About this draft
Status. This is Draft v1.0 of the Punjab Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for the State of Punjab.
Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Punjab, its Council of Ministers or the Punjab Vidhan Sabha, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Department of Housing and Urban Development (HUD) or its Department of Town and Country Planning (DTCP), the Punjab Urban Planning and Development Authority (PUDA), the Greater Mohali Area Development Authority (GMADA), the Greater Ludhiana Area Development Authority (GLADA) or any other development authority, the Department of Local Government (DLG), any Municipal Corporation, Municipal Council or Nagar Panchayat, the Water Resources Department (WRD) or its Drainage-cum-Mining & Geology wing, the Punjab Water Regulation and Development Authority (PWRDA), the Punjab Water Supply and Sewerage Board (PWSSB), the Punjab Municipal Infrastructure Development Company (PMIDC), the Department of Soil and Water Conservation, the Department of Rural Development and Panchayats, or any other agency. Where it names a body, such as the Punjab Pollution Control Board (PPCB), the Punjab State Wetlands Authority, the Punjab State Disaster Management Authority (PSDMA), the Department of Revenue, Rehabilitation and Disaster Management, the State Flood Control Board, the Bhakra Beas Management Board (BBMB), Punjab Agricultural University (PAU), a Smart City company, a Deputy Commissioner or a district administration, the Punjab and Haryana High Court, the Supreme Court of India, the National Green Tribunal (NGT), or a body of the Union, such as the Central Pollution Control Board (CPCB), the Central Water Commission (CWC), the India Meteorological Department (IMD) or the Central Ground Water Board (CGWB), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role. Nor has the Manual or its Supplement been adopted, notified or endorsed by the Administrator of the Union Territory of Chandigarh, the Chandigarh Administration or any of its bodies (see Supplements below).
No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. A competent authority (for example DLG for municipal building approvals, HUD for the 2021 Building Rules, or WRD for drains and choes) could adopt it. Until then, the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021, each as amended, the master plans and zoning regulations made under the Punjab Regional and Town Planning and Development Act, 1995, the limits notified under section 38 of the Punjab Canal and Drainage Act, 2023 (or under section 55 of the Northern India Canal and Drainage Act, 1873, before it), the Directions of PWRDA, drainage schemes, orders of courts and tribunals and approval conditions in force continue to apply.
Building rules. Punjab has two building instruments, each for its own territory, and this Manual cites both. The Punjab Municipal Building Bye-Laws 2018 (PMBBL), notified by DLG (No. CTP(LG)/2018/3548 of 22 November 2018) under section 201(1) of the Punjab Municipal Act, 1911 and section 399(2) of the Punjab Municipal Corporation Act, 1976, apply in the municipal areas of every Municipal Corporation, Municipal Council and Nagar Panchayat. The Punjab Urban Planning and Development Building Rules 2021, notified by HUD (G.S.R. 144 of 31 August 2021) under sections 180 and 43(2) of the Punjab Regional and Town Planning and Development Act, 1995, apply to the rest of the State, outside municipal limits, the lal lakir of village abadi, Cantonment Boards and protected monuments, and they do apply in the urban estates and other schemes of the development authorities. "PUDBR" is an abbreviation set by this Manual; the State uses none, and the "PUDA Building Rules" are the 2018 rules that the 2021 Rules repealed. The shared chapters write "PMBBL/PUDBR" where both instruments are meant, and cite a clause with its instrument and edition, for example "PMBBL 2018 (as amended), cl. 10.1" or "PUDBR 2021 (as amended), r.40". The Punjab Unified Building Rules 2025, notified on 15 December 2025 and stayed in part by the High Court on 24 December 2025, were withdrawn on 27 April 2026, as reported, restoring the 2021 Rules and PMBBL 2018 "as if the 2025 Rules had never been notified". This Manual cites them as history only (Chapter 1).
Chandigarh and the capital. Chandigarh is the capital of Punjab, and also of Haryana, but it is a Union Territory and lies outside the State's jurisdiction. The chapters of this Manual do not apply there; Chandigarh is covered only by Supplement S01. Where a shared clause names the State's principal city or its municipal corporation, this Manual names Ludhiana, the State's largest city, and the Municipal Corporation Ludhiana (MC Ludhiana), the State's largest municipal drainage system. Ludhiana is not the capital, and the choice says nothing about the status of Chandigarh; it only keeps the State's own rules on the State's own ground. Amritsar, Jalandhar, Patiala and SAS Nagar (Mohali) are named beside Ludhiana wherever a clause lists bodies. The IMD observatory at Chandigarh (42105) is used as the reference gauge for SAS Nagar, Zirakpur and Kharar, and the N-Choe, the Sukhna Choe and the Patiali-ki-Rao, which leave Chandigarh, are Punjab drainage once they cross the boundary.
