Chapter 3Hydrologic Methods


3.1 Purpose and scope

3.1.1 This chapter sets out how design rainfall from Chapter 2 is turned into runoff peaks, volumes and hydrographs for:

  • (a) drain, inlet and culvert sizing (Chapter 6);
  • (b) retention and detention sizing, and the pre- vs post-development comparison (Chapter 4);
  • (c) downstream and tailwater analysis (Chapter 5); and
  • (d) waterbody, tank (pond) and regional facility studies (Chapter 7).

3.1.2 It specifies:

  • (a) which method may be used for which purpose and catchment size (Clause 3.4);
  • (b) how the pre- and post-development land surfaces are defined (Clause 3.3);
  • (c) the parameters of each method: runoff coefficients, time of concentration, soils, curve numbers, unit hydrographs and routing (Clauses 3.5–3.12);
  • (d) when continuous simulation and model calibration are required (Clauses 3.13 and 3.15);
  • (e) the step-by-step pre- vs post-development comparison (Clause 3.14); and
  • (f) software acceptance and documentation (Clauses 3.16 and 3.17).

3.1.3 Rainfall inputs (depth, duration, areal reduction, climate factor, temporal pattern and antecedent moisture) are governed by Chapter 2 and shall not be varied in this chapter.

Commentary. The CPHEEO (2019) Manual on Storm Water Drainage Systems gives a full Rational Method procedure and names SWMM for hydrograph work, but it is a drain-sizing guide. It does not say how a regulator should define "pre-development" or which method must be used to test a development against it (CPHEEO Part A §4.4, §8.5.1). APWA Section 5600 does both: it limits the Rational Method, names baseline hydrograph methods, and fixes the land-use assumptions for existing and proposed conditions (KC Metro APWA 5600, 2011, §5602.2–5602.3; Version 2025.01, §5603.4). This chapter follows that model.


3.2 Definitions

Term Meaning in this Manual
Pre-development condition The reference land surface defined in Clause 3.3.2, against which post-development runoff is tested. It is not the existing condition.
Post-development condition The land surface after the proposed works are complete, as defined in Clause 3.3.3.
Point of comparison (POC) A location where site runoff leaves the site, at which pre- and post-development flows are compared (Clause 3.14).
Time of concentration (Tc) The time for runoff to travel from the hydraulically most distant point of the catchment to the point of interest.
Lag (tL) The time from the centroid of rainfall excess to the peak of the runoff hydrograph.
Hydrologic soil group (HSG) The NRCS classification (A, B, C, D) of a soil by its minimum infiltration rate when wet (USDA NRCS, NEH Part 630, Ch. 7).
Curve number (CN) The NRCS parameter that combines soil group, land cover and antecedent moisture into a single runoff-potential index (USDA NRCS, NEH Part 630, Ch. 9–10).
Antecedent moisture condition (AMC) The soil wetness at the start of a storm: AMC I (dry), II (average), III (wet).
Directly connected impervious area (DCIA) Impervious surface that drains to a drain, pipe or channel without first flowing over a pervious surface.
Disconnected impervious area Impervious surface whose runoff flows as sheet flow over a pervious surface before reaching the drainage system, and meets Clause 3.9.3.
Peak rate factor (PRF) The constant in the unit hydrograph peak equation (484 in US customary units; 0.208 in the SI form of Clause 3.11.2).
Continuous simulation A model run over a long rainfall record (years), with soil moisture, storage and tank levels carried forward between storms.
Tank cascade A chain of tanks (ponds) in which the surplus of one tank feeds the next.

3.3 Pre-development and post-development land surface

3.3.1 Same site, same storm. Pre- and post-development runs shall cover the same area draining to each POC, and use the same design storms (Clause 2.11.1). They shall differ only in the land-surface parameters of this clause, the resulting Tc, and the stormwater controls.

3.3.2 Pre-development condition. The pre-development land surface shall be greenfield: open land in good condition for the mapped hydrologic soil group, as follows:

  • (a) All land within the site, including land that is now built on, paved, compacted or cultivated, is treated as open land (grass cover > 75%) in good condition. Existing impervious cover shall not be counted.
  • (b) The curve number is the TR-55 value for "open space, good condition" for the HSG of Clause 3.7: CN 39 (A), 61 (B), 74 (C), 80 (D) at AMC II (Table 3.5).
  • (c) The HSG is the natural HSG of Clause 3.7, including the dual-group rule for high water table (Clause 3.10.1). No HSG improvement for drainage works is allowed.
  • (d) Tc is computed on the pre-development ground surface using unchannelled overland and shallow concentrated flow and natural channels only (Clause 3.6). Existing pipes, lined drains and kerbs are ignored.
  • (e) Existing waterbodies, tank waterspreads up to the full tank level (FTL), natural channels and supply or surplus channels are kept as they are, and modelled as water surfaces or channels, not as open land.

3.3.3 Post-development condition. The post-development land surface shall represent the proposed works at full build-out:

  • (a) Impervious areas shall be measured from the site plan, separately for roofs, paved surfaces, roads and other sealed surfaces, and classified as directly connected or disconnected (Clause 3.9). Lot-size residential rows of TR-55 shall not be used for the site itself.
  • (b) Pervious areas disturbed by construction (graded, filled or trafficked) shall be assigned one HSG lower in infiltration capacity than the natural HSG (A to B, B to C, C to D), unless post-construction infiltration tests (Clause 3.7.3) show otherwise. Soil disturbed by construction shall never be classed as HSG A.
  • (c) Rainwater harvesting (RWH) sumps shall be treated as full at the start of storms of 12 hours or more, and the roof area draining to them as directly connected for those storms (Chapter 4).
  • (d) Retention and detention facilities shall be represented explicitly as storage (Clause 3.12), not by lowering CN.

3.3.4 Redevelopment. The pre-development condition of Clause 3.3.2 applies to redevelopment as well. A site that is already fully paved is tested against greenfield, not against its existing state. For the constrained-redevelopment route of Clause 4.5.6, the existing condition shall also be modelled, with existing impervious areas as surveyed, so that the 50% minimum can be checked.

3.3.5 Off-site areas.

  • (a) For conveyance design (Chapter 6), areas upstream of the site shall be taken at their ultimate land use under the approved master plan or development plan. Where no plan exists, upstream undeveloped land shall be assumed to be at least 35% impervious.
  • (b) For the pre- vs post-development comparison, off-site run-on shall be modelled identically in both runs, at its existing condition (Clause 3.14.2).

Commentary. A greenfield reference stops each redevelopment from being judged against an already degraded baseline. The UK non-statutory standards and KC APWA take the same approach in different forms: APWA caps existing agricultural land at no more than "good condition pasture, grassland or range (C = 0.30, CN = 74)" for HSG C, and forbids disturbed soils from being classed as HSG A or B (KC Metro APWA 5600, 2011, §5602.3A and E). The TR-55 "open space, good condition" values used in (b) are identical to TR-55's "pasture, grassland or range, good" values (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c), so this Manual's pre-development CN equals the APWA cap on HSG C soils. The one-class downgrade for disturbed soils in 3.3.3(b) is set by this Manual as a simpler, less strict version of the APWA rule, suited to the red clayey soils over the Disang shales and Barail sandstones of the ranges, the piedmont alluvium, pebble-boulder beds and residual red clays of the Dimapur–Chümoukedima plain, and the cut-and-fill ground of the hill towns, where an HSG A to C jump would be excessive. The 35% minimum imperviousness for unplanned upstream land in 3.3.5(a) is the APWA value (2011, §5602.3E.2). Using the master-plan land use for conveyance follows CPHEEO, which requires C to reflect "ultimate development of the catchment as per the master plan" (CPHEEO 2019, Part A §4.4.1.5).


3.4 Selection of method

3.4.1 The method shall be selected from Table 3.1 by purpose and catchment size. Figure 3.1 shows the same rules as a flowchart.

Table 3.1 — Permitted hydrologic methods

Purpose Catchment / condition Permitted method Clause
Peak flow for one conveyance element (inlet, pipe reach, drain reach, culvert) ≤ 16 ha contributing, no upstream storage, no backwater Rational Method 3.5
Peak flow for conveyance > 16 ha, or any upstream storage, tank or pond Hydrograph method (SCS-CN with SCS unit hydrograph, SWMM or HEC-HMS) 3.8–3.12
Retention, detention, any storage; pre- vs post-development comparison Any size Hydrograph method; Rational Method not permitted 3.8–3.12, 3.14
Pipe or drain network with backwater, tidal or tank tailwater Any size Hydrograph method with dynamic-wave hydraulic routing 3.12.4; Chapter 5
Catchment-scale flows 25–5,000 km² in CWC subzone 2(b) (South Brahmaputra), with the report for subzone 2(b) applied in its place in the eastern ranges and the south-western hills, which no CWC report covers HEC-HMS or SWMM, benchmarked against the CWC synthetic unit hydrograph (SUH) 3.11.4
Regional facilities Draining > 25 km² Design-storm hydrograph method plus continuous simulation 3.13
Tank (pond) cascades Any size Design-storm hydrograph method plus continuous simulation 3.13
Tier B: small sites under Chapter 1 Within the limits of the design aid Design aids issued under Chapter 4, which are themselves derived by the methods of this chapter 3.4.4
Small sites, any authority ≤ 1 ha, within the limits of Clause 4.14.3 Fixed-coefficient route of Chapter 4 (fixed release coefficients, rainfall-mass storage) 3.4.4; 4.14.3

Figure 3.1 — Selection of hydrologic method Start: state the purpose of the calculation Storage, retention, detention, or a pre- vs post-development comparison? Yes No (conveyance peak) Hydrograph method required (Rational Method not permitted, Clause 3.4) Contributing area ≤ 16 ha, one conveyance element, and no storage upstream? No Yes Rational Method (Clause 3.5) Tc ≥ 10 min; frequency factor Cf; partial-area check (Clause 3.5.6) Catchment area? < 25 km² 25–5,000 km² Event model SCS-CN losses with SCS unit hydrograph, or SWMM / HEC-HMS (Clauses 3.8–3.12) Catchment model HEC-HMS / SWMM, benchmarked against CWC subzone SUH (Clause 3.11.4) Regional facility > 25 km², or a tank cascade in the system? Yes Add continuous simulation (Clause 3.13), in addition to design storms Tidal or backwater outfall: route with a dynamic-wave hydraulic model (Chapter 5).

