Chapter 4Site Runoff Control: Retention and Detention


4.1 Purpose and scope

4.1.1 This chapter sets the performance standard that every regulated development shall meet for runoff leaving the site. It covers:

  • (a) the order in which runoff-control measures are to be applied (Clause 4.3);
  • (b) retention of frequent rainfall, and how retained volume is credited against detention (Clause 4.4);
  • (c) release-rate criteria for standard and flood-sensitive catchments (Clause 4.5);
  • (d) the procedure for sizing detention storage and outlets (Clauses 4.6 to 4.9);
  • (e) facility types, rainwater harvesting (RWH) accounting, and high-groundwater sites (Clauses 4.10 to 4.12);
  • (f) regional detention and fee-in-lieu (Clause 4.13);
  • (g) simplified methods for small sites: the Tier B tables and the fixed-coefficient route (Clause 4.14); and
  • (h) public safety (Clause 4.15).

4.1.2 This chapter applies to land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, as set in Chapter 1. Single dwellings below that threshold, and road resurfacing that adds no impervious area, are exempt. The existing RWH mandate of the building rules (rainwater harvesting for every plot category and use under Table G1 of the Bye-Laws 2021 in the master-plan, municipal and scheme areas, with ground water recharge for residential covered area of more than 3,000 sq ft, and, in the Khasi Hills Autonomous District, the storing of water runoff including rainwater in all existing and new buildings under section 36 of the KHADC Regulation 2015; neither sets a volume, and both are discussed in the Commentary to Clause 4.11) continues to apply to every building it covers, whether or not this chapter applies.

4.1.3 Rainfall inputs come from Chapter 2. Hydrologic methods come from Chapter 3. Tailwater, downstream analysis and the outfall-closed check come from Chapter 5. Water quality volume (WQv) treatment comes from Chapter 8. Where this chapter and those chapters overlap, the more stringent requirement governs.

Commentary. No Indian national rule or Meghalaya rule found during research for this Manual limits the rate of discharge from a site, and none requires on-site detention or "zero run-off". No Meghalaya document found sets a design storm, a return period, a runoff coefficient or a time of concentration for any drain. The building rules are the Meghalaya Building Bye-Laws 2021, notified by the Urban Affairs Department under section 74 of the Meghalaya Town and Country Planning Act 1973 (No. UAU.73/2016/Pt/402 of 9 March 2021), which apply to "all the Master Plan Areas, Municipal areas and Scheme Areas within the State" (A1.2) and name as the "Authority" "the Meghalaya Urban Development Authority / Autonomous District Councils as applicable" (A2.5). The text read is the notification of 2021 with its amendments of 29 February 2024 (No. UAU.73/2016/Pt/55, which inserted Section I), 19 November 2024, 15 January 2025, 18 June 2025, 13 August 2025, 21 October 2025, 19 December 2025 and 7 May 2026, cited here by number and date because two instruments are each called the "(Amendment)" and two the "Second Amendment", and the notification of 15 January 2025 amends "the Meghalaya Building Bye-Law, 2024". Outside those areas building and land are regulated by the District Councils: in the Khasi Hills Autonomous District by the Khasi Hills Autonomous District (Land Development and Building) Regulation 2015, with permissions issued by the KHBSRA since 2020 (as reported); the building instruments of the Jaintia Hills and Garo Hills District Councils were not found [TBC]. The Town Committees and census towns, which hold 47% of the urban population, are "governed by the concerned ADCs", not by the Urban Affairs Department (CAG, Performance Audit on Solid Waste Management in Urban Areas of Meghalaya, executive summary), so nearly half of the State's urban people live outside the reach of the Bye-Laws 2021; the KHADC Executive Committee "outright rejected" the Bye-Laws 2021 on 25 October 2021 for encroaching on Sixth Schedule areas (as reported), and whether MUDA's jurisdiction reaches the District Council parts of a master-plan area is disputed (Chapter 1). This Manual takes no side in that dispute. The drainage provisions that can be found protect the building, the slope and the watercourse, not the catchment. The site shall be "properly drained or capable of being drained" and "not prone to land slide" (B1(ii), (iv)); where a plot lies along a stream or river, the septic tank and soak pit are to be "as far away as possible from the stream/river", the stilt at least 1.20 m above the Highest Flood Level on a sloping site and the plinth at least 0.90 m on a flat site (B1(v)); a soil report from a geotechnical expert is needed where the soil is weak (B1(vi)); earth cutting is limited to 3.00 m, relaxable to 6.00 m to the crest of an RCC wall, with a report of the Geological Survey of India beyond that (B1(vii)); and no land shall be used where "the proposed development falls in the area liable to flooding, except where protection measures are adopted" (B1.1(ii)). Since 2024 no construction is permitted on a slope of more than 50°, and building on slopes of 40–50° is limited (Section I(a)); "Buildings to be provided with good drainage facilities to prevent excessive saturation of sub-surface formations", "Construction should not obstruct existing surface drainage courses", and builders shall "Construct diversion ditches and swales to direct runoff away from sensitive areas and into designated sediment basins" and "Install silt fences, sediment barriers, or basins around the construction site" (Section I(b)); on water-logged plains, "Storm water inlet protection" is required (Section I(c)); and stream setbacks are governed by the Meghalaya Waterbodies (Conservation and Protection) Guidelines 2023 (B2(ii)(c) and Section I(a)4 and I(f), replacing the 2.40 m of 2021). The bye-laws define "Natural Hazard Prone Areas" to include areas flooded by "back flow in drains, inadequate drainage, etc., as to be identified through local surveys in the development plan" (A2.37), ask for "good drainage of water so that the saturation of the hill slope is avoided" (C12.1(iv)) and list flood-protection measures such as the "Clearing of clogged cross drainage works" (C12.3), and leave drainage itself to the National Building Code: "Requirements of water supply, drainage shall be as per National Building Code 2016" (D4.2, D5.6). The drawings show "Surface drains, position and sizes of septic tank and soak pit", the rainwater harvesting and the roof drainage, and large projects a services plan with the "drainage and storm water disposal system". Rainwater harvesting is required for every plot (Table G1; Commentary to Clause 4.11). None of these sets a design storm, a release rate, a detention volume or an overflow path. The KHADC Regulation adds a duty on the Executive Committee, Town Committee or Dorbar Shnong to ensure that development does not damage "catchment areas, water sources, spring sheds, streams and rivers" (s.15(1)), with restoration at the cost of the polluter (s.15(2)); a "Reserved Forest & Conservation Area", including the river edge, where "No development should normally be allowed" (s.2.101); the same 3 m and 6 m cut limits (s.34(v)); soft cover of at least 15% where the covered area is 500 m² or more and at least 10% otherwise, with "Semi-pervious ground cover … as paving wherever possible" (s.35(iii)(d)); and drawings that show "the highest flood level (HFL) reached above the street in front of the building" and the surface drains. Section I(b) and I(c) of the Bye-Laws and s.35(iii)(d) of the KHADC Regulation are the only provisions found that touch runoff from a site, and they are the hooks for this chapter. The Meghalaya Municipal Act 1973 vests "all public streams, channels, water-courses, springs tanks, reservoirs" and the public drains in the Board (s.62), lets it require an owner "to improve bad drainage" (s.190) and to drain land within 100 feet of a drain (s.206), and makes an unauthorised drain into a Board drain or water-course an offence (s.204, fine up to ₹50; s.205, up to ₹25), penalties too small to deter; its drainage tax (s.68, as substituted in 2021) cannot be levied until a drainage scheme is approved and made (s.73). The Meghalaya Flood Plain Zoning Act 2026 defines a "flood zone" as "the area which is required to carry the flow of the maximum probable floods" and makes the restrictions notified in it prevail over other laws (Bill, ss. 2(g) and 12(2)), but no Flood Zoning Authority, rules or zone notification was found, and no zone is notified (Chapter 7). No published highest flood level exists for Shillong's streams, so the stilt rule of B1(v)(b) and the KHADC's HFL above the street have no level to use; this Manual supplies the method (surveyed flood marks or the modelled 1% AEP level, Chapter 5). The only drainage design statement found is that of RMSI's multi-hazard assessment of Shillong (2019), which used the IMD station at Shillong, design rainfall "adopted from the Brahmaputra Basin PMP Atlas developed by the Central Water Commission (CWC, 2014) using data from 1957-2010" and the rational formula (as quoted in the IRADe/NMHS plan; the report and the atlas were not obtained [TBC]). Shillong's 148.91 km of drains "drain directly into the Umkhrah and Umshyrpi rivers", with coverage "less than 75% of the city" and "the incidence of sewerage mixing in drains … almost 100%" (Smart City Proposal 2016-17, as quoted in the IRADe/NMHS plan, whose service-level table gives a coverage of 85%: the figures conflict); the plan recommends "Upgradation of the existing drains" and "Desilting to avoid flooding during monsoons"; and NESAC found that "Encroachment and clogging of channels are the main causes of flooding over Shillong" (NESAC, 2023). Basements are limited by terrain, not for flooding. The Bye-Laws allow basements "only in flat terrain" (A2.7) and require that "surface drainage does not enter the basement / lower ground floor / cellar / underground floor" (A2.8(j)); no basement rule of the KHADC Regulation was read [TBC], and no Meghalaya rule found sets a level for a basement ramp or opening. This Manual therefore adds its own requirements for every basement: no detention storage in a habitable basement (Clause 4.10.1); the crest of every basement ramp and the sill of every basement opening at least 0.5 m above the 1% AEP flood level, with basement drainage pumped to the surface drain through a non-return valve (Clauses 6.11.1 and 6.11.4); and no basement in Zone 2 (Clause 7.5.2). In the flood-sensitive catchments of Clause 4.5.3.2, in any catchment notified under Clause 4.5.4, and on the plains, valley-floor, floodplain and waterbody-margin land of Clause 4.12.1, it recommends that no basement be permitted where the 1% AEP flood level stands above the surrounding ground; and wherever a basement or lower floor is cut into a slope, it shall carry the geotechnical certificate of the hill rule of Clause 4.11, with the water behind its walls drained to a lined drain and not to the ground, and none shall be cut into limestone or mine ground without a check for voids. For a sloping site, this chapter also supplies what the Bye-Laws leave open in Section I(b): runoff from the catchment above the site shall be intercepted and carried round the building in the design storms of Chapter 6, and every flow from the site shall discharge to a lined drain or a stable natural channel through an energy dissipator, never onto an unprotected slope or into fill. These are the Manual's proposals, not rules of the Bye-Laws 2021 or of the KHADC Regulation. This chapter is written so that it can supply, as a technical companion to the Bye-Laws 2021, the District Councils' building regulations, the master plans and the Municipal Act, the design storm, release rates and storage volumes that they leave open; a competent authority could adopt it for that purpose, but none has. In practice the storm drains of Shillong are its sewerage: "The Shillong Planning Area has no sewerage system", and "The sullage from the kitchen and bathroom flows into the primary, secondary and natural drains and finally to the nearby rivers Wah Umkhrah in the north and Wah Umshyrpi in the south" (NESAC, 2023); the MSPCB has identified 20 outfalls on the Wah Umkhrah and 12 on the Umshyrpi (minutes of 14 April 2023); and the CPCB places both rivers in Priority I among polluted river stretches, with a maximum BOD in 2022–23 of 56 mg/L at Mawpdang on the Umkhrah and 59 mg/L at the Law College on the Umshyrpi (CPCB, 2025) (Clause 8.9). Retention and detention apply in full on every site whatever the drain carries: every litre a site releases at the peak of a storm takes up capacity in a drain that is already part-filled with sewage. The CPHEEO (2019) manual describes limiting outflow to the pre-development peak as typical practice, but it uses no "shall" and names no storm frequencies (CPHEEO Part A §8.5.1). This chapter turns that description into a development-control requirement.


4.2 Definitions

Term Meaning in this Manual
Retention Permanent removal of runoff from the surface drainage system by infiltration, evapotranspiration or reuse, so that the water never reaches the outfall.
Retention depth The 90th percentile wet-day 24-hour rainfall depth for the site's zone (Clause 2.10, Annex 2E).
Required retention volume (RRV) The runoff volume from the retention depth over the post-development site (Clause 4.4.2).
Detention Temporary storage of runoff, released through a controlled outlet at a rate set by Clause 4.5.
Retention credit The reduction in required detention storage that results from retention practices, determined by routing under Clause 4.4.6. It is not the same as the retained volume.
Permissible site discharge (PSD) The maximum rate at which a site may discharge for a stated AEP, in L/s or L/s/ha.
Site storage requirement (SSR) The detention storage required per hectare of site under the simplified method of Clause 4.14.
Multi-stage outlet An outlet structure with separate openings at different levels, each controlling a different AEP (Figure 4.2).
Drawdown time Time from the peak stored volume until the stated fraction of that volume has been released.
Emergency spillway A secondary overflow that passes flows above the primary outlet capacity, or all flow when the primary outlet is blocked, without overtopping the embankment.
Freeboard Vertical distance between the maximum design water level and the embankment crest or other critical level.
Flood-sensitive catchment A catchment listed in Clause 4.5.3 or notified under Clause 4.5.4.
Authority The approving authority under Chapter 1 (MUDA, through its Chairperson or the officer to whom the power is delegated, in the master-plan, municipal and scheme areas of the Bye-Laws 2021; the Municipal Board concerned for its own drains and works under the Meghalaya Municipal Act 1973; the Shillong Cantonment Board in the Cantonment; NSTDA in New Shillong [TBC]; and, in the autonomous districts outside those areas, the District Council or its building authority (in the Khasi Hills, the KHADC Executive Committee and the KHBSRA under the 2015 Regulation), as applicable).
Tier A / Tier B Adoption tiers defined in Chapter 1. Tier A: the Shillong Municipal Board (SMB) and every approving authority within the Shillong Planning Area, whichever has jurisdiction over a site: MUDA, the Shillong Cantonment Board, NSTDA in New Shillong [TBC] and, for the parts of the planning area under the Khasi Hills Autonomous District Council, its building authority, if the District Council adopts the Manual (this Manual does not decide where MUDA's jurisdiction ends and the District Council's begins); and the Tura Municipal Board, with MUDA in the Tura master-plan area. Tier B: Municipal Boards, Town Committees and District Council building authorities.