Supplements. The Manual carries one supplement, for a place that adjoins Punjab but lies outside the State's jurisdiction. Supplement S01 covers the Union Territory of Chandigarh, the capital of Punjab and of Haryana, administered under Article 239 of the Constitution by an Administrator, an office held by the Governor of Punjab since 1 June 1984, as reported. Chandigarh lies at the foot of the Shivalik hills between SAS Nagar (Mohali) in Punjab and Panchkula in Haryana, and its storm water leaves the Union Territory through three choes, the N-Choe, the Sukhna Choe below Sukhna Lake and the Patiali-ki-Rao, into SAS Nagar district and on to the Ghaggar. The supplement has not been adopted, notified or endorsed by the Administrator, the Chandigarh Administration, the Municipal Corporation Chandigarh, the Chandigarh Housing Board, Chandigarh Smart City Ltd or any of the Administration's departments or agencies, nor by the Governments of Punjab, Haryana or Himachal Pradesh. What this notice says of the Manual applies to the supplement.
Names. Some places, rivers and drains have more than one name or spelling in statutes, sources and on IMD and CWC stations:
- older sources and IMD stations use Jullundur or Jullundar for Jalandhar, Rupar or Ropar for Rupnagar, Ferozepore, Ferozpur or Firozpur for Ferozepur, Bhatinda for Bathinda and Ludiana for Ludhiana. SAS Nagar (Sahibzada Ajit Singh Nagar) is the district and city also called Mohali, SBS Nagar (Shaheed Bhagat Singh Nagar) is Nawanshahr, and Sri Muktsar Sahib is also written Muktsar. The district map has changed: as generally recorded, and to be confirmed before a clause relies on it, Fatehgarh Sahib was formed from Patiala in 1992, Moga, Sri Muktsar Sahib and Nawanshahr in 1995, Tarn Taran from Amritsar, SAS Nagar from Rupnagar and Barnala from Sangrur in 2006, Pathankot from Gurdaspur and Fazilka from Ferozepur in 2011, and Malerkotla from Sangrur in 2021. The CWC flood reports and IMD's Climate of Punjab (1993) and Extremes tables use the districts of their time, and a clause that names a district must be checked against the current list;
- the Sutlej is also written Satluj. The Patiala ki Rao is also written Patiali-ki-Rao or Patiala Ki Rao, and is called a nadi or choe in its notification; the Buddha Nallah of Ludhiana is also written Budha Nallah or Buddha Nullah, and is called the Buddha Dariya. Of the beins of the Doaba, the Kali Bein is also called the Holy Bein, the Chitti Bein the East Bein, and the Black Bein is the Kala Sanghian drain. The place on the Sutlej where the dhussi bandh broke in August 2019 is Janian, also written Jania or Janian Chahal;
- river and reservoir levels in Punjab's sources are given in feet at WRD headworks and BBMB dams (Bhakra, Pong) and on district gauges, and in metres at Ranjit Sagar; river flows are given in cusecs (cubic feet a second; 1 cusec = 0.0283 m³/s) and lakh cusecs (100,000 cusecs). CWC has no flood-forecasting or level-monitoring site in Punjab, as reported, so no Punjab river has a CWC danger level. This Manual quotes levels as given, names the gauge and its datum with each one, and treats gauge zeros not found tied to mean sea level as [TBC];
- Majha (the land between the Ravi and the Beas, around Amritsar, Tarn Taran and Gurdaspur), Doaba (between the Beas and the Sutlej, around Jalandhar, Kapurthala and Hoshiarpur) and Malwa (south of the Sutlej, from Ludhiana and Patiala to Bathinda and Fazilka) are regions, not administrative units. The Shivalik hills, also written Siwalik, rise along the north-eastern edge of the State, from Pathankot and Dhar Kalan past Hoshiarpur, Garhshankar and Anandpur Sahib to the hills above Kharar and Mullanpur; and
- the Kandi is the belt of boulder-and-gravel fans, 10 to 15 km wide, at the foot of the Shivaliks, crossed by choes, and the Sirowal is the belt of finer soils with a shallow water table and springs below it, as CGWB uses the names. Both are administrative and hydrogeological terms, not dictionary words.
This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies need a word of explanation:
- a Municipal Corporation is constituted under the Punjab Municipal Corporation Act, 1976, and Municipal Councils and Nagar Panchayats under the Punjab Municipal Act, 1911. The CAG counted 13 Municipal Corporations, 101 Municipal Councils and 52 town councils, the Nagar Panchayats, in March 2023, and Barnala was reported to have become the fourteenth Corporation in October 2025; the current list is [TBC]. All are urban local bodies (ULBs), overseen by DLG, which issues PMBBL through its Town Planning Wing (CTP(LG)). The sections of the two Acts that vest drains in a local body and govern connections to them were not read [TBC];
- HUD is the Department of Housing and Urban Development, which issues PUDBR; its Department of Town and Country Planning (DTCP), under the Chief Town Planner, issues the Uniform Zoning Plan (Drawing No. 01/2020 CTP(Pb)). In this Manual DTCP always means the Punjab department and is named with HUD. PUDA is the Punjab Urban Planning and Development Authority, and GMADA (SAS Nagar and New Chandigarh) and GLADA (Ludhiana) are the development authorities under it; the development authorities of Amritsar, Jalandhar, Patiala and Bathinda are [TBC], and the sections of the PRTPD Act that constitute them were not read. A shared clause that says "a development authority" means any of them;
- WRD is the Water Resources Department. Its canal wing runs the canals, distributaries and watercourses, and its Drainage-cum-Mining & Geology wing, called the Drainage Wing in this Manual, runs the rivers, choes, notified drains and dhussi bandhs and notifies limits under section 38 of the Punjab Canal and Drainage Act, 2023 (Punjab Act 11 of 2023). That Act repeals the Northern India Canal and Drainage Act, 1873 in its application to Punjab (s.61) and carries over its section 55 as section 38, under which a notified reach "shall be held to be a drainage-work". Its "drainage work" excludes the removal of sewage from towns, villages or any other habitat (s.2(7)). The date on which it came into force was not found [TBC], and notifications made under the 1873 Act before then are cited under section 55. The State's observation wells are WRD's, with CGWB's; PWRDA, the Punjab Water Regulation and Development Authority, constituted under the Punjab Water Resources (Management and Regulation) Act, 2020, regulates groundwater extraction and charges for it under its Directions of 2023;
- PWSSB (the Punjab Water Supply and Sewerage Board) and PMIDC (the Punjab Municipal Infrastructure Development Company, the State's nodal agency for AMRUT) build water, sewerage and drainage works for the local bodies, and BBMB, the Bhakra Beas Management Board, operates the Bhakra and Pong dams, whose releases set the stage of the Sutlej and the Beas;
- village ponds are commons (shamlat) of the Gram Panchayat under the Punjab Village Common Lands (Regulation) Act, 1961, in the charge of the Department of Rural Development and Panchayats. No pond statute and no pond authority was found; and
- a tehsil is the revenue subdivision of a district, under a Tehsildar.
