Chapter 8Water Quality and Recharge
8.1 Purpose and scope
8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:
- (a) the water quality volume (WQv) and the water quality design flow;
- (b) the treatment train, and the selection and design of best management practices (BMPs);
- (c) the criteria for infiltration and recharge;
- (d) the exclusion of sewage and dry-weather flow from storm drains;
- (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
- (f) how rainwater harvesting (RWH) fits with retention and detention;
- (g) erosion and sediment control during construction; and
- (h) monitoring.
8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.
8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.
8.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Water quality volume (WQv) | The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4). |
| Water quality rainfall depth (P_wq) | The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A). |
| 3-month ARI depth | The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record. |
| Water quality design flow (Q_wq) | The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5). |
| Runoff coefficient for WQv (Rv) | The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I. |
| BMP | A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume. |
| Treatment train | Two or more BMPs in series, from source to site to regional scale (Clause 8.5). |
| Pretreatment | A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP. |
| First flush | The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil. |
| Gross pollutant trap (GPT) | A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm. |
| Dry-weather flow (DWF) | Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge. |
| Cross-connection | Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain. |
| Infiltration facility | A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells. |
| Seasonal high groundwater table | As defined in Clause 3.10.2: the highest level in the monsoon season. |
| Hotspot | A land use with a high risk of spills or contaminated runoff (Clause 8.8.8). |
| Level of Service (LoS) / Value Rating (VR) | The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012). |
8.3 Objectives and pollutants of concern
8.3.1 Stormwater treatment under this Manual shall aim to:
- (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
- (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
- (c) keep sewage and sullage out of storm drains and waterbodies;
- (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
- (e) prevent erosion and sediment discharge during construction.
8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:
Table 8.1 — Pollutants of concern, sources and primary controls
| Pollutant | Main sources in Meghalaya towns | Primary control |
|---|---|---|
| Gross pollutants (plastics, litter, vegetation) | Streets, markets, open dumping in drains | Source collection; GPTs and screens (Clause 8.10) |
| Suspended sediment | Construction sites, unpaved roads and verges, road wear, drain silt | Erosion and sediment control (Clause 8.12); pretreatment; filtration |
| Oil, grease and fuel | Roads, parking, fuel stations, workshops, bus depots | Oil-grit separators at hotspots; bioretention |
| Pathogens and organic load (BOD) | Sewage and sullage cross-connections, animal waste | Exclusion and DWF interception (Clause 8.9) |
| Nutrients (N, P) | Sewage, fertiliser, food waste, detergents | Exclusion; bioretention; wetlands |
| Heavy metals | Roads, roofs, industrial yards | Filtration; sedimentation |
Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Meghalaya, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.
8.4 Water quality volume and design flow
8.4.1 Water quality rainfall depth. The water quality rainfall depth is:
P_wq = max (P_ret, P_3m)
where:
- P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
- P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.
8.4.2 Water quality volume. The WQv shall be computed as:
WQv = (P_wq / 1000) × Rv × A
where:
- WQv is in m³;
- A = the contributing area, m²;
- Rv = 0.05 + 0.009·I; and
- I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.
The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.
8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.
8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:
- (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
- (b) hotspot controls (Clause 8.8.8); and
- (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.
8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:
- (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
- (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.
8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).
8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).
Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Meghalaya value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).
The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.
Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:
- Rv = 0.05 + 0.009 × 80 = 0.77
- WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³
8.5 Treatment train and pretreatment
8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:
- (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
- (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
- (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.
8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).
8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.
8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.
Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Meghalaya, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.
Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.
8.6 BMP selection: Level of Service and Value Rating
8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.
8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):
Table 8.2 — Required Level of Service for sites that are not redevelopment
| ΔCN | Impact | Required LoS |
|---|---|---|
| 17 or more | High | 8 |
| 7 to 16 | Moderate | 7 |
| 4 to 6 | Low | 6 |
| 1 to 3 | Minimal | 5 |
For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.
8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.
8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:
- (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
- (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
- (c) it has pretreatment under Clause 8.5.3.
8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:
- (a) retained on site under Chapter 4; or
- (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.
