Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Meghalaya. Meghalaya is landlocked and hilly: it has no coast, no tide and no Coastal Regulation Zone, and the monsoon reaches it only as rainfall, driven against the plateau and the southern escarpment; that rainfall is dealt with in Chapter 2, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Meghalaya: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials, and shall resist abrasion by gravel and boulders and attack by acid mine drainage in the coal belt), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Meghalaya the receiving water is one of five kinds: a city stream, the Umkhrah or the Umshyrpi through Shillong, ungauged and narrowed by building and garbage, whose valley floors flood with nearly every heavy downpour; a river, reached directly, through a gate in a bank or through a pumping station, such as the Umngot at Dawki, the Myntdu below Jowai and the rivers that run into Assam or Bangladesh, which rise within hours on the escarpment and stay high for the days that a monsoon spell lasts; a jhora (a small hill stream) or other hill stream, ungauged, steep and laden with boulders, slide debris and garbage, whose bed rises and falls in a single flood; a reservoir of MePGCL held near its full level, such as the Umiam (Barapani) reservoir, or the reach of river below one of its dams, or a lake or pung (Khasi and Pnar: pond, pool or small lake; Garo: pokri), such as Ward's Lake (Nan Polok) or Thadlaskein (Pung Sajar Nangli); or a river of the Garo foothill plains, such as the Jinjiram, held up by the backwater of the Brahmaputra; and:

  • (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a city stream, a river, a jhora or hill stream, a reservoir, lake or pung, a river under backwater or a receiving drain, with the locks and closures of Clause 5.8.5(a) to (e) in place of the tidal lock windows.

Commentary. The drains of Meghalaya's towns fail in places that site design does not see, and in five different ways. The first is the city stream. Shillong's drains, 148.91 km of them, "drain directly into the Umkhrah and Umshyrpi rivers" (Smart City Proposal 2016-17, as quoted in the IRADe/NMHS plan, 2020); neither stream has a gauge; Polo, Pynthorbah, Nongmynsong, Forest Colony and Mawlai flood "with nearly every heavy downpour" when the Wah Umkhrah overflows, a flooding attributed to "clogging of Wah Umkhrah and the decreasing width of the river due to human activities" (as reported; the same text in the IRADe/NMHS plan); and NESAC found that "Encroachment and clogging of channels are the main causes of flooding over Shillong" (NESAC, 2023). The second is the river. CWC has seven level-monitoring sites in the State and no forecasting site, and no site has a warning or a danger level (SANDRP, 2018, as reported); the highest levels at Dawki and Kharkhana were set on 28 May 2006 and 23 April 1995, before the south-west monsoon, and in June 2026 the Umngot at Dawki rose rapidly and submerged a labour camp of the bridge project (as reported). The third is the jhora. The jhoras are ungauged, many are dry for most of the year and so fall outside the Waterbodies Guidelines' definition of a waterbody, and they carry the slide debris of the slopes and the waste of the towns: 49,612 m³ of waste was removed from the Wahumkhrah alone (State action-taken report to the National Green Tribunal, 2023). The fourth is the reservoir and its release reach. The Umiam reservoir receives everything Shillong drains, and MePGCL's guidelines describe reservoirs so small that release notices are "not practicable", with warnings by siren, telephone or SMS; the escarpment's dams pass floods of a size the northern slope never sees, 12,000 m³/s from a catchment of 350 km² at Myntdu–Leshka against 3,820 m³/s from 1,020 km² at New Umtru (MePGCL guidelines). The fifth is the backwater of the plains: in September 2014 the Brahmaputra and the Jinjiram submerged over 200 villages of the Garo Hills (as reported). The outfalls also belong to one body while the drains above them belong to others: the rivers and flood works are the Water Resources Department's, the reservoirs MePGCL's, the city drains the Municipal Boards', the road drains PWD's, NHAI's or NHIDCL's, and the village drains and jhoras the District Councils' and the Dorbar Shnongs', and no rule divides them (Chapter 6, Clause 6.9). No document found during research sets a design level for any stream, river, reservoir, lake or pung outfall in the State, or a design standard for any town drain. A detention basin that meets every release rate in Chapter 4 still fails if the stream it drains to stands above its outfall, if the jhora has buried its outlet in boulders or garbage, or if the reservoir is full. This chapter makes these failure modes part of the design. Meghalaya has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, Water Resources Department canal, the Umkhrah (Wah Umkhrah) and the Umshyrpi (Wah Umshyrpi) through Shillong and the Wah Roro that they form, the Umkhen and the Wah Tamdong, the Myntdu at Jowai, the Ganol and the Ringrey and Rongkhon streams at Tura, the Simsang at Williamnagar, the Umngot at Dawki, the Umtru below the New Umtru dam, the Jinjiram and the Krishnai on the Garo foothill plains, any drain built or held by a Municipal Board, the Shillong Cantonment Board, NSTDA, Shillong Smart City Ltd, PWD (Roads), NHAI or NHIDCL with an internal width of 1.0 m or more, and every jhora or other natural stream that drains 8 ha or more, whether or not the Waterbodies Guidelines treat it as a waterbody, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, pung or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or pung under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, SMB, MSDMA or Water Resources Department; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next pung or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Meghalaya. In the hill towns, where a colony's drain runs down a jhora to a stream (wah), and the stream to a river or reservoir many kilometres below, as Shillong's drains run by the Umkhrah and the Umshyrpi to the Wah Roro and the Umiam reservoir, and on the Garo foothill plains, where the drains of Phulbari and Tikrikilla run to the Jinjiram and on to the Brahmaputra in Assam, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the valley floors and plains of Meghalaya whose outfalls lie below streams, rivers and reservoirs held high for hours or days: Polo, Pynthorbah, Nongmynsong, Forest Colony and Mawlai in Shillong flood "with nearly every heavy downpour" when the Wah Umkhrah overflows (as reported; IRADe/NMHS plan, 2020), the Brahmaputra and the Jinjiram submerged over 200 villages of the Garo Hills in September 2014 (as reported), and the shore of the Umiam reservoir drains to a lake held near its full level, from which releases were reported to have begun in August 2024 on an IMD warning (as reported). Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Meghalaya, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, MUDA or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Meghalaya has no coast, and the surge term does not arise in the State, which the monsoon reaches only as rainfall, driven against the plateau and the southern escarpment (Chapter 2).

