Draft v1.0 prepared by NEER. Not adopted by the Government of Meghalaya, any District Council, authority or local body, and has no legal force. About this draft

Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Meghalaya. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration storms of the monsoon season, which on the southern escarpment bring more than 1,000 mm in a day (1,563.0 mm at Cherrapunji on 16 June 1995 and 1,003.6 mm at Mawsynram on 17 June 2022, IMD) and on the plateau fall for days on thin soils already saturated, from the pre-monsoon storms of April and May to the October storms that follow the withdrawal of the south-west monsoon, as well as for short-duration intensities;
  • (d) to design outfalls for the streams, rivers and reservoirs into which the towns drain: the Umkhrah and Umshyrpi below Shillong, which flood the valley floors of Polo, Pynthorbah and Nongmynsong in heavy downpours and run on as the Wah Roro to Umiam lake; the jhoras and hill streams of every town, which rise within the hour and carry boulders, slide debris and garbage; the Myntdu at Jowai, the Umngot at Dawki, the Ganol at Tura, the Simsang at Williamnagar and the south Garo rivers at Baghmara and Dalu; the Jinjiram and the Krishnai under backwater on the Garo foothill plains; and the reservoirs and release reaches of MePGCL, Umiam (Barapani), Kyrdemkulai, Nongkhyllem, New Umtru and Myntdu–Leshka, held and released by their operator, including the case where the outfall is closed;
  • (e) to protect tanks (pungs), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building bye-laws notified by the Government under section 74 of the Meghalaya Town and Country Planning Act, 1973 (the Meghalaya Building Bye-Laws 2021), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Meghalaya's floods come from four sources, often together. The first is the rain of the southern escarpment, the wettest belt on record. IMD prints 1,563.0 mm in 24 hours at Cherrapunji on 16 June 1995 and 1,003.6 mm at Mawsynram in the 24 hours to 17 June 2022 (IMD), and the storms come before the south-west monsoon as well as during it: Cherrapunji's highest days for March, April and May are 587.4 mm (1994), 644.2 mm (1990) and 812.0 mm (1916) (IMD, Extremes). In June 2022, when IMD found the month's rainfall over Assam and Meghalaya the highest since 1901, 13 people died on 17 June in the Khasi and Garo Hills, landslides cut NH-6, and the deaths counted since 1 April were reported as 32 and as 34 on successive days (IMD; as reported; conflict). The second is the flash flood of the hill towns. In Shillong, Polo, Pynthorbah, Nongmynsong, Forest Colony and Mawlai flood "with nearly every heavy downpour" when the Wah Umkhrah overflows, a flooding attributed to the "clogging of Wah Umkhrah and the decreasing width of the river due to human activities" (as reported; the same text in the IRADe/NMHS plan, 2020), and the NESAC report for the Shillong Planning Area names "Polo Market, Pynthorbah, Nongrim hills, Dhankheti" as highly prone to flash floods and "Encroachment and clogging of channels" as the main causes (NESAC, 2023). The IRADe/NMHS plan tabulates a flash flood at Polo, Forest Colony and Mawlai in July 2019, when Shillong received "more than 72.2 mm of rain on 9th July 2019", floods in July 2020 in which 5 people died and 1.5 lakh were affected, and floods in September 2020 in which 13 died and the Nongstoin roads were cut (IRADe/NMHS plan, Table 17, from the District Disaster Management Authority, the Geological Survey of India and the District Magistrate). The third, found in no plains State of the series, is slides, debris and unstable ground. The great earthquake of 12 June 1897 damaged every stone house in Shillong and brought down a landslide at Sohra in which 600 people were reported killed; Shillong's deaths are given as 13 in one account and 29 in another (as reported; conflict). Landslides in the State caused about 22 deaths in 2014 (IRADe/NMHS plan, citing the Revenue and Disaster Management Department). On 30–31 May 2025, before the south-west monsoon, floods and landslides struck 86 villages in 10 districts and killed 6 people (MSDMA, as reported), with a flash flood at Sumer Latara, slides in 15 villages of Umling block near NH-6 linked to hill cutting along the highway, and a drowning in the Umlew; in June 2026 the Shillong–Dawki road collapsed at Laitlyngkot while the Umngot at Dawki rose rapidly, submerging a labour camp and sweeping away an excavator (as reported). The fourth is the river flood of the Garo hills and plains. On the night of 21 September 2014 torrential rain began floods and landslides in the Garo Hills; the toll was reported as 52 by 28–29 September and as more than 60, with damage of more than ₹1,500 crore, in a year-end account that called it the "worst natural calamity that struck the state in the past century"; the Brahmaputra and the Jinjiram submerged more than 200 villages and NH-51 to Tura was blocked (all as reported; tolls differ by date and include the missing; no rainfall measurement of the storm was found [TBC]). The Brahmaputra and the Jinjiram had flooded more than 100 villages in September 2012 (IRADe/NMHS plan, Table 17). On 4–6 October 2024, after the south-west monsoon had withdrawn, 3 people drowned at Dalu and 7 died in a landslide at Hatiasia Songma in South Garo Hills, 15 deaths were reported by 6 October and 2,630 households were affected in Dalu block (as reported; no rainfall value found [TBC]). MSDMA's official tolls for these events were not found [TBC].

Missing design makes all four worse. No design storm, return period or drain standard was found for the drains of any town in the State: Shillong's 148.91 km of drains "drain directly into the Umkhrah and Umshyrpi rivers", their coverage is put at "less than 75%" of the city in one passage and 85% in another of the same plan, and "the incidence of sewerage mixing in drains is almost 100%" (Smart City Proposal 2016-17, as quoted in the IRADe/NMHS plan; conflict). The Bye-Laws 2021 control slopes, cuts, siting and rainwater harvesting, not runoff, and in the autonomous districts outside the master-plan, municipal and scheme areas, where the Town Committees and census towns hold 47 per cent of the urban population (CAG), they do not apply at all. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix; the third source is answered by the siting, screening, infiltration and debris rules of Chapters 2, 4, 6 and 7, because no drain is sized to carry a debris flow, and the fourth by the corridors and floor levels of Chapters 6 and 7.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Meghalaya Building Bye-Laws 2021 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Meghalaya, the top two layers have a particular meaning. Much of the State's natural storage and supply lies in its springs (umpohliew), which with the streams, not wells, supply most towns by gravity (CGWB, GWRA 2022); in its jhoras, the small hill streams that become the Umkhrah, the Umshyrpi and the other town rivers; in its pungs and small lakes, such as Thadlaskein (Pung Sajar Nangli) and Ward's Lake (Nan Polok), and its reservoirs, Umiam (Barapani) the largest; in the sacred groves (law kyntang) that stand at many stream heads (as reported); and in the alluvium of the Garo foothill plains and the valley fills of Ri-Bhoi. The counts of the State's springs conflict, an inventory of 1,400 in one account and "So far, we have mapped 1,000 springs across 11 districts" in another (both as reported), and the State reports the rejuvenation of 306 springsheds. The law protects some of this. The Meghalaya Municipal Act, 1973 vests "all public streams, channels, water-courses, springs tanks, reservoirs" within municipal limits in the Board (s.62(b)); the KHADC Regulation 2015 makes the Executive Committee, Town Committee or Dorbar Shnong responsible for ensuring that land development does not damage "catchment areas, water sources, spring sheds, streams and rivers" (s.15(1)); the Waterbodies Guidelines set setbacks from lakes, ponds, rivers and streams, but exclude streams whose beds are dry for 240 days or more in each of the past ten years, which takes out most jhoras (para 2(e)); the Wetlands Rules 2017 apply to notified wetlands through the Meghalaya State Wetlands Authority, and no wetland of the State has been found notified under rule 4; and the Meghalaya Flood Plain Zoning Act, 2026 provides for flood zones, none of which has been notified. No statute protects springs or sacred groves as such. In the hills the second layer changes. Retention on a slope is storage and reuse, not infiltration: water put into colluvium, fill or slide debris raises the pressure in the slope, and water put into limestone or into old coal workings goes where no one can follow it, into caves and voids that can collapse ("smaller streams and rivers either disappear or have become seasonal" as water "disappears in the unfilled mine pits and caves", as reported). This Manual therefore bars deliberate infiltration on natural slopes of more than 10°, on colluvium, fill or slide debris, in mapped landslide zones and close upslope of a cut or retaining wall, unless a geotechnical certificate allows it (Clause 4.11, hill rule); bars it on limestone, within a coal-mining area and where caves or sinkholes are known, with no certificate to allow it (Clause 4.11, karst and mine rule); and allows recharge only on the tested alluvium of the Garo foothill plains and the tested valley fills of Ri-Bhoi, because every groundwater assessment unit of the State is "Safe" and recharge is not a design objective there (Clause 4.11, recharge rule; CGWB) (all set by this Manual). Rainwater harvesting elsewhere is storage for the dry season, when, CGWB notes, there is "acute shortage of water during the summer as the major part of rainfall is lost as surface run-off". Losing the springs and the stream heads cannot be offset by pipes, and in the hills drains that put water into a slope or a void can make it fail.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Meghalaya through:

