Draft v1.0 prepared by NEER. Not adopted by the Government of Punjab or the Chandigarh Administration, and has no legal force. About this draft

SupplementUnion Territory of Chandigarh

Status. This Supplement is part of Draft v1.0 of the Manual. Neer prepared it as a proposal for applying the Manual in the Union Territory of Chandigarh, which adjoins Punjab and Haryana and is the capital of both. The Union Territory is administered by an Administrator appointed by the President under Article 239 of the Constitution; the office has been held by the Governor of Punjab since 1 June 1984, as reported. The authority that could adopt this Supplement is therefore the Administrator, acting through the Chandigarh Administration. The Union Territory lies outside the State's jurisdiction: the Manual's statewide rules are written for Punjab, and this Supplement states how they would be read in a territory the State does not govern.

Not adopted. This Supplement has not been adopted, notified or endorsed by the Administrator (the Governor of Punjab), the Chandigarh Administration or its Chief Secretary, the Department of Urban Planning (the Chief Architect), the Estate Office, the Engineering Department, the Municipal Corporation Chandigarh (MCC), the Chandigarh Housing Board (CHB), Chandigarh Smart City Ltd, the Chandigarh Pollution Control Committee (CPCC), the Department of Forests and Wildlife, the Union Territory of Chandigarh Wetlands Authority, the Chandigarh Disaster Management Authority, the Deputy Commissioner, or any other department or agency of the Administration, nor by the Government of Punjab, the Government of Haryana or the Government of Himachal Pradesh, or by any of their departments and bodies, including GMADA, the Municipal Corporation SAS Nagar, the local bodies of Zirakpur and Nayagaon and the Water Resources Department of Punjab. Where it names a body, it describes the role that body would have if the Manual and this Supplement were adopted. It does not say the body has agreed to that role. Until the Administrator adopts it, the Chandigarh Building Rules (Urban) 2017, the zoning plans and architectural controls, and the approval conditions in force in the Union Territory continue to apply.


S1.1 Scope

S1.1.1 This Supplement applies to the whole of the Union Territory of Chandigarh (about 114 km²), including:

  • (a) the area of the Municipal Corporation Chandigarh, which was 79.34 km² at the Corporation's formation in 1994 by one passage of the City Development Plan (CDP) and 79.74 km² by another; it has since been enlarged by the addition of villages, but its present extent was not confirmed [TBC]; and
  • (b) the rest of the Union Territory, including Sukhna Lake, the Sukhna Wildlife Sanctuary, the part of the Sukhna Lake catchment in the Union Territory, and the sectors, villages and roads developed or maintained by the Engineering Department of the Administration.

S1.1.2 How this Supplement works. In the Union Territory, the chapters and annexes of the Manual apply as written, except as modified by Table S1.1 and Clauses S1.3 to S1.8. Where the Manual names a Punjab body, statute or rule, the Union Territory equivalent in Table S1.1 is read in its place. The following do not apply inside the Union Territory:

  • (a) PMBBL and PUDBR, and every clause of the Manual that cites them, which is read with the instrument of Table S1.1;
  • (b) the Punjab Water Resources (Management and Regulation) Act, 2020, the PWRDA Groundwater Extraction and Conservation Directions, 2023 and their water-conservation credits;
  • (c) the Punjab Canal and Drainage Act, 2023, and section 55 of the Northern India Canal and Drainage Act, 1873, unless either is shown to apply to the choes inside the Union Territory [TBC]; and
  • (d) the rainfall zones PB-Z1 to PB-Z4 and the sub-areas PB-A to PB-F of Annex 2A, except where this Supplement applies the rule of a named sub-area.

Punjab bodies remain named for the reaches of the choes downstream in Punjab (Clause S1.4). Clause, table, annex and form numbers do not change.

S1.1.3 Values marked [TBC] are to be confirmed from the primary source before adoption. Until they are confirmed, the clause concerned states the rule that applies in the meantime.

Commentary. This is the series' first Supplement for a capital city, and the first whose every outfall leaves its territory. Chandigarh is laid out in sectors on the plain between two seasonal streams, the Sukhna Choe on the east and Patiali-ki-Rao on the west, with the N-Choe through its centre (CDP). Its rainfall, soils and streams are those of the Shivalik piedmont of sub-area PB-C and the foothills of PB-A, so the engineering of the Manual applies to it unchanged. Its law is its own: development control runs under the Capital of Punjab (Development and Regulation) Act, 1952 as in force in the Union Territory, through the Chandigarh Building Rules (Urban) 2017 and the zoning plans; municipal law is the Punjab Municipal Corporation Act, 1976 as extended to Chandigarh in 1994, read in its Chandigarh text. The Punjab building instruments, the Punjab groundwater regulator and the Punjab drainage statute do not reach it. All of its storm water leaves through three choes into SAS Nagar (Mohali) and on to the Ghaggar, so its drains are designed against levels set outside the Union Territory, and its works change levels in Punjab.


S1.2 How the Manual applies: clause-by-clause modifications

S1.2.1 The clauses of the Manual listed in Table S1.1 apply in the Union Territory with the changes shown. Clauses not listed apply unchanged.

