, starting at the outfall and working upstream. The analysis shall include friction losses and losses at junctions, manholes, bends, inlets, outlets and gates.
6.8.2 Starting water level. The starting (tailwater) level at the outfall shall be the higher of:
- (a) the tailwater level of Chapter 5: mean high water springs (MHWS) plus the sea-level allowance of +0.3 m for minor-system design at tidal outfalls, and the level in the receiving drain, river or tank for the coincident event at other outfalls; and
- (b) the level computed at the outlet pipe from the critical depth and the pipe diameter, (dc + D)/2, where the receiving water is lower.
6.8.3 Minor-event limit. In the minor design event, the HGL shall be at least 0.3 m below the rim of every inlet and the cover level of every manhole and access chamber.
6.8.4 Check-event and 1% limit. In the check event and the 1% AEP event, the HGL may rise above the inlet rims. Water that leaves the minor system shall then be carried by the major system within the limits of Table 6.2 and shall not enter any building. Manholes that can surcharge above ground in these events shall have bolted or locked covers (Chapter 9, Clause 9.12).
6.8.5 Structure losses. Losses at manholes and junctions shall be computed by the energy-based access-hole method of FHWA HEC-22 (2009 or 2024 edition), or by an equivalent method in an approved hydraulic model. A simplified loss-coefficient method (h = K V²/2g) with coefficients from HEC-22 may be used for Tier B networks below 16 ha.
6.8.6 Invert and soffit levels. Where pipe size increases at a manhole, the soffits (crowns) of the incoming and outgoing pipes shall be matched, or the outgoing soffit set lower. The outgoing invert shall not be higher than the lowest incoming invert. Vertical drops in manholes shall follow Chapter 9, Clause 9.12.
6.8.7 Gates and valves. The head loss through flap gates and non-return valves in the open position shall be included in the HGL (Chapter 9, Clause 9.10).
6.8.8 Private connections. Building drainage that connects to a public drain whose 1% HGL is above the building's lowest drainage fitting shall have a non-return valve.
Commentary. The 0.3 m clearance between the minor-event HGL and the inlet rim is set by this Manual. It keeps a margin for losses that a model underestimates, and it stops water from bubbling out of inlets in the event the system is designed for. In Meghalaya many town drains end in a stream that no one gauges and that overtops its banks in ordinary storms, a jhora whose bed moves, a river below a dam, or a reservoir held near its full level (Clause 5.8.5). Shillong's drains end in the Umkhrah and the Umshyrpi, whose valley floors at Polo, Pynthorbah and Nongmynsong flood "with nearly every heavy downpour" when the Umkhrah overflows (as reported; IRADe/NMHS plan, 2020), and 32 of their outfalls also carry the sewage and sullage of a city with no sewerage (minutes of the stakeholder meeting, 14 April 2023); outfalls on the Umtru's 9.80 km of ravine to the Byrnihat bridge lie below the New Umtru dam; and the shore of the Umiam reservoir drains to a lake whose level is reported only in feet, with no datum (as reported). No flood level of any stream or jhora, and no design level of any outfall, was found during research. A drain whose HGL is started from a free outfall, or computed one length at a time without the stream, river or reservoir level, fails in exactly that way. An HGL computed from the outfall, with the tidal tailwater of Chapter 5, exposes those errors at design stage. The MHWS plus 0.3 m starting level is from CPHEEO (2019) Table 6.2. The access-hole method is described in HEC-22 from the 2009 edition onward.
6.9 Major system: overland flow paths, easements and drainage reserves
6.9.1 Streets as the primary major system. Streets shall be graded so that the 1% AEP major-system flow is carried along the road reserve to a receiving waterway without being trapped, except at sags designed under Clause 6.10.
6.9.2 Overland flow paths outside streets. Where a major-system path leaves the road reserve, it shall be:
- (a) in public land, in the open space of a layout, or in an easement recorded on the layout approval and the title;
- (b) at least as wide as the 1% AEP flow top width plus 0.5 m on each side, and not less than 3.0 m;
- (c) kept free of buildings, compound walls, fences, fill, stored materials and planting that would obstruct flow;
- (d) graded to a continuous fall with no sag that lacks an outlet; and
- (e) within the hazard limits of Table 6.3.
6.9.3 Compound walls. A compound wall or fence shall not be built across a mapped overland flow path. Where a wall must cross one, it shall have openings with a total area that passes the 1% AEP flow with a 50% blockage, without raising the upstream water level above the limits of this chapter.
6.9.4 Access along open drains. Open drains with a top width of 2 m or more shall have a maintenance access strip at least 3.5 m wide along one bank, connected to a public road at intervals of not more than 500 m.
6.9.5 Supply channels, surplus courses and tanks. Tank supply channels and surplus courses are part of the major system and shall be protected under Chapter 7.
6.9.6 Drainage reserves. A drainage reserve is a strip of land, including the drain, kept free of buildings so that the drain can be maintained, widened and used as a flood path. A drainage reserve shall be provided:
- (a) along every public drain or channel with an internal width of 1.0 m or more that runs through or along a layout or site being developed or redeveloped;
- (b) along every drain or channel shown in an adopted Basin Stormwater Master Plan (Chapter 11), at the width of the future drain in that plan; and
- (c) along every new public drain with an internal width of 1.0 m or more built by a public body.
6.9.7 Width. The reserve shall be not less than the width in Table 6.9, measured from the drain's internal width W. The width is based on the required drain size (for a planned drain, the size in the master plan), not the existing size. Where the access strip of Clause 6.9.4 is wider than the margin in Table 6.9, the wider governs.
Table 6.9 — Minimum drainage reserve width (adopted from PUB Singapore)
| Internal width of drain, W | Open drain | Closed (covered) drain |
|---|---|---|
| 1.0 m to 1.2 m | 3.0 m | W + 0.6 m |
| more than 1.2 m to 3.0 m | W + 2.6 m | W + 1.6 m |
| more than 3.0 m to 4.5 m | W + 3.5 m | W + 1.6 m |
| more than 4.5 m to 6.0 m | W + 4.5 m | W + 3.0 m |
| more than 6.0 m to 9.0 m | W + 6.0 m | W + 3.0 m |
| more than 9.0 m to 25.0 m | W + 7.5 m | W + 3.0 m |
| more than 25.0 m | W + 12.0 m | W + 3.0 m |
For an open drain, the larger part of the margin shall be on the side used for maintenance access.
6.9.8 Use and protection.
- (a) The reserve shall be shown as a separate plot on the layout or site plan and transferred to the Approving Authority free of cost, as roads and open space reservations are. Where the drain is a Water Resources Department channel, the reserve is transferred to the Water Resources Department.