  • (a) an amendment to the Meghalaya Building Bye-Laws 2021 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. In Meghalaya the building rules are the Meghalaya Building Bye-Laws, 2021, notified by the Urban Affairs Department under section 74 of the Meghalaya Town and Country Planning Act, 1973 (the Assam Town and Country Planning Act, 1959, as adapted) and published under section 72(2) (Notification No. UAU.73/2016/Pt/402 of 9 March 2021; Gazette of Meghalaya No. 12, Part IIA, 25 March 2021). They "apply to all the Master Plan Areas, Municipal areas and Scheme Areas within the State" (A1.2), and their "Authority" is "the Meghalaya Urban Development Authority / Autonomous District Councils as applicable" (A2.5). They replaced the bye-laws of 2011 made by MUDA, and have been amended at least eight times, each by a notification of the Urban Affairs Department under the same section: No. UAU.73/2016/Pt/55 of 29 February 2024 (Gazette, 9 May 2024), which inserted Section I on hilly and hazard-prone areas and tied stream setbacks to the Waterbodies Guidelines; No. UAU.73/2016/Pt.III/76 of 19 November 2024 (industrial buildings in Table D-2); No. UAU.73/2016/Pt.VIII/191 of 15 January 2025, which amends what it calls "the Meghalaya Building Bye-Law, 2024" (B1(i) and Table D10); No. UAU.73/2016/Pt.VII/97 of 18 June 2025 (Table D-2); No. UAU.110/2020/208 of 13 August 2025 (Gazette, 11 September 2025), which added Section J on the online building permission system; No. UAU.73/2016/Pt.III(A)/70 of 21 October 2025 (Gazette Extraordinary, 3 November 2025), which substituted B10 on septic tanks; No. UAU.73/2016/Pt VIII-A/22 of 19 December 2025 (green building certification above 10,000 m²); and No. UAU.73/2016/Pt.VIII/203 of 7 May 2026 (thresholds for special projects). Their short titles conflict: two notifications, of 15 January and 18 June 2025, each call themselves the "(Amendment) Byelaws, 2025", and two, of 2024 and of August 2025, a "Second Amendment", so this Manual cites each by number and date. The Bye-Laws 2021 forbid construction on slopes of more than 50° and regulate slopes of 40°–50° (Section I(a)); limit earth cutting to 3.00 m, relaxable to 6.00 m to the crest of an RCC wall, with a report of the Geological Survey of India beyond that (B1(vii)); require a site "properly drained or capable of being drained" and "not prone to land slide" (B1(ii), (iv)), a stilt at least 1.20 m above the Highest Flood Level on a sloping site beside a stream or river and a plinth of at least 0.90 m on a flat one (B1(v)(b)); bar the use of land "liable to flooding, except where protection measures are adopted" (B1.1(ii)); allow basements "only in flat terrain" and keep surface drainage out of them (A2.7, A2.8(j)); and, in hazard-prone areas, ask for "good drainage facilities to prevent excessive saturation of sub-surface formations", for construction that does not "obstruct existing surface drainage courses", for diversion ditches and swales into "designated sediment basins" and for silt fences (Section I(b)). They require rainwater harvesting for every plot category (Table G1) and defer drainage to the National Building Code 2016 (D4.2, D5.6), but set no design storm, return period, release rate or detention volume. The route of Clause 1.3.1(a) therefore runs through an amendment of the Bye-Laws 2021 under section 74 of the 1973 Act, which the Urban Affairs Department could make. It reaches only the areas to which the Bye-Laws 2021 apply. Outside them, in the autonomous districts, building and land are regulated under the Sixth Schedule by the District Councils: in the Khasi Hills by the Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015 (KHADC Executive Committee Notification No. DC.II/Genl/31/2015/9 of 4 August 2015, Gazette Extraordinary No. 97 of 25 August 2015, made under the proviso to section 8, read with section 8(11), of the United Khasi-Jaintia Hills District (Establishment of Town Committee) Act, 1960), which extends to the whole of the Khasi Hills Autonomous District and under which the KHBSRA has issued building permissions since 2020 (as reported); the building instruments of the Jaintia Hills and Garo Hills Autonomous District Councils were not found [TBC]. The Comptroller and Auditor General found that the "jurisdiction of the Town Committees and Census Towns was not vested upon the Urban Affairs Department. Rather, these areas (47 per cent of the total urban population) are governed by the concerned ADCs" (CAG, performance audit on solid waste management in urban areas of Meghalaya, 2017-18 to 2021-22, executive summary; report number [TBC]), so nearly half of the State's urban population lies outside the reach of the Bye-Laws 2021. The boundary between the two regimes is disputed. The Urban Affairs Department notified the three District Councils to implement building bye-laws outside the municipalities on 1 February 2019 (as reported; number not found [TBC]); the KHADC Executive Committee "outright rejected" the Bye-Laws 2021 on 25 October 2021 for encroaching on Sixth Schedule areas (as reported), and their status in the District Council areas since then is not known [TBC]; and an earlier challenge concerned MUDA and the bye-laws of 2011 (as reported). This Manual states the dispute and takes no side in it. In a District Council area the Manual could take effect only through the District Council: its Executive Committee could adopt it for its district by amending its own building regulation, as the KHADC made its 2015 Regulation under the 1960 Act (Annex 1D). The KHADC Regulation already asks that plans show "the system of storm water drainage along with points of collection of rain water" (s.36) and "the highest flood level (HFL) reached above the street", which are the natural hooks for the drainage report there. This Manual is a draft; neither the Government, MUDA, any District Council nor any other authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the competent authority for the area: MUDA (its Chairperson, or an officer to whom the power has been delegated) in the master-plan, municipal and scheme areas to which the Meghalaya Building Bye-Laws 2021 apply (A1.2, A2.3); the Municipal Board for its own drains and works and for the sanctions it gives under the Meghalaya Municipal Act, 1973; the Shillong Cantonment Board in the Cantonment; the New Shillong Township Development Authority (NSTDA) in New Shillong [TBC]; in the autonomous districts outside those areas, the District Council or its building authority (in the Khasi Hills, the Executive Committee of the Khasi Hills Autonomous District Council (KHADC) and the Khasi Hills Building and Structure Regulatory Authority (KHBSRA) under the Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015; the building instruments of the Jaintia Hills and Garo Hills Autonomous District Councils were not found [TBC]); the Flood Zoning Authority in a flood zone notified under the Meghalaya Flood Plain Zoning Act, 2026 (none is constituted or notified); and the Forest and Environment Department for matters under the Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the Meghalaya Building Bye-Laws 2021 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The catchments of Shillong's Umkhrah and Umshyrpi, with their jhoras, down to the Wah Roro and Umiam lake, including the valley floors of Polo, Pynthorbah, Nongmynsong, Mawlai, Forest Colony, Dhankheti and Nongrim Hills; the land on the shore of Umiam lake and along the release reaches of the Umiam–Umtru stages and of New Umtru down to Byrnihat; the land of Jowai that drains to the headwaters of the Myntdu, and the release reach of the Myntdu–Leshka dam to the Bangladesh border; the escarpment settlements of Sohra, Mawsynram and Shella; the land of Dawki that drains to the Umngot; the land of the Tura master-plan area that drains to the Ganol and the Ringrey and Rongkhon streams; the land of Williamnagar that drains to the Simsang; the land of Baghmara and Dalu on the rivers of the south Garo slopes; the Garo foothill plains on the Jinjiram and the Krishnai, at Phulbari and Tikrikilla; and the land of Nongpoh and Umling block that drains to the Umlew and the streams crossed by NH-6, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (pung), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the Meghalaya Building Bye-Laws 2021 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Gazette of Meghalaya.