Table 8.3 — BMP Value Ratings and suitability in Meghalaya
| BMP | VR (MARC 2012) | Main pollutants removed | Volume reduction / recharge | Garo plains alluvium and Ri-Bhoi valley fills | Laterite / hard rock | Hill slopes, colluvium, limestone and mine areas / high water table | Meghalaya notes |
|---|---|---|---|---|---|---|---|
| Native vegetation (preserved) | 9.25 | All | High | Suited | Suited | Suited | Counts only for preserved, undisturbed area |
| Rain garden / infiltration | 9.0 | Sediment, metals, oil, nutrients | High | Suited if 1.0 m separation met | Conditional (test) | Not suited | Mosquito control: drain within 48 h |
| Bioretention | 8.5 | Sediment, metals, oil, nutrients | Medium–high (unlined); low (lined) | Suited | Suited, with underdrain | Lined, with underdrain | Media source and phosphorus content to be specified |
| Permeable pavement | 7.5 | Sediment, metals, oil | Medium–high | Suited | Conditional | Lined only | Not where run-on carries heavy silt |
| Extended detention wetland | 7.0 | Sediment, nutrients, metals | Low | Conditional (water balance) | Suited | Suited | Good at tank inlets (Clause 7.9.7) |
| Media / sand filter | 6.0 | Sediment, metals | Low | Suited | Suited | Suited (lined) | Needs frequent cleaning |
| Extended wet detention (wet pond) | 5.0 | Sediment, metals, some nutrients | Low | Conditional (water balance) | Suited | Suited | Dry-season water balance (Clause 8.7.8) |
| Vegetated filter strip | 5.0 | Sediment | Low–medium | Suited | Suited | Suited | Mostly as pretreatment |
| Native vegetation swale | 4.0 | Sediment, oil | Low–medium | Suited | Suited | Suited | Not where Q_wq velocity is high |
| Extended dry detention | 4.0 | Coarse sediment | Low | Suited | Suited | Suited | Combine with detention (Chapter 4) |
| Proprietary / hydrodynamic devices | 3.0–5.0 | Coarse sediment, oil, litter | None | Suited | Suited | Suited | VR from verified test data only |
| Signage (public education) | +0.25 | — | — | — | — | — | Added to composite VR |
The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.
Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Meghalaya for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Meghalaya stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.
8.7 BMP design summaries
8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).
8.7.2 Bioretention and rain gardens (Figure 8.2).
- (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
- (b) Surface ponding drained within 48 hours.
- (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
- (d) A transition (choker) layer and a gravel drainage layer below the media.
- (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
- (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
- (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.
8.7.3 Vegetated swales.
- (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
- (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
- (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
- (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
- (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.
8.7.4 Vegetated filter strips.
- (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
- (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
- (c) Used mainly as pretreatment for bioretention, infiltration and swales.
8.7.5 Permeable pavement.
- (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
- (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
- (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
- (d) Structural design for the traffic loading by the road authority's standards.
- (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.
8.7.6 Infiltration trenches and basins (Figure 8.3).
- (a) Pretreatment under Clause 8.5.3 in every case.
- (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
- (c) An observation well to the base of each trench.
- (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
- (e) An overflow to the minor or major system at grade.
- (f) Not brought into service until the contributing area is stabilised (Chapter 10).
8.7.7 Wet ponds (extended wet detention).
- (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
- (b) A sediment forebay at each inlet (Clause 8.5.3).
- (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
- (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
- (e) A dry-season water balance (Clause 8.7.8).
- (f) The detention storage of Chapter 4 may sit above the extended detention level.
8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.
8.7.9 Constructed wetlands.
- (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
- (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
- (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
- (d) A high-flow bypass so that floods do not scour the macrophyte zone.
- (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.
8.7.10 Gross pollutant traps.
- (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
- (b) Capture of gross pollutants down to about 5 mm.
- (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
- (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
- (e) Vehicle access for cleaning by suction or grab.
8.7.11 Oil-grit separators.
- (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
- (b) Sized for Q_wq, with a high-flow bypass.
- (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.
8.7.12 Silt traps and catch pits.
- (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
- (b) A sump at least 300 mm below the outlet invert.
- (c) Silt traps are pretreatment only and earn no VR.
Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Meghalaya. Three local issues drive changes from the source manuals:
- Mosquitoes. Dengue is endemic in Meghalaya. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
- Dry seasons. Most of Meghalaya's rain falls in the monsoon season of 1 April to 31 October: the CWC report for subzone 2(b) describes rain "spread over a period of eight months, i.e. from March to October", with thunderstorms in April and May and "May rainfall … more than the September rainfall", and a winter that is practically dry. The gauges of Shillong have annual normals of 225.3 cm and 242.5 cm (CWC, FER 2(b)), while Cherrapunji's wettest month brought 6,667.4 mm (July 1974, IMD). From November to March pungs fall and springs weaken, and the towns, supplied by gravity from streams and springs, face "acute shortage of water during the summer" (CGWB). In the towns the feed of a drain, jhora or pung in the dry months is often sewage, because the drains carry it (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool through the dry months on its own catchment's runoff is not to be used; in the plateau towns, where Clause 4.11 bars infiltration on slopes, limestone and mine land and there is little flat land, the practical forms are lined bioretention with an underdrain, swales on gentle ground, storage for use, and lined extended dry detention. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage; pungs, lakes, springs, sacred groves and wetlands are waterbodies or source catchments under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
- Litter and silt. GPTs and silt traps are treated as essential, not optional, because Meghalaya drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.
The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.
Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.
