Chapter 7Waterbodies, Ponds, Springs and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (pond) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Nagaland, a landlocked State with no Ramsar site, means the Doyang reservoir with its drawdown zone, Shilloi lake and Dzüdu lake (listed with the Doyang reservoir as priority wetlands, as reported), the ponds, among them the natural pond in Dr. Haralu Colony, Dimapur, the seepage ground of springs, any wetland notified under the 2017 Rules (none was found notified), and the 421 wetlands over 215 km² reported for the State (as reported);
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Nagaland Building Bye-Laws 2012, the Nagaland Municipal Act, 2023, the Nagaland Town and Country Planning Act, 1966 and the Town Planning Schemes made under it, the Nagaland Village Council Act, 1978 and the customary law that Article 371A protects, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. Nagaland has no Act for the protection of ponds, lakes, streams or springs, and no floodplain law or Bill was found. Its waterbodies are touched by one building rule, by its municipal and planning law, by the Village Councils and the customary law under which most land and water are held, by the wetland rules and by the courts. The Nagaland Building Bye-Laws 2012 (the NBBL 2012), made under the Nagaland Municipal Act 2001 and continued by section 143(2) of the Nagaland Municipal Act, 2023, apply in Master Plan areas, in the areas of the Municipal and Town Councils and in other notified areas (bye-law 1(ii)); they say that "no building shall be allowed to be constructed, which will obstruct the natural flow of drain" (bye-law 23), but they set no distance from a stream, spring, pond or drain, no flood plinth and no slope limit (Clause 7.4, Disclosure); the NSDMA Joint CEO has said that "the 2012 byelaws have not been implemented" (as reported, 2024), and the CAG has written that "no Rules and Bye-laws have been framed as of date" for the urban local bodies (Audit Report 2022-23, Local Governments), statements that do not reconcile with the 2012 text [TBC]. Within a Municipality "all public tanks, streams, reservoirs and wells" and "all public sewers and drains, channels, tunnels, culverts and water courses in, alongside or under any street" vest in it "notwithstanding anything contained in any other law" (Nagaland Municipal Act, 2023, s.119(1)(b) and (d)), although drainage, storm water and water supply are not among the obligatory functions of section 61. The Nagaland Town and Country Planning Act, 1966 provides for Master Plans with a "Public utilities plan" (s.11) and, since its Fourth Amendment Act, 2025, for Town Planning Schemes prepared by the urban local body, whose contents may include "The filling up or reclamation of low laying, swamp or unhealthy areas" (s.14F(g)); no Master Plan for Kohima or Dimapur has been notified, and the reclamation clause is the main statutory risk to ponds and low-lying storage (definitions after Clause 7.2). Land and its resources are protected by Article 371A(1)(a)(iv) and held mostly by villages, clans and individuals under Naga customary law: a recognised village stands on land that belongs to its people (s.3, Explanation, Nagaland Village Council Act, 1978), its Council has the duty "to supervise proper maintenance of water supply, roads, … sanitation" (s.12(1)), and "no transfer of immovable property shall be affected without the consent of the Village Council" (s.15(1)(g)). Village Councils sit inside towns: "The oldest part of Kohima is the gated village administered by Kohima Village Council", and the Secretariat area "is said to be a part of Kohima village and does not form part of Kohima municipal area" (ADB, Project Administration Manual, 2022), so the area of the Kohima Municipal Council (KMC) is not the whole town. Wetlands are the concern of the State Wetland Authority, whose nodal officer is reported to be the Principal Chief Conservator of Forests (as reported; its exact name and the notice constituting it were not found [TBC]); the State has no Ramsar site, and no wetland notified under rule 4 of the 2017 Rules was found. In this chapter NEEPCO means the North Eastern Electric Power Corporation Ltd, which operates the Doyang reservoir (75 MW, Wokha district) and is the only custodian of impounded water in the State with gates, stated levels and a spillway; it is named here as the operator whose levels and records a design uses, not as an approving authority, and the custodians of the ponds, springs and lakes are recorded one by one in the inventory (Annex 7A). Who regulates where, and who is the competent authority for each area, including on village land inside and outside the towns, is set out in Chapter 1.

This Manual treats every recorded waterbody as drainage infrastructure. Five features set Nagaland apart. The first is the ravine stream: the hill towns stand on ridges and spurs, and every drain falls to a small, steep stream in a ravine; at Kohima the Dzuna is "a small river and a natural drain flowing in a west to east direction before meeting River Dzu", the Dzu is "formed after the confluence of River Dzuna and Dzucha Ru", and the Sano Ru "flows through the capital city Kohima" (NPCB), and their reaches below the KMC dumping site and below the town were listed as polluted. The second is the nullah: "The city of Dimapur relies on three primary nullahs, namely Hospital Nullah, Dhobi Nullah, and Lengrijan Nullah … carrying wastewater from various parts of the city and channeling it to the Dhnasiri [sic] River" (NSDMA), and they are reported to be "heavily encroached waterways" with "weak culverts" (as reported). The third is the river of the plain: the Dhansiri, the Chathe and the Diphu, which back up the nullahs when they are high, and on which no State gauge level and no CWC site were found; the press says only that the Chathe and the Dhansiri "crossed the danger mark" at Dimapur in September 2025 (as reported). The fourth is the spring: the hill towns and villages drink from springs and streams, in Kohima "only about 30% of municipal areas get regular supply" and the Kohima Municipal Council distributes water by tanker (as reported), and the Land Resources Department has inventoried 2,361 springs in 1,025 settlements, with about 4,600 more to inventory (as reported); no statute keeps building or drains away from a spring. The fifth is the reservoir: the Doyang reservoir, whose release in July and August 2018 is reported to have flooded the reach below the dam and the plain downstream (Clause 7.14, Commentary). The ponds are small, mostly private and mostly rural: the first Water Bodies Census (reference year 2017-18) counted 1,432 water bodies in Nagaland, of which 90.64% were ponds, 5.03% tanks, 0.84% lakes and 3.49% water-conservation schemes; 688 natural and 744 man-made; 1,287 rural and 145 urban; 1,348 (94.13%) privately owned; and 1 encroached (as reported). NSDMA has proposed "Utilizing Natural Ponds and Water Retention Areas" in Dimapur, among them "an ancient natural pond in Dr. Haralu Colony". Nagaland has no irrigation tank cascades; the tank clauses of this chapter apply to the ponds, the lakes, the Doyang reservoir and any other impounded water. This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the bye-laws, the municipal and planning law, the Village Councils' powers and the customary law of land, the wetland procedures, or the directions of the Gauhati High Court (Kohima Bench), the National Green Tribunal and the Supreme Court.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river or stream, such as the Dhansiri, the Chathe and the Diphu on the Dimapur–Chümoukedima plain, the Dzuna and the Dzucha, which join to form the Dzu, and the Sano Ru at Kohima, the Doyang, the Dikhow and the Tizu (a stream is kerre in Angami, McCabe 1887, p. 88, and zükhürō in Lotha, Witter 1888, p. 148; a river is pōfü in Lotha, Witter 1888, p. 140); ravine stream (a small, steep hill stream, perennial or seasonal, into which the drains of a hill town fall); nullah (an open urban channel that carries storm water and waste water, such as the Hospital, Dhobi and Lengrijan Nullahs of Dimapur); drain (chārhé in Angami, McCabe 1887, p. 60; zkhüro in Lotha, Witter 1888, p. 105); pond, natural or dug, such as the natural pond in Dr. Haralu Colony, Dimapur (risā or dzüdu in Angami, McCabe 1887, p. 79; no Lotha word was found); reservoir, such as the Doyang reservoir, with its drawdown zone; lake or wetland, such as Shilloi lake and Dzüdu lake (as reported); spring (dzülå in Angami, McCabe 1887, p. 87; tchhükhü in Lotha, Witter 1888, p. 147) with its recharge area; supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (pond) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Water Resources Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (stream or feeder channel) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice, spillway gate or regulator) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Nagaland terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Pond A pond, natural or dug, private, community or public. "Pond" is used in plain English because English is the State's official language and no single Naga word serves the State: Angami gives risā or dzüdu for "Pond" (McCabe 1887, p. 79), no Lotha word for a pond was found, and the Nagamese word was not confirmed from any dictionary (Annex 7E). A pond with a controlled outlet is a tank under Clause 7.2: its outlet gate is its sluice, and its FTL is the level at which it spills over its outlet with any gate closed, found by survey. A pond with an uncontrolled outlet has its FTL at the crest of that outlet. A natural pond keeps its own description, such as the natural pond in Dr. Haralu Colony, Dimapur (NSDMA's "ancient natural pond"). Engineered storage built under this Manual is a "detention pond", never a natural or community pond, a spring pool or a reservoir.