Competent authority for the area The body that grants permission for the site under the instrument that applies there: MUDA in the master-plan, municipal and scheme areas of the Bye-Laws 2021; the Municipal Board for its drains, works and sanctions under the Meghalaya Municipal Act, 1973; the Shillong Cantonment Board in the Cantonment; NSTDA in New Shillong [TBC]; elsewhere in an autonomous district, the District Council or its building authority (in the Khasi Hills, the KHADC Executive Committee and the KHBSRA under the 2015 Regulation); the Flood Zoning Authority in a notified flood zone (none yet); and the Forest and Environment Department for matters under the Waterbodies Guidelines. Where this Manual says "the Authority", the competent authority for the area is meant. This Manual reaches an area of an Autonomous District Council only through that District Council.
Autonomous District Council (ADC), District Council The Khasi Hills, Jaintia Hills and Garo Hills Autonomous District Councils (KHADC, JHADC, GHADC) under the Sixth Schedule to the Constitution, with their Executive Committees, Town Committees and building authorities. Outside the master-plan, municipal and scheme areas, building and land in their districts are regulated under their own instruments, not under the Bye-Laws 2021.
Traditional institution The Dorbar Shnong (village council) and its Rangbah Shnong (headman) in the Khasi and Jaintia Hills, acting under the rules of the District Council, and the village institutions of the Garo Hills led by the Nokma [TBC: not researched for this Manual].
Community land Land held by a community, a clan or a private owner rather than by the State, which is most land in the State. Where this Manual reserves a drainage corridor, an easement or a regional facility site on such land, it is secured by agreement with the landholding institution (the Dorbar Shnong, the clan or the owner) or reserved in a master plan, not taken (set by this Manual).
Jhora A small hill stream (local English usage in Shillong). A jhora draining 8 ha or more is a natural channel under Chapter 7 whether or not it is a "waterbody" under the Waterbodies Guidelines.
Shillong Planning Area The 288.5 km² of the Shillong Master Plan 2041: the Shillong urban agglomeration and 54 villages, 37 in East Khasi Hills and 17 in Ri Bhoi (NESAC, 2023), as notified from time to time.

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the Meghalaya Building Bye-Laws 2021;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Meghalaya, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply under Table G1 of the Meghalaya Building Bye-Laws 2021 to every plot category and use in the master-plan, municipal and scheme areas, with "Ground water recharge for covered area more than 3000 sqft" for residential plots of Category II, soft cover of at least 10% or 20% of the plot by category, and a 10% rebate of the permission fee where both rainwater harvesting and the recycling of waste water are provided (G2.1.2), but with no storage volume or roof-area rate; and under section 36 of the Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015, which makes "storing of water runoff including rainwater in all existing and new buildings" mandatory in the Khasi Hills Autonomous District and asks that plans show "the system of storm water drainage along with points of collection of rain water", as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Meghalaya plots are small and the cumulative effect of many small plots is what fills Shillong's drains. For small buildings in Meghalaya, the Bye-Laws 2021 already reach every plot category in the master-plan, municipal and scheme areas with rainwater harvesting and a soft cover of 10% of the plot or more (Table G1), and the KHADC Regulation makes rainwater storage mandatory for every building in the Khasi Hills Autonomous District and asks for a storm-drainage layout with the points of collection (s.36). Neither sets a volume, and the tank is full when the season's storm arrives, so none of it limits what leaves the plot in a design storm. Outside the areas of the Bye-Laws 2021, where the Town Committees and census towns hold 47 per cent of the urban population (CAG), small buildings follow the District Councils' instruments, of which only the KHADC's was read for this Manual [TBC]. No rule asks a single building to carry the water from uphill around its foundations or to discharge its roof water to a lined drain or stable channel rather than down the slope, and both sets of rules show the septic tank and the soak pit on the site plan without forbidding the soak pit on a slope, on limestone or over old mine workings. Clause 1.5.4(b) applies to every building whatever its size for this reason. A small building on a hill slope, or on the limestone of the escarpment and the Jaintia hills, is also where a soak pit or soakaway can do most harm, and an Authority may make the hill rule and the karst and mine rule of Clause 4.11 a condition of every building permit in its area, whatever the size of the site (a recommendation of this Manual, not a requirement of Clause 1.5.4). Where Table G1 asks a residential plot of Category II for groundwater recharge, the recharge rule of Clause 4.11 allows it only on the tested alluvium of the Garo foothill plains and the tested valley fills of Ri-Bhoi, and storage takes its place elsewhere (Table 1.3).

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Shillong Municipal Board (SMB);
  • (b) every Approving Authority within the Shillong Planning Area of the Shillong Master Plan 2041, as that area is notified from time to time under the Meghalaya Town and Country Planning Act, 1973, whichever has jurisdiction over a site: MUDA, the Shillong Cantonment Board, NSTDA in New Shillong [TBC] and, for the parts of the planning area under the Khasi Hills Autonomous District Council, its building authority, if the District Council adopts this Manual (this Manual does not decide where MUDA's jurisdiction ends and the District Council's begins); and
  • (c) the Tura Municipal Board, with MUDA in the Tura master-plan area.

1.6.2 Tier B authorities. All other Municipal Boards, Town Committees and District Council building authorities are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with Urban Affairs regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the Shillong Planning Area of the Shillong Master Plan 2041, or another master-plan area under the Meghalaya Town and Country Planning Act, 1973, or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Shillong Municipal Board, with 148.91 km of drains that run directly into the Umkhrah and Umshyrpi, whose coverage of the city is put at "less than 75%" in one passage and at 85% in a table of the same plan (Smart City Proposal 2016-17, as quoted in the IRADe/NMHS plan, 2020; conflict), and with only part of Greater Shillong within its limits, and a small Town Committee with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Shillong.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
Meghalaya Building Bye-Laws, 2021 (Notification No. UAU.73/2016/Pt/402 of 9 March 2021), made under section 74 of the Meghalaya Town and Country Planning Act, 1973, as amended by Nos. UAU.73/2016/Pt/55 of 29 February 2024, UAU.73/2016/Pt.III/76 of 19 November 2024, UAU.73/2016/Pt.VIII/191 of 15 January 2025, UAU.73/2016/Pt.VII/97 of 18 June 2025, UAU.110/2020/208 of 13 August 2025, UAU.73/2016/Pt.III(A)/70 of 21 October 2025, UAU.73/2016/Pt VIII-A/22 of 19 December 2025 and UAU.73/2016/Pt.VIII/203 of 7 May 2026 (all read) Continue. They apply to the master-plan, municipal and scheme areas (A1.2), with MUDA or the District Councils "as applicable" as the Authority (A2.5). They forbid construction on slopes of more than 50° and regulate slopes of 40°–50° (Section I(a)); limit earth cutting to 3.00 m, or 6.00 m to the crest of an RCC wall, with a report of the Geological Survey of India beyond (B1(vii)); require a stilt at least 1.20 m above the Highest Flood Level on a sloping site beside a stream or river and a plinth of 0.90 m on a flat site (B1(v)(b)), and keep septic tanks and soak pits "as far away as possible from the stream/river" (B1(v)(a)) and, beside a waterbody, at least 6 m or half the plot depth from it (B10, 2025); bar land "liable to flooding, except where protection measures are adopted" (B1.1(ii)); define natural hazard prone areas to include "back flow in drains, inadequate drainage" (A2.37); ask for drainage that prevents "excessive saturation of sub-surface formations", for construction that does not "obstruct existing surface drainage courses", for diversion ditches, swales, sediment basins and silt fences (Section I(b)) and for "Storm water inlet protection" on water-logged plains (Section I(c)); and require site plans to show "Surface drains, position and sizes of septic tank and soak pit", roof drainage and rainwater harvesting, and large projects a services plan with the "drainage and storm water disposal system". Drainage is "as per National Building Code 2016" (D4.2, D5.6). They set no design storm, release rate, detention volume or rule on infiltration on slopes, limestone or mine ground. The design criteria of Chapters 2–6, the hill, karst and mine and recharge rules of Clause 4.11 and the corridors of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the Bye-Laws 2021, a master plan or a statute are stricter, they govern (Clause 1.3.3).
