Chapter 6Minor and Major Drainage Systems
6.1 Purpose and scope
6.1.1 This chapter sets the level of service and the hydraulic criteria for the conveyance system that carries runoff from a development, a road or a public drainage scheme to a receiving waterway, tank or outfall. It covers:
- (a) the dual drainage concept: a minor system and a major system (Clause 6.3);
- (b) design return periods by land use and road class (Clause 6.4);
- (c) street hydraulics: spread, depth and flow hazard (Clause 6.5);
- (d) inlets, including clogging (Clause 6.6);
- (e) pipes and open and covered drains (Clause 6.7);
- (f) hydraulic grade line analysis (Clause 6.8);
- (g) overland flow paths, ponding at sags and building floor levels (Clauses 6.9 to 6.11);
- (h) culverts and road crossings (Clause 6.12); and
- (i) Nagaland construction-practice requirements for covered drains, silt, solid waste, utilities and desilting access (Clause 6.13).
6.1.2 The detailed hydraulic design of individual structures (culverts, channels, energy dissipators, screens, pumps, gates, manholes) is in Chapter 9. Rainfall is in Chapter 2, runoff methods in Chapter 3, on-site storage in Chapter 4, tailwater in Chapter 5, waterbodies in Chapter 7 and water quality in Chapter 8.
6.1.3 This chapter applies to all public drains, all roads with kerbs or roadside drains, and all private drainage systems in developments that meet the applicability thresholds of Chapter 1. In Tier B local bodies, the simplified procedures and design aids referred to in Chapter 1 may be used for elements serving ≤ 16 ha, but the criteria of this chapter still apply.
6.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Minor system | Inlets, pipes, covered drains and open drains that carry runoff up to the minor design AEP of Table 6.1 without surcharge above the limits of Clause 6.8. |
| Major system | The surface flow paths (streets, overland flow paths, open channels, floodways and storage) that carry flow above the capacity of the minor system, up to the 1% AEP (100-yr) event. |
| Overland flow path | A defined surface route, in public land or a recorded easement, that carries major-system flow to a receiving waterway. |
| Spread (T) | Width of flow in the gutter and carriageway, measured from the face of the kerb. |
| Sag | A low point on a road or flow path from which water can leave only through an inlet or by ponding to an overflow level. A trapped sag has no surface overflow route. |
| Clogging factor | The fraction of an inlet's clean hydraulic capacity assumed lost to debris (Clause 6.6.3). |
| Hydraulic grade line (HGL) | The line joining the free-surface levels in a conduit system, or the piezometric levels where the system is under pressure. |
| Covered drain | A rectangular drain, usually beside a road, closed by cast-in-situ or precast cover slabs that form a footpath. |
| Sediment allowance | The depth or area of a drain or pipe assumed filled with silt when its design capacity is computed (Clause 6.7.8). |
| Check event | An AEP rarer than the design AEP at which the combined minor and major system must still meet the limits of Table 6.2. |
| High-density area | An area notified as such by the approving authority under Clause 6.4.4. |
| Class I area | An urban local body with a population of 1 lakh or more (the CPHEEO definition). |
6.3 The dual drainage concept
6.3.1 Every drainage system shall be designed as two systems that work together:
- (a) a minor system that carries the minor design flow of Table 6.1 below ground or in drains, keeping streets usable and spread within Table 6.2; and
- (b) a major system that carries all flow above the minor-system capacity, up to the 1% AEP (100-yr) flow, on the surface without entering buildings and within the depth and hazard limits of Clause 6.5.
6.3.2 Every element has a 1% path. Every inlet, sag, pipe, drain, culvert and storage element shall have an identified 1% AEP overland flow path to a receiving waterway, tank or outfall. The path shall be shown on the drainage plan (Clause 6.15).
6.3.3 Major-system design flow. The major system at any point shall carry the 1% AEP peak flow less the minor-system capacity at that point. The minor-system capacity used in this subtraction is the capacity of the inlets after the clogging factors of Clause 6.6.3, or the pipe capacity, whichever is less. At sags and at any location used to set building floor levels, the major system shall also be checked with the minor system fully blocked (Clause 6.10.3).
6.3.4 Rainfall and method. Design flows shall use the rainfall of Chapter 2 (including the climate factor of Clause 2.8) and the methods of Chapter 3:
- (a) the Rational Method only for catchments ≤ 16 ha and a single conveyance element. It shall not be used to accumulate flows down a network whose total catchment exceeds 16 ha;
- (b) a hydrograph method with hydraulic routing (for example SWMM, HEC-HMS with a hydraulic model, or an equivalent 1D/2D model) for networks above 16 ha and for any network with storage, pumping or a tidal outfall;
- (c) a minimum time of concentration of 10 minutes.
6.3.5 No transfer between catchments. Neither the minor nor the major system shall divert flow from one natural catchment to another unless the approving authority accepts a catchment-wide study showing no adverse effect.
6.3.6 Drains that carry sewage and sullage, and hill and foothill drains. Outside the part of Dimapur that its sewerage serves, no town in Nagaland has a sewer, and the Nagaland Building Bye-Laws 2012 send the waste water from kitchens and bathrooms to the public drain and allow a "rain water-waste combined drain" (bye-law 20(ii)–(iii)), so the public drain or nullah that receives storm water from a site or a public drainage project normally also carries sullage, and often the overflow of septic tanks (Clause 8.9); and in the ranges the drains also carry silt, gravel, slide debris and garbage. This chapter applies to the storm-water system up to the point of connection and to every public drain, with the following additions (all set by this Manual).
Items (a) to (e) apply wherever the receiving drain or nullah carries dry-weather flow of sewage or sullage, whatever its owner calls it:
- (a) Separation on site. Storm water and waste water shall be collected in separate systems within the site, each with its own last inspection chamber at the site boundary, so that the storm-water system can be connected to a separate public storm drain, without rework on the site, when one is built or when the sewers of the area are commissioned. Where the Authority allows only one connection to the receiving drain, the two systems shall meet only in a final chamber after both inspection chambers. The site plan of bye-law 4, which already shows "the position of rainwater drains, wastewater drains from kitchen and bathroom", and bye-law 20(iv), under which a separate rain water drain "will be guided by the provision applicable to rain water-waste drain", are the hooks for this item. Septic-tank effluent shall enter neither system (bye-law 20(i)). Clause 6.13.7 applies to every storm drain within the site.
- (b) No rise in the peak inflow. A development to which Chapter 4 applies shall meet Chapter 4 at each connection to a drain that carries sewage, as at any other site outfall (Clause 4.5.1.3). A development below the thresholds of Clause 1.5.2 shall not raise the peak inflow above that of the site before the development: where it adds impervious area, the roof water of the added area shall pass through a rainwater harvesting or storage tank with a controlled overflow before it reaches the connection.
- (c) Tailwater and backflow. The HGL of Clause 6.8 shall be started from the level in the receiving drain at the connection in the coincident event, taken from the owner's model where one exists and otherwise at the drain's obvert or top of bank (Clause 5.6.2). Where the receiving drain or nullah ends at an outfall backed up by the Dhansiri, the Chathe or the Diphu, the outfall-closed check of Clause 5.10 applies with the lock of Clause 5.8.5(a). A non-return valve (Clause 6.8.8) shall be fitted on every connection, storm or foul, to a drain that carries sewage wherever the lowest drainage fitting or opening it serves is below the cover or bank level of the receiving drain at the connection.
- (d) Capacity, velocity, access and odour. A public drain or nullah that carries sewage shall be designed as a combined channel until the sewers of its area are connected: its storm capacity used in Clause 6.3.3 shall be the capacity left after its dry-weather flow, measured or estimated from the population served; it shall reach the minimum velocity of Clause 6.7.3(a) at its dry-weather flow, or have a low-flow channel in its invert that does, so that sewage solids do not settle between storms; where it is covered, it shall have the access openings of Clause 6.13.2, with covers and vents placed so that odour does not reach homes and footpaths; and it shall be cleanable by machine from those openings, without anyone entering it. Flow above its storm capacity, or above what the inlets admit, shall be carried on the surface by the major system (Clauses 6.3.2 and 6.9), and floor levels shall be set under Clause 6.11 with the drain surcharged.
- (e) Interception and screens before outfalls; separation planned by the Authority. Every public drain or nullah that carries sewage shall have dry-weather-flow interception and a screen before its outfall to the Dhansiri, the Chathe, the Diphu, the Sano Ru, the Dzuna, the Dzucha or the Dzu, and before any pond used as storage, the natural pond in Dr. Haralu Colony at Dimapur first, designed under Clause 8.9 so that it does not reduce the drain's storm capacity, and no new storm drain shall be brought to a pond without that treatment. The Authority shall identify in its master plan (Chapter 11) the areas where a separate public storm drain is feasible, among them the areas of Dimapur served by its sewerage and the four Kohima drains of the interception and diversion projects (Clause 8.9), and elsewhere the storage that will hold back the combined peak; where a separate public storm drain is available at the site boundary, the site's storm-water system shall be connected to it and not to the drain that carries sewage. The Conveyance Design Report (Form 6-1) shall state whether each receiving drain carries sewage, the source of that information, and how items (a) to (e) are met.
Items (f) to (m) apply to every element of the minor and major systems that receives runoff from a hill catchment, which in this Manual means land in sub-areas NL-B, NL-B1, NL-C and NL-D of Annex 2A, any catchment whose natural ground slopes more than 10% on average, and every stream or ravine that comes down from the ranges, including where it runs out across the foothill fans at the edge of the Dimapur–Chümoukedima plain (sub-area NL-A):
- (f) Debris racks and traps. Every inlet, drain or pipe entrance and culvert that receives flow from 1 ha or more of unbuilt hill land (forest, scrub, cultivated or bare slope, a quarry, a cut slope or a slide scar), or from a stream or ravine of the ranges whatever its catchment, shall have a debris rack or a debris trap upstream of it, designed under Chapter 9 (Clause 9.8), with machine access and a stable place to stockpile what it catches, which shall not be a slope, a stream, a ravine or the margin of a pond. With 50% of the rack blocked, the element it protects shall still pass its design flow, and the overflow route shall not send the flow onto a building or an unprotected slope. Racks and traps shall be cleared by 31 March, again by 15 May after the April–May storms, and after the season by 15 November (Chapter 10). The volume of a debris basin is to be set in Chapter 9 [TBC].
- (g) Bulking factor. The design flow of every channel, drain, pipe, culvert and crossing that receives flow from a hill catchment shall be the clear-water peak flow of Chapter 3 multiplied by a bulking factor of 1.25, for the minor design flow, the check event and the 1% AEP flow; elsewhere the factor is 1.0. The factor applies to capacity, freeboard and velocity; it does not apply to the runoff volume used for storage (Chapter 4). A larger factor shall be used where a sediment study of the catchment gives one. A catchment that the screening of Clause 2.3.6(i) shows to be prone to debris flow or landslides, or that drains a mapped slide, slide scar, fan or the path of a channel shift, is not designed by a bulking factor: no building, outfall, pumping station or storage shall be placed in that path, and the drains are designed for the bulked flow only [TBC].
- (h) Blockage. The blockage check of Clause 6.12.4 shall assume 50% of the inlet area blocked for every culvert and pipe entrance with a span or diameter below 3.0 m, and 20% for larger ones, whether or not a debris rack is provided. Grate inlets keep the clogging factor of Table 6.5, and kerb openings on grade take the sag value of 20%.
- (i) Sediment and minimum velocity. Drains and pipes that receive flow from a hill catchment, or that run across the foothill fans of the Dimapur–Chümoukedima plain, shall reach a velocity of at least 1.0 m/s at the minor design flow, in place of the minimum of Clause 6.7.3(a). Where the gradient does not allow it, a sediment trap shall be provided upstream and the sediment allowance of Clause 6.7.8 doubled (Clause 6.7.4).
- (j) Steep drains and steep streets. Where the gradient of a drain gives a velocity above the limits of Clause 6.7.3(b), or a Froude number above 0.8, at the design flow, the drain shall be a lined chute, a stepped channel or a series of drop structures designed under Chapter 9 for the bulked flow of item (g), with the freeboard of Table 6.7 for steep channels and an energy dissipator at every change to a flatter gradient and at the outlet. No unlined drain shall be laid on a gradient on which the velocity exceeds the limit of Chapter 9 for its bed material. A rain water-waste combined drain that passes over ground with a slope of more than 1 in 5, whose first 50 m the bye-laws already require to be pucca and "constructed in stepped manner" (bye-law 20(iii)), shall be designed under this item for its whole length. On a street steeper than 5%, grate-only inlets shall not be used, and inlets shall be placed by the calculation of Clause 6.6.4 with the bypass flows of a steep gutter; on a street steeper than 10%, the flow shall be intercepted by transverse grated channels or kerb inlets at a spacing that keeps the street flow within the limits of Table 6.3 in the check and 1% AEP events. Where the 1% AEP flow cannot be kept within those limits on the carriageway, the excess shall be carried in a lined side channel or stepped drain, and the street, unless it is a notified evacuation route, is treated as closed in that event. Steps and footpaths that carry flow shall have a lined side channel.
