Annexes to Chapter 3Hydrologic Methods
These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.
Annex 3A — Nagaland soil series to HSG lookup; seasonal high water table map
Supports Clauses 3.7 and 3.10 of Chapter 3.
To be prepared. This annex will contain (a) a lookup from each soil series mapped in Nagaland to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the monsoon season (April–October). It needs NBSS&LUP and Directorate of Soil and Water Conservation (Soil Survey Wing) [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the WRD, supplemented by piezometers in the Dimapur–Chümoukedima plain, where dug-well levels ranged from 1.04 to 18.88 m below ground before the monsoon and from 1.0 to 16.66 m after it (CGWB, 2013), above all the auto-flow zone round Dhansiripar, the Recent alluvium along the Dhansiri and the Diphu and the clayey north-western plain; the land beside the Dimapur nullahs; the margins of ponds, such as the natural pond in Dr. Haralu Colony; the margins of the Doyang reservoir; and hill sites with perched water or springs. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).
Table 3A.1 — Soil series to HSG lookup (layout)
| Soil series | District(s) | Taxonomic class | Surface texture | Saturated hydraulic conductivity (mm/h) | Depth to impermeable layer (m) | HSG, drained | HSG, undrained | Source map and scale |
|---|---|---|---|---|---|---|---|---|
Table 3A.2 — Seasonal high water table, by mapping unit (layout)
| Mapping unit or grid cell | Observation wells used | Years of April–October record | Highest April–October level below ground (m) | Within 0.6 m of ground (Clause 3.10.1)? | Data source |
|---|---|---|---|---|---|
Annex 3B — Nagaland CN calibration and supplementary land covers (forest and scrub of the ranges, terraced and valley fields, slide scars and hill-road cuts and fills, boulder-bed streams and the piedmont gravels of the plain, and pond and reservoir beds)
Supports Clauses 3.8 and 3.15 of Chapter 3.
To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Nagaland catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the forest and scrub that cover most of the ranges; the terraced and valley fields of the hills and the fields of the Dimapur–Chümoukedima plain, with their bunds recorded; the fresh scars, slide debris and fills of landslides and of hill-road cuts, such as those on NH-29 at Pherima and Pagla Pahar in September 2024 and September 2025 and at Mon in July 2026 (as reported); the boulder beds of the hill streams and the pebble–boulder bed of the plain, 4–50 m thick south of Rangapahar–Singrijan–Diphupar (CGWB, Dimapur district booklet); and the beds and margins of ponds, and of the Doyang reservoir, that are exposed at the start of a storm. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).
Table 3B.1 — Supplementary land covers, AMC II (layout)
| Cover type | HSG A | HSG B | HSG C | HSG D | Ia ratio | Basis (catchments, events, years) |
|---|---|---|---|---|---|---|
| Forest and scrub of the ranges, with the litter and the depth of soil over rock recorded | ||||||
| Terraced or valley fields of the hills, with the terrace risers and bunds recorded | ||||||
| Fields of the Dimapur–Chümoukedima plain, with the bunds and the depth to water recorded | ||||||
| Fresh landslide scar or slide debris; hill-road cut slope or fill (NH-29 at Pagla Pahar and Pherima and the like) | ||||||
| Boulder bed of a hill stream, dry at the start of the storm | ||||||
| Piedmont gravel or pebble–boulder bed of the plain, with the depth to water recorded | ||||||
| Pond bed or margin, or Doyang reservoir margin, exposed at the start of the storm | ||||||
| Other (state) |
Table 3B.2 — CN calibration catchments (layout)
| Catchment | District | Area (km²) | Dominant HSG and cover | Events used | Table 3.5 CN | Calibrated CN | Calibrated ÷ Table 3.5 |
|---|---|---|---|---|---|---|---|
Annex 3C — Benchmark test problems for software acceptance
Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.
Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.
Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.
Problem 3C-1 — Rational Method peak (Clause 3.5)
Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.
Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.
Table 3C.1 — Problem 3C-1 solution
| Step | Calculation | Result |
|---|---|---|
| Composite C (Clause 3.5.4) | (1.2 × 0.90 + 0.8 × 0.15) / 2.0 | 0.60 |
| Frequency factor (Table 3.3) | 1% AEP | Cf = 1.25 |
| C · Cf (≤ 1.0) | 0.60 × 1.25 | 0.75 |
| Peak flow (Clause 3.5.1) | 0.75 × 120 × 2.0 / 360 | Q = 0.500 m³/s |
| Part (b): C · Cf | 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) | 1.00 |
| Part (b): peak flow | 1.00 × 150 × 0.5 / 360 | Q = 0.208 m³/s |
Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)
Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).
Table 3C.2 — Problem 3C-2 solution
| Segment | Calculation | Travel time |
|---|---|---|
| Sheet flow (Clause 3.6.2(a)) | 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h | 12.83 min |
| Shallow concentrated (Clause 3.6.2(c)) | V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h | 6.78 min |
| Channel (Clause 3.6.2(d)) | 400 / (3,600 × 1.0) = 0.1111 h | 6.67 min |
| Tc (Clause 3.6.1; ≥ 10 min) | 12.83 + 6.78 + 6.67 | 26.27 min |
| Lag (Clause 3.6.5) | 0.6 × 26.27 | 15.76 min |
Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)
Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.
Table 3C.3 — Problem 3C-3 solution
| Case | S (mm) | Ia (mm) | Runoff Q (mm), P = 100 mm | Runoff Q (mm), P = 25 mm |
|---|---|---|---|---|
| (a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 | 89.24 | 17.85 | 39.38 | 0.53 |
| (b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 | 38.80 | 7.76 | 64.93 | — |
| (c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 | 143.31 | 7.17 | 36.49 | 1.97 |
Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.
Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)
Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.
Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.
Table 3C.4 — Problem 3C-4 solution
| Step | Calculation | Result |
|---|---|---|
| (a) Impervious half (Clause 3.9.2) | S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) | 19.70 mm |
| (a) Pervious half | S = 162.39 mm, Ia = 32.48 mm > P | 0 mm |
| (a) Area-weighted runoff, separate sub-areas | 0.5 × 19.70 + 0.5 × 0 | 9.85 mm |
| (a) Composite CN (Clause 3.9.4) | 61 + 0.50 × (98 − 61) | 79.5 |
| (a) Runoff with composite CN | S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) | 1.83 mm |
| (b) Interval check (Clause 3.11.3(a)) | 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h | satisfied |
| (b) Lag and time to peak (Clause 3.11.2) | tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 | tp = 0.65 h |
| (b) Unit hydrograph peak, Q = 1 mm | 0.208 × 2.5 × 1 / 0.65 | qp = 0.800 m³/s per mm |
Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).
Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)
Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.
Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship
| Stage (m) | Storage S (m³) | Outflow O (m³/s) |
|---|---|---|
| 0.0 | 0 | 0.00 |
| 0.5 | 250 | 0.05 |
| 1.0 | 500 | 0.10 |
| 1.5 | 750 | 0.15 |
| 2.0 | 1,000 | 0.20 |
| 2.5 | 1,250 | 0.25 |
Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.
Table 3C.6 — Problem 3C-5 routed outflow
| Time (min) | Inflow I (m³/s) | Outflow O (m³/s) | Storage (m³) | Stage (m) |
|---|---|---|---|---|
| 0 | 0.0000 | 0.0000 | 0.0 | 0.000 |
| 10 | 0.1667 | 0.0094 | 47.2 | 0.094 |
| 20 | 0.3333 | 0.0367 | 183.3 | 0.367 |
| 30 | 0.5000 | 0.0797 | 398.4 | 0.797 |
| 40 | 0.4167 | 0.1226 | 612.8 | 1.226 |
| 50 | 0.3333 | 0.1511 | 755.7 | 1.511 |
| 60 | 0.2500 | 0.1670 | 835.2 | 1.670 |
| 70 | 0.1667 | 0.1717 | 858.6 | 1.717 |
| 80 | 0.0833 | 0.1664 | 832.1 | 1.664 |
| 90 | 0.0000 | 0.1523 | 761.5 | 1.523 |
| 120 | 0.0000 | 0.1062 | 531.1 | 1.062 |
| 180 | 0.0000 | 0.0517 | 258.3 | 0.517 |
Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.