Rainwater harvesting: Bye-Laws 2021, Table G1, G2.1.2 and D8.2; KHADC Regulation 2015, sections 35(iii) and 36 Continue unchanged. Table G1 requires rainwater harvesting for every plot category and use, "Ground water recharge for covered area more than 3000 sqft" for residential plots of Category II and soft cover of at least 10% or 20% of the plot by category; G2.1.2 rebates 10% of the permission fee where both rainwater harvesting and recycling of waste water are provided; and new buildings in the City Centre Zone adopt rainwater harvesting with 30% of the plot as soft-covered open space (D8.2). Section 36 of the KHADC Regulation makes "storing of water runoff including rainwater in all existing and new buildings" mandatory and asks plans to show "the system of storm water drainage along with points of collection of rain water"; section 35(iii) sets soft cover of at least 15% of the plot where the covered area is 500 m² or more, and 10% otherwise, and asks for semi-pervious paving "wherever possible". Neither sets a storage volume or a roof-area rate. This Manual counts the stored water against its retention requirement only as reuse (Clause 4.4.3), never as detention. Where Table G1's recharge requirement falls on a site where the hill rule or the karst and mine rule of Clause 4.11 forbids infiltration, the two conflict: this Manual requires storage in place of recharge there, and the applicant seeks the Authority's relaxation of the recharge requirement; the Manual does not override the bye-law.
Meghalaya Town and Country Planning Act, 1973 (the Assam Town and Country Planning Act, 1959, Assam Act 2 of 1960, as adapted; as cited in the notifications under it); the Shillong Master Plan 2041 (notified by No. UAU.76/2022/Pt.I/74 of 27 November 2024, as cited in its amendment; amended under section 10(2) by No. UAU.76/2022/Pt.I/186 of 29 October 2025, Gazette of 13 November 2025, read) and the transit-oriented development corridors of 2025; the NESAC report for the plan; the draft risk-informed master plan for Tura (notice No. UAU.76/2022/129 of 16 February 2024) Continue. The Shillong Planning Area covers 288.5 km², against 174 km² in the plan of 1991–2011: the urban agglomeration and 54 villages, bounded on the west by the Umiam river and lake and on the east by the Umkhen, and "drained mainly by the upstream reaches of Wah Umiam, Wah Umkhen, and Wah Tamdong"; the NESAC report maps 3.2 km² of "Regulated Slope" at 40°–50° and 0.53 km² of "Restricted Slope/No Construction Zone" above 50°, places the area in seismic zone V and gives its flash-flood susceptibility as 18.38% very low, 55.44% low, 20.5% medium, 4.67% high and 1.01% very high (NESAC, Formulation of Risk Informed GIS Based Master Plan, Shillong Planning Area, Ver 1.0, May 2023). The Tura draft covers 54.65 km² bounded by the Ringrey stream, the Ganol river and the Rongkhon stream. No drainage chapter of the notified plan of 2041 was read [TBC], and no master plan states a design storm. Master plans would show the flood-sensitive catchments, drainage reserves and regional facility sites of this Manual (Chapter 11). The plan in force is the plan of 2041.
Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015 (KHADC Executive Committee Notification No. DC.II/Genl/31/2015/9 of 4 August 2015; Gazette Extraordinary No. 97 of 25 August 2015), made under the United Khasi-Jaintia Hills District (Establishment of Town Committee) Act, 1960, and the permissions of the KHBSRA (since 2020, as reported); the Jaintia Hills Autonomous District (Establishment and Administration of Town Committees) Act, 1975 and the Garo Hills District (Administration of Town Committees) Act, 1950, which the Bye-Laws 2021 list as Acts (A2.1); the building instruments of the JHADC and the GHADC (not found [TBC]) Continue in the autonomous districts, outside the master-plan, municipal and scheme areas. The 2015 Regulation, which sets out to "codify our ancient traditional conventions on built forms", extends to the whole of the Khasi Hills Autonomous District and is enforced through "the Executive Committee/Town Committee/Dorbar Shnong or Executive Dorbar"; it makes them responsible for ensuring that development does not damage "catchment areas, water sources, spring sheds, streams and rivers" (s.15(1)), with restoration costs on the polluter (s.15(2)); treats river edges as a zone where "No development should normally be allowed" (s.2.101); limits cuts to 3 m and 6 m (s.34(v)); requires rainwater storage (s.36) and drawings that show the highest flood level "reached above the street" and the drains; and forbids septic effluent in a drain or body of water "without adequate treatment" (s.40.3(b)). It sets no design storm. Whether the Bye-Laws 2021 apply in the District Council areas is disputed (Commentary to Clause 1.3); this Manual takes no side, and could take effect in a District Council's area only if that District Council adopted it.
Meghalaya Municipal Act, 1973 (the Assam Municipal Act, 1956, as adapted), as amended by the Meghalaya Municipal (Amendment) Act, 2021 (Act No. 4 of 2021) Continue. The Act vests in the Board the drains of public roads, "all public streams, channels, water-courses, springs tanks, reservoirs" and the public sewers and drains (s.62); regulates the line of buildings on public roads and drains (s.164) and forbids building without sanction (s.171); lets the Board require an owner "to improve bad drainage" within 15 days (s.190), require land within one hundred feet of a drain to be drained (s.206) and drain a block of houses together (s.208); forbids a drain into a Board drain or water-course without written consent (s.204, fine up to ₹50) and sullage on a public road or into a road drain (s.205, fine up to ₹25); and provides for a sewerage scheme (s.212) and a drainage tax (s.68, as substituted in 2021), which is not leviable until a drainage scheme is approved and made (s.73). Its penalties are nominal. The State has six Municipal Boards: Shillong, Jowai, Tura, Williamnagar, Resubelpara and Baghmara. In 2023 the SMB served notices under section 201 and the Environment (Protection) Act on 47 of the 1,169 households it inspected along the Umshyrpi and the Wahumkhrah (State action-taken report, 21.03.2023), and by public notice No. SMB/PW/40/2023/10 of 17 February 2023 told residents "to not discharge untreated sewage directly into drains and water bodies". Only part of the Umkhrah and the Umshyrpi lies within the SMB's limits; the rest is under the KHADC (same report).
Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023 (No. FOR/CC/29/2019/Pt/688 of 25 August 2023; Gazette Part IIA, 7 September 2023), as amended by No. FOR/CC/29/2019/1140 of 13 February 2024 and No. FOR/CC/29/2019/Pt/771 of 6 July 2026; the earlier (Preservation and Conservation) Guidelines, No. FOR/CC/29/2019/Pt/637 of 18 July 2023 (superseded) Apply as executive guidelines. The Forest and Environment Department made them on the High Court's direction in PIL 10/2019, and the Bye-Laws 2021 apply them in the areas the bye-laws cover (B2(ii)(c), Section I(a)4 and I(f), 2024); elsewhere they are to be implemented "in such manner as may be prescribed" (para 10(2)), and nothing prescribed was found [TBC]. Setbacks are measured from "the mean high flood level of a water body observed in the past ten years" (para 2(f)): 3 m from a stream up to 3 m wide in an urban area and 6 m from a wider one (Appendix 3 as merged in 2024; that the merger cut the setback in urban areas outside the municipalities and cantonments from 5 m and 10 m to 3 m and 6 m is a NEER reading [TBC]); 10 m from a rural stream up to 4 m wide and 10, 20 or 30 m from a wider one by plot size (Appendix 2A, 2026); 10, 20 or 50 m from lakes and ponds of up to 1 ha, 1–500 ha and more than 500 ha; and a regulated zone four times the setback for lakes and rural streams (para 7(1A)). Their "waterbody" excludes streams whose bed "remained dry for a period not less than 240 days during each of the past ten calendar years" (para 2(e)), which takes out most jhoras, and they exempt works permitted under the Bye-Laws 2021 and in progress (para 10(3)). The 2.40 m of the original B2(ii)(c) was replaced in 2024. The Pt/688 notification is dated 25 August 2023 in its gazette text and in the 2026 amendment and "18th July, 2023" in the 2024 amendment; this Manual uses 25 August 2023. This Manual's corridor of Chapter 7 applies to every natural channel draining 8 ha or more, whether or not the Guidelines treat it as a waterbody, with a Zone 1 of at least 15 m from top of bank, five times the 3 m and two and a half times the 6 m urban setback; it is stricter than the Guidelines, applies to development approved under this Manual and not to existing buildings, and where the Guidelines' line lies further out, theirs governs (Clause 7.4.5).
Meghalaya Flood Plain Zoning Act, 2026 (Bill read: Gazette Extraordinary Part V, 23 February 2026, No. LB.43/LA/2026/2; the Act, as quoted from the State law site, "Act No. 4 of 2026 … received the assent of the Governor on the 6th March, 2026", notification No. LL(B)14/2026/2) Apply in a flood zone once it is notified; none has been. The Act provides for a Flood Zoning Authority, surveys, objections and the notification of limits, defines a "flood zone" as "the area which is required to carry the flow of the maximum probable floods" (s.2(g)), without a return period, and makes restrictions notified under it prevail over any other law (s.12(2)), with permission deemed granted if not refused within 90 days (as in the Bill). No constitution of the Authority, rules or zone notification was found [TBC]. This Manual maps the 1% AEP corridor of Chapter 7 and reads it as the "maximum probable floods" for its own purpose only; where a zone is notified, its restrictions prevail.
Wetlands (Conservation and Management) Rules, 2017; the Meghalaya State Wetlands Authority (Notification No. ENV.1/2007/Pt/110 of 1 November 2017; Gazette, 16 November 2017); the officers empowered to take cognizance of offences (No. ENV.I/2007/Pt-II/102 of 15 September 2023) Continue. The Authority is chaired by the Minister in charge of Forests and Environment, with the Principal Chief Conservator of Forests as Member Secretary and the Secretaries of Urban Affairs and Water Resources, the Director of NESAC and a hydrology expert among its members. The State has no Ramsar site, and no wetland was found notified under rule 4; the High Court accepted in April 2025 that 225 water bodies had been ground-truthed and that none qualified as a Ramsar site (as reported). Reservoirs, lakes and pungs are governed by Chapter 7.
High Court of Meghalaya, PIL No. 10 of 2019, In Re: Cleanliness of Umiam Lake (orders of 24.05.2023, 19.07.2023 and 19.02.2024); the suo motu PIL on wetlands (disposed of on 29 April 2025; number not found, as reported); PIL 2/2024 (tree felling) and PIL 13/2022 (the Shillong–Dawki road) (as reported) Apply where they bind; none sets a current setback. On 24.05.2023 the Court barred construction "within 50 metres of the high-water mark of the relevant waterbody without the express previous leave of this Court"; on 19.07.2023 it found the guidelines of July 2023 to "fall woefully short" and observed that "Several of the rivers, including the Umkhrah in Shillong itself are carrying such contaminated water that they may not be fit even to step into"; and on 19.02.2024 it took the amendment of 13.02.2024 on record and closed the PIL, with six general directions on retrieved public property, circulated by the Forest and Environment Department on 5 March 2024. The 50 m bar ended with the PIL. The Expert Committee's "Restricted Zones of 50m + 300m" around Umiam, annexed to the Guidelines, and the NESAC report's "buffer as per NGT" along the town streams, 50 m from Umiam lake and 100 m from protected forests, are recommendations, not rules; no NGT order fixing a buffer for Shillong's streams was found.
National Green Tribunal, OA 192/2022 (In re: News item, The Shillong Times, 23.02.2022, "Poison flowing in Shillong's rivers"; orders of 28.04.2022 and 22.11.2022), OA 673/2018 (polluted river stretches) and OA 172/2016/EZ (Sanjay Laloo) Apply where they bind. On 22.11.2022 the Tribunal recorded that the Additional Chief Secretary, Urban Development, "is required to ensure that the raw fecal matter is not discharged into fresh water streams and Umkhrah and Umshyrpi rivers"; the State's action-taken report of 21.03.2023 and the joint committee report of 28.02.2023 set out the interception and treatment works, and the State ring-fenced ₹109 crore for liquid and solid waste (letter of 22.12.2023). OA 673/2018 requires full treatment of sewage and in-situ remediation meanwhile (as recited in the action-taken report), and OA 172/2016/EZ required ₹10 crore in a ring-fenced account (as recited in the joint committee report). CPCB lists the Umkhrah (Demthring to Mawpdang, Mawlai) and the Umshyrpi (Umshyrpi Bridge to Law College, Dhanketi) as Priority I stretches (CPCB, Polluted River Stretches, September 2025). Sewage in storm drains is dealt with in Chapter 8.
National Green Tribunal, OA 73/2014 (order of 17.04.2014, as recited by the Supreme Court) and Supreme Court of India, State of Meghalaya v. All Dimasa Students Union, CA No. 10720 of 2018 (judgment of 03.07.2019); Meghalaya Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2022 (as reported) Apply where they bind. The Tribunal directed that "rat-hole mining/illegal mining is stopped forthwith throughout the State of Meghalaya"; the Supreme Court's judgment of 2019 deals with mining on private and community land under the mining laws, and its directions were not extracted for this Manual [TBC]. Rat-hole mining is reported to continue (as reported). The karst and mine rule of Clause 4.11 and the outfall checks of Chapter 8 apply in coal-mining areas whatever the status of the workings.
Groundwater: no State groundwater Act; the no-objection certificates of the District Level Committee and the CGWA portal; the Meghalaya State Water Policy, 2019 (as reported) Continue. No State law regulates groundwater; abstraction for commercial use needs a no-objection certificate through the District Level Committee and the portal of the Central Ground Water Authority (as quoted in the State's procedure; not read [TBC]). Every assessment unit of the State is "Safe", with a stage of extraction of 3.55% (CGWB, GWRA 2022), so recharge is not a design objective of this Manual (Clause 4.11, recharge rule).
Environment (Protection) Act, 1986; Water (Prevention and Control of Pollution) Act, 1974; the Meghalaya State Pollution Control Board Continue. MSPCB monitored 64 locations on 35 rivers in 2022–23 (CPCB, 2025) and consents industrial effluent before it is let into "a watercourse or drain" (Bye-Laws 2021, D4.6). Sewage and acid drainage in storm drains are dealt with in Chapter 8.
Disaster Management Act, 2005; MSDMA, the Revenue and Disaster Management Department and the District Disaster Management Authorities Continue. No urban flood plan or standard operating procedure of MSDMA was read for this Manual [TBC], and no order of the State fixing a date for pre-monsoon desilting was found; the works calendar of Chapter 10 sets this Manual's dates, beginning with 31 March.
IRC:SP:42-2014, IRC:SP:48 (Hill Road Manual) and the practice of the Public Works Department, NHAI and NHIDCL on hill-road drainage Apply to the drainage of hill roads, cross-referenced from Chapter 6, where they do not conflict with it; the drainage clauses of IRC:SP:48 were not read for this Manual [TBC].