Nullah An open urban channel that carries storm water and waste water, as NSDMA uses the word for Dimapur's Hospital, Dhobi and Lengrijan Nullahs. A nullah that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whether it is lined, piped or covered, and whatever it carries; until sewers exist it is also a combined channel (Clause 8.9, Commentary). Its top of bank is the edge of its channel as built or, where it has been narrowed, the edge shown in any record or survey of its earlier width, whichever is wider (Clause 7.13.1). In quoted titles the spelling of the source is kept ("Dhobi Nallah", "Sugar Mill Nallah", as reported). This definition is set by this Manual.
Ravine stream A small, steep hill stream, perennial or seasonal, in a ravine below a ridge town, into which the town's drains fall (plain English; a stream is kerre in Angami and zükhürō in Lotha, Annex 7E). Every ravine stream that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whether it is dry for most of the year and whether it is lined, piped or covered. It carries boulders, slide debris and garbage in flood: its inlets and culverts take the racks, bulking and blockage of Clause 6.3.6(f) to (h), and its top of bank is the edge of its active bed where that is wider than the edge of the 50% AEP flow. This definition is set by this Manual.
Recorded waterbody A pond, lake, reservoir, stream, ravine stream, nullah, spring or wetland shown in any source of Clause 7.3.3(a): a record of the Department of Land Records and Survey, a Village Council, clan or owner; a Municipal or Town Council's record of what vests in it under section 119 of the Nagaland Municipal Act, 2023; a master-plan map; NSDMA's Dimapur assessment; the Water Bodies Census; the Land Resources Department's spring inventory; NEEPCO's records; or a town's drain register. A recorded waterbody is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual.
Low-lying land and reclamation Land below the 1% AEP flood level of a river, stream or nullah, and the margins of a pond, are flood storage. A Town Planning Scheme under the Nagaland Town and Country Planning Act, 1966 may include "The filling up or reclamation of low laying, swamp or unhealthy areas" (s.14F(g), inserted by the Fourth Amendment Act, 2025). For this Manual such reclamation is fill: where it lies below the 1% AEP flood level, or on the margin of a pond, the storage it removes is replaced under Clause 7.6.4 (1:1 in bands of not more than 0.3 m), in the same reach and before or with the fill, and is secured under Clause 7.6.4(f); the replacement is not counted as detention (Clause 7.6.5). This Manual does not override a scheme; it states the storage the scheme must keep. This reading is set by this Manual.
Boundary of a pond or reservoir For this Manual, the boundary of a pond or lake under Clauses 7.3.3 and 7.13.1 is the largest of its recorded boundary, its surveyed FTL and the outer edge of its water in the season of 1 April to 31 October shown by dated imagery or survey of recent years. The boundary of the Doyang reservoir is the higher of 333.0 m, the level at which NEEPCO's data give a storage of 400 MCM (CERC data format, as quoted; that it is the full reservoir level is a NEER reading, and its datum is not stated [TBC]), and the highest level NEEPCO states in writing, stated to the datum of Clause 7.3.5. The drawdown land of the reservoir below that level is part of the reservoir. This reading is set by this Manual.
Reference lines for setbacks No statutory reference line exists in Nagaland (Clause 7.4, Disclosure). Two lines are used, and the setback that reaches furthest from the water governs: (a) the FTL of a pond, lake or reservoir, the outlet or the edge of the chamber or pool of a spring, or the top of bank of a channel, with Zone 1 of Clause 7.4.3 measured from it; and (b) the 1% AEP flood extent of Clause 7.3.4, with the 10 m of Clause 7.4.4 added. NSDMA's proposed buffer of 0.75 to 3.0 m along Dimapur's drainage lines is stated on Form 7-1 where it is relevant, but it is narrower than Zone 1 and never governs alone. This rule is set by this Manual.
Spring; spring recharge area A spring is a place where groundwater comes out at the surface (dzülå in Angami, McCabe 1887, p. 87; tchhükhü in Lotha, Witter 1888, p. 147; Annex 7E). A spring is a waterbody for Clause 7.3, and its Zone 1 under Clause 7.4 is measured from its outlet or the edge of its chamber or pool. Its recharge area is the area upslope from which it is fed, as a hydrogeologist maps it; above a drinking-water intake that area is a no-paving zone, except for access, into which no road runoff is infiltrated, no soak pit or septic tank is placed, no drain is cut that would intercept the flow to the spring, and no fill is placed that would bury its outlet (Clause 8.8.1). No storm drain or sewer is laid within Zone 1 of a spring, and no drain or fill is laid across its outlet, except a lined drain below the outlet that carries its overflow away. A spring pool is never a detention pond. This definition and these rules are set by this Manual.