- (b) No building, compound wall, fence, ramp, step, fill or other structure shall be built in the reserve. Compound walls and boundary fences shall stand outside it.
- (c) The access strip in the reserve shall be level and continuous, and connected to a public road. Bollards or posts and chains may be used at entrances to keep out vehicles other than maintenance vehicles.
- (d) Where the reserve is not fenced off, its edge shall be marked with concrete markers at not more than 50 m spacing.
- (e) Services shall cross under the drain, with at least 1.0 m clearance below the invert, or over it on an approved structure. Services shall not run along the reserve inside the drain section.
- (f) A structure within 2 m of the edge of the reserve shall be designed to remain stable when the drain is excavated to 1.0 m below its invert. The design shall be signed by a qualified structural engineer.
- (g) The reserve counts toward the site's open space requirements only where the Approving Authority's rules allow it; it does not reduce any setback required by Chapter 7.
Figure 6.4 — Drainage reserve along an open drain: reserve width from Table 6.9, no-structure zone, access strip on the maintenance side, the 1.0 m service clearance below the invert and the 2 m stability-check zone (Clauses 6.9.6 to 6.9.8). Original drawing for this Manual, adapted from PUB Singapore, Code of Practice on Surface Water Drainage (7th ed., with Addendum No. 3, 2025), clauses 5.1, 5.3, 9.6 and 9.7 and Appendix 1.
Commentary. Drainage reserves follow Singapore, where "the width of a drainage reserve is based on the required drain size" and the reserve is set aside as a separate plot, "kept free of all encumbrances" (PUB Code of Practice on Surface Water Drainage, 7th ed. with Addendum No. 3, 2025, cl. 1.1). Table 6.9 reproduces PUB's Appendix 1 widths. Clauses 6.9.8(b) to (f) follow PUB clauses 5.1 (no structure within a drain or drainage reserve), 5.3 and 5.3.1 (stability for excavation 1.0 m below the invert; engineer's calculations within 2 m of the reserve), 9.6 (level, continuous access, with bollards or posts and chains) and 9.7 (markers at a maximum of 50 m). The 1.0 m clearance for services crossing under a drain is from PUB's development-plan guidance. In Meghalaya, buildings and compound walls are often built up to the edge of a drain, so it cannot be widened or desilted by machine. Reserving the land when a plot is developed or redeveloped is the cheapest time to secure it, because widening later needs land acquisition. Basing the width on the master-plan drain size (6.9.6(b)) protects the land a future drain will need. Meghalaya has statutory setbacks from water but no reserve width along a drain, and a floodplain law with no zone notified under it. The setbacks are those of the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023 (No. FOR/CC/29/2019/Pt/688 of 25 August 2023), as amended by No. FOR/CC/29/2019/1140 of 13 February 2024 and No. FOR/CC/29/2019/Pt/771 of 6 July 2026, executive guidelines made by the Forest and Environment Department on the High Court's direction in PIL 10/2019, which bind in Bye-Laws areas through B2(ii)(c), Section I(a)4 and I(f) of the Bye-Laws 2021 (2024) and elsewhere only "in such manner as may be prescribed" (para 10(2)), and nothing has been prescribed that was found. They are measured from "the mean high flood level of a water body observed in the past ten years" (para 2(f)), a level that was not found published for any stream, and are 3 m from an urban stream up to 3 m wide and 6 m from a wider one (Appendix 3 as merged in 2024; the NEER reading is that the merge cut the setback in urban areas outside the municipalities and cantonments from 5 m and 10 m to 3 m and 6 m [TBC]); 10 m from a rural stream up to 4 m wide and 10, 20 or 30 m from a wider one by plot size (Appendix 2A, 2026); and 10, 20 or 50 m from a lake or pond by its area, with a regulated zone of four times the setback for lakes and rural streams (para 7(1A)). The 2.40 m that the Bye-Laws 2021 first set beside a stream (B2(ii)(c)) was replaced in 2024 by a reference to the Guidelines. A "waterbody" excludes seasonal streams "where the entire bed remained dry for a period not less than 240 days during each of the past ten calendar years" (para 2(e)), which is most of the jhoras that town drains end in. The High Court's bar on building within 50 m of the high-water mark of a waterbody (24 May 2023) ended when the petition was closed on 19 February 2024. The Meghalaya Flood Plain Zoning Act, 2026 (Bill read; the Act, No. 4 of 2026, known from a search snippet) defines a flood zone as "the area which is required to carry the flow of the maximum probable floods" and lets restrictions notified under it prevail over other laws (s.12(2)), but no Authority, rule or zone notified under it was found. Within municipal limits, public streams, water-courses, springs and drains vest in the Municipal Board (Meghalaya Municipal Act, 1973, s.62), which may regulate the line of buildings on public roads and drains (s.164) and require land within one hundred feet of a drain to be drained (s.206); in the Khasi Hills, the KHADC Regulation 2015 treats a river edge as a zone where "No development should normally be allowed" (s.2.101). None of these gives a reserve width along a jhora or town drain. For this Manual, as its own proposal and not as the meaning of the rules, the bank of a channel is its top of bank, and the edge of a pung, lake or reservoir is the higher of its full or maximum level and its monsoon water line (Chapter 7, definitions after Clause 7.2); every jhora and other natural channel that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it, whether or not it is lined, piped or covered, and whether or not the Guidelines treat it as a waterbody, so the corridor covers the jhoras that the 240-day rule excludes (all set by this Manual). This Manual therefore gives the reserve a width, as its own proposal and not as a statutory width: a hydraulic corridor made up of the reserve of Table 6.9, based on the drain size needed to carry the design flow with the bulking factor of Clause 6.3.6(b) (Clause 6.9.7), the access strip of Clause 6.9.4 on the access bank, and, along every natural channel that drains 8 ha or more, the setbacks of Clause 7.4 measured from its top of bank, with a Zone 1 of at least 15 m and a Zone 2 to the 1% AEP extent plus 10 m; where the Guidelines' setback, measured from the ten-year mean high flood level, a notified flood zone or a court sets a wider line, that line applies for as long as it binds, and the widest governs (Chapter 7). The corridor is stricter than the statute: beside an urban stream its 15 m Zone 1 is five times the Guidelines' 3 m and two and a half times their 6 m. It applies to new development and redevelopment approved under this Manual, not to existing buildings, and Clause 7.4.7 allows no variance below it. Land is mostly community, clan or private, and in the autonomous districts it is not the State's to take, so Zone 1 land and the reserve that is community, clan or private land is secured by agreement with the landholding institution (the Dorbar Shnong, the clan or the owner), recorded on the layout approval and the land record where one exists, or reserved in the master plan, and not taken; where it is so secured, the transfer of Clause 6.9.8(a) is made by that recorded agreement rather than by a transfer of title (set by this Manual). The corridor should be shown in the Shillong Master Plan 2041 and the Tura and other master plans as land kept free along drainage lines, and checked at building permission, where the site plan already has to show "Surface drains" under the Bye-Laws 2021 and, in the Khasi Hills, "the system of storm water drainage" under s.36 of the KHADC Regulation, rather than made a new NOC.
