Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.1.4 No tidal outfalls in Nagaland. Nagaland is landlocked: it has no coast, no tide and no Coastal Regulation Zone, and the monsoon reaches it only as rainfall on the Naga hills and the Dimapur–Chümoukedima plain; that rainfall is dealt with in Chapter 2, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Nagaland: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials, and shall resist abrasion by gravel and stones and attack by the sewage that the nullahs carry), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Nagaland the receiving water is one of five kinds: a river of the Dimapur–Chümoukedima plain, the Dhansiri, the Chathe or the Diphu, reached through one of Dimapur's nullahs (open urban channels that carry storm water and waste water), which back up when the river is high; a stream or ravine of the ranges, such as the Dzuna, the Dzucha, the Dzu and the Sano Ru at Kohima, ungauged, steep and laden with gravel, slide debris and garbage; the Doyang reservoir of NEEPCO, or the reach of the Doyang below its dam; a river with no gauge in the State that runs out of it, the Tizu to the Chindwin in Myanmar, the headwaters of the Barak, or the Dhansiri, the Doyang, the Dikhow and the Disang into Assam; or a pond, natural or man-made, such as the natural pond in Dr. Haralu Colony at Dimapur; and:
- (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
- (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
- (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river of the plain, a nullah, a hill stream, the Doyang reservoir or its release reach, a pond or a receiving drain, with the locks and closures of Clause 5.8.5(a) to (f) in place of the tidal lock windows.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the Hospital, Dhobi and Lengrijan Nullahs of Dimapur, the old Dhansiri channel and the Chathe and the Diphu at Dimapur and Chümoukedima, the Dzuna, the Dzucha, the Dzu and the Sano Ru through Kohima, the Doyang below the Doyang dam, any drain built or held by a Municipal Council or Town Council, KSCDL, UDD, PWD, PWD (NH) or NHIDCL with an internal width of 1.0 m or more, and every stream, ravine or other natural channel that drains 8 ha or more, whether or not it is lined, piped or covered, or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, pond or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or pond under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, KMC, NSDMA or WRD; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next pond or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Nagaland. In the hill towns, where a colony's drain runs down a ravine to a stream, and the stream to a river many kilometres below, as Kohima's drains run by the Dzuna and the Dzucha to the Dzu, which press and local sources place in the Doyang–Dhansiri system (as reported), and on the Dimapur–Chümoukedima plain, where the nullahs run to the Dhansiri, the Chathe and the Diphu and on into Assam, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the Dimapur–Chümoukedima plain, whose nullah outfalls lie below the Dhansiri, the Chathe and the Diphu when those rivers are high: Dhobinala, Burma Camp, Bank Colony, Nagarjan and the other localities of NSDMA's Dimapur list were submerged from 11 to 24 September 2008 (NSDMA, Dimapur urban flood assessment), and on 14 September 2025 the Chathe and the Dhansiri crossed the danger mark at Dimapur while Vilhume, SM and Mao colonies flooded to "thigh level" (as reported); and in the reach of the Doyang below its dam, whose gates stayed open from 27 July to 5 August 2018 (NEEPCO, as reported by SANDRP). Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Nagaland, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, the Municipal Affairs Department or the Authority adopts a higher projection for the planning area; and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Nagaland has no coast, and the surge term does not arise in the State, which the monsoon reaches only as rainfall on the Naga hills and the Dimapur–Chümoukedima plain (Chapter 2).
Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Nagaland, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- the Dhansiri, the Chathe and the Diphu on the Dimapur–Chümoukedima plain at Dimapur, Chümoukedima and Niuland, the old Dhansiri channel, and the Hospital Nullah, the Dhobi Nullah and the Lengrijan Nullah that drain Dimapur to the Dhansiri (Clause 5.8.5(a));
- the streams and ravines of the hill towns, among them the Dzuna, the Dzucha, the Dzu and the Sano Ru at Kohima, the streams of Mokokchung, Wokha, Zunheboto, Tuensang, Mon, Phek, Kiphire, Peren and Longleng, and the streams that leave the ranges at the foot of the Tsiedukhru range above the plain (Clause 5.8.5(b));
- the Doyang reservoir of NEEPCO and the Doyang below its dam, past Runchan and Liphi to the Assam border (Clauses 5.8.3 and 5.8.5(c));
- the Dhansiri, the Doyang, the Dikhow, the Jhanji and the Disang where they leave the State, whose CWC sites lie in Assam (Clause 5.8.5(d));
- the Tizu and the Zungki in the eastern ranges, which drain to the Chindwin in Myanmar, and the streams of the Barak headwaters round Peren, Jalukie and Tening and on the south face of Kohima (Clause 5.8.5(e));
- the ponds, among them the natural pond in Dr. Haralu Colony at Dimapur (Clause 5.8.5(f));
- any drain or channel of a Municipal Council or Town Council, UDD, KSCDL, PWD, PWD (NH) or NHIDCL, and any village drain or stream on village land, that receives storm water (Clause 5.8.5(g)); and
- elsewhere: any river or WRD channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Doyang dam of NEEPCO's Doyang Hydro Electric Project (75 MW) in Wokha district, whose releases run down the Doyang past Runchan and Liphi into Assam), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 The Dimapur nullahs and the plain's rivers, Kohima and the hill streams, the Doyang reservoir and its release reach, the Assam reaches, the Tizu and the Barak headwaters, ponds, and consents and lines.
