Chapter 7Waterbodies, Pungs (Ponds and Lakes) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (pung) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Meghalaya, a landlocked State with no Ramsar site, means the Umiam (Barapani) reservoir and the other reservoirs of MePGCL with their drawdown zones, the pungs and small lakes, such as Ward's Lake (Nan Polok) in Shillong and Thadlaskein (Pung Sajar Nangli), the bogs and seepage ground of springs, the marshes (chibol) and waterlogged ground of the Garo plains along the Jinjiram, any wetland notified under the 2017 Rules (none was found notified), and the 225 water bodies ground-truthed for the High Court in 2025 (as reported);
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Meghalaya Town and Country Planning Act, 1973 and the Meghalaya Building Bye-Laws, 2021 made under it, the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, the Meghalaya Flood Plain Zoning Act, 2026, the Meghalaya Municipal Act, 1973, the Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015 and the other instruments of the District Councils, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river or stream (wah in Khasi and Pnar; chibima, a river, or chiring, a brook, in Garo), such as the Umiam, the Umkhrah and the Umshyrpi, which join as the Wah Roro above the Umiam lake, the Umkhen and the Wah Tamdong at Shillong, the Myntdu at Jowai, the Umngot at Dawki, the Umtru, the Kynshi, the Simsang, the Ganol at Tura, the Bugi and the Dareng in the south Garo hills, and the Jinjiram and the Krishnai on the Garo plains; jhora (a small hill stream, perennial or seasonal, into which the drains of a hill town fall); drain (nur or muri in Khasi, dooid in Pnar); pung (a pond, pool or small lake, natural or dug, such as Thadlaskein, Pung Sajar Nangli, near Mukhla); lake or built tank (nan, such as Ward's Lake, Nan Polok, in Shillong); reservoir or pondage, such as the Umiam (Barapani) reservoir and the reservoirs of MePGCL at Kyrdemkulai, Nongkhyllem, New Umtru and Myntdu–Leshka; spring (umpohliew) with its recharge area; wetland, marsh or bog (chibol in Garo); supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (pung) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Water Resources Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (stream, jhora or feeder channel) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, spillway gate or regulator) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Meghalaya terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Pung | A pond, pool or small lake, natural or dug: "Pung, ka, n. a pool" in Singh's Khasi-English Dictionary (1906), and the first equivalent of both "Pond" and "Pool" in his English-Khasi Dictionary (1920) (Annex 7E). First used in this Manual as "pung (Khasi and Pnar: pond, pool or small lake; Garo: pokri)". The plural "pungs" is this Manual's English form; Khasi and Pnar mark the plural with the article ki. A pung with a controlled outlet is a tank under Clause 7.2: its outlet gate is its sluice, and its FTL is the level at which it spills over its outlet with any gate closed, found by survey. A pung with an uncontrolled outlet has its FTL at the crest of that outlet. Natural, sacred and community waters keep their own names, such as Nan Polok (Ward's Lake) and Pung Sajar Nangli (Thadlaskein). Engineered storage built under this Manual is a "detention pond", never a sacred or community pung. |
| Recorded waterbody | A pung, lake, reservoir, stream, jhora, spring or wetland shown in any source of Clause 7.3.3(a): a Revenue or District Council record, a Municipal Board's record of what vests in it, a master-plan map, the Expert Committee's inclusion and exclusion lists, the 2025 ground-truthing list, MePGCL's records, an MBDA spring inventory or a town's drain-and-jhora register. A recorded waterbody is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual. |
| Boundary of a pung, lake or reservoir | For this Manual, the boundary of a pung or lake under Clauses 7.3.3 and 7.13.1 is the largest of its recorded boundary, its surveyed FTL and the outer edge of its water in the season of 1 April to 31 October shown by dated imagery or survey of recent years; and the boundary of a reservoir is the higher of its full reservoir level and the highest level its operator states, converted from feet at 1 ft = 0.3048 m and stated to the datum of Clause 7.3.5. For the Umiam (Barapani) reservoir no MePGCL guideline was found: its full level is given only in the press as 3,220 ft (about 981.5 m) and a spillway crest at EL 969.5 m in another document (both as reported; datum unknown), and until MePGCL states the level and datum the boundary is fixed by survey of the highest water line [TBC]. The drawdown land of a reservoir below that level is part of the reservoir. This reading is set by this Manual. |
| Stream (wah); jhora | A stream or river is a wah in Khasi and Pnar (Annex 7E). A jhora is a small hill stream, perennial or seasonal, the word used in Shillong for the streams into which the town's drains fall (as reported; no dictionary source was checked). Every stream or jhora that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name, whether it is dry for most of the year, whether the Waterbodies Guidelines exclude it under their 240-day rule (para 2(e)), and whether it is lined, piped or covered. A jhora carries boulders, debris and garbage in flood: its inlets and culverts take the racks, bulking and blockage of Clause 6.3.6, and its top of bank is the edge of its active bed where that is wider than the edge of the 50% AEP flow. This definition is set by this Manual. |
| Reference lines for setbacks | Three lines are used, and the setback that reaches furthest from the water governs: (a) the Waterbodies Guidelines' line, "the mean high flood level of a water body observed in the past ten years" (para 2(f)), with the Guidelines' setback measured from it; (b) the FTL of a pung, lake or reservoir or the top of bank of a channel, with Zone 1 of Clause 7.4.3 measured from it; and (c) the 1% AEP flood extent of Clause 7.3.4, with the 10 m of Clause 7.4.4 added. Where the ten-year mean high flood level is not known, it is found by the survey of flood marks and the evidence of residents, recorded on Form 7-1. This rule is set by this Manual. |
| Spring (umpohliew); spring recharge area | A spring is a place where groundwater comes out at the surface: "Umpohliew, ka, n. a spring, a fountain" (Singh, 1906; Annex 7E). A spring is a waterbody for Clause 7.3, and its Zone 1 under Clause 7.4 is measured from its outlet or the edge of its tank or chamber. Its recharge area is the area upslope from which it is fed, as a hydrogeologist maps it; above a drinking-water intake that area is a no-paving zone, except for access, into which no road runoff is infiltrated, no drain is cut that would intercept the flow to the spring, and no fill is placed that would bury its outlet (Clause 8.8.1). No storm drain or sewer is laid within Zone 1 of a spring except a lined drain below its outlet that carries its overflow away. This definition and these rules are set by this Manual. |
| Sacred grove (law kyntang); source catchment | A sacred grove is a forest kept by custom: "'lawkyntang, ka, n. a sacred grove" (Singh, 1906; Annex 7E). Where a grove stands at the head of a stream or above a spring that supplies a town or village, it is treated for this Manual as a protected source catchment: no drain discharges into it, no runoff from development is led through it, and no infiltration facility, soak pit or septic tank is placed in it. The grove's custodian decides what happens inside it; this Manual only keeps the drainage of development out of it. Counts of the State's groves conflict and none is used here without its source (Clause 7.12, Commentary). This rule is set by this Manual, with section 15 of the KHADC Regulation, 2015 as its hook in the Khasi Hills. |
| Limestone and mine areas | The limestone of the southern escarpment and the Jaintia hills (sub-areas ML-C and ML-B1 of Annex 2A), any coal-mining area with rat-hole workings, and any place where caves or sinkholes are known. No pung, retention basin or detention pond is excavated into them, no infiltration facility is placed in them (Clause 4.11, karst and mine rule), and no drain is designed to lose water into them. |