The reserve matters because the drains of Meghalaya's towns are divided among owners, and no rule divides them. Within municipal limits the public drains, streams, springs and tanks vest in the Municipal Board (s.62 of the Municipal Act), but in Shillong only part of the Umkhrah and of the Umshyrpi lies in the Board's area and the rest under the Khasi Hills Autonomous District Council (State action-taken report to the National Green Tribunal, 21 March 2023), and the Town Committees and census towns, with "47 per cent of the total urban population", are "governed by the concerned ADCs" (CAG, performance audit on solid waste management in urban areas, 2017-18 to 2021-22). PWD holds the roads and their drains, culverts and scuppers, which in the hills carry the runoff of the land above them, and NHAI and NHIDCL the national highways, among them NH-6 and the Shillong–Dawki road; the Shillong Cantonment Board holds the Cantonment, NSTDA New Shillong, and Shillong Smart City Ltd builds drains in the city (as reported); the Water Resources Department holds the rivers and flood works, MePGCL the reservoirs and their release reaches, and the Soil and Water Conservation Department works in the catchments; and outside municipal limits the village drains and jhoras are kept by the Dorbar Shnongs under the District Councils' rules. Shillong's count of its own drains is not settled: 148.91 km with a coverage of "less than 75%" in the Smart City Proposal 2016-17, and 85% in the same plan's service-level table (both as quoted in the IRADe/NMHS plan, 2020). No rule dividing the jhoras and streams from the municipal drains was found during research. For the purposes of this Manual, and until the State issues such a rule [TBC], the drains are assigned as follows: the drains, public streams, channels, water-courses, springs and tanks within municipal limits to the Municipal Board (Meghalaya Municipal Act, 1973, s.62), in Shillong to the SMB for the reaches within its area; roadside drains, catch-water drains, scuppers and culverts to PWD (Roads), and on NH-6, the Shillong–Dawki road and the other national highways to NHAI or NHIDCL; the drains of the Cantonment to the Shillong Cantonment Board; the drains of New Shillong to NSTDA [TBC]; rivers, with their beds, banks and floodplains, and flood works on any stream, to the Water Resources Department; village drains and jhoras outside municipal limits to the District Council and the Dorbar Shnong under the District Council's rules (the Nokma-led villages of the Garo Hills were not researched [TBC]); the reservoirs, their drawdown land and the reaches below the dams to MePGCL; catchment treatment to the Soil and Water Conservation Department; and works built by Shillong Smart City Ltd to that company until they are handed over in writing, and then to the Municipal Board (as reported) (set by this Manual). Each town shall keep a drain-and-jhora register that gives every reach its owner under this assignment, its land status (community, clan, private or State) and whether it is a "waterbody" under the Guidelines or is excluded by the 240-day rule (set by this Manual); the geo-referenced map dividing the SMB's reaches of the Umkhrah and Umshyrpi from the KHADC's, which the Board was asked to prepare (State action-taken report, 2023), is its first sheet [TBC]. Under Clause 6.9.8(a), the reserve along a channel assigned to the Water Resources Department is transferred to, or secured for, the Water Resources Department. Where a channel's status is disputed, the corridor follows the channel and not its name: Shillong's jhoras are at once storm drains, carriers of sewage and sullage, and the feeders of the Umiam reservoir (Clause 8.9). No approved city drainage master plan with a design return period was found for any town in the State, and no design storm for any town drain. A drain sized to fit the land left beside it cannot be enlarged, which is why the reserve is based on the required size. Until a Basin Stormwater Master Plan is adopted (Clause 6.9.6(b)), the required drain size of Clause 6.9.7 is the size computed by the designer under this chapter. This Manual does not prescribe a lined or an unlined section, except where Clause 6.3.6(e) and Chapter 9 require lining on steep gradients and the karst and mine rule of Clause 4.11 requires it on limestone and in the coal belt. It requires the section to meet the velocity limits of Clause 6.7.3 and Chapter 9, and a reserve wide enough for an unlined or vegetated section is a reserve that keeps both options open.
Commentary. Requirements 6.9.2(b)–(e), 6.9.3 and 6.9.4 have no direct precedent and are set by this Manual. Compound walls around individual plots are almost universal in Meghalaya and are one of the most common ways that overland flow paths get blocked. The 50% blockage assumption for wall openings is set to match the grate clogging factor of Clause 6.6.3. The 3.5 m access width is set by this Manual, sized for a small excavator or desilting vehicle. For comparison, APWA 5600 (2006, 5608.4) requires a 15 ft (about 4.6 m) maintenance access strip for detention facilities.
6.10 Ponding at sags and low points
6.10.1 Minor event. At every sag, the minor design flow shall be removed by inlets (after clogging) with ponded spread within Table 6.2.
6.10.2 1% AEP event. At every sag:
- (a) the ponded depth shall not exceed 350 mm at the deepest point of the carriageway;
- (b) a surface overflow route shall be provided (for example over a lowered kerb and footpath into a designated overland flow path), so that the ponding level cannot rise above the overflow level; and
- (c) building floor levels around the sag shall comply with Clause 6.11.
6.10.3 Fully-blocked check. At sags, the 1% AEP ponding level shall also be computed with the minor system fully blocked and all flow leaving by the surface overflow route. Floor levels around the sag shall be set from the higher of the two ponding levels.
6.10.4 Trapped sags. Where a sag has no surface overflow route, the inlets and conduits (after clogging) shall carry the 1% AEP flow, and the approving authority shall agree the arrangement.
6.10.5 Road underpasses. Underpasses and other trapped sags on public roads shall:
- (a) be drained by a minor system (with pumping under Chapter 9, Clause 9.9, where gravity drainage is not possible) designed for the 2% AEP (50-yr) flow, checked at the 1% AEP flow;
- (b) have flanking inlets at both approaches to intercept flow before it reaches the low point;
- (c) be protected from inflow from surrounding streets by raised approach crests where practicable; and
- (d) have depth markers and automatic warning or closure signals that operate at 150 mm depth on the carriageway.