Some abbreviations have more than one meaning:
- MC in this Manual means a Municipal Corporation only, as in MC Ludhiana. A Municipal Council is always written in full, although Punjab's sources, the CAG among them, also abbreviate councils as MC;
- AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for Amritsar or for any municipal body;
- ADA, BDA, JDA and PDA are used in Punjab's sources for the development authorities of Amritsar, Bathinda, Jalandhar and Patiala, whose names are [TBC]; the same letters name other bodies in other States, and this Manual writes the names out;
- PUDBR is set by this Manual for the Punjab Urban Planning and Development Building Rules 2021, and PMBBL is the Punjab Municipal Building Bye-Laws 2018; neither abbreviation is the State's own;
- HFL is the highest flood level recorded at a gauge. It is not a design level, and sources sometimes give different values for the same gauge. In Punjab most river levels are headworks, dam or district gauge readings in feet, and this Manual proposes how a design flood line is drawn (Chapter 7);
- RD (reduced distance) is the chainage along a canal or drain from its head, in metres or, in older WRD records, in feet; and
- SWD is a storm water drain.
The sense is clear from the context. Punjabi terms used in the text are explained where they first appear and in Annex 7E, with their Gurmukhi spelling and the dictionary that gives it (Bhai Maya Singh, The Panjabi Dictionary, 1895, and Platts, 1884; the Mahan Kosh and the Punjabi University dictionary were not consulted):
- a chhappar (ਛੱਪੜ; toba ਟੋਭਾ; pond) is the village pond of Punjab, natural or dug, which stores rainwater runoff and often the village's sullage ("A pond; a puddle", Maya Singh). It is the word the State's own pond programme uses. Written ਛੱਪਰ, chhappar means a thatched roof, and Platts gives only the thatch sense, so the Gurmukhi is always printed at first use. Toba (ਟੋਭਾ, "An unwalled tank, a pond, a pool") is the same thing, common in Malwa, and is not tobá (ਤੋਬਾ), repentance. Dhab (ਢਾਬ, "a natural pool, a lake, a deep depression in the earth") is kept for larger natural depressions and seasonal lakes;
- a choe or cho (ਚੋ, "the bed of a torrent") is a seasonal torrent from the Shivalik hills, dry for most of the year, with a wide bed of sand, gravel and boulders; it rises and falls within hours and carries sand and debris as well as water. A rao or rau (ਰੌ, "A small stream from the mountains, the dry bed of such a stream") is the same kind of stream, as in the Patiala ki Rao;
- a bein (ਬੇਈਂ, "An irregular stream with a clay bottom, having the appearance of a canal") is a sluggish plains stream of the Doaba, such as the Kali Bein and the Chitti Bein; a nala or nallah (ਨਾਲਾ, "A brook, a rivulet") is a natural channel or a large open drain, such as the Buddha Nallah;
- a khal (ਖਾਲ) is a field channel or watercourse, and a kassi (ਕੱਸੀ, "A small distributary channel from a canal") is a canal distributary. Neither is a storm drain;
- bet (ਬੇਟ, "Low, alluvial lands, or islands in the bed of rivers") is the riverine floodplain land of the Sutlej, Beas, Ravi and Ghaggar; and
- a dhussi bandh, also written dhussi bundh, is an earthen flood embankment along a river, as WRD uses the term. No dictionary gives this sense, and this Manual does not print a Gurmukhi spelling for it, nor for kandi or Sirowal.
Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.
Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.
Comments. Comments and corrections are welcome at info@neer.ai.
Preface
Punjab's towns flood for three reasons. The storm of 4–5 October 1955 showed the first, when a single day of rain exceeded the 100-year depth of the CWC design map at ten or more stations at once, across Majha, Doaba and central Malwa, after the monsoon's normal withdrawal; the Sutlej, the Beas, the Ravi and the Ghaggar showed the second in 2023 and again in 2025, when they rose against their dhussi bandhs and headworks; and the State shows the third every year, with its groundwater drawn down across the centre while the south-west is waterlogged.