Table S1.1 — Modifications to the Manual for the Union Territory of Chandigarh

Manual clause What changes in the Union Territory Status of the basis
Status and Not adopted The authority that could adopt the Manual and this Supplement is the Administrator, acting through the Chandigarh Administration, in place of the Government of Punjab. Article 239; the Governor of Punjab as Administrator since 1984, as reported
1.3.1 Notification Statutory effect would be given by: (a) an amendment to the Chandigarh Building Rules (Urban) 2017 (CBR), made by the Administrator under the Capital of Punjab (Development and Regulation) Act, 1952 as in force in the Union Territory (the section under which the CBR are framed is [TBC]); (b) for site-specific conditions, zoning plans and architectural controls, which are "Directions issued by the Chief Administrator in exercise of powers conferred upon him under Section 4(1)" of that Act; and (c) bye-laws or standing orders of the MCC under the Punjab Municipal Corporation Act, 1976 as extended to the Union Territory (section [TBC]). PMBBL and PUDBR do not apply. Zoning plan, Sector 23-D (read); CBR enabling section and MCC section not found
Building rules ("PMBBL/PUDBR" throughout) Read as the CBR, notified on 25-07-2017 (as quoted on the Sector 23-D zoning plan; a copy dated 02-05-2017 conflicts and the date is [TBC]), as amended in 2018 (an amendment notification of the Administration, listed but not read) and, as reported, in 2019 and 2020. The CBR rule numbers are [TBC]: their text was not obtained, so this Supplement cites the zoning-plan wording. Where the CBR are silent, the National Building Code and the Model Building Bye-Laws 2016, and the Chandigarh Master Plan 2031, prevail, as quoted in a summary of the CBR [TBC]. Older zoning plans cite the Capital of Punjab (Development and Regulation) Building Rules 1952 and apply the National Building Code where those rules are silent. "PMBBL/PUDBR registration number" on the Forms is read as the registration under the CBR [TBC]. Zoning plan (read); CBR text not obtained
1.3.2 State Stormwater Technical Committee The committee would be constituted by the Administrator. CPHEEO (2019) allows a committee "constituted by State/UT Government". CPHEEO (2019)
1.4.1 Approving Authority The authority that sanctions building plans under the CBR is [TBC]. Until it is confirmed, the Approving Authority is the authority that sanctions the plan in each case; the Chief Architect (Department of Urban Planning) issues zoning plans and architectural controls; the Estate Officer (the Deputy Commissioner) enforces building and rainwater-harvesting violations under the Chandigarh Estate Rules, 2007, as reported; the MCC approves connections to its drains and sewers; and a department of the Administration, or the CHB, is the Authority for its own works and estates. Zoning plan (read); Estate Rules not read
1.5.3 RWH The rainwater-harvesting requirement in force in the Union Territory applies in place of the PMBBL and PUDBR thresholds: "All building on a plot of one kanal and above shall have rain water harvesting system to recharge ground water installed as per specification of Chandigarh Administration" (Sector 23-D zoning plan). A Rajya Sabha answer of 8 July 2019 applies the same rule to existing and new buildings, as quoted in a search copy [TBC], and an Estate Office notice of 28 June 2024 applied it to group housing, hotels, malls, hospitals, schools, hostels, religious sites and commercial, institutional and industrial plots of one kanal and above, as reported. One kanal is taken as 500 square yards (about 418 m²), set by this Supplement until the CBR definition is confirmed [TBC]. The 100-litre and 200-litre figures on the same zoning plan are solar water-heater capacities, not rainwater-harvesting volumes. Recharge is modified by Clause S1.6. Zoning plan (read); notice and answer as stated
1.6 Tiers The MCC is a Tier A authority (set by this Supplement). The Engineering Department and the CHB apply the Tier A methods to their own works and estates (set by this Supplement). Set by this Supplement
1.8, 1.9 Other instruments and roles PMBBL, PUDBR, the Punjab Municipal Act, 1911, the PRTPD Act, 1995, the Punjab Water Resources (Management and Regulation) Act, 2020 and the PWRDA Directions do not apply. The Punjab Municipal Corporation Act, 1976 applies as extended, with the modifications in its Schedule, by the Punjab Municipal Corporation Law (Extension to Chandigarh) Act, 1994 (Act 45 of 1994, in force from 24 May 1994); its Chandigarh text, not Punjab's, is cited, and the Schedule was not read [TBC]. Also in force: the Chandigarh Estate Rules, 2007 (not read [TBC]); the Chandigarh Master Plan 2031, notified in April 2015 as reported, under section 4(1)(f) of the 1952 Act as quoted in a summary of a Supreme Court judgment [TBC], whose drainage, choe and disaster chapters were not read [TBC]; the Wetlands (Conservation and Management) Rules, 2017; the eco-sensitive zone notification of the Sukhna Wildlife Sanctuary; and the High Court judgment of Clause S1.5. Whether the Punjab New Capital (Periphery) Control Act, 1952 (Punjab Act 1 of 1953) has any present application inside the Union Territory is [TBC]. Roles are as in Table S1.2. As stated
2.3 to 2.12 Design rainfall Chapter 2 applies, with Clause S1.3. Clause 2.3.6 of this Manual applies as written, with the sub-area references read as in Clause S1.3. —
2.11.4 Antecedent moisture The rule of Clause 2.11.4 for a site outside the paddy and waterlogged areas applies throughout the Union Territory: AMC III for a design storm that follows or contains a 5-day total of more than 53 mm, and AMC II otherwise. The paddy rule applies only to the parts of a choe catchment in Punjab that lie under paddy or other ponded fields. Rule of this Manual
4.4, 4.11, 8.8, 8.11 Retention, infiltration and recharge Modified by Clause S1.6. —
5.3, 5.8, 5.9, 5.10 Downstream analysis, river backwater and outfall closure The three choes are the governing receiving channels, and the downstream analysis continues across the boundary into Punjab to the Ghaggar, as in Clause S1.4. Clause 5.8.5(b) (the Ghaggar) and (e) (choes and nallahs) of this Manual apply to the reaches in Punjab and, for (e), to the choes in the Union Territory. —
5.8.3 Reservoir releases Releases from Sukhna Lake are as in Clause S1.5. —
6.3.6 Choe crossings and Kandi drains Clause 6.3.6 applies to every road crossing, causeway, culvert, bridge and tail end (Clause S1.8) on the Sukhna Choe, the N-Choe, Patiali-ki-Rao and the other choes of the Union Territory, as if they were in sub-area PB-A (set by this Supplement). Set by this Supplement
6.11 Floor levels The kanal-plot zoning plan sets the plinth at "minimum 0.30m (1'-0") and maximum upto 1.20m (4'-0")" for buildings intended for human habitation; basements, where built, are for "parking, storage and services etc."; and "Adequate arrangement shall be made so that surface drainage does not enter into the basement" (zoning plan, Sector 23-D; site plan, Rajiv Gandhi Chandigarh Technology Park). Habitable use of basements was withdrawn by the CBR in 2017, as reported. Clauses 6.11.1 to 6.11.4 also apply, with the choe levels of Clause S1.4.2, and the higher level governs: the 0.30 m minimum is below both the default of Clause 6.11.3 and the 450 mm of PMBBL in Punjab. Where the level required by Clause 6.11 is above the 1.20 m maximum, the conflict shall be put to the Chief Architect before approval; this Supplement does not override the zoning plan (set by this Supplement). Zoning and site plans (read)
7.4 Setbacks No CBR or zoning-plan setback from a choe was found. Clauses 7.4.3 to 7.4.7 apply, with the Zone 1 minimum of Clause 7.4.7 as the Manual's minimum. The pillar line on Patiali-ki-Rao (Clause S1.4.5), the catchment construction restraint of Clause S1.5.6 and the eco-sensitive zone of Clause S1.5.7 bind under Clause 7.4.5 for the uses they restrict, each with its status; the 50 m of the draft wetland notification is not applied until a final notification is confirmed (Clause S1.5.7). Section 38 of the Punjab Canal and Drainage Act, 2023 does not apply in the Union Territory unless shown to apply [TBC]. As stated
Chapter 7 custodian and NOC The MCC builds and maintains the storm drains in its area (CDP). The legal custodian of the choes, and the division of trunk drains and road drains between the MCC and the Engineering Department after the transfer of the V3 roads in 2025–26 (as reported), are [TBC]. Until they are confirmed, where the Manual names WRD as custodian of a channel or requires its NOC, the Authority shall consult the Engineering Department for every work in or on a choe, and the MCC for every connection to a drain in its area, and record their responses; the Department of Forests and Wildlife is consulted for the Sukhna catchment and sanctuary, and the Union Territory of Chandigarh Wetlands Authority for the lake. CDP (read); transfer as reported
7.8 Operating rules Sukhna Lake is as in Clause S1.5. —
7.12 Wetlands The wetland authority is the Union Territory of Chandigarh Wetlands Authority, constituted by the Administrator on 6 December 2017 (as recorded in the High Court judgment). Sukhna Lake is as in Clause S1.5.7. Judgment (read)
8.9 Sewage and dry-weather flow Modified by Clause S1.7. —
10.10 Works calendar The calendar of this Manual applies: desilting complete by 15 June, gates, pumps, inlets and choe crossings certified ready by 25 June, standby to 15 October. The post-monsoon clearance of sand and debris that this Manual sets for sub-area PB-A, by 31 October, applies to the choe crossings, causeways and tail ends of the Union Territory (set by this Supplement). Dates set by this Manual
10.16 Post-event review Led by the Chandigarh Disaster Management Authority or the Deputy Commissioner, in place of PSDMA [TBC], with the MCC and the Engineering Department. Body to be confirmed
Chapter 11 Basin plans The planning unit is the Ghaggar basin, with Punjab, Haryana and Himachal Pradesh. The Sukhna Lake catchment is a joint unit of the Union Territory, Punjab and Haryana, and the N-Choe and Patiali-ki-Rao are joint units of the Union Territory and Punjab. A basin plan would be prepared with the bodies of Clause S1.4.4. —
Heritage controls The controls on the Capitol Complex (a World Heritage property) and its buffer zone, and the Edict of Chandigarh, were not researched for this draft [TBC]. Any approval within their scope follows those controls. Not researched

