Sikkim · Draft v1.0

Sikkim Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Sikkim Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Sikkim. It is published in English; a Nepali edition is to follow.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Sikkim, by its Governor, its Council of Ministers or its Legislative Assembly, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Urban Development Department (UDD), formerly the Urban Development and Housing Department (UD&HD), by the Gangtok Municipal Corporation (GMC), the Namchi Municipal Council or any Nagar Panchayat (Rangpo, Singtam, Mangan, Gyalshing, Nayabazar-Jorethang, Soreng or Pakyong), by Gangtok Smart City Development Ltd (GSCDL), or by any District Collector. Nor has it been adopted, notified or endorsed by the Sikkim Commission on Glacial Hazards, the High-Level Steering Committee or the Multi-disciplinary Task Force constituted by the Home Department, the River Rejuvenation Committee of the Forest and Environment Department, the State-level Monitoring Committee, or the Sikkim Town and Country Planning Board, which is not yet constituted. Where it names a body, such as the Water Resources Department (WRD), formerly the Irrigation and Flood Control Department, the Public Health Engineering Department (PHED), the Rural Management and Development Department (RMDD) or its Dhara Vikas programme, the Land Revenue and Disaster Management Department (LR&DMD), the Sikkim State Disaster Management Authority (SSDMA) or a District Disaster Management Authority, the Mines and Geology Department, the Science and Technology Department, the Forest and Environment Department, the Sikkim State Pollution Control Board (SSPCB), the State Wetland Authority, the Roads and Bridges Department or the Public Works Department (PWD), the Energy and Power Department or the Home Department; NHPC Ltd (NHPC) or any other hydropower operator; the National Highways and Infrastructure Development Corporation Ltd (NHIDCL), the Border Roads Organisation (BRO) or IRCON International Ltd (IRCON); the High Court of Sikkim, the National Green Tribunal (NGT) or the Supreme Court; or a body of the Union or an external or research body, such as the Central Water Commission (CWC), the India Meteorological Department (IMD), the Central Ground Water Board (CGWB), the Central Pollution Control Board (CPCB), the National Disaster Management Authority (NDMA), the National Dam Safety Authority (NDSA), the Ministry of Environment, Forest and Climate Change (MoEF&CC), the Comptroller and Auditor General of India (CAG), the National Institute of Hydrology (NIH), the Asian Development Bank (ADB) or the International Centre for Integrated Mountain Development (ICIMOD), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role. Citing a body's document does not make this Manual that body's document.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. Until then, the Sikkim Building Construction Regulations, 1991 as amended (the SBCR 1991), the Sikkim Allotment of House Sites and Construction of Building (Regulation and Control) Act, 1985 as amended (the 1985 Act), the stability zones notified by the Mines and Geology Department in 2021, the Sikkim Municipalities Act, 2007 as amended, the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 as amended (the 1988 Act), the monsoon notices that stop earth excavation, any development plan made once the Sikkim Town and Country Planning Act, 2024 commences, orders of courts and tribunals, and approval conditions in force continue to apply.

Where this Manual can apply. The SBCR 1991 apply "to all the notified areas in Sikkim" (regulation 1(2)), to State, Central, semi-government and private builders alike, except Defence, and the 1985 Act requires prior permission for any construction in a notified area (section 7(1)). Inside Gangtok, building plans have been approved since 2017 by GMC's Town Planning Cell, still under the SBCR 1991. The Municipalities Act also provides a building permit system of its own (sections 266–287) and a power to make rules on "infrastructure in relation to building activity" (section 287), but no drainage rules have been made under it, as far as was found, and the Town and Country Planning Act, 2024 has not commenced. So in this Manual, setbacks and corridors are conditions of building permission in the notified areas and the municipal areas, and guidance elsewhere. The competent authority for the area is: in Gangtok, GMC; in another notified area, UDD or the urban local body that approves plans there (how approval is divided between them outside Gangtok was not found [TBC]); for the bank of a scheduled river, the Forest Department; and for a public work, the department or agency that executes it. Outside every notified and municipal area the SBCR 1991 give no building permission at all, so there the Manual reaches public works and any body that adopts it, and is guidance for everyone else. Land for a public drain or corridor that is not State or municipal land is secured by agreement with its owner or by donation, or reserved in a development plan once the 2024 Act commences; this Manual does not assume that land can be taken. A competent authority could take the Manual up in several ways: the State Government could amend the SBCR 1991 under section 7(2) of the 1985 Act, at regulations 6, 13(iii), 21, 25(iv) and 35; the Mines and Geology Department could cite its standards for jhora training and catchment drains in the conditions for reviewing a stability zone; a Municipality could make rules or regulations under the Municipalities Act, or the State could notify the limits of jhoras under its section 173; development plans could carry its drainage and flood-control content once the 2024 Act commences; SSDMA could refer to it in district disaster management plans; and the departments could apply it to their public works. None has done so.

The October 2023 flood. On the night of 3–4 October 2023 the South Lhonak glacial lake, in the far north of the State, drained into the Teesta; on that all sources agree, and this Manual calls the event the South Lhonak lake outburst and Teesta flood of 3–4 October 2023. Sattar et al. (2025) date the collapse of a frozen moraine into the lake to 22:12 IST on 3 October, from seismic records; the flood reached Chungthang at about 00:30 IST, where "The 60 m high dam" of Teesta-III "was destroyed", and Rangpo, about 135 km downstream, was "severely impacted by the debris, burying buildings and automobiles". The river bed "has risen by an average of 7-8 meters", in the words of a project prefeasibility report annexed to the State's affidavit to the NGT of 28 February 2026. Whether it was a glacial lake outburst flood (GLOF) or a cloudburst is disputed. The State's affidavit of 5 April 2024 attributed the flood "primarily to a cloudburst"; a committee constituted by NDSA found in June 2024, in a report not published, that "all scientific data and satellite images from that period points to GLOF and not a cloudburst", as reported; and Sattar et al. found a moraine collapse under modest rain, 29–39 mm over the lake from 28 September to 5 October in the ERA5 reanalysis. This Manual takes no side. The toll is also given two ways: 55 dead and 74 missing, with over 7,025 displaced, in SSDMA's multi-stakeholder survey as cited by Sattar et al.; and 79 dead and 44 missing in the post-disaster needs assessment (PDNA) of SSDMA with NDMA, annexed to the State's affidavit of 28 February 2026. Press figures differ again. Whatever its trigger, the flood was not a rainfall flood that a drain can be sized for: at the lake the water "peaked at 4.85 × 10⁴ m³ s⁻¹", with 1.03 × 10⁴ m³ s⁻¹ of sediment besides (Sattar et al.). So this Manual screens the GLOF corridors and the Teesta valley floor separately from rainfall design: there, siting, setbacks and floor levels govern (Chapters 2, 5 and 7).