8.8 Infiltration and recharge criteria
8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Meghalaya, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is the highest level found from April to November, which covers the season of 1 April to 31 October and the month after it (Clause 3.10.2). Meghalaya needs the three rules of Clause 4.11 here, and Clause 8.8.1 applies with the following. (i) Recharge only on the tested alluvium and valley fills (Clause 4.11, recharge rule). Recharge is not a design objective in Meghalaya: every assessment unit is Safe, and the State draws 3.55% of its extractable groundwater (CGWB, GWRA 2022; 4.60% in the assessment of 2024, as reported). Deliberate recharge is allowed only on the alluvium of sub-area ML-A1, where the water stands 3 to 5 m below ground, and on the tested valley fills of Ri-Bhoi in sub-area ML-A, on ground sloping 10° or less and away from slide-prone slopes, with pretreatment, the field test of Clause 8.8.3 and the separation of this Clause. The CGWB's 60 tests give rainfall infiltration factors of 4 to 5% on the weathered hard rock and Tertiary rocks and 10 to 13% on the alluvium and valley fills: they are fractions of rainfall, not infiltration rates, and no infiltration rate has been measured in the State. (ii) No infiltration on hill slopes (Clause 4.11, hill rule). No deliberate infiltration practice (soakaway, soak pit, recharge pit, shaft or well, infiltration trench, unlined bioretention, or permeable paving with an exfiltrating base) shall be built or credited on natural ground sloping more than 10°; on colluvium, fill or slide debris, whatever its slope; in a mapped landslide zone or landslide locality, among them, in Shillong, Laitumkhrah, Lawsohtun, Happy Valley, Mccabe Road, Bethesda and Arbuthnot and the very-high-susceptibility ground along NH-40 and near the Umshyrpi named in the IRADe/NMHS plan; or upslope of a cut slope or retaining wall within twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. On such sites roof runoff goes to rainwater storage sized under Clause 4.11 (25 L per m² of roof), with its overflow, and all other runoff, led by a lined drain through a sediment trap and an energy dissipator to a stable natural channel, never onto an unprotected slope; the exception for roof water in Clause 8.11.3(c) does not apply, and no infiltration is credited toward retention or the WQv. The Bye-Laws 2021 already ask for "good drainage facilities to prevent excessive saturation of sub-surface formations" in natural hazard prone areas (Section I(b), cl. 1) and for "good drainage of water so that the saturation of the hill slope is avoided" (C12.1(iv)), and the IRADe/NMHS plan for Shillong records that "due to increasing levels of urbanization and unregulated construction work the natural drainage system is blocked". (iii) No infiltration at all on limestone or in mining areas (Clause 4.11, karst and mine rule). No deliberate infiltration practice shall be built or credited, and no geotechnical certificate makes one acceptable, on limestone (the Sohra–Shella limestones of sub-area ML-C and the Jaintia limestones of ML-B1 and ML-C round Khliehriat, Lumshnong and Sutnga), within a coal-mining area (the rat-hole workings of the Jaintia and Garo coalfields), or where caves or sinkholes are known. There every BMP is lined, drains are lined, routed away from cave entrances and checked for void collapse along their alignment, drainage from mine spoil is not routed to a drinking-water intake or to any infiltration device, and pH and metals are added to the outfall checks of Clause 8.13. The CGWB describes the aquifer as "Discontinuous … in the cavernous limestones"; in the coal belt "smaller streams and rivers either disappear or have become seasonal in nature as surface water trickles into and disappears in the unfilled mine pits and caves", and the Krem Liat Prah–Um Im–Labit cave system is reported to run for 30.9 km (both as reported); no karst map, sinkhole inventory or subsidence record was found [TBC], so water put into the ground there goes where no designer can follow it. (iv) No infiltration where the water is within 1 m. On the marshes and waterlogged ground of the Garo plains, on the low terraces and floodplains of the rivers, and on the margins of pungs, lakes and reservoirs, no infiltration facility or recharge structure shall receive runoff of any kind where the seasonal high water table is within 1 m of the ground or the ground is waterlogged; the exception for roof water in Clause 8.11.3(c) does not apply there, and retention is met by storage for use and by detention under Chapter 4. (v) Springs and their recharge areas. Meghalaya has no statute that keeps building or drains away from a spring. Section 62(b) of the Meghalaya Municipal Act, 1973 vests public springs in the Municipal Board, and section 15(1) of the KHADC Regulation, 2015 makes it the duty of the Executive Committee, Town Committee or Dorbar Shnong to ensure that land development does not damage "catchment areas, water sources, spring sheds, streams and rivers". Within the recharge area of a spring (umpohliew) above a town's or village's drinking-water intake, as a hydrogeologist maps it, no paving is laid except for access, no road runoff is led into the ground, and no infiltration facility, soak pit or septic tank is placed; no drain, cut or fill intercepts the flow to a spring or buries its outlet; no infiltration facility, soak pit or septic tank lies within Zone 1 of the spring (Clause 7.4); and a sacred grove (law kyntang) at the head of a stream above an intake is treated as a protected source catchment, into which no drain discharges and through which no runoff from development is led. These rules for springs and groves are set by this Manual, with section 15 of the KHADC Regulation as their hook in the Khasi Hills, not any statute on springs. (vi) Quality. No runoff from mine spoil, quarries, industrial yards or roads with heavy traffic is led to any recharge structure, and a recharge well or shaft on the alluvium or valley fills is used only for roof water or for runoff that has passed a filtering BMP, after a hydrogeologist's report confirming the depth to water, the receiving zone, and that no drinking-water well, spring or intake within 30 m will be harmed. Groundwater in the State already carries iron above the drinking-water limit at Shillong (11.25 mg/l), Nongpoh, Balat, Dawki, Bajengdoba and Kharkutta (CGWB). The 10° trigger, the distance of twice the wall height, the 1 m limit, the karst and mine rule and these conditions are set by this Manual; no Meghalaya rule on infiltration or soak pits on slopes, limestone or mine land was found. The seasonal high groundwater table shall be determined under Clause 3.10.2.
