Chapter 11Basin and City Stormwater Master Plans


11.1 Purpose and scope

11.1.1 Chapters 2 to 10 control one project at a time. This chapter sets the requirements for the plan that ties those projects together: the Basin Stormwater Master Plan (BSMP). A BSMP is prepared for each drainage basin of a city or urban area. A city's set of BSMPs makes up its City Stormwater Master Plan.

11.1.2 A BSMP shall:

  • (a) map flood hazard for the basin under existing and future conditions;
  • (b) set the level of service each part of the drainage system must achieve (Clause 11.6);
  • (c) identify the works, storage and land needed to reach that level of service, and rank them (Clauses 11.7 and 11.8);
  • (d) reserve land for regional storage, pokhari and tank restoration, and major flow paths in the statutory land-use plan (Clause 11.9);
  • (e) set the basin-specific inputs that site designs under Chapter 4 depend on: regional facilities, the fee-in-lieu unit rate, and any basin release rate stricter than Chapter 4 (Clause 11.8.3); and
  • (f) recommend catchments for notification as flood-sensitive (Clause 4.5.4).

11.1.3 Relationship to site design. Site criteria (Chapters 4 to 8) apply whether or not a BSMP exists. A BSMP may make the site criteria stricter for its basin. It shall not relax them, except through the regional detention and fee-in-lieu routes of Clauses 4.13 and 4.5.6.

Commentary. Sikkim's towns have project plans and hazard studies, but no storm-drainage master plan with a design storm, and no notified master plan or drainage master plan for Gangtok was found. Gangtok's City Development Plan of 2006 proposed ₹2,217 crore of works, among them "Drainage and Landslip Protection", but project reports for only seven projects (₹153.02 crore) were approved, and the drainage and landslip works "were not taken up" (CAG, Report No. 3 of 2016, para 2.3.9.2); the Sikkim Strategic Plan of 2008, with its "Long-Term Strategies: 2040", is listed by the Urban Development Department (UDD) (as reported; not read). The ADB-funded Sikkim Integrated Urban Development Project (SIUDP, 57230-001) includes stormwater drains on about 60 km of roads in seven towns, Gangtok (Ranipool and Tadong), Singtam, Pakyong, Rangpo, Mangan, Gyalshing and Soreng, the "preparation of urban infrastructure master plan for four towns" other than Gangtok, and the strengthening of the State climate change cell (ADB, due-diligence report, December 2024), and UDD has sought proposals for a "GIS based Master Plan for Namchi Planning Area"; none of these sets a design storm that was seen. The Sikkim Town and Country Planning Act, 2024 (Act 10 of 2024, amended by Act 24 of 2025; enacted in 2024 and amended in 2025, not yet commenced) would require development plans with "proposals for water supply, drainage, sewage and solid waste disposal" and "proposals for flood control, land stability and sloped linked controls", and regional plans that map the "natural disaster-prone area", but no commencement notification, rules, Board or development authority under it was found. The hazard studies are led by the flood of 2023: the project proposal for the mitigation of glacial-lake outburst flood (GLOF) risk in the Lhonak valley (Science and Technology Department, annexed to the State's affidavit to the National Green Tribunal of 28 February 2026) counts 320 glacial lakes in the State, of which NDMA identifies 40 as high-risk and 16 as very high-risk, and proposes works such as a retention structure at Dolma Sampa and the siphoning of Shako Chho, as proposals. Drainage work in the towns has been led by the training of jhoras (झोरा; natural watercourses or ravine streams) and by sewage rather than by a basin plan: Gangtok Smart City Development Ltd's (GSCDL's) "Construction of drainage and jhora training works" (as reported), and the sewer zones of Gangtok, one of which is described as "Pollution abatement of Rani chu through Ro-Ro Chu" (monthly progress report of September 2025). The receiving waters are kholas (खोला; rivers or large streams), jhoras, dharas (धारा; springs or spring spouts) and pokharis (पोखरी; ponds, lakes or tanks), with the Teesta, the Rangit and the Rongni Chu below them. No published document sets a design return period for the storm-drain network of any Sikkim town. This chapter supplies the design storm, levels of service, storage and buffer criteria that such a plan needs, with the design storms of Chapter 2 and the levels of service of Clause 11.6; it has not been adopted by UDD, the Gangtok Municipal Corporation (GMC), the Namchi Municipal Council, any Nagar Panchayat, GSCDL, WRD, SSDMA, the Science and Technology Department or any other body. A site-level manual cannot fix basin-level problems: lost tank storage, jhoras narrowed, culverted or loaded with construction spoil, garbage and slide debris on the ridges of Gangtok and the other towns, slopes that water from drains, soak pits and springs destabilises, so that the State's own stability zones grade a site by the training of the jhora beside it, drains and jhoras that carry septic effluent and sullage to the Rani Khola, the Roro Chu and the Teesta, valley-floor towns on a Teesta whose bed the flood of October 2023 raised by metres, outfalls in the reaches of hydropower reservoirs whose levels and releases are not published, and single jhoras split between a Municipality, the Forest Department, a road owner and private land on their way to a river, and drains that are adequate on their own but overload the next reach. Comparable manuals pair site criteria with basin planning:

  • Denver's Mile High Flood District prepares major drainageway master plans that set regional facilities and release rates.
  • The Kansas City APWA criteria rest on regional watershed studies (MARC).
  • England's Surface Water Management Plans (Defra, Surface Water Management Plan Technical Guidance, 2010) set a phased method of preparation, risk assessment, options and implementation.
  • Malaysia's MSMA requires drainage master plans for urban areas.

This chapter adapts that method to Sikkim, the series' last North-East edition, its third mountain State and its first in the Eastern Himalaya: to towns in two settings, the ridge towns, Gangtok, Pakyong, Namchi, Ravangla and Gyalshing among them, built on phyllite, schist and colluvium where water put into the slope moves the ground and whose drains fall freely to steep jhoras, and the valley-floor towns, Singtam, Rangpo, Melli, Majitar and Jorethang, on a Teesta whose bed the flood of October 2023 raised by metres; to one CWC subzone whose plates draw no contour north of the capital, and records up to twice the plate, 504.2 mm in 24 hours at Singhik and 310.3 mm at Gangtok, both in May; to a building rule of 1991 that already grades a site by the training of the jhora beside it but sets no setback, detention, rainwater harvesting or design storm; to jhoras that the Municipalities Act calls drains and makes the Municipality protect, and a statutory river bank of "sixty metres … or area within high flood level mark, whichever is less" on the scheduled rivers only; to drains that carry septic effluent and sullage to the jhoras and rivers outside Gangtok's partial sewer network; to hydropower reservoirs whose levels and releases are not published; to springs on which most rural households depend; and to a valley whose largest flood was a glacial-lake outburst, not a rainfall flood, so that in North Sikkim and on the Teesta trunk a BSMP begins with the hazard, not the storm (Clause 11.3.3).


