Draft v1.0 prepared by NEER. Not adopted by the Government of Nagaland, any Village Council, authority or local body, and has no legal force. About this draft

Nagaland · Draft v1.0

Nagaland Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Nagaland Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Nagaland.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Nagaland, by its Governor, its Council of Ministers or its Legislative Assembly, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Urban Development Department (UDD) or the Directorate of Urban Development, the Municipal Affairs Department or the Directorate of Municipal Affairs (DMA), the Building Byelaws Review Committee of the Municipal Affairs Department or any Building Plan Approval Committee, the Kohima, Dimapur or Mokokchung Municipal Councils, any Town Council or Urban Station Committee, or Kohima Smart City Development Ltd (KSCDL). Nor has it been adopted, notified or endorsed by any Village Council, Village Development Board (VDB), tribal hoho or Land Owners' Board, or by any Deputy Commissioner. Where it names a body, such as the Water Resources Department (WRD), the Public Health Engineering Department (PHED), the Public Works Department (PWD) or PWD (NH), the National Highways and Infrastructure Development Corporation Ltd (NHIDCL), the Land Resources Department, the Soil and Water Conservation Department or the Directorate of Soil & Water Conservation, the Department of Land Records and Survey, the Nagaland State Disaster Management Authority (NSDMA) or a District Disaster Management Authority, the Nagaland Pollution Control Board (NPCB), the Department of Environment, Forest and Climate Change, the State Wetland Authority, the Nagaland State Climate Change Cell (NSCCC), the North Eastern Electric Power Corporation (NEEPCO), the Gauhati High Court at its Kohima Bench, the National Green Tribunal (NGT) or the Supreme Court, or a body of the Union or an external or research body, such as the Central Water Commission (CWC), the India Meteorological Department (IMD), the Central Ground Water Board (CGWB), the Central Pollution Control Board (CPCB), the Comptroller and Auditor General of India (CAG), the National Institute of Hydrology (NIH), the Ministry of Jal Shakti (MoJS) or the Asian Development Bank (ADB), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role. Citing a body's document does not make this Manual that body's document.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. Until then, the Nagaland Building Bye-Laws 2012 as amended (the NBBL 2012), the Nagaland Municipal Act, 2023 as amended, the Nagaland Town and Country Planning Act, 1966 as amended (the TCP Act) and the Town Planning Schemes made under it, the Nagaland Land (Requisition and Acquisition) Act, 1965, the Nagaland Village Council Act, 1978, Naga customary law and procedure, any master plan once it is notified, orders of courts and tribunals, and approval conditions in force continue to apply.

Nagaland and Article 371A. Under Article 371A(1)(a) of the Constitution, no Act of Parliament in respect of, among other matters, Naga customary law and procedure or the "ownership and transfer of land and its resources" applies to Nagaland "unless the Legislative Assembly of Nagaland by a resolution so decides", as quoted from a published copy of the Constitution. Land in the State is held mostly by villages, clans and individuals under customary law, and the State has no District Councils. Each of its 1,280 recognised villages has a Village Council under the Nagaland Village Council Act, 1978; a recognised village stands on land that belongs to its population or was given to it by the Government or the lawful owner (section 3), its Council is to "supervise proper maintenance of water supply, roads, … sanitation" and may make Village Development Schemes (section 12(1)), and "no transfer of immovable property shall be affected without the consent of the Village Council" (section 15(1)(g)). Villages lie inside towns as well as outside them: the oldest part of Kohima is Kohima Village, under its Village Council, and the area of the State Secretariat "is said to be a part of Kohima village and does not form part of Kohima municipal area", as the ADB recorded in 2022. The NBBL 2012 reach the Master Plan areas, the areas of the Municipal and Town Councils and other notified areas of local bodies (bye-law 1(ii)); no master plan for Kohima or Dimapur has been notified, as far as was found. This Manual is not an Act of Parliament, and Article 371A does not stop the State or a local body from setting technical standards, as this Manual reads it; but drainage corridors and setbacks act on land in practice. So in this Manual setbacks and corridors are conditions of building permission in the areas of the Municipal and Town Councils and in Master Plan areas once notified, and guidance elsewhere. Outside those areas the Manual reaches the public works that the State's departments and agencies execute (Clause 1.5.1(b)) and any body that adopts it; for a household or a village it is guidance only. On village land, inside a town or outside it, the Village Council's consent governs, and nothing in this Manual binds a Village Council. Land for a public drain or corridor that is not State or municipal land is secured by agreement with the Village Council, the clan or the owner, or by donation, or reserved in a master plan or a Town Planning Scheme; this Manual does not assume that land can be taken. A Council or the State could take the Manual up in several ways: the State Government could amend the NBBL 2012 on the recommendation of the Building Byelaws Review Committee, or carry the Manual into the draft Nagaland Building Bye-Laws 2026; a Municipal or Town Council could make drainage regulations under section 138 of the Nagaland Municipal Act, 2023, which take effect only when "approved by the Government and published in the Official Gazette" (section 139); UDD could carry drainage reserves into master plans and Town Planning Schemes; NSDMA could refer to it in district disaster management plans; and a Village Council could use it in a Village Development Scheme or by a resolution under its own powers. None has done so.