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Meghalaya, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • the Umkhrah (Wah Umkhrah) and the Umshyrpi (Wah Umshyrpi) through Shillong, with the jhoras that run to them and the valley floors of Polo, Pynthorbah, Nongmynsong, Forest Colony, Mawlai, Dhankheti and Nongrim Hills, and the Wah Roro that they form before Umiam lake (Clause 5.8.5(a));
  • the Umngot at Dawki, the Umnohryngkew at Therriaghat, the Myntdu at Jowai and at Kharkhana, the Bugi at Dimapara and the Dareng at Sibbari, and the other rivers that run south to Bangladesh, among them the Kynshi and the Simsang at Williamnagar (Clauses 5.8.3 and 5.8.5(b));
  • the Kopili, the Digaru, the Kulsi, the Krishnai (Dudhnai) and the Umtru below Byrnihat, where they run into Assam (Clause 5.8.5(b));
  • the jhoras and hill streams of the towns, among them the jhoras of Shillong and the Umkhen and Wah Tamdong, the Ganol and the Ringrey and Rongkhon streams at Tura, the Myntdu headwater streams at Jowai, the Umlew at Nongpoh–Umling, and the streams of Sohra, Mawsynram, Shella and Pynursla on the southern escarpment (Clause 5.8.5(c));
  • the Umiam (Barapani) reservoir, the Kyrdemkulai (Stage III), Nongkhyllem (Stage IV), New Umtru and Myntdu–Leshka reservoirs of MePGCL and their release reaches, among them the Umtru to the Byrnihat bridge and the Myntdu to the Bangladesh border, and the Kopili project of NEEPCO (Clauses 5.8.3 and 5.8.5(d));
  • Ward's Lake (Nan Polok), Thadlaskein (Pung Sajar Nangli) and the other lakes and pungs (Clause 5.8.5(d));
  • the Jinjiram and the Krishnai on the Garo foothill plains at Phulbari and Tikrikilla, under the backwater of the Brahmaputra, and the south Garo rivers at Baghmara and Dalu (Clause 5.8.5(e));
  • any drain or channel of a Municipal Board, the Shillong Cantonment Board, NSTDA, Shillong Smart City Ltd, PWD (Roads), NHAI or NHIDCL, and any village drain or jhora held under a District Council's rules, that receives storm water (Clause 5.8.5(f)); and
  • elsewhere: any river or Water Resources Department channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) Water Resources Department design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Umiam dam (Stage I) at Barapani and the Kyrdemkulai (Stage III) and Nongkhyllem (Stage IV) dams of the Umiam–Umtru projects; the New Umtru dam on the Umtru above Byrnihat; the Myntdu–Leshka dam on the Myntdu downstream of Jowai; and the Kopili project of NEEPCO on the Kopili, shared with Assam), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 The Umkhrah and Umshyrpi, gauged and border rivers, jhoras, reservoirs and release reaches, pungs and lakes, the Garo plains, the drains of other bodies, and Water Resources Department consent.

  • (a) Shillong's Umkhrah and Umshyrpi. For an outfall to the Umkhrah (Wah Umkhrah) or the Umshyrpi (Wah Umshyrpi), to a jhora or drain that ends in either of them, or to the Wah Roro that they form before Umiam lake (NESAC, 2023):
    • No gauge, no level. Neither stream has a gauge of CWC or of any other body, and no flood level has been published for any reach of either [TBC]. The floodplain zonation of identified stretches, among them the Umkhrah, awarded to RMSI in June 2021 and reported 80% complete in March 2023 (State action-taken report to the National Green Tribunal, 21 March 2023), has not been published [TBC], and the levels of the embankment and channel scheme for the Wahumkhrah and Umshyrpi that the Water Resources Department is reported to have resubmitted were not obtained (as reported) [TBC]. The IRADe/NMHS plan for Shillong (2020) says that the two rivers reach "the danger mark during heavy rainfall", but no danger level is set for either.
    • Design level. The tailwater for the major-system and storage cases shall be the highest of: (i) the 1% AEP level at the outfall from a hydraulic model (Clause 5.8.2(b)) of the stream from the outfall to at least the next confluence downstream, with the rainfall of sub-area ML-B under the Shillong rule of Clause 2.3.6(c)(i), the AMC of Clause 3.8.4, the bulking factor of Clause 6.3.6(b) on the peak flow, the crossings downstream blocked as Clause 6.3.6(c) requires, and the channel as surveyed in its present condition, net of encroachment, silt, solid waste, stone bunds, waste traps and the interception works of Clause 8.9; (ii) the level at the outfall of any flood study of the stream made by or for the Water Resources Department or the State, among them the RMSI floodplain zonation, once it is published [TBC]; and (iii) the highest flood level surveyed at the outfall from flood marks, such as debris lines, silt marks and the accounts of residents, of the flash flood of 9 July 2019 at Polo, Forest Colony and Mawlai (IRADe/NMHS plan, 2020) or a later flood, and from the records of the Shillong Municipal Board, the Water Resources Department, the District Council, the Dorbar Shnong or the Deputy Commissioner, with its source stated. No outfall to either stream shall be designed without items (i) and (iii) (set by this Manual).
    • Valley floors. Polo, Pynthorbah, Nongmynsong, Forest Colony, Mawlai, Dhankheti and Nongrim Hills flood "with nearly every heavy downpour" when the Umkhrah overflows (as reported; the same text in the IRADe/NMHS plan, 2020), and NESAC's master-plan study names "Polo Market, Pynthorbah, Nongrim hills, Dhankheti" as "highly potential for flash flood" (NESAC, 2023). Every outfall on these valley floors, and every outfall elsewhere on either stream whose invert is below the design level of this item, is an outfall-closed case: the outfall-closed check of Clause 5.10 applies with a single lock that lasts for the duration of the design storm plus the stream's recession, computed with the model of item (i) for as long as the stream stays above the outfall invert, and not less than 24 hours; where the 48- and 72-hour storms of Clause 5.10.2 are run, the lock lasts for the whole storm (set by this Manual). A shorter lock may be used only where the outfall invert is above the 1% AEP level of this item.
