Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Nagaland. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration storms of the monsoon season, which fall for days on the ranges and the plain together, filling the Doyang reservoir and raising the Dhansiri, the Chathe and the Diphu against the town drains (in 2018 the gates of the Doyang dam stayed open from 27 July to 5 August, and the Dhansiri downstream at Numaligarh stayed above its old highest level for more than 60 hours, as reported), from the pre-monsoon storms of April and May to the October storms that follow the withdrawal of the south-west monsoon, as well as for short-duration intensities;
  • (d) to design outfalls for the streams, nullahs, rivers and reservoir into which the towns drain: the steep streams and ravines of the ridge towns, among them the Dzuna, the Dzucha, the Dzu and the Sano Ru through Kohima, which rise within the hour and carry slide debris and garbage to free outfalls; the Hospital, Dhobi and Lengrijan Nullahs of Dimapur, which the Dhansiri backs up, and the drains of the plain to the Chathe and the Diphu when those rivers are high; the Doyang reservoir of NEEPCO and the reach below its dam, held and released by its operator; and the rivers that leave the State, none of which has a CWC gauge within Nagaland, including the case where the outfall is closed;
  • (e) to protect tanks (ponds), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building bye-laws made under sections 479 and 481 of the Nagaland Municipal Act 2001 (Act No. 10 of 2001) and continued by section 143(2) of the Nagaland Municipal Act, 2023 (Act No. 9 of 2023) (the Nagaland Building Bye-Laws 2012), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Nagaland's floods come from three sources, often together. The first is the river and nullah flood of the Dimapur–Chümoukedima plain. Dimapur drains through three nullahs, the Hospital, Dhobi and Lengrijan Nullahs, to the Dhansiri, and floods when they are blocked or when the Dhansiri, the Chathe or the Diphu backs up into them. The Nagaland State Disaster Management Authority (NSDMA) records the floods of 11–24 September 2008, which submerged Dobhinalla, Super Market, Nagarjan, Burma Camp, Walford, Sachu Colony, Nagagaon, Khermahal, Netaji Colony, Naharbari and the Airport area; those of 2019, which killed 3 people and submerged 13 areas; those of 2021-22, which affected 1,265 people; and a submergence of the town on 12 June 2023 (NSDMA). Press accounts of October 2019 give 13 to 17 villages submerged and 2 dead (as reported), against NSDMA's 3 deaths for the year (conflict). In July 2025 three people died in Dimapur and Niuland, flights were grounded and NH-29 was blocked; and on 8–15 September 2025 the Chathe and the Dhansiri crossed the danger mark, the Vilhume, SM, East Police, Namgalong, Ragailong and Kuda colonies flooded, and the Chümoukedima–Seithekema bridge was destroyed (all as reported, the last citing NSDMA). The second is the slide and debris of the ranges. On 4 July 2023 a rockslide on NH-29 at Chümoukedima killed two people (the year to be checked), and in July 2023 a landslide at a construction site in Kohima killed one; on the night of 3 September 2024 a landslide near Pherima killed six, and the Chathe washed out NH-29 at chainage 126 at Pagla Pahar, which washed out again in September 2025; in July 2025 landslides in Mon district were reported to have killed 3 and then 8; and on 19 July 2026 a landslide in Mon town (Defence Colony) killed at least 8, given as 8, 9 or 10 in different reports (all as reported). The Pherima landslide of 2024 and the Pagla Pahar washout of 2025 are often conflated, and the Mon reports of 2025 and 2026 overlap; this Manual keeps the dates apart. The third is the statewide monsoon flood, with the Doyang's releases. In July–September 2018 floods and landslides struck the whole State: the toll was given as 10 in early August and as at least 11 or 12 later, with more than 3,000 families displaced in 400 villages, or 532 villages in 11 districts by 2 September; Kiphire was cut off for two weeks and food was air-dropped to Tobu, Pungro, Tenzing and Noklak; the State made an interim request of ₹219 crore and put the damage at "around ₹800 crore"; and at Runchan below the Doyang the river shifted and 1,000 acres of crops were lost (all as reported; the tolls changed through the season). The gates of the Doyang dam were open from 27 July to 5 August 2018; SANDRP argued that the release drove the flood at Golaghat downstream, and NEEPCO that not releasing would have threatened the dam (as reported); this Manual states both and takes no side. In 2024 the State recorded extreme weather on 46 days, with 26 deaths (CSE, as reported). NSDMA's final tolls for these events were not found [TBC].

Missing design makes all three worse. No design storm, return period or drain standard was found for the drains of any town in the State; an administrator of the Dimapur Municipal Council (DMC) called Dimapur's drains "orphans" in 2019 (as reported); NSDMA names "Garbage disposal through drains", "Encroachment", "A lack of maintenance" and "Non-existent infrastructure" among the causes of Dimapur's floods (NSDMA); and the NBBL 2012 control the site plan, cuts and rainwater harvesting, not runoff, and set no setback from any stream, spring or drain. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix; the slides are answered by the siting, screening, infiltration and debris rules of Chapters 2, 4, 6 and 7, because no drain is sized to carry a debris flow.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Nagaland Building Bye-Laws 2012 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Nagaland, the top two layers have a particular meaning. Much of the State's natural storage and supply lies in its springs, which with the streams supply its towns and villages: the Land Resources Department has inventoried 2,361 springs in 1,025 settlements, with about 4,600 more to inventory and a "Springshed Atlas of Nagaland" in preparation, and its springshed work is reported to have made 11,857 households in 95 villages "all-weather water sufficient" (as reported). It lies too in the steep streams of the ridge towns, such as the Dzuna, the Dzucha and the Sano Ru at Kohima; in the State's ponds, which make up 90.64% of the 1,432 water bodies of the first Water Bodies Census, 94.13% of them private (as reported), among them the "ancient natural pond in Dr. Haralu Colony" that NSDMA proposes to keep for retention in Dimapur (NSDMA); in the Doyang reservoir and the wetlands reported as priorities, Shilloi lake and Dzüdu lake (as reported); and in the piedmont sands, gravels and pebble–boulder beds of the Dimapur plain, whose Quaternary sediments "provide good scope for infiltration and recharge" (CGWB, 2013). The law protects little of this. The Nagaland Municipal Act, 2023 vests "all public tanks, streams, reservoirs and wells" of a municipality in it (s.119(1)(b)); the NBBL 2012 forbid any building "which will obstruct the natural flow of drain" (bye-law 23); and a Village Council's duties include supervising the "proper maintenance of water supply" (Village Council Act, s.12(1)). No statute or bye-law found protects springs, ponds or wetlands with a buffer, no floodplain zoning law was found, and no wetland of the State was found notified under rule 4 of the Wetlands (Conservation and Management) Rules, 2017. In the ranges the second layer changes. Retention on a slope is storage and reuse, not infiltration: water put into the red clays, colluvium and fill over Disang shale raises the pressure in the slope, and the bye-laws' own appendix asks that slopes be kept stable "by ensuring good drainage of water so that the saturation of the hill-slope is avoided" (Appendix A1(d)). This Manual therefore bars deliberate infiltration on natural slopes of more than 10°, on Disang or Barail shale at any slope, on colluvium, fill or slide debris, in mapped landslide zones and close upslope of a cut or retaining wall, unless a geotechnical certificate allows it (Clause 4.11, hill rule); bars it on the plain below the 1% AEP flood level of the rivers and nullahs, in the auto-flow zone round Dhansiripar, on pond margins and wherever the seasonal high water table is within 2.0 m of ground (Clause 4.11, floodplain rule); and allows recharge only on the tested piedmont sands and gravels of NL-A and on proven sandstone benches, because every groundwater assessment unit of the State is "Safe", with a stage of extraction of 4.72% (GWRA 2024, as quoted), and recharge is not a design objective (Clause 4.11, recharge rule) (all set by this Manual). Rainwater harvesting elsewhere is storage and reuse, which the hill towns need: in Kohima "only about 30% of municipal areas get regular supply", and the Kohima Municipal Council distributes water by tanker (as reported). Losing the springs and the stream heads cannot be offset by pipes, and in the ranges a drain that puts water into a slope can make it fail.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Nagaland through:

  • (a) an amendment to the Nagaland Building Bye-Laws 2012 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. In Nagaland the building rules are the Nagaland Building Bye-Laws 2012 (Urban Development Department; made under sections 479 and 481 of the Nagaland Municipal Act 2001 (Act No. 10 of 2001), and continued by section 143(2) of the Nagaland Municipal Act, 2023 (Act No. 9 of 2023)), as amended. The copy hosted by the Kohima Municipal Council prints no notification number, date or gazette reference, and the bye-laws come into force "on a date to be notified" (1(iii)); both are to be confirmed [TBC]. They extend to "Master Plan Areas", to "Municipal Council/Town Council Areas as may be notified under the Nagaland Municipal Act, 2001" and to "Notified Areas under local bodies as may be constituted under any other laws in force" (1(ii)); their "Authority" is "the Municipal Councils/Town Councils … and shall also include a Local Authority or officer authorized" (2(i)); and they repealed the Nagaland Building Byelaws 2001 (bye-law 32). The 2001 Act was itself repealed in 2023 (Act No. 3 of 2023), after the Assembly resolved on 28 March 2023 to repeal it, citing the perception that it ran "contrary to the spirit of … Article 371-A" (as reported). Section 143(2) of the 2023 Act keeps the rules, regulations, notifications and schemes made under the 2001 Act in force "in so far as it is not inconsistent with the provisions of this Act", which is how this Manual reads the bye-laws as continuing (NEER reading). Two statements stand beside that reading and do not reconcile with it: a Joint CEO of NSDMA said in October 2024 that "the 2012 byelaws have not been implemented" (as reported), and the Comptroller and Auditor General found that "In Nagaland, however, no Rules and Bye-laws have been framed as of date", in a paragraph on the internal controls of the urban local bodies (CAG, Audit Report 2022-23, Local Governments). Whether and where the bye-laws are applied is to be confirmed [TBC]. Their amendments are known only from summaries published by TeamLease: a Second Amendment of 2024 (No. MA-22/2024, 30 November 2024), inserting sections 17A and 17B, 25(vi) and 76; a Third Amendment of 2025 (No. MA-22/2024/816, 25 February 2025, in force from 28 February 2025), section 77; and a Fourth Amendment (No. MA-22/2024/382), which defines the Building Plan Approval Committee and creates, in sections 33A–33B, a Building Byelaws Review Committee under the Municipal Affairs Department as the "competent authority" for their review, amendment and relaxation, titled 2025 but dated 30 June 2026 in the summary (all as summarised by TeamLease; the date conflict is not settled here); no First Amendment was found. A new draft Nagaland Building Bye-Laws 2026 is reported to be "in the final stages", aligned with the Draft National Building Bye-Laws 2026 (as reported); it has not been notified as far as found. The NBBL 2012 ask for a site plan that shows the slope "to facilitate convenience for graphical study of drainage pattern of the site" and the "Proposed method of drainage or disposal of rain water, waste water" (bye-law 4); require a toe or protection wall below a downhill site (17); let the Authority restrict earth cutting and require retaining walls (21); forbid any building "which will obstruct the natural flow of drain" (23); require rooftop rainwater harvesting on plots of 100 m² and more (39); and count among natural hazard prone areas those flooded by "back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area" (42(iii)). They test a site only for liquefaction or storm surge (5), and set no setback from a stream, spring or drain, no slope limit, no flood plinth and no runoff limit; their only slope number is the "1 in 5" above which a combined drain is stepped (20(iii)).

Land is the second matter, and it is particular to Nagaland. Under Article 371A(1)(a) of the Constitution, no Act of Parliament in respect of "ownership and transfer of land and its resources" shall apply to the State "unless the Legislative Assembly of Nagaland by a resolution so decides" (as quoted). Land is held mostly by villages, clans and individuals under Naga customary law, and the State has no District Councils. Each of its 1,280 recognised villages has a Village Council under the Nagaland Village Council Act, 1978 (CAG), and some lie inside towns: the oldest part of Kohima is the village administered by the Kohima Village Council, and the area of the State Secretariat "is said to be a part of Kohima village and does not form part of Kohima municipal area" (ADB, 2022). No transfer of immovable property is made without the Village Council's consent (s.15(1)(g)). No Assembly resolution adopting the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 was found (as reported). The State's own Nagaland Land (Requisition and Acquisition) Act, 1965 lets the State requisition land for "flood control and anti-erosion measures including embankment and drainage" (s.3(1)), and the 2023 Act lets a municipality acquire land by agreement (s.120) or ask the Government to acquire it under the 1965 Act (s.121). On 3 November 2026 the Kohima Bench of the Gauhati High Court held, on review, that the 1965 Act "has not been replaced by the Act of 2013 in the State of Nagaland", that acquisition "may be done in terms of the Act of 1965", and that compensation is to be paid "as per rates and quantification as provided under the Act of 2013" (as reported). Article 371A does not stop the State or an urban local body from setting technical standards, and this Manual is not an Act of Parliament, so a competent authority could adopt it without an Assembly resolution (NEER reading); but its corridors and setbacks act on "land and its resources" in practice. This Manual therefore presents them as conditions of building permission in the areas of the urban local bodies and in Master Plan areas, and as recommendations elsewhere; land for public drains is secured by agreement, by donation or under the 1965 Act as the State decides; and on village land the Village Council's consent governs. The Manual states the route of the 1965 Act; it does not invoke it, and it takes no land.

