Draft v1.0 prepared by NEER. Not adopted by the Government of Punjab or the Chandigarh Administration, and has no legal force. About this draft

Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Punjab. Punjab is landlocked: it has no coast, no tide and no Coastal Regulation Zone. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Punjab: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Punjab the receiving water is one of four kinds: a river, the Sutlej, the Beas, the Ravi or the Ghaggar, reached through a sluice or flap gate in a dhussi bandh or through a pumping station, whose level is set by the releases of the dams and headworks upstream and, at the border, by reaches outside the State's control; a drain of WRD, such as the Buddha Nallah, the Tung Dhab and Hudiara drains or a notified drain, or a sector or trunk drain that leads to one; a choe, rao or nadi of the Kandi and the Shivalik fringe, ungauged and sand-laden; or a depression or chhappar that may have no outlet at all, or may be emptied only by pumping, as in the waterlogged south-west; and the canals cross all of them. In Punjab:

  • (a) the tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall;
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river, a receiving drain, a choe, a canal or a pumped sump, with the river locks of Clause 5.8.5(a) to (e), the drain lock of Clause 5.8.5(i) and the closures of Clause 5.8.5(f) and (g) in place of the tidal lock windows; and
  • (d) where there is no defined outfall, Clause 5.8.5(g) applies: the outfall is treated as closed for the whole storm and after it (Clause 5.9.4), and the downstream analysis ends at the storage or at the depression that receives it.

Commentary. The drains of Punjab's towns fail in places that site design does not see, and in four different ways. The first is the river. The Sutlej, the Beas and the Ravi are held between dhussi bandhs, about 1,800 km of them (WRD), below the Bhakra, Pong and Ranjit Sagar dams and the Ropar, Harike, Hussainiwala and Madhopur headworks, and the towns along them drain through the bandhs. In 2025 the Sutlej passed 3,35,030 cusecs at Harike and the Madhopur headworks on the Ravi lost gates (as reported); in 2023 the Ghaggar rose to 754.2 ft on the Khanauri gauge and breached its banks at Moonak, Khanauri and Makraud Sahib (as reported); and no river in the State has a CWC gauge (SANDRP, 2018 and 2022, as reported), so the only levels are those of WRD's and the district gauges, in feet, read in the press. The second is the receiving drain. Ludhiana drains to the Sutlej through the Buddha Nallah, 47.55 km long and rebuilt on a 2-year return period (PMIDC, 2020), which carries about 700 MLD of wastewater before it reaches the river at Walipur Kalan (River Rejuvenation Committee, 2025); Amritsar drains through the Tung Dhab and City Outfall drains of WRD to the Hudiara drain and on into Pakistan (Amritsar Smart City bid, 2018); and no design discharge is stated for any of these drains. The third is the choe. The Kandi below the Shivaliks is "traversed by numerous small and big seasonal streams called choes and is prone to flashy floods" (WRD, Kandi Area Development), Hoshiarpur alone has "more than 100 choes" that leave "thick deposits of sand and silt" (District Environment Plan, Hoshiarpur), and the choes of SAS Nagar carry the runoff of Chandigarh and the Shivaliks to the Ghaggar. The fourth is the land with nowhere to drain to. In the south-west the canals and feeders cut across the land's drainage, the water table stands near the surface, and low villages drain only by pumping to the drains of WRD. The outfalls also belong to one body while the drains above them belong to others: the rivers, choes, notified drains and dhussi bandhs are held by WRD, the canals by WRD's canal wing, the dams on the Sutlej and the Beas by BBMB, the sector drains by PUDA or a development authority, the street drains by the Municipal Corporations, Councils and Nagar Panchayats and the chhappars by the Gram Panchayats, and no rule divides them (Chapter 6, Clause 6.9). A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, if the river it drains to stands above its outfall for days, if its outfall is buried in choe sand, or if there is nowhere for the water to go. This chapter makes all four failure modes part of the design. Punjab has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the Buddha Nallah, the Tung Dhab and City Outfall drains and the Hudiara drain, the Kala Sanghian drain and the Chitti and Kali Beins, the Sakki/Kiran, Patti and Kasur nallahs, the Chand Bhan drain and its diversion drain, every choe, rao and nadi, every drain notified under section 38 of the Punjab Canal and Drainage Act 2023 or section 55 of the Northern India Canal and Drainage Act 1873, any drain of WRD, and any drain maintained by PUDA, GMADA, GLADA or another development authority, a Municipal Corporation, a Municipal Council or a Nagar Panchayat with an internal width of 1.0 m or more, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, chhappar or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or chhappar under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, MC Ludhiana, PSDMA or WRD; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next chhappar or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Punjab. In Ludhiana, where the city's drains reach the Sutlej through the Buddha Nallah, which runs 47.55 km from the confluence of the Kum Link and Neelon drains near Ghumait to the river at Walipur Kalan (PMIDC, 2020), in Amritsar, where the city's storm water travels by the Tung Dhab and City Outfall drains to the Hudiara drain and on into Pakistan (Amritsar Smart City bid, 2018), and in SAS Nagar, where the N-Choe leaves Chandigarh and runs through the sectors of Mohali and the Pachisdhara drain to the Ghaggar at Sarala Khurd, about 70 km in all (CPCB, 2024), the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the river towns and the waterlogged south-west of Punjab: the Sutlej at Harike was reported at 2.73 lakh cusecs on 26 August 2025 and at 3,35,030 cusecs on 3 September 2025, above the 3 lakh cusec band that WRD calls "High Flood" (as reported); the Ghaggar at Khanauri crossed its danger mark on 13 July 2023 and stood at 754.2 ft on 15 July, with breaches at Moonak, Khanauri and Makraud Sahib (as reported); and in the south-west, where the water table stands within 1.5 to 5 m of the surface over about 15% of the State (ground water resource assessment of 2020, CGWB and WRD), low villages drain only by pumping and by pipelines to the drains of WRD. Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Punjab, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, a development authority or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Punjab has no coast, and the surge term does not arise in the State.