- (k) Hill roads as the minor system. On every road and street in a hill catchment as this clause defines it, and on any road elsewhere that crosses one, the drainage of a road is the minor system for the land above it as well as for the road. Every such road and street shall have, as works of the road's owner, PWD, PWD (NH), NHIDCL, the Municipal or Town Council or the Village Council:
- (i) a lined catch-water drain above every cut slope where the land above drains towards the road, discharging to a natural channel or a cross-drainage work and not over the cut;
- (ii) lined side drains on the hill side (IRC:SP:42-2014, cl. 8.5.1);
- (iii) a cross-drainage work at every stream and ravine, and culverts or scuppers at intervals such that no side drain exceeds its capacity at the design AEP of Table 6.1 with the factors of items (g), (h) and (m);
- (iv) at the outlet of every scupper, culvert and side drain on the valley side, a lined chute, cascade or pipe carrying the flow to a stable natural channel or a public drain, with an energy dissipator, so that road runoff is never discharged onto an unprotected slope, fill, retaining wall or the land of a building below, by PWD, PWD (NH), NHIDCL or any other owner of a road;
- (v) culverts of at least the size of Clause 6.12.5, designed under Clause 6.12 and not less than IRC:SP:42-2014 cl. 7.1.4 requires for the road; where the drainage provisions of IRC:SP:48-1998, the Hill Road Manual, which were not read for this Manual [TBC], are stricter than this item, they apply; and
- (vi) no muck, spoil, slide debris or excavated material from the construction, widening or maintenance of the road, or from earth cutting beside it, placed in or beside a stream, a ravine or another line of natural drainage, or on a slope from which a storm can carry it into one, and every culvert, side drain and natural drain that such material has blocked cleared by 31 March and after every slide, so that the runoff of its catchment reaches the nearest stream or river.
- (l) Sloping sites and earth cutting. On a site where the land above drains towards a building, its cut or its retaining wall, the runoff of that land shall be intercepted above them by a lined diversion drain sized for the minor design flow of Table 6.1 from the land above it, with the factors of items (g), (h) and (m), with a 1% AEP flow path that does not pass through or against the building. The space between a building and the cut or retaining wall above it shall be paved or lined and drained so that water does not stand against the building or soak into the foot of the cut, and both shall discharge to a public drain or a stable natural channel as item (k)(iv) requires, not onto the slope below. Roof and paved-area runoff on such a site follows the hill rule of Clause 4.11. These items give a design standard to what the bye-laws already ask on sloping sites: a site plan whose slope is shown by contours or spot levels "to facilitate convenience for graphical study of drainage pattern of the site" (bye-law 4), a toe wall or protection wall for a downhill site (bye-law 17), restrictions on the height of earth cutting and the width of terraces, with retaining walls, that the Authority may prescribe (bye-law 21), and slopes made stable "by ensuring good drainage of water so that the saturation of the hill-slope is avoided" (Appendix A1(d)). During construction, runoff shall be kept off the existing drainage courses and led to sediment traps (Chapter 8).
- (m) Garbage-laden flows and the hill–plain break. Every drain outfall to a Dimapur nullah, to the Dhansiri, the Chathe or the Diphu, or to the Dzuna, the Dzucha, the Dzu or the Sano Ru, and every public drain or culvert where a stream or ravine below a settlement enters it, shall have a solid-waste trap or screen designed under Chapter 9 (Clause 9.8), with access for cleaning by hand or machine and a place to store what it catches that is not a stream, a nullah, a pond margin or a slope, cleared on the dates of item (f) and after every heavy-rainfall day (Chapter 10). The blockage of item (h) shall be taken to include solid waste whether or not a trap is provided, and the capacity of an existing drain or nullah shall be taken net of the silt, vegetation and waste surveyed in it (Clause 6.7.8). Where a stream or a drain that receives one leaves the ranges and reaches flatter ground, as the streams do at the foot of the Tsiedukhru range and on the foothill fans of the plain, a silt trap designed under Chapter 9 shall be provided above the point where the gradient falls, sized for the sediment of item (i), with machine access and a stockpile place of the same kind, and cleared on the same dates. A trap, screen or bund placed in a stream or nullah shall not raise its 1% AEP level at any outfall (Clause 5.8.5(a) and (b)) and shall be designed to be overtopped without damage. A trap is not a treatment work: dry-weather flow is intercepted under item (e) and Clause 8.9.
Commentary. The CPHEEO (2019) manual defines major and minor systems in its glossary but gives no return period for the major system. APWA 5600 (2006, 5601.8) requires the system to convey the 1% peak and, where in-system capacity is less, an overflow system to carry the remainder. Clause 6.3.3 subtracts only the clogged inlet capacity, not the full pipe capacity, because in practice the pipes cannot take more water than the inlets admit. The fully-blocked check at sags has no direct precedent; this Manual sets it because of the Dimapur experience that drains under footpaths are often silted or blocked by solid waste when the heaviest rain arrives (CPHEEO 2019 Part A, Ch 1 and 2, Figures 1.2 and 2.1 on solid waste dumping in drains). The prohibition on inter-catchment transfer follows the DID Malaysia 2008 submission checklist, which prohibits inter-catchment diversion. Clause 6.3.6 is set by this Manual for Nagaland, and it has two parts because the State's drains fail in two ways that the criteria of this chapter, which assume clear storm water on gentle ground, do not see. The first is sewage. The building rule itself puts sullage in the storm drain: "The waste water from kitchen and bathrooms shall be taken by means of pucca drain and dropped in public drain", and "The rain water may also be disposed off by the waste water drain provided that in such case the drain shall be called rain water-waste combined drain" (NBBL 2012, bye-law 20(ii)–(iii)). Septic effluent is to go to soak pits (bye-law 20(i)), but in Dimapur, the only town with sewerage, 10.4% of households had piped sewerage and 74.2% septic tanks, and "Around 75% of sewerage goes into septic tanks, which are prone to overflow" (Census 2011, via the NSDMA Dimapur urban flood assessment); "none of the towns has sewerage or septage management systems except in Dimapur (under a state government project)" (ADB, NUIDP, 2022); and the three nullahs "serve the purpose of carrying wastewater from various parts of the city and channeling it to the Dhnasiri [sic] River" (NSDMA). CPCB lists the Dhansiri from Khatkati Gate to Ganesh Nagar (BOD 8.7–9 mg/L) in Priority IV and the Sanuo Ru below the New Secretariat at Kohima (BOD 3.4 mg/L) in Priority V (CPCB, Polluted River Stretches, 2025). Items (a) to (e) follow the combined-sewer rules of the plains editions of this series: a site keeps its storm water separate up to the boundary, so that a town can separate its system street by street as sewers come, without going back into every plot; a development does not add to the peak of a drain that carries sewage; a non-return valve guards every connection, because what comes back up a surcharged drain is sewage; the drain is designed as the combined channel it is, with its capacity taken net of its dry-weather flow; and the outfall to a river, a Kohima stream or a pond is intercepted and screened. The Manual's interception rules run against bye-law 20(ii)–(iii) until it changes; this clause does not override the bye-law, and Clause 8.9 proposes the transition.
The second is the hills. Kohima, Mokokchung, Wokha, Zunheboto, Tuensang and Mon are ridge or spur towns on the Disang and Barail rocks, whose shales "are grey in colour and splintery … At places shale has been changed into slate", and where "due to hilly nature most of it goes as runoff" (CGWB, Kohima district booklet). The slopes fail at the drains: on 3 September 2024 a landslide near Pherima killed six people and the flooding Chathe washed away NH-29 at chainage 126 at Pagla Pahar, with the village's Gaonbura blaming "the blockage of the culvert drainage" (as reported); the Chathe undercut the same stretch again in September 2025 (as reported); and on 19 July 2026 a landslide in Defence Colony in Mon town killed at least eight people (8, 9 or 10 in different reports, as reported). The Kohima Bench of the Gauhati High Court recorded NHIDCL's affidavit that Package-I of NH-29 (about 14.935 km) is maintained under a short-term maintenance contract "including road repairs, drain clearances and, slide removal works", with about 4 km to be reconstructed under a five-year performance-based contract (order of 9 September 2026 in PIL(Suo Moto)/2/2019), and in a PIL on the Kigwema–Mao road it noted that "clogged drains and/or lack of drainage has resulted in waterlogging" (as reported; case number not found). No Nagaland allowance for debris, bulking or blockage was found during research [TBC], and no Indian guidance on bulking factors, debris racks or debris basins [TBC], so each number in items (f) to (m) is an interim value with a stated reason, the same as in the mountain editions of this series. The 1 ha trigger for a debris rack reflects the time of concentration on hill slopes, a few minutes, so that even a small unbuilt slope delivers stones, gravel and leaves to an inlet in the first burst of a storm. The bulking factor of 1.25 is the factor for a flow that carries a fifth of its volume as sediment (bulking factor = 1 / (1 − sediment fraction by volume)): about the most that a drain can carry and still behave as a water flood. A flow with more sediment than that behaves as a debris flow, which no drain can be sized for; that is why item (g) keeps buildings and outfalls out of a debris-flow or slide path rather than sizing a drain for it, and why the factor is to be replaced by a sediment study as soon as one is made [TBC]. The 3.0 m limit in item (h) doubles the core's 1.5 m because boulders, timber and waste block openings that leaves alone do not. The 1.0 m/s minimum in item (i) replaces the 0.6 m/s of CPHEEO, which is based on carrying fine sand of 0.09 mm, because hill drains carry gravel. The bye-laws' only slope number is bye-law 20(iii)'s "1 in 5" (20%, about 11°), which asks for a stepped drain over the first 50 m from the building; item (j) gives that drain a design and carries it to its outfall. On a 10% street, the hazard limit of 2.0 m/s is reached when sheet flow on a concrete surface is only about 30 mm deep, which is why item (j) takes the flow off steep carriageways. IRC:SP:42-2014 (cl. 8.5.1) already treats hill roads differently: their side drains are "normally restricted to 60 cm" in width and lined because "rolling stones cause high friction", "culverts are required at closer intervals compared to those in plain areas", and "stepped chutes/baffles are to be provided where the longitudinal bed slope exceeds critical". Items (k) and (l) keep road and site runoff off unprotected slopes, because water discharged onto a slope raises its pore pressure (Clause 4.11), and give a design standard to bye-laws 4, 17 and 21 and Appendix A1(d), which ask for the drainage of sloping sites without numbers. Item (m) deals with garbage and with the foot of the ranges. NSDMA's assessment gives the causes of Dimapur's floods as "Garbage disposal through drains", "Development of vegetation", "Encroachment", "A lack of maintenance" and "Non-existent infrastructure", and finds the Walford culvert "extremely close to the road surface" (NSDMA); a trap catches waste only if it is placed where the waste arrives and cleared when it fills, and a trap built in a stream must not raise the stream at the outfalls it protects. Where the streams leave the ranges they drop their load on the plain, whose Tertiary hills "act as runoff zones" above Quaternary sediments (CGWB, Dimapur valley aquifer mapping, 2013), which is why item (m) puts a silt trap at the break. The clearance dates are the Manual's works calendar (Chapter 10): the mid-season clearance falls on 15 May, as in the adjoining edition to the south, and not on 31 May, the date used downstream on the Dhansiri plain, because Dimapur's floods start in May and a clearance due at the end of that month falls in the storms it is meant to precede. The clause deals with debris and garbage at the drain; it does not ask for the concrete channelisation of the streams or the nullahs, whose capacity has been lost to encroachment and waste, not to roughness.
6.4 Design return periods
6.4.1 The minor system, roads and crossings shall be designed for the AEPs of Table 6.1. Where both a land-use row and a road-class row apply to an element, the rarer AEP (longer return period) governs.