The route of Clause 1.3.1 therefore runs several ways, each of which a body could take and none of which has been taken. The State Government could amend the NBBL 2012, at bye-laws 4, 20, 21, 23 and 39, on the recommendation of the Municipal Affairs Department's Building Byelaws Review Committee, the competent authority for amendments under the Fourth Amendment (as summarised by TeamLease), or carry this Manual into the draft Nagaland Building Bye-Laws 2026 (Clause 1.3.1(a)). A Municipal or Town Council could make drainage regulations under section 138 of the 2023 Act, which take effect only once "approved by the Government and published in the Official Gazette" (s.139) (Clause 1.3.1(b)). The Urban Development Department (UDD) could carry drainage reserves and the 1% AEP areas into a Master Plan's "Public utilities plan" (Nagaland Town and Country Planning Act, 1966, s.11) and into Town Planning Schemes (ss.14A–14K), and NSDMA could refer to the Manual in the district disaster management plans. Departments could apply it to their works. A Village Council could take it into a Village Development Scheme (s.12(1)). Outside the areas of the urban local bodies and of Master Plans, this Manual reaches only public works executed by the State's departments and agencies (Clause 1.5.1(b)) and any body that adopts it; for a household or a village it is guidance (Commentary to Clause 1.5). This Manual is a draft; neither the Government, any department, any Municipal or Town Council, any Village Council nor any other authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the competent authority for the area: in the area of a Municipal Council or Town Council, that Council, or another local authority or officer authorised under bye-law 2(i) of the Nagaland Building Bye-Laws 2012, for the building permit under the bye-laws and, under section 119 of the Nagaland Municipal Act, 2023, for its own drains; in a Master Plan area published under the Nagaland Town and Country Planning Act, 1966, the Authority whose permission section 13 of that Act requires (no Master Plan for Kohima or Dimapur has been notified, so there is none yet); for a Town Planning Scheme under sections 14A–14K of that Act, the urban local body, which issues the commencement certificate (s.14K); for a public work, the department or agency that executes it (the Public Works Department (PWD), PWD (NH), NHIDCL, the Water Resources Department (WRD), the Public Health Engineering Department (PHED), the Urban Development Department (UDD) or Kohima Smart City Development Ltd (KSCDL)); WRD for any work in or on a river or embankment; and, on village land inside or outside a town, the Village Council, for which this Manual is guidance unless the Council takes it into a Village Development Scheme under section 12(1) of the Nagaland Village Council Act, 1978 or into a resolution under its own powers (none has), or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the Nagaland Building Bye-Laws 2012 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The catchments of Dimapur's Hospital, Dhobi and Lengrijan Nullahs to the Dhansiri, with the vulnerable areas of NSDMA's assessment; the Chathe through Chümoukedima and Dimapur; the Diphu and the old Dhansiri channel at Dimapur; the Dimapur airport area on the Sugar Mill Nallah; Kohima's Dzuna, Dzucha and Sano Ru; the NH-29 corridor from Chümoukedima to Kohima, with Pagla Pahar and Pherima; the Doyang reservoir and its release reach to the State border; Mon town; Peren and Jalukie on the Barak headwaters; and the Dzuma, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (pond), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the Nagaland Building Bye-Laws 2012 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Nagaland Gazette.
Competent authority for the area The body that grants permission for the site, or executes the work, under the instrument that applies there: the Municipal Council or Town Council, or another local authority or officer authorised under bye-law 2(i) of the Nagaland Building Bye-Laws 2012, for the building permit and, under section 119 of the Nagaland Municipal Act, 2023, for its own drains; the Authority under section 13 of the Nagaland Town and Country Planning Act, 1966 in a published Master Plan area (none yet); the urban local body for a Town Planning Scheme (s.14K); the executing department or agency for a public work; WRD for any work in or on a river or embankment; and, on village land inside or outside a town, the Village Council, for which this Manual is guidance unless the Council takes it into a Village Development Scheme or a resolution under its own powers (none has). Where this Manual says "the Authority", the competent authority for the area is meant. This Manual does not bind a Village Council or village land.
Village Council The council of a recognised village under the Nagaland Village Council Act, 1978 (enacted as the Nagaland Village and Area Councils Act, 1978 and renamed in 1990; called the "Nagaland Village and Tribal Council Act, 1978" by CAG in 2025, the renaming amendment not found [TBC]). Nagaland has 1,280 recognised villages (CAG), some of them inside towns, among them Kohima Village, the oldest part of Kohima. A Council's duties include "to formulate Village Development Schemes, to supervise proper maintenance of water supply, roads, … sanitation" (s.12(1)), and no transfer of immovable property is made without its consent (s.15(1)(g)). Each village has a Village Development Board, of which the Deputy Commissioner is ex officio chairman (CAG).
Village land Land of a recognised village, which belongs to the population of that area or was given to them (s.3, Explanation), held by the village, its clans or individuals under Naga customary law; Article 371A(1)(a) of the Constitution protects the ownership and transfer of land and its resources. Most land in the State, inside and outside towns, is held this way. Where this Manual reserves a drainage corridor, an easement or a facility site on village, clan or private land, the land is secured by agreement with the Village Council or the landowners, by donation, or by reservation in a Master Plan or Town Planning Scheme; it is never taken (set by this Manual).
Nullah An open urban channel that carries storm water and waste water to a river, as Dimapur's Hospital, Dhobi and Lengrijan Nullahs carry them to the Dhansiri (NSDMA). A nullah draining 8 ha or more is treated as a natural channel under Chapter 7.
Master Plan area An area for which a Master Plan has been published under the Nagaland Town and Country Planning Act, 1966. None has been found notified for Kohima or Dimapur; the Draft Kohima Master Plan 2030 and the GIS-based master plan for the Greater Dimapur Planning Area (horizon 2041) are drafts (as reported).

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the Nagaland Building Bye-Laws 2012;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Nagaland, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply under bye-law 39 of the Nagaland Building Bye-Laws 2012 to new buildings on plots of 100 m² and more where the bye-laws apply, thatched roofs excepted, with roof, gutters, down pipe and first flush, filter and a "Storage tank with provision for drawing water and spill over", kept "for storage of water for non-potable purposes or recharge of groundwater", and under bye-law 40 to the recycling of waste water from buildings that discharge 10,000 litres a day or more, but with no storage volume, release rate or design storm, as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Nagaland plots are small and the cumulative effect of many small plots is what fills Kohima's drains. For small buildings in Nagaland, the NBBL 2012 already require rooftop rainwater harvesting on new buildings on plots of 100 m² and more (bye-law 39), and ask every site plan to show the rainwater drains, the waste-water drains and "the soil pipe from tank to soak pit" (bye-law 4). Neither sets a volume, and the tank is full when the season's storm arrives, so none of it limits what leaves the plot in a design storm. The bye-laws send septic effluent "to soak pits for disposal" (20(i)), which on a slope puts water into the ground that the hill rule of Clause 4.11 protects, and send kitchen and bath water to the public drain or, where there is none within 50 m, "to the nearest nulla or gorge or fallow land" (20(ii)). No rule asks a single building to carry the water from uphill around its foundations or to discharge its roof water to a lined drain or stable channel rather than down the slope. Clause 1.5.4(b) applies to every building whatever its size for this reason. Outside the areas to which the bye-laws extend (1(ii)), among them village land outside the municipal areas, such as Kohima Village and the Secretariat area beside it (ADB, 2022), no building rule found reaches a small building, and this Manual is guidance only: a household or a Village Council could use the small-site method of Chapter 4 and the hill rule of Clause 4.11 as guidance. A small building on a hill slope is where a soak pit or soakaway can do most harm, and an Authority may make the hill rule of Clause 4.11 a condition of every building permit in its area, whatever the size of the site (a recommendation of this Manual, not a requirement of Clause 1.5.4); where a septic soak pit on a slope of more than 10° or on shale cannot be avoided, this Manual recommends that a geotechnical engineer site it, downslope of buildings and cuts, and refers sewage questions to Clause 8.9. Where bye-law 39's option of "recharge of groundwater" falls on a site where the hill rule or the floodplain rule of Clause 4.11 forbids infiltration, the two conflict: this Manual requires storage in place of recharge there, and the applicant seeks the Authority's relaxation; the Manual does not override the bye-law (Table 1.3).

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Kohima Municipal Council (KMC);
  • (b) the Dimapur Municipal Council (DMC); and
  • (c) once a master plan for Kohima or for the Greater Dimapur planning area is notified under the Nagaland Town and Country Planning Act, 1966, every approving authority within its planning area, whichever has jurisdiction over a site (no such plan has been notified).