4.3 Order of measures

4.3.1 Every site runoff-control design shall apply measures in the following order, and shall document in the submittal why each earlier step could not do more:

  1. Preserve. Keep existing waterbodies, pungs, natural drainage lines, wetlands, and permeable soils and vegetation. Avoid fill in flood storage (Chapter 7).
  2. Retain. Retain the RRV on site by infiltration, reuse or evapotranspiration (Clause 4.4).
  3. Detain. Detain the remaining runoff so that the release-rate criteria of Clause 4.5 are met for every design storm and duration (Clauses 4.6 to 4.9).
  4. Convey. Convey the 1% AEP (100-yr) flow safely through the site to the receiving system on a defined overland path (Chapter 6), and check the receiving system downstream (Chapter 5).

4.3.2 Preservation and retention reduce the detention required (Clauses 4.4.6 and 4.4.7). They do not relieve the site of the release-rate criteria of Clause 4.5 or of the downstream analysis of Chapter 5.

Commentary. This order follows the "layers of stormwater management" adopted in the Kansas City Metro APWA Section 5600 Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet; MARC Supplement, Nov 2025). Maintenance is the fifth layer and is set in Chapter 10. The 2025.01 manual credits retention and natural-area preservation against detention size (MARC Supplement, Nov 2025). Clause 4.4.6 adopts that credit, and defines it so that it cannot be claimed twice.


4.4 Retention

4.4.1 Requirement

The site shall retain the RRV. Retention shall be achieved by one or more of the following:

  • infiltration practices (soakaways, infiltration trenches, permeable pavement with an infiltration base, bioretention);
  • rainwater reuse that is drawn down by a demonstrated non-potable demand;
  • green roofs and landscape areas that do not drain to the outfall in the retention-depth storm.

The limits of Clause 4.4.4 apply.

4.4.2 Computation of the RRV

RRV (m³) = 10 × Q_R × A

where:

  • Q_R (mm) is the runoff depth from the retention depth P_R (Annex 2E). It is computed with the SCS-CN method for the post-development cover of each sub-area, at AMC II, with Ia = 0.2S (Chapter 3); and
  • A (ha) is the area of the site that drains to the outfall.

Q_R shall be computed for each sub-area separately and summed. An area-weighted CN shall not be used where impervious and pervious areas differ by more than 20 CN points.

The volumetric method RRV = 10 × P_R × Rv × A, with Rv = 0.05 + 0.009 × I (I = percent impervious), may be used for sites under 0.5 ha and under the Tier B method.

Commentary. The Rv formula is the one used in the KC water quality volume (MARC BMP Manual 2012). It is simple to review for small sites. The SCS-CN form is required for larger sites so that the retention computation uses the same runoff model as the detention routing. That keeps the credit computation of Clause 4.4.6 consistent.

4.4.3 Verification

Retention by infiltration shall be supported by:

  • (a) site infiltration tests at the location and depth of each practice, at the frequency set in Chapter 8;
  • (b) a design infiltration rate of no more than half of the measured rate; and
  • (c) groundwater evidence showing the seasonal high groundwater table at least 1.0 m below the base of the practice (Chapter 8).

Retention by reuse shall be supported by a demand calculation showing that the RRV is drawn down within 72 hours by a continuous non-potable use, such as toilet flushing, cooling or irrigation.

Commentary. The factor of 2 on measured infiltration rate has no direct precedent; this Manual sets it to allow for clogging and for the difference between a test pit and a full-scale practice. Chapter 8 may set a different factor; if it does, Chapter 8 governs.

4.4.4 Limits on retention

4.4.4.1 Infiltration practices shall not be used:

  • where the seasonal high groundwater table is less than 1.0 m below the base (Chapter 8);
  • on contaminated land;
  • within the setbacks from foundations, wells and septic systems set in Chapter 8; or
  • on fill, unless tested after placement.

4.4.4.2 Where the RRV cannot be fully retained, the shortfall shall be stated in the submittal. The shortfall shall be treated as WQv under Chapter 8 and shall get no retention credit.

4.4.5 Drawdown of retention

Retention storage shall be emptied by infiltration or reuse within 72 hours of the end of the retention-depth storm, verified by the tests of Clause 4.4.3.

4.4.6 Retention credit: definition and computation

4.4.6.1 What the credit is. The retention credit is the reduction in required detention storage that results when the retention practices are included in the post-development routing. It is computed. It is not assumed equal to the RRV.

4.4.6.2 Tier A method (routing). For each design storm and duration of Clause 4.6.3:

  • (a) model each retention practice explicitly as a storage that is empty at the start of the storm, unless Clause 4.11 says otherwise;
  • (b) let the practice fill from the front of the storm, and let it lose water during the storm only at the design infiltration or reuse rate of Clause 4.4.3;
  • (c) once it is full, route its overflow to the detention facility; and
  • (d) size the detention for the residual hydrograph.

The required detention storage is the largest storage over all storms and durations. The credit is the difference between that storage and the storage required with no retention. No further deduction shall be made.

4.4.6.3 Tier B method (simplified). The detention storage required by Clause 4.14 may be reduced by:

V_credit = C_R × RRV_provided

where C_R is the retention credit factor from Annex 4B for the zone, soil group and drawdown rate. Until Annex 4B is published, C_R = 0.

4.4.6.4 Retention that is not verified under Clause 4.4.3 gets no credit.

Commentary. "Credited against detention" (APWA 5600 2025.01) can be read in two ways. One reading subtracts the retained volume from the detention volume, cubic metre for cubic metre. The other routes the storms with retention in place and sees what detention is still needed. The two readings give very different answers in Meghalaya, because the mandatory 48- and 72-hour storms (Clause 2.5.2) fill any retention practice on the first day, long before the peak arrives on the last day (Clause 2.9.2). Unless the practice keeps infiltrating during the storm, it is full at the peak and does nothing to reduce the peak storage.

The illustrative example in Clause 4.6.7 shows the size of the effect. A 2 ha site with 552 m³ of retention (no infiltration during the storm) needs 138 m³ less detention for the 24-hour storm. That is a credit of about a quarter of the retained volume. For the 48- and 72-hour storms, which govern, the credit is close to zero. Subtracting the retained volume directly would have under-sized the detention by about 545 m³ (about 19%).

This Manual therefore defines the credit as the result of routing. Retention on fast-draining sandy soils, which keeps infiltrating through a multi-day storm, will earn a real credit. Retention that only fills will earn little. Both outcomes are physically correct. Setting C_R = 0 until Annex 4B exists is a safe default for Tier B, not a judgement that retention has no value: retention is still required for water quality and recharge (Chapter 8).

4.4.7 Preservation credit

Areas of the site that are permanently preserved in natural cover may be modelled at their pre-development CN in the post-development condition, provided that:

  • they are protected by a registered covenant or dedication; and
  • their runoff is not concentrated onto impervious surfaces.

This lowers both the RRV and the detention required. No other preservation credit applies.


4.5 Release-rate criteria

4.5.1 General

4.5.1.1 Peak discharge from the site shall be computed by a hydrograph method (Chapter 3) for the pre-development and post-development conditions with identical design storms (Clause 2.11.1). The Rational Method shall not be used for any part of storage sizing.

4.5.1.2 Pre-development is greenfield: open land in good condition for the mapped HSG. Existing impervious cover is not counted (Clause 2.11.5, Chapter 3). This applies to redevelopment as well, subject only to the constrained-redevelopment route of Clause 4.5.6.

4.5.1.3 The criteria apply at each point where runoff leaves the site. Where a site drains to more than one outfall, the criteria apply to each outfall for the area draining to it. Runoff shall not be diverted between catchments.

4.5.2 Standard catchments

For each of the 50%, 10% and 1% AEP (2-, 10- and 100-yr) storms, and for every duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:

Q_post(T, d) ≤ 0.9 × Q_pre(T, d)

4.5.3 Flood-sensitive catchments

4.5.3.1 In the catchments listed below, the mixed-frequency rule of Clause 2.11.3 applies, for every duration in Clause 2.5.2:

Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr).

Each cap is the pre-development peak at the duration that maximises it: the 10-yr peak for the 100-yr check, and the 2-yr peak for the 2-yr check. The cap applies to every post-development duration (Clause 2.11.3).

4.5.3.2 The flood-sensitive catchments are:

  • (a) Shillong's Umkhrah and Umshyrpi: the catchments of the Wah Umkhrah and the Wah Umshyrpi, with their jhoras, down to the Wah Roro and Umiam lake, including the valley floors of Polo, Pynthorbah, Nongmynsong, Mawlai, Forest Colony, Dhankheti and Nongrim Hills, the land in the high and very high flash-flood susceptibility classes of the NESAC report for the Shillong Planning Area, and the landslide ground along NH-40 and near the Umshyrpi (Commentary to Clause 4.11);
  • (b) Umiam lake shore and the Umiam–Umtru release reaches: the land that drains to Umiam lake below or near its starting level of Clause 3.12.5, and the land along the release reaches of the Umiam–Umtru stages and of New Umtru down to Byrnihat;
  • (c) Jowai on the Myntdu: the land of Jowai that drains to the headwaters of the Myntdu, and the land along the release reach of the Myntdu–Leshka dam to the Bangladesh border;
  • (d) The escarpment settlements of Sohra, Mawsynram and Shella: the land of Sohra, Mawsynram, Shella and the other settlements of the southern escarpment in sub-area ML-C, where the State's record rainfall falls on limestone and steep ground;
  • (e) Dawki on the Umngot: the land of Dawki that drains to the Umngot, whose CWC level-monitoring site has a highest recorded level of 73.47 m;
  • (f) Tura on the Ganol: the land of the Tura master-plan area that drains to the Ganol and to the Ringrey and Rongkhon streams;
  • (g) Williamnagar on the Simsang: the land of Williamnagar that drains to the Simsang;
  • (h) Baghmara and Dalu on the south Garo rivers: the land of Baghmara and Dalu that drains to the rivers of the south Garo slopes and the edge of the plains, among them the Simsang, the Bugi and the Dareng;
  • (i) The Garo foothill plains on the Jinjiram and the Krishnai: the land of Phulbari, Tikrikilla and the other settlements of the Garo foothill plains that drains to the Jinjiram and the Krishnai under their backwater;
  • (j) Nongpoh–Umling on NH-6 and the Umlew: the land of Nongpoh and Umling block that drains to the Umlew and the streams crossed by NH-6; and
  • (k) any catchment notified under Clause 4.5.4.

The boundaries shall be those mapped in Annex 4A.

4.5.4 Notification of further flood-sensitive catchments

4.5.4.1 The Authority may propose that a catchment be notified as flood-sensitive where one or more of the following is documented:

  • (a) buildings or arterial roads flooded in an event of 1% AEP or more frequent, on at least two occasions in the previous 20 years;
  • (b) receiving drains or channels with capacity below the 10% AEP flow under existing conditions;
  • (c) an outfall that is held up by a stream in flood, a river backwater or a reservoir, such as the Wah Umkhrah at Polo, Pynthorbah, Nongmynsong and Mawlai in Shillong, the Umngot at Dawki, the Jinjiram and the Brahmaputra backwater on the Garo plains, Umiam lake or another MePGCL reservoir held near its full level, or that is buried or blocked by the boulders, debris and garbage of a jhora, for part of the monsoon season (Chapter 5);
  • (d) loss of more than a quarter of the mapped tank and pung storage in the catchment since the earliest available survey; or
  • (e) a basin master plan that relies on limiting site discharge.

4.5.4.2 The procedure shall be:

  1. The Authority prepares a technical note with the catchment boundary in GIS form and the evidence for 4.5.4.1.
  2. The State-level technical committee constituted under Chapter 1 reviews the note.
  3. The draft notification and map are published for public comment for at least 60 days.
  4. The Government notifies the catchment and the map is added to Annex 4A.
  5. The rule applies to applications received 6 months or more after notification. Applications received earlier are assessed under Clause 4.5.2.

4.5.4.3 A notified catchment may be de-notified only by the same procedure, and only after a basin study shows that the downstream system meets Chapter 5 with all development under Clause 4.5.2.

