Annexes to Chapter 10Submittals, Review, Operation & Maintenance and Enforcement
These annexes support Chapter 10. They give the specification and user-guide outline of the compliance calculator, the GIS data specification, the maintenance access dimensions that the Manual sets, model O&M plans for each facility type, model empanelment criteria, and the eight forms that Chapter 10 requires. The Design Rainfall Sheet (Form 2-1) is in the annexes to Chapter 2. The forms are draft forms. The model texts are for consideration by a competent authority and are not in force.
Annex 10A — Compliance calculator and user guide
Supports Clauses 10.4.1(g), 10.5 and 10.9.1(b) of Chapter 10.
Status. The compliance calculator does not exist yet. Clause 10.5.1 requires the State Stormwater Technical Committee to issue and maintain it. This annex is the specification the calculator shall meet and the outline of its user guide. Until the calculator is issued, the designer completes Form 10-2 by hand from the calculations of Chapters 4, 5 and 8, enters "not issued" as the calculator version, and attaches the calculations.
10A.1 General requirements
The calculator shall:
- (a) be a spreadsheet or web tool, published free of charge with its user guide and the source of every table in it (Clause 10.5.4);
- (b) print its version number and release date on every output page and every exported file (Clause 10.5.3);
- (c) keep a public version log. A new version applies to new submittals 6 months after release; a submittal keeps one version from Stage 1 to Stage 4 unless the Applicant elects a later one (Clause 10.5.3);
- (d) work for one site at a time, with one or more drainage areas, each draining to its own outfall (Clause 4.5.1.3);
- (e) never apply a value that the Manual has not published. Where a table it needs has not been issued (for example Table 4.3 of Annex 4B, or the S-2 discharge tables of Annex 1C), the calculator shall show that route as "not available" rather than estimate the value; and
- (f) export its inputs and results as a machine-readable file (CSV or JSON) as well as Form 10-2, so that the Authority can load them into the facility register (Clause 10.17.1(b)).
10A.2 Inputs
Table 10A.1 — Calculator inputs
| No. | Input | Unit | Source |
|---|---|---|---|
| I1 | Authority, tier (A or B) and file number | — | Clause 1.6 |
| I2 | Site area; land disturbance area | ha | Clause 1.5.2 |
| I3 | New impervious area; replaced impervious area; existing impervious area before demolition | m² | Clauses 1.5.2, 1.5.6, 4.5.6.1 |
| I4 | Development type: new, redevelopment, linear public work, single dwelling | — | Clauses 1.5.6–1.5.8 |
| I5 | Flood-sensitive catchment (yes / no), and basin with an approved BSMP (yes / no) | — | Clauses 4.5.3, 4.13, 11.12 |
| I6 | Rainfall zone | — | Annex 2A |
| I7 | Retention depth P_R; 3-month ARI 24-hour depth P_3m | mm | Annexes 2E, 8A |
| I8 | Design rainfall depths by duration (1–72 h) and AEP, with the climate factor, as recorded on Form 2-1 | mm | Clauses 2.5, 2.8, 2.13 |
| I9 | 15-minute intensities i_10 and i_2, with the climate factor (fixed-coefficient route only) | mm/h | Clause 4.14.4 |
| I10 | Drainage areas: for each, area, land cover, impervious percentage, HSG and curve number, pre- and post-development | ha, %, — | Clauses 3.3, 3.7, 3.9 |
| I11 | Areas preserved under a registered covenant | ha | Clause 4.4.7 |
| I12 | Seasonal high groundwater depth below the base of each retention practice | m | Clauses 4.4.3(c), 8.8 |
| I13 | Measured infiltration rate at each practice | mm/h | Clause 4.4.3 |
| I14 | Retention volume provided, by practice; reuse demand where retention is by reuse | m³, m³/d | Clauses 4.4.3, 4.4.5 |
| I15 | Route: full hydrograph method (Clause 4.6); design-aid S-1 (Clause 4.14.2); PSD S-2 (Clause 1.7); fixed-coefficient (Clause 4.14.3); constrained redevelopment (Clause 4.5.6) | — | Clauses 1.7, 4.5.6, 4.6, 4.14 |
| I16 | For the full method: model results for each AEP and duration — pre- and post-development peaks, storage used, retention credit found by routing | m³/s, m³ | Clauses 4.4.6.2, 4.6 |
| I17 | Outlet: low-flow orifice diameter or least slot dimension; drawdown times from routing | mm, h | Clauses 4.7, 4.8.2 |
| I18 | Outfall: tidal or non-tidal; outfall-closed check result | — | Chapter 5 |
| I19 | Fee-in-lieu unit rate notified for the basin, where the route applies | ₹/m³ | Clause 4.13.3 |
| I20 | Stage of submittal (1, 2 or 4) and, at Stage 4, the as-built values of I14, I16 and I17 | — | Clauses 10.5.2, 10.9.1(b) |
10A.3 Calculations, by clause
Table 10A.2 — Calculations the calculator shall perform
| Step | Calculation | Clause |
|---|---|---|
| C1 | Applicability. Chapters 4 and 5 apply where land disturbance ≥ 0.1 ha or new plus replaced impervious area ≥ 500 m², over the common plan of development. Report exemptions. Flag that the universal provisions apply at every size, and that RWH applies under bye-law 39 of the NBBL 2012 to new buildings on plots of 100 m² and more (thatched roofs excepted), as storage of at least 25 litres per m² of roof (Clause 4.11, set by this Manual, since bye-law 39 sets no volume), credited as retention only through reuse; recharge is credited only where Clause 4.11 (recharge rule) allows it, which is on tested piedmont sands, gravels and pebble–boulder beds of the Dimapur–Chümoukedima plain and on proven sandstone benches on slopes of 10° or less, with the seasonal high water table at least 2.0 m below ground and not within 30 m of a dug well used for drinking water; never, unless a geotechnical certificate allows it, on natural ground sloping more than 10°, on Disang or Barail shale, on colluvium, fill or slide debris, in a mapped landslide zone or within twice the height of a cut slope or retaining wall upslope of it (Clause 4.11, hill rule); and never below the 1% AEP flood level of the Dhansiri, the Chathe, the Diphu or a nullah, in the auto-flow zone round Dhansiripar, on the margins of a pond, on the clayey north-western plain or where the seasonal high water table is less than 2.0 m below ground (Clause 4.11, floodplain rule). | 1.5.2–1.5.8 |
| C2 | Process flags. Stage 0 mandatory (≥ 2 ha, flood-sensitive, variance or regional route, tidal outfall or waterbody); Stages 1 and 2 may be combined (< 1 ha, not flood-sensitive); empanelled signatory required; independent check required. | 10.3.2, 10.3.3, 10.6.1, 10.6.4 |
| C3 | Route eligibility. Tier B simplified method: ≤ 2 ha, or ≤ 0.5 ha in a flood-sensitive catchment, and only once Table 4.3 is published. Fixed-coefficient route: ≤ 1 ha and none of the exclusions of Clause 4.14.3. Constrained redevelopment: existing ≥ 60% impervious and ≤ 1 ha. Regional detention or fee-in-lieu: only in a basin with an approved BSMP. | 4.5.6.1, 4.13.1, 4.14.1, 4.14.3, 11.12.1(b) |
| C4 | Retention volume. RRV = 10 × Q_R × A, with Q_R the SCS-CN runoff from P_R for each sub-area at AMC II, summed over sub-areas. The larger of the Ia = 0.2S and Ia = 0.05S results governs. The Rv form (RRV = 10 × P_R × Rv × A, Rv = 0.05 + 0.009 × I) is offered only for sites < 0.5 ha and the Tier B method. No climate factor. | 4.4.2, 3.8.5(c), 2.8.3 |