Names. Some places, rivers, gauges and instruments have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • the Teesta is the Tista in CWC's flood estimation report and in IMD's tables; the Rangit is also the Rangeet (as in the Schedule of the 1988 Act) and the Great Rangit. The Rani Khola of Gangtok is also written Ranikhola, Ranichu and Rani chu; the Schedule of the 1988 Act does not name it under any of these, and this Manual reads the scheduled "Rongni chu" (no. 14) as probably the same river, a reading still to be confirmed [TBC]. The Rongni Chu is also the Rongni Chhu, and the Roro Chu is written "Ro-Ro Chu" in the State's reports. Darjeeling is printed DARJILING on CWC's plates.;
  • Gyalshing is also Geyzing; Chaten, near Lachen, is also Chhaten; Khecheopalri lake is also Khachoedpalri; and Nayabazar-Jorethang, the name of the Nagar Panchayat, is written Jorethang/Nayabazar in the State's reports. Some glacial lakes carry Pokhari in their names, such as Bhalay Pokhari and Doodh Pokhari: they keep their names, and they are glacial lakes, not pokharis of the storage clauses (below);
  • Sikkim has had six districts since 2021, named as IMD's Meteorological Centre Gangtok names them in its reports, as summarised: Gangtok, Mangan (formerly North Sikkim), Namchi (formerly South Sikkim), Gyalshing (formerly West Sikkim), Pakyong and Soreng. Older sources, such as CGWB's district reports, use the four earlier districts, and a clause that names a district must be checked against the current list;
  • CWC's flood estimation report for subzone 2(a), North Brahmaputra (NB/18/1991) covers the whole State, but its maps of design rainfall draw no contour north of Gangtok. This subzone is not the two rainfall zones (SK-Z1 and SK-Z2) and four hydrologic sub-areas (SK-A, SK-B, SK-B1 and SK-C) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7, nor the six stability zones of the Mines and Geology Department;
  • the hydropower projects are named as their operators and the State name them: Teesta-III at Chungthang, Teesta-V with its dam at Dikchu, Teesta-VI, and the Teesta Low Dam projects III and IV (TLDP-III and TLDP-IV); Chuzachen, Dikchu, Jorethang, Tashiding, Rongnichu and Rangit-III are the names of projects, not only of places. Sattar et al. (2025) print "Teesta Low Dam VI", which this Manual reads as probably Low Dam IV [TBC], and does not use;
  • CWC's levels for its sites on the Teesta and its tributaries were read only as SANDRP transcribed them, or in snippets of CWC's bulletins, and no source read states their datum [TBC]. The sources conflict at Melli, where the peak of October 2023 is 225.5 m in SANDRP's text and 228.0 m in a CWC bulletin of 2024. This Manual names the gauge, the date and the source with every level; and
  • in this Manual "the monsoon" and "the monsoon season" mean the wet season of 1 April to 31 October: the pre-monsoon storms of April and May and the south-west monsoon. That is not IMD's usage, and IMD's normal dates of onset and withdrawal for Sikkim were not found [TBC]; the Manual's season begins on 1 April because Gangtok's wet season does, and because the largest 24-hour falls on record at Gangtok and at Singhik both fell in May (Chapter 2).

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:

  • the Sikkim Building Construction Regulations, 1991 (the SBCR 1991) are the State's building rules. This Manual cites them as the Sikkim Building Construction Regulations, 1991 (UD&HD Notification No. 29(202)UD&HD/90/295, 19 March 1991, made under section 7(2) of the 1985 Act), as amended by the Sikkim Building Construction (Amendment) Regulations, 2000 and 2001 (No. GOS/UD&HD/6(294)2001, 16 October 2001), and writes "regulation 25(iv) of the SBCR 1991" or "SBCR 1991, reg. 25(iv)" for a provision. The copy read is hosted by a third party, Sikkim Manipal University. A Sikkim Building Construction (Amendment) Regulation, 2022, reportedly published on 12 April 2023, was not read, and may change what this Manual says of the regulations [TBC]. They apply only in notified areas, whose current list was not found [TBC]; they set a building's height by the stability zone of its site (regulation 17(i)), and regulation 39, added in 2001, lets the Government relax any provision. No instrument called the Gangtok Building Bye-laws was found, and this Manual cites none. MBBL 2016, in Chapters 1 and 10, is the national Model Building Bye-Laws of 2016, not the State's rules;
  • the stability zones are those of the Mines and Geology Department's Notification No. 17/DMG/20-21 of 19 March 2021 (Sikkim Government Gazette Extraordinary No. 86, 6 April 2021), read as an annexure to the State's counter-affidavit in NGT case OA 5/2022. Zones 1 to 6 allow 5½, 4½, 3½, 2½ and 1½ storeys and "No construction", and they are graded partly by the state of the jhoras: zone 1 "Training of jhoras/drains have been completed and done properly (with safe distance)", zone 3 "Jhora training is required/annual maintenance of drain is necessary" and zone 4 "Untrained jhora/ erosional potential jhora". The copy of the 2001 amendment read gives zone 2 "1 ½" storeys, against the 4½ of the 2021 notification; this Manual cites the 2021 notification for the zones and notes the conflict;
  • the 1985 Act (Act 11 of 1985, amended in 2000, 2001, 2007 and 2022) requires permission for any construction in a notified area and lets the Government make building regulations (section 7) and demolish illegal works (section 8). Its preamble records that allotments made without consulting the PWD had caused "encroachment of septic, water supply tanks … within the notified green belt and effecting and likely to cause land slides during monsoons";
  • the Sikkim Municipalities Act, 2007 (Act 5 of 2007, amended six times to 2026) makes a jhora a drain (section 2(24)) and defines it as "any natural watercourse, whether on a public land or on a private land" (section 163(b)); "the Municipality shall protect any jhora, whether on a public land or on a private land, within the municipal area" (section 172(2)); and rain water is to be "connected with the natural nullahs, khola-kholsas, jhoras, or storm water drainage" (section 193(b)). Under it, GMC is the Gangtok Municipal Corporation, whose wards rose from 19 to 21 by an ordinance of 2026. The sources do not agree on how many urban local bodies the State has: the State told the NGT on 19 December 2025 that there are seven, and UDD's notification No. 06/UDD/2026 of 23 April 2026 lists nine, the Gangtok Municipal Corporation, the Namchi Municipal Council and the Rangpo, Singtam, Mangan, Gyalshing, Nayabazar-Jorethang, Soreng and Pakyong Nagar Panchayats. UDD's web page lists seven and calls Namchi a "Municipal Corporation". This Manual uses the names of the 2026 notification and says "seven or nine, as the sources differ";
  • the 1988 Act (Act 6 of 1988, amended by Act 8 of 2000) defines the "river bank" of each of the 103 rivers in its Schedule as "an area of sixty metres on either side of such river or area within high flood level mark, whichever is less" (section 29(1)), under the Forest Department's control "as if it were a forest" since 2000 (section 29(9)). The words "whichever is less" make it a maximum, not a minimum, as this Manual reads them. It is the only line along water in the State's law that was found;
  • the Sikkim Town and Country Planning Act, 2024 (Act 10 of 2024, amended by Act 24 of 2025) was enacted in 2024 and amended in 2025, but has not commenced: it comes into force on a date the State Government notifies, and no such notification, rules, Board or development authority was found. When it commences it repeals the planning Acts of 1998 and 2007, whose status until then this Manual leaves open [TBC]; its development plans are to carry "proposals for flood control, land stability and sloped linked controls";
  • UDD, formerly UD&HD (renamed in about 2020), is "the nodal department which undertakes planning and development in the notified areas", administers the SBCR 1991, issues the monsoon notices and is the executing agency of the ADB-assisted Sikkim Integrated Urban Development Project (SIUDP), which covers about 60 km of roads "with … stormwater drains" in seven towns. GSCDL is the company for Gangtok's Smart City Mission;
  • WRD, formerly Irrigation and Flood Control, does river and jhora works, and is named in this Manual as the State groundwater agency, although no State network of observation wells was found; the only network found is CGWB's. PHED, written "Water Security and PHED" at times, is "the concern department for sewage management in the State". RMDD manages sewage in rural and peri-urban areas and runs the Dhara Vikas programme of spring-shed development. The Mines and Geology Department prepares the stability maps. The Forest and Environment Department holds the scheduled river banks and the slip reserves under the 1988 Act, and its River Rejuvenation Committee was "notified as the Nodal Agency for all water bodies" in 2021. The Science and Technology Department is the nodal department for GLOF studies and mitigation (Notification No. 10/Home/2025, 7 February 2025), and the Home Department constituted the Sikkim Commission on Glacial Hazards (No. 73/Home/2024) and the High-Level Steering Committee and Multi-disciplinary Task Force (No. 72/Home/2024), both on 11 September 2024. LR&DMD keeps the land records and, with SSDMA, the disaster function; the District Disaster Management Authorities are written in full. SSPCB grants consents to sewage treatment plants. The Roads and Bridges Department, written "PWD" in many sources, keeps the State's roads and their drains, and NHIDCL and BRO the national highways; IRCON builds the Sevoke–Rangpo railway. NHPC operates Teesta-V, and other companies operate the other hydropower projects;
  • the High Court of Sikkim and the NGT have shaped the State's drainage, river and glacial-lake work. The High Court's suo motu case In re Climate Justice in State of Sikkim (WP(PIL) 11/2026) is known only from press reports, and its orders were not read [TBC]. Before the NGT the State has filed affidavits on the breach of Teesta-III (OA 171/2023), on its rivers (OA 673/2018), on sewage and solid waste (OA 606/2018) and on building height in Gangtok (OA 5/2022 and OA 38/2022). This Manual cites court and tribunal orders with their status; and
  • where a shared clause names a revenue subdivision, this Manual uses the sub-division. Where it says "revenue village", Sikkim's land records use revenue blocks, as this Manual reads them [TBC]. A district is headed by a District Collector, the "chief executive and chief administrative and revenue officer" of the district, who "also deals with disaster management during natural calamities"; this Manual writes District Collector, the title the State's affidavits use, not Deputy Commissioner.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • GMC is the Gangtok Municipal Corporation. In other editions of this series and in some sources the same letters stand for other bodies; in this Manual they mean only this one, and each chapter writes the full name at its first use;
  • "SBCR 1991" is the Sikkim Building Construction Regulations, 1991, as amended, and "MBBL 2016" the national Model Building Bye-Laws 2016. Neither is the building rule of any other State;
  • HFL is the highest flood level recorded at a gauge, and DL and WL the danger and warning levels that CWC sets at its sites. None is a design level, and every HFL recorded before October 2023 on the Teesta must be checked against the raised bed. In the 1988 Act "high flood level mark" is the line that bounds a river bank;
  • FRL and MWL are the full reservoir level and the maximum water level of a hydropower reservoir; no operator's levels or release rules were found [TBC];
  • PPR is a project prefeasibility report and PDNA a post-disaster needs assessment, as the State's affidavit of 2026 uses them; and
  • "District Disaster Management Authority" is always written in full.

The sense is clear from the context.

Languages. This Manual is published in English; a Nepali edition is to follow. The Sikkim Official Languages Act, 1977 (Act 5 of 1977), as amended, makes "the Nepali, the Bhutia, the Lepcha and the Limbu languages" the languages "to be used for all official purposes of the State" (the amendment of 1981); Newari, Rai, Gurung, Mangar, Sherpa and Tamang were added in 1995, as reported, Sunuwar later, by an amendment not seen, and Bhujel by Act 16 of 2022, in force on a date to be notified. Where a shared clause calls for the State's language, this Manual names Nepali, the first language the Act names, the language of the edition to follow and the language of the local words it uses; the Nepali script is Devanagari, and the data fields whose names end in NE, such as NAME_NE in Annex 7A, hold a name in Devanagari. As set by this Manual, signs and flood-depth markers are in Nepali and English; where the local body's own public notices also use another official language of the State, such as Bhutia, Lepcha or Limbu, the sign carries that language too, because a sign must be readable by the people it warns.