Village land; landholder Land held by a village, a clan or an individual under Naga customary law, inside or outside a town. Its landholder is the village, clan or owner, and no transfer of it is made without the consent of the Village Council (section 15(1)(g) of the Nagaland Village Council Act, 1978). Zone 1 land that is not State or municipal land is secured for this Manual by a written agreement with the Village Council or the landowners, by donation, or by reservation in a Master Plan or Town Planning Scheme, and is not taken. Where the State decides that land must be obtained compulsorily, that is under the Nagaland Land (Requisition and Acquisition) Act, 1965, whose section 3(1) covers "flood control and anti-erosion measures including embankment and drainage", at a Municipality's request (section 121 of the Nagaland Municipal Act, 2023); this Manual states that route and does not invoke it. On village land this chapter is guidance for the Village Council unless the Council takes it into a Village Development Scheme or a resolution of its own. This rule is set by this Manual.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the Water Resources Department and the Department of Land Records and Survey, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (the Municipal Council or Town Council (for the public tanks, streams, reservoirs and wells, and the public drains, channels, culverts and water courses in, alongside or under any street, within its limits, which vest in it under section 119(1) of the Nagaland Municipal Act, 2023), PWD (R&B), PWD (NH) or NHIDCL (for the drains and culverts of their roads), the Urban Development Department (UDD) or KSCDL (for the drains they build, until these are handed over to the urban local body), the Water Resources Department (for rivers and embankments), NEEPCO (for the Doyang reservoir and the reach below its dam, as operator), PHED (for water-supply sources and intakes, sewers and septage), the Soil and Water Conservation Department (for catchment treatment works, such as those on the Dzuma), the Land Resources Department (for the springs it has inventoried or rejuvenated, as reported), the Village Council (for the lanes, drains, springs and ponds of a village, inside or outside a town, under section 12(1) of the Nagaland Village Council Act, 1978), a clan or a private owner (for land and water held under customary law; 94.13% of the water bodies counted in the first Water Bodies Census are privately owned, as reported), a colony developer (for the drains of a layout until they are handed over), the State Wetland Authority (for a notified wetland; none was found), or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) records of the Department of Land Records and Survey, which are thin in Nagaland, because most land is held by villages, clans and individuals under Naga customary law and is allotted, held and transferred within the village rather than recorded by the State (no transfer of immovable property is made without the consent of the Village Council, section 15(1)(g) of the Nagaland Village Council Act, 1978), so that the records of the Village Councils, clans and owners are also needed (none was read for this Manual [TBC]); the public tanks, streams, reservoirs, wells and drains that vest in each Municipal Council or Town Council under section 119(1) of the Nagaland Municipal Act, 2023; the maps of the draft master plans for Kohima and for the Greater Dimapur Planning Area, once notified (none has been); NSDMA's list of the flood-vulnerable areas of Dimapur and its description of the city's three nullahs; the first Water Bodies Census (reference year 2017-18; 1,432 water bodies, as reported); the Land Resources Department's inventory of 2,361 springs in 1,025 settlements (as reported) and its Springshed Atlas of Nagaland, once published; the 421 wetlands reported for the State and the National Wetland Inventory and Assessment geodatabase (as reported; neither was obtained [TBC]); NEEPCO's records of the levels and land of the Doyang reservoir; and each town's drain register (Chapter 6);
  • (b) NEEPCO and Village Council tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where NEEPCO records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. Nagaland has no floodplain law and no flood line. No flood plain zoning Act or Bill was found, and no flood zone, flood line or riverbank setback has been drawn for any town. The bye-laws treat as "Natural Hazard Prone Areas" the areas of "significant flood flow or inundation, or landslides/mud flows", including those in the CWC Flood Atlas, "besides, other areas can be flooded under conditions of heavy intensity rains, inundation in depressions, back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area" (NBBL 2012, bye-law 42(iii)), but no development plan with such a survey has been notified: the Draft Kohima Master Plan 2030 and the GIS-based master plan for the Greater Dimapur Planning Area, with a horizon of 2041, are drafts (as reported), and no drainage chapter was seen in either. The best map of flooding in Dimapur is NSDMA's list of vulnerable areas, "May–Sep", and its table of localities flooded from 11 to 24 September 2008 (Dobhinalla, Super Market, Nagarjan, Burma Camp, Walford, Sachu Colony, Nagagaon, Khermahal, Netaji Colony, Naharbari and the Airport area); NSDMA also records the floods of 2019 (13 areas) and a photograph of the submergence of 12 June 2023. The rivers are hardly gauged: there is no CWC site in Nagaland ("Like last year, there is still no site from Nagaland", SANDRP, 2019, as reported), the nearest CWC levels are tens of kilometres downstream outside the State, and no State gauge level for the Dhansiri at Dimapur, the Chathe or the Diphu was found; the press says only that the rivers "crossed the danger mark" (September 2025, as reported). NEEPCO's levels for the Doyang reservoir are given in metres "RWL" without a stated datum (Clause 7.2, definitions). No local authority has fixed a highest flood level for any town [TBC], and the bye-laws have no flood plinth. The best evidence of flood extent is therefore on the ground: the flood marks of 2008, 2019, June 2023 and September 2025 in Dimapur and Chümoukedima, the marks along the Kohima streams, and the evidence of residents. Clause 7.3.4 lets the Authority adopt flood maps once they exist; until then the Applicant produces the 1% AEP extent for larger and flood-sensitive sites, with the river backing up the nullah under Clause 5.8.5(a), the bulking of Clause 6.3.6(g) on ravine streams and the surveyed flood marks of Clause 5.8.5(a) and (b), and the floor levels of this Manual (the 1% AEP level + 0.5 m) govern. Levels shall be stated to one datum (Clause 7.3.5). Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual along every natural channel draining 8 ha or more, including the Dimapur nullahs and the Kohima streams, and round every pond, reservoir and spring (no statute, rule or bye-law found in Nagaland sets any distance from a stream, spring, pond or drain: bye-law 23 of the NBBL 2012 forbids a building "which will obstruct the natural flow of drain" but sets no width, and NSDMA's "mandatory buffer zone (0.75 – 3.0 meters) along drainage lines" in Dimapur is a proposal of an assessment report, not a rule; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or a line of a Master Plan or Town Planning Scheme under the Nagaland Town and Country Planning Act, 1966 (none has been notified for Kohima or Dimapur); a condition imposed under bye-law 21 or 23 of the NBBL 2012 (bye-law 23 forbids a building "which will obstruct the natural flow of drain" but sets no width, and NSDMA's proposed 0.75–3.0 m drain buffer in Dimapur is not a rule); the consent of the Water Resources Department for a work in or on a river or embankment; NEEPCO's conditions for a work that drains to, or lies next to, the Doyang reservoir or the reach below its dam; the written permission of the owner of land across which a drain is carried (bye-law 20(ii)); a condition of the Village Council on village land, inside or outside a town, where its consent to a transfer of land is needed (section 15(1)(g) of the Nagaland Village Council Act, 1978); the views of the State Wetland Authority for a work in or next to a notified wetland (none was found); or a direction of the Gauhati High Court (Kohima Bench), the National Green Tribunal or the Supreme Court (none setting a distance from a stream, pond or spring in Nagaland was found; Clause 7.4, Disclosure) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor, because there is nothing else to measure against: no statute, rule or bye-law found in Nagaland sets any distance from a stream, spring, pond or drain. Bye-law 23 of the Nagaland Building Bye-Laws 2012 says that "no