11.2 Definitions

Term Meaning in this Manual
Basin The land draining to one outfall to the sea, a river, or a major waterbody, as delineated under Clause 11.3.
Basin Stormwater Master Plan (BSMP) The plan for one basin prepared under this chapter.
Lead Authority The body responsible for preparing a BSMP (Clause 11.4).
Level of service (LoS) The flood performance a part of the drainage system must achieve, expressed as an AEP and an outcome (Clause 11.6).
Flood hazard map A map of flood extent, depth, velocity and hazard class (H1–H6, Chapter 6) for a stated AEP and scenario.
Regional facility A storage, conveyance or outfall work serving more than one development, identified in a BSMP.
Capital Improvement Programme (CIP) The ranked, costed list of works in a BSMP (Clause 11.8.4).

11.3 Planning unit: the basin, not the ward

11.3.1 BSMPs shall be prepared by hydrological basin, not by ward, zone or local-body boundary. Where a basin crosses local-body boundaries, one BSMP shall cover the whole basin.

11.3.2 Basin boundaries shall be delineated from the digital elevation model of Clause 11.5.2, checked against the drain network, road embankments, canals and tank supply channels. Diversions between basins, whether by canal, drain or surplus course, shall be mapped and represented in the model.

11.3.3 No basin delineation has been published for any Sikkim town. For the urban areas where the evidence identifies them, the basins are at least the following, in the order of the flood-sensitive catchments of Clause 4.5.3.2:

  • Gangtok, Rani Khola and Roro Chu: the catchments of the jhoras of Gangtok, with Tadong and Ranipool, that drain west and south to the Rani Khola and east to the Roro Chu, delineated jhora by jhora and not by ward, with the jhoras named in ICLEI's documents for the city, Goshkhan and the Hospital jhora among them (as cited), the stability zones of the Mines and Geology Department and the slide areas of June 1997 shown where they can be located, the sewer zones and the outfalls of the treatment plants at Adampool, Ranipool, Lower Sichey, Lower Syari and Tathangchen in the 1D network, free outfalls to the jhoras checked to the next confluence or trained reach (Clause 5.8.5(a)), and surveyed flood marks and the 1% AEP level with its sediment and debris as the boundary condition, since neither stream has a gauge (whether the Rani Khola is the scheduled "Rongni chu" of the 1988 Act is this Manual's reading, to be confirmed [TBC]);
  • Teesta valley floor, Chungthang to Melli: the catchments of Chungthang, Dikchu, Singtam, Rangpo and Melli, with Toong Naga, that drain to the Teesta in the corridor of the flood of October 2023, with the river bed surveyed after that flood, the surveyed flood mark of October 2023 and the CWC levels at Khanitar and Melli as boundary conditions (Clause 5.8.5(b)), the outfall-closed case a design case for at least the 72-hour storm, and the GLOF corridor mapped as its own layer under the hazard-first rule below;
  • Jorethang and Majitar, Rangit: the catchments of Jorethang (Nayabazar-Jorethang) and Majitar that drain to the Rangit, with the high flood level at CWC's Majitar site (279.29 m, 17 October 1985; datum not stated) re-surveyed and the release reaches of the Jorethang, Tashiding and Rangit-III projects as boundary conditions;
  • Ranipool and Singtam, Rongni Chu: the catchments that drain to the Rongni Chu at Ranipool and Singtam, with the high flood level at CWC's Singtam site (356.09 m, undated) and the Teesta's level at the confluence below Singtam as boundary conditions;
  • Mangan: the catchments of Mangan town and of the slopes of the North Sikkim road that drain to the Teesta, with the slides of June 2024 mapped and the debris-flow and jhora gullies above the town treated as hazards, not drains;
  • Lachen, Chaten and the catchments below high-risk glacial lakes: the catchments of the settlements and camps of the Lachen Chu and Lachung Chu valleys in sub-area SK-C, under the hazard-first rule below, with the slide of 1 June 2025 at Chaten mapped;
  • Hydropower reservoirs and release reaches: the catchments that drain to the reservoirs of Teesta-III to Teesta-VI, the Teesta Low Dam III and IV projects, Chuzachen, Dikchu, Jorethang, Tashiding, Rongnichu and Rangit-III and to the reaches below their dams, with the reservoir levels and the largest recorded releases, once the operators state them on a named datum [TBC], as boundary conditions (Clause 5.8.5(c));
  • NH-10 corridor: the catchments of the road and its settlements along the Teesta, with the reaches where the road is "prone to submergence and subsidence" and the drainage damage before the High Court mapped;
  • Namchi: the catchments of the ridge town and its jhoras, free outfalls to the jhoras checked downstream (Clause 5.8.5(a)), with the sewage that the stalled sewerage leaves in the drains in the 1D network; and
  • Soreng: the catchments of the town, whose septic effluent discharges into open storm drains, with the same boundary conditions.

Hazard first in North Sikkim and on the Teesta trunk (set by this Manual). In sub-areas SK-B1, Middle Teesta valley (Dikchu–Mangan–Singhik–Chungthang), and SK-C, High valleys (Lachen–Lachung–Thangu), of Annex 2A, on the Teesta valley floor, and in any basin with a glacier, a glacial lake, a mapped debris-flow fan, a slide scar or a sinking area above it or a dam release upstream, the BSMP begins with a hazard screening for glacial-lake outbursts, debris flows, landslide dams and releases, made with the GLOF evacuation maps of SSDMA and the District Disaster Management Authorities where they exist [TBC], the State's glacial-lake studies and the stability zones, and uses site-specific hydrology in sub-area SK-C (Clause 2.3.6(i)). The GLOF corridors and the Teesta valley floor at or below the flood and aggradation level of October 2023 are mapped as their own layer, not as a rainfall flood extent: the flood of 3–4 October 2023 peaked at 5,340 m³/s at Chungthang within about six minutes (Sattar et al., 2025), so the 1% AEP rainfall flood is not the design flood for the trunk, and no rainfall-based setback or level protects against the cascade. The hazard zones are shown on the 1% AEP map, no drain, storage, pumping station or treatment work is sited in them, and no work in the CIP is sized to carry a GLOF, a debris flow or a landslide. Other Tier A bodies and the other urban local bodies define their basins in the first BSMP that covers them.

Stress tests (set by this Manual). Besides the calibration events of Clause 11.7.5, each BSMP is run against two stress tests, neither of which calibrates a model. The first is the regional storm of 2–5 October 1968, with its "hundreds of landslides" and about 1,000 dead in Darjeeling and Sikkim, and Kalimpong's 419.2 mm on 5 October (IMD) across the Teesta (as reported; the "1,000 mm of rainfall in 52 hours" quoted in the press is not a measurement, and no Sikkim gauge record of the storm was found [TBC]): it is run as the 72-hour design storm of Clause 2.3.6(e) with every outfall to the Teesta closed, to show where the drains and jhoras of a basin fail when the river and the slopes fail together. The second is the South Lhonak lake outburst and Teesta flood of 3–4 October 2023, used as a siting test, not a calibration event, because the rain over the lake was modest (29–39 mm over eight days in ERA5) and the flood came from the lake and the sediment it carried, not from the rain on the basin, so a rainfall-runoff model cannot reproduce it: the BSMP maps its flood and aggradation line and shows that every asset of the plan stands above it and outside the mapped GLOF path (its cause is disputed, the State's affidavit of 5 April 2024 attributing it "primarily to a cloudburst"; this Manual takes no side). The slide of 1 June 2025 at Chaten is a siting case of the same kind for slides and debris flows, and the rain and slides of 12–13 June 2024 in Mangan district serve both as a calibration event, where rainfall and flood marks can be found, and as such a siting case. Where CWC, a hydropower operator, a development plan or a court has a high flood level, a reservoir level, a flood line or an operating rule for a dam, gate or pumping station, the BSMP shall take its boundary conditions from it and show those levels against its own 1% AEP map.