Figure 3.1 — Selection of hydrologic method. Original drawing for this Manual, adapted from KC Metro APWA, Section 5600 Storm Drainage Systems and Facilities, 2011 (§5602.2) and Version 2025.01 (§5603.4, Policy Supplement, 2025).

3.4.2 Rational Method limits. The Rational Method shall be used only for catchments of 16 ha or less and only to compute the peak flow to a single conveyance element. It shall never be used to size retention, detention or any other storage, nor to derive a hydrograph or runoff volume.

3.4.3 Hydrograph methods. Above 16 ha, and for every storage calculation, a hydrograph method shall be used: SCS-CN losses with the SCS (NRCS) unit hydrograph, EPA SWMM, or HEC-HMS. For 25–5,000 km² the CWC synthetic unit hydrograph shall also be computed as a benchmark (Clause 3.11.4).

3.4.4 Simplified routes. In Tier B areas (Chapter 1), sites within the limits stated on a design aid issued under Chapter 4 may use that design aid in place of a site-specific hydrograph model. In any area, sites of 1 ha or less may use the fixed-coefficient route of Clause 4.14.3; it is the only exception to the rule in 3.4.2 that rainfall-based peak methods shall not be used for storage. The Rational Method remains available for conveyance under 3.4.2.

3.4.5 Catchments above 5,000 km². These are outside the scope of this Manual and require a basin study approved by the Water Resources Department.

Commentary. The 16 ha limit and the single-element rule follow APWA 5600 Version 2025.01, which cut the Rational Method from 200 ac to 40 ac and restricted it to "a single pipe segment". The MARC Policy Supplement adds that it "cannot be used to size runoff reduction practices or determine retention volumes and detention volumes" (MARC, APWA Stormwater Standards Supplement, 2025). CPHEEO (2019, Part A §4.4.1.3) allows the Rational Method up to 8–10 km², which is too large for a method that assumes uniform rainfall intensity over the whole catchment for the whole of Tc and gives no volume. The Rational Method is excluded from storage design because it gives a peak, not a hydrograph, and storage depends on volume and timing.


3.5 Rational Method

3.5.1 Equation. The peak flow shall be computed as:

Q = C · Cf · i · A / 360

where Q is the peak flow (m³/s); C is the runoff coefficient (Table 3.2); Cf is the frequency factor (Table 3.3), with C · Cf ≤ 1.0; i is the rainfall intensity (mm/h) for a duration equal to Tc, from Chapter 2 (with the climate factor of Clause 2.8); and A is the contributing area (ha).

Commentary. This is the CPHEEO equation Qp = 10 C I A, with Qp in m³/h (CPHEEO 2019, Part A §4.4.1.1–4.4.1.3), converted to m³/s.

3.5.2 Runoff coefficients. C shall be taken from Table 3.2. Within a range, the designer shall use the upper half of the range unless site data justify a lower value.

Table 3.2 — Runoff coefficient C (for AEP of 10% or more frequent)

Surface or land use C Source
Commercial 0.70–0.95 CPHEEO 2019, Table 4.2
Industrial 0.60–0.90 CPHEEO 2019, Table 4.2
Institutional 0.70–0.95 CPHEEO 2019, Table 4.2
Residential, high density 0.60–0.75 CPHEEO 2019, Table 4.2
Residential, low density 0.40–0.60 CPHEEO 2019, Table 4.2
Recreational 0.10–0.25 CPHEEO 2019, Table 4.2
Asphalt 0.70–0.95 CPHEEO 2019, Table 4.2
Concrete 0.80–0.95 CPHEEO 2019, Table 4.2
Brick paving 0.70–0.85 CPHEEO 2019, Table 4.2
Roofs: tiles 0.80–0.90 CPHEEO 2019, Table 4.2
Roofs: metal 0.70–0.90 CPHEEO 2019, Table 4.2
Roofs: concrete 0.70–0.90 CPHEEO 2019, Table 4.2
Lawns, sandy soil, flat (≤ 2%) 0.05–0.10 ASCE/WPCF 1969
Lawns, sandy soil, average (2–7%) 0.10–0.15 ASCE/WPCF 1969
Lawns, sandy soil, steep (> 7%) 0.15–0.20 ASCE/WPCF 1969
Lawns, heavy (clay) soil, flat (≤ 2%) 0.13–0.17 ASCE/WPCF 1969
Lawns, heavy soil, average (2–7%) 0.18–0.22 ASCE/WPCF 1969
Lawns, heavy soil, steep (> 7%) 0.25–0.35 ASCE/WPCF 1969
Undeveloped land (maximum for any condition) 0.30 KC APWA 5600 (2011), §5602.3E

3.5.3 Frequency factor. For design AEPs rarer than 10%, C shall be multiplied by Cf from Table 3.3. The product C · Cf shall not exceed 1.0.

Table 3.3 — Frequency factor Cf

Design AEP (return period) Cf
10% (10-yr) and more frequent 1.00
4% (25-yr) 1.10
2% (50-yr) 1.20
1% (100-yr) 1.25

3.5.4 Composite C. Where a catchment contains more than one surface, C shall be the area-weighted value C = Σ(Cj · Aj) / ΣAj, computed from the measured areas of each surface. Cf is applied to the composite C.

3.5.5 Time of concentration and networks.

  • (a) Tc shall be computed by Clause 3.6 and shall not be less than 10 minutes.
  • (b) For each reach of a network within the 16 ha limit, the peak shall be computed with the cumulative Σ(C · A) upstream of that reach and the longest Tc to that reach. Peaks from upstream reaches shall not be added.

3.5.6 Partial-area check. Where a compact, highly impervious part of the catchment has a much shorter Tc than the whole, the peak shall also be computed for that part alone, using its own area, C and Tc. The larger peak governs.

Commentary. The developed-surface coefficients in Table 3.2 are CPHEEO Table 4.2, which CPHEEO adapted from ASCE/WPCF (1969). CPHEEO keeps C constant for all return periods. Table 3.3 instead adopts the APWA antecedent-precipitation factors (KC Metro APWA 5600, 2011, §5602.2A: K = 1.1, 1.2 and 1.25 for 4%, 2% and 1% storms, with C·K ≤ 1.0). These factors matter here because Nagaland's rare storms arrive on wet ground (Clause 2.11.4). The 10-minute minimum Tc matches the minimum design duration of Clause 2.5.1. APWA 2011 bounds inlet time between 5 and 15 minutes (§5602.7A). The partial-area check follows CPHEEO's treatment of "partial area effect" (CPHEEO 2019, Part A §4.4.1.7). This Manual requires the upper half of each range in 3.5.2 because Indian urban plots are typically more densely covered than the US land uses behind the ASCE ranges.


3.6 Time of concentration

3.6.1 General. Tc shall be computed separately for the pre- and post-development conditions, along the flow path that gives the longest travel time to the point of interest, as the sum of travel times in each flow segment. Tc shall not be less than 10 minutes for either condition.

3.6.2 NRCS velocity (segment) method. The NRCS segment method is the default for all catchments. Tc = Tt(sheet) + Tt(shallow) + Tt(channel), where:

  • (a) Sheet flow:

    Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4)

    where Tt is in hours; n is the sheet-flow roughness from Table 3.4; L is the sheet-flow length (m); P2 is the present-day 50% AEP (2-yr) 24-hour rainfall (mm) from Clause 2.3, without the climate factor; and S is the land slope (m/m).

  • (b) Sheet-flow length. In urban areas, and for all post-development conditions, the sheet-flow length shall not exceed 30 m. For pre-development greenfield surfaces, up to 90 m may be used only where survey shows unchannelled planar ground; otherwise 30 m applies.

  • (c) Shallow concentrated flow: Tt = L / (3,600 V), with V = 4.918 S^0.5 (unpaved) or V = 6.196 S^0.5 (paved), V in m/s, L in m and S in m/m.

  • (d) Channel and pipe flow: Tt = L / (3,600 V), with V from Manning's equation at bank-full or pipe-full flow.

Time of concentration: flow segments along the longest flow path (schematic, not to scale) Time of concentration: flow segments along the longest flow path (schematic, not to scale) Ground surface Hydraulically most distant point Point of interest (inlet, reach or POC) Sheet flow thin film over the surface Shallow concentrated flow rills, gutters, swales Channel and pipe flow drains, pipes, natural channels L ≤ 30 m (urban; all post-development) ≤ 90 m only for surveyed planar pre-development ground Sheet flow — Clause 3.6.2(a), (b) Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4) [h] n from Table 3.4; pre-development n = 0.15 P2: 2-yr 24 h rainfall, no climate factor Shallow concentrated — Clause 3.6.2(c) Tt = L / (3,600 V) V = 4.918 S^0.5 (unpaved) V = 6.196 S^0.5 (paved) Channel and pipe — Clause 3.6.2(d) Tt = L / (3,600 V) V from Manning's equation at bank-full or pipe-full flow Tc = Tt(sheet) + Tt(shallow) + Tt(channel) ≥ 10 min (Clause 3.6.1) Computed separately for pre- and post-development; lag tL = 0.6 Tc (Clause 3.6.5)

Figure 3.2 — Time of concentration by the NRCS segment method: sheet flow, shallow concentrated flow and channel or pipe flow along the longest flow path, with the travel-time equations and limits of Clause 3.6. Schematic, not to scale. Original drawing for this Manual, adapted from USDA SCS TR-55 (1986), Ch. 3, and USDA NRCS, NEH Part 630, Ch. 15 (2010).

Table 3.4 — Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)

Surface n
Smooth surfaces (concrete, asphalt, gravel, bare soil) 0.011
Fallow (no residue) 0.05
Cultivated, residue cover ≤ 20% 0.06
Cultivated, residue cover > 20% 0.17
Grass: short-grass prairie 0.15
Grass: dense grasses 0.24
Range (natural) 0.13
Woods: light underbrush 0.40
Woods: dense underbrush 0.80

3.6.3 Pre-development roughness. For the pre-development greenfield surface of Clause 3.3.2, sheet-flow n shall be 0.15 unless the designer justifies another Table 3.4 value from the natural vegetation of the area.