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Punjab, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • the Sutlej from the Bhakra dam past Nangal, Anandpur Sahib and the Ropar headworks at Rupnagar, along Ludhiana, Phillaur and Shahkot to the Harike headworks, and on past Ferozepur to the Hussainiwala headworks and the border, with the releases of Bhakra, behind the dhussi bandhs, and the drains that lead to it, among them the Buddha Nallah at Walipur Kalan and the Kala Sanghian drain and Chitti Bein of Jalandhar, and the Swan below Anandpur Sahib (Clauses 5.8.3 and 5.8.5(a), (c) and (i));
  • the Beas from the Pong dam past Talwara and Mukerian to Harike, with the releases of Pong, and the Kali Bein that joins it (Clauses 5.8.3 and 5.8.5(c) and (i));
  • the Ravi below the Ranjit Sagar and Shahpur Kandi dams and the Madhopur headworks, at Pathankot, Gurdaspur and Dera Baba Nanak to the border, with the Chakki Khad at Pathankot (Clauses 5.8.3 and 5.8.5(c) and (e));
  • the Ghaggar from the boundary with Haryana at Mubarakpur and Bhankharpur, along Dera Bassi and Zirakpur in SAS Nagar district, past Patiala and Samana districts to Moonak, Khanauri and Makraud Sahib and on to Sardulgarh, for which no CWC gauge exists, with the choes and nadis that reach it from SAS Nagar and Chandigarh, among them the N-Choe, the Sukhna Choe, the Patiali-ki-Rao and the Jayanti Devi ki Rao, and the Badi and Chhoti Nadi of Patiala (Clause 5.8.5(b) and (e));
  • the Tung Dhab and City Outfall drains of Amritsar and the Hudiara drain, which enters Pakistan near village Lalo (Clause 5.8.5(d));
  • the choes of the Kandi, among them those of Hoshiarpur, Garhshankar and Balachaur, the Sirhind choe, the Lakhnaur choe at SAS Nagar and the other choes, raos and nadis of sub-area PB-A (Clause 5.8.5(e));
  • the Sakki/Kiran, Patti and Kasur nallahs, the Chand Bhan drain and its diversion drain, and the other drains of WRD and those notified under section 38 of the Punjab Canal and Drainage Act 2023 or section 55 of the 1873 Act (Clause 5.8.5(i));
  • the pumped drains and depressions of the south-west, at Bathinda, Sri Muktsar Sahib, Fazilka, Abohar and Faridkot, and the chhappars that receive storm water (Clause 5.8.5(g));
  • the Sirhind canal, the Bhakra Main Line, the Sirhind and Rajasthan feeders, the SYL canal and the Narwana branch, and every siphon or culvert that carries a drain or choe under a canal (Clause 5.8.5(f)); and
  • elsewhere: any river or WRD channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Bhakra dam on the Sutlej and the Pong dam on the Beas, operated by BBMB, the Ranjit Sagar and Shahpur Kandi dams on the Ravi, the Ropar, Harike and Hussainiwala headworks on the Sutlej and the Madhopur headworks on the Ravi, and the low dams of the Kandi), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 Outfalls to the Sutlej, the Ghaggar, the Ravi and the Beas, the Hudiara drain, choes and nallahs, canals, the south-west depressions and the drains of WRD. In Punjab no river level is published by CWC: CWC has no flood-forecasting, level-monitoring or inflow site in the State (SANDRP, 2018 and 2022, as reported), so no level in this clause is a CWC level, and no "CWC danger level" exists for any Punjab river. The levels below are readings of the gauges of WRD at its headworks, of BBMB at its dams, or of district gauges, mostly in feet and mostly known from the press. Every level used under this clause shall name its gauge, its unit (feet or metres) and its gauge zero, and shall be tied to the project datum and a Survey of India benchmark by levelling, with WRD's or BBMB's confirmation of the reading; the gauge zeros were not found during research [TBC], and a level in feet shall not be converted to metres above mean sea level until its datum is confirmed (set by this Manual).