Names. Some places, rivers, gauges and instruments have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • Chümoukedima is also spelt Chumukedima and Chumoukedima. It is the district headquarters next to Dimapur. Pagla Pahar, also Pagala Pahar ("pakala pahar" in one report), is the stretch of National Highway 29 on the Tsiedukhru range between Chümoukedima and Kohima, where the Chathe undercuts the road;
  • Kohima's streams are written as NPCB writes them: the Dzuna and the Dzucha, which join as the Dzu, and the Sano Ru. CPCB's list of polluted river stretches (2025) writes Sanuo Ru, and the press writes Dzüza and Dzudza. This Manual keeps each source's spelling where it quotes the source;
  • the Dhansiri of this Manual is CWC's Dhansiri (S), the southern Dhansiri, which flows from south-west to north-east across the plain at Dimapur and leaves the State; the Dikhow is also the Dikhu, and the Disang also the Desang. The Tizu and its tributary the Zungki drain the eastern ranges to the Chindwin in Myanmar. Gelabil is CWC's site on the Doyang, downstream in Assam;
  • IMD's station "Kohima" (index 42527, rainfall data 1948–2012) is the only Nagaland station in IMD's tables of extremes. IMD's Meteorological Centre Kohima (MC Kohima), which issues the State's daily rainfall summary, gives its address on its letterhead as Dimapur. The daily gauge of the Directorate of Soil & Water Conservation (DSWC) at Kohima, whose series of 1997–2022 Dabral (2025) analysed, is a different gauge;
  • CWC's flood estimation reports divide the State three ways, as this Manual reads their plates. The plain and the central and northern ranges are in subzone 2(b), South Brahmaputra (revised report No. SB-2(b)/R-4/44/99, March 2000), whose text names Kohima among its towns; the south-western hills of Peren, on the Barak headwaters, lie on or beyond the boundary with subzone 2(c), "Barak and others", for which CWC never published a report; and the eastern ranges of Phek, Kiphire, Meluri and eastern Tuensang lie outside every plate, in a subzone the report does not name. These subzones are not the four rainfall zones (NL-Z1 to NL-Z4) and five hydrologic sub-areas (NL-A, NL-B, NL-B1, NL-C and NL-D) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7;
  • the Nagaland Village Council Act, 1978 was enacted as the Nagaland Village and Area Councils Act, 1978 (Nagaland Act 1 of 1979) and renamed by its amendment of 1990, which abolished the Area Councils. The CAG's report of 2025 calls it "the Nagaland Village and Tribal Council Act, 1978 (erstwhile Nagaland Village Council Act, 1978)"; the amendment that made that change was not found [TBC]. This Manual writes "the Village Council Act";
  • KMC is the Kohima Municipal Council and DMC the Dimapur Municipal Council. Both are Municipal Councils under the Nagaland Municipal Act, 2023, not corporations; NSDMA's Dimapur assessment calls DMC a "Municipal Corporation" in places, and this Manual quotes that only as printed. The KMC area is not the whole town (above);
  • NEEPCO publishes the levels of the Doyang reservoir as "M RWL": 400 MCM at 333.0 m RWL and 220 MCM at 324.0 m RWL, as quoted from the data format filed with the Central Electricity Regulatory Commission (CERC). Other figures, of 535 MCM gross, 370 or 400 MCM live and 216.5 MCM at 324.0 m, are reported by SANDRP; the sources conflict, and no source read states the datum [TBC]. CWC's levels at its sites downstream were read only as SANDRP transcribed them. This Manual names the gauge, the unit and the datum with every level; and
  • in this Manual "the monsoon" and "the monsoon season" mean the wet season of 1 April to 31 October. That is not IMD's usage: IMD counts April and May as pre-monsoon months, and the south-west monsoon's normal onset at Dimapur is 4 June (2 June in IMD's normals for 1901–1940) and its normal withdrawal 14 October (9 October before), in IMD's monsoon normals of 2020; IMD gives no dates for Kohima. The Manual's season begins on 1 April because Kohima's monthly rainfall rises steeply from April and Dimapur's flood season starts in May (Chapter 2).

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:

  • the Nagaland Building Bye-Laws 2012 (the NBBL 2012) are the State's building rules. This Manual cites them as the Nagaland Building Bye-Laws 2012 (Urban Development Department; made under sections 479 and 481 of the Nagaland Municipal Act 2001 (Act No. 10 of 2001), and continued by section 143(2) of the Nagaland Municipal Act, 2023 (Act No. 9 of 2023)), as amended. The copy read, hosted by KMC, prints no notification number, date or gazette reference [TBC], and the bye-laws come into force "on a date to be notified" (1(iii)), a date not found [TBC]. They extend to "Master Plan Areas", "Municipal Council/Town Council Areas" and "Notified Areas under local bodies" (1(ii)); their "Authority" is the Municipal and Town Councils, including "a Local Authority or officer authorized" (2(i)). They repealed the Nagaland Building Byelaws 2001 (32). Three amendments are known only as summarised by TeamLease: a Second Amendment (No. MA-22/2024, 30 November 2024), a Third Amendment (No. MA-22/2024/816, 25 February 2025) and a Fourth Amendment (No. MA-22/2024/382), which provides a Building Plan Approval Committee and makes a Building Byelaws Review Committee under the Municipal Affairs Department the "competent authority" for review, amendment and relaxation of the bye-laws; the Fourth Amendment is titled "2025" but dated 30 June 2026 in the summary, and the two do not agree [TBC]. No First Amendment was found. Their force is disputed: section 143(2) of the 2023 Act keeps rules, regulations and notifications made under the repealed Act "in so far as it is not inconsistent" with it, but an NSDMA officer said in October 2024 that "the 2012 byelaws have not been implemented", as reported, and the CAG wrote in its audit of local bodies for 2022-23 that "In Nagaland, however, no Rules and Bye-laws have been framed as of date". These statements do not reconcile with the 2012 text, and this Manual leaves the question open [TBC]. This Manual writes "bye-law 23 of the NBBL 2012" for a provision. Bye-law 39(iii) refers to "Bye-Law 38", apparently meaning 39; this Manual quotes it as printed. Two later texts are always written in full: the draft Nagaland Building Bye-Laws 2026, reported to be "in their final stages" and not notified as far as was found, and the Draft National Building Bye-Laws 2026, which the draft is reported to follow. MBBL 2016, in Chapters 1 and 10, is the national Model Building Bye-Laws of 2016, not the State's bye-laws;
  • the Nagaland Municipal Act, 2023 (Act No. 9 of 2023; Notification No. LAW/MISC-ACTS/45/2023 of 9 November 2023; Nagaland Gazette Extraordinary No. 225 of 9 November 2023), amended by Act No. 11 of 2024, replaced the Nagaland Municipal Act 2001, which was repealed by Act No. 3 of 2023. It sets up Municipal Councils for towns of 20,000 people and more, Town Councils for towns of 5,000 to 20,000 and Urban Station Committees for 1,000 to 5,000 (section 5). "Drainage", "storm water" and "water supply" are not among the obligatory functions of section 61, yet section 119 vests in the Municipality "all public tanks, streams, reservoirs and wells" and "all public sewers and drains, channels, tunnels, culverts and water courses in, alongside or under any street", "notwithstanding anything contained in any other law". Section 120 provides for land to be acquired by agreement and section 121 for its compulsory acquisition by the Government, at the Municipality's request, under the 1965 Act; regulations under section 138 need the Government's approval and publication (section 139). The State has 39 urban local bodies: three Municipal Councils (Kohima, Dimapur and Mokokchung) and 36 Town Councils. Elections were held on 26 June 2024 in all three Municipal Councils and in 21 of the Town Councils, as the CAG reports, or 22 or 23, as the press reports [TBC];
  • the Nagaland Town and Country Planning Act, 1966 (the TCP Act; Nagaland Act 4 of 1966), as amended in 1975, 1982 and 2000 and by the Fourth Amendment Act, 2025 (Act No. 6 of 2025), lets the State prepare master plans, which "may include" a "Public utilities plan" (section 11); once a plan is published, development needs "the permission of the Authority" (section 13). Its amendment of 1982 provides for a "Development Authority, Nagaland" (section 8A), whose constitution was not found [TBC]. The Fourth Amendment Act adds Town Planning Schemes, prepared by the urban local body, which may include "The filling up or reclamation of low laying, swamp or unhealthy areas" (section 14F(g)), with a commencement certificate that is deemed granted after two months (section 14K). No master plan for Kohima or Dimapur has been notified, as far as was found: a Draft Kohima Master Plan 2030 is reported, and a GIS-based master plan for the Greater Dimapur Planning Area, with a horizon of 2041, reached stakeholder consultation on 10 February 2023, as reported; the Second Amendment to the bye-laws refers to "the draft Master Plans for Kohima and Dimapur", as summarised. No "Kohima Master Plan 2031" or "2035" was found, and this Manual does not cite one;
  • the Nagaland Land (Requisition and Acquisition) Act, 1965 (Act III of 1965; assented to on 20 April 1965) is the State's land acquisition law. Its power to requisition covers "flood control and anti-erosion measures including embankment and drainage" (section 3(1)), and it applies "partially to the district of Tuensang". The compendium of the Department of Land Records and Survey prints it as "Published in the Nagaland Gazette-Extraordinary Dated the 22nd April, 1964", with the short title "Act, 1964", which conflicts with its assent [TBC]. On 3 November 2026 a Division Bench at Kohima held, on review, that acquisition "may be done in terms of the Act of 1965", with compensation "as per rates and quantification as provided under the Act of 2013", as reported. This Manual states that route; it does not invoke it;
  • UDD, with the Directorate of Urban Development (DUD), administers the TCP Act and the master plans, issued the NBBL 2012, runs the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) in the State, and is the executing agency of the ADB-assisted Nagaland Urban Infrastructure Development Project (NUIDP), whose project readiness financing (PRF, Loan 6045) was approved on 10 March 2022 and whose terms cover storm drainage in eight towns. The Municipal Affairs Department has "administrative control of the ULBs", and DMA "administers, facilitates, coordinates and monitors the ULBs", as the CAG records; DMA was separated from UDD on 1 April 2015, as reported. KSCDL is the company for Kohima's Smart City Mission;
  • WRD holds the rivers and embankments and, as reported, is building a flood-forecasting model of the Dhansiri; it is named in this Manual as the State groundwater agency, although no State network of observation wells was found, and the only network found is CGWB's, in its North Eastern Region. PHED supplies water and prepares the State's sewage and septage treatment projects. The PWD keeps the State's roads and their drains, and PWD (NH) and NHIDCL the national highways. The Soil and Water Conservation Department treats catchments, and its Directorate keeps the Kohima gauge above; the Land Resources Department runs the State's spring programme, as reported. NSDMA, under the Home Department, prepared the assessment of Dimapur's urban floods that this Manual cites, with the District Disaster Management Authority of Dimapur and DMC; the District Disaster Management Authorities are written in full. NPCB grants pollution consents; the State Wetland Authority is named in the press, and its exact name and constitution were not found [TBC]. NEEPCO operates the Doyang hydro-electric project (75 MW) in Wokha district;
  • the Gauhati High Court at its Kohima Bench and the NGT have shaped the State's drainage and river work. The Kohima Bench's suo motu case on National Highway 29 (PIL(Suo Moto)/2/2019) records, in its order of 9 September 2026, NHIDCL's maintenance of the highway "including road repairs, drain clearances and, slide removal works". The State's affidavit of 12 December 2023 in the NGT's case on polluted river stretches (EA 35 of 2023 in OA 673 of 2018) sets out the Dhansiri action plan, Dimapur's sewage treatment plant and the interception of Kohima's drains. This Manual cites court and tribunal orders with their status; and
  • where a shared clause names a revenue subdivision, this Manual uses the sub-division, and where it says "revenue village" it means a recognised village under section 3 of the Village Council Act. A district is headed by a Deputy Commissioner (DC), who chairs every VDB in the district. Most land is held by villages, clans and individuals under customary law, and its records are not kept by the State (Chapter 7).

Where a shared clause calls for the local language on a sign, a form field or a basin name, this Manual writes "the local language". English is the official language of the State and the language of this Manual. The State Legislature (Continuance of the English Language) Act, 1964, in force from 26 January 1965, is listed under that title on the State's website; an Assembly resolution of 18 September 1967 recommended English "for all official purposes … indefinitely", and the parties reaffirmed it in June 2025, both as reported. Nagaland has many Naga languages and no single local language. Nagamese, a creole drawn mainly from Assamese, is the common spoken language, as reported, and no Naga language with official status was found. So, as set by this Manual, signs and flood-depth markers are in English and the local language: the Naga language in local use in the village or ward, or Nagamese, as the local body or the Village Council uses for its own public notices, because a sign must be readable by the people it warns. The Naga languages are written in the Roman script, as in the vocabularies cited below, so where a shared clause says "script" it means the Roman spelling used locally. In Annex 7A the field coded LOC holds a water body's name in the local language.

Some local words are used in the text, and are explained again where they first appear:

  • a pond is this Manual's word for a natural or dug body of standing water. The Manual uses the plain English word because English is the State's official language; because no single Naga word serves the whole State; because the Nagamese word was not confirmed from any dictionary; and because the first Water Bodies Census counts ponds, 90.64% of the State's 1,432 water bodies, as reported. In the shared clauses a "tank" is water impounded by a bund with a surplus weir; the census counts tanks as 5.03% of the State's water bodies, as reported, and the tank clauses apply in this Manual to ponds, to the Doyang reservoir and to any other impounded water. Where a shared list therefore names a pond twice ("tank (pond), lake, pond"), the repetition is the shared text's. Engineered storage is a detention pond. A natural pond keeps its own description, such as the natural pond in Dr. Haralu Colony in Dimapur that NSDMA proposes to keep for retention, and a spring pool or a reservoir is never called a detention pond;
  • a nullah is an open channel in a town that carries storm water and waste water, as NSDMA names Dimapur's Hospital Nullah, Dhobi Nullah and Lengrijan Nullah. The bye-laws write "nulla" (20(ii)). This Manual spells it "nullah", except inside a quoted title such as "Dhobi Nallah" or "Sugar Mill Nallah";
  • a spring is a natural outlet of groundwater at the surface, the water source of many towns and villages. The Land Resources Department's inventory counts 2,361 springs in 1,025 settlements, with about 4,600 more to be inventoried, as reported; a stream is a natural channel, and a ravine stream one of the small steep streams into which a ridge town's drains fall;
  • in Angami, McCabe's Outline Grammar of the Angami Naga Language (1887) gives, in its English–Angami vocabulary: dzü "Water" (p. 93), the first part of names such as Dzüza and Dzüdu, as this Manual reads them; risā and dzüdu "Pond" (p. 79), risā also "Tank" (p. 89, read from scanned text); keho, dzüthu and dzübe "Pool" (p. 79); chārhé "Drain" (p. 60); kerre "Stream" (p. 88); dzülå "Spring" (p. 87); and dzüvo "Waterfall" (p. 93);
  • in Lotha, Witter's Outline Grammar of the Lhōtā Nāgā Language (1888) gives ōtchhü "Water" (p. 157), zkhüro "Drain" (p. 105), zükhürō "Stream" (p. 148), tchhükhü "Spring (of water)" (p. 147) and pōfü "River" (p. 140). No Lotha word for "pond" was found;
  • in Nagamese, pani is water, as reported. No Nagamese dictionary was read, and the words pukhuri, pukhri and nala are not used in this Manual, since their use in Nagamese was not confirmed; and
  • no terms were found in Ao (the dictionary sought could not be opened), Sumi, Konyak or Chakhesang [TBC].

The page numbers are the printed pages of the vocabularies, read on page images. These words are glosses: the Manual's working words are pond, nullah, spring and stream, and the Naga-language terms appear only here and in Annex 7E.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • KMC is the Kohima Municipal Council and DMC the Dimapur Municipal Council. In other editions of this series and in some sources the same letters stand for other bodies; in this Manual they mean only these two. Each chapter writes the full name at its first use;
  • "NBBL 2012" is the Nagaland Building Bye-Laws 2012 as amended, and "MBBL 2016" the national Model Building Bye-Laws 2016. Neither is the building rule of any other State, and "NBBL" never stands for either of the drafts of 2026;
  • "Authority", in the bye-laws, is the Municipal or Town Council (bye-law 2(i)); in the TCP Act it is the Authority for a published master plan (section 13);
  • HFL is the highest flood level recorded at a gauge, and DL and WL the danger and warning levels that CWC sets at its sites. None is a design level. Nagaland has no CWC site, and no State gauge level for the Dhansiri, the Chathe or the Diphu was found; the NBBL 2012 set no flood plinth, and Chapters 5 and 7 say how this Manual finds a design level;
  • RWL is the reservoir water level in NEEPCO's figures for the Doyang; this Manual reads 333.0 m as about the full reservoir level (FRL) and 324.0 m as about the minimum draw-down level (MDDL), although the source does not label them so;
  • MC is IMD's Meteorological Centre Kohima; DC is a Deputy Commissioner; and
  • I&D is the interception and diversion of drains to a treatment plant.

The sense is clear from the context.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Nagaland's towns flood, and fail, for three reasons. Kohima's own rainfall records show the first: IMD's largest day there, 322.0 mm on 6 June 1985, is 2.4 times the largest day in 26 years of a State gauge in the same town, and the CWC plate lies between the two. Pherima showed the second on the night of 3 September 2024, when a landslide on National Highway 29 killed six people and the Chathe washed out the highway at Pagla Pahar, and the Gaonbura, a village headman, blamed "the blockage of the culvert drainage", as reported. And Dimapur shows the third in every monsoon, because its three nullahs carry its waste water to the Dhansiri, and the river backs up into them when it is high.

  1. Rainfall that the national products barely cover. Most of the State lies in CWC's subzone 2(b), but on its upland edge. The report for 2(b) (March 2000) built its ratios of short to 24-hour rain from six recording gauges, none in Nagaland, and lists one Nagaland gauge among its heaviest falls: Wokha, with 277 mm dated "12.02.1906", a February date that this Manual reads as probably an error. Its plates cover the plain and the central and northern ranges, but the south-western hills of Peren lie on or beyond the boundary with subzone 2(c), for which CWC never published a report, and the eastern ranges of Phek, Kiphire, Meluri and eastern Tuensang, which drain to the Chindwin in Myanmar, lie outside every plate. At Kohima the sources disagree. Plate 9 gives a 50-year day of about 240–280 mm, read by eye, as this Manual reads it; the 26-year daily series of the DSWC gauge (1997–2022) fits only 133 mm for the 50-year 1-day fall (Dabral, 2025), and its own tables are internally inconsistent; and IMD's record, 322.0 mm on 6 June 1985, is 1.46 times the next-largest Kohima day in IMD's tables, 221.2 mm on 23 August 1971, and has not been confirmed. IMD's national set of rainfall intensity curves (Das et al., 2022) has no panel for any Nagaland station, and the gridded rainfall of NIH-DHAARA gives Dimapur a 50-year day of 332 mm, 1.4 to 1.7 times the plate. No hourly rainfall from any Nagaland gauge was found in any primary source.
  2. Ridge towns on shale, where water put into the slope moves the ground, and highways that fail at blocked culverts. Kohima sits on ridges of the Disang and Barail formations, its DSWC gauge at 1,444 m, under "Red Clayey soil", as CGWB describes them; in its recharge estimate CGWB excluded "hilly areas with slope greater than 20%", and found that most of the rain "goes as runoff". The highway between Dimapur and Kohima fails where the Chathe cuts its toe at Pagla Pahar, in 2024 and again in September 2025, as reported, and the Kohima Bench's order of 9 September 2026 records NHIDCL's statement that part of the highway is maintained under a contract "including road repairs, drain clearances and, slide removal works". On 19 July 2026 a landslide in Mon town killed at least eight people, as reported, though the tolls differ. The NBBL 2012 ask for "good drainage of water so that the saturation of the hill-slope is avoided" (Appendix A1(d)) and require stepped drains only where the ground slopes "more than 1 in 5" (20(iii)), the only slope number in the bye-laws; they set no slope limit, and they send the effluent of every septic tank "to soak pits for disposal" (20(i)), on a slope as on the plain.
  3. A foothill city whose nullahs carry its sewage to a river that backs up into them. "The city of Dimapur relies on three primary nullahs, namely Hospital Nullah, Dhobi Nullah, and Lengrijan Nullah, as the main drainage system. These nullahs serve the purpose of carrying wastewater from various parts of the city", NSDMA records. In Dimapur 74.2% of households used septic tanks and 10.4% piped sewerage (Census 2011, as NSDMA gives it), and the ADB found in 2022 that "none of the towns has sewerage or septage management systems except in Dimapur". The bye-laws themselves send kitchen and bath water to the public drain and allow a "rain water-waste combined drain" (20(ii)–(iii)). The press reports "unchecked backflow from the Dhansiri river" and "heavily encroached waterways"; on 14 September 2025 the Chathe and the Dhansiri were above their danger marks at Dimapur, as reported; and in 2023 the colonies flooded while the Dhansiri stayed low, as officials said, so the drains fail both ways. In the annexure to its report of 2025 CPCB lists the Dhansiri from Khatkati Gate to Ganesh Nagar (biochemical oxygen demand 8.7–9 mg/L) in Priority IV of its polluted river stretches, and the Sanuo Ru below the New Secretariat at Kohima in Priority V.