Table 6.1 — Design AEPs for conveyance (matches Clause 2.4)
| Element | Design AEP (return period) | Check event | Basis |
|---|---|---|---|
| Minor system: Dimapur, Kohima, Chümoukedima and Mokokchung core and other high-density areas | 10% (10-yr) | 1% (100-yr) overland path | This Manual (see Commentary) |
| Minor system: other Class I areas | 20% (5-yr) | 1% overland path | This Manual; CPHEEO Table 4.1 |
| Minor system: other areas | 50% (2-yr) | 1% overland path | This Manual; CPHEEO Table 4.1 |
| Arterial road drainage and crossings | 2% (50-yr) for arterials that are notified evacuation or emergency routes; 4% (25-yr) for other arterials | Next higher AEP: 1% for a 2% design; 2% for a 4% design | This Manual (25–50-yr); split set by this Manual |
| Collector road drainage and crossings | 4% (25-yr) | 2% (50-yr) | This Manual |
| Local road drainage and crossings | 10% (10-yr) | 4% (25-yr) | This Manual |
| Road underpasses and other trapped sags on public roads | 2% (50-yr) | 1% (100-yr) | This Manual (Clause 6.10.5) |
| Airports, railway stations, power stations and other critical infrastructure | 1% (100-yr) in Class I areas; 2% (50-yr) elsewhere | — | CPHEEO 2019 Table 4.1 |
| Major (overland) system, every element | 1% (100-yr) | — | This Manual |
| Building floor levels | 1% level + 0.5 m freeboard | — | This Manual (Clause 6.11) |
6.4.2 Check events. At the check event of Table 6.1, the combined minor and major system shall carry the check-event flow within the 1% AEP limits of Table 6.2 and without water entering any building. The 1% overland path requirement of Clause 6.3.2 applies in addition to the check event.
6.4.3 Higher standards. An approving authority may adopt a rarer AEP for any element, including through the high-powered committee route in Note 2 of CPHEEO Table 4.1. It shall not adopt a more frequent AEP than Table 6.1.
6.4.4 High-density areas. The approving authority shall notify, by map, the high-density areas to which the 10% AEP minor-system standard applies. Until it does, the 10% AEP standard applies to:
- (a) in Dimapur, the localities that NSDMA lists as vulnerable to flooding, Dhobinala, Burma Camp, New Market, Bank Colony, Walford, Super Market, Nagarjan, Khermahal, Netaji Colony, Rail Colony, Niu Colony, Riverbelt Colony, Zeliangrong Colony, Sachu Colony, Police Colony, Holy Cross Area and Lengrijan (NSDMA, Dimapur urban flood assessment), and the colonies reported flooded in September 2025, Vilhume, SM, East Police, Namgalong, Ragailong and Kuda (as reported), with the boundary of each to be confirmed by the Dimapur Municipal Council and, for parts on village land, the Village Council [TBC]; in Kohima, no locality is named for flooding in the sources found [TBC], so item (b) applies there;
- (b) in Kohima and in every other Municipal Council and Town Council area, the area that the applicable master plan, once one is notified, identifies as the core area, old town or central business district, and, until then, the main market of the town and its densely built centre, as the Municipal or Town Council identifies them by map [TBC]; and
- (c) any area in a Tier A body where the master plan permits a floor space index above the base value for the zone.
6.4.5 Retrofit. Where an existing drain cannot practicably be enlarged to the Table 6.1 AEP, the shortfall shall be made good by upstream storage (Chapter 4), regional storage (Chapter 7) or an improved major-system path. The approving authority shall record the residual level of service.
Commentary. The values in Table 6.1 match the Clause 2.4 summary and add rows for underpasses and critical infrastructure. They exceed the CPHEEO (2019) national advisory minimums of 5-yr for Class I cities and 2-yr elsewhere (CPHEEO Part A, Table 4.1). Note 2 of that table allows a State committee to adopt higher values. The 10-yr tier for high-density areas follows Gupta (IIT Bombay), who recommends "1 in 10 year for residential-high density", and Malaysia's MSMA 2, which uses 10-yr minor and 100-yr major systems for link houses, apartments, commercial and industrial land. The road values resolve a conflict in Indian codes. IRC:SP:50-2013 recommends 1–2 years for urban road drains. IRC:SP:42-2014 suggests 25 years for urban roadside drains and a check flood at the next higher return period. APWA 5600 (2006) uses 50-yr for arterial, 25-yr for collector and 10-yr for residential street crossings. Table 6.1 adopts the APWA tiers and the IRC:SP:42 check-flood concept. Splitting arterials into 50-yr evacuation routes and 25-yr others has no direct precedent and is set by this Manual. The 50-yr standard for underpasses is likewise set by this Manual, because an underpass is a trapped sag where the failure mode is deep water on a live carriageway. The default high-density areas in Clause 6.4.4 are set by this Manual and apply until the approving authority notifies a map.
6.5 Street hydraulics: spread, depth and flow hazard
6.5.1 Gutter flow. Flow in a triangular kerb-and-gutter section shall be computed with the modified Manning (Izzard) equation:
Q = (Ku / n) · Sx^(5/3) · SL^(1/2) · T^(8/3)
where Q is the gutter flow (m³/s), Ku = 0.376 (SI), n is the Manning roughness of the gutter (Table 6.6), Sx is the cross slope (m/m), SL is the longitudinal slope (m/m) and T is the spread (m). Composite and depressed gutter sections shall be analysed by the methods of FHWA HEC-22 (4th edition, 2024).
6.5.2 Spread and depth limits. Street flow shall not exceed the limits of Table 6.2.
Table 6.2 — Street flow limits
| Road class | Minor design event (Table 6.1) | Check event and 1% AEP event |
|---|---|---|
| Arterial | Spread shall leave at least one through lane in each direction clear of water. No flow across the crown. | Depth ≤ 150 mm at the crown and ≤ 350 mm at the deepest point; hazard limits of Clause 6.5.3 |
| Collector | Spread T ≤ 3 m. No flow across the crown except at a sag intersection. | As above |
| Local | Spread T ≤ 3 m. Flow shall not overtop the kerb. | As above |
| All classes, at intersections | Cross-flow over the crown ≤ 0.03 m³/s at sag intersections and superelevation transitions; none at mid-block sags. | As above |
6.5.3 Flow hazard limits. In the check event and the 1% AEP event, the product of depth (D, m) and velocity (V, m/s) of street and overland flow shall not exceed the limits of Table 6.3.
Table 6.3 — Flow hazard limits for streets and overland flow paths
| Location | Required hazard class (Table 6.4) | Limits |
|---|---|---|
| Carriageways of all roads | H2 or better | D·V ≤ 0.6 m²/s; D ≤ 0.35 m (Table 6.2); V ≤ 2.0 m/s |
| Footpaths, pedestrian crossings, school, hospital and transit-stop frontages | H1 | D·V ≤ 0.3 m²/s; D ≤ 0.3 m; V ≤ 2.0 m/s |
| Notified evacuation and emergency routes | H1 | D·V ≤ 0.3 m²/s; D ≤ 0.3 m; V ≤ 2.0 m/s |
| Overland flow paths in public open space or easements, away from roads | H3 or better, with warning signs | D·V ≤ 0.6 m²/s; D ≤ 1.2 m; V ≤ 2.0 m/s |
Table 6.4 — Combined flood hazard vulnerability classes (reproduced for reference)
| Class | Description | D·V limit (m²/s) | Depth limit D (m) | Velocity limit V (m/s) |
|---|---|---|---|---|
| H1 | Generally safe for vehicles, people and buildings | ≤ 0.3 | 0.3 | 2.0 |
| H2 | Unsafe for small vehicles | ≤ 0.6 | 0.5 | 2.0 |
| H3 | Unsafe for vehicles, children and the elderly | ≤ 0.6 | 1.2 | 2.0 |
| H4 | Unsafe for vehicles and people | ≤ 1.0 | 2.0 | 2.0 |
| H5 | Unsafe for vehicles and people; buildings vulnerable to structural damage | ≤ 4.0 | 4.0 | 4.0 |
| H6 | Unsafe for vehicles and people; all buildings vulnerable to failure | > 4.0 | — | — |
Source: AIDR Guideline 7-3, Technical flood risk management guideline: Flood hazard (2014), Tables 1 and 2, modelled after Smith and Wasko (2012).
6.5.4 Depth and velocity for Clause 6.5.3 shall be taken from the gutter-flow calculation for simple sections, or from a 1D or 2D hydraulic model where flow leaves the kerb-and-gutter section.
Figure 6.1 — Minor and major drainage in a kerbed street. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 (2006, 5601.8) and FHWA, HEC-22 Urban Drainage Design Manual (4th ed., 2024).
Commentary. The Izzard form of Manning's equation with Ku = 0.376 is used both in FHWA HEC-22 and in the CPHEEO (2019) manual (Part A, Example 5.5, where the constant is written Kc = 0.376). The arterial spread rule (one lane clear) and the 3 m spread for local and collector streets are close to the APWA 5600 (2006, 5604.2) limit of 12 ft (3.66 m) from the back of kerb in each outside lane. The cross-flow limit of 0.03 m³/s is the SI equivalent of the APWA limit of 1.0 cfs at intersection sumps and superelevation transitions, with no cross-flow at mid-block sumps. The 150 mm and 350 mm depth limits are close to the APWA 5600 limits for 1% overflow at road crossings (7 in, about 180 mm, at the crown; 14 in, about 360 mm, at the deepest point). Mumbai's criterion of no flooding above 15 cm (IRC:SP:50-2013, §6.4.1) is a local precedent for the 150 mm crown value.
The hazard classes of Table 6.4 are the combined hazard curves published by the Australian Institute for Disaster Resilience (AIDR Guideline 7-3, 2014), which are modelled after Smith and Wasko (2012). Requiring H2 or better on carriageways means the 1% depth limit of 350 mm (Table 6.2) governs the depth, and the D·V product controls fast, shallow flow on steep streets. H2 is described as "unsafe for small vehicles". Two-wheelers are the dominant vehicles on Nagaland streets, so the 1% event must be treated as a road-closure event on all roads except notified evacuation routes, which must meet H1. The assignment of hazard classes to locations in Table 6.3 has no direct precedent and is set by this Manual.
6.6 Inlets
6.6.1 Inlet types. Inlets may be kerb-opening inlets, grate inlets, combination inlets (a grate with a kerb opening) or slotted and trench drains. On public streets:
- (a) kerb-opening or combination inlets shall be used, unless the approving authority accepts grate-only inlets for a specific location;
- (b) inlet openings shall be set at road level, with a gutter depression where practicable, so that water is not held on the carriageway by a raised kerb or footpath;
- (c) grates in carriageways, cycle lanes and footpaths shall be of a bicycle- and pedestrian-safe pattern (Chapter 9, Clause 9.11).
6.6.2 Inlet capacity. The clean capacity of inlets on grade and in sags shall be computed by the methods of FHWA HEC-22 (4th edition, 2024), or from tested ratings published by the manufacturer for the exact grate and kerb-opening geometry. The empirical kerb-inlet equations of CPHEEO (2019) Part A §5.6.2 may be used as a cross-check only.
6.6.3 Clogging factors. The design capacity of every inlet shall be its clean capacity reduced by the clogging factors of Table 6.5:
Table 6.5 — Inlet clogging factors (share of clean capacity assumed lost)
| Inlet type | On grade | In a sag |
|---|---|---|
| Grate | 50% | 50% |
| Kerb opening | 10% | 20% |
| Combination | Apply the grate and kerb factors to each part separately | Apply the grate and kerb factors to each part separately |
Design capacity = (1 − clogging factor) × clean capacity.
6.6.4 Inlet spacing. Inlets shall be located by a sequential calculation that starts at the top of each gutter run. At each inlet, the intercepted flow is computed, and the bypass flow is added to the gutter flow arriving at the next inlet. Spacing shall be such that the spread limits of Table 6.2 are met everywhere in the minor design event. In addition:
- (a) inlet spacing shall not exceed 30 m on kerbed roads, whatever the calculation gives;
- (b) inlets shall be provided at every sag, immediately upstream of pedestrian crossings and intersections, upstream of bridge decks and superelevation transitions, and at the end of every gutter run;
- (c) bypass flow from the last inlet of a run shall not be passed onto a road of a higher class or into private land.
6.6.5 Sag inlets. At a sag on a kerbed road:
- (a) the sag inlet's design capacity (after clogging) shall be not less than the total minor design flow arriving at the sag;
- (b) flanking inlets shall be placed on each side of a sag on any road where ponding could spread beyond the Table 6.2 limits, and at every underpass;
- (c) the ponding at the sag shall comply with Clause 6.10.
6.6.6 Inlet connections. The pipe connecting an inlet to the main drain shall have a diameter of at least 300 mm and shall be laid at a gradient that gives at least 0.9 m/s at the inlet's design flow.
6.6.7 Silt sumps. Every inlet chamber on a public road shall have a silt sump at least 300 mm deep below the invert of its outlet pipe, accessible for cleaning from the surface.
Figure 6.2 — Gutter spread, inlet interception and clogging. Original drawing for this Manual, adapted from FHWA, HEC-22 Urban Drainage Design Manual (3rd ed., 2009; 4th ed., 2024) and CPHEEO, Manual on Storm Water Drainage Systems (2019).