  • (a) Sutlej-front towns. For an outfall to the Sutlej, directly, through a sluice or flap gate in a dhussi bandh (flood embankment), through a pumping station, or through a drain that discharges in one of those ways, at Rupnagar, Ludhiana, Phillaur, Shahkot, Ferozepur or elsewhere between the Ropar headworks and the Hussainiwala headworks:
    • Operator and levels. The designer shall identify the body that operates each gate, sluice and pumping station, and obtain the sill of each gate, the crest of the dhussi bandh, the installed pumping capacity and the operating levels, including the river level at which each gate is closed.
    • Design river level (1% AEP). The river level of Clause 5.8.2 at the outfall for the major-system cases (Clause 5.8.4(b)) shall be the higher of: (i) the 1% AEP level from a hydraulic model under Clause 5.8.2(b), carrying the 100-year flood of a flood-frequency study by Gumbel's method of the gauge record, which is the method WRD uses for its floodplain zoning (Chief Engineer, Drainage-cum-Mining & Geology, to CWC, 2 May 2024), and, on the Ferozepur–Tarn Taran reach, not less than 5,34,441 cusecs, the 100-year discharge on which WRD based the Sutlej floodplain zone notified there on 4 March 2024 (WRD affidavit in NGT OA 303/2023); and (ii) the highest flood level surveyed at the outfall from the flood marks of 2019, 2023 and 2025 and from the records of WRD, the local body or the Deputy Commissioner, plus 0.5 m (set by this Manual). The 0.5 m is added to the marks because the floods that left them breached the dhussi bandhs upstream, and a mark left by a flood that spilled out of the river is lower than the level the same flood would have reached between intact embankments.
    • 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the headworks record, and shall be not less than the level for a flow of 3,00,000 cusecs at Harike, routed to the outfall: WRD classes a discharge above 3,00,000 cusecs at Harike as "High Flood" (as reported), and the river passed 3,35,030 cusecs at Harike on 3 September 2025, at a reading of 686.50 ft on the upstream gauge (as reported). On the reach above Harike, the 10% AEP level shall be not less than the level of the highest flow recorded at the Ropar headworks, about 2.4 lakh cusecs in 1988 (as reported), routed down the river with the flows of the tributaries that joined it in the same event, until a frequency analysis of the headworks record is accepted (set by this Manual) [TBC].
    • Tailwater behind the bandh. The tailwater at the outfall shall be the higher of the river level beyond the gate or bandh and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of its whole catchment, its storage as surveyed in its present condition, net of silt, sand, encroachment and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump, with gravity discharge through the gate only while the river is lower than the level behind it (set by this Manual). Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5). Portable dewatering pumps brought in for an event, pumps lent for a flood, and capacity sanctioned or proposed but not commissioned shall not be counted.
    • River lock. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, or above the level at which its gate is closed if that is lower, taken from the river model or from the stage record of the nearest headworks gauge in the flood that set the highest recorded level or in a comparable flood, and not less than 7 days (168 hours) on the Sutlej below the Bhakra dam (set by this Manual). The lock covers the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4), and the drawdown of Clause 5.10.5 is met by pumping until the lock ends. A shorter lock may be used only where the outfall invert is above the design river level of this item, or where a gauge analysis under Clause 5.10.6, including the releases of item (c), shows it and the Authority approves it.
    • Release notices. BBMB's notices of releases from the Bhakra and Pong dams, and WRD's flood warnings for the reach, give hours to days of warning, which the operation and maintenance plan of Chapter 10 shall use as the trigger to close the gates on the dhussi-bandh outfalls and to bring standby pumps into service. They give no warning of a local storm, and the design shall not assume that a gate is opened, a pump started or a drain lowered before the storm on the strength of a notice.
    • The Buddha Nallah. For an outfall to the Buddha Nallah, or to a drain that ends in it, the level of the Nallah shall be computed under item (i) for the design AEP of the outfall, with all the storm water it receives and its dry-weather flow (Clause 8.9), and with its downstream boundary at the level of the Sutlej at Walipur Kalan, where it joins the river (PMIDC, 2020), from this item: the 1% AEP Sutlej level for the major-system cases and the 10% AEP level for the others. The Nallah's rejuvenation design, on a 2-year return period "with reduced run-off within the city reach due to active storm water detention" (PMIDC feasibility report, January 2020), is a project choice and not a capacity this Manual accepts as a bound: the outfall shall be checked against the minor and major storms of Table 6.1 with the Sutlej at Walipur Kalan as above, and no detention that the project assumes upstream shall be counted unless it is built, maintained and documented (Clause 5.4.4).
    • Gate failure and breach. Floor levels and pumped outfalls behind a gate or dhussi bandh shall also be checked for the failure of the gate and for a breach of the bandh, with the land and drains behind it filled to the river level beyond it (item (c) gives the 2025 stress case).
  • (b) Ghaggar towns. For an outfall to the Ghaggar or to a drain that ends in it, at SAS Nagar, Zirakpur and Dera Bassi, Patiala, Samana, Moonak, Khanauri, Makraud Sahib, Sardulgarh or elsewhere, the rules of item (a) on operators, the tailwater behind a bandh, release notices, gate failure and breach apply, and:
    • Design river level (1% AEP). Until WRD gives the gauge zero, the danger level and the highest flood level for each gauge on the river [TBC], the design river level shall be the higher of: (i) the 1% AEP level from a hydraulic model under Clause 5.8.2(b), whose inflow at the outfall shall be not less than 2.40 m³/s per km² of the catchment above it, the 50-year flood of the Ghaggar at MoST road bridge No. 2 in the worked example of the CWC Flood Estimation Report for subzone 1(e) (2,706 m³/s from 1,126 km²), used here as a yardstick for catchments of the same order of size and not as a 1% AEP flood; and (ii) the highest flood level surveyed at the outfall from the flood marks of July 2023 and of 2025, plus 0.5 m, transferred under item (a). At Khanauri, on the boundary with Haryana, the river stood at 753 ft on 13 July 2023, described as "the highest-ever so far", and at 754.2 ft on 15 July 2023, about 6 ft above its danger mark (as reported); the design level there shall be not less than 754.2 ft on that gauge plus 0.5 m. The danger mark at Khanauri is reported as 748 ft, and also as 752 ft and 753 ft (as reported): the sources conflict, and none is cited here as the danger level.
    • 10% AEP level. For the cases of Clause 5.8.4(a), the level shall be not less than the highest of the danger marks reported for the nearest gauge, transferred: 753 ft at Khanauri, the highest of the three reported values, until WRD confirms one; about 16 ft at Sarala Kalan in Patiala district, reported to correspond to 27,195.94 cusecs; and 20 ft at the Sardulgarh bridge (all as reported). Where no danger mark has been found, as at Bhankharpur and on the choes, the 10% AEP case shall use the design river level of this item until a frequency analysis is accepted (all set by this Manual).
    • Capacity. No reach of the Ghaggar shall be assumed to carry more than it has carried without breaching. At Bhankharpur the river is reported to have carried 1.22 lakh cusecs, against a stated "full capacity" of 70,000 cusecs (both as reported), and below Khanauri the channel is reported to narrow from 588 ft wide to 190 ft between Makraud Sahib and Kadail (as reported); the widening and embankment works on the river recommended by CWPRS (Case 2-D, RD 14,000 to 182,000 m; WRD) shall not be counted until they are complete.
    • The Haryana reach. Below Khanauri the Ghaggar runs through Haryana, past Guhla and on to the Ottu weir, and above Mubarakpur it comes from Panchkula, where Haryana has notified a floodplain zone on a 100-year flood of 2,933.45 m³/s (Haryana edition of this Manual, Clause 5.8.5(b)). The level at an outfall near the boundary therefore cannot be set by a Punjab body alone: the designer shall obtain it through WRD, which may coordinate it with the Irrigation and Water Resources Department of Haryana, and shall state on Form 5-1 the level used and its source; until a level is agreed, the level of this item governs (set by this Manual).