Some local words are used in the text, and are explained again where they first appear in each chapter. Their meanings are taken from R. L. Turner's A Comparative and Etymological Dictionary of the Nepali Language (1931), with his page numbers; his headwords sometimes use older spellings, and this Manual writes the modern form:

  • a pokhari (पोखरी; pond, lake or tank) is this Manual's word for a natural or built body of standing water. Turner spells it पोखरि and gives "Lake, pool, tank" (p. 391), which covers natural lakes and built ponds alike. This Manual uses it because it is the plain Nepali word for the whole class, because it is in current use in Sikkim in the names of lakes, and because it passes directly into the Nepali edition; tāl (ताल, p. 281) also means musical time and a palm, and talāu (तलाउ, "Tank, pool, lake", p. 275) is less used. In the shared clauses a "tank" is water impounded by a bund with a surplus weir, which Sikkim hardly has, so the tank clauses apply in this Manual to pokharis, to the hydropower reservoirs and to any other impounded water. Engineered storage is a detention pond, and a glacial lake keeps its own name and is a hazard source, never storage, even where its name contains "Pokhari";
  • a jhora (झोरा; plural jhoras) is a natural watercourse or ravine stream, the word the Municipalities Act and the 1988 Act use. Turner marks it as a Darjeeling word for "Ravine" (p. 237). A ridge town's drains fall to its jhoras, and the jhoras to a khola or a river;
  • a khola (खोला) is a river or large stream, as in the Rani Khola and the Maney Khola. Turner's headword is खोलो kholo, "Small river, valley" (p. 130). The words "khola-kholsas" appear only inside the quotation of section 193 of the Municipalities Act; Turner gives kholso as "Stream, ravine" (p. 131);
  • a dhara (धारा) is a spring or a spring spout, often with a small stone basin, and the name of RMDD's Dhara Vikas programme. Turner's headword is धारो dhāro, "Spring of water" (p. 328); and
  • a kulo (कुलो) is an irrigation channel. Turner gives "Any channel for water, drain, ditch, irrigation-channel; small stream, watercourse" (p. 101).

A built channel is a drain in this Manual, not a nāli (नाली, p. 341). The Bhutia and Tibetan chu (river) and chho or tso (lake) appear only inside proper names, such as Lachen Chu and Shako Chho, and are not glossed, because no dictionary was consulted for them; no Lepcha word is used, for the same reason; and pahiro (landslide) and bāḍhi (flood) were not found in Turner by headword, and are not used [TBC].

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Sikkim's towns flood, slide and fail for three reasons. Gangtok's own rain gauge shows the first: its largest day, 310.3 mm on 30 May 1975, lies near the top of the band that CWC's map gives for a 100-year day there, and north of the capital the map gives no value at all. The ridge towns show the second, in every monsoon: water put into their slopes moves the ground, and the State's own building rule already grades a site by the state of the jhora beside it. And the valley towns show the third: on the night of 3–4 October 2023 a glacial lake drained into the Teesta, and the river that receives every jhora of the State now runs metres higher on its own debris.

  1. Rainfall that the national products barely cover. The whole State lies in CWC's subzone 2(a), North Brahmaputra, whose report (NB/18/1991) names "Gangtok the capital of Sikkim" first among the subzone's towns. Its ratios of short to 24-hour rain come from recording gauges in the subzone, none identified in Sikkim, and its maps draw no contour north of Gangtok, so that Mangan, Chungthang, Lachen and Lachung read only by implication, at about 200–240 mm for the 50-year day, as this Manual reads the plate. The State's records exceed the maps. At Gangtok the 100-year band on Plate 10 is about 240–320 mm, and the gauge recorded 310.3 mm in a day; in the north, Singhik recorded 504.2 mm on 12 May 1981 and Dikchu 400.8 mm on 25 August 1969, 1.7 to 2.5 times the plate's implied value by this Manual's arithmetic, both printed in the report's own Table 7. The steepness is local too: on 25 September 2005 Gangtok recorded 141.0 mm and Tadong, 4–5 km away, 212.5 mm. IMD's national set of rainfall intensity curves (Das et al., 2022) has no panel for any Sikkim station; the gridded rainfall of NIH-DHAARA gives Gangtok a 50-year day of 195 mm and Lachung 121 mm, lower than the records, not higher; and no hourly rainfall from any Sikkim gauge was found.
  2. Ridge towns on phyllite and colluvium, where water put into the slope moves the ground. Gangtok stands on "Precambrian rocks which contain foliated schists and phyllites", as summarised from a study of its slopes, and the ridge towns on thin hill soils, colluvium and the cut and fill of their own terraces. In June 1997, a month in which Gangtok's gauge recorded 1,281.3 mm, the town's largest month on record, landslides killed 38 people, as one source reports. GSCDL told the NGT that "landslides are caused mainly due to loose soil by spring water generated at natural Jhora". The State's rules already link building to drainage: the stability zones of 2021 are graded partly by whether the jhora beside a site is trained, and a site's zone can be reviewed only after the "Training of untrained Jhora" and the "Proper channelization of surface runoff by providing catchment drains … to natural waterways/Jhora". But the rules say nothing of what training or a catchment drain is, and the SBCR 1991 send every building's sewage to a septic tank and soak pit within the site (regulations 6, 13(iii) and 25(i)), on a wet slope as on a dry one.
  3. Valley towns on a river whose bed a glacial-lake outburst raised by metres. The flood of October 2023 destroyed the Teesta-III dam at Chungthang, buried parts of Rangpo, damaged the sewage treatment plants at Singtam, Rangpo and Melli, and left the Teesta's bed "risen by an average of 7-8 meters", with National Highway 10 "prone to submergence and subsidence"; NHPC estimates the rise at about 7.44 m at TLDP-IV and 7.29 m at TLDP-III. At Toong Naga 155 households were "mandated for relocation". Every outfall set from the old bed may now be buried, every highest flood level recorded before 2023 is suspect, and the sources disagree on the level the river reached at Melli. The State has 320 glacial lakes in the count of the project prefeasibility report (other inventories give 232 or 266), of which NDMA counts 40 as high-risk and 16 as very high-risk, and hydropower reservoirs and their release reaches line the trunk from Chungthang to Melli.

Over all three lie four more conditions. The only building rule is a storey-based one of 1991: it sets no setback from a jhora or a river, requires no rainwater harvesting and sets no design storm, runoff coefficient or detention; its drainage clauses carry no numbers. The only statutory rainwater harvesting is section 186 of the Municipalities Act, for buildings owned or occupied by the State Government and its bodies, and no manner has been specified under it, as far as was found. Drains carry sewage into the jhoras. In September 2025 the State estimated the towns' sewage at 29.51 MLD and the flow actually treated at Gangtok's plants at 15.22 MLD; the sewerage of Namchi and of Jorethang "has remained stalled since the year 2013 and 2015 respectively"; at Soreng, effluent from septic tanks discharges "into the open surface drains", as an ADB report found; and the NGT recorded on 4 July 2024 that "treated sewage is entering in to river/ rivulets/ jhoras and this is not permissible under the Water Act", while the State replied that "No sewage is disposed off in the rivers or fast flowing water bodies". No line protects a jhora: the 1988 Act's river bank reaches only the 103 scheduled rivers and is a maximum, the SBCR 1991 set no line from water, the Municipalities Act's power to notify the limits of a jhora (section 173) has not been used, as far as was found, and no setback along the Teesta was found after 2023. And no drain has a design standard: no State, municipal or departmental document fixes a design storm, a return period or a runoff coefficient for any town's drains.