Over all three lie four more conditions. Land is held under customary law, mostly by villages, clans and individuals, and a public drain or corridor needs the agreement of its owners or the Village Council's consent; even the oldest part of the capital is a village under its Village Council. The only building rule is an old one kept alive by a savings clause: the NBBL 2012 were made under a Municipal Act that was repealed in 2023, they continue through the new Act's savings clause, and their force is questioned by an NSDMA officer and by the CAG. No setback exists anywhere: no statute or bye-law sets a line from a stream, spring, pond or drain; bye-law 23 forbids a building that "will obstruct the natural flow of drain", and NSDMA's proposal of a "mandatory buffer zone (0.75 – 3.0 meters) along drainage lines" in Dimapur is a recommendation, not a rule. And no drain has a design standard: no State, municipal or departmental document fixes a design storm, a return period or a runoff coefficient for any town's drains.

Behind all of this lie the State's springs, streams, ponds and its one large reservoir, which supply the towns, set the level at the outfall and carry what the drains carry. Springs and streams, not wells, supply most towns; in Kohima "only about 30% of municipal areas get regular supply", as reported, and the ADB found an average supply of "1 hour per day". The ponds are small and mostly private: 94.13% of the 1,432 water bodies in the census are privately owned, and 145 are urban, as reported. The Doyang reservoir, behind NEEPCO's dam in Wokha district, holds 400 MCM at 333.0 m RWL, as quoted, or other figures as SANDRP reports them; NEEPCO opened its gates at 05:30 on 27 July 2018 and closed them at 05:00 on 5 August, while the inflow rose from "over 600" to "over 1150 cum/sec" on 31 July, as reported, and the release reach runs to the State's border. The State has no Ramsar site, no wetland notified under the Wetlands Rules, and no statute that protects a spring or a pond; Shilloi lake, the Doyang reservoir and Dzüdu lake are named as priority wetlands, as reported.

Design for Nagaland therefore has to cover a wet season that rises steeply from April. At Kohima NSCCC's monthly means (1981–2022) rise from 106 mm in April and 179 mm in May to 350 mm in July, and fall to 133 mm in October; March to May bring about 19% of the year, by this Manual's sum. Dimapur's flood season starts in May: NSDMA lists its vulnerable areas for "May–Sep", and CGWB writes that the monsoon "persists from May to September". The south-west monsoon reaches Dimapur in the first week of June and withdraws in mid-October, and Kohima's largest days fall from June to October, as late as 19 October 2001 (140.0 mm); its April and May records are only 74.8 mm and 76.0 mm. This Manual's monsoon season is 1 April to 31 October, so that drains are cleared and slopes stabilised before the plain's May floods. Large falls come outside it too, as on 7 November 1971 (87.0 mm) and 27 March 1994 (75.2 mm) at Kohima, so design statistics use the annual maxima of every month. The annual normals conflict: Kohima's monthly means sum to about 1,744 mm, CGWB gives "about 2000 mm" and "2000–2500", and Dabral 2,280 mm; Dimapur's are given as 1,504.7 mm by NSDMA, with no source, and as 1,101.79 mm for 2003–2009 by CGWB. This Manual uses none of them as a normal. There is no snow. Underground, every one of the State's 52 assessed units is safe, with 4.72% of its extractable groundwater drawn (2024, as quoted), so rainwater is worth storing for use, not putting into the slopes.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval wherever a building permission is granted. Every development above a modest size must:

  • hold frequent rainfall on site, in tanks for use, and in the ground only where the ground can safely take it;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving stream, nullah, river, pond or reservoir is high, when the Doyang is releasing, or when a drain or culvert is choked with debris, silt and garbage.