Commentary. The clogging factors are more severe than the APWA 5600 (2006, 5604.2) rating of sump inlets at 80% of theoretical capacity (a 20% reduction), because grates in Nagaland streets are routinely blinded by plastic and leaves. CPHEEO (2019) Part A shows solid waste dumped in drains as a primary cause of drain failure (Figures 1.2 and 2.1). APWA 5600 (2006) allows only kerb-opening inlets on public streets; Clause 6.6.1(a) is less strict because combination inlets are useful on flat roads. No standard inlet, kerb-channel or covered-drain detail of PWD, PWD (NH), NHIDCL, the Kohima or Dimapur Municipal Council or any other local body in the State was found during research [TBC]; the Nagaland Building Bye-Laws 2012 ask that a site plan show "The position of rainwater drains" and the "Proposed method of drainage or disposal of rain water, waste water" (bye-law 4), and refer to the National Building Code and IS codes for structure only. The 30 m maximum spacing and the treatment of combination inlets in Table 6.5 have no direct precedent and are set by this Manual. Roads on the Dimapur–Chümoukedima plain are flat, which shortens the calculated spacing anyway; on the steep streets of Kohima, Mokokchung, Wokha and the other ridge towns gutter flow runs fast and passes inlets by, which Clause 6.3.6(j) deals with. A fixed cap stops a single blocked inlet from leaving a long dry gutter run. The 300 mm silt sump is set by this Manual. It matches the 0.3 m sump shown on the CPHEEO catch-basin detail (CPHEEO 2019, Figure 5.9).
6.7 Pipes and open and covered drains
6.7.1 Uniform flow. Pipe and drain capacity shall be computed with Manning's equation:
V = (1/n) · R^(2/3) · S^(1/2); Q = A · V
where V is the mean velocity (m/s), n is the Manning roughness (Table 6.6), R is the hydraulic radius (m), S is the friction slope (m/m), A is the flow area (m²) and Q is the discharge (m³/s). Where backwater from a tailwater, a junction or a structure affects the water level, a gradually varied flow (standard step) or hydraulic network model shall be used, and the HGL requirements of Clause 6.8 apply.
6.7.2 Manning roughness. Design values of n shall be taken from Table 6.6. For concrete pipes and masonry or concrete drains, the design value shall be not less than the "fair" or "rough" condition value listed, to allow for sediment, biofilm and ageing.
Table 6.6 — Manning's n for design (from CPHEEO 2019)
| Material | Condition | n (CPHEEO) | Minimum design n in this Manual |
|---|---|---|---|
| Cement concrete pipe (collar joints) | Good / fair | 0.013 / 0.015 | 0.015 |
| Spun concrete pipe (RCC, PSC) with S/S joints | Manufacturer's design value | 0.011 | 0.013 |
| HDPE / uPVC pipe | — | 0.010 | 0.011 |
| Plastic (smooth), asbestos cement | — | 0.011 | 0.011 |
| Concrete drain, steel trowelled / wood trowelled | — | 0.014 / 0.015 | 0.015 |
| Sand and cement plaster | — | 0.015 | 0.015 |
| Brick masonry | Good / rough | 0.015 / 0.017 | 0.017 |
| Masonry | Bad condition | 0.020 | 0.020 |
| Rubble set in cement | — | 0.017 | 0.017 |
| Earth channel | Regular, good / ordinary | 0.020 / 0.025 | 0.025 |
| Earth channel | With stones and weeds / poor | 0.030 / 0.035 | 0.035 |
| Earth channel | Partly obstructed by debris or weeds | 0.050 | 0.050 |
| Gutter: concrete | — | 0.013 | 0.013 |
| Gutter: hot-mix asphalt | — | 0.015 | 0.015 |
| Gutter: sprayed seal | — | 0.018 | 0.018 |
Source of the CPHEEO column: CPHEEO (2019) Part A, Table 5.1 (itself from the CPHEEO Manual on Sewerage and Sewage Treatment Systems, 2013) and Table 5.8 (gutters).
6.7.3 Velocity limits. At the minor design flow:
- (a) minimum (self-cleansing) velocity: 0.6 m/s in open and covered drains and 0.9 m/s in pipes;
- (b) maximum velocity: 3.0 m/s in lined drains and in pipes, unless the drain or pipe is designed as a chute under Chapter 9. CPHEEO permits up to 6.0 m/s in plastic or plastic-lined pipes in hilly regions; this may be used in Kohima, Mokokchung, Wokha, Zunheboto, Tuensang, Mon, Phek, Kiphire, Peren and Longleng and other hill towns with the approving authority's agreement;
- (c) maximum velocity in unlined and vegetated channels: Chapter 9, Table 9.2;
- (d) the Froude number of flow in open and covered drains shall not exceed 0.8 at the design flow, unless the drain is designed for supercritical flow under Chapter 9.
6.7.4 Gradient. Each pipe and drain shall be laid at a gradient that achieves Clause 6.7.3(a). Where flat terrain or a fixed outfall level makes this impossible, the designer shall:
- (a) report the velocity achieved;
- (b) double the sediment allowance of Clause 6.7.8; and
- (c) provide access for mechanical desilting at the spacing of Clause 6.13.2.
6.7.5 Pipe flow condition. Pipes shall be sized so that the minor design flow does not exceed the pipe-full capacity. The greater discharge that a circular pipe carries at about 0.95 of its depth shall not be relied on.
6.7.6 Minimum sizes.
- (a) Pipes: 300 mm internal diameter; 450 mm for public mains.
- (b) Open drains: bed width 0.3 m.
- (c) Covered public drains (drains closed by cover slabs): clear internal width 0.6 m and clear internal depth 0.6 m.
6.7.7 Cover to pipes. Pipes shall have at least 0.6 m of cover to finished level, and at least 0.9 m under carriageways unless a structural design for the traffic load is submitted. Where the seasonal high groundwater table is within 1 m of the pipe crown, the pipe shall be checked for flotation with the pipe empty (CPHEEO 2019, Table 11.2) and anchored where necessary.
6.7.8 Sediment allowance. The design capacity of open drains, covered drains and pipes of 600 mm diameter or more shall be computed with the following depth of sediment at the invert:
- (a) open and covered drains: the greater of 75 mm and 10% of the clear internal depth;
- (b) pipes of 600 mm diameter or more: 5% of the internal diameter;
- (c) pipes below 600 mm: no allowance, but Clause 6.7.3(a) shall be met.
The Manning n for the reduced section shall be that of the drain material in Table 6.6.
6.7.9 Freeboard in open and covered drains. At the minor design flow, the water surface (computed with the sediment allowance) shall be below the top of the drain wall, or below the soffit of the cover slab in a covered drain, by at least the freeboard of Table 6.7.
Table 6.7 — Minimum freeboard in open and covered drains
| Drain | Minimum freeboard | Source |
|---|---|---|
| Bed width up to 300 mm | 100 mm | CPHEEO 2019 Table 5.3 (from IRC:SP:50-2013) |
| Bed width 300–900 mm | 150 mm | CPHEEO 2019 Table 5.3 |
| Bed width 900–1,500 mm | 300 mm | CPHEEO 2019 Table 5.3 |
| Wider drains and engineered channels, Q < 3 m³/s | 450 mm | CPHEEO 2019 Table 5.12 (from IS 7784 (Part 1): 1993) |
| Q 3 to < 30 m³/s | 600 mm | As above |
| Q 30 to < 300 m³/s | 900 mm | As above |
| Q 300 to < 3,000 m³/s | 1,200 mm | As above |
| Q ≥ 3,000 m³/s | 1,500 mm | As above |
| Any roadside drain | Not less than 150 mm | IRC:SP:42-2014 |
| Steep (supercritical) channels | Equal to the flow depth | CPHEEO 2019 §5.3.2 |
At bends, the freeboard shall be measured from the water level on the outside of the bend, including the superelevation Δy = V²T / (2 g rc), where T is the top width and rc the centreline radius (CPHEEO 2019, Eq. 5.29).
6.7.10 Bends and junctions.
- (a) The centreline radius of a bend in a drain shall be at least 3 times the drain width (CPHEEO 2019 §5.3.3). In engineered channels it shall be at least 2 times the top width and not less than 30 m (CPHEEO 2019 Table 5.11).
- (b) Where drains meet, a junction sump shall be provided with an internal width of at least twice the width of the outgoing drain. Incoming drains shall enter at less than a right angle to the outgoing flow, and the outgoing invert shall be below the sump floor so that water does not stand in the sump (CPHEEO 2019 §5.3.4).
6.7.11 Manholes and access chambers on pipes. Manholes shall be provided at every junction, change of size, alignment or gradient, and at the head of every pipe. Spacing on straight runs shall not exceed Table 6.8.
Table 6.8 — Maximum spacing of manholes on straight pipe runs
| Pipe diameter | Maximum spacing |
|---|---|
| 300–600 mm | 40 m |
| 700–1,000 mm | 100 m |
| 1,050–1,400 mm | 150 m |
| 1,500 mm and above | 300 m |
Source: CPHEEO 2019 Table 11.5. Manhole sizes, drops and covers: Chapter 9, Clause 9.12.
Figure 6.3 — Drain sections: freeboard, sediment allowance and access. Original drawing for this Manual, adapted from CPHEEO, Manual on Storm Water Drainage Systems (2019), Tables 5.3 and 5.12, and IRC:SP:50-2013.
Commentary. The n values are those of CPHEEO (2019) Table 5.1. The higher minimum design values have no direct precedent; this Manual sets them because CPHEEO notes that the 0.011 value for spun pipes "may be taken as given by the manufacturer". That is a clean-pipe value, and Nagaland drains carry heavy silt and solid waste. The 0.6 m/s minimum velocity is CPHEEO's (Table 5.2), based on carrying 0.09 mm sand (§5.3.1). The 0.9 m/s value for pipes is stricter, because a silted pipe cannot be cleaned as easily as an open drain. The 3.0 m/s maximum is from CPHEEO Table 5.2 (WPCF/ASCE 1982). The Froude limit of 0.8 is from CPHEEO §5.3, which advises avoiding critical flow because the water surface becomes unstable.
The 0.6 m × 0.6 m minimum for covered drains has no direct precedent and is set by this Manual. A covered drain narrower than this cannot be desilted by hand or by small machines through a cover opening, and silted, inaccessible drains were a recurring finding after the floods of Dimapur, whose causes the State's assessment lists as "Garbage disposal through drains", "Development of vegetation", "Encroachment", "A lack of maintenance" and "Non-existent infrastructure", with the Walford culvert "extremely close to the road surface" (NSDMA, Dimapur urban flood assessment), and in towns whose drains carry their sullage by rule (NBBL 2012, bye-law 20(ii)–(iii)). The 0.6 m minimum cover is the value used in the CPHEEO (2019) worked pipe-design computation sheet (Part A, Chapter 5). The 0.9 m cover under carriageways is set by this Manual.
The sediment allowance values (75 mm or 10% for drains, 5% for large pipes) are set by this Manual. No Indian standard sets a sediment allowance for design. Dimapur's experience is that drains run partly full of silt for much of the year, so a capacity computed for a clean section overstates the real capacity.
The CPHEEO freeboard table (Table 5.3) prints the first row as "Beyond 300 mm bed width". Read with the second row ("Beyond 300 mm & up to 900 mm"), the first row must mean "up to 300 mm"; Table 6.7 is written that way. The CPHEEO manhole spacing table (Table 11.5) gives overlapping ranges (700–1,050 mm and 1,000–1,400 mm); Table 6.8 removes the overlap by assigning 1,050 mm to the 150 m class.
6.8 Hydraulic grade line
6.8.1 HGL analysis. For every pipe and covered-drain network, the designer shall compute the HGL for the minor design event and for the check event, starting at the outfall and working upstream. The analysis shall include friction losses and losses at junctions, manholes, bends, inlets, outlets and gates.
6.8.2 Starting water level. The starting (tailwater) level at the outfall shall be the higher of:
- (a) the tailwater level of Chapter 5: mean high water springs (MHWS) plus the sea-level allowance of +0.3 m for minor-system design at tidal outfalls, and the level in the receiving drain, river or tank for the coincident event at other outfalls; and
- (b) the level computed at the outlet pipe from the critical depth and the pipe diameter, (dc + D)/2, where the receiving water is lower.
6.8.3 Minor-event limit. In the minor design event, the HGL shall be at least 0.3 m below the rim of every inlet and the cover level of every manhole and access chamber.
6.8.4 Check-event and 1% limit. In the check event and the 1% AEP event, the HGL may rise above the inlet rims. Water that leaves the minor system shall then be carried by the major system within the limits of Table 6.2 and shall not enter any building. Manholes that can surcharge above ground in these events shall have bolted or locked covers (Chapter 9, Clause 9.12).
6.8.5 Structure losses. Losses at manholes and junctions shall be computed by the energy-based access-hole method of FHWA HEC-22 (2009 or 2024 edition), or by an equivalent method in an approved hydraulic model. A simplified loss-coefficient method (h = K V²/2g) with coefficients from HEC-22 may be used for Tier B networks below 16 ha.
