Chapter 8Water Quality and Recharge


8.1 Purpose and scope

8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:

  • (a) the water quality volume (WQv) and the water quality design flow;
  • (b) the treatment train, and the selection and design of best management practices (BMPs);
  • (c) the criteria for infiltration and recharge;
  • (d) the exclusion of sewage and dry-weather flow from storm drains;
  • (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
  • (f) how rainwater harvesting (RWH) fits with retention and detention;
  • (g) erosion and sediment control during construction; and
  • (h) monitoring.

8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.

8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.

Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.


8.2 Definitions

Term Meaning in this Manual
Water quality volume (WQv) The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4).
Water quality rainfall depth (P_wq) The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A).
3-month ARI depth The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record.
Water quality design flow (Q_wq) The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5).
Runoff coefficient for WQv (Rv) The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I.
BMP A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume.
Treatment train Two or more BMPs in series, from source to site to regional scale (Clause 8.5).
Pretreatment A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP.
First flush The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil.
Gross pollutant trap (GPT) A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm.
Dry-weather flow (DWF) Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge.
Cross-connection Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain.
Infiltration facility A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells.
Seasonal high groundwater table As defined in Clause 3.10.2: the highest level in the SW monsoon season.
Hotspot A land use with a high risk of spills or contaminated runoff (Clause 8.8.8).
Level of Service (LoS) / Value Rating (VR) The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012).

8.3 Objectives and pollutants of concern

8.3.1 Stormwater treatment under this Manual shall aim to:

  • (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
  • (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
  • (c) keep sewage and sullage out of storm drains and waterbodies;
  • (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
  • (e) prevent erosion and sediment discharge during construction.

8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:

Table 8.1 — Pollutants of concern, sources and primary controls

Pollutant Main sources in Punjab towns Primary control
Gross pollutants (plastics, litter, vegetation) Streets, markets, open dumping in drains Source collection; GPTs and screens (Clause 8.10)
Suspended sediment Construction sites, unpaved roads and verges, road wear, drain silt Erosion and sediment control (Clause 8.12); pretreatment; filtration
Oil, grease and fuel Roads, parking, fuel stations, workshops, bus depots Oil-grit separators at hotspots; bioretention
Pathogens and organic load (BOD) Sewage and sullage cross-connections, animal waste Exclusion and DWF interception (Clause 8.9)
Nutrients (N, P) Sewage, fertiliser, food waste, detergents Exclusion; bioretention; wetlands
Heavy metals Roads, roofs, industrial yards Filtration; sedimentation

Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Punjab, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.


8.4 Water quality volume and design flow

8.4.1 Water quality rainfall depth. The water quality rainfall depth is:

P_wq = max (P_ret, P_3m)

where:

  • P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
  • P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.

8.4.2 Water quality volume. The WQv shall be computed as:

WQv = (P_wq / 1000) × Rv × A

where:

  • WQv is in m³;
  • A = the contributing area, m²;
  • Rv = 0.05 + 0.009·I; and
  • I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.

The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.

8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.

8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:

  • (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
  • (b) hotspot controls (Clause 8.8.8); and
  • (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.

8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:

  • (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
  • (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.

8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).

8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).

Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Punjab value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).

The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.

Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:

  • Rv = 0.05 + 0.009 × 80 = 0.77
  • WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³

8.5 Treatment train and pretreatment

8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:

  • (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
  • (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
  • (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.

8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).

8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.

8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.

Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Punjab, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.

Stormwater treatment train: source, site and regional Treatment train: source → site → regional → receiving waterbody Runoff from roofs, roads, parking and open space: first flush carries most sediment, litter and oil 1. Source control on the plot, at the roof or kerb • Rooftop RWH: sump, recharge well • Rain garden, small bioretention • Permeable paving • Disconnect roofs onto lawns • Green roof, soil restoration • Silt trap / catch pit at inlets Retain first (Chapter 4) 2. Site control layout, campus, road corridor • Bioretention, swales, filter strips • Infiltration trench or basin • Oil-grit separator (hotspots) • Wet pond or extended detention • Sediment forebay pretreatment • Treat WQv, then detain Treat WQv (Clause 8.4) 3. Regional control basin or outfall, public land • Gross pollutant trap at outfall • Dry-weather flow interceptor • Constructed wetland at tank inlet (sedimentation zone) • Regional pond / restored tank (fee-in-lieu, Clause 7.11) Required at outfalls (8.10) Receiving waterbody tank, channel, marsh, estuary (Chapter 7) Each stage removes a different fraction. Coarse solids and litter are removed first so that filters and infiltration media do not clog. Flows above the WQ peak bypass treatment to detention (Chapter 4). Sewage and dry-weather flow are not stormwater No sewage or sullage connection to any storm drain (Clause 8.9). Dry-weather flow found at an outfall is intercepted and sent to the sewer or a treatment plant, not to the treatment train or the waterbody.

Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.


8.6 BMP selection: Level of Service and Value Rating

8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.

8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):

Table 8.2 — Required Level of Service for sites that are not redevelopment

ΔCN Impact Required LoS
17 or more High 8
7 to 16 Moderate 7
4 to 6 Low 6
1 to 3 Minimal 5

For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.

8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.

8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:

  • (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
  • (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
  • (c) it has pretreatment under Clause 8.5.3.

8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:

  • (a) retained on site under Chapter 4; or
  • (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.

Table 8.3 — BMP Value Ratings and suitability in Punjab

BMP VR (MARC 2012) Main pollutants removed Volume reduction / recharge Kandi fans, dune sands and alluvium Laterite / hard rock Sirowal, sodic soils / water table within 3 m Punjab notes
Native vegetation (preserved) 9.25 All High Suited Suited Suited Counts only for preserved, undisturbed area
Rain garden / infiltration 9.0 Sediment, metals, oil, nutrients High Suited if 1.0 m separation met Conditional (test) Not suited Mosquito control: drain within 48 h
Bioretention 8.5 Sediment, metals, oil, nutrients Medium–high (unlined); low (lined) Suited Suited, with underdrain Lined, with underdrain Media source and phosphorus content to be specified
Permeable pavement 7.5 Sediment, metals, oil Medium–high Suited Conditional Lined only Not where run-on carries heavy silt
Extended detention wetland 7.0 Sediment, nutrients, metals Low Conditional (water balance) Suited Suited Good at tank inlets (Clause 7.9.7)
Media / sand filter 6.0 Sediment, metals Low Suited Suited Suited (lined) Needs frequent cleaning
Extended wet detention (wet pond) 5.0 Sediment, metals, some nutrients Low Conditional (water balance) Suited Suited Dry-season water balance (Clause 8.7.8)
Vegetated filter strip 5.0 Sediment Low–medium Suited Suited Suited Mostly as pretreatment
Native vegetation swale 4.0 Sediment, oil Low–medium Suited Suited Suited Not where Q_wq velocity is high
Extended dry detention 4.0 Coarse sediment Low Suited Suited Suited Combine with detention (Chapter 4)
Proprietary / hydrodynamic devices 3.0–5.0 Coarse sediment, oil, litter None Suited Suited Suited VR from verified test data only
Signage (public education) +0.25 — — — — — Added to composite VR

The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.

Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Punjab for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Punjab stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.


8.7 BMP design summaries

8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).

8.7.2 Bioretention and rain gardens (Figure 8.2).

  • (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
  • (b) Surface ponding drained within 48 hours.
  • (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
  • (d) A transition (choker) layer and a gravel drainage layer below the media.
  • (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
  • (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
  • (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.

8.7.3 Vegetated swales.

  • (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
  • (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
  • (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
  • (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
  • (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.

8.7.4 Vegetated filter strips.

  • (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
  • (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
  • (c) Used mainly as pretreatment for bioretention, infiltration and swales.

8.7.5 Permeable pavement.

  • (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
  • (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
  • (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
  • (d) Structural design for the traffic loading by the road authority's standards.
  • (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.

8.7.6 Infiltration trenches and basins (Figure 8.3).

  • (a) Pretreatment under Clause 8.5.3 in every case.
  • (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
  • (c) An observation well to the base of each trench.
  • (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
  • (e) An overflow to the minor or major system at grade.
  • (f) Not brought into service until the contributing area is stabilised (Chapter 10).

8.7.7 Wet ponds (extended wet detention).

  • (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
  • (b) A sediment forebay at each inlet (Clause 8.5.3).
  • (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
  • (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
  • (e) A dry-season water balance (Clause 8.7.8).
  • (f) The detention storage of Chapter 4 may sit above the extended detention level.

8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.

8.7.9 Constructed wetlands.

  • (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
  • (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
  • (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
  • (d) A high-flow bypass so that floods do not scour the macrophyte zone.
  • (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.

8.7.10 Gross pollutant traps.

  • (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
  • (b) Capture of gross pollutants down to about 5 mm.
  • (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
  • (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
  • (e) Vehicle access for cleaning by suction or grab.

8.7.11 Oil-grit separators.

  • (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
  • (b) Sized for Q_wq, with a high-flow bypass.
  • (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.

8.7.12 Silt traps and catch pits.

  • (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
  • (b) A sump at least 300 mm below the outlet invert.
  • (c) Silt traps are pretreatment only and earn no VR.

Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Punjab. Three local issues drive changes from the source manuals:

  • Mosquitoes. Dengue is endemic in Punjab. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
  • Dry seasons. Most of Punjab's rain falls in the south-west monsoon, whose normal for June to September is 439.8 mm (ICAR-CRIDA), and the State is wet in the north-east and dry in the south-west: the district normals range from 388.6 mm a year at Ferozpur, 429.8 mm at Bhatinda and 433.0 mm at Faridkot to 660.3 mm at Ludhiana, 818.8 mm at Hoshiarpur and 1,106.1 mm at Gurdaspur (IMD, Climate of Punjab, normals of 1901–1980). The monsoon now sets in at Jalandhar on about 26 June, at Patti on about 28 June and at Ludhiana on about 1 July, withdraws from all three by about 21 September, and leaves most of the State by 1 October (IMD, new normal dates, 2020); the western disturbances of winter add rain, and falls of more than 100 mm in a day have been recorded at Ludhiana in January, March and December (IMD). For eight or nine months of the year the chhappar (ਛੱਪੜ; toba ਟੋਭਾ; pond) and the dhab fall or dry out unless they are fed, and in the villages and towns the feed is sullage or sewage (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool through the dry months on its own catchment's runoff is not to be used; in the dry south-west (sub-area PB-F) the dry forms of Clause 8.7 (bioretention, swales and extended dry detention) are the practical choice, lined and with no infiltration where the October water table is within 3 m (Clause 8.8.1, class (ii)); and in the Kandi (PB-A) a wet pond or wetland on a choe fills with sand, so that dry forms with a sediment forebay are preferred there too. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage; chhappars, tobas, dhabs and the Kandi low dams are waterbodies under Chapter 7 and are not to be used as treatment for a development, even where the State's pond programme treats the sullage reaching a village chhappar on the Seechewal or Thapar model. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
  • Litter and silt. GPTs and silt traps are treated as essential, not optional, because Punjab drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.

The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.

Bioretention cell: cross-section Bioretention cell (rain garden): section, not to scale Paved area Pretreatment: grass strip or forebay to drain ponding ≤ 300 mm filter media 600–900 mm overflow crest = max ponding mulch 50–75 mm engineered sandy-loam media (low fines, low phosphorus) transition (choker) layer gravel drainage layer perforated underdrain (if needed) Seasonal high groundwater table (post-monsoon) ≥ 1.0 m if unlined (infiltrating) Lined version (no infiltration): impermeable liner below the gravel layer. Required at pollution hotspots and wherever the 1.0 m separation to seasonal high groundwater cannot be met. Dimensions as set in Clause 8.7.2.

Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.