Commentary. The 0.9 factor is derived from the Denver (MHFD) analysis. In that analysis, ten basins each releasing 100% of the historic 100-yr peak still produced 106% of the historic peak at the outlet; releasing 90% at each gave 97% (UDFCD Full Spectrum Detention Release Rate Memorandum, 2012). The mixed-frequency rule has no direct precedent; the nearest is the Malaysian DID (2008) checklist, which required post-development 2-, 10-, 50- and 100-yr peaks below the pre-development 2-yr peak. The specific "100-yr post ≤ 10-yr pre" form appears in a New Berlin, Wisconsin planning discussion (not an adopted rule). The Shillong entry follows the two city streams. The Umkhrah and the Umshyrpi drain the city and join as the Wah Roro before Umiam lake (NESAC, 2023); Shillong's 148.91 km of drains "drain directly into the Umkhrah and Umshyrpi rivers", and storm-water drainage covered "less than 75% of the city" in 2016-17 (Smart City Proposal, as quoted in the IRADe/NMHS plan, which elsewhere gives a coverage of 85%: the two figures conflict). NESAC classes 4.67% of the planning area as of high and 1.01% as of very high flash-flood susceptibility and names "Polo Market, Pynthorbah, Nongrim hills, Dhankheti" as "highly potential for flash flood"; Polo, Pynthorbah, Nongmynsong, Forest Colony and Mawlai flood "with nearly every heavy downpour" (as reported; IRADe/NMHS plan); a flash flood struck Polo, Forest Colony and Mawlai on 9 July 2019 after "more than 72.2 mm of rain" (IRADe/NMHS plan, Table 17); and the plan names historical landslides at Laitumkhrah (2008), Lawsohtun, Happy Valley (2007), Mccabe Road, Bethesda and Arbuthnot, and "very high susceptibility" along NH-40 and near the Umshyrpi. Neither stream has a gauge or a published flood level; the floodplain zonation of the Umkhrah and other stretches let to RMSI in June 2021 was "80%" complete in March 2023 and has not been published (State action-taken report to the NGT, 21.03.2023). The Umiam entry follows the reservoir and its release reaches: the lake receives the drainage of Shillong and "serves as a cesspool of the waste materials of Shillong" (Expert Committee report, 2023), releases are set by MePGCL, which began them at 3,216.15 ft in August 2024 on an IMD warning (as reported), and below the dams the Stage III reach runs 13.05 km through a ravine to the Stage IV reservoir, the Stage IV reach 33.5 km, and the New Umtru reach 9.80 km to the bridge at Byrnihat (MePGCL guidelines). The Jowai entry follows the Myntdu: Jowai lies inside the closed 680-mm contour of the CWC subzone 2(b) plate, the Myntdu at Kharkhana far downstream set its highest level, 47.0 m, on 23 April 1995 (CWC, as transcribed by SANDRP), and below the Myntdu–Leshka dam, whose spillway passes 12,000 m³/s from 350 km², the release reach runs about 24 km to the Bangladesh border past settlements and farms (MePGCL, 2022). The escarpment entry follows the record rainfall belt: Cherrapunji recorded 1,563.0 mm on 16 June 1995 (IMD Extremes) and Mawsynram 1,003.6 mm on 17 June 2022 (IMD), nine people were reported killed in Mawsynram block alone in that storm (as reported), the landslide at Sohra in the earthquake of 12 June 1897 is reported to have killed 600 people (as reported), and the ground is cavernous limestone on which no infiltration is allowed (Clause 4.11). The Dawki entry follows the Umngot, whose highest level at Dawki, 73.47 m, came before the south-west monsoon, on 28 May 2006 (CWC, as transcribed by SANDRP); in June 2026 the river "rose rapidly", submerging a labour camp of the bridge project and sweeping away an excavator, while the Shillong–Dawki road collapsed at Laitlyngkot (as reported). The Tura entry follows the streams of its draft risk-informed master plan, which bounds the 54.65 km² planning area by the Ringrey Stream, the Ganol River and the Rongkhon Stream (notice No. UAU.76/2022/129 of 16 February 2024); in the Garo Hills floods of September 2014, which were reported to have killed more than 60 people and blocked NH-51 to Tura, no rainfall measurement was found (as reported) [TBC]. The Williamnagar entry follows the Simsang, which has no gauge and flows on to Bangladesh, in a sub-area where the reanalysis gives values (859.7 mm at 50 years in 24 hours, NIH-DHAARA) that no gauge checks. The Baghmara and Dalu entry follows the south Garo rivers: in the storm of 4–6 October 2024 three people drowned at Dalu, seven died in a landslide at Hatiasia Songma and 2,630 households were affected in Dalu block (as reported), the Bugi at Dimapara and the Dareng at Sibbari have highest levels of 29.75 m (27 July 2007) and 20.34 m (12 August 2017) (CWC, as transcribed by SANDRP), and the Dalu gauge recorded 32.0 cm in a day on 13 June 1956 (CWC subzone 2(b) report, Annex 4.1). The Garo plains entry follows the Jinjiram and the Krishnai, whose floods of September 2012 and September 2014 submerged over 100 and over 200 villages (IRADe/NMHS plan, Table 17; as reported), on alluvium with water 3–5 m below ground (CGWB, GWRA 2022); the reaches of these rivers in Assam are governed by the Assam edition of this series. The Nongpoh–Umling entry follows NH-6: in the storm of 30–31 May 2025 landslides hit 15 villages of Umling block "near National Highway 6", linked to hill cutting along the highway, and one person drowned in the Umlew (as reported). Nongstoin, where the storm of September 2020 cut the roads (IRADe/NMHS plan, Table 17), Mairang, Resubelpara, Khliehriat and New Shillong are candidates for notification under Clause 4.5.4. The notification triggers in 4.5.4.1 have no direct precedent and are set by this Manual. The 6-month lead time follows the update rule of Clause 2.14.2. Clause 4.16 explains why releases below pre-development are needed at all.

4.5.5 Minimum outlet and short-duration 2-yr checks

4.5.5.1 Where the PSD for any AEP and duration is less than the discharge of a 50 mm orifice (Clause 4.8.2) at the corresponding stage, the 50 mm orifice is deemed to comply for that AEP and duration.

4.5.5.2 Where meeting the 2-yr criterion at a duration of 3 hours or less would require a low-flow orifice so small that the drawdown requirement of Clause 4.7 cannot be met, the designer shall:

  • size the low-flow orifice as the smallest opening that meets Clause 4.7; and
  • report the resulting 2-yr exceedance for those durations.

The Authority may accept the design if the exceedance is below the discharge of the 50 mm orifice at the 2-yr stage, or if the downstream analysis of Chapter 5 shows no adverse effect.

Commentary. Under AMC II, a greenfield site produces almost no runoff in a 1- or 2-hour, 2-yr storm, because most of the rain is lost to initial abstraction. A pre-development peak of a few litres per second, compared duration by duration, then forces a very small low-flow orifice. That orifice cannot release the 10-yr volume within 48 hours. Checked as if it were outside a flood-sensitive catchment, the illustrative example of Clause 4.6.7 would need a low-flow orifice of about 75 mm to match the 1-hour, 2-yr pre-development peak. 90% drawdown of the 10-yr volume would then take about 84 hours even with a clean orifice, against the 48-hour limit. The 170 mm orifice that meets drawdown with 50% blockage exceeds the 1-hour, 2-yr pre-development peak by about 11 L/s. Clause 4.5.5.2 resolves that conflict in favour of drawdown, because a basin that is still partly full when the next monsoon storm arrives fails in the event that matters more. KC APWA 5600 (2006) used a 75 mm (3 in) minimum orifice with trash racks. This Manual sets a 50 mm minimum (Clause 4.8.2).

4.5.6 Constrained redevelopment sites

4.5.6.1 Eligibility. The relief route of this clause is available only for redevelopment where all of the following hold:

  • (a) the existing site is at least 60% impervious, as surveyed before demolition;
  • (b) the site is 1 ha or less; and
  • (c) the designer shows, in a Constraint Statement submitted with Form 4-1, that the greenfield criteria of Clauses 4.5.2 or 4.5.3 cannot be met on the site. The statement must show that every storage option of Clause 4.10 has been assessed: rooftop and podium storage, tanks under parking or landscape, permeable paving with sub-base storage, and landscape depressions. It must also give the storage each option can provide.

New development on undeveloped land is never eligible.

4.5.6.2 Minimum on-site performance. An eligible site shall provide all of the following on site:

  • (a) the full retention volume (Clause 4.4) and the WQv treatment (Chapter 8), with no relief;
  • (b) post-development peak discharge no more than 50% of the existing-condition peak for the 50%, 10% and 1% AEP storms, at each duration of Clause 2.5.2. The existing condition is modelled under Clause 3.3.4; and
  • (c) no increase in the 1% AEP water level at any building or road downstream (Chapter 5).

4.5.6.3 Shortfall. The shortfall is the detention storage required to meet the greenfield criteria (Clause 4.6) minus the storage provided on site under 4.5.6.2. The applicant shall pay for the shortfall as a fee-in-lieu at the unit rate of Clause 4.13.3. The fee shall be:

  • (a) paid into the ring-fenced account of the basin in which the site lies;
  • (b) spent only on regional detention or on restoring pung or tank flood storage identified in the basin stormwater master plan (Chapter 11); and
  • (c) recorded in the public ledger of Clause 4.13.4, which shall show the volume owed and the volume delivered in each basin.

Where no basin master plan has yet been approved, the fee shall be held for up to 5 years. If no plan is approved in that time, it shall be spent on restoring tank flood storage in the same basin, with Water Resources Department agreement.

4.5.6.4 Flood-sensitive catchments. In the catchments of Clause 4.5.3, the route is available under the same conditions. The Authority may, however, refuse it where the downstream analysis of Chapter 5 shows existing flooding of buildings in the 10% AEP event within the analysis extent.

Commentary. Greenfield is the target for all redevelopment, because a dense city only reduces its runoff as it rebuilds. On small, fully built plots in areas such as Laitumkhrah, Mawlai, Polo and Pynthorbah in Shillong, or the old centres of Tura and Jowai [TBC], there is often no space for the full greenfield storage. A rule that cannot be met invites variances and non-compliance, which help no one downstream. This clause follows the approach of the UK Non-statutory Technical Standards for Sustainable Drainage (Defra, 2015, S2–S3). For previously developed sites, those standards require peak runoff "as close as reasonably practicable to the greenfield runoff rate" and never above the pre-redevelopment rate. The fixed 50% minimum reduction has no direct precedent; this Manual sets it to give reviewers a clear number in place of a "reasonably practicable" judgement. The fee-in-lieu turns the shortfall into regional storage in the same basin, so the basin still receives greenfield-equivalent control in total. Retention and water quality get no relief, because they are small volumes that almost every site can hold.


4.6 Detention sizing procedure

4.6.1 Method

Detention shall be sized by hydrograph routing through the stage–storage–discharge relationship of the facility, by level-pool (Modified Puls) or an equivalent numerical method (SWMM, HEC-HMS). Fixed-ratio and Rational-based storage formulae shall not be used. The simplified methods of Clause 4.14 (the Tier B tables and the fixed-coefficient route) are the only exceptions.

4.6.2 Steps

  1. Delineate the site and sub-areas. Map HSG and confirm by testing (Chapter 3).
  2. Extract design rainfall for 50%, 10% and 1% AEP and every duration in Clause 2.5.2, with the climate factor (Chapter 2, Form 2-1).
  3. Build design hyetographs: alternating block for ≤ 24 h; the "peak day last" pattern for 48 and 72 h (Clause 2.9).
  4. Compute pre-development hydrographs (greenfield CN; AMC III for storms of every duration from 1 June to 15 October in sub-areas ML-A, ML-A1, ML-B, ML-B1 and ML-D and from 1 April to 31 October in sub-areas ML-C and ML-C1, at all times in catchments draining to a MePGCL or other reservoir, its backwater or a release reach below a dam, and at other sites and times after a 5-day total of more than 53 mm, AMC II otherwise).
  5. Compute the release caps for each AEP and duration under Clause 4.5.2 or 4.5.3.
  6. Compute post-development hydrographs with the same storms and AMC, including retention practices (Clause 4.4.6).
  7. Choose a trial facility geometry (stage–storage) and a multi-stage outlet (Clause 4.6.5).
  8. Route every storm and duration. Use a time step of no more than 5 minutes, and no more than Tc/3 of the post-development catchment.
  9. Check every release against its cap, and check drawdown (Clause 4.7). Adjust the outlet and storage and repeat.
  10. Check the tailwater condition of Clause 4.6.6 and the downstream analysis of Chapter 5.
  11. Size the emergency spillway and set freeboard (Clause 4.9).
  12. Report the governing storm for storage, for each outlet stage, and for the spillway (Clause 4.17).

4.6.3 Storms to be routed

Every facility shall be routed for the full matrix:

Table 4.1 — Design storms to be routed for detention sizing

AEP Durations (h) AMC
50% (2-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h
10% (10-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h
1% (100-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h

The 24-, 48- and 72-hour runs are mandatory whatever the critical-duration result (Clause 2.5.2). Where Ia = 0.05S sensitivity is required by Chapter 3, it shall be run for the governing storage case.

4.6.4 Initial conditions

Each run shall start with:

  • detention storage empty, down to the invert of the lowest outlet;
  • any permanent pool full;
  • retention practices empty, except as limited by Clause 4.11; and
  • RWH storage full (Clause 4.11).

The 48- and 72-hour storms already contain their antecedent rain, so no further pre-filling is applied.

4.6.5 Multi-stage outlet design

4.6.5.1 The outlet shall have a separate control for each criterion, normally stacked as in Figure 4.2:

  • Stage 1, at the invert: the low-flow orifice. It releases the WQv over 24–48 h (Chapter 8) and controls the 2-yr release.
  • Stage 2: an orifice or slot set at or near the maximum 2-yr level. It controls the 10-yr release.
  • Stage 3: a weir, riser crest or larger orifice set at or near the maximum 10-yr level. It controls the 100-yr release.
  • Emergency spillway: separate from the primary outlet (Clause 4.9).

Stages may be combined where routing shows that every cap is met.

4.6.5.2 Orifices shall be computed with a discharge coefficient of 0.60 unless a rated device is used. Weirs shall use a coefficient appropriate to their shape. Submerged-outlet and tailwater effects shall be included (Clause 4.6.6).

4.6.5.3 Vortex flow controls and other proprietary devices may be used where the supplier provides a certified head–discharge curve and the minimum clear opening is at least 50 mm.

4.6.6 Tailwater on the outlet

The outlet shall be routed against the tailwater of the receiving system, not free outfall, wherever the receiving water level can rise above the outlet invert. The tailwater shall be:

  • for a receiving drain: its water level in the same storm, from the Chapter 5 analysis or, for Tier B, the drain obvert;
  • for tidal or backwater-affected outfalls: the levels and joint cases of Clause 2.12 and Chapter 5, including the outfall-closed check (Clause 5.10).

Where tailwater governs, a flap gate shall be fitted to the outlet (Clause 5.11). The storage below the tailwater level shall not be counted as available unless the routing includes the gate closure.

4.6.7 Illustrative example

Illustrative — not design values. This example shows the procedure and the sizes it produces. The inputs are invented to be plausible for a colony draining to a jhora in Shillong. They are not NIH-DHAARA values and must not be used for design.

Inputs:

  • Site: 2.0 ha, flood-sensitive catchment (Clause 4.5.3).
  • Land cover: pre-development all pervious, CN 70. Post-development as two sub-areas (Clause 3.9.2): 1.57 ha of directly connected impervious surface at CN 98, never converted for AMC, and 0.43 ha of pervious open space at CN 70, on the same soil as pre-development; the area-weighted CN at AMC II is 92. For storms of 12 h and longer the pervious CN only is converted to AMC III: CN_III = 23·CN / (10 + 0.13·CN) = 84.3 (Clause 3.8.4).
  • Time of concentration (Tc): 45 min pre-development, 15 min post-development (used for both sub-areas). SCS triangular unit hydrograph; 5-minute time step.
  • 24-h depths: 110, 200 and 350 mm for 2-, 10- and 100-yr (the same 10- and 100-yr values as Clause 2.11).
  • Shorter durations: P(t) = P24·(t/24)^0.40, an assumed ratio set and not Annex 2B.
  • Longer durations: 48-h and 72-h depths taken as 1.25 and 1.40 × P24, laid out per Clause 2.9.2.
  • Storage: vertical-walled, 2,500 m² plan area.
  • Outlet, sized so that drawdown is met with the low-flow orifice 50% blocked (Clause 4.8.3). Annex 4C shows the trial outlet that failed this check.
    • Stage 1: 170 mm orifice at the invert.
    • Stage 2: 460 mm orifice with its invert 0.53 m above the floor.
    • Stage 3: none needed, because the 100-yr cap is met by Stages 1 and 2.