8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.
8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:
- (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
- (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
- (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
- (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).
Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.
8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:
- (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
- (b) 3.0 otherwise.
8.8.5 Minimum rates.
- (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
- (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
- (c) No infiltration credit where the design rate is below 3 mm/h.
8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:
- (a) 3 m from building foundations, and 5 m from a basement;
- (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
- (c) 30 m from a drinking-water well or borewell;
- (d) 15 m from a septic tank or soak pit; and
- (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.
Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.
8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).
8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:
- (a) fuel stations;
- (b) vehicle workshops, washing bays, and bus and truck depots;
- (c) industrial yards and loading areas where hazardous materials are handled or stored;
- (d) solid waste transfer stations and landfill areas; and
- (e) land known or suspected to be contaminated.
Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.
8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Meghalaya has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The alluvium of the Garo foothill plains and the Jinjiram valley and the valley fills of Ri-Bhoi are not coastal sand areas: Clause 8.8.1 applies there in full, and the reduced separation of item (d) does not. In coastal sand areas:
- (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
- (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
- (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
- (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
- (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.
8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the gneiss, granite, quartzite, phyllite and schist of the Archaean gneissic complex and the Shillong Group over most of the plateau, as at Shillong, Jowai and Nongstoin, where groundwater is held in weathered and fractured zones to about 150 m below ground and stands 7 to 17 m down, and the laterite of the south-west (CGWB); on any slope in these areas the hill rule of Clause 4.11 applies first under Clause 8.8.1, and on limestone or in a coal-mining area no infiltration is allowed at all (Clause 4.11, karst and mine rule)):
- (a) tests shall be made at the facility base, below any surface crust or hardpan;
- (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
- (c) infiltration on or above slopes shall be checked for slope stability.
8.8.11 Delta clays and black cotton soils. In the clays and shales of the Garo Group, the marshes (chibol) and waterlogged ground of the Garo plains along the Jinjiram, the silted beds of pungs and the margins of reservoirs, and the clayey colluvium, fill and slide debris of the hills, and in expansive black cotton soils:
- (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
- (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.
Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Meghalaya precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Meghalaya RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.
No map of hydrologic soil groups for Meghalaya, and no measured infiltration rate anywhere in the State, was found. The CGWB's 60 infiltration tests under its aquifer mapping give rainfall infiltration factors, the share of the year's rain that reaches the water table, of 5% on the weathered granite and quartzite and the Tertiary rocks of East Khasi Hills, Ri-Bhoi and the Jaintia hills, 4% on the weathered Tertiary rocks of East Garo Hills, and 10 to 13% only on the alluvium and valley fills of Ri-Bhoi and the Jaintia hills (CGWB, GWRA 2022); these are not infiltration rates, and every infiltration design needs the tests of Clause 8.8.3. The State "is essentially occupied by hard massive rocks belonging to the Archaean gneissic complex … and Precambrian Shillong Group"; its south-western, southern and south-eastern parts are sandstones, shales, conglomerates and limestones of Cretaceous–Tertiary age; and unconsolidated sediments lie as a "thin veneer along rivulets and as valley-fills", thick only "along extreme north-western fringe of the state in South West Garo Hills" (CGWB). The water stands 3 to 5 m below ground in the alluvium, 4 to 9 m in the sandstones and shales of the Garo Group, 2 to 4 m in the "Discontinuous aquifer in the cavernous limestones and sandstones" of the Jaintia and Khasi Groups, and 7 to 17 m in the weathered and fractured gneiss and Shillong Group (CGWB, Table 1). Every assessment unit is Safe, and the State draws 3.55% of its extractable groundwater (GWRA 2022; 4.60% in the assessment of 2024, as reported); the towns are supplied by gravity from "streams and springs by tapping water source at higher altitudes", and still "there is acute shortage of water during the summer as the major part of rainfall is lost as surface run-off" (CGWB). Water put into the ground is a hazard as well as a resource: on the plateau it raises the pore pressure in thin soils over rock in a State where landslides caused "approximately 22 deaths in 2014" (IRADe/NMHS plan, citing the Revenue and Disaster Management Department); on the limestone and in the coal belt it disappears into caves and mine voids (as reported). This Manual's interim soil groups follow from these: the alluvium and valley fills B to C, the Garo Group sandstones C (D on clay or shale), the plateau gneiss, quartzite and phyllite with their thin red loam D for design, the limestone, karst and coal belt D with any loss to voids never credited, the laterite C to D, and urban fill C (D if clayey or compacted) (Chapter 3). The State therefore needs three rules, not one (Clause 4.11). On the tested alluvium of sub-area ML-A1 and the tested valley fills of Ri-Bhoi, recharge is allowed, with pretreatment, as a choice rather than a duty, because groundwater is not short. On hill slopes, on colluvium and fill and in landslide localities, no water is put into the ground on purpose, under the hill rule. On limestone and mine land, no water is put into the ground at all, under the karst and mine rule, whatever a certificate says. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Meghalaya, which has no coast.
Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.
8.9 Sewage cross-connections and dry-weather flow
8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.
8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.
8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Meghalaya State Pollution Control Board (MSPCB) and the drain owner.
8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the monsoon, and record:
- (a) the outfalls with DWF;
- (b) the estimated DWF rate; and
- (c) the upstream sources found by tracing, CCTV, dye or smoke testing.
The results shall be published in the register of Clause 10.17.
8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:
- (a) diverts the DWF to a sewer or a treatment plant;
- (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
- (c) has a screen ahead of the diversion; and
- (d) is not a substitute for removing the source connections.
8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.
Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Meghalaya. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.
In Meghalaya's capital the storm drains are the sewerage. "The Shillong Planning Area has no sewerage system … the sewage flows into individual septic tanks and soaks pits. The sullage from the kitchen and bathroom flows into the primary, secondary and natural drains and finally to the nearby rivers Wah Umkhrah in the north and Wah Umshyrpi in the south" (NESAC, 2023), and the city's 148.91 km of drains "drain directly into the Umkhrah and Umshyrpi rivers", with "the incidence of sewerage mixing in drains … almost 100%" (Smart City Proposal 2016-17, as quoted in the IRADe/NMHS plan). MSPCB has identified 32 outfalls, 20 on the Wah Umkhrah and 12 on the Umshyrpi (minutes of the meeting of 14 April 2023), and five drains entering the Umkhrah "account for 42% of Umkhrah's pre-monsoon discharge" (Chief Secretary's presentation, April 2023). The CPCB's list of September 2025 places both rivers in Priority I, the only two of the State's 35 monitored rivers that fail: the Umkhrah from Demthring to Mawpdang, Mawlai, with a maximum BOD in 2022–23 of 52 mg/L at Demthring, 20 at Umkaliar, 55 near the slaughter house at Mawlai and 56 at Mawpdang, and the Umshyrpi from the Umshyrpi Bridge to the Law College, Dhanketi, with 59 and 39 mg/L; the Chief Secretary's table of 2023 shows no dissolved oxygen at all at Mawlai and total coliforms up to 1,50,000 MPN/100 mL. The five stretches listed in 2018 outside Shillong (the Kyrhukhla, Nonbah, Umtrew, Lukha and Myntdu) dropped out of the 2025 list on BOD, but BOD does not measure acid mine drainage (NEER reading): the joint committee before the National Green Tribunal found the Lukha "to have become acidic", with cement plants, power plants, breweries and ferro-alloy units among the sources (State action-taken report, 21 March 2023), phyco-remediation of the Lukha and the Lunar was minuted in February 2023, and acid discharge from the coal mines to the Kopili was the subject of the 2014 petition (as reported). The drains end in the Umiam lake, which "serves as a cesspool of the waste materials of Shillong and many other villages through Wahumkhrah, Umshyrpi and Umiam rivers" (Expert Committee, 2023), with a BOD of 4.8 to 5.6 mg/L, "Not satisfactory" at all four of MSPCB's stations in June 2023, cyanobacterial blooms and leachate from the Mawiong landfill. Under NGT O.A. 192/2022, in which the Tribunal held that the Additional Chief Secretary, Urban Development, "is required to ensure that the raw fecal matter is not discharged into fresh water streams and Umkhrah and Umshyrpi rivers" (order of 22 November 2022), the State reported in-situ treatment by CSIR-NEERI's ReNEU method in five drains (Pomdngiem or Wah Thangsiniang, Oakland, Lawmali, Wahingdoh–Raimohan and Polo Drain 2), five on-site sewage treatment plants of 13.42 MLD, 55% complete in February 2023, a faecal sludge and septage treatment plant of 0.35 MLD ("350 KLD" in the report, whose cost of "51 Cr" is probably a misprint; the figures conflict), a septage plant of 115 KLD at Marten, a diversion drain at Nongrah, and a survey of 1,169 households along the two rivers that found 47 with faulty septic tanks, served with notices under section 201 of the Meghalaya Municipal Act, 1973 and a fine of ₹500 a day (State action-taken report, 21 March 2023); a sewerage scheme for Shillong was not found, and NESAC's plan proposes decentralised treatment. The State's only distance between sewage and water is the 6 m, or half the depth of the plot, between a septic tank, STP or ETP and the waterbody setback (Waterbodies Guidelines, para 7(3); Bye-Laws 2021, B10, inserted in 2025), and in the Khasi Hills "Under no circumstance should effluent from a septic tank or toilet/latrine be allowed into an open channel, drain or body of water without adequate treatment" (KHADC Regulation, 2015, s.40.3(b)); the Municipal Act's fine for letting sewage run into a drain is ₹25 (s.205). In Meghalaya, therefore: (i) every storm-drain and jhora outfall to the Umkhrah, the Umshyrpi, the Wah Roro and the Umiam lake is taken to carry dry-weather flow until the survey of Clause 8.9.4 shows that it does not, and has a DWF interceptor and a screen under Clause 8.9.5 before it reaches the river or lake, and before any detention or infiltration device; (ii) no septic tank overflow, soak-pit overflow or sullage pipe is connected to a storm drain or jhora on any site approved under this Manual (Clauses 8.9.1 and 8.9.2), with section 40.3(b) of the KHADC Regulation and B10 of the Bye-Laws 2021 as the local hooks; (iii) until sewers exist, a jhora that receives the drains of a settlement is designed as a combined channel: for the velocities that keep sludge moving in dry weather as well as for the storm flow, with access for cleaning along it, and with covers or screens where it passes homes, because of the smell and the risk to health; and (iv) at every outfall in a coal-mining or limestone area of the Jaintia and Garo hills, the outfall survey and monitoring of Clauses 8.9.4 and 8.13 include pH and dissolved metals, as MSPCB directs, and no outfall carrying mine drainage discharges to a drinking-water intake. Every interceptor is sized from the measured dry-weather flow of its drain, does not reduce the drain's capacity for the minor and major events (Clause 8.9.5(b)), and passes the storm flow above its capacity on down the drain; on a jhora that carries boulders and garbage in flood, it and its chamber are placed above the stream's 1% AEP level found under Clause 5.8.5(c), or protected against the scour and debris of that flood (Chapter 9). These conditions are set by this Manual.