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Meghalaya is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the monsoon, because RWH sumps are usually full or the ground saturated by the time a June monsoon storm against the plateau and the southern escarpment, such as those of 16 June 1995 and 15–17 June 2022, arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

Meghalaya is spending on its town streams, but without a design basis. Under the NGT's supervision of the Umkhrah and Umshyrpi (OA 192/2022), the State reported 49,612 m³ of waste removed from the Wahumkhrah for ₹7.9 crore under the 15th Finance Commission, stone bunds and solid-waste traps for ₹3.60 crore, in-situ treatment of five drains, five on-site sewage treatment plants of 13.42 MLD and a diversion drain at Nongrah (State action-taken report, 21.03.2023); Shillong Smart City Ltd is reported to have sanctioned eleven projects worth ₹670.95 crore, among them "in-situ Nallah Treatment Technology", and rainwater harvesting at 52 locations (as reported; State action-taken report); and the Water Resources Department is reported to have resubmitted a DPR for embankments and channel improvement on the Wahumkhrah and the Umshyrpi after the Brahmaputra Board returned the first (as reported). The flood plain zonation of the Umkhrah and other stretches awarded to RMSI in June 2021 was reported 80% complete in March 2023 and has not been published (State action-taken report). None of the documents found states a design storm, and no development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.

The State's law holds some of the tools. The Bye-Laws 2021 forbid building above 50° of slope, limit cuts, set the stilt and plinth above the Highest Flood Level, bar building on land liable to flooding without protection, require rainwater harvesting on every plot and, in hazard-prone areas, drainage that keeps water out of the subsoil and sediment basins during construction; the KHADC Regulation 2015 protects "catchment areas, water sources, spring sheds, streams and rivers" (s.15), makes rainwater storage mandatory for every building (s.36) and forbids septic effluent in "an open channel, drain or body of water without adequate treatment" (s.40.3(b)); the Meghalaya Municipal Act, 1973 vests the public streams, springs and drains of a municipality in its Board and lets the Board require land within one hundred feet of a drain to be drained (ss.62, 206); the Waterbodies Guidelines set setbacks from lakes, ponds, rivers and streams, measured from "the mean high flood level of a water body observed in the past ten years"; and the Meghalaya Flood Plain Zoning Act, 2026 lets restrictions in notified flood zones "prevail" over other laws (s.12(2), as in the Bill). The courts have acted too: the High Court's supervision of Umiam lake (PIL 10/2019) produced the Waterbodies Guidelines, and the NGT's orders on the Shillong rivers (OA 192/2022) produced the interception and treatment works above. What the law lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how much water a hill site may put into its slope or a limestone or mine area into its voids, how the flood level of a jhora is to be fixed, or how much storage a paved plot removes; the Guidelines' setback from a stream in a municipal area is only 3 m or 6 m, and most jhoras fall outside them under the 240-day rule; and no flood zone has been notified under the 2026 Act. This Manual's checks are framed as part of the permission given by the competent authority for the area, under the Bye-Laws 2021 or a District Council's regulation, not as a separate no-objection certificate. This Manual is offered as a technical companion to these instruments, to the orders of the courts and to the drainage and river works of the towns: it supplies the design storm, detention, hill-site drainage, infiltration and corridor numbers they do not set, as a proposal for the Government, the District Councils and the other authorities to consider. Neither the Urban Affairs Department, MUDA, any Municipal Board, any District Council, the Water Resources Department nor any other body has adopted it.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Urban Affairs Department (Urban Affairs) Notifies the Bye-Laws 2021 under the Meghalaya Town and Country Planning Act, 1973 and the master plans of Shillong, Tura and the other towns, prepared with NESAC, and oversees the Municipal Boards and the State's urban programme unit (SIPMIU). Would prepare the amendment of Clause 1.3.1(a), show flood-sensitive catchments, drainage reserves and regional facility sites in the master plans (Chapter 11), issue the model bye-law of Clause 1.3.1(b) to the Municipal Boards, and give regional support to Tier B authorities (Table 1.1). Its jurisdiction does not reach the Town Committees and census towns governed by the District Councils (CAG).
Meghalaya Urban Development Authority (MUDA) The "Authority" of the Bye-Laws 2021 in the master-plan, municipal and scheme areas, acting through its Chairperson or an officer to whom the power is delegated (A2.3). Would require the drainage report of Chapter 10 with each application, check the hill rules at the plinth inspection, and record drainage reserves and easements in the permissions it grants. Whether its jurisdiction reaches the District Council parts of a master-plan area is disputed; this Manual does not decide it.
State Stormwater Technical Committee (Clause 1.3.2) Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12).
Shillong Municipal Board (SMB) and the Municipal Boards of Jowai, Tura, Williamnagar, Resubelpara and Baghmara Hold the public drains, streams, springs and tanks of their areas under section 62 of the Meghalaya Municipal Act, 1973, give consent for drains into them (s.204) and may require land to be drained (ss.190, 206). Would apply this Manual to their own works, keep the drain-and-jhora register of their area, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15). SMB would also keep the solid-waste traps on the drains it maintains clear before each season.
Shillong Cantonment Board Governs building and drainage in the Shillong Cantonment, where "each house in the civil areas of cantonment has their own septic tank" (State action-taken report, 2023). Would apply this Manual to the works it approves and executes in the Cantonment.
New Shillong Township Development Authority (NSTDA) [TBC] and Shillong Smart City Ltd Plan and build the New Shillong township (NSTDA; its powers not read for this Manual [TBC]) and drains, rainwater harvesting and in-situ nallah treatment in Shillong under the Smart Cities Mission (Shillong Smart City Ltd, as reported). Would design their drainage works to this Manual from the dates of Clause 1.11 and hand them over under Clause 10.14.
Khasi Hills, Jaintia Hills and Garo Hills Autonomous District Councils (KHADC, JHADC, GHADC), their Executive Committees and building authorities (KHBSRA in the Khasi Hills), and the Town Committees Regulate building and land in their districts outside the master-plan, municipal and scheme areas: in the Khasi Hills under the 2015 Regulation, with permissions from the KHBSRA (as reported); the JHADC and GHADC instruments were not found [TBC]. The Manual has no force in their areas unless a District Council adopts it. A District Council's Executive Committee could adopt it for its district by amending its own building regulation; if it did, its building authority would require the drainage report of Chapter 10, or the simplified drainage layout of section 36 of the KHADC Regulation for small buildings, and the District Council would be the competent authority for the area.
Dorbar Shnong and Rangbah Shnong (Khasi and Jaintia Hills); the village institutions of the Garo Hills led by the Nokma [TBC] Act under the rules of the District Councils; the KHADC Solid Waste Management Rules, 2022 empower the Dorbar Shnong to fine polluters (as recorded in the minutes of 14 April 2023), and the 2015 Regulation names the Dorbar Shnong among the bodies that protect water sources and streams (s.15(1)). Hold or speak for much of the community land on which jhoras and corridors lie. Would agree the drainage corridors, easements and regional facility sites on community land (Chapter 7) and keep village jhoras and drains clear under the District Council's rules.
Water Resources Department Builds and maintains flood works on the rivers, carries out the flood plain zonation study awarded to RMSI, and issues groundwater no-objection certificates through the District Level Committee. Would supply river levels and flood marks for Chapter 5, approve the site-specific hydrology of Clause 2.3.6(i) for rivers, and apply this Manual to its flood works, among them the works proposed on the Wahumkhrah and the Umshyrpi.
Public Health Engineering Department (PHED) Supplies water to the towns, mostly by gravity from streams and springs, and has been the nodal department for sanitation outside the municipalities since 2023 (minutes of 14 April 2023). Would protect the spring-recharge areas above its intakes under Chapter 8 and keep septic and sullage overflows out of the storm drains it serves.
Public Works Department (PWD (Roads)), NHAI and NHIDCL Build and maintain the roads, their side drains, catch-water drains and culverts, which in the hill towns are much of the minor drainage system; NHAI and NHIDCL on NH-6 and the Shillong–Dawki road. Would apply Chapter 6 and the hill-road rules to them and never discharge a road drain onto an unprotected slope.