| C5 | Preservation credit. Preserved areas are modelled at their pre-development CN in the post-development condition. | 4.4.7 |
| C6 | Retention checks. Design infiltration rate ≤ half the measured rate; groundwater ≥ 1.0 m below the base; drawdown of the retained volume within 72 h at the design rate (or by the stated reuse demand). A practice that fails any check gets no credit; any shortfall is reported and treated as WQv. | 4.4.3–4.4.5, 4.4.6.4 |
| C7 | Water quality volume. P_wq = max(P_ret, P_3m); WQv = 10 × Q_wq × A by SCS-CN, or (P_wq / 1000) × Rv × A (A in m²) for sites < 0.5 ha and the Tier B method. The retained volume counts toward the WQv in full. No climate factor. | 8.4.1–8.4.4, 3.8.5(c) |
| C8 | Retention credit. Tier A: the credit found by routing is entered (I16); the calculator does not compute it. Tier B: V_credit = C_R × RRV provided, with C_R = 0 until Annex 4B is published. | 4.4.6 |
| C9 | Design-aid route (S-1). V = SSR × A − V_credit; Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages, from Table 4.3. Shown as "not available" until Table 4.3 is published. | 1.7.2, 4.14.2 |
| C10 | Permissible site discharge (S-2). Q = PSD (m³/s/ha) × A for each AEP, from the S-2 tables. Shown as "not available" until they are issued. | 1.7.2, 1.7.3(e) |
| C11 | Fixed-coefficient route. Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A (L/s); V_100 and V_2 = max over d of [10 × C_v × P(d) × A − 1.8 × Q_cap × d] for d = 1 to 72 h, with pervious C ≥ 0.50 for d ≥ 12 h; V = max(V_100, V_2); retention added without credit. Coefficients from Table 4.3A (provisional). | 4.14.4–4.14.7 |
| C12 | Release-rate screen (full method). For each AEP and duration: Q_post ≤ 0.9 × Q_pre (standard), or the two mixed-frequency caps (flood-sensitive). Report the governing duration and margin. | 4.5.2, 4.5.3 |
| C13 | Constrained redevelopment. Q_post ≤ 0.5 × Q_existing for 2-, 10- and 100-yr at each duration; shortfall volume = greenfield storage − storage provided; fee = shortfall × unit rate. | 4.5.6.2, 4.5.6.3 |
| C14 | Minimum orifice. Flag any orifice < 50 mm. Where a cap is below the discharge of a 50 mm orifice at the corresponding stage, report "50 mm orifice deemed to comply". | 4.5.5.1, 4.8.2 |
| C15 | Drawdown. Report the detention drawdown (90% of the 10-yr stored volume within 48 h), the WQv release time (24–48 h) and the retention emptying time (≤ 72 h). | 4.7 |
| C16 | Fee-in-lieu. Fee = detention volume required on site × notified unit rate. | 4.13.3 |
| C17 | Model screen. Where the full method is used, compare the model results (I16) with the calculator's screen values (C9 to C11, where available) and flag a difference above the tolerance stated in the user guide. | 10.5.2(c) |
| C18 | As-built re-run. At Stage 4, repeat C4 to C17 with the as-built values and report each change from Stage 2. | 10.9.1(b), 10.9.2 |
10A.4 Outputs
The calculator produces:
- (a) Form 10-2, filled in, with the calculator version and release date on every page;
- (b) a machine-readable export of every input and result of Tables 10A.1 and 10A.2; and
- (c) a list of the flags raised (C1 to C3, C6, C14, C17), each with the clause on which it is based (Clause 10.7.7).
10A.5 Testing before release
Before each release the State Stormwater Technical Committee shall check that the calculator reproduces, within rounding, the worked examples of the Manual that use the same method, including the illustrative examples of Clauses 4.6.7 and 4.14, and the benchmark problems of Annex 3C where they apply. The test results shall be published with the version log.
10A.6 Outline of the user guide
The user guide shall contain at least:
- Purpose, status and limits of the calculator: a summary and screening check outside the design-aid route (Clause 10.5.2(c)).
- How to obtain the current version, and the version rule of Clause 10.5.3.
- Each input of Table 10A.1, with where to find it in the Manual and its annexes.
- Each calculation of Table 10A.2, with its equation and clause.
- The tolerance used in step C17, and what the drainage report must explain where it is exceeded (Clause 10.5.2(c)).
- How to read and sign Form 10-2, and what to attach.
- At least one worked example for each route, labelled "Illustrative — not design values".
- The sources of every table in the calculator (Clause 10.5.4), and the version log.
Annex 10B — GIS data specification and attribute schema
Supports Clauses 10.4.4, 10.14.1(d), 10.14.3 and 10.17 of Chapter 10.
10B.1 Format and reference systems
- (a) Format. One OGC GeoPackage (.gpkg) per submittal is preferred. Shapefiles are accepted, one per layer, zipped with all component files. Field names shall be as in Tables 10B.2 to 10B.6; shapefile names are limited to 10 characters, and the names below meet that limit.
- (b) Horizontal reference. WGS 84 geographic (EPSG:4326), or WGS 84 / UTM zone 46N (EPSG:32646), which covers the whole State, whichever contains the site (Clause 10.4.4(c)). One system shall be used for all layers.
- (c) Vertical reference. All levels shall be in metres relative to a named vertical datum, stated in the metadata. The metadata shall also state the relationship between that datum and the river datums of any gauge on the Dhansiri, the Chathe and the Diphu at Dimapur (no State gauge level or datum was found [TBC]), of the reservoir levels of NEEPCO's Doyang dam (quoted in metres of reservoir water level, RWL, on a datum not stated [TBC]), of the CWC sites on the reaches in Assam where a check against them is needed (not stated in any source found [TBC]), and of the flood marks surveyed on ungauged streams, nullahs and ponds used in Chapter 5 (Clause 10.4.4(d)).
- (d) Accuracy. Positions shall come from the site survey or the approved drawings. At Stage 4 and at handover, positions and levels shall come from the as-built survey (Clause 10.9.1(a)).
- (e) File name.
<Authority file number>_<stage>_<yyyymmdd>.gpkg, for exampleKMC-BP-2026-0123_S2_20261015.gpkg. - (f) Identifiers. Every feature has an identifier unique within the submittal (FAC_ID, OUT_ID, CAT_ID, FLP_ID). The Authority replaces them with register identifiers on acceptance and returns the mapping to the Applicant.
10B.2 Layers
Table 10B.1 — Layers
| Layer | Geometry | Content | Required at |
|---|---|---|---|
| SW_SITE | Polygon | Site boundary | Stages 1, 2, 4 |
| SW_CATCH | Polygon | Catchment boundaries draining to and through the site, pre- and post-development (Clause 10.4.1(b)) | Stages 1, 2, 4 |
| SW_FAC | Polygon (point for buried items smaller than 5 m across) | Every stormwater facility: retention, detention, water quality, pumping, gate, conveyance element designed under this Manual | Stages 2, 4; handover |
| SW_OUTF | Point | Every outfall from the site, and every public outfall | Stages 1, 2, 4; handover |
| SW_FLOW | Line | Major-system flow paths through and from the site, and natural drainage paths (Clause 10.15.1(g)) | Stages 1, 2, 4 |
| SW_CONV | Line | Drains and pipes designed under Chapter 6 | Stage 4 for public works; handover |
| SW_META | Table (no geometry) | Metadata of Table 10B.6 | Every stage |
10B.3 Attribute schema
Types: T = text, I = integer, R = real, D = date (ISO 8601, yyyy-mm-dd). "Req." marks fields that shall not be empty; other fields are filled where they apply.