1.6.2 Tier B authorities. All other Municipal Councils, Town Councils and other local authorities under the bye-laws are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with UDD regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the area of the Kohima or Dimapur Municipal Council or, once a Master Plan is notified under the Nagaland Town and Country Planning Act, 1966, the Kohima or Greater Dimapur planning area (none has been notified), or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Kohima Municipal Council, with no drain inventory or drain design standard found, a storm-water drainage "phase 1" reported complete in 2018 with Rs 107 crore sanctioned (as reported), a septage treatment plant of 90 KLD (State affidavit before the NGT, 2023), and the oldest part of the town, Kohima Village, under its own Village Council, with the area of the State Secretariat "said to be a part of Kohima village" and outside the municipal area (ADB, 2022), and a small Town Council with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Kohima.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
Nagaland Building Bye-Laws 2012 (Urban Development Department; made under sections 479 and 481 of the Nagaland Municipal Act 2001 (Act No. 10 of 2001), and continued by section 143(2) of the Nagaland Municipal Act, 2023 (Act No. 9 of 2023)), as amended (notification number, date, gazette reference and commencement date [TBC]); the Second Amendment 2024 (No. MA-22/2024, 30 November 2024), the Third Amendment 2025 (No. MA-22/2024/816, 25 February 2025) and the Fourth Amendment (No. MA-22/2024/382; "2025" in its title, 30 June 2026 in the summary; conflict), all as summarised by TeamLease; the draft Nagaland Building Bye-Laws 2026 (as reported; not notified) Continue where they apply. They extend to Master Plan areas, to Municipal Council and Town Council areas and to the notified areas of other local bodies (1(ii)), with the Municipal and Town Councils, or a local authority or officer authorised, as the Authority (2(i)); "Building" includes "drainage works" and "earth bank" (2(iii)), and a change to the "sanitary or drainage system" is a material alteration (2(iv)). They require a site plan with the slope shown "with contour lines or spot levels to facilitate convenience for graphical study of drainage pattern of the site", "The position of rainwater drains, wastewater drains from kitchen and bathroom, the soil pipe from tank to soak pit" and the "Proposed method of drainage or disposal of rain water, waste water" (4); deem a plan sanctioned if no decision is made within 30 days, without authorising anything "against the terms of lease or titles of the land" (9(A)(ii)); set road setbacks and a toe or protection wall below a downhill site (17); let the Authority restrict earth cutting and direct retaining walls (21); tie height to structural and geotechnical certification (22); forbid any building "which will obstruct the natural flow of drain" and give the Authority "the power to cause the free flow of public drains" (23); and count among natural hazard prone areas those flooded by "back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area" (42(iii)), with a flood-protection menu in Appendix A3. They test a site for liquefaction or storm surge only (5) and set no storm-water volume, peak-flow, detention, setback, slope-limit, flood-plinth or design-storm rule. Whether they are applied is disputed: "the 2012 byelaws have not been implemented" (NSDMA Joint CEO, as reported, October 2024), and "no Rules and Bye-laws have been framed as of date" (CAG, Audit Report 2022-23, Local Governments); the two do not reconcile with the 2012 text [TBC]. The design criteria of Chapters 2–6, the hill, floodplain and recharge rules of Clause 4.11 and the corridors of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the NBBL 2012, a Master Plan or a statute is stricter, it governs (Clause 1.3.3).
Rainwater harvesting and recycling: NBBL 2012, bye-laws 39 and 40 Continue unchanged. Bye-law 39: "Unless otherwise stipulated specifically in a Town Planning Scheme, workable rooftop rainwater harvesting arrangements shall be included in the building plans of new buildings on plot size of 100 sq.ms and above", thatched roofs excepted, with roof, gutters, down pipe and first flush, filter and a "Storage tank with provision for drawing water and spill over", maintained "for storage of water for non-potable purposes or recharge of groundwater at all times" (39(iii) cross-refers to "Bye-Law 38", apparently meaning 39; quoted as printed). Bye-law 40: buildings discharging 10,000 litres a day or more recycle waste water "for horticultural purposes". Neither sets a storage volume, release rate or design storm. This Manual counts the stored water against its retention requirement only as reuse (Clause 4.4.3), never as detention. Where bye-law 39's "recharge of groundwater" option falls on a site where the hill rule or the floodplain rule of Clause 4.11 forbids infiltration, the two conflict: this Manual requires storage in place of recharge there, and the applicant seeks the Authority's relaxation; the Manual does not override the bye-law.
Effluents: NBBL 2012, bye-laws 19 and 20 Continue. Every building has a septic tank of at least 2.5 m³ (19); septic effluent "shall not be allowed to flow to rain water drains" and goes "to soak pits for disposal" (20(i)); kitchen and bath water "shall be taken by means of pucca drain and dropped in public drain", or, with no public drain within 50 m, carried "to the nearest nulla or gorge or fallow land" with the landowner's written permission (20(ii)); and rain water may be disposed of by the waste-water drain, "called rain water-waste combined drain", stepped "where it passes over ground with slope more than 1 in 5" (20(iii)). The bye-laws thus put sullage into storm drains by rule; this Manual's interception rules (Chapter 8) run against bye-law 20(ii)–(iii) until it changes, and the Manual proposes a transition without overriding the bye-law. A soak pit on a slope of more than 10° or on shale conflicts with the hill rule of Clause 4.11; the Manual recommends that a geotechnical engineer site it.
Nagaland Municipal Act, 2023 (Act No. 9 of 2023; Notification No. LAW/MISC-ACTS/45/2023 of 9 November 2023; Nagaland Gazette Extraordinary No. 225, 9 November 2023), as amended by the Nagaland Municipal (Amendment) Act, 2024 (Act No. 11 of 2024; Notification No. LAW/ACT/23-44/2024 of 12 November 2024); the Nagaland Municipal Act 2001 (Repeal Act, 2023) (Act No. 3 of 2023) Continue. Municipal Councils serve populations of 20,000 and above, Town Councils 5,000 to 20,000 and Urban Station Committees 1,000 to 5,000 (s.5). The obligatory functions of a Municipal Council (s.61) include urban planning, "Regulation of Land-use and Construction of Buildings" and public health and sanitation, but "drainage", "storm water" and "water supply" do not appear; further functions may be assigned by notification (s.62). Yet, "notwithstanding anything contained in any other law", the Act vests in the municipality "all public tanks, streams, reservoirs and wells" and "all public sewers and drains, channels, tunnels, culverts and water courses in, alongside or under any street" (s.119(1)(b), (d)). Land may be acquired by agreement (s.120) or, at the municipality's request, by the Government under the Nagaland Land (Requisition and Acquisition) Act, 1965 (s.121). The Act levies no tax on land and buildings (s.124). Rules carry fines of up to ₹5,000 (s.137); a municipality may make regulations (s.138), which have no effect until "approved by the Government and published in the Official Gazette" (s.139) and which the Government may cancel or modify (s.140); rules, regulations and notifications under the 2001 Act continue in so far as they are consistent (s.143(2)); and the Act is to be reviewed every ten years (s.144). The State has 39 urban local bodies: the Municipal Councils of Kohima, Dimapur and Mokokchung and 36 Town Councils (CAG, March 2023). Elections were held on 26 June 2024 in all three Municipal Councils and in 21 of the 36 Town Councils (CAG), or 22 or 23 in press reports (conflict), after administrators had run the bodies since 2009.