Results (discharges in L/s; storage in m³):

Table 4.2 — Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)

Duration (h) 2-yr pre 2-yr post, detained 10-yr pre 10-yr post, detained 100-yr post, uncontrolled 100-yr post, detained 100-yr storage used 10-yr drawdown, 50% blocked (h)
1 4 15 51 28 922 42 1,426 31.3
2 14 20 84 34 961 79 1,911 32.1
3 19 22 104 37 981 139 1,999 32.8
6 32 25 150 41 1,010 194 2,154 34.2
12 127 30 302 46 1,074 276 2,512 39.0
24 149 32 327 49 1,081 320 2,766 45.3
48 173 34 349 82 1,087 343 2,913 44.8
72 180 34 356 84 1,089 343 2,911 44.7

How to read it:

  • 100-yr cap. The cap is the largest pre-development 10-yr peak, 356 L/s (72 h). Every 100-yr detained peak is at or below it; the largest is 343 L/s.
  • 2-yr cap. The site is flood-sensitive, so the 2-yr cap is the largest pre-development 2-yr peak, 180 L/s (72 h; Clause 4.5.3.1). The largest 2-yr detained peak is 34 L/s. At 1, 2 and 3 hours the detained 2-yr peak is above the pre-development peak of the same duration (15 against 4 L/s, 20 against 14 L/s, and 22 against 19 L/s). That comparison is not required here. It would be for a site under Clause 4.5.2, and Clause 4.5.5.2 would then apply.
  • Governing storage. Storage is governed by the 48- and 72-hour storms: 2,913 m³, which is 0.146 m³ per m² of site, at a maximum depth of 1.17 m. A design that checked only the critical-duration peak storm (1–3 h here) would have provided about 2,000 m³, roughly two-thirds of what is needed.
  • Drawdown. With the low-flow orifice 50% blocked (Clause 4.8.3), 90% of the 10-yr storage drains in at most 45.3 h (the 24-hour storm), within the 48 hours of Clause 4.7. A 120 mm orifice would drain it in about 42 h when clean but 54 to 75 h when half blocked, so it fails. Annex 4C shows that trial and the routing step by step.
  • Retention credit. With an illustrative retention depth of 40 mm, RRV = 552 m³, computed for each sub-area (Clause 3.9.4). Modelled as filling from the start of the storm with no infiltration during it, the retention reduces the 24-hour storage by 138 m³ and the 48- and 72-hour storage by 7 m³ or less. The credit under Clause 4.4.6 is therefore effectively zero for this site.

The order of magnitude, about 0.15 m³ per m² of site, is consistent with the indication in Clause 2.11.

2026-11-01T10:14:56.974241 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 5 10 15 20 25 30 35 40 Time from start of 24 h design storm (h) 0 200 400 600 800 1000 1200 Discharge (L/s) Release cap = max pre-development 10-yr peak over all durations (356 L/s) Uncontrolled peak 1081 L/s Detained: peak later and flatter, recession prolonged (volume unchanged) Illustrative — not design values. 2 ha site, 24 h storm, AMC III, mixed-frequency rule Post-development 1% AEP (100-yr), uncontrolled Post-development 1% AEP (100-yr), detained Pre-development 10% AEP (10-yr)

Figure 4.1 — Pre-development 10-yr, post-development 100-yr uncontrolled and detained hydrographs for the 24-hour storm of the illustrative example (Clause 4.6.7). Illustrative — not design values. Original drawing for this Manual, adapted from the pre/post-development hydrograph concept in MARC/KC APWA Section 5600 and the Georgia Stormwater Management Manual (2016).

Commentary. Figure 4.1 shows what detention does and does not do. It cuts and delays the peak. It does not reduce the volume: the area under the detained curve equals the area under the uncontrolled curve, more than twice the pre-development 10-yr volume. The extra volume leaves the site over many hours after the storm. That prolonged release can coincide with the peak of the larger catchment downstream (Clause 4.16), and it must still drain when the outfall is tide-locked (Chapter 5).


4.7 Drawdown

4.7.1 Detention. At least 90% of the maximum volume stored in the 10% AEP (10-yr) storm of each duration shall be released within 48 hours of the time of maximum storage, by gravity, with the tailwater of Clause 4.6.6.

4.7.2 Water quality volume. The WQv shall be released over not less than 24 hours and not more than 48 hours (Chapter 8).

4.7.3 Retention. Retention storage shall be emptied within 72 hours by infiltration or reuse (Clause 4.4.5).

4.7.4 Tidal outfalls. Where gravity drawdown is prevented by tide for part of each cycle, the 48-hour limit applies with the tidal tailwater modelled. Where it cannot be met by gravity, pumped drawdown shall be provided under Clause 5.12.

Commentary. KC APWA 5600 (2006) required dry basins to release at least 80% of storage within 24 hours of the inflow peak and to empty within 72 hours. Singapore PUB requires detention to be restored within 4 hours. The 48-hour, 90% rule is longer than PUB's because Meghalaya storage must hold multi-day volumes. It is still short enough that a basin filled by one monsoon depression will have most of its volume back before the next, which in June 2022, when the 24-hour falls of 15 and 17 June at Sohra (811.6 mm, also reported as 811.2 mm, and 972 mm, as reported) and of 17 June at Mawsynram (1,003.6 mm, IMD) came two days apart followed within days.


4.8 Outlet structures

4.8.1 General. Primary outlets shall be:

  • unattended, with no moving parts, valves or pumps, except where Clause 5.12 permits pumped drawdown;
  • accessible for inspection and cleaning from the surface without confined-space entry, where practicable; and
  • built of durable materials. In coastal areas these shall be corrosion-resistant (Clause 4.12.5).

4.8.2 Minimum orifice. No control orifice shall be smaller than 50 mm in diameter, or 50 mm in least dimension for a slot.

4.8.3 Trash racks and screens. Every orifice and weir shall be protected by a trash rack or screen. The rack shall:

  • have a clear bar spacing no greater than half the smallest opening it protects, and not less than 25 mm;
  • have a clear open area at least 10 times the area of the opening it protects;
  • be inclined, or set as a cage around the riser, so that debris rises with the water and does not pin against the bars;
  • be removable or hinged for cleaning; and
  • for routing, be assumed 50% blocked at the low-flow orifice when checking drawdown.

4.8.4 Anti-vortex devices. Riser crests and orifices that may run under more than 1.5 times their diameter of head shall have an anti-vortex plate or hood (Figure 4.2).

4.8.5 Outlet barrels. Outlet barrels through embankments shall:

  • be at least 300 mm in diameter (Chapter 6);
  • have watertight joints;
  • have a filter diaphragm or seepage collars over the length within the embankment; and
  • have an energy-dissipating outfall (Chapter 9).

4.8.6 Isolation. Facilities serving more than 1 ha shall have a means of isolating the outlet for maintenance, such as a stop-log slot or penstock. In normal service it shall be left fully open.

Commentary. The 50 mm minimum is smaller than the 75 mm (3 in) of KC APWA 5600 (2006), so the trash-rack requirements are correspondingly stricter. The ratios in 4.8.3 (bar spacing at half the opening, open area 10 times the opening, 50% blockage for the drawdown check) have no direct precedent and are set by this Manual. The blockage factor matches the 50% grate clogging factor for sag inlets in Chapter 6. Indian urban drains carry heavy loads of solid waste, so a low-flow orifice without an effective rack will block within one season.

Figure 4.2 — Detention storage stack and multi-stage outlet (schematic) Schematic cross-section of a detention basin showing stacked storage zones (permanent pool, water quality volume, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and a multi-stage riser outlet with trash rack, anti-vortex plate, outlet barrel and emergency spillway. Not to scale. Storage stack and multi-stage outlet — schematic section, not to scale Embankment crest Max level, spillway flowing (outlet blocked) Emergency spillway crest 1% AEP (100-yr) max water level 10% AEP (10-yr) max water level 50% AEP (2-yr) max water level Top of water quality volume (WQv) Permanent pool (wet basin only) Basin floor / pool bottom Spillway surcharge (Clause 4.9) 100-yr detention zone 10-yr detention zone 2-yr / channel-protection zone WQv — 24–48 h release (Ch 8) Permanent pool / retention Freeboard ≥ 0.3 m Spillway crest (offset in plan) 1 2 3 4 5 6 7 Key 1 Stage 1 low-flow orifice (≥ 50 mm, Clause 4.8.2) — releases WQv over 24–48 h 2 Stage 1 second orifice — with 1, controls 50% AEP (2-yr) release 3 Stage 2 orifice or weir slot — controls 10% AEP (10-yr) release 4 Stage 3 riser crest / overflow grate with anti-vortex plate — controls 1% AEP (100-yr) release 5 Trash rack enclosing all openings (Clause 4.8.3) 6 Seepage collar or filter diaphragm on outlet barrel 7 Outlet barrel, energy dissipation and outfall apron Levels and zone thicknesses are diagrammatic only.

Figure 4.2 — Detention storage stack (permanent pool, WQv, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and multi-stage riser outlet. Schematic, not to scale. Original drawing for this Manual, adapted from the multi-stage outlet and storage-zone concepts in MARC/KC APWA Section 5600 (2006, 2025.01) and the Mile High Flood District Urban Storm Drainage Criteria Manual, Volume 2 (full-spectrum detention).


4.9 Emergency spillway, freeboard and embankment safety

4.9.1 Spillway capacity. Every detention facility formed wholly or partly by an embankment, or whose overflow would reach buildings, shall have an emergency spillway that passes the 1% AEP (100-yr) peak inflow:

  • with the primary outlet assumed fully blocked;
  • with the facility full to the spillway crest at the start of the storm; and
  • with at least 0.3 m freeboard from the maximum water level to the embankment crest.

4.9.2 High-hazard facilities. A facility is high-hazard if its failure or overflow could:

  • endanger life;
  • flood a habitable building or critical facility; or
  • close an arterial road.

High-hazard facilities shall also be checked for the 0.2% AEP (500-yr) peak inflow under the conditions of 4.9.1, with the embankment not overtopped.

4.9.3 Spillway crest. The spillway crest shall be at or above the 1% AEP maximum water level from routing with the primary outlet working. The recommended clearance is 0.15 m.

4.9.4 Spillway location. The spillway shall be:

  • on natural ground or a reinforced section, not on fill, unless protected against erosion for the full design flow;
  • discharging to the 1% AEP overland flow path of Chapter 6; and
  • placed so that its flow does not reach a building.

4.9.5 Underground and enclosed facilities. Tanks, vaults and podium storage shall have an overflow route that operates when the outlet is blocked. The route shall carry the 1% AEP inflow to the overland path without surcharging any building, basement or lift pit.

4.9.6 Embankments.

  • (a) Embankments more than 2 m high (measured from the downstream toe to the crest) shall be designed by a qualified geotechnical engineer. The design shall include stability, seepage and settlement analysis.
  • (b) Side slopes shall be no steeper than 3H:1V on any face that is mown or accessible to the public. Slopes shall be flatter where Clause 4.15 requires.
  • (c) Embankments shall have:
    • a crest width of at least 3 m;
    • compacted, engineered fill with a core or cut-off where required by the seepage analysis; and
    • no trees or large shrubs.
  • (d) An embankment structure that falls within the Dam Safety Act, 2021 is subject to that Act in addition to this Manual.

4.9.7 Excavated facilities. Facilities wholly below the surrounding ground, with no embankment, need not meet 4.9.6. They shall still meet 4.9.1, with the overflow route treated as the spillway.

Commentary. The spillway criterion (1% inflow, outlet blocked, basin full, 0.3 m freeboard; 0.2% for high hazard) follows the KC APWA 5600 (2006) rule: the spillway passes the 1% storm with 1 ft (0.3 m) freeboard to the top of the dam, assuming zero storage and a clogged primary outlet, with the crest at least 0.5 ft (0.15 m) above the 1% maximum water surface. KC designed dams above 10 ft (3 m) to SCS TR-60 Class C. The 2 m embankment trigger, the 3H:1V slope (KC wet ponds), and the 3 m crest width have no direct precedent and are set by this Manual.


4.10 Facility types

4.10.1 General. Any storage that meets Clauses 4.5 to 4.9 may be used. Surface storage that is visible and can be inspected without confined-space entry is preferred. Storage shall not be placed in a habitable basement or in any space whose flooding would endanger life.

4.10.2 Underground tanks and vaults.

  • (a) Gravity outlet is required where the receiving drain allows it. Pumped outlets are permitted only under Clause 5.12, with a registered maintenance declaration (Chapter 10).
  • (b) Access openings shall be provided over the outlet chamber and over every inlet. In tanks over 500 m², they shall be no more than 30 m apart.
  • (c) The floor shall fall at least 1% to a sump at the outlet, with a sediment pocket below the low-flow orifice invert.
  • (d) The tank shall be ventilated.
  • (e) Inlets shall pass through a silt trap or gross pollutant trap (Chapter 8).
  • (f) Flotation and groundwater ingress shall be checked under Clause 4.12.

4.10.3 Rooftop detention.

  • (a) It is permitted on flat roofs designed for the full ponded load with the outlet blocked. The ponding depth shall not exceed 150 mm unless a structural engineer certifies a greater depth.
  • (b) Each roof outlet shall have a flow-control ring or weir with a certified rating, and every roof area shall have at least one overflow scupper, independent of the controlled outlets, that passes the 1% AEP inflow.
  • (c) Roofs used for RWH collection may also provide rooftop detention. The detained volume is released through the control, not into the RWH sump.

4.10.4 Podium and landscape-deck detention.

  • (a) It is permitted above ground level or above a basement car park, provided the structure is designed for full saturation and ponding, and waterproofed.
  • (b) The release, overflow and safety rules for rooftop detention (4.10.3) apply.