Table 10B.2 — Attributes of SW_FAC (facilities)
| Field | Type | Unit | Req. | Content | Source |
|---|---|---|---|---|---|
| FAC_ID | T | — | Yes | Facility identifier | 10B.1(f) |
| FAC_TYPE | T | — | Yes | Code from Table 10B.7 | Clause 4.10, Table 10.3 |
| FAC_NAME | T | — | Name on the drawings | — | |
| OWNER_TYP | T | — | Yes | PRIVATE / ASSOC / DEVELOPER / ULB / DEPT | Clauses 10.10, 10.14 |
| OWNER_NM | T | — | Yes | Name of a corporate owner or association only; for an individual, "private individual" (Clause 10.17.3) | Clause 10.17.3 |
| CTRL_AREA | R | ha | Yes | Area draining to the facility | Clause 4.5.1.3 |
| V_RET | R | m³ | Retention volume provided | Clause 4.4 | |
| V_WQ | R | m³ | Water quality volume provided | Clause 8.4 | |
| V_DET | R | m³ | Detention volume at the top design level | Clause 4.6 | |
| Q_2 | R | L/s | Release at the 50% AEP (2-yr) design level | Clause 4.5 | |
| Q_10 | R | L/s | Release at the 10% AEP (10-yr) design level | Clause 4.5 | |
| Q_100 | R | L/s | Release at the 1% AEP (100-yr) design level | Clause 4.5 | |
| ORIF_MM | R | mm | Low-flow orifice diameter or least slot dimension | Clause 4.8.2 | |
| INV_OUT | R | m | Outlet invert level | Clause 10.9.1(a) | |
| TWL_DES | R | m | Top design water level | Clause 10.9.2(a) | |
| SPILL_LV | R | m | Spillway or overflow crest level | Clause 4.9 | |
| PUMPED | T | — | Yes | Y / N | Clause 10.10.3 |
| REGIONAL | T | — | Yes | Y / N | Clause 4.13 |
| EMPANEL | T | — | Yes | Y / N: facility under Clause 10.6.1(c) or (d) | Clause 10.6.1 |
| STATUS | T | — | Yes | Code from Table 10B.8 | Clause 10.17.1(a) |
| APPR_DATE | D | — | Date of Stage 2 approval | Clause 10.3 | |
| ASB_DATE | D | — | Date the as-built certificate was accepted | Clause 10.9 | |
| DECL_REF | T | — | Registration reference of the Maintenance Declaration (Form 10-6) | Clause 10.10.1(e) | |
| HAND_DATE | D | — | Date of the Asset Handover Certificate (Form 10-8) | Clause 10.14 | |
| LAST_INSP | D | — | Date of the latest inspection | Clause 10.12 | |
| INSP_RES | T | — | Code from Table 10B.9 | Clause 10.17.1(a) | |
| OUT_ID | T | — | Yes | Outfall to which the facility discharges | — |
Table 10B.3 — Attributes of SW_OUTF (outfalls)
| Field | Type | Unit | Req. | Content | Source |
|---|---|---|---|---|---|
| OUT_ID | T | — | Yes | Outfall identifier | 10B.1(f) |
| RECEIVER | T | — | Yes | Receiving drain, channel, waterbody or sea, by name | Clause 4.5.1.3 |
| RECV_TYPE | T | — | Yes | PUBLIC_DRAIN / CANAL / RIVER / TANK / SEA / OTHER | Chapter 5 |
| INV_LEVEL | R | m | Yes | Outfall invert level | Clause 10.9.1(a) |
| SIZE_MM | R | mm | Yes | Diameter, or width × height written in the drawing | Chapter 6 |
| TIDAL | T | — | Yes | Y / N | Chapter 5 |
| GATE_TYPE | T | — | NONE / FLAP / TIDE / DUCKBILL / PENSTOCK / NRV | Clauses 5.11, 9.10 | |
| GATE_REQ | T | — | Yes | Y / N: invert below the 1% AEP still-water level | Clause 5.11.1 |
| GPT | T | — | Y / N: gross pollutant trap fitted | Clause 8.10.1 | |
| Q_100 | R | L/s | Design 1% AEP discharge | Chapter 5 |
Table 10B.4 — Attributes of SW_CATCH (catchments)
| Field | Type | Unit | Req. | Content | Source |
|---|---|---|---|---|---|
| CAT_ID | T | — | Yes | Catchment identifier | 10B.1(f) |
| CONDITION | T | — | Yes | PRE / POST / EXTERNAL (land outside the site draining through it) | Clause 10.4.1(b) |
| AREA_HA | R | ha | Yes | Area | — |
| IMPERV_PC | R | % | Yes | Impervious percentage | Clause 3.9 |
| HSG | T | — | Yes | A / B / C / D, or mixed with area shares in NOTES | Clause 3.7 |
| CN | R | — | Curve number, AMC II | Chapter 3 | |
| OUT_ID | T | — | Yes | Outfall to which it drains | Clause 4.5.1.3 |
| FLOODSENS | T | — | Yes | Y / N | Clause 4.5.3 |
| NOTES | T | — | Free text | — |
Table 10B.5 — Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
| Field | Type | Unit | Req. | Content | Source |
|---|---|---|---|---|---|
| FLP_ID | T | — | Yes | Line identifier | 10B.1(f) |
| LINE_TYPE | T | — | Yes | OVERLAND / NATURAL / OPEN_DRAIN / COVERED_DRAIN / PIPE / CULVERT | Chapter 6 |
| US_LEVEL | R | m | Upstream invert or ground level | Chapter 6 | |
| DS_LEVEL | R | m | Downstream invert or ground level | Chapter 6 | |
| SIZE_MM | R | mm | Pipe diameter, or drain width (depth in NOTES) | Clause 6.7.6 | |
| Q_DES | R | L/s | Design discharge | Chapter 6 | |
| AEP_DES | T | — | Design AEP, for example "10%" or "1%" | Clause 6.4 | |
| RESERVE_M | R | m | Drainage reserve width, where one applies | Clause 6.9.7 | |
| NOTES | T | — | Free text | — |
Table 10B.6 — Metadata (SW_META)
| Field | Content |
|---|---|
| FILE_NO | Authority file number |
| STAGE | 1, 2, 4 or HANDOVER |
| H_CRS | EPSG code of the horizontal reference system |
| V_DATUM | Name of the vertical datum |
| TIDE_REL | Relationship of the vertical datum to the Chapter 5 river datums of any gauge on the Dhansiri, the Chathe and the Diphu at Dimapur (no State gauge level or datum was found [TBC]), of the reservoir levels of NEEPCO's Doyang dam (quoted in metres of reservoir water level, RWL, on a datum not stated [TBC]), of the CWC sites on the reaches in Assam where a check against them is needed (not stated in any source found [TBC]), and of the flood marks surveyed on ungauged streams, nullahs and ponds (for example, MSL = x.xx m on the site datum) |
| SURVEYOR | Name and licence number of the surveyor |
| SURV_DATE | Date of the survey |
| PREP_BY | Name and registration number of the certifying professional |
| CALC_VER | Compliance calculator version (Annex 10A), or "not issued" |
| DATE | Date the file was prepared |
10B.4 Code lists
Table 10B.7 — Facility type codes (FAC_TYPE)
| Code | Facility | Inspection row of Table 10.3 |
|---|---|---|
| RET_SOAK | Soakaway, recharge pit or shaft | Retention / infiltration |
| RET_TRENCH | Infiltration trench or basin | Retention / infiltration |
| RET_BIO | Bioretention or rain garden | Retention / infiltration |
| RET_PERM | Permeable pavement | Retention / infiltration |
| RET_REUSE | Retention by reuse (tank with demand) | Underground or podium detention tank, gravity outlet |
| DET_BASIN | Surface detention basin | Surface detention basin or multi-use open space area |
| DET_OSR | Multi-use detention in open space, park or playfield | Surface detention basin or multi-use open space area |
| DET_ROOF | Rooftop detention | Underground or podium detention tank, gravity outlet |
| DET_PODIUM | Podium or landscape-deck detention | Underground or podium detention tank, gravity outlet |
| DET_PARK | Parking-lot detention | Surface detention basin or multi-use open space area |
| DET_TANK | Underground tank or vault, gravity outlet | Underground or podium detention tank, gravity outlet |
| DET_PUMP | Pumped detention or pump station | Pumped detention, pumps and controls |
| WQ_POND | Wet pond or constructed wetland | Surface detention basin or multi-use open space area |
| WQ_SWALE | Swale or filter strip | Private drains and inlets |
| WQ_GPT | Gross pollutant trap, first-flush device or oil-grit separator | Gross pollutant trap / first-flush device |
| GATE | Flap or tide gate, non-return valve | Flap / tide gate, non-return valve |
| CONV | Private drain, inlet or culvert | Private drains and inlets |
Table 10B.8 — Status codes (STATUS)
| Code | Meaning |
|---|---|
| PROPOSED | In a Stage 1 or Stage 2 submittal |
| APPROVED | Stage 2 approved; not yet built |
| ASBUILT | As-built certificate accepted (Clause 10.9) |
| HANDEDOVER | Accepted by the ULB (Clause 10.14) |
| ALTERED | Changed with the Authority's approval (Clause 10.3.5) |
| REMOVED | Removed with the Authority's approval |
Table 10B.9 — Inspection result codes (INSP_RES)
| Code | Meaning |
|---|---|
| OK | Working as designed; no defect |
| MINOR | Defect found and corrected; date in the inspection record |
| MAJOR | Defect affecting storage, outlet or safety; notice issued (Clause 10.15.2, step 1) |
| NOACCESS | Inspection could not be made |
| NOTFOUND | Facility missing, filled, covered or changed in use (Clause 10.15.1(c)) |
10B.5 Facility register extract
The public facility register of Clause 10.17.1(a) is an extract of SW_FAC: FAC_ID, FAC_TYPE, location (centroid), V_DET (and V_RET, V_WQ), Q_100 (and Q_2, Q_10), OWNER_NM, ASB_DATE, LAST_INSP and INSP_RES. It is published as CSV and GeoPackage under the licence of Clause 10.17.4. Personal data are not published (Clause 10.17.3).