Basin Stormwater Master Plan (BSMP) — process and links to site design 1. Basin set-up Delineate by basin, not ward (Cl. 11.3) Lead Authority + partners 2. Data DEM, drains, tanks, river levels, flood marks (Cl. 11.5) 3. Model 1D–2D, 24–72 h storms, river, continuous sim. calibrate to past floods 4. Gap vs LoS Scenarios: existing, future ± site controls, climate (Cl. 11.6–11.7) 5. Options Restore tanks first, then regional storage, conveyance, outfalls 6. Outputs (Cl. 11.8.4) — approved by State Stormwater Technical Committee • Flood hazard maps 10% / 1% / 0.2% AEP • Flood-sensitive catchments, basin release rates • Regional facility sites and fee-in-lieu rate • Capital Improvement Programme, ranked • Pre-monsoon maintenance programme • Monitoring network • Open data + public map viewer • Annual report, pre-monsoon Land-use plan Statutory master plan: reserve storage sites, flow paths, hazard zoning (Cl. 11.9) Site design Ch 4 release rates, regional detention and fee-in-lieu (Cl. 4.13, 4.5.6) Floors and setbacks 1% AEP future-with-plan map sets floor levels (Ch 6) and setbacks (Ch 7) Public works CIP funds: ULB, State, Union; O&M and desilting (Ch 10) Review every 10 yr, after a >1% AEP event, or plan revision (Cl. 11.11)

Figure 11.1 — Basin Stormwater Master Plan process and its links to site design. Original drawing for this Manual. The phase structure is adapted from Defra, Surface Water Management Plan Technical Guidance (2010), and Mile High Flood District master planning practice.

Commentary. Water does not follow ward boundaries. A ward-by-ward drain plan can pass the problem to the next ward, and to the next local body. In Sikkim a single jhora passes through many hands on its way from a ridge to a river. In Gangtok the jhoras are at once storm drains, the receivers of septic effluent and sullage, and the feeders of the Rani Khola and the Roro Chu, and the treatment plants of the city's sewer zones discharge to the same streams; the Tribunal recorded that treated sewage "is entering in to river/ rivulets/ jhoras" (O.A. No. 606 of 2018, order of 4 July 2024, as quoted by the State), which the State disputes. Within a municipal area the jhoras on public land other than forest land vest in the Municipality, which must protect every jhora in that area, public or private (Sikkim Municipalities Act, 2007, s.172), and the drains vest "in the Municipality, or the concerned Department, or organization, of the State Government, or the agency, as the case may be" (s.189(1)); the river bank of each of the 103 scheduled rivers, up to sixty metres or the high flood level line, whichever is less, is under the Forest Department (Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988, s.29); the road drains are the road owner's; the jhoras that GSCDL, WRD or RMDD train are worked on by that agency (as reported); and the jhoras outside municipal limits or on forest land have no named owner, because section 172 excludes forest land (this Manual's reading). No notification divides the jhoras from the municipal drains or the drains from the rivers, and no limits of any jhora have been notified under section 173. Below the towns the jhoras reach the Teesta, whose valley floor receives everything the ridge towns send, and whose lower reaches run on into the area that the West Bengal edition governs. This clause makes the basin the planning unit, so that one model carries each jhora from its head on the ridge to the river or reservoir whoever owns each reach, and so that the drain and jhora register of each town (Chapter 6) gives every reach an owner, its land status (municipal, Forest Department, private or road reserve) and its outfall, and so that the sewage it carries is separated before it reaches a dhara, a pokhari, an intake or the river (Chapter 8, Clause 8.9).


11.4 Who prepares, and when

11.4.1 Lead Authority.

  • For the basins of Gangtok: the Gangtok Municipal Corporation (GMC), in which the municipal drains and the jhoras on public land other than forest land within its area vest and which must protect every jhora in that area (Sikkim Municipalities Act, 2007, ss.172 and 189) and which has approved building plans in Gangtok since 2017, jointly with the Urban Development Department (UDD), the department for planning and development in the notified areas, into whose plans, and once the Sikkim Town and Country Planning Act, 2024 commences into whose development plan, the BSMP is taken (Clause 11.9). For the basins of Namchi: the Namchi Municipal Council, with UDD, which has sought proposals for a GIS-based master plan for the Namchi Planning Area. Each role is the one the body would have if the Manual were adopted; none has adopted it. Where a basin extends beyond the municipal limits, the other urban local bodies and the Gram Panchayats in the basin are partners, and one BSMP covers the whole basin (Clause 11.3.1).
  • No order dividing the jhoras from the municipal drains, or the drains of the local bodies from the rivers and reservoirs, was found; until one is made, this Manual assigns the reaches within each BSMP as follows, each body being Lead Authority for the reaches and works it owns or runs and for the parts of the CIP on them: WRD for the rivers and their beds, banks and river works, and for the jhora works in its charge; the urban local body for its drains and the jhoras that vest in it; the Forest Department for the river banks of the scheduled rivers, which are under its control "as if it were a forest" (1988 Act, s.29(9)); GSCDL for the drains and jhora-training works it builds, until handed over in writing; the Roads and Bridges Department (PWD) for the side drains, catch-water drains and culverts of the State roads, and NHIDCL and BRO for those of the national highways, NH-10 among them, with the spoil of their works; PHED for the sewers and treatment plants, and RMDD for rural and peri-urban sewage and the Dhara Vikas springshed works; NHPC and the other hydropower operators for their reservoirs, levels and releases, as providers of data, not as approving authorities; and SSDMA, with the Science and Technology Department (the nodal department for GLOF studies and mitigation since 7 February 2025) and the Mines and Geology Department (the stability zones), for the mapping of glacial-lake, landslide, sinking and debris hazards that a BSMP must show.
  • In the Nagar Panchayats (Rangpo, Singtam, Mangan, Gyalshing, Nayabazar-Jorethang, Soreng and Pakyong, as UDD's notification No. 06/UDD/2026 lists them) and in other Tier B bodies: the Lead Authority would be named by UDD. Basins draining to a common river reach or reservoir, such as the Teesta valley floor from Singtam to Melli, may be grouped into one district-level plan.