The Manual also sets how public drains, hill roads and their drains and culverts, ravine streams, nullahs, rivers, ponds, the Doyang reservoir, springs and their recharge areas, outfalls and basin-wide master plans are designed, and how drains in steep catchments are protected against debris, sediment and garbage, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Nagaland's wet season of April to October; to the ridge towns of the central and northern ranges, Kohima, Mokokchung, Wokha, Zunheboto, Tuensang and Mon, built on Disang and Barail shales whose slopes slide; to the Dimapur–Chümoukedima plain, its piedmont alluvium and pebble–boulder beds, its high water table, and its nullahs that fall to the Dhansiri, the Chathe and the Diphu; to the Doyang reservoir and its release reach; to the eastern ranges that drain to the Chindwin and the south-western hills that drain to the Barak, which no CWC report covers; to springs and streams that supply the towns; and to towns that stand on village, clan and private land, whose roads and houses lie across the natural lines of drainage on the slopes.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 on hill roads, and the NDMA urban flood guidelines are also used. The drainage chapter of the IRC's hill road manual, IRC:SP:48, was not read for this Manual.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Report for subzone 2(b), South Brahmaputra (revised, March 2000), as the interim source on the plain and in the central and northern ranges: on the plain with the report's own ratios of short to 24-hour rain, and in the ranges with lower ratios set by this Manual, which are not below any ratio that NIH-DHAARA gives for the State. At Kohima the plate governs, with no departure below it, and IMD's record of 322.0 mm sets a floor on the 1% AEP day within 25 km of the gauge until IMD confirms or withdraws it. In the eastern ranges, outside every plate, the design day is not less than the plate's values on the boundary or NIH-DHAARA's, whichever is higher; in the south-western hills, in subzone 2(c), it is the table of the adjoining edition's western hills, so that one storm reads alike on both sides of the border. The design day is checked against the largest reliable days recorded within 25 km, but only within the same domain (the plain, the 2(b) ranges, the eastern ranges or the south-western hills) and never across a ridge or the edge of the plain. NIH-DHAARA is reported beside the design value elsewhere, and IMD's national curves (Das et al., 2022) are not used, since they have no Nagaland panel.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The NBBL 2012 and their amendments of 2024 to 2026 as summarised; the Nagaland Municipal Act, 2023 and its amendment of 2024; the TCP Act and its Fourth Amendment Act, 2025; the Nagaland Land (Requisition and Acquisition) Act, 1965; the Village Council Act; Article 371A; NSDMA's assessment of Dimapur's urban floods; the terms of reference of the ADB's NUIDP; the Kohima Bench's order of 9 September 2026 in PIL(Suo Moto)/2/2019; and the State's affidavit of 12 December 2023 before the NGT. This Manual follows them or, where disclosed, makes them stricter. The notification of the NBBL 2012 and the gazetted texts of their amendments, the draft Nagaland Building Bye-Laws 2026, the draft master plans of Kohima and Dimapur, the judgments of the Kohima Bench on land compensation, and the text of Article 371A as printed by the Government of India were not read, and the renaming of the Village Council Act was not traced. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Nagaland can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. Nagaland's State Action Plan on Climate Change, as summarised in a search result, projects more rainfall at Kohima, Zunheboto and Phek and 15% and 20% more at Wokha and Tuensang, and the State Action Plan on Climate Change and Human Health 2022–27, also as summarised, projects more days of 100 mm in some districts; neither gives a factor for design, and neither was read in full.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. The CWC report for subzone 2(b) (2000) covers the plain and the central and northern ranges, but no Nagaland recording gauge contributed to its ratios; its ratio of the 1-hour to the 24-hour rain, 0.48, built on gauges outside the State, would give Kohima about 134 mm in an hour on the plate's 280 mm, by this Manual's arithmetic, while NIH-DHAARA gives 58 mm for the same 50-year hour. The south-western hills are in subzone 2(c), which has no report at all, and the eastern ranges lie outside every plate. IMD's 2022 national set of rainfall intensity curves has no panel for Kohima, Dimapur or any other Nagaland station.

Nagaland has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of UDD, the Municipal Affairs Department, KMC, DMC or any other local body, the PWD or WRD that fixes a return period, a runoff coefficient or a design rainfall for town storm drains; the bye-laws refer to the National Building Code and the IS codes for structure only. No IDF relationship with published constants was found for any station in the State. Kohima's "storm water drainage phase 1" was reported complete in 2018, with Rs 107 crore sanctioned, but no design basis for it was seen; the Smart City's "Sustainable urban drainage system including Re-use" (₹41.52 crore) and "Rain water harvesting" (₹18.84 crore) stood at "DPR Completed" with nothing spent in 2022, as the CAG found; and the NUIDP terms of reference, the first State-level brief for urban storm drainage, as this Manual reads it, ask for "Indian national standards and guidelines" and state no return period or runoff coefficient. Dimapur's drains are cleared each year in a campaign that runs from January to late May, as reported, without a published design basis. These are projects and campaigns, not a State standard. This Manual is offered as a technical companion to the NBBL 2012, the Nagaland Municipal Act, 2023, the TCP Act and its Town Planning Schemes, the master plans once notified, and NSDMA's recommendations for Dimapur: it supplies the design storm, detention, slope, water-level and buffer values that they leave open. It has not been adopted by UDD, the Municipal Affairs Department, any local body, any Village Council or any other body. In particular:

  • The building rules require rainwater harvesting, but size nothing. Bye-law 39 requires "workable rooftop rainwater harvesting arrangements" in the plans of new buildings on plots of 100 m² and more, with a "Storage tank with provision for drawing water and spill over", for "non-potable purposes or recharge of groundwater"; bye-law 40 requires the recycling of waste water where a building discharges 10,000 litres a day or more. Neither gives a storage volume. No rule requires on-site detention, limits peak runoff or sets a design storm; the nearest are bye-law 4, which asks the site plan to show the slope "to facilitate convenience for graphical study of drainage pattern of the site" and the "Proposed method of drainage or disposal of rain water, waste water", and bye-law 23, which forbids obstructing a natural drain. The NUIDP terms go the other way: "Ponding of water within the towns is to be avoided", and "flood storages and retarding basins are only to be considered as a last resort";
  • The slope rules stop little, and nothing about infiltration. The bye-laws let the Authority restrict earth cutting and require retaining walls (21), require a toe or protection wall below a downhill site (17), and leave a building's height to structural and geotechnical certification (22); bye-law 5 refuses a site only for liquefaction or storm surge, not for a landslide, a slope or a flood. No rule restricts soak pits, recharge pits or infiltration trenches on slopes or on shale, and bye-law 20(i) sends septic effluent to soak pits wherever the building stands;
  • There are no setbacks from streams, springs, ponds or drains. No statute or bye-law sets one. Bye-law 23 forbids a building that obstructs a natural drain, without a width, and bye-law 17's setbacks are from roads and plot lines. NSDMA's proposed buffer of 0.75–3.0 m along Dimapur's drainage lines is a recommendation, and many nullah reaches are "heavily encroached", as reported;
  • There is no floodplain law. No floodplain zoning Act or Bill was found, the bye-laws set no flood plinth, and no local authority has fixed a flood level for any town. Bye-law 42(iii) counts as hazard-prone the areas in CWC's flood atlas and those flooded by "back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area", but no development plan with such surveys was found. A Town Planning Scheme may include "the filling up or reclamation of low laying, swamp or unhealthy areas" (TCP Act, section 14F(g)), which can remove the ponds and low land that store floods. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); where a line that a master plan, a scheme or a court draws is wider and binds, it governs; and
  • No document sets the river or reservoir level for which an outfall is designed. Nagaland has no CWC site; CWC's nearest levels are tens of kilometres downstream in Assam, at Golaghat and Numaligarh on the Dhansiri and at Gelabil on the Doyang, and were read only in transcriptions. The Dhansiri, the Chathe and the Diphu at Dimapur have no published gauge level; the press says only that they "crossed the danger mark". Kohima's streams are ungauged. NEEPCO's levels for the Doyang conflict with other reports, and its release protocol and warning thresholds were not found. Highest flood levels are records, not design levels.

