Chapter 1Policy, Applicability and Adoption
1.1 Purpose and objectives
1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Punjab. It applies to private development and to public works, as set out in Clause 1.5.
1.1.2 The Manual has the following objectives:
- (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
- (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
- (c) to size storage for the long-duration south-west monsoon storms of July–September and the late storms of early October, which fall on paddy fields ponded since June and on rivers already raised by the releases of Bhakra, Pong and Ranjit Sagar, and have put more than 350 mm in a day on Ludhiana (4 October 1955) and Patiala (11 July 1993) and more than 450 mm on Aliwal, Batala and Khara in Majha (5 October 1955), as well as for short-duration intensities;
- (d) to design outfalls for the stage of the Sutlej, the Beas, the Ravi and the Ghaggar, held behind dhussi bandhs and set by the releases of Bhakra, Pong and Ranjit Sagar and by the headworks at Ropar, Harike, Hussainiwala and Madhopur; the levels of the WRD drains that receive the town drains, such as the Buddha Nallah, which joins the Sutlej at Walipur Kalan, and the Tung Dhab and Hudiara drains, which carry Amritsar's storm water into Pakistan; and the sand-laden beds of the Kandi choes, which rise and shift with every flood, including the case where the outfall is closed;
- (e) to protect tanks (chhappars), marshes, rivers, supply channels and surplus courses as part of the drainage system;
- (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
- (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
- (h) to make sure that facilities, once built, are maintained and remain effective.
1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building bye-laws made by the Department of Local Government on 22 November 2018 for the municipal areas of the State, and the building rules made by the Department of Housing and Urban Development on 31 August 2021 for the rest of the State and for the schemes of the development authorities (the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).
1.2 Stormwater management hierarchy
1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.
- Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
- Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
- Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
- Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).
1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.
1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.
Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).
Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Punjab, the top layer has a particular meaning. The storage that matters is in the village ponds, the chhappar (ਛੱਪੜ; toba ਟੋਭਾ; pond) of almost every village, about 15,000 of which the State has taken up for cleaning in some 13,500 villages, with ₹4,573 crore earmarked in April 2025 (as reported), and of which the first census of water bodies counted 16,012 in the State, 1,578 of them encroached (as reported); in the larger natural depressions, the dhabs; in the bet lands of the Sutlej, the Beas, the Ravi and the Ghaggar between the dhussi bandhs; in the beds of the Kandi choes, where the boulder and gravel fans take water into the ground; and in the six Ramsar sites, Harike, at the confluence of the Sutlej and the Beas (1990), Kanjli on the Kali Bein and Ropar (2002), and Keshopur-Miani (344 ha), the Beas Conservation Reserve (6,429 ha) and the Nangal Wildlife Sanctuary (116 ha) (26 September 2019) (as reported). Losing it has a record: the High Court's Local Commissioner found the Punjab portion of the Patiala ki Rao "heavily encroached by squatters" in 2024 (CWP 5901/2017), and the GMADA social impact assessment for a storm-sewer road in SAS Nagar recorded that "the village Abadi area is seven feet lower than the level of stream (Nadi)" (GMADA, 2021). The law protects only part of it. The chhappars are Panchayat commons (shamlat), held under the Punjab Village Common Lands (Regulation) Act, 1961, and the Supreme Court ordered encroachers on pond land in a Punjab village to restore it to the Gram Panchayat (Jagpal Singh v. State of Punjab, 28 January 2011, as reported); the High Court ordered encroachments on village ponds removed within six months in 2020, with PPCB to monitor the water (as reported). No pond statute or pond authority was found in the State [TBC], no wetland notified under rule 7 of the Wetlands Rules, 2017 was found, and no buffer distance round any pond, wetland or Ramsar site was found; the Punjab State Wetlands Authority recommended 72 water bodies for notification in September 2025 (as reported). Any buffer round a chhappar in this Manual is therefore its own proposal. Losing that storage cannot be offset economically by pipes and pumps.
1.3 Legal basis and status
1.3.1 Notification. This Manual shall be given statutory effect by the Government of Punjab through:
- (a) an amendment to the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
- (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.
1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.
1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.
1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.
Commentary. In Punjab the building rules are split by territory between two instruments (PMBBL/PUDBR). In the municipal areas of all Municipal Corporations, Municipal Councils and Nagar Panchayats they are the Punjab Municipal Building Bye-Laws, 2018 (PMBBL), made by the Department of Local Government (DLG) through its Town Planning Wing by notification No. CTP(LG)/2018/3548 of 22 November 2018, under section 201(1) of the Punjab Municipal Act, 1911 and section 399(2) of the Punjab Municipal Corporation Act, 1976 (PMBBL 1.3), and amended on 31 December 2019 and, for independent floors, on 9 August 2023 (the second as listed by DLG; text not read). In the rest of the State, except the Lal Lakir of village abadi, Cantonment Boards and sites under the Archaeological Survey of India, and in the urban estates and other schemes of the development authorities wherever they lie, they are the Punjab Urban Planning and Development Building Rules, 2021, made by the Department of Housing and Urban Development (HUD) by G.S.R. 144/P.A.11/1995/Ss.180 and 43/2021 of 31 August 2021, under section 180 read with section 43(2) of the Punjab Regional and Town Planning and Development Act, 1995 (r.1(3)), with a corrigendum of 16 March 2022 and the Amendment Rules of 29 March 2022; amendments of 14 July 2026 (mixed use) and 7 September 2026 are reported (as reported; texts not read), and none found touches rainwater harvesting, plinths, basements or drainage. The State gives the 2021 Rules no abbreviation; "PUDBR" is an abbreviation set by this Manual, and "PUDA Building Rules" names the rules of 2018 that the 2021 Rules repealed (r.53). The Punjab Unified Building Rules, 2025, notified on 15 December 2025, were stayed in part by the High Court on 24 December 2025 and withdrawn by HUD on 27 April 2026, restoring PUDBR and PMBBL "as if the 2025 Rules had never been notified" (as reported); they are history and are not cited as current. PUDBR requires building plans to show the disposal of storm water (r.11); both instruments require rainwater harvesting above thresholds that differ by instrument (PMBBL cl. 10.1; PUDBR r.40), set the plinth from the surrounding ground (PMBBL cl. 5.2.1.1, 450 mm) or from the crown of the road in front (PUDBR r.3(A), 900 mm for residential plots), keep surface drainage out of basements (PMBBL cl. 4.23(vii); PUDBR r.30(5)(iv)(e)), and, for group housing, ask for permeable materials in all open parking, Punjab's only permeable-paving rule. They set no design storm, return period, release rate or detention volume, no "zero runoff" rule, and no setback from a river, nallah, choe, pond or canal. The route of Clause 1.3.1(a) therefore runs through two departments: DLG could amend PMBBL under the same sections of the municipal Acts, and HUD could amend PUDBR under sections 180 and 43(2) of the Act of 1995; and WRD could notify the lines along rivers, choes and drains under section 38 of the Punjab Canal and Drainage Act, 2023, which Chapter 7 uses. Both are notifications made under an Act, as Clause 1.3.1 and Annex 1D assume; PUDBR was published in the Punjab Government Gazette of 10 September 2021. This Manual is a draft; neither the Government nor any department or authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.
1.4 Definitions
1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).
