Draft v1.0 prepared by NEER. Not adopted by the Government of Punjab or the Chandigarh Administration, and has no legal force. About this draft

Chapter 7Waterbodies, Chhappars (Village Ponds) and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (chhappar) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Punjab, with no coast and no tidal water, means the six Ramsar sites (Harike, Kanjli, Ropar, Keshopur-Miani, the Beas Conservation Reserve and Nangal Wildlife Sanctuary), any wetland that the Punjab State Wetlands Authority notifies under the 2017 Rules (none was found notified; it recommended 72 water bodies for notification in September 2025, as reported), the wetlands of the national atlas, the dhabs and other natural depressions that hold water through the monsoon, the marshy reaches of the beins, and the village ponds (chhappars and tobas) recorded in the Revenue records;
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Punjab Canal and Drainage Act, 2023, the Punjab Village Common Lands (Regulation) Act, 1961, the Punjab Land Preservation Act, 1900, the Punjab Municipal Corporation Act, 1976, the Punjab Municipal Act, 1911, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. Punjab has no pond Act and no pond authority. Its village ponds, the chhappar (ਛੱਪੜ; toba ਟੋਭਾ; pond) of every village of the plains, stand on shamlat, the common land of the village, under the Punjab Village Common Lands (Regulation) Act, 1961 (not read for this Manual), and the courts have protected them as commons: the Supreme Court upheld the order that those who had occupied the land of a village pond in Punjab vacate it and restore it to the Gram Panchayat (Jagpal Singh v. State of Punjab, 28 January 2011, as reported), and the Punjab and Haryana High Court directed in July 2020 that encroachments on village ponds in Punjab be removed within six months, with the PPCB to monitor their water (as reported; the order was not read). Their restoration is a programme of the Department of Rural Development and Panchayats: ₹4,573 crore for cleaning some 15,000 chhappars in about 13,500 villages, announced in April 2025 (as reported), of which about 1,062 had been dewatered and about 400 desilted by the Minister's account (as quoted). The first census of water bodies counted 16,012 in Punjab, 1,578 of them encroached (as reported). No statute sets out what a pond includes, whether its catchment, its feeder inlets or its overflow, and no authority keeps a register of the State's ponds (none was found for this Manual). The rivers, choes and drains have their own tool: under section 38 of the Punjab Canal and Drainage Act, 2023 (Punjab Act 11 of 2023), as under section 55 of the Northern India Canal and Drainage Act, 1873 before it, the State may notify limits along a river, stream or drainage channel within which no obstruction may be formed, and the notified reach "shall be held to be a drainage-work" (Clause 7.4, Disclosure). The Act came into force on a date to be notified (s. 1(3)); no commencement notification was found for this Manual [TBC], and notifications issued under section 55 of the 1873 Act are cited as such.

Punjab's waterbodies are of more kinds than its ponds. The Sutlej, the Beas and the Ravi, and the seasonal Ghaggar, run between the dhussi bandhs, WRD's flood embankments, which enclose the bet, the low riverine land that the river floods. The beins, the Kali (Holy) Bein, the Chitti (East) Bein and the Black Bein, or Kala Sanghian drain, are slow streams of the Doaba with clay beds. In the Kandi, the foothill belt below the Shivaliks, "numerous small and big seasonal streams called choes" make the area "prone to flashy floods" (WRD, Kandi Area Development), and "more than 100 choes" cross Hoshiarpur district alone, leaving "thick deposits of sand and silt" (District Environment Plan, Hoshiarpur); the raos, such as the Patiala ki Rao at the edge of SAS Nagar, are streams of the same kind. WRD maintains about 7,200 km of drains, among them the Buddha Nallah at Ludhiana and the Tung Dhab and Hudiara drains at Amritsar, and it has notified 393 of 869 drains, choes and rivers under section 55 of the 1873 Act by the count on its own page, or 514 of 935 by a press report of November 2024 (the counts differ, and no list was found [TBC]). The canals, distributaries and minors of WRD's canal wing form a separate class: they carry irrigation water, they are not a receiving water for storm runoff, and no drain under this Manual discharges into one without WRD's written consent (Chapter 5). The dhabs are the larger natural depressions and lakes, and six wetlands are Ramsar sites (Clause 7.12, Commentary).

This Manual treats every recorded chhappar, toba and dhab, with its catchment and the flow paths that feed it, as drainage infrastructure. No Punjab law says how a pond's catchment is to be found on the ground, which flow paths count, or what a development inside it must do. The catchment and flow-path rules of this chapter (see "Recorded chhappar" and "Catchment and flow paths" in the definitions after Clause 7.2, the setbacks of Clause 7.4 and Figure 7.3) answer those questions: the catchment delineated from the terrain under Chapter 3, every flow path that drains 8 ha or more treated as a natural channel with its setback, no flow path blocked except by a crossing that meets Clause 7.10.3, and the runoff not retained on a site returned, after treatment, to the path it used before. They, and any buffer around a chhappar, are this Manual's proposal. No department, Gram Panchayat, court or other body of the State has adopted or endorsed them, and the 1961 Act, the orders of the courts and any later statute or notification govern wherever they say more. No design under this Manual shall assume or rely on the filling of a recorded chhappar, or on the blocking or diversion of a flow path that feeds it, unless a drainage assessment under Chapters 3 to 5 shows where the storage and the flow go, and the lost storage is replaced under Clause 7.6.4. Neither the Punjab Municipal Building Bye-Laws 2018 nor the Punjab Urban Planning and Development Building Rules 2021 sets a setback from water; their nearest provision is the environmental condition, for buildings of 5,000 to 20,000 m² built-up area, that "The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water" (PMBBL 2018, Table 15.1, item 1; PUDBR 2021, r.43, by reference to the Ministry of Environment, Forest and Climate Change notification S.O. 3999(E) of 9 December 2016). This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the revenue, panchayat, municipal, drainage and wetland procedures that record and protect waterbodies in law, or the directions of the Supreme Court, the High Court and the National Green Tribunal.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river or seasonal stream (such as the Sutlej, the Beas, the Ravi and the Ghaggar, and the choes and raos of the Kandi and the Shivalik foothills, such as the Patiala ki Rao, the N-Choe, the Lakhnaur choe and the choes of Hoshiarpur district), bein (such as the Kali Bein, the Chitti Bein and the Black Bein, or Kala Sanghian drain), natural drain or nala, WRD drain (such as the Buddha Nallah, the Tung Dhab and Hudiara drains, the Sakki/Kiran nallah and the Chand Bhan drain), canal, distributary, minor or kassi (which carries irrigation water and does not receive storm water, Chapter 5), pond (chhappar, toba), whether or not it holds water, dhab or other natural depression or lake, marsh or other wetland (such as the Ramsar sites of Harike, Kanjli, Ropar and Keshopur-Miani), bet land (the low riverine land between a river and its dhussi bandh), the pondage of a Kandi low dam or check dam, abandoned borrow or mining pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (chhappar) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (overflow, outlet, spill point or escape) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (feeder inlet, nala, khal or watercourse) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice, regulator or outlet gate) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Punjab terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Chhappar (ਛੱਪੜ; toba ਟੋਭਾ; pond) A natural or excavated village pond that stores rainfall runoff from its own catchment, and often the village's sullage: in Maya Singh's Panjabi Dictionary (1895), "A pond; a puddle" (Annex 7E). Toba is its synonym, common in Malwa. Not ਛੱਪਰ, a thatched roof, which is spelt alike in Roman letters. A chhappar is a tank or pond under Clause 7.2. Most chhappars have no surplus weir or sluice, only a low point in the rim over which they spill; where a chhappar has none, its FTL is the level at which it spills to the village nala, a drain or low ground, found by survey. A chhappar need not hold water to be a chhappar: one that is dry, or kept full only by sullage, keeps its bed, its rim, its catchment and its flow paths.