8.8 Infiltration and recharge criteria

8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Punjab, which has no coastal sand areas (Clause 8.8.9). Depth to water decides. Punjab's groundwater runs to both extremes: in the assessment of 2024 the stage of extraction was 156.87%, and 115 of the 153 assessment units (112 blocks and 3 urban areas) were over-exploited (CGWB); in June 2019 the water table lay deeper than 10 m over about 68% of the State, against 14.9% in 1989, with "deep water levels" in the Kandi belt, yet within 1.5 m of the ground over about 1% of the State, in Faridkot, Fazilka and Sri Muktsar Sahib, and within 5 m over about 5,723 km², mainly in the south-west, where "Water logging conditions exist" (CGWB and WRD, assessment as on 31 March 2020). For this Clause the seasonal high groundwater table is the post-monsoon level of October, the State's shallowest, read from the CGWB and WRD October maps, not the pre-monsoon level, and the 1.0 m separation above is measured from it. Each site falls in one of three classes, which are those of Clause 4.11. (i) Deeper than 10 m (the over-exploited plains of sub-areas PB-B, PB-C, PB-D and PB-E and the deep-water parts of PB-F, and the Kandi fans and choe beds of PB-A): recharge, with pretreatment and a first-flush diversion, is the first means of meeting retention wherever this Clause is met; no runoff from roads, parking, service yards or industrial premises is led directly to any recharge well, borewell or shaft (Clause 8.11.3(b); PUDBR 2021, r.40, already requires industrial units "not to inject contaminated water into recharge structures"); only filtered roof water goes to an injection well; recharge structures are kept away from sewer lines, septic tanks, soak pits and landfill (r.40, which sets no distance); and no septic tank or absorption pit is placed within 30 m of a well, water source or stream used or likely to be used for drinking (r.45(7)). In the Kandi, recharge is preferred on the boulder-gravel fans and in the choe beds, on site infiltration tests and with sediment control ahead of every facility, because the choes carry sand and silt; the Kandi low dams and WRD's 410 check dams on rivers and nallahs are recharge structures of this kind. On the Shivalik slopes themselves (natural ground of sandstone and clay sloping more than 10°, in the Pathankot–Dhar Kalan hills, the Mukerian–Dasuya, Hoshiarpur and Garhshankar Shivaliks, the Anandpur Sahib–Nangal Shivaliks and the Kharar–Mullanpur hills) the hill infiltration rule of Clause 4.11 applies, and no infiltration is built or credited there without the geotechnical certificate it requires. (ii) Within 3 m (the waterlogged south-west, sub-area PB-F where the October water table is within 3 m, including parts of Sri Muktsar Sahib, Fazilka, Faridkot, Bathinda and Ferozepur; the Sirowal belt below the Kandi; the bet lands within the seasonal flood level; and the beds and foreshores of chhappars and dhabs): no infiltration facility, soakaway, recharge pit, recharge well, recharge shaft or exfiltrating paving shall receive runoff of any kind, the exception for roof water in Clause 8.11.3(c) does not apply, and no infiltration or recharge is credited toward retention or the WQv; rainwater harvesting there is storage for use, saline groundwater is not a recharge target, and retention is met by storage for use, by evaporation from shallow lined storage and by detention under Chapter 4, with conveyance and pumped outfalls carrying the design. (iii) Between 3 m and 10 m: infiltration or recharge is credited only on a check at the site of the October water table and its trend over at least the past five years, which shows that this Clause is met and that the water table is not rising. Quality. Before a recharge well or shaft is designed, the groundwater at the site is tested against the limits of the State's assessment of 2024 (uranium above 30 ppb, found in 32.6% of the samples; nitrate above 45 mg/L, 12.58%; fluoride above 1.5 mg/L, 13.77%; arsenic above 10 ppb, 4.85%; and an electrical conductivity above 3,000 µS/cm, 6.72%, with up to 8,320 µS/cm at Abohar; CGWB), and where any of them is exceeded at the site, recharge through a well or shaft is not credited unless a hydrogeologist shows that it will not worsen the aquifer or the wells it supplies; the State's own assessment records that "Groundwater at Shallow depth is largely contaminated caused by surface water pollution" (CGWB and WRD). Credits. A user who implements an approved rainwater harvesting scheme earns water-conservation credits under the Punjab Groundwater Extraction and Conservation Directions, 2023, one credit for each cubic metre conserved, with a rebate of ₹2.50 (Directions 2.7 and 4.7); the drainage report states each recharge structure's design volume in m³ a year so that a user can claim them, which is a link to that regime and not a mandate. The classes, the 3 m and 10 m limits, the October reading and the quality screen are set by this Manual. The seasonal high groundwater table shall be determined under Clause 3.10.2.

8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.

8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:

  • (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
  • (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
  • (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
  • (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).

Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.

8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:

  • (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
  • (b) 3.0 otherwise.

8.8.5 Minimum rates.

  • (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
  • (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
  • (c) No infiltration credit where the design rate is below 3 mm/h.

8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:

  • (a) 3 m from building foundations, and 5 m from a basement;
  • (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
  • (c) 30 m from a drinking-water well or borewell;
  • (d) 15 m from a septic tank or soak pit; and
  • (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.

Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.

8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).

8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:

  • (a) fuel stations;
  • (b) vehicle workshops, washing bays, and bus and truck depots;
  • (c) industrial yards and loading areas where hazardous materials are handled or stored;
  • (d) solid waste transfer stations and landfill areas; and
  • (e) land known or suspected to be contaminated.

Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.

8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Punjab has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The dune sands and loamy sands of the south-west (Bathinda, Fazilka, Abohar and Sri Muktsar Sahib), the boulder-gravel fans and choe beds of the Kandi and the sands of the river beds and bet lands are not coastal sand areas: Clause 8.8.1 applies there in full, and the reduced separation of item (d) does not. In coastal sand areas:

  • (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
  • (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
  • (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
  • (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
  • (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.

8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the sandstone and clay of the Shivalik hills, in the Pathankot–Dhar Kalan hills, the Mukerian–Dasuya, Hoshiarpur and Garhshankar Shivaliks, the Anandpur Sahib–Nangal Shivaliks and the Kharar–Mullanpur hills, where water moves through joints and the weathered mantle; Punjab has no laterite, and on any slope in these hills the hill rule of Clause 4.11 and the limits of Clause 8.8.1 apply first):

  • (a) tests shall be made at the facility base, below any surface crust or hardpan;
  • (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
  • (c) infiltration on or above slopes shall be checked for slope stability.

8.8.11 Delta clays and black cotton soils. In the Sirowal belt below the Kandi, where the water table is shallow and seepage comes out, the waterlogged and saline-sodic ground of the south-west (sub-area PB-F) where the October water table is within 3 m, the sodic patches of the old alluvium between Patiala, Sangrur and Mansa, the bet lands of the Sutlej, Beas, Ravi and Ghaggar, the clay beds of the beins, the silted beds of chhappars, tobas and dhabs, the Shivalik clays, the puddled paddy fields of the plains in the paddy season, and in expansive black cotton soils:

  • (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
  • (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.

Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Punjab precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Punjab RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.

No statewide map of hydrologic soil groups for Punjab was found, and no measured basic infiltration rates by soil group for the Kandi or the central plains; every infiltration design needs the tests of Clause 8.8.3. The only measured rates found are from the dry south-west, where double-ring tests on rainfed soils near Bathinda gave final intake rates of 0.26, 0.09 and 0.05 cm/min, about 156, 54 and 30 mm/h, on sand, loamy sand and sandy loam (Singh, Singh and Chaudhary, 1995): upper bounds on dry, recently cultivated soil, not design values. The State's ground falls into six broad kinds. Immediately south-west of the Shivalik hills, the Kandi belt, 10 to 15 km wide, is made of fans whose deposits grade "from boulders to clays", sloping at about 16 m per km and less to the west, with deep water levels; below it the Sirowal "imperceptibly merges with the alluvial plain", with a shallow water table and seepage (CGWB). The recent alluvium of the upper Ravi, Beas, Sutlej and Ghaggar, sandy loams and loams in the Doaba and around Ludhiana, is open, though puddled paddy fields behave as tight soil in season; calcareous alluvium covers the middle reaches, and old alluvium lies between the Sutlej and the Ghaggar, with saline and alkaline patches (CWC, Flood Estimation Report for subzone 1(e)); the bet lands of the rivers have seasonally high water tables; and the south-west has dune sands and loamy sands, with desert and grey-brown soils near the boundary (CWC; CGWB). This Manual's interim soil groups follow from these: Kandi boulder-gravel fans and choe beds A; the Shivalik slopes, of sandstone and clay, C or D; south-west dune sands and loamy sands A, or A/B on loamy sand, but D where the water table is within 1.5 m; the sandy loams and loams of the central plains and the Doaba B, behaving as C or D under ponded paddy; the old alluvium with kankar between Patiala, Sangrur and Mansa B or C, with sodic patches D; bet soils B, with a seasonally high water table; the Sirowal C or D; and made ground C unless tested, D if compacted. Groundwater runs to both extremes. In the assessment of 2024 the stage of groundwater extraction was 156.87%, and 115 of 153 assessment units were over-exploited, 4 critical, 12 semi-critical and 22 safe (CGWB); by district in 2020 the stage ranged from 301% in Sangrur, 257% in Jalandhar and 211% in Ludhiana to 53% in Pathankot and 43% in Sri Muktsar Sahib, and the water table fell by up to 36.15 m at Rajpura between 1984 and 2019 while it rose by up to 20.70 m at Talwara (CGWB and WRD). In June 2019 it lay deeper than 10 m over about 68% of the State and deeper than 30 m over about 21%, but within 5 m over about 5,723 km², mainly in the south-west, where "Water logging conditions exist in some parts" (CGWB and WRD); the waterlogged area itself is uncertain, with reported figures ranging from about 52,500 ha in 2009 to "around 2 lakh hectares" in Sri Muktsar Sahib, Ferozepur, Fazilka and Faridkot, part of it alongside the Rajasthan and Sirhind feeder canals (all as reported). The quality of the groundwater limits what recharge can do: of the samples of 2024, 32.6% had uranium above 30 ppb, 13.77% fluoride above 1.5 mg/L, 12.58% nitrate above 45 mg/L, 4.85% arsenic above 10 ppb and 6.72% an electrical conductivity above 3,000 µS/cm (CGWB); about 15 to 25% of the groundwater is saline or alkaline, in Sri Muktsar Sahib, Bathinda, Mansa and Sangrur, and "Groundwater at Shallow depth is largely contaminated caused by surface water pollution" (CGWB and WRD). The State recharges as well as draws: WRD reports 129 recharge schemes along its canals and 60 more, 410 check dams on rivers and nallahs and 33 Amrit Sarovar works (reply in O.A. 694/2023), and of the Kandi's rain "About 40% … gets wasted in floods" (WRD, Kandi Area Development). The Punjab Water Regulation and Development Authority regulates extraction under the Punjab Water Resources (Management and Regulation) Act, 2020, which lets it issue directions on "water conservation and groundwater recharge, including rain water harvesting" (s. 15(2)(ix)), and charges for groundwater by block and slab under its Directions of 2023, with credits for approved rainwater harvesting (Directions 2.7 and 4.7). The State therefore needs recharge in most places and must avoid it in others. Where the October water table is deeper than 10 m, recharge comes first, with pretreatment and a quality check; where it is within 3 m, in the waterlogged south-west, the Sirowal, the bet lands and the beds of chhappars and dhabs, no recharge or infiltration is credited, and storage, detention and drainage carry the design; in between, a check at the site decides (Clause 8.8.1). Everywhere, runoff from roads goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)), and water drawn back from a recharged aquifer for drinking should be tested for uranium, nitrate, fluoride, arsenic and salinity. Clause 8.8.9 has no effect in Punjab, which has no coast.