| Landholding institution | The body that holds the land of a waterbody or its setback where it is not State land: the Dorbar Shnong of a Khasi or Jaintia village, a clan, or a private owner (the village institutions of the Garo Hills, led by the Nokma, were not researched [TBC]). Zone 1 land that is not State land is secured for this Manual by a written agreement with the landholding institution, or reserved in a master plan, and is not taken. This rule is set by this Manual. |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the Water Resources Department and the Revenue and Disaster Management Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Municipal Board (for the drains, public streams, springs, tanks and reservoirs within its limits, which vest in it under section 62 of the Meghalaya Municipal Act, 1973), the Shillong Cantonment Board (in the Cantonment), NSTDA (in New Shillong [TBC]), PWD (Roads), NHAI or NHIDCL (for the drains and culverts of their roads), the Water Resources Department (for rivers and flood works), MePGCL (for the Umiam, Kyrdemkulai, Nongkhyllem, New Umtru and Myntdu–Leshka reservoirs and the reaches below their dams), PHED (for water-supply sources and intakes), the Soil and Water Conservation Department (for catchment treatment works), the Forest and Environment Department (for forest land and for matters under the Waterbodies Guidelines), the District Council and the Dorbar Shnong under the District Council's rules (for the drains, jhoras, springs and pungs of a village outside municipal limits; the Nokma-led villages of the Garo Hills were not researched [TBC]), a clan or a private owner (for land and water held by them), a colony developer (for the drains of a layout until they are handed over), the Meghalaya State Wetlands Authority (for a notified wetland; none was found), or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records and maps of the Revenue and Disaster Management Department and the Deputy Commissioners, which are thin in the Sixth Schedule areas, because most land there is community, clan or private and is held, allotted and recorded by the District Councils, the Dorbar Shnongs and the clans rather than by the State's revenue staff (none of these records was read for this Manual [TBC]); the land records, permissions and conditions of the District Councils and their building authorities, such as the KHBSRA; the drains, public streams, springs and tanks that vest in each Municipal Board under section 62 of the Meghalaya Municipal Act, 1973; the land use, waterbody and flash-flood and landslide susceptibility maps of the Shillong Master Plan 2041 and of NESAC's risk-informed master plan report for the Shillong Planning Area (2023), and of the draft Tura master plan (2024); the "inclusion and exclusion lists of water bodies" that the Expert Committee under the Waterbodies Guidelines circulated to the Deputy Commissioners; the 225 water bodies ground-truthed for the High Court of Meghalaya in 2025 (as reported; the inventory of the Meghalaya State Wetlands Authority was not obtained [TBC]); MePGCL's records of reservoir levels and reservoir land; the spring inventories of MBDA (whose counts conflict, as reported); and each town's drain-and-jhora register (Chapter 6);
- (b) MePGCL and Dorbar Shnong or village council tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where MePGCL records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. Meghalaya has a floodplain Act but no flood line. The Meghalaya Flood Plain Zoning Bill, 2026 (Gazette Extraordinary, Part V, 23 February 2026, No. LB.43/LA/2026/2) was read for this Manual; it defines a "flood zone" as "the area which is required to carry the flow of the maximum probable floods" (s.2(g)), without a return period, and provides for a Flood Zoning Authority to survey rivers and for the State to notify their limits (ss. 3 to 11). The Act is known only from a snippet of the State law site, as "Act No. 4 of 2026 … received the assent of the Governor on the 6th March, 2026" (notification No. LL(B)14/2026/2, as quoted); its gazetted text was not obtained, and no constitution of the Authority, no rules and no notification of any zone were found. For its own purpose this Manual reads "maximum probable floods" as the 1% AEP extent with the climate factor of Clause 2.8; where a zone is notified under the Act, its restrictions prevail. A floodplain zonation of "identified river stretches including Umkhrah River" was awarded to RMSI Private Ltd in June 2021 and reported 80% complete in March 2023 (State action-taken report to the National Green Tribunal, 21 March 2023); it has not been published, and the return period it maps is not known [TBC]. NESAC's risk-informed master plan report for the Shillong Planning Area (2023) maps flash-flood susceptibility (very high 1.01% of the area, high 4.67%) and names "Polo Market, Pynthorbah, Nongrim hills, Dhankheti" as "highly potential for flash flood", but it draws no flood line. The rivers are hardly gauged: CWC has seven level-monitoring sites in the State and no forecasting site, none with a warning or danger level, and records highest levels only at a few, such as 73.47 m for the Umngot at Dawki (28 May 2006) and 47.0 m for the Myntdu at Kharkhana (23 April 1995); there is no gauge on the Umkhrah, the Umshyrpi, the Umiam, the Umtru, the Kynshi, the Simsang, the Ganol or the Jinjiram (all as reported by SANDRP; Chapter 5). MePGCL states some reservoir levels in feet and some in metres. No source read for this Manual states the datum of any of these levels. The Bye-Laws 2021 raise stilts above "the Highest Flood Level" (B1(v)(b)) and the KHADC Regulation's drawings show "the highest flood level (HFL) reached above the street", but no highest flood level has been published for any of Shillong's streams, and the Waterbodies Guidelines' reference line, the mean high flood level of the past ten years, is a field quantity that no one has mapped. The best evidence of flood extent in the towns is therefore on the ground: the flood marks at Polo, Pynthorbah and Nongmynsong on the Umkhrah, and those of June 2026 at Dawki. Clause 7.3.4 lets the Authority adopt flood maps once they exist; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, with the bulking of Clause 6.3.6 on jhoras and streams and the surveyed flood marks of Clause 5.8.5(a) and (c), and a highest flood level stated in a permission or a plan is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Levels shall be stated to one datum (Clause 7.3.5), and reservoir levels converted from feet at 1 ft = 0.3048 m. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual along every natural channel draining 8 ha or more and round every pung, lake, reservoir and spring (wider lines govern under Clause 7.4.5 where they bind: the waterbody setback of the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, as amended, measured from the mean high flood level of the past ten years, is 3 m or 6 m along streams in urban areas, 10 to 30 m along streams in rural areas and 10, 20 or 50 m round lakes and ponds, with a regulated zone four times as wide round lakes and along rural streams; the Guidelines do not reach a seasonal stream whose bed was dry for 240 days or more in each of the past ten years, as most jhoras are, and this Manual's 15 m does; and no flood zone has been notified under the Meghalaya Flood Plain Zoning Act, 2026; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the waterbody setback or regulated zone of the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, as amended in 2024 and 2026, measured from the mean high flood level of the past ten years, where the Guidelines bind through the Bye-Laws 2021 or as later prescribed; a restriction notified in a flood zone under the Meghalaya Flood Plain Zoning Act, 2026 (none has been notified); the consent of the Water Resources Department for a work on or next to one of its flood works; the consent of MePGCL for a work that drains to, or lies next to, one of its reservoirs or the reach below its dam; the written consent of the Municipal Board for a drain into one of its drains or water-courses (section 204 of the Meghalaya Municipal Act, 1973); a condition of a District Council or its building authority, such as the "Reserved Forest & Conservation Area" along a river edge in the Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015; the views or permission of the Meghalaya State Wetlands Authority or the Forest and Environment Department for a work in or next to a notified wetland or forest land; or a direction of the High Court of Meghalaya, the National Green Tribunal or the Supreme Court (the High Court's interim bar on building within 50 m of the high-water mark of a waterbody ended on 19 February 2024; Clause 7.4, Disclosure) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Meghalaya's distances from water are executive guidelines of the Forest and Environment Department, the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023 (No. FOR/CC/29/2019/Pt/688 of 25 August 2023, as amended by No. FOR/CC/29/2019/1140 of 13 February 2024 and No. FOR/CC/29/2019/Pt/771 of 6 July 2026), made on the direction of the High Court of Meghalaya in PIL No. 10 of 2019. They bind in the areas of the Bye-Laws 2021, which have pointed to them since 2024 (B2(ii)(c); Section I(a), cl. 4, and I(f)), and elsewhere