building shall be allowed to be constructed, which will obstruct the natural flow of drain" and gives the Authority "the power to cause the free flow of public drains", but it sets no width, and it applies only where the bye-laws apply (Master Plan areas, the areas of the Municipal and Town Councils and other notified areas, bye-law 1(ii)). The only distance in any document read for this Manual is NSDMA's proposal, in its assessment of Dimapur's urban floods, of "a mandatory buffer zone (0.75 – 3.0 meters) along drainage lines"; it is a recommendation, not a rule, and the 15 m floor is five to twenty times it. The floor applies to new development and redevelopment approved under this Manual, not to existing buildings. It is offered as a condition of building permission in the areas of the Municipal and Town Councils and of any Master Plan, and as a recommendation elsewhere, including on village land inside the towns; where Zone 1 land is village, clan or private land, it is secured by agreement with the Village Council or the landowners, by donation, or by reservation in a Master Plan or Town Planning Scheme, and is not taken. It is this Manual's proposal, not a statutory width, and it never reduces a wider line of a plan, permission or order (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Nagaland flood maps are mostly coarser than US maps, the only level land in a Nagaland hill town is usually a narrow valley floor or terrace beside a stream, and Dimapur and Chümoukedima stand on the flat piedmont plain of the Dhansiri, the Chathe and the Diphu, whose levels back up the town's nullahs (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Nagaland has no distance from water in any law found for this Manual. The Nagaland Building Bye-Laws 2012 govern building in Master Plan areas, in the areas of the Municipal and Town Councils and in other notified areas (bye-law 1(ii)); their "Authority" is the Municipal and Town Councils, including "a Local Authority or officer authorized" (bye-law 2(i)). Five of their provisions touch water. Bye-law 23 says: "Notwithstanding any of the provisions contained in these Bye-Laws, no building shall be allowed to be constructed, which will obstruct the natural flow of drain. The Authority shall have the power to cause the free flow of public drains." It sets no width. Bye-law 17 sets building setbacks from plot boundaries (front 2.0 to 3.0 m and rear 1.8 to 5.0 m by plot area) and from roads (1.0 to 9.0 m by road width), unless a Town Planning Scheme says otherwise, and on a downhill site asks the applicant to protect the road "by constructing toe wall or protection wall"; none of these is measured from water. Bye-law 20(ii) lets a waste-water drain run "to the nearest nulla or gorge or fallow land", with the written permission of the owner of any land it crosses. Bye-law 42(iii) and Appendix A3 describe natural hazard prone areas and a menu of flood protection ("Construction/improvement of drainage paths", "Clearing of clogged cross drainage works"), without a distance. Bye-law 21 lets the Authority restrict earth cutting on sloping sites and direct retaining walls. The bye-laws' force is itself uncertain: they were made under the Nagaland Municipal Act 2001, which was repealed in 2023, and continue through the savings clause of the Nagaland Municipal Act, 2023 (s.143(2)); the NSDMA Joint CEO has said that "the 2012 byelaws have not been implemented" (as reported, Morung Express, 23 October 2024); and new bye-laws, the draft Nagaland Building Bye-Laws 2026, are reported to be "in the final stages" (as reported), with no text seen, so whether they add any distance from water is not known [TBC]. The Nagaland Municipal Act, 2023 vests public tanks, streams, reservoirs, wells, drains and water courses in the Municipality (s.119(1)) but sets no distance. The Nagaland Town and Country Planning Act, 1966 lets a Master Plan include a "Public utilities plan" (s.11), and after a plan is published no one may develop land "except with the permission of the Authority" (s.13); no plan has been notified for Kohima or Dimapur. The Nagaland Village Council Act, 1978 gives a Village Council no building-permit power, but its duty to maintain "water supply, … sanitation" (s.12(1)) and its consent to any transfer of land (s.15(1)(g)) are the hooks for drains and springs on village land. The one distance in any document read for this Manual is NSDMA's recommendation, in its assessment of Dimapur's urban floods, of "a mandatory buffer zone (0.75 – 3.0 meters) along drainage lines", with "encroachment removal", "Utilizing Natural Ponds and Water Retention Areas" and "increasing permeable surfaces" among its other measures; it is a recommendation of an assessment report, not a rule. No order of the Gauhati High Court (Kohima Bench), the National Green Tribunal or the Supreme Court setting a distance from a stream, pond, spring or nullah in Nagaland was found. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.

Disclosure. Nagaland has no distance from water in any statute, rule or bye-law found for this Manual: the NBBL 2012 forbid a building that "will obstruct the natural flow of drain" (bye-law 23) but set no width; the Nagaland Municipal Act, 2023 vests public tanks, streams and drains in the Municipality (s.119(1)) but sets no distance; no Master Plan or Town Planning Scheme has been notified for Kohima or Dimapur; no floodplain zoning law or Bill was found, so no flood zone exists in law; and the only distance in any document read is NSDMA's proposal of "a mandatory buffer zone (0.75 – 3.0 meters) along drainage lines" in Dimapur, a recommendation, not a rule. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor: along every natural channel draining 8 ha or more, including the Dimapur nullahs and the Kohima streams, and round every pond, reservoir and spring. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's reference lines and its reading of the boundary of a pond or reservoir, and the rules on nullahs, ravine streams, springs, village land and reclamation (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body, urban local body, Village Council or other body has adopted or endorsed them. The 15 m Zone 1 is five to twenty times NSDMA's proposed 0.75 to 3.0 m. It applies to new development and redevelopment approved under this Manual, not to existing buildings; Clause 7.4.7 allows no variance below it; it is offered as a condition of building permission in the areas of the Municipal and Town Councils and of any Master Plan, and as a recommendation elsewhere, including on village land inside the towns, where the Village Council's consent governs any transfer of land (s.15(1)(g) of the Nagaland Village Council Act, 1978); and where Zone 1 land is village, clan or private land, it is secured by agreement with the Village Council or the landowners, by donation, or by reservation in a Master Plan or Town Planning Scheme, never taken. Where the State decides that land for a public drain must be obtained compulsorily, the route is the Nagaland Land (Requisition and Acquisition) Act, 1965, whose section 3(1) covers "flood control and anti-erosion measures including embankment and drainage", at a Municipality's request under section 121 of the Nagaland Municipal Act, 2023, with compensation as the Kohima Bench of the Gauhati High Court held on 3 November 2026, "as per rates and quantification as provided under the Act of 2013" (as reported); this Manual states that route and does not invoke it. The setback is applied as whichever line reaches furthest (definitions after Clause 7.2), so the Manual is stricter than every line that exists and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • The NBBL 2012 (made under sections 479 and 481 of the Nagaland Municipal Act 2001 and continued by section 143(2) of the Nagaland Municipal Act, 2023), in force where the bye-laws apply: bye-law 23, no building that obstructs the natural flow of a drain, and the Authority's power "to cause the free flow of public drains"; bye-law 17's setbacks from plot boundaries and roads and its toe wall on downhill sites; bye-law 20(ii)'s written permission of the owner of land crossed by a drain; bye-law 21's directions on earth cutting; and bye-law 42(iii)'s natural hazard prone areas "as identified through local surveys in the development plan of the area", which no plan has yet identified. Whether the bye-laws are in force everywhere they claim is uncertain: the NSDMA Joint CEO said "the 2012 byelaws have not been implemented" (as reported) and the CAG that "no Rules and Bye-laws have been framed as of date" (Audit Report 2022-23); the two statements do not reconcile with the 2012 text [TBC]. The draft Nagaland Building Bye-Laws 2026 is reported but not notified [TBC].