- (a) The Dimapur nullahs and the plain's drains to the Dhansiri, the Chathe and the Diphu. For an outfall on the Dimapur–Chümoukedima plain (sub-area NL-A of Annex 2A) to the Dhansiri, the Chathe, the Diphu or the old Dhansiri channel, directly, through a gate or flap gate in a bank, wall or embankment, or through a pumping station, or into one of Dimapur's three nullahs, the Hospital Nullah, the Dhobi Nullah and the Lengrijan Nullah, which "serve the purpose of carrying wastewater from various parts of the city and channeling it to the Dhnasiri [sic] River" (NSDMA, Dimapur urban flood assessment), or into another drain that ends in one of them:
- No CWC site and no State level. There is no CWC site in Nagaland ("Like last year, there is still no site from Nagaland", SANDRP, 2019, as reported), and no State gauge level for the Dhansiri at Dimapur, the Chathe or the Diphu was found during research: the press says only that the Chathe and the Dhansiri "crossed the danger mark" at Dimapur in September 2025 (as reported). The gauge, its datum and the level of that mark are to be obtained from WRD, NSDMA or the Deputy Commissioner [TBC]. WRD's flood-forecasting model of the Dhansiri under the National Hydrology Project is reported to be in progress (as reported); its levels were not obtained [TBC]. Every level used shall name its gauge and its datum; where no gauge exists, the designer shall say so on Form 5-1.
- Two failure cases. The plain's drains fail in two ways, and both shall be checked: (i) with the river low and the drains blocked, as in 2023, when officials said that the Dhansiri stayed low while colonies flooded and blamed the drainage (as reported), and wherever blockages of the Hospital Nullah flood Burma Camp, Bank Colony and Nagarjan (NSDMA): the drain is routed to a free outfall with its section as surveyed, net of silt, solid waste, vegetation and encroachment, and with its culverts and inlets blocked as Clauses 6.3.6(h) and 6.3.6(m) require; and (ii) with the river high and the outfalls backed up, from the "unchecked backflow from the Dhansiri river" (as reported): the tailwater of this item applies.
- Interim design tailwater. For the major-system and storage cases (Clause 5.8.4(b)), the tailwater at the outfall shall be the higher of: (i) the 1% AEP level at the outfall from a hydraulic model (Clause 5.8.2(b)) of the river and the nullah from the outfall to beyond the next confluence downstream, with the rainfall of sub-area NL-A on the plain and of the river's own sub-areas in the ranges above it (Clause 2.3.6), the AMC of Clause 3.8.4, the releases of item (c) where the river is below the Doyang, and the channel as surveyed in its present condition, net of encroachment, silt, solid waste and vegetation; and (ii) the river at its danger-mark stage at the nearest State gauge on the same river, surveyed, tied to a Survey of India benchmark and transferred to the outfall with the water-surface slope of the model or of the surveyed flood marks. The design shall be checked with the river at the highest flood level surveyed at the outfall from flood marks, such as debris lines, silt marks and the accounts of residents, of the floods of 11–24 September 2008, 2019, 12 June 2023 and 8–15 September 2025 or a later flood, and from the records of NSDMA, the Dimapur Municipal Council, WRD, the Deputy Commissioner or the Village Council, with its source stated, with the outfall closed and the stored volume held; where that check level is above the design level, the floor levels of Clause 6.11 and the storage of the outfall-closed check are set from it. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)) and for the minor-system tailwater, the river stands at its danger-mark stage, or at the design level of this item where no danger mark has been surveyed. Until a danger mark has been surveyed and tied [TBC], item (ii) is not available, and the higher of item (i) and the surveyed flood mark governs. No outfall to these rivers or nullahs shall be designed without item (i) and the flood-mark survey (set by this Manual).
- Gates, flap gates and pumps. Where an outfall passes through a gate or flap gate, or a pumping station, the designer shall identify the body that operates each, and obtain the sill of each gate, the crest of the bank, wall or embankment, the installed pumping capacity and the operating levels, including the river level at which each gate is closed, every level with its datum and its tie to the gauge used. No gate, flap gate or pumping station on any Dimapur nullah or river outfall, and no operator or operating rule for one, was found during research [TBC]. At a gated outfall the tailwater is the higher of the river level beyond the gate and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of its whole catchment, its storage as surveyed in its present condition, net of silt, encroachment, solid waste and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump, with gravity discharge through the gate only while the river is lower than the level behind it (set by this Manual). A pond behind the gate starts the storm full to its outlet level (item (f)). Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. Pumps shall deliver against the design level of this item, and every pump, panel and control shall remain operable with the river at that level and the land behind the bank ponded (Clause 5.12.5).
- River lock. The outfall-closed check of Clause 5.10 applies with a single lock: the outfall stands at the design tailwater of this item for the whole of the 72-hour storm of Clause 5.10.2, and where a gate or flap gate would shut, no gravity discharge is credited for not less than 72 hours, or for as long as a stage record or the model shows the river above the outfall invert, or above the level at which the gate is closed if that is lower, where that is longer (set by this Manual). The lock covers the whole of the 48- and 72-hour storms, so that storage and pumping handle the full storm volume (Clause 5.9.4). With the gate still closed, the volume stored in the storm shall be pumped down to the level at which the storm started within 48 hours of the end of the storm, the drawdown time of Clause 4.7, so that the storage is ready for the next storm while the river stays high (set by this Manual). A shorter lock may be used only where the outfall invert is above the design level of this item, or where an analysis of a stage record under Clause 5.10.6 shows it and the Authority approves it.
- Gate failure, encroachment and works not built. Floor levels and pumped outfalls behind a gate, wall or bank shall also be checked with the gate failed open and the land and drains behind it filled to the river level beyond it. Buildings and fill on the old Dhansiri channel, where about 200 families are reported to be affected every year (as reported), and on nullah reaches described as "heavily encroached" (as reported) are not channel and shall not be counted as conveyance or storage; a widening, desilting or diversion that has been proposed but not completed shall not be counted.