only "in such manner as may be prescribed" (para 10(2)); nothing prescribed was found. They measure the setback from "the mean high flood level of a water body observed in the past ten years" (para 2(f)): 3 m along a stream up to 3 m wide in an urban area and 6 m along a wider one, 10 m to 30 m along streams in rural areas, and 10, 20 or 50 m round lakes and ponds. The 15 m floor is five times the 3 m and two and a half times the 6 m of the urban streams, along which the towns' drains run; it also covers the seasonal streams, most of the jhoras, that the Guidelines exclude where the bed was dry for 240 days or more in each of the past ten years (para 2(e)), and the springs, which they do not name. It applies to new development and redevelopment approved under this Manual, not to existing buildings; and where Zone 1 land is community, clan or private, it is secured by agreement with the landholding institution (the Dorbar Shnong, the clan or the owner) or reserved in a master plan, not taken. It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Meghalaya flood maps are mostly coarser than US maps, the only level land in a Meghalaya town is usually a valley floor beside a stream, such as the Umkhrah's at Polo and Pynthorbah in Shillong, a river terrace, the margin of a pung, lake or reservoir, or the plains along the Jinjiram at the foot of the Garo hills (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Meghalaya's setbacks from water come from executive guidelines, not from its building bye-laws. The Forest and Environment Department first issued the Meghalaya Waterbodies (Preservation and Conservation) Guidelines, 2023 (No. FOR/CC/29/2019/Pt/637 of 18 July 2023), which the High Court found "fall woefully short" and "more of a formality" (order of 19 July 2023); they were superseded by the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023 (No. FOR/CC/29/2019/Pt/688 of 25 August 2023; Gazette, Part IIA, 7 September 2023), amended by No. FOR/CC/29/2019/1140 of 13 February 2024 and No. FOR/CC/29/2019/Pt/771 of 6 July 2026 (the amendment of 2024 dates Pt/688 "18th July, 2023"; the gazette and the amendment of 2026 give 25 August 2023, which this Manual uses). Their "waterbody setback" is "an area located in immediate vicinity of the mean high flood level of a water body observed in the past ten years where no new construction of permanent nature" is permitted except the works of para 4, such as fencing "which does not hinder in any manner free flow of rain water", bank stabilisation, intakes, dams, weirs and footpaths (para 2(f)). The setbacks are: round lakes and ponds, 10 m up to 1 ha, 20 m from 1 to 500 ha and 50 m above 500 ha (Appendix 1); along streams outside urban areas, 10 m where the stream is up to 4 m wide and, where it is wider, 10, 20 or 30 m by plot size (Appendix 2A, 2026, which reduced the 15, 25 and 50 m of 2023); along streams in industrial areas, as MSPCB's consent guidelines of 2025 provide (Appendix 2B, 2026); and along streams "within urban areas", 3 m where the stream is up to 3 m wide and 6 m where it is wider (Appendix 3, as merged in 2024). The merger of 2024 appears to have cut the setback along streams in urban areas outside the municipal and cantonment areas from 5 m and 10 m to 3 m and 6 m (NEER reading; to be confirmed with the Department [TBC]). Round lakes and ponds and along rural streams a regulated zone four times the setback, limited to the waterbody's catchment, caps coverage, FAR, floors and height (para 7(1A), 2024); a septic tank, STP or ETP stands at least 6 m, or half the depth of the plot, from the setback (para 7(3)); and "dense plantation of native species shall be undertaken in the waterbody setback" (para 5). Two exclusions matter for drainage. A "waterbody" does not include "seasonal rivers and streams or parts thereof where the entire bed remained dry for a period not less than 240 days during each of the past ten calendar years", nor ponds and lakes that dry in the same way (para 2(e)), which leaves out most jhoras; and buildings permitted under the Bye-Laws 2021 and works in progress are outside the Guidelines (para 10(3)). The Bye-Laws 2021 first gave 2.40 m from a stream (B2(ii)(c)), replaced in 2024 by a reference to the Guidelines (B2(ii)(c); Section I(a), cl. 4, and I(f)); they also keep a septic tank and soak pit "as far away as possible from the stream/river" (B1(v)(a)). Outside the Bye-Laws' areas the Guidelines are to be implemented "in such manner as may be prescribed" (para 10(2)), and nothing prescribed was found; in the Khasi Hills the KHADC Regulation, 2015 keeps a river edge in its "Reserved Forest & Conservation Area", where "No development should normally be allowed" (s.2.101), without a width. Three wider figures are not rules. The High Court's order of 24 May 2023 that no construction be allowed "within 50 metres of the high-water mark of the relevant waterbody without the express previous leave of this Court" ended when the PIL was closed on 19 February 2024, after the amendment of 13 February 2024 was taken on record; the Expert Committee's "Restricted zones of 50m + 300m" round the Umiam lake, in its report annexed to the Guidelines, is a recommendation; and NESAC's "buffer as per NGT" along the Umkhrah and the Umshyrpi, 50 m from the Umiam lake and 100 m from protected forests, are recommendations of its master plan report (no order of the National Green Tribunal setting a buffer for Shillong's streams was found). The Guidelines leave gaps for drainage: their line is a ten-year mean flood level that no one has mapped; they give the urban streams, along which the towns' drains run, 3 m or 6 m; they exclude the seasonal jhoras; and they do not name springs. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Meghalaya has distances from water, but they are executive guidelines, measured from a line no one has mapped, narrow in the towns and silent on the jhoras: the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, as amended, give 3 m along an urban stream up to 3 m wide and 6 m along a wider one, 10 to 30 m along rural streams and 10, 20 or 50 m round lakes and ponds, measured from "the mean high flood level of a water body observed in the past ten years"; they exclude seasonal streams whose bed is dry for 240 days a year; they bind through the Bye-Laws 2021 in master-plan, municipal and scheme areas and elsewhere only as may be prescribed; and no flood zone has been notified under the Meghalaya Flood Plain Zoning Act, 2026. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor where nothing wider binds: along every natural channel draining 8 ha or more, whether or not the Guidelines treat it as a waterbody, and round every pung, lake, reservoir and spring. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's three reference lines and its reading of the boundary of a pung, lake or reservoir, and the rules on jhoras, springs, sacred groves and limestone and mine areas (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body, District Council or traditional institution has adopted or endorsed them. Along an urban stream the 15 m Zone 1 is five times the 3 m and two and a half times the 6 m of the Guidelines. It applies to new development and redevelopment approved under this Manual, not to existing buildings; Clause 7.4.7 allows no variance below it; and where Zone 1 land is community, clan or private, it is secured by agreement with the landholding institution (the Dorbar Shnong, the clan or the owner) or reserved in a master plan, not taken. The setback is applied as whichever of the three reference lines and its setback reaches furthest (definitions after Clause 7.2), so the Manual is stricter than statute along the towns' streams and jhoras and round springs, and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- The Waterbodies Guidelines (No. FOR/CC/29/2019/Pt/688 of 25 August 2023, as amended on 13 February 2024 and 6 July 2026). 3 m or 6 m along urban streams (Appendix 3 as merged in 2024; whether the merger cut the non-municipal urban setback from 5 m and 10 m is to be confirmed [TBC]); 10 m along rural streams up to 4 m wide and 10, 20 or 30 m by plot size along wider ones (Appendix 2A, 2026); MSPCB's consent guidelines in industrial areas (Appendix 2B, 2026); 10, 20 or 50 m round lakes and ponds (Appendix 1); the regulated zone four times the setback round lakes and along rural streams (para 7(1A)); and the 6 m between a septic tank, STP or ETP and the setback (para 7(3)). The urban setbacks are narrower than Zone 1 and never govern alone; the Applicant states them on Form 7-1. Round the Umiam lake, if its water spread at full reservoir level, about 10.148 km² (as reported), is the basis of its class, the Guidelines give a 50 m setback and a regulated zone of 200 m, wider than this Manual's lines, and they govern (NEER reading [TBC]).