Recorded chhappar A chhappar, toba, dhab or other pond shown in the Revenue records and khasra maps, the lists of the Department of Rural Development and Panchayats, the census of water bodies, a municipal record, a master plan or layout, or a survey made under a court's or the Tribunal's directions. A recorded chhappar is part of the drainage system for this Manual. Where it is proposed to be filled or built on, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual; they do not override the Punjab Village Common Lands (Regulation) Act, 1961, a court order or another law that forbids the filling.
Catchment and flow paths The catchment of a chhappar is the land that drains to it, and its flow paths are the nalas, khals, feeder inlets and depressions by which that runoff reaches it, recorded or not. The catchment shall be delineated from the terrain under Chapter 3, or taken from the Revenue records or a court-ordered survey where it is recorded, and shown on the Waterbody Sheet (Form 7-1), and in it: (a) every flow path draining 8 ha or more is a natural channel under Clause 7.4.1(b), with its setback, whether or not it is recorded; (b) no flow path shall be blocked, filled, diverted or built across except by a crossing that meets Clause 7.10.3; (c) the runoff of a development that is not retained on site under Chapter 4 shall leave it, after treatment under Chapter 8, by the flow path it used before development, so that the chhappar keeps its inflow; and (d) the catchment boundary shall be marked on the approved layout plan. This is this Manual's proposed method; no Punjab body has adopted it.
Monsoon water line The outer edge of a chhappar's, dhab's, bein's or wetland's water in the monsoon: the largest of the edge shown by dated imagery of the monsoon and the month after it (July to October) in the years of record, which shall cover at least 20 years so as to include wet years such as 1988, 1993, 2019, 2023 and 2025, the edge recorded in the Revenue records, and the spill level (FTL) contour; where none is available, the MWL contour. The boundary of a chhappar, dhab or lake under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and its monsoon water line, and setbacks are measured from that boundary. A dry year's edge never sets the boundary. This definition, and the 20 years, are set by this Manual.
Dhab A larger natural pool, lake or depression: in Maya Singh, "An unwalled tank or pond, a natural pool, a lake, a deep depression in the earth" (Annex 7E). A dhab is a lake under Clause 7.2 and, where Clause 7.12.1 lists it, a wetland; where it is recorded, it is a recorded chhappar for this chapter.
Choe; rao A choe (cho) is a seasonal torrent of the Shivalik foothills and the Kandi, dry for most of the year and in spate in the monsoon, with a wide bed of sand and boulders, such as the choes of Hoshiarpur district, the N-Choe and the Lakhnaur choe; a rao is a stream of the same kind from the hills, such as the Patiala ki Rao (Annex 7E). Every choe and rao is a river or seasonal stream under Clause 7.2, and its whole active bed, from the toe of one bank to the toe of the other, is part of the waterbody: Zone 1 is measured from the top of bank, never from the edge of the low-flow channel, and a choe bed is the receiving system, not a drain to be narrowed (Clause 6.3.6).
Bein A slow, irregular stream with a clay bed, such as the Kali (Holy) Bein, the Chitti (East) Bein and the Black Bein, or Kala Sanghian drain (Annex 7E). A bein is a river or seasonal stream under Clause 7.2 whoever maintains it and however much drain water it now carries; where WRD has notified it, it is also a section 38 reach.
Bet; dhussi bandh Bet is the low alluvial land along a river and in its bed (Annex 7E), such as the bet of the Sutlej and the Beas; a dhussi bandh is a flood embankment of WRD along a river, an administrative term with no dictionary source (Annex 7E). Bet land on the river side of a dhussi bandh is within the 1% AEP extent until a hydraulic study under Clause 7.3.4 shows otherwise, and bet land behind a bandh is checked for the breach and outfall-closed cases of Chapter 5. A dhussi bandh is a flood embankment for Clause 7.14, not a tank bund.
WRD drain; section 38 reach A WRD drain is a drain maintained by WRD's Drainage-cum-Mining & Geology wing, notified or not, such as the Buddha Nallah, the Tung Dhab drain, the Hudiara drain, the Sakki/Kiran nallah and the Chand Bhan drain. A section 38 reach is a river, stream or drainage channel within limits notified under section 38 of the Punjab Canal and Drainage Act, 2023, or under section 55 of the Northern India Canal and Drainage Act, 1873 before it, which "shall be held to be a drainage-work", such as the Patiala ki Rao in Kharar tehsil (2013) and the Sutlej floodplain in Ferozepur and Tarn Taran districts (2024). Each is a waterbody under Clause 7.3; a section 38 limit governs where it is wider than the setback of Clause 7.4 (Clause 7.4.5).
Canal; kassi A canal, branch, distributary or minor of WRD's canal wing, and a kassi, a small distributary channel from a canal (Annex 7E). Each is a waterbody for Clause 7.3 and its setback, but it is not a receiving water: no storm drain shall discharge into a canal, distributary, minor, kassi or watercourse without WRD's written consent (Chapter 5), and every siphon or culvert that carries a drain or choe under a canal is a hydraulic control on the upstream flood level (Chapter 9).
Sullage-fed chhappar A chhappar that receives the sullage (grey water) of a village or colony, by its drains or nalis, in addition to rainfall runoff. It remains a waterbody under this chapter, not a treatment unit for a development; it is a combined sullage-and-storm basin, whose sullage is intercepted, screened and treated ahead of it under Clause 8.9.5, and whose starting level for Clause 7.7.3 is FTL in every season.