4.10.5 Parking-lot detention.

  • (a) It is permitted only on surface parking. Ponding depth shall not exceed:
    • 200 mm in the 10% AEP storm and 300 mm in the 1% AEP storm at any parking bay;
    • zero on accessible routes, ramps and pedestrian crossings; and
    • zero in the 10% AEP storm on fire-tender access routes.
  • (b) Signs shall warn that the area floods.
  • (c) Ponding shall not reach a building wall unless the wall is waterproofed above the 1% level plus freeboard (Chapter 6).

4.10.6 Multi-use detention (parks, playfields, open space reservation).

  • (a) Open space land may be used for detention, provided its primary use remains available in at least the 50% AEP storm.
  • (b) The storage areas shall be graded to drain fully within the times of Clause 4.7.
  • (c) A low-flow channel or underdrain shall carry dry-weather and frequent flows, so that the park is not waterlogged.
  • (d) The depth and slope limits of Clause 4.15 apply.
  • (e) Play equipment and seating shall be placed above the 10% AEP level.

4.10.7 Ponds and wet basins.

  • (a) A permanent pool shall be at least 1.2 m deep over most of its area to discourage weed growth and mosquito breeding, with a vegetated safety bench at the edge (Clause 4.15).
  • (b) Only storage above the permanent pool counts as detention.

Commentary.

  • The rooftop depth (150 mm) and parking depths (200 and 300 mm) have no direct precedent. This Manual sets them so that a blocked outlet is noticed before it becomes dangerous.
  • The 1.2 m pool depth equals the 4 ft minimum permanent pool of KC APWA 5600 (2006). This Manual adopts it mainly for weed and mosquito control.
  • Pumped detention tanks need maintenance declarations in Singapore (PUB Addendum No. 3, April 2025). This Manual adopts the same approach through Chapter 10.
  • Using open space for multi-use detention fits the soft-cover rules of the building rules, under which a plot keeps at least 10% of its area as soft cover in Category I (under 5,000 sq ft) and at least 20% in Categories II and III (Bye-Laws 2021, Table G1), a new building in the City Centre Zone earmarks 30% of the plot "for open space with soft cover and landscaping" (D8.2), and, in the Khasi Hills Autonomous District, a plot keeps at least 15% as soft cover where the covered area is 500 m² or more and at least 10% otherwise, with "Semi-pervious ground cover … as paving wherever possible" (KHADC Regulation 2015, s.35(iii)). On the tested alluvium of the Garo foothill plains and the valley fills of Ri-Bhoi, on flat ground, a detention area graded into the open space below the level of the road keeps it pervious and usable, which is what 4.10.6 requires, and can also infiltrate under Clause 4.11 (recharge rule). Everywhere else the position is different. Ground on a natural slope of more than 10°, a terrace held up by a retaining wall, land within twice the height of a cut or wall downslope of it, colluvium, fill and slide debris, mapped landslide ground, and any limestone, cave or coal-mining ground are not to be used for ponding, because water held there soaks into the slope or into voids (Clause 4.11, hill rule and karst and mine rule). On such sites, detention is provided in lined tanks, open or closed, with an orifice outlet and an overflow to a lined drain, on rooftops and podiums under 4.10.3 and 4.10.4, or on a level open space only where it stands on rock or on ground that the geotechnical certificate of the hill rule covers (never on limestone or mine ground); an excavated pond or basin on a slope is not accepted, and semi-pervious paving there is laid on a lined or non-exfiltrating base with an underdrain. Four kinds of land are not open space for this purpose. A pung, lake or spring on the land is preserved under step 1 of Clause 4.3.1; a pung is modelled as a water surface (Clause 3.3.2(e)) that starts at its spill level (Clause 3.12.5), so only its flood storage above that level can count, and only as Chapter 7 allows; and a natural or sacred pung is never turned into a detention pond. The setbacks of the Meghalaya Waterbodies (Conservation and Protection) Guidelines 2023 (3 m or 6 m from urban streams, 10–30 m from rural streams, 10–50 m from lakes and ponds, measured from the mean high flood level of the past ten years) and the Manual's corridor of Chapter 7 are flood land already: water reaches them first, so they are not counted as detention for the development beside them. And land kept open on purpose, such as a sacred grove (law kyntang) at the head of a stream, a forest or other land with "No development" under s.2.101 of the KHADC Regulation, the 40–50° "Regulated Slope" and the > 50° "Restricted Slope/No Construction Zone" of the Shillong Planning Area (NESAC, 2023; Bye-Laws 2021, Section I(a)), or a spring-recharge area above a town's intake (Clause 4.11), is not graded or paved for detention.

4.11 Rainwater harvesting versus detention accounting

4.11.1 No double counting. RWH storage (sumps, tanks, recharge pits and wells provided under the RWH mandate) shall not be counted as detention.

4.11.2 RWH sumps assumed full. For all routing under this chapter, RWH sumps and tanks shall be assumed full at the start of every storm, in every season. Their overflow shall be routed to the detention facility, or directly to the outfall if it bypasses detention. In the latter case the bypass flow counts against the PSD.

4.11.3 Combined tanks. A single tank may provide both RWH and detention only if:

  • (a) the detention zone lies wholly above the RWH overflow level;
  • (b) the detention zone is drained by its own gravity control orifice set at the RWH overflow level, meeting Clauses 4.7 and 4.8;
  • (c) no pump, valve or user action can hold water in the detention zone; and
  • (d) the two zones and the orifice level are shown on the drawings and in the maintenance declaration.

Only the volume between the RWH overflow level and the detention overflow level counts as detention.

4.11.4 Recharge structures. Recharge pits, trenches, shafts and wells may count as retention (not detention) if they meet Clauses 4.4.3 to 4.4.5. In particular, the seasonal high groundwater table shall be at least 1.0 m below their base. In the routing they are treated under Clause 4.4.6 with the groundwater level for the monsoon season.

4.11.5 RWH remains mandatory. Nothing in this chapter reduces the RWH requirement of Table G1 of the Bye-Laws 2021, section 36 of the Khasi Hills Autonomous District (Land Development and Building) Regulation 2015, any building rule of the Jaintia Hills or Garo Hills Autonomous District Council [TBC], the guidelines of the Central Ground Water Authority where they apply, any condition of a building permission, or any rainwater harvesting rule or direction of an approving authority.

Commentary. Rainwater harvesting in Meghalaya is required by two instruments, and neither sizes it. In the master-plan, municipal and scheme areas, Table G1 of the Bye-Laws 2021 lists "Rain Water Harvesting" for every plot category and use, adds "Ground water recharge for covered area more than 3000 sqft" for residential buildings in Category II (plots of 5,001–25,000 sq ft), and requires soft cover of at least 10% of the plot in Category I and 20% in Categories II and III; G2.1.2 gives a 10% rebate of the building-permission fee to buildings that "Undertake both recycling of waste water and rain water harvesting structures", and new buildings in the City Centre Zone "shall adopt rain water harvesting systems" (D8.2). In the Khasi Hills Autonomous District, "Water harvesting through storing of water runoff including rainwater in all existing and new buildings shall be mandatory", and "The plans submitted shall indicate the system of storm water drainage along with points of collection of rain water in surface reservoirs or in recharge wells" (KHADC Regulation 2015, s.36). The State told the NGT that RWH is "Incorporated as one of the conditions while giving building permission", with RWH being installed at 52 locations under the Smart City Mission (action-taken report, 21.03.2023). Neither instrument gives a storage volume, a roof-area rate, a drawdown or an infiltration test [N]. This Manual therefore sets a sizing rule for credit: RWH storage shall hold at least 25 L per m² of roof area (about 25 mm of rain over the roof). This is set by this Manual. The 20 L per m² of the mountain editions of this series is the precedent. It is raised by a quarter because Meghalaya's towns are supplied by gravity from "streams and springs" and face "acute shortage of water during the summer as the major part of rainfall is lost as surface run-off" (CGWB, GWRA 2022), while December to February is "practically dry" (CWC subzone 2(b) report), so the store is for the dry season, not for the storm; and because, with an annual normal of 225.3–242.5 cm at Shillong (CWC subzone 2(b) report, Annex 4.1), a larger tank still refills many times in the season. The rule makes the bye-laws' requirement measurable; it does not replace it, and a larger tank is always allowed. This Manual credits these structures against its own retention requirement (Clause 4.4) as follows:

  • An RWH tank under Table G1 or s.36 is RWH storage. It is not detention (Clause 4.11.1), and it is assumed full at the start of every storm (Clause 4.11.2), because in the monsoon season it is full after the first heavy rain. A tank may also provide detention only if it is built as a combined tank under Clause 4.11.3, with a detention zone above its RWH overflow level that drains through its own orifice; only that zone counts.
  • An RWH tank counts toward the retention requirement of Clause 4.4 only to the extent that it is emptied within 72 hours by a continuous non-potable use, such as toilet flushing or washing, demonstrated under Clause 4.4.3; watering a garden is not a continuous use in the monsoon season. The tank is then modelled under Clause 4.4.6 like any other retention practice. Outside the two recharge areas below, storage and reuse is the way retention is provided, and the 25 L per m² is the first part of it.
  • Recharge pits, trenches, shafts and wells count as retention only where they meet Clause 4.11.4 and the recharge rule below: they are credited only to the extent that they drain within 72 hours at half the rate measured in a site test (Clauses 4.4.3 and 4.4.5), with their base at least 1.0 m above the seasonal high water table, and the credit is found by routing under Clause 4.4.6, not by deducting their volume.
  • Hill rule. No deliberate infiltration practice (soakaway, soak pit, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base) shall be built or credited: on natural ground sloping more than 10°; on colluvium, fill or slide debris, whatever its slope; in a mapped landslide zone or landslide locality, among them, in Shillong, Laitumkhrah, Lawsohtun, Happy Valley, Mccabe Road, Bethesda and Arbuthnot and the very-high-susceptibility ground along NH-40 and near the Umshyrpi named in the IRADe/NMHS plan; or upslope of a cut slope or retaining wall within twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. On such sites roof runoff goes to rainwater storage of at least 25 L per m² of roof, with overflow to a lined drain that discharges through a sediment trap and an energy dissipator to a stable natural channel, never onto an unprotected slope. The rule applies in every sub-area of Annex 2A except on the tested alluvium of sub-area ML-A1 and the tested valley fills of Ri-Bhoi on flat ground. The Bye-Laws 2021 are its hooks: no construction above 50° and a limited regime on 40–50° (Section I(a)), cuts of 3.00 m, or 6.00 m to the crest of an RCC wall, with a report of the Geological Survey of India beyond (B1(vii); the same limits in s.34(v) of the KHADC Regulation), and "good drainage facilities to prevent excessive saturation of sub-surface formations" (Section I(b)1). Where the geotechnical report of B1(vi) or the GSI report of B1(vii) is required, it shall also state whether the site's drainage, storage and any infiltration add water to the slope. On these sites, retention is provided by storage and reuse, and detention by lined tanks, not by ponds or basins on the slope (Commentary to Clause 4.10). The 1.0 m groundwater separation of Clause 4.4.3 does not make an infiltration practice acceptable on a slope: perched water and pore pressure in a slope are the hazard, not the depth to the water table.
  • Karst and mine rule. No deliberate infiltration practice shall be built or credited, and no geotechnical certificate makes one acceptable, on limestone (the Sohra–Shella limestones of sub-area ML-C and the Jaintia limestones of sub-areas ML-B1 and ML-C round Khliehriat, Lumshnong and Sutnga), within a coal-mining area (the rat-hole workings of the Jaintia and Garo coalfields), or where caves or sinkholes are known. There drains are lined, routed away from cave entrances and checked for void collapse along their alignment; drainage from mine spoil is not routed to a drinking-water intake or to any infiltration device; and pH and metals are added to the outfall checks of Chapter 8. Water put into limestone or a mine void does not stay where it is put: the CGWB describes a "Discontinuous aquifer in the cavernous limestones and sandstones area" (GWRA 2022, Table 1); in the coal belt "smaller streams and rivers either disappear or have become seasonal in nature as surface water trickles into and disappears in the unfilled mine pits and caves" (as reported); and the Krem Liat Prah–Um Im–Labit cave system of the Jaintia hills is reported to run for 30.9 km (as reported). No karst map, sinkhole inventory or subsidence record was found [TBC], so no test can show where the water goes, and the rule has no certificate exception.
  • Recharge rule. Recharge is not a design objective in Meghalaya: every assessment unit is safe, and the stage of groundwater extraction was 3.55% in GWRA 2022 (CGWB) and 4.60% in GWRA 2024 (as reported). Deliberate recharge is allowed only on the alluvium of sub-area ML-A1 (the Garo foothill plains and the Jinjiram valley, with water 3–5 m below ground) and on the valley fills of Ri-Bhoi in sub-area ML-A, where the NAQUIM tests gave a rainfall infiltration factor of 13% (GWRA 2022, §4.4), on ground sloping 10° or less, away from slide-prone slopes, after a field infiltration test, where the seasonal high water table stands more than 2 m below ground in the monsoon season and with the separation of Clause 4.12, and through a silt trap, a filter and a first-flush diverter ahead of the recharge structure. Everywhere else rainwater harvesting is storage and reuse for the dry season.
  • Where Table G1 asks for recharge on a forbidden site. Table G1's "Ground water recharge for covered area more than 3000 sqft", and the "recharge wells" of s.36 of the KHADC Regulation, can fall on a site where the hill rule or the karst and mine rule forbids infiltration. This Manual does not override the bye-law or the regulation. It states the conflict plainly: on such a site the Manual requires storage and reuse in place of recharge, with the overflow to a lined drain, and the applicant seeks the relaxation of the recharge requirement from the Authority, citing this rule and, where one is required, the geotechnical or GSI report. Until the Authority relaxes it, the bye-law requirement stands, and a recharge structure that the bye-law forces on such a site earns no credit under this Manual.
  • Springs and sacred groves. Springs and streams, not wells, supply most towns (GWRA 2022). The MBDA spring-shed programme is reported to have mapped 1,000 springs, or to hold an inventory of 1,400 (both as reported: the figures conflict), and the State reports work on 306 springsheds (State scheme page, as quoted). No spring statute was found; the hooks are s.62(b) of the Municipal Act, which vests "springs" in the Board, and s.15(1) of the KHADC Regulation, which protects "catchment areas, water sources, spring sheds, streams and rivers". In the recharge area of a spring above a town's intake, where it has been mapped, no surface shall be paved and no road or parking runoff shall be infiltrated; only clean roof runoff, passed through a filter, may be infiltrated, and only where the three rules above allow; and drains and fills shall not intercept or bury a spring outlet. A sacred grove (law kyntang) above a town is treated as a protected source catchment, with KHADC s.15 as the hook (all set by this Manual).
  • Polluted runoff. Runoff from fuel stations, workshops, industrial premises and the like, from mine spoil, and from any drain or jhora that carries sewage, as most of Shillong's drains do (Commentary to Clause 4.1), shall not be recharged; road and parking runoff shall be recharged, where the recharge rule allows it at all, only through a surface practice with a filter, such as a vegetated basin or trench, never directly into a bore or well (Chapter 8).