Table 3C.7 — Benchmark results to be reported by the applicant
| Problem | Result | Benchmark | Software result | Difference (%) | Within ±5%? |
|---|---|---|---|---|---|
| 3C-1 | Q, main case (m³/s) | 0.500 | |||
| 3C-1 | Q, part (b) (m³/s) | 0.208 | |||
| 3C-2 | Tc (min) | 26.27 | |||
| 3C-3 | Q, case (a), P = 100 mm (mm) | 39.38 | |||
| 3C-3 | Q, case (b), P = 100 mm (mm) | 64.93 | |||
| 3C-3 | Q, case (c), P = 100 mm (mm) | 36.49 | |||
| 3C-3 | Q, case (c), P = 25 mm (mm) | 1.97 | |||
| 3C-4 | Runoff, separate sub-areas (mm) | 9.85 | |||
| 3C-4 | Runoff, composite CN (mm) | 1.83 | |||
| 3C-4 | qp (m³/s per mm) | 0.800 | |||
| 3C-5 | Peak outflow (m³/s) | 0.172 | |||
| 3C-5 | Peak storage (m³) | 859 |
Annex 3D — Peak rate factor study for flat coastal land
Supports Clauses 3.11.5 and 3.15 of Chapter 3.
Not required in Nagaland. Nagaland is landlocked and mostly hilly, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The Dimapur–Chümoukedima plain is flat in places and slow to drain when the Dhansiri, the Chathe or the Diphu is high, but it is not coastal plain; its slow response is represented by storage and backwater (Clauses 3.10.4 and 3.12.4) and by the outfall-closed check of Chapter 5, not by a lower peak rate factor, while the ranges respond fast. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.
Table 3D.1 — Calibrated peak rate factors (layout)
| Catchment | Area (km²) | Mean slope (m/m) | Drainage condition | Events used | Calibrated PRF (US customary) | PRF′ (SI) | Range of applicability |
|---|---|---|---|---|---|---|---|
Annex 3E — CWC SUH parameters for subzone 2(b), with worked example
Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.
To be prepared. This annex will tabulate, for CWC subzone 2(b) (South Brahmaputra), whose report this Manual also applies, as a check only, in the eastern ranges and in subzone 2(c) (Barak and others), for which CWC has published no report, the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the one CWC Flood Estimation Report that covers part of Nagaland, the South Brahmaputra subzone 2(b) report (Revised; Design Office Report No. SB-2(b)/R-4/44/99, March 2000), whose Plates 8, 9 and 10 cover the Dimapur–Chümoukedima plain and the central and northern ranges (Dimapur, Chümoukedima, Kohima, Tseminyu, Wokha, Zunheboto, Mokokchung, Longleng, Tuensang and Mon), draw no contour over the eastern ranges (Phek, Meluri, Kiphire and eastern Tuensang) and draw the subzone boundary through Peren, and not in the same place on Plates 9 and 10 (see the References of Chapter 3); a report for subzone 2(c) (Barak and others), which covers the south-western hills (Peren, Jalukie, Tening and the southern Kohima slopes at Jakhama and Viswema) and which CWC has never published, with written confirmation from CWC that none exists or is in preparation, and of the subzone to which the Tizu and Zungki basins of the eastern ranges belong [TBC]; and, from the 2(b) report, the time distribution of its Fig. 11 and Annex 4.4, which were not read, its areal reduction table of Annex 4.3, read only by optical character recognition, and the position of the subzone boundary at Zunheboto, Tuensang, Phek and Peren, which is read by eye to within about 0.05–0.1° and is still to be confirmed on a cleaner scan [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).