So each agency and each local body interprets the central manual its own way. KMC, DMC and the other local bodies, UDD and the Municipal Affairs Department, KSCDL, the PWD, PWD (NH) and NHIDCL, WRD, PHED, the Soil and Water Conservation Department, NEEPCO, the Village Councils, their consultants and funding agencies fill the gaps differently. No notification divides the drains between them. The Municipality holds the public drains and streams by section 119 of the 2023 Act, though drainage is not among its obligatory functions; the PWD builds roadside drains with its roads, UDD builds storm drains under AMRUT and the NUIDP and hands them over, PHED runs the sewers, and the Village Councils keep the lanes, drains and springs of village land, inside towns as well as outside them. A DMC administrator called Dimapur's drains "orphans" in 2019, as reported. In Kohima a stream may run through village land, the municipal area and a State highway's culvert before it leaves the town. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in four rainfall zones and five hydrologic sub-areas, with a checked station analysis to govern where one exists; the 2(b) plates on the plain and in the central and northern ranges, with the report's ratios on the plain and lower interim ratios in the ranges; IMD's Kohima record as a floor within 25 km of the gauge until IMD rules on it; the plate's boundary values or NIH-DHAARA, whichever is higher, in the eastern ranges; the adjoining hills' table in the south-western hills; and a check of the design day against the largest reliable days recorded nearby that never crosses a ridge or the edge of the plain (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites, with rainwater storage credited only through its use (Chapter 4);
  • a required tailwater check for outfalls to streams, nullahs, rivers, ponds and the Doyang reservoir: on the plain, a design river level from a model, the river's danger-mark stage once surveyed, and the highest surveyed flood mark, with the outfall at that level for the whole 72-hour design storm, and a check with the river low and the drain blocked; on the hill streams, a 1% AEP study that allows for debris; and, below the Doyang, release scenarios from the operator's levels (Chapter 5);
  • a design flood line, and corridors and setbacks along streams, nullahs and rivers and around ponds, the reservoir and springs, proposed by this Manual where no line binds, with a corridor at least 15 m from the top of bank on every natural channel draining 8 ha or more, the Dimapur nullahs and the Kohima streams among them; a condition of building permission in the areas of the local bodies and in Master Plan areas, and guidance elsewhere; and corridor land that is not State or municipal land secured by agreement with the Village Council or the owners, never taken (Chapter 7);
  • no deliberate infiltration on slopes steeper than 10°, on the Disang and Barail shales at any slope, on colluvium, fill or slide debris, in mapped landslide zones, or above a cut slope or retaining wall, unless a geotechnical certificate allows it; none on the plain below the 1% AEP flood level or where the water table rises within 2 m of the ground; recharge only on the tested sands, gravels and pebble–boulder beds of the plain and on proven sandstone benches; roof runoff to storage for use, with its overflow to lined, stepped drains; the recharge areas of springs above town and village intakes kept free of paving and road runoff; and the interception of dry-weather flow before every outfall to the Dhansiri, the Chathe, the Sano Ru and the Dzuna, Dzucha and Dzu, and before any pond used as storage, where drains carry sewage (Chapters 4 and 8);
  • debris racks and traps, allowances for sediment, garbage and blockage, energy dissipation in steep drains, and hill-road drainage that never discharges onto an unprotected slope (Chapters 6 and 9), with drains, nullahs, inlets, racks and culverts cleared and certified ready by 31 March, cleared again by 15 May before the plain's May floods, and again by 15 November after the season, and standby kept from 1 April to 31 October (Chapter 10); and
  • basin-wide master plans, so that the agencies that share a basin, and the Village Councils for the village land within it, plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal or Town Council, UDD in a master plan or a Town Planning Scheme, the State in the bye-laws, or a Village Council in its own schemes can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Nagaland Building Bye-Laws 2012 (Urban Development Department; KMC copy), bye-laws 1, 2, 4, 5, 9, 17, 19–23, 31, 32, 39, 40, 42 and Appendices A1 and A3, and the Second, Third and Fourth Amendments as summarised by TeamLease; Nagaland Municipal Act, 2023 (Act No. 9 of 2023), ss. 5, 61, 119–121, 124, 137–140, 143 and 144, and the Nagaland Municipal (Amendment) Act, 2024 (Act No. 11 of 2024); Nagaland Municipal Act 2001 (Repeal) Act, 2023 (Act No. 3 of 2023); Nagaland Town and Country Planning Act, 1966 (Act 4 of 1966), ss. 1, 8A, 11–13, as amended, and the (Fourth Amendment) Act, 2025 (Act No. 6 of 2025), ss. 14A–14K; Nagaland Land (Requisition and Acquisition) Act, 1965 (Act III of 1965), ss. 3 and 11, with the Rules of 1968 and the amendment of 1969 (Department of Land Records and Survey compendium); Nagaland Village and Area Councils Act, 1978 (Nagaland Act 1 of 1979), ss. 3, 12, 14 and 15, as amended in 1985, 1990 and 2002; Constitution of India, Article 371A, as quoted; NSDMA, Critical Assessment and Recommendation of Remedial Measures on Dimapur Urban Flood (undated; published 2023); ADB, Nagaland Urban Infrastructure Development Project (54166), Project Readiness Financing Report and Project Administration Manual (March 2022); Gauhati High Court, Kohima Bench, PIL(Suo Moto)/2/2019, order of 9 September 2026; NGT, OA 673/2018, affidavit of the State of Nagaland in EA 35/2023 (12 December 2023); CAG, Audit Reports for the years ended 31 March 2020 (para 2.3), 31 March 2022 (Kohima Smart City Mission) and 31 March 2023 (Local Governments); CPCB, Polluted River Stretches for Restoration of Water Quality (2025); CWC, Flood Estimation Report for South Brahmaputra subzone 2(b) (Revised), No. SB-2(b)/R-4/44/99 (March 2000), Table 4.1, Annex 4.1 and Plates 8–10, read by eye; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012), Kohima (42527); IMD, Monsoon normals (2020), Table 2; NSCCC, Rainfall Kohima (1981–2022); Dabral (2025), CIGR Journal 27(2); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (queried 14 November 2026); CGWB, district booklets for Kohima and Dimapur and the Dimapur aquifer mapping report (2013); R. B. McCabe, Outline Grammar of the Angami Naga Language (1887); W. E. Witter, Outline Grammar of the Lhōtā Nāgā Language (1888); NEEPCO levels as quoted from its CERC data format; CWC levels as transcribed by SANDRP (2018, 2019); reports of the floods and landslides of 2018, 2023, 2024, 2025 and 2026, of the Doyang releases, of the State's springs, ponds and wetlands, of the official language and of the draft bye-laws and master plans (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Ponds, Springs and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Nagaland