    • Two jurisdictions. Only part of each stream lies in the area of the Shillong Municipal Board; the rest lies under the Khasi Hills Autonomous District Council (State action-taken report, 21 March 2023), and the Board was asked to prepare a geo-referenced map dividing the two [TBC]. The designer shall state on Form 5-1 which body holds the reach at the outfall and obtain its consent under item (f).
    • Interception and waste traps. An interception and diversion structure, an on-site treatment plant at a junction with the Umkhrah, an in-situ drain treatment work, a stone bund or a solid-waste trap on either stream or its jhoras (Clauses 6.3.6(i) and 8.9) shall not raise the design level of this item or reduce the capacity of the drain or stream; it shall stand above that level or be designed to be overtopped without damage. The 20 outfalls to the Umkhrah and 12 to the Umshyrpi identified by MSPCB (minutes of the stakeholder meeting, 14 April 2023) carry dry-weather sewage and sullage and are dealt with under Clause 8.9.
  • (b) Rivers with CWC level-monitoring sites, and rivers that leave the State. For an outfall to a river directly, through a gate in a bank, a flood wall or an embankment, or through a pumping station, or into a drain that itself discharges in one of those ways, the designer shall identify the body that operates each gate and pumping station, and obtain the sill of each gate, the crest of the bank, wall or embankment, the installed pumping capacity and the operating levels, including the river level at which each gate is closed. Every level shall state its datum and its connection to the gauge datum of the nearest CWC gauge, or of the MePGCL or other gauge used, with its operator named.
    • Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall, from a hydraulic model under Clause 5.8.2(b), with the releases of item (d). No floodplain zone has been notified under the Meghalaya Flood Plain Zoning Act, 2026 and no flood level has been published for any reach of any river in the State (Chapter 7), so no level is available from a floodplain study [TBC]. The level shall in no case be less than the highest recorded level at the nearest CWC gauge on the same river, transferred to the outfall. CWC has seven level-monitoring sites in Meghalaya and no forecasting site (SANDRP, 2018, a copy of CWC data, as reported); the highest levels found during research (Table 5B.1), with no datum stated and none read in a CWC site sheet [TBC], are: the Umngot at Dawki 73.47 m (28 May 2006); the Umnohryngkew at Therriaghat 20.62 m (15 June 1995); the Myntdu at Kharkhana 47.0 m (23 April 1995); the Bugi at Dimapara 29.75 m (27 July 2007); and the Dareng at Sibbari 20.34 m (12 August 2017). The two sites at the Myntdu Stage-II dam and power house have no published level, and two sites are listed as inactive and were not identified [TBC]. Where a later flood has exceeded the listed level, the later level governs: at Dawki, the level of the Umngot flood of June 2026, which submerged a labour camp of the bridge project (as reported), shall be surveyed from its flood marks, tied to a Survey of India benchmark, and used where it is higher (set by this Manual) [TBC]. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the gauge records or from the model; on these steep rivers, whose beds fall several metres in a kilometre where they leave the escarpment, a profile of the flood marks of the same flood, surveyed between the gauge and the outfall and tied to a Survey of India benchmark, may be used in place of the unchanged level, and the level of the nearest gauge downstream shall not be carried upstream (set by this Manual).
    • Rivers and reaches with no gauge level. No CWC site exists on the Umiam, the Umtru, the Kynshi, the Simsang, the Ganol, the Jinjiram or the Kopili within Meghalaya, or on the Myntdu at Jowai, where the Kharkhana site lies far downstream (SANDRP, 2018, as reported). On such a reach, and for an outfall upstream of every gauge on its reach, the river level shall be the higher of the level from a model under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks, including those of June 2022, May 2025 and June 2026, and from the records of the Water Resources Department, the local body, the District Council or the Deputy Commissioner, with its source stated. Where a level is known only as a gauge reading, the designer shall tie the gauge zero to the project datum and a Survey of India benchmark by levelling. No outfall shall be designed on such a reach without one of these levels (set by this Manual).
    • Rivers that leave the State. The Kopili, the Digaru, the Kulsi, the Krishnai (Dudhnai), the Jinjiram and the Umtru below Byrnihat run into Assam, where the Assam edition of this Manual governs the plains reaches. CWC's sites on them in Assam are the Kopili at Kampur (warning level 59.5 m, danger level 60.5 m, highest level 61.79 m on 20 July 2004) and at Dharamtul (warning level 55.0 m, danger level 56.0 m, highest level 58.09 m on 21 July 2004), and level-monitoring sites with no published level on the Digaru at Sonapur, on the Kulsi and on the Dudhnai (SANDRP, 2018, as reported) [TBC]. For an outfall in Meghalaya on these rivers, the level at the State boundary from the Assam edition, or from those sites transferred upstream, is a lower bound on the downstream boundary of the model, not the level at the outfall. The Umngot, the Myntdu, the Kynshi, the Simsang, the Bugi and the Dareng run south into Bangladesh; no flood level of their lower reaches across the border was found [TBC], and the model of an outfall on them shall start far enough downstream that the boundary does not govern the level at the outfall (set by this Manual).
    • 10% AEP level. No CWC site in Meghalaya has a warning or a danger level (SANDRP, 2018, as reported). For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or from a frequency analysis of the gauge record; until such an analysis is accepted, the 10% AEP case shall use the design river level of this item (set by this Manual). The datum of every level is to be confirmed for each gauge; the levels are presumed to be metres above mean sea level [TBC].
    • Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the gate, bank, wall or embankment, and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, boulders, debris, encroachment, solid waste and weed, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the gate only while the river is lower than the level behind it. No pumped outfall was found in the State during research [TBC]. Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5).
    • River lock. Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, or above the level at which its gate is closed if that is lower, taken from the river model or from the stage record of the nearest CWC gauge in the flood that set the highest recorded level or in a comparable flood, with the releases of item (d), and not less than 72 hours, or, on a river below a dam, the time for which the largest release of the dams above stays above the flow at which the outfall is closed, from the operator's records, if that is longer (set by this Manual). The lock covers the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4) and the drawdown of Clause 5.10.5 is met by pumping until the lock ends. A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where an analysis of the stage record of a CWC gauge under Clause 5.10.6, including the releases of the dams above, shows it and the Authority approves it.