Commentary. The fully-blocked check, the trapped-sag rule and the underpass requirements have no direct precedent and are set by this Manual. No record of a flooded road underpass in the State was found during research [TBC]. The roads already act as the major system, and in the hills as its steepest part: on 30–31 May 2025 landslides in 15 villages of Umling block near NH-6 were linked to hill cutting along the highway (as reported); the NH-6 tunnel at Sonapur in the Jaintia Hills, built along a stream, was closed by mudslides in August 2023 and reopened only in May 2024 (as reported); and in June 2026 the Shillong–Dawki road collapsed at Laitlyngkot, at chainage 25+200 (as reported). Clause 6.10.5(d) links the 150 mm crown depth limit of Table 6.2 to the point at which traffic should stop.
6.11 Building floor levels
6.11.1 The lowest habitable floor, and every opening through which water could enter a building (doors, ventilators, basement ramps, lift pits and service entries), shall be at least 0.5 m above the 1% AEP flood level.
6.11.2 The 1% AEP flood level is the highest of:
- (a) the 1% AEP major-system water level in the street or overland flow path next to the building (Clauses 6.9 and 6.10, including the fully-blocked check at sags);
- (b) the 1% AEP flood level of any river, channel, tank or waterbody (Chapter 7); and
- (c) the 1% AEP level with the tailwater of Chapter 5; and
- (d) where the Approving Authority has adopted a 1% AEP flood depth map under Clause 7.3.4, the ground level at the plot plus the mapped 1% AEP depth.
6.11.3 Default where no level has been computed. For a plot below the Chapter 1 thresholds, or where no 1% AEP level has been computed for the plot, the lowest habitable floor and openings shall be at least the higher of:
- (a) 0.65 m above the highest crown level of the road on which the plot fronts; and
- (b) where an adopted 1% AEP flood depth map covers the plot, the ground level plus the mapped 1% AEP depth plus 0.5 m.
The Approving Authority may adopt a regional map, such as a State-approved map or a published national map of modelled 1% AEP flood depth (for example the India Flood Atlas), until a local study replaces it. A map that does not model storm surge shall not be used in place of Clause 6.11.6.
6.11.4 Basements. The crest of every basement ramp and the sill of every basement opening shall meet Clause 6.11.1. Basement drainage shall be pumped to the surface drain through a non-return valve.
6.11.5 Services. Electrical panels, transformers, standby generators, lift machinery and pumps that serve a building shall meet Clause 6.11.1.
6.11.6 Coastal band. The coastal band is the land within 500 m landward of the High Tide Line along the sea front, as defined by the CRZ Notification, 2019, with the High Tide Line as demarcated in the approved Coastal Zone Management Plan. Where the Survey of India Hazard Line lies further inland than 500 m, the band extends to the Hazard Line. Within the coastal band, in addition to Clauses 6.11.1 to 6.11.5:
- (a) the lowest habitable floor and every opening shall also be at least 0.5 m above the coastal flood level, which is the 1% AEP still-water level (Clause 5.7.3(b), Annex 5A) plus twice the sea-level allowance of Clause 5.7.4 (so at least 0.6 m), because buildings have a design life of more than 50 years (Clause 5.7.4(c));
- (b) where the plot fronts the open beach, the coastal flood level shall include wave set-up from a site study;
- (c) no habitable room, electrical service room or plant listed in Clause 6.11.5 shall be placed in a basement; and
- (d) every basement opening, ramp crest and ventilation opening shall meet Clause 6.11.6(a).
Clause 6.11.6 does not authorise any construction that the CRZ Notification prohibits. Where both apply, the stricter governs.
Figure 6.5 — Coastal band: the minimum floor level built up from the 1% AEP still-water level, twice the sea-level allowance, wave set-up where the plot fronts the open beach and 0.5 m freeboard; and the extent of the band, to 500 m from the High Tide Line or to the Hazard Line where it lies further inland (Clause 6.11.6). Original drawing for this Manual, adapted from the CRZ Notification, 2019 (para 1(i) and Annexure IV) and PUB Singapore, Code of Practice on Surface Water Drainage (7th ed.), cl. 2.1.1.
Commentary. The 0.5 m freeboard above the 1% AEP level follows the DID Malaysia 2008 checklist (platform and lowest floor at 100-yr ARI + 0.5 m). It is more than the APWA 5600 (2006, 5601.8 A2) requirement of 1 ft (about 0.3 m) above the 1% stage. The 0.65 m default in Clause 6.11.3 is derived from the other limits of this chapter, not separately sourced: the 1% water level at the crown may be up to 150 mm (Table 6.2), plus the 0.5 m freeboard. It has no direct precedent and applies to plots where no flood level exists. URDPFI (2015) also links minimum plinth levels to flood frequency in its flood-plain zoning, which is covered in Chapter 7.
Clause 6.11.3(b) lets a small plot use a mapped 1% AEP depth where no local study exists, instead of guessing from the road level alone. Modelled national maps are coarse (about 30 m), and most model rainfall and river flooding but not storm surge, which is why 6.11.3 keeps the road-crown check and Clause 6.11.6 sets a separate coastal rule.