Table 3E.1 — SUH relationships by subzone (layout)
| Parameter | Symbol | Unit | Subzone 2(b) (South Brahmaputra) relationship |
|---|---|---|---|
| Peak discharge of the 1-hour unit hydrograph | Qp | m³/s | Qp = 0.905 A^0.758 (Eq. 3.4.3.2); the peak depends on the catchment area alone |
| Peak discharge per unit area | qp | m³/s per km² | qp = Qp / A |
| Time from centre of unit rainfall to peak | tp | h | tp = 2.87 qp^−0.839 |
| Width of UH at 50% of peak | W50 | h | W50 = 2.304 qp^−1.035 |
| Width of UH at 75% of peak | W75 | h | W75 = 1.339 qp^−0.978 |
| Width of rising limb at 50% of peak | WR50 | h | WR50 = 0.814 qp^−1.018 |
| Width of rising limb at 75% of peak | WR75 | h | WR75 = 0.494 qp^−0.966 (confirmed by the errata) |
| Base width of UH | TB | h | TB = 2.447 tp^1.157 |
| Time to peak from start of rise | Tm | h | Tm = tp + tr/2 |
| Unit duration | tr | h | 1 |
| Design storm duration | TD | h | TD = 1.1 tp, "rounded off to nearest full hour", or any value that gives the maximum discharge |
| Design loss rate | — | mm/h | 3.5 (printed "0.35 cm/hr", the modal value of 100 flood events, kept from the report of 1984); for rural SUH runs only |
| Design base flow | — | m³/s per km² | 0.05 (68 of 100 events in the range 0.01–0.09) |
| Ratio of t-hour to 24-hour rainfall | — | — | 10-yr, partial duration, mean of the six self-recording gauges of the report, none of them in Nagaland: 1 h 0.48; 3 h 0.62; 6 h 0.74; 9 h 0.81; 12 h 0.87; 15 h 0.91; 18 h 0.95; 24 h 1.00 (Table 4.1). Used in this Manual only in sub-area NL-A (Clause 2.3.6(f)) |
| Time distribution of rainfall | — | cumulative fraction by hour | 1,040 storms in five duration groups (2–3 h: 229; 4–6 h: 286; 7–12 h: 322; 13–18 h: 116; 19–24 h: 87); for a 13-hour storm 0.26, 0.43, 0.56, 0.64, 0.70, 0.76, 0.82, 0.87, 0.90, 0.94, 0.96, 0.98, 1.00 (worked example); Fig. 11 and the tables of Annex 4.4 not read [TBC] |
| Conversion of 1-day to 24-hour rainfall | — | factor | 1.15 (§4.3.1) |
| Areal reduction factor | ARF | % of point rainfall | Annex 4.3, read by optical character recognition only [TBC]: at 50 km², 93.75 (1 h), 94.25 (3 h), 95.50 (6 h), 97.00 (12 h), 98.00 (24 h); at 100 km², 88.00, 90.00, 91.75, 94.50, 96.50; at 200 km², 78.50, 82.00, 85.50, 90.00, 94.00; at 300 km², 71.00, 75.50, 80.00, 87.50, 92.00; at 500 km², 64.50 (3 h), 71.25, 83.00, 88.50; at 1,000 km², 76.00 (12 h), 83.00; at 2,000 km², 77.50 (24 h); the errata correct the 24-hour value at 1,500 km² from 79.50 to 79.00. Also used, as the nearest published CWC curves, in sub-areas NL-C and NL-D (Clause 2.7.3) |
| Simplified formulae | — | m³/s | A km², S m/km, L and Lc km, R the 24-hour point rainfall in cm: Q25 = 1.9194 A^0.4240 S^0.0917 L^0.9965 Lc^−0.5092 R25^0.3789; Q50 = 1.1368 A^0.4846 S^0.0540 L^0.8915 Lc^−0.5012 R50^0.6107; Q100 = 0.5160 A^0.5226 S^0.0552 L^0.7010 Lc^+0.3961 R100^0.9286, with the Lc exponent printed positive, unlike Q25 and Q50, probably a sign error [TBC]; not used for design in this Manual |
| 50-yr 24-hour point rainfall at Nagaland towns (100-yr in brackets) | — | mm | Plate 9 (Plate 10), read by eye within about one contour (contours 180, 200, 240, 280 and 320 in this sector; NEER reading): Dimapur and Chümoukedima 200–240 (200–240; about 240 on the line at Chümoukedima); Kohima 240–280 (on the 280 line); Tseminyu and Wokha 200–240 (240–280); Mokokchung about 200 (about 240); Zunheboto about 200, on the line and the boundary (240–280); Longleng about 200 (about 240); Tuensang 180–200 (about 240); Mon inside a closed ">240" cell (">280" cell); Peren about 280, on the line and the boundary (240–280); Phek outside the plate (about 280, on the boundary); Kiphire outside every plate. The design depths taken from these readings are those of Clause 2.3.6(c) |