3.6.4 Kirpich formula. The Kirpich formula may be used only as a cross-check, or for pre-development rural catchments with a defined main channel:

tc = 0.0195 L^0.77 S^−0.385

where tc is in minutes, L is the length of the main flow path (m) and S is its average slope (m/m). It shall not be used for urban or post-development catchments.

3.6.5 Lag. Where a unit hydrograph method requires lag, tL = 0.6 Tc.

3.6.6 Check. Post-development Tc shall normally be shorter than pre-development Tc. Where it is longer, the designer shall explain why in the submittal.

Commentary. The segment method and its equations are from TR-55 (USDA SCS, 1986, Ch. 3) and NEH Part 630, Ch. 15 (USDA NRCS, 2010). The SI constants are direct conversions of the US equations: 0.007 becomes 0.091 with L in m and P2 in mm, and 16.1345 and 20.3282 ft/s become 4.918 and 6.196 m/s. TR-55 (1986) allowed sheet flow up to 300 ft (≈ 90 m). NEH 630 Ch. 15 states that sheet flow typically lasts no more than about 100 ft (≈ 30 m) before becoming shallow concentrated flow (citing Merkel, 2001), and many US agencies now cap it there. This Manual sets the 30 m urban limit in 3.6.2(b) on that basis: in Indian urban plots, flow reaches a drain, kerb or compound-wall weep hole within a few metres. The undisturbed P2 is used in the sheet-flow equation because P2 is a parameter of the travel-time relationship, not a design load. The default n = 0.15 for greenfield is the TR-55 short-grass value; this Manual adopts it to avoid long pre-development Tc values that would make Q_pre artificially low. The Kirpich formula is the SI form given by Chow, Maidment and Mays (1988, Table 15.1.2), from small agricultural catchments in Tennessee (Kirpich, 1940), so it does not suit urban surfaces. The lag ratio 0.6 is the NRCS value, also used by APWA (2011, §5602.7C).


3.7 Soils and hydrologic soil groups

3.7.1 Mapping. HSG shall be assigned from the soil series mapped by the National Bureau of Soil Survey and Land Use Planning (NBSS&LUP) or the Directorate of Soil and Water Conservation (Soil Survey Wing) [TBC], using the soil-series-to-HSG lookup of Annex 3A. The source map and its scale shall be stated.

3.7.2 Assignment rule. Where Annex 3A is not yet available for a series, the HSG shall be assigned from the measured saturated hydraulic conductivity and depth to an impermeable layer or water table using the criteria of NEH Part 630, Ch. 7. Until Annex 3A is published, this Manual sets the following interim groups for Nagaland. On the Dimapur–Chümoukedima plain (sub-area NL-A of Annex 2A): the piedmont sands, gravels and pebble–boulder beds, HSG A or B where the seasonal high water table stands more than 2 m below ground, with infiltration practices on them only under Clause 4.11 (recharge rule); the clayey north-western plain, the residual red clays, the Recent alluvium along the Dhansiri and the Diphu, and any part of the plain where the seasonal high water table is within 2 m of ground, HSG C or D, and HSG D in the auto-flow zone round Dhansiripar. In the ranges (sub-areas NL-B, NL-B1, NL-C and NL-D, and every natural slope of more than 10° on the plain): the red clayey soils that lie shallow over the Disang shales and the Barail sandstones and shales, HSG C or D by test, and HSG D for design on natural slopes of more than 10° and on shale, whatever group the soil itself would take. Everywhere: colluvium and slide debris, HSG D for design, with no infiltration credit; and urban fill and the cut-and-fill ground of the hill towns, HSG C, and HSG D where it is clayey or compacted. A field infiltration test is required on every site larger than the limits of the simplified method of Clause 4.14.1, at the depth of the proposed facility; on smaller sites, a soil that has not been tested shall be given the less permeable of the groups listed for it. Whether an infiltration practice may be built at all is governed by the three infiltration rules of Clause 4.11 (the hill rule, the floodplain rule and the recharge rule), not by its HSG. Clause 3.10.1 applies to all of these groups.

3.7.3 Site verification. For every site that relies on retention by infiltration (Chapter 4), the mapped HSG shall be verified by site infiltration tests at the location and depth of each infiltration facility. Where the tests show a lower infiltration capacity than the mapped HSG, the test result governs for both the retention design and the post-development CN. Where they show a higher capacity, the pre-development HSG shall not be changed without the approval of the authority.

3.7.4 Disturbed and filled ground. Clause 3.3.3(b) applies.

Commentary. NBSS&LUP soil maps are typically at 1:250,000 to 1:50,000 scale and classify soils by series and taxonomy, not by HSG. A lookup table is therefore needed (Annex 3A). Site tests matter most where one site can span two groups: at the foot of the ranges, where the foothill fans of sand, gravel and boulders pass into the clays of the Dimapur–Chümoukedima plain and the water table rises towards the Dhansiri, the Chathe and the Diphu; on the plain itself, where 0.5–2.0 m of top soil of sand, silt and clay can lie over gravels that drain freely or over hard clays; and on hill sites, where a high rate in a pit dug in colluvium or fill can be water entering a slope that cannot take it (Clause 4.11). No HSG map or table for Nagaland, no soil-series lookup, no SCS-CN calibration and no measured infiltration rate for any site in the State were found during research for this Manual [TBC]. The interim groups follow the soils and geology as the CGWB describes them. In Kohima district the major soil is "Red Clayey soil" over the Disang, Barail, Surma and Tipam formations; the Disang Formation "consists mainly of rocks like shale, sandstone. The shales are grey in colour and splintery … At places shale has been changed into slate", the Barail is "massive sandstone, shale and sandy shale", and the moderate structural hills of "semi-consolidated sandstone, siltstone, shale and claystone" "show high degree of erosion"; the district "is receiving good amount of rainfall but due to hilly nature most of it goes as runoff" (CGWB, Ground Water Information Booklet, Kohima district). In Dimapur district the soils are "Alluvial and Residual soil", the "most common type of soil … is red clay soil", Recent alluvium lies "along the banks of Dhansiri and Diphu", and a pebble–boulder bed with a clayey matrix lies 4–50 m thick south of Rangapahar–Singrijan–Diphupar and 3–4 m thick in the north-west (CGWB, Ground Water Information Booklet, Dimapur district); in the foothills a top soil of "sand, silt and clay" 0.5–2.0 m thick lies over boulders, pebbles, sand and clay (booklet), and within 10 m the top layer of the resistivity soundings "comprises top soil with clays / hard clays" (CGWB, Aquifer Mapping … Dimapur Valley, 2013). The same study found that "The Quaternary sediments provide good scope for infiltration and recharge … The Tertiary rocks which form the structural hills and residual hill act as runoff zones". The interim groups therefore divide the State in two. The hill soils may themselves test as HSG C, but they lie thin over shale on slopes, so they are designed as D; on the plain the groups follow the clay and the depth to water, A or B on the gravels where the water is deep and C or D on the clays and wherever the water stands within 2 m of ground (Commentary to Clause 3.10). The CGWB's recharge computation for Kohima district states that "hilly areas with slope greater than 20% have been excluded"; that is a convention of a groundwater assessment, not a design rule, and the 10° threshold of the hill rule of Clause 4.11 is set by this Manual. The only regional measure of losses is the design loss rate of the CWC subzone 2(b) report, 0.35 cm/h (3.5 mm/h), the modal value of 100 flood events on rural catchments gauged at valley bridges outside the State, none of them in the Naga hills (Annex 3E). It was derived on valley alluvium and forest: on the Disang shale slopes it may be too high, and so understate runoff, and on the gravels of the Dimapur plain it may be too low. It shall be used only in rural SUH runs under Clause 3.11.4, not to assign an HSG, not in an urban SCS-CN or SWMM model and not to size an infiltration practice. The interim groups of Clause 3.7.2, the 2 m water-table condition on the plain, the design of the hill soils on slopes and on shale, colluvium and slide debris as group D, and the rule for untested soil on small sites are set by this Manual pending a soil-series lookup for Nagaland. Steep ground matters as much as soil: Kohima, Mokokchung, Wokha, Zunheboto, Tuensang and Mon are ridge or spur towns on shale (NEER reading), and on their steep streets and ravine streams runoff from rock, cut faces and thin soil reaches a channel within minutes; no slope map of any Nagaland town was found [TBC]. The following rules are set by this Manual. (a) Tc shall be found by the velocity-based segment method of Clause 3.6.2, segment by segment, and shall not be taken below the 10-minute minimum of Clause 3.6.1, which matches the shortest design duration of Chapter 2 (the 5-minute minimum sometimes used for steep hill catchments is not used in this Manual); the Kirpich formula, derived from small farm catchments of moderate slope, shall not be used even as a cross-check where the average slope of the flow path exceeds 10%. (b) The sheet-flow segment over bare rock, a road cut or a paved hill street shall use the smooth-surface n of Table 3.4 and shall not exceed 30 m. (c) A catchment that runs from the ranges onto the plain, such as the streams that leave the Tsiedukhru range at Pagla Pahar and the Chathe below Medziphema, shall be split at the break of slope and the hill sub-area modelled on its own, so that a flatter lower reach does not average away the fast response of the hill; flow in lined drains on steep hill streets is supercritical, and stepped or baffled drains, with energy dissipation at every change of slope and at every outfall onto a slope, are designed under Chapters 6 and 9. (d) On the Dimapur–Chümoukedima plain, where every urban catchment is far below 50 km², drains are modelled in SWMM with dynamic-wave routing (Clause 3.12.4) for two design cases, and the more severe governs each element: a short urban burst of 1 to 6 hours with the Dhansiri, the Chathe or the Diphu low and the outfalls free, which tests the drains, as in 2023, when officials said that the Dhansiri stayed low while colonies flooded (as reported); and a multi-day storm of 24 to 72 hours with the river at its design level under Clause 5.8.5(a) and the nullah outfalls backed up, which tests the storage and the outfall-closed case, as on 14 September 2025, when the Chathe and the Dhansiri crossed the danger mark at Dimapur (as reported). (e) In sub-areas NL-C and NL-D no CWC unit hydrograph applies (Annex 3E): every cross-drainage structure and outfall of more than 1 km² there needs a site-specific hydrology study with the design rainfall of Clause 2.3.6, the subzone 2(b) SUH computed only as a check, losses near zero in the monsoon season (AMC III, Clause 3.8.4) and the routing of multi-day storms, because duration and volume govern culverts and outfalls there, not only the peak; Clause 3.11.4(d) applies as written, so where the study's 1% AEP peak is lower than the SUH peak, the study is justified by calibration under Clause 3.15 or the SUH peak is adopted. (f) Catchments that drain to the Doyang reservoir, or to its release reach below the dam, are modelled with storage routing and the operator's release scenarios, not by a peak-flow method alone (Clause 3.12; Chapter 5); NEEPCO's release protocol and warning thresholds were not found [TBC]. (g) No method of this chapter predicts debris flow; in steep catchments the design flow is bulked for sediment and debris, and inlets and culverts are protected against blockage, under Chapters 6 and 9, as the landslide near Pherima of 3 September 2024 shows, which was blamed locally on "the blockage of the culvert drainage" (as reported).