- The Bye-Laws 2021 and the District Councils' regulations. In the Bye-Laws' areas, the Guidelines through B2(ii)(c) and Section I(a), cl. 4, and I(f) (2024), with stilts 1.20 m above the Highest Flood Level on sloping sites beside a stream or river and plinths 0.90 m high on flat sites (B1(v)(b)), and no building on land liable to flooding without protection (B1.1(ii)); in the Khasi Hills, the "Reserved Forest & Conservation Area" along a river edge of the KHADC Regulation, 2015 (s.2.101), and its duty to protect "catchment areas, water sources, spring sheds, streams and rivers" (s.15(1)); the instruments of the Jaintia Hills and Garo Hills District Councils were not found [TBC].
- The Meghalaya Flood Plain Zoning Act, 2026. Restrictions in a flood zone notified under the Act prevail over other laws (s.12(2) of the Bill). No zone has been notified; where one is, it governs as a statutory line under Clause 7.4.5.
- Wetlands. Any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found) and the waters the Meghalaya State Wetlands Authority lists (Clause 7.12).
- Courts, plans and custodians. The orders of the High Court of Meghalaya, the National Green Tribunal and the Supreme Court as they stand; the lines of the Shillong Master Plan 2041 and other master plans (whose river buffers were not read [TBC]); MePGCL's lines at its reservoirs; the Water Resources Department's at its flood works. The High Court's interim bar on building within 50 m of the high-water mark of a waterbody (24 May 2023) ended on 19 February 2024; the Expert Committee's "Restricted zones of 50m + 300m" round the Umiam lake and NESAC's buffers of 50 m from the lake and 100 m from protected forests are recommendations only, cited in this Manual as expert guidance, never as binding; and no order of the National Green Tribunal setting a buffer for Shillong's streams was found.
This Manual sets 15 m as the floor because the Guidelines give the urban streams, which carry most of the towns' storm water and sewage, only 3 m or 6 m, from a flood level no one has mapped, and give the seasonal jhoras and the springs nothing; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because a jhora needs room for the boulders, debris and garbage it carries in flood and for the people and machines that clear them. The reasons for the corridor are the record: NESAC found that "Encroachment and clogging of channels are the main causes of flooding over Shillong" and that the water "tops the banks along most of the streams", "aggravated by a drastic reduction in channel capacities in most streams due to encroachments along their banks by buildings" (2023); 49,612 m³ of waste was removed from the Wahumkhrah for ₹7.9 crore (State action-taken report, 21 March 2023); and encroachment on the jhoras is reported to make them more vulnerable to flooding (as reported). Until a statute, rule, notification, master plan, District Council regulation or court adopts it, the 15 m minimum is this Manual's recommended standard, and the Guidelines, the bye-laws, the regulations and the orders above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Meghalaya Building Bye-Laws 2021, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to hill-town practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The valley floors of Shillong along the Umkhrah and the Umshyrpi, the margins of the Umiam lake and of the pungs, and the Jinjiram plains at the foot of the Garo hills are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Meghalaya the Guidelines measure a setback from "the mean high flood level of a water body observed in the past ten years", but that level has not been mapped for any pung, lake or reservoir, so the line from which a setback is measured must come from this Manual. The difference matters most at the reservoirs, whose levels move through the year: MePGCL operates its reservoirs between a minimum drawdown level and a maximum level, with frequent releases in and out of the season (Kyrdemkulai between 2,215 ft and 2,235 ft, Myntdu–Leshka between 606.15 m and 618.00 m; MePGCL), and the Umiam reservoir, whose full level is known only from the press, is reported to have lost more than a tenth of its gross capacity to sediment between 1965 and 2004 (as reported), so a line drawn from the edge of the water in the dry months would leave the reservoir's own bed open to building, and one drawn from today's edge would give up its lost area for good. This Manual gives every pung, lake and reservoir a boundary measured from a high level, not from the water's edge on the day of survey: the edge of a pung in the season and the operator's highest level of a reservoir are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the valley floors of Shillong along the Umkhrah and the Umshyrpi, where Polo, Pynthorbah, Nongmynsong, Forest Colony, Mawlai, Dhankheti and Nongrim Hills flood "with nearly every heavy downpour" when the Wah Umkhrah overflows (as reported) and where NESAC found that "the water tops the banks along most of the streams", and of the Garo plains along the Jinjiram, where the floods of September 2014 submerged over 200 villages (as reported) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Meghalaya has no tank Act and no irrigation tank cascades, and its standing waters range from village pungs a few metres across to the Umiam reservoir. The storages that matter for urban drainage are of four kinds. The first is the reservoirs of MePGCL, the State's largest waterbodies: the Umiam (Barapani) reservoir, impounded in 1965 for Umiam Stage I, with a water spread of about 10.148 km² at full reservoir level, a catchment given as 221.5 km² (also about 220 and 225 km², and 547 km² for the whole river at the dam: the figures conflict), and a gross capacity reported to have fallen from 179.757 Mm³ in 1965 to 167.069 in 1990 and 159.206 in 2004 (all as reported), for which no MePGCL guideline and no level other than the press's 3,220 ft were found [TBC]; and, downstream, Kyrdemkulai (Stage III; full reservoir level 2,230 ft, about 679.7 m), Nongkhyllem (Stage IV; 503.00 m), New Umtru (full reservoir level 130.10 m, maximum 132.78 m, 3.55 MCM) and Myntdu–Leshka (618.00 m) (MePGCL gate-operation guidelines; feet converted at 0.3048 m). Their releases enter a design as inflow and tailwater (Clauses 5.8.3 and 5.8.5(d)), and they are not tanks for these clauses unless their storage is counted. The Kopili project shared with Assam is held by NEEPCO, and its levels were not obtained [TBC]. The second is the small lakes and pungs of the towns and villages: Ward's Lake (Nan Polok) in Shillong, built about 1894 (as reported; who designed it is disputed), and Thadlaskein (Pung Sajar Nangli) beside the national highway near Mukhla, revered by the people of Raid Mukhla and the Niamtre community (as reported); no levels, areas or outlet records were found for either [TBC], so their storage is modelled as an existing feature and not counted unless Clause 7.7.1 is met. The third is the village pungs, which are modelled as existing features where they intercept runoff but are never counted as storage, because they are not surveyed, have no controlled outlet and are full by the time of the peak storm. The fourth is the springs, which are protected for their water and never counted as storage. These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: in a plateau town every drain ends in a jhora and every jhora in a stream that runs to a reservoir or a river. Any pung, lake or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with MePGCL or the other custodian, and the custodian of each pung and lake shall be confirmed for the inventory (Annex 7A) [TBC].