| Term | Meaning in this Manual |
|---|---|
| Approving Authority (the Authority) | The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the authority that sanctions the building plan, layout or scheme for the site, which is, within municipal limits, the Municipal Corporation, Municipal Council or Nagar Panchayat under PMBBL 2018; in the urban estates and other schemes of PUDA, GMADA, GLADA and the other development authorities, that authority under PUDBR 2021; and elsewhere in the State, the competent authority under PUDBR 2021 (its definition in the Rules was not read for this Manual [TBC]), or a department for its own works. |
| Applicant | The owner, developer or department that seeks approval, and its successors in title. |
| Development | Any building, layout, sub-division, road, paving or land-use change that requires approval under the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021 or that is executed as a public work. |
| Redevelopment | Development on a site where impervious cover already exists. |
| Land disturbance | Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5). |
| Impervious area | Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats. |
| New or replaced impervious area | Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced". |
| Retention | Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4). |
| Detention | Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4). |
| Rainwater harvesting (RWH) | Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it. |
| Minor system | Drains, pipes and inlets designed for the minor-system AEP of Chapter 6. |
| Major system | The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6). |
| Pre-development condition | Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3). |
| Flood-sensitive catchment | The catchments of the Buddha Nallah, its city reach through Ludhiana and the land that drains to it; of the Shivalik choes that cross SAS Nagar, Zirakpur, Kharar, Dera Bassi and New Chandigarh, among them the N-Choe, the Patiali-ki-Rao, the Sukhna Choe, the Jayanti Devi ki Rao and the Lakhnaur choe, and of the Ghaggar at Bhankharpur; of the Badi and Chhoti Nadi, the Ghaggar and the canal crossings at Patiala, Rajpura and Samana; of the Ghaggar at the towns of Sangrur and Mansa districts, Moonak, Khanauri, Makraud Sahib and Sardulgarh; of the Kali and Chitti Bein and the Kala Sanghian drain at Jalandhar, Kapurthala and Phagwara, with the Sutlej at Phillaur and Shahkot; of the walled city of Amritsar and its outfall by the Tung Dhab drain to the Hudiara drain; of the Ravi, the Chakki Khad and the dhussi bandh at Pathankot, Gurdaspur and Dera Baba Nanak; of the choes of the Kandi towns of Hoshiarpur, Garhshankar, Mukerian and Talwara, with the Beas below Pong; of the Sutlej below Bhakra and the Swan at Rupnagar, Nangal and Anandpur Sahib; of Ferozepur and the Harike–Hussainiwala reach of the Sutlej; and of the waterlogged towns of the south-west, Bathinda, Sri Muktsar Sahib, Fazilka, Abohar and Faridkot, and any catchment the Authority notifies (Chapter 4; Annex 1B). |
| Waterbody | A river, stream, canal, tank (chhappar), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7). |
| Regional facility | A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4). |
| Tier A / Tier B authority | An Approving Authority classed under Clause 1.6. |
| Policy supplement | The set of adoptable alternative clauses in Clause 1.7 and Annex 1C. |
| Drainage report | The preliminary or final report required by Chapter 10. |
| Registered professional | A person registered under the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6. |
| Compliance calculator | The State-issued tool for computing and reporting compliance (Clause 10.5). |
| Maintenance declaration | The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10). |
| Variance | Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10). |
| Waiver | Approval that a requirement does not apply to a site, on the grounds in Clause 1.10. |
| Notified | Published by the Government or the State Stormwater Technical Committee in the Punjab Government Gazette. |
| PMBBL | The Punjab Municipal Building Bye-Laws, 2018, as amended, made by the Department of Local Government (notification No. CTP(LG)/2018/3548 of 22 November 2018) under section 201(1) of the Punjab Municipal Act, 1911 and section 399(2) of the Punjab Municipal Corporation Act, 1976. They apply to building in the municipal areas of all Municipal Corporations, Municipal Councils and Nagar Panchayats (PMBBL 1.3). Cited as "PMBBL 2018 (as amended), cl. …". |
| PUDBR | The Punjab Urban Planning and Development Building Rules, 2021, as amended, made by the Department of Housing and Urban Development (notification No. G.S.R. 144/P.A.11/1995/Ss.180 and 43/2021 of 31 August 2021) under section 180 read with section 43(2) of the Punjab Regional and Town Planning and Development Act, 1995. They apply to the whole State except within municipal limits, the Lal Lakir of village abadi, Cantonment Boards and sites under the Archaeological Survey of India, and they do apply to the urban estates and other schemes of the development authorities (r.1(3)). "PUDBR" is an abbreviation set by this Manual; the State uses none. Cited as "PUDBR 2021 (as amended), r. …". |
| Competent authority | The authority that sanctions a building plan under PMBBL (the Municipal Corporation, Municipal Council or Nagar Panchayat) or under PUDBR (the development authority in its schemes, and the authority the Rules name elsewhere; the Rules' definition was not read for this Manual [TBC]). Where this Manual refers to the Approving Authority for a development, the competent authority for the site acts as it. |
Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).
1.5 Applicability
1.5.1 Who is covered. This Manual applies to:
- (a) all development requiring planning permission, building permit or layout approval under the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021;
- (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
- (c) works executed by Central agencies or their contractors within Punjab, to the extent that the Authority's approval or no-objection is required.
1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:
- (a) land disturbance of 0.1 ha or more; or
- (b) new or replaced impervious area of 500 m² or more.
1.5.3 RWH. The existing RWH mandate continues to apply in the municipal areas, under PMBBL 2018 (as amended), cl. 10.1, to every building on a plot of 100 m² or more and to group housing, public, commercial and industrial buildings of any size, with groundwater recharge on plots of more than 500 m² (cl. 10.5) and inspection by the municipal Rainwater Harvesting Cell before a completion certificate or a service connection is issued (cl. 10.6); and elsewhere in the State, under PUDBR 2021 (as amended), r.40, to residential plots and public and institutional buildings of more than 250 m², to commercial, mixed-use and industrial buildings of more than 100 m² and to group housing of any size, with the design certified by a civil engineer, as now. This Manual does not change it.
1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:
- (a) no sewage connection to a storm drain (Chapter 8);
- (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
- (c) waterbody setbacks and the no-fill zone (Chapter 7); and
- (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).
1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.
1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.
1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.
1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:
- (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
- (b) linear road resurfacing that adds no impervious area.
Exempt development remains subject to the RWH mandate and to Clause 1.5.4.
1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.
Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.
Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:
- Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
- Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
- The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
- MBBL 2016 makes recharge mandatory for buildings over 500 m².
The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Punjab plots are small and the cumulative effect of many small plots is what fills Ludhiana's drains. For small buildings in Punjab, the two building instruments set different thresholds, and each must be cited with its own number. In municipal areas, PMBBL 2018 (as amended), cl. 10.1, requires "the complete proposal of rainwater harvesting" with the building plans of every plot of 100 m² or more, and recharge on plots of more than 500 m² (cl. 10.5); elsewhere, PUDBR 2021 (as amended), r.40, requires rainwater harvesting on residential plots of more than 250 m², commercial and industrial plots of more than 100 m², and group housing of any size, with the design certified by a civil engineer. Earlier rules used other thresholds, 400 m² (2010) and 500 sq yd (2013) (as reported). Neither instrument sizes the system to a runoff volume, and neither limits what leaves the plot. The plinth is set at not less than 450 mm "from the surrounding ground level", sited so "that adequate drainage of the site is assured" (PMBBL 2018, cl. 5.2.1.1), or at 900 mm "from the crown of adjoining road in front" for residential plots (PUDBR 2021, r.3(A)(1)), not from any flood level; both require that "surface drainage does not enter the basement" (PMBBL 2018, cl. 4.23(vii); PUDBR 2021, r.30(5)(iv)(e)), without a design level for the ramp crest. Clause 1.5.4(b) applies to every building whatever its size for this reason. How a site meets the retention of Clause 1.5.2 depends on its ground, and Chapters 4 and 8 set three regimes for the State: the Kandi fans and choe beds of sub-area PB-A, where recharge is preferred, but not on the Shivalik slopes themselves, where the hill rule of Clause 4.11 bars infiltration; the over-exploited central plains, where 115 of the State's 153 assessment units were over-exploited in 2024 (CGWB) and recharge is encouraged with protection of groundwater quality; and the waterlogged south-west, the Sirowal belt and the bet lands, where the water table is within 3 m and no infiltration is credited. This Manual applies within the State of Punjab; the Union Territory of Chandigarh, which is not part of the State, is covered only by Supplement S01.
Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.
1.6 Tiered adoption
1.6.1 Tier A authorities. The following are Tier A:
- (a) the Municipal Corporation Ludhiana (MC Ludhiana), with GLADA and every other approving authority within GLADA's area;
- (b) the Municipal Corporation SAS Nagar (Mohali), with GMADA and every other approving authority within GMADA's area, among them the local bodies of Zirakpur and Kharar and the authority for New Chandigarh; and
- (c) every other Municipal Corporation constituted under the Punjab Municipal Corporation Act, 1976, among them those of Amritsar, Jalandhar and Patiala (13 at March 2023 by the CAG, with Barnala reported as the fourteenth; list [TBC]), with every other approving authority within its limits; and, wherever they lie, PUDA and the development authorities in their urban estates and schemes.
1.6.2 Tier B authorities. All other Municipal Councils and Nagar Panchayats are Tier B.
1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:
Table 1.1 — Differences between Tier A and Tier B authorities
| Item | Tier A | Tier B |
|---|---|---|
| Performance criteria (Chapters 2–9) | Apply in full | Apply in full |
| Hydrologic method for storage | Hydrograph method (Chapter 3) | Hydrograph method, or the design-aid route of Clause 1.7 where eligible |
| Compliance calculator (Clause 10.5) | Required as a summary | Required; may be the sole calculation on the design-aid route |
| Policy supplement alternatives (Clause 1.7) | Only with State Stormwater Technical Committee concurrence | May be adopted by council resolution |
| Technical review | By the Authority | By the Authority, with DLG regional support or an empanelled reviewer (Clause 10.7) |
| Flood-sensitive catchment rule | Applies | Applies |
1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the area of a development authority (GMADA, GLADA or another authority under the Punjab Regional and Town Planning and Development Act, 1995) as notified, or is found by a post-event review (Clause 10.16) to need the full methods.