    • Gate failure and breach. Floor levels and pumped outfalls behind a gate, flood wall or embankment shall also be checked for the failure of the gate and for a breach of the wall or embankment, with the land and drains behind it filled to the river level beyond it. Below a dam they shall also be checked for the release that results from a gate failing open.
  • (c) Jhoras and other ungauged hill streams. For an outfall to a jhora (a small hill stream), a wah (stream) or another hill stream, such as the jhoras of Shillong that run to the Umkhrah, the Umshyrpi, the Umkhen and the Wah Tamdong, the streams of Jowai on the Myntdu headwaters, the Ringrey and Rongkhon streams and the Ganol at Tura, the streams of Williamnagar, Nongpoh and Nongstoin, and the streams of Sohra, Mawsynram, Shella and Pynursla on the escarpment, or into a drain that ends in one:
    • No gauge. None of these streams has a gauge or a published flood level [TBC]. They are steep and short, rise within minutes of a burst of rain, and carry boulders, gravel, slide debris and, below the towns, garbage: 49,612 m³ of waste was removed from the Wahumkhrah under the 15th Finance Commission at a cost of ₹7.9 crore, and stone bunds and solid-waste traps were built for ₹3.60 crore (State action-taken report to the National Green Tribunal, 21 March 2023). Many of them dry out for most of the year and are outside the Waterbodies Guidelines' definition of a "waterbody" (Chapter 7), but not outside this clause.
    • Design level. The tailwater for the major-system and storage cases shall be the highest of: (i) the 1% AEP level at the outfall from a study of the stream, made with a hydrograph method of Chapter 3 for the whole catchment above the outfall, with the rainfall of its sub-area in Annex 2A, the AMC of Clause 3.8.4 and the bulking factor of Clause 6.3.6(b) on the peak flow, and routed through a hydraulic model (Clause 5.8.2(b)) of the channel as surveyed, net of encroachment, silt and solid waste, with the crossings downstream blocked as Clauses 6.3.6(c) and 6.3.6(i) require; in sub-areas ML-C and ML-C1 the study is the site-specific hydrology study of the ML-Z3 rule of Clause 2.3.6, with the 24- to 72-hour storms of Clause 6.3.6(j); (ii) the level at the outfall of any flood study of the stream made by or for the Water Resources Department or the local body, where it gives one [TBC]; and (iii) the highest flood level surveyed at the outfall from flood marks, such as debris lines, silt and scour marks and the accounts of residents, of the floods of June 2022, October 2024, May 2025 and June 2026 or a later flood, and from the records of the local body, the District Council, the Dorbar Shnong or the Deputy Commissioner, with its source stated. No outfall to such a stream shall be designed without items (i) and (iii) (set by this Manual).
    • Bed level, scour and aggradation. The designer shall survey the bed of the stream at the outfall and for at least 100 m upstream and downstream, and state the range within which the bed has moved, from past surveys, cross-sections, exposed foundations and pipes, and the records of the local body. The outfall invert, and the seat of any flap gate on it, shall stand at least 0.5 m above the highest bed level found in that range within 50 m downstream of the outfall, and the foundation of the outfall structure and its apron shall be taken below the scour depth computed under Chapter 9 (Clause 9.6) for the 1% AEP flow with the bulking factor (set by this Manual).
    • Siting. An outfall shall be built into the bank and shall not project into the bed or the active channel, taken for this Manual as the land flooded once in 5 years (set by this Manual). It shall discharge in the direction of the stream's flow, with the bank protection that Chapter 9 requires, and no pipe, interceptor or chamber of the drainage system shall be laid along the bed of the stream. No muck, spoil or excavated material from the works shall be placed in the stream or where a storm can carry it into one (Clause 6.3.6(g)). No outfall shall discharge to a spring or its recharge area, into a sinkhole, a cave entrance or a mine pit, or to a reach of stream that sinks into one (Clause 4.11 (karst and mine rule)) (set by this Manual).
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the level of the stream, computed under item (i) for the coincident cases of Clause 5.8.4, stays above the invert, and, where no hydrograph of the stream has been computed, for the whole storm (Clause 5.9.4) (set by this Manual).
    • Interceptors and water sources. An interception and diversion structure on a jhora or its drains (Clause 8.9) shall not raise the design level of this item or reduce the capacity of the drain; it shall stand above that level or be designed to be overtopped without damage. Where the stream or a spring on it supplies drinking water, as the streams and springs that supply most towns by gravity do (CGWB, 2022), Clause 8.9 and the spring rules of Chapter 7 also apply.
  • (d) MePGCL reservoirs and release reaches; lakes and pungs. For an outfall to a reservoir, a lake or a pung (Khasi and Pnar: pond, pool or small lake; Garo: pokri), directly or through a drain, jhora or stream that ends in it, such as the Umiam (Barapani) reservoir, which receives the Umkhrah and Umshyrpi through the Wah Roro; the reservoirs of the Umiam–Umtru Stage III dam at Kyrdemkulai and Stage IV dam at Nongkhyllem; the New Umtru reservoir; the Myntdu–Leshka reservoir; Ward's Lake (Nan Polok) in Shillong; and Thadlaskein (Pung Sajar Nangli) and the other pungs; or to a reach of river below one of the dams:
    • Consent. Storm water shall not be discharged to a reservoir or its release reach without the written consent of MePGCL, which holds the Umiam–Umtru, New Umtru and Myntdu–Leshka projects, or, for the Kopili project on the Kopili, shared with Assam, of NEEPCO. Storm water shall not be discharged to a lake or pung without the written consent of its custodian, which was not confirmed during research for Ward's Lake, Thadlaskein or any other [TBC]; within municipal limits, public tanks and reservoirs vest in the Municipal Board (Meghalaya Municipal Act, 1973, s.62(b)), whose consent is also required, and a pung held by a community, clan or Dorbar Shnong needs the written consent of that institution (set by this Manual). No sacred or community pung shall be used as a detention pond. An outfall that carries dry-weather flow is dealt with under Clause 8.9; the Umiam reservoir already "serves as a cesspool of the waste materials of Shillong" (Expert Committee report annexed to the Waterbodies Guidelines, 2023).