Annex 10C — Maintenance access dimensions
Supports Clause 10.13 of Chapter 10.
Clause 10.13 sets access by function. This annex collects the access dimensions that the Manual already sets in other chapters, and lists the dimensions that it does not set. Where a dimension is not set by the Manual, the designer shall state it on the drawings, show that it suits the plant and equipment named in the O&M plan (Clause 10.11.1(h)), and mark it "to be confirmed in design".
Table 10C.1 — Access dimensions set by the Manual
| Element | Requirement | Clause |
|---|---|---|
| Open drains with a top width of 2 m or more | Maintenance access strip at least 3.5 m wide along one bank, connected to a public road at intervals of not more than 500 m | 6.9.4 |
| Drainage reserves | Width not less than Table 6.9, based on the required drain size; where the access strip of Clause 6.9.4 is wider, the wider governs | 6.9.7 |
| Covered drains, minimum section | 0.6 m × 0.6 m clear | 6.7.6 |
| Covered drains, removable covers | Panels at not more than 10 m centres, each at least 0.6 m long and spanning the full clear width, liftable by two workers or a hand-operated device | 6.13.2(a) |
| Covered drains, access chambers | Clear opening at least 0.6 m × 0.6 m at every junction, bend and change of section, and at not more than 30 m centres on straight runs | 6.13.2(b) |
| Manholes and access chambers on public drains | Clear access opening at least 600 mm | 9.12.3 |
| Inlet chambers on public roads | Silt sump at least 300 mm deep below the outlet pipe invert, cleanable from the surface | 6.6.7 |
| Underground tanks and vaults | Access openings over the outlet chamber and over every inlet; in tanks over 500 m², not more than 30 m apart; floor falling at least 1% to a sump at the outlet | 4.10.2(b), (c) |
| Detention outlets serving more than 1 ha | A means of isolating the outlet (stop-log slot or penstock) | 4.8.6 |
| Outfall gates | Stop-log slot or penstock upstream on outfalls larger than 600 mm (Chapter 5) and on outfalls of 900 mm or more or serving a pumped or storage system (Chapter 9); the gate chamber accessible at all tides, with its access above HAT + surge + sea-level allowance | 5.11.3(d), (e); 9.10.3 |
| Pump stations | Maintenance vehicle access usable in the 1% AEP event; hard standing and a quick-coupling connection for mobile pumps; clear space between adjacent pumps or motors of 0.6 m (small and medium units) or 1.0 m (large units) | 9.9.6, 9.9.10, 9.9.12 |
| Pretreatment devices | Cleanable without entering or disturbing the main BMP | 8.5.4 |
| Screens at outfalls, culvert inlets and pump sumps | Cleanable from a safe platform, with vehicle access | 8.10.3(d) |
| Infiltration trenches | Observation well to the base of each trench | 8.7.6(c) |
| Publicly accessible storage | Side slopes no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter | 4.15.1(c) |
| Wet basins | Safety bench at least 3 m wide, no more than 0.3 m below normal water level | 4.15.2 |
| Fencing | At least 1.2 m high, non-climbable, with a lockable gate, where Clause 4.15.3 requires it | 4.15.3 |
Table 10C.2 — Access dimensions not set by the Manual (to be confirmed in design)
| Element | What the designer shall state | Clause setting the function |
|---|---|---|
| Vehicle access route to the inlet, outlet and base of a basin, pond or open channel | Width, gradient, turning space and design load for the plant in the O&M plan | 10.13.2 |
| Maintenance strip beside a basin or pond | Width along at least one side | 10.13.2 |
| Ramp into a basin | Width, gradient and surface for the sediment-removal plant | 10.13.2 |
| Access openings of private tanks | Clear size of each opening over the inlet, outlet and each chamber | 10.13.3(a) |
| Ladders and steps | Type and spacing; ventilation for confined-space entry | 10.13.3(b) |
| Headroom in underground tanks | Clear height for manual cleaning | 10.13.3(d) |
| Reach to orifices and screens | How the outlet is cleaned without entering a full facility | 10.13.4 |
Annex 10D — Model O&M plans by facility type
Supports Clauses 10.11, 10.12 and 10.13 of Chapter 10.
The model plans below are starting points. The designer adapts them to each facility and completes the items marked "______". Inspection frequencies are the minimum frequencies of Table 10.3; a plan may set more frequent inspection, never less. Where this annex leaves a value to the designer, the Manual does not set it.