    • River lock. The single lock of item (a) applies, not less than 7 days on the Ghaggar below the Patiala district boundary, at Samana, Moonak, Khanauri, Makraud Sahib and Sardulgarh, and not less than 72 hours on the Ghaggar at and above Bhankharpur, in SAS Nagar, Zirakpur and Dera Bassi, and on its choes (set by this Manual).
  • (c) Ravi and Beas towns, and rivers below dams and headworks. For an outfall to the Ravi, at Pathankot, Gurdaspur or Dera Baba Nanak, to the Beas, at Talwara, Mukerian or elsewhere above Harike, or to the Sutlej between the Bhakra dam and the Ropar headworks, at Nangal and Anandpur Sahib, the rules of item (a) apply, with the river lock of not less than 7 days on the Ravi below the Madhopur headworks, on the Beas below the Pong dam and on the Sutlej below the Bhakra dam, at Nangal, Anandpur Sahib and Rupnagar, and of 72 hours on the Chakki Khad and the Swan (set by this Manual), and:
    • Dam-spill tailwater. In addition to the cases of Clause 5.8.4, the site design storm (each AEP required) shall be run with the river at the level that results from the largest recorded release of the dam or headworks above, routed to the outfall, with the flow of the catchment below it as it occurred in the same event, until the operator publishes an operating rule that bounds the release [TBC] (set by this Manual). The largest releases found during research, all as reported, are: from Pong, about 1.40 to 1.50 lakh cusecs over the days after the record inflow of 7.3 lakh cusecs on 14 August 2023, BBMB stating that the dam "has never released beyond 1.49 lakh cusecs"; below Bhakra, no release record was found [TBC], and the largest flow found is about 2.4 lakh cusecs at the Ropar headworks in 1988, most of it reported to come from streams below the dam, which applies at Ropar and below until BBMB gives the record; and from Ranjit Sagar in August 2025, between 77,027 cusecs and 1.01 lakh cusecs in one set of reports and 2.12 to 2.21 lakh cusecs in another, which conflict. Where two releases are reported for the same event, the larger applies until the operator gives the record (set by this Manual).
    • Reservoir and pond levels. For an outfall to the reservoir or pond of a dam or headworks, the tailwater shall be the higher of its highest recorded level and its highest stated limit, plus 0.5 m, and the outfall shall be treated as closed for the whole storm wherever its invert is below that level: for Ranjit Sagar, the full reservoir level of 527.91 m, which is also reported as 1,731 ft (527.61 m at 0.3048 m to the foot, so the two figures do not agree), the higher governing; for Shahpur Kandi, its maximum of 405 m; and for Pong, whose full reservoir level is 1,390 ft, a "permissible limit of 1,394 feet" and a "technical limit up to 1,410 feet" were both reported in 2025 against a recorded level of 1,399.65 ft on 15 August 2023 (all as reported), so 1,410 ft governs (all set by this Manual) [TBC]. The datum of each level is to be confirmed with the operator [TBC].
    • Madhopur stress case. On 27 August 2025 gates of the Madhopur headworks on the Ravi jammed, and on 28 August a gate was washed away, under a flow described by the State as "less than 2 lakh cusec", with the river "just 2 feet below" the level of the floods of 1988, and the dhussi bandh then breached at three places in the Ajnala and Ramdass areas of Amritsar district and near Dera Baba Nanak (as reported). Every outfall, pumping station and floor level on the Ravi below Madhopur, and on the drains and canals that the headworks commands, shall also be checked for that event: the river at the 2025 flow with the headworks gates failed open and no regulation at the headworks, and a breach of the bandh under item (a). The check is a stress case: where it floods a building or disables a pumping station that the design cases do not, the designer shall report it on Form 5-1 and state the measures taken (set by this Manual).
    • No early opening. No dam, headworks or barrage gate shall be assumed to open earlier or wider than the operator's records show, and a release shall be placed before, during and after the site storm; the travel time of a release from the dam to the outfall may be used to place it, but not to lower it. A river level shall not be reduced on the ground that the flood comes from rain that falls outside the town, outside the State or above a dam.
  • (d) Amritsar, the Tung Dhab and City Outfall drains, and the Hudiara drain. For an outfall that reaches the Tung Dhab drain or the City Outfall drain of Amritsar, which are maintained by WRD's drainage division and carry the city's storm water to the Hudiara drain (Amritsar Smart City bid 07/ASCL/2018-19, 2018), the Hudiara drain entering Pakistan at RD-138 near village Lalo (as reported):
    • the rules of item (i) apply to both drains;
    • the downstream boundary of the model shall be the level at the junction of the Tung Dhab and Hudiara drains, the higher of the level computed with the Hudiara drain running full at the border and the highest flood level surveyed at the junction plus 0.5 m (set by this Manual). The level of the Hudiara drain beyond the border, and of the river it joins there, is outside the control of any Indian body, and no record of it was found [TBC]; no lowering of it shall be assumed;
    • the river lock of item (a), not less than 7 days, applies to an outfall to the Hudiara drain and to every outfall whose drain is backed up by it (set by this Manual).
  • (e) Choes, raos, nadis and nallahs. For an outfall to a choe, rao, nadi or nallah, such as the choes of Hoshiarpur and the Kandi, the N-Choe, the Patiali-ki-Rao, the Sukhna Choe, the Jayanti Devi ki Rao and the Lakhnaur choe in and around SAS Nagar, the Badi and Chhoti Nadi of Patiala, the Sirhind choe, the Swan and the Chakki Khad, none of which has a gauge whose level was found:
    • the level at the outfall shall be the higher of the 1% AEP level of a hydraulic study of the choe under Clause 5.8.2(b), with the design flow of Clause 2.3.6(i) multiplied by the bulking factor of Clause 6.3.6(b) and the crossings below the outfall blocked under Clause 6.3.6(c), and the highest flood level surveyed at the outfall from the flood marks of 2023 and 2025 and from the records of WRD, the local body or the Deputy Commissioner, plus 0.5 m, with the level of the river or drain the choe ends in under items (a), (b) or (i) as its downstream boundary (set by this Manual);
    • the outfall invert shall be at least 0.5 m above the highest bed level surveyed within 50 m downstream, because a choe's bed rises and falls with the sand each flood brings and leaves, and its foundation shall be below the scour depth of Chapter 9 (Clause 9.6); no outfall structure shall stand in the active channel of the choe (Clause 6.3.6(f));
    • the outfall-closed check applies with a lock of not less than 72 hours, or the lock of the river the choe ends in, where the outfall is closed by the river (set by this Manual);
    • a choe notified under section 38 of the Punjab Canal and Drainage Act 2023, or under section 55 of the Northern India Canal and Drainage Act 1873 before it, such as the Patiala ki Rao in Kharar tehsil (notification of 4 March 2013), is a drainage-work within the notified limits, and item (h) applies to any structure in it.
  • (f) Canals: a barrier, not a receiving system. A canal, branch, feeder, distributary, minor, kassi or watercourse of WRD carries supply water and is not a drainage outfall. Storm water shall not be discharged to any of them without the written consent of WRD; where WRD consents, the tailwater is the higher of the channel's full supply level and its level in the coincident case of Clause 5.8.4, the discharge shall not exceed the rate the consent allows, and the outfall shall have a flap gate (Clause 5.11) where that level is above the outfall invert (set by this Manual). No procedure for WRD's consent, and no policy of WRD on canal escapes taking storm water, was found during research [TBC]. In addition:
    • Crossings as controls. Every siphon, aqueduct, culvert and super-passage that carries a choe, nallah or drain under or over a canal, and every canal bank across the line of the drainage, shall be modelled as a control on the upstream flood level, with its waterway as surveyed in its present condition, net of silt, and the blockage of Clause 6.12.4 (or of Clause 6.3.6(c) in sub-area PB-A); the canal bank shall be taken as a weir only at its surveyed crest and only where WRD confirms that the bank may be overtopped. Examples are the siphon that carries the Sirhind choe under the Bhakra Main Line canal (WRD lists the lining of the choe from the "BML Syphon D/s"), the siphon of the Hansi–Butana canal on the Ghaggar, blamed for ponding at Samana, and the SYL canal and the Narwana branch, whose breaches flooded Rajpura in 2023 (as reported).