Behind all of this lie the State's springs, jhoras, pokharis, glacial lakes and reservoirs. Springs, not wells, supply most of the State: RMDD's Dhara Vikas, begun in 2008 (2010 in one source), mapped 704 springs for rejuvenation, as reported, while an RMDD presentation of 2018 counts "more than 2000 springs mapped on GIS platform", as reported; the two counts conflict. Groundwater lies "largely in disconnected localized pockets and in deeper fracture zones", as CGWB is quoted, and no State network of observation wells was found. Khecheopalri lake became Sikkim's first Ramsar site in February 2025, as reported; its area is given in figures that conflict, and this Manual cites none. No wetland has been notified under the Wetlands Rules, as far as was found, and no statute protects a spring or a pokhari.

Design for Sikkim therefore has to cover a wet season that starts in April. At Gangtok IMD's normals (1981–2010) give 296.9 mm in April, on 15.2 rainy days, and 496.4 mm in May, before 609.8, 626.3, 565.9 and 438.7 mm from June to September and 173.4 mm in October, out of 3,490.4 mm in the year; March to May bring 26% of the year, by this Manual's sum. Thunder peaks in April and May, and Gangtok's and Singhik's largest days both fell in May. The State itself stops earth excavation each monsoon by notice, from 6 May in 2019 and from 1 June in 2020. This Manual's monsoon season is 1 April to 31 October, so that drains and jhoras are cleared before the April storms. Large falls come outside it too, as on 11 November 1995 (96.0 mm) and 27 March 2008 (72.0 mm) at Gangtok, so design statistics use the annual maxima of every month. Above about 2,500 m there is seasonal snow, and Gangtok itself has recorded −2.2 °C in January.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval wherever a building permission is granted. Every development above a modest size must:

  • hold frequent rainfall on site, in tanks for use, and in the ground only where the ground can safely take it;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving jhora, khola, river, pokhari or reservoir is high, when a dam upstream is releasing, or when a drain or culvert is choked with debris, silt and garbage.

The Manual also sets how public drains, hill roads and their drains and culverts, jhoras and their training, kholas, rivers, pokharis, the hydropower reservoirs, springs and their recharge areas, outfalls and basin-wide master plans are designed, and how drains in steep catchments are protected against debris, sediment and garbage, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Sikkim's wet season of April to October and its pre-monsoon storms; to the ridge towns, Gangtok, Pakyong, Namchi, Ravangla, Gyalshing and Soreng, built on phyllite, schist and colluvium whose slopes slide, and graded into stability zones by their jhoras; to the valley-floor towns of the Teesta, the Rangit and the Rongni Chu, Singtam, Rangpo, Melli, Majitar and Jorethang, on river terraces and a bed raised by the flood of 2023; to the middle Teesta valley of Dikchu, Mangan, Singhik and Chungthang, where the State's largest days were recorded and no CWC contour is drawn; to the high valleys of Lachen and Lachung, with their snow, glaciers and glacial lakes; to the hydropower reservoirs and their release reaches; and to springs that supply the towns and villages.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 on hill roads, and the NDMA urban flood guidelines are also used. The drainage chapter of the IRC's hill road manual, IRC:SP:48, was not read for this Manual.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Report for subzone 2(a), North Brahmaputra (NB/18/1991), as the interim source, with the report's own ratios of short to 24-hour rain in every part of the State. Where the plates draw contours, in the southern hills and valleys, the plate governs, with no departure below it, and Gangtok's record of 310.3 mm raises the design day within 25 km of the gauge on the same side of the Teesta. In the middle Teesta valley, where no contour is drawn, the design day is not less than a floor set from the Singhik record until a station there is analysed; in the high valleys it is not less than the plate's values at Gangtok, and every large structure has a site study. The design day is checked against the largest reliable days recorded within 25 km, but only within the same domain and never across the Teesta or the Rangit valley floor. NIH-DHAARA gives only the shape of the growth and duration curves and is reported beside the design value; IMD's national curves (Das et al., 2022) are not used, since they have no Sikkim panel. Glacial lake outbursts and the Teesta valley floor are screened separately: no drain is sized for them.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The SBCR 1991 and their amendments of 2000 and 2001; the 1985 Act; the stability zones of 2021; the Sikkim Municipalities Act, 2007 and its amendments; the 1988 Act; the Sikkim Town and Country Planning Act, 2024, not yet commenced; the monsoon notices of 2019 and 2020; the State's affidavits to the NGT of 2022, 2025 and 2026, with the PDNA of 2023 and the project prefeasibility report on the Lhonak valley annexed to them; and the High Court's judgments on the Dikchu release (2021) and the flood of 2023. This Manual follows them or, where disclosed, makes them stricter. The amendment of the SBCR 1991 of 2022, the notification that transferred building-plan approval in Gangtok to GMC, the list of notified areas, the orders of the High Court in its climate-justice case of 2026 and the report of the committee constituted by NDSA were not read. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Sikkim can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. No factor for Sikkim was found: the trends are mixed, with most indices of extreme rainfall falling over 1950–2018 and the number of days of 10 mm or more rising (Dubey et al., 2022, as summarised), while the monsoon rain over the South Lhonak catchment has risen by 8.6 mm a decade in ERA5 (Sattar et al., 2025), and the glacial lakes are growing. The State Action Plan on Climate Change was not read [TBC].
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. The CWC report for subzone 2(a) (1991) covers the whole State, but draws no contour north of Gangtok, and the records at Singhik and Dikchu are about twice the value the plate implies there; its ratio of the 1-hour to the 24-hour rain, 0.260, was built on recording gauges outside the State, and is the only published set. IMD's 2022 national set of rainfall intensity curves has no panel for Gangtok, Tadong or any other Sikkim station. The one study that offers rainfall intensity curves for a Gangtok catchment (Wangsu et al., 2022) derives them from daily rain and reports a "peak intensity" of 259.785 mm/h for July, which is not a usable design value.