6.8.6 Invert and soffit levels. Where pipe size increases at a manhole, the soffits (crowns) of the incoming and outgoing pipes shall be matched, or the outgoing soffit set lower. The outgoing invert shall not be higher than the lowest incoming invert. Vertical drops in manholes shall follow Chapter 9, Clause 9.12.
6.8.7 Gates and valves. The head loss through flap gates and non-return valves in the open position shall be included in the HGL (Chapter 9, Clause 9.10).
6.8.8 Private connections. Building drainage that connects to a public drain whose 1% HGL is above the building's lowest drainage fitting shall have a non-return valve.
Commentary. The 0.3 m clearance between the minor-event HGL and the inlet rim is set by this Manual. It keeps a margin for losses that a model underestimates, and it stops water from bubbling out of inlets in the event the system is designed for. In Nagaland many town drains end in a nullah that backs up when the river is high, in a hill stream that no one gauges and whose bed moves, or in the reach of the Doyang below its dam (Clause 5.8.5). Dimapur's three nullahs carry the town's waste water to the Dhansiri (NSDMA, Dimapur urban flood assessment), and "unchecked backflow from the Dhansiri river" is reported in the colonies along them (as reported); Kohima's drains end in the Dzuna, the Dzucha, the Dzu and the Sano Ru, none of which has a gauge or a published flood level. No flood level of any river, nullah or stream, and no design level of any outfall, was found during research. A drain whose HGL is started from a free outfall, or computed one length at a time without the river or stream level, fails in exactly that way. An HGL computed from the outfall, with the tidal tailwater of Chapter 5, exposes those errors at design stage. The MHWS plus 0.3 m starting level is from CPHEEO (2019) Table 6.2. The access-hole method is described in HEC-22 from the 2009 edition onward.
6.9 Major system: overland flow paths, easements and drainage reserves
6.9.1 Streets as the primary major system. Streets shall be graded so that the 1% AEP major-system flow is carried along the road reserve to a receiving waterway without being trapped, except at sags designed under Clause 6.10.
6.9.2 Overland flow paths outside streets. Where a major-system path leaves the road reserve, it shall be:
- (a) in public land, in the open space of a layout, or in an easement recorded on the layout approval and the title;
- (b) at least as wide as the 1% AEP flow top width plus 0.5 m on each side, and not less than 3.0 m;
- (c) kept free of buildings, compound walls, fences, fill, stored materials and planting that would obstruct flow;
- (d) graded to a continuous fall with no sag that lacks an outlet; and
- (e) within the hazard limits of Table 6.3.
6.9.3 Compound walls. A compound wall or fence shall not be built across a mapped overland flow path. Where a wall must cross one, it shall have openings with a total area that passes the 1% AEP flow with a 50% blockage, without raising the upstream water level above the limits of this chapter.
6.9.4 Access along open drains. Open drains with a top width of 2 m or more shall have a maintenance access strip at least 3.5 m wide along one bank, connected to a public road at intervals of not more than 500 m.
6.9.5 Supply channels, surplus courses and tanks. Tank supply channels and surplus courses are part of the major system and shall be protected under Chapter 7.
6.9.6 Drainage reserves. A drainage reserve is a strip of land, including the drain, kept free of buildings so that the drain can be maintained, widened and used as a flood path. A drainage reserve shall be provided:
- (a) along every public drain or channel with an internal width of 1.0 m or more that runs through or along a layout or site being developed or redeveloped;
- (b) along every drain or channel shown in an adopted Basin Stormwater Master Plan (Chapter 11), at the width of the future drain in that plan; and
- (c) along every new public drain with an internal width of 1.0 m or more built by a public body.
6.9.7 Width. The reserve shall be not less than the width in Table 6.9, measured from the drain's internal width W. The width is based on the required drain size (for a planned drain, the size in the master plan), not the existing size. Where the access strip of Clause 6.9.4 is wider than the margin in Table 6.9, the wider governs.
Table 6.9 — Minimum drainage reserve width (adopted from PUB Singapore)
| Internal width of drain, W | Open drain | Closed (covered) drain |
|---|---|---|
| 1.0 m to 1.2 m | 3.0 m | W + 0.6 m |
| more than 1.2 m to 3.0 m | W + 2.6 m | W + 1.6 m |
| more than 3.0 m to 4.5 m | W + 3.5 m | W + 1.6 m |
| more than 4.5 m to 6.0 m | W + 4.5 m | W + 3.0 m |
| more than 6.0 m to 9.0 m | W + 6.0 m | W + 3.0 m |
| more than 9.0 m to 25.0 m | W + 7.5 m | W + 3.0 m |
| more than 25.0 m | W + 12.0 m | W + 3.0 m |
For an open drain, the larger part of the margin shall be on the side used for maintenance access.
6.9.8 Use and protection.
- (a) The reserve shall be shown as a separate plot on the layout or site plan and transferred to the Approving Authority free of cost, as roads and open space reservations are. Where the drain is a Water Resources Department channel, the reserve is transferred to the Water Resources Department.
- (b) No building, compound wall, fence, ramp, step, fill or other structure shall be built in the reserve. Compound walls and boundary fences shall stand outside it.
- (c) The access strip in the reserve shall be level and continuous, and connected to a public road. Bollards or posts and chains may be used at entrances to keep out vehicles other than maintenance vehicles.
- (d) Where the reserve is not fenced off, its edge shall be marked with concrete markers at not more than 50 m spacing.
- (e) Services shall cross under the drain, with at least 1.0 m clearance below the invert, or over it on an approved structure. Services shall not run along the reserve inside the drain section.
- (f) A structure within 2 m of the edge of the reserve shall be designed to remain stable when the drain is excavated to 1.0 m below its invert. The design shall be signed by a qualified structural engineer.
- (g) The reserve counts toward the site's open space requirements only where the Approving Authority's rules allow it; it does not reduce any setback required by Chapter 7.
Figure 6.4 — Drainage reserve along an open drain: reserve width from Table 6.9, no-structure zone, access strip on the maintenance side, the 1.0 m service clearance below the invert and the 2 m stability-check zone (Clauses 6.9.6 to 6.9.8). Original drawing for this Manual, adapted from PUB Singapore, Code of Practice on Surface Water Drainage (7th ed., with Addendum No. 3, 2025), clauses 5.1, 5.3, 9.6 and 9.7 and Appendix 1.
Commentary. Drainage reserves follow Singapore, where "the width of a drainage reserve is based on the required drain size" and the reserve is set aside as a separate plot, "kept free of all encumbrances" (PUB Code of Practice on Surface Water Drainage, 7th ed. with Addendum No. 3, 2025, cl. 1.1). Table 6.9 reproduces PUB's Appendix 1 widths. Clauses 6.9.8(b) to (f) follow PUB clauses 5.1 (no structure within a drain or drainage reserve), 5.3 and 5.3.1 (stability for excavation 1.0 m below the invert; engineer's calculations within 2 m of the reserve), 9.6 (level, continuous access, with bollards or posts and chains) and 9.7 (markers at a maximum of 50 m). The 1.0 m clearance for services crossing under a drain is from PUB's development-plan guidance. In Nagaland, buildings and compound walls are often built up to the edge of a drain, so it cannot be widened or desilted by machine. Reserving the land when a plot is developed or redeveloped is the cheapest time to secure it, because widening later needs land acquisition. Basing the width on the master-plan drain size (6.9.6(b)) protects the land a future drain will need. Nagaland has no reserve width, setback or buffer along any stream, spring or drain in any statute or bye-law found during research (NEER reading). What exists is a rule against obstruction: "Notwithstanding any of the provisions contained in these Bye-Laws, no building shall be allowed to be constructed, which will obstruct the natural flow of drain. The Authority shall have the power to cause the free flow of public drains" (NBBL 2012, bye-law 23), in force where the bye-laws apply; the road setbacks of bye-law 17; the "Natural Hazard Prone Areas" of bye-law 42(iii), whose flood-prone areas are to be "identified through local surveys in the development plan of the area", and no such plan has been notified; and, in Dimapur, NSDMA's proposed "mandatory buffer zone (0.75 – 3.0 meters) along drainage lines", a recommendation of an assessment report and not a rule (NSDMA, Dimapur urban flood assessment). Within municipal limits, "all public tanks, streams, reservoirs and wells" and "all public sewers and drains, channels, tunnels, culverts and water courses in, alongside or under any street" vest in the Municipality (Nagaland Municipal Act, 2023, s.119(1)(b) and (d)); a Master Plan may include a "Public utilities plan" (Nagaland Town and Country Planning Act, 1966, s.11(d)), and a Town Planning Scheme, which a ULB may now prepare, may include "The filling up or reclamation of low laying, swamp or unhealthy areas" (s.14F(g), Fourth Amendment Act, 2025), the main statutory risk to ponds and low land kept as storage (Chapter 7). No Master Plan has been notified for Kohima or Dimapur as far as found. None of these gives a reserve width along a stream, a ravine or a nullah. For this Manual, as its own proposal and not as the meaning of any rule, the bank of a channel is its top of bank, and the edge of a pond or the Doyang reservoir and the outlet of a spring are as Chapter 7 defines them (definitions after Clause 7.2); every stream, ravine, nullah and other natural channel that drains 8 ha or more is a natural channel under Clause 7.4.1(b), including the Dimapur nullahs and the Kohima streams, whoever maintains it and whether or not it is lined, piped or covered (all set by this Manual). This Manual therefore gives the reserve a width, as its own proposal and not as a statutory width: a hydraulic corridor made up of the reserve of Table 6.9, based on the drain size needed to carry the design flow with the bulking factor of Clause 6.3.6(g) (Clause 6.9.7), the access strip of Clause 6.9.4 on the access bank, and, along every natural channel that drains 8 ha or more, the setbacks of Clause 7.4 measured from its top of bank, with a Zone 1 of at least 15 m and a Zone 2 to the 1% AEP extent plus 10 m; where a court order or a later notified rule sets a wider line, that line applies for as long as it binds, and the widest governs (Chapter 7). No statute sets any line, so the corridor is a NEER proposal throughout: its 15 m Zone 1 is 5 to 20 times NSDMA's proposed 0.75–3.0 m drain buffer. It applies to new development and redevelopment approved under this Manual, not to existing buildings, although many nullah reaches are "heavily encroached" (as reported) and slums stand along the Lengrijan Nullah (NSDMA), and Clause 7.4.7 allows no variance below it. Land in Nagaland is held largely by villages, clans and individuals under customary law, and Article 371A(1)(a)(iv) protects the ownership and transfer of land and its resources, so the corridor is a condition of building permission in ULB and Master Plan areas and a recommendation elsewhere, including on village land inside towns, where the Village Council's consent governs any transfer of immovable property (Village Council Act, s.15(1)(g)). Zone 1 land and the reserve that is village, clan or private land is secured by agreement with the Village Council or the landowners (as the 2023 Act provides for a Municipality's acquisition "by agreement", s.120), by donation, or by reservation in a Master Plan or Town Planning Scheme (ss.11 and 14A–14K of the TCP Act), recorded on the layout approval and in the land record where one exists, and is not taken; where it is so secured, the transfer of Clause 6.9.8(a) is made by that recorded agreement rather than by a transfer of title (set by this Manual). Where the State decides that land for a public drain must be obtained compulsorily, that is under the Nagaland Land (Requisition and Acquisition) Act, 1965, whose s.3(1) covers "flood control and anti-erosion measures including embankment and drainage", at the Municipality's request (2023 Act, s.121), with compensation as the Kohima Bench held on 3 November 2026, "as per rates and quantification as provided under the Act of 2013" (as reported); the Manual states that route and does not invoke it. The corridor should be shown as land kept free along drainage lines in the draft master plans for Kohima and the Greater Dimapur Planning Area if they are notified, and checked at building permission, where the site plan already has to show the "Proposed method of drainage or disposal of rain water, waste water" (bye-law 4), rather than made a new NOC.