3.8 SCS curve number (SCS-CN) loss method

3.8.1 Runoff equation. Runoff depth shall be computed by:

Q = (P − Ia)² / (P − Ia + S) for P > Ia; Q = 0 otherwise S = 25,400 / CN − 254

where Q is runoff depth (mm), P is the cumulative rainfall depth (mm), S is potential maximum retention (mm) and Ia is initial abstraction (mm). In hydrograph models the equation is applied to the cumulative rainfall at each time step to obtain incremental rainfall excess.

3.8.2 Curve numbers. CN at AMC II shall be taken from Table 3.5, for the HSG of Clause 3.7.

Table 3.5 — Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)

Cover type HSG A HSG B HSG C HSG D
Pre-development reference (Clause 3.3.2): open space, good condition (grass > 75%) 39 61 74 80
Open space, fair condition (grass 50–75%) 49 69 79 84
Open space, poor condition (grass < 50%) 68 79 86 89
Impervious: roofs, paved parking, driveways, paved roads with kerbs and drains 98 98 98 98
Paved roads with open ditches (including right-of-way) 83 89 92 93
Gravel roads (including right-of-way) 76 85 89 91
Dirt roads (including right-of-way) 72 82 87 89
Newly graded areas (pervious, no vegetation) 77 86 91 94
Fallow, bare soil 77 86 91 94
Meadow (continuous grass, protected from grazing) 30 58 71 78
Brush, good condition 30 48 65 73
Woods, good condition 30 55 70 77
Woods, fair condition 36 60 73 79
Woods, poor condition 45 66 77 83
Water surfaces, tank waterspreads, wet detention basins Runoff = rainfall (no losses)

3.8.3 Use of Table 3.5.

  • (a) Post-development CN shall be built up from measured surfaces (Clause 3.9). The TR-55 urban district and residential lot-size rows shall not be used for the site.
  • (b) Pervious areas in the post-development condition shall use "open space" in the condition the landscape plan will achieve. Where no landscape plan is submitted, fair condition applies.
  • (c) Cultivated rows of TR-55 may be used for off-site existing conditions, but never for the pre-development reference of Clause 3.3.2.

3.8.4 Antecedent moisture. AMC shall follow Clause 2.11.4: AMC III for every design storm, whatever its duration, from 1 June to 15 October at a site in sub-area NL-A (Dimapur–Chümoukedima plain), NL-B (Central ranges), NL-B1 (Northern ranges) or NL-C (Tizu ranges) of Annex 2A, and from 1 May to 31 October at a site in sub-area NL-D (Peren hills); AMC III for every design storm from 1 April to 31 October, in every sub-area, on land below the 1% AEP flood level of the Dhansiri, the Chathe, the Diphu or another river, stream or nullah, in the auto-flow zone round Dhansiripar, on the margins of a pond and wherever the seasonal high water table is within 2 m of ground; AMC III for every design storm at any time of year in a catchment that drains to the Doyang reservoir or another reservoir or its backwater, or to a reach below a dam into which the dam releases water, such as the Doyang below the Doyang dam; at any other site or time, AMC III for a design storm that follows, or contains, a 5-day rainfall total of more than 53 mm; and AMC II for every other storm. AMC I is not used. CN for AMC I and III shall be obtained from AMC II by:

CN(I) = 4.2 CN(II) / (10 − 0.058 CN(II)) CN(III) = 23 CN(II) / (10 + 0.13 CN(II))

The conversion shall be applied to the pervious component only. Impervious surfaces stay at CN 98 for all AMC. Composite CNs shall not be converted directly.

Illustrative — not design values. Pre-development reference CNs at AMC III are: HSG A 59.5; HSG B 78.2; HSG C 86.7; HSG D 90.2.

3.8.5 Initial abstraction.

  • (a) Default: Ia = 0.2S, with the CNs of Table 3.5.

  • (b) Sensitivity run (mandatory): every storage design shall also be run with Ia = 0.05S. For this run, S shall be converted as S0.05 = 1.33 · S0.20^1.15 (S in inches), which in SI is:

    S0.05 = 25.4 × 1.33 × (S0.20 / 25.4)^1.15 (mm)

  • (c) The design shall be based on the default run. The sensitivity results shall be reported on Form 3-2. Where the sensitivity run increases the required retention volume or water quality volume, the larger value governs for that volume.

2026-10-31T09:51:23.520885 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 50 100 150 200 250 300 350 400 Rainfall depth P (mm) 0 50 100 150 200 250 300 350 400 Runoff depth Q (mm) Q = P (dotted) CN 98 (impervious) CN 90 CN 80 (open land, HSG D) CN 74 (open land, HSG C) CN 61 (open land, HSG B) CN 39 (open land, HSG A) CN 74 with Ia = 0.05S (dashed) S converted per Hawkins et al. (2002) Solid lines: Ia = 0.2S (default). Illustrative — not design values.

Figure 3.3 — SCS-CN runoff depth versus rainfall depth for selected curve numbers at Ia = 0.2S, with the Ia = 0.05S sensitivity case for CN 74. Original drawing for this Manual, computed from the runoff equation of USDA NRCS, NEH Part 630, Ch. 10 (2004) and USDA SCS TR-55 (1986), and the S-conversion of Hawkins et al. (2002). Illustrative — not design values.

Commentary. Table 3.5 reproduces standard NRCS TR-55 (1986) values. They were derived from US catchments and have not been calibrated in Nagaland. The AMC conversion equations are the standard NEH-4 relationships as given by Chow, Maidment and Mays (1988, §5.5). Converting only the pervious component follows APWA, which states that "direct conversion of composite antecedent moisture conditions is not appropriate" (KC Metro APWA 5600, 2011, §5602.2C). Converting a composite CN would wrongly lower the CN of the impervious part.

Ia = 0.2S is the original NRCS ratio. Analysis of US rainfall–runoff data found that 0.05S fits better on average (Hawkins et al., 2002; Woodward et al., 2003), and gave the conversion of 3.8.5(b). NRCS has not formally replaced 0.2S, so this Manual keeps it as the default. Figure 3.3 shows why the sensitivity run is needed: for CN 74, the 0.05S case gives more runoff for small storms (about 2.0 mm vs 0.5 mm from 25 mm of rain) but less for large storms (about 242 mm vs 262 mm from 350 mm). Illustrative — not design values. The ratio therefore matters most for retention and water quality volumes, and the default 0.2S is the conservative choice for peak and detention design. The rule in 3.8.5(c) that the larger retention or water-quality volume governs has no direct precedent; this Manual sets it because the 0.05S case gives more runoff from the small storms that set those volumes.


3.9 Impervious connectivity

3.9.1 Classification. Every impervious surface in the post-development condition shall be classified as directly connected (DCIA) or disconnected, and shown on the drainage plan.

3.9.2 Preferred representation. In hydrograph models, DCIA and pervious areas shall be modelled as separate sub-areas (or as the separate impervious and pervious fractions of a SWMM subcatchment), each with its own loss parameters. The runoff from disconnected impervious areas shall be routed onto the receiving pervious area.

3.9.3 Disconnection criteria. An impervious area may be classed as disconnected only if all of the following hold:

  • (a) its runoff discharges as sheet flow onto a pervious area, without a pipe, channel or kerb;
  • (b) the pervious flow path is at least as long as the impervious flow path draining to it;
  • (c) the pervious area is not compacted, not HSG D, and is protected from paving by the approved plan; and
  • (d) for storms of 12 hours or more, it does not drain to an RWH sump or tank (Clause 3.3.3(c)).

3.9.4 Composite CN. Where a single composite CN is used instead of 3.9.2, it shall be computed as:

  • for directly connected impervious area: CNc = CNp + (Pimp / 100)(98 − CNp);
  • where total impervious area is below 30% and part of it is disconnected: CNc = CNp + (Pimp / 100)(98 − CNp)(1 − 0.5 R),

where CNp is the pervious CN, Pimp is the percentage of impervious area and R is the ratio of disconnected to total impervious area. The composite CN shall not be used for retention or water quality volumes.

Commentary. The composite equations are from TR-55 (USDA SCS, 1986, Ch. 2, Figures 2-3 and 2-4). This Manual prefers separate representation in 3.9.2 because a composite CN spreads the impervious response over the whole area, which suppresses runoff from small storms. For a site that is 50% directly connected impervious on HSG B open space (CNp 61), 25 mm of rain gives about 9.9 mm of runoff when the two parts are modelled separately, but only about 1.8 mm with the composite CN 79.5. At 200 mm the two methods agree (139.5 mm vs 138.4 mm). Illustrative — not design values. The error is largest for the frequent storms that set retention and water-quality volumes. The disconnection criteria of 3.9.3 are set by this Manual, drawing on common practice in US runoff-reduction manuals. Criterion (d) follows the rule of Clause 3.3.3(c) that RWH sumps are full at the start of monsoon storms.


3.10 Groundwater, high water table and tank backwater

3.10.1 High water table (dual HSG). Where the seasonal high groundwater table is within 0.6 m of the ground surface, the soil shall be assigned HSG D for both the pre- and post-development runs, whatever its texture, unless it is permanently drained by works that are maintained under Chapter 10. This rule applies in every case to storms of 12 hours or more, which are run at AMC III (Clause 2.11.4).