| Gauged catchments in or near Nagaland | — | — | None of the 14 gauged catchments lies in the Naga hills: all are railway and highway bridges in the valley below the hills, outside the State, such as bridge 463 (875 km²; L 86.45 km; S 3.71 m/km) and bridge 414 (554 km²; S 1.06 m/km) on the line through the valley below the Mokokchung and Longleng foothills (Annex 3.2) |
| Catchment area for which the relationships apply | A | km² | more than 50 to 1,500; up to 5,000 "judiciously" |
| Report reference | — | — | SB-2(b)/R-4/44/99: §§3.4–3.7, Table 3.3, the simplified formulae (p. 17), Table 4.1 (p. 20), §4.3, Annexes 3.1, 3.2, 4.1–4.3, the errata and the worked example, Plates 8–10 |
Note: relationships as printed in the CWC subzone 2(b) report (References of Chapter 3), read from a scanned copy; Table 3.3, the simplified formulae, the ratio table and the errata were checked against the page images for the Assam edition of this series, which uses the same report. A is the catchment area in km², L the length of the main stream in km, Lc the length to the point nearest the catchment centroid in km and S the equivalent slope in m/km. Coverage. The report covers 73,556 km² between 89°45′ and 97°15′ E and 25°15′ and 28° N, a subzone that "comprises of large parts of Assam and areas of Meghalaya, Nagaland and Arunachal Pradesh", bounded "on the south by Barak Subzone 2 (c)" and "on the East by Burma"; it names Kohima among its towns ("Towns situated at altitude between 600 m to 1350 m are Haflong and Kohima"; the Directorate of Soil and Water Conservation prints 1,444 m for its Kohima gauge, Dabral, 2025). On its Plates 8–10 the boundary passes through Peren and about 0.1–0.15° south of Kohima, then runs north-east from near Zunheboto to the Myanmar border at about 26.3–26.5° N, and it is not drawn in the same place on Plate 9 (Zunheboto on it) and Plate 10 (further east, Phek on it) (NEER reading). The Dimapur–Chümoukedima plain and the central and northern ranges (sub-areas NL-A, NL-B and NL-B1) are in subzone 2(b); the south-western hills (NL-D: Peren, Jalukie, Tening and the southern Kohima slopes), the Barak headwaters, lie on or beyond the boundary, in subzone 2(c), Barak and others, for which CWC has published no report (the 2(b) report's list of published reports has none, and neither has CWC's download page of 2024); and the eastern ranges (NL-C: Phek, Meluri, Kiphire, Pungro, Shamator and eastern Tuensang, the Tizu and Zungki basins that drain to the Chindwin in Myanmar) lie outside every plate, in a subzone the report does not name, probably 2(c) "others" (NEER reading; written confirmation from CWC [TBC]). Basis. The unit hydrograph rests on 14 catchments with 100 bridge-years of record, all of them valley bridges outside the State. Some of the streams on the railway below the Mokokchung and Longleng foothills may rise in Nagaland (NEER reading; the river names of Annex 3.2 are to be checked on the page images [TBC]), but no gauged catchment lies in the Naga hills, and