Table S1.2 — Roles in the Union Territory

Body Role under this Manual (if adopted) Status of the basis
Administrator; Chief Secretary (the post renamed from "Adviser to the Administrator" in January 2025, as reported) Would amend the CBR and constitute the committee of Clause 1.3.2. As reported
Department of Urban Planning (Chief Architect; Senior Town Planner) Would issue the zoning plans and architectural controls that carry site conditions under section 4(1) of the 1952 Act; keeper of the Master Plan 2031. Zoning plan (read)
Estate Office (the Deputy Commissioner as Estate Officer) Would enforce rainwater harvesting and building conditions under the Estate Rules 2007; its role in plan sanction is [TBC]. As reported
Engineering Department (Chief Engineer; Public Health Circle) Would design and build storm drainage outside the MCC area and in new sectors, and on the V3 roads; operate the Sukhna Lake regulator and gates and publish its operating rule and releases (Clause S1.5); desilt the choes; approve rainwater-harvesting specifications; consulted on every work in or on a choe (Table S1.1). Department page (summary); press
Municipal Corporation Chandigarh (Public Health and Roads wings) Tier A Approving Authority for connections to its drains; owner and maintainer of the storm drains in its area (713 km, or "About 720 k.m", of main and branch lines in the CDP — older figures, current length [TBC]); receives handed-over assets (Clause 10.14); monsoon control rooms; owner of the Diggian sewage treatment plant, which lies in SAS Nagar according to the annexures of an NGT appeal seen only in a copy [TBC]. CDP (read)
Chandigarh Housing Board Would be the Authority for the drainage of its own housing estates [TBC]. Role not confirmed
Chandigarh Smart City Ltd Would apply the Manual to its own works; it upgraded five sewage treatment plants and built a 2 MLD plant at Kishangarh (State of Environment report, 2018), and proposed an underground storm drain of about 1 km in Sector 43, as reported. SoE 2018 (read); press
Department of Forests and Wildlife Would keep the check dams and silt-retention dams of the Sukhna catchment, the Sukhna Wildlife Sanctuary and its eco-sensitive zone, and comment on any work there. Judgment (read)
Union Territory of Chandigarh Wetlands Authority Would administer the Sukhna Wetland under the Wetlands Rules 2017 and the Ramsar listing (Clause S1.5.7). Judgment (read); press
Chandigarh Pollution Control Committee (CPCC) Water Act consents for sewage treatment plants and outfalls into the choes (Clause S1.7). SoE 2018 (read)
Chandigarh Disaster Management Authority; Deputy Commissioner Warnings, including Sukhna release alerts; flood records; post-event review [TBC]. Body to be confirmed
Punjab: Water Resources Department (Drainage), including the Executive Engineer, Water Management Investigation Division, Rupnagar, for Patiala Ki Rao; Deputy Commissioner SAS Nagar; GMADA; Municipal Corporation SAS Nagar; the Municipal Council Zirakpur; the Nayagaon body (called a Municipal Council in the body of a reply to the NGT and a Nagar Panchayat in its index [TBC]); PPCB Owners of the receiving reaches of the N-Choe, Patiali-ki-Rao and the Sukhna Choe in Punjab; would comment on drainage reports and works under Clause S1.4.4; the Punjab part of the Sukhna catchment (Kansal, Nayagaon). NGT reply, OA 180/2026 (read); press
Haryana: Irrigation and Water Resources Department; the Town and Country Planning Department (periphery control); the Panchkula Metropolitan Development Authority; Deputy Commissioner, Panchkula The Haryana part of the Sukhna catchment (Saketri and the Mata Mansa Devi complex); the Ghaggar and its notified floodplain zone at Panchkula (Clause S1.4.3). Judgment (read); Haryana research
Himachal Pradesh The upper Ghaggar catchment; no direct outfall from the Union Territory was found. NEER reading
CWC; IMD (Meteorological Centre, Chandigarh); CGWB (North Western Region) The Flood Estimation Reports; rainfall records (Chandigarh, 42105); groundwater assessment. —