  • NSDMA's proposal. "A mandatory buffer zone (0.75 – 3.0 meters) along drainage lines" in Dimapur, with encroachment removal and the use of natural ponds and retention areas: a recommendation of an assessment report, not a rule, cited in this Manual as expert guidance, never as binding. Where it is stated on Form 7-1 it is narrower than Zone 1 and never governs alone.
  • Plans. A line of a Master Plan or a Town Planning Scheme under the Nagaland Town and Country Planning Act, 1966, once notified (none yet): a Master Plan's "Public utilities plan" (s.11) and a scheme's drainage could carry the corridors of this chapter; a scheme's "filling up or reclamation of low laying, swamp or unhealthy areas" (s.14F(g)) is fill under Clause 7.6.4 (definitions after Clause 7.2).
  • Villages and customary law. On village land the Village Council's consent to any transfer (s.15(1)(g)) and its duties for water supply and sanitation (s.12(1)) govern; this chapter is guidance there unless the Council takes it into a Village Development Scheme or a resolution of its own (none has).
  • Wetlands, custodians and courts. Any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found) and the waters the State Wetland Authority lists (Clause 7.12); the Water Resources Department's lines at its rivers and embankments; NEEPCO's at the Doyang reservoir; and the orders of the Gauhati High Court (Kohima Bench), the National Green Tribunal and the Supreme Court as they stand (none setting a distance from water was found).

This Manual sets 15 m as the floor because nothing else sets any width; because NSDMA's proposal of 0.75 to 3.0 m would leave a nullah no room for its flood, for cleaning machines or for the garbage it carries; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because a ravine stream needs room for the boulders and slide debris it brings down. The reasons for the corridor are the record: NSDMA lists "Encroachment", "Garbage disposal through drains" and "A lack of maintenance" among the causes of Dimapur's floods and finds that blockages of the Hospital Nullah flood Burma Camp, Bank Colony and Nagarjan; the nullahs are reported to be "heavily encroached waterways", with slums along the Lengrijan Nullah, and about 200 families are affected each year by structures on an old channel of the Dhansiri (as reported); and springs are reported to be "drying up due to dev" (headline, as reported). Until a statute, rule, Master Plan, Town Planning Scheme, Village Council resolution or court adopts it, the 15 m minimum is this Manual's recommended standard, and the bye-laws, the plans, the Village Councils' consent and the orders above remain the only legal controls. Approving authorities should state in each approval which was applied.

Waterbody setback zones: cross-section Waterbody setback: Zone 1 and Zone 2, with the lines that exist in Nagaland (section, not to scale) Zone 1 Waterbody protection Zone 2 Flood fringe setback Developable land Waterbody: pond bed, stream, nullah (no development) FTL (crest of spillway or outlet) / top of bank 1% AEP (100-yr) flood level, with climate factor (or MWL for tanks) Bed (surveyed, original) park, path floor ≥ 1% level + 0.5 m ≥ 15 m (set by this Manual) greater of 15 m and floodway to mapped 1% AEP extent + 10 m margin 1% extent 15 m This Manual: Zone 1 and Zone 2 What exists in Nagaland: measured from the top of bank of a drain or stream top of bank No statutory setback from any stream, spring, pond or drain (no statute, rule or bye-law found; no floodplain zoning law, so no flood zone exists in law) NBBL 2012, bye-law 23: no building that obstructs the natural flow of a drain (no width); in force where the bye-laws apply (ULB, Master Plan and other notified areas) NSDMA proposal: 0.75–3.0 m along drainage lines in Dimapur (not a rule) This Manual's Zone 1 ≥ 15 m: 5 to 20 times NSDMA's proposal, on every channel draining 8 ha or more (nullahs and ravine streams included) and round every pond and spring Floors: the bye-laws have no flood plinth and no local authority has fixed a highest flood level; this Manual: lowest habitable floor ≥ 1% AEP level + 0.5 m. Village, clan or private land: secured by agreement with the Village Council or the landowners, by donation or in a notified plan; not taken. Zone 1: no buildings, fill, paving or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. New development and redevelopment only; a permit condition in ULB and plan areas, a recommendation elsewhere; 15 m is a proposal. Whichever is wider governs: Zone 1 from FTL or top of bank, or the 1% AEP extent + 10 m; and any wider line of a notified plan, a permission, the Water Resources Department, NEEPCO, a Village Council or a court.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Nagaland Building Bye-Laws 2012, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to hill-town and nullah-side practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Dimapur–Chümoukedima plain along the Dhansiri, the Chathe and the Diphu, the margins of its ponds, and the valley floors and terraces beside the hill streams are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In Nagaland no law fixes a line from which a setback is measured, so the line comes from this Manual. The difference matters most at the Doyang reservoir, whose level moves through the year between about 324.0 m, below which its gates are reported to stay shut, and 333.0 m (as quoted and reported; datum not stated [TBC]): a line drawn from the edge of the water in the dry months would leave the reservoir's drawdown land open to building. It matters at the ponds of the plain, whose edges spread in the season and whose margins are the low land that a Town Planning Scheme may "fill up or reclaim" (s.14F(g) of the Nagaland Town and Country Planning Act, 1966). This Manual gives every pond, lake and reservoir a boundary measured from a high level, not from the water's edge on the day of survey: the edge of a pond in the season and the operator's highest level of the reservoir are part of its boundary (definitions after Clause 7.2), the foreshore up to MWL is its flood storage, and the reclamation of low or swampy land below the 1% AEP flood level is fill whose storage is replaced under Clause 7.6.4. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Dimapur along its three nullahs, the Dhansiri and the old Dhansiri channel, where NSDMA lists Dhobinala, Burma Camp, New Market, Bank Colony, Walford, Super Market, Nagarjan, Khermahal, Netaji Colony, Rail Colony, Niu Colony, Riverbelt Colony, Zeliangrong Colony, Sachu Colony, Police Colony, Holy Cross Area and Lengrijan as vulnerable from May to September, and where about 200 families are affected each year by structures on the old channel (as reported), and of Chümoukedima and Dimapur along the Chathe, where the Vilhume, SM, East Police, Namgalong, Ragailong and Kuda colonies flooded in September 2025 (as reported) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Nagaland has no tank Act and no irrigation tank cascades, and its standing waters range from village ponds a few metres across to the Doyang reservoir. The storages that matter for urban drainage are of four kinds. The first is the Doyang reservoir of NEEPCO's Doyang Hydro Electric Project (75 MW, Wokha district), the State's largest waterbody. NEEPCO's data give "220 MCM at 324.0 M RWL, 400 MCM at 333.0 M RWL" (CERC data format, as quoted); that 333.0 m is the full reservoir level and 324.0 m the minimum drawdown level is a NEER reading, as the source does not label them. SANDRP gives a gross storage of 535 MCM, a live storage of 370 or 400 MCM and 216.5 MCM at 324.0 m, with the gates closed below 324 m (as reported): the figures conflict, and both are stated. The spillway, with four radial gates, is given as 5,977 cumec, the catchment as 2,606 km² and the dam, of earth and rockfill, as about 92 m high (as reported; sources differ). Its releases enter a design as inflow and tailwater (Clauses 5.8.3 and 5.8.5(c)), and it is not a tank for these clauses unless its storage is counted, with NEEPCO's written levels and concurrence. The second is the lakes: Shilloi lake and Dzüdu lake are listed with the Doyang reservoir as priority wetlands (as reported); no levels, areas or outlet records were found for either [TBC], so they are modelled as existing features and not counted unless Clause 7.7.1 is met. The third is the ponds: 90.64% of the 1,432 water bodies of the first Water Bodies Census, mostly rural and private (as reported), and in the towns a few such as the natural pond in Dr. Haralu Colony, Dimapur, which NSDMA proposes to use for retention. They are modelled as existing features where they intercept runoff but are not counted as storage unless Clause 7.7.1 is met, because they are not surveyed, have no controlled outlet and, on the plain, stand full to their outlets when the nullah they drain to is backed up by the river (Clause 5.8.5(f)). The fourth is the springs, which are protected for their water and never counted as storage. The retention ponds of Kohima's interception and diversion works treat sewage (Clause 8.9, Commentary) and are not storage for this chapter. These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: in a ridge town every drain ends in a ravine stream, and on the plain every drain ends in a nullah that the river backs up. Any pond, lake or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with NEEPCO or the other custodian, and the custodian of each pond and lake shall be confirmed for the inventory (Annex 7A) [TBC].