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. MePGCL, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a plateau town, every jhora that falls from the ridge and its slopes to the stream (wah) below, any pung with its inlets and outlet, the springs above the town's intakes, and the stream itself down to the reservoir or river whose level sets the tailwater of the jhoras (Clause 5.8.5), as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than MePGCL's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Meghalaya's reservoirs are small for the floods they pass, and they are drawn on through the season. MePGCL's guidelines for Stage III, Stage IV and New Umtru say that "the Reservoir capacity is very small", with "frequent release of water through the Gates during Monsoon as well as during Non-monsoon period"; Myntdu–Leshka's spillway is built for 12,000 cumec from a catchment of 350 km², and its guideline records "very high discharge of about 10440 cumecs during high rainfall" (MePGCL). In August 2024 releases from the Umiam reservoir began at 3,216.15 ft on an IMD warning, close to its reported full level of 3,220 ft (as reported). The Manual's season begins on 1 April because the escarpment's largest falls come before the south-west monsoon as well as during it (Cherrapunji: 644.2 mm in 24 hours on 16 April 1990 and 812.0 mm on 25 May 1916, IMD), and storms follow its withdrawal (594.0 mm at Cherrapunji on 11 October 1975, and 262.0 mm at Shillong on 8 October 2004, IMD), so a reservoir or pung may be full at any time from April to October. No record of how long Ward's Lake, Thadlaskein or any village pung stays at or above its outlet level in a wet spell was found. While a pung or reservoir is full, it stores nothing more below FTL, the streams and jhoras that flow into it discharge against its level, and its release adds to the flow in the stream below it. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A plateau town: its jhoras, stream, pung and spring (schematic, not to scale; no particular town, lake, grove or landmark is shown). A: in plan, the town stands on a ridge, the catchment divide, and on the slopes below it, so every drain of the town ends in a jhora and every jhora in the stream (wah) in the valley, which runs on to a reservoir whose level is the stream's tailwater (Clause 5.8.5(d)). The drains are lined where they pass through the built-up area, and each jhora passes a sediment trap and a solid-waste trap before it reaches the stream, because a hill drain carries more silt, gravel and garbage than any other load (Clauses 6.3.6 and 8.12). At the head of the stream a sacred grove (law kyntang) is kept as a protected source catchment, into which no drain discharges. Upslope of the town's intake a spring (umpohliew) comes out; its recharge area, as a hydrogeologist maps it, is kept free of paving, road runoff and soak pits, and no drain crosses it or buries its outlet (Clause 8.8.1). A pung in the valley receives the jhoras only through traps, and the outfalls that reach it and the stream carry a dry-weather-flow interceptor and screen, because the drains carry sewage (Clause 8.9). Zone 1 along the stream is at least 15 m from the top of its bank, five times the Guidelines' 3 m along an urban stream up to 3 m wide; a jhora that is dry for 240 days a year is outside the Guidelines but inside this Manual's corridor. B: in section, from the plateau to the escarpment edge, roof water goes to a storage tank (Clause 4.11) and its overflow and the road runoff go by a lined drain through a trap to the jhora, because no soakaway is placed on a slope steeper than 10°; and where the plateau falls to the plains over limestone with caves and old mine workings, no water is put into the ground at all (Clause 4.11, karst and mine rule). The 15 m minimum, the spring, grove, interception and infiltration rules are this Manual's proposals; the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, the bye-laws, the District Councils' regulations and the courts' orders govern where they say more. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, MSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under MePGCL control, the operating rule shall be MePGCL's rule. This Manual does not authorise any other body to operate a MePGCL tank.
Commentary. No pung or lake in Meghalaya was found with a written operating rule, and most pungs have no gates to operate. MePGCL's guidelines for its Stage III, Stage IV, New Umtru and Myntdu–Leshka reservoirs set their levels and gate operations, and say that "issuing the notification for release of water is not practicable; however warnings in the form of blowing the Siren, Telephone/SMS may be issued"; no guideline for Umiam Stage I was found, and its full level is known only from the press. Without an agreed rule with dates, levels, release rates and a named operator, storage in a pung or reservoir cannot be relied on, and a release made without warning to the towns and villages downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the April and May storms gives no protection when a June monsoon storm against the plateau and the southern escarpment, such as those of 16 June 1995 and 15–17 June 2022, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
For a natural pung, Clause 7.8.3 is the governing condition: with no controllable outlet, no cushion is assumed, a design that relies on the pung routes the storm through it from its outlet level, and the outflow over the outlet is limited by the jhora or stream below it, which shall be shown to carry it with the debris of Clause 6.3.6. For a reservoir, a design takes the operator's level and release for the storm being checked (Clause 5.8.3), not a drawdown the operator has not agreed to in writing. Many pungs and lakes are sacred or communal, and they belong to the Dorbar Shnong, a clan or another custodian rather than to the State, which is why Clause 7.8.2(d) requires the custodian to accept any drawdown, and why no detention pond built under this Manual is called a pung.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Meghalaya State Pollution Control Board (MSPCB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 March each year (Chapter 10).
Commentary. No statewide order fixing a date for the pre-monsoon cleaning of drains, jhoras or pungs was found; the IRADe/NMHS plan for Shillong recommends "Desilting to avoid flooding during monsoons" by PWD and the Shillong Municipal Board, without a date. In the plateau towns the material to be removed is garbage and slide debris as much as silt: 49,612 m³ of waste was removed from the Wahumkhrah for ₹7.9 crore under the Fifteenth Finance Commission, and stone bunds and solid-waste traps were built for ₹3.60 crore (State action-taken report to the National Green Tribunal, 21 March 2023); and the Umiam reservoir is reported to have received 20.551 Mm³ of sediment between 1965 and 2004 (as reported). The date of 31 March in this Manual is set by this Manual, before the Manual's season begins on 1 April, because the escarpment's largest falls come in April and May as well as later (Cherrapunji: 644.2 mm in 24 hours on 16 April 1990 and 812.0 mm on 25 May 1916, IMD) and CWC's highest levels on the Myntdu and the Umngot were set in April and May (as reported); because storms also follow the season, the jhoras, racks and sediment traps are cleared again by 31 May, before the south-west monsoon arrives, and after it by 15 November (Chapter 10). Excavation to "increase capacity" is governed by Clause 7.9.3. In a pung fed by springs in its bed, deepening can cut the springs off or break the silt and clay that hold the water; on limestone it can open the bed to caves and voids. This Manual allows no spring-fed pung to be deepened below its original bed or its bed to be lined or cemented, and no pung or pond on limestone or in a mining area to be deepened at all. The 31 March deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Meghalaya precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Meghalaya the drains, public streams, springs and tanks within municipal limits vest in the Municipal Board (Meghalaya Municipal Act, 1973, s.62), which may require an owner "to improve bad drainage" (s.190), consents to any drain into its drains or water-courses (s.204) and may require land within 100 ft of a drain to be drained (s.206); outside municipal limits the village drains and jhoras are the concern of the District Council and the Dorbar Shnong under the District Council's rules, the roads' drains are PWD's or, on the national highways, NHAI's and NHIDCL's, and the rivers and flood works are the Water Resources Department's. Only part of the Umkhrah and the Umshyrpi lies within the Shillong Municipal Board's area; the rest is under the KHADC (State action-taken report, 21 March 2023). No rule or order dividing streams and jhoras from municipal drains was found; Chapter 6 gives this Manual's working split and each town's drain-and-jhora register. The record of Shillong shows a network that is partial and has become the streams themselves: the city's drains "run for 148.91 km and drain directly into the Umkhrah and Umshyrpi rivers", and storm-water drainage covers "less than 75% of the city" (Smart City Proposal 2016-17, as quoted in the IRADe/NMHS plan, whose own service-level table gives 85%: the figures conflict); NESAC found that the rivers' "tributaries are no more than drain now", and that the water "tops the banks along most of the streams … aggravated by a drastic reduction in channel capacities in most streams due to encroachments along their banks by buildings" (2023); and encroachment on the jhoras is reported to make them more vulnerable to flooding (as reported). The response has been to clean and confine the rivers: waste removal, stone bunds and solid-waste traps on the Wahumkhrah (Clause 7.9, Commentary), and a project report of the Water Resources Department for embankments and channel improvement on the Wahumkhrah and the Umshyrpi, resubmitted after the Brahmaputra Board returned the first (as reported). The Guidelines give an urban stream 3 m or 6 m from a ten-year mean flood level and exclude the seasonal jhoras; the Municipal Act's fines are ₹50 and ₹25 (ss. 204 and 205); neither keeps a stream or jhora at its recorded width once it has been lined, piped, covered, built over or filled with garbage, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored pung or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Meghalaya no shared form of storage is required by the building rules: Table G1 of the Bye-Laws 2021 requires rainwater harvesting on every plot but sets no volume, the soft cover of 10% or 20% of the plot is a landscape rule, and neither the Bye-Laws nor the KHADC Regulation, 2015 has a detention, peak-flow or design-storm rule (Chapter 4). The plans for Shillong's streams are for cleaning and conveyance, not storage: NESAC's master plan report proposes decentralised wastewater treatment, the Water Resources Department's project report for the Wahumkhrah and the Umshyrpi is for embankments and channel improvement (as reported), and the Smart City works include rainwater harvesting at 52 locations (State action-taken report, 2023). In the plateau towns there is little flat land on which a regional pond could be built, and none may be built on a slope where Clause 4.11 bars infiltration or on limestone or mine land; a regional facility there is a lined tank or a lined detention structure, not a pond, and it is never called a pung. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Meghalaya State Wetlands Authority;
- (b) any wetland notified under the 2017 Rules, to its notified boundary (Meghalaya has no Ramsar site, and none was found notified);
- (c) the Umiam (Barapani) reservoir and MePGCL's other reservoirs, with their drawdown zones; Ward's Lake (Nan Polok), Thadlaskein (Pung Sajar Nangli) and the other pungs and small lakes; the bogs and seepage ground of springs; the marshes (chibol) and waterlogged ground of the Garo plains along the Jinjiram; and the 225 water bodies ground-truthed for the High Court of Meghalaya in 2025 (as reported), within the 1% AEP extent of Clause 7.3.4 (a river, stream or reservoir itself is a waterbody under the rest of this chapter); and
- (d) any other pung, marsh or wetland that the Authority notifies, that the wetland authority lists, or that the High Court of Meghalaya, the National Green Tribunal or the Supreme Court directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Meghalaya's wetlands are the concern of the Meghalaya State Wetlands Authority, constituted under rule 5(1) of the Wetlands (Conservation and Management) Rules, 2017 by notification No. ENV.1/2007/Pt/110 of 1 November 2017 (Gazette, 16 November 2017), chaired by the Minister in charge of Forests and Environment, with the Chief Secretary as Vice-Chair, the Secretaries of Urban Affairs, Water Resources and Revenue and Disaster Management and the Director of NESAC among its members, an expert in hydrology among its non-official members, and the Principal Chief Conservator of Forests and Head of Forest Force as Member Secretary. Officers who may take cognizance of offences under rule 4 of the Rules were notified on 15 September 2023 (No. ENV.I/2007/Pt-II/102). The State has no Ramsar site, and no wetland notified under rule 4 was found. In 2025, in a suo motu PIL, the State conceded that "an exhaustive survey of all waterbodies and wetlands had not yet been undertaken"; the High Court then accepted a report that 225 water bodies had been ground-truthed (66 lakes and ponds, 1 oxbow, 6 riverine wetlands, 18 waterlogged areas, 100 rivers and streams, 9 reservoirs and barrages and 25 tanks and ponds) and that "none of the above wetlands qualify as a Ramsar site", and disposed of the PIL on 29 April 2025 (all as reported; the PIL's number and the list were not obtained [TBC]). The wetland that matters most to drainage is the Umiam lake, which "serves as a cesspool of the waste materials of Shillong" (Expert Committee, 2023) and was "Not satisfactory" at all four of MSPCB's stations in June 2023, with cyanobacterial blooms and leachate from the Mawiong landfill; no data were found for Ward's Lake or the pungs. The sacred groves (law kyntang) that stand at the heads of many perennial streams (as reported) are counted differently by each source (125 in NESAC's report, which finds none in the Shillong Planning Area; "around 79" covering "close to 9,000 hectares" in another account; the Forest Department's documentation volumes in a third; all as cited), and none of these counts is used in this Manual. A drain outfall, desilting, diversion or gate operation in or next to a notified wetland or forest land therefore needs the views or permission of the Wetlands Authority or the Forest and Environment Department where the Rules reach it, as well as compliance with this chapter; for the pungs, springs, groves and marshes they do not reach, this chapter, the Guidelines and the District Councils' rules are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Meghalaya's streams, pungs and the Umiam lake through the drains (Clause 8.9, Commentary). MSPCB has identified 32 outfalls to the Umkhrah and the Umshyrpi (minutes of 14 April 2023); the CPCB placed both rivers in Priority I in September 2025; and the Expert Committee found the lake to be the "cesspool" of Shillong (2023). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by most existing outfalls in Shillong. In Meghalaya they apply in full to every new outfall, and every existing outfall to the Umkhrah, the Umshyrpi, the Wah Roro, the Umiam lake or a pung is taken to carry dry-weather flow and comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed. On the shore of the Umiam lake and in the catchment of a pung, every drain that enters the water also passes a sediment trap and a solid-waste trap first (Figure 7.3; Clause 6.3.6), because the lake or pung is the end of the slope's drainage and has no other way to lose the silt and garbage.