    • Breach. Where water ponds against a canal bank in the design case, floor levels and pumped outfalls on the other side shall also be checked for a breach of the bank, with the land behind it filled to the ponded level.
    • Feeders in the south-west. The Sirhind and Rajasthan feeders and the other canals of the south-west cut across the natural drainage of the land and their seepage feeds its waterlogging (as reported); no cross-drainage capacity shall be assumed under them that is not surveyed, and item (g) applies to the land behind them.
  • (g) South-west depressions, pumped outfalls and catchments with no outfall. In sub-area PB-F of Annex 2A, and wherever a site or the catchment it drains to has no defined outfall to a river, a drain or a waterbody that carries water away from it, or reaches one only by pumping:
    • No outfall. There is no receiving water and no tailwater. The outfall is treated as closed for the whole storm and after it (Clause 5.9.4): the storage shall hold, below the level of its overflow, the runoff volume of the 1% AEP 72-hour design storm of Clause 2.9.2, with the climate factor of Clause 2.8, from the whole area draining to it, computed by Clause 3.8 for the post-development condition, and shall be emptied only by infiltration at the verified rate of Clause 4.4.3 (where Clause 4.11 allows infiltration), by evaporation or by reuse, within 7 days of the end of the 10% AEP 72-hour storm, with no gravity or pumped discharge credited to a drain, nallah or road (set by this Manual).
    • Shared depressions. Where the site drains to a public depression, chhappar or low ground that also receives other land, the downstream analysis of Clauses 5.3 to 5.5 shall end there and report its maximum water level in the 1% AEP 72-hour storm, with and without the project; it shall start the storm at the level that the 10% AEP 72-hour storm leaves in it 7 days after that storm ends, or higher where its flood marks or the records of the local body, the Gram Panchayat or the Deputy Commissioner show it, and a chhappar that receives sullage shall start full (set by this Manual). The overflow path shall be traced to where it ends, within the limits of Table 6.3, and shall not end on a neighbour's land or in another catchment; a pump or pipe that moves the water onto a road, a neighbour's land or another catchment is not an outfall.
    • Pumped outfalls. Where a town's or village's drains reach a WRD drain only by pumping, as WRD's pumped drainage and its RCC pipelines from low-lying villages do in the south-west (WRD), the tailwater of the drain or sump shall be its routed level under item (a), with the permanent pumps less the largest one and no portable pumps, with the receiving drain at its level under item (i), and with pumping credited only at the rate that WRD's consent allows while the receiving drain is at that level; where the consent provides for pumping to stop when the receiving drain is full, no pumping shall be credited for that period (set by this Manual).
    • No infiltration where the water table is high. Where the October water table is within 3 m of the surface, no infiltration shall be credited in the routing, and the ground and any storage shall be taken as saturated, with the design groundwater level at ground level (Clauses 4.11 and 4.12.1); low ground, fields and depressions shall not be credited as storage unless their owner and the local body have agreed in writing to receive the water and the depth and duration of ponding on them are reported.
  • (h) WRD consent, section 38 limits, and court and plan lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of a river or choe, or in a drain, dhussi bandh or canal of WRD, without the written consent of WRD; WRD has stated that no notified drain may be realigned "without prior permission/NOC from competent authority of Water Resources Department" (report of the Executive Engineer, Drainage-cum-Mining & Geology, SAS Nagar, in NGT OA 279/2024). Within the limits of a notification under section 38 of the Punjab Canal and Drainage Act 2023 (Punjab Act 11 of 2023), or under section 55 of the Northern India Canal and Drainage Act 1873 for a notification issued before the 2023 Act came into force, the notified reach "shall be held to be a drainage-work", the Divisional Canal Officer may have an obstruction removed (s.39), and to construct or alter a drainage work is an offence (s.52); an outfall there shall not be built without WRD's written permission. WRD reports 393 of 869 drains, choes and rivers notified under section 55 (WRD website), and the press 514 of 935 under the 2023 Act (as reported); no list or notification text giving widths was found [TBC], and the designer shall state whether the outfall lies within notified limits. The designer shall also check the outfall against the lines that bind at the time of design (Chapter 7): the Sutlej floodplain zone in Ferozepur and Tarn Taran districts (notification of 4 March 2024), the land between the embankments; the Patiala ki Rao, where the High Court has had pillars fixed 200 ft apart in Chandigarh and the same is pending in Punjab (Local Commissioner's report of 8 January 2024 in CWP 5901/2017), a court-monitored line for that choe only; and the lines proposed for the Chitti Bein and the Black Bein in the Master Plan Jalandhar report, which are plan proposals whose notified status was not seen. The NoC of the drainage wing for projects "within the 150-metre radius" of a water body was announced by the Water Resources Minister on 20 September 2023 (as reported); no order was found, and it is not applied in this Manual [TBC]. Whether a drain outfall is permitted within each line is to be confirmed with the authority concerned before design [TBC].
  • (i) Receiving drains of WRD and of other bodies. For an outfall to a drain of WRD, such as the Buddha Nallah, the Tung Dhab, City Outfall and Hudiara drains, the Kala Sanghian drain and the Chitti and Kali Beins, the Sakki/Kiran, Patti and Kasur nallahs and the Chand Bhan drain, to a drain notified under section 38 (or section 55), to a sector or trunk drain of PUDA, GMADA, GLADA or another development authority or of a Municipal Corporation, Municipal Council or Nagar Panchayat, or to a drain that ends in any of them:
    • Consent. Storm water shall not be discharged to a drain of WRD without the written consent of WRD, or to another body's drain without the written consent of that body. The discharge shall not exceed the rate the consent allows.
    • Design water level. The tailwater is the higher of the drain's design water level as WRD or the owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water and dry-weather flow it receives, including the drains of other bodies, with its downstream boundary at the level of the river, drain or depression it ends in under items (a) to (g). No design discharge or design basis was found for any WRD drain [TBC]; until one is published for a drain, the computed level governs.
    • Present condition and capacity. The drain shall be taken in its present condition, net of silt, encroachment, solid waste and obstruction by crossing services and culverts, with its narrowest section as surveyed. Where the owner's records give different capacities or widths for the same reach, the lowest applies until the owner confirms one in writing; on the Buddha Nallah, where a road is alleged before the NGT to have cut the channel's width "from 58 feet to 35 feet" (OA 327/2025), the width as surveyed governs. A widening, lining, remodelling or new drain that has been proposed but not completed, including the works of the Buddha Nallah rejuvenation project until each reach is commissioned, shall not be counted (set by this Manual).
    • Drain lock. Where the drain is at or above its design water level, or at bank-full, in the coincident case, the outfall-closed check of Clause 5.10 applies with a single lock for as long as the drain stays above the outfall invert, taken from the drain model and not less than 72 hours, covering the whole of the 48- and 72-hour storms of Clause 5.10.2; where the drain is itself backed up by a river under items (a) to (d), the lock is the river lock of that item (set by this Manual).
    • Flap gate. The outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.
    • Sewage. Many of these drains carry sewage and industrial effluent: the Buddha Nallah about 700 MLD (River Rejuvenation Committee, 2025, as reported to the NGT). The Punjab Canal and Drainage Act 2023 excludes from a "drainage work" the "removal of sewage from towns, villages or any other habitat" (s.2(7)); the interception of dry-weather flow is the subject of Clause 8.9, not of this clause, but the dry-weather flow is part of the flow that sets the drain's level.