Kandi; Sirowal The Kandi is the belt of boulder-gravel fans, 10 to 15 km wide, immediately south-west of the Shivalik hills, with deep water levels; the Sirowal is the belt below it where the fans give way to the plain and the water table is shallow, with seepage (CGWB). Both are administrative or hydrogeological terms, not dictionary terms (Annex 7E). In this chapter a choe's setback and its 1% AEP extent are found over its whole run across the Kandi and the Sirowal, where it may spread and change course.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with WRD and the Department of Revenue, Rehabilitation and Disaster Management, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (WRD (its Drainage-cum-Mining & Geology wing for the rivers, choes, raos and beins, the drains it maintains, the dhussi bandhs and other flood embankments, and the reaches notified under section 38 of the Punjab Canal and Drainage Act, 2023, or under section 55 of the Northern India Canal and Drainage Act, 1873, before it; its canal wing for the canals, distributaries, minors and watercourses; and its Kandi Area Development wing for the Kandi low dams), a Municipal Corporation, Municipal Council or Nagar Panchayat (for the street and public drains in its area; the sections of the Punjab Municipal Corporation Act, 1976 and the Punjab Municipal Act, 1911 that vest drains and tanks were not read for this Manual [TBC]), PUDA or a development authority such as GMADA or GLADA (for the drains and waterbodies of its urban estates and schemes until they are transferred), the Gram Panchayat (for village chhappars and other shamlat land, under the Punjab Village Common Lands (Regulation) Act, 1961, with the Department of Rural Development and Panchayats), the Department of Soil and Water Conservation (for the Kandi check dams it built), the Forests and Wildlife department and the Punjab State Wetlands Authority (for the Ramsar sites, the conservation and community reserves and any notified wetland, and the Forests department for land closed under the Punjab Land Preservation Act, 1900 [TBC]), BBMB (for the headworks and reservoirs it operates), a private owner, or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) Revenue records and khasra maps of the Department of Revenue, Rehabilitation and Disaster Management, in which village ponds stand on shamlat land (the common land of the village under the Punjab Village Common Lands (Regulation) Act, 1961) and ponds, choes, nalas and bet parcels are entered under their local names (the entries used for chhappars, tobas and dhabs were not checked for this Manual [TBC]); the pond lists of the Department of Rural Development and Panchayats for its programme for some 15,000 chhappars, and the first census of water bodies, which counted 16,012 in Punjab, 1,578 of them encroached (both as reported); WRD's list of drains notified under section 55 of the Northern India Canal and Drainage Act, 1873 or section 38 of the Punjab Canal and Drainage Act, 2023 (393 of 869 drains, choes and rivers on WRD's page; 514 of 935 as reported in November 2024; the counts differ and no list was found [TBC]) and its notifications, such as those for the Patiala ki Rao (4 March 2013) and the Sutlej floodplain in Ferozepur and Tarn Taran (4 March 2024); the alignments of WRD's dhussi bandhs, canals and minors; the drains, green belts and waterbodies shown in master plans and plan reports, such as the Ludhiana Master Plan (2007–2031) and the Master Plan Jalandhar report (Vision 2031), and in the layouts of PUDA and the development authorities; the boundaries of the six Ramsar sites and of any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was confirmed for this Manual), with the 72 water bodies recommended for notification in September 2025; the areas of the Kandi notified under the Punjab Land Preservation Act, 1900; and the wetlands of the national atlas;
  • (b) WRD and Gram Panchayat tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. No 1% AEP flood map of any Punjab city was found, and no design return period was found for any of the State's urban drains except two project choices: the trunk storm sewers of the walled city of Amritsar, designed for "a return period of once in two years" (Amritsar Smart City, bid of 2018), and the Buddha Nallah, whose proposed design considers a "2 year return period with reduced run-off within the city reach due to active storm water detention" (PMIDC, feasibility report, 2020). WRD has a method for flood lines: it computes the 5-, 25- and 100-year floods by Gumbel's method, takes the 100-year flood as the one "in which no construction is to be allowed", finds the waterway by Lacey's formula, and notifies that area under the drainage law (Chief Engineer, Drainage-cum-Mining & Geology, to the CWC, 2 May 2024). The one floodplain zone found that was drawn under it is the Sutlej in Ferozepur and Tarn Taran districts, notified on 4 March 2024 for a reach of 47 km: the 100-year flood was taken as 5,34,441 cusecs and the Lacey waterway computed as 0.58 km, but because the permanent embankments stand about 4.5 km apart, the land between them was declared the floodplain zone, on embankment sections of 1976 and Survey of India sheets of 1984 (WRD, affidavit in O.A. 303/2023); the National Green Tribunal found "no material … indicating the exercise for demarcating the flood plain zone as per the applicable zone" (order of 14 March 2024, as quoted). No zone was found for the Ghaggar, the Beas, the Ravi or any choe of the Kandi, and Punjab has no floodplain zoning Act (as reported). The only other notified line found is that of the Patiala ki Rao, notified under section 55 of the 1873 Act on 4 March 2013 by khasra in villages of Kharar tehsil, among them Karoran and Nada, against any construction in or covering of the "Nadi/Choe" (notification No. 4/8/2013-iw(3)26573/1), with no width stated. This Manual uses WRD's method as the State's precedent, but in the order that the Tribunal's criticism implies: the flood line is computed first, from the 1% AEP flood of Chapters 2 and 3 with the climate factor, and only then compared with the embankment alignment; where the embankments stand outside the computed line, the land between them stays a waterbody and a floodplain for this chapter, and where the computed line lies outside an embankment, as behind a breach or a low reach, it governs. The State's records of its rivers are kept in feet at WRD's headworks and BBMB's gauges, and the gauge zeros were not found [TBC]: the Chitti Bein's high flood level "at Railway Bridge Chaheru is generally 12'", with a spread "up to a distance of about 200 metres" at about 2 ft deep (Master Plan Jalandhar report), and the Ghaggar reached 754.2 ft at Khanauri on 15 July 2023 (as reported); each such level shall be tied to a surveyed datum before use (Clause 7.3.5), and no "danger level" of the CWC exists for any Punjab river. The length of the dhussi bandhs is itself uncertain, 1,365 km by one count (as reported) and "about 1800 Kms." of flood embankments by WRD's page (as quoted). The records of the ponds are no better: the counts of the pond programme (about 15,000) and of the census of water bodies (16,012) differ, and the Revenue entries for chhappars, tobas and dhabs were not checked for this Manual [TBC]. Every site plan under this Manual shall therefore overlay the khasra map and show each chhappar, toba and dhab, each choe, rao, bein and nala, each bet parcel and each WRD drain, canal and dhussi bandh, with its notified limits where they exist, on the Waterbody Sheet (Form 7-1); PUDBR 2021 already requires building plans to show the "methods of disposal of waste water, sewerage and storm water" and the "surroundings up to a distance of fifteen metres on all sides" (r.11). Clause 7.3.4 lets the Authority adopt flood maps once they are issued; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and a section 38 or section 55 limit, where one has been notified, is a minimum that the 1% AEP extent of this Manual may exceed but never reduce. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual (no statute, rule or building code read for this Manual sets a distance in metres from a river, choe, bein, drain, nala, chhappar or canal in Punjab; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval of WRD for a work on or next to one of its rivers, choes, drains, dhussi bandhs, canals or headworks, including its permission or no-objection certificate for the realignment of a notified drain, or within limits notified under section 38 of the Punjab Canal and Drainage Act, 2023 (or under section 55 of the Northern India Canal and Drainage Act, 1873, for notifications issued before the 2023 Act came into force), such as the Patiala ki Rao in Kharar tehsil (2013) and the Sutlej floodplain in Ferozepur and Tarn Taran districts (2024); WRD's written consent to any discharge to a canal, distributary or minor; the permission of the Punjab State Wetlands Authority for a regulated activity in a notified wetland; a master-plan buffer in force; or a direction of the Supreme Court, the Punjab and Haryana High Court or the National Green Tribunal (such as the 200 ft width of the Patiala ki Rao being marked with pillars under CWP 5901 of 2017; the no-objection certificate of WRD's drainage wing for projects within 150 m of a water body, announced by the Water Resources Minister on 20 September 2023, is not one, as no notification or order giving it effect was found) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual. Punjab has no general statutory distance from water: neither the Punjab Municipal Building Bye-Laws 2018 nor the Punjab Urban Planning and Development Building Rules 2021 sets a setback from a river, nallah, choe, pond or canal, and no WRD instruction barring construction within a stated distance of a drain or canal was found. The lines that exist are tied to a notification or to one channel: within limits notified under section 38 of the Punjab Canal and Drainage Act, 2023 (section 55 of the Northern India Canal and Drainage Act, 1873, before it), no obstruction may be formed, and the notified reach becomes a drainage work; WRD draws such limits from the 100-year flood found by Gumbel's method and the waterway found by Lacey's formula, but the one floodplain zone found, on the Sutlej in Ferozepur and Tarn Taran districts (2024), was declared as the land between the existing embankments, about 4.5 km apart, where the computed waterway was 0.58 km; on the Patiala ki Rao, pillars marking a width of 200 ft are being fixed under the High Court's supervision, a width for that one channel; and the Master Plan Jalandhar report proposes a 30 m buffer along the Chitti Bein and the Black Bein, a plan proposal and not a statutory buffer. This Manual's 15 m gives every choe, bein, nala, drain and chhappar a hydraulic corridor where nothing wider binds, and is this Manual's proposal, not a statutory width, to be superseded by a notification under section 38 where one exists (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Punjab flood maps are mostly coarser than US maps, the alluvial plains of Punjab, where river slopes seldom exceed 0.38 m per km (CWC), the bet lands behind the dhussi bandhs and the waterlogged south-west are very flat (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Punjab's building instruments give no distance in metres from water. The Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021 were searched for river, nallah, choe, pond, canal and flood, and neither sets a setback from any of them: the setbacks of PUDBR 2021 run by building height (r.26) and by the Uniform Zoning Plan Drawing No. 01/2020 CTP(Pb) of 28 July 2020. Their only distance near water concerns sewage: a septic tank or absorption pit is not to be "within thirty meters of any percolation well, water sources or stream used or likely to be used for drinking", and an absorption pit has no outlet into "any sewer, storm water, drain or surface drain" (PUDBR 2021, r.45(7) and (8)); recharge structures are to be kept away from sewer lines, septic tanks and soak pits, with no distance (r.40). No instruction of WRD barring construction within a stated distance of a drain, choe or canal was found; WRD's report to the National Green Tribunal says only that no drain may be realigned "without prior permission/NOC from competent authority of Water Resources Department" (O.A. 279/2024). The lines that exist are tied to a notification, to a court or to one plan. Within limits notified under section 38 of the Punjab Canal and Drainage Act, 2023, or under section 55 of the 1873 Act before it, no obstruction may be formed, any obstruction may be ordered removed by the Divisional Canal Officer (s. 39), no compensation is paid for an illegal structure (s. 45), and damaging, altering or building on a drainage work is an offence punishable with a fine of ₹5,000 to ₹50,000 or imprisonment of up to six months (s. 52); WRD draws such limits on the 100-year flood and Lacey's waterway (Clause 7.3, Commentary), but no width is set by the Act. On the Patiala ki Rao, where the Punjab reach is "heavily encroached by squatters", the fixing of pillars on both sides "measuring 200 Ft." was done in the Union Territory and was still pending on the Punjab side in January 2024 (Local Commissioner, fourth periodic report in CWP 5901/2017 before the High Court): a width fixed for one channel under a court's supervision, not a WRD norm. The Master Plan Jalandhar report (Vision 2031) proposes that "No construction activity should be allowed on both sides of the Bein up to a distance of atleast 200 metres untill concrete bandh is constructed … except 30 metre buffer zone from the bank of Chitti Bein", and a plantation "buffer strip of 30 m width" along the Black (Kala Sanghian) Bein (13.8.6–13.8.7): the only numeric river or bein setback found in a Punjab plan text, a plan proposal whose notification was not seen [TBC]. On 20 September 2023 the Water Resources Minister announced that projects "within the 150-metre radius" of a water body would need the approval of WRD's drainage wing (as reported); no notification or order giving it effect was found, and this Manual does not apply it. Around a notified wetland, no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)), but no wetland in Punjab was confirmed as notified under the Rules for this Manual. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.

Disclosure. Punjab has no statutory setback in metres from a river, choe, bein, drain, nala, chhappar or canal: neither PMBBL 2018 nor PUDBR 2021, and no other statute or rule read for this Manual, sets one, and the only floodplain zone found under the State's drainage law is the Sutlej in Ferozepur and Tarn Taran districts, declared as the land between the embankments. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, and so are the catchment and flow-path rules for chhappars, any buffer around a chhappar, and the reading of the monsoon water line (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, to be superseded by a notification under section 38 of the Punjab Canal and Drainage Act, 2023 where one exists, and no department, authority, Gram Panchayat or court of the State has adopted or endorsed them. The setback is applied as the larger of the corridor and any statutory, court or plan line in force, so the Manual is stricter than statute along choes, beins, nalas, drains and chhappars, and no less strict anywhere. The 1% AEP extent of this Manual, with the climate factor, governs Zone 2 wherever it is wider than a notified or court line, and it is computed before it is compared with any embankment. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • Rivers, choes and drains (section 38). Limits notified under section 38 of the Punjab Canal and Drainage Act, 2023, or under section 55 of the Northern India Canal and Drainage Act, 1873 for notifications issued before the 2023 Act came into force, within which no obstruction may be formed and any obstruction may be removed, the notified reach becoming a drainage work: the Patiala ki Rao in Kharar tehsil (4 March 2013) and the Sutlej floodplain in Ferozepur and Tarn Taran districts (4 March 2024; 100-year flood 5,34,441 cusecs; Lacey waterway 0.58 km; zone declared between embankments about 4.5 km apart). WRD's method, the 100-year flood by Gumbel's method with Lacey's waterway, is the State's precedent; no zone was found for the Ghaggar, the Beas, the Ravi or a Kandi choe, and the lists of notified drains (393 of 869, or 514 of 935) were not found.
  • Court-fixed widths. The 200 ft width of the Patiala ki Rao, marked with pillars under the High Court's supervision in CWP 5901/2017 (done in the Union Territory, pending in Punjab in January 2024): a width for that channel only, not a general rule.
  • Plan proposals. The Master Plan Jalandhar report (Vision 2031): a 30 m buffer from the bank of the Chitti Bein, with no construction within at least 200 m until a concrete bandh is built, and a 30 m plantation buffer along the Black (Kala Sanghian) Bein. They govern only as far as a notified master plan carries them [TBC].
  • Wetlands. No permanent construction within 50 m of the mean high flood level of a notified wetland (Wetlands Rules, 2017, r. 4(2)(vi)); the six Ramsar sites, Harike, Kanjli, Ropar, Keshopur-Miani, the Beas Conservation Reserve and Nangal Wildlife Sanctuary, to their designated boundaries. No wetland notified under rule 7, and no eco-sensitive zone or buffer distance for any of them, was found.