The coastal band of Clause 6.11.6 uses the 500 m line of the CRZ Notification, 2019 (G.S.R. 37(E), para 1(i): "the land area from High Tide Line ... to 500 meters on the landward side"), because every coastal authority already maps it and it needs no new survey. The Hazard Line, demarcated by the Survey of India to show the extent of flooding and shoreline change, extends the band where it lies further inland (CRZ Notification, 2019, Annexure IV). The band takes the coastal level from the joint-case still-water level of Chapter 5 rather than from the rainfall map. The higher standard reflects the setting: a coastal flood rises with the sea, cannot be drained while the tide is up, and will rise further with the sea. Singapore takes the same approach with a fixed minimum platform level of 4.0 m above datum on its southern coast and 4.5 m on its northern coast, whatever the rainfall flood level (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 2.1.1). Each coastal State's tide and surge levels vary too much along its coast for one fixed level, so this Manual uses the computed still-water level instead. Using twice the sea-level allowance applies the sensitivity case of Clause 5.7.4(c) as the design case, because a building, unlike a drain, cannot easily be raised later. The basement restriction in 6.11.6(c) is set by this Manual: a basement in the coastal band fills from the sea as well as from rain, and cannot be pumped out to a tide-locked outfall. Meghalaya has no coast, no High Tide Line and no Coastal Regulation Zone, so the coastal band is empty in the State and Clause 6.11.6 does not apply there. Clauses 6.11.3 and 6.11.4 matter instead. The only flood-level building rules found are those of the Bye-Laws 2021: where a plot lies along a stream or river, the stilt of a building on a sloping site shall be "minimum 1.20m above the Highest Flood Level" and the plinth on a flat site at least 0.90 m (B1(v)(b)); no land shall be developed in an area "liable to flooding, except where protection measures are adopted" (B1.1(ii)); basements are "applicable only in flat terrain" (A2.7), and surface drainage shall not enter them (A2.8(j)); and, in the Khasi Hills, the drawings of a building shall show "the highest flood level (HFL) reached above the street" (KHADC Regulation 2015). No Highest Flood Level has been published for any stream in Shillong or any other town, so the rules give no level to build to. For this Manual, the Highest Flood Level of B1(v)(b) is taken as the 1% AEP flood level of Clause 6.11.2, or, where none has been computed, the highest flood level surveyed from flood marks, and the floor levels of Clause 6.11.1, 0.5 m above the 1% AEP level, govern where they are higher than the Bye-Laws' stilt and plinth (set by this Manual). Clause 6.11.3, which sets the lowest habitable floor and every opening 0.65 m above the road crown where no flood level has been computed, and Clause 6.11.4, which applies the same level, or 0.5 m above the 1% AEP flood level, to the crest of every basement ramp and the sill of every basement opening, are set by this Manual and add to the rules. On a hillside the road crown is not always the right reference: a building below a road takes the road's runoff, so Clause 6.11.2(a) sets its floor and openings from the 1% AEP level of the flow path past it, with the uphill diversion and the drained space against the cut of Clause 6.3.6(h) in place, and a floor or basement cut into a slope also needs the geotechnical certificate of the hill rule of Clause 4.11, the soil report of B1(vi) where the soil is weak, and the report of the Geological Survey of India that B1(vii) requires for a cut of more than 6.00 m; on limestone or in a coal-mining area, where the karst and mine rule of Clause 4.11 applies, no certificate makes infiltration acceptable. Along the streams, rivers and jhoras, near the pungs, lakes and springs and on the shores of the reservoirs, the lines of Chapter 7 also apply.
6.12 Culverts and road crossings
6.12.1 Design AEP. A culvert or bridge that carries a road over a drain or waterway shall pass the design AEP flow of Table 6.1 for that road class without overtopping the road, and with the headwater limits of Chapter 9, Clause 9.4. Where the waterway is a State highway or national highway crossing, the design AEP shall also be not less than that of IRC:SP:42-2014 §7.1.4 for the span. The rarer AEP governs.
6.12.2 Check event and 1% AEP. At the check event and at the 1% AEP event, the crossing and the road together shall pass the flow:
- (a) with overtopping depth ≤ 150 mm at the road crown and ≤ 350 mm at the deepest point of the road;
- (b) within the hazard limits of Table 6.3;
- (c) with no overtopping at all of arterial roads that are notified evacuation routes; and
- (d) without raising the 1% AEP flood level at any upstream building or property boundary above the level for the existing condition, unless the affected owners and the approving authority agree.
6.12.3 Where overtopping is not permitted. Overtopping in the 1% AEP event is permitted only where the structure span is less than 6 m and the 1% AEP peak flow is not more than 7 m³/s, unless a guard rail is installed downstream of the overtopping section. Otherwise, the crossing shall pass the 1% AEP flow without overtopping.
6.12.4 Blockage check. The 1% AEP check shall be repeated with a blocked inlet:
- (a) 50% of the inlet area blocked for culverts with a span or diameter below 1.5 m; and
- (b) 20% blocked for larger culverts.
The results of this check shall meet Clause 6.12.2(a) and (d).
6.12.5 Minimum size. Culverts under public roads shall be at least 900 mm in diameter, or 900 mm × 900 mm for box culverts.
6.12.6 Hydraulic design. Culvert hydraulics, including inlet and outlet control, tailwater, road overtopping and outlet protection, shall follow Chapter 9, Clauses 9.4 and 9.6.
Commentary. The design AEPs are those of Table 6.1. The overtopping limits are the street-depth limits of Table 6.2. The span and flow threshold in Clause 6.12.3 is the SI conversion of APWA 5600 (2006): overtopping allowed only where the structure span is under 20 ft and the 1% peak is 250 cfs or less, unless a downstream guard fence is installed. IRC:SP:42-2014 (§7.1.4) sets 25-yr for NH/SH culverts up to 2 m span and 50-yr for 2–6 m spans. The blockage percentages in Clause 6.12.4 and the 900 mm minimum size have no direct precedent and are set by this Manual. The 50% value matches the grate clogging factor.
6.13 Meghalaya construction-practice requirements
6.13.1 Covered roadside drains. Where a roadside drain is covered by slabs that form a footpath:
- (a) it shall be designed as an open channel with the freeboard of Table 6.7 measured to the soffit of the cover slab, and its HGL shall meet Clause 6.8 measured to the footpath and inlet levels;
- (b) road runoff shall enter through openings in the drain wall at road level (Clause 6.6.1(b)), each with a silt sump (Clause 6.6.7), at the spacing of Clause 6.6.4;
- (c) footpath runoff shall enter through slots or grated openings in the cover, not by ponding on the footpath; and
- (d) the clear section shall meet Clause 6.7.6(c).
6.13.2 Removable covers and access openings. Covered drains shall have:
- (a) removable cover panels at not more than 10 m centres, each at least 0.6 m long and spanning the full clear width, with recessed lifting points, liftable by two workers or by a hand-operated lifting device, and flush with the footpath;
- (b) access chambers with a clear opening of at least 0.6 m × 0.6 m at every junction, bend and change of section, and at not more than 30 m centres on straight runs; and
- (c) covers rated for the traffic or pedestrian load at their location (Chapter 9, Clause 9.11).
6.13.3 Silt traps. In addition to the inlet sumps of Clause 6.6.7, silt trap chambers shall be provided:
- (a) upstream of every culvert under an arterial road;
- (b) upstream of every pump station and detention facility; and
- (c) at every outfall to a tank, river or other waterbody (with the gross pollutant trap required by Chapter 8).
Each silt trap shall be sized to hold the sediment expected between scheduled cleanings, using the sediment yield in Annex 6B, and shall be reachable by a desilting vehicle.
6.13.4 Garbage and gross pollutant screens. Screens shall be provided where an open drain enters a covered drain, a pipe or a culvert, and at outfalls under Chapter 8. Each screen shall:
- (a) be designed under Chapter 9, Clause 9.8;
- (b) have a bypass or overflow, so that a fully blinded screen does not flood properties or the road beyond the limits of this chapter; and
- (c) be checked hydraulically with 50% of its area blocked.
6.13.5 No building over drains. No structure other than an approved crossing or a removable cover shall be built over a public drain. Shop frontages, ramps and steps that cross a drain shall be removable or shall leave access openings that meet Clause 6.13.2.