1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.
Commentary. Municipal Corporation Ludhiana, with its engineering wing and, beside it, GLADA in its schemes and WRD for the Buddha Nallah and the other notified drains, and a small Nagar Panchayat with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Ludhiana.
1.7 Policy supplement: adoptable alternatives
1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.
1.7.2 The alternatives are:
Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5
| No. | Main-text requirement | Adoptable alternative | Eligibility |
|---|---|---|---|
| S-1 | Storage sized by hydrograph method (Chapter 3) | Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator | Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1) |
| S-2 | Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site | Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule | Any site outside flood-sensitive catchments |
| S-3 | Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) | Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 | Waterbodies with no mapped 1% AEP extent |
| S-4 | Downstream analysis by hydraulic model (Chapter 5) | Screening checklist of downstream capacity and known flooding, with a model only where the screen fails | Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall |
| S-5 | On-site detention | Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) | Where a basin plan has been notified |
1.7.3 Conditions on adoption.
- (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
- (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
- (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
- (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
- (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).
Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.
1.8 Relationship with other instruments
1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.
Table 1.3 — Relationship with other instruments
| Instrument | Relationship |
|---|---|
| Punjab Municipal Building Bye-Laws, 2018 (PMBBL; DLG notification No. CTP(LG)/2018/3548 of 22 November 2018, under s.201(1) of the Punjab Municipal Act, 1911 and s.399(2) of the Punjab Municipal Corporation Act, 1976; amended on 31 December 2019 and 9 August 2023) | Continue, in the municipal areas of all Municipal Corporations, Municipal Councils and Nagar Panchayats (PMBBL 1.3). They site the plinth "so … that adequate drainage of the site is assured", at not less than 450 mm above the surrounding ground (cl. 5.2.1.1); keep surface drainage out of basements and require sewage from a basement to be pumped to the sewer "to avoid any risk of the sewerage or sludge heading back into the basement" (cl. 4.23(vii)–(viii)); carry roof water away from the building to a drain or covered channel (cl. 5.16.1); keep at least 20% of recreational open space unpaved and "The inlet and outlet point of natural drain system … with adequate size of channel" on large sites (cl. 11.2.1(iv); Table 15.1); and ask for permeable materials in all open parking of group housing (Table 10.1). They set no design storm, release rate or detention volume, and no setback from a drain, choe, pond or river. The design criteria of Chapters 2–6 and the hydraulic corridor and setbacks of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where PMBBL, a master plan, a statute or a court order is stricter, it governs (Clause 1.3.3). |
| Punjab Urban Planning and Development Building Rules, 2021 (PUDBR, an abbreviation set by this Manual; HUD notification No. G.S.R. 144/P.A.11/1995/Ss.180 and 43/2021 of 31 August 2021, Gazette of 10 September 2021, under s.180 read with s.43(2) of the Punjab Regional and Town Planning and Development Act, 1995; corrigendum of 16 March 2022; Amendment Rules of 29 March 2022; amendments of 14 July and 7 September 2026 reported) | Continue, in the whole State except within municipal limits, the Lal Lakir of village abadi, Cantonment Boards and sites under the Archaeological Survey of India, and in the urban estates and other schemes of the development authorities wherever they lie (r.1(3)). Plans show "methods of disposal of waste water, sewerage and storm water" and the surroundings to 15 m (r.11); the plinth of a residential plot is 900 mm "from the crown of adjoining road in front" (r.3(A)(1)); no basement is allowed in a "No construction Zone" or "Master Plan Green area", and "surface drainage does not enter the basement" (r.30(5)(iii) and (iv)(e)); septic tanks and absorption pits are kept 30 m from drinking-water sources and streams, and absorption pits have no outlet to a storm drain (r.45(7)–(8)); a certificate in Form H precedes the use of drainage (r.44(5)), and connections to public sewers are made in Form L (r.45); MoEFCC's conditions of S.O. 3999(E) of 9 December 2016 apply to large buildings (r.43); and NBC 2016 applies where the Rules are silent (r.52). No setback from any river, nallah, choe, pond or canal is set (r.26). The Punjab Unified Building Rules, 2025, which were to replace PUDBR and PMBBL, were withdrawn on 27 April 2026 (as reported) and are not cited as current. |
| Rainwater harvesting: PMBBL 2018, Ch. X; PUDBR 2021, r.40; Punjab Groundwater Extraction and Conservation Directions, 2023 (PWRDA) | Continue unchanged. PMBBL requires a harvesting proposal on every plot of 100 m² or more and in group housing, public, commercial and industrial buildings of any size, recharge on plots of more than 500 m², and inspection by a municipal Rainwater Harvesting Cell before a completion certificate or service connection, with every building above 1,000 m² verified each year (cl. 10.1–10.6); PUDBR requires harvesting above 250 m² for residential and public plots and above 100 m² for commercial and industrial plots, in group housing of any size, and "not to inject contaminated water into recharge structures" in industrial areas (r.40). The Directions make harvesting voluntary for users who extract groundwater, earning one water-conservation credit, and a rebate of ₹2.50, for each cubic metre conserved under an approved scheme (Directions 2.7 and 4.7). None of these gives an outlet rule or a storage that is empty when a storm arrives. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). The State drew 156.87% of its annual extractable groundwater in 2024, and 115 of its 153 assessment units were over-exploited (CGWB); yet the water table lay within 5 m of the surface over about 5,723 km² of the south-west in 2019 (CGWB and WRD). Recharge structures may count toward retention where they meet Chapters 4 and 8, which make recharge the first choice, with pre-treatment and a quality screen, where the seasonal high water table is deeper than 10 m, give no recharge credit where it is within 3 m, ask for a site check in between, and bar infiltration on the Shivalik slopes (Clause 4.11). |
| Punjab Regional and Town Planning and Development Act, 1995 (Punjab Act 11 of 1995); the master plans; PUDA and the development authorities | Continue. PUDBR is made under ss.180 and 43(2) of the Act; master plans are notified under it, as the Master Plan Ludhiana (2007–2031) was on 12 September 2008 under s.70(5) (HUD, reply to the NGT in O.A. 1295/2024); and PUDA, GMADA, GLADA and the other development authorities develop urban estates and schemes under it. The Act itself, and the sections that constitute the authorities, were not read for this Manual [TBC]. The report of the Master Plan Jalandhar (Vision 2031) proposes no construction within at least 200 m of the Chitti Bein "untill concrete bandh is constructed", except a 30 m buffer zone from its bank, and a 30 m plantation strip along the Black (Kala Sanghian) Bein; these are proposals of a plan report whose notification was not seen, not statutory buffers. This Manual does not decide zoning; the drain reserves and regional facility sites of Chapters 4 and 7 are meant to be shown in the master plans and in the layouts of the authorities. |
| Punjab Municipal Corporation Act, 1976 (Act 42 of 1976); Punjab Municipal Act, 1911 (Act 3 of 1911); Punjab One-Time Voluntary Disclosure and Settlement of Violations of the Buildings Bye-Laws Act, 2019 | Continue. The Acts are the parents of PMBBL (s.399(2) and s.201(1)), and govern the Municipal Corporations, Municipal Councils and Nagar Panchayats; their sections on the vesting of drains, connections to them and building over them were not read for this Manual [TBC]. This Manual does not change those powers; Chapter 7 treats chhappars and choes as drainage assets and Chapter 8 keeps sewage out of storm drains. |