The reserve matters because the drains of Nagaland's towns are divided among owners, and no rule divides them: a Dimapur Municipal Council administrator called the town's drains "orphans" in 2019 (as reported). The public drains, streams and tanks vest in the Municipality "notwithstanding anything contained in any other law" (2023 Act, s.119(1)), yet drainage, storm water and water supply are not among the obligatory functions of a Municipal Council (s.61), and the municipal area is not the whole town: the oldest part of Kohima is Kohima Village under its Village Council, and the Secretariat area "is said to be a part of Kohima village and does not form part of Kohima municipal area" (ADB, NUIDP project administration manual, 2022). PWD builds the roadside drains with the roads, and PWD (NH) and NHIDCL the drains of the national highways, among them NH-29, whose maintenance includes "drain clearances" (Kohima Bench order of 9 September 2026); UDD builds storm drains under AMRUT, JNNURM and the ADB NUIDP, and the Dimapur Municipal Council submits drainage projects that UDD tenders (as reported); KSCDL builds the Smart City works in Kohima; WRD looks after the rivers and embankments, PHED the sewers, the Dimapur sewage treatment plant and the septage plants, the Soil and Water Conservation Department the treatment of catchments such as the Dzuma's, and NEEPCO operates the Doyang dam; and on village land, inside towns and outside them, the lanes, drains and springs are the Village Council's to maintain (Village Council Act, s.12(1): "to supervise proper maintenance of water supply, roads, … sanitation"). No notification dividing the drains of any Nagaland town among these bodies was found during research (NEER reading). For the purposes of this Manual, and until the State issues such a rule [TBC], the drains are assigned as follows: public drains, channels, culverts and water courses in, alongside or under any street, and public tanks, streams, reservoirs and wells, within municipal limits to the Municipality (the Municipal Council or Town Council) (2023 Act, s.119(1)(b) and (d)); roadside drains, catch-water drains, scuppers and culverts on State roads to PWD (R&B), and on NH-29 and the other national highways to PWD (NH) or NHIDCL; storm drains built under AMRUT, JNNURM and the ADB NUIDP to UDD as executing agency until they are handed over in writing to the Municipality, and Smart City works in Kohima to KSCDL until they are so handed over; rivers, with their beds, banks and embankments, to WRD; sewers, the Dimapur sewage treatment plant and septage to PHED (and village drainage under SBM-G to PHED (Urban)); catchment treatment to the Soil and Water Conservation Department; the Doyang reservoir and its gates to NEEPCO as operator; and village lanes, drains and springs on village land, inside or outside towns, to the Village Council (s.12(1)) (set by this Manual). Each town shall keep a drain register that gives every reach its owner under this assignment, its land status (village, clan, individual, municipal or State land), whether it carries sullage or septic overflow (bye-law 20), and its outfall (set by this Manual). Under Clause 6.9.8(a), the reserve along a channel assigned to WRD is transferred to, or secured for, the Water Resources Department, by agreement where the land is village, clan or private land. Where a channel's status is disputed, the corridor follows the channel and not its name: Dimapur's nullahs are at once storm drains, carriers of sewage and sullage, and the outfalls of the town to the Dhansiri (Clause 8.9). No approved city drainage master plan with a design return period was found for any town in the State, and no design storm for any town drain: Kohima's "storm water drainage phase 1" was reported complete in 2018 with Rs 107 crore sanctioned, with no design basis seen (as reported), and UDD's AMRUT mission director said in 2019 that "There is no comprehensive project for drains" (as reported). A drain sized to fit the land left beside it cannot be enlarged, which is why the reserve is based on the required size. Until a Basin Stormwater Master Plan is adopted (Clause 6.9.6(b)), the required drain size of Clause 6.9.7 is the size computed by the designer under this chapter. This Manual does not prescribe a lined or an unlined section, except where Clause 6.3.6(j) and Chapter 9 require lining on steep gradients; it requires the section to meet the velocity limits of Clause 6.7.3 and Chapter 9, and a reserve wide enough for an unlined or vegetated section keeps both options open.
Commentary. Requirements 6.9.2(b)–(e), 6.9.3 and 6.9.4 have no direct precedent and are set by this Manual. Compound walls around individual plots are almost universal in Nagaland and are one of the most common ways that overland flow paths get blocked. The 50% blockage assumption for wall openings is set to match the grate clogging factor of Clause 6.6.3. The 3.5 m access width is set by this Manual, sized for a small excavator or desilting vehicle. For comparison, APWA 5600 (2006, 5608.4) requires a 15 ft (about 4.6 m) maintenance access strip for detention facilities.
6.10 Ponding at sags and low points
6.10.1 Minor event. At every sag, the minor design flow shall be removed by inlets (after clogging) with ponded spread within Table 6.2.
6.10.2 1% AEP event. At every sag:
- (a) the ponded depth shall not exceed 350 mm at the deepest point of the carriageway;
- (b) a surface overflow route shall be provided (for example over a lowered kerb and footpath into a designated overland flow path), so that the ponding level cannot rise above the overflow level; and
- (c) building floor levels around the sag shall comply with Clause 6.11.
6.10.3 Fully-blocked check. At sags, the 1% AEP ponding level shall also be computed with the minor system fully blocked and all flow leaving by the surface overflow route. Floor levels around the sag shall be set from the higher of the two ponding levels.
6.10.4 Trapped sags. Where a sag has no surface overflow route, the inlets and conduits (after clogging) shall carry the 1% AEP flow, and the approving authority shall agree the arrangement.
6.10.5 Road underpasses. Underpasses and other trapped sags on public roads shall:
- (a) be drained by a minor system (with pumping under Chapter 9, Clause 9.9, where gravity drainage is not possible) designed for the 2% AEP (50-yr) flow, checked at the 1% AEP flow;
- (b) have flanking inlets at both approaches to intercept flow before it reaches the low point;
- (c) be protected from inflow from surrounding streets by raised approach crests where practicable; and
- (d) have depth markers and automatic warning or closure signals that operate at 150 mm depth on the carriageway.
Commentary. The fully-blocked check, the trapped-sag rule and the underpass requirements have no direct precedent and are set by this Manual. No record of a flooded road underpass in the State was found during research [TBC]. The roads already act as the major system, and in the hills as its steepest part: on 3 September 2024 NH-29 at chainage 126 on the Tsiedukhru range at Pagla Pahar was washed away by the flooding Chathe, and a landslide near Pherima killed six people, with the village's Gaonbura blaming "the blockage of the culvert drainage" (as reported); the same stretch was washed out again in the storms of 8–15 September 2025 (as reported); and in July 2025 NH-29 was blocked in floods at Dimapur and Niuland that killed three people (as reported). Clause 6.10.5(d) links the 150 mm crown depth limit of Table 6.2 to the point at which traffic should stop.
6.11 Building floor levels
6.11.1 The lowest habitable floor, and every opening through which water could enter a building (doors, ventilators, basement ramps, lift pits and service entries), shall be at least 0.5 m above the 1% AEP flood level.
6.11.2 The 1% AEP flood level is the highest of:
- (a) the 1% AEP major-system water level in the street or overland flow path next to the building (Clauses 6.9 and 6.10, including the fully-blocked check at sags);
- (b) the 1% AEP flood level of any river, channel, tank or waterbody (Chapter 7); and
- (c) the 1% AEP level with the tailwater of Chapter 5; and
- (d) where the Approving Authority has adopted a 1% AEP flood depth map under Clause 7.3.4, the ground level at the plot plus the mapped 1% AEP depth.
6.11.3 Default where no level has been computed. For a plot below the Chapter 1 thresholds, or where no 1% AEP level has been computed for the plot, the lowest habitable floor and openings shall be at least the higher of:
- (a) 0.65 m above the highest crown level of the road on which the plot fronts; and
- (b) where an adopted 1% AEP flood depth map covers the plot, the ground level plus the mapped 1% AEP depth plus 0.5 m.
The Approving Authority may adopt a regional map, such as a State-approved map or a published national map of modelled 1% AEP flood depth (for example the India Flood Atlas), until a local study replaces it. A map that does not model storm surge shall not be used in place of Clause 6.11.6.
6.11.4 Basements. The crest of every basement ramp and the sill of every basement opening shall meet Clause 6.11.1. Basement drainage shall be pumped to the surface drain through a non-return valve.
6.11.5 Services. Electrical panels, transformers, standby generators, lift machinery and pumps that serve a building shall meet Clause 6.11.1.
6.11.6 Coastal band. The coastal band is the land within 500 m landward of the High Tide Line along the sea front, as defined by the CRZ Notification, 2019, with the High Tide Line as demarcated in the approved Coastal Zone Management Plan. Where the Survey of India Hazard Line lies further inland than 500 m, the band extends to the Hazard Line. Within the coastal band, in addition to Clauses 6.11.1 to 6.11.5:
- (a) the lowest habitable floor and every opening shall also be at least 0.5 m above the coastal flood level, which is the 1% AEP still-water level (Clause 5.7.3(b), Annex 5A) plus twice the sea-level allowance of Clause 5.7.4 (so at least 0.6 m), because buildings have a design life of more than 50 years (Clause 5.7.4(c));
- (b) where the plot fronts the open beach, the coastal flood level shall include wave set-up from a site study;
- (c) no habitable room, electrical service room or plant listed in Clause 6.11.5 shall be placed in a basement; and
- (d) every basement opening, ramp crest and ventilation opening shall meet Clause 6.11.6(a).
Clause 6.11.6 does not authorise any construction that the CRZ Notification prohibits. Where both apply, the stricter governs.
Figure 6.5 — Coastal band: the minimum floor level built up from the 1% AEP still-water level, twice the sea-level allowance, wave set-up where the plot fronts the open beach and 0.5 m freeboard; and the extent of the band, to 500 m from the High Tide Line or to the Hazard Line where it lies further inland (Clause 6.11.6). Original drawing for this Manual, adapted from the CRZ Notification, 2019 (para 1(i) and Annexure IV) and PUB Singapore, Code of Practice on Surface Water Drainage (7th ed.), cl. 2.1.1.
Commentary. The 0.5 m freeboard above the 1% AEP level follows the DID Malaysia 2008 checklist (platform and lowest floor at 100-yr ARI + 0.5 m). It is more than the APWA 5600 (2006, 5601.8 A2) requirement of 1 ft (about 0.3 m) above the 1% stage. The 0.65 m default in Clause 6.11.3 is derived from the other limits of this chapter, not separately sourced: the 1% water level at the crown may be up to 150 mm (Table 6.2), plus the 0.5 m freeboard. It has no direct precedent and applies to plots where no flood level exists. URDPFI (2015) also links minimum plinth levels to flood frequency in its flood-plain zoning, which is covered in Chapter 7.
Clause 6.11.3(b) lets a small plot use a mapped 1% AEP depth where no local study exists, instead of guessing from the road level alone. Modelled national maps are coarse (about 30 m), and most model rainfall and river flooding but not storm surge, which is why 6.11.3 keeps the road-crown check and Clause 6.11.6 sets a separate coastal rule.
The coastal band of Clause 6.11.6 uses the 500 m line of the CRZ Notification, 2019 (G.S.R. 37(E), para 1(i): "the land area from High Tide Line ... to 500 meters on the landward side"), because every coastal authority already maps it and it needs no new survey. The Hazard Line, demarcated by the Survey of India to show the extent of flooding and shoreline change, extends the band where it lies further inland (CRZ Notification, 2019, Annexure IV). The band takes the coastal level from the joint-case still-water level of Chapter 5 rather than from the rainfall map. The higher standard reflects the setting: a coastal flood rises with the sea, cannot be drained while the tide is up, and will rise further with the sea. Singapore takes the same approach with a fixed minimum platform level of 4.0 m above datum on its southern coast and 4.5 m on its northern coast, whatever the rainfall flood level (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 2.1.1). Each coastal State's tide and surge levels vary too much along its coast for one fixed level, so this Manual uses the computed still-water level instead. Using twice the sea-level allowance applies the sensitivity case of Clause 5.7.4(c) as the design case, because a building, unlike a drain, cannot easily be raised later. The basement restriction in 6.11.6(c) is set by this Manual: a basement in the coastal band fills from the sea as well as from rain, and cannot be pumped out to a tide-locked outfall. Nagaland has no coast, no High Tide Line and no Coastal Regulation Zone, so the coastal band is empty in the State and Clause 6.11.6 does not apply there. Clauses 6.11.3 and 6.11.4 matter instead. The Nagaland Building Bye-Laws 2012 set no flood plinth and no floor level above any flood level. Their only flood rules are the definition of "Natural Hazard Prone Areas", which takes flood-prone areas from the CWC Flood Atlas, "besides, other areas can be flooded under conditions of heavy intensity rains, inundation in depressions, back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area" (bye-law 42(iii)), and the flood-protection menu of Appendix A3, which includes the "Construction/improvement of drainage paths" and the "Clearing of clogged cross drainage works". No local authority has published a highest flood level for any town [TBC], no development plan with such a survey has been notified, and no flood zone exists in law (Chapter 7), so the rules give no level to build to. For this Manual, the floor levels of Clause 6.11.1, 0.5 m above the 1% AEP flood level, govern; on the Dimapur–Chümoukedima plain, where no 1% AEP level has been computed for the Dhansiri, the Chathe, the Diphu or a nullah, the level is taken as the highest flood level surveyed from the flood marks of Clause 5.8.5(a) where that is higher (set by this Manual). Clause 6.11.3, which sets the lowest habitable floor and every opening 0.65 m above the road crown where no flood level has been computed, and Clause 6.11.4, which applies the same level, or 0.5 m above the 1% AEP flood level, to the crest of every basement ramp and the sill of every basement opening, are set by this Manual and add to the rules. No rule of the bye-laws on basements was found [TBC]; on the plain a basement is also checked for flotation with the groundwater at ground level where no piezometer readings exist (Clauses 4.12.1 and 4.12.3). On a hillside the road crown is not always the right reference: a building below a road takes the road's runoff, so Clause 6.11.2(a) sets its floor and openings from the 1% AEP level of the flow path past it, with the uphill diversion and the drained space against the cut of Clause 6.3.6(l) in place, and a floor or basement cut into a slope also needs the geotechnical certificate of the hill rule of Clause 4.11; the bye-laws already make the height of a building depend on its structural design and the soil, "certified by the Structural Engineer/Geo-technical Expert on Record" (bye-law 22). Along the streams, nullahs and rivers, near the ponds and springs and on the shore of the Doyang reservoir, the lines of Chapter 7 also apply.