Sikkim has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of UDD, GMC or any other local body, GSCDL, WRD, PHED, RMDD or the Roads and Bridges Department that fixes a return period, a runoff coefficient or a design rainfall for town storm drains. No IDF relationship with published constants was found for any station in the State. Gangtok's City Development Plan of 2006 proposed works for "Drainage and Landslip Protection", but "Projects under Drainage, Landslip Protection, Traffic, Street Lighting, Tourism and Environment were not taken up", as the CAG found in 2016. GSCDL has tendered drainage and jhora-training works in Gangtok, as reported, and the SIUDP is building stormwater drains on about 60 km of roads in seven towns, but no design storm was seen for either. These are projects, not a State standard. This Manual is offered as a technical companion to the SBCR 1991, the stability zones of 2021, the Municipalities Act's duties on jhoras, drains and outfalls, the 1988 Act's river banks and slip reserves, the monsoon notices, and the development plans of the 2024 Act once it commences: it supplies the design storm, detention, slope, water-level and buffer values that they leave open. It has not been adopted by UDD, GMC, any other local body or any other body. In particular:

  • The building rule asks for drains, but sizes nothing, and asks for no rainwater harvesting. The SBCR 1991 require roof gutters and down pipes "of such design and capacity that the water will neither spill out of them nor leak through them", connected to "the storm water plinth protection drain" (regulation 21); a "Pucca storm water/plinth protection drain … leading to the road side drain or to adjoining permanent drains or jhora" (regulation 25(iv)); and no occupation certificate "if the drain has not been provided to main outlet/jhora" (regulation 13(iii)). None of these gives a capacity, and no rule requires on-site detention, limits peak runoff or sets a design storm. The only rainwater rule for roofs is that a quarter of each roof be sloped "with rain water gutter" (regulation 6); the only statutory rainwater harvesting is section 186 of the Municipalities Act, for buildings of the State Government and its bodies;
  • The slope rules grade sites, but say nothing of infiltration. The stability zones set a building's height by the ground, its slope and its jhora, and regulation 35 forbids allotment in "any sinking area, landslide prone or in areas having scars of old landslides or in slope exceeding or around 70 (Seventy) degree". No rule restricts soak pits, recharge pits or infiltration trenches on slopes, on colluvium or above a cut or retaining wall, and regulation 25 sends sewage to a septic tank and soak pit within every site;
  • There are no setbacks from jhoras, springs or pokharis. The SBCR 1991 set setbacks only from roads and plot lines (regulation 18). The 1988 Act's river bank of "sixty metres … or area within high flood level mark, whichever is less" reaches only the scheduled rivers and is a maximum, and after 2023 the flood mark itself has moved. Zone 1 asks for jhoras trained "with safe distance", without a distance; the Municipalities Act makes the Municipality protect every jhora in its area, without a width; and no setback along the Teesta was found after the flood of 2023;
  • There is no floodplain law. No floodplain zoning Act or notified flood line was found. A project prefeasibility report annexed to the State's affidavit of 2026 proposes "High-risk Zoning" of the floodplains below glacial lakes, and the 2024 Act's development plans are to carry "proposals for flood control, land stability and sloped linked controls", but neither is in force. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); where a line that a development plan, a notification or a court draws is wider and binds, it governs; and
  • No document sets the river or reservoir level for which an outfall is designed. CWC's levels for its sites on the Teesta, the Rongni Chu and the Rangit were read only in transcriptions, on no stated datum; the October 2023 peak at Melli is 225.5 m in one and 228.0 m in another, and Rangpo has no CWC level that was found. The levels recorded before 2023 sit on a bed that has since risen by metres. No operator's reservoir levels or release rules were found, although the High Court directed in 2021, after a release from the Dikchu project, that "the hydropower projects in Sikkim shall ensure strict compliance of the safety guidelines". Highest flood levels are records, not design levels.