10D.1 Contents of every O&M plan
Every plan shall contain the items of Clause 10.11.1:
Table 10D.1 — Contents of an O&M plan
| Item | Content | Clause |
|---|---|---|
| 1 | Inventory and plan drawing of each facility, with design levels, volumes and outlet details (from SW_FAC, Annex 10B) | 10.11.1(a) |
| 2 | Routine tasks and their frequency (Tables 10D.2 to 10D.8) | 10.11.1(b) |
| 3 | Trigger for sediment removal, as a depth (mm) or a percentage of design volume: ______ | 10.11.1(c) |
| 4 | Inspection checklist matching Form 10-7 | 10.11.1(d) |
| 5 | For pumps, gates and valves: operating rules, test schedule, standby power, and actions on a cyclone or heavy-rainfall warning | 10.11.1(e) |
| 6 | Actions against standing water and mosquito breeding, consistent with the drawdown times of Clause 4.7 | 10.11.1(f) |
| 7 | Safety: confined spaces, deep water, public access | 10.11.1(g) |
| 8 | Access routes and equipment (Annex 10C) | 10.11.1(h) |
| 9 | Annual cost estimate (₹ ______ per year) and who pays it | 10.11.1(i) |
| 10 | Records to be kept, and for how long: ______ years (pump records at least 5 years, Clause 9.9.8(c)) | 10.11.1(j) |
10D.2 Model plans
Table 10D.2 — Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
| Task | Frequency | Standard or trigger | Clause |
|---|---|---|---|
| Inspect surface, inlets, pretreatment and overflow | Every 6 months; before 31 March; after each heavy-rainfall day | No blockage; overflow clear | Table 10.3 |
| Check drawdown at the observation well or surface | At each inspection after rain | Empties within 72 h of the end of rain; if not, investigate clogging | 4.4.5, 8.7.6(c) |
| Clean pretreatment (forebay, filter strip, silt trap) | When the sediment trigger (item 3) is reached | Pretreatment cleaned without disturbing the main BMP | 8.5.3, 8.5.4 |
| Bioretention: mulch, plants, ponding | Every 6 months | Ponding drains within 48 h; dead plants replaced; mulch 50–75 mm | 8.7.2 |
| Permeable paving: surface | Every 6 months | Sweep or vacuum; no resurfacing with impermeable material | 8.7.5(e) |
| Keep the contributing area stable | Each inspection | Bare soil stabilised; no sediment washing in | 10.8.3(b) |
| Keep the facility in place and in use | Each inspection | Not filled, covered, paved or built over without approval | 10.10.1(d) |
Table 10D.3 — Surface detention basin or multi-use open space area
| Task | Frequency | Standard or trigger | Clause |
|---|---|---|---|
| Inspect inlets, outlet, orifice, trash rack and spillway | Every 6 months; before 31 March; after each heavy-rainfall day | Orifice and rack clear; spillway unobstructed | Table 10.3, 4.8, 4.9 |
| Remove debris and sediment | When the sediment trigger is reached, and after events | Design volume restored | 10.11.1(c) |
| Check that the basin drains | After rain | No low point ponds for more than 72 h | 4.15.7 |
| Vegetation | As set in the plan | Grass cut; no woody growth on embankments or in the outlet zone | 10.11.1(b) |
| Safety features | Every 6 months | Signs in the local language and English and a depth marker in place; fences and gates sound where required | 4.15.3, 4.15.5 |
| Embankment (if any) | Every 6 months and after events | No cracks, slips, seepage or animal burrows | 4.9.6 |
Table 10D.4 — Underground or podium detention tank, gravity outlet
| Task | Frequency | Standard or trigger | Clause |
|---|---|---|---|
| Inspect from the access openings: inlets, outlet, orifice, screen, sump, vents | Every 6 months; before 31 March; after each heavy-rainfall day | Clear; vents open | Table 10.3, 4.10.2 |
| Clean the sump and floor | When the sediment trigger is reached | Floor falls freely to the sump | 4.10.2(c) |
| Inlet silt trap or GPT | Every 3 months (Table 10.3 row for GPTs) | Cleaned | 4.10.2(e) |
| Overflow route | Each inspection | Operates when the outlet is blocked; route to the overland path unobstructed | 4.9.5 |
| Confined-space entry | Each entry | Entry procedure stated in the maintenance declaration followed; covers locked after | 4.15.6 |
| Use of the space | Each inspection | Not used for parking or storage; volume not reduced | 10.10.1(d) |
Table 10D.5 — Pumped detention, pumps and controls
| Task | Frequency | Standard or trigger | Clause |
|---|---|---|---|
| Test run of each pump, duty and standby | Monthly | Each pump starts on level control; roles alternate | Table 10.3, 9.9.4(c) |
| Full duty test | Before 31 March | Station meets its design duty point | Table 10.3, 10.9.3 |
| Standby power | Monthly with the test run; full test before 31 March | Automatic changeover works; fuel for at least 72 h of all duty pumps on site | 9.9.9 |
| Level sensors, float back-up, alarms, telemetry | Monthly | High-level and fault alarms reach the control room | 9.9.8 |
| Screens and silt trap | Every 3 months and after events | Clean | 9.9.7 |
| Records | Continuous | Sump levels, run hours and power status logged; kept at least 5 years | 9.9.8(c) |
| Warning actions | On an IMD heavy-rainfall or cyclone warning | Actions written in the plan: ______ (for example staff on site, fuel topped up, mobile pump connection checked) | 10.11.1(e), 9.9.12 |
Table 10D.6 — Flap or tide gate, non-return valve
| Task | Frequency | Standard or trigger | Clause |
|---|---|---|---|
| Inspect and operate | Every 3 months; after each heavy-rainfall day | Opens at a small head; no debris, sand or growth holding it | Table 10.3, 9.10.4 |
| Seal test | Before 31 March | Seals against the receiving water | Table 10.3, 10.9.3 |
| Beach, estuary and creek outfalls | After every high-tide or surge event in the monsoon season | Sand and debris cleared | 9.10.5(b) |
| Isolation | Before 31 March | Stop-log slot or penstock operable | 9.10.3 |
| Hinges, pins and fixings | Before 31 March | No corrosion that would stop the gate working | 9.10.6 |
| Property non-return valves | Every 3 months | Cleaning eye accessible; valve seals | 5.11.4 |
Table 10D.7 — Gross pollutant trap or first-flush device
| Task | Frequency | Standard or trigger | Clause |
|---|---|---|---|
| Inspect and empty | Every 3 months; before 31 March; after each heavy-rainfall day | Emptied before the capture chamber is full; bypass clear | Table 10.3, 8.4.6 |
| Screens | Each inspection | Clean; overflow path clear | 8.10.3(b) |
| Disposal | Each cleaning | Material taken to an authorised solid-waste facility | — |
Table 10D.8 — Private drains and inlets
| Task | Frequency | Standard or trigger | Clause |
|---|---|---|---|
| Inspect and clean drains, inlets and silt sumps | Every 6 months; before 31 March | Free of silt and debris | Table 10.3 |
| Check for sewage connections | Each inspection | None; any cross-connection removed | 1.5.4, 8.9 |
| Overland flow paths | Each inspection | Not obstructed by walls, fill or stored material | 6.9.2, 10.15.1(g) |
Annex 10E — Empanelment criteria for Stormwater Design Professionals and reviewers
Supports Clauses 10.6, 10.7.4 and 11.4.3 of Chapter 10.
Model text for consideration by a competent authority. Not in force. Clause 10.6.2 assigns the issue of empanelment criteria to UDD. The text below is a model. Values shown as "[ ]" are for the competent authority to set; the Manual does not set them.
10E.1 Model criteria
- Lists. The competent authority shall keep three public lists:
- (a) Stormwater Design Professionals, who may sign designs under Clause 10.6.1 and act as independent checkers under Clause 10.6.4;
- (b) Empanelled Reviewers, who may review submittals for an Authority under Clause 10.7.4; and
- (c) a basin modelling endorsement, held by a Stormwater Design Professional who may prepare or direct a BSMP under Clause 11.4.3.
- Eligibility for list (a). An applicant shall:
- (a) hold a degree in civil engineering, or an equivalent qualification recognised by the competent authority (Clause 10.6.2);
- (b) be registered as a professional under the Nagaland Building Bye-Laws 2012 (Clause 1.4);
- (c) have at least [ ] years of experience in drainage design after graduation, shown by a list of at least [ ] projects with the applicant's role in each (Clause 10.6.2); and
- (d) have completed a training course on this Manual, with an assessment, within the [ ] years before application (Clause 10.6.2).
- Eligibility for list (b). As for list (a), with at least [ ] years of experience, of which at least [ ] years in the design or review of drainage under this Manual or an equivalent standard.
- Basin modelling endorsement (c). A Stormwater Design Professional who shows experience in basin-scale 1D–2D modelling, including calibration, on at least [ ] studies (Clause 11.4.3).
- Independence of a checker. A checker under Clause 10.6.4 shall not be employed by, or a partner of, the designer's firm or the Applicant, and shall not have worked on the design.
- Conflict of interest of a reviewer. An Empanelled Reviewer shall not review a site on which the reviewer, or the reviewer's firm, has worked in any capacity (Clause 10.7.4), and shall declare any other interest before accepting a review. The Authority remains the decision-maker (Clause 10.7.4).
- Application. The application shall include proof of degree and registration, the project list with references, the training certificate, and a signed declaration that the information is true.
- Term and renewal. Empanelment is valid for [ ] years. Renewal requires evidence of continuing practice and of any refresher training issued after a revision of the Manual (Clause 1.12).
- Suspension and removal. The competent authority may suspend or remove an empanelled person after a false or negligent certificate (Clause 10.6.5), on a report under step 6 of Table 10.4, or on loss of registration. The person shall be given notice and an opportunity to be heard. Every suspension and removal shall be published on the list.
- Publication. The lists shall be published and kept current, with each person's name, registration number, list, endorsement and validity date.
Form 10-1 — Drainage Report Checklist
Supports Clauses 10.4.1 to 10.4.4 and 10.7.1 of Chapter 10.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. Lodge with every Stage 1 and Stage 2 submittal. For each item give the page or sheet where it is addressed, or the reason it does not apply. The Authority does not start technical review without a completed Form 10-1 (Clause 10.4.3).