8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens
8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:
- (a) a GPT designed under Clause 8.7.10; and
- (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.
8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:
- (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
- (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.
8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:
- (a) be designed with 50% blockage for hydraulic capacity;
- (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
- (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
- (d) be cleanable from a safe platform, with vehicle access.
8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.
Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Meghalaya waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.
8.11 Rainwater harvesting integration
8.11.1 RWH mandate continues. The rainwater harvesting required by the Meghalaya Building Bye-Laws 2021 (Table G1, which requires rainwater harvesting for every plot category and use, "Ground water recharge for covered area more than 3000 sqft" on residential plots of Category II, and soft cover of at least 10% or 20% of the plot, with a 10% rebate of the permission fee where both waste-water recycling and rainwater harvesting are provided (G2.1.2), but sets no storage volume or roof-area rate; and, in the Khasi Hills Autonomous District, section 36 of the Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015, which makes "storing of water runoff including rainwater in all existing and new buildings" mandatory and asks the plans to "indicate the system of storm water drainage along with points of collection of rain water") continues to apply, subject to the limits of Clause 8.8.1: where the recharge that Table G1 asks for falls on a site where Clause 4.11 bars infiltration, this Manual states the conflict, requires storage for use in its place, and leaves the Applicant to seek the Authority's relaxation of the bye-law, which this Manual does not override (Chapter 1). This Clause sets how RWH structures are counted under this Manual.
8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:
- (a) harvesting: storage for use (sumps and tanks);
- (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
- (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).
8.11.3 Recharge structures.
- (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
- (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
- (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.
8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:
- (a) its infiltration rate has been tested under Clause 8.8.3;
- (b) it empties within 72 hours at the design rate; and
- (c) it has pretreatment.
A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).
8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every monsoon (April–October) design storm (Chapter 4).
8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.
8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.
Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Meghalaya's building rules make rainwater harvesting compulsory, but none of them sets a volume or a detention rule. Under the Bye-Laws 2021, "All buildings while submitting the building plans for sanctions, shall mandatorily include the complete proposal for green buildings and sustainability norms" (G.1), and Table G1 lists "Rain Water Harvesting" for every plot category and use, "Ground water recharge for covered area more than 3000 sqft" on residential plots of Category II (5,001 to 25,000 sq ft), and soft cover of at least 10% of a plot of up to 5,000 sq ft and 20% of a larger one; new buildings in the City Centre Zone "shall adopt rain water harvesting systems" and keep 30% of the plot as open space with soft cover (D8.2); a rebate of 10% of the permission fee is given where both waste-water recycling and rainwater harvesting structures are provided (G2.1.2); and the drawings show the rainwater harvesting with the surface drains, septic tank and soak pit. In the Khasi Hills "Water harvesting through storing of water runoff including rainwater in all existing and new buildings shall be mandatory", and the plans "shall indicate the system of storm water drainage along with points of collection of rain water in surface reservoirs or in recharge wells" (KHADC Regulation, 2015, s.36), with soft cover of at least 15% of the plot where the covered area is 500 m² or more and "Semi-pervious ground cover" as paving "wherever possible" (s.35(iii)). The State told the National Green Tribunal in 2023 that rainwater harvesting is "Incorporated as one of the conditions while giving building permission" and that the Smart City programme was installing it at 52 locations (action-taken report, 21 March 2023); the State Water Policy of 2019 is reported to focus on rainwater harvesting (as reported; not read). None of these gives litres per m² of roof, a tank volume, a recharge rate, a test of a recharge pit or a limit on soak pits on slopes, limestone or mine land, and no audit of what has been built was found. This Manual credits storage sized at 25 L per m² of roof (Clause 4.11), more than the 20 L per m² of the mountain editions of this series, because Meghalaya's towns go short of water from November to March and the bye-laws set no volume. On the alluvium of sub-area ML-A1 and the tested valley fills of Ri-Bhoi, recharge may be one function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); on hill slopes, on colluvium and fill, in landslide localities, on limestone and in mining areas, harvesting is for storage and use only, and its overflow goes to a lined drain; where the bye-law's recharge requirement falls on such a site, this Manual states the conflict and requires storage in its place (Clause 8.11.1). RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a June monsoon storm against the plateau and the southern escarpment, such as those of 16 June 1995 and 15–17 June 2022, arrives after weeks of rain, which is why it cannot be counted as detention.
Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.
8.12 Construction-stage erosion and sediment control
8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:
- (a) the sequence of clearing, earthworks and stabilisation;
- (b) the area exposed at each stage;
- (c) the measures of Clause 8.12.3, with their locations and sizes;
- (d) the protection of infiltration and retention areas (Chapter 10);
- (e) stockpile, concrete washout and fuel storage locations; and
- (f) the inspection and maintenance schedule.
8.12.2 Monsoon timing. Earthworks shall be planned so that:
- (a) the area exposed during the monsoon (April to October) is as small as practicable;
- (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 March; and
- (c) any area exposed between 1 April and 31 October has sediment controls in place before it is cleared.
8.12.3 Measures.
- (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
- (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
- (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
- (d) Inlet protection at every existing drain inlet that receives runoff from the site.
- (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
- (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the monsoon.
- (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
- (h) Concrete washout in a lined pit, never into a drain.
8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).
8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.
8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).
Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Meghalaya's 2-year 24-hour depths are high and construction sites are commonly left exposed through the monsoon. The 2 ha division between traps and basins, the 31 March stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 March date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Meghalaya garbage and slide debris travel with the sediment: 49,612 m³ of waste was removed from the Wahumkhrah (State action-taken report to the National Green Tribunal, 21 March 2023), drains blocked by waste are reported to raise the susceptibility of Shillong's slopes to landslides (as reported), the Umiam reservoir is reported to have received 20.551 Mm³ of sediment between 1965 and 2004, and the landslides of 30–31 May 2025 in Umling block, near NH-6, were linked to hill cutting along the highway (both as reported). The Bye-Laws 2021 already ask, in natural hazard prone areas, that "Construction should not obstruct existing surface drainage courses", that builders "Construct diversion ditches and swales to direct runoff away from sensitive areas and into designated sediment basins" and "Install silt fences, sediment barriers, or basins around the construction site" (Section I(b), cls. 2, 4 and 5, inserted in 2024), and on water-logged plains "Storm water inlet protection" (Section I(c), cl. 4); they give no size, date or inspection, which Clause 8.12 supplies. The stabilisation date of 31 March is set by this Manual, before its season begins on 1 April, because the escarpment's largest falls come in April and May as well as in June (Chapter 2). The reason given above for the larger basin volume, that the 2-year 24-hour depths are high, holds on the southern escarpment, where the Cherrapunji curve of IMD Das et al. (2022) gives about 410 mm, and on the plateau and the northern foothills, where the NIH-DHAARA reanalysis gives about 93 mm at Shillong, 121 mm at Jowai and 82 mm at Nongpoh (comparison values only, not design values; Chapter 2) and AMC III applies through the season (Chapter 3); no 2-year value was found for the Garo hills, and the rule of Clause 8.12.3(c) is kept unchanged everywhere. In Meghalaya the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel and never onto an unprotected slope; no sediment basin or trap is designed to infiltrate where Clause 4.11 bars infiltration, which includes every slope steeper than 10° and all limestone and mine land; no spoil, debris or garbage from a site is placed in a jhora, stream or pung, within its Zone 1, or on the recharge area of a spring; and a construction site in the catchment of the Umiam lake or of a pung keeps its sediment out of every drain that reaches the water.
8.13 Monitoring
8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:
- (a) dry-weather sampling (Clause 8.9.4), at least once a year before the monsoon; and
- (b) wet-weather sampling of at least three events each monsoon at a set of index outfalls.
8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.
8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).
8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.
8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.
Commentary. No Meghalaya programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.
8.14 Submittal requirements
Every drainage report under this chapter shall include:
- the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
- for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
- the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
- for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
- the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
- the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
- the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
- the ESC plan (Clause 8.12).