SSDMA and the District Collector shall be consulted on every BSMP; the hydropower operator on every BSMP whose basin drains to a reservoir or to a reach below a dam; the Forest Department on every BSMP whose works touch the river bank of a scheduled river, a slip reserve or a road reserve; the Science and Technology Department on every BSMP in sub-area SK-B1 or SK-C or on the Teesta trunk; the Sikkim State Pollution Control Board (SSPCB) on every BSMP that proposes works on a drain or jhora that carries sewage; the landowners on every BSMP that needs private land for a corridor or storage, which is secured by agreement or donation, or reserved in a development plan once the 2024 Act commences, and never taken; and, for a basin whose outfall lies on the Teesta or the Rangit where they run on across the State border, the water resources department of the adjoining State, through WRD.

The Water Resources Department (WRD) shall be a partner in every BSMP that includes a river, canal or tank under its control.

11.4.2 When a BSMP is required.

  • (a) Every Tier A body shall approve BSMPs covering its whole area within 3 years of this Manual taking effect.
  • (b) A BSMP is required before:
    • any regional detention or fee-in-lieu is accepted under Clause 4.13;
    • a fee held under Clause 4.5.6.3 is spent; and
    • a basin-specific release rate is applied under Clause 11.8.3.
  • (c) A Tier B body shall prepare a BSMP where its Lead Authority, or the State Stormwater Technical Committee, finds recurrent flooding of buildings or arterial roads.

11.4.3 Preparation. BSMPs shall be prepared by, or under the direction of, an engineer empanelled as a Stormwater Design Professional (Chapter 10) with experience in basin-scale modelling.


11.5 Data and surveys

11.5.1 Each BSMP shall assemble and publish (Clause 11.10) the data in Table 11.1:

Table 11.1 — Minimum data and surveys for a BSMP

Data Minimum requirement
Terrain Digital elevation model from LiDAR or photogrammetry, with vertical accuracy of 0.15 m RMSE or better in urban areas, tied to the Survey of India datum
Drain network Inventory of all public drains, culverts and outfalls with invert levels, sizes, condition and silt depth; private drains above 600 mm
Waterbodies Survey of every tank, pokhari, pond and marsh under Chapter 7: FTL, MWL, bund level, stage–storage, sluices, surplus weirs, supply channels, encroachment
Rivers and canals Cross-sections at no more than 200 m spacing and at every structure
Outfalls, rivers, kholas, jhoras, reservoirs and pokharis The datum of every level named; outfall invert levels against the river bed surveyed after October 2023 and against the high flood level of the receiving river at the nearest CWC level-monitoring site, where there is one (298.4 m on the Teesta at Khanitar, 4 October 2023; 225.5 m or 228.0 m on the Teesta at Melli, 4 October 2023, a conflict between two transcriptions, of which the higher is used for checks; 356.09 m on the Rongni Chu at Singtam; 279.29 m on the Rangit at Majitar, 17 October 1985; none found for Rangpo; CWC levels as transcribed by SANDRP and the press, as reported, with the datum not stated), with the flood mark of October 2023 surveyed at every valley-floor outfall; for the Rani Khola, the Roro Chu and the other ungauged kholas and jhoras, surveyed flood marks, the debris lines of past floods and the 1% AEP flood level with its sediment and debris; for outfalls to hydropower reservoirs and their release reaches, the maximum water level, full reservoir level, spillway capacity and release records from NHPC and the other operators, none of which was found [TBC], naming which is used; pokharis at their surveyed spill levels; the GLOF corridors of the Teesta, the Lachen Chu, the Lachung Chu and the streams below the high-risk glacial lakes, from the evacuation maps of SSDMA and the District Disaster Management Authorities and the State's glacial-lake studies where they exist; the stability zones of the Mines and Geology Department and the landslide, sinking and debris-flow areas above the basin; and the flap gates, debris racks, debris basins, silt traps, check dams and any pumping stations on the outfalls, with their capacities and operating rules
Rainfall and levels All available rain gauges (IMD, including its observatories at Gangtok (42299; rainfall from 1958) and Tadong (22209; 1978–2007 in its Extremes) and the district gauges reported by the Meteorological Centre Gangtok (types and record lengths [TBC]); the ordinary gauges at Singhik and Dikchu used for the CWC Flood Estimation Report for subzone 2(a), whose record lengths are not confirmed [TBC]; the automatic weather station at Lachen used by Sattar et al. (2025) and the India-WRIS rainfall station at Lachen; the river gauges of CWC on the Teesta, the Rangit, the Rongni Chu and the Dik Chu; the hydro-meteorological gauges of NHPC and the other hydropower operators, at Teesta-V, Dikchu and Chuzachen among them [TBC]; and any gauges or sensors kept by the Gangtok Municipal Corporation, GSCDL, SSDMA or WRD [TBC]) and water-level records, including those for the 9 June 1997 (Gangtok's 223.8 mm in 24 hours, in a June whose 1,281.3 mm is the station's highest monthly total, IMD, with the Gangtok landslides of that month, for which a single unofficial source gives 38 deaths, as reported), 25 September 2005 (212.5 mm at Tadong, its record, and 141.0 mm at Gangtok on the same day, IMD, at stations 4–5 km apart; no flood record of the day was found [TBC]) and 12–13 June 2024 (the rain and landslides of Mangan district, with 6 deaths reported at first and 9 in a later account, the Sangkalang bridge lost and tourists stranded at Lachung, and about 250 mm over the State in 1–13 June, all as reported; no IMD station rainfall for the event was found [TBC]) events
Flood evidence Surveyed flood marks and mapped flood extents from past events, including public reports
Land use Existing land use and imperviousness; future land use from the statutory master plan
Soils and groundwater HSG map (Annex 3A); seasonal high groundwater; aquifer and recharge zones
Sewer interaction Known sewage cross-connections, dry-weather flow in drains, and solid-waste hotspots

Commentary. The 0.15 m accuracy has no direct precedent; this Manual sets it because on the valley floors and river terraces of the Teesta, the Rangit and the Rongni Chu at Singtam, Rangpo, Melli, Majitar and Jorethang, where the flood of October 2023 left a flattened, wider river bed metres above the old one, and on the benches and pokhari margins of the ridge towns, where a raised road, a dumped fill or a low wall can turn an overflow from one side of a flat to the other, a small error in ground level moves the flood edge a long way, and the 1% extent from the BSMP sets floor levels (Chapter 6) and setbacks (Chapter 7). Past flood marks matter as much as models. The 9 June 1997 (Gangtok's 223.8 mm in 24 hours, in a June whose 1,281.3 mm is the station's highest monthly total, IMD, with the Gangtok landslides of that month, for which a single unofficial source gives 38 deaths, as reported), 25 September 2005 (212.5 mm at Tadong, its record, and 141.0 mm at Gangtok on the same day, IMD, at stations 4–5 km apart; no flood record of the day was found [TBC]) and 12–13 June 2024 (the rain and landslides of Mangan district, with 6 deaths reported at first and 9 in a later account, the Sangkalang bridge lost and tourists stranded at Lachung, and about 250 mm over the State in 1–13 June, all as reported; no IMD station rainfall for the event was found [TBC]) events are the best calibration data Sikkim has, and much of the evidence is held in photographs, news reports and residents' records that should be collected before it is lost.