  • Sewage near water. No septic tank or absorption pit within 30 m of a well, water source or stream used or likely to be used for drinking (PUDBR 2021, r.45(7)). This protects drinking water, not a flood corridor.
  • WRD drains, dhussi bandhs, canals and headworks. Works on or next to them, and the realignment of a notified drain, need WRD's approval; a discharge to a canal needs its written consent.
  • Announced only. The no-objection certificate of WRD's drainage wing for projects within 150 m of a water body, announced on 20 September 2023 (as reported). No order was found; it is not applied by this Manual and is shown in Figure 7.1 only as announced.

This Manual sets 15 m as the floor because no width exists in Punjab for choes, beins, nalas, drains or chhappars outside a notified reach; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and the desilting machinery that the drains and choes need. The reasons for the corridor and the catchment rules are the record: the Punjab reach of the Patiala ki Rao is "heavily encroached by squatters" with "rampant illegal construction even deep inside the Nadi/Choe" (Local Commissioner, 2024); a road along the Buddha Nallah is alleged to have cut its width "from 58 feet to 35 feet" (O.A. 327/2025, the allegation as recorded); the Chitti Bein is to be widened from 40–60 ft to "atleast 80'-100'" (Master Plan Jalandhar report); the village abadi beside a nadi in SAS Nagar "is seven feet lower than the level of stream (Nadi)" (GMADA, social impact assessment, 2021); and 1,578 of Punjab's 16,012 water bodies were counted as encroached (as reported). Until a statute, rule, notification or master plan adopts them, the 15 m minimum and the catchment rules are this Manual's recommended standard, and the statutory, court and plan lines above remain the only lines with legal force. Approving authorities should state in each approval which was applied.

Waterbody setback zones: cross-section Waterbody setback: Zone 1 and Zone 2, with Punjab's statutory, court and plan lines (section, not to scale) Zone 1 Waterbody protection Zone 2 Flood fringe setback Developable land Waterbody: tank bed, channel, marsh (no development) FTL (crest of surplus weir) / top of bank 1% AEP (100-yr) flood level, with climate factor (or MWL for tanks) Bed (surveyed, original) park, path floor ≥ 1% level + 0.5 m ≥ 15 m (set by this Manual) greater of 15 m and floodway to mapped 1% AEP extent + 10 m margin 1% extent 15 m This Manual: Zone 1 and Zone 2 Statute, courts and plans: PUDBR 2021, r. 45(7); Jalandhar plan report; Canal and Drainage Act 2023, s. 38; High Court; PMBBL, PUDBR (none) 30 m: no septic tank or absorption pit from a well, source or stream used for drinking (PUDBR r. 45(7); not a flood line) Chitti Bein: 30 m buffer from the bank; no construction within 200 m until a concrete bandh is built (off scale). Black Bein: 30 m plantation strip. Plan report proposals, not statute Notified limits (s. 38; s. 55 before it): no obstruction. WRD method: 100-yr flood (Gumbel) and Lacey waterway. Sutlej, Ferozepur–Tarn Taran (2024): zone = land between embankments ≈4.5 km apart 200 ft (≈61 m) between pillars Patiala ki Rao: pillars on both banks marking a 200 ft width (High Court, CWP 5901/2017; done in Chandigarh, pending in Punjab, Jan 2024). One channel, case-specific; not a WRD norm 150 m NoC of WRD's drainage wing: announced 20 Sep 2023; no notification or order seen; not applied ? rivers, choes, beins, drains, chhappars, canals: no setback in PMBBL 2018 or PUDBR 2021 Zone 1: no buildings, fill, paving or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. Measured from the largest of the Revenue boundary, FTL (or top of bank) and the monsoon water line. The 15 m floor is this Manual's proposal. Wider lines govern: s. 38 or s. 55 limits; court-fixed widths; master-plan buffers in force; notified wetlands 50 m (Wetlands Rules, r. 4(2)(vi)); Ramsar boundaries; WRD drain, dhussi bandh and canal lines.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Punjab practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The alluvial plains of Punjab, where river slopes seldom exceed 0.38 m per km, the bet lands behind the dhussi bandhs and the waterlogged depressions of the south-west, where runoff spreads and stands, are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In Punjab the lines that exist around waterbodies are drawn from a high level or a flood, not from the dry-season water line: WRD's floodplain method starts from the 100-year flood, the Wetlands Rules, 2017 measure their 50 m from the mean high flood level, and the High Court's pillars on the Patiala ki Rao mark the width of the "Nadi/Choe", not of its low-flow channel. The difference matters because most of the State's waterbodies are full only in the monsoon. The choes of the Kandi are dry for most of the year and in spate in the monsoon, "most of the rainfall occurs in 2½ months only" (WRD, Kandi Area Development), and their beds of sand and boulders look like spare land in the dry months; the Chitti Bein, whose channel is 40 to 60 ft wide, spreads "up to a distance of about 200 metres" in flood (Master Plan Jalandhar report); and the chhappars of the plains fill with the monsoon and stand full on sullage in the villages that feed them. A line drawn from the edge of the dry months would leave the foreshore that the monsoon floods, and that the chhappar, dhab or bein needs in order to store it, open to building. This Manual gives the same rule a level for every chhappar, dhab, bein and wetland: its monsoon water line, read over at least 20 years, and its FTL are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the colonies of Ludhiana along the Buddha Nallah, the sectors and village abadis of SAS Nagar along the choes, such as Phase 11 beside the Lakhnaur choe and the abadis of Nayagaon, Karoran and Nada along the Patiala ki Rao, the low parts of Patiala along the Badi and Chhoti Nadi, the land along the Chitti Bein at Jalandhar, and the towns on the Ghaggar, such as Khanauri, Moonak and Sardulgarh, and on the bet lands of the Sutlej and the Beas (each reported to have flooded, or recorded as low-lying, in the documents cited in this chapter; no 1% AEP map of any of them exists) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Punjab has neither a tank Act nor a pond Act, and its storages range from the village chhappar to the dams on its rivers. The storages that matter for urban drainage are of six kinds. The first is the village chhappar or toba on shamlat land, in the care of the Gram Panchayat, usually with no outlet structure and often fed by the village's sullage as well as its catchment; some 15,000 are in the State's cleaning programme of 2025 (as reported). The second is the chhappar that now lies inside a town, a sector or a colony, vested in a municipal body or a development authority or privately owned, and the low-lying collection areas around the towns, many of them filled or built on; no register of them was found. The third is the dhabs and other natural depressions of the plains, and the waterlogged depressions of the south-west, which hold water through and after the monsoon. The fourth is the low dams and check dams of the Kandi: WRD reports "12 Low Dams" completed under its Kandi Area Development programme, with the Nara dam in Hoshiarpur district one of nine more, and lists "Flood attenuation" among their benefits, and it counts 410 check dams on rivers and nallahs (WRD, reply in O.A. 694/2023); no operating rule, level record or flood-cushion rule for any of them was found. The fifth is the dams and headworks of the rivers, such as the Ranjit Sagar and Shahpur Kandi dams on the Ravi, BBMB's reservoirs on the Sutlej and the Beas, and WRD's headworks at Ropar, Harike, Hussainiwala and Madhopur; they are not tanks for these clauses, and their releases and levels enter a design as inflow and tailwater (Chapter 5). The sixth is the wetlands, the six Ramsar sites among them, which are wetlands under Clause 7.12; Harike, at the confluence of the Sutlej and the Beas, is both a Ramsar site and a headworks pond. Clauses 7.7 and 7.8 apply to any of these whose storage is counted; a Kandi low dam, check dam or dhab whose storage is to be counted is subject to Clause 7.7.1 in full, with WRD, the Department of Soil and Water Conservation, the Gram Panchayat or other custodian, and the custodian of each low dam and check dam shall be confirmed for the inventory (Annex 7A), because it was not established for this Manual.