- (b) Kohima and the hill towns' streams. For an outfall to a stream or ravine of the ranges (sub-areas NL-B, NL-B1, NL-C and NL-D), such as the Dzuna, "a small river and a natural drain flowing in a west to east direction before meeting River Dzu", the Dzucha, the Dzu, "formed after the confluence of River Dzuna and Dzucha Ru", and the Sano Ru, which "flows through the capital city Kohima" (NPCB), the streams of Mokokchung, Wokha, Zunheboto, Tuensang, Mon, Phek, Kiphire, Peren, Longleng and the other ridge and spur towns, and the streams that run out onto the plain at the foot of the Tsiedukhru range, or to a drain that ends in one:
- No gauge. None of these streams has a gauge or a published flood level [TBC]. They are steep and short, rise within minutes of a burst of rain, and carry gravel, stones and slide debris from the Disang and Barail slopes and, below the towns, garbage: NPCB places polluted stretches of the Kohima streams below the Kohima Municipal Council's dumping site and below the town (NPCB). Kohima's north and east faces drain by the Dzuna and the Dzucha to the Dzu, which press and local sources place in the Doyang–Dhansiri system (as reported; not confirmed by a hydrological authority), and its south face drains towards the Barak (NEER reading); the receiving system of each outfall shall be confirmed by survey.
- Design level. The tailwater for the major-system and storage cases shall be the highest of: (i) the 1% AEP level at the outfall from a study of the stream, made with a hydrograph method of Chapter 3 for the whole catchment above the outfall, with the rainfall of its sub-area under Clause 2.3.6 (with the Kohima record check of Clause 2.3.6(h) where it applies), the AMC of Clause 3.8.4 and the bulking factor of Clause 6.3.6(g) on the peak flow, and routed through a hydraulic model (Clause 5.8.2(b)) of the channel as surveyed, net of encroachment, silt and solid waste, with the crossings downstream blocked as Clauses 6.3.6(h) and 6.3.6(m) require; (ii) the level at the outfall of any flood study of the stream made by or for WRD or the local body, where it gives one [TBC]; and (iii) the highest flood level surveyed at the outfall from flood marks, such as debris lines, silt and scour marks and the accounts of residents, of the floods of July–September 2018, 14 September 2025 or a later flood, and from the records of the local body, the Village Council or the Deputy Commissioner, with its source stated. No outfall to such a stream shall be designed without items (i) and (iii) (set by this Manual).
- Bed level, scour and aggradation. The designer shall survey the bed of the stream at the outfall and for at least 100 m upstream and downstream, and state the range within which the bed has moved, from past surveys, cross-sections, exposed foundations and pipes, and the records of the local body. The outfall invert, and the seat of any flap gate on it, shall stand at least 0.5 m above the highest bed level found in that range within 50 m downstream of the outfall, and the foundation of the outfall structure and its apron shall be taken below the scour depth computed under Chapter 9 (Clause 9.6) for the 1% AEP flow with the bulking factor (set by this Manual).
- Siting. An outfall shall be built into the bank and shall not project into the bed or the active channel, taken for this Manual as the land flooded once in 5 years (set by this Manual). It shall discharge in the direction of the stream's flow, with the bank protection and the energy dissipation that Chapter 9 requires at every outfall onto a slope or into a ravine, and no pipe, interceptor or chamber of the drainage system shall be laid along the bed of the stream. No muck, spoil or excavated material from the works shall be placed in the stream or where a storm can carry it into one (Clause 6.3.6(k)). No outfall shall discharge onto an unprotected slope, to a spring or its recharge area, or to a stream above a spring or an intake that supplies a town or village (Chapter 7) (set by this Manual).
- Closed outfall. Where the outfall invert is below the design level of this item, the outfall-closed check of Clause 5.10 applies with a single lock that lasts for the design storm plus the stream's recession, computed under item (i) for as long as the stream stays above the invert, and not less than 24 hours; where the 48- and 72-hour storms of Clause 5.10.2 are run, the lock lasts for the whole storm, and where no hydrograph of the stream has been computed, for the whole storm (Clause 5.9.4) (set by this Manual). Where the stream itself ends in a river backed up under item (a) or in the release reach of item (c), the longer lock governs.
- Interceptors. An interception and diversion structure on a Kohima stream or its drains, such as those of the four interception and diversion projects on the major drains of Kohima (Clause 8.9), shall not raise the design level of this item or reduce the capacity of the drain; it shall stand above that level or be designed to be overtopped without damage.
- (c) The Doyang reservoir and its release reach. For an outfall to the Doyang reservoir of NEEPCO's Doyang Hydro Electric Project (75 MW, Wokha district), directly or through a stream that ends in it, or to the Doyang below the dam, past Runchan and Liphi to the Assam border:
- Operator data. NEEPCO operates the dam. Its levels, spillway rating, operating rule and release records, in writing, are the data this item needs, and the designer shall ask NEEPCO for them; this Manual does not make NEEPCO an approving authority. Work in or on the river below the dam needs WRD's consent (item (g)), and a Village Council's or landowner's for village or private land.
- Levels as quoted, in conflict. NEEPCO's data format for CERC gives "220 MCM at 324.0 M RWL, 400 MCM at 333.0 M RWL" (as quoted); that 333.0 m is the full reservoir level and 324.0 m the minimum drawdown level is a NEER reading, not a label in the source. SANDRP gives a gross storage of 535 MCM, a live storage of 370 or 400 MCM and 216.5 MCM at 324.0 m, with the gates closing when the level is below 324 m (as reported). The two do not agree, and this Manual does not choose between them. The spillway, with four radial gates, is reported at 5,977 m³/s, the catchment at 2,606 km², and the dam at about 92 m, of earth and rockfill, with sources differing (as reported). No maximum water level, spillway rating or datum was found [TBC].
- Design level. For an outfall to the reservoir, the tailwater for the major-system and storage cases is the reservoir's maximum water level (MWL) as NEEPCO publishes it, or FRL plus the surcharge in its design flood, computed from the rating of its spillway with the gates operated only as NEEPCO's written rule provides. Until NEEPCO gives either, the tailwater is 333.5 m (the higher quoted level, 333.0 m RWL, plus 0.5 m), taken as above mean sea level until NEEPCO states the datum (set by this Manual) [TBC], and in every case not less than the highest level recorded at the reservoir. The reservoir starts every design storm at 333.0 m (Clause 7.7.3), and the minor-system tailwater is that level. An outfall below the design level is closed for the whole of the 72-hour storm of Clause 5.10.2 and of every shorter storm, with storage and pumping handling the full storm volume (Clause 5.9.4). The drawdown zone is part of the reservoir, and no outfall structure, pumping station or storage shall be built in it.