3.10.2 Water-table data. The seasonal high water table shall be taken as the highest level recorded in the monsoon season (April–October), from site piezometers or trial pits, or from the nearest Central Ground Water Board (CGWB) or WRD observation well, adjusted for ground level.

3.10.3 Infiltration-based losses. Where Green–Ampt, Horton or soil-moisture-accounting losses are used instead of SCS-CN, the cumulative infiltration in any storm shall not exceed the storage available in the soil above the seasonal high water table.

3.10.4 Tank and waterbody backwater. Where a site or sub-catchment drains to a tank, pond, marsh or other waterbody:

  • (a) the water level in the receiving waterbody shall be applied as the downstream boundary of the model, per Chapter 5 and Chapter 7;
  • (b) land below the level of the receiving waterbody in the design event (including the tank foreshore below FTL) shall be modelled as water surface or storage, with no losses; and
  • (c) where the outfall is submerged by the waterbody level, the routing shall use the dynamic-wave method of Clause 3.12.4.

Commentary. The dual-group rule follows NEH Part 630, Ch. 7 (USDA NRCS, 2009), which places wet soils with a water table within 60 cm (24 in) of the surface in group D in their undrained state, with a dual group (A/D, B/D, C/D) where drainage is feasible. This Manual applies the undrained group to long storms because part of Nagaland is wet in the monsoon season, although most of the State is hill ground where the water runs off. On the Dimapur–Chümoukedima plain the CGWB's aquifer mapping of the Dimapur valley (400 km² of the "Dhansiri and Doyang Sub-basins") found dug-well water levels of 1.04–18.88 m below ground before the monsoon and 1.0–16.66 m after it, with piezometric levels of 5.20–19.09 m and a seasonal fluctuation of 0.11–5.02 m (CGWB, Aquifer Mapping … Dimapur Valley, 2013); the district booklet gives 1.86–10.25 m before and 1.75–5.70 m after the monsoon in 2011–12, and records "auto flow zones" round Dhansiripar, where wells flow without pumping (CGWB, Ground Water Information Booklet, Dimapur district). So on parts of the plain the water table is within 2 m of ground both before and after the monsoon, and nearer still beside the Dhansiri, the Chathe and the Diphu in flood. In the ranges the water is deeper and the ground sheds water: at Kohima levels of 4.41–7.22 m below ground before the monsoon and 3.98–4.68 m after it are recorded, with a stage of groundwater development of 2.13%, and the CGWB notes that "due to hilly nature most of it goes as runoff" (CGWB, Ground Water Information Booklet, Kohima district); but perched water and springs occur on the slopes, and water put into them is the hazard of Clause 4.11. The wet land is therefore the plain's auto-flow zone, the Recent alluvium "along the banks of Dhansiri and Diphu", the clayey north-western plain, the land beside the Dimapur nullahs, the margins of the ponds and of the Doyang reservoir, and hill sites with perched water or springs. No monsoon water-table depths for individual sites in Dimapur, Chümoukedima, Kohima or the other towns, and no map of the seasonal high water table, were obtained [TBC]; Annex 3A is to supply them. No State observation-well network was found; the wells are the CGWB's, North Eastern Region (Commentary to Clause 4.12).

Clause 3.10.4 reflects the State's receiving waters, which are ravine streams in the ranges, the nullahs and rivers of the plain and one large reservoir. There is no CWC flood-forecasting or level site in Nagaland ("there is still no site from Nagaland", SANDRP, 2019, as reported), and no State gauge level for the Dhansiri at Dimapur, the Chathe or the Diphu was found: the press reports only that the rivers "crossed the danger mark" in September 2025 (as reported) [TBC]. Dimapur "relies on three primary nullahs, namely Hospital Nullah, Dhobi Nullah, and Lengrijan Nullah", which carry its waste water and storm water to the Dhansiri (NSDMA, Critical Assessment and Recommendation of Remedial Measures on Dimapur Urban Flood), and when the river is high the town drains back up into them ("unchecked backflow from the Dhansiri river", as reported). Kohima drains to small, steep streams: the Dzuna, "a small river and a natural drain flowing in a west to east direction before meeting River Dzu", the Dzucha, which joins it to form the Dzu, and the Sano Ru, which "flows through the capital city Kohima" (NPCB); their place in the Doyang–Dhansiri system rests on press and local sources, not on a hydrological authority, and the south face of the town drains towards the Barak (NEER reading). The Doyang reservoir of NEEPCO is held for power through the season; a site that drains to it or to its backwater drains to a water surface that the operator holds, and Clause 3.10.4(b) applies to the land below the starting level set in the Commentary to Clause 3.12. The nearest CWC levels are tens of kilometres downstream in Assam, on the Dhansiri at Golaghat and Numaligarh, the Doyang at Gelabil, the Dikhow at Sivasagar and the Disang at Nanglamoraghat (as transcribed by SANDRP); they are not tailwater for any Nagaland town, and the Assam edition governs those reaches.


3.11 Unit hydrographs and runoff transformation

3.11.1 Permitted transforms.

  • (a) SCS (NRCS) dimensionless unit hydrograph, curvilinear or triangular, for catchments below 25 km² and for any sub-area of a larger model;
  • (b) the SWMM non-linear reservoir with kinematic overland flow;
  • (c) Clark or ModClark unit hydrograph in HEC-HMS, where parameters are calibrated under Clause 3.15; and
  • (d) the CWC synthetic unit hydrograph, for 25–5,000 km² (Clause 3.11.4).

3.11.2 SCS unit hydrograph. The peak and time to peak of the unit hydrograph shall be:

qp = PRF′ · A · Q / tp, with PRF′ = 0.208 (SI form of the standard peak rate factor 484) tp = Δt / 2 + tL, tL = 0.6 Tc

where qp is the peak flow (m³/s); A is the area (km²); Q is the runoff depth (mm), equal to 1 mm for the unit hydrograph; tp is the time to peak (h); and Δt is the computation interval (h).

3.11.3 Computation interval and sub-areas.

  • (a) Δt shall not exceed 0.133 Tc of the smallest sub-area, nor the hyetograph time step of Clause 2.9.1.
  • (b) Sub-areas shall be reasonably uniform in HSG, land cover and slope. Pervious and directly connected impervious areas shall be separate sub-areas, per Clause 3.9.2.

3.11.4 CWC synthetic unit hydrograph. For catchments of 25–5,000 km² in CWC subzone 2(b) (South Brahmaputra), which covers the Dimapur–Chümoukedima plain and the central and northern ranges (sub-areas NL-A, NL-B and NL-B1 of Annex 2A); the south-western hills (NL-D) lie in subzone 2(c) (Barak and others), for which CWC has published no Flood Estimation Report, and the eastern ranges (NL-C) lie outside every plate of the 2(b) report, in a subzone it does not name, so that in those two sub-areas the 2(b) report is used only for its areal reduction curves and as a check on unit hydrographs, and no CWC point rainfall exists there for the cross-check of Clause 2.3.3(b):

  • (a) the SUH parameters, design storm duration, loss rate, base flow, areal reduction and time distribution shall be taken from the applicable CWC Flood Estimation Report, using the catchment's physiographic parameters measured from survey or a DEM;
  • (b) the 24-hour design rainfall shall follow Clause 2.3.3(b) and Clause 2.7.3, and the climate factor of Clause 2.8 shall be applied;
  • (c) the SUH result shall be reported alongside the HEC-HMS or SWMM result for the existing natural condition; and
  • (d) where the hydrograph model gives a lower 1% AEP peak than the CWC SUH, the designer shall either justify the model by calibration under Clause 3.15 or adopt the CWC SUH peak.

3.11.5 Peak rate factor for flat coastal land. The standard factor (484; PRF′ = 0.208) is the default. A lower factor may be used only:

  • (a) for unchannelled, flat coastal-plain land without piped or lined drainage;
  • (b) in the same way in both the pre- and post-development runs for any land that stays unchannelled; and
  • (c) after the authority adopts calibrated values in Annex 3D.

Land drained by pipes, lined drains or kerbs in the post-development condition shall use the standard factor.

Commentary. The SCS unit hydrograph, the 0.6 lag ratio and the 0.133 Tc interval are from NEH Part 630, Ch. 16 (USDA NRCS, 2007). The interval follows from the unit hydrograph geometry: with tp = Δt/2 + 0.6 Tc and Tc + Δt = 1.7 tp, Δt = 0.133 Tc. The SI constant 0.208 is the direct conversion of 484 (cfs, mi², in, h). APWA uses the SCS dimensionless unit hydrograph as its basis (2011, §5602.5). The CWC Flood Estimation Reports give regression equations for SUH parameters, a design storm duration, a constant loss rate and ARF and time-distribution curves for each subzone (CWC 2000; see Chapter 2). They were derived from natural, mostly rural catchments with data that predate the report of 2000 (its 14 gauged catchments are railway and highway bridges in the valley below the hills, outside the State, observed between the 1960s and 1988, none of them in the Naga hills), so they represent pre-development conditions, not urbanised ones. That is why the SUH is used as a benchmark rather than as the post-development model. Clause 3.11.4(d) mirrors the floor principle of Clause 2.3.3. HEC-HMS has been calibrated against CWC subzone SUH responses in Indian studies, which shows the two can be linked.

The lower-factor option of 3.11.5 is based on the NRCS Delmarva unit hydrograph, which uses a peak rate factor of 284 (PRF′ ≈ 0.122) for flat, poorly channelled coastal-plain catchments on the Delmarva Peninsula (Welle et al., 1980, as adopted by NRCS; New Jersey Department of Agriculture, Delmarva bulletin, which uses 285). A lower factor gives a lower, later peak. Used only in the pre-development run, it would lower Q_pre and make the release cap stricter; used in a piped post-development run, it would understate Q_post. Clause 3.11.5(b) prevents both biases.