In the hills, water put into the ground does not stay where it is put. The IRADe/NMHS plan records that in Shillong "due to increasing levels of urbanization and unregulated construction work the natural drainage system is blocked", and names the landslide localities above; Meghalaya's landslides caused "approximately 22 deaths in 2014" (as cited from the Revenue and Disaster Management Department); and the landslides in 15 villages of Umling block in May 2025 were linked to hill cutting along NH-6 (as reported). In the monsoon season an RWH tank is full after the first heavy rain, and on the alluvium a recharge pit can sit in the water table. Treating RWH as detention would therefore credit storage that does not exist when it is needed. That is why this Manual assumes RWH tanks are full at the start of every storm. Applying the assumption to every season keeps one simple rule. The combined-tank provision (4.11.3) lets an owner build one structure, as long as the detention part is empty when the storm arrives. The 25 L per m² sizing rule, the hill rule, the karst and mine rule, the recharge rule, the treatment of the Table G1 conflict, the spring and sacred-grove rules and the polluted-runoff rule are set by this Manual. No Meghalaya source sets a slope or distance threshold for infiltration: the slopes in the Bye-Laws 2021 (40° and 50°) and in the NESAC classes are limits on building. The 10° limit is set by this Manual, as in the mountain editions of this series, well below those slopes, because a slope that can carry a building can still be destabilised by water put into it, and the distance of twice the height of a cut or wall is set by this Manual as a precaution, pending guidance from a geotechnical study for the State [TBC]. The karst and mine rule is new in this series; it has no certificate exception because, unlike a slope, a void cannot be seen from the surface.


4.12 High-groundwater and sandy coastal sites

4.12.1 Design groundwater level. Each site in the alluvium of the Garo foothill plains and the Jinjiram valley in sub-area ML-A1, where the water table stands 3–5 m below ground, the valley fills of Ri-Bhoi, the floodplains and low terraces of the rivers and the valley floors of the Umkhrah and Umshyrpi in Shillong, the limestone and sandstone ground of the escarpment and the Jaintia hills, where water stands 2–4 m below ground, the margins of Ward's Lake (Nan Polok), Thadlaskein (Pung Sajar Nangli) and the other pungs and lakes, the margins and backwaters of Umiam lake and the other MePGCL reservoirs, and hill sites with perched water or springs, or any area where the groundwater table lies within 3 m of the surface at any time of year shall establish a design groundwater level (DGWL) for the facility. The DGWL is the seasonal high level during or after the monsoon, from:

  • (a) site piezometer readings over at least one full April–November season; or
  • (b) where (a) is not available, the higher of the CGWB or Water Resources Department record for the nearest observation well, plus 0.5 m, and the design flood level of any adjacent river, stream, jhora, pung, lake or reservoir.

For the flotation check of 4.12.3 at sites in the alluvium of the Garo foothill plains and the Jinjiram valley, the valley fills of Ri-Bhoi, the river terraces and floodplains, and the pung, lake and reservoir margins, where (a) is not available, the DGWL shall be taken as existing ground level.

4.12.2 Lined storage. Where the DGWL is less than 1.0 m below the base of a storage facility:

  • (a) the facility shall be watertight (lined or of watertight concrete), and no infiltration credit applies (Clause 4.4.4); or
  • (b) if unlined, the volume below the DGWL shall not be counted as detention, and groundwater inflow shall be added to the routed inflow.

4.12.3 Uplift and flotation. Every below-ground tank, vault, lined pond or chamber shall be checked for flotation:

  • with the facility empty;
  • with groundwater at the DGWL; and
  • for coastal sites, with groundwater also at the major-system tailwater level of Chapter 5, where that is higher.

The factor of safety against uplift, counting only permanent dead loads and ignoring wall friction unless supported by geotechnical design, shall be at least 1.2. Anchoring by ballast, toe extensions or tension piles may be used.

4.12.4 Shallow and above-ground storage preferred. On sites where the DGWL is within 1.5 m of ground, storage should be provided above ground where possible: rooftop, podium, landscape or surface storage. Deep tanks should be avoided.

4.12.5 Durability. Concrete and metal parts in contact with saline or brackish groundwater or tidal water shall be designed for the exposure class appropriate to coastal conditions under IS 456:2000. Outlet fittings, trash racks and gates shall be of stainless steel, HDPE, FRP or another corrosion-resistant material.

4.12.6 Sandy soils with deep groundwater. Where the DGWL is 1.0 m or more below the base, infiltration retention in sandy soils is encouraged. The design infiltration rate of Clause 4.4.3 applies, and the Chapter 8 requirements on pollution of shallow aquifers shall be met.

Commentary. Meghalaya is landlocked, so the coastal provisions of this clause, the tidal water levels of 4.12.1 and 4.12.3, do not apply in the State, and no saline groundwater was reported in the assessments read for this Manual [TBC]. The CGWB reports groundwater with a pH of 5.4–8.2 and iron above the permissible limit at Shillong (11.25 mg/l), Nongpoh (5.7), Balat (7.2), Dawki (3.2), Bajengdoba (3.8) and Kharkutta (4.88 mg/l) (GWRA 2022), and runoff and seepage from the coal-mine spoil of the Jaintia and Garo hills is acid and metal-laden (as reported); in the coal-mining areas, and wherever a site test shows acid or iron-rich groundwater, the exposure provisions of 4.12.5 apply to concrete and metal parts as if the groundwater were aggressive, with the exposure class set from the test (set by this Manual). Groundwater lies at four kinds of depth (GWRA 2022, Table 1). In the alluvium of the Garo foothill plains it is shallow, 3–5 m below ground, in a thick continuous aquifer, and higher still beside the Jinjiram in flood. In the limestones and sandstones of the escarpment and the Jaintia hills it is at 2–4 m, in a discontinuous, cavernous aquifer, and in the coal belt the pits hold water at unknown levels. In the Garo Group of the Tura and Williamnagar hills it is at 4–9 m. On the plateau, in the gneiss and the Shillong Group, it is at 7–17 m in weathered and fractured rock, but perched water and springs occur in the slopes, and the valley floors of the Umkhrah and Umshyrpi in Shillong are wet when the streams rise. The Garo foothill plains, the valley fills of Ri-Bhoi, the river floodplains and low terraces, the valley floors of the Shillong streams, the margins of the pungs and lakes and of Umiam lake and the other reservoirs, and hill sites with perched water or springs are the wet cases. There an unlined tank fills with groundwater before the storm, and an empty lined tank can float, especially when a river in flood, a reservoir at its full level or a pung at its spill level raises the water table beside it. The design groundwater level of 4.12.1(b) therefore takes the design flood level of the adjacent river, stream, jhora, pung, lake or reservoir where that is higher than the well record, and on the alluvium of the Garo foothill plains and the Jinjiram valley, the valley fills of Ri-Bhoi, the river terraces and floodplains and the pung, lake and reservoir margins it is taken as existing ground level for the flotation check unless piezometers show otherwise. On a hill site, a deep tank is not preferred even where groundwater is deep, because a leaking tank on a slope is an infiltration practice by another name: storage on a slope or on limestone shall be lined and watertight, and its leakage and overflow taken to a lined drain (Clause 4.11). The April–November monitoring season of 4.12.1(a) is set by this Manual to cover the Manual's monsoon season of 1 April to 31 October, whose pre-monsoon storms can raise the water table in April and May, and the post-monsoon high after the withdrawal in mid-October; a reading taken in March understates the design level. Most of the State's observation wells are those of the CGWB, North Eastern Region, Guwahati. No monsoon water-table depths for individual town sites in Shillong, Tura, Jowai, Nongpoh or the Garo plains, and no map of the seasonal high water table, were obtained [TBC]. The factor of 1.2, the 0.5 m allowance, the "ground level" default for the plains, valley fills, floodplains and waterbody margins, and the exposure rule for acid groundwater have no direct precedent; this Manual sets them because no published site-scale seasonal groundwater depths for Meghalaya were found during research.


4.13 Regional detention and fee-in-lieu

4.13.1 Where permitted. In a basin covered by a Basin Stormwater Master Plan approved under Chapter 11, a development may meet all or part of its detention requirement through:

  • (a) a regional detention facility identified in the plan; or
  • (b) a fee-in-lieu paid toward restoration of pung or tank storage identified in the plan.

4.13.2 Conditions. Regional detention or fee-in-lieu shall be accepted only where:

  • (a) the regional facility or restored tank is operational, or is funded and scheduled to be operational within 3 years. Until then, interim on-site detention is required.
  • (b) the conveyance from the site to the facility carries the 1% AEP post-development flow without increasing water levels at buildings or roads between them (Chapter 5);
  • (c) the storage credited at a tank is the flood storage only. This is the volume between full tank level (FTL) and the maximum water level the bund and surplus weir can safely hold, plus any volume below FTL that a notified operating rule commits to empty before the monsoon. Storage below FTL that is held for irrigation or supply through April to October shall not be credited.
  • (d) the tank meets Chapter 7: surveyed FTL, a documented operating rule, and a maintained surplus weir;
  • (e) the site still provides retention (Clause 4.4) and WQv treatment (Chapter 8) on site; and
  • (f) in flood-sensitive catchments, the regional facility meets the mixed-frequency rule for its whole contributing area.

4.13.3 Fee. The fee-in-lieu shall be computed as:

Fee = (detention volume required on site under Clause 4.6, m³) × (unit rate, ₹/m³, notified by the Authority)

The unit rate shall include land, construction and 10 years of maintenance. Fees shall be held in a ring-fenced basin account and spent only on the facilities named in the plan.

4.13.4 Ledger. The Authority shall keep a public ledger of:

  • detention volume credited to each regional facility;
  • volume delivered; and
  • fees received and spent.

Commentary. The Malaysian DID (2008) checklist favoured community ponds over on-site detention for sites above 0.1 ha. Studies of on-site detention show that its benefit depends on location and fades with distance downstream (Colorado State University thesis; McEnroe for Kansas City), and that a pond low in the catchment can synchronise with the main-stem peak (Water 2016). Regional storage therefore has to be sited by basin modelling, not simply aggregated.

Meghalaya has no tank or lake Act, and no pung, lake or reservoir in its towns was found to be operated for flood control under a documented rule. The Meghalaya State Wetlands Authority was constituted on 1 November 2017 under the Wetlands (Conservation and Management) Rules 2017, with the Principal Chief Conservator of Forests as its member secretary (notification No. ENV.1/2007/Pt/110), but no wetland in the State was found notified under rule 4 of those Rules [TBC], and the State has no Ramsar site: of 225 waterbodies ground-truthed for the High Court in 2025, "none … qualify as a Ramsar site" (as reported). The State's regional storage is of five kinds: the reservoirs of MePGCL, Umiam lake (impounded in 1965; about 10.148 km² at full level, with a gross capacity reported to have fallen from 179.757 Mm³ in 1965 to 159.206 Mm³ in 2004, as reported), Kyrdemkulai, Nongkhyllem, New Umtru and Myntdu–Leshka; the small urban lakes, such as Ward's Lake (Nan Polok) in Shillong; the pungs (Khasi and Pnar: pond, pool or small lake; Garo: pokri), such as Thadlaskein (Pung Sajar Nangli) near Mukhla (as reported); the springs that supply most towns; and the river floodplains, which the Meghalaya Flood Plain Zoning Act 2026 can protect once zones are notified, as none yet is. Four points follow:

  • A pung on the record may not be a working pung, and a pung in the hills is not a detention basin. No inventory of the pungs, lakes and springs within the Municipal Boards and the Town Committees, with their beds, rims and outlets, was found [TBC]. A pung or lake is credited only after a survey shows its bed, rim and outlet, and only for the storage above its spill level; a natural, community or sacred pung is never turned into a detention pond, and engineered storage is called a detention pond. A spring-recharge area is not storage for detention (Commentary to Clause 4.11).
  • The reservoirs are not spare capacity for a site. They are small, held for power through the season and released "frequent[ly] … during Monsoon as well as during Non-monsoon period" (MePGCL guidelines); Umiam lake has lost storage to sediment since 1965 (as reported) and receives Shillong's sewage-laden streams; their storage below full level is not credited (Clause 4.13.2(c)); their releases are set by MePGCL for the whole river; and storm water spilled to a reservoir, or to a reach below a dam, can be relied on only with the written agreement of MePGCL, or of NEEPCO on the Kopili, for a stated flow and level.
  • A pond or check dam in the bed of a jhora or hill stream is not regional detention unless it is designed for debris and garbage. The jhoras carry boulders, slide debris and solid waste in every large storm (49,612 m³ of waste was removed from the Wahumkhrah under the 15th Finance Commission, with stone bunds and solid-waste traps built for ₹3.60 crore; State action-taken report to the NGT, 21.03.2023); such a facility is credited only for the storage left after the sediment and debris volume of Chapter 6, with a debris rack or trap at its inlet, a geotechnical check of its bund and abutments, its failure path mapped, and a maintenance budget for clearing it after each large storm (Chapters 9 and 10). A regional facility on a slope is also subject to the hill rule, and one on limestone or in a coal-mining area to the karst and mine rule, of Clause 4.11; in sub-areas ML-C and ML-C1 no storage is credited against the 24- to 72-hour storms (Clause 2.3.6).
  • No rule dividing natural streams from municipal drains was found [TBC]. Until one is made, this Manual follows the working assignment of Chapter 1: drains, public streams, springs and tanks within municipal limits as the Municipal Board's (Meghalaya Municipal Act 1973, s.62); roadside drains and culverts as the PWD (Roads)'s, and on NH-6 and the Shillong–Dawki road NHAI's or NHIDCL's; the Cantonment's drains as the Shillong Cantonment Board's; New Shillong's as NSTDA's [TBC]; rivers and flood works as the Water Resources Department's; village drains and jhoras outside municipal limits as the District Council's and the Dorbar Shnong's under the District Council's rules (the Garo Hills village institutions were not researched [TBC]); the reservoirs and release reaches as MePGCL's; catchment treatment as the Soil and Water Conservation Department's; and Smart City works as Shillong Smart City Ltd's (as reported). Each town keeps a drain-and-jhora register giving every reach its owner, its land status (community, clan, private or State) and whether it is a "waterbody" under the Waterbodies Guidelines (Commentary to Clause 6.9). This is the Manual's working assignment, not a statutory one; where land is community, clan or private, a drainage corridor or easement is secured by agreement with the landholding institution, not taken.