Table 10F.1 — Form 10-1, Section A: Submittal
| No. | Field | Entry |
|---|---|---|
| A1 | Authority and file number | ______ |
| A2 | Site name and address; survey numbers | ______ |
| A3 | Stage: 1 / 2 / combined 1 and 2 (Clause 10.3.3) / public work DPR or tender (Clause 10.3.4) | ______ |
| A4 | Applicant | ______ |
| A5 | Certifying professional (name, registration and empanelment number) | ______ |
Table 10F.2 — Form 10-1, Section B: Stage 1 contents (Clause 10.4.1)
| No. | Item | Clause | Page / sheet | Not applicable: reason |
|---|---|---|---|---|
| B1 | Form 1-1; Form 1-2 where a variance or waiver is sought | 10.4.1(a) | ______ | ______ |
| B2 | Site plan: existing and proposed levels, impervious areas, catchment boundaries to and through the site | 10.4.1(b) | ______ | ______ |
| B3 | Soils (HSG), seasonal high groundwater, infiltration tests or test plan | 10.4.1(c) | ______ | ______ |
| B4 | Design Rainfall Sheet (Form 2-1) | 10.4.1(d) | ______ | ______ |
| B5 | Pre-development condition and hydrologic method | 10.4.1(e) | ______ | ______ |
| B6 | Order of measures: areas preserved, retention method, detention concept, conveyance | 10.4.1(f) | ______ | ______ |
| B7 | Preliminary retention, WQ and detention volumes and release rates, with Form 10-2 | 10.4.1(g) | ______ | ______ |
| B8 | Downstream extent and tailwater case | 10.4.1(h) | ______ | ______ |
| B9 | Waterbodies, setbacks and the 1% AEP level | 10.4.1(i) | ______ | ______ |
| B10 | Land reserved for facilities and maintenance access | 10.4.1(j) | ______ | ______ |
| B11 | Professional Design Certificate (Form 10-3) | 10.4.5 | ______ | ______ |
Table 10F.3 — Form 10-1, Section C: Stage 2 contents (Clause 10.4.2)
| No. | Item | Clause | Page / sheet | Not applicable: reason |
|---|---|---|---|---|
| C1 | Updated Stage 1 contents (Section B) | 10.4.2 | ______ | ______ |
| C2 | Final calculations for every storage duration and AEP, with the outfall-closed check | 10.4.2(a) | ______ | ______ |
| C3 | Stage–storage–discharge tables; emergency spillway design | 10.4.2(b) | ______ | ______ |
| C4 | Hydraulic design of conveyance, inlets and structures | 10.4.2(c) | ______ | ______ |
| C5 | Water quality design; first-flush device or GPT where required | 10.4.2(d) | ______ | ______ |
| C6 | Construction drawings, details and specifications of every facility | 10.4.2(e) | ______ | ______ |
| C7 | Construction sequence, with protection of retention and infiltration areas | 10.4.2(f) | ______ | ______ |
| C8 | Hold-point schedule (Form 10-4, Section A) | 10.4.2(g) | ______ | ______ |
| C9 | Draft O&M plan and draft Maintenance Declaration (Form 10-6) | 10.4.2(h) | ______ | ______ |
| C10 | Model input files and GIS data | 10.4.2(i) | ______ | ______ |
| C11 | Certificates (Form 10-3, signed by designer and, where required, checker) | 10.4.2(j) | ______ | ______ |
Table 10F.4 — Form 10-1, Section D: Digital submittal (Clause 10.4.4)
| No. | Item | Clause | Provided (yes / no) | Detail |
|---|---|---|---|---|
| D1 | Reports and drawings as searchable PDF | 10.4.4(a) | ______ | ______ |
| D2 | Models in native, runnable format; software name and version | 10.4.4(b) | ______ | ______ |
| D3 | GIS data to Annex 10B; horizontal reference system (EPSG code) | 10.4.4(c) | ______ | ______ |
| D4 | Vertical datum named; relationship to the Chapter 5 river datums of any gauge on the Dhansiri, the Chathe and the Diphu at Dimapur (no State gauge level or datum was found [TBC]), of the reservoir levels of NEEPCO's Doyang dam (quoted in metres of reservoir water level, RWL, on a datum not stated [TBC]), of the CWC sites on the reaches in Assam where a check against them is needed (not stated in any source found [TBC]), and of the flood marks surveyed on ungauged streams, nullahs and ponds | 10.4.4(d) | ______ | ______ |
Table 10F.5 — Form 10-1, Section E: Declaration and completeness check
| Field | Entry |
|---|---|
| I confirm that this checklist is complete and correct. Certifying professional: name, signature, date | ______ |
| For the Authority: date received | ______ |
| Date of completeness check (within 5 working days, Clause 10.7.1) | ______ |
| Result: accepted for review / returned | ______ |
| Missing items, if returned | ______ |
| Officer: name, designation, signature | ______ |
Form 10-2 — Compliance Calculator Summary
Supports Clauses 10.4.1(g), 10.5 and 10.9.1(b) of Chapter 10.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. Produced by the compliance calculator (Annex 10A) with Stage 1, 2 and 4 submittals. Until the calculator is issued, complete it by hand and enter "not issued" in A3. One column per drainage area where the site has more than one outfall.
Table 10F.6 — Form 10-2, Section A: Site and route
| No. | Field | Entry | Clause |
|---|---|---|---|
| A1 | Authority, file number, stage (1 / 2 / 4) | ______ | 10.5.2(a) |
| A2 | Site area, ha; land disturbance, ha; new + replaced impervious area, m² | ______ | 1.5.2 |
| A3 | Calculator version and release date | ______ | 10.5.3 |
| A4 | Tier (A / B); flood-sensitive (yes / no); approved BSMP for the basin (yes / no) | ______ | 1.6, 4.5.3, 11.12 |
| A5 | Route: full method / S-1 / S-2 / fixed-coefficient / constrained redevelopment / regional or fee-in-lieu | ______ | 1.7, 4.5.6, 4.13, 4.14 |
| A6 | Flags raised by the calculator (list) | ______ | Annex 10A.4 |
Table 10F.7 — Form 10-2, Section B: Rainfall and soils
| No. | Field | Entry | Clause |
|---|---|---|---|
| B1 | Rainfall zone; Form 2-1 reference | ______ | 2.13 |
| B2 | Retention depth P_R, mm; 3-month ARI depth P_3m, mm | ______ | 2.10, 8.4.1 |
| B3 | Climate factor applied (≤ 6 h; > 6–72 h) | ______ | 2.8 |
| B4 | HSG by sub-area; seasonal high groundwater, m below base | ______ | 3.7, 4.4.3 |
| B5 | Measured and design infiltration rates, mm/h | ______ | 4.4.3 |
Table 10F.8 — Form 10-2, Section C: Volumes
| No. | Quantity | Required (m³) | Provided (m³) | Clause |
|---|---|---|---|---|
| C1 | Retention volume (RRV) | ______ | ______ | 4.4.2 |
| C2 | Water quality volume (WQv) | ______ | ______ | 8.4.2 |
| C3 | Retention credit against detention | ______ | — | 4.4.6 |
| C4 | Detention volume | ______ | ______ | 4.6, 4.14 |
| C5 | Fee-in-lieu or regional volume, and fee (₹) | ______ | ______ | 4.5.6.3, 4.13.3 |
Table 10F.9 — Form 10-2, Section D: Release rates (each outfall)
| AEP | Q_pre or cap (L/s) | Q_post (L/s) | Governing duration (h) | Meets criterion (yes / no) | Clause |
|---|---|---|---|---|---|
| 50% (2-yr) | ______ | ______ | ______ | ______ | 4.5 |
| 10% (10-yr) | ______ | ______ | ______ | ______ | 4.5 |
| 1% (100-yr) | ______ | ______ | ______ | ______ | 4.5 |
Table 10F.10 — Form 10-2, Section E: Outlets, drawdown and stage comparison
| No. | Field | Entry | Clause |
|---|---|---|---|
| E1 | Low-flow orifice, mm (minimum 50 mm) | ______ | 4.8.2 |
| E2 | Detention: time to release 90% of the 10-yr stored volume, h (≤ 48 h) | ______ | 4.7.1 |
| E3 | WQv release time, h (24–48 h) | ______ | 4.7.2 |
| E4 | Retention emptying time, h (≤ 72 h) | ______ | 4.7.3 |
| E5 | Model result differs from the calculator screen by more than the guide tolerance? If yes, report section that explains it | ______ | 10.5.2(c) |
| E6 | Stage 4 only: changes from the Stage 2 values (list), and whether every criterion is still met | ______ | 10.9.2 |
| E7 | Prepared by (name, registration number), signature, date | ______ | 10.6.3(b) |
Form 10-3 — Professional Design Certificate
Supports Clauses 10.6.1 to 10.6.5 of Chapter 10.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. Signed by the designer with every Stage 1 and Stage 2 submittal, and by an independent checker for facilities under Clause 10.6.1(c) and (d).