- Release reach. For an outfall to the Doyang below the dam, in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) and the 72-hour storm shall be run with the river at the level that results from the largest release of the dam, routed to the outfall, with the flow of the catchment below the dam as it occurred, and with the release placed before, during and after the site storm. No release record was obtained [TBC]: in 2018 NEEPCO reported an inflow rising from "over 600" to "over 1150 cum/sec" by 31 July (NEEPCO's statement, as reported by SANDRP), and no outflow figure was found. Until NEEPCO states the largest recorded release and its duration, the release is the spillway capacity of 5,977 m³/s (as reported) (set by this Manual). The lock of item (a) applies for not less than 72 hours, and, where the outfall invert is below the river level of the release, for as long as the release lasts, which, until NEEPCO gives a release record, is the period for which the gates stayed open in 2018: from 05:30 on 27 July to 05:00 on 5 August, about 215 hours (as reported) (set by this Manual). No attenuation by the reservoir's storage shall be credited to the river below, and no gate shall be assumed to open earlier or wider than NEEPCO's records show. The reach is a hazard-first site (Clause 2.3.6(i)): at Runchan "the river shifted 50–100 m" in 2018 (as reported), and no outfall, pumping station or storage shall be placed in the path of a channel shift.
- Release scenarios, not notices. NEEPCO's release protocol and warning thresholds were not found during research [TBC]; in July 2025 an "alert sounded over rise in Doyang's water level" (headline, as reported). No design shall rely on a notice or warning of a release, on the reservoir being drawn down before a storm, or on a gate being opened early, late or partly: the release scenarios of this item govern (set by this Manual). SANDRP argued that the 2018 release drove the flood at Golaghat, and NEEPCO that not releasing would have threatened the dam (as reported); this Manual takes neither side, and the scenarios hold whichever is right.
- (d) The Assam reaches. The Dhansiri, the Doyang, the Dikhow, the Jhanji and the Disang leave Nagaland and run into Assam, where the nearest CWC sites on them are (SANDRP's 2019 transcription of CWC tables, as reported; datum not stated [TBC]): the Dhansiri (S) at Golaghat (warning level 88.5 m, danger level 89.5 m, highest flood level 92.45 m, 11 October 1986) and at Numaligarh (warning level 76.42 m, danger level 77.42 m, highest flood level 80.16 m on 3 August 2018 in SANDRP's 2019 table, and 80.18 m on 2 August 2018 in SANDRP's 2018 article, 31 cm above the 79.87 m of 24 September 1985); the Doyang at Gelabil (highest flood level 101.05 m, 18 June 1985); the Dikhow at Sivasagar (warning level 91.4 m, danger level 92.4 m, highest flood level 94.23 m, 1 August 2018) and at Bihubar (highest flood level 104.77 m, 24 June 1998); and the Disang at Nanglamoraghat (warning level 93.46 m, danger level 94.46 m, highest flood level 96.49 m, 6 September 1998) and at Desangpani (highest flood level 106.26 m, 24 April 2016). These sites lie tens of kilometres downstream and are not the tailwater of any Nagaland town; the Assam edition governs those reaches. For an outfall in Nagaland, a level at one of these sites, or a level that the Assam edition gives, is used only as a lower bound on the downstream boundary of a river model, which shall start far enough downstream that the boundary does not govern the level at the outfall; no level shall be carried upstream from these sites to a Nagaland outfall (set by this Manual). The two Numaligarh values conflict, and the Assam edition prints neither; where a check level at Numaligarh is needed as such a boundary, the higher, 80.18 m, is used, because a boundary set too low lets the modelled river fall too fast upstream and understates the tailwater, while one set too high only costs storage (set by this Manual).
- (e) The Tizu and the Barak headwaters. For an outfall in the eastern ranges (sub-area NL-C) to the Tizu, the Zungki or another stream of their basins, which drain to the Chindwin in Myanmar, or in the south-western hills (sub-area NL-D) and on the south face of Kohima at Jakhama and Viswema to a stream of the Barak headwaters, or to a drain that ends in one:
- No gauge. The Tizu and the Zungki have no gauge and no CWC site, and no flood level has been published for any reach [TBC]. The nearest CWC site on the Barak is at Chotebekra, with a highest flood level of 32.1 m on 31 July 1989 (as reported in the research for the adjoining edition), far downstream and not a level for any Nagaland outfall; the adjoining edition governs the reaches across the State border.
- Design level and lock. These are hill streams, and item (b) applies to them in full, with the rainfall of sub-area NL-C or NL-D under Clause 2.3.6, the flood marks of the July–September 2018 floods, when Kiphire was cut off for two weeks (as reported), of 14 September 2025, when AWS Jalukie recorded 121.0 mm (as reported), or of a later flood, and a model whose downstream boundary does not govern the level at the outfall, because no level exists across the border (set by this Manual).
- (f) Ponds as receiving storage. For an outfall to a pond, natural or man-made, directly or through a drain that ends in it, such as the "ancient natural pond in Dr. Haralu Colony" that NSDMA proposes to use for retention in Dimapur (NSDMA):
- Starting level. The pond starts every design storm full to its outlet level: the crest of its outlet weir or overflow, the sill of its gate or the invert of the channel that drains it, or, where it has no defined outlet, its highest monsoon water line surveyed and tied to a Survey of India benchmark, and in every case not less than the highest level recorded at it (set by this Manual).
- Design level. The tailwater for the major-system and storage cases is the level reached when the inflow of the pond's whole catchment is routed through its stage–storage relation from that starting level, with its outlet closed for as long as the nullah or river beyond it stands above the outlet (item (a)), and with the project's discharge included (Clause 5.12.3). The stage–storage relation shall be surveyed: none was found for the Dr. Haralu Colony pond or any other pond in the State [TBC]. The minor-system tailwater is the starting level.