No pump, gate, sluice, regulator, headworks or dam operation that helps drainage, such as pumping a drain down before a storm, lowering a chhappar before a storm, closing a gate late or opening dam or headworks gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain or the river (Clause 5.12.3). Pumping shall not be used to move water out of a catchment with no outfall (item (g)).

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Punjab's rivers break that assumption, because the monsoon spells that fill them fall on the Shivaliks, on the dam catchments and on the towns of the plains together. In the 24 hours to 08:30 on 9 July 2023 Nangal recorded 28 cm, and in the 24 hours to 08:30 on 10 July Ropar 35 cm (IMD press releases); Chandigarh recorded 302.2 mm on 9 July (IMD); and the Sutlej passed 1.79 lakh cusecs at the Ropar headworks and the Ghaggar rose to its highest-ever reading at Khanauri in the same week (as reported). On 24 September 1988 Ludhiana PAU recorded 338.0 mm and Kapurthala 284.2 mm in a day (IMD) while the Sutlej passed about 2.4 lakh cusecs at Ropar and the Bhakra gates were opened (as reported). In August 2025 Pong, Bhakra and Ranjit Sagar were all releasing while the rain went on over the plains, and the towns of SAS Nagar, Ludhiana, Jalandhar and Amritsar flooded in the first days of September (as reported). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the dams and headworks above the State's towns, on which no operating rule or release record was obtained during research [TBC], so every figure below is a level or release reported in the press. Bhakra (Gobind Sagar), operated by BBMB on the Sutlej, has a permissible level of 1,680 ft, reduced from 1,685 ft after the floods of 1988, and a "technical limit up to 1,690 feet"; its spillway capacity is reported as "four lakh cusecs" and also as 8,212 m³/s, about 2.9 lakh cusecs, which conflict; in 1988 its gates were opened by 22 ft in one report and 20 ft in another, and the Sutlej passed about 2.4 lakh cusecs at the Ropar headworks, most of it from streams below the dam; in July 2023 the flow at Ropar reached 1.79 lakh cusecs (all as reported). Pong, operated by BBMB on the Beas, has a full reservoir level of 1,390 ft; it took a record inflow of 7.3 lakh cusecs on 14 August 2023 and rose to 1,399.65 ft, and then released about 1.4 to 1.5 lakh cusecs, BBMB stating that it "has never released beyond 1.49 lakh cusecs"; in 2025 its outflow "was capped at one lakh cusecs" against inflows of 2 to 2.5 lakh cusecs, with the level "four feet above the permissible limit of 1,394 feet" and a "technical limit up to 1,410 feet" (all as reported). On the Ravi, Ranjit Sagar has a full reservoir level of 527.91 m, also reported as 1,731 ft, and stood at 527.14 m on 27 August 2025; its releases that week are reported as 77,027 cusecs to 1.01 lakh cusecs and also as 2.12 to 2.21 lakh cusecs, which conflict; Shahpur Kandi, about 7 km upstream of Madhopur, has a maximum level of 405 m and stood at 399.60 m on 28 August 2025; and the Madhopur headworks lost gates on 27 and 28 August 2025 under "less than 2 lakh cusec" (all as reported). Its discharge capacity is reported as "17,750" in a unit given in the same source both as cumecs and as cusecs [TBC]. Below the dams, the Harike headworks at the confluence of the Sutlej and the Beas passed 3,35,030 cusecs, 686.50 ft on its upstream gauge, and Hussainiwala 3,02,508 cusecs, 646.50 ft, on 3 September 2025 (as reported), with the Rajasthan feeder taking off at Harike. The Kandi has 12 low dams completed by WRD and others in progress (WRD, Kandi Area Development), whose spillways reach the choes; no operating level or spill record for any of them was found [TBC]. The releases give warning to close gates and move pumps, but they do not lower the river. Until operating rules and release records are obtained, the largest recorded release applies, with the flow of the catchment below it as it occurred in the same event, and the higher of two conflicting reports (Clause 5.8.5(c)).