- Storms that outrun the design maps, on towns drained for a 2-year storm or for none. IMD's records show Ludhiana with 354.3 mm on 4 October 1955 and Patiala with 356.5 mm on 11 July 1993, against a 100-year day of about 240–280 mm and 260 mm on the CWC map; the CWC zone-7 report lists 475 mm at Batala on 5 October 1955; Ludhiana's PAU observatory recorded 338.0 mm and Kapurthala 284.2 mm on 24 September 1988; and in July 2023 Chandigarh, beside Mohali, recorded 302.2 mm on the 9th, a July record, and Ropar 35 cm (350 mm) in the 24 hours to 08:30 on the 10th, above the 310.4 mm of the district's earlier record. The only design storms found for Punjab's town drains are project choices: the trunk storm sewers of Amritsar's walled city were specified for "a return period of once in two years" in the Smart City tender of 2018, and the Buddha Nallah, Ludhiana's main drain, was designed for a 2-year storm "with reduced run-off within the city reach due to active storm water detention" (PMIDC, 2020). Under AMRUT, "No work was done" on storm water drainage in Punjab by September 2020, the CAG found. In Jalandhar the storm water network covers about 5% of the city, and rain is "largely discharged in to the sewer network".
- Rivers held behind embankments and headworks whose stage dams and the border set, and canals across the line of drainage. WRD's own pages give about 1,800 km of flood embankments, along rivers that dams upstream and headworks downstream control. On 3 September 2025 Harike headworks passed 3,35,030 cusecs, as reported, above the 3 lakh cusecs beyond which a discharge "falls under the High Flood category", and in late August a gate of Madhopur headworks on the Ravi was washed away under less than 2 lakh cusecs, as reported. In July 2023 the Ghaggar reached 754.2 ft at Khanauri against a danger mark reported as 748 ft (752 and 753 ft are also reported), and broke its banks in Sangrur and Mansa districts, as reported. Pong received a record inflow of 7.3 lakh cusecs on 14 August 2023, as reported. Amritsar drains through the Tung Dhab and the City Outfall drains to the Hudiara drain, which flows into Pakistan, where Punjab cannot set the level. Across the plains, canals, distributaries and their feeders block the natural drainage, and in 2023 breaches in the SYL canal and the Narwana branch were reported to have flooded Rajpura.
- Ground that is over-drawn in the centre and waterlogged in the south-west. In 2024 Punjab drew 156.87% of its extractable groundwater, and 115 of its 153 assessment units were over-exploited; the area where the water lay deeper than 10 m in June grew from 14.9% of the State in 1989 to 68% in 2019. Yet "Water logging conditions exist in some parts of south-western districts", where the water table stood 0.79 m below ground at Abohar in June 2019, and the groundwater is saline, with an electrical conductivity of up to 8,320 µS/cm at Abohar. In the Kandi the water lies deep, below a belt of sand and gravel fans crossed by more than 100 choes in Hoshiarpur district alone. Recharge that is right for Sangrur or Jalandhar is wrong for Sri Muktsar Sahib or Fazilka, and no single rule serves the State.
Behind all three lie the drains and ponds that carry sewage and the land beside them that no rule protects. About 700 MLD of wastewater passes down the Buddha Nallah to the Sutlej, which below it turns from Class B to Class E; in April 2024, before its confluence with the river, the drain carried a BOD of 161 mg/l, against a limit of 30. In September 2023 the State reported a treatment gap of 326.58 MLD in its 166 towns, and in Amritsar the road-side drains are "connected to the sewerage system typically at the road junctions, thus making the sewerage system as combined system". Neither building instrument sets any distance from a river, nallah, choe, pond or canal. The village chhappars are Panchayat commons, protected by the Supreme Court's judgment in Jagpal Singh v. State of Punjab (2011) and a High Court order of 2020 to remove encroachments, as reported, but by no pond law. The first census of water bodies counted 16,012 in the State, 1,578 of them encroached, as reported, and in April 2025 the State announced ₹4,573 crore for about 15,000 ponds in about 13,500 villages, as reported. Six Ramsar sites lie in the State, from Harike (1990) to Keshopur-Miani, the Beas Conservation Reserve and Nangal (2019), but no wetland notified under the Wetlands Rules, 2017 was found.
Design for Punjab therefore has to cover a monsoon that arrives late in June and can bring its largest storms in September and October, on Kandi gravels, alluvial plains, bet land and the dune sands of the south-west, in towns that drain to rivers raised by dam releases, to drains that carry sewage and across canals that block their way. The monsoon normally reaches Jalandhar by 26 June, Patti by 28 June and Ludhiana by 1 July, withdraws from all three by 21 September, and by 1 October has left most of the State; paddy is transplanted from 1 to 9 June, and much of the plains is under ponded paddy before the rains begin. Annual normals run from 388.6 mm in Ferozepur district and 429.8 mm in Bathinda to 660.3 mm in Ludhiana and 1,106.1 mm in Gurdaspur. Large days fall outside the season too: 160.6 mm at Patiala on 8 June 2000, 144.2 mm at Patiala on 16 April 1983, and 119.6 mm at Ludhiana on 4 January 1911.