Soil and Water Conservation Department Treats catchments. Would apply the hill rules of Clause 4.11 to its works and coordinate catchment treatment above the flood-sensitive catchments of Annex 1B.
Forest and Environment Department Made and administers the Waterbodies Guidelines, provides the Member Secretary of the Meghalaya State Wetlands Authority and constituted the River Rejuvenation Committee (No. ENV.5/2018/44 of 24.01.2019, reconstituted by No. ENV.5/2018/172 of 9 October 2020). Would be the competent authority for matters under the Guidelines, could align their setbacks with the corridors of Chapter 7, and the Wetlands Authority's consent would be needed before a notified wetland is used for storage or as an outfall (Chapter 7).
Meghalaya State Pollution Control Board (MSPCB) Monitors rivers (64 locations on 35 rivers in 2022–23) and identified the 32 outfalls of the Umkhrah and the Umshyrpi. Would receive the records of sewage and acid drainage found in storm drains under Chapter 8.
MSDMA, the Revenue and Disaster Management Department, the Deputy Commissioners and the District Disaster Management Authorities Prepare for and respond to floods, flash floods and landslides and report their tolls. Would supply the landslide and flash-flood inventories used in the screening of Clause 2.3.6(i) and lead post-event reviews with the Authority (Clause 10.16). In the Sixth Schedule areas most land is community, clan or private, and its records are not held by the State's revenue staff.
Meghalaya Basin Development Authority (MBDA) Runs the State's spring-shed programme (as reported). Would supply spring locations and recharge areas for the spring rules of Chapter 8.
MeECL and MePGCL Operate the Umiam–Umtru dams, New Umtru and Myntdu–Leshka, whose gate-operation guidelines give their levels and release reaches. Would supply reservoir levels, release rules and release records for Chapter 5 and the screening of Clause 2.3.6(i).
NESAC, a centre of the Department of Space Prepared the risk-informed master plans of Shillong and Tura with their flash-flood and landslide susceptibility maps. Its maps would be used in the screening of Clause 2.3.6(i) and in Chapter 11.
Flood Zoning Authority (Meghalaya Flood Plain Zoning Act, 2026; not constituted) Once constituted, would survey rivers, notify flood zones and grant permissions in them; it could use the corridor maps of Chapter 7 in its notifications. Until then no flood zone exists.
Central Water Commission (CWC), a body of the Union Publishes the Flood Estimation Report for subzone 2(b) used in Chapters 2 and 3 and monitors river levels at seven sites in the State, none with a warning level. Would supply river stage records for Chapter 5 and confirm whether a report for subzone 2(c) is in preparation.
Central Ground Water Board (CGWB), North Eastern Region, Guwahati, a body of the Union Assesses the State's groundwater (every unit "Safe"; stage of extraction 3.55% in 2022) and holds the observation wells. Would supply groundwater levels and quality with the Water Resources Department.
IMD (Meteorological Centre Shillong), and road and rail owners IMD's stations supply the rainfall records of Chapter 2; Cherrapunji (42515) and Shillong (C.S.O.) (42516) are the first data request of Clause 2.3.6(a). Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7).

Commentary. Stormwater in Meghalaya is split, first, by the Sixth Schedule. In the master-plan, municipal and scheme areas the Urban Affairs Department makes the Bye-Laws 2021 and the master plans, MUDA grants permission and the Municipal Boards hold the drains; in the rest of each autonomous district the District Council regulates building and land under its own instruments, the Town Committees and Dorbar Shnongs act under its rules, and the land is mostly community, clan or private. The Comptroller and Auditor General found that the Town Committee and census-town areas, 47 per cent of the urban population, are governed by the District Councils and not by the Urban Affairs Department (CAG). The split is then repeated among the bodies that drain the land: the Water Resources Department for the rivers and flood works, the PWD, NHAI and NHIDCL for the road drains that are much of the minor system in the hill towns, MePGCL for the reservoirs that hold outfalls up and release floods down the valleys, PHED for the water supply and, outside the municipalities, sanitation, and the courts, which have acted on Umiam lake and on the Shillong rivers. Shillong shows why the split matters. The Umkhrah and the Umshyrpi are at once trunk storm drains, the city's sewers, since the Shillong Planning Area "has no sewerage system" and its sullage flows through "the primary, secondary and natural drains and finally to the nearby rivers" (NESAC, 2023), and Priority I polluted stretches (CPCB, 2025). Only part of their length lies within the SMB's limits; the rest is under the KHADC (State action-taken report to the NGT, 21.03.2023), and the Cantonment, the census towns, New Shillong and the 54 villages of the planning area lie outside the Board. The Municipal Act vests the public drains and streams of a municipality in its Board (s.62), but no rule or order found divides the jhoras and streams outside the municipalities, or the road drains from the town drains, between the bodies concerned [TBC]. Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5, as Chapter 6 does for the drains themselves, and recommends that each town keep a drain-and-jhora register giving every reach its owner, its land status (community, clan, private or State) and whether it is a "waterbody" under the Waterbodies Guidelines, that is, whether the 240-day rule excludes it (set by this Manual). The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers, and on community land it is put into effect by agreement with the landholding institution, not by acquisition.

Table 1.5 — Working assignment of drainage elements under this Manual

Element Assigned to
Drains of public roads, public streams, channels, water-courses, springs and tanks, and public drains, within the limits of a Municipal Board The Municipal Board (Meghalaya Municipal Act, 1973, s.62); in Shillong, SMB
Roadside drains, catch-water drains and culverts of State roads PWD (Roads); on NH-6 and the Shillong–Dawki road, NHAI or NHIDCL
Drains in the Shillong Cantonment The Shillong Cantonment Board
Drains of the New Shillong township NSTDA [TBC]
Rivers and the flood works on them The Water Resources Department
Village drains and jhoras outside municipal limits The District Council, and the Dorbar Shnong under the District Council's rules (the Nokma-led villages of the Garo Hills not researched for this Manual [TBC])
Reservoirs, their gates and releases, and their release reaches MePGCL
Catchment treatment The Soil and Water Conservation Department
Drains and treatment works built by Shillong Smart City Ltd, until handed over in writing Shillong Smart City Ltd (as reported), and the Municipal Board after handover

This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Meghalaya has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a stream in flood on a valley floor, such as the Umkhrah at Polo, to a reservoir or release reach of MePGCL, or to a river under backwater on the Garo plains, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it; nor is it waived for a site because it drains to a steep jhora, a gorge or down the escarpment.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Meghalaya the High Court found the waterbody guidelines of July 2023 to "fall woefully short" and to "appear to be more of a formality" (PIL 10/2019, order of 19.07.2023); the guidelines that replaced them keep buildings only 3 m or 6 m from streams in municipal and cantonment areas, and their amendment of 2026 reduced the setbacks from rural streams on larger plots; and the NESAC report for the Shillong Planning Area found that "Encroachment and clogging of channels are the main causes of flooding over Shillong" (NESAC, 2023).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

  • Government of Meghalaya, Urban Affairs Department. Meghalaya Building Bye-Laws, 2021, Notification No. UAU.73/2016/Pt/402 of 9 March 2021, Gazette of Meghalaya No. 12, Part IIA, 25 March 2021. https://megurban.gov.in/laws/BuildingByeLaws.pdf