Commentary. The CBR were drafted by the Department of Urban Planning on the model of the Model Building Bye-Laws 2016, as reported, and their text was not obtained for this draft; the zoning plans, which were read, carry the rules that matter for drainage — rainwater harvesting on plots of one kanal and above, the plinth band and the basement condition. No CBR or zoning-plan rule on paving, detention or setbacks from a choe was found, which is the gap the Manual fills. The MCC is set at Tier A because it is the only urban local body, it serves almost the whole city, and its drains discharge into choes shared with Punjab, where errors are exported to another jurisdiction. The Punjab Municipal Corporation Act, 1976 is the one Punjab statute this Supplement carries into the Union Territory, and only in the text extended to Chandigarh.


S1.3 Design rainfall and season

S1.3.1 Report. The whole Union Territory lies in CWC subzone 1(e), whose report names Chandigarh among its towns and Union Territories. Under Clause 2.3.6(c) the 24-hour depths are read from Plates 9 and 10 at the coordinates of the site; at Chandigarh the 50-year plate prints a spot value of 262 mm and the 100-year plate about 289 mm, inside a closed 280 mm contour.

S1.3.2 Shivalik catchments. On the 1(e) plates the boundary with zone 7 runs just north-east of the city (NEER reading by eye, to be confirmed on the report's index maps [TBC]). For the Sukhna Lake catchment, for Patiali-ki-Rao above Kansal and Nayagaon, and for any other choe catchment of 25 km² or more that rises in the Shivalik hills, Clause 2.3.6(b) and (i) apply as they do in sub-area PB-A: the design depth is the larger of the 1(e) plate and a station fit that includes the 2023 storm; the zone 7 report is run as a sensitivity check and the higher result is reported; the 1(e) "suitable increase" for foothill catchments is applied; and choe crossings carry the sediment allowance of Clause 6.3.6.

S1.3.3 Station. For Clause 2.3.6(a) and (d), the station is IMD Chandigarh, 42105 (daily record 1954–2009 in IMD's Extremes). Its recording-gauge annual maxima and the airport (Aero) record after 2009 are part of the first data request of Clause 2.3.6(a) [TBC].

S1.3.4 24-hour record check. Clause 2.3.6(h) applies. IMD recorded 302.2 mm at Chandigarh on 9 July 2023 (IMD Monthly Climate Summary, July 2023, "based on real time available data"; the previous July record was 262 mm on 18 July 2000). This exceeds the 100-year plate value of about 289 mm, so in the whole Union Territory, all of which lies within 25 km of the gauge, the 1% AEP (100-yr) 24-hour depth is 302.2 mm and the 2% AEP (50-yr) 24-hour depth is not less than 262.2 mm, about equal to the plate. This follows from the Manual's rule; it is not a new value. IMD's final (non-real-time) value is [TBC]; if IMD revises the figure, the revised value is used. The press figures of 322.2 mm and 290.9 mm for the same day conflict with IMD's and are not used. Earlier records at the station are 234.9 mm at the observatory (26 September 1955) and 212.0 mm at the aerodrome (19 August 1978) (IMD Extremes), both below the plates.

S1.3.5 Short storms. The statewide floors of Clause 2.3.6(g)(i) apply. The floors that Clause 2.3.6(g)(ii) sets for sub-area PB-C — a 2% AEP one-hour depth of not less than 93 mm and a three-hour depth of not less than 153 mm, with other AEPs scaled as that clause provides — apply in the whole Union Territory as they do in PB-C (set by this Supplement: the city lies in the same plate cell as SAS Nagar and Zirakpur, and its drains discharge into the same choes). The record check of S1.3.4 raises the 24-hour and longer depths, not the depths of one to 18 hours.

S1.3.6 Legacy design basis. The City Development Plan and the State of Environment report of 2018 state that the drainage system "was designed for the rainfall of 12 mm/hour", and, in another passage of the same documents, that the northern sectors "have been designed at 15mm rainfall intensity per hour" and the southern sectors at 20 mm, with "dire need to augment the whole S.W.D. system of the city at 25mm rainfall intensity/hr"; a press account gives "half an inch of rainfall per hour". The 12 mm/h and the 15 and 20 mm/h figures conflict within the same documents, and neither is confirmed by design records. These figures carry no stated AEP, so under Clause 2.3.4(d) they are evidence of the capacity of the existing network only and are never design values under this Manual:

  • (a) new and replacement drains follow Chapter 2 and the depths of this Clause; and
  • (b) where a development connects to an existing drain, the capacity check of Chapter 5 shall take that drain at the legacy basis (12 mm/h, the lower figure) unless the MCC or the Engineering Department gives its as-built capacity (set by this Supplement).