The first point is the basis of condition 4.13.2(c) in Meghalaya. A pung or lake gives flood storage only above its spill level, unless a notified operating rule commits it to be lowered before the monsoon season. The 3-year operational limit and the 10-year maintenance allowance have no direct precedent and are set by this Manual.


4.14 Simplified methods for small sites

4.14.1 Applicability. Tier B local bodies may permit the simplified method for sites of 2 ha or less outside flood-sensitive catchments. In flood-sensitive catchments, it may be used for sites of 0.5 ha or less. All other sites shall use Clause 4.6. Until Table 4.3 (Annex 4B) is published, all Tier B sites shall also use Clause 4.6.

4.14.2 Method.

  1. Read the PSD (L/s/ha) and SSR (m³/ha) for the site's zone, HSG and post-development imperviousness from Table 4.3 (Annex 4B).
  2. Required storage: V = SSR × A − V_credit (Clause 4.4.6.3).
  3. Permissible discharges: Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages.
  4. Select the low-flow orifice and upper control from the standard outlet table in Annex 4B (orifice sizes for the PSD at the stated depths), subject to the 50 mm minimum.
  5. Provide a spillway or overflow under Clause 4.9, the RWH accounting of Clause 4.11, and the safety provisions of Clause 4.15.
  6. Complete Form 4-2 (Tier B site sheet).

Table 4.3 — Tier B permissible site discharge and site storage requirement (template)

Zone (Annex 2A) HSG Imperviousness PSD 2-yr (L/s/ha) PSD 100-yr (L/s/ha), standard PSD 100-yr (L/s/ha), flood-sensitive SSR (m³/ha), standard SSR (m³/ha), flood-sensitive
ML-Z1 Northern foothills: ML-A Northern foothills and Ri-Bhoi (Nongpoh–Umsning–Byrnihat–Umiam) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
ML-Z1 Northern foothills: ML-A1 Garo foothills and plains (Resubelpara–Mendipathar–Tikrikilla–Phulbari) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
ML-Z2 Plateau: ML-B Shillong plateau (Shillong–Mawphlang–Nongstoin–Mairang) C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
ML-Z2 Plateau: ML-B1 Jaintia hills karst and mine belt (Jowai–Khliehriat–Sutnga–Ladrymbai) C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
ML-Z3 Southern escarpment: ML-C Southern escarpment (Sohra–Mawsynram–Shella–Pynursla–Dawki) — — Not tabulated: Clause 4.6 applies (Clause 2.3.6(c)(ii)) — — — —
ML-Z3 Southern escarpment: ML-C1 South Garo slopes (Baghmara–Siju–Gasuapara) — — Not tabulated: Clause 4.6 applies (Clause 2.3.6(c)(ii)) — — — —
ML-Z4 Garo hills: ML-D Garo hills interior (Tura–Williamnagar–Rongjeng–Ampati–Dalu) C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]

Worked example (illustrative — not design values).

A 0.4 ha residential layout in a Tier B Municipality, in a flood-sensitive catchment, with about 80% directly connected impervious area (area-weighted post-development CN about 92). Suppose Table 4.3 had been computed and gave the per-hectare equivalent of the Clause 4.6.7 example:

  • PSD 100-yr = 356 / 2.0 = 178 L/s/ha
  • SSR = 2,913 / 2.0 ≈ 1,460 m³/ha
  • PSD 2-yr ≈ 17 L/s/ha

Then:

  • Storage: V = 1,460 × 0.4 = 584 m³. C_R = 0, so there is no retention credit.
  • 100-yr release: 178 × 0.4 = 71 L/s.
  • 2-yr release: 17 × 0.4 = 7 L/s. At about 1 m head this needs a low-flow orifice of about 60 mm, above the 50 mm minimum (Clause 4.8.2).
  • Layout options:
    • a 400 m² underground tank 1.5 m deep; or
    • 250 m² of podium storage at 0.3 m (75 m³) plus a 350 m² tank 1.5 m deep (525 m³).
    • Rooftop storage at 150 mm over 1,200 m² of roof (180 m³) could replace part of the tank.
  • RWH sumps are additional, and are assumed full (Clause 4.11).

Commentary. Australian councils use permissible site discharge and site storage requirement tables in the same way (Sydney Water OSD guide; the Upper Parramatta River Catchment Trust handbook listed SSR of about 455 m³/ha). The illustrative SSR here, about 1,460 m³/ha, is much larger. That is the expected effect of combining a mixed-frequency cap with mandatory 48–72-hour storms at AMC III. MSMA 2 in Malaysia offers a similar simplified OSD method for sites under 5 ha. The MARC policy supplement offers smaller Kansas City municipalities adoptable alternatives within the regional standard; Clause 4.14 follows that model for Tier B.

4.14.3 Fixed-coefficient route. As an alternative to Clauses 4.6 and 4.14.2, the designer of any site of 1 ha or less, under any Approving Authority and in any catchment, may size detention by Clauses 4.14.4 to 4.14.7. The route shall not be used where:

  • (a) the site counts tank or waterbody storage in its design (Chapter 7);
  • (b) any part of the site lies within a waterbody setback (Chapter 7); or
  • (c) the site drains to a tank cascade whose storage is counted in a downstream design.

The route sets the release caps by fixed coefficients and does not need Table 4.3. It may therefore be used before Annex 4B is published. Retention (Clause 4.4), drawdown (Clause 4.7), outlets (Clause 4.8), the spillway (Clause 4.9), the downstream and tailwater checks (Chapter 5) and water quality (Chapter 8) still apply.

4.14.4 Release caps. Two caps apply at each point where runoff leaves the site:

Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A

where Q_cap is in L/s; A is the site area (ha); i_10 and i_2 are the 10% AEP (10-yr) and 50% AEP (2-yr) rainfall intensities (mm/h) for a 15-minute duration at the site, from the sources of Chapter 2, with the climate factor of Clause 2.8; and C_10 and C_2 are the fixed coefficients of Table 4.3A for the site's hydrologic soil group (Clause 3.7). For a site with more than one soil group, the coefficients are area-weighted.

Table 4.3A — Fixed release coefficients (provisional)

Hydrologic soil group C_10 C_2
A (sandy, well drained) 0.05 0.02
B 0.08 0.03
C 0.15 0.08
D (clay, poorly drained) 0.25 0.15

Q_cap,10 is the maximum release for every storm up to and including the 1% AEP (100-yr) storm, in every catchment. Q_cap,2 is the maximum release for the 50% AEP (2-yr) storm. Where a cap is smaller than the discharge of a 50 mm orifice at the corresponding stage, the 50 mm orifice is deemed to comply (Clause 4.5.5.1).

4.14.5 Storage. The detention storage V (m³) is the larger of V_100 and V_2, each the largest over the durations d of Clause 2.5.2 (1 to 72 hours):

V_100 = max over d of [ 10 × C_v × P_100(d) × A − 1.8 × Q_cap,10 × d ]

V_2 = max over d of [ 10 × C_v × P_2(d) × A − 1.8 × Q_cap,2 × d ]

where P_100(d) and P_2(d) are the 1% and 50% AEP rainfall depths (mm) for duration d (hours), with the climate factor; and C_v is the post-development volumetric coefficient: the composite C of Table 3.2 (upper half of each range), multiplied by Cf of Table 3.3 for the 1% AEP. For durations of 12 hours or more, C for every pervious surface shall be taken as not less than 0.50. The factor 1.8 assumes an average release of half the cap over the storm (3.6 × 0.5).

4.14.6 Outlet. The outlet shall be a two-stage control: a low-flow orifice that passes Q_cap,2 when the storage holding V_2 is full, and an upper orifice or weir that limits the total release to Q_cap,10 at the top of V. The outlet table of Annex 4B may be used once it is published.

4.14.7 Retention. The retention volume of Clause 4.4 is provided in addition to V. No retention credit (Clause 4.4.6) is taken under this route.

Figure 4.3 — Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic) Schematic. Left: cumulative inflow volume against storm duration for the 1% and 50% AEP storms, with straight release lines 1.8 x Q_cap x d; the storage is the largest vertical gap. Right: two-stage outlet. Not to scale. Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3–4.14.7) — schematic, not to scale 0 12 24 36 48 60 72 Storm duration d (h) Volume (m³) V_100 = largest gap V_2 = largest gap 1% AEP inflow 10·C_v·P_100(d)·A Release line 1.8·Q_cap,10·d 50% AEP inflow 10·C_v·P_2(d)·A Release line 1.8·Q_cap,2·d Dots: durations of Clause 2.5.2 (1, 2, 3, 6, 12, 24, 48, 72 h). Pervious C ≥ 0.50 for d ≥ 12 h. Two-stage outlet (Clause 4.14.6) Top of V Top of V_2 Overflow / spillway (Clause 4.9) Upper orifice or weir: total release ≤ Q_cap,10 at top of V Low-flow orifice (≥ 50 mm): passes Q_cap,2 at top of V_2 Retention (Clause 4.4) is provided in addition; no retention credit (Clause 4.14.7) Q_cap,10 = 2.78 × C_10 × i_10 × A ; Q_cap,2 = 2.78 × C_2 × i_2 × A ; (L/s; A in ha; i in mm/h) C_10, C_2 from Table 4.3A by soil group; i_10, i_2 for a 15-minute duration with the climate factor (Clause 2.8) V = max(V_100, V_2); V_T = max over d of [ 10 × C_v × P_T(d) × A − 1.8 × Q_cap × d ] (m³) ; 1.8 = 3.6 × 0.5 (average release of half the cap)

Figure 4.3 — Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3 to 4.14.7): the release caps Q_cap,10 and Q_cap,2 from Table 4.3A; the storage V as the largest gap, over the durations of Clause 2.5.2, between the cumulative inflow 10·C_v·P(d)·A and the release line 1.8·Q_cap·d, for the 1% and 50% AEP storms; and the two-stage outlet that passes Q_cap,2 at the top of V_2 and Q_cap,10 at the top of V. Schematic, not to scale. Original drawing for this Manual, adapted from the rainfall mass-curve (inflow minus outflow) storage concept and the single-coefficient peak cap of the PUB Code of Practice on Surface Water Drainage, 7th ed. (cl. 7.1.5).

Commentary. The fixed-coefficient route follows Singapore, which caps the peak runoff from every development of 0.2 ha or more with one runoff coefficient, C = 0.55, applied to the 10-yr storm (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5, Addendum No. 3, 2025). It is quick to apply and quick to check: the cap needs only the site area, the soil group and two intensities. PUB's 0.55 is not used here, because Singapore's baseline is the existing urban drainage system, while this Manual's baseline is greenfield land (Clause 4.5.1.2). The coefficients of Table 4.3A are set by this Manual from the greenfield curve numbers of Clause 3.3 (CN 39, 61, 74 and 80 for soil groups A to D). They are the ratios of runoff to rainfall that those curve numbers give for 1-hour depths typical of the Shillong plateau, rounded down. They are therefore provisional. The State Stormwater Technical Committee shall confirm or revise them against NIH-DHAARA values for each zone when it issues Annex 4B.

The route is deliberately stricter than the full method, so that simplicity costs the developer storage rather than costing the people downstream. The 100-yr release is held to about the greenfield 10-yr peak everywhere, which is the flood-sensitive rule of Clause 4.5.3; the storage assumes the outlet releases only half the cap on average; pervious ground is assumed wet in long storms; and no retention credit is taken. A designer who wants a smaller tank can use the full method of Clause 4.6. The storage formula is the rainfall-mass (inflow minus outflow) method. Clause 3.4.2 otherwise forbids rainfall-based peak methods for storage, because they ignore the shape of the hydrograph; this route is a stated exception because its conservative assumptions cover that error for small sites, and the 24- to 72-hour durations are always checked.


4.15 Safety, fencing and multi-use

4.15.1 Depth limits for publicly accessible storage. Where the public has access to a storage area (parks, playfields, open space, school grounds):

  • (a) maximum depth in the 10% AEP storm: 0.45 m;
  • (b) maximum depth in the 1% AEP storm: 1.2 m, except in a fenced zone under 4.15.3;
  • (c) side slopes: no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter for escape; and
  • (d) no vertical drop greater than 0.3 m within the storage area or at its edge.

4.15.2 Wet basins. Permanent pools shall have:

  • a safety bench at least 3 m wide, no more than 0.3 m below the normal water level; and
  • an emergent planting fringe that deters entry.

4.15.3 Fencing. A fence at least 1.2 m high, of a non-climbable design with a lockable gate, is required around any part of a storage that:

  • has a vertical wall or headwall drop greater than 0.6 m;
  • exceeds 1.2 m depth in the 1% AEP storm with slopes steeper than 4H:1V; or
  • contains an outlet structure with an opening larger than 300 mm that is not grated.

4.15.4 Outlets. Every inlet and outlet opening larger than 300 mm accessible to the public shall be fitted with a grate or rack. The grate shall be designed so that a person pinned against it can escape: low approach velocity, inclined, with a large open area.

4.15.5 Signs and depth markers. Every publicly accessible storage shall have signs in Khasi or Garo and English stating that the area floods during rain, and a depth marker at the deepest point.

4.15.6 Confined spaces. Underground tanks shall have lockable covers. They shall be marked as confined spaces, and the maintenance declaration (Chapter 10) shall state the entry procedure.

4.15.7 Vector control. Dry storage shall drain completely (Clause 4.7) and have no low points that pond for more than 72 hours. Wet basins shall meet Clause 4.10.7.