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. NEEPCO, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a ridge town, every ravine stream that falls from the ridge and its slopes to the stream below, the springs above the town's intakes, and the stream itself down to the river or reservoir whose level sets its tailwater (Clause 5.8.5(b) and (c)), and, on the Dimapur–Chümoukedima plain, every nullah with the ponds it passes, down to the Dhansiri, the Chathe or the Diphu, whose level backs it up (Clause 5.8.5(a) and (f)), as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than NEEPCO's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. Nagaland's ponds and its reservoir may be full at any time in the season. In the monsoon of 2018 the gates of the Doyang reservoir were opened at 05:30 on 27 July and closed at 05:00 on 5 August, with inflow rising from "over 600" to "over 1150 cum/sec" on 31 July (NEEPCO, via SANDRP, as reported), and in July 2025 an "alert sounded over rise in Doyang's water level" (headline, as reported). The Manual's season begins on 1 April because Kohima's monthly rainfall rises steeply from April (106.27 mm in April and 179.40 mm in May, against 268.70 mm in June and 349.82 mm in July; NSCCC, 1981–2022) and Dimapur's flood season begins in May (NSDMA lists its vulnerable areas for "May–Sep"); the largest Kohima days fall in June to October (IMD), and storms follow the season, such as 140.0 mm at Kohima on 19 October 2001 (IMD). No record of how long any pond stays at or above its outlet level in a wet spell was found [TBC]. On the plain a pond connected to a nullah also fills from the nullah when the Dhansiri, the Chathe or the Diphu backs it up. While a pond or reservoir is full, it stores nothing more below FTL, the drains and streams that flow into it discharge against its level, and its release adds to the flow in the channel below it. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

A ridge town and a foothill town: a ridge-top town with lined, stepped drains, silt traps and a debris rack at a hill-road culvert falling to ravine streams; a spring above the town's intake with its protected recharge area; no soakaways on slopes steeper than 10 degrees or on shale; a cut slope with catch and toe drains; the stream leaving the ranges at a foothill fan; on the plain a town with a nullah to a river that backs up the outfall, a pond kept as storage with dry-weather interception before it, infiltration only on tested sands and gravels; and a reservoir with its dam and release reach (schematic) A ridge town and a foothill town (schematic, not to scale; no particular town, river, dam or landmark is shown) A. Plan: ridge drains fall to ravine streams; on the plain a nullah runs to a river that backs it up THE RANGES (hill rule) THE PLAIN (floodplain and recharge rules) ridge: the catchment divide ridge-top town silt trap lined, stepped drain hill road: culvert with a debris rack; road water never onto an open slope spring recharge area (mapped): no paving, no road runoff into the ground, no soak pits; no drain across it spring and intake; Zone 1 (15 m) round it; no drain or fill across its outlet pipe to the village supply no soakaways on slopes > 10° or on shale ravine stream Zone 1 ≥ 15 m from top of bank foothill fan: silt trap where the stream leaves the ranges river foothill town on the plain (right): nullah storm water and sullage, a combined channel until sewers exist DWF interceptor, screen outfall backed up when the river is high pond pond kept as storage: DWF interceptor and screen before it infiltration only on tested sands and gravels, water table ≥ 2.0 m down reservoir dam release reach: villages need a release scenario B. Section from the ridge to the plain: roof and road water to tanks and lined drains, none into slopes or shale roof water to a storage tank (Clause 4.11: 25 L per m² of roof) overflow and road runoff: lined, stepped drain (slope over 1 in 5) cut slope: catch drain above, toe drain below, road bench no soakaway on a slope > 10° or on shale: water in the slope raises pore pressure Disang shales and Barail sandstones, red clayey soil over them ravine stream Zone 1 ≥ 15 m foothill fan water table (high) pond nullah river backwater piedmont alluvium: sands, gravels, pebble–boulder beds river, stream, pond, reservoir lined drain, stream or nullah Zone 1 spring recharge area silt trap debris rack DWF interceptor and screen outfall (gate or flap, if any) no soakaway or pit shale sands and gravels The 15 m Zone 1 and the spring, interception and infiltration rules are this Manual's proposals; the NBBL 2012, the municipal and planning law, the Village Councils' consent on village land and the courts' orders govern where they say more. Original drawing for this Manual.

Figure 7.3 — A ridge town and a foothill town: springs, ravine streams, a nullah, a pond, a river and a reservoir (schematic, not to scale; no particular town, river, dam or landmark is shown). A: in plan, the hill town stands on a ridge, the catchment divide, and on the spurs below it; its drains are lined and stepped where they fall steeply (NBBL 2012, bye-law 20(iii), above a slope of 1 in 5), pass silt traps, and reach the ravine streams through a debris rack at each hill-road culvert, because a hill drain carries more silt, gravel, slide debris and garbage than any other load (Clauses 6.3.6 and 8.12). Upslope of the town's intake a spring comes out; its recharge area, as a hydrogeologist maps it, is kept free of paving, road runoff and soak pits, and no drain crosses it or buries its outlet (Clause 8.8.1). The stream leaves the ranges at a foothill fan, where silt traps catch what it brings down, and crosses the plain. On the plain the town's nullah runs to the river, whose level backs up the outfall when the river is high (Clause 5.8.5(a)); a pond kept as storage receives the nullah only after a dry-weather-flow interceptor and screen, because the drains carry sullage (Clause 8.9); and infiltration is allowed only on tested sands and gravels with the water table at least 2.0 m below ground (Clause 4.11, recharge rule). Upstream, a reservoir held by a dam releases water into a reach whose villages need a release scenario (Clause 5.8.5(c)). Zone 1 along every stream and nullah draining 8 ha or more is at least 15 m from the top of its bank, five to twenty times the 0.75 to 3.0 m drain buffer that NSDMA has proposed for Dimapur. B: in section, from the ridge town to the plain, roof water goes to a storage tank (Clause 4.11) and its overflow and the road runoff go by a lined drain through a trap to the ravine stream, because no soakaway is placed on a slope steeper than 10° or on shale; a cut slope has a catch drain above it and a toe drain below it; and the plain's pond and nullah sit on alluvium where the water table is high. The 15 m minimum and the spring, interception and infiltration rules are this Manual's proposals; the NBBL 2012, the municipal and planning law, the Village Councils' consent on village land and the courts' orders govern where they say more. Original drawing for this Manual.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, NSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under NEEPCO control, the operating rule shall be NEEPCO's rule. This Manual does not authorise any other body to operate a NEEPCO tank.