Nagaland Town and Country Planning Act, 1966 (Nagaland Act 4 of 1966; assent 27 August 1966; Gazette Extraordinary, 3 September 1966), as amended in 1975, 1982 and 2000 and by the Nagaland Town and Country Planning (Fourth Amendment) Act, 2025 (Act No. 6 of 2025; assent 6 May 2025; Notification No. LAW/BILL/23-61/2025 of 23 May 2025; Gazette Part V, 13 June 2025); a Sixth Amendment Bill, 2026 (title only); the Draft Kohima Master Plan 2030 and the GIS-based master plan for the Greater Dimapur Planning Area, horizon 2041 (both drafts, as reported) Continue. A Master Plan "may include" a general land-use plan, a zoning plan, a transportation plan and a "Public utilities plan" (s.11); after its publication no person may develop land "except with the permission of the Authority" (s.13). The amendment of 1982 provides for a "Development Authority, Nagaland" (s.8A), whose constitution was not found. The Fourth Amendment adds Town Planning Schemes prepared by the urban local body (ss.14A–14K), whose contents may include "The filling up or reclamation of low laying, swamp or unhealthy areas" (14F(g)), and after whose declaration no development proceeds without the body's commencement certificate, deemed granted after two months (14K). No Master Plan for Kohima or Dimapur has been found notified; the bye-law amendment of 2024 refers to "the draft Master Plans for Kohima and Dimapur" (as summarised by TeamLease), and a State presentation of April 2026 noted "the absence of statutory master plans in most urban areas" (as reported). No drainage chapter of any plan was seen [TBC]. Master Plans and schemes would show the flood-sensitive catchments, drainage reserves and regional facility sites of this Manual (Chapter 11), and the compensatory-storage rule of this Manual applies to reclamation under a scheme.
Constitution of India, Article 371A; the Nagaland Land (Requisition and Acquisition) Act, 1965 (Act No. III of 1965; assent 20 April 1965; the compendium of the Department of Land Records and Survey prints "Published in the Nagaland Gazette-Extraordinary Dated the 22nd April, 1964" and the short title "Act, 1964", an internal conflict), with the Rules of 1968 and the First Amendment Act, 1969; the Kohima Bench of the Gauhati High Court, review in WP(C) 216/2021 and 50/2022 and WA 6/2025 and 7/2025, 3 November 2026 (as reported) Apply as they stand. No Act of Parliament on the "ownership and transfer of land and its resources" applies to the State unless the Assembly so resolves (Article 371A(1)(a)(iv), as quoted); no resolution adopting the Act of 2013 on land acquisition was found (as reported). The 1965 Act covers requisition for "flood control and anti-erosion measures including embankment and drainage" (s.3(1)), excludes land "used for the purpose of religious worship", pays compensation on the five-year average market value with 15% added by the 1969 amendment (s.11), and applies "partially to the district of Tuensang". The Kohima Bench held that acquisition "may be done in terms of the Act of 1965" with compensation "as per rates and quantification as provided under the Act of 2013" (as reported). This Manual takes no land: its corridors and setbacks are conditions of building permission in the areas of the urban local bodies and in Master Plan areas and recommendations elsewhere, and land for public drains is secured by agreement, by donation or under the 1965 Act as the State decides; the Manual states that route and does not invoke it.
Nagaland Village Council Act, 1978 (the Nagaland Village and Area Councils Act, 1978, Nagaland Act 1 of 1979, as amended in 1985, 1990, when it was renamed and the Area Councils abolished, and 2002; the "Nagaland Village and Tribal Council Act, 1978" in CAG, 2025, the renaming amendment not found [TBC]) Continue. Every recognised village has a Village Council (s.3), and a village stands on land that belongs to its population or was given to it (s.3, Explanation). A Council's duties include "to formulate Village Development Schemes, to supervise proper maintenance of water supply, roads, power, forest, sanitation, education and other welfare activities" (s.12(1)); it administers justice by customary law (s.14) and has "full powers to deal with internal administration of the village", including "(e) to enforce orders passed by the competent authority on the village as a whole" and "(g) no transfer of immovable property shall be affected without the consent of the Village Council" (s.15). Nagaland is exempt from the Seventy-third Amendment, and each of its 1,280 villages has a Village Development Board chaired ex officio by the Deputy Commissioner (CAG). Land Owners' Boards and tribal hohos are not statutory (as reported). This Manual does not bind a Village Council or village land; a Council could take it into a Village Development Scheme.
Official language: the State Legislature (Continuance of the English Language) Act, 1964, in force 26 January 1965 (title as listed on nagaland.gov.in; as quoted), and the Assembly resolution of 18 September 1967 (as reported) English is the official language of the State and the language of this Manual.
Floodplains, waterbodies, springs and wetlands: no State law found; the Wetlands (Conservation and Management) Rules, 2017, with the State Wetland Authority (as reported; its exact name and constitution notice [TBC]) No floodplain zoning Act or Bill, and no statute or bye-law protecting ponds, springs or wetlands with a buffer, was found; no flood zone exists in law. No Ramsar site and no wetland notified under rule 4 was found. NSDMA's proposed "mandatory buffer zone (0.75 – 3.0 meters) along drainage lines" in Dimapur is a recommendation of its assessment, not a rule (NSDMA). The corridors and the spring rule of Chapter 7 are this Manual's proposals.
Gauhati High Court, Kohima Bench: PIL(Suo Moto)/2/2019 (NH-29, Dimapur–Kohima; order of 09.09.2026); the PIL on the Kigwema–Mao road (as reported; case number not found [TBC]); National Green Tribunal: OA 673/2018 (polluted river stretches), with the State's affidavit in EA 35/2023 filed on 12.12.2023, and OA 606/2018 (as reported; not read) Apply as directions where they bind; none sets a design standard or a setback. In the NH-29 PIL the Court recorded NHIDCL's affidavit that Package-I (about 14.935 km) is maintained under a short-term maintenance contract "including road repairs, drain clearances and, slide removal works", with about 4 km to be rebuilt under a five-year performance-based contract; in the Kigwema–Mao road PIL it noted that "clogged drains and/or lack of drainage has resulted in waterlogging" (as reported). Before the NGT the State reported the Dhansiri action plan, the 25.43 MLD Dimapur sewage treatment plant "made fully functional on 14.1.2023", and four interception and diversion projects on Kohima's major drains. No PIL on the drainage of Dimapur or Kohima was found. Sewage in storm drains is dealt with in Chapter 8.
Groundwater: no State rule found; a Nagaland groundwater act reported "being implemented" (as reported) Continue. Every assessment unit of the State is "Safe", with a stage of extraction of 4.72% (GWRA 2024, as quoted), and 2.13% in Kohima district (CGWB), so recharge is not a design objective of this Manual (Clause 4.11, recharge rule). No State observation-well network was found; the network is CGWB's [TBC].
Environment (Protection) Act, 1986; Water (Prevention and Control of Pollution) Act, 1974; the Nagaland Pollution Control Board (NPCB) and its River Rejuvenation Committee (Notification No. FOR/NPCB-27/6/18 of 2 November 2018, as cited in the State's affidavit) Continue. CPCB lists the Dhansiri from Khatkati Gate to Ganesh Nagar (Priority IV) and the Sanuo Ru below the New Secretariat, Kohima (Priority V) as polluted stretches (CPCB, 2025). Sewage in storm drains is dealt with in Chapter 8.
Disaster Management Act, 2005; NSDMA, the District Disaster Management Authorities and the Deputy Commissioners; NSDMA's Critical Assessment and Recommendation of Remedial Measures on Dimapur Urban Flood Continue. The assessment's recommendations, among them desilting, removal of encroachments, the 0.75–3.0 m drain buffer, natural ponds and retention areas, a closed drainage system and permeable surfaces, are proposals, not rules (NSDMA). No order of the State fixing a date for pre-monsoon desilting was found; the works calendar of Chapter 10 sets this Manual's dates, beginning with 31 March.
Terms of reference of the Nagaland Urban Infrastructure Development Project (ADB 54166; Task-4, "Improving Overall Drainage Systems") Apply to the contracts under the project. The terms ask that "Ponding of water within the towns is to be avoided" and treat flood storages and retarding basins "only … as a last resort", while asking that low impact development "shall be duly explored" (ADB). This Manual keeps storage first (Chapters 4, 7 and 11); where a project design follows the terms, the designer states on the submittal which governs. The Manual does not override a contract.
IRC:SP:42-2014, IRC:SP:48 (Hill Road Manual) and the practice of the Public Works Department, PWD (NH) and NHIDCL on hill-road drainage Apply to the drainage of hill roads, cross-referenced from Chapter 6, where they do not conflict with it; the drainage clauses of IRC:SP:48 were not read for this Manual [TBC].
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Nagaland is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the monsoon, because RWH sumps are usually full or the ground saturated by the time a July to September monsoon storm on the Naga hills, such as those of late July 2018 and 14 September 2025, arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