    • Design level. The tailwater for the major-system and storage cases shall be the waterbody's maximum water level (MWL) as its custodian publishes it, or, where only the full reservoir level (FRL) is published, FRL plus the surcharge in its design flood, computed from the rating of its spillway and gates with the gates operated only as the custodian's written rule provides. Where neither the MWL nor the surcharge has been published, or where the published MWL is not above the FRL, the tailwater is FRL + 0.5 m (set by this Manual) [TBC]. In every case it shall be not less than the highest level recorded at the waterbody. The minor-system tailwater is the FRL. The project's discharge shall be included in the level (Clauses 5.3.2 and 5.12.3).
    • The MePGCL reservoirs. MePGCL's gate-operation guidelines give the levels in metres for three projects and in feet for one; every level in feet shall be converted at 1 ft = 0.3048 m exactly, and the conversion and the datum stated on Form 5-1. No guideline states the datum of its levels, and this Manual takes them as above mean sea level, to be confirmed with MePGCL before final design [TBC]. Until MePGCL confirms the design-flood level, the tailwaters are (set by this Manual) [TBC]: Myntdu–Leshka Stage I, FRL and MWL both 618.00 m (top of dam 620.00 m): 618.50 m; New Umtru, FRL 130.10 m and MWL 132.78 m: 132.78 m; Umiam–Umtru Stage III (Kyrdemkulai), FRL 2,230 ft (679.70 m) and MWL 2,235 ft (681.23 m): 681.23 m; and Umiam–Umtru Stage IV (Nongkhyllem), FRL and MWL both 503.00 m: 503.50 m (MePGCL gate-operation guidelines, 2022–2026). For the Umiam (Barapani) reservoir of Stage I, no MePGCL guideline was found; its full level is reported only in the press as 3,220 ft (981.46 m), releases were reported to have begun at 3,216.15 ft (980.28 m) in August 2024 on an IMD warning, and a spillway crest at EL 969.5 m is given in another document, with no datum stated for any (as reported) [TBC]. These are not design levels, because their datum is unknown: no outfall to the Umiam reservoir or its shore shall be designed without MePGCL's FRL, MWL and spillway rating in writing, or, until it gives them, the higher of the highest water line surveyed on the shore and the top of the closed spillway gates surveyed at the dam, each tied to a Survey of India benchmark, plus 0.5 m, with the reported levels recorded beside it on Form 5-1 (set by this Manual). No level of the Kopili project was obtained [TBC].
    • Warnings are not notices. The MePGCL guidelines for Stage III, Stage IV and New Umtru state that, because the reservoir capacity is very small and the gates must be opened often in and out of the monsoon, "issuing the notification for release of water is not practicable", and that warnings may be given by siren, telephone or SMS. No design shall rely on a notice or a warning of a release, on the reservoir being drawn down before a storm, or on a gate being opened early, late or partly: the release scenarios of this item govern (set by this Manual).
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall shall be treated as closed for the whole of the 72-hour storm of Clause 5.10.2 and of every shorter storm (Clause 5.9.4), with storage and pumping handling the full storm volume, unless the custodian's stage record shows the waterbody below the invert at the start of comparable storms and the Authority accepts it (set by this Manual). Every reservoir starts every design storm at its FRL (Clause 7.7.3); the drawdown zone of a reservoir is part of the reservoir, and no outfall structure, pumping station or storage shall be built in it without MePGCL's consent.
    • Release reaches. For an outfall to a river below a dam, such as the Umtru on its 9.80 km of ravine below the New Umtru dam to the bridge at Byrnihat, the 13.05 km of ravine below Stage III to the Stage IV reservoir, the 33.5 km of ravine below Stage IV, and the Myntdu below the Myntdu–Leshka dam, whose releases run through "Ravines and Plains of East & West Jaintia Hills" for about 24 km to the Bangladesh border (MePGCL guidelines), in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) and the 72-hour storm shall be run with the river at the level that results from the largest release of the dams above, routed to the outfall, with the flow of the catchment below them as it occurred, and with the release placed before, during and after the site storm, and the lock of item (b) applies for not less than 72 hours (set by this Manual). No release record of any MePGCL dam was obtained during research [TBC]; until MePGCL states the largest recorded release and its duration, the release is the spillway design capacity in its guideline: 12,000 m³/s at Myntdu–Leshka, which the guideline says has seen "very high discharge of about 10440 cumecs during high rainfall"; 3,820 m³/s at New Umtru; 60,000 cusec (about 1,699 m³/s) at Stage III; and 75,000 cusec (about 2,124 m³/s) at Stage IV (set by this Manual). No attenuation by the storage of any reservoir shall be credited to the river below, because those guidelines describe reservoirs of very small capacity whose gates are opened often, and no written rule found commits any reservoir's storage to flood control [TBC], and no dam gate shall be assumed to open earlier or wider than the operator's records show.
    • Lakes and pungs. No level on a stated datum, and no outlet or overflow level, was found for Ward's Lake, Thadlaskein or any other lake or pung [TBC]. Until the custodian gives one, the tailwater is the level at which the lake or pung spills, from its outlet or overflow crest surveyed and tied to a Survey of India benchmark, plus the head over that crest needed to pass the 1% AEP inflow, and not less than the highest level recorded at it; the lake or pung starts every design storm at its spill level, and an outfall below the tailwater is closed for the whole storm (Clause 5.9.4) (set by this Manual). Every drain that discharges to a lake or pung shall pass a debris and solid-waste trap and a sediment trap (Clauses 6.3.6(a) and 6.3.6(i) and Chapter 8) before it reaches it, and no drain that carries sewage shall discharge to one (Clause 8.9).