3.12 Routing

3.12.1 Storage routing. Routing through detention and retention facilities, tanks, ponds and any storage behind embankments shall use level-pool (modified Puls, storage-indication) routing with:

  • (a) a stage–storage relationship from the design grading or survey;
  • (b) a stage–discharge relationship for every outlet (orifices, weirs, surplus weirs, pumps), including the minimum orifice and trash screen of Chapter 4; and
  • (c) the tailwater boundary of Chapter 5, where the tailwater affects the outlet rating.

3.12.2 Channel routing. Routing through channels and drains shall use the Muskingum–Cunge method, or the Muskingum method with parameters K and X that are derived from channel geometry or calibration. For the Muskingum method, the routing interval Δt shall satisfy 2KX ≤ Δt ≤ 2K(1 − X).

3.12.3 Incidental storage. Storage behind road embankments, culverts or boundary walls that is not part of an approved facility shall not be counted in the design unless the authority is satisfied that it will be maintained for the design life.

3.12.4 Dynamic-wave routing. Dynamic-wave (full Saint-Venant) routing, in SWMM or HEC-RAS unsteady flow, shall be used where:

  • (a) the outfall is under tidal, river or tank backwater (Chapter 5, Clause 3.10.4);
  • (b) flow can reverse, or the network has loops or overflow links; or
  • (c) the network surcharges in the design event and the hydraulic grade line sets the design.

3.12.5 Tank cascades. Tanks in a cascade shall each be routed by Clause 3.12.1, with the surplus weir and sluice ratings and the documented operating rule of Chapter 7. The starting water level in each tank shall be FTL unless continuous simulation (Clause 3.13) supports a lower level.

Commentary. Modified Puls routing for storage and Muskingum–Cunge for channels are the APWA requirements (KC Metro APWA 5600, 2011, §5602.8). APWA also excludes "incidental detention" behind embankments unless it will be maintained, which 3.12.3 adopts. CPHEEO's detention procedure uses the same three inputs as 3.12.1: an inflow hydrograph, a stage–storage curve and a stage–discharge curve (CPHEEO 2019, Part A §8.5.3). The Muskingum stability limits are standard (Chow, Maidment and Mays, 1988, §8.4). This Manual starts ponds and reservoirs at their full or outlet level in 3.12.5 because Nagaland's heavy rain falls on waterbodies that are already full, or held up for power, not drawn down for drainage. The Manual's monsoon season runs from 1 April to 31 October. At Kohima the monthly means rise steeply from April: 106.27 mm in April, 179.40 mm in May, 268.70 mm in June, 349.82 mm in July, 327.53 mm in August, 256.13 mm in September and 133.04 mm in October (NSCCC, Rainfall Kohima, 1981–2022), so the ponds of the hill towns and the plain are full well before the largest storms. Those come from June to October: the Kohima 24-hour records by month are 322.0 mm in June (6 June 1985, a value this Manual flags for IMD's confirmation under Clause 2.3.6(h)), 109.0 mm in July (31 July 1992), 221.2 mm in August (23 August 1971), 134.2 mm in September (4 September 2003) and 140.0 mm in October (19 October 2001), against 74.8 mm in April and 76.0 mm in May (IMD Extremes). The starting levels are as follows.

  • Doyang reservoir (NEEPCO). The only levels found are "220 MCM at 324.0 M RWL, 400 MCM at 333.0 M RWL" in a data format filed for NEEPCO's Doyang project with CERC (as quoted). Neither level is labelled there as the full reservoir level or the minimum drawdown level; reading 333.0 m as the full level and 324.0 m as the minimum drawdown level is NEER's, and the datum is not stated [TBC]. SANDRP gives a gross storage of 535 MCM, a live storage of 370 or 400 MCM and 216.5 MCM at 324.0 m, with the gates closing below 324 m (as reported): the storage figures conflict with the CERC format, and this Manual does not choose between them. Until NEEPCO states the full and maximum water levels and their datum in writing, the reservoir shall be started at 333.0 m as quoted, recorded in the submittal with that label, and an outfall below that level is treated as closed for the duration of Clause 5.8.5(c). The spillway, of four radial gates, is reported to pass 5,977 m³/s from a catchment of 2,606 km² (as reported). In 2018 the gates were opened at 05:30 on 27 July and closed at 05:00 on 5 August, with inflow reported to have risen from "over 600" to "over 1150 cum/sec" on 31 July (NEEPCO, as quoted by SANDRP), and in July 2025 an "alert" was "sounded over rise in Doyang's water level" (as reported). NEEPCO's release protocol and warning thresholds were not found [TBC].
  • Ponds. No pond in a Nagaland town was found with a published outlet level, operating rule or level record [TBC], among them the "ancient natural pond in Dr. Haralu Colony" in Dimapur that NSDMA proposes to use for retention. A pond shall be started at its surveyed spill or outlet level, and, where its outfall is backed up by a river or a nullah, full to that outlet for the whole storm (Clause 5.8.5(f)); the small rain-fed and spring-fed ponds of the hill towns and villages are started full throughout the monsoon season.
  • Other waterbodies. Shilloi lake and Dzüdu lake are reported as priority wetlands (as reported); no level or outlet data were found for either [TBC], and both are started at their surveyed spill level.

A gated reservoir is modelled with its gate rule from its operator, and a waterbody is modelled below these levels only where a continuous simulation under Clause 3.13 or a notified operating rule supports it. The window of 1 April to 31 October in Clause 3.13.5(a) is set by this Manual and is the Manual's monsoon season. It starts on 1 April, not with the south-west monsoon, whose normal onset at Dimapur is 4 June (2 June in 1901–1940; IMD, 2020, Table 2), because Kohima's April and May means already make up about a sixth of its year's rain (NEER sum), Dimapur's flood season begins in May (NSDMA lists its vulnerable areas for "May–Sep"; the CGWB that the monsoon there "persists from May to September") and the ponds and the Doyang fill on the pre-monsoon rain. It ends on 31 October because the monsoon's normal withdrawal from Dimapur is 14 October (9 October before; 1971–2019; IMD, 2020) and October storms are real, such as Kohima's 140.0 mm on 19 October 2001 (IMD Extremes). Pumps, gates and debris screens are on standby from 1 April to 31 October (Chapter 10).


3.13 Continuous simulation

3.13.1 When required. Continuous simulation shall be carried out, in addition to the design-storm analysis, for:

  • (a) regional facilities draining more than 25 km²; and
  • (b) any system that includes a tank cascade whose storage is counted in the design (Chapter 7).

The authority may also require it for any facility where the starting storage level governs the design.

3.13.2 Rainfall input.

  • (a) The longest available hourly record from IMD or another approved recording gauge representative of the catchment shall be used.
  • (b) Where hourly data are shorter than 30 years, the record shall be extended with the IMD 0.25° gridded daily data. The full gridded record (1901 to present) should be used; at least the most recent 30 years shall be. The daily data shall be disaggregated to hourly by a method stated in the submittal and checked against the hourly gauge for the overlapping years. Grid values shall be converted to point values under Clause 2.7.1 where applicable.
  • (c) A future-climate run shall scale the record by the climate factors of Clause 2.8.

3.13.3 Model content. The model shall include soil-moisture accounting with evaporation (IMD pan evaporation or equivalent), groundwater or base flow, tank storage with operating rules and irrigation withdrawals, and the tailwater series of Chapter 5 (predicted tides plus a surge allowance for coastal outfalls).

3.13.4 Use of results. Annual maxima of water level, storage and volume, and the duration of outfall closure, shall be extracted and fitted by frequency analysis. Results shall be compared with the design-storm results. The more severe result at each AEP governs. Peak flows in drains and channels with a response time of less than one day shall be taken from the design-storm analysis where the continuous record was disaggregated from daily data, because the disaggregated hourly peaks are synthetic.

3.13.5 Two-step approach. The continuous simulation need not use the full hydraulic model. It may use a simplified hydrologic and storage model, at a daily or hourly step, that represents the soil moisture, groundwater, tank storage, operating rules and tailwater of 3.13.3. Its results shall then be passed to the design-storm runs of the full hydraulic model as:

  • (a) the starting level of each tank, taken as the level exceeded on 10% of the days from 1 April to 31 October over the record; and
  • (b) the antecedent soil-moisture condition, taken from the same days and compared with the AMC rule of Clause 3.8.

The designer shall show that the simplified model reproduces the water balance of the full model for at least one recorded event.

Two-step continuous simulation: setting the starting tank level (schematic, not to scale) Two-step continuous simulation: setting the starting tank level (schematic, not to scale) Step 1 — Long continuous run with a simplified hydrologic and storage model (daily or hourly step) Rainfall record: hourly gauge, extended with IMD 0.25° gridded daily data (at least 30 years; full record preferred) Tank level Year 1 Year 2 Year 3 Year 4 Year 5 Year n Monsoon season FTL (surplus weir crest) 0 10 50 100 % of days level is exceeded Tank levels on all monsoon-season days, ranked L10 L10 = level exceeded on 10% of the monsoon-season days over the record Pass to the design-storm runs (Clause 3.13.5): (a) starting level of each tank = L10; (b) antecedent soil moisture from the same days, compared with the AMC rule Step 2 — Design-storm run of the full hydraulic model, starting from L10 Design storm hyetograph (Chapter 2) Tank level 0 12 24 36 48 60 72 Time from start of design storm (h) FTL (surplus weir crest) Tank level, start at L10 Default without continuous simulation: start at FTL (Clause 3.12.5) Peak design level Check: the simplified model reproduces the water balance of the full model for at least one recorded event.

Figure 3.4 — Two-step approach of Clause 3.13.5. Step 1: a long continuous run with a simplified hydrologic and storage model gives the tank level exceeded on 10% of the days from 1 April to 31 October (L10). Step 2: the design storms are run in the full hydraulic model from that starting level, in place of the default start at FTL of Clause 3.12.5. Schematic, not real data. Original drawing for this Manual, illustrating the two-step approach set by this Manual in Clause 3.13.5.