6.13.6 Utilities. No water main, sewer, power or telecom cable, gas pipe or duct shall be laid along, or pass through, the flow area or freeboard of any drain. A utility that must cross a drain shall:
- (a) cross above the cover soffit or below the drain invert, inside a sleeve; and
- (b) be shown on the drainage plan with its level.
Where an existing utility crossing obstructs a drain, its area shall be deducted from the drain section, with a 50% blockage allowance for the debris it traps, until the utility is relocated. The utility owner shall relocate it when the drain is rebuilt.
6.13.7 Sewage. No sewage connection is permitted to a storm drain (Chapter 8). Covered drains shall be built with sealed joints where they run next to sewers.
6.13.8 Edge protection. Open drains deeper than 1.0 m beside a footpath, a carriageway or a public open space shall have railings or barriers. Open drains of any depth shall not be left uncovered across a footpath.
6.13.9 As-built levels. The as-built invert levels of every public drain, pipe and manhole shall be surveyed and submitted (Chapter 10). Inverts shall be within ±15 mm of design. An HGL re-check shall be submitted where they are not.
6.13.10 Desilting. Public drains shall be desilted before the monsoon season each year, as set out in Chapter 10.
Commentary. Clause 6.13 has no direct precedent; this Manual sets it on the basis of Meghalaya practice. Most urban drains in the State are covered roadside drains under footpaths. They are often built with continuous cast-in-situ slabs and few openings, so they cannot be cleaned and fill with silt and solid waste within a season. CPHEEO (2019) notes that uncovered channels "are prone to the dumping of garbage" (Part A, Ch 2), which is why the drains are covered. Covering without access openings simply moves the problem out of sight. NDMA (2010) recommends that pre-monsoon desilting be complete by 31 March. In Meghalaya that date is also the start of the wet season. The south-west monsoon reaches Shillong at about the beginning of June (an old IMD normal of 1 June, as reported) and withdraws in mid-October (by 14 October in 2025, as IMD expected, and on 15 October in 2026 for the North East, as reported), but the storms come earlier: Cherrapunji's highest 24-hour falls for April and May are 644.2 mm (16 April 1990) and 812.0 mm (25 May 1916) (IMD Extremes), the CWC report for subzone 2(b) finds the rainfall "spread over a period of eight months, i.e. from March to October", and the highest recorded levels of the Umngot at Dawki and the Myntdu at Kharkhana were set on 28 May 2006 and 23 April 1995 (SANDRP's copy of CWC data, as reported). Storms also come after the withdrawal: 594.0 mm at Cherrapunji on 11 October 1975 and 262.0 mm at Shillong on 8 October 2004 (IMD Extremes). The only direction found is the IRADe/NMHS plan's recommendation of "Desilting to avoid flooding during monsoons", with no date; no desilting order of the Urban Affairs Department, a Municipal Board or a District Council with a completion date was found during research [TBC]. So Clause 6.13.10 refers to the monsoon season as this Manual defines it, 1 April to 31 October, and Chapter 10 requires desilting and the clearance of debris, garbage and slide material from drains, jhoras, inlets, racks, traps and culverts to be complete by 31 March, with inlets, debris racks, culverts, flap gates and pumps certified ready and test-run on the same date (Clauses 5.11.5 and 5.12.9); a mid-season clearance of racks, culverts, sediment traps and jhora inlets by 31 May, after the April–May storms and before the south-west monsoon sets in; standby from 1 April to 31 October; and a post-season clearance of debris and slide material in every town by 15 November, because every storm in the hills fills the racks and traps. These dates are set by this Manual. Meghalaya's towns have no snow regime.
No rule of the Bye-Laws 2021 on building over a drain was found. Within municipal limits the public drains, streams and water-courses vest in the Municipal Board (Meghalaya Municipal Act, 1973, s.62), which may regulate the line of buildings on public roads and drains (s.164); outside them, the KHADC Regulation 2015 treats a river edge as a zone where "No development should normally be allowed" (s.2.101). Natural jhoras and streams are open channels with a drainage reserve (Clause 6.9), and should not be covered, decked or built over: NESAC found the channel capacities of Shillong's streams drastically reduced "due to encroachments along their banks by buildings" (NESAC, 2023), and encroachment on the jhoras is reported to make them "more vulnerable to flooding" (ICLEI, as reported). Where a drain is covered, Clause 6.13.2 applies to it in full; where it is open beside a footpath or a carriageway, Clause 6.13.8 applies. In the hill towns many drains run beside steps and footpaths on steep ground, where an open drain is a fall hazard and a covered one cannot be cleared of stones and waste without its access openings.
Clause 6.13.7 is not yet the practice, and in Shillong it cannot be until sewers exist. "The Shillong Planning Area has no sewerage system": the sewage flows into septic tanks and soak pits, and the sullage "flows into the primary, secondary and natural drains and finally to the nearby rivers Wah Umkhrah in the north and Wah Umshyrpi in the south" (NESAC, 2023); MSPCB identified 20 outfalls to the Umkhrah and 12 to the Umshyrpi (minutes of the stakeholder meeting, 14 April 2023); and CPCB lists both streams in its first priority for pollution (CPCB, Polluted River Stretches, September 2025). The National Green Tribunal has required the State to ensure that "raw fecal matter is not discharged into fresh water streams and Umkhrah and Umshyrpi rivers" (O.A. 192/2022, order of 22 November 2022). Clause 8.9 sets how dry-weather flow in storm drains is surveyed and intercepted until the connections are removed, including the rule that interception shall not reduce the capacity of the drain (Clause 8.9.5(b)).
The 10 m and 30 m spacings and the ±15 mm tolerance have no direct precedent and are set by this Manual. Clause 6.13.6 responds to the common sight of water mains and cables running through drains. Each one traps debris and reduces the section. Mechanical cleaning through cover openings, rather than manual entry, is assumed throughout, consistent with the Prohibition of Employment as Manual Scavengers and their Rehabilitation Act, 2013.
6.14 Outfalls
6.14.1 Outfalls shall be designed for the tailwater conditions of Chapter 5. Outfalls below the 1% AEP still-water level shall have flap or tide gates or non-return valves (Chapter 5 and Chapter 9, Clause 9.10).
6.14.2 Outfall protection and energy dissipation shall be designed under Chapter 9, Clause 9.6. Outfalls to tanks and waterbodies shall also meet Chapters 7 and 8.