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including the catchment of each chhappar and the flow paths that feed it, the chhappar with its FTL and its overflow to the village nala or a WRD drain, and the drain, with its crossings under canals and its outfall through a dhussi bandh to the river, whose design water level and stage are the tailwater of the chhappar's overflow (Chapter 5), and, in the Kandi, the choe from the Shivalik hills to the Sirowal with its low dam or check dam and its crossings, as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. Punjab's chhappars and depressions are fullest, and its water table highest, when its worst storms come. Paddy is transplanted from 1 to 9 June, by districts (Punjab Preservation of Subsoil Water Act, 2009, schedule for 2025, as reported), so that the fields of the central and south-western plains are ponded through the monsoon; the water table is shallowest in October (CGWB and WRD); and the largest daily falls of record came late in the season, 354.3 mm at Ludhiana on 4 October 1955 and 338.0 mm at Ludhiana (PAU) on 24 September 1988 (IMD), after weeks of rain. The drains and rivers that take the overflow run full at the same time: Harike carried 3,35,030 cusecs on 3 September 2025, above the 3,00,000 cusecs at which a flow "falls under the High Flood category", and the Ghaggar stood at 754.2 ft at Khanauri on 15 July 2023 (both as reported), so that a WRD drain whose outfall passes through a dhussi bandh may be closed by its flap gate for days (Chapter 5). Many village chhappars are also fed by sullage, which keeps them at or near FTL in every season; the State's programme of 2025 had to dewater them, about 1,062 by the Minister's account (as quoted), before they could be desilted. No record of how long Punjab's chhappars and dhabs stay at or above FTL in a wet spell was obtained for this Manual. An empty chhappar at the start of the season is not a design assumption: in a wet spell it fills, and while it is full it stores nothing more below FTL, its feeder nalas discharge against a high level, and its overflow joins a drain that is already running full. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

A village chhappar, a WRD drain, a canal crossing and a dhussi-bandh outfall on the plains, and a choe across the Kandi and the Sirowal A chhappar, a WRD drain and a dhussi-bandh outfall on the plains; a choe across the Kandi (schematic) A. Plains (plan): sullage intercepted, the chhappar and its overflow, a WRD drain under a canal, a flap-gated outfall village (abadi) sullage (nali) interceptor screen; dry-weather flow intercepted (Cl. 8.9.5) sullage treatment ponds treated water only flow path from fields (Zone 1 if ≥ 8 ha) chhappar (water at FTL) monsoon water line; Zone 1 ≥ 15 m spill point (FTL) overflow WRD drain (notified or not) canal: irrigation water, not a receiving water siphon under the canal: a control on the upstream flood level (Chapter 9) kassi (distributary) no storm discharge to a canal or kassi without WRD's consent town: nallah to the drain, DWF intercepted first dhussi bandh bet land river flap-gated outfall through the bandh The river's stage is the drain's tailwater: the outfall-closed check (Cl. 5.10) for every outfall the river can close; a breach of the bandh is a Chapter 5 case. Inset: south-west village October water table within 3 m pumped outfall no infiltration credit (Cl. 8.8.1 (ii)) B. Kandi and Sirowal (section along a choe): hills, fan, low dam, road crossing, spring line, Sirowal Shivalik hills sandstone and clay; slopes > 10°: hill rule (Cl. 4.11) foothill road: lined drains to the choe, never onto an unprotected slope choe (seasonal torrent) low dam / check dam holds and recharges water table Kandi fan: boulders to clays; deep water table recharge zone, tested, sediment-controlled (Cl. 8.8.1 (i)) road crossing: culvert or causeway for sand and debris (Cl. 6.3.6) sand settles spring line Sirowal: seepage, shallow water table no infiltration (Cl. 8.8.1 (ii)); choe setback kept alluvial plain → catchment flow, overflow sullage Zone 1 WRD drain canal, kassi bandh, dam bet land Kandi gravels Catchment and flow-path rules, the 15 m minimum and the chhappar as a combined sullage-and-storm basin are this Manual's proposals, not adopted by any body; s. 38 limits of the Punjab Canal and Drainage Act 2023, WRD's consent and notified wetland boundaries govern where they say more. No particular place is shown. Original drawing for this Manual.

Figure 7.3 — A village chhappar, a WRD drain, a canal crossing and a dhussi-bandh outfall on the plains, and a choe across the Kandi and the Sirowal (schematic, not to scale; no particular place is shown). A (plains, in plan): the village's sullage is intercepted and treated ahead of the chhappar (Clause 8.9.5), so that only storm runoff and treated water reach it; the chhappar spills at its FTL to a WRD drain, which passes under a canal by a siphon and never discharges into the canal or its kassi without WRD's written consent (Chapter 5); a town nallah joins the drain; and the drain reaches the river through a flap-gated outfall in the dhussi bandh, behind which lies the bet land, so that the river's stage is the drain's tailwater and the outfall-closed check of Clause 5.10 applies. The inset shows a village of the south-west where the October water table is within 3 m: there no infiltration is credited and the outfall is pumped (Clause 8.8.1, class (ii)). B (Kandi and Sirowal, in section): a choe leaves the Shivalik hills and crosses the Kandi fan, where its bed of sand and boulders is the recharge zone and a low dam or check dam holds and recharges its flow (Clause 8.8.1, class (i)); sand settles at the road crossing, which is designed for sand and debris (Clause 6.3.6); below the fan the spring line marks the Sirowal, where seepage and a shallow water table bar infiltration (class (ii)); and the foothill road carries its runoff in lined drains to the choe, never onto an unprotected slope. The catchment and flow-path rules, the 15 m minimum and the treatment of a chhappar as a combined sullage-and-storm basin are this Manual's proposals, not adopted by any body; limits notified under section 38 of the Punjab Canal and Drainage Act, 2023, WRD's consent and a notified wetland boundary govern where they say more. Original drawing for this Manual.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, PSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.