the steepest catchments of the report (3-MOT, S 23.86 m/km, and bridge 130, S 10.83 m/km) are outliers in its own validation. The 50-yr peaks it reproduces err by "+ 40.72% − 57.84%", and "very small catchments have larger variation". Area only. The 2(b) peak depends on A alone: slope enters nowhere, so the SUH gives the same unit hydrograph to a steep catchment of the Naga hills and a flat valley catchment of the same area. Worked example. The report's example is railway bridge 160, outside Nagaland (470 km², L 56.35 km, Lc 31.40 km, S 2.02 m/km): Qp = 96.00 m³/s, qp = 0.20 m³/s per km², tp = 11.07 h, adjusted to 11.50 h, W50 = 12.19 h, W75 = 6.46 h, WR50 = 4.19 h, WR75 = 2.34 h and TB = 41.00 h, with a loss of 0.35 cm/h and a base flow of 0.05 × 470 = 23.50 m³/s. Use in the State. The SUH applies only to the rural rivers of subzone 2(b) of more than 50 km² that leave the State or enter its towns, such as the Chathe, the Diphu, the Dzu and the upper Doyang, the Tsurang, the Milak, the Jhanji and the headwaters of the Dikhu, and is computed only as the benchmark of their natural condition (Clause 3.11.4). It is untested on Naga-hill slopes, so on a hill catchment the SUH result is reported beside the hydrograph model and the reason for any large difference is stated; below the Doyang dam the flood is set by releases (Chapter 5), and the reaches downstream of the State are outside it (the Assam edition governs those reaches). The urban catchments of Kohima, Dimapur, Chümoukedima and the other towns, among them the wards and ravines of the Dzuna, the Dzucha and the Sano Ru and the colonies of the Dimapur nullahs, are far smaller than 50 km², and those of the hill towns far steeper than the gauged catchments; they are designed by the Rational Method or SWMM under Clause 3.4, with Tc by the segment method and the rules for steep ground of the Commentary to Clause 3.7. No SUH in NL-C or NL-D. In the eastern ranges and the south-western hills no CWC unit hydrograph applies: every cross-drainage structure and outfall of more than 1 km² there needs a site-specific hydrology study with the design rainfall of Clause 2.3.6, losses near zero in the monsoon season (AMC III, Clause 3.8.4) and the routing of multi-day storms, with the 2(b) SUH computed only as a check; Clause 3.11.4(d) still applies as written, so a study whose 1% AEP peak is below the SUH peak is justified by calibration under Clause 3.15 or adopts the SUH peak. For catchments of 25–50 km², below the report's range, the SUH is computed and reported as outside that range, and Clause 3.11.4(d) applies in the same way. The design loss rate of 3.5 mm/h is a φ-index fitted to the floods of rural catchments on valley alluvium and forest; it may be too high on the Disang shale slopes and too low on the gravels of the Dimapur plain; it is used only in rural SUH runs, is not a soil infiltration capacity and is not used to assign HSG (Clause 3.7), in urban SCS-CN or SWMM models, or to size infiltration practices (Chapter 4). The 2(b) ratios are not to be used to derive intensities in the ranges: applied to the Plate 9 value at Kohima (about 240–280 mm) the 1-hour ratio of 0.48 gives 115–134 mm in an hour, against 58 mm from NIH-DHAARA's Kohima cell at 50 years (NEER's computation; tool output), and no recording gauge in Nagaland has a published hourly maximum; Clause 2.3.6(f) deals with the difference.