6.15 Submittal requirements
Every conveyance submittal shall include a Conveyance Design Report (Form 6-1) containing:
- a catchment plan showing sub-catchments, the minor system, inlet locations and the major-system overland flow paths for the 1% AEP event (Clause 6.3.2);
- the land-use and road-class AEP adopted for each element (Table 6.1), and the high-density area status;
- design flows, with the rainfall sheet of Chapter 2 and the method of Chapter 3;
- gutter spread, depth and D·V checks for the minor, check and 1% events (Tables 6.2 and 6.3);
- an inlet schedule with clean capacity, clogging factor, design capacity and bypass flow (Clause 6.6);
- pipe and drain design tables with n, velocity, sediment allowance and freeboard (Clause 6.7);
- HGL profiles for the minor and check events, with the tailwater used (Clause 6.8);
- sag ponding levels, including the fully-blocked check (Clause 6.10);
- a floor-level schedule for every building (Clause 6.11);
- culvert and crossing calculations (Clause 6.12 and Chapter 9); and
- a utilities-crossing schedule and access-opening layout for covered drains (Clause 6.13).
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Volume I, Part A: Engineering Design. Tables 4.1, 5.1, 5.2, 5.3, 5.8, 5.11, 5.12, 6.2, 11.2, 11.5; §5.3, §5.6.2, Fig. 5.9. https://www.mohua.gov.in/static/uploads/2025/10/8a2456c722036d78c72a698898ef846d.pdf
- PUB Singapore (2018, with Addendum No. 3, April 2025). Code of Practice on Surface Water Drainage, 7th edition. Clauses 1.1, 2.1.1, 5.1, 5.3, 9.6, 9.7 and Appendix 1 (Drainage Reserve Requirements). https://www.pub.gov.sg/-/media/PUB/PDF/Code-of-Practices-and-Submission-Guidelines/Surface-Water-Drainage/Code-of-Practice-on-Surface-Water-Drainage.pdf
- Indian Roads Congress (2013). IRC:SP:50-2013, Guidelines on Urban Drainage (First Revision). https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.050.2013.pdf
- Indian Roads Congress (2014). IRC:SP:42-2014, Guidelines on Road Drainage (First Revision). https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.042.2014.pdf
- Bureau of Indian Standards. IS 7784 (Part 1): 1993, Code of practice for design of cross drainage works, Part 1: General features (as cited in CPHEEO 2019 Table 5.12).
- Federal Highway Administration (2024). Urban Drainage Design Manual, Hydraulic Engineering Circular No. 22, 4th edition, FHWA-HIF-24-006. (3rd edition 2009, FHWA-NHI-10-009.)
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.8, 5604.2, 5608.4). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf ; and Version 2025.01 (Dec 2025).
- Australian Institute for Disaster Resilience (2014). Australian Disaster Resilience Guideline 7-3: Technical flood risk management guideline: Flood hazard. Tables 1 and 2. https://knowledge.aidr.org.au/media/1891/guideline-7-3-technical-flood-risk-management.pdf
- Smith, G.P. and Wasko, C.D. (2012). Australian Rainfall and Runoff Revision Project 15: Two-dimensional modelling in urban and rural floodplains. Engineers Australia.
- Ball, J. et al. (eds) (2019). Australian Rainfall and Runoff: A Guide to Flood Estimation, Book 6 (Chapters 6 and 7). Commonwealth of Australia (Geoscience Australia).
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management; and (2012) Urban Stormwater Management Manual for Malaysia (MSMA), 2nd edition.
- Gupta, K. Return Period and Rainfall Intensity for Drainage Design in India. IIT Bombay. https://www.civil.iitb.ac.in/~kgupta/drainagedesign.pdf
- Integrated Research and Action for Development (IRADe), with NESAC and GBPNIHE-SRC (2020). Disaster Resilience Action Plan, Shillong, IRADe-PR-73(2020), under the National Mission on Himalayan Studies (the drains of Shillong, quoting the Smart City Proposal 2016-17; the service-level table; the RMSI assessment of 2019; landslide localities and susceptibility; recommendations on drains and desilting; Table 17, flood events), https://nmhs.org.in/w/pdf/publication/Technical_Report/Dr.Rohit_Mangotra/Shillong_Disaster_Resilience_Action_Plan.pdf
- North Eastern Space Applications Centre (NESAC) (2023). Formulation of Risk Informed GIS Based Master Plan, Shillong Planning Area, Ver 1.0, May 2023 (no sewerage; flash-flood susceptibility; encroachment and clogging of channels; slope classes), https://megurban.gov.in/notifications/RiskInformedMasterPlans/Finalised%20Report%20-%20Shillong.pdf
- Government of Meghalaya. Action Taken Report in O.A. No. 192 of 2022, National Green Tribunal, 21 March 2023 (waste removed from the Wahumkhrah under the 15th Finance Commission; stone bunds and solid-waste traps; the reaches under the Shillong Municipal Board and the KHADC), https://www.greentribunal.gov.in/sites/default/files/news_updates/Action%20Taken%20Report%20in%20OA%20No.%20192%20of%202022%20(In%20re%20News%20item%20publsihed%20in%20Shillong%20Times%20dated%2023.02.2022%20titled%20Poison%20flowing%20in%20Shillong%20Rivers%20water%20quality%20index).pdf ; National Green Tribunal, O.A. No. 192 of 2022, order of 22 November 2022; minutes of the stakeholder meeting on the Wah Umkhrah, Wah Umshyrpi and Wah Umkhen, 14 April 2023, https://smb.gov.in/other_menu/new_projects/files/MoM%20_RestorationOfRivers.pdf ; and the Chief Secretary's presentation on the restoration of the rivers (five drains and the Umkhrah's pre-monsoon discharge), https://smb.gov.in/other_menu/new_projects/files/Restoraton%20of%20Rivers.pdf
- Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality, September 2025 (the Umkhrah and Umshyrpi in Priority I), https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf
- Meghalaya Power Generation Corporation Ltd (MePGCL). Guidelines for the operation of the spillway gates of the Myntdu–Leshka HEP Stage I, the New Umtru HEP and the Umiam–Umtru Stage III and Stage IV HEPs (2022–2026) (spillway capacities and catchments), meecl.nic.in.
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012) (Cherrapunji and Shillong (C.S.O.)), https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf ; and Central Water Commission (2000). Flood Estimation Report for South Brahmaputra Subzone 2(b) (Revised), Design Office Report No. SB-2(b)/R-4/44/99 (the eight-month rainfall season).
- Indian Roads Congress (1998). IRC:SP:48-1998, Hill Road Manual (drainage provisions not read for this Manual); and IRC:SP:42-2014, cl. 7.1.4 (design return periods for road drains and culverts) and cl. 8.5.1 (drainage of hill roads).