Commentary. No pond or lake in Nagaland was found with a written operating rule, and most ponds have no gates to operate. The Doyang reservoir has four radial spillway gates, but NEEPCO's release protocol and warning thresholds were not found [TBC]. Its release of July and August 2018 shows why a rule matters: SANDRP argued that the rainfall in the week before 2 August was not unprecedented and that the release drove the flood at Golaghat downstream, while NEEPCO said that not releasing would have threatened the dam (both as reported); this Manual takes no side, and asks only that the operator's levels, releases and warnings be in writing. Without an agreed rule with dates, levels, release rates and a named operator, storage in a pond or reservoir cannot be relied on, and a release made without warning to the towns and villages downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the April and May storms gives no protection when a July to September monsoon storm on the Naga hills, such as those of late July 2018 and 14 September 2025, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

For a natural pond, Clause 7.8.3 is the governing condition: with no controllable outlet, no cushion is assumed, a design that relies on the pond routes the storm through it from its outlet level, and the outflow over the outlet is limited by the nullah, drain or stream below it, which shall be shown to carry it with the debris of Clause 6.3.6. For the Doyang reservoir, a design takes the operator's level and release for the storm being checked (Clause 5.8.3), not a drawdown the operator has not agreed to in writing. Most ponds are private, clan or community property under customary law, which is why Clause 7.8.2(d) requires the custodian to accept any drawdown, and why no detention pond built under this Manual is described as a natural or community pond.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Nagaland Pollution Control Board (NPCB) directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 March each year (Chapter 10).

Commentary. No State or municipal order fixing a date for the pre-monsoon cleaning of drains, nullahs or ponds was found. In Dimapur the drain-cleaning drive "started in January and would continue based on urgency", the urban councils' federation said it was "impossible to clean every drain", so the major drains got priority, a mass social work was held on 31 May, and in May 2025 the Deputy Commissioner called a flood "man-made" while "drains desilting still on" (all as reported); in Kohima the district disaster management authority stressed clearing drains in every colony before the monsoon, without a deadline (as reported). NSDMA recommends "immediate de-silting" and annual de-silting of Dimapur's nullahs, and lists "Garbage disposal through drains" and "Development of vegetation" among the causes of its floods, so that the material to be removed is garbage and plant growth as much as silt; in the hill towns it is also slide debris. The date of 31 March in this Manual is set by this Manual, before its season begins on 1 April, because the plain's floods begin in May and the slope work must be finished before the season, not because April's falls are large (Kohima's April and May 24-hour records are 74.8 mm and 76.0 mm, IMD); a mid-season clearance of inlets, culverts, racks, silt traps and the nullah mouths is due by 15 May, before the plain's May floods, and a post-season clearance by 15 November (Chapter 10). Excavation to "increase capacity" is governed by Clause 7.9.3. In a pond fed by springs in its bed, deepening can cut the springs off or break the silt and clay that hold the water; on the plain, where dug wells stand about 1 m below ground in places (CGWB), deepening can open the bed to the shallow aquifer from which wells draw, through the drains that feed the pond. This Manual allows no spring-fed pond to be deepened below its original bed or its bed to be lined or cemented, and no pond on the plain that receives a drain or nullah to be deepened below its original bed until the dry-weather flow of every inflow is intercepted (Clause 8.9). The 31 March deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Nagaland precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Nagaland the public drains, channels, culverts and water courses in, alongside or under any street, and the public tanks, streams, reservoirs and wells, vest in the Municipality "notwithstanding anything contained in any other law" (Nagaland Municipal Act, 2023, s.119(1)(b) and (d)), although drainage, storm water and water supply are not among its obligatory functions (s.61); roadside drains are built by PWD with its roads and, on the national highways, by PWD (NH) and NHIDCL, whose maintenance contract on NH-29 includes "road repairs, drain clearances and, slide removal works" (Gauhati High Court, Kohima Bench, order of 9 September 2026 in PIL(Suo Moto)/2/2019); storm drains under AMRUT and the ADB NUIDP are tendered by UDD; rivers and embankments are the Water Resources Department's; and the lanes, drains and springs of a village, inside or outside a town, are the Village Council's concern (s.12(1) of the Nagaland Village Council Act, 1978). No notification dividing the drains among their owners was found; a DMC administrator called Dimapur's drains "orphans" (2019, as reported), and the Dimapur Municipal Council (DMC) cleans them with a dedicated crew (as reported). Chapter 6 gives this Manual's working split and each town's drain register. The record of Dimapur shows a network that has become the nullahs themselves: the Hospital Nullah runs from the Army Supply Road to the Dhansiri near the CP Office and Police Colony, and its blockages flood Burma Camp, Bank Colony and Nagarjan; the Dhobi Nullah runs from Sachu Colony and Signal Bosti to join the Lengrijan Nullah near the NST Garage; and the Lengrijan Nullah runs from Lower Lengrijan to the Dhansiri near Burma Camp, along the State border, with slums along it (NSDMA). NSDMA names "Garbage disposal through drains", "Development of vegetation", "Encroachment", "A lack of maintenance" and "Non-existent infrastructure" as the causes of the floods, and finds the Walford culvert "extremely close to the road surface"; the waterways are reported to be "heavily encroached", with "weak culverts" and "unchecked backflow from the Dhansiri river" (as reported); and "59.5% of urban houses have access to drainage facility" (ADB). NSDMA's measures include covering drains and "phase-wise priority-based improvements in the drainage system (closed system)": under Clause 7.10.2 a nullah that drains 8 ha or more may be covered only under a design that keeps its 1% AEP capacity and its access for cleaning. At Kohima the Dzuna is itself "a natural drain" (NPCB). Neither the bye-laws' bye-law 23 nor the Municipal Act's fines, at most ₹5,000 for a breach of its rules (s.137), keeps a stream or nullah at its recorded width once it has been lined, covered, built over or filled with garbage, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored pond or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Nagaland no shared form of storage is required by the building rules: bye-law 39 of the NBBL 2012 requires rooftop rainwater harvesting on plots of 100 m² and more but sets no volume, and the bye-laws have no detention, peak-flow or design-storm rule (Chapter 4). The first State-level brief for urban storm drainage, the terms of reference of the ADB-assisted Nagaland Urban Infrastructure Development Project for eight towns, says that "Ponding of water within the towns is to be avoided" and that "Structures such as flood storages and retarding basins are only to be considered as a last resort", while "low impact development/green infrastructure … shall be duly explored" (ADB, 2022). This Manual keeps ponds and low land as storage first, without criticising the terms, because Dimapur's outfalls back up from the Dhansiri, so that removing water faster fills the nullahs sooner when the river is high; because water removed "outside of the town limits" goes to the villages and the reaches downstream; and because NSDMA's own recommendations for Dimapur include "Utilizing Natural Ponds and Water Retention Areas", with the natural pond in Dr. Haralu Colony, and "increasing permeable surfaces" (Chapters 4 and 11). Where a NUIDP design follows the terms, the designer states on the submittal which governs; this Manual does not override a contract. Kohima's Smart City "Sustainable urban drainage system including Re-use" (₹41.52 crore) stood at "DPR Completed" with nothing spent (CAG, Audit Report 2021-22). In the ridge towns there is little flat land on which a regional pond could be built, and none may be built on a slope or on shale where Clause 4.11 bars infiltration; a regional facility there is a lined tank or a lined detention structure, a detention pond and never a natural pond. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the State Wetland Authority;