- Closed outfall. Where the outfall invert is below the design level of this item, the outfall is closed for the whole storm (Clause 5.9.4), and where the pond itself drains to a river-backed outfall, the lock of item (a) applies to both. A pond with no outlet is a closed basin, and an outfall to it is closed for the whole storm.
- Storage is the system's. The storage of a pond is part of the drainage system: it shall not be credited to one project, and no project shall reduce it; a Town Planning Scheme's "filling up or reclamation of low laying, swamp or unhealthy areas" (TCP Act, s.14F(g)) is subject to the compensatory storage of Chapter 7. Engineered storage is a detention pond; a natural pond keeps its own description, and a spring pool or the Doyang reservoir is never a detention pond. Most ponds are private (94.13% of the 1,432 water bodies of the first Water Bodies Census, as reported), so a discharge to a pond needs the written consent of its owner and, on village land, of the Village Council; within municipal limits, public tanks vest in the Municipality (2023 Act, s.119(1)(b)), whose consent is also required (set by this Manual). No drain that carries sewage shall discharge to a pond without the interception and screens of Clause 6.3.6(e) and Clause 8.9.
- (g) Consents and lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of a river or on an embankment without the consent of WRD; the procedure for that consent was not found during research [TBC]. Storm water shall not be discharged to a drain of another body without the written consent of that body: to a drain, channel, culvert or water course vested in a Municipality (2023 Act, s.119(1)(d)), the consent of the Municipal or Town Council, which already has the power "to cause the free flow of public drains" (NBBL 2012, bye-law 23), no procedure for connections having been found [TBC]; to a road drain or culvert, that of PWD, PWD (NH) or NHIDCL; to a drain built by UDD or KSCDL and not yet handed over, that of UDD or KSCDL; and to a village drain or a stream on village land, that of the Village Council, for which no written procedure was found [TBC] (set by this Manual). An outfall or drain carried across land that is not the applicant's needs the written permission of the landowner and, on village land, the consent of the Village Council, without which no transfer of immovable property takes effect (Village Council Act, s.15(1)(g)); the bye-laws already ask for the landowner's written permission where waste water is carried across others' land "to the nearest nulla or gorge or fallow land" (bye-law 20(ii)), and that permission, recorded on Form 5-1, is the hook (set by this Manual). For the Doyang, NEEPCO's written data of item (c) are required. Where consent is given, the discharge shall not exceed the rate the consent allows; the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives and with its downstream boundary at the level of items (a) to (f); the channel shall be taken in its present condition, net of silt, solid waste, vegetation and encroachment and with its narrowest section as surveyed, and a widening, desilting or diversion that has been proposed but not completed shall not be counted; and the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert. The designer shall also check the outfall against the lines that bind at the time of design (Chapter 7): no statute or bye-law sets a line along a stream, a spring or a drain (NEER reading); bye-law 23 forbids a building that "will obstruct the natural flow of drain", in force where the bye-laws apply; NSDMA's proposed "mandatory buffer zone (0.75 – 3.0 meters) along drainage lines" in Dimapur is a recommendation and is not applied by this clause; the corridor of Clause 7.4 is this Manual's own proposal; no floodplain zoning law exists and no flood zone has been notified; and the bye-laws set no flood plinth, so the 1% AEP level of this clause and the floor levels of Clause 6.11 govern. Orders of the Kohima Bench of the Gauhati High Court, among them those on NH-29 in PIL(Suo Moto)/2/2019, are directions to their parties, not lines for this clause.
No pump, gate or dam operation that helps drainage, such as pumping a drain, nullah or pond down before a storm, closing a gate late, opening a gate while the river is higher than the land behind it, or opening the Doyang's gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the nullah, the pond or the river (Clause 5.12.3). Pumping shall not be used to move water into a pond, the reservoir or another catchment without the consent of its owner or custodian, or onto a slope.
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Nagaland's rivers break that assumption, because their catchments lie in the ranges just above the towns and the storms that fill them fall on the towns at the same time. On 14 September 2025 the State's mean rainfall was 33.4 mm against a normal of 6.5 mm, AWS Jalukie recorded 121.0 mm and ARG Medziphema 105.0 mm, and the Chathe and the Dhansiri crossed the danger mark at Dimapur while colonies of the town flooded to "thigh level" (as reported, quoting MC Kohima); and in July 2018 Wokha recorded 95 mm on 8 July and 84.4 mm on 31 July (as reported) while the Doyang's inflow rose to "over 1150 cum/sec" (NEEPCO's statement, as reported by SANDRP). The reverse also happens: in 2023 officials said that the Dhansiri stayed low while Dimapur's colonies flooded (as reported), so a local storm with the river low is a design case of its own (Clause 5.8.5(a)). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects the one dam above the rivers of Nagaland's towns and villages, the Doyang dam of NEEPCO's Doyang Hydro Electric Project (75 MW) in Wokha district, with a catchment reported at 2,606 km² (as reported). Its levels are known only as quoted: NEEPCO's data format for CERC gives "220 MCM at 324.0 M RWL, 400 MCM at 333.0 M RWL" (as quoted), without saying which is the full reservoir level, while SANDRP gives a gross storage of 535 MCM, a live storage of 370 or 400 MCM and 216.5 MCM at 324.0 m, with the gates closing when the level is below 324 m (as reported); the spillway, with four radial gates, is reported at 5,977 m³/s, and the dam at about 92 m of earth and rockfill, with sources differing (as reported). In 2018 the gates were opened at 05:30 on 27 July and closed at 05:00 on 5 August, as the inflow rose from "over 600" to "over 1150 cum/sec" on 31 July (NEEPCO's statement, as reported by SANDRP); below the dam, at Runchan, "the river shifted 50–100 m" and 1,000 acres of crops were lost (as reported), and downstream the Dhansiri set a new highest level at Numaligarh (as reported). SANDRP argued that the rainfall of the week before was not unprecedented and that the release drove the flood at Golaghat; NEEPCO said that not releasing would have threatened the dam (as reported). In July 2025 the reservoir's level was reported to rise "beyond normal range following heavy rains", and an "alert sounded over rise in Doyang's water level" (headlines, as reported). NEEPCO's release protocol, warning thresholds, spillway rating and release records were not found during research, and no datum is stated for any level [TBC]. Until they are available, the spillway capacity applies as the release, with the flow of the catchment below the dam as it occurred and the 2018 gate-open period as its duration (Clause 5.8.5(c)). The river levels downstream in Assam come from SANDRP's copies of CWC tables; their datum and gauge zero are to be confirmed with CWC [TBC].