- ICLEI South Asia (2021). Shillong city profile (drains blocked by waste; encroachment of the jhoras), https://southasiaoffice.iclei.org/wp-content/uploads/2021/09/Shillong_4_pager.pdf (not read; as reported).
- Press reports on the landslides of 30–31 May 2025 in Umling block near NH-6 (Down To Earth, 3 June 2025); on the mudslides at the Sonapur tunnel on NH-6 (August 2023; May 2024); on the collapse of the Shillong–Dawki road at Laitlyngkot and the Umngot flood at Dawki in June 2026 (BorderLens, 21 June 2026); on the flash floods along the Wah Umkhrah (The Shillong Times); and on the onset and withdrawal of the monsoon in 2021, 2025 and 2026.
- National Disaster Management Authority (2010). National Guidelines: Management of Urban Flooding.
- MoHUA / TCPO (2015). URDPFI Guidelines, Volume I.
- Ministry of Environment, Forest and Climate Change (2019). Coastal Regulation Zone Notification, 2019, G.S.R. 37(E), 18 January 2019. Para 1(i) and Annexure IV. https://crz.elaw.in/crz2019.html
- Urban Affairs Department, Government of Meghalaya. Meghalaya Building Bye-Laws, 2021, Notification No. UAU.73/2016/Pt/402 of 9 March 2021, Gazette of Meghalaya No. 12, Part IIA, 25 March 2021 (A2.7, A2.8(j), B1(v), B1(vii), B1.1(ii), B2(ii)(c), C12.1(iv), C12.3, D4.2, D5.6), https://megurban.gov.in/laws/BuildingByeLaws.pdf ; as amended, among others, by No. UAU.73/2016/Pt/55 of 29 February 2024 (Section I(a) to I(f): slopes, protective measures in natural hazard prone areas, water-logged plains, buffer zones), https://megpns.gov.in/gazette/2024/05/09-05-24-IIA.pdf
- Khasi Hills Autonomous District Council. Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015, Notification No. DC.II/Genl/31/2015/9 of 4 August 2015, Gazette Extraordinary No. 97 of 25 August 2015 (ss.2.101, 15, 34(v) and 36; the highest flood level on drawings), https://megpns.gov.in/gazette/2015/08/25-08-15-X.pdf
- The Meghalaya Municipal Act, 1973 (the Assam Municipal Act, 1956, as adapted), ss.62, 164, 204 and 206, consolidated text, https://megurban.gov.in/laws/mma.pdf
- Forest and Environment Department, Government of Meghalaya. Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, Notification No. FOR/CC/29/2019/Pt/688 of 25 August 2023, paras 2(e), 2(f), 4, 7 and 10 and Appendices 1–3, https://megpns.gov.in/gazette/2023/09/07-09-23-IIA.pdf ; as amended by No. FOR/CC/29/2019/1140 of 13 February 2024, https://megpns.gov.in/gazette/2024/02/22-02-24-IIA.pdf , and No. FOR/CC/29/2019/Pt/771 of 6 July 2026, https://meghalaya.gov.in/sites/default/files/documents/FOR_CC_29_2019_Pt_771.pdf
- The Meghalaya Flood Plain Zoning Bill, 2026, Gazette of Meghalaya Extraordinary, Part V, 23 February 2026, No. LB.43/LA/2026/2, https://megpns.gov.in/gazette/2026/02/23-02-26-X.pdf (the Act, Act No. 4 of 2026, known from a search snippet and not read).
- Comptroller and Auditor General of India. Performance Audit on Solid Waste Management in Urban Areas of Meghalaya (2017-18 to 2021-22), executive summary (Town Committee and census-town areas governed by the District Councils), https://cag.gov.in/uploads/download_audit_report/2024/03--Excutive-Summery---PA-ON-SWM-REPORT-Meghalaya-066d1a92eedf988.65076513.pdf
- Government of India. The Prohibition of Employment as Manual Scavengers and their Rehabilitation Act, 2013.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 6A | Standard inlet types for Meghalaya with capacity curves (on grade and sag) |
| 6B | Sediment yield for silt-trap sizing and calibration of the sediment allowance |
| 6C | Standard drawings: covered roadside drain with removable covers, access chamber, inlet with silt sump |
| Form 6-1 | Conveyance Design Report checklist |
Commentary. Meghalaya's drains were not designed against any State or municipal standard: none was found during research, and no document found gives a design return period, runoff coefficient or drain size for any town; the Bye-Laws 2021 leave the requirements of drainage to the National Building Code 2016 (D4.2, D5.6). The only drainage-design statement found is that of a multi-hazard assessment of Shillong made in 2019, which divided the city into sub-watersheds, took its design rainfall from the CWC Brahmaputra Basin PMP Atlas and estimated flows by the rational formula (as quoted in the IRADe/NMHS plan, 2020; the assessment was not obtained) [TBC]. Shillong's count of its own drains is not settled: "The drains in the city run for 148.91 km and drain directly into the Umkhrah and Umshyrpi rivers … storm-water drainage network coverage is less than 75% of the city, the incidence of sewerage mixing in drains is almost 100%" (Smart City Proposal 2016-17, as quoted in the IRADe/NMHS plan), while the same plan's service-level table gives a coverage of 85% and waterlogging in 25% of the city, a conflict that the plan does not resolve. The plan recommends "Upgradation of the existing drains" and "Desilting to avoid flooding during monsoons", by PWD and the Shillong Municipal Board, without a design basis, and five drains entering the Umkhrah are reported to "account for 42% of Umkhrah's pre-monsoon discharge" (Chief Secretary's presentation, April 2023). The drains also work in a setting that the plains editions of this Manual do not meet. In the hill towns they collect water from slopes that deliver gravel, stones and slide debris with every storm, and, with no sewerage in Shillong, they carry the town's sullage and much of its waste; they end in jhoras and streams whose beds move and whose channels have been narrowed by building, and NESAC found that "Encroachment and clogging of channels are the main causes of flooding over Shillong" (NESAC, 2023). The road drains of the hills are the drains of the land above them. The drains are also divided among owners: the Municipal Boards, the Shillong Cantonment Board, NSTDA, Shillong Smart City Ltd, PWD, NHAI and NHIDCL, the Water Resources Department, MePGCL, and, outside municipal limits, the District Councils and the Dorbar Shnongs all build or hold drains and receiving waters, and no rule divides them (see the Commentary to Clause 6.9). Fixing the rainfall (Chapter 2) is only half the answer. The other half is a second, surface-level system that carries the flows the pipes cannot, without flooding buildings. That is the dual drainage concept of this chapter, taken from Kansas City Metro APWA Section 5600 (5601.8, Levels of Service), which requires every element to have a 1% AEP overflow path.