Infiltration trench: section with groundwater separation Infiltration trench: section, not to scale Seasonal high groundwater table (measured after the monsoon) Drinking-water well Sediment sump (pretreatment) Runoff in Observation well overflow clean washed aggregate (void ratio from test) geotextile on sides and top sand filter base ≥ 1.0 m Building foundation foundation setback well setback Test infiltration at the proposed base level. Design rate = measured rate ÷ safety factor. Empty within 72 h. Setback distances and test methods: Clauses 8.8.3 to 8.8.6. Road and parking runoff is never piped into a well. Sandy coastal soils: high rates, shallow groundwater. Laterite, hard rock: low rates. Delta clay: usually unsuitable.

Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.


8.9 Sewage cross-connections and dry-weather flow

8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.

8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.

8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Punjab Pollution Control Board (PPCB) and the drain owner.

8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the SW monsoon, and record:

  • (a) the outfalls with DWF;
  • (b) the estimated DWF rate; and
  • (c) the upstream sources found by tracing, CCTV, dye or smoke testing.

The results shall be published in the register of Clause 10.17.

8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:

  • (a) diverts the DWF to a sewer or a treatment plant;
  • (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
  • (c) has a screen ahead of the diversion; and
  • (d) is not a substitute for removing the source connections.

8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.

Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Punjab. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.

In Punjab the law keeps drainage and sewage apart, but the drains carry both. A "drainage work" under the Punjab Canal and Drainage Act, 2023 excludes the "removal of sewage from towns, villages or any other habitat" (s. 2(7)), so WRD's drains are not sewers in law; an absorption pit may have no outlet into "any sewer, storm water, drain or surface drain" (PUDBR 2021, r.45(8)(ii)); and the waste water of a basement is pumped into the sewer, not connected to it directly, "to avoid any risk of the sewerage or sludge heading back into the basement" (PMBBL 2018, cl. 4.23(viii)). The sections of the Punjab Municipal Corporation Act, 1976 and the Punjab Municipal Act, 1911 on drains and sewer connections were not read for this Manual [TBC]. In practice the large drains are wastewater channels. The Buddha Nallah at Ludhiana, a seasonal tributary of the Sutlej 47.55 km long that WRD lists among its drains, receives "A quantum of 700 MLD discharge of treated effluent", including that of three dyeing CETPs of 15, 40 and 50 MLD to which 211 of about 345 dyeing units are connected, and turns the Sutlej from Class B, at which it enters the State, to Class E below the confluence at Walipur (River Rejuvenation Committee, 28 October 2025); before the confluence in April 2024 its water had a BOD of 161 mg/l, a COD of 456 mg/l and TSS of 328 mg/l, against the general discharge standards of 30, 250 and 100 mg/l (CPCB, reply in O.A. 327/2025), so that much of what it carries is not treated. At Jalandhar the Kala Sanghian drain, which takes the treated effluent of the Leather Complex CETP of 5 MLD (State of Punjab, report in E.A. 35/2023), runs to the Chitti Bein and on to the Sutlej (as reported). In the walled city of Amritsar the road-side drains "are connected to the sewerage system typically at the road junctions, thus making the sewerage system as combined system" (Amritsar Smart City, bid of 2018); at Jalandhar "only about 5% of the city area is covered under the storm water network" and the rain "is largely discharged in to the sewer network" (Master Plan Jalandhar report); and at Bathinda the storm-water pumping stations are reported to be connected to the sewers (as reported). The State's 166 towns generated 2,212 MLD of sewage in September 2023, with a treatment gap of 326.58 MLD (State of Punjab, E.A. 35/2023). The polluted river stretches listed in 2023 were the Sutlej from Roopnagar to Harike and the Ghaggar from Sardulgarh to Mubarakpur, both Priority I, with the Kali Bein (Priority V) and others (PPCB, letter of 5 September 2023); in September 2025 the CPCB kept only two Priority I stretches in the State, the Ghaggar from Mubarakpur to Sardulgarh and the Sutlej from Ludhiana to Harike, and removed the Kali Bein, the Sirsa and the Swan from its list (PPCB, reply in O.A. 413/2025). In the villages the chhappar takes the village's sullage as well as its storm runoff, and the State's pond programme treats the sullage on the Seechewal and Thapar models (as reported; their specifications were not read); the CAG found that at the pond-based treatment works of Punnawal and Bhalwan, in Dhuri block, a choked screening chamber resulted in the "discharge of untreated wastewater into the drain" (Report No. 1 of 2026). This Manual therefore treats a chhappar as a combined sullage-and-storm basin: the drawings show both its sullage inflow and its storm overflow route; the sullage is intercepted, screened and treated ahead of the chhappar; and only the storm flow above the interceptor's capacity reaches the chhappar and passes over its overflow. A DWF interceptor with a screen is likewise placed, under Clause 8.9.5, ahead of every outfall that carries dry-weather flow to a chhappar, to a bein (the Kali, Chitti and Black Beins), to the Ghaggar or to the Buddha Nallah, until its sources are removed (set by this Manual). Clause 8.9.5(b) applies to every one of them in full: each is sized from the measured dry-weather flow, does not reduce the drain's capacity for the minor and major events, and sends the storm flow above its capacity on down the drain or over the chhappar's overflow, never to the treatment plant or back into the village.