Commentary. Design storms assume one starting condition, but in a tank cascade the governing variable is how full the tanks are when the storm arrives, which depends on the weeks of rain before it. An Australian study of 20 real on-site detention systems found that designs based on one temporal pattern, or even an ensemble of ten, "cannot reliably produce an OSD system design that will always be effective" under real rainfall, and continuous simulation showed frequent-event peaks exceeding pre-development levels (Water Science and Engineering, 2019). The 30-year minimum in 3.13.2(b) matches the station IDF rule of Clause 2.3.2; a longer record is better, and the IMD gridded daily record, which starts in 1901, is the practical long series for Nagaland. The record length matters less than what the simulation is for. Its main purpose here is to find how full the tanks and soils usually are when a monsoon season storm arrives, and how often heavy rain coincides with a closed outfall. A design storm cannot answer either question, because it starts from one assumed condition. It is not intended to replace design storms for the peak flow in urban drains. Clause 3.13.5 therefore allows the long run to be made with a simple storage model, which takes minutes, and passes the starting tank levels to the detailed hydraulic model, which is then run only for the design storms. Running a detailed 1D–2D city model continuously for decades is rarely practical and is not required. The 10% exceedance level in 3.13.5(a) is set by this Manual: it represents a wet but not exceptional monsoon, so that the design storm arrives on tanks that are already well filled, as they were in late July and early August 2018, when the gates of the Doyang reservoir were opened from 27 July to 5 August and its inflow was reported to have risen from "over 600" to "over 1150 cum/sec" on 31 July (NEEPCO, as quoted by SANDRP).


3.14 Pre- vs post-development comparison procedure

3.14.1 The comparison required by Clause 2.11 and Chapter 4 shall be carried out by the following steps. The results shall be recorded on Form 3-2.

2026-10-31T09:51:23.621054 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ Time (same design storm for both scenarios) Discharge 0.9 × Q_pre (standard-catchment cap, Clause 2.11.2) Q_pre Q_post (uncontrolled): higher and earlier peak Storage volume Routed peak ≤ cap; volume released over a longer time (drawdown, Ch 4) Schematic. Illustrative — not design values. Pre-development (greenfield, Clause 3.3.2) Post-development, no control Post-development, routed through storage

Figure 3.5 — Pre-development, uncontrolled post-development and routed post-development hydrographs for the same design storm. Original drawing for this Manual, adapted from the pre- vs post-development detention concept in CPHEEO, Manual on Storm Water Drainage Systems, Part A §8.5, 2019, and KC Metro APWA Section 5600, 2025.01. Schematic. Illustrative — not design values.

3.14.2 Step 1 — Define the site, catchments and points of comparison.

  • (a) Delineate the site and every area that drains to it, from survey.
  • (b) Identify each POC where runoff leaves the site. Each POC shall be tested separately. Runoff shall not be diverted from one natural catchment to another to meet the criterion.
  • (c) Model off-site run-on identically in both runs, at its existing condition (Clause 3.3.5(b)). Where it passes through the site's storage, the criterion applies to the total outflow at the POC.

3.14.3 Step 2 — Soils. Map HSG (Clause 3.7), apply the high-water-table rule (Clause 3.10.1) and record the infiltration tests.

3.14.4 Step 3 — Pre-development model. Build the pre-development model per Clause 3.3.2: greenfield CN (Table 3.5), Tc (Clause 3.6, with n = 0.15), and existing waterbodies and channels. Compute CN at AMC II and AMC III.

3.14.5 Step 4 — Post-development model. Build the post-development model per Clause 3.3.3: measured impervious areas, connectivity (Clause 3.9), disturbed-soil HSG, CN, Tc, and the proposed retention, detention and outlets as storage (Clause 3.12.1).

3.14.6 Step 5 — Design storms. From Chapter 2, prepare for each required AEP (50%, 10% and 1%; 2-, 10- and 100-yr) and each duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:

  • the depth with the climate factor (Clause 2.8), ARF = 1.0 for the site (Clause 2.7.4);
  • the hyetograph (Clause 2.9); and
  • the AMC (Clause 2.11.4).

The same storms shall be used in both runs (Clause 2.11.1).

3.14.7 Step 6 — Run the pre-development model for every storm and tabulate Q_pre(T, d). For flood-sensitive catchments, identify the largest 10% AEP pre-development peak over all durations; that value is the cap of Clause 2.11.3.

3.14.8 Step 7 — Run the post-development model without controls and tabulate Q_post(T, d) and runoff volumes. This shows the size of the problem and is reported, not tested.

3.14.9 Step 8 — Add retention and detention.

  • (a) Represent the retention volume of Chapter 4 as storage that is lost to infiltration or reuse (not released to the POC) within the period verified under Chapter 4.
  • (b) Route the remaining hydrograph through the detention storage and outlets (Clause 3.12.1).
  • (c) Apply the tailwater of Chapter 5, including the joint cases of Clause 2.12, where the outfall is tidal or under backwater.
  • (d) Adjust storage and outlets until Step 9 is met.

3.14.10 Step 9 — Test the criterion at each POC, for every AEP and every duration:

  • (a) standard catchments: Q_post(T) ≤ 0.9 × Q_pre(T) for the 50%, 10% and 1% AEP (Clause 2.11.2);
  • (b) flood-sensitive catchments: Q_post(1% AEP) ≤ Q_pre(10% AEP), and Q_post(50% AEP) ≤ Q_pre(50% AEP) (Clause 2.11.3).

The governing duration for storage is the one that needs the largest storage or gives the highest water level; the 24, 48 and 72 h runs are always reported (Clause 2.5.2).

3.14.11 Step 10 — Sensitivity runs. Repeat Steps 6–9 for the governing storms with Ia = 0.05S (Clause 3.8.5) and, where a lower peak rate factor is used, with the standard factor (Clause 3.11.5). Report the change in peaks and required storage.

3.14.12 Step 11 — Associated checks. Using the final routed model, check the drawdown times, minimum orifice and emergency spillway of Chapter 4, the outfall-closed storage check of Chapter 5, and the downstream analysis of Chapter 5.

3.14.13 Step 12 — Document the results on Forms 3-1 and 3-2 (Clause 3.17).

Commentary. The step sequence follows the standard event-based workflow: delineate; set pre-development CN and Tc; set post-development CN and shorter Tc; run identical storms through a unit hydrograph or kinematic model; compare peaks and volumes; and size storage by modified Puls routing. It adds the Nagaland elements: the 48–72 h storms, AMC III, and tailwater. Figure 3.5 shows why the long-duration runs matter: the routed peak can meet the cap while the storage holds the volume difference between the post- and pre-development hydrographs, which must then drain within the Chapter 4 limits. The ban on diverting runoff between catchments in 3.14.2(b) stops a site meeting the rule at one POC by moving flow to a neighbour's drain.


3.15 Model calibration and validation

3.15.1 When required. Calibration and validation are required for:

  • (a) catchment models of 25 km² or more;
  • (b) regional facilities and continuous simulation under Clause 3.13;
  • (c) city or basin drainage master plans; and
  • (d) any model whose parameters differ from the defaults of this chapter (for example a Clark transform or a lower peak rate factor).

3.15.2 Data. Calibration shall use observed rainfall (gauges, and radar where available) and observed flows or water levels (WRD gauging sites, KMC or NSDMA level sensors, tank gauges, or surveyed flood marks).

3.15.3 Events. At least three independent events shall be used for calibration and at least one further event for validation. At least one event shall be a long-duration monsoon or cyclone event (for example the Dimapur floods of 11–24 September 2008, the floods and landslides of July–September 2018 with the Doyang release, the Dimapur floods of 2019 and of 12 June 2023, or the storm of 14 September 2025, for which the only rainfall in the sources read for this Manual is press values quoting IMD's Meteorological Centre Kohima [TBC], where data exist).

3.15.4 Performance. The submittal shall report, for each event, the observed and modelled peak, volume and time to peak, and for continuous models the Nash–Sutcliffe efficiency (NSE) and percent bias. As a guide, a calibrated model should reproduce event peaks and volumes within ±25%, and a continuous model should achieve NSE ≥ 0.5 and percent bias within ±25%.

3.15.5 Limits on calibration. Calibration shall not be used to justify design flows lower than those given by the default methods of this chapter, unless site-specific factors are thoroughly examined and documented and the authority agrees.

3.15.6 Reasonableness check. Design peak flows shall be plotted as discharge per unit area against catchment area and compared with the CWC SUH results, regional gauged estimates and known historical floods.

Commentary. Clauses 3.15.5 and 3.15.6 follow APWA, which states that "model calibration shall not be used to justify discharge estimates that are lower than those provided by the baseline unit hydrograph method" and requires unit discharges to be plotted against tributary area and compared with regression, gauge and historical values (KC Metro APWA 5600, 2011, §5602.9). The event-count and performance values in 3.15.3 and 3.15.4 are set by this Manual. The NSE ≥ 0.5 and ±25% bias thresholds are the "satisfactory" streamflow ratings of Moriasi et al. (2007), which were developed for monthly continuous simulation; their use for event peaks and volumes here is an extension.


3.16 Software acceptance

3.16.1 Accepted software. The following are accepted without further demonstration, in a version current at the time of submittal:

  • (a) EPA Storm Water Management Model (SWMM 5.x);
  • (b) USACE HEC-HMS and HEC-RAS;
  • (c) USDA NRCS WinTR-55 and WinTR-20; and
  • (d) spreadsheets for the Rational Method and single-area SCS-CN calculations, where every formula and input is shown.

3.16.2 Other software. Commercial packages built on the SWMM or HEC engines are accepted if the engine and version are stated. Any other method or software is accepted only if the designer reports, for every sub-area, the peak flow, lag, runoff volume and equivalent CN from both that method and a baseline method of 3.16.1, identifies every difference greater than 5%, and justifies every difference that gives a less conservative result.

3.16.3 Benchmark problems. The authority shall publish benchmark test problems (Annex 3C). Software not listed in 3.16.1 shall reproduce them within the stated tolerance.

3.16.4 Model files. Native model input and output files shall be submitted with every hydrograph-based design.

Commentary. The 5% equivalence test is the APWA rule for alternative methods (KC Metro APWA 5600, 2011, §5602.2D). APWA names TR-55, TR-20, HEC-1 and HEC-HMS as baseline methods (§5602.2B). CPHEEO names SWMM for hydrograph and continuous modelling (CPHEEO 2019, Part A §4.4.2). Submitting native model files lets the authority rerun the model and is the main safeguard against unreviewable black-box results.