S1.3.7 Season. The season, the works calendar and the antecedent moisture rule of this Manual apply as stated in Table S1.1. The monsoon's new normal dates at Chandigarh are onset on 28 June and withdrawal on 23 September (IMD, Pai et al., 2020).

Commentary. IMD's normal annual rainfall for Chandigarh is 1,073.6 mm over 48.7 rainy days (1901–80); CGWB uses 1,078 mm and the CDP 1,150 mm. NIH-DHAARA gives about 313 mm for the 50-year 24-hour depth at the city's cell, above the plate; under Clause 2.3.6(l) it is used only for the ratio of projected to present-day depths, never as a value, check or floor. The Sukhna catchment is steep, with slopes "ranging from 30 degree to 75 degree", and its soil is "sandy, embedded with pockets of clay, which is highly susceptible to erosion" (High Court judgment, 2020), which is why the foothill rules of Clause 2.3.6(i) and Clause 6.3.6 are applied to the choes. The 12 mm/h figure is about the average intensity of the 302.2 mm day of 9 July 2023 spread evenly over 24 hours (about 12.6 mm/h, NEER reading), so that storm exceeded every legacy figure for most of its duration, and the 25 mm/h augmentation proposed in the CDP would still be an evidence figure, not a design basis. No IMD hourly or 15-minute maximum for Chandigarh was found [TBC].


S1.4 The three choes and the boundary with Punjab

S1.4.1 Governing receiving channels. Every outfall of the Union Territory discharges, directly or through the city drains, to one of three choes, each of which leaves the Union Territory into Punjab and reaches the Ghaggar:

  • (a) the N-Choe, which rises near Sector 2, passes through Leisure Valley and Sectors 16, 23, 36 and 42, leaves the Union Territory at Sector 53 (30.721836 N, 76.731728 E), flows through Sectors 62, 63, Phase 9, 67 and 81 of SAS Nagar to Chilla Manauli, and, as the Pachisdhara drain, joins the Ghaggar at Sarala Khurd (Rajpura, Patiala district), about 70 km from its source (CPCB inspection report, 2024);
  • (b) the Sukhna Choe, which carries the releases of Sukhna Lake from the regulator past the causeways at Kishangarh, Bapu Dham and Industrial Area Phase I, through Baltana (Zirakpur, SAS Nagar), to the Ghaggar near Bhankharpur, as reported; and
  • (c) Patiali-ki-Rao (also Patiala Ki Rao), which enters the Union Territory from Nayagaon and Kansal in Punjab, passes Dhanas and Dadumajra, and leaves for SAS Nagar.

Other choes named in the press (Attawa, Baltana and Faida) and the nala that the CDP says starts at Sector 29 are receiving channels where an outfall reaches them.

S1.4.2 Choe levels. No design flood level for any reach of the three choes was found [TBC]. Until the custodian (Table S1.1) publishes one, the high flood level used for Clause 5.8.2, for Clause 6.11.2(b) and for Clause S1.5 shall be the higher of:

  • (a) the highest recorded flood level at the site, from the records of the MCC, the Engineering Department or the Deputy Commissioner, or a surveyed flood mark, with the record stated on Form 5-1; and
  • (b) the level from a hydraulic model of the reach under Clause 5.8.2(b), with the choe in its present condition (silt, debris and encroachment included), the bed taken at its highest surveyed level, and, on the Sukhna Choe, the release of Clause S1.5.2.

Where neither (a) nor (b) is available for a plot below the Chapter 1 thresholds, Clause 6.11.3 applies.

S1.4.3 Downstream analysis across the boundary. Where the downstream analysis of Chapter 5 reaches a choe or drain in Punjab, it shall continue to the point required by Clause 5.3, whatever the boundary, and where Clause 5.3 requires it, to the Ghaggar, with the Ghaggar tailwater of Clause 5.8.5(b) of this Manual. For the Ghaggar downstream of the Sukhna Choe the notified floodplain zone of Haryana at Panchkula (section 45 of the Haryana Canal and Drainage Act, 1974, 27 October 2023, on a 100-year flood of 2,933.45 m³/s, as recorded in the research for the Haryana edition) is a check on the river level.

S1.4.4 Cross-boundary consultation. Before approval under this Manual:

  • (a) the drainage report of a development whose downstream analysis reaches SAS Nagar, Zirakpur or Nayagaon should be sent for comment to the local body concerned, and to GMADA where it reaches a GMADA scheme;
  • (b) a work in or on Patiali-ki-Rao on or near the boundary should be referred to the Water Resources Department of Punjab (the Executive Engineer, Water Management Investigation Division, Rupnagar, who is authorised under the notification of 4 March 2013 under section 55 of the Northern India Canal and Drainage Act, 1873 on the Punjab side);
  • (c) a work on the N-Choe at or near its exit at Sector 53 should be referred to the Water Resources Department of Punjab, GMADA and the Municipal Corporation SAS Nagar; and
  • (d) a work on the Sukhna Choe below the regulator should be referred to the Municipal Council Zirakpur and the Water Resources Department of Punjab.

Each comment shall be recorded. These bodies have not agreed to this role; it is the role they would have if the Manual and this Supplement were adopted (set by this Supplement).

S1.4.5 No narrowing of a choe. No work shall narrow, cover, fill or realign the bed of a choe, or reduce its section below the section needed to carry its 1% AEP flow with the freeboard of Chapter 6, and Clause 6.3.6 applies to every crossing. Court and plan lines are taken as in Clause 5.8.5(h). On Patiali-ki-Rao, boundary pillars have been fixed in the Union Territory on both sides of a width of 200 ft, under the High Court's directions in CWP 5901 of 2017 (Local Commissioner's report of 8 January 2024); the fixing of pillars on the Punjab side was still pending. That width is court-monitored and specific to this case. It is not a rule of this Supplement, but Zones 1 and 2 of Clause 7.4 shall be measured outward from the pillar line wherever it lies outside the top of bank (set by this Supplement).