Clause 5.8.5 is set by this Manual. In Punjab the tailwater at a town outfall is set not by the tide but by a river held behind dhussi bandhs and headworks whose stage the dams upstream and the border downstream decide, by a drain of WRD that may already be full of sewage and storm water, by a choe that brings sand as well as water, by a canal that crosses the line of the drainage, or by a depression in the south-west with nowhere else to go. No document found during research gives a design water level for any of them, and none of the State's building instruments sets one: the Punjab Urban Planning and Development Building Rules 2021 require the plans to show the "methods of disposal of waste water, sewerage and storm water" (PUDBR 2021, r.11), and the Punjab Municipal Building Bye-Laws 2018 require a large project to keep "The inlet and outlet point of natural drain system" with a channel of adequate size (PMBBL 2018, Table 15.1, item 1), with no level in either.

The first is the river, and its gauges. CWC has no flood-forecasting, level-monitoring or inflow site in Punjab (SANDRP, 2018 and 2022, as reported), so there is no CWC highest flood level or danger level to transfer to an outfall. The levels that exist are readings of WRD's headworks gauges and of district gauges, in feet, reported in the press, with no gauge zero found: the Sutlej at Harike at 686.50 ft and Hussainiwala at 646.50 ft on 3 September 2025, and the Ghaggar at Khanauri at 754.2 ft on 15 July 2023 (as reported). That is why item (a) requires every level to name its gauge, unit and zero and to be levelled to the project datum, and why it builds the design level from a model and from the flood marks rather than from a gauge reading alone. WRD's own method for its floodplain zoning is a 100-year discharge by Gumbel's method with a waterway by Lacey's formula (Chief Engineer, Drainage-cum-Mining & Geology, to CWC, 2 May 2024), and its 100-year discharge on the Ferozepur–Tarn Taran reach of the Sutlej is 5,34,441 cusecs (WRD affidavit in NGT OA 303/2023); item (a) uses both as the State's precedent for a 1% AEP river. The flood marks of 2019, 2023 and 2025 are raised by 0.5 m, the freeboard this Manual uses for floor levels (Clause 6.11.1), because each of those floods breached the dhussi bandhs (at Janian Chahal near Shahkot, at Gidderpindi and at Mandala in August 2019, and in the Ajnala and Ramdass areas and near Dera Baba Nanak in 2025; as reported), and a flood that spills through a breach leaves a lower mark downstream than it would have left between intact banks. The "High Flood" band at Harike, above 3,00,000 cusecs (as reported), is used as the floor of the 10% AEP level because the river crossed it in 2025 and passed 2.35 lakh cusecs at Harike in 2019 (as reported), so a flow reached about once in ten years is unlikely to lie below it; it is to be replaced by a frequency analysis of the headworks record [TBC].

The second is the length of a river flood. A Punjab river in flood is high for days, not hours, because the dams release for days after the inflow peaks and the plains drain slowly behind the embankments. The flow at Harike was reported at 2.73 lakh cusecs on 26 August 2025 and at 3,35,030 cusecs on 3 September 2025 (as reported); Pong, after a record inflow of 7.3 lakh cusecs on 14 August 2023, released about 1.4 to 1.5 lakh cusecs over the following days, and in 2025 its outflow "was capped at one lakh cusecs" while its inflows ran at 2 to 2.5 lakh cusecs (BBMB, as reported); and the Ghaggar at Khanauri crossed its danger mark on 13 July 2023 and was still rising on 15 July, with breaches at Moonak, Khanauri, Makraud Sahib and Phullad (as reported), while in Mansa the river was reported to be running at levels not seen "since 1993". A single river lock of 7 days on the main rivers below the dams and on the lower Ghaggar covers those spells, and matches the lock that the Haryana edition of this Manual sets on the Ghaggar below Guhla, the reach that continues from Khanauri. The Ghaggar above Bhankharpur, the choes, the Chakki Khad and the Swan rise and fall within hours to days, and the 72-hour lock covers the whole of the longest design storm of Clause 2.5.2, as it does in the Haryana and Himachal Pradesh editions on the same streams. Neither lock is a substitute for the stage record of the flood that set the highest level, from which each is to be lengthened. BBMB's release notices are useful for operation, not for design: they give hours to days of warning before a release reaches a town, which is enough to close a gate and move a pump, but a local storm gives none, and the storm and the release come from the same monsoon spell (see the Commentary to Clause 5.8.4).

The third is the dams and headworks. Item (c) runs the design storm with the river at the largest recorded release because the storage of the dams does not bound the river below them. In 2023 Pong took a record inflow of 7.3 lakh cusecs and rose to 1,399.65 ft, about 10 ft above its full reservoir level of 1,390 ft (as reported), before its releases were raised; in 2025 the Madhopur headworks on the Ravi lost gates under a flow the State put at "less than 2 lakh cusec", with the river close to its level of 1988 (as reported), and the dhussi bandh breached below it. The levels and limits of the dams are themselves reported in conflicting forms: Bhakra's permissible level is 1,680 ft, reduced from 1,685 ft after 1988, with a "technical limit up to 1,690 feet"; Pong's full reservoir level is 1,390 ft but a "permissible limit of 1,394 feet" and a "technical limit up to 1,410 feet" were stated in 2025; and the releases of Ranjit Sagar in August 2025 are reported as about 1 lakh cusecs in one set of reports and more than 2 lakh in another (all as reported). Item (c) takes the higher value in each case until the operator gives the record, and treats the Madhopur failure as a stress case rather than a design case because a gate failure is not an event with a return period; it is checked so that a pumping station or floor level that would fail in it is known.

The fourth is the Ghaggar. The Ghaggar crosses the State boundary twice, from Panchkula into SAS Nagar and from Khanauri into Haryana, and no CWC gauge exists anywhere in its basin (SANDRP, 2018). Its levels are known only as readings in feet, its danger mark at Khanauri is reported as 748 ft, 752 ft and 753 ft (as reported), and its capacity is reported as 70,000 cusecs at Bhankharpur, where 1.22 lakh cusecs was also reported (as reported). Item (b) therefore names no danger level as fact, takes the highest reported mark as the floor of the 10% AEP case, and sets a floor on the model inflow from the only Ghaggar flood in a CWC report, the 50-year flood of 2,706 m³/s from 1,126 km² at the border bridge (CWC Flood Estimation Report, subzone 1(e), worked example), about 2.40 m³/s per km². The level at the boundary depends on Haryana's reach downstream, which is why item (b) asks WRD to coordinate it.