So each agency and each local body interprets the central manual its own way. GMC and the other urban local bodies, UDD, GSCDL, WRD, PHED, RMDD, the Roads and Bridges Department, NHIDCL and BRO, the Forest Department, the hydropower operators, their consultants and funding agencies fill the gaps differently. No notification divides the drains between them. Jhoras on public land other than forest land within a municipal area vest in the Municipality, and it must protect every jhora in its area, public or private (section 172); drains vest "in the Municipality, or the concerned Department, or organization, of the State Government, or the agency, as the case may be" (section 189(1)); the banks of the scheduled rivers are the Forest Department's; the road drains are the road owner's; PHED runs the sewers; and jhoras outside the municipal areas, or on forest land, have no named owner at all. In Gangtok a jhora may take a road's drainage and a ward's sullage, be trained by one agency and cleared by GMC's waste contractor, and end in a scheduled river under the Forest Department. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in two rainfall zones and four hydrologic sub-areas, with a checked station analysis to govern where one exists; the 2(a) plates where they draw contours, with the report's ratios everywhere; Gangtok's record as a floor within 25 km of the gauge east of the Teesta; a floor from the Singhik record in the middle Teesta valley, and the plate's values at Gangtok carried north into the high valleys, until stations there are analysed; a check of the design day against the largest reliable days recorded nearby that never crosses a ridge or the Teesta or Rangit valley floor; and a separate screening of every site for glacial lake outbursts, the Teesta valley floor, landslide ground and hydropower releases (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites, with rainwater storage credited only through its use (Chapter 4);
  • a required tailwater check for outfalls: in the ridge towns, a free outfall to a jhora with energy dissipation and a check of the jhora downstream; on the valley floors, the higher of CWC's highest recorded level and the surveyed flood mark of October 2023, with outfall inverts above the surveyed post-2023 bed; and in reservoir and release reaches, release scenarios from the operator's levels (Chapter 5);
  • a standard for what a "trained" jhora is, with the capacity, freeboard, drop structures, toe protection, debris basins and maintenance access that the stability zones' "proper" training leaves undefined (Chapter 6);
  • a design flood line, and corridors and setbacks along jhoras, kholas and rivers and around pokharis and springs, proposed by this Manual where no line binds, with a corridor at least 15 m from the top of bank, or from the crest of an incised bank, on every natural channel draining 8 ha or more; the 1988 Act's river bank wherever it is wider; a condition of building permission in the notified and municipal areas, and guidance elsewhere; corridor land that is not State or municipal land secured by agreement or donation, never taken; and every drainage asset sited above the flood and aggradation level of October 2023 and outside a mapped GLOF path (Chapter 7);
  • no deliberate infiltration on slopes steeper than 10°, on colluvium, fill or slide debris, in stability zones 3 to 6 without a geotechnical certificate and in zones 4 to 6 at all, or above a cut slope or retaining wall; none on the valley floors below the 1% AEP flood level, on the bed raised in 2023 or where the water table rises within 2 m of the ground; roof runoff to storage for use, with its overflow to lined, stepped drains and trained jhoras; no storm outfall within 15 m of a dhara, and the recharge areas of springs kept free of paving and road runoff; and the interception of dry-weather flow before every outfall to a jhora that feeds a dhara, a pokhari or an intake, and to the Rani Khola, the Roro Chu, the Rongni Chu and the Teesta within a town (Chapters 4 and 8);
  • debris racks and basins, allowances for sediment, garbage and blockage, energy dissipation in steep drains, and hill-road drainage that never discharges onto an unprotected slope (Chapters 6 and 9), with drains, jhora channels, inlets, racks and culverts cleared and certified ready by 31 March, cleared again by 30 April before the May storms, and again by 15 November after the season, standby kept from 1 April to 31 October, and, above about 2,500 m, the dates moved for snow and inlets kept clear of snow and ice in winter (Chapter 10); and
  • basin-wide master plans, so that the agencies that share a basin plan together, from the ridge towns' jhoras to the Teesta (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). The State in the SBCR 1991, a Municipality in its rules, the Mines and Geology Department in its stability zones, or a development plan once the 2024 Act commences can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Sikkim Building Construction Regulations, 1991 (UD&HD Notification No. 29(202)UD&HD/90/295, 19 March 1991), as amended in 2000 and 2001 (No. GOS/UD&HD/6(294)2001, 16 October 2001), regs. 1, 3, 4–6, 13, 17, 18, 21, 22, 25, 33–35 and 39 and Form III (copy hosted by Sikkim Manipal University); Mines and Geology Department Notification No. 17/DMG/20-21 (19 March 2021); Sikkim Allotment of House Sites and Construction of Building (Regulation and Control) Act, 1985 (Act 11 of 1985), as amended to Act 24 of 2022; Sikkim Municipalities Act, 2007 (Act 5 of 2007), ss. 2, 163, 172, 173, 186, 187, 189, 193, 266–287, as amended to 2026, and the Sikkim Municipalities (Amendment) Ordinance, 2026; UDD Notification No. 06/UDD/2026 (23 April 2026); Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 (Act 6 of 1988), ss. 2, 29, 30 and 32 and the Schedule, as amended by Act 8 of 2000; Sikkim Town and Country Planning Act, 2024 (Act 10 of 2024) and (Amendment) Act, 2025 (Act 24 of 2025); Sikkim Official Languages Act, 1977 (Act 5 of 1977), as amended; UD&HD Notice No. 613/GOS/JCTP/UD&HD (1 May 2019) and UDD Notice No. T(1689)/997 (26 May 2020); NGT, OA 5/2022 (EZ), counter-affidavits of the State and of GMC (2022), and OA 38/2022 (EZ), reply of GSCDL; NGT, OA 171/2023 (EZ), affidavit of the State of Sikkim of 28 February 2026, with the Home Department's notifications of 2024, the project prefeasibility report on GLOF risk mitigation in the Lhonak valley and the PDNA of the floods of 2023; NGT, EA 35/2023 in OA 673/2018, affidavit of the State of 19 December 2025 with the monthly progress report of September 2025, and the State's compliance report; NGT, OA 606/2018, six-monthly report of the State; High Court of Sikkim, WP(PIL) 4/2017 (1 March 2021) and WP(PIL) 3/2023 (7 December 2023); CAG, Report No. 3 of 2016 (Economic Sector, Sikkim), Chapter II; ADB, Sikkim Integrated Urban Development Project (57230-001), due-diligence report on Soreng sewerage (December 2024); CWC, Flood Estimation Report for North Brahmaputra subzone 2(a), No. NB/18/1991, Table 7 and Plates 8–10, read by eye; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012), Gangtok and Tadong; IMD, climatological normals of Gangtok, 1981–2010; Das et al. (2022), MAUSAM 73(4); Wangsu et al. (2022), as summarised; Dubey et al. (2022), as summarised; Sattar et al. (2025), Science; NIH-DHAARA (queried 14 November 2026); R. L. Turner, A Comparative and Etymological Dictionary of the Nepali Language (1931); CWC levels as transcribed by SANDRP; reports of the floods and landslides of 1968, 1997, 2023, 2024 and 2025, of the State's springs, wetlands and glacial lakes, of the High Court's climate-justice case and of the amendment of the SBCR 1991 of 2022 (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Pokharis, Jhoras, Springs and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Sikkim
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Sikkim locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies and channels
7E.2Terms not found or not checked
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A ridge town: its jhoras, dhara, pokhari and river. A town on a ridge with roof gutters to plinth drains and lined, stepped drains through silt traps and a debris rack at a hill-road culvert, falling through a trained jhora with drop structures to a main river on a raised gravel bed; an untrained, eroding jhora marked as unstable ground with no infiltration; a dhara below the town with its protected recharge area and no drains across it; a pokhari on a bench kept as storage with dry-weather interception of sullage before it; a cut slope with catch and toe drains; a valley-floor town with a flap-gated outfall above the post-2023 bed; a dam with its release reach; and, far up the valley, a glacial lake behind a moraine with a GLOF corridor down the river