| Punjab Canal and Drainage Act, 2023 (Punjab Act 11 of 2023; assent 18 December 2023; Gazette (Extra.) 27 December 2023), ss.2, 5, 38, 39, 41, 52 and 61; notifications under s.55 of the Northern India Canal and Drainage Act, 1873 | Continues. The Act comes into force on a date the Government notifies (s.1(3)); no commencement notification was found [TBC]. Where obstruction of a river, stream or drainage channel may cause injury, the Government may by notification bar obstruction within defined limits, and the reach so notified "shall be held to be a drainage-work" (s.38, which carries over s.55 of the Act of 1873, repealed in its application to Punjab by s.61); the Divisional Canal Officer may remove an obstruction (s.39); damaging, altering or constructing a drainage work, or altering the flow of a river or stream so as to endanger one, is an offence punishable with a fine of ₹5,000–50,000 or up to six months' imprisonment (s.52); and the removal of sewage from towns is not a drainage work (s.2(7)). The 150 m limit of s.5 protects State tubewells and is not a buffer round a water body. WRD notified 393 of 869 drains, choes and rivers under s.55 (WRD) or 514 of 935 (as reported); no notification text, list or width was found. Its notifications include the Patiala ki Rao in Kharar tehsil (No. 4/8/2013-iw(3)26573/1 of 4 March 2013) and the floodplain of the Sutlej in Ferozepur and Tarn Taran (4 March 2024), which WRD computed as a 100-year Lacey waterway of 0.58 km but declared as the land between the embankments, about 4.5 km apart; the NGT found "no material … indicating the exercise for demarcating the flood plain zone as per the applicable zone" (order of 14 March 2024, as quoted). A drainage-wing NoC for projects within 150 m of a water body was announced by the Water Resources Minister on 20 September 2023 (as reported); no notification or order was found, and this Manual does not apply it as a rule. No floodplain zoning Act exists (as reported). Where a s.38 line is wider than the corridor of Chapter 7, it governs (Clause 1.3.3). |
| Punjab Water Resources (Management and Regulation) Act, 2020 (Act 2 of 2020); Punjab Groundwater Extraction and Conservation Directions, 2023 (in force 1 February 2023) | Continue. The Act establishes PWRDA (s.3), lets it categorise areas by the stage, trend, level and quality of groundwater (s.14(5)), and direct "water conservation and groundwater recharge, including rain water harvesting" (s.15(2)(ix)) and advise on the "utilization and storage of surface runoff" (s.15(7)(ii)). The Directions charge for groundwater by zone and slab, ₹0–22 per m³, exempt drinking and domestic use, agriculture, urban local bodies, panchayats and development authorities, and penalise the non-maintenance of recharge structures with ₹10,000–1,00,000. The recharge rules of Chapters 4 and 8 state recharge volumes in m³ a year so that they can be linked to the credits; the link is not a mandate. |
| Punjab Preservation of Subsoil Water Act, 2009 (Act 6 of 2009) | Continues. The dates from which paddy may be transplanted, 1, 5 or 9 June by district in 2025 (as reported), set the start of the ponded-field season that Clause 2.11.4 uses; the Act's text was not read [TBC]. |
| Punjab Land Preservation (Chos) Act, 1900 | Applies where it binds. The Government may notify erosion-prone Kandi areas (s.3) and regulate, restrict or prohibit clearing, quarrying, cultivation and the cutting of trees in them (s.4) (as seen through an index); a notification under s.4 covers 21,944 acres in 15 villages of the Shivalik foothills near Chandigarh (as reported). Which department administers the Act, and the list of notified areas, are to be confirmed [TBC]. Earthworks and drainage works in notified Kandi areas are subject to it. |
| Punjab Village Common Lands (Regulation) Act, 1961; the orders of the courts on village ponds | Apply where they bind. Village chhappars are Panchayat commons (shamlat) under the Act; the Supreme Court ordered encroached pond land restored to a Gram Panchayat (Jagpal Singh v. State of Punjab, 28 January 2011), and the High Court ordered encroachments on village ponds removed within six months in 2020, with PPCB to monitor pond water (as reported). No pond statute or pond authority was found [TBC]. Any buffer round a chhappar in Chapter 7 is this Manual's proposal. |
| Wetlands (Conservation and Management) Rules, 2017; the Punjab State Wetlands Authority; the Ramsar sites | Continue. The six Ramsar sites are Harike (1990), Kanjli and Ropar (2002), and Keshopur-Miani, the Beas Conservation Reserve and the Nangal Wildlife Sanctuary (26 September 2019) (as reported). The State Wetlands Authority under r.5 had recommended 72 water bodies for notification by September 2025 (as reported); no notification under r.7 and no buffer distance was found [TBC]. Where a notification or order is wider than the setback of Chapter 7, it governs (Clause 1.3.3). |
| Orders of the Supreme Court, the High Court and the National Green Tribunal on choes, drains, rivers and ponds | Apply where they bind. Patiala ki Rao: the High Court's case on encroachment (Shamsher Singh v. State of Punjab, CWP 5901/2017, judgment of 2 June 2017; contempt petition COCP 1105/2023 pending), in which pillars "measuring 200 Ft." apart were fixed on the Union Territory side and were pending on the Punjab side in January 2024 (Local Commissioner's report of 8 January 2024), a width fixed for that case and not a WRD norm; and a petition for an embankment along it (Ram Lal v. State of Punjab, CWP-PIL 79/2025). The NGT has heard the pollution of the Sutlej and the Beas (O.A. 916/2018, as reported; O.A. 673/2018), the Sutlej floodplain zone (O.A. 303/2023), the realignment of a drain at Manauli, for which WRD requires its prior permission (O.A. 279/2024), the narrowing of the Buddha Nallah (O.A. 327/2025), the rivers of the State (O.A. 413/2025), groundwater (O.A. 694/2023), the Patiala ki Rao (O.A. 180/2026) and the Master Plan Ludhiana (O.A. 1295/2024). The hydraulic corridor and setbacks of Chapter 7, with a Zone 1 of at least 15 m, are this Manual's proposals; where a court's line binds and is wider, it governs. |
| Disaster Management Act, 2005; PSDMA; the draft State Disaster Management Plan; the State Flood Control Board | Continue. A draft State plan of about 2011 was found, which names drainage congestion and waterlogging as the main problem of the monsoon and asks that streams be desilted "before the onset of monsoons every year" (draft SDMP); no current State plan and no urban flood plan was found [TBC]. No State order fixes a date for pre-monsoon works; ministers and Deputy Commissioners set 30 June most years (as reported). Chapter 10 sets 15 June, ahead of the onset at Jalandhar and Patti. |
| Earlier design values: Amritsar Smart City Ltd, bid No. 07/ASCL/2018-19 (2018); PMIDC, feasibility report for the Buddha Nallah (2020); WRD, rooftop rainwater harvesting of government buildings (undated) | Superseded for works designed under this Manual. The walled-city trunk sewers of Amritsar were designed for "a return period of once in two years" with surcharge in manholes, and the Buddha Nallah for a "2 year return period with reduced run-off within the city reach due to active storm water detention"; WRD sized rooftop recharge for 40 mm/h. These are design values of single projects and of recharge structures, cited as the history of practice; the return periods of Table 2.1 and the rainfall of Chapter 2 apply instead (Clause 2.3.6(n)). |
| CPHEEO Manual on Storm Water Drainage Systems (2019) | Engineering reference. This Manual sets higher return periods under Clause 1.3.2. |
| NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) | This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF. |
| NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 | Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create. |
| IRC:SP:42-2014 and IRC:SP:50-2013 | Apply to road drainage only where they do not conflict with Chapter 6. |
| MBBL 2016, Chapter 9 | Model for RWH and for the inspection regime in Chapter 10. |
Commentary. RWH in Punjab is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a late-season storm, such as those of 24 September 1988 and 4–5 October 1955, arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.
Punjab is spending on its drains and rivers. The rejuvenation of the Buddha Nallah in Ludhiana was sanctioned at ₹650 crore and awarded at ₹839.79 crore with its operation and maintenance (as reported); WRD lists the channelisation of the N-Choe in Sector 101 of SAS Nagar (₹22.43 crore), flood works on the Swan (₹284.98 crore) and embankments and widening of the Ghaggar on a case recommended by CWPRS (₹1,104.11 crore), and took up 19 flood-protection works worth ₹1,091.40 lakh in SAS Nagar district for the monsoon of 2024 (WRD); the Smart City companies of Ludhiana, Jalandhar and Amritsar have storm-drain projects, among them the rehabilitation of the storm drains of Ludhiana's area-based development (₹17.79 crore) and of Dugri (₹41.35 crore) (CAG, Report No. 7 of 2021); and a revamp of the Badi and Chhoti Nadi at Patiala has been discussed at ₹208.33 crore (as reported). None of these works was found with a stated design rainfall, and only the Buddha Nallah and the Amritsar walled-city sewers with a return period, 2 years. No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.