Nagaland is spending on its town drains, but without a design basis. Kohima's storm-water drainage "phase 1" was reported complete in 2018, with Rs 107 crore sanctioned, and a JNNURM storm drain of Rs 30 crore in Kohima is reported (both as reported); the Kohima Smart City's "Sustainable urban drainage system including Re-use" (₹41.52 crore) and "Rain water harvesting" (₹18.84 crore) stood at "DPR Completed", with nothing spent, in July 2022 (CAG); AMRUT has funded storm and waste-water drains in nine Dimapur localities, among them the Dhobi Nallah (as reported), and four interception and diversion projects on Kohima's major drains (State affidavit before the NGT, 2023); and the ADB's Nagaland Urban Infrastructure Development Project covers "urban roads and roadside drains, storm water drainage networks, and landslip protection" in eight district headquarters, under terms of reference that state no design return period or runoff coefficient (ADB). The Comptroller and Auditor General also found a "fraudulent payment of ₹90.54 lakh without actual execution of 2,338 metres of drainage works in 18 villages" by the Public Health Engineering Department (Urban), Dimapur Division (CAG, Audit Report 2019-20). None of the documents found states a design storm, and no development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.

The State's law holds some of the tools. The NBBL 2012 require a site plan that shows the slope, "the position of rainwater drains" and the "Proposed method of drainage or disposal of rain water, waste water" (bye-law 4); let the Authority restrict earth cutting and direct retaining walls (21); forbid any building that "will obstruct the natural flow of drain" and give the Authority "the power to cause the free flow of public drains" (23); and require rooftop rainwater harvesting on plots of 100 m² and more (39). The Nagaland Municipal Act, 2023 vests the public drains, streams and tanks of a municipality in it "notwithstanding anything contained in any other law" (s.119) and lets it make regulations with the Government's approval (ss.138–139). The Nagaland Town and Country Planning Act, 1966 provides for a "Public utilities plan" in a Master Plan (s.11) and, since its Fourth Amendment Act, 2025, for Town Planning Schemes prepared by the urban local body (ss.14A–14K); the contents of a scheme under the Act include "drainage inclusive of sewerage, surface or sub-soil drainage and sewage disposal". The courts have acted on the highway: in the Kohima Bench's suo motu PIL on NH-29, the highway's maintenance contract was recorded to include "drain clearances and, slide removal works" (PIL(Suo Moto)/2/2019, order of 09.09.2026). What the law lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how much water a hill site may put into its slope, how far a building must stand from a stream, spring or nullah, or how much storage a paved plot removes; the bye-laws send kitchen and bath water to the public drain and allow a combined "rain water-waste" drain (20(ii)–(iii)); and no Master Plan has been notified for Kohima or Dimapur. This Manual's checks are framed as part of the permission given by the competent authority for the area under the NBBL 2012, not as a separate no-objection certificate. This Manual is offered as a technical companion to these instruments, to the orders of the courts and to the drainage works of the towns: it supplies the design storm, detention, hill-site drainage, infiltration and corridor numbers they do not set, as a proposal for the Government, the urban local bodies, the Village Councils and the other authorities to consider. Neither the Urban Development Department, the Municipal Affairs Department, any Municipal or Town Council, any Village Council, the Water Resources Department nor any other body has adopted it.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Urban Development Department (UDD) and the Directorate of Urban Development Issued the NBBL 2012, administers the Nagaland Town and Country Planning Act, 1966 and the master plans, runs AMRUT and is the executing agency of the ADB's Nagaland Urban Infrastructure Development Project, with the Directorate as implementing agency (ADB). Could carry the flood-sensitive catchments, drainage reserves, 1% AEP areas and regional facility sites of this Manual into the master plans' "Public utilities plan" (s.11) and into Town Planning Schemes (ss.14A–14K), design its drainage works to this Manual, and give regional support to Tier B authorities (Table 1.1), if the Manual were adopted. The "Development Authority, Nagaland" of section 8A of the Act was not found constituted.
Municipal Affairs Department and the Directorate of Municipal Affairs (DMA) Have "the administrative control of the ULBs" (CAG, 2025); through the Building Byelaws Review Committee, the "competent authority" for review, amendment and relaxation of the bye-laws under the Fourth Amendment, and through the Building Plan Approval Committee (both as summarised by TeamLease). Could recommend the amendment of Clause 1.3.1(a), or carry this Manual into the draft Nagaland Building Bye-Laws 2026, and commend the model regulation of Clause 1.3.1(b) to the urban local bodies.
State Stormwater Technical Committee (Clause 1.3.2) Would set the higher standards of Clause 1.3.2, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12).
Kohima Municipal Council (KMC), the Dimapur Municipal Council (DMC), the Mokokchung Municipal Council and the 36 Town Councils The Authority of the bye-laws in their areas (2(i)); hold the public drains, streams and tanks of their areas under section 119 of the Nagaland Municipal Act, 2023, although drainage is not among the obligatory functions of section 61. DMC cleans Dimapur's drains with a dedicated crew and submits AMRUT drainage projects that UDD tenders (as reported). Would require the drainage report of Chapter 10 with each application, apply this Manual to their own works, keep the drain register of their area, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15). Could make drainage regulations under section 138 of the Act, with the Government's approval (s.139). Kohima Village and the Secretariat area lie outside the KMC's municipal area (ADB, 2022).
Kohima Smart City Development Ltd (KSCDL) Builds works in Kohima under the Smart Cities Mission; its "Sustainable urban drainage system including Re-use" and "Rain water harvesting" stood at "DPR Completed" in 2022 (CAG). Would design its drainage works to this Manual from the dates of Clause 1.11 and hand them over under Clause 10.14.
Village Councils and Village Development Boards (Nagaland Village Council Act, 1978), and the Deputy Commissioners as ex officio chairmen of the Boards Govern the 1,280 recognised villages, some inside towns, and supervise "proper maintenance of water supply, roads, … sanitation" there (s.12(1)); no transfer of immovable property is made without the Council's consent (s.15(1)(g)). Hold or speak for much of the land on which streams, springs and corridors lie. This Manual has no force on village land unless a Council adopts it: a Council could take it into a Village Development Scheme, agree drainage corridors, easements and facility sites on its land (Chapter 7) and keep village drains and springs clear; it would then be the competent authority for the area for those works.
Water Resources Department (WRD) Builds and maintains river and embankment works and is building a Dhansiri flood-forecasting model under the National Hydrology Project (as reported). Would supply river levels and flood marks for Chapter 5, consent to any work in or on a river or embankment, and apply this Manual to its works. Its works on rivers keep its own calendar.
Public Health Engineering Department (PHED) Develops and operates water supply, with the Dimapur sewage treatment plant, septage plants and the sewerage proposals for 13 urban local bodies (ADB; State affidavit before the NGT, 2023); PHED (Urban) has built village drainage under SBM-G (CAG). Would protect the spring-recharge areas above its intakes and keep septic and sullage overflows out of the storm drains it serves (Chapter 8).
Public Works Department (PWD (R&B)), PWD (NH) and NHIDCL Build and maintain the roads, their side drains, catch-water drains and culverts, which in the hill towns are much of the minor drainage system; NHIDCL maintains NH-29 under a contract that includes "drain clearances and, slide removal works" (Kohima Bench, order of 09.09.2026). Would apply Chapter 6 and the hill-road rules to them and never discharge a road drain onto an unprotected slope.
Soil and Water Conservation Department and its Directorate Treats catchments, among them the Dzuma, a tributary of the Dhansiri, "for flood and bank erosion" (State affidavit before the NGT, 2023), and keeps the Kohima daily rain gauge of Dabral (2025). Would apply the hill rule of Clause 4.11 to its works and supply its gauge records under Clause 2.3.6(a).
Land Resources Department Runs the State's spring inventory and springshed work (as reported). Would supply spring locations and recharge areas for the spring rule of Chapter 7.
Department of Environment, Forest and Climate Change and the State Wetland Authority (as reported) Administer the Wetlands Rules, 2017 in the State; no wetland has been found notified under rule 4. The Authority's consent would be needed before a notified wetland is used for storage or as an outfall (Chapter 7).
Nagaland Pollution Control Board (NPCB) Monitors rivers and constituted the River Rejuvenation Committee (2018). Would receive the records of sewage found in storm drains under Chapter 8.
NSDMA, the Department of Land Records and Survey, the Deputy Commissioners and the District Disaster Management Authorities Prepare for and respond to floods and landslides and report their tolls; NSDMA prepared the Dimapur urban-flood assessment with the District Disaster Management Authority and DMC. Would supply the landslide and flood inventories used in the screening of Clause 2.3.6(i) and lead post-event reviews with the Authority (Clause 10.16). Most land is held by villages, clans and individuals under customary law, and its records are not with the State.
NEEPCO (Doyang Hydro Electric Project, 75 MW, Wokha district) Operates the Doyang dam and its gates. An operator, not an approving authority: would supply reservoir levels, release records and its release protocol, which was not found [TBC], for Chapter 5 and the screening of Clause 2.3.6(i).
Central Water Commission (CWC), a body of the Union Publishes the Flood Estimation Report for subzone 2(b) used in Chapters 2 and 3; has no site in Nagaland. Would supply stage records downstream for Chapter 5 and confirm the subzone of the Tizu basin and whether a report for subzone 2(c) is in preparation.
Central Ground Water Board (CGWB), North Eastern Region, a body of the Union Assesses the State's groundwater (every unit "Safe"; stage of extraction 4.72% in 2024, as quoted) and holds the observation wells. Would supply groundwater levels and quality with WRD.
IMD (Meteorological Centre Kohima), and road and rail owners IMD's stations and the automatic stations of its Kohima centre and of NSDMA supply the rainfall records of Chapter 2; Kohima (42527) is the first data request of Clause 2.3.6(a). Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7).