National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:
- hold frequent rainfall on site;
- release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
- show that its outfall still works when the receiving drain, choe or river is high, when a headworks or regulator is being operated, or when the flap gate in a dhussi bandh is shut.
The Manual also sets how public drains, roads, nallahs, choes, chhappars and other water bodies, gated and pumped outfalls and basin-wide master plans are designed, so that private sites and public works aim at the same standard.
The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Punjab's south-west monsoon from late June to September, with its late-season storms and its winter rains; the Sutlej, the Beas, the Ravi and the Ghaggar, the dams and headworks that control them and the dhussi bandhs that hold them; the choes and raos of the Shivalik foothills, the beins and nallahs of the plains and the drains of WRD; the canals and kassis that cross the land; the gravels of the Kandi, the alluvium and bet land of the plains and the sands and saline ground of the south-west, over aquifers drawn down across most of the State and brimming in a few places; the village chhappars; and towns whose new sectors and colonies lie across the natural lines of drainage.
- National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
- Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
- Design rainfall. Two CWC Flood Estimation Reports as the interim source: the report for subzone 1(e) (Upper Indo-Ganga Plains, 1984), which covers the plains and the Kandi piedmont up to the Shivalik front, and the report for zone 7 (Western Himalayas, 1994), which covers Pathankot and the Shivalik fringe. Their maps are checked against IMD's 24-hour records, which exceed them at most long-record stations, and their short-storm ratios are given floors where Punjab's recording gauges show them to be low. IMD's rainfall intensity curve for Amritsar (Das et al., 2022) repeats a curve printed for many other cities and is not used; no station analysis of short-duration rainfall was found for any Punjab station; and frequency analysis of gridded rainfall by the National Institute of Hydrology (NIH), Roorkee, is used only to compare climate ratios.
- Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
- Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
- Local rules. PMBBL 2018 and PUDBR 2021; the Punjab Regional and Town Planning and Development Act, 1995 and the master plans made under it; the Punjab Municipal Corporation Act, 1976 and the Punjab Municipal Act, 1911; the Punjab Canal and Drainage Act, 2023; the Punjab Water Resources (Management and Regulation) Act, 2020 and the Directions of PWRDA; the Punjab Preservation of Subsoil Water Act, 2009; the Punjab Land Preservation (Chos) Act, 1900 in the Kandi; the Punjab Village Common Lands (Regulation) Act, 1961; the Wetlands (Conservation and Management) Rules, 2017; and the orders of the Supreme Court, the Punjab and Haryana High Court and the NGT on ponds, choes, floodplains, drains and sewage. This Manual follows them or, where disclosed, makes them stricter. PUDBR is cited from its Gazette text with its corrigendum of 16 March 2022 and the Amendment Rules of 29 March 2022; its amendments of 14 July and 7 September 2026 have been reported but were not read. PMBBL is cited from DLG's text and its amendment of 31 December 2019; an amendment of 9 August 2023 was seen only in DLG's list. None of those read concerns detention or a setback from water. The Canal and Drainage Act is cited from its Bill and its enacted particulars, and the Municipal Acts, the PRTPD Act, the Subsoil Water Act, the Land Preservation Act and the Village Common Lands Act were not read in full. Every rule cited must be checked against the current text.
Why this Manual is needed
India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.
The national documents leave key values open, or give different answers.
- Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in Punjab can cite 1, 2, 5 or 25 years, depending on the code chosen.
- Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
- Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
- Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has one panel for the State, Amritsar, and it repeats the curve printed for many other cities: it implies a 2-year day of about 170 mm, 28% of Amritsar's normal of 598.7 mm a year. The CWC report for subzone 1(e), which covers almost the whole State, dates from 1984; it takes the 1-hour rain as 0.34 of the 24-hour rain and assumes a loss of 3.0 mm/h. Its maps are exceeded at most of the State's long-record stations: Patiala recorded 356.5 mm in a day against a 100-year depth of about 260 mm on the map, Ludhiana 354.3 mm against about 240–280 mm, and a raingauge at Bhatinda 256.1 mm on 18 August 1964 against about 180 mm. The reanalysis grids of NIH-DHAARA spread the State wider still: they read 443 mm for a 50-year day at Pathankot, against about 320 mm on the map, but 126 mm at Bathinda, half that gauge's record.