  • (e) The Garo plains under river backwater. For an outfall on the Garo foothill plains of sub-area ML-A1, such as those of Phulbari and Tikrikilla, to the Jinjiram or the Krishnai, or to a drain or stream that ends in them, and for an outfall at Baghmara or Dalu on the south Garo rivers where they leave the hills:
    • Design level. These rivers have no CWC site in Meghalaya with a published level (SANDRP, 2018, as reported), and their lower reaches are held up by the Brahmaputra, whose levels the Assam edition of this Manual governs. In September 2014 the Brahmaputra and the Jinjiram "submerged over 200 villages" (as reported), and in September 2012 floods on the Brahmaputra and the Jingiram affected "over 100 villages" (IRADe/NMHS plan, 2020, as tabulated from district records). The design level at the outfall shall be the higher of the 1% AEP level from a hydraulic model (Clause 5.8.2(b)) whose downstream boundary is the Brahmaputra or other receiving level that the Assam edition gives for the coincident case, and the highest flood level surveyed at the outfall from the flood marks of September 2012, September 2014 or a later flood, with its source stated. At Baghmara and Dalu the levels at Dimapara and Sibbari under item (b) apply where the outfall is on the Bugi or the Dareng, and a surveyed flood level, among them those of the floods of October 2024 at Dalu (as reported), elsewhere (set by this Manual) [TBC].
    • Lock. Every outfall whose invert is below the design level of this item is an outfall-closed case with a single lock of not less than 72 hours, covering the whole of the 72-hour storm of Clause 5.10.2, or longer where the river model or a stage record shows the backwater lasting longer (set by this Manual). The tailwater, pumping and gate-failure rules of item (b) apply.
  • (f) Consents, the drains of other bodies, and lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of a river or in a flood-protection work without the consent of the Water Resources Department, or in a reservoir, its drawdown zone or a release reach without the consent of MePGCL; the procedure for the Department's consent was not found during research [TBC]. Storm water shall not be discharged to a drain of another body without the written consent of that body: to a drain or water-course vested in a Municipal Board, the Board's written consent under s.204 of the Meghalaya Municipal Act, 1973, without which the Board may demolish the connection; to a road drain or culvert, that of PWD (Roads), NHAI or NHIDCL; in the Cantonment, that of the Shillong Cantonment Board; in New Shillong, that of NSTDA [TBC]; and to a village drain or jhora outside municipal limits, that of the District Council and the Dorbar Shnong under the District Council's rules, for which no written procedure was found [TBC] (set by this Manual). Where consent is given, the discharge shall not exceed the rate the consent allows; the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives and with its downstream boundary at the level of items (a) to (e); the channel shall be taken in its present condition, net of silt, boulders, debris, encroachment, solid waste and weed and with its narrowest section as surveyed, and a widening, channelisation or restoration that has been proposed but not completed shall not be counted; and the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert. The designer shall also check the outfall against the lines that bind at the time of design (Chapter 7): the setbacks of the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, as amended, measured from "the mean high flood level of a water body observed in the past ten years", among them 3 m from an urban stream up to 3 m wide and 6 m from a wider one, and the regulated zone of four times the setback for lakes and rural streams, which bind in Bye-Laws areas through B2(ii)(c) and Section I(a)4 and I(f) and elsewhere only as may be prescribed; para 4 of the Guidelines lists the works permitted in a setback and does not name a drain outfall, so whether one is permitted within it is to be confirmed with the Forest and Environment Department before design [TBC]; the bar on the "discharge of untreated wastes and effluents from … cities, towns, villages and other human settlements" into a waterbody (para 3(e)); any flood zone notified under the Meghalaya Flood Plain Zoning Act, 2026, whose restrictions prevail over other laws (s.12(2)), none of which has been notified; the Highest Flood Level above which the Bye-Laws 2021 set the stilt of a building on a sloping site along a stream or river (B1(v)(b)); and, in the Khasi Hills, the duty of the District Council, Town Committee or Dorbar Shnong that no land development damages "catchment areas, water sources, spring sheds, streams and rivers" (KHADC Regulation 2015, s.15(1)). The High Court's bar on construction within 50 m of the high-water mark of a waterbody (order of 24 May 2023 in PIL 10/2019) ended when the petition was closed on 19 February 2024, and the "Restricted Zones of 50m + 300m" round Umiam in the Expert Committee's report and NESAC's buffers are recommendations, not rules; none of them is applied by this clause.

No pump, gate or dam operation that helps drainage, such as pumping a drain down before a storm, lowering a reservoir, lake or pung before a storm, closing a gate late or opening dam gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the waterbody or the river (Clause 5.12.3). Pumping shall not be used to move water into a pung, a lake, a reservoir or another catchment without the consent of its custodian, or onto a slope.