  • Government of Meghalaya, Urban Affairs Department. Amendments to the Meghalaya Building Bye-Laws, 2021: Nos. UAU.73/2016/Pt/55 of 29 February 2024 (Gazette, 9 May 2024); UAU.73/2016/Pt.III/76 of 19 November 2024; UAU.73/2016/Pt.VIII/191 of 15 January 2025; UAU.73/2016/Pt.VII/97 of 18 June 2025; UAU.110/2020/208 of 13 August 2025 (Gazette, 11 September 2025); UAU.73/2016/Pt.III(A)/70 of 21 October 2025 (Gazette Extraordinary, 3 November 2025); UAU.73/2016/Pt VIII-A/22 of 19 December 2025; UAU.73/2016/Pt.VIII/203 of 7 May 2026. https://megurban.gov.in/ and https://megpns.gov.in/gazette/
  • Meghalaya Urban Development Authority. Meghalaya Building Bye-Laws, 2011 (superseded). https://megurban.gov.in/laws/building.pdf
  • Khasi Hills Autonomous District Council. Khasi Hills Autonomous District (Land Development and Building) Regulation, 2015, Executive Committee Notification No. DC.II/Genl/31/2015/9 of 4 August 2015, Gazette Extraordinary No. 97, 25 August 2015. https://megpns.gov.in/gazette/2015/08/25-08-15-X.pdf
  • Government of Meghalaya. Meghalaya Municipal Act, 1973 (the Assam Municipal Act, 1956, as adapted; consolidated text), and the Meghalaya Municipal (Amendment) Act, 2021 (Act No. 4 of 2021), notification No. LL(B)87/97/227 of 26 March 2021. https://megurban.gov.in/laws/mma.pdf
  • Government of Meghalaya, Forest and Environment Department. Meghalaya Waterbodies (Preservation and Conservation) Guidelines, 2023, No. FOR/CC/29/2019/Pt/637 of 18 July 2023 (superseded); Meghalaya Waterbodies (Conservation and Protection) Guidelines, 2023, No. FOR/CC/29/2019/Pt/688 of 25 August 2023 (Gazette Part IIA, 7 September 2023, with the report of the Expert Committee); amendments No. FOR/CC/29/2019/1140 of 13 February 2024 (Gazette, 22 February 2024) and No. FOR/CC/29/2019/Pt/771 of 6 July 2026; order No. FOR/CC/29/2019/Pt-I/7 of 5 March 2024. https://megpns.gov.in/gazette/2023/09/07-09-23-IIA.pdf
  • Meghalaya Legislative Assembly. Meghalaya Flood Plain Zoning Bill, 2026, Gazette Extraordinary Part V, 23 February 2026, No. LB.43/LA/2026/2 (read); the Meghalaya Flood Plain Zoning Act, 2026 (Act No. 4 of 2026), notification No. LL(B)14/2026/2 of 6 March 2026 (as quoted from the State law site; not read [TBC]). https://megpns.gov.in/gazette/2026/02/23-02-26-X.pdf
  • Government of Meghalaya, Forest and Environment Department. Notification No. ENV.1/2007/Pt/110 of 1 November 2017 (Meghalaya State Wetlands Authority; Gazette, 16 November 2017); No. ENV.I/2007/Pt-II/102 of 15 September 2023 (cognizance of offences under the Wetlands Rules); Nos. ENV.5/2018/44 of 24 January 2019 and ENV.5/2018/172 of 9 October 2020 (River Rejuvenation Committee).
  • Government of Meghalaya, Urban Affairs Department. Shillong Master Plan 2041, amendment No. UAU.76/2022/Pt.I/186 of 29 October 2025, Gazette of 13 November 2025 (citing the notification of the plan, No. UAU.76/2022/Pt.I/74 of 27 November 2024); draft risk-informed master plan for Tura, notice No. UAU.76/2022/129 of 16 February 2024. https://megpns.gov.in/gazette/2025/11/13-11-25-IIA.pdf
  • Government of Meghalaya. Meghalaya State Language Act, 2005 (Act No. 10 of 2005).
  • High Court of Meghalaya. PIL No. 10 of 2019, In Re: Cleanliness of Umiam Lake v. State of Meghalaya, orders of 24.05.2023, 19.07.2023 and 19.02.2024. https://www.livelaw.in/pdf_upload/inrecleanlinessofumiamlake-482242.pdf
  • National Green Tribunal. OA No. 192 of 2022, In re: News item published in The Shillong Times dated 23.02.2022 titled "Poison flowing in Shillong's rivers": action-taken report of the State of Meghalaya, 21.03.2023, and report of the CPCB–MSPCB Joint Committee, 28.02.2023. https://www.greentribunal.gov.in/
  • Supreme Court of India. State of Meghalaya v. All Dimasa Students Union, Dima Hasao District Committee & Ors., Civil Appeal No. 10720 of 2018, judgment of 03.07.2019 (reciting NGT OA 73/2014, order of 17.04.2014). https://api.sci.gov.in/supremecourt/2018/39439/39439_2018_11_1501_14662_Judgement_03-Jul-2019.pdf
  • Comptroller and Auditor General of India. Performance Audit on Solid Waste Management in Urban Areas of Meghalaya, 2017-18 to 2021-22 (executive summary read; report number [TBC]). https://cag.gov.in/
  • Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality, September 2025.
  • Central Ground Water Board, North Eastern Region, Guwahati (2022). Dynamic Ground Water Resources of Meghalaya (GWRA 2022).
  • Minutes of the stakeholder meeting on the restoration of the Wah Umkhrah, Wah Umshyrpi and Wah Umkhen, 14 April 2023, and the Chief Secretary's presentation (Shillong Municipal Board website). https://smb.gov.in/
  • Press reports of the KHBSRA (2020), the notification of 1 February 2019 to the District Councils, the KHADC's rejection of the Bye-Laws 2021 (October 2021), the High Court's suo motu wetlands PIL (2025), the Meghalaya Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2022 and the Meghalaya Official Languages Ordinance, 2026 (secondary sources). https://theshillongtimes.com/
  • Indian Roads Congress. IRC:SP:48, Hill Road Manual (drainage clauses not read [TBC]).
  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
  • Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
  • National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
  • MoHUA (2016). Model Building Bye-Laws, Chapter 9.
  • Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
  • India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): Cherrapunji (42515) and Shillong (C.S.O.) (42516). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
  • India Meteorological Department. Monthly Climate Summary, June 2022 (the 24-hour record at Mawsynram; the rainfall of June 2022 over Assam and Meghalaya). https://imdpune.gov.in/cmpg/Product/Monthly_Climate_Summary/Monthly_Clim_Summary_6_2022.pdf
  • Central Water Commission (2000). Flood Estimation Report for South Brahmaputra Subzone 2(b) (Revised), Annexes 4.1 and 4.2 (heaviest daily falls at the Shillong, Upper Shillong and Dalu gauges; recording-gauge maxima at Shillong).
  • Press reports of the earthquake of 1897 at Shillong and Sohra, the Garo Hills floods of September 2014, the storms of June 2022, the Garo Hills floods of October 2024, the storms of 30–31 May 2025 and the Laitlyngkot collapse and Dawki flood of June 2026 (secondary sources). https://www.downtoearth.org.in/
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
  • Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
  • Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
  • Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
  • PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
  • Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
  • Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
  • North Eastern Space Applications Centre (2023). Formulation of Risk Informed GIS Based Master Plan, Shillong Planning Area, Ver 1.0, May 2023. https://megurban.gov.in/notifications/RiskInformedMasterPlans/Finalised%20Report%20-%20Shillong.pdf
  • Integrated Research and Action for Development (2020). Disaster Resilience Action Plan, Shillong, IRADe-PR-73(2020), for the National Mission on Himalayan Studies (quoting the Shillong Smart City Proposal 2016-17 and RMSI's multi-hazard risk and vulnerability assessment of 2019). https://nmhs.org.in/w/pdf/publication/Technical_Report/Dr.Rohit_Mangotra/Shillong_Disaster_Resilience_Action_Plan.pdf
  • Shillong Municipal Board. Shillong Smart City Proposal (not read in full) and the project on the restoration and rejuvenation of the Wah Umkhrah, Wah Umkhen and Wah Umshyrpi. https://smb.gov.in/
  • Urban Affairs Department (2018). Expression of interest for detailed project reports for the restoration of seven polluted river stretches in Meghalaya. https://megurban.gov.in/adverts/EOI_river_restoration.pdf

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the boundaries of the Shillong and Tura Municipal Boards and of the master-plan areas under the Meghalaya Town and Country Planning Act, 1973, among them the Shillong Planning Area and the Tura master-plan area
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model Bye-Laws 2021 amendment and model ULB bye-law
Form 1-1 Applicability Determination
Form 1-2 Variance / Waiver Request