11.6 Levels of service

11.6.1 Each BSMP shall adopt the following minimum levels of service. A BSMP may adopt stricter levels.

Table 11.2 — Minimum levels of service

Element Minimum level of service
Minor system The design AEP of Chapter 6 (Table 6.1)
Habitable buildings No flooding above floor level in the 1% AEP (100-yr) event
Critical facilities (hospitals, emergency services, substations, water and sewage plants) No flooding of the facility in the 0.2% AEP (500-yr) event; access road passable in the 1% AEP event
Evacuation routes and arterial roads Passable (hazard class H2 or better, Chapter 6) in the 1% AEP event
Ponding drain time Surface water cleared from roads within 6 hours after rain ends in the 10% AEP (10-yr) event
Tank and pokhari storage No net loss of flood storage below the MWL in the basin, measured against the earliest available survey
Outfalls Functioning under the joint and outfall-closed cases of Chapter 5

Commentary. The building and road levels repeat Chapter 6, so that the basin plan and the site designs aim at the same outcome. The 0.2% AEP for critical facilities, the 6-hour ponding drain time and the no-net-loss rule for tank storage have no direct precedent and are set by this Manual. The drain time reflects what residents notice most after a storm. The no-net-loss rule reflects a loss of storage that has been reported but rarely measured. Sikkim's storage is in its pokharis, its few wetlands, its benches and valley floors and its hydropower reservoirs more than in tanks; it has no irrigation tank cascades. Khecheopalri (Khachoedpalri) lake became the State's first Ramsar site in February 2025 (as reported; its area is given in figures that conflict, and none is used here), and Khecheopalri, Tamze, Tembao, Phedang, Guru Dongmar and Tsomgo were placed in the National Wetland Conservation Programme (as reported); the State is said to hold "534 wetlands covering 7,477 ha" (as reported, from a summary). No notification constituting a State Wetland Authority and no wetland notified under rule 4 of the Wetlands (Conservation and Management) Rules, 2017 were found, and the River Rejuvenation Committee of the Forest and Environment Department is "the Nodal Agency for all water bodies" (Order No. 205/GOS/F&ED/SECY, 21 January 2021). The glacial lakes are not storage: there are 320 of them, Bhalay Pokhari and Doodh Pokhari among them despite their names (project proposal for the Lhonak valley, 2026), and they are hazard sources under Clause 2.3.6(i) and Chapter 7, to which no storage credit or tank clause applies. The hydropower reservoirs are operated for power, their levels are not published, and the flood of 2023 filled reaches of the Teesta with sediment, raising its bed by about 7.44 m at the Teesta Low Dam IV project and 6.00 m at Teesta-V (NHPC's estimates, in the same proposal). No survey of the storage of any pokhari, of any floodplain of the Teesta, Rangit or Rongni Chu inside a municipal area, or of the benches on which the ridge towns are built, was found.


11.7 Modelling and scenarios

11.7.1 Model. Each BSMP shall use a coupled 1D–2D hydraulic model of:

  • the minor system;
  • the major (overland) system;
  • rivers, canals and tanks; and
  • the outfalls.

Methods shall follow Chapter 3. Tidal and river boundaries shall follow Chapter 5.

11.7.2 Design storms. The model shall be run for the design storms of Chapter 2, including the 24-, 48- and 72-hour storms, for at least the 50%, 10%, 1% and 0.2% AEPs. Areal reduction shall be applied under Clause 2.7.3.

11.7.3 Continuous simulation. Basins with tank cascades shall also be run by continuous simulation (Clause 3.13), using the full IMD gridded daily record where available and at least 30 years, disaggregated by the temporal patterns of Annex 2D. This shows how full the tanks are when the design storms arrive, and how often heavy rain coincides with a closed outfall. The two-step approach of Clause 3.13.5 may be used: a simplified storage model is run for the whole record, and the coupled 1D–2D model of Clause 11.7.1 is run only for the design storms, starting from the tank levels the continuous run gives. A continuous run of the full 1D–2D model is not required.

11.7.4 Scenarios. Each BSMP shall model at least:

  • (a) Existing: existing land use, network, tanks and outfalls;
  • (b) Future, uncontrolled: future land use under the statutory master plan, with no site controls;
  • (c) Future, controlled: future land use with the site controls of Chapter 4;
  • (d) Future, with plan: scenario (c) plus the works of the CIP; and
  • (e) Climate: scenarios (a) and (d), with the climate factors of Clause 2.8, used unchanged: no projection of heavy rainfall for Sikkim has been adopted with a design factor, and the Sikkim State Action Plan on Climate Change and NIH-DHAARA's projected depths were not read [TBC]; the trends are mixed, most indices of extreme precipitation over Sikkim having fallen over 1950–2018 while the count of days above 10 mm rose and the one- to five-day maxima changed mainly in the west and north (Dubey et al., 2022, as summarised), and June–September precipitation over the South Lhonak catchment rising by 8.6 mm a decade in ERA5 (Sattar et al., 2025), so the case for the factors rests on the record storms and the cascade risk, not on trend statistics; and in sub-areas SK-B1 and SK-C, and on the Teesta valley floor, the hazard screening of Clause 11.3.3 is made in every scenario.

11.7.5 Calibration. The model shall be calibrated and validated under Clause 3.15, using at least two of the 9 June 1997 (Gangtok's 223.8 mm in 24 hours, in a June whose 1,281.3 mm is the station's highest monthly total, IMD, with the Gangtok landslides of that month, for which a single unofficial source gives 38 deaths, as reported), 25 September 2005 (212.5 mm at Tadong, its record, and 141.0 mm at Gangtok on the same day, IMD, at stations 4–5 km apart; no flood record of the day was found [TBC]) and 12–13 June 2024 (the rain and landslides of Mangan district, with 6 deaths reported at first and 9 in a later account, the Sangkalang bridge lost and tourists stranded at Lachung, and about 250 mm over the State in 1–13 June, all as reported; no IMD station rainfall for the event was found [TBC]) events where data exist.