Table 10F.11 — Form 10-3, Section A: Project and signatory
| No. | Field | Entry | Clause |
|---|---|---|---|
| A1 | Authority, file number, stage | ______ | — |
| A2 | Site and facilities covered by this certificate | ______ | — |
| A3 | Designer: name, qualification, NBBL 2012 registration number | ______ | 10.6.1 |
| A4 | Empanelment number, where required, and the reason: Tier A ≥ 1 ha / flood-sensitive / embankment or high-hazard basin / pumped, tide gate or regional facility | ______ | 10.6.1(a)–(d) |
| A5 | Variances or waivers approved (Form 1-2 references), or "none" | ______ | 10.6.3(a) |
Table 10F.12 — Form 10-3, Section B: Certificate of the designer
| No. | I certify that: | Initials |
|---|---|---|
| B1 | the design complies with the Nagaland Stormwater Design Manual, except for the variances listed at A5, which have been approved | ______ |
| B2 | the rainfall, soils and tailwater inputs are as recorded on Form 2-1 and Form 10-2 | ______ |
| B3 | the models submitted reproduce the results reported | ______ |
| B4 | I understand that a false or negligent certificate is a contravention under Clause 10.15 | ______ |
Table 10F.13 — Form 10-3, Section C: Certificate of the independent checker (Clause 10.6.4)
| No. | Field or statement | Entry |
|---|---|---|
| C1 | Checker: name, registration and empanelment number | ______ |
| C2 | I am independent of the designer and the Applicant and have not worked on this design | ______ |
| C3 | I have checked the facilities listed: ______, and agree with the certificate in Section B | ______ |
| C4 | Matters on which I do not agree, if any | ______ |
Table 10F.14 — Form 10-3, Section D: Signatures
| Role | Name | Signature | Date |
|---|---|---|---|
| Designer | ______ | ______ | ______ |
| Independent checker (where required) | ______ | ______ | ______ |
Form 10-4 — Hold-Point Inspection Record
Supports Clauses 10.4.2(g), 10.8 and 10.9.3 of Chapter 10.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. Section A is the hold-point schedule, approved at Stage 2. Section B is completed at each hold point, with dated, geotagged photographs (Clause 10.8.2). Work shall not proceed past a hold point until Section B is signed. See Figure 10.2.
Table 10F.15 — Form 10-4, Section A: Hold-point schedule
| Hold point | Facility (FAC_ID) | Stage of work | Planned date | Notice to Authority sent (date)* | Authority attended (yes / no) |
|---|---|---|---|---|---|
| (a) Excavated base, before media, liner or structure | ______ | ______ | ______ | ______ | ______ |
| (b) Outlet structure, orifice and trash screen, before backfill or first filling | ______ | ______ | ______ | ______ | ______ |
| (c) Infiltration and verification tests (Clause 10.9.3) | ______ | ______ | ______ | — | ______ |
| (d) Outfall, flap or tide gate and non-return valve, before downstream connection | ______ | ______ | ______ | — | ______ |
| (e) Pumps and controls, at commissioning | ______ | ______ | ______ | — | ______ |
| Other hold points added by the Authority | ______ | ______ | ______ | ______ | ______ |
* For sites under Clause 10.6.1, at least 3 working days' notice of hold points (a) and (b) (Clause 10.8.2).
Table 10F.16 — Form 10-4, Section B: Inspection record (one per hold point)
| No. | Field | Entry |
|---|---|---|
| B1 | Hold point and facility | ______ |
| B2 | Date and time of inspection; weather | ______ |
| B3 | Inspected by (certifying professional); others present | ______ |
| B4 | Approved drawing and revision checked against | ______ |
| B5 | Levels, dimensions and materials found, against approved values | ______ |
| B6 | For (a): retention and infiltration areas protected from traffic and stockpiles (Clause 10.8.3(a)) | ______ |
| B7 | For (b): orifice size and invert; screen in place | ______ |
| B8 | For (c): infiltration test result and emptying time (≤ 72 h); pump duty point; gate opening and sealing | ______ |
| B9 | For (d) and (e): gate type, seating and test; pump commissioning record | ______ |
| B10 | Photograph references (dated, geotagged) | ______ |
| B11 | Result: released / not released; corrective work required | ______ |
| B12 | Corrective work checked (date, by) | ______ |
| B13 | Signature of the certifying professional, date | ______ |
Form 10-5 — As-built Certificate
Supports Clauses 10.9 and 10.3.5 of Chapter 10.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. Lodged before the completion certificate. The Authority shall not issue the completion certificate until this form is accepted (Clause 10.9.4).
Table 10F.17 — Form 10-5, Section A: Project and survey
| No. | Field | Entry | Clause |
|---|---|---|---|
| A1 | Authority, file number; Stage 2 approval reference and date | ______ | — |
| A2 | Licensed surveyor: name, licence number, date of survey | ______ | 10.9.1(a) |
| A3 | Vertical datum | ______ | 10.4.4(d) |
| A4 | GIS data to Annex 10B, as built (file name) | ______ | 10.4.4(c) |
Table 10F.18 — Form 10-5, Section B: Approved against as built (one block per facility)
| Item | Approved | As built | Accepted (yes / no) | Clause |
|---|---|---|---|---|
| Storage volume at each design level, m³ | ______ | ______ | ______ | 10.9.2(a) |
| Outlet dimensions (orifice, weir), mm | ______ | ______ | ______ | 10.9.2(b) |
| Outlet and outfall inverts, m | ______ | ______ | ______ | 10.9.2(b) |
| Spillway or overflow level, m | ______ | ______ | ______ | 4.9 |
| Retention volume, m³ | ______ | ______ | ______ | 4.4 |
Table 10F.19 — Form 10-5, Section C: Re-run and tests
| No. | Field | Entry | Clause |
|---|---|---|---|
| C1 | Compliance calculator re-run with as-built values: version, and Form 10-2 (Stage 4) attached | ______ | 10.9.1(b) |
| C2 | Model re-run with as-built values (where a model was used): file name | ______ | 10.9.1(b) |
| C3 | Every criterion of Chapters 4 and 5 met on re-run (yes / no; list any not met) | ______ | 10.9.2(c) |
| C4 | Infiltration retention: measured emptying time, h (≤ 72 h) | ______ | 10.9.3 |
| C5 | Pumps: duty point achieved (flow at head) | ______ | 10.9.3 |
| C6 | Tide gates and non-return valves: shown to open and seal | ______ | 10.9.3 |
| C7 | Deviations, and how corrected or re-certified under Clause 10.3.5 | ______ | 10.9.2 |
Table 10F.20 — Form 10-5, Section D: Attachments and certificate
| No. | Field | Entry |
|---|---|---|
| D1 | Completed hold-point records (Form 10-4) | ______ |
| D2 | Final O&M plan | ______ |
| D3 | Executed Maintenance Declaration (Form 10-6) or handover documents (Form 10-8) | ______ |
| D4 | I certify that the facilities listed were built as approved, except as stated at C7, and perform as designed. Certifying professional: name, registration number, signature, date | ______ |
| D5 | For the Authority: accepted / returned; officer, date | ______ |
Form 10-6 — Maintenance Declaration
Supports Clauses 10.10.1, 10.10.2, 10.10.4 and 10.13.1 of Chapter 10.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. Model text for consideration by a competent authority. Not in force. Executed by the owner of every private stormwater facility before the completion certificate is issued, and registered so that it runs with the land.