  • (b) any wetland notified under the 2017 Rules, to its notified boundary (Nagaland has no Ramsar site, and none was found notified);
  • (c) the Doyang reservoir, with its drawdown zone; Shilloi lake and Dzüdu lake (listed as priority wetlands, as reported); the ponds, among them the natural pond in Dr. Haralu Colony, Dimapur; the seepage ground of springs; and the 421 wetlands reported for the State (as reported), each to the boundary of Clause 7.13.1 and the 1% AEP extent of Clause 7.3.4 (a river, stream, nullah or reservoir itself is a waterbody under the rest of this chapter); and
  • (d) any other pond, marsh or wetland that the Authority notifies, that the wetland authority lists, or that the Gauhati High Court (Kohima Bench), the National Green Tribunal or the Supreme Court directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. Nagaland's wetlands are the concern of the State Wetland Authority, whose nodal officer is reported to be the Principal Chief Conservator of Forests (as reported); the notification constituting it under rule 5 of the Wetlands (Conservation and Management) Rules, 2017 and its exact name were not found [TBC]. The State has no Ramsar site, and no wetland notified under rule 4 was found. The press reports 421 wetlands over 215 km², a National Wetland Inventory and Assessment geodatabase prepared with NESAC since 2008, and Shilloi lake, the Doyang reservoir and Dzüdu lake as priority wetlands (all as reported); none of these lists was obtained [TBC]. The Doyang reservoir has been the subject of a "mission mode clean up" and of project reports for navigation on "Doyang Lake" (both as reported). No water-quality data were found for Shilloi, Dzüdu or any pond. A drain outfall, desilting, diversion or gate operation in or next to a notified wetland therefore needs the views or permission of the wetland authority where the Rules reach it, as well as compliance with this chapter; for the ponds, springs, lakes and marshy ground they do not reach, this chapter, the custodian and, on village land, the Village Council are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Nagaland's rivers, streams and ponds through the drains and nullahs (Clause 8.9, Commentary). The CPCB placed the Dhansiri from Khatkati Gate to Ganesh Nagar in Priority IV and the Sanuo Ru below the New Secretariat, Kohima in Priority V in 2025; the Chathe's pollution is mainly domestic sewage from Medziphema and Chümoukedima, and the Kohima streams were listed as polluted below the KMC dumping site and below the town (NPCB). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by most existing outfalls in Dimapur and Kohima. In Nagaland they apply in full to every new outfall, and every existing outfall to the Dhansiri, the Chathe, the Diphu, the Sano Ru, the Dzuna, the Dzucha, the Dzu or a pond is taken to carry dry-weather flow and comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed. Every drain or nullah that enters a pond also passes a silt trap and a solid-waste trap first (Figure 7.3; Clause 6.3.6(m)), because the pond is the end of its catchment's drainage and has no other way to lose the silt and garbage.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. Nagaland's controls on building and dumping along its nullahs and streams have come from the bye-laws and from NSDMA's recommendations, not from the courts: no petition before the Gauhati High Court (Kohima Bench) on urban drainage or on the encroachment of nullahs in Dimapur or Kohima was found. NSDMA names "Encroachment" among the causes of Dimapur's floods and recommends "encroachment removal" with the buffer it proposes along drainage lines; the waterways are reported to be "heavily encroached", with slums along the Lengrijan Nullah, and about 200 families are affected each year by structures on an old channel of the Dhansiri (as reported); a Water Resources Department officer has attributed Dimapur's floods to "human interference with river systems and natural drainage networks" (as reported). The first Water Bodies Census recorded only 1 of 1,432 water bodies as encroached (as reported). The courts have spoken about road drainage: in the PIL on NH-29, PIL(Suo Moto)/2/2019, the Kohima Bench recorded on 9 September 2026 that NHIDCL maintains the highway under a contract "including road repairs, drain clearances and, slide removal works", and in a petition on the Kigwema–Mao road it noted that "clogged drains and/or lack of drainage has resulted in waterlogging" (as reported; the case number was not found). Before the National Green Tribunal, in O.A. 673/2018 on polluted river stretches, the State reported the Dhansiri's sources as "sewage drainage from Dimapur City, improper disposal of solid waste into the drains and industrial effluents" (affidavit of 12 December 2023). Land along most streams and ponds is held by villages, clans and individuals under customary law, and on village land no transfer is made without the Village Council's consent (Chapter 1). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. No pond or lake in Nagaland was found to be held by a bund high enough to be a specified dam, though the bunds and outlets of the ponds and of Shilloi and Dzüdu lakes were not surveyed for this Manual [TBC]; each outlet work or bund shall be screened under Clause 7.14.1. The Doyang dam, of earth and rockfill and reported to be about 92 m high (as reported; sources differ), is a dam across a river under the Act and is above the 15 m of Clause 7.14.1(a). Where the storage of a pond or reservoir is counted under Clause 7.7, its bund, outlet works or dam is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Nagaland the embankment that matters most to the villages and towns below it is the Doyang dam, and the hazard below it is the release. In 2018 the gates were open from 27 July to 5 August; at Runchan and Liphi below the dam "the river shifted 50–100 m" and about 1,000 acres of crops were lost (as reported); and SANDRP linked the release to the flood at Golaghat downstream, where 36 villages were reported inundated, while NEEPCO said that not releasing would have threatened the dam (both as reported). NEEPCO's release protocol, warning thresholds and spillway rating were not found [TBC]; in July 2025 an "alert sounded over rise in Doyang's water level" (headline, as reported). No breach map or emergency action plan for the Doyang dam, any pond or any lake was read for this Manual. A failed or overtopped bund floods the land below it, and a release made without warning floods it too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments, and why Chapter 5 treats the Doyang release reach as a flood-sensitive outfall (Clause 5.8.5(c)). The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Angami and Lotha waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)