3.17 Documentation

Every hydrologic submittal shall include:

  1. Form 3-1, Hydrologic Calculation Summary, stating the method used and why (Table 3.1), the software and version, and the computation interval.
  2. Catchment maps for the pre- and post-development conditions, showing sub-areas, flow paths used for Tc, POCs, and off-site run-on.
  3. Soils: the HSG map and its source and scale (Clause 3.7), water-table data (Clause 3.10), and infiltration test results.
  4. Parameter tables for each sub-area and condition: area, impervious area by type and connectivity, HSG, CN at AMC II and III (or C and Cf), Tc worksheets, and n values.
  5. Rainfall: the Design Rainfall Sheet (Form 2-1) and the hyetographs used.
  6. Results: hydrograph tables and plots for each storm; stage–storage and stage–discharge tables; routed outflows; and peak water levels.
  7. Form 3-2, Pre- vs Post-Development Comparison, with Q_pre, Q_post (uncontrolled and routed) and the criterion for each POC, AEP and duration, and the sensitivity runs of Clause 3.14.11.
  8. Calibration report, where Clause 3.15 applies.
  9. Model files (Clause 3.16.4).
  10. A statement by the responsible engineer that the methods and parameters of this chapter have been used, with any departures listed and justified.

References (chapter)

  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Volume I, Part A: Engineering Design. Ministry of Housing and Urban Affairs, New Delhi. §4.4 (Rational Method, Table 4.2 runoff coefficients, time of concentration, partial area effect), §8.5 (detention).
  • Kansas City Metro Chapter APWA (2011). Section 5600 Storm Drainage Systems and Facilities (Feb 16, 2011), §5602.2–5602.9.
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01, §5603.4. https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
  • Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Policy Supplement). https://www.marc.org/document/apwa-stormwater-standards-supplement
  • USDA Soil Conservation Service (1986). Urban Hydrology for Small Watersheds, Technical Release 55 (TR-55), 2nd ed. Tables 2-2a, 2-2c, 3-1; Figures 2-3, 2-4, 3-1.
  • USDA NRCS. National Engineering Handbook, Part 630 Hydrology: Ch. 7 Hydrologic Soil Groups (2009); Ch. 9 Hydrologic Soil-Cover Complexes; Ch. 10 Estimation of Direct Runoff from Storm Rainfall (2004); Ch. 15 Time of Concentration (2010); Ch. 16 Hydrographs (2007). https://directives.nrcs.usda.gov/
  • Hawkins, R.H., Jiang, R., Woodward, D.E., Hjelmfelt, A.T. and Van Mullem, J.A. (2002). Runoff curve number method: examination of the initial abstraction ratio. Proc. Second Federal Interagency Hydrologic Modeling Conference, Las Vegas.
  • Woodward, D.E., Hawkins, R.H., Jiang, R., Hjelmfelt, A.T., Van Mullem, J.A. and Quan, Q.D. (2003). Runoff curve number method: examination of the initial abstraction ratio. World Water & Environmental Resources Congress, ASCE.
  • Welle, P.I., Woodward, D.E. and Moody, H.F. (1980). A dimensionless unit hydrograph for the Delmarva Peninsula. American Society of Agricultural Engineers paper. See also New Jersey Department of Agriculture, Delmarva Unit Hydrograph bulletin. https://nj.gov/agriculture/divisions/anr/pdf/DelmarvaBulletin.pdf
  • Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill. §5.5 (SCS method, AMC), §8.4 (Muskingum), Table 15.1.2 (Kirpich).
  • Kirpich, Z.P. (1940). Time of concentration of small agricultural watersheds. Civil Engineering 10(6), 362.
  • Merkel, W.H. (2001), as cited in USDA NRCS NEH Part 630, Ch. 15 (2010), on the length of sheet flow.
  • ASCE and WPCF (1969). Design and Construction of Sanitary and Storm Sewers. ASCE Manual of Practice No. 37.
  • Texas Department of Transportation. Hydraulic Design Manual, Ch. 4, §12 Runoff Coefficients. https://www.txdot.gov/manuals/des/hyd/chapter-4--hydrology/section-12--rational-method/runoff-coefficients.html
  • Central Water Commission (2000). Flood Estimation Report for South Brahmaputra Subzone 2(b) (Revised). Design Office Report No. SB-2(b)/R-4/44/99, March 2000, CWC (Hydrology (Regional Studies) Directorate), IMD, RDSO and the Ministry of Surface Transport; revises report SB/8/1984. Read from the Internet Archive copy of 12 April 2016 (scanned, read by optical character recognition): the text of §§2.1–2.3, which names Kohima ("Towns situated at altitude between 600 m to 1350 m are Haflong and Kohima") and describes a subzone that "comprises of large parts of Assam and areas of Meghalaya, Nagaland and Arunachal Pradesh"; Table 3.3 (the synthetic unit hydrograph), the simplified formulae, Table 4.1 (the ratios of t-hour to 24-hour rainfall), §4.3, Annexes 3.1, 3.2, 4.1 (one Nagaland station, Wokha) and 4.2 (no Nagaland station), Annex 4.3 (by optical character recognition only), the errata and the worked example, as checked against the page images in the Assam edition of this series; Plates 8, 9 and 10 read by eye over Nagaland, with town markers placed by an affine fit to the printed graticule (NEER reading; residual about 0.03°); Fig. 11 and Annex 4.4 not read [TBC]. http://web.archive.org/web/20160412151207id_/http://www.cwc.gov.in:80/main/downloads/South%20Brahmaputra%20subzone%202%20(b).Pdf
  • Central Water Commission (1991). Flood Estimation Report for North Brahmaputra Subzone 2(a), report No. NB/18/1991. Read only for its table of the ratios of t-hour to 24-hour rainfall, one of the three sets whose upper envelope gives the Nagaland interim ratios of Clause 2.3.6(f); no part of Nagaland lies in the subzone.
  • Central Water Commission. "Regional Flood Estimation Report" download page, Internet Archive copy of 20 March 2024 (no report for subzone 2(c), Barak and others). http://web.archive.org/web/20240320001002/https://cwc.gov.in/regional-flood-estimation-report
  • Moriasi, D.N. et al. (2007). Model evaluation guidelines for systematic quantification of accuracy in watershed simulations. Trans. ASABE 50(3), 885–900.
  • "OSD for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
  • India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): Kohima (42527, rainfall data 1948–2012), the only Nagaland station, monthly page M157 and the annual and seasonal tables. https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
  • India Meteorological Department (2020). New Normal Dates of Onset/Progress and Withdrawal of Southwest Monsoon, Table 2 (Dimapur).
  • Nagaland State Climate Change Cell. Rainfall Kohima (Kohima annual totals and monthly means, 1981–2022). https://nsccc.nagaland.gov.in/wp-content/uploads/2023/11/Rainfall-Kohima.pdf
  • Dabral, P. P. (2025). Frequency analysis for one day to seven consecutive days annual maximum rainfall for Kohima (Nagaland), India. CIGR Journal 27(2): 18–28 (the daily series of the Directorate of Soil and Water Conservation (Soil Survey Wing) at Kohima, 1997–2022). https://cigrjournal.org/index.php/Ejounral/article/view/9539
  • Central Ground Water Board, North Eastern Region. Ground Water Information Booklets, Kohima district and Dimapur district (Internet Archive captures of 6 February 2020); and Aquifer Mapping … Dimapur Valley (July 2013; Internet Archive capture of 25 July 2022) (water levels; soils and geology; the auto-flow zone; iron and fluoride). GWRA 2024 for Nagaland (stage of extraction 4.72%, all 52 units Safe; as quoted).
  • Nagaland State Disaster Management Authority. Critical Assessment and Recommendation of Remedial Measures on Dimapur Urban Flood (prepared with the District Disaster Management Authority, Dimapur and the Dimapur Municipal Council; undated, uploaded September 2023) (the three nullahs; vulnerable areas; the flood table; the pond in Dr. Haralu Colony). Internet Archive capture 20240901051148 of https://nsdma.nagaland.gov.in/sites/default/files/2023-09/Critical%20Assessment%20%26%20Recommendation%20of%20Remedial%20Measures%20on%20Dimapur%20Urban%20Flood_0.pdf
  • Nagaland Pollution Control Board. Revised Action Plan for rejuvenation of polluted river stretches, Priority III/IV/V (updated 25 May 2019) (the Dzuna, the Dzucha, the Dzu, the Sano Ru and the Chathe; read through a fetch summary).
  • Central Electricity Regulatory Commission. Data formats filed for NEEPCO's Doyang hydroelectric project for 2024–29 (reservoir storage at 324.0 m and 333.0 m RWL; as quoted). https://cercind.gov.in/2024/draft_reg/O&M_data/NEEPCO/CR_DHPS_Data_Formats_CERC_2024-29%20Converted.pdf
  • SANDRP, "Overview of CWC's flood forecasting sites 2019: North East India" (2 October 2019) and "Role of Doyang dam in bringing unprecedented floods in Golaghat" (7 August 2018), transcribing CWC's site tables and NEEPCO's statements. https://sandrp.in/2019/10/02/overview-of-cwcs-flood-forecasting-sites-2019-north-east-india/ ; https://sandrp.in/2018/08/07/role-of-doyang-dam-in-bringing-unprecedented-floods-in-golaghat/
  • Reports on the floods and landslides of 2018, 2023, 2024, 2025 and 2026, the Doyang reservoir and Dimapur's drains (Down To Earth; Morung Express; Eastern Mirror; Nagaland Tribune; EastMojo; as reported).
  • US EPA. Storm Water Management Model (SWMM 5). US Army Corps of Engineers, Hydrologic Engineering Center. HEC-HMS and HEC-RAS.

Annexes and forms

Annex / Form Content
3A Nagaland soil series to HSG lookup; seasonal high water table map
3B Nagaland CN calibration and supplementary land covers (forest and scrub of the ranges, terraced and valley fields, slide scars and hill-road cuts and fills, boulder-bed streams and the piedmont gravels of the plain, and pond and reservoir beds)
3C Benchmark test problems for software acceptance
3D Peak rate factor study for flat coastal land
3E CWC SUH parameters for subzone 2(b), with worked example
Form 3-1 Hydrologic Calculation Summary
Form 3-2 Pre- vs Post-Development Comparison