8.15 Review and update
8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A: Engineering Design (§9.5, Ch. 10). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- Mid-America Regional Council and Kansas City Metro Chapter APWA (2012). Manual of Best Management Practices for Stormwater Quality (Tables 4.2–4.6). https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01; MARC factsheet and Supplement. https://www.marc.org/document/apwa-5600-manual-factsheet ; https://www.marc.org/document/apwa-stormwater-standards-supplement
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, 2016 Edition, Vols 1–2. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd Edition. https://did.sarawak.gov.my/web/attachment/show/?docid=clRsMlRycU1lNnFRcnl3eDZnNkJMdz09OjpY0au0UPvQ9zUHVWRMbCKX
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- CIRIA (2015). The SuDS Manual (C753). London: CIRIA.
- PUB, Singapore's National Water Agency. Active, Beautiful, Clean Waters Design Guidelines (current edition).
- Central Ground Water Board (2007). Manual on Artificial Recharge of Ground Water. Ministry of Water Resources, Government of India.
- US Environmental Protection Agency (2022). NPDES Construction General Permit (sediment basin sizing).
- ASTM D3385. Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer.
- BRE Digest 365. Soakaway Design. Building Research Establishment, UK.
- Government of Meghalaya, Urban Affairs Department. Meghalaya Building Bye-Laws, 2021, Notification No. UAU.73/2016/Pt/402 of 9 March 2021, Section G (Table G1; G2.1.2), D8.2 and the drawing requirements; (Amendment) Byelaws, 2024, No. UAU.73/2016/Pt/55 of 29 February 2024, Section I(b) and I(c); (Third Amendment) Bye-laws, 2025, No. UAU.73/2016/Pt.III(A)/70 of 21 October 2025, B10 (Chapter 7 references).
- Khasi Hills Autonomous District Council. Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015, ss. 35(iii), 36 and 40.3(b) (Chapter 7 references).
- Government of Meghalaya. Meghalaya Municipal Act, 1973, ss. 201, 204 and 205 (Chapter 7 references).
- Central Ground Water Board, North Eastern Region, Guwahati (2022). Dynamic Ground Water Resources of Meghalaya (GWRA 2022), Table 1 and §4.4. http://web.archive.org/web/20250402124501/https://www.cgwb.gov.in/old_website/GW-Assessment/GWR-2022-Reports%20State/Meghalaya.pdf ; GWRA 2024 (as reported; not read).
- Central Pollution Control Board (September 2025). Polluted River Stretches for Restoration of Water Quality (Meghalaya; Annexures with the 2018 list). https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf
- Shillong Municipal Board. Minutes of the stakeholder meeting on the Wah Umkhrah, Wah Umshyrpi and Wah Umkhen, 14 April 2023, https://smb.gov.in/other_menu/new_projects/files/MoM%20_RestorationOfRivers.pdf ; and the Chief Secretary's presentation Restoration of Rivers (April 2023), https://smb.gov.in/other_menu/new_projects/files/Restoraton%20of%20Rivers.pdf
- National Green Tribunal. O.A. 192/2022: State action-taken report of 21 March 2023 and Joint Committee report of 28 February 2023 (Chapter 7 references); O.A. 73/2014 (order of 17 April 2014), as recited in the Supreme Court's judgment in State of Meghalaya v. All Dimasa Students Union, Dima Hasao District Committee, C.A. 10720/2018, 3 July 2019, https://api.sci.gov.in/supremecourt/2018/39439/39439_2018_11_1501_14662_Judgement_03-Jul-2019.pdf
- Expert Committee under the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023: report on the Umiam lake, with MSPCB's water quality of June 2023, annexed to the Guidelines (Chapter 7 references).
- North Eastern Space Applications Centre (2023). Risk Informed GIS Based Master Plan, Shillong Planning Area (sewage and sullage; decentralised treatment) (Chapter 7 references).
- Integrated Research and Action for Development (2020). Disaster Resilience Action Plan, Shillong, IRADe-PR-73(2020), for the National Mission on Himalayan Studies. https://nmhs.org.in/w/pdf/publication/Technical_Report/Dr.Rohit_Mangotra/Shillong_Disaster_Resilience_Action_Plan.pdf
- Central Water Commission (2000). Flood Estimation Report for South Brahmaputra Subzone 2(b) (Revised), Report No. SB-2(b)/R-4/44/99 (Chapter 2 references); Das, Srivastava and Yadav (2022), MAUSAM 73(4), and NIH-DHAARA (Chapter 2 references).
- Reports of acid mine drainage and karst in the Jaintia hills (secondary): Down To Earth on the Kopili petition (2014); India Water Portal and Mongabay (2018) on streams lost to mine pits and caves and on the Krem Liat Prah–Um Im–Labit cave system.
- Parliament reply AU1419 on AMRUT 2.0 admissible components. https://eparlib.sansad.in/bitstream/123456789/2988692/1/AU1419_tzCIvw.pdf
Annexes and forms
| Annex / Form | Content |
|---|---|
| 8A | 3-month ARI 24-hour depth and IDF by zone |
| 8B | Redevelopment LoS table and treatment-train composite VR |
| 8C | Meghalaya BMP performance calibration |
| 8D | BMP design sheets, media specification, plant lists |
| 8E | Erosion and sediment control standard details |
| Form 8-1 | Water Quality Sheet |
| Form 8-2 | Infiltration Test Record |
Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.