Table 3E.2 — Worked example outline (layout)
| Step | Content | Clause |
|---|---|---|
| 1 | Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM | 3.11.4(a) |
| 2 | SUH parameters from Table 3E.1 and the plotted unit hydrograph | 3.11.4(a) |
| 3 | Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution | 3.11.4(a), (b) |
| 4 | Effective rainfall after the design loss rate; convolution with the SUH; base flow added | 3.11.4(a) |
| 5 | 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition | 3.11.4(c), (d) |
Form 3-1 — Hydrologic Calculation Summary
Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.
A. Project
Table 3F.1 — Form 3-1: project
| Field | Entry |
|---|---|
| A1. Project name and applicant | |
| A2. Location (village or ward, survey numbers, district) | |
| A3. Site area (ha) and number of points of comparison (POCs) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Design Rainfall Sheet reference (Form 2-1) |
B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)
Table 3F.2 — Form 3-1: method and software
| Field | Entry |
|---|---|
| B1. Purpose of each calculation (conveyance, storage, comparison, catchment study) | |
| B2. Contributing area for each purpose (ha or km²) | |
| B3. Method used and the row of Table 3.1 that permits it | |
| B4. Reason for the choice of method | |
| B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2) | |
| B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2 | |
| B7. Runoff transform (Clause 3.11.1) | |
| B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a)) | |
| B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2) | |
| B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4 | |
| B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference | |
| B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5) | |
| B13. Calibration required (Clause 3.15.1)? Calibration report reference |
C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)
Table 3F.3 — Form 3-1: soils and groundwater
| Field | Entry |
|---|---|
| C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2) | |
| C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3) | |
| C3. Seasonal high water table: depth below ground and source (Clause 3.10.2) | |
| C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1) | |
| C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b)) |
D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)
Table 3F.4 — Form 3-1: parameters by sub-area and condition
| Sub-area | Condition (pre / post) | Area (ha) | Impervious: roofs / paved / roads (ha) | DCIA (ha) | Disconnected (ha) | HSG | CN, AMC II | CN, AMC III (pervious part) | C and Cf (if Rational) | Tc (min) |
|---|---|---|---|---|---|---|---|---|---|---|
E. Time of concentration worksheet (Clause 3.6)
One worksheet per sub-area and condition.
Table 3F.5 — Form 3-1: time of concentration worksheet
| Segment | Flow type | Surface and n (Table 3.4) | L (m) | S (m/m) | P2 (mm) | V (m/s) | Tt (min) |
|---|---|---|---|---|---|---|---|
| 1 | Sheet | — | |||||
| 2 | Shallow concentrated | — | |||||
| 3 | Channel or pipe | — | |||||
| Tc (not less than 10 min) |
E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______
F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)
Table 3F.6 — Form 3-1: rainfall, losses and starting levels
| Field | Entry |
|---|---|
| F1. AEPs and durations run; climate factor applied (Chapter 2) | |
| F2. AMC used for each duration (Clause 3.8.4) | |
| F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5) | |
| F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5) | |
| F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5) | |
| F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5) | |
| F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3) |
G. Departures
Table 3F.7 — Form 3-1: departures from Chapter 3
| No. | Clause departed from | Value used in place of the Chapter 3 value | Justification |
|---|---|---|---|
| 1 | |||
| 2 |
H. Attachments (Clause 3.17)
Table 3F.8 — Form 3-1: attachments
| Item | Attached (yes / no / not applicable) | Reference |
|---|---|---|
| H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on | ||
| H2. HSG map, water-table data and infiltration test results | ||
| H3. Parameter tables (Section D) and Tc worksheets (Section E) | ||
| H4. Design Rainfall Sheet (Form 2-1) and hyetographs | ||
| H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels | ||
| H6. Form 3-2 for each POC | ||
| H7. Calibration report (Clause 3.15) | ||
| H8. Native model input and output files (Clause 3.16.4) |
I. Statement by the responsible engineer (Clause 3.17 item 10)
I state that the methods and parameters of Chapter 3 of the Nagaland Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.