Commentary. The numeric limits in Clause 4.15 have no single direct precedent. They are drawn from common international practice, for example KC APWA 5600 (2006), which required at least a quarter of a dry-pond perimeter at 5:1 or flatter, a 20 ft (6 m) clearance from property lines and a 15 ft (4.6 m) maintenance strip. They are made somewhat stricter here because multi-use storage on open space land and in schools will be used by children during the monsoon. Standing water in dry basins is a mosquito-breeding risk, so complete drainage (Clause 4.15.7) is a public-health requirement, not an amenity.


4.16 Basis: why peak matching alone fails

Commentary. This section has no requirements. It records why this chapter requires release below pre-development rates, retention, long-duration checks and a downstream analysis, rather than simple peak matching.

  1. Timing. Detention lowers a site's peak but stretches its hydrograph (Figure 4.1). Downstream, the stretched releases from many sites overlap with each other and with the main-stem peak. In Denver's study, ten basins each releasing 100% of the historic 100-yr peak produced 106% of the historic peak at the outlet. Only releasing 90% at each site brought it to 97% (UDFCD memo, 2012). A Colorado State University thesis found that location-blind on-site detention "can actually increase peak flows above post-development peaks". An optimisation study found that a downstream pond performed worse than upstream ponds because its outflow synchronised with the main stem (Water 2016, 8(7):290).
  2. Volume. Detention does not remove volume. In the illustrative example, the post-development 100-yr storm produces about three times the runoff volume of the pre-development 10-yr storm (Clause 2.11). Only retention, or storage that empties to somewhere other than the receiving drain, reduces volume.
  3. Scale. Kansas City modelling (McEnroe, 2005) found that uniform 3 cfs/ac control reduced Q100 by 36% in a 200-ac watershed. With the same control everywhere, Q100 still rose by 40% at 14 sq mi, and the benefit faded beyond about 1–2 sq mi. The KC committee concluded that "'match existing' can harm streams" (MARC Evolution deck). Georgia makes a ten-percent downstream analysis mandatory for the same reason: "Due to peak flow timing and runoff volume effects, some structural practices fail to reduce discharge peaks to pre-development levels downstream" (GSMM 2016).
  4. Design-storm dependence. An Australian study of 20 real on-site detention systems found that designs using even ten temporal patterns "cannot reliably produce an OSD system design that will always be effective" under real rainfall (Water Science and Engineering, 2019). This is why Clause 4.6.3 routes the full duration matrix rather than one critical storm.
  5. Closed outfalls. In Meghalaya the governing failure takes three forms. On the valley floors of Shillong it is a stream that rises faster than the drains can empty: Polo, Pynthorbah, Nongmynsong, Forest Colony and Mawlai flood "with nearly every heavy downpour" when the Wah Umkhrah overflows, a flooding attributed to "clogging of Wah Umkhrah and the decreasing width of the river due to human activities" (as reported; the same text in the IRADe/NMHS plan), and NESAC found that "Encroachment and clogging of channels are the main causes of flooding over Shillong" and that "the water tops the banks along most of the streams" (NESAC, 2023). The Umkhrah and the Umshyrpi have no gauge, so how long they stay above a drain's outlet is not recorded anywhere. On the reservoirs and below the dams it is volume with no outlet: Umiam lake, Kyrdemkulai, Nongkhyllem, New Umtru and Myntdu–Leshka are held near their full levels for power, their releases are set by MePGCL and announced by siren, telephone or SMS rather than by notice (MePGCL guidelines), and when a reservoir is at that level every drain below it discharges to a water surface that cannot fall until the operator releases. On the Garo plains, the Jinjiram and the Brahmaputra back up into the foothill streams, as in September 2012 ("over 100 villages", IRADe/NMHS plan, Table 17) and September 2014, when the Brahmaputra and the Jinjiram "submerged over 200 villages" (as reported). Everywhere in the hills the outfall can also be closed by debris and garbage: the jhoras rise within minutes and carry boulders, slide debris and solid waste that bury outfalls and block culverts, and 49,612 m³ of waste was removed from the Wahumkhrah alone under the 15th Finance Commission (State action-taken report to the NGT, 21.03.2023). No hourly record of how long any river, reservoir or pung in Meghalaya stays above a town's outfalls was obtained [TBC], no CWC site in the State has a warning or danger level, and no document was found that sets a design river level for an outfall; Chapter 5 sets the design level and the closure to be assumed (Clause 5.8.5), and Chapters 6 and 9 the debris and blockage allowances. A perfectly orificed basin behind a closed outfall simply fills. No release-rate rule can fix that; it is handled by the outfall-closed check of Chapter 5.

The response in this Manual is layered:

  • release below pre-development (Clause 4.5);
  • retain the frequent storms (Clause 4.4);
  • route long monsoon storms (Clause 4.6.3);
  • prefer regional storage in the pung system (Clause 4.13); and
  • check downstream and at the outfall (Chapter 5).

Kansas City's own history shows the price. On a test site, peak matching needed 3.0 ac-ft of storage and the 2011 comprehensive criteria needed 4.9 ac-ft (MARC Evolution deck). Over-detention costs more storage. That is the cost of protecting the catchment rather than only the site boundary.


4.17 Submittal requirements

Every site runoff-control submittal shall include a Site Runoff Control Report (Form 4-1) containing:

  1. the Design Rainfall Sheet (Form 2-1) and the hydrology inputs (Chapter 3);
  2. the evidence for the order of measures under Clause 4.3.1;
  3. the RRV computation, infiltration tests, groundwater evidence and drawdown calculation (Clause 4.4);
  4. the retention credit computation (Clause 4.4.6);
  5. the release-rate criterion applied, standard or flood-sensitive, with the Annex 4A map extract (Clause 4.5);
  6. a results table in the format of Clause 4.6.7 for every AEP and duration, with the governing case highlighted;
  7. stage–storage and stage–discharge tables and plots, and inflow/outflow hydrographs for the governing cases;
  8. the drawdown calculation (Clause 4.7);
  9. outlet details, including orifice sizes and levels, trash racks and anti-vortex devices (Clause 4.8);
  10. the spillway or overflow calculation, freeboard and hazard classification, and the geotechnical report where required (Clause 4.9);
  11. the RWH and detention accounting, with tank sections showing zone levels (Clause 4.11);
  12. the design groundwater level and flotation check (Clause 4.12);
  13. the downstream and tailwater report (Chapter 5, Form 5-1); and
  14. the safety provisions (Clause 4.15) and the draft maintenance declaration (Chapter 10).

Tier B sites using Clause 4.14.2 shall submit Form 4-2 in place of items 6 and 7. Sites using the fixed-coefficient route (Clause 4.14.3) shall submit Form 4-3 in place of items 6 and 7.


References (chapter)

  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01 (approved 10 Dec 2025). https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
  • Mid-America Regional Council (2025). APWA 5600 Stormwater Standards Policy Supplement (7 Nov 2025); APWA 5600 Manual factsheet. https://www.marc.org/document/apwa-stormwater-standards-supplement ; https://www.marc.org/document/apwa-5600-manual-factsheet
  • Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.8, 5608.4). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
  • MARC / APWA (2012). Manual of Best Management Practices for Stormwater Quality. https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
  • MARC. The Evolution of Regional Stormwater Design Standards (presentation; McEnroe 2005 results). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
  • Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Volume 1. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
  • Urban Drainage and Flood Control District (now MHFD) (2012). Full Spectrum Detention Release Rate Memorandum. https://mhfd.specialdistrict.org/files/23cb85ce8/UDFCD_Full_Spectrum_Detention_Release_Rate_Memorandum.pdf
  • Mile High Flood District. Urban Storm Drainage Criteria Manual, Volume 2 (Storage).
  • Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
  • Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd ed.
  • PUB Singapore (2024). On-site Detention Tank Technical Guide, Rev. 3; Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3 (16 Apr 2025). https://www.pub.gov.sg/-/media/PUB/PDF/detentionTank.pdf
  • Sydney Water (2020). On-site Stormwater Detention Guide (SW201). https://www.sydneywater.com.au/content/dam/sydneywater/documents/on-site-stormwater-detention-guide.pdf
  • Upper Parramatta River Catchment Trust (2005). On-site Stormwater Detention Handbook, 4th ed.
  • "On-site stormwater detention for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
  • Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
  • Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
  • Forest and Environment Department, Government of Meghalaya. Notification No. ENV.1/2007/Pt/110 of 1 November 2017 (Gazette of Meghalaya, 16 November 2017), constituting the Meghalaya State Wetlands Authority under rule 5(1) of the Wetlands (Conservation and Management) Rules 2017; and No. ENV.I/2007/Pt-II/102 of 15 September 2023 (officers who may take cognizance under rule 4). https://megpns.gov.in/gazette/2017/11/16-11-17-IIA.pdf
  • Forest and Environment Department. Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, No. FOR/CC/29/2019/Pt/688 of 25 August 2023 (Gazette Part IIA, 7 September 2023, with the report of the Expert Committee on Umiam), as amended by No. FOR/CC/29/2019/1140 of 13 February 2024 and No. FOR/CC/29/2019/Pt/771 of 6 July 2026. https://megpns.gov.in/gazette/2023/09/07-09-23-IIA.pdf
  • MePGCL. Gate-operation guidelines for the Umiam–Umtru Stage III and Stage IV, New Umtru and Myntdu–Leshka Stage I reservoirs (levels; release reaches; warnings by siren, telephone or SMS).
  • Reports on the Umiam (Barapani) reservoir (water spread, catchment and capacity surveys; full level and releases), Ward's Lake (Nan Polok) and Thadlaskein (Pung Sajar Nangli), and on the waterbodies ground-truthed before the High Court in 2025 (India Water Portal; Highland Post; other press reports; as reported).
  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A (§8.5).
  • Urban Affairs Department, Government of Meghalaya. Meghalaya Building Bye-Laws, 2021, Notification No. UAU.73/2016/Pt/402 of 9 March 2021 (Gazette of Meghalaya No. 12, Part IIA, 25 March 2021), under section 74 of the Meghalaya Town and Country Planning Act, 1973: A1.2, A2.7, A2.8(j), A2.16, A2.37, B1, B1.1, B2(ii)(c), C12, D4.2, D4.6, D5.6, D8.2, Section G (Table G1, G2.1.2) and the drawing requirements. https://megurban.gov.in/laws/BuildingByeLaws.pdf ; amendments read: No. UAU.73/2016/Pt/55 of 29 February 2024 (Section I); No. UAU.73/2016/Pt.III/76 of 19 November 2024; No. UAU.73/2016/Pt.VIII/191 of 15 January 2025; No. UAU.73/2016/Pt.VII/97 of 18 June 2025; No. UAU.110/2020/208 of 13 August 2025; No. UAU.73/2016/Pt.III(A)/70 of 21 October 2025 (B10); No. UAU.73/2016/Pt VIII-A/22 of 19 December 2025; No. UAU.73/2016/Pt.VIII/203 of 7 May 2026.
  • Khasi Hills Autonomous District Council. Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015, Executive Committee Notification No. DC.II/Genl/31/2015/9 of 4 August 2015 (Gazette Extraordinary No. 97, 25 August 2015): ss. 2.101, 15, 34, 35, 36 and 40.3 and the forms. https://megpns.gov.in/gazette/2015/08/25-08-15-X.pdf
  • Meghalaya Municipal Act, 1973 (the Assam Municipal Act, 1956, as adapted), ss. 62, 68, 73, 164, 171, 190, 201, 204–206, 208 and 212, as amended by the Meghalaya Municipal (Amendment) Act, 2021 (Act No. 4 of 2021). https://megurban.gov.in/laws/mma.pdf
  • Meghalaya Flood Plain Zoning Bill, 2026 (Gazette Extraordinary Part V, 23 February 2026, No. LB.43/LA/2026/2), ss. 2 and 12; the Act, as Act No. 4 of 2026 assented on 6 March 2026, known from a search snippet of notification No. LL(B)14/2026/2. https://megpns.gov.in/gazette/2026/02/23-02-26-X.pdf
  • Forest and Environment Department. Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, No. FOR/CC/29/2019/Pt/688 of 25 August 2023, as amended in 2024 and 2026 (paras 2, 7 and 10; Appendices).
  • North Eastern Space Applications Centre (2023). Formulation of Risk Informed GIS Based Master Plan, Shillong Planning Area, Version 1.0, May 2023; and the Shillong Master Plan 2041 (notified by No. UAU.76/2022/Pt.I/74 of 27 November 2024, as cited in No. UAU.76/2022/Pt.I/186 of 29 October 2025). Draft risk-informed master plan for Tura, notice No. UAU.76/2022/129 of 16 February 2024.
  • IRADe, for the National Mission on Himalayan Studies (2020). Disaster Resilience Action Plan, Shillong, IRADe-PR-73(2020).
  • Government of Meghalaya. Action-taken report of 21 March 2023 in NGT O.A. 192/2022 (In re: News item, The Shillong Times, 23.02.2022), and the report of the CPCB–MSPCB Joint Committee of 28 February 2023; minutes of the stakeholder meeting on the Wah Umkhrah, Wah Umshyrpi and Wah Umkhen, 14 April 2023 (Shillong Municipal Board).
  • Central Ground Water Board, North Eastern Region (2022). Dynamic Ground Water Resources of Meghalaya (GWRA 2022); GWRA 2024 (as reported).
  • Comptroller and Auditor General of India. Performance Audit on Solid Waste Management in Urban Areas of Meghalaya (2017-18 to 2021-22), executive summary; report number not confirmed [TBC].
  • Reports on the rejection of the Bye-Laws 2021 by the KHADC Executive Committee (25 October 2021), the KHBSRA (2020), the Water Resources Department's project report for the Wahumkhrah and the Umshyrpi, and the floods and landslides of 2014, 2022, 2024, 2025 and 2026 (OhMeghalaya; The Shillong Times; Highland Post; Down To Earth; BorderLens; as reported).
  • Bureau of Indian Standards. IS 456:2000 Plain and Reinforced Concrete — Code of Practice.
  • Government of India. Dam Safety Act, 2021.
  • Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill (AMC conversion).

Annexes and forms

Annex / Form Content
4A Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map
4B Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A)
4C Worked example (Tier A) with full routing tables
Form 4-1 Site Runoff Control Report
Form 4-2 Tier B Site Sheet
Form 4-3 Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7)