Commentary. Stormwater in Nagaland is split, first, by land. In the areas of the urban local bodies the NBBL 2012 and the Nagaland Municipal Act, 2023 apply: the Municipal and Town Councils grant building permits and hold the public drains, UDD makes the master plans and the Municipal Affairs Department controls the councils and the bye-law amendments. Most land, inside and outside the towns, is held by villages, clans and individuals under customary law, protected by Article 371A, and the Village Councils govern the recognised villages, some of which lie inside the towns: Kohima Village and the Secretariat area beside it are outside the Kohima municipal area (ADB, 2022). The split is then repeated among the bodies that drain the land: UDD, KSCDL and the ADB project build drains; PWD, PWD (NH) and NHIDCL build the road drains that are much of the minor system in the hill towns; WRD holds the rivers; PHED the water supply, the sewers and septage; NEEPCO the Doyang dam, whose releases set the river below it; and the Soil and Water Conservation Department treats catchments. Dimapur shows why the split matters. Its three nullahs carry "wastewater from various parts of the city" to the Dhansiri (NSDMA), 74.2% of its households use septic tanks (Census 2011, via NSDMA), and an administrator of DMC called its drains "orphans" (2019, as reported). The Municipal Act vests public drains in the municipality "notwithstanding anything contained in any other law" (s.119(1)(b), (d)), but drainage is not among the obligatory functions of section 61, and no notification divides the drains of any Nagaland town among their owners (NEER reading). Until the State issues such a rule [TBC], this Manual assigns the drainage elements as in Table 1.5, as Chapter 6 does for the drains themselves, and recommends that each town keep a drain register giving every reach its owner under this split, its land status (village, clan, individual, municipal or State), whether it carries sullage or septic overflow (bye-law 20) and its outfall (set by this Manual). The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers, and on village, clan or private land it is put into effect by agreement with the Village Council or the landowners, not by acquisition.

Table 1.5 — Working assignment of drainage elements under this Manual

Element Assigned to
Public drains, sewers, channels, culverts and water courses in, alongside or under any street, and public tanks, streams, reservoirs and wells, within a municipal area The Municipal or Town Council (Nagaland Municipal Act, 2023, s.119(1)(b) and (d)), although drainage, storm water and water supply are not among the obligatory functions of s.61; in Kohima, KMC
Roadside drains, scuppers and culverts of State roads PWD (R&B)
Drains and culverts of national highways, among them NH-29 PWD (NH) and NHIDCL
Storm drains built under AMRUT, JNNURM and the ADB's Nagaland Urban Infrastructure Development Project UDD as executing agency, until handed over in writing to the urban local body
Smart City works in Kohima KSCDL, until handed over in writing
Rivers, their beds and banks, and embankments The WRD
Sewers, the Dimapur sewage treatment plant and septage PHED (PHED (Urban) for village drainage under SBM-G)
Catchment treatment, such as that of the Dzuma The Soil and Water Conservation Department
The Doyang reservoir, its dam and gates NEEPCO (operator)
Village lanes, drains and springs on village land, inside or outside towns The Village Council (Village Council Act, s.12(1))

This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Nagaland has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a Dimapur nullah backed up by the Dhansiri, to the Chathe or the Diphu, to the Doyang reservoir or its release reach, or to any river in flood, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it; nor is it waived for a site because it drains to a steep stream or a ravine in the ranges.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Nagaland no statute or bye-law sets any setback from a stream, spring or drain, and the one numerical drain buffer found, "a mandatory buffer zone (0.75 – 3.0 meters) along drainage lines" in Dimapur, is a recommendation of an NSDMA assessment, not a rule; the same assessment names "Encroachment" among the causes of Dimapur's floods, and the press reports "heavily encroached waterways" there (NSDMA; as reported).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