Commentary. No operating rule for a Punjab chhappar, dhab or Kandi low dam that keeps a flood cushion was found, and most chhappars have no controllable outlet, so Clause 7.8.3 applies to them. WRD lists "Flood attenuation" among the benefits of its Kandi low dams (Kandi Area Development), but no rule, level record or release record for any of them was found. The controlled flows that matter in the State are those of the dams and headworks on its rivers: BBMB's releases from Bhakra and Pong, which in 2023 and 2025 kept the Sutlej and the Beas high for weeks (as reported); the Ranjit Sagar and Shahpur Kandi dams on the Ravi; and WRD's headworks at Ropar, Harike, Hussainiwala and Madhopur, where in August 2025 the gates jammed and one was washed away at a flow reported as less than 2 lakh cusecs (as reported). No current State disaster management plan or urban flood plan was found, only a draft State plan of about 2011, and no warning protocol tied to a headworks setting or a dam release that reaches the drains and chhappars of the towns was found. Without an agreed rule with dates, levels, release rates and a named operator, storage in a chhappar or low dam cannot be relied on, and a release made without warning to the colonies and fields downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection when a late-season storm, such as those of 24 September 1988 and 4–5 October 1955, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

Most chhappars have other users. A village chhappar on shamlat land is kept for the common purposes of the village, a use the courts have protected (Jagpal Singh v. State of Punjab, Supreme Court, 2011, as reported), and the water of the Kandi low dams irrigates their commands (WRD, Kandi Area Development). Drawing a chhappar or a low dam down before a storm has a cost to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Punjab Pollution Control Board (PPCB) directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 15 June each year (Chapter 10).

Commentary. No standing order of the State fixes a date for the desilting of drains, choes or ponds. In practice the date is set each year by ministers or Deputy Commissioners, usually 30 June: in 2023 the State Flood Control Board, under the Chief Minister, ordered the cleaning of waterways by 30 June, and in 2026 the Local Government Minister and the Deputy Commissioner of Kapurthala set 30 June for sewers and drains (all as reported); the draft State disaster management plan of about 2011 asks only that streams be desilted "before the onset of monsoons every year". The date of 15 June in this Manual is set by this Manual: the monsoon now sets in at Jalandhar on about 26 June, at Patti on about 28 June and at Ludhiana on about 1 July (IMD, new normal dates, 2020), so that 30 June comes after the onset in the Doaba and Majha; storms of June are real, such as 160.6 mm at Patiala on 8 June 2000 (IMD); and the plains are wetted from 1 to 9 June by the transplanting of paddy. Village chhappars are dewatered and desilted under the programme of the Department of Rural Development and Panchayats, about 1,062 dewatered and about 400 desilted by the Minister's account in 2025 (as quoted), with treatment on the Seechewal and Thapar models; some 1,450 ponds prepared on those models are reported to lie empty (as reported), and the CAG found a choked screening chamber at the pond works of Punnawal and Bhalwan (Report No. 1 of 2026). No published measure of their effect on storage or recharge was found. In the Kandi the choes leave "thick deposits of sand and silt" (District Environment Plan, Hoshiarpur), so their crossings and the drains they feed are cleared after the monsoon as well as before it (Chapter 10). Excavation to "increase capacity" is governed by Clause 7.9.3; in the waterlogged south-west deepening that cuts into the groundwater gives no storage at all, and in the over-exploited centre it can let polluted water reach an aquifer that is already contaminated at shallow depth (Clause 8.8.1). The 15 June deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Punjab precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Punjab the rivers, choes and the drains it maintains lie with WRD's Drainage-cum-Mining & Geology wing, the canals with its canal wing, the street drains with the Municipal Corporations, Municipal Councils and Nagar Panchayats, and the sector drains of the urban estates with PUDA and the development authorities until they are transferred, but no rule or order dividing them was found for this Manual, and the sections of the Punjab Municipal Corporation Act, 1976 and the Punjab Municipal Act, 1911 that would vest drains in a municipal body were not read [TBC]. This Manual's working split of drain ownership (Chapter 1 and Chapter 6) is its own, not a statement of law. The drainage law protects the channels it reaches: under the Punjab Canal and Drainage Act, 2023 a notified reach is a drainage work (s. 38), WRD may remove an obstruction (s. 39), and damaging, altering or building on a drainage work, or altering the flow of a river or stream so as to endanger one, is an offence (s. 52); but a "drainage work" excludes the "removal of sewage from towns, villages or any other habitat" (s. 2(7)), so the town drains that carry sewage fall outside it. WRD told the National Green Tribunal that no drain may be realigned "without prior permission/NOC from competent authority of Water Resources Department" (O.A. 279/2024), and it has itself realigned and channelised the N-Choe in IT City, Sector 101, SAS Nagar, and lined the Sirhind choe below the Bhakra Main Line siphon (WRD, Drainage Administration). The record shows what is lost when the natural channels are treated as spare land: the Punjab reach of the Patiala ki Rao is "heavily encroached by squatters" (Local Commissioner, 2024); a road along the Buddha Nallah is alleged to have narrowed it "from 58 feet to 35 feet" (O.A. 327/2025, the allegation as recorded); the Chitti Bein is 40 to 60 ft wide where the Master Plan Jalandhar report asks for "atleast 80'-100'"; and in SAS Nagar a social impact assessment for a storm sewer under a sector road recorded villagers saying that "the village Abadi area is seven feet lower than the level of stream (Nadi)" and asked GMADA "not [to] disturb the natural passage of 'Nadi' or allied tributaries" (GMADA, 2021). The only existing rule on channel width is the environmental condition, for buildings of 5,000 to 20,000 m² built-up area, that the inlet and outlet of the natural drain system be kept "with adequate size of channel for ensuring unrestricted flow of water" (PMBBL 2018, Table 15.1, item 1), with no width or design flow; Clauses 7.10.2 and 7.10.3 give it both. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored chhappar or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Punjab no shared form of storage is required by either building instrument: rainwater harvesting under PMBBL 2018 (Chapter X) and PUDBR 2021 (r.40) is plot-level, and neither has a detention, peak-flow or "zero runoff" rule. The nearest existing forms of shared storage are the village chhappars restored under the State's pond programme of 2025; the Kandi low dams, whose listed benefits include "Flood attenuation" (WRD, Kandi Area Development); WRD's 410 check dams and 33 Amrit Sarovar works (WRD, reply in O.A. 694/2023); the condition of PMBBL 2018 that public open spaces of more than 500 m² provide for the "complete utilization and capture of storm water", including "Artificial or natural Storage of storm water runoff from larger sites" (cl. 10.4); and the "active storm water detention" assumed in the city reach of the Buddha Nallah (PMIDC, feasibility report, 2020). None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Punjab State Wetlands Authority;
  • (b) the six Ramsar sites of Punjab (Harike, designated in 1990; Kanjli and Ropar, in 2002; and Keshopur-Miani Community Reserve, the Beas Conservation Reserve and Nangal Wildlife Sanctuary, on 26 September 2019), each to its boundary as designated, any wetland notified under the 2017 Rules, the 72 water bodies that the Punjab State Wetlands Authority recommended for notification in September 2025, and the wetlands of the national atlas, until each is notified or found not to be a wetland;