The fifth is the drains, the border and the canals. The city drains of Amritsar reach the Tung Dhab and City Outfall drains of WRD and then the Hudiara drain, which crosses into Pakistan (Amritsar Smart City bid, 2018; as reported); the level beyond the border cannot be obtained or influenced, so item (d) bounds it from the Indian side and gives it the long lock. Ludhiana's drains reach the Sutlej through the Buddha Nallah, which is being rebuilt on a 2-year return period (PMIDC, 2020) and carries about 700 MLD of wastewater (River Rejuvenation Committee, 2025), so item (a) checks every outfall to it against this Manual's storms with the Sutlej high at Walipur Kalan, and item (i) counts its dry-weather flow in its level. No design discharge was found for any WRD drain, and WRD's own counts of its drains differ (7,200 km of drains, and 393 of 869 notified, on its website; 514 of 935 notified in the press; as reported), which is why item (i) computes each drain's level and takes the lowest reported capacity. The canals are the State's largest structures across the line of the land's drainage. No policy of WRD on canal escapes taking storm water was found; the Sirhind canal was reported stopped after villagers put rainwater into it, the SYL canal and the Narwana branch breached and flooded Rajpura in 2023, the Hansi–Butana siphon on the Ghaggar was blamed for ponding at Samana, and about 35 breaches in canals and minors were reported in a single storm in June 2026 (all as reported). Item (f) therefore treats a canal as a barrier, not as an outfall, and models every siphon and canal bank as a control on the level upstream of it.

The sixth is the land with no outfall. In the south-west the water table stands within 1.5 to 5 m of the surface over about 15% of the State, mostly in the south-west, while elsewhere the area deeper than 10 m grew from 14.9% of the State in June 1989 to 68% in June 2019 (ground water resource assessment of 2020, CGWB and WRD), the canals and feeders block the natural drainage and feed the waterlogging, and WRD drains low villages by pumping and by pipelines (WRD). Item (g) applies the 72-hour design volume where there is no outfall, gives no infiltration credit where the October water table is within 3 m, counts only permanent pumps, and limits credited pumping to what WRD's consent allows when its drain is full, because a pump that discharges into a full drain only moves the flood downstream.

The seventh is the body that owns the receiving water. The rivers, choes, notified drains and dhussi bandhs are WRD's, the canals are WRD's canal wing's, the dams on the Sutlej and the Beas are BBMB's, the sector drains are PUDA's or a development authority's until they are transferred, the street drains are the local body's, and the chhappars are the Gram Panchayat's; no rule divides them (Chapter 6, Clause 6.9). Items (h) and (i) ask for the owner's consent and design level because a design that discharges to a channel cannot be checked without them. Section 38 of the Punjab Canal and Drainage Act 2023 lets the State notify limits along a river, stream or drainage-channel within which obstruction is barred, and WRD reports notifying several hundred drains under it and under section 55 of the 1873 Act before it; no list giving the limits was found, and item (h) asks the designer to state whether the outfall lies in notified limits. The lines of item (h) decide where an outfall can be built, not its level; their status is set out in Chapter 7.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Punjab requirement in this Manual. In Punjab it applies where an outfall is shut not by the tide but by a river that stays high for days behind its dhussi bandhs, by a receiving drain that is already full, by a choe or a canal, or by a depression with no outlet. The Sutlej at Harike was reported at 2.73 lakh cusecs on 26 August 2025 and at 3,35,030 cusecs on 3 September 2025, above the band that WRD calls "High Flood" (as reported). The Ghaggar at Khanauri crossed its danger mark on 13 July 2023 and was still higher on 15 July (as reported). Pong released about 1.4 to 1.5 lakh cusecs for days after its record inflow of August 2023, and kept releasing into September in 2025 (as reported). A river in flood stays high for as long as the flood lasts, a drain beyond its capacity backs up into every drain that joins it, a depression with no outlet empties only by infiltration and evaporation, and the low ground of the south-west only by pumping, which is why Clause 5.8.5 replaces the two 6-hour windows described below with a single river lock of at least 7 days on the Sutlej, the Beas and the Ravi below the dams, on the lower Ghaggar and on the Hudiara drain, of at least 72 hours on the upper Ghaggar and the choes, with a drain lock where the receiving drain is full, and with a closure for the whole storm where there is no outfall. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 25 June each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Punjab the outfalls do not cross a beach, but many of them pass through a sluice or flap gate in a dhussi bandh, or reach a river below headworks whose gates can fail, and the bandhs breach. On 27 August 2025 gates of the Madhopur headworks on the Ravi jammed, and the next day a gate was washed away, under a flow the State described as "less than 2 lakh cusec" (as reported); the dhussi bandh on the Ravi then breached at three places in the Ajnala and Ramdass areas of Amritsar district, and near Dera Baba Nanak (as reported). In August 2019 the Sutlej breached the dhussi bandh near Shahkot, flooding Janian and Janian Chahal, and at Gidderpindi near Sultanpur Lodhi and at Mandala in Jalandhar district; the breach at Janian Chahal was reported as 500 feet wide in one account and as about 130 m wide and 13 m deep in another (as reported). A gate that is jammed or left open lets the river or the receiving drain back into the drains behind it, and a bandh that breaches fills the land behind it to the river level. The dhussi bandhs, the sluices in them and the headworks are held by WRD, and the dams upstream by BBMB or the operator of the dam, while the drains that reach them belong to the Municipal Corporations, Councils and Nagar Panchayats, to PUDA and the development authorities or to the Gram Panchayats, and no rule linking the operation of any of these gates to the levels of the drains was found during research [TBC], so a gate and the drains behind it can belong to different bodies. The 25 June inspection date is set ahead of the SW monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 25 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Punjab: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless WRD certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless WRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Punjab has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the sand and silt that the choes of the Kandi leave at an outfall, and the silt, solid waste and dumped material that block the drains below them. The choes of Hoshiarpur "originate from Shivalik slopes and take shape of wide channels after entering the foothill plains", leaving "thick deposits of sand and silt" (District Environment Plan, Hoshiarpur); the Phase 11 area of SAS Nagar is reported to flood when the Lakhnaur choe is not cleared (as reported); and the NGT has recorded that debris in the N-Choe is "shrinking size of drain causing serious apprehension of flood" (OA 736/2022, as quoted by CPCB, 2024). A flap gate held open or shut by sand, a sluice in a dhussi bandh whose gates cannot be moved, or a headworks gate that jams, as at Madhopur in 2025, turns a designed outfall into a dead end or a back-flow path. No written gate-operation rule for any sluice in a dhussi bandh, or for any regulator on a WRD drain, was found during research [TBC]. Clauses 5.8.5(e) and 6.3.6 deal with the sand, and Clause 5.8.5 gives no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a site on a choe draining to the Ghaggar in SAS Nagar (Mohali)
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)