Drafting note D10A.1. The instrument under which this declaration is registered, and the Act that gives the Authority its right of entry and its power to carry out works in default, are to be confirmed by the competent authority. This form does not cite statute sections.
Table 10F.21 — Form 10-6, Section A: Parties and land
| No. | Field | Entry |
|---|---|---|
| A1 | Owner (the declarant): name and address; for a company or association, its registration number | ______ |
| A2 | Authority | ______ |
| A3 | Land: survey numbers, village, sub-division, district; extent | ______ |
| A4 | Approval reference (file number, Stage 2 approval date) | ______ |
| A5 | For multi-owner developments: the association or body that takes over after the developer (Clause 10.10.2) | ______ |
Table 10F.22 — Form 10-6, Section B: Schedule of facilities
| Facility (FAC_ID) | Type | Location on the attached plan | Design volume (m³) | Outlet | O&M plan reference |
|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ |
Model declaration. I/We, the owner named in Section A, declare and undertake, for myself/ourselves and for every successor in title to the land:
- to operate, inspect and maintain each facility in Section B under the approved O&M plan, and to make the inspections of Clause 10.12 (Clause 10.10.1(b));
- to give the Authority, its officers and its contractors a right of entry to inspect each facility and the access route shown on the plan, and to carry out works in default under Clause 10.15, with the cost recoverable from the owner (Clause 10.10.1(c));
- not to remove, fill, cover, reduce or change the use of any facility, or obstruct its access route, without the Authority's written approval (Clauses 10.10.1(d), 10.13.5);
- where Clause 10.10.3 applies, to lodge an Annual Maintenance Declaration and Inspection Report (Form 10-7) by 31 March each year;
- for underground tanks, to follow the confined-space entry procedure stated here: ______ (Clause 4.15.6);
- on sale or transfer of the land or any part of it, to disclose this declaration and the latest Form 10-7 to the purchaser, who takes on these obligations from the date of transfer (Clause 10.10.4); and
- for a multi-owner development, that the developer remains responsible until the body named at A5 is legally constituted and has accepted this declaration in writing (Clause 10.10.2).
Table 10F.23 — Form 10-6, Section C: Execution and registration
| Field | Entry |
|---|---|
| Owner: signature, name, date | ______ |
| Witness 1: signature, name, address | ______ |
| Witness 2: signature, name, address | ______ |
| Acceptance by the association or body at A5 (when constituted): signature, date | ______ |
| Registration: office, document number, date | ______ |
| For the Authority: received and recorded in the facility register; officer, date | ______ |
Form 10-7 — Annual Maintenance Declaration and Inspection Report
Supports Clauses 10.10.3, 10.11.1(d) and 10.12 of Chapter 10.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. Due by 31 March each year from every owner of a facility in a Tier A area, and from every owner of a pumped facility, tide gate or regional facility anywhere (Clause 10.10.3). See Figure 10.3.
Table 10F.24 — Form 10-7, Section A: Owner and facilities
| No. | Field | Entry |
|---|---|---|
| A1 | Reporting year (1 April to 31 March) | ______ |
| A2 | Owner or association; Maintenance Declaration registration reference | ______ |
| A3 | Facilities covered (FAC_ID and type) | ______ |
| A4 | Any facility under Clause 10.6.1(c) or (d) (yes / no). If yes, Section E is required | ______ |
Table 10F.25 — Form 10-7, Section B: Inspections made during the year (Table 10.3)
| Facility | Routine inspections (dates) | Pre-monsoon inspection (date) | After heavy-rainfall events (dates) | Monthly pump test runs (number) |
|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ |
Table 10F.26 — Form 10-7, Section C: Pre-monsoon checklist (one per facility)
| No. | Item | Condition (OK / defect) | Defect and date corrected |
|---|---|---|---|
| C1 | Inlets, pretreatment and silt traps clear | ______ | ______ |
| C2 | Orifice, trash screen and outlet clear; orifice size unchanged | ______ | ______ |
| C3 | Sediment below the trigger in the O&M plan | ______ | ______ |
| C4 | Storage volume not reduced; no filling, covering or change of use | ______ | ______ |
| C5 | Overflow and spillway route clear | ______ | ______ |
| C6 | Retention drains within 72 h (observation well or surface) | ______ | ______ |
| C7 | Pumps: full duty test; standby pump and standby power tested; fuel for 72 h on site | ______ | ______ |
| C8 | Alarms and telemetry tested | ______ | ______ |
| C9 | Flap or tide gates and non-return valves: operated and seal tested | ______ | ______ |
| C10 | Safety: covers locked, fences, signs and depth markers in place | ______ | ______ |
| C11 | Access routes clear and not used for parking | ______ | ______ |
Table 10F.27 — Form 10-7, Section D: Declaration of the owner
| Field | Entry |
|---|---|
| I/We declare that the pre-monsoon inspection of Clause 10.12 has been made, that the defects found have been corrected as listed in Section C, and that the facilities are maintained under the approved O&M plan. Owner: name, signature, date | ______ |
Table 10F.28 — Form 10-7, Section E: Empanelled professional (facilities under Clause 10.6.1(c) and (d))
| Field | Entry |
|---|---|
| I have inspected the facilities listed and confirm Section C. Name, empanelment number, signature, date | ______ |
Table 10F.29 — Form 10-7, Section F: For the Authority
| Field | Entry |
|---|---|
| Date received; on time (by 31 March) yes / no | ______ |
| Entered in the facility register (Clause 10.17), date | ______ |
| Follow-up action, if any (Clause 10.15) | ______ |
Form 10-8 — Asset Handover Certificate
Supports Clause 10.14 of Chapter 10.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. Signed by the developer and the ULB when drains, open space facilities, regional facilities or other stormwater assets built by a developer are handed over.
Table 10F.30 — Form 10-8, Section A: Asset and parties
| No. | Field | Entry |
|---|---|---|
| A1 | Developer: name and address | ______ |
| A2 | ULB | ______ |
| A3 | Layout or project, approval reference | ______ |
| A4 | Assets handed over (FAC_ID, type, length or volume), with a plan | ______ |
Table 10F.31 — Form 10-8, Section B: Conditions of handover (Clause 10.14.1)
| No. | Condition | Met (yes / no) | Reference or date |
|---|---|---|---|
| B1 | As-built certificate (Form 10-5) accepted | ______ | ______ |
| B2 | Facility cleaned; pipes and culverts inspected internally (CCTV or manual entry), record handed over | ______ | ______ |
| B3 | Land, or an easement over it, transferred to the ULB | ______ | ______ |
| B4 | O&M plan, drawings, GIS data (Annex 10B) and warranties handed over | ______ | ______ |
Table 10F.32 — Form 10-8, Section C: Defects liability and register
| No. | Field | Entry | Clause |
|---|---|---|---|
| C1 | Defects liability period: from ______ to ______ (includes at least one full monsoon season, from 1 April to 31 October, after handover) | ______ | 10.14.2 |
| C2 | Developer responsible during the period for defects and routine maintenance | ______ | 10.14.2 |
| C3 | Security deposit held by the ULB, ₹, and release date | ______ | 10.14.2 |
| C4 | Entered in the ULB GIS drainage asset register and the facility register: date | ______ | 10.14.3 |
Table 10F.33 — Form 10-8, Section D: Signatures
| Party | Name and designation | Signature | Date |
|---|---|---|---|
| Developer | ______ | ______ | ______ |
| Certifying professional | ______ | ______ | ______ |
| ULB | ______ | ______ | ______ |
Commentary. APWA 5600 (2006, §5608) required a maintenance access strip of 15 ft (about 4.5 m) for detention facilities. The Manual did not adopt a fixed width for private sites, because plot sizes in Nagaland cities vary widely (Clause 10.13, Commentary). The State Stormwater Technical Committee may add standard values to Table 10C.2 when it issues the standard drawings of Annexes 6C and 9B.