Punjab has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of PWSSB, PUDA, GMADA, GLADA or the Drainage Wing of WRD, or in any Smart City or AMRUT project, that fixes a return period or a design rainfall for town storm drains. What exists is project practice and WRD's own numbers: the Amritsar walled-city storm sewers on a 2-year return period with a minimum time of concentration of 15 minutes and surcharge allowed inside the manholes (Smart City tender, 2018); the Buddha Nallah on a 2-year return period with detention (PMIDC, 2020); WRD's floodplain method, a 100-year flood by Gumbel's method and a waterway by Lacey's formula, within which "no construction is to be allowed"; and WRD's rooftop rainwater harvesting for government buildings, sized for 40 mm/h, which is a recharge figure and not a drain design storm. This Manual is offered as a technical companion to PMBBL, PUDBR, the Municipal Acts, the Canal and Drainage Act and the master plans: it supplies the design storm, detention, water-level and buffer values that they leave open. It has not been adopted by DLG, HUD, WRD or any other body. In particular:
- The building rules require rainwater harvesting, but not detention. PMBBL requires "the complete proposal of rainwater harvesting" for every building on a plot of 100 m² or more in a municipal area, recharge on plots of more than 500 m², and, in public open spaces of more than 500 m², the "complete utilization and capture of storm water", including "Artificial or natural Storage of storm water runoff from larger sites"; it sets up a rainwater harvesting cell in each local body to inspect systems before a completion certificate or a service connection is given (PMBBL 10.1–10.6). PUDBR requires rainwater harvesting above 250 m² for residential plots and public buildings, above 100 m² for commercial and industrial buildings and on all group housing, designed and certified by an engineer, with industry "not to inject contaminated water into recharge structures" (r.40). Neither sets a volume, and the thresholds differ by instrument. Both require that "Concrete paving to be avoided and permeable materials are to be used" for the open parking of group housing, the State's only permeable-paving rule. No rule requires on-site detention, limits peak runoff or sets "zero runoff";
- There is no setback from water. Neither instrument sets a distance from any river, nallah, choe, pond or canal; PUDBR's setbacks depend on building height (r.26). PMBBL requires a plinth of at least 450 mm, sited so "that adequate drainage of the site is assured" (5.2.1.1), and PUDBR one of 900 mm above the crown of the road in front for residential plots (r.3(A)(1)); both require that surface drainage does not enter a basement (PUDBR r.30(5)(iv)(e); PMBBL 4.23(vii)). PUDBR keeps septic tanks and absorption pits 30 m from a source or stream used for drinking (r.45(7)), which is a health rule, not a waterbody setback. A drainage-wing approval for projects within 150 m of a water body was announced by the Water Resources Minister on 20 September 2023, as reported, but no notification or order was found, and this Manual does not apply it;
- No pond law gives a method. Ponds are protected as village commons and by the courts, and are being cleaned under the State's programme on the Seechewal and Thapar models, as reported. No law sets a distance, a design flood or a storage to be kept, and a buffer around a chhappar is this Manual's proposal;
- A floodplain is notified on one reach only, and not on the line its method gives. WRD's Chief Engineer (Drainage) told CWC in May 2024 that the State notifies the area of waterway for the 100-year flood under section 55 and that no construction is to be allowed in it. The first such zone, on the Sutlej in Ferozepur and Tarn Taran districts (March 2024), was computed for a 100-year flood of 5,34,441 cusecs and a Lacey width of 0.58 km, but was declared as the land between the existing embankments, about 4.5 km apart; the NGT found "no material … indicating the exercise for demarcating the flood plain zone as per the applicable zone". No zone was found for the Ghaggar, the Beas, the Ravi or any choe. The pillars marking the Patiala ki Rao at a width of 200 ft were placed under a High Court case (CWP 5901 of 2017), on the Chandigarh side but not yet in Punjab in January 2024; that width is case-specific, not a WRD norm. The report of Master Plan Jalandhar proposes, along the Chitti Bein, a 30 m buffer from the bank and no construction within at least 200 m "untill concrete bandh is constructed", and a 30 m plantation buffer along the Black Bein: the only numeric river setbacks found in a Punjab plan text, and plan proposals, not statutory buffers. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); it does not replace any line that the State notifies or a court draws, and where such a line binds and is wider, it governs; and
- No document sets the river or drain level for which an outfall is designed. CWC has no flood site in Punjab; the levels that exist are WRD headworks, BBMB dam and district gauge readings, mostly in feet, with gauge zeros not found; the drains of WRD carry no published design levels; and the Hudiara drain's level is set in another country.
So each agency and each local body interprets the central manual its own way. The Municipal Corporations, the Municipal Councils and Nagar Panchayats, PUDA and the development authorities, colonisers, WRD, PWSSB, PMIDC, the Smart City companies, road agencies, their consultants and funding agencies fill the gaps differently. Two drains on the same road, built by different agencies, can be sized for different storms from different rainfall sources. No rule divides the drains between the bodies that build and run them: a sector drain in SAS Nagar may be built by GMADA, run by the Municipal Corporation, and end in a choe that WRD has notified, which flows on into the Ghaggar and Haryana. The drains also carry sewage: the Buddha Nallah's water is non-compliant with the limits for BOD, COD and suspended solids before it reaches the Sutlej, and storm pumping stations in Bathinda are reported to be connected to the sewers. And a reviewer has no common basis against which to check a design.