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Meghalaya's streams and rivers break that assumption, because their catchments are small and steep and the storms that fill them fall on the towns at the same time. The valley floors of Shillong flood when the Umkhrah overflows in the same downpour that falls on the streets above them (as reported; IRADe/NMHS plan, 2020); on 9 and 16 June 2022 IMD listed extremely heavy rainfall in East, South and South West Garo Hills and South West Khasi Hills, and on 17 June Mawsynram recorded 1,003.6 mm in 24 hours (IMD); and in June 2026 the Shillong–Dawki road collapsed at Laitlyngkot while the Umngot at Dawki rose rapidly (as reported). The highest levels at Dawki (28 May 2006) and Kharkhana (23 April 1995) were set by pre-monsoon storms (SANDRP's copy of CWC data, as reported), so the coincident case is not confined to the south-west monsoon. The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the dams above and below the State's towns, all of them MePGCL's except the Kopili project of NEEPCO, shared with Assam. MePGCL's gate-operation guidelines give their levels: Myntdu–Leshka Stage I, FRL and MWL 618.00 m, top of dam 620.00 m, minimum drawdown level 606.15 m and spillway crest 587.50 m, with a spillway of 12,000 m³/s on a catchment of 350 km² and releases running through the ravines and plains of the Jaintia Hills for about 24 km to the Bangladesh border (guideline of 4 April 2022); New Umtru, FRL 130.10 m and MWL 132.78 m, crest 124.00 m, a storage of 3.55 MCM at FRL over 0.537 km², and a spillway of 3,820 m³/s on 1,020 km², with 9.80 km of ravine to the Byrnihat bridge (2025); Umiam–Umtru Stage III at Kyrdemkulai, FRL 2,230 ft and MWL 2,235 ft, minimum drawdown level 2,215 ft and crest 2,205 ft, a spillway of 60,000 cusec on 150 km² and 13.05 km of ravine to the Stage IV reservoir (2026); and Stage IV at Nongkhyllem, FRL and MWL 503.00 m, a spillway of 75,000 cusec on an intermediate catchment of 52 km² and 33.5 km of ravine below it (2025). The guidelines for Stage III, Stage IV and New Umtru say that "Since the Reservoir capacity is very small, and the requirement of frequent release of water through the Gates during Monsoon as well as during Non-monsoon period, issuing the notification for release of water is not practicable; however warnings in the form of blowing the Siren, Telephone/SMS may be issued". The specific yields of the spillways, about 34 m³/s per km² at Myntdu–Leshka on the escarpment against about 3.7 m³/s per km² at New Umtru on the northern slope (NEER arithmetic), show how much harder the escarpment's rivers run. For the Umiam (Barapani) reservoir of Stage I, impounded in 1965, no MePGCL guideline was found: its full level is reported in the press as 3,220 ft, and releases were reported to have begun at 3,216.15 ft in August 2024 on an IMD warning; a spillway crest at EL 969.5 m, with two gated bays of 12.2 m, is given in another document; and its gross capacity is reported to have fallen from 179.757 Mm³ in 1965 to 159.206 Mm³ in 2004 with sediment (all as reported). No datum is stated for any of these levels, no release record or operating rule that bounds a release was obtained for any dam, and no level of the Kopili project was found during research [TBC]. Until they are available, the spillway design capacity applies as the release, with the flow of the catchment below the dam as it occurred in the same event (Clause 5.8.5(d)). The river levels used in this Manual come from SANDRP's copies of CWC data; their datum and gauge zero are to be confirmed with CWC [TBC].

Clause 5.8.5 is set by this Manual. In Meghalaya the tailwater at a town outfall is set not by the tide but by a city stream that no one gauges, by a river held high by a monsoon spell or by the releases of a dam, by a jhora whose level no one has recorded and whose bed moves, by a reservoir, lake or pung at its full level, or by the backwater of the Brahmaputra on the Garo plains, and no document found during research gives a design level for any of them. No design standard for any town drain in the State was found: the only drainage-design statement found is that of a multi-hazard assessment of Shillong made in 2019, which took its design rainfall from the CWC Brahmaputra Basin PMP Atlas and used the rational formula (as quoted in the IRADe/NMHS plan, 2020; the assessment and the atlas were not obtained) [TBC]. The State has a floodplain zoning law, the Meghalaya Flood Plain Zoning Act, 2026, but no zone has been notified under it, and no flood level has been published for any reach (Chapter 7).

The first is the city stream. Item (a) treats the Umkhrah and the Umshyrpi as a case of their own because the State's capital drains into them, because they have no gauge, no flood study and no published level, and because their valley floors flood in ordinary storms. The design level must therefore come from a model and from flood marks, as for the ungauged hill streams of the mountain editions of this series, with the bulking and blockage of Clause 6.3.6, because the channels are narrowed by building and choked by waste: NESAC found "a drastic reduction in channel capacities in most streams due to encroachments along their banks by buildings" (NESAC, 2023). Polo, Pynthorbah, Nongmynsong and the other valley floors are named as outfall-closed cases because their drains cannot discharge while the stream is up. The lock there is the storm and the stream's recession, and not less than 24 hours, shorter than the 72 hours of the rivers, because the streams are small and fall within hours of the rain stopping; it is still long enough to cover a whole day's storm, because the plateau's 24-hour totals are long orographic falls (Chapter 2), and where the longer storms of Clause 5.10.2 are run, the lock lasts for all of them. The model of the stream also keeps the interception works, stone bunds and waste traps that the State has built for the National Green Tribunal (Clause 8.9) from raising the level at the outfalls they were built to protect.

The second is the river. Item (b) follows the interim river rule of the mountain editions: the design level is the 1% AEP level, and never below the highest level recorded at the nearest CWC gauge. No CWC site in Meghalaya has a warning or a danger level, and all seven of its sites record levels only (SANDRP, 2018, as reported), so the 10% AEP case uses the design level until a frequency analysis exists. Item (b) allows a surveyed profile of flood marks in place of the unchanged gauge level, because the escarpment's rivers fall several metres in a kilometre, and adds the surveyed flood mark of June 2026 at Dawki because the 2006 record there was set before that flood. The rivers that run into Assam are governed downstream by the Assam edition, and those that run into Bangladesh have no levels across the border, so item (b) makes the model start far enough downstream that the boundary does not decide the answer. The lock is not less than 72 hours because the storms that raise the rivers last for days, as on 15–16 June 1995 and 15–17 June 2022 (Chapter 2), and because no hourly stage record of any gauge in the State was obtained during research [TBC]. A designer who has the stage record of a CWC gauge can justify a shorter lock under Clause 5.10.6.

The third is the jhora. Item (c) follows the khad and nallah rule of the mountain editions: a study with the bulking factor of Clause 6.3.6(b), surveyed flood marks, the higher of the two, and an invert at least 0.5 m above the highest bed level surveyed downstream, a margin set by this Manual for the aggradation that a boulder bed can show in a single flood. Two things are added for Meghalaya. On the escarpment, where no CWC method applies and the storms run for days, the study is the site-specific study of the ML-Z3 rule of Clause 2.3.6, with the long storms of Clause 6.3.6(j). And in the karst and the coal belt, a stream can disappear underground: streams are reported to "disappear or have become seasonal in nature as surface water trickles into and disappears in the unfilled mine pits and caves" (as reported), so item (c) sends no outfall into a sinkhole, a cave or a mine pit, in line with the karst and mine rule of Clause 4.11.