S1.4.6 Outfall closure. Where the choe level of Clause S1.4.2 is above the invert of an outfall or tail end, the outfall shall be treated as closed for the whole design storm (Clause 5.9.4) and the outfall-closed check of Clause 5.10 applies, with the lock duration that Clause 5.8.5 of this Manual sets for the choes (at least 72 hours, and covering the whole of the 48- and 72-hour storms); storage and pumping shall handle the storm volume, and pumps shall meet Clause 5.12. On the Sukhna Choe the check is made with the release of Clause S1.5.2 coinciding with the local storm.

Commentary. The N-Choe is, in the CPCB's words, an "interstate drain which carry sewage, storm water / over flow of fresh water of Chandigarh and Mohali (SAS Nagar)". The CDP lists its "disappearance" through urbanisation, filling, dumping and the laying of service lines along and across natural courses among the causes of flooding, and the NGT, in OA 736 of 2022, recorded that debris was "shrinking size of drain causing serious apprehension of flood in Chandigarh" (as quoted in the CPCB report). The CDP also records that the railway from Morinda to Ludhiana, built on fill, formed a barrier around the eastern and southern part of the city. On Patiali-ki-Rao, the Local Commissioner found the Punjab side "heavily encroached" and the Union Territory side cleared of debris (report of 8 January 2024, annexed to the reply in NGT OA 180 of 2026); a public-interest petition (CWP-PIL 79 of 2025) seeks an embankment against "season flooding" at Khuda Lahora, Nada, Nayagaon and Karoran, and an application in it (notice of 7 May 2026) reports construction in the Rao "significantly increasing the risk of flooding". The rao overflowed at Dadumajra and Dhanas on 6 September 2025, and in July 2025 water from Patiala Ki Rao and Jayanti ki Rao entered houses at Rurka in SAS Nagar, as reported. The Administration has asked SAS Nagar to clean the Sukhna Choe in its area, as reported. Works on a shared choe change levels on both sides of the boundary, which is why S1.4.3 carries the analysis across it and S1.4.4 makes the downstream bodies' comment a step in approval. The Sukhna Choe of this Supplement is not the stream of the same name in Himachal Pradesh that CPCB lists among polluted river stretches.


S1.5 Sukhna Lake: gates, catchment and the courts

S1.5.1 The lake as a reservoir. Sukhna Lake was built in 1958 across the Sukhna Choe. Its releases to the Sukhna Choe are reservoir releases under Clause 5.8.3. The Engineering Department operates the regulator and its floodgates (three, as reported); the danger mark is 1,163 ft and the gates are usually opened above 1,162 ft, as reported. No operating rule, spillway or gate capacity, rating, release record, or datum for the 1,163 ft mark was found [TBC]. Every lake level used under this Clause shall be stated with its gauge and datum.

S1.5.2 Downstream design case. Until the Engineering Department publishes an operating rule and a rating for the regulator, the release used on the Sukhna Choe shall be the discharge of all gates fully open with the lake at the danger mark, from a rating computed for the design and agreed with the Engineering Department [TBC], and, once a release record exists, the higher of that discharge and the largest recorded release (set by this Supplement). The coincidence of the release with the local storm is as in Clause 5.8.4.

S1.5.3 No credit for unrecorded coordination. No reduction in the release of Clause S1.5.2, and no credit for the timing of releases relative to local rain, shall be taken on the basis of coordination between the operator of the regulator and the bodies downstream unless that coordination is set out in a published operating rule or a written agreement that the Authority has seen and recorded (set by this Supplement).

S1.5.4 No flood cushion. No flood cushion in Sukhna Lake shall be counted as storage under Clause 7.7 until the conditions of Clause 7.8.2 are met; until then Clause 7.8.3 applies.

S1.5.5 Upstream of the lake. No new urban drain shall be connected to the lake or to a stream that feeds it, and no work in the catchment shall divert or reduce the inflow to the lake (set by this Supplement, following directions L and M of the judgment of S1.5.6). Every work in the catchment shall carry the construction-stage erosion and sediment controls of Clause 8.12.

S1.5.6 Court restrictions in the catchment. In Court on its own motion v. Chandigarh Administration (CWP 18253 of 2009 and connected cases, judgment of 2 March 2020), the Punjab and Haryana High Court, among other directions:

  • (a) declared Sukhna Lake a "legal entity/legal person/juristic person" (direction B);
  • (b) declared illegal, and ordered the demolition of, structures in the catchment "as delineated in the map prepared by the Survey of India on 21.9.2004" in Punjab, Haryana and the Union Territory (directions C and D), and directed Punjab and Haryana to pay ₹100 crore each for its restoration (direction A);
  • (c) directed that "New construction is completely banned in the catchment areas as delineated in the Survey of India map dated 21.9.2004 falling in the States of Punjab, Haryana and UT Chandigarh as well as in the Sukhna Wetland, Sukhna Wildlife Sanctuary" (direction J);
  • (d) directed dredging to raise the lake's capacity, lowering of the storage of the check dams "to ensure regular flow of water into Sukhna Lake", and a "permanent discharge measurement site about half a km upstream in the channel" (direction L); and
  • (e) directed that "no waste water/sewage flows into the river from the villages i.e Kansal, Kaimbwala and Saketri" (direction M).

The demolition direction was stayed by a coordinate Bench of the High Court on 18 December 2020 pending review applications; the restraint on construction in the catchment was not disturbed, as reported. The review applications were still pending, and physical demarcation of the catchment was ordered, in CWP-PIL 9 of 2023 (interim order of 2 August 2024, as quoted in a report of the order [TBC]). The only Supreme Court stay found in research for this draft is of 2012, of an earlier High Court direction to demolish constructions in the catchment, as reported; no Supreme Court stay of the 2020 judgment was found. The construction restraint is a court restriction, not a rule of this Supplement: before any approval in or near the catchment, the Authority shall confirm the current status of the judgment and of the demarcation, and record it [TBC].