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Meghalaya's controls on building and dumping along its streams and lakes have come mostly from the courts. In PIL No. 10 of 2019, In Re: Cleanliness of Umiam Lake, the High Court of Meghalaya ordered on 24 May 2023 that "neither the State nor the local authorities will allow any construction to come up within 50 metres of the high-water mark of the relevant waterbody without the express previous leave of this Court"; on 19 July 2023 it found that the first guidelines did "not deal with the most serious aspect of buildings and construction mushrooming around waterbodies", that "Several of the rivers, including the Umkhrah in Shillong itself are carrying such contaminated water that they may not be fit even to step into", and that the State should persuade "the District Councils to abide by the same"; and on 19 February 2024 it closed the PIL, taking the amended Guidelines on record and laying down general directions on retrieved public property (display boards, no hawking or parking, removal of unauthorised structures, action against officials), which the Forest and Environment Department circulated by order No. FOR/CC/29/2019/Pt-I/7 of 5 March 2024 to the departments, MSPCB, the Deputy Commissioners, the Shillong Municipal Board, the KHADC, the Cantonment Board and the Rangbah Shnong of Mawlai and Umniam. In 2022 the Court ordered the removal of two buildings on the Umiam side of the national highway after the KHADC called them unauthorised, and the Deputy Commissioner of East Khasi Hills banned the dumping of trash in the lake (both as reported). Under NGT O.A. 192/2022 the Shillong Municipal Board inspected 1,169 households along the Umshyrpi and the Wahumkhrah and served notices on 47 under section 201 of the Municipal Act and the Environment (Protection) Act, issued a public notice (No. SMB/PW/40/2023/10 of 17 February 2023) "to not discharge untreated sewage directly into drains and water bodies", and the KHADC told "all headmen" on 13 March 2023 not to let "untreated waste, faecal matter and garbage" into the two rivers (State action-taken report, 21 March 2023). The KHADC's rules on solid waste let the Dorbar Shnong fine polluters (minutes of 14 April 2023). On building in flood land, NESAC found "Encroachment and clogging of channels" to be "the main causes of flooding over Shillong" (2023). The orders on rat-hole mining (NGT O.A. 73/2014, 17 April 2014; Supreme Court, C.A. 10720/2018, 3 July 2019) bear on the coal belt's streams (Chapter 8). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. No pung or lake in Meghalaya was found to be held by a bund high enough to be a specified dam, though the bunds and outlets of Ward's Lake and the other pungs were not surveyed for this Manual [TBC]; each outlet work or bund shall be screened under Clause 7.14.1. The dams of MePGCL's reservoirs are dams across rivers under the Act, and the Umiam (Barapani) dam, a concrete dam reported to be about 69 m high (as reported), is above the 15 m of Clause 7.14.1(a); the heights of the Kyrdemkulai, Nongkhyllem, New Umtru and Myntdu–Leshka dams were not obtained [TBC]. Where the storage of a pung or reservoir is counted under Clause 7.7, its bund, outlet works or dam is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Meghalaya the embankments that matter to the towns and villages are MePGCL's dams, and the hazard below them is the release. The release reaches are long and inhabited: below Myntdu–Leshka the Myntdu runs through "Ravines and Plains of East & West Jaintia Hills" for about 24 km to the Bangladesh border past settlements and farms; below New Umtru the river runs 9.80 km through a ravine to the Byrnihat bridge; and below Kyrdemkulai and Nongkhyllem the Umiam–Umtru reaches run 13.05 km and 33.5 km (MePGCL). Warnings are by siren, telephone and SMS, not by notification (MePGCL); releases from the Umiam reservoir in August 2024 began on an IMD warning (as reported). No breach map or emergency action plan for any dam, pung or lake was read for this Manual. A failed or overtopped bund floods the land below it, and a release made without warning floods it too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments, and why Chapter 5 treats every release reach as a flood-sensitive outfall. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Meghalaya, Forest and Environment Department. Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, Notification No. FOR/CC/29/2019/Pt/688 of 25 August 2023 (Gazette of Meghalaya, Part IIA, 7 September 2023, with the report of the Expert Committee), paras 2–7, 10–12 and Appendices 1–4, https://megpns.gov.in/gazette/2023/09/07-09-23-IIA.pdf ; Amendment Guidelines, No. FOR/CC/29/2019/1140 of 13 February 2024 (Gazette, 22 February 2024), https://megpns.gov.in/gazette/2024/02/22-02-24-IIA.pdf ; Amendment Guidelines, 2026, No. FOR/CC/29/2019/Pt/771 of 6 July 2026 (Appendices 2A and 2B), https://meghalaya.gov.in/sites/default/files/documents/FOR_CC_29_2019_Pt_771.pdf ; and the superseded Meghalaya Waterbodies (Preservation and Conservation) Guidelines, 2023, No. FOR/CC/29/2019/Pt/637 of 18 July 2023, https://www.meghalaya.gov.in/sites/default/files/documents/FOR_CC_29_2019_Pt_637.pdf
- Government of Meghalaya, Urban Affairs Department. Meghalaya Building Bye-Laws, 2021, Notification No. UAU.73/2016/Pt/402 of 9 March 2021 (Gazette, Part IIA, 25 March 2021), A1.2, A2.5, B1(v), B1.1(ii), B2(ii)(c) and C12, https://megurban.gov.in/laws/BuildingByeLaws.pdf ; (Amendment) Byelaws, 2024, No. UAU.73/2016/Pt/55 of 29 February 2024 (Section I), https://megpns.gov.in/gazette/2024/05/09-05-24-IIA.pdf ; (Third Amendment) Bye-laws, 2025, No. UAU.73/2016/Pt.III(A)/70 of 21 October 2025 (B10), https://megpns.gov.in/gazette/2025/11/03-11-25-X.pdf
- Khasi Hills Autonomous District Council. Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015, Notification No. DC.II/Genl/31/2015/9 of 4 August 2015 (Gazette Extraordinary No. 97, 25 August 2015), ss. 2.101, 15 and 36 and the drawing requirements, https://megpns.gov.in/gazette/2015/08/25-08-15-X.pdf
- Government of Meghalaya. Meghalaya Municipal Act, 1973 (the Assam Municipal Act, 1956, as adapted; consolidated text), ss. 62, 190, 201, 204–206, https://megurban.gov.in/laws/mma.pdf
- Meghalaya Legislative Assembly. Meghalaya Flood Plain Zoning Bill, 2026 (Gazette Extraordinary, Part V, 23 February 2026, No. LB.43/LA/2026/2), ss. 2, 3, 5–12, https://megpns.gov.in/gazette/2026/02/23-02-26-X.pdf ; the Act, as "Act No. 4 of 2026", assented on 6 March 2026, seen only as quoted from notification No. LL(B)14/2026/2 on the State law site.
- Government of Meghalaya, Forest and Environment Department. Notification No. ENV.1/2007/Pt/110 of 1 November 2017 constituting the Meghalaya State Wetlands Authority (Gazette, 16 November 2017), https://megpns.gov.in/gazette/2017/11/16-11-17-IIA.pdf ; notification No. ENV.I/2007/Pt-II/102 of 15 September 2023 (cognizance under the Wetlands Rules), https://meghalaya.gov.in/meghalaya/sites/default/files/circulars/ENV_1_2007_Pt_II_102.pdf
- High Court of Meghalaya. PIL No. 10 of 2019, In Re: Cleanliness of Umiam Lake v. State of Meghalaya, orders of 24 May 2023, 19 July 2023 and 19 February 2024, https://www.livelaw.in/pdf_upload/1282ed72a77c4d348131b6226546d2cd-473620.pdf , https://www.livelaw.in/pdf_upload/inrecleanlinessofumiamlake-482242.pdf ; Forest and Environment Department order No. FOR/CC/29/2019/Pt-I/7 of 5 March 2024, https://meghalaya.gov.in/sites/default/files/circulars/FOR_CC_29_2019_Pt_I_7.pdf
- National Green Tribunal. O.A. 192/2022, In re: News item, The Shillong Times, 23.02.2022, "Poison flowing in Shillong's rivers": orders of 28 April 2022 and 22 November 2022; State action-taken report of 21 March 2023; report of the CPCB–MSPCB Joint Committee of 28 February 2023 (greentribunal.gov.in).