6.12 Culverts and road crossings
6.12.1 Design AEP. A culvert or bridge that carries a road over a drain or waterway shall pass the design AEP flow of Table 6.1 for that road class without overtopping the road, and with the headwater limits of Chapter 9, Clause 9.4. Where the waterway is a State highway or national highway crossing, the design AEP shall also be not less than that of IRC:SP:42-2014 §7.1.4 for the span. The rarer AEP governs.
6.12.2 Check event and 1% AEP. At the check event and at the 1% AEP event, the crossing and the road together shall pass the flow:
- (a) with overtopping depth ≤ 150 mm at the road crown and ≤ 350 mm at the deepest point of the road;
- (b) within the hazard limits of Table 6.3;
- (c) with no overtopping at all of arterial roads that are notified evacuation routes; and
- (d) without raising the 1% AEP flood level at any upstream building or property boundary above the level for the existing condition, unless the affected owners and the approving authority agree.
6.12.3 Where overtopping is not permitted. Overtopping in the 1% AEP event is permitted only where the structure span is less than 6 m and the 1% AEP peak flow is not more than 7 m³/s, unless a guard rail is installed downstream of the overtopping section. Otherwise, the crossing shall pass the 1% AEP flow without overtopping.
6.12.4 Blockage check. The 1% AEP check shall be repeated with a blocked inlet:
- (a) 50% of the inlet area blocked for culverts with a span or diameter below 1.5 m; and
- (b) 20% blocked for larger culverts.
The results of this check shall meet Clause 6.12.2(a) and (d).
6.12.5 Minimum size. Culverts under public roads shall be at least 900 mm in diameter, or 900 mm × 900 mm for box culverts.
6.12.6 Hydraulic design. Culvert hydraulics, including inlet and outlet control, tailwater, road overtopping and outlet protection, shall follow Chapter 9, Clauses 9.4 and 9.6.
Commentary. The design AEPs are those of Table 6.1. The overtopping limits are the street-depth limits of Table 6.2. The span and flow threshold in Clause 6.12.3 is the SI conversion of APWA 5600 (2006): overtopping allowed only where the structure span is under 20 ft and the 1% peak is 250 cfs or less, unless a downstream guard fence is installed. IRC:SP:42-2014 (§7.1.4) sets 25-yr for NH/SH culverts up to 2 m span and 50-yr for 2–6 m spans. The blockage percentages in Clause 6.12.4 and the 900 mm minimum size have no direct precedent and are set by this Manual. The 50% value matches the grate clogging factor.
6.13 Nagaland construction-practice requirements
6.13.1 Covered roadside drains. Where a roadside drain is covered by slabs that form a footpath:
- (a) it shall be designed as an open channel with the freeboard of Table 6.7 measured to the soffit of the cover slab, and its HGL shall meet Clause 6.8 measured to the footpath and inlet levels;
- (b) road runoff shall enter through openings in the drain wall at road level (Clause 6.6.1(b)), each with a silt sump (Clause 6.6.7), at the spacing of Clause 6.6.4;
- (c) footpath runoff shall enter through slots or grated openings in the cover, not by ponding on the footpath; and
- (d) the clear section shall meet Clause 6.7.6(c).
6.13.2 Removable covers and access openings. Covered drains shall have:
- (a) removable cover panels at not more than 10 m centres, each at least 0.6 m long and spanning the full clear width, with recessed lifting points, liftable by two workers or by a hand-operated lifting device, and flush with the footpath;
- (b) access chambers with a clear opening of at least 0.6 m × 0.6 m at every junction, bend and change of section, and at not more than 30 m centres on straight runs; and
- (c) covers rated for the traffic or pedestrian load at their location (Chapter 9, Clause 9.11).
6.13.3 Silt traps. In addition to the inlet sumps of Clause 6.6.7, silt trap chambers shall be provided:
- (a) upstream of every culvert under an arterial road;
- (b) upstream of every pump station and detention facility; and
- (c) at every outfall to a tank, river or other waterbody (with the gross pollutant trap required by Chapter 8).
Each silt trap shall be sized to hold the sediment expected between scheduled cleanings, using the sediment yield in Annex 6B, and shall be reachable by a desilting vehicle.
6.13.4 Garbage and gross pollutant screens. Screens shall be provided where an open drain enters a covered drain, a pipe or a culvert, and at outfalls under Chapter 8. Each screen shall:
- (a) be designed under Chapter 9, Clause 9.8;
- (b) have a bypass or overflow, so that a fully blinded screen does not flood properties or the road beyond the limits of this chapter; and
- (c) be checked hydraulically with 50% of its area blocked.
6.13.5 No building over drains. No structure other than an approved crossing or a removable cover shall be built over a public drain. Shop frontages, ramps and steps that cross a drain shall be removable or shall leave access openings that meet Clause 6.13.2.
6.13.6 Utilities. No water main, sewer, power or telecom cable, gas pipe or duct shall be laid along, or pass through, the flow area or freeboard of any drain. A utility that must cross a drain shall:
- (a) cross above the cover soffit or below the drain invert, inside a sleeve; and
- (b) be shown on the drainage plan with its level.
Where an existing utility crossing obstructs a drain, its area shall be deducted from the drain section, with a 50% blockage allowance for the debris it traps, until the utility is relocated. The utility owner shall relocate it when the drain is rebuilt.
6.13.7 Sewage. No sewage connection is permitted to a storm drain (Chapter 8). Covered drains shall be built with sealed joints where they run next to sewers.
6.13.8 Edge protection. Open drains deeper than 1.0 m beside a footpath, a carriageway or a public open space shall have railings or barriers. Open drains of any depth shall not be left uncovered across a footpath.
6.13.9 As-built levels. The as-built invert levels of every public drain, pipe and manhole shall be surveyed and submitted (Chapter 10). Inverts shall be within ±15 mm of design. An HGL re-check shall be submitted where they are not.
6.13.10 Desilting. Public drains shall be desilted before the monsoon season each year, as set out in Chapter 10.
Commentary. Clause 6.13 has no direct precedent; this Manual sets it on the basis of Nagaland practice. Most urban drains in the State are covered roadside drains under footpaths. They are often built with continuous cast-in-situ slabs and few openings, so they cannot be cleaned and fill with silt and solid waste within a season. CPHEEO (2019) notes that uncovered channels "are prone to the dumping of garbage" (Part A, Ch 2), which is why the drains are covered. Covering without access openings simply moves the problem out of sight. NDMA (2010) recommends that pre-monsoon desilting be complete by 31 March. In Nagaland that date is also the start of the wet season as this Manual defines it. IMD's normal onset of the south-west monsoon at Dimapur is 4 June and its normal withdrawal 14 October (IMD, 2020; IMD gives no Kohima row), but the floods come earlier: NSDMA lists Dimapur's vulnerable areas for "May–Sep" (NSDMA, Dimapur urban flood assessment), CGWB finds that the monsoon at Dimapur "persists from May to September" (CGWB, Dimapur district booklet), and in May 2025 the Deputy Commissioner called a Dimapur flood "man-made", with "drains desilting still on" (headline, as reported). Kohima's April and May 24-hour records are modest, 74.8 mm (11 April 1965) and 76.0 mm (18 May 1995), but its monthly means rise steeply from April, 106.27 mm in April and 179.40 mm in May (NSCCC, Rainfall Kohima, 1981–2022), and the slope work of the hill towns must be finished before the season. Storms also come after the withdrawal: 140.0 mm at Kohima on 19 October 2001 and 87.0 mm on 7 November 1971 (IMD Extremes). No order of a Municipal or Town Council, UDD or the Municipal Affairs Department fixing a completion date for desilting was found during research [TBC]: Dimapur's drain clearance is reported to start "in January" and "continue based on urgency" into late May, with a mass social work on 31 May (as reported), and no deadline was reported for Kohima (as reported). So Clause 6.13.10 refers to the monsoon season as this Manual defines it, 1 April to 31 October, and Chapter 10 requires desilting and the clearance of silt, debris, garbage and slide material from drains, nullahs, inlets, racks, traps and culverts to be complete by 31 March, with gates, flap gates and any pumps certified ready on the same date (Clauses 5.11.5 and 5.12.9); a mid-season clearance of inlets, culverts, racks, silt traps and the nullah mouths by 15 May, after the April–May storms and before the plain's May floods, earlier than the 31 May used downstream on the Dhansiri plain because a clearance due at the end of May falls in the floods it is meant to precede, as the adjoining edition to the south also found; standby from 1 April to 31 October; and a post-season clearance of silt, debris and slide material in every town by 15 November, after the October storms. These dates are set by this Manual. WRD's works on rivers and embankments keep WRD's own calendar. Nagaland's towns have no snow regime.
No rule of the Nagaland Building Bye-Laws 2012 forbids building over a drain in so many words, but "no building shall be allowed to be constructed, which will obstruct the natural flow of drain", and the Authority "shall have the power to cause the free flow of public drains" (bye-law 23). Dimapur's nullahs are reported to be "heavily encroached" (as reported), slums stand along the Lengrijan Nullah (NSDMA), and about 200 families are reported to be affected every year by building on an old channel of the Dhansiri (as reported). NSDMA's recommendations include "covering drains" (NSDMA); this Manual allows a drain to be covered only with the access openings of Clause 6.13.2, and natural streams, ravines and nullahs are open channels with a drainage reserve (Clause 6.9), which should not be covered, decked or built over. Where a drain is covered, Clause 6.13.2 applies to it in full; where it is open beside a footpath or a carriageway, Clause 6.13.8 applies. In the hill towns many drains run beside steps and footpaths on steep ground, where an open drain is a fall hazard and a covered one cannot be cleared of stones and waste without its access openings.
Clause 6.13.7 is not yet the practice, and it cannot be until sewers exist and the bye-laws change. The bye-laws send kitchen and bathroom waste water to the public drain and allow a "rain water-waste combined drain" (bye-law 20(ii)–(iii)); in Dimapur, the only town with sewerage, 10.4% of households had piped sewerage and 74.2% septic tanks, and 65.4% of households' waste water went to open drains (Census 2011, via NSDMA); the four major drains of Kohima are the subject of interception and diversion projects under AMRUT 2.0, whose retention ponds treat sewage, not storm runoff (State affidavit to the National Green Tribunal in E.A. 35/2023, 12 December 2023); and CPCB lists the Dhansiri below Dimapur and the Sanuo Ru below the New Secretariat at Kohima as polluted stretches (CPCB, Polluted River Stretches, 2025). Clause 8.9 sets how dry-weather flow in storm drains is surveyed and intercepted until the connections are removed, including the rule that interception shall not reduce the capacity of the drain (Clause 8.9.5(b)).
The 10 m and 30 m spacings and the ±15 mm tolerance have no direct precedent and are set by this Manual. Clause 6.13.6 responds to the common sight of water mains and cables running through drains. Each one traps debris and reduces the section. Mechanical cleaning through cover openings, rather than manual entry, is assumed throughout, consistent with the Prohibition of Employment as Manual Scavengers and their Rehabilitation Act, 2013.
6.14 Outfalls
6.14.1 Outfalls shall be designed for the tailwater conditions of Chapter 5. Outfalls below the 1% AEP still-water level shall have flap or tide gates or non-return valves (Chapter 5 and Chapter 9, Clause 9.10).
6.14.2 Outfall protection and energy dissipation shall be designed under Chapter 9, Clause 9.6. Outfalls to tanks and waterbodies shall also meet Chapters 7 and 8.