  • (c) the dhabs and other natural depressions that hold water through the monsoon, the marshy reaches of the Kali, Chitti and Black Beins, and the low wet bet land of the Sutlej, Beas, Ravi and Ghaggar, within the 1% AEP extent of Clause 7.3.4 or any limit notified under section 38 of the Punjab Canal and Drainage Act, 2023 (or section 55 of the Northern India Canal and Drainage Act, 1873), whichever is larger (the river and bein channels themselves are waterbodies under the rest of this chapter); and
  • (d) any other marsh, wetland, dhab or chhappar that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. Punjab's wetlands are the concern of the Punjab State Wetlands Authority, constituted under rule 5 of the Wetlands (Conservation and Management) Rules, 2017 and chaired by the minister in charge of wildlife preservation (as reported; the notification constituting it was not seen [TBC]). No wetland notified by it under rule 7 of the Rules was found for this Manual. After its District Wetland Committees had ground-truthed 1,143 sites under the Supreme Court's directions (Anand Arya, W.P.(C) 304/2018), the Authority recommended 72 water bodies across 14 districts for notification on 25 September 2025, the largest numbers in Fatehgarh Sahib, Mansa, Barnala and Fazilka, and approved a management plan of ₹38.45 crore over five years for the Beas Conservation Reserve (as reported; the district counts given sum to 72 over 13 named districts). The State has six Ramsar sites: Harike, designated in 1990, and Kanjli and Ropar, designated in 2002, which together cover about 56.48 km² (as reported); and Keshopur-Miani Community Reserve (344 ha), the Beas Conservation Reserve (6,429 ha) and Nangal Wildlife Sanctuary (116 ha), all designated on 26 September 2019 (Rajya Sabha reply of 13 February 2025, as quoted; the Ramsar Information Sheets were not read). Harike lies at the confluence of the Sutlej and the Beas, at WRD's headworks, and Kanjli on the Kali Bein. A meeting of the Authority in 2024 listed seven of these sites for a "zone of influence" (as reported), but no eco-sensitive zone, zone of influence or buffer distance for any Punjab wetland was found. A drain outfall, desilting, diversion or regulator operation in or near a Ramsar site or a notified wetland therefore needs the Authority's permission where a notification or the Rules regulate it, and compliance with the directions of the courts and the Tribunal, as well as compliance with this chapter; for the chhappars, dhabs and depressions that are not notified, including the 72 recommended in 2025 until they are, this chapter, the commons law and the drainage and municipal law are the only controls, and Clause 7.12.1(b) treats the recommended sites as wetlands. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Punjab's beins, rivers and wetlands through its drains (Clause 8.9, Commentary). The Buddha Nallah carries "A quantum of 700 MLD discharge of treated effluent" to the Sutlej at Walipur, turning the river from Class B to Class E, from which it recovers to D and C by Harike, a Ramsar site (River Rejuvenation Committee, 28 October 2025); its water before the confluence had a BOD of 161 mg/l in April 2024 (CPCB). The Kala Sanghian drain carries the treated effluent of the Leather Complex CETP at Jalandhar to the Chitti Bein, which joins the Sutlej above Harike (as reported), and the National Green Tribunal ordered nineteen tanneries at Jalandhar closed in December 2017 for discharging into drains (as reported). The Kali Bein, on which Kanjli lies, was removed from the CPCB's list of polluted stretches in 2025 (PPCB, reply in O.A. 413/2025). In the villages the chhappars take sullage, and pond-based treatment works can fail, as at Punnawal and Bhalwan (CAG, Report No. 1 of 2026). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Punjab they apply in full to every new outfall, and every existing outfall to a chhappar, bein, river, wetland or WRD drain that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. Punjab's main controls on filling and building in chhappars, choes and drains are the commons law, the drainage law and the courts. Village ponds are shamlat land under the Punjab Village Common Lands (Regulation) Act, 1961 (not read for this Manual), and the Supreme Court upheld the order that those who had occupied a village pond in Punjab vacate it and restore it to the Gram Panchayat (Jagpal Singh v. State of Punjab, 28 January 2011, a case under section 7 of the 1961 Act, as reported); in July 2020 the High Court directed that all encroachments and unauthorised constructions on village ponds in Punjab be removed within six months (as reported). The first census of water bodies counted 1,578 of the State's 16,012 water bodies as encroached (as reported). Within a reach notified under section 38 of the Punjab Canal and Drainage Act, 2023, the Divisional Canal Officer may order an obstruction removed (s. 39), no compensation is paid for a structure built without approval (s. 45), and damaging, altering or building on a drainage work is punishable with a fine of ₹5,000 to ₹50,000 or imprisonment of up to six months, or both (s. 52). The courts have had to enforce the channels one by one: on the Patiala ki Rao, notified in 2013, the High Court appointed a Local Commissioner in Shamsher Singh v. State of Punjab (CWP 5901/2017), who reported in January 2024 "rampant illegal construction even deep inside the Nadi/Choe" on the Punjab side, with the pillars marking its 200 ft width still to be fixed there, and contempt proceedings remain pending (COCP 1105/2023); a further petition seeks an embankment along it against seasonal flooding in Khuda Lahora, Nada, Nayagaon and Karoran (CWP-PIL 79/2025); and before the National Green Tribunal a road along the Buddha Nallah is alleged to have cut its width "from 58 feet to 35 feet" (O.A. 327/2025). In the Kandi, the Punjab Land Preservation Act, 1900 lets the State notify erosion-prone areas (s. 3) and regulate, restrict or prohibit clearing, quarrying, cultivation and tree-cutting in them (s. 4), and one such notification is reported to cover 21,944 acres in 15 villages near Chandigarh (as reported; the Punjab text and the list of notified areas were not read [TBC]). The announcement of 20 September 2023 that projects within 150 m of a water body would need the approval of WRD's drainage wing was meant "to regulate the construction activities in the vicinity of natural water bodies" (as reported), but no order giving it effect was found. This Manual treats a recorded chhappar, with its catchment and flow paths, as drainage infrastructure (definitions after Clause 7.2), and land recorded as a chhappar, toba or dhab as a waterbody under Clause 7.3 whatever its present state. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 15 June) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The rims of most chhappars are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The low dams of the Kandi are higher, and their heights were not found for this Manual [TBC]; each, and every check dam whose storage is counted, shall be screened. The dhussi bandhs and other flood embankments of WRD are excluded from the Act's definition of a dam, and the dams of the rivers, such as Ranjit Sagar and Shahpur Kandi on the Ravi, and WRD's headworks are not tanks under this chapter (Clause 7.7, scope note). Where the storage of a chhappar, dhab or low dam is counted under Clause 7.7, its rim, bund or dam is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Punjab the embankments that matter to the towns are WRD's dhussi bandhs along the rivers and the banks of its drains and canals. They have breached in most great floods: in August 2019 the Sutlej breached the Shahkot dhussi bandh, flooding Janian and Janian Chahal, and broke through at Gidderpindi and Tibbi near Sultanpur Lodhi and at Mandala; in July 2023 the Ghaggar breached at Moonak, Khanauri, Banarasi, Makraud Sahib and Phullad and in Mansa district, and breaches of the SYL canal and the Narwana branch flooded Rajpura; and in 2025 a dhussi bandh breached in the Ajnala–Ramdass area and the gates of the Madhopur headworks on the Ravi failed (all as reported). No breach map or emergency action plan for a chhappar rim, a Kandi low dam, a dhussi bandh or a drain embankment was found, and no current State disaster management plan was found. A failed or overtopped bank floods the villages, colonies and fields below it, and an unannounced release floods them too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments, and why the breach of a dhussi bandh is a case of Chapter 5 for the outfalls behind it. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Punjabi waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)