Clause 5.8.5 is set by this Manual. In Nagaland the tailwater at a town outfall is set not by the tide but by a river of the plain that backs up into a nullah, by a hill stream that no one gauges and whose bed moves, by the Doyang reservoir and the releases of its dam, by a river that runs out of the State into Assam or Myanmar, or by a pond at its outlet level, and no document found during research gives a design level for any of them. No design standard for any town drain in the State was found: the Nagaland Building Bye-Laws 2012 have no storm-water rule beyond the site drainage plan of bye-law 4 and the no-obstruction rule of bye-law 23, and the terms of reference of the ADB-financed urban infrastructure project for eight towns ask for "Indian national standards and guidelines" without a return period (ADB, NUIDP, 2022). The State has no floodplain zoning law, and no flood level has been published for any reach (Chapter 7).
The first is the plain. Item (a) treats Dimapur's three nullahs and the plain's other drains as a case of their own because the State's largest town drains through them, because they carry its waste water as well as its storm water (NSDMA), and because they fail in two opposite ways. In 2023 officials said that the Dhansiri stayed low while colonies flooded (as reported): the drains were blocked, by "Garbage disposal through drains", "Development of vegetation" and "Encroachment" among NSDMA's causes. In September 2025 the Chathe and the Dhansiri crossed the danger mark at Dimapur (as reported): the outfalls could not discharge. A design checked only for one of these fails in the other, so item (a) asks for both. No CWC site and no State gauge level exist, so item (a) cannot use the interim river rule of the hill editions, the highest level recorded at the nearest gauge, as it stands. It uses the danger mark that the press says the rivers crossed, once that mark has been found, surveyed and tied to a benchmark, as the design case, because it is the one level that WRD and the district administration already watch, and checks the design against the highest flood mark surveyed at the outfall, because the floods of 2008, 2019, 2023 and 2025 show how high the water has stood in the town; the 1% AEP model stands beside both until the danger mark is known, and governs wherever it is higher. This is the research's own recommendation, which has no datum yet [TBC]. The lock is not less than 72 hours, and covers the whole 72-hour storm, because the Dhansiri, the Chathe and the Diphu at Dimapur are hill-fed rivers that respond to multi-day rain in the ranges: in 2018 the Dhansiri stayed above its old highest level at Numaligarh for more than 60 hours (as reported), and the September 2025 spell lasted two days (as reported). The 7-day lock of the Assam edition's Brahmaputra and Barak outfalls is not used, because those great rivers stay high for weeks and these do not; a stage record of a Dimapur gauge, once obtained, governs under Clause 5.10.6 [TBC]. The 48-hour pump-down is the drawdown time of Clause 4.7: a storage still full when the next storm comes on a river that is still high does not exist for that storm. No gate, flap gate or pump was found on any outfall, so item (a) asks the designer to find the operator of each, as the Assam edition does, rather than assuming one.
The second is the hill stream. Item (b) follows the stream rule of the mountain editions of this series: a study with the bulking factor of Clause 6.3.6(g), surveyed flood marks, the higher of the two, and an invert at least 0.5 m above the highest bed level surveyed downstream, a margin set by this Manual for the aggradation that a stream laden with slide debris can show in a single flood. The lock is the storm and the stream's recession, and not less than 24 hours, shorter than the 72 hours of the plain's rivers, because the streams are small and fall within hours of the rain stopping. Kohima's streams are named because the capital drains into them, because NPCB places their polluted stretches below the town and its dumping site, and because the town lies on a divide: its north and east faces drain by the Dzu to the Doyang–Dhansiri system, as press and local sources say (as reported), and its south face towards the Barak (NEER reading), so the receiving system of an outfall is to be confirmed on the ground, not assumed.
The third is the reservoir and its release reach. Item (c) follows the reservoir rule of the North-East hill editions. A reservoir at its full level does not fall for the rest of the season but passes its inflow over its spillway, so an outfall below its design level is closed for the whole 72-hour storm. The Doyang's levels are known only as quoted, and the two sources disagree on its storage; the higher quoted level plus 0.5 m, the freeboard that this Manual uses for floor levels (Clause 6.11.1), is a floor, not an estimate of the surcharge, until NEEPCO gives its maximum water level [TBC]. No release record was obtained, so the spillway capacity stands in for the largest release, which is conservative by design: a tailwater set too low floods a village, while one set too high only costs storage. The 2018 gates stayed open for about nine days (as reported), so a lock of 72 hours alone would end while the release was still running; item (c) holds the lock for as long as the release lasts. SANDRP and NEEPCO disagree about what the 2018 release did at Golaghat (as reported); the release scenarios of item (c) do not depend on who is right. A warning helps people leave a reach but does not change the level an outfall must withstand, so item (c) designs for the release and not for the warning.
The fourth is the river that leaves the State. Item (d) names the CWC sites in Assam only to say that there is none in Nagaland and that the Assam edition governs those reaches. Two of the seven highest levels, at Numaligarh and at Sivasagar, were set in the 2018 flood, both fed from Nagaland's catchments (NEER reading): Nagaland's rivers set Assam's records, and a model of a Nagaland outfall must reach far enough downstream that Assam's levels bound it from below and do not decide it. The two Numaligarh values differ by 2 cm and the edition downstream prints neither; item (d) uses the higher only where a model boundary needs one and records both. Item (e) covers the rivers that have no gauge at all, the Tizu running to the Chindwin and the Barak headwaters, whose nearest CWC site lies far downstream, and treats their streams as hill streams under item (b).