- North Eastern Space Applications Centre (2023). Formulation of Risk Informed GIS Based Master Plan, Shillong Planning Area, Ver 1.0, May 2023, https://megurban.gov.in/notifications/RiskInformedMasterPlans/Finalised%20Report%20-%20Shillong.pdf ; Shillong Master Plan 2041 amendment, No. UAU.76/2022/Pt.I/186 of 29 October 2025, https://megpns.gov.in/gazette/2025/11/13-11-25-IIA.pdf ; Tura draft master plan notice, No. UAU.76/2022/129 of 16 February 2024.
- Meghalaya Power Generation Corporation Ltd. Gate-operation guidelines for Umiam–Umtru Stage III (2026), Stage IV (2025), New Umtru HEP (2025) and Myntdu–Leshka HEP Stage I (4 April 2022) (meecl.nic.in).
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012) (Cherrapunji, 42515; Shillong (C.S.O.), 42516).
- SANDRP. "Overview of CWC's flood monitoring & forecasting in North East India" (5 August 2018) (secondary; CWC sites and levels as transcribed). https://sandrp.in/2018/08/05/overview-of-cwcs-flood-monitoring-forecasting-in-north-east-india/
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Reports of the High Court's suo motu PIL on wetlands (2025): The Sentinel, 19 March 2025, and Highland Post, 30 April 2025 (secondary; the orders were not read).
- Reports of the Umiam (Barapani) reservoir (secondary): water spread, catchment and capacity surveys of 1965, 1990 and 2004 (Assam Tribune; India Water Portal); full level and releases of August 2024 (press).
- Reports of Ward's Lake (Nan Polok) and Thadlaskein (Pung Sajar Nangli) (secondary; tourism and press sources), and of the sacred groves of Meghalaya (India Water Portal; press).
- Reports of the removal of buildings on the Umiam side of the national highway (Highland Post, 29 September 2022) and of the Water Resources Department's project report for the Wahumkhrah and the Umshyrpi (OhMeghalaya) (secondary).
- ICLEI South Asia. Shillong city profile (2021) (secondary, as reported; not read). https://southasiaoffice.iclei.org/wp-content/uploads/2021/09/Shillong_4_pager.pdf
- Singh, U Nissor (1906). Khasi-English Dictionary, ed. P. R. T. Gurdon. Shillong: Eastern Bengal and Assam Secretariat Press (Internet Archive, khasienglishdict00singrich); and Singh, U Nissor (1920). English-Khasi Dictionary. Shillong (Internet Archive, in.ernet.dli.2015.42078).
- Passah, Sajeki (2013). Pnar–English Dictionary. Jowai: Pnar Printers and Publishers (Internet Archive, in.ernet.dli.2015.467593).
- Nengminza, D. S. (1978). The School Dictionary Garo to English, 7th ed. Tura: Garo Hills Book Emporium (Internet Archive, in.ernet.dli.2015.463953); and Members of the Garo Mission, American Baptist Missionary Union (1905). English-Garo Dictionary. Shillong: Assam Secretariat Printing Office (Internet Archive, englishgarodicti00amerrich).
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Khasi, Pnar and Garo waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Meghalaya has no Act for the protection of lakes, tanks, ponds or springs as such. Its waterbodies are protected by executive guidelines, by its building bye-laws and the regulations of its District Councils, by its municipal law, by a new floodplain Act whose zones have not yet been drawn, by the wetland rules and by the courts, and in most of the State the land and water belong to communities, clans and private owners rather than to the State. The Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023 (No. FOR/CC/29/2019/Pt/688 of 25 August 2023, as amended on 13 February 2024 and 6 July 2026) were made by the Forest and Environment Department on the direction of the High Court in PIL No. 10 of 2019, In Re: Cleanliness of Umiam Lake; they set setbacks from streams, lakes and ponds measured from "the mean high flood level of a water body observed in the past ten years", bind in the areas of the Bye-Laws 2021 through B2(ii)(c) and Section I(a), cl. 4, and I(f), as amended in 2024, and elsewhere only "in such manner as may be prescribed" (para 10(2)) (Clause 7.4, Disclosure). The Meghalaya Building Bye-Laws 2021 apply to "all the Master Plan Areas, Municipal areas and Scheme Areas within the State" (A1.2); they keep building off land "liable to flooding, except where protection measures are adopted" (B1.1(ii)) and raise stilts 1.20 m above the Highest Flood Level on sloping sites beside a stream or river (B1(v)(b)). Outside those areas building and land are regulated by the District Councils: in the Khasi Hills by the Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015, whose section 15(1) makes it the duty of the Executive Committee, Town Committee or Dorbar Shnong to ensure that land development does not damage "catchment areas, water sources, spring sheds, streams and rivers", and whose "Reserved Forest & Conservation Area", including a river edge, is a zone where "No development should normally be allowed" (s.2.101); the building instruments of the Jaintia Hills and Garo Hills Autonomous District Councils were not found [TBC]. Within municipal limits "all public streams, channels, water-courses, springs tanks, reservoirs" vest in the Municipal Board (Meghalaya Municipal Act, 1973, s.62(b)). The Meghalaya Flood Plain Zoning Act, 2026 provides for a Flood Zoning Authority, the survey of rivers and the notification of flood zones whose restrictions "shall prevail" over other laws (s.12(2) of the Bill), but no Authority, rules or zone had been notified when this Manual was drafted (Clause 7.3, Commentary). Wetlands are the concern of the Meghalaya State Wetlands Authority, constituted on 1 November 2017 (Clause 7.12, Commentary); the State has no Ramsar site. In this chapter MePGCL means the Meghalaya Power Generation Corporation Ltd, which holds the reservoirs of the Umiam–Umtru and Myntdu–Leshka projects and is the only custodian in the State with written rules for its gates and levels; the custodians of the pungs and lakes are recorded one by one in the inventory (Annex 7A). Who regulates where in the Sixth Schedule areas, and who is the competent authority for each, is set out in Chapter 1.
This Manual treats every recorded waterbody as drainage infrastructure. Five features set Meghalaya apart. The first is the jhora: the small hill streams into which every town on the plateau drains, which in Shillong are also the sewerage (Clause 8.9, Commentary), which are narrowed by building and choked with garbage, and which the Waterbodies Guidelines do not protect where their bed is dry for 240 days a year. The second is the reservoir: the State's largest standing water is the Umiam (Barapani) reservoir, impounded in 1965, which receives Shillong's rivers through the Wah Roro and "serves as a cesspool of the waste materials of Shillong" (Expert Committee, 2023), with MePGCL's smaller reservoirs at Kyrdemkulai, Nongkhyllem, New Umtru and Myntdu–Leshka, whose levels are kept partly in feet. The third is the spring (umpohliew): the towns are supplied by gravity from streams and springs (CGWB), MBDA's counts of mapped springs conflict, and no statute keeps building or drains away from them. The fourth is the sacred grove (law kyntang), many of which stand at the heads of perennial streams (as reported) and which this Manual treats as protected source catchments. The fifth is the ground: limestone with caves on the southern escarpment and in the Jaintia hills, and rat-hole coal workings, into which water vanishes. The pungs and small lakes, such as Ward's Lake (Nan Polok) in Shillong and Thadlaskein (Pung Sajar Nangli) near Mukhla, are few, small and often sacred or communal, and Meghalaya has no irrigation tank cascades; the tank clauses of this chapter apply to pungs, small lakes and reservoirs. This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the Guidelines, the bye-laws, the District Councils' regulations, the customary rules of the Dorbar Shnongs and clans, the municipal, floodplain and wetland procedures that record and protect them, or the directions of the High Court of Meghalaya, the National Green Tribunal and the Supreme Court.