Figure 11.2 — BSMP model schematic Schematic plan of a basin model: design rainfall over sub-catchments; two pokharis in cascade with an overflow course; a 1D drain network linked to a 2D surface grid; a reach of drains and jhoras with an inter-basin link; an outfall with a flap gate and pumps, needed only at valley-floor outfalls; and a downstream boundary that is a free outfall to a jhora on the ridges, river backwater at a valley-floor outfall, or a reservoir level or release reach below a hydropower dam. Numbered notes on the right explain each element. BSMP model: elements required by Clause 11.7 (schematic, not to scale) Jhora / river / reservoir 1 S1 S2 S3 2 Upper pokhari Lower pokhari start level start level 3 2D surface 5 4 Drains and jhoras (1D) 6 Inter-basin link Gate Pumps 7 8 1 Design rainfall Ch. 2 storms incl. 24, 48, 72 h; 50%, 10%, 1%, 0.2% AEP; areal reduction (Cl. 2.7.3, 11.7.2) 2 Sub-catchments Runoff by Ch. 3 methods; land use for each scenario (a)–(e) of Cl. 11.7.4 3 Pokharis and reservoirs Surveyed FTL, MWL, stage–storage, sluices, surplus weirs (Cl. 11.5.1); start level from continuous run (Cl. 3.13.5, 11.7.3) 4 1D drain network Minor system: drains, pipes, culverts with surveyed inverts and silt (Cl. 11.5.1) 5 2D surface Major (overland) system on the DEM, 0.15 m RMSE or better; exchange with 1D at inlets and manholes 6 Drains and jhoras (1D) Sections ≤ 200 m apart and at every structure; diversions between basins mapped (Cl. 11.3.2) 7 Outfall Sluices, flap gates and pumps; joint and outfall-closed cases of Ch. 5 8 Downstream boundary Per Ch. 5: free outfall to a jhora on the ridges; river backwater at a valley-floor outfall; reservoir level, or the release reach below a hydropower dam Calibrate and validate with at least two major past flood events where data exist (Cl. 11.7.5).

Figure 11.2 — Elements of the BSMP model required by Clause 11.7: sub-catchments, the 1D drain and channel network, the 2D surface, tanks and pokharis with starting levels from continuous simulation, and the tidal or river boundary at the outfall (schematic, not to scale). Original drawing for this Manual, adapted from common coupled 1D–2D urban flood modelling practice.

Commentary. Scenario (b) against scenario (c) shows what the site rules achieve on their own. Scenario (d) shows what the public works add. This comparison is also the evidence base for notifying flood-sensitive catchments (Clause 4.5.4) and for setting a stricter basin release rate (Clause 11.8.3).


11.8 Options, outputs and the Capital Improvement Programme

11.8.1 Options hierarchy. Options shall be considered in the following order, the basin-scale form of the hierarchy in Clause 1.2:

  1. Protect and restore storage: pokharis, tanks, marshes and floodplains, including desilting to the original bed and recovering encroached area (Chapter 7);
  2. Regional retention and detention, sited by modelling so that releases do not coincide with the main-stem peak (Clause 4.13);
  3. Conveyance upgrades to drains, canals and culverts;
  4. Outfall works: flap gates and penstocks on the outfalls of the valley-floor towns, Singtam, Rangpo, Melli, Majitar and Jorethang among them, to the Teesta, the Rangit and the Rongni Chu, with storage or pumping behind them where a river in flood can close an outfall, and outfall inverts reset above the river bed surveyed after October 2023; drop structures, chutes, energy dissipators and protected outfalls where the drains of the ridge towns reach a jhora, never an outfall onto an unprotected slope, and the training of the receiving jhoras to the standard of Clause 6.3.6(m) down to the next confluence or trained reach; debris racks, debris basins and silt traps where jhoras enter culverts and towns, with ramps for the machines that empty them, and the removal of spoil, garbage and slide debris from the jhoras; the interception and screening of dry-weather flow, and the separation of sewage, before the outfalls to a jhora that feeds a dhara, a pokhari or an intake and to the Rani Khola, the Roro Chu, the Rongni Chu and the Teesta within a town (Chapter 8, Clause 8.9); and the reservoir levels and release rules of the hydropower dams that set the receiving levels, obtained in writing from their operators;
  5. Property-level protection where works cannot reach the level of service; and
  6. Non-structural measures: flood warning (for example IMD district rainfall warnings and nowcasts issued by the Meteorological Centre Gangtok, CWC level monitoring on the Teesta and its tributaries, early-warning systems for the 40 high-risk glacial lakes, which the High Court has urged the State and the Union to install (as reported), with the GLOF evacuation maps prepared with SSDMA's participatory risk assessments of May 2024, warnings of releases by the hydropower operators, which no published rule was found to require [TBC], and level sensors with alarms at the main jhora and river outfalls of the towns, which none has today), flood-hazard zoning, emergency planning and public information.

11.8.2 Option assessment. Each option shall be assessed for:

  • reduction in flood risk (buildings and people flooded; expected annual damage);
  • capital and 30-year maintenance cost;
  • land required;
  • effect on the springs (dhara) on which most rural households and many town households depend, about 80% of rural Sikkim by one account (as reported), and their recharge areas above the intakes, which this Manual keeps free of paving and of infiltrated road runoff (the spring rule of Clause 8.8.1), the stability of hill slopes, where water put into colluvium, fill or slide debris raises the pore pressure and the stability zones of 2021 already treat "Wet", "Dripping" and "Flowing" ground as signs of instability, recharge on the tested river-terrace gravels of sub-area SK-A and the stable benches of stability zone 1, the only ground where it is allowed (Clause 4.11, recharge rule), and the quality of the springs, jhoras, rivers and pokharis that the runoff reaches (Chapter 8);
  • effect on downstream basins and the receiving jhora, khola, river, reservoir or pokhari; and
  • who benefits.

11.8.3 Basin release rates. Where scenario (c) does not meet the level of service, the BSMP may set a basin-specific permissible site discharge (m³/s/ha) stricter than Chapter 4, by AEP and sub-catchment. The rate takes effect under the notification procedure of Clause 4.5.4.

11.8.4 Outputs. Each BSMP shall produce:

  • (a) flood hazard maps (extent, depth, velocity, hazard class) for the 10%, 1% and 0.2% AEPs, existing and future-with-plan. The 1% AEP future-with-plan map becomes the reference map for floor levels (Chapter 6) and setbacks (Chapter 7);
  • (b) recommended flood-sensitive catchments and any basin release rates (Clauses 4.5.4 and 11.8.3);
  • (c) regional facility sites, with storage volumes, land needs and the sites they serve;
  • (d) the fee-in-lieu unit rate for the basin (Clause 4.13.3);
  • (e) the Capital Improvement Programme: works ranked by risk reduction per rupee, with cost, phasing and agency;
  • (f) a pre-monsoon maintenance programme: desilting, gate and pump testing, and tank operating rules (Chapter 10); and
  • (g) monitoring needs: new rain gauges, level sensors and flood-mark survey points.