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Nagaland locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Ponds and pools
7E.2Water, springs, streams, rivers and drains
7E.3The Manual's working words
7E.4Terms not found or not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A ridge town, its springs and ravine streams, and a foothill town on the plain with its nullah, pond and river. A ridge-top town with lined, stepped drains, silt traps and a debris rack at a hill-road culvert, falling to ravine streams; a spring above the town's intake with its protected recharge area and no drains across it; no soakaways on slopes steeper than 10° or on shale; a cut slope with a catch drain and toe drain; the stream leaving the ranges at a foothill fan onto a plain; on the plain a town with an open nullah to a river whose high level backs up the outfall, a pond kept as storage with dry-weather interception of sewage before it, infiltration only on tested sands and gravels above the water table; and a reservoir with a dam and its release reach
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
ABC Waters Active, Beautiful, Clean Waters (PUB Singapore's design guidelines)
ADB Asian Development Bank
AEP Annual exceedance probability
AIDR Australian Institute for Disaster Resilience
AMC Antecedent moisture condition
AMFU Agrometeorological field unit (at Jharnapani)
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
ARG Automatic rain gauge
ASABE American Society of Agricultural and Biological Engineers
ASTM ASTM International (standards)
AWS Automatic weather station
BMP Best management practice
BOD Biochemical oxygen demand
BRE Building Research Establishment (UK)
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CERC Central Electricity Regulatory Commission
CGP Construction General Permit (US EPA)
CGWB Central Ground Water Board
CIP Capital Improvement Programme
CN Curve number (SCS/NRCS method)
COD Chemical oxygen demand
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DC Deputy Commissioner
DEM Digital elevation model
DL / WL Danger level / warning level (CWC; no CWC site in Nagaland)
DMA Directorate of Municipal Affairs
DMC Dimapur Municipal Council
DPR Detailed project report
DSWC Directorate of Soil & Water Conservation, Nagaland
DUD Directorate of Urban Development
DWF Dry-weather flow
EN European Standard (Norme Européenne)
EPD Environmental Protection Division (Georgia, United States)
ESC Erosion and sediment control
EV1 Extreme value type I (Gumbel) distribution
FER Flood Estimation Report (CWC)
FRL / MWL / MDDL Full reservoir level / maximum water level / minimum draw-down level
FRP Fibre-reinforced plastic
FSTP Faecal sludge treatment plant
GIS Geographic information system
GSI Geological Survey of India
GWRA Ground water resource assessment (CGWB)
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Nagaland)
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HSG Hydrologic soil group
HY-8 FHWA's culvert hydraulic analysis program
I&D Interception and diversion (of drains to a treatment plant)
IDF Intensity–duration–frequency
IIT Indian Institute of Technology
IMD India Meteorological Department
IMDAA Indian Monsoon Data Assimilation and Analysis (the regional reanalysis behind NIH-DHAARA)
IRC Indian Roads Congress
IS Indian Standard (Bureau of Indian Standards)
ISO International Organization for Standardization
IST Indian Standard Time
JNNURM Jawaharlal Nehru National Urban Renewal Mission
KC Kansas City (Kansas City Metro APWA Section 5600)
KLD Kilolitres a day
KMC Kohima Municipal Council
KSCDL Kohima Smart City Development Ltd
KVK Krishi Vigyan Kendra (its automatic weather stations)
LID Low impact development
LiDAR Light detection and ranging (laser survey)
MBBL 2016 Model Building Bye-Laws 2016 (MoHUA; not the State's bye-laws)
MC Kohima Meteorological Centre Kohima (IMD)
MCM Million cubic metres
MLD Million litres a day
MoHUA Ministry of Housing and Urban Affairs
MoJS Ministry of Jal Shakti
MW Megawatt
NBBL 2012 The Nagaland Building Bye-Laws 2012, as amended
NCDC National Centre for Disease Control
NDMA National Disaster Management Authority
NEEPCO North Eastern Electric Power Corporation (operator of the Doyang dam)
NESAC North Eastern Space Applications Centre
NGT National Green Tribunal
NH National Highway (as in NH-29)
NHIDCL National Highways and Infrastructure Development Corporation Ltd
NIH National Institute of Hydrology, Roorkee
NOC No-objection certificate
NPCB Nagaland Pollution Control Board
NPDES National Pollutant Discharge Elimination System (United States)
NRCD National River Conservation Directorate
NRSC National Remote Sensing Centre
NSCCC Nagaland State Climate Change Cell
NSDMA Nagaland State Disaster Management Authority
NUIDP Nagaland Urban Infrastructure Development Project (ADB)
NWIA National Wetland Inventory and Assessment
OA Original Application (NGT)
OGC Open Geospatial Consortium
PHED Public Health Engineering Department
PIL Public interest litigation
PRF Project readiness financing (ADB)
PSD Permissible site discharge
PWD Public Works Department, Nagaland
PWD (NH) The PWD's National Highways wing
RDSO Research Designs and Standards Organisation (Railways)
RMSE Root-mean-square error
RRV Required retention volume
RWH Rainwater harvesting
RWL Reservoir water level (NEEPCO's "M RWL")
SANDRP South Asia Network on Dams, Rivers and People
SBM-G Swachh Bharat Mission (Gramin)
SH State highway
SLA Sea-level allowance (coastal term; not applicable in Nagaland)
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUH Synthetic unit hydrograph (CWC)
TBC To be confirmed: a fact or value not yet found in a source
TCP Act The Nagaland Town and Country Planning Act, 1966, as amended
TCPO Town and Country Planning Organisation (MoHUA)
TR-55 Technical Release 55 (USDA SCS/NRCS)
UDD Urban Development Department
UH Unit hydrograph
ULB Urban local body (in Nagaland, a Municipal Council, Town Council or Urban Station Committee)
USACE US Army Corps of Engineers
UT Union Territory
UTM Universal Transverse Mercator
VDB Village Development Board
VR Value rating (of a BMP treating the WQv)
WP(C) Writ petition (civil)
WQv Water quality volume
WRD Water Resources Department, Nagaland
WSUD Water-sensitive urban design