S1.5.7 Wetland, eco-sensitive zone and Ramsar listing. The lake was declared a "common wetland" on 6 July 1988, and a draft notification under the Wetlands (Conservation and Management) Rules, 2017 was issued on 21 October 2019 (High Court judgment); the draft proposed no "permanent construction within 50 metres of the mean high flood level", as reported. Whether a final notification has been issued, and its buffer, are [TBC]; until it is confirmed, the 50 m is not applied as a statutory setback, and Clause 7.4 applies to the lake as a waterbody. The Ministry of Environment, Forest and Climate Change notified 1,050 ha "to an extent varying 2.0 to 2.75 kilometres from the boundary of Sukhna Wildlife Sanctuary" as its eco-sensitive zone on 18 January 2017 (as recorded in the judgment); Punjab's position before the Court was an eco-sensitive zone of 100 metres, and the Court directed at least 1.0 km in Punjab and Haryana (direction H). The Union Minister announced Sukhna Wetland as a Ramsar site on 15 October 2026, as reported; its site number, area and designation date are from a single secondary source and are [TBC] against the Ramsar Sites Information Service.

Commentary. The judgment records that the lake's capacity fell from 1,074.4 ha·m in 1958 to 513.28 ha·m in 2005 and its water spread from 228.64 ha to 148.28 ha, and that 192 silt-retention dams and 200 check dams had been built in the catchment, 110 of them silted or partly silted. The Sukhna Wildlife Sanctuary covers 25.9849 km². The catchment is about 10,395 acres, of which about 2,525 acres are in Haryana and 684 in Punjab, as reported in 2019; the rest, about 29 km², is in the Union Territory (NEER reading by difference). The judgment's narrative also dates the Survey of India map 14.9.2004 and records it taken on record on 24.09.2004; this Supplement uses 21.9.2004, the date in the directions. The gates were opened eleven times in the 2025 monsoon, a record, four times in 2023, six in 2022 and five in 2021; in August 2020 the opening of two gates flooded low-lying Zirakpur along the Sukhna Choe; and the opening of 24 September 2018 was the first in ten years (all as reported). During one release all three causeways on the choe overflowed, and traffic on the Baltana bridge and on the Ghaggar causeway at Mubarikpur has been suspended at high flows, as reported. The releases are therefore a recurring design load on the Sukhna Choe in Punjab, set by a gate whose rule is not published; S1.5.2 and S1.5.3 apply the Manual's reservoir rule to it. The Engineering Department runs a control room at the regulator end in the monsoon, coordinating with the Deputy Commissioners of Chandigarh and SAS Nagar, as reported.


S1.6 Groundwater, infiltration and rainwater harvesting

S1.6.1 Recharge permitted. In the Union Territory, recharge and infiltration under Clauses 4.4, 8.8 and 8.11 are permitted, subject to S1.6.2 to S1.6.4. Punjab's three infiltration rules for the Kandi, the over-exploited central plains and the waterlogged south-west, and the PWRDA water-conservation credits, do not apply (set by this Supplement).

S1.6.2 Southern sectors and shallow water. In the southern sectors, and wherever the pre-monsoon water table is within about 3 m of the ground, infiltration shall be credited only at a rate measured on site under Chapter 8, after a water-table check at the site, and the separation of Clause 8.8.1 shall be shown from the seasonal-high water table (set by this Supplement). The extent of the southern sectors to which this applies (roughly south of Sector 30) is [TBC]; until a depth-to-water map is published, the check is made at every site south of Sector 30.

S1.6.3 Shivalik slopes. On the natural slopes of the Shivalik hills in the Union Territory (the Sukhna catchment and the sanctuary), the hill rule of Clause 4.11 applies as in sub-area PB-A: no deliberate infiltration on a natural slope steeper than 10°, or within twice the wall height upslope of a cut, without a geotechnical certificate.

S1.6.4 Quality. Road, parking, yard and industrial runoff shall not be led into an injection well or recharge shaft; only roof water may be (set by this Supplement, as in Punjab). Recharge structures shall be kept away from sewers, septic tanks and soak pits as Chapter 8 requires.

S1.6.5 Rainwater harvesting. The one-kanal rule of Table S1.1 applies, with the specification of the Administration. Its structures count toward retention only as Clauses 8.11.4 and 8.11.5 allow.

Commentary. CGWB's assessment for 2024 rates the Union Territory "Safe", with a stage of extraction of 66.13%, down from 89% in 2017, 80.6% in 2020, 80.99% in 2022 and 75.41% in 2023; it describes "Fair to good aquifer horizons" of medium to coarse sand to 180 m below ground, with "Coarser sediments … along the Sukhna Choe and Patialiki Rao", groundwater "under confined as well as semi-confined conditions", no quality exceedance in its eight samples, and recommends "Roof Top Rainwater Harvesting in feasible areas of Chandigarh for recharging the Ground water Reservoirs". The brochure prints the recharge-worthy area as "11.4 Thousand Sq. Km", an error for the 114 km² it gives elsewhere; a secondary summary placing the Union Territory in the 70–90% band conflicts with CGWB's own figure, which governs. The ground is therefore unlike most of Punjab, where 115 of 153 assessment units are over-exploited, and the Punjab rules are not imported. A shallow aquifer between about 1.22 and 45 m and a deep one between 15 and 70 m are reported, with shallow levels in the southern sectors where "flooding there occurs even after light rain", as reported; S1.6.2 screens those areas. The groundwater-extraction guidelines of the Ministry of Jal Shakti (24 September 2020, amended March 2023) apply in the Union Territory, as the CGWB brochure notes.


S1.7 Sewage in the choes

S1.7.1 Mixed-flow channels. The choes carry sewage, treated effluent and fresh-water leakage as well as storm water. Clause 8.9 applies in full; in addition, before approval of an outfall to a choe:

  • (a) the outfall invert, or the invert of the tail end it discharges through, shall be above the dry-weather flow level of the choe at that point, from a survey in the dry season, as well as meeting the bed rule of Clause 6.3.6; and
  • (b) where the outfall has been intercepted ("tapped") to take dry-weather flow to a sewer, the design shall check that the interceptor, when surcharged in a storm, does not back sewage into the storm drain or flood its catchment (set by this Supplement).