The fifth is the pond, and the sixth is the consents and lines. A pond that a nullah fills is storage that the system needs, and item (f) starts it full to its outlet, as the plains editions of this series do for their wetlands, because a pond at the end of a wet week has no room left. Most ponds are private, and many stand on village land, so a discharge to one needs its owner's consent and, on village land, the Village Council's. Item (g) asks for the owner's consent and design level because a design that discharges to a channel, a river or a pond cannot be checked without them, and because the drains belong to several bodies and, on village land, to no one the State appoints. Land for an outfall or a drain across another's land is held under customary law, and the bye-laws' own requirement of the landowner's written permission for a waste-water drain carried across others' land (bye-law 20(ii)) is the hook that item (g) uses; the Manual does not take land for an outfall. The lines of item (g) decide where an outfall can be built, not its level: no statute sets a line along any stream, spring or drain, NSDMA's 0.75–3.0 m drain buffer is a recommendation, and the Manual's own corridor (Clause 7.4) is its proposal, so item (g) names them and applies none of them as law.
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive Nagaland requirement in this Manual. In Nagaland it applies where an outfall is shut not by the tide but by the Dhansiri, the Chathe or the Diphu backing up a Dimapur nullah, by a hill stream that has risen over the outlet or buried it in gravel, slide debris and garbage, by the Doyang reservoir at its full level or by the releases of its dam, or by a pond at its outlet level. The Chathe and the Dhansiri crossed the danger mark at Dimapur in the two-day spell of 14–15 September 2025 (as reported); in 2018 the Doyang dam's gates stayed open from 27 July to 5 August, and the Dhansiri at Numaligarh downstream stayed above its old highest level for more than 60 hours (as reported); and the storms that raise the plain's rivers are multi-day falls on the ranges, as in late July 2018 (Chapter 2). That is why Clause 5.8.5 replaces the two 6-hour windows described below with a lock of at least 72 hours on the plain's rivers, held for the whole 72-hour storm, the storm and the stream's recession and at least 24 hours on the hill streams, at least 72 hours and as long as the release lasts on the Doyang below the dam, and a closure for the whole storm at a reservoir or pond outfall below its design level. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 31 March each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Nagaland the outfalls do not cross a beach, but some of them end in a nullah or a river that backs up when the Dhansiri, the Chathe or the Diphu is high, and some in the reach of the Doyang below its dam. No gate or flap gate on any Dimapur nullah or river outfall was found during research [TBC], so the gates that matter today are the four radial gates of the Doyang dam of NEEPCO, with a spillway reported at 5,977 m³/s (as reported). In 2018 they were opened at 05:30 on 27 July and closed at 05:00 on 5 August, while the inflow rose from "over 600" to "over 1150 cum/sec" on 31 July (NEEPCO's statement, as reported by SANDRP); SANDRP argued that the release drove the flood at Golaghat in Assam, and NEEPCO that not releasing would have threatened the dam (as reported). A gate opened in a hurry raises the river below; a gate held shut or jammed by debris raises the reservoir and every outfall that drains to it; a flap gate on a nullah, once one is fitted, held open by silt or garbage lets the river into the town. NEEPCO operates the dam and WRD looks after the rivers, while the drains that reach them belong to the Municipal and Town Councils, PWD, PWD (NH), NHIDCL, UDD and, on village land, the Village Councils; NEEPCO's release protocol and warning thresholds were not found during research, and no rule linking the operation of any gate to the levels of the drains was found [TBC]. A gate and the drains behind it can therefore belong to different bodies. The 31 March inspection date is set ahead of the monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 31 March each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Nagaland: Clause 5.1.4), and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the monsoon. The mouth shall be assumed closed by a bar at the start of the April–October season, at the crest level of the most recent pre-monsoon survey. This applies unless the Water Resources Department certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless the Water Resources Department has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. Nagaland has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the silt, gravel, slide debris, vegetation and garbage that the nullahs and hill streams leave at an outfall, a culvert or a gate. NSDMA gives the causes of Dimapur's floods as "Garbage disposal through drains", "Development of vegetation", "Encroachment", "A lack of maintenance" and "Non-existent infrastructure" (NSDMA, Dimapur urban flood assessment); at Pherima in September 2024 the blockage of a culvert was blamed for a landslide (as reported); and NPCB places polluted stretches of the Kohima streams below the town's dumping site (NPCB). A flap gate held open or shut by silt, debris or waste, an outlet buried by a rising bed or left hanging by scour, or a gate that cannot be moved, turns a designed outfall into a dead end or a back-flow path. No gate on any Dimapur nullah outfall was found, and no rule linking the operation of the Doyang dam's gates to the levels of the drains above or below it was found during research [TBC]. Clause 5.8.5 deals with both by setting outfalls above the range of bed movement and by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- SANDRP (2019). Overview of CWC's flood forecasting sites 2019: North East India (no site in Nagaland; the Dhansiri (S) at Golaghat and Numaligarh, the Doyang at Gelabil, the Dikhow at Sivasagar and Bihubar, and the Disang at Nanglamoraghat and Desangpani, with their warning, danger and highest flood levels), https://sandrp.in/2019/10/02/overview-of-cwcs-flood-forecasting-sites-2019-north-east-india/ ; and SANDRP (7 August 2018). Role of Doyang dam in bringing unprecedented floods in Golaghat (NEEPCO's statement on the 2018 gate operation and inflows; the Numaligarh level of 2 August 2018; the Doyang's storages), https://sandrp.in/2018/08/07/role-of-doyang-dam-in-bringing-unprecedented-floods-in-golaghat/ . These are copies of CWC and NEEPCO data, read through a summary; the datum and gauge zero of each gauge are to be confirmed with CWC.