Commentary. Restoring and adding storage comes first because no Sikkim document states a drainage design basis and the projects that exist convey: GSCDL's "Construction of drainage and jhora training works" in Gangtok (as reported) and the stormwater drains of about 60 km of roads in seven towns under SIUDP (ADB, December 2024). This Manual differs, for three reasons, and does not criticise the projects, which were scoped as works. First, every litre sent faster down a jhora arrives sooner, with more energy and more debris, on a slope that the stability zones of 2021 already treat as unstable when its jhora is "Untrained" or "erosional", with "Gully erosion & collapse of jhora facing slope" (Notification No. 17/DMG/20-21). Second, the jhoras end in a Teesta whose bed rose by "an average of 7-8 meters" in 2023 and whose valley-floor towns, Singtam, Rangpo and Melli among them, receive everything the ridge towns send. Third, the Municipality must already provide an outfall that does not cause "any nuisance … by flooding … any area surrounding the outfall" (Sikkim Municipalities Act, 2007, s.187), which makes the downstream effect a municipal duty. So the Manual requires on-site detention and keeps the pokharis, wetlands and flat benches as storage first (Chapters 4, 7 and 11). On the slopes storage means a lined tank or a shallow terrace, never a pond that soaks into the ground (Clause 4.11, hill rule), and on the valley floors a lined store checked for flotation (Clause 4.11, valley-floor rule); the rainwater storage of at least 25 litres per m² of roof that Clause 4.11 sets, where no rule requires rainwater harvesting in a private building, is the first of it, and it also serves the dry months, when springs fail. Where a project's terms govern, the designer states on the submittal which governs; this Manual does not override a contract. The storms are large for drains with no stated design basis: 310.3 mm in 24 hours at Gangtok on 30 May 1975 (IMD) and 504.2 mm at Singhik on 12 May 1981 (CWC Flood Estimation Report for subzone 2(a)). Conveyance upgrades on their own move water faster to an outfall that the Teesta, the Rangit or the Rongni Chu in flood, or a hydropower reservoir held near its full level, may close, to a jhora whose bed and banks shift with the boulders, spoil and slide debris it carries and whose slopes the stability zones already treat as unstable when it is untrained, or to a valley floor that receives everything the ridge towns send. Groundwater in Sikkim calls for storage and restraint, not recharge. The State has no plains aquifer: groundwater lies "largely in disconnected localized pockets and in deeper fracture zones", "springs are the main source", and on steep ground it emerges "as seepages and springs wherever the land surface intersects local ground water body" (CGWB, as quoted); no CGWB figure for depth to water or extraction was read [TBC]. The springs matter more than the wells: "about 80%" of rural Sikkim depends on them and "half of the perennial springs have already dried up or have become seasonal" (as reported); RMDD's Dhara Vikas programme, begun in 2008 (2010 in one source; a conflict), is reported to have mapped 704 springs for rejuvenation by one account and "more than 2000 springs" on a GIS platform by an RMDD presentation of 2018 (both as reported; the counts conflict), and an assessment by IISc is reported to have found a "15% enhancement in the spring discharge" (as reported). Water put into the ground can also do harm: GSCDL told the National Green Tribunal that "landslides are caused mainly due to loose soil by spring water generated at natural Jhora" (reply affidavit in O.A. No. 38 of 2022), and the stability zones of 2021 record the ground of zones 3 to 6 as "Wet", "Dripping" or "Flowing". No State groundwater Act and no spring-protection law or order was found. This is why springs and their recharge areas, slope stability, recharge only on the ground that can take it, and the quality of the springs and jhoras are all assessment criteria. This Manual ranks projects by risk reduction per rupee so that limited budgets go first where most people are protected.


11.9 Integration with land-use planning

11.9.1 An approved BSMP shall be incorporated into the statutory land-use plan: the development plans, regional plans and perspective plans of the Sikkim Town and Country Planning Act, 2024, once it commences (enacted in 2024 and amended in 2025, not yet commenced; no plan, Board or authority under it exists), with any master plan prepared under an earlier law, which that Act deems a perspective plan; until then, the GIS-based master plans for which UDD has sought proposals, for the Namchi Planning Area and, under SIUDP, for four towns other than Gangtok, if UDD takes the BSMP into them; the master plan or area plan to which the Sikkim Building Construction Regulations, 1991 refer setbacks and plot sizes (regs. 18 and 33); and the layouts and buildings permitted under them. In particular:

  • (a) regional facility sites, restored tank flood storage, and major flow paths shall be reserved in the plan;
  • (b) the 1% AEP hazard map shall be shown, and Chapter 7 setbacks applied to it;
  • (c) land in hazard classes H5–H6 in the 1% AEP event shall not be zoned for new habitable development; and
  • (d) the open space of layouts within a basin should be located, where possible, to form part of the major flow paths or regional storage shown in the BSMP.

11.9.2 Where a land-use plan is revised before a BSMP is approved, the planning authority shall use the best available flood mapping and record the BSMP as pending.

Commentary. Sikkim draws one water line in statute, and it is a maximum. For the 103 scheduled rivers the river bank is "an area of sixty metres on either side of such river or area within high flood level mark, whichever is less" (Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988, s.29(1)), under the Forest Department "as if it were a forest" since 2000 (s.29(9)), with its occupation an offence (s.30); "whichever is less" makes it a maximum, not a minimum (this Manual's reading), so on an incised reach the high flood level line may lie a few metres from the channel, and after October 2023 the high flood level itself has moved. The Act counts a jhora as a river (s.2(m)), but the sixty metres apply only to the Schedule. No statutory line exists beside a jhora: the Sikkim Building Construction Regulations, 1991 set setbacks from the road only (reg. 18), and the stability zones of 2021 ask for jhora training "with safe distance" without defining it; the Sikkim Municipalities Act, 2007 makes the Municipality "protect any jhora, whether on a public land or on a private land" (s.172(2)) and lets the State "specify the limits of any jhora, watercourse or channel within a municipal area" by notification (s.173), and no such notification was found. No floodplain zoning law, notified flood line or post-flood setback from the Teesta was found; the project proposal for the Lhonak valley suggests "High-risk Zoning" of floodplains below glacial lakes, as a proposal (2026); and the Sikkim Town and Country Planning Act, 2024 would require development plans with "proposals for flood control, land stability and sloped linked controls", but has not commenced. Where a statutory line binds it applies; elsewhere the hydraulic corridor and setback zones of Chapter 7, with a Zone 1 of at least 15 m from the top of bank on every channel draining 8 ha or more, measured from the crest of the bank slope on an incised jhora or khola steeper than 10°, and a Zone 2 of the 1% AEP extent plus 10 m, whichever is wider, apply as this Manual's proposal, to new development and redevelopment approved under the Manual, with Zone 1 land that is private secured by agreement or donation, or reserved in a development plan once the 2024 Act commences, and never taken. A BSMP gives the development plans that the 2024 Act would require, and UDD's GIS-based master plans in the meantime, the 1% AEP drainage-flood map, the GLOF corridors and the valley floor of 2023 as a separate layer, and the buffer widths of Chapter 7 that they need. Using open space land as storage or flow path has no direct precedent; this Manual adopts it because the Sikkim Building Construction Regulations, 1991 already require setbacks and an open area round each building (reg. 18), a pucca storm-water or plinth drain leading to the road drain or a jhora (reg. 25(iv)) and plans that show the drainage and its connection to the main outlet (reg. 6), and the review conditions of the stability zones of 2021 ask for catchment drains that carry surface runoff to "natural waterways/Jhora", but no rule sets a detention or peak-runoff limit or reserves open space for water; storage placed in a layout's open space builds on these duties, and because that land still serves as open space, the storage must stay usable as one, and on a hill slope, in stability zones 3 to 6 or on a valley floor below the 1% AEP flood level it is a lined tank or a shallow terrace, never an infiltration basin (Clause 4.11). Placing it on the flow path costs the developer nothing extra and gives the basin storage it would otherwise have to buy.