What this Manual does about it. It turns those open choices into one State standard:
- one source and method for design rainfall across the State, in four rainfall zones and six sub-areas, with the two CWC reports, a 24-hour record check against IMD's long-record stations, a checked station analysis to govern where one exists, and floors where the CWC ratios understate short storms (Chapter 2);
- named return periods for every drainage element (Chapters 2 and 6);
- a required pre- versus post-development rule for private sites (Chapter 4);
- a required tailwater check for outfalls to drains, choes, headworks reaches and rivers, gated, flap-gated or pumped, against a design river or drain level, with no discharge to a canal or kassi without WRD's consent (Chapter 5);
- a design flood line, and corridors and setbacks along rivers, choes, beins and nallahs and around chhappars, which no rule now sizes, proposed by this Manual for use with the limits notified under section 38 and the lines the courts have drawn (Chapter 7);
- recharge first in the Kandi fans and where the water table is deep, no recharge credit where it lies within 3 m of the ground, as across much of the south-west, the Sirowal and the bet lands, and treatment where drains carry sewage (Chapter 8); and
- basin-wide master plans, so that the agencies that share a basin plan together, across the boundaries with Chandigarh, Haryana and Himachal Pradesh where a basin crosses them (Chapter 11).
It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a development authority or DLG can still adopt a stricter standard (Chapter 1).
Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Government of Punjab, Department of Local Government, Punjab Municipal Building Bye-Laws, 2018, Notification No. CTP(LG)/2018/3548 dated 22 November 2018, cl. 1.3, 2.44, 3.10.7, 4.23, 5.2.1, 5.16, 10.1–10.6, 11.2.1 and Table 15.1, and amendment No. LG/CTP(LG)/2019/3977 of 31 December 2019; Government of Punjab, Department of Housing and Urban Development, Punjab Urban Planning and Development Building Rules, 2021, Notification No. G.S.R. 144/P.A.11/1995/Ss.180 and 43/2021 dated 31 August 2021 (Punjab Government Gazette, 10 September 2021), r.1(3), 3(A)(1), 11, 26, 30, 40, 43, 45, 52 and 53, corrigendum of 16 March 2022 and Amendment Rules, G.S.R. 23 of 29 March 2022 (as circulated by PPCB); HUD notification withdrawing the Punjab Unified Building Rules, 2025 (27 April 2026; as reported); Punjab Canal and Drainage Act, 2023 (Punjab Act 11 of 2023), ss.2, 5, 38, 39, 52 and 61 (Bill No. 20 of 2023 as read; enacted particulars from the Gazette); Northern India Canal and Drainage Act, 1873, s.55; Punjab Water Resources (Management and Regulation) Act, 2020 (Act 2 of 2020); PWRDA, Punjab Ground Water Extraction and Conservation Directions, 2023 (27 January 2023); WRD, notification under s.55 for the Patiala ki Rao (4 March 2013), and the Local Commissioner's report of 8 January 2024 in CWP 5901 of 2017, as filed in NGT O.A. 180/2026; WRD affidavit in NGT O.A. 303/2023, with the Chief Engineer (Drainage)'s email to CWC of 2 May 2024 and the Tribunal's order of 14 March 2024 (as quoted); WRD project report on rooftop rainwater harvesting for government buildings (undated); State of Punjab status report in E.A. 35/2023 in NGT O.A. 673/2018; CPCB reply of 13 October 2025 in NGT O.A. 327/2025; PPCB reply in NGT O.A. 413/2025 with the River Rejuvenation Committee proceedings of 28 October 2025; Amritsar Smart City Ltd, tender 07/ASCL/2018-19 (November 2018); PMIDC, feasibility report on the Buddha Nallah (January 2020); Master Plan Jalandhar 2031, report, §9.3 and §13.8; CAG, Report No. 7 of 2021 (AMRUT and Smart Cities) and Report No. 1 of 2026 (Local Bodies); Supreme Court of India, Jagpal Singh v. State of Punjab (28 January 2011; as reported); Punjab and Haryana High Court, suo motu order on village ponds (2020; as reported); Rajya Sabha reply on the Ramsar sites (as quoted); CWC, Flood Estimation Report for Upper Indo-Ganga Plains Subzone 1(e) (1984), Plates 9 and 10 (read by eye) and Table 1, and Flood Estimation Report for Western Himalayas Zone 7 (WH/22/1994), Annexes 4.3 and 4.4; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Climate of Punjab (1993); IMD, Monthly Climate Summary, July 2023, and press releases of 9 and 10 July 2023; IMD, Pai et al. (2020), new normal dates of onset and withdrawal of the south-west monsoon, Table 2; Das et al. (2022), MAUSAM 73(4), Fig. 4(ii); NIH-DHAARA (accessed 13 November 2026); CGWB and the State, Dynamic Ground Water Resources of Punjab, 2020 and 2024; Punjab Preservation of Subsoil Water Act, 2009 schedule of transplanting dates for 2025 (as reported); WRD, Kandi Area Development and drainage pages; CWC list of flood forecasting sites (as copied by SANDRP); reports of the floods of 2023 and 2025, of the Harike, Madhopur, Pong and Khanauri levels and flows, of the 2023 canal breaches near Rajpura, of the Bathinda storm pumping stations, of the pond programme and of the 150 m approval (press and secondary sources).
How to use this Manual
Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.
Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.
Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.
Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.
Supplements. The supplement follows the annexes. It applies the Manual to the Union Territory of Chandigarh and states where its rules differ.
Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.