S1.7.2 Interception ahead of the choes. Every new or reconstructed outfall to a choe shall have dry-weather-flow interception and screening ahead of it, under Clause 8.9 (set by this Supplement).

Commentary. In January 2024 CPCB measured a BOD of 28 mg/l in the N-Choe at Sector 36 and 22 mg/l at its exit at Sector 53; 31 mg/l where it enters SAS Nagar (Sector 83, behind the industrial area) and 50 mg/l 1 km before its confluence with the Ghaggar at Sarala Khurd; the outlet of the 45 MLD sewage treatment plant at Chilla (Sector 83, SAS Nagar) had a BOD of 68 mg/l. CPCB found the outfalls at Sector 36 and Sector 42 intercepted, four tail ends in Bougainvillea Garden and three in Leisure Valley "tapped", and untreated domestic sewage entering the choe at several points in SAS Nagar (CPCB inspection report, 2024). The Indian Express had reported "a wide drain pipe which is only for the storm and rain water" at Sector 36 "emitting continuous sewage water" (15 December 2023, as quoted in the NGT's order). The CDP records that "22 mgd sewage is being dispose off dumping into 'N' choe" and that the MCC was treating 30 mgd of the 60 mgd it received — figures of about 2006 (NEER reading of the CDP's date), not current. Interception structures that back up in storms, and base flow from treated effluent, raise the water at the outfalls; S1.7.1 sets the outfall above it.


S1.8 Local terms and event evidence

S1.8.1 Terms. In this Supplement:

  • (a) choe is a seasonal stream of the Shivalik foothills and the plain below them (the Sukhna Choe, the N-Choe);
  • (b) rao is the local name of a larger seasonal stream, used for Patiali-ki-Rao, which documents also call Patiala-Ki-Rao, Patiala Ki Rao and Patialiki Rao, a "Nadi/Choe", and "Chao"; this Supplement writes Patiali-ki-Rao;
  • (c) nallah is an open drain or minor stream ("open Nallahs/N-choe", CDP);
  • (d) tail end is the outfall structure by which a storm drain discharges into a choe, built "to avoid scouring of the embankments & its bed" (CDP);
  • (e) causeway is a road crossing laid on the bed of a choe; and
  • (f) regulator end is the outlet end of Sukhna Lake, with its spillway and gates.

Commentary. The CDP lists the low-lying areas of the city as Sectors 11 and 24, parts of Sectors 15 and 35, Mauli Jagran and the Gobindpura area of Manimajra. On 9 July 2023 IMD recorded 302.2 mm (Clause S1.3.4); underpasses were submerged and the road at the Kaimbwala turn closed, and 531.6 mm was reported over 8–10 July for Chandigarh, SAS Nagar and Panchkula together, as reported. In 2025 the city received 1,071.2 mm by 24 September, 27.9% above normal, as reported; the lake gates opened eleven times (Clause S1.5) and Patiali-ki-Rao overflowed on 6 September. The trunk main laid between Sectors 17/18, 21/22, 34/35 and 43/44 to the N-Choe at Sector 51, at a cost of about ₹2 crore, and about 500 vertical road gullies (State of Environment report, 2018), and the MCC's storm-water master plan study, which recommended "deepening and widening of the nallahs for the sections affected by encroachments" (CDP), are the augmentation works found; the study's date, consultant and design storm were not found. These records are evidence only and are not design values (Clause 2.3.4(c)).


To be confirmed

The following are needed before this Supplement could be adopted; the interim rule stated in each clause applies until then:

  1. the text of the Chandigarh Building Rules (Urban) 2017, with their rule numbers for rainwater harvesting, plinth, basements and paving, the section of the 1952 Act under which they are framed, their notification date (25-07-2017 or 02-05-2017) and the amendments of 2018 to date (Table S1.1);
  2. the plan-sanctioning authority under the CBR, the Estate Rules 2007, the CBR definition of a kanal, and the Engineering Department's current rainwater-harvesting specification (Table S1.1);
  3. the Chandigarh text of the Schedule to Act 45 of 1994, and the sections under which the MCC could adopt bye-laws (Table S1.1);
  4. the drainage, choe and disaster chapters of the Chandigarh Master Plan 2031 and its 2026 amendments, and the section under which it is notified (Table S1.1);
  5. the present area of the MCC, the length of its storm drains, the MCC storm-water master plan study, and the division of drains and choes between the MCC and the Engineering Department after the transfer of the V3 roads, including the legal custodian of the choes (Clauses S1.1 and S1.4; Table S1.1);
  6. whether the Northern India Canal and Drainage Act, 1873, the Punjab Canal and Drainage Act, 2023 or any other statute applies to the choes inside the Union Territory, and whether the Punjab New Capital (Periphery) Control Act, 1952 applies there (Clause S1.1.2);
  7. the name and status of the Nayagaon local body, and the role of the Chandigarh Housing Board (Table S1.2);
  8. the Sukhna Lake regulator: its gates, spillway capacity, rating, operating rule, release record and the datum of the 1,163 ft mark (Clause S1.5);
  9. the current status of the 2020 Sukhna judgment (the review applications, the demarcation in CWP-PIL 9 of 2023 and the payments of direction A), the final wetland notification and its buffer, and the Ramsar entry (Clauses S1.5.6 and S1.5.7);
  10. IMD's final value for 9 July 2023, Chandigarh's recording-gauge maxima and any hourly data, and the airport record after 2009 (Clause S1.3);
  11. the zone-7 line near the city on the index maps of the two CWC reports (Clause S1.3.2);
  12. design flood levels and surveyed flood marks for the three choes (Clause S1.4.2), and a depth-to-water map for the southern sectors (Clause S1.6.2);
  13. the Chandigarh Disaster Management Authority and its plan (Table S1.1, Clause 10.16);
  14. any CAG audit of storm drainage in the Union Territory (none was found); and
  15. the controls of the Capitol Complex and its buffer zone and of the Edict of Chandigarh (Table S1.1).