The State's law already holds many of the tools. Section 38 of the Punjab Canal and Drainage Act, 2023 lets the Government notify limits along a river, stream or drainage channel within which obstruction is barred, and the reach so notified becomes a drainage work (as section 55 of the Act of 1873 did before); WRD has used the power for the Patiala ki Rao (2013) and the Sutlej in Ferozepur and Tarn Taran (2024), and computes its floodplains on a 100-year discharge by Gumbel's method with a waterway by Lacey's formula (WRD, letter to CWC, 2024). Building plans must show "methods of disposal of waste water, sewerage and storm water" (PUDBR r.11); a municipal Rainwater Harvesting Cell must inspect harvesting structures before a completion certificate or a service connection is issued (PMBBL cl. 10.6); PMBBL asks public open spaces of more than 500 m² for "complete utilization and capture of storm water", including "Artificial or natural Storage of storm water runoff from larger sites" (cl. 10.4), and large sites to keep "The inlet and outlet point of natural drain system … with adequate size of channel" (Table 15.1); the Water Resources (Management and Regulation) Act, 2020 lets PWRDA direct "water conservation and groundwater recharge, including rain water harvesting" (s.15(2)(ix)), and its Directions of 2023 earn a rebate for each cubic metre conserved under an approved scheme (Directions 2.7 and 4.7); and town sewage works are not drainage works (Punjab Canal and Drainage Act, 2023, s.2(7)). What the law lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how wide a choe's corridor must be, or how much storage a filled chhappar or a paved plot removes. This Manual's checks are framed as part of the building-plan, completion and occupation stages of PMBBL and PUDBR, not as a separate NOC. It is offered as a technical companion to these instruments, to the orders of the courts and the NGT, and to the drainage works of the State: it supplies the design storm, detention and corridor numbers they do not set, as a proposal for the Government and the authorities to consider. Neither DLG, HUD, WRD nor any other body has adopted it.
1.9 Roles and responsibilities
1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.
Table 1.4 — Roles and responsibilities under this Manual
| Agency | Role under this Manual |
|---|---|
| Department of Local Government (DLG), with its Town Planning Wing (CTP(LG)) | Makes PMBBL and its amendments for the municipal areas; oversees the Municipal Corporations, Municipal Councils and Nagar Panchayats; and runs the in-situ remediation of drains in 22 urban local bodies, 12 of them incomplete in October 2025 (PPCB, reply to the NGT). Would make the amendment to PMBBL of Clause 1.3.1(a) if it adopted the Manual, issue the model bye-law of Clause 1.3.1(b), give regional support to Tier B authorities (Table 1.1) and maintain the empanelled reviewer list (Clause 10.7). |
| Department of Housing and Urban Development (HUD), with the Department of Town and Country Planning (Chief Town Planner) | Makes PUDBR and its amendments for the rest of the State and the schemes of the development authorities; issues the Uniform Zoning Plan (Drawing No. 01/2020 CTP(Pb) of 28 July 2020); and notifies master plans under the Punjab Regional and Town Planning and Development Act, 1995. Would make the amendment to PUDBR of Clause 1.3.1(a) if it adopted the Manual, and show the drain reserves and regional facilities of Chapters 4 and 7 in master plans and layouts. |
| State Stormwater Technical Committee (Clause 1.3.2) | Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12). |
| Municipal Corporation Ludhiana (MC Ludhiana) and the other Municipal Corporations; Municipal Councils and Nagar Panchayats | Sanction building plans within their limits under PMBBL, and must each constitute a Rainwater Harvesting Cell that inspects harvesting structures before a completion certificate or service connection is issued (PMBBL cl. 10.6). MC Ludhiana built the road along the Buddha Nallah that is alleged to have narrowed it (NGT, O.A. 327/2025). Their powers over drains under the municipal Acts were not read [TBC]. Would apply this Manual to their works, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15). |
| PUDA and the development authorities (GMADA, GLADA, and those of Amritsar, Jalandhar, Patiala and Bathinda [TBC]) | Develop urban estates and other schemes, in which PUDBR applies and they sanction plans; GMADA has acquired land for a 200-ft sector road "for Disposal of Storm Sewer" in SAS Nagar, whose social impact assessment asks it to recalculate the runoff of the nadi and to make "strong provisions … in the 'City Drainage Plan'" (GMADA, 2021), a plan not found [TBC]. Would apply this Manual to their layouts and drains and hand them over under Clause 10.14. |
| Water Resources Department (WRD): the Drainage-cum-Mining & Geology wing and the canal wing; the State Flood Control Board | The Drainage wing holds the rivers, choes and notified drains, about 7,200 km of drains, about 1,800 km of flood embankments (dhussi bandhs) and 3,800 river-training works (WRD); notifies limits under s.38 of the Punjab Canal and Drainage Act, 2023, as for the Patiala ki Rao, enforced by the Executive Engineer of the Water Management Investigation Division, Rupnagar, and the Sutlej in Ferozepur and Tarn Taran; computes floodplains on a 100-year Gumbel discharge and Lacey's waterway (letter to CWC, 2024); and requires its permission for the realignment of a notified drain (O.A. 279/2024). The canal wing holds the canals, distributaries and watercourses. As the Water Resources Department, WRD keeps the State's observation wells and, with CGWB, assesses groundwater. The State Flood Control Board, chaired by the Chief Minister, reviews flood works (as reported). Would provide design river and drain levels, headworks operating rules and release scenarios for Chapter 5, consent to outfalls into its drains and canals, and keep the s.38 lines that Chapter 7 applies. |
| Punjab Water Regulation and Development Authority (PWRDA) | Regulates groundwater extraction under the Act of 2020 and the Directions of 2023, charges for it, and grants water-conservation credits for approved harvesting; it had processed 985 applications and collected ₹253.52 crore by 2024 (Amendment Bill, 2025). Would accept the recharge volumes of Chapters 4 and 8, stated in m³ a year, in applications for credits. |
| Punjab Pollution Control Board (PPCB) and the River Rejuvenation Committee | Monitors the rivers at 41 stations, 11 of them in real time, among them the Buddha Nallah and the Ghaggar below the Patiala Nadi (PPCB); grants consents to the treatment plants that discharge to drains and rivers; and was told by the High Court in 2020 to monitor the water of village ponds (as reported). Supports the removal of sewage from storm drains (Chapter 8). |
| PSDMA and the District Disaster Management Authorities | A draft State plan of about 2011 was found; no current State plan or urban flood plan was found [TBC]. Would recommend flood-sensitive catchments, hold the record of flood-prone locations with the Deputy Commissioners, and lead the post-event review (Clause 10.16). |
| Punjab State Wetlands Authority | Constituted under r.5 of the Wetlands Rules, 2017 (as reported); keeps the inventory of wetlands, and recommended 72 water bodies for notification in September 2025 after ground-truthing 1,143 sites (as reported). Would permit regulated activities in notified wetlands and Ramsar sites (Chapter 7). |
| Department of Revenue, Rehabilitation and Disaster Management: the Deputy Commissioners and the tehsil offices | Keep the revenue (khasra) records in which chhappars, tobas, dhabs, choes, raos, beins and bet land are recorded, and run the district flood-control action plans. Would certify the recorded extent of a choe, nala or chhappar for Chapter 7. |
| Punjab Water Supply and Sewerage Board (PWSSB) and the Punjab Municipal Infrastructure Development Company (PMIDC) | Build sewers and sewage treatment plants in many towns; PMIDC is the nodal agency for AMRUT and prepared the feasibility report for the Buddha Nallah (2020). Would apply Chapter 8 to the interception of sewage that now flows in storm drains, and this Manual to the drains they build. |
| Smart City companies of Ludhiana, Amritsar and Jalandhar | Build storm-drain and sewer works in their area-based development, such as the walled-city trunk sewers of Amritsar. Would apply this Manual to them and hand them over under Clause 10.14. |
| Department of Rural Development and Panchayats and the Gram Panchayats | Own most village chhappars, which they are cleaning on the Seechewal and Thapar models (as reported); the CAG found a choked screening chamber discharging untreated wastewater into the drain at the pond works of Punnawal and Bhalwan (Report No. 1 of 2026). Would apply Chapter 7 to chhappars that receive town or highway runoff. |
| Department of Soil and Water Conservation; Department of Forests | Soil and Water Conservation reuses treated sewage for irrigation, with a target of 1,519 MLD (PPCB, reply to the NGT, 2025), and is assigned the check dams of the Kandi in Table 1.5; Forests manages land closed under the Punjab Land Preservation (Chos) Act, 1900 [TBC]. Would apply Clause 6.3.6 to works on the choes. |
| Bhakra Beas Management Board (BBMB), a body of the Union | Operates Bhakra and Pong, whose releases set the stage of the Sutlej and the Beas. Would supply release notices and reservoir levels for the outfall-closed checks of Chapter 5. |
| Central Water Commission (CWC), a body of the Union | Publishes the Flood Estimation Reports for subzone 1(e) and zone 7 used in Chapters 2 and 3; it has no flood-forecasting or level-monitoring site in the State (as reported). |
| Central Ground Water Board (CGWB), a body of the Union | Assesses the State's groundwater with WRD, 115 of 153 units over-exploited in 2024. Would supply groundwater levels and quality with WRD. |
| National Institute of Hydrology (NIH), Roorkee | Runs NIH-DHAARA (Chapter 2). |
| IMD (Meteorological Centre Chandigarh) and PAU; road and rail owners (PWD (B&R), NHAI, Indian Railways) | IMD's stations and PAU's observatories supply the rainfall records of Chapter 2. Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7). |
Commentary. The roles in Table 1.4 are those each body would have if the Manual were adopted; until then they describe its present functions only. Stormwater in Punjab is split by territory and by kind of channel: between DLG, through PMBBL and the Municipal Corporations, Municipal Councils and Nagar Panchayats, in the municipal areas; HUD, through PUDBR, the master plans and the development authorities, in the rest of the State and in the authorities' schemes; WRD, through the rivers, choes, notified drains and dhussi bandhs of its Drainage wing, the canals of its canal wing and the s.38 lines; the Gram Panchayats, through the village chhappars; and the Department of Revenue, Rehabilitation and Disaster Management, through the revenue records, with the courts and the NGT setting the lines along the Patiala ki Rao and the conditions on the Buddha Nallah. SAS Nagar shows why the split matters. Its sectors, built by GMADA, drain to choes that come down from the Shivaliks and through Chandigarh, among them the Patiala ki Rao, whose Punjab reach WRD's Executive Engineer at Rupnagar enforces under a notification of 2013 while the local body of Naya Gaon supplies "only … the manpower and machinery" (reply to the NGT, 2026), and on to the Ghaggar, which WRD embanks; and when a drain near Manauli was to be realigned, WRD said that no realignment could be made without its permission, while GMADA's acquisition of the land was "under process" (O.A. 279/2024). No rule or order found divides the drains of WRD from those of the local bodies and the development authorities [TBC]. Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5. The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers.