6.15 Submittal requirements
Every conveyance submittal shall include a Conveyance Design Report (Form 6-1) containing:
- a catchment plan showing sub-catchments, the minor system, inlet locations and the major-system overland flow paths for the 1% AEP event (Clause 6.3.2);
- the land-use and road-class AEP adopted for each element (Table 6.1), and the high-density area status;
- design flows, with the rainfall sheet of Chapter 2 and the method of Chapter 3;
- gutter spread, depth and D·V checks for the minor, check and 1% events (Tables 6.2 and 6.3);
- an inlet schedule with clean capacity, clogging factor, design capacity and bypass flow (Clause 6.6);
- pipe and drain design tables with n, velocity, sediment allowance and freeboard (Clause 6.7);
- HGL profiles for the minor and check events, with the tailwater used (Clause 6.8);
- sag ponding levels, including the fully-blocked check (Clause 6.10);
- a floor-level schedule for every building (Clause 6.11);
- culvert and crossing calculations (Clause 6.12 and Chapter 9); and
- a utilities-crossing schedule and access-opening layout for covered drains (Clause 6.13).
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Volume I, Part A: Engineering Design. Tables 4.1, 5.1, 5.2, 5.3, 5.8, 5.11, 5.12, 6.2, 11.2, 11.5; §5.3, §5.6.2, Fig. 5.9. https://www.mohua.gov.in/static/uploads/2025/10/8a2456c722036d78c72a698898ef846d.pdf
- PUB Singapore (2018, with Addendum No. 3, April 2025). Code of Practice on Surface Water Drainage, 7th edition. Clauses 1.1, 2.1.1, 5.1, 5.3, 9.6, 9.7 and Appendix 1 (Drainage Reserve Requirements). https://www.pub.gov.sg/-/media/PUB/PDF/Code-of-Practices-and-Submission-Guidelines/Surface-Water-Drainage/Code-of-Practice-on-Surface-Water-Drainage.pdf
- Indian Roads Congress (2013). IRC:SP:50-2013, Guidelines on Urban Drainage (First Revision). https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.050.2013.pdf
- Indian Roads Congress (2014). IRC:SP:42-2014, Guidelines on Road Drainage (First Revision). https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.042.2014.pdf
- Bureau of Indian Standards. IS 7784 (Part 1): 1993, Code of practice for design of cross drainage works, Part 1: General features (as cited in CPHEEO 2019 Table 5.12).
- Federal Highway Administration (2024). Urban Drainage Design Manual, Hydraulic Engineering Circular No. 22, 4th edition, FHWA-HIF-24-006. (3rd edition 2009, FHWA-NHI-10-009.)
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.8, 5604.2, 5608.4). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf ; and Version 2025.01 (Dec 2025).
- Australian Institute for Disaster Resilience (2014). Australian Disaster Resilience Guideline 7-3: Technical flood risk management guideline: Flood hazard. Tables 1 and 2. https://knowledge.aidr.org.au/media/1891/guideline-7-3-technical-flood-risk-management.pdf
- Smith, G.P. and Wasko, C.D. (2012). Australian Rainfall and Runoff Revision Project 15: Two-dimensional modelling in urban and rural floodplains. Engineers Australia.
- Ball, J. et al. (eds) (2019). Australian Rainfall and Runoff: A Guide to Flood Estimation, Book 6 (Chapters 6 and 7). Commonwealth of Australia (Geoscience Australia).
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management; and (2012) Urban Stormwater Management Manual for Malaysia (MSMA), 2nd edition.
- Gupta, K. Return Period and Rainfall Intensity for Drainage Design in India. IIT Bombay. https://www.civil.iitb.ac.in/~kgupta/drainagedesign.pdf
- Nagaland State Disaster Management Authority (NSDMA). Critical Assessment and Recommendation of Remedial Measures on Dimapur Urban Flood (with the District Disaster Management Authority, Dimapur, and the Dimapur Municipal Council; uploaded September 2023) (the three nullahs; the vulnerable localities; the causes of flooding; the Walford culvert; household sewerage and waste-water outlets from Census 2011; the recommended measures, among them the proposed buffer along drainage lines and the use of natural ponds), https://web.archive.org/web/20240901051148/https://nsdma.nagaland.gov.in/sites/default/files/2023-09/Critical%20Assessment%20%26%20Recommendation%20of%20Remedial%20Measures%20on%20Dimapur%20Urban%20Flood_0.pdf
- Asian Development Bank (2022). Nagaland Urban Infrastructure Development Project (54166-001): Project Readiness Financing report and project administration manual, Loan 6045 (the consultants' terms of reference for drainage; access to drainage; sewerage; Kohima Village and the Secretariat area), https://ewsdata.rightsindevelopment.org/files/documents/01/ADB-54166-001_Yo13VLd.pdf and https://ewsdata.rightsindevelopment.org/files/documents/01/ADB-54166-001_YBR92el.pdf
- Comptroller and Auditor General of India. Audit Report for the year ended 31 March 2022, Chapter II (performance audit of the Kohima Smart City Mission; Appendix 2.2.1(A)), https://cag.gov.in/uploads/download_audit_report/2022/Chapter-II-Social-Sector-0650306d6658c13.40908577.pdf
- State of Nagaland. Affidavit in E.A. No. 35/2023 in O.A. No. 673/2018 before the National Green Tribunal, filed 12 December 2023 (the Dimapur sewage treatment plant; the septage plants; the AMRUT 2.0 interception and diversion projects on four Kohima drains; the Dzuma catchment treatment), https://www.greentribunal.gov.in/sites/default/files/news_updates/AFFIDAVIT%20BY%20STATE%20F%20NAGALAND%20IN%20EA%20NO.%2035%20of%202023%20IN%20OA%20NO.%20673%20of%202018%20News%20item%20published%20in%20the%20Hindu%20authored%20by%20shri%20Jacob%20Koshy%20titled......pdf
- Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality (the Dhansiri, Khatkati Gate to Ganesh Nagar, Priority IV; the Sanuo Ru below the New Secretariat, Kohima, Priority V), https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf
- Gauhati High Court, Kohima Bench. PIL(Suo Moto)/2/2019, In re Kohima v. Union of India and 20 Ors. (NH-29), order of 9 September 2026 (NHIDCL's affidavit on the maintenance of Package-I, including "drain clearances"), https://www.livelaw.in/pdf_upload/2026/09/14/1-700075.pdf
- Central Ground Water Board, North Eastern Region. Ground Water Information Booklets, Kohima District and Dimapur District, archived at web.archive.org from cgwb.gov.in (capture of 6 February 2020), and Aquifer Mapping … Dimapur Valley (July 2013) (geology, runoff, the monsoon at Dimapur).
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012) (Kohima, 42527), https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf ; and IMD (2020), New Normal Dates of Onset/Progress and Withdrawal of Southwest Monsoon (Dimapur, Table 2); and Nagaland State Climate Change Cell, Rainfall Kohima (1981–2022), https://nsccc.nagaland.gov.in/wp-content/uploads/2023/11/Rainfall-Kohima.pdf
- Indian Roads Congress (1998). IRC:SP:48-1998, Hill Road Manual (drainage provisions not read for this Manual); and IRC:SP:42-2014, cl. 7.1.4 (design return periods for road drains and culverts) and cl. 8.5.1 (drainage of hill roads).
- Press reports on the Pherima landslide and the NH-29 washout at Pagla Pahar of 3 September 2024 and on the washout of September 2025 (Morung Express; All India Radio); on the Mon landslide of 19 July 2026 (IANS; EastMojo); on the Kigwema–Mao road PIL; on the Dimapur floods of July 2025 and the May 2025 desilting (Eastern Mirror, Morung Express, Nagaland Post); on Kohima's storm-water drainage and AMRUT works (Elets eGov, March 2018; Eastern Mirror, 2019); and on Dimapur's drains as "orphans" (2019).
- National Disaster Management Authority (2010). National Guidelines: Management of Urban Flooding.
- MoHUA / TCPO (2015). URDPFI Guidelines, Volume I.
- Ministry of Environment, Forest and Climate Change (2019). Coastal Regulation Zone Notification, 2019, G.S.R. 37(E), 18 January 2019. Para 1(i) and Annexure IV. https://crz.elaw.in/crz2019.html
- Urban Development Department, Government of Nagaland. Nagaland Building Bye-Laws 2012, made under sections 479 and 481 of the Nagaland Municipal Act 2001 (Act No. 10 of 2001) and continued by section 143(2) of the Nagaland Municipal Act, 2023, as amended (bye-laws 4, 17, 20, 21, 22, 23 and 42(iii) and Appendices A1 and A3; notification number, date and gazette reference [TBC]), copy hosted by the Kohima Municipal Council, https://kmc.nagaland.gov.in/wp-content/uploads/2023/12/Building-Bye-Laws.pdf
- Government of Nagaland. The Nagaland Municipal Act, 2023 (Act No. 9 of 2023), Notification No. LAW/MISC-ACTS/45/2023 of 9 November 2023, Nagaland Gazette Extraordinary No. 225, as amended by Act No. 11 of 2024 (ss.61, 119, 120, 121, 138 and 139), https://prsindia.org/files/bills_acts/acts_states/nagaland/2023/Act9of2023Nagaland.pdf
- Government of Nagaland. The Nagaland Town and Country Planning Act, 1966 (Nagaland Act 4 of 1966), as amended (s.11), https://nagaland.gov.in/storage/PostFiles/The-Nagaland-Town-and-Country-Planning-Act,-1966.pdf ; and the (Fourth Amendment) Act, 2025 (Act No. 6 of 2025; Notification No. LAW/BILL/23-61/2025 of 23 May 2025) (ss.14A–14K and 14F(g)), https://nagaland.gov.in/storage/actRules/jMXU5KJuxtktVu2WES5RkP3puVc7f6R3p3M5J2P0.pdf
- Government of Nagaland. The Nagaland Land (Requisition and Acquisition) Act, 1965 (Act No. III of 1965) (s.3(1)), in the compendium of the Department of Land Records and Survey, https://dlrs.nagaland.gov.in/wp-content/uploads/2025/01/Act_and_Rules.pdf
- Government of Nagaland. The Nagaland Village and Area Councils Act, 1978, renamed the Nagaland Village Council Act, 1978, as amended (ss.12(1) and 15(1)(g)), https://faolex.fao.org/docs/pdf/ind94094.pdf
- The Constitution of India, Article 371A(1)(a) (as quoted at constitutionofindia.net); and the Gauhati High Court, Kohima Bench, judgment of 3 November 2026 on review in WP(C) 216/2021 and 50/2022 and WA 6/2025 and 7/2025 (acquisition under the 1965 Act; compensation at the rates of the Act of 2013) (Morung Express, as reported).
- Government of India. The Prohibition of Employment as Manual Scavengers and their Rehabilitation Act, 2013.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 6A | Standard inlet types for Nagaland with capacity curves (on grade and sag) |
| 6B | Sediment yield for silt-trap sizing and calibration of the sediment allowance |
| 6C | Standard drawings: covered roadside drain with removable covers, access chamber, inlet with silt sump |
| Form 6-1 | Conveyance Design Report checklist |
Commentary. Nagaland's drains were not designed against any State or municipal standard: none was found during research, and no document found gives a design return period, runoff coefficient or drain size for any town. The Nagaland Building Bye-Laws 2012 ask for a site plan with "Proposed method of drainage or disposal of rain water, waste water" (bye-law 4) and refer to the National Building Code and IS codes for structure only; the terms of reference of the ADB-financed Nagaland Urban Infrastructure Development Project, which covers "urban roads and roadside drains, storm water drainage networks, and landslip protection" in eight towns, ask for "Indian national standards and guidelines" without a return period (ADB, 2022), and the same project found that "59.5% of urban houses have access to drainage facility" (ADB). Kohima's "storm water drainage phase 1" was reported complete in 2018, with Rs 107 crore sanctioned, but no design basis was seen (as reported); the Kohima Smart City's "Sustainable urban drainage system including Re-use" stood at "DPR Completed" with nothing spent in 2022 (CAG, Audit Report 2021-22); and UDD's AMRUT mission director said in 2019 that "There is no comprehensive project for drains" (as reported). Dimapur's drains are cleared in an annual campaign with no published design basis (as reported). The drains also work in a setting that the plains editions of this Manual do not meet. In the hill towns they collect water from slopes of Disang and Barail rock that deliver gravel, stones and slide debris with every storm; in every town they carry sullage, because the bye-laws send kitchen and bathroom waste water to the public drain (bye-law 20(ii)); and they end in hill streams that no one gauges, or, on the Dimapur–Chümoukedima plain, in nullahs that back up when the Dhansiri, the Chathe or the Diphu is high. The road drains of the hills are the drains of the land above them. The drains are also divided among owners: the Municipal and Town Councils, UDD, KSCDL, PWD, PWD (NH) and NHIDCL, WRD, PHED, NEEPCO and, on village land, the Village Councils all build or hold drains and receiving waters, and no rule divides them (see the Commentary to Clause 6.9). Fixing the rainfall (Chapter 2) is only half the answer. The other half is a second, surface-level system that carries the flows the pipes cannot, without flooding buildings. That is the dual drainage concept of this chapter, taken from Kansas City Metro APWA Section 5600 (5601.8, Levels of Service), which requires every element to have a 1% AEP overflow path.