11.10 Consultation and publication

11.10.1 A draft BSMP shall be published for public comment for at least 60 days, with public meetings in each affected local body.

11.10.2 After approval, the following shall be published as open data:

  • the model files;
  • the flood hazard maps;
  • the data of Clause 11.5.1, except security-sensitive asset details; and
  • the CIP.

They shall also be shown on a public map viewer.

Commentary. Publishing the maps lets buyers, lenders, insurers and residents see flood hazard before they build or buy. Publishing the model lets designers use the same boundary conditions as the Authority, so site designs and the basin plan stay consistent. This matches the publication approach of Chapter 10.


11.11 Approval, review and reporting

11.11.1 Approval. BSMPs shall be approved by the State Stormwater Technical Committee (Chapter 1), after review of the model and of the public comments.

11.11.2 Review. Each BSMP shall be reviewed:

  • every 10 years;
  • within 2 years of an event exceeding the 1% AEP design depth in the basin (Clause 2.14); and
  • when the statutory land-use plan is revised.

11.11.3 Annual report. The Lead Authority shall publish an annual implementation report before each monsoon (by 31 March). The report shall show:

  • CIP progress;
  • the fee-in-lieu ledger (Clause 4.13.4);
  • maintenance completed; and
  • any flooding against the levels of service.

11.12 Interim arrangements

11.12.1 Until a BSMP is approved for a basin:

  • (a) all site criteria of Chapters 4 to 8 apply in full;
  • (b) regional detention and fee-in-lieu under Clause 4.13 are not available, except the holding of fees under Clause 4.5.6.3;
  • (c) floor levels and setbacks use the best available mapping, and the methods of Chapters 6 and 7 where no mapping exists; and
  • (d) public drain projects shall include a basin-level check that their outfall and downstream reaches can take the design flow under the Chapter 5 tailwater cases.

References (chapter)

  • Sikkim Town and Country Planning Act, 2024 (Act 10 of 2024; Sikkim Government Gazette Extraordinary No. 317, 15 June 2024), as amended by Act 24 of 2025 (Gazette Extraordinary No. 13, 17 January 2026): development, regional and perspective plans; s.1(3) (commencement on a notified date; none found). https://prsindia.org/files/bills_acts/acts_states/sikkim/2024/Act10of2024SK.pdf
  • Sikkim Municipalities Act, 2007 (Act 5 of 2007), as amended to Act 3 of 2026: ss.172, 173, 187, 189, 193 and Chapter XXX. https://prsindia.org/files/bills_acts/acts_states/sikkim/2007/2007SK5.pdf
  • Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 (Act 6 of 1988), as amended by Act 8 of 2000: ss.2(m), 29, 30 and 32, and the Schedule of rivers. https://prsindia.org/files/bills_acts/acts_states/sikkim/1988/1988SK6.pdf
  • Government of Sikkim. Additional affidavit of 28 February 2026 in O.A. No. 171 of 2023 (EZ) before the National Green Tribunal, with the project proposal GLOF Risk Mitigation in Lhonak Valley, Sikkim (Science and Technology Department), the summary of the post-disaster needs assessment of 2023 and the Home Department's notifications Nos. 72/Home/2024 and 73/Home/2024 of 11 September 2024 and No. 10/Home/2025 of 7 February 2025. https://www.greentribunal.gov.in/
  • Comptroller and Auditor General of India. Report No. 3 of 2016 (Economic Sector, Government of Sikkim), Chapter II, performance audit of JNNURM, para 2.3.9.2 (Gangtok City Development Plan, 2006). https://www.cag.gov.in/uploads/download_audit_report/2017/Chapter_2_Economic_Sector_Sikkim_Report_No_3_of_2016.pdf
  • Asian Development Bank. Sikkim Integrated Urban Development Project (57230-001), due-diligence report, December 2024 (outputs: road and stormwater drains in seven towns; urban infrastructure master plans for four towns; State climate change cell). https://www.adb.org/sites/default/files/project-documents/57230/57230-001-sddr-en.pdf
  • Government of Sikkim, Urban Development Department. "Urban scenario" web page (request for proposal for a GIS-based master plan for the Namchi Planning Area). https://www.sikkim.gov.in/departments/urban-dev-housing-department/urban-scenario
  • Sattar, A. et al. (2025). The Sikkim flood of October 2023: drivers, causes and impacts of a multihazard cascade. Science, doi:10.1126/science.ads2659 (accepted manuscript).
  • Defra (2010). Surface Water Management Plan Technical Guidance. Department for Environment, Food and Rural Affairs, London.
  • Mile High Flood District (Denver). Master planning programme and Urban Storm Drainage Criteria Manual.
  • Mid-America Regional Council (2025). APWA Stormwater Standards Supplement; KC Metro APWA Section 5600, Version 2025.01.
  • Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd ed.
  • Government of Sikkim, Department of Mines and Geology. Notification No. 17/DMG/20-21 of 19 March 2021 (Gazette Extraordinary No. 86, 6 April 2021): site stability zonation parameters; and Sikkim Building Construction Regulations, 1991 (as amended), regs. 18, 25 and 33.
  • Government of Sikkim, Forest and Environment Department. Order No. 205/GOS/F&ED/SECY of 21 January 2021 (River Rejuvenation Committee as the nodal agency for all water bodies), as recited in the State's filings before the National Green Tribunal.
  • Government of Sikkim. Affidavit of 19 December 2025 in E.A. No. 35 of 2023 in O.A. No. 673 of 2018 before the National Green Tribunal, with the monthly progress report of September 2025 (sewer zones; treatment plants); six-monthly report in O.A. No. 606 of 2018; and GSCDL's reply affidavit in O.A. No. 38 of 2022 (EZ). https://www.greentribunal.gov.in/
  • Central Ground Water Board. Aquifer mapping and State assessment reports for Sikkim (as quoted; not read in full).
  • India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): Gangtok (42299) and Tadong (22209); Central Water Commission (1991), Flood Estimation Report for North Brahmaputra Subzone 2(a), Report No. NB/18/1991, Table 7.
  • Dubey et al. (2022). Variability of precipitation extremes and drought intensity over the Sikkim State, India, during 1950–2018 (as summarised).
  • South Asia Network on Dams, Rivers and People. Transcriptions of CWC site data for the Teesta basin (secondary source).
  • India Water Portal, Scroll, The Wire, Sikkim Express, ThePrint and other news and web sources (2018–2026). Reports of the Dhara Vikas programme and the spring counts, Khecheopalri's designation as a Ramsar site, the wetland programme, the Sikkim Strategic Plan, GSCDL's jhora-training works, the storm of October 1968 and the events of 1997, 2024 and 2025 (secondary sources).

Annexes and forms

Annex / Form Content
11A BSMP terms of reference template
11B Basin lists and boundaries for Tier A bodies
11C Depth–damage curves for Sikkim building types
11D BSMP data and model publication standard
Form 11-1 Annual implementation report