Table 1.5 — Working assignment of drainage elements under this Manual
| Element | Assigned to |
|---|---|
| Rivers, choes, raos, nadis and beins; the drains notified under s.38 of the Punjab Canal and Drainage Act, 2023 (s.55 of the Act of 1873 for earlier notifications) and every other drain that WRD maintains, among them the Buddha Nallah, the Tung Dhab, the City Outfall drain, the Hudiara, the Sakki/Kiran, Patti, Kasur and Chand Bhan drains and the Kala Sanghian drain; dhussi bandhs, flood embankments and river-training works | WRD (Drainage-cum-Mining & Geology wing) |
| Canals, branches, distributaries, minors, kassis and watercourses, with their siphons and escapes | WRD (canal wing) |
| Sector and scheme drains of the urban estates and other schemes, until transferred to the local body | PUDA or the development authority (GMADA, GLADA or another authority [TBC]) |
| Street drains, public drains and sewers within the limits of a local body | The Municipal Corporation, Municipal Council or Nagar Panchayat, under DLG |
| Drains and sewers built under AMRUT and for the Buddha Nallah, until handed over | PWSSB or PMIDC, as builder |
| Storm-drain works of the Smart City projects of Ludhiana, Amritsar and Jalandhar, until handed over | The Smart City company, as builder |
| Drains, culverts and cross-drainage of State and national highways and other roads | PWD (B&R) or NHAI |
| Village chhappars (shamlat ponds) and village drains | The Gram Panchayat, under the Department of Rural Development and Panchayats |
| Check dams of the Kandi | The Department of Soil and Water Conservation, and WRD for its low dams |
| Land and choes in Kandi areas notified under the Punjab Land Preservation (Chos) Act, 1900 | The Department of Forests [TBC] |
Sewage in storm drains is dealt with in Chapter 8; the removal of sewage from towns is not a drainage work under s.2(7) of the Act of 2023. This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.
1.10 Variances and waivers
1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:
- (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
- (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.
1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Punjab has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to the Sutlej, the Beas, the Ravi or the Ghaggar through a flap gate in a dhussi bandh, to a WRD drain whose level is held up by the river it joins, such as the Buddha Nallah at Walipur Kalan, to the Hudiara drain, whose level is set across the border, or only by pumping, as in the depressions of the south-west, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it.
1.10.3 No variance or waiver. No variance or waiver shall be granted for:
- (a) a sewage connection to a storm drain;
- (b) the lowest habitable floor level of Chapter 6;
- (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
- (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.
1.10.4 Procedure.
- (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
- (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
- (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
- (d) A variance runs with the approval. It lapses if the approval lapses.
Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Punjab, the first census of water bodies counted 16,012 in the State, 1,578 of them encroached (as reported), the High Court's Local Commissioner found the Punjab portion of the Patiala ki Rao "heavily encroached by squatters" in January 2024 (CWP 5901/2017), and a road built along the Buddha Nallah in Ludhiana is alleged to have cut the channel's width "from 58 feet to 35 feet" (NGT, OA 327/2025).
1.11 Transition provisions
1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).
1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.
1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.
1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.
1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.
Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).
1.12 Review and amendment
1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.
1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.
1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.
References (chapter)
- Department of Local Government, Punjab (2018). Punjab Municipal Building Bye-Laws, 2018, notification No. CTP(LG)/2018/3548, 22 Nov 2018, cl. 1.1–1.3, 2.3, 2.44, 3.10.7, 4.23, 5.2.1, 5.16, Ch. X (10.1–10.6), 11.2.1 and Ch. 15 (Wayback Machine copy); amendment, notification No. LG/CTP(LG)/2019/3977, 31 Dec 2019; amendment of 9 Aug 2023 (independent floors; seen only in a list of documents). http://web.archive.org/web/20190713054359id_/http://lgpunjab.gov.in:80/upload/5bfb9b6b8b129Final%20PMBBL,%2022-11-2018.pdf ; http://web.archive.org/web/20200926062809id_/http://lgpunjab.gov.in/upload/documentation/5e18013e68c4bPMBBL-2020.pdf
- Department of Housing and Urban Development, Punjab (2021). Punjab Urban Planning and Development Building Rules, 2021, notification No. G.S.R. 144/P.A.11/1995/Ss.180 and 43/2021, 31 Aug 2021 (Punjab Government Gazette, 10 Sep 2021), rr.1–3, 11, 14, 23, 26, 30, 40, 43–45 and 51–53, with the corrigendum of 16 Mar 2022 and the Amendment Rules, G.S.R. 23/P.A.11/1995/Ss.180 and 43/Amd.(1)/2022, 29 Mar 2022 (as circulated by PPCB; Wayback Machine copy). http://web.archive.org/web/20221222012900id_/https://ppcb.punjab.gov.in/sites/default/files/2022-07/Building%20Rules-2021.pdf
- Department of Housing and Urban Development, Punjab. Amendments of the 2021 Rules, G.S.R.43/P.A.11/1995/Ss.43 and 180/Amd.(8)/2026, 14 Jul 2026, and the Second Amendment Rules of 7 Sep 2026; withdrawal of the Punjab Unified Building Rules, 2025, by notification No. H-U-11020/22/2026-4H1/I/1378803/2026, 27 Apr 2026 (all as reported; texts not read). https://teamleaseregtech.com/updates/article/57858/punjab-urban-planning-and-development-building-amendment-rules-2026/ ; https://teamleaseregtech.com/updates/article/55344/department-of-housing-and-urban-development-punjab-issued-a-notificati/ ; https://www.tribuneindia.com/news/punjab/punjab-withdraws-2025-building-rules-reverts-to-old-system/
- The Punjab Canal and Drainage Act, 2023 (Punjab Act No. 11 of 2023), Punjab Government Gazette (Extra.), 27 Dec 2023, ss.1, 2, 5, 38, 39, 41, 45, 51, 52, 57 and 61 (PRS copy); and the Northern India Canal and Drainage Act, 1873, ss.3 and 55–57 (central text). https://prsindia.org/files/bills_acts/acts_states/punjab/2023/Act11of2023-Punjab.pdf ; https://thc.nic.in/Central%20Governmental%20Acts/Northern%20India%20Canal%20and%20Drainage%20Act,%201873..pdf
- The Punjab Water Resources (Management and Regulation) Act, 2020 (Punjab Act No. 2 of 2020), ss.3, 14–17 (PRS copy); and the Punjab Water Resources (Management and Regulation) Amendment Bill, 2025 (Bill No. 1-PLA-2025), statement of objects and reasons. https://prsindia.org/files/bills_acts/acts_states/punjab/2020/Act%20No.%202%20of%202020%20Punjab.pdf ; https://prsindia.org/files/bills_acts/bills_states/punjab/2025/Bill1of2025PB.pdf