  • Government of Nagaland, Urban Development Department. Nagaland Building Bye-Laws 2012, made under sections 479 and 481 of the Nagaland Municipal Act 2001 (Act No. 10 of 2001) (copy hosted by the Kohima Municipal Council; no notification number, date or gazette reference printed [TBC]). https://kmc.nagaland.gov.in/wp-content/uploads/2023/12/Building-Bye-Laws.pdf
  • Amendments to the Nagaland Building Bye-Laws 2012: Second Amendment 2024 (No. MA-22/2024, 30 November 2024); Third Amendment 2025 (No. MA-22/2024/816, 25 February 2025); Fourth Amendment (No. MA-22/2024/382; date in conflict) (as summarised by TeamLease; gazette texts not read [TBC]).
  • Government of Nagaland. Nagaland Municipal Act, 2023 (Act No. 9 of 2023), Notification No. LAW/MISC-ACTS/45/2023 of 9 November 2023, Nagaland Gazette Extraordinary No. 225, 9 November 2023. https://prsindia.org/files/bills_acts/acts_states/nagaland/2023/Act9of2023Nagaland.pdf
  • Government of Nagaland. Nagaland Municipal (Amendment) Act, 2024 (Act No. 11 of 2024), Notification No. LAW/ACT/23-44/2024 of 12 November 2024. https://nagaland.gov.in/storage/actRules/yhi22IXXuCxLg6hRItjw0djsuqxEuL3fmju7HoYf.pdf
  • Government of Nagaland. Nagaland Municipal Act 2001 (Repeal Act, 2023) (Act No. 3 of 2023). https://prsindia.org/files/bills_acts/acts_states/nagaland/2023/Act3of2023Nagaland.pdf
  • Government of Nagaland. Nagaland Town and Country Planning Act, 1966 (Nagaland Act 4 of 1966), as amended in 1975, 1982 and 2000; and the Nagaland Town and Country Planning (Fourth Amendment) Act, 2025 (Act No. 6 of 2025), Notification No. LAW/BILL/23-61/2025 of 23 May 2025. https://nagaland.gov.in/storage/PostFiles/The-Nagaland-Town-and-Country-Planning-Act,-1966.pdf and https://nagaland.gov.in/storage/actRules/jMXU5KJuxtktVu2WES5RkP3puVc7f6R3p3M5J2P0.pdf
  • Government of Nagaland, Department of Land Records and Survey. Nagaland Land (Requisition and Acquisition) Act, 1965 (Act No. III of 1965), with the Rules of 1968 and the First Amendment Act, 1969 (compendium). https://dlrs.nagaland.gov.in/wp-content/uploads/2025/01/Act_and_Rules.pdf
  • Government of Nagaland. Nagaland Village and Area Councils Act, 1978 (Nagaland Act 1 of 1979), as amended in 1985, 1990 (renamed the Nagaland Village Council Act, 1978) and 2002. https://faolex.fao.org/docs/pdf/ind94094.pdf
  • Constitution of India, Article 371A (as quoted from constitutionofindia.net).
  • Government of Nagaland. State Legislature (Continuance of the English Language) Act, 1964 (title as listed on nagaland.gov.in).
  • Gauhati High Court, Kohima Bench. PIL(Suo Moto)/2/2019, In re Kohima v. Union of India and 20 Ors., order of 09.09.2026. https://www.livelaw.in/pdf_upload/2026/09/14/1-700075.pdf
  • Gauhati High Court, Kohima Bench. Review in WP(C) 216/2021 and 50/2022 and WA 6/2025 and 7/2025, 3 November 2026 (as reported, Morung Express); the PIL on the Kigwema–Mao road (as reported).
  • National Green Tribunal. OA No. 673 of 2018: affidavit of the State of Nagaland in EA No. 35 of 2023, filed 12.12.2023. https://www.greentribunal.gov.in/
  • Comptroller and Auditor General of India. Audit Report for the year ended 31 March 2022, Chapter II (Kohima Smart City); Audit Report for the year ended 31 March 2020, Chapter II, para 2.3; Audit Report for the year ended 31 March 2023, Part II, Local Governments. https://cag.gov.in/
  • Asian Development Bank. Nagaland Urban Infrastructure Development Project (54166): Project Readiness Financing report and Project Administration Manual, Loan 6045 (March 2022), with the consultants' terms of reference.
  • Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality.
  • Central Ground Water Board, North Eastern Region. Dynamic Ground Water Resources of Nagaland (GWRA 2024, as quoted [TBC]); Ground Water Information Booklets, Kohima and Dimapur districts.
  • Press reports of the bye-laws' implementation (Morung Express, 23 October 2024), the draft Nagaland Building Bye-Laws 2026, the repeal of the 2001 Act (March 2023), the ULB elections of June 2024, the spring inventory and the Water Bodies Census (secondary sources).
  • Indian Roads Congress. IRC:SP:48, Hill Road Manual (drainage clauses not read [TBC]).
  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
  • Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
  • National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
  • MoHUA (2016). Model Building Bye-Laws, Chapter 9.
  • Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
  • Nagaland State Disaster Management Authority. Critical Assessment and Recommendation of Remedial Measures on Dimapur Urban Flood (tables of the floods of 2008, 2019 and 2021-22; the submergence of 12 June 2023).
  • India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): Kohima (42527). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
  • South Asia Network on Dams, Rivers and People (2018). Role of Doyang dam in bringing unprecedented floods in Golaghat (NEEPCO's statements on the release of July–August 2018; secondary source). https://sandrp.in/2018/08/07/role-of-doyang-dam-in-bringing-unprecedented-floods-in-golaghat/
  • Press reports of the floods and landslides of July–September 2018, October 2019, July 2023, September 2024 (Pherima and Pagla Pahar), July and September 2025 and July 2026 (Mon) (secondary sources). https://www.downtoearth.org.in/
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
  • Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
  • Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
  • Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
  • PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
  • Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
  • Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
  • Nagaland State Disaster Management Authority. Critical Assessment and Recommendation of Remedial Measures on Dimapur Urban Flood (with the District Disaster Management Authority, Dimapur, and the Dimapur Municipal Council; undated, uploaded September 2023). https://nsdma.nagaland.gov.in/sites/default/files/2023-09/Critical%20Assessment%20%26%20Recommendation%20of%20Remedial%20Measures%20on%20Dimapur%20Urban%20Flood_0.pdf
  • Urban Development Department. Draft Kohima Master Plan 2030 and the GIS-based master plan for the Greater Dimapur Planning Area, horizon 2041 (drafts; as reported; not read [TBC]); note on the Nagaland Urban Infrastructure Development Project (August 2026). https://ud.nagaland.gov.in/wp-content/uploads/2026/08/NUIDP-Introduction.pdf
  • Kohima Smart City Development Ltd. Smart City Proposal (approved September 2016; as cited by CAG).

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the boundaries of the Kohima and Dimapur Municipal Councils and, once notified, of the master-plan areas under the Nagaland Town and Country Planning Act, 1966
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model NBBL 2012 amendment and model ULB bye-law
Form 1-1 Applicability Determination
Form 1-2 Variance / Waiver Request