The fourth is the reservoir, the release reach, the lake and the pung. A reservoir at its full level does not fall for the rest of the season but passes its inflow over its spillway, and its level rises above FRL by whatever head the flood needs. Item (d) therefore takes the MWL, or FRL plus the design-flood surcharge, and treats an outfall below it as closed for the whole of the 72-hour storm. Where MePGCL publishes an MWL equal to its FRL, as at Myntdu–Leshka and Stage IV, FRL + 0.5 m is set as the interim value: it is the freeboard that this Manual uses for floor levels (Clause 6.11.1), and it is a floor, not an estimate of the surcharge [TBC]. Stage III's levels are in feet and are converted at the exact factor of 0.3048 m. The Umiam reservoir, which takes all of Shillong's drainage, has no MePGCL guideline that was found and only a press level in feet with no datum, so item (d) does not use that level as a design level and requires MePGCL's figures or a surveyed shore line. The guidelines say that notices of release are not practicable and that warnings are given by siren, telephone or SMS; a warning helps people leave a reach but does not change the level an outfall must withstand, so item (d) designs for the release and not for the warning. No release record was obtained for any dam, so the spillway capacity stands in for the largest release until MePGCL gives one, which is conservative by design: a tailwater set too low floods the town, while one set too high only costs storage. Lakes and pungs have no published levels, so item (d) uses their surveyed spill level, as the mountain editions do for their lakes, keeps sewage out of them and does not let a sacred or community pung be used as a detention pond.

The fifth is the backwater of the plains, and the sixth is the consents and lines. On the Garo foothill plains the Jinjiram and the Krishnai are held up by the Brahmaputra for days, as in September 2012 and September 2014, so item (e) takes a lock of at least 72 hours and the Brahmaputra level of the Assam edition as the model's boundary. Item (f) asks for the owner's consent and design level because a design that discharges to a channel, a reservoir or a pung cannot be checked without them, and because the drains belong to several bodies, among them, outside municipal limits, the District Councils and the Dorbar Shnongs on land that is mostly community, clan or private. The lines of item (f) decide where an outfall can be built, not its level. The Waterbodies Guidelines set stream setbacks of 3 m and 6 m in urban areas, measured from a ten-year mean high flood level that was not found published for any stream, and exclude most jhoras from their protection; the Manual's own corridor (Clause 7.4) is wider and covers them. The High Court's 50 m bar of May 2023 ended in February 2024, and the Umiam and NESAC buffers are recommendations, so item (f) names them and does not apply them.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Meghalaya requirement in this Manual. In Meghalaya it applies where an outfall is shut not by the tide but by a city stream that has overtopped its banks, by a river held high by a monsoon spell or by the releases of a dam, by a jhora that has risen over the outlet or buried it in boulders and garbage, by a reservoir, lake or pung at its full level, or by the backwater of the Brahmaputra on the Garo plains. The valley floors of Shillong along the Umkhrah flood "with nearly every heavy downpour" (as reported; IRADe/NMHS plan, 2020); the storms that raise the escarpment's rivers last for days, as on 15–16 June 1995, when Cherrapunji is reported to have recorded 2,493 mm in 48 hours (as reported), and on 15–17 June 2022, when Mawsynram recorded 1,003.6 mm in the 24 hours to 0830 IST on 17 June (IMD); and in September 2014 the Brahmaputra and the Jinjiram submerged over 200 villages of the Garo Hills (as reported). A reservoir at its full level stays there for the rest of the season, and a jhora in flood can block an outlet with boulders and waste, which is why Clause 5.8.5 replaces the two 6-hour windows described below with a lock of at least 24 hours on the Shillong valley floors, at least 72 hours on the rivers, the release reaches and the Garo plains, and a closure for the whole storm at a reservoir, lake, pung or jhora outfall below its design level. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 31 March each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Meghalaya the outfalls do not cross a beach, but some of them end in a reach of river below a dam of MePGCL, or in a reservoir held near its full level. MePGCL's guidelines for its Stage III, Stage IV and New Umtru dams say that, because the reservoirs are very small and the gates are opened often, in the monsoon and out of it, "issuing the notification for release of water is not practicable", and that warnings may be given by siren, telephone or SMS; the Myntdu–Leshka dam has a spillway of 12,000 m³/s on a catchment of 350 km², whose releases run through the ravines and plains of the Jaintia Hills for about 24 km to the Bangladesh border (MePGCL guidelines); and the Umiam reservoir, which receives all of Shillong's drainage, was reported to have begun releasing water in August 2024 on an IMD warning (as reported). A gate opened in a hurry raises the river below; a gate held shut or jammed by debris raises the reservoir and every outfall that drains to it. The dams are held by MePGCL, and the Kopili project by NEEPCO, while the drains that reach the rivers and reservoirs below them belong to the Municipal Boards, PWD, NHAI and NHIDCL, the District Councils and the Dorbar Shnongs; no rule linking the operation of any of these gates to the levels of the drains was found during research, and no MePGCL guideline was found for the Umiam dam [TBC]. A gate and the drains behind it can therefore belong to different bodies. The 31 March inspection date is set ahead of the monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 31 March each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Meghalaya: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the monsoon. The mouth shall be assumed closed by a bar at the start of the April–October season, at the crest level of the most recent pre-monsoon survey. This applies unless the Water Resources Department certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless the Water Resources Department has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Meghalaya has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the boulders, slide debris, silt and garbage that hill streams leave at an outfall or a gate. In Shillong 49,612 m³ of waste was removed from the Wahumkhrah, and ₹3.60 crore was spent on stone bunds and solid-waste traps (State action-taken report to the National Green Tribunal, 21 March 2023); the Umiam reservoir fell in gross capacity from 179.757 Mm³ in 1965 to 159.206 Mm³ in 2004 with sediment (as reported); and the IRADe/NMHS plan for Shillong (2020) found that "due to increasing levels of urbanization and unregulated construction work the natural drainage system is blocked". A flap gate held open or shut by gravel, debris or waste, an outlet buried by a rising bed or left hanging by scour, or a gate that cannot be moved, turns a designed outfall into a dead end or a back-flow path. MePGCL has written gate-operation guidelines for four of its dams, but no rule linking the operation of any gate to the levels of the drains above or below it was found during research [TBC]. Clause 5.8.5 deals with both by setting outfalls above the range of bed movement and by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting Water Resources Department certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a site on a jhora draining to the Umkhrah in Shillong
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)