Table 3F.9 — Form 3-1: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Organisation | |
| Signature | |
| Date |
Draft form — Nagaland Stormwater Design Manual, Draft v1.0.
Form 3-2 — Pre- vs Post-Development Comparison
Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.
Draft form — Nagaland Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.
A. Point of comparison (Clause 3.14.2)
Table 3F.10 — Form 3-2: point of comparison
| Field | Entry |
|---|---|
| A1. POC identifier and location | |
| A2. Area draining to the POC: site (ha) and off-site run-on (ha) | |
| A3. Off-site run-on passes through site storage? (Clause 3.14.2(c)) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c)) | |
| A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7) | |
| A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3) |
B. Peak flows (Clauses 3.14.7–3.14.10)
Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).
Table 3F.11 — Form 3-2: peak flows by AEP and duration
| AEP | Duration (h) | AMC | Q_pre | Q_post, uncontrolled | Q_post, routed | Limit | Met? |
|---|---|---|---|---|---|---|---|
| 50% (2-yr) | 1 | II | |||||
| 50% (2-yr) | 2 | II | |||||
| 50% (2-yr) | 3 | II | |||||
| 50% (2-yr) | 6 | II | |||||
| 50% (2-yr) | 12 | III | |||||
| 50% (2-yr) | 24 | III | |||||
| 50% (2-yr) | 48 | III | |||||
| 50% (2-yr) | 72 | III | |||||
| 10% (10-yr) | 1 | II | |||||
| 10% (10-yr) | 2 | II | |||||
| 10% (10-yr) | 3 | II | |||||
| 10% (10-yr) | 6 | II | |||||
| 10% (10-yr) | 12 | III | |||||
| 10% (10-yr) | 24 | III | |||||
| 10% (10-yr) | 48 | III | |||||
| 10% (10-yr) | 72 | III | |||||
| 1% (100-yr) | 1 | II | |||||
| 1% (100-yr) | 2 | II | |||||
| 1% (100-yr) | 3 | II | |||||
| 1% (100-yr) | 6 | II | |||||
| 1% (100-yr) | 12 | III | |||||
| 1% (100-yr) | 24 | III | |||||
| 1% (100-yr) | 48 | III | |||||
| 1% (100-yr) | 72 | III |
C. Volumes and storage (Clauses 3.14.8–3.14.10)
Table 3F.12 — Form 3-2: volumes and storage
| AEP | Governing duration (h) | Runoff volume, pre | Runoff volume, post uncontrolled | Retention volume | Detention storage required | Peak water level in storage (m) |
|---|---|---|---|---|---|---|
| 50% (2-yr) | ||||||
| 10% (10-yr) | ||||||
| 1% (100-yr) |
C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______
D. Sensitivity runs (Clauses 3.8.5, 3.14.11)
Table 3F.13 — Form 3-2: sensitivity runs
| Run | Governing storm (AEP, duration) | Change in Q_post, routed (%) | Change in required storage (%) | Retention volume or WQv governing (Clause 3.8.5(c)) |
|---|---|---|---|---|
| Ia = 0.05S | ||||
| Standard peak rate factor (only where a lower factor is used) | — |
E. Associated checks (Clause 3.14.12)
Table 3F.14 — Form 3-2: associated checks
| Check | Result | Reference in submittal |
|---|---|---|
| Drawdown times (Chapter 4) | ||
| Minimum orifice and trash screen (Chapter 4) | ||
| Emergency spillway (Chapter 4) | ||
| Outfall-closed storage check (Chapter 5) | ||
| Downstream analysis (Chapter 5) |
F. Statement by the responsible engineer
I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).
Table 3F.15 — Form 3-2: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Nagaland Stormwater Design Manual, Draft v1.0.