8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens

8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:

  • (a) a GPT designed under Clause 8.7.10; and
  • (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.

8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:

  • (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
  • (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.

8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:

  • (a) be designed with 50% blockage for hydraulic capacity;
  • (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
  • (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
  • (d) be cleanable from a safe platform, with vehicle access.

8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.

Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Punjab waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.


8.11 Rainwater harvesting integration

8.11.1 RWH mandate continues. The rainwater harvesting required by the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021 (in municipal areas, PMBBL 2018 (as amended), cl. 10.1, for all buildings on plots of 100 m² or more and for group housing, public, commercial and industrial buildings of every plot size, with recharge for plots of more than 500 m² (cl. 10.5), complete capture of storm water in public open spaces of more than 500 m² (cl. 10.4), and inspection by the municipal Rainwater Harvesting Cell before a completion certificate or service connection is given (cl. 10.6); outside municipal limits and in the schemes of PUDA and the development authorities, PUDBR 2021 (as amended), r.40, for residential plotted and public or institutional buildings above 250 m², commercial, mixed-use and industrial buildings above 100 m² and group housing of every plot size, with a design certified by an engineer; and, under both, permeable materials for all open parking in group housing) continues to apply, subject to the limits of Clause 8.8.1 (Chapter 1). This Clause sets how RWH structures are counted under this Manual.

8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:

  • (a) harvesting: storage for use (sumps and tanks);
  • (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
  • (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).

8.11.3 Recharge structures.

  • (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
  • (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
  • (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.

8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:

  • (a) its infiltration rate has been tested under Clause 8.8.3;
  • (b) it empties within 72 hours at the design rate; and
  • (c) it has pretreatment.

A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).

8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every SW monsoon (JJAS) design storm (Chapter 4).

8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.

8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.

Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Punjab's two building instruments make rainwater harvesting mandatory on different thresholds, and neither sets a detention rule. In municipal areas, "All buildings having a plot size of 100 sq.m. or more, while submitting the building plans for sanction, shall mandatorily include the complete proposal of rainwater harvesting" (PMBBL 2018, cl. 10.1), with residential plots of 100 m² and above (where storage and reuse are emphasised) and group housing, public, commercial, mixed-use and industrial buildings of every plot size (Table 10.1); recharge is to be "made mandatory" for plots of more than 500 m² and for parks, parking, plazas and playgrounds (cl. 10.5); public open spaces of more than 500 m² are to provide for the "complete utilization and capture of storm water" (cl. 10.4); and each municipality is to constitute a Rainwater Harvesting Cell, inspect the structures "before issuing Completion Certificates or NOCs for service connections", and verify every building above 1,000 m² each year and a 10% random sample below it (cl. 10.6). Outside municipal limits and in the schemes of PUDA and the development authorities, PUDBR 2021 requires harvesting for residential plotted and public or institutional buildings "Above 250 sq.mt.", for commercial, mixed-use and industrial buildings "Above 100 Sq.mt." and for group housing of all plot sizes, with the design "prepared and certified by an Engineer dealing with civil work", industrial units "not to inject contaminated water into recharge structures", and recharge structures kept away from sewer lines, septic tanks, soak pits and landfill (r.40). Group housing under both instruments is to avoid concrete paving, "permeable materials are to be used [for] all open parking spaces", and its plans are to show the storm water drainage, the harvesting structure and the recharging well, Punjab's only permeable-paving rule. The thresholds therefore differ by instrument, and earlier ones differed again: 400 m² in a 2010 amendment of the PUDA rules and 500 square yards in 2013 (as reported), and "above 200 sq. yds." in a Lok Sabha reply (as quoted); this Manual cites the instrument with each number and never a single "Punjab threshold". Neither instrument sets a volume, a sizing method or a storage to be empty before a storm: PMBBL 2018 says only that rain "can be harvested to the extent of 55,000 liters per 100sq. meters area per year from rooftops" (cl. 10.1), a description of about 550 mm a year, not a design rule. WRD's own scheme for the roofs of government buildings sizes a 40 m injection well with a filter chamber for 900 m² of roof on an intensity of 40 mm/h ("Hourly Rainfall Intensity is typically 25 to 30 mm/hr … For safer side we assumed it to be 40 mm/hr") and runoff coefficients of 0.8 to 0.9 for roofs, 0.6 to 0.7 for paved areas and 0.1 to 0.2 for green areas (WRD, Proposal RWH); that is a recharge-structure figure, never a design storm for drains. Enforcement is reported to be weak, with MC Ludhiana "not serious about rainwater harvesting" (as reported). The Punjab Water Regulation and Development Authority rewards approved harvesting with water-conservation credits under its Directions of 2023 (2.7 and 4.7), but its charges fall on non-exempt users, mainly industry, not on households. Because Punjab's water table is deep in the centre and the Kandi and shallow in the south-west (Clause 8.8.1), the function of harvesting depends on where the building is: recharge is its main function where the October water table is deeper than 10 m, over most of the central plains, with the quality limits of Clause 8.8.1 (Clause 8.11.2(b)); in the waterlogged south-west, the Sirowal and the bet lands, where it is within 3 m, the instruments' recharge duty can be met only by storage for use, and recharge structures earn no credit under this Manual. RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a late-season storm, such as those of 24 September 1988 and 4–5 October 1955, arrives after weeks of rain, which is why it cannot be counted as detention.

Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.


8.12 Construction-stage erosion and sediment control

8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:

  • (a) the sequence of clearing, earthworks and stabilisation;
  • (b) the area exposed at each stage;
  • (c) the measures of Clause 8.12.3, with their locations and sizes;
  • (d) the protection of infiltration and retention areas (Chapter 10);
  • (e) stockpile, concrete washout and fuel storage locations; and
  • (f) the inspection and maintenance schedule.

8.12.2 Monsoon timing. Earthworks shall be planned so that:

  • (a) the area exposed during the SW monsoon (June to September) is as small as practicable;
  • (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 15 June; and
  • (c) any area exposed between 15 June and 15 October has sediment controls in place before it is cleared.

8.12.3 Measures.

  • (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
  • (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
  • (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
  • (d) Inlet protection at every existing drain inlet that receives runoff from the site.
  • (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
  • (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the SW monsoon.
  • (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
  • (h) Concrete washout in a lined pit, never into a drain.

8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).

8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.

8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).

Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Punjab's 2-year 24-hour depths are high and construction sites are commonly left exposed through the SW monsoon. The 2 ha division between traps and basins, the 15 June stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 15 June date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Punjab sediment takes the storage of the chhappars, the drains and, above all, the choes: the Kandi is "traversed by numerous small and big seasonal streams called choes and is prone to flashy floods" (WRD, Kandi Area Development), and the choes of Hoshiarpur district "originate from Shivalik slopes" and leave "thick deposits of sand and silt" where they reach the plains (District Environment Plan, Hoshiarpur), in the culverts, siphons and town drains that they cross (Clause 6.3.6). In the Kandi and on the Shivalik slopes the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel and never onto an unprotected slope; no sediment basin or trap is designed to infiltrate where Clause 8.8.1 bars infiltration, which includes the Sirowal; no spoil, sand or debris from a site is placed in a choe, rao, bein, nala, drain or chhappar or within its Zone 1; and in an area notified under the Punjab Land Preservation Act, 1900, clearing and quarrying are regulated by that Act before this Clause applies. The reason given above for the larger basin volume, that the 2-year 24-hour depths are high, holds in the Kandi and the north-east of the State, where the 50-year 24-hour depths of the CWC plates are about 255 to 320 mm and the annual normal reaches 1,106.1 mm at Gurdaspur; it holds less in the south-west, where the plates give about 150 to 180 mm and the normal is 388.6 mm at Ferozpur, and there the minimum of 250 m³ per hectare is likely to govern over the 2-year runoff, so the rule of Clause 8.12.3(c) is kept unchanged (set by this Manual).


8.13 Monitoring

8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:

  • (a) dry-weather sampling (Clause 8.9.4), at least once a year before the SW monsoon; and
  • (b) wet-weather sampling of at least three events each SW monsoon at a set of index outfalls.

8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.

8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).

8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.

8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.

Commentary. No Punjab programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.


8.14 Submittal requirements

Every drainage report under this chapter shall include:

  1. the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
  2. for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
  3. the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
  4. for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
  5. the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
  6. the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
  7. the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
  8. the ESC plan (Clause 8.12).

8.15 Review and update

8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.


References (chapter)

Annexes and forms

Annex / Form Content
8A 3-month ARI 24-hour depth and IDF by zone
8B Redevelopment LoS table and treatment-train composite VR
8C Punjab BMP performance calibration
8D BMP design sheets, media specification, plant lists
8E Erosion and sediment control standard details
Form 8-1 Water Quality Sheet
Form 8-2 Infiltration Test Record