- North Eastern Electric Power Corporation Ltd (NEEPCO). Data formats for the Doyang Hydro Electric Project submitted for the CERC tariff period 2024–29 (storages at 324.0 m and 333.0 m RWL), https://cercind.gov.in/2024/draft_reg/O&M_data/NEEPCO/CR_DHPS_Data_Formats_CERC_2024-29%20Converted.pdf (as quoted; not read in full).
- Nagaland State Disaster Management Authority (NSDMA). Critical Assessment and Recommendation of Remedial Measures on Dimapur Urban Flood (with the District Disaster Management Authority, Dimapur, and the Dimapur Municipal Council; uploaded September 2023) (the Hospital, Dhobi and Lengrijan Nullahs; the vulnerable localities; the causes of flooding; the flood events of 2008 and 2019; the Dr. Haralu Colony pond; the proposed buffer along drainage lines), https://web.archive.org/web/20240901051148/https://nsdma.nagaland.gov.in/sites/default/files/2023-09/Critical%20Assessment%20%26%20Recommendation%20of%20Remedial%20Measures%20on%20Dimapur%20Urban%20Flood_0.pdf
- Nagaland Pollution Control Board (NPCB). Revised Action Plan for rejuvenation of polluted river stretches, Priority III, IV and V (the Dzuna, Dzucha, Dzu, Sano Ru and Chathe), npcb.nagaland.gov.in, updated 25 May 2019 (read through a summary).
- Central Ground Water Board, North Eastern Region. Ground Water Information Booklet, Dimapur District (the Dhansiri and Diphu river systems), archived at web.archive.org from cgwb.gov.in (capture of 6 February 2020).
- Urban Development Department, Government of Nagaland. Nagaland Building Bye-Laws 2012 (bye-laws 4, 20, 23 and 42(iii)), copy hosted by the Kohima Municipal Council, https://kmc.nagaland.gov.in/wp-content/uploads/2023/12/Building-Bye-Laws.pdf
- Government of Nagaland. The Nagaland Municipal Act, 2023 (Act No. 9 of 2023) (s.119), https://prsindia.org/files/bills_acts/acts_states/nagaland/2023/Act9of2023Nagaland.pdf ; The Nagaland Village and Area Councils Act, 1978, as renamed the Nagaland Village Council Act, 1978 (s.15(1)(g)), https://faolex.fao.org/docs/pdf/ind94094.pdf ; and The Nagaland Town and Country Planning (Fourth Amendment) Act, 2025 (Act No. 6 of 2025) (s.14F(g)), https://nagaland.gov.in/storage/actRules/jMXU5KJuxtktVu2WES5RkP3puVc7f6R3p3M5J2P0.pdf
- Asian Development Bank (2022). Nagaland Urban Infrastructure Development Project (54166-001), Project Readiness Financing report and project administration manual (the consultants' terms of reference for drainage; Kohima Village and the Secretariat area), https://ewsdata.rightsindevelopment.org/files/documents/01/ADB-54166-001_YBR92el.pdf
- Press reports on the Dimapur floods of 2023 and of 14–15 September 2025 and the danger mark on the Chathe and the Dhansiri (Eastern Mirror, Morung Express, Nagaland Tribune); on the Doyang release and the Runchan and Liphi floods of 2018 (Down To Earth); on the Doyang reservoir alerts of July 2025 (Morung Express, Eastern Mirror); on the Pherima landslide and the NH-29 washout at Pagla Pahar of September 2024 (Morung Express); on WRD's Dhansiri flood-forecasting model; on the old Dhansiri channel at Dimapur; and on the Water Bodies Census (Eastern Mirror, 24 April 2023).
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a hillside colony in Kohima draining to the Dzuna |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. The drains of Nagaland's towns fail in places that site design does not see, and in five different ways. The first is the plain. "The city of Dimapur relies on three primary nullahs, namely Hospital Nullah, Dhobi Nullah, and Lengrijan Nullah, as the main drainage system", which carry its waste water to the Dhansiri; their blockages flood Burma Camp, Bank Colony and Nagarjan, and seventeen localities are listed as vulnerable from May to September (NSDMA, Dimapur urban flood assessment); "unchecked backflow from the Dhansiri river" is reported, and so are floods with the river low (as reported). The second is the hill stream. Kohima stands on ridges of Disang and Barail rock and drains to the Dzuna, the Dzucha, the Dzu and the Sano Ru, which no one gauges and which NPCB records as polluted below the town (NPCB); on NH-29 between Chümoukedima and Kohima, the blockage of a culvert was blamed for the landslide near Pherima that killed six people on 3 September 2024 (as reported). The third is the reservoir and its release reach. The Doyang dam's gates stayed open from 27 July to 5 August 2018 while the inflow rose to "over 1150 cum/sec" (NEEPCO's statement, as reported by SANDRP), and at Runchan below the dam "the river shifted 50–100 m" (as reported). The fourth is the river with no gauge. There is no CWC site in Nagaland (SANDRP, 2019, as reported); the nearest levels are in Assam, tens of kilometres downstream, and two of their highest levels were set in the 2018 flood from Nagaland's catchments (NEER reading); the Tizu and the Barak headwaters have no level at all. The fifth is the pond: the State's first Water Bodies Census counted 1,432 water bodies, 90.64% of them ponds and 94.13% private (as reported). The outfalls also belong to one body while the drains above them belong to others: the rivers are WRD's to look after, the dam NEEPCO's to operate, the town drains the Municipal and Town Councils', the road drains PWD's, PWD (NH)'s or NHIDCL's, and the lanes and drains of village land the Village Councils', and no rule divides them (Chapter 6, Clause 6.9). No document found during research sets a design level for any river, stream, reservoir or pond outfall in the State, or a design standard for any town drain. A detention basin that meets every release rate in Chapter 4 still fails if the river stands above its outfall, if the stream has buried its outlet in gravel or garbage, or if the reservoir is full. This chapter makes these failure modes part of the design. Nagaland has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.