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
ABC Waters Active, Beautiful, Clean Waters (PUB Singapore's design guidelines)
ADB Asian Development Bank
AEP Annual exceedance probability
AIDR Australian Institute for Disaster Resilience
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
ANSI / HI American National Standards Institute / Hydraulic Institute (pump standards)
APWA American Public Works Association
ARF Areal reduction factor
ARI Average recurrence interval
ASABE American Society of Agricultural and Biological Engineers
ASCE American Society of Civil Engineers
ASTM ASTM International (standards)
AWS Automatic weather station
BMP Best management practice
BOD Biochemical oxygen demand
BRE Building Research Establishment (UK)
BRO Border Roads Organisation
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CCTV Closed-circuit television (pipe inspection)
CDP City Development Plan (Gangtok, 2006)
CGP Construction General Permit (US EPA)
CGWB Central Ground Water Board
CIP Capital improvement programme (of a BSMP)
CIRIA Construction Industry Research and Information Association (UK)
CN Curve number (SCS/NRCS method)
COD Chemical oxygen demand
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CRZ Coastal Regulation Zone (coastal term; not applicable in Sikkim)
CSE Centre for Science and Environment
CSV, GeoTIFF, JSON, PDF File formats for data, rasters and documents
CWC Central Water Commission
DCIA Directly connected impervious area
DEM Digital elevation model
DGWL Design groundwater level
DID Department of Irrigation and Drainage, Malaysia
DL / WL Danger level / warning level (CWC)
DMG Department of Mines and Geology (its stability-zone notification, No. 17/DMG/20-21)
DPR Detailed project report
DST Department of Science and Technology (as the Lhonak valley PPR names its author)
DWF Dry-weather flow
EA Execution Application (NGT)
EN European Standard (Norme Européenne)
EPA Environmental Protection Agency (United States)
EPD Environmental Protection Division (Georgia, United States)
EPSG EPSG geodetic parameter registry (codes for coordinate systems)
ERA5 The fifth-generation global atmospheric reanalysis of the European Centre for Medium-Range Weather Forecasts
ESC Erosion and sediment control
EV1 Extreme value type I (Gumbel) distribution
EZ / PB Eastern Zone Bench / Principal Bench (of the NGT)
F&ED Forest and Environment Department (in order numbers)
FER Flood Estimation Report (CWC)
FHWA Federal Highway Administration (United States)
FRL / MWL Full reservoir level / maximum water level
FRP Fibre-reinforced plastic
FTL Full tank level
GIS Geographic information system
GLOF Glacial lake outburst flood
GMC Gangtok Municipal Corporation
GOS Government of Sikkim (in notification and order numbers)
GPT Gross pollutant trap
GSCDL Gangtok Smart City Development Ltd
GSI Geological Survey of India
GSMM Georgia Stormwater Management Manual
HAT / MHWS / MHWN / CD Highest astronomical tide / mean high water springs / mean high water neaps / chart datum (coastal terms; not applicable in Sikkim)
HDPE High-density polyethylene
HDS Hydraulic Design Series (FHWA)
HEC Hydrologic Engineering Center (US Army Corps of Engineers): HEC-HMS, HEC-RAS; also FHWA's Hydraulic Engineering Circulars (HEC-14, HEC-22)
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HSG Hydrologic soil group
HY-8 FHWA's culvert hydraulic analysis program
ICIMOD International Centre for Integrated Mountain Development
ICLEI ICLEI – Local Governments for Sustainability
IDF Intensity–duration–frequency
IISc Indian Institute of Science
IIT Indian Institute of Technology
IMD India Meteorological Department
IMDAA Indian Monsoon Data Assimilation and Analysis (a regional reanalysis)
INCOIS Indian National Centre for Ocean Information Services
India-WRIS India Water Resources Information System
IRC Indian Roads Congress
IRCON IRCON International Ltd
IS Indian Standard (Bureau of Indian Standards)
ISO International Organization for Standardization
ISRO Indian Space Research Organisation
IST Indian Standard Time
JNNURM Jawaharlal Nehru National Urban Renewal Mission
KC Kansas City (Kansas City Metro APWA Section 5600)
LID Low impact development
LiDAR Light detection and ranging (laser survey)
LoS Level of service
LR&DMD Land Revenue and Disaster Management Department
MARC Mid-America Regional Council (Kansas City)
MBBL 2016 Model Building Bye-Laws 2016 (MoHUA; not the State's rule)
MHFD Mile High Flood District (Denver)
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
MSL Mean sea level
MSMA Urban Stormwater Management Manual for Malaysia
MW Megawatt
NBSS&LUP National Bureau of Soil Survey and Land Use Planning
NCCR National Centre for Coastal Research
NDMA National Disaster Management Authority
NDSA National Dam Safety Authority
NEH National Engineering Handbook (USDA NRCS)
NGT National Green Tribunal
NH National highway
NHIDCL National Highways and Infrastructure Development Corporation Ltd
NHO National Hydrographic Office
NHPC NHPC Ltd (operator of Teesta-V and the Teesta Low Dam projects)
NIH National Institute of Hydrology, Roorkee (NIH-DHAARA is its online design-rainfall platform)
NIO National Institute of Oceanography
NIT National Institute of Technology
NOC No-objection certificate
NPDES National Pollutant Discharge Elimination System (United States)
NRCS Natural Resources Conservation Service (USDA; formerly SCS)
NRSC National Remote Sensing Centre
NSE Nash–Sutcliffe efficiency
NWIA National Wetland Inventory and Assessment (ISRO)
O&M Operation and maintenance
OA Original Application (NGT)
OGC Open Geospatial Consortium
OSD On-site detention
PDNA Post-disaster needs assessment (the floods of 2023)
PHED Public Health Engineering Department
PIL Public interest litigation
POC Point of comparison (where runoff leaves a site)
PPR Project prefeasibility report (the Lhonak valley GLOF report annexed to the State's affidavit of 2026)
PRS PRS Legislative Research (source of the copies of Acts read)
PSD Permissible site discharge
PUB PUB, Singapore's national water agency
PWD Public Works Department (in Sikkim, the Roads and Bridges Department)
RCC Reinforced cement concrete
RMDD Rural Management and Development Department
RMSE Root-mean-square error
RRV Required retention volume
RWH Rainwater harvesting
SANDRP South Asia Network on Dams, Rivers and People
SBCR 1991 The Sikkim Building Construction Regulations, 1991, as amended
SCS Soil Conservation Service (USDA; now NRCS)
SH State highway
SI International System of Units
SIUDP Sikkim Integrated Urban Development Project (ADB)
SK-Z1, SK-Z2; SK-A, SK-B, SK-B1, SK-C The rainfall zones and hydrologic sub-areas of this Manual (Annex 2A)
SLA Sea-level allowance (coastal term; not applicable in Sikkim)
SRRG Self-recording rain gauge
SSDMA Sikkim State Disaster Management Authority
SSPCB Sikkim State Pollution Control Board
SSR Site storage requirement
STP Sewage treatment plant
SuDS Sustainable drainage systems
SUH Synthetic unit hydrograph (CWC)
SWMM Storm Water Management Model (US EPA)
TBC To be confirmed: a fact or value not yet found in a source
TBL Top bund level
TCPO Town and Country Planning Organisation (MoHUA)
TLDP Teesta Low Dam Project (TLDP-III, TLDP-IV)
TR-55 Technical Release 55 (USDA SCS/NRCS)
TSS Total suspended solids
UD&HD Urban Development and Housing Department (now UDD)
UDD Urban Development Department
UDFCD Urban Drainage and Flood Control District (Denver; now MHFD)
UH Unit hydrograph
UK / US United Kingdom / United States
ULB Urban local body (in Sikkim, a Municipal Corporation, Municipal Council or Nagar Panchayat)
URDPFI Urban and Regional Development Plans Formulation and Implementation Guidelines (MoHUA, 2015)
USACE US Army Corps of Engineers
USDA United States Department of Agriculture
UT Union Territory
UTM Universal Transverse Mercator
VR Value rating (of a BMP treating the WQv)
WGS 84 World Geodetic System 1984
WMO World Meteorological Organization
WPCF Water Pollution Control Federation (now the Water Environment Federation)
WQv Water quality volume
WRD Water Resources Department
WSUD Water-sensitive urban design