- Punjab Water Regulation and Development Authority (2023). Punjab Groundwater Extraction and Conservation Directions, 2023, notification of 27 Jan 2023, paras 2.7, 3.1, 4.1, 4.6 and 4.7. https://faolex.fao.org/docs/pdf/IND221379.pdf
- The Punjab Land Preservation (Chos) Act, 1900 (India Code record; not read), and a notification under s.4 covering 21,944 acres in 15 villages near Chandigarh (as reported). https://www.indiacode.nic.in/bitstream/123456789/21865/1/eo-_the_punjab_land_preservation_act%2c1900_new_doc_07-26-2025_19.36.pdf ; https://www.tribuneindia.com/news/archive/punjab/over-21-000-acres-around-ut-notified-under-plpa-537892
- Supreme Court of India. Jagpal Singh v. State of Punjab, SLP(C) 3109/2011, judgment of 28 Jan 2011 (as summarised; not read). https://api.sci.gov.in/jonew/judis/37417.pdf
- High Court of Punjab and Haryana. Suo motu order on village ponds, July 2020 (as reported). https://www.pressreader.com/india/hindustan-times-amritsar/20200716/281702617018140
- Nagar Panchayat Naya Gaon (2026). Reply in NGT O.A. 180/2026 (Sumitra Negi), with the Local Commissioner's fourth periodic report of 8 Jan 2024 in CWP 5901/2017 (Shamsher Singh v. State of Punjab), CWP-PIL 79/2025 (Ram Lal v. State of Punjab) and the notification of the Department of Irrigation No. 4/8/2013-iw(3)26573/1 of 4 Mar 2013 under s.55 (the Patiala ki Rao). https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20on%20behalf%20of%20R%206%20Nagar%20Panchayat%20Naya%20Gaon%20in%20OA%20No%20180%20of%202026%20Sumitra%20Negi%20Vs%20State%20of%20Punjab%20and%20Ors.pdf
- Water Resources Department, Punjab (2024). Affidavit in NGT O.A. 303/2023 (Karnvir Thamman; the Sutlej floodplain zone of 4 Mar 2024 and the Chief Engineer Drainage's letter to CWC of 2 May 2024), and report of 11 Oct 2024 in NGT O.A. 279/2024 (Dildeep Singh Basi; realignment of a drain at Manauli). https://www.greentribunal.gov.in/sites/default/files/news_updates/AFFIDAVIT%20BY%20GOVT.%20OF%20PUNJAB%20IN%20OA%20NO.%20303%20OF%202023%20Karnvir%20Thamman%20VS%20State%20of%20Punjab%20&%20Ors.pdf ; https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20WATER%20RESOURCE%20DEPTT.%20OF%20PUNJAB%20IN%20OA%20NO.%20279%20of%202024%20Dildeep%20Singh%20Basi%20VS%20State%20of%20Punjab.pdf
- Water Resources Department, Punjab (2024). Reply of 10 Feb 2024 in NGT O.A. 694/2023 (groundwater; recharge works), with the Directions of 2023 as an annexure. https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20on%20behalf%20State%20of%20Punjab%20in%20OA%20No.%20694%20of%202023%20(In%20Re%20News%20item%20titled%20UN%20predicts%20groundwater%20level%20in%20India%20will%20reduce%20to%20low%20by%202025).pdf
- Water Resources Department, Punjab. Drainage Administration (web page: rivers, embankments, drains notified under s.55; Wayback Machine copy of 22 Aug 2024). https://web.archive.org/web/20240822134624/https://irrigation.punjab.gov.in/en/node/5709
- Punjab Pollution Control Board (2025). Short reply in NGT O.A. 413/2025 (Abhisht Kusum Gupta), with the proceedings of the River Rejuvenation Committee of 28 Oct 2025; and Central Pollution Control Board (2025), reply of 13 Oct 2025 in NGT O.A. 327/2025 (Public Action Committee; the Buddha Nallah). https://www.greentribunal.gov.in/sites/default/files/news_updates/SHORT%20REPLY%20BY%20PPCB%20IN%20OA%20NO.%20413%20of%202025%20ABHISHT%20KUSUM%20GUPTA%20VS%20UNION%20OF%20INDIA%20AND%20ORS..pdf ; https://www.greentribunal.gov.in/sites/default/files/news_updates/REPLY%20BY%20R-7%20CPCB%20IN%20OA%20NO.%20327%20of%202025%20Public%20Action%20Committee%20through%20its%20Member%20Er%20Kapil%20Dev%20Vs%20The%20State%20of%20Punjab%20through%20the%20Principal%20Secretary%20Department%20of%20Water%20Resources.pdf
- State of Punjab (2023). Status report in NGT E.A. 35/2023 in O.A. 673/2018 (polluted river stretches; sewage generation and treatment). https://www.greentribunal.gov.in/sites/default/files/news_updates/AFFIDAVIT%20BY%20GOVT.%20OF%20PUNJAB%20IN%20EA%20NO.%2035%20of%202023%20IN%20OA%20NO.%20673%20of%202018%20News%20item%20published%20in%20the%20Hindu%20authored%20by%20shri%20Jacob%20Koshy%20......pdf
- Department of Housing and Urban Development, Punjab. Reply in NGT O.A. 1295/2024 (Munish Kumar; the Master Plan Ludhiana 2007–2031, notified 12 Sep 2008). https://www.greentribunal.gov.in/sites/default/files/news_updates/REPLY%20BY%20R-2%20PRINCIPAL%20SECRETARY,%20DEPARTMENT%20OF%20HOUSING%20AND%20URBAN%20DEVELOPMENT,%20PUNJAB%20IN%20OA%20NO.%201295%20of%202024%20Munish%20Kumar%20VS%20State%20of%20Punjab.pdf
- Comptroller and Auditor General of India (2026). Audit Report on Local Bodies for the period ended March 2023, Government of Punjab, Report No. 1 of 2026 (ULB counts; the Municipal Council Amloh; the pond works at Punnawal and Bhalwan). https://cag.gov.in/en/audit-report/details/124559
- Comptroller and Auditor General of India (2021). Performance Audit on Efficacy of implementation of the 74th Constitutional Amendment Act, Government of Punjab, Report No. 7 of 2021 (AMRUT and Smart Cities; Table 4.6 and Appendix 4.2). https://cag.gov.in/webroot/uploads/download_audit_report/2021/Report%20No.%207%20of%202021%20Govt.%20of%20Punjab_PA-062e0dc92d20019.93581063.pdf
- Central Ground Water Board (2024). Dynamic Ground Water Resources and Ground Water Quality of Punjab, 2024 (Wayback Machine copy); and Central Ground Water Board and Water Resources Department, Punjab, Ground Water Resources of Punjab State (as on 31 March 2020). https://web.archive.org/web/20250330134545id_/https://cgwb.gov.in/cgwbpnm/public/uploads/documents/1742295732461871757file.pdf ; https://web.archive.org/web/20240917170102id_/https://www.cgwb.gov.in/sites/default/files/MainLinks/Punjab_State_Resource_Report_2020.pdf
- Rajya Sabha reply of 13 Feb 2025 on the Ramsar sites, and press reports on the Punjab State Wetlands Authority, the Ramsar designations of 2019 and the pond programme of April 2025 (secondary sources). https://www.tribuneindia.com/news/three-more-wetlands-get-international-ramsar-tag-32032 ; https://www.tribuneindia.com/news/punjab/aap-govt-sanctions-rs-4573-crore-for-cleaning-15000-ponds-in-13500-punjab-villages ; https://www.tribuneindia.com/news/punjab/process-to-notify-water-bodies-on-all-encroachments-to-go/amp
- Press report of the announcement of a drainage-wing NoC for construction within 150 m of a water body, 20 Sep 2023 (secondary source; no order seen).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
- Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
- National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
- MoHUA (2016). Model Building Bye-Laws, Chapter 9.
- Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
- India Meteorological Department (1993). Climate of Punjab (district records of the heaviest rainfall in 24 hours to 1980, with the years of data of each gauge). https://imdpune.gov.in/library/public/Climate%20of%20Punjab.pdf
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012), stations of Punjab. https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- India Meteorological Department (2023). Press releases of 9 and 10 Jul 2023 (24-hour rainfall at Punjab stations). https://internal.imd.gov.in/press_release/20230709_pr_2421.pdf ; https://internal.imd.gov.in/press_release/20230710_pr_2423.pdf
- Ministry of Home Affairs (2026). Details of damages as reported by State/UT due to hydro-meteorological disasters, 2023-24 to 2025-26 (provisional), Annexure-I (PIB document, Aug 2026). https://static.pib.gov.in/WriteReadData/specificdocs/documents/2026/aug/doc202684944101.pdf
- Government of Punjab. Punjab State Action Plan on Climate Change 2.0, Table 3.8 (flood damage by year). https://napccindia.moef.gov.in/resources/pdfs/punjab-sapcc-2.0.pdf
- Press reports of the floods of 1988 and 1993, of the Sutlej breaches of August 2019, of the floods of July 2023 and August–September 2025, of the Madhopur headworks in 2025 and of urban flooding at Mohali, Ludhiana, Jalandhar, Amritsar and Bathinda (secondary sources). https://www.tribuneindia.com/news/punjab/redux-of-1988-1993-flooding-no-lessons-learnt-524523 ; https://www.ptcnews.tv/work-on-plugging-500-feet-wide-jania-chahal-breach-completed-jalandhar ; https://www.tribuneindia.com/news/punjab/ghaggar-flows-5-ft-above-danger-mark-in-sangrur-525383 ; https://www.babushahi.com/full-news.php?id=210817 ; https://sandrp.in/2025/08/29/aug-2025-ravi-flood-damages-madhopur-barrage-gates-in-punjab/ ; https://www.downtoearth.org.in/natural-disasters/the-2025-punjab-floods-are-a-sum-total-of-extreme-rain-weak-embankments-floodplain-encroachment-and-obstruction-of-natural-drainage
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
- PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
- Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
- Master Plan Jalandhar, report (Local Planning Area Jalandhar, Vision 2031), §§2.2, 9.3, 13.8.5–13.8.7 and 13.9.3 (GMADA-hosted file; Wayback Machine copy; notification status not seen). http://web.archive.org/web/20230726152616id_/https://www.gmada.gov.in/sites/default/files/documents/Jal_rpt_2011.pdf
- Greater Mohali Area Development Authority (2021). Report of Social Impact Assessment and SIMP: Master Plan Sector Dividing Road 92 & 92 Alpha for Disposal of Storm Sewer, SAS Nagar (Wayback Machine copy). http://web.archive.org/web/20250707200848id_/https://gmada.gov.in/sites/default/files/documents/2.%20(E)%2092%20%26%2092%20Alpha%20Road%20for%20Storm%20Water%20Disposal.pdf
- Amritsar Smart City Ltd (2018). Bid No. 07/ASCL/2018-19, Performance Based Management Contract for Construction of Trunk Storm Water Drainage & Allied Works … at Walled City Amritsar, Section V. https://www.amritsarcorp.com/NoticePDF/RFP_07_ASCL_2018-19.pdf
- Punjab Municipal Infrastructure Development Company (2020). Rejuvenation of Buddha Nallah at Ludhiana — Feasibility Report, January 2020. https://pwssb.punjab.gov.in/wp-content/uploads/2020/03/Buddha-Nallah-Feasibility-Report.pdf
- Water Resources Department, Punjab (2024). Letter of the Executive Engineer, Drainage-cum-Mining & Geology, SAS Nagar, of 26 Jun 2024, with a public notice of flood-protection works for the monsoon of 2024 (Wayback Machine copy). http://web.archive.org/web/20240930055944id_/https://irrigation.punjab.gov.in/sites/default/files/notifiction_circulars/files/flood%20protection%20work.pdf
- Department of Revenue, Rehabilitation and Disaster Management, Punjab. Draft Punjab State Disaster Management Plan (c. 2011; flood chapter and damage table). https://www.nitiforstates.gov.in/public-assets/Policy/policy_files/PSS1349O000461.pdf
- Hoshiarpur District Environment Plan (choes of the district). https://decc.punjab.gov.in/wp-content/uploads/2021/11/DEP-Hoshiarpur.pdf
- Press reports of the Buddha Nallah project, of the revamp of the Badi and Chhoti Nadi at Patiala, of the meetings of the State Flood Control Board and of the pre-monsoon targets of 30 June (secondary sources). https://www.tribuneindia.com/news/ludhiana/centre-raises-questions-over-840-cr-buddha-nullah-rejuvenation-project ; https://www.dailypioneer.com/2023/state-editions/punjab-cm-orders-completion-of-flood-protection-work--cleansing-of-waterways-by-jun-30.html
Annexes and forms
| Annex / Form | Content |
|---|---|
| 1A | List of Tier A authorities, with the boundaries of the Municipal Corporations and of the areas of GMADA, GLADA and the other development authorities |
| 1B | Maps of flood-sensitive catchments |
| 1C | Policy Supplement: text of alternatives S-1 to S-5 and model council resolution |
| 1D | Model PMBBL/PUDBR amendment and model ULB bye-law |
| Form 1-1 | Applicability Determination |
| Form 1-2 | Variance / Waiver Request |
Commentary. Punjab's floods come from three sources, often together. The first is the long, heavy storm on the plains. On 4–5 October 1955, after the monsoon had withdrawn, a single day put more than 330 mm on ten or more gauges at once across Majha, Doaba and central Malwa, among them Aliwal 495.3 mm, Batala 474.5 mm and Khara 457.2 mm, with 354.3 mm at the Ludhiana observatory (IMD, Climate of Punjab and Extremes); the draft State plan records the largest flood damage to houses of any year, "627000 houses", in 1955, but no figure for deaths or area was found (draft SDMP). Patiala recorded 356.5 mm on 11 July 1993 and Ludhiana PAU 338.0 mm on 24 September 1988 (IMD), both above the 100-year value of the CWC plates drawn in 1984. The second source is the rivers, fed from the Himalayan and Shivalik hills, held behind dhussi bandhs and set by the releases of Bhakra, Pong and Ranjit Sagar. The figures for the great floods conflict, and are given here with their sources. The draft State plan's table records 7,203 villages, 15,057 km² and 95 lives lost in 1962; 341 villages, 741 km² and 10 lives in 1988; 5,017 villages, 7,977 km² and 359 lives in 1993; and 6,585 villages and 157 lives in 1995 (draft SDMP, from the Economic Adviser of Punjab); its quality is poor, with identical rows for 2004 and 2005 and a sentence on floods coinciding with "high tide" copied from a coastal template. For 1988 the State's climate plan gives 1,483 villages and 607 deaths (Punjab SAPCC 2.0), the press quotes official data of "9,221.2 sq km (18.3% area)" inundated, worst in Ferozepur, and other accounts give 9,000 villages and 600–1,500 deaths, with Bhakra at 1,685 ft and 2.4 lakh cusecs at the Ropar headworks (as reported); for 1993 the press quotes "9,757.4 sq km (19.4%)", worst in Fatehgarh Sahib, with Mansa and Sangrur flooded by "congested" drainage (as reported). On 19–20 August 2019 the Sutlej breached the dhussi bandh near Shahkot, flooding Janian and Janian Chahal, and at Gidderpindi and Mandala, with 2.35 lakh cusecs at Harike and eight lives lost (as reported); the official record of that flood was not read [TBC]. In July 2023 Ropar recorded 27 cm and then 35 cm in successive 24-hour readings (IMD), the Ghaggar breached in Sangrur and Mansa districts, and Pong received a record inflow of 7.3 lakh cusecs in August (as reported); the State reported 41 deaths by 25 July (as reported), and the Union's provisional table gives 77 lives lost to all the hydro-meteorological events of 2023-24 (MHA). In August–September 2025 the Ravi, the Beas, the Sutlej and the Ghaggar flooded together, the gates of the Madhopur headworks failed and Harike passed 3,35,030 cusecs; the State's bulletin of 16 September reported 56 dead, 2,483 villages in 23 districts and more than 1.98 lakh ha of crops damaged (as reported), a reply in the Rajya Sabha gave 40 deaths, 14,065 houses and about 1.93 lakh ha (as reported), and the Union's provisional table gives 28 lives, 14,062 houses and 1.93 lakh ha (MHA); no post-disaster needs assessment was found. The third source is the town whose drains fail in a fall that is not extreme: the Lakhnaur choe floods Phase 11 of Mohali when it is not cleared, Bathinda waterlogs every monsoon, and Mohali, Ludhiana, Jalandhar and Amritsar flooded on 1–3 September 2025 (as reported).
Missing design makes all three worse. No State or urban local body storm-drain standard was found. The only design return periods found in Punjab urban drainage documents are 2 years, for the trunk storm sewers of Amritsar's walled city (Amritsar Smart City bid, 2018) and for the Buddha Nallah through Ludhiana (PMIDC, 2020), a channel that carries about 700 MLD of treated and untreated effluent to the Sutlej (PPCB, reply to the NGT, 2025); and under AMRUT "No work was done" on storm-water drainage in the State to September 2020 (CAG, Report No. 7 of 2021). Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix.
No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Punjab Municipal Building Bye-Laws 2018 and the Punjab Urban Planning and Development Building Rules 2021 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.