Where to start.
| If you are… | Read first |
|---|---|
| A developer or architect | Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit) |
| A design engineer | Chapters 2–6, then 8 and 9 |
| A local body or approving authority | Chapters 1, 10 and 11 |
| A planner or waterbody manager | Chapters 7 and 11 |
Contents
Supplements
| No. | Title | Status |
|---|---|---|
| S01 | Chandigarh (Union Territory) | Not adopted by the Chandigarh Administration |
List of tables
List of figures
Abbreviations
| Abbreviation | Meaning |
|---|---|
| AEP | Annual exceedance probability |
| AMC | Antecedent moisture condition (not Amritsar) |
| AMRUT | Atal Mission for Rejuvenation and Urban Transformation |
| APWA | American Public Works Association |
| ARF | Areal reduction factor |
| AWS | Automatic weather station |
| BBMB | Bhakra Beas Management Board |
| BOD | Biochemical oxygen demand |
| BSMP | Basin Stormwater Master Plan |
| CAG | Comptroller and Auditor General of India |
| CBR | Chandigarh Building Rules (Urban) 2017 (Supplement S01) |
| CDMA | Chandigarh Disaster Management Authority (Supplement S01) |
| CDP | City Development Plan, Chandigarh (Supplement S01) |
| CETP | Common effluent treatment plant |
| CGWB | Central Ground Water Board |
| CHB | Chandigarh Housing Board (Supplement S01) |
| CN | Curve number (SCS/NRCS method) |
| COD | Chemical oxygen demand |
| CPCB | Central Pollution Control Board |
| CPCC | Chandigarh Pollution Control Committee (Supplement S01) |
| CPHEEO | Central Public Health and Environmental Engineering Organisation |
| CSE | Centre for Science and Environment |
| CTP(LG) | Chief Town Planner (Local Government), the Town Planning Wing of DLG |
| CWC | Central Water Commission |
| DLG | Department of Local Government, Punjab |
| DPR | Detailed project report |
| DTCP | Department of Town and Country Planning, Punjab (under HUD) |
| DWF | Dry-weather flow |
| EIA | Environmental impact assessment |
| ESC | Erosion and sediment control |
| ESZ | Eco-sensitive zone (Supplement S01) |
| FAR | Floor area ratio |
| FER | Flood Estimation Report (CWC) |
| FTL / MWL | Full tank level / maximum water level |
| GLADA | Greater Ludhiana Area Development Authority |
| GMADA | Greater Mohali Area Development Authority |
| HAT / MHWS | Highest astronomical tide / mean high water springs (coastal terms; not applicable in Punjab) |
| HFL | High flood level (the highest level recorded at a gauge) |
| HGL | Hydraulic grade line |
| HSG | Hydrologic soil group |
| HUD | Department of Housing and Urban Development, Punjab |
| IDF | Intensity–duration–frequency |
| IMD | India Meteorological Department |
| IRC | Indian Roads Congress |
| MC | Municipal Corporation (only; Municipal Councils are written in full) |
| MCC | Municipal Corporation Chandigarh (Supplement S01) |
| MLD | Million litres a day |
| MoEF&CC | Ministry of Environment, Forest and Climate Change |
| MoHUA | Ministry of Housing and Urban Affairs |
| NDMA | National Disaster Management Authority |
| NGT | National Green Tribunal |
| NICDA | Northern India Canal and Drainage Act, 1873 (repealed in Punjab by the PCDA) |
| NIH | National Institute of Hydrology, Roorkee |
| NOC | No-objection certificate |
| PAU | Punjab Agricultural University, Ludhiana |
| PCDA | Punjab Canal and Drainage Act, 2023 (Punjab Act 11 of 2023) |
| PLPA | Punjab Land Preservation (Chos) Act, 1900 |
| PMBBL | Punjab Municipal Building Bye-Laws 2018, as amended (municipal areas) |
| PMIDC | Punjab Municipal Infrastructure Development Company |
| PPCB | Punjab Pollution Control Board |
| PRTPD Act | Punjab Regional and Town Planning and Development Act, 1995 |
| PSD | Permissible site discharge |
| PSDMA | Punjab State Disaster Management Authority |
| PUDA | Punjab Urban Planning and Development Authority |
| PUDBR | Punjab Urban Planning and Development Building Rules 2021, as amended (outside municipal areas and in authority schemes; abbreviation set by this Manual) |
| PWRDA | Punjab Water Regulation and Development Authority |
| PWRM Act | Punjab Water Resources (Management and Regulation) Act, 2020 |
| PWSSB | Punjab Water Supply and Sewerage Board |
| RD | Reduced distance (chainage along a canal or drain) |
| RRV | Required retention volume |
| RWH | Rainwater harvesting |
| SANDRP | South Asia Network on Dams, Rivers and People |
| SDMP | State Disaster Management Plan |
| SLA | Sea-level allowance (coastal term; not applicable in Punjab) |
| SoI | Survey of India |
| SRRG | Self-recording rain gauge |
| STP | Sewage treatment plant |
| SUH | Synthetic unit hydrograph (CWC) |
| SW monsoon / JJAS | South-west monsoon, June–September |
| SWD | Storm water drain |
| TSS | Total suspended solids |
| ULB | Urban local body (a Municipal Corporation, Municipal Council or Nagar Panchayat) |
| UTM | Universal Transverse Mercator |
| WLS | Wildlife sanctuary (Supplement S01) |
| WQv | Water quality volume |
| WRD | Water Resources Department, Punjab |
| WSUD | Water-sensitive urban design |