Chapter 8Water Quality and Recharge


8.1 Purpose and scope

8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:

  • (a) the water quality volume (WQv) and the water quality design flow;
  • (b) the treatment train, and the selection and design of best management practices (BMPs);
  • (c) the criteria for infiltration and recharge;
  • (d) the exclusion of sewage and dry-weather flow from storm drains;
  • (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
  • (f) how rainwater harvesting (RWH) fits with retention and detention;
  • (g) erosion and sediment control during construction; and
  • (h) monitoring.

8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.

8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.

Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.


8.2 Definitions

Term Meaning in this Manual
Water quality volume (WQv) The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4).
Water quality rainfall depth (P_wq) The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A).
3-month ARI depth The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record.
Water quality design flow (Q_wq) The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5).
Runoff coefficient for WQv (Rv) The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I.
BMP A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume.
Treatment train Two or more BMPs in series, from source to site to regional scale (Clause 8.5).
Pretreatment A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP.
First flush The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil.
Gross pollutant trap (GPT) A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm.
Dry-weather flow (DWF) Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge.
Cross-connection Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain.
Infiltration facility A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells.
Seasonal high groundwater table As defined in Clause 3.10.2: the highest level in the monsoon season.
Hotspot A land use with a high risk of spills or contaminated runoff (Clause 8.8.8).
Level of Service (LoS) / Value Rating (VR) The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012).

8.3 Objectives and pollutants of concern

8.3.1 Stormwater treatment under this Manual shall aim to:

  • (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
  • (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
  • (c) keep sewage and sullage out of storm drains and waterbodies;
  • (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
  • (e) prevent erosion and sediment discharge during construction.

8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:

Table 8.1 — Pollutants of concern, sources and primary controls

Pollutant Main sources in Sikkim towns Primary control
Gross pollutants (plastics, litter, vegetation) Streets, markets, open dumping in drains Source collection; GPTs and screens (Clause 8.10)
Suspended sediment Construction sites, unpaved roads and verges, road wear, drain silt Erosion and sediment control (Clause 8.12); pretreatment; filtration
Oil, grease and fuel Roads, parking, fuel stations, workshops, bus depots Oil-grit separators at hotspots; bioretention
Pathogens and organic load (BOD) Sewage and sullage cross-connections, animal waste Exclusion and DWF interception (Clause 8.9)
Nutrients (N, P) Sewage, fertiliser, food waste, detergents Exclusion; bioretention; wetlands
Heavy metals Roads, roofs, industrial yards Filtration; sedimentation

Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Sikkim, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.


8.4 Water quality volume and design flow

8.4.1 Water quality rainfall depth. The water quality rainfall depth is:

P_wq = max (P_ret, P_3m)

where:

  • P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
  • P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.

8.4.2 Water quality volume. The WQv shall be computed as:

WQv = (P_wq / 1000) × Rv × A

where:

  • WQv is in m³;
  • A = the contributing area, m²;
  • Rv = 0.05 + 0.009·I; and
  • I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.

The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.

8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.

8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:

  • (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
  • (b) hotspot controls (Clause 8.8.8); and
  • (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.

8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:

  • (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
  • (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.

8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).

8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).

Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Sikkim value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).

The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.

Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:

  • Rv = 0.05 + 0.009 × 80 = 0.77
  • WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³

8.5 Treatment train and pretreatment

8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:

  • (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
  • (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
  • (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.

8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).

8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.

8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.

Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Sikkim, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.

Stormwater treatment train: source, site and regional Treatment train: source → site → regional → receiving waterbody Runoff from roofs, roads, parking and open space: first flush carries most sediment, litter and oil 1. Source control on the plot, at the roof or kerb • Rooftop RWH: sump, recharge well • Rain garden, small bioretention • Permeable paving • Disconnect roofs onto lawns • Green roof, soil restoration • Silt trap / catch pit at inlets Retain first (Chapter 4) 2. Site control layout, campus, road corridor • Bioretention, swales, filter strips • Infiltration trench or basin • Oil-grit separator (hotspots) • Wet pond or extended detention • Sediment forebay pretreatment • Treat WQv, then detain Treat WQv (Clause 8.4) 3. Regional control basin or outfall, public land • Gross pollutant trap at outfall • Dry-weather flow interceptor • Constructed wetland at tank inlet (sedimentation zone) • Regional pond / restored tank (fee-in-lieu, Clause 7.11) Required at outfalls (8.10) Receiving waterbody tank, channel, marsh, estuary (Chapter 7) Each stage removes a different fraction. Coarse solids and litter are removed first so that filters and infiltration media do not clog. Flows above the WQ peak bypass treatment to detention (Chapter 4). Sewage and dry-weather flow are not stormwater No sewage or sullage connection to any storm drain (Clause 8.9). Dry-weather flow found at an outfall is intercepted and sent to the sewer or a treatment plant, not to the treatment train or the waterbody.

Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.


8.6 BMP selection: Level of Service and Value Rating

8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.

8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):

Table 8.2 — Required Level of Service for sites that are not redevelopment

ΔCN Impact Required LoS
17 or more High 8
7 to 16 Moderate 7
4 to 6 Low 6
1 to 3 Minimal 5

For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.

8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.

8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:

  • (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
  • (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
  • (c) it has pretreatment under Clause 8.5.3.

8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:

  • (a) retained on site under Chapter 4; or
  • (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.

Table 8.3 — BMP Value Ratings and suitability in Sikkim

BMP VR (MARC 2012) Main pollutants removed Volume reduction / recharge River terraces of SK-A (tested) Laterite / hard rock Slopes over 10°, colluvium, fill, zones 3–6 / high water table Sikkim notes
Native vegetation (preserved) 9.25 All High Suited Suited Suited Counts only for preserved, undisturbed area
Rain garden / infiltration 9.0 Sediment, metals, oil, nutrients High Suited if 1.0 m separation met Conditional (test) Not suited Mosquito control: drain within 48 h
Bioretention 8.5 Sediment, metals, oil, nutrients Medium–high (unlined); low (lined) Suited Suited, with underdrain Lined, with underdrain Media source and phosphorus content to be specified
Permeable pavement 7.5 Sediment, metals, oil Medium–high Suited Conditional Lined only Not where run-on carries heavy silt
Extended detention wetland 7.0 Sediment, nutrients, metals Low Conditional (water balance) Suited Suited Good at tank inlets (Clause 7.9.7)
Media / sand filter 6.0 Sediment, metals Low Suited Suited Suited (lined) Needs frequent cleaning
Extended wet detention (wet pond) 5.0 Sediment, metals, some nutrients Low Conditional (water balance) Suited Suited Dry-season water balance (Clause 8.7.8)
Vegetated filter strip 5.0 Sediment Low–medium Suited Suited Suited Mostly as pretreatment
Native vegetation swale 4.0 Sediment, oil Low–medium Suited Suited Suited Not where Q_wq velocity is high
Extended dry detention 4.0 Coarse sediment Low Suited Suited Suited Combine with detention (Chapter 4)
Proprietary / hydrodynamic devices 3.0–5.0 Coarse sediment, oil, litter None Suited Suited Suited VR from verified test data only
Signage (public education) +0.25 — — — — — Added to composite VR

The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.

Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Sikkim for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Sikkim stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.


8.7 BMP design summaries

8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).

8.7.2 Bioretention and rain gardens (Figure 8.2).

  • (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
  • (b) Surface ponding drained within 48 hours.
  • (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
  • (d) A transition (choker) layer and a gravel drainage layer below the media.
  • (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
  • (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
  • (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.

8.7.3 Vegetated swales.

  • (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
  • (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
  • (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
  • (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
  • (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.

8.7.4 Vegetated filter strips.

  • (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
  • (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
  • (c) Used mainly as pretreatment for bioretention, infiltration and swales.

8.7.5 Permeable pavement.

  • (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
  • (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
  • (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
  • (d) Structural design for the traffic loading by the road authority's standards.
  • (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.

8.7.6 Infiltration trenches and basins (Figure 8.3).

  • (a) Pretreatment under Clause 8.5.3 in every case.
  • (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
  • (c) An observation well to the base of each trench.
  • (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
  • (e) An overflow to the minor or major system at grade.
  • (f) Not brought into service until the contributing area is stabilised (Chapter 10).

8.7.7 Wet ponds (extended wet detention).

  • (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
  • (b) A sediment forebay at each inlet (Clause 8.5.3).
  • (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
  • (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
  • (e) A dry-season water balance (Clause 8.7.8).
  • (f) The detention storage of Chapter 4 may sit above the extended detention level.

8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.

8.7.9 Constructed wetlands.

  • (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
  • (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
  • (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
  • (d) A high-flow bypass so that floods do not scour the macrophyte zone.
  • (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.

8.7.10 Gross pollutant traps.

  • (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
  • (b) Capture of gross pollutants down to about 5 mm.
  • (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
  • (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
  • (e) Vehicle access for cleaning by suction or grab.

8.7.11 Oil-grit separators.

  • (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
  • (b) Sized for Q_wq, with a high-flow bypass.
  • (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.

8.7.12 Silt traps and catch pits.

  • (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
  • (b) A sump at least 300 mm below the outlet invert.
  • (c) Silt traps are pretreatment only and earn no VR.

Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Sikkim. Three local issues drive changes from the source manuals:

  • Mosquitoes. Dengue is endemic in Sikkim. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
  • Dry seasons. Most of Sikkim's rain falls in the monsoon season of 1 April to 31 October: Gangtok's normals run from 296.9 mm in April to 173.4 mm in October, and from November to March they are 37.9, 19.5, 27.1, 72.2 and 126.4 mm (IMD, Gangtok, 1981–2010). In the dry months the pokharis (पोखरी; ponds, lakes or tanks) fall, the jhoras (झोरा; natural watercourses or ravine streams) shrink, and the springs (dhara, धारा) weaken: "about 80%" of rural Sikkim is reported to depend on springs, and "half of the perennial springs have already dried up or have become seasonal" (as reported). In the towns the dry-weather flow of a drain or jhora is often sullage or septic effluent, because the drains carry it (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool through the dry months on its own catchment's runoff is not to be used; in the ridge towns, where Clause 4.11 bars infiltration on slopes and in stability zones 3 to 6 and there is little flat land, the practical forms are lined bioretention with an underdrain, swales on gentle ground, storage for use, and lined extended dry detention. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage or with water taken from a spring; pokharis, dharas, lakes and wetlands are waterbodies under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
  • Litter and silt. GPTs and silt traps are treated as essential, not optional, because Sikkim drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.

The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.

Bioretention cell: cross-section Bioretention cell (rain garden): section, not to scale Paved area Pretreatment: grass strip or forebay to drain ponding ≤ 300 mm filter media 600–900 mm overflow crest = max ponding mulch 50–75 mm engineered sandy-loam media (low fines, low phosphorus) transition (choker) layer gravel drainage layer perforated underdrain (if needed) Seasonal high groundwater table (post-monsoon) ≥ 1.0 m if unlined (infiltrating) Lined version (no infiltration): impermeable liner below the gravel layer. Required at pollution hotspots and wherever the 1.0 m separation to seasonal high groundwater cannot be met. Dimensions as set in Clause 8.7.2.

Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.


8.8 Infiltration and recharge criteria

8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Sikkim, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is the highest level found from April to November, which covers the season of 1 April to 31 October and the month after it (Clause 3.10.2). Sikkim needs the three rules of Clause 4.11 here, with the spring rule of this Manual, and Clause 8.8.1 applies with the following. (i) No infiltration on the hills (Clause 4.11, hill rule). In sub-areas SK-B, SK-B1 and SK-C, and on any slope steeper than 10° in SK-A, no deliberate infiltration practice (soakaway, soak pit for storm water, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base; an unlined bioretention cell is an infiltration facility under Clause 8.2 and is treated the same way) shall be built or credited on natural ground sloping more than 10°; on colluvium, fill or slide debris, whatever its slope; in stability zones 3 to 6 of the Mines and Geology Department's notification of 2021; in any area "sinking", "landslide prone" or "having scars of old landslides" (SBCR 1991, reg. 35); or upslope of a cut slope or retaining wall within twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope; and in stability zones 4 to 6 not at all, whatever certificate is offered, because the zonation already records "Dripping" or "Flowing" ground water there and judges zone 4 "Not suitable for habitation unless immediate protective measures" are taken. On such sites roof runoff goes to rainwater storage credited under Chapter 4, and its overflow and all other runoff go by a lined, stepped drain through a silt trap and an energy dissipator to a trained jhora or the road drain, never onto an unprotected slope; the exception for roof water in Clause 8.11.3(c) does not apply, and no infiltration is credited toward retention or the WQv. The hooks are regulations 21, 25(iv) and 13(iii) of the SBCR 1991, which already send roof water and surface water by "Pucca storm water/plinth protection drain" to "the road side drain or to adjoining permanent drains or jhora", and the zone-review condition of the 2021 notification: "Proper channelization of surface runoff by providing catchment drains especially during the rainy seasons and connect it to natural waterways/Jhora which also improves the stability of the area due to reduced erosions and percolation of water". Gangtok Smart City Development Ltd (GSCDL) told the National Green Tribunal that "landslides are caused mainly due to loose soil by spring water generated at natural Jhora" (OA 38/2022). Regulation 25(i) of the SBCR 1991 has every building treat its sewage "in septic tanks built within the site", and regulations 6 and 13(iii) require the soak pit, which on a wet slope puts water into the ground that the hill rule protects: this Manual states the conflict and does not override the regulation; it puts no storm water into a soak pit, and recommends that no new soak pit be placed in stability zones 3 to 6 and that one on a slope steeper than 10° be sited by a geotechnical engineer, downslope of buildings and cuts (Clause 8.9). (ii) No infiltration on the valley floors where the water stands high (Clause 4.11, valley-floor rule). In sub-area SK-A no deliberate infiltration practice shall be built or credited on land below the 1% AEP flood level of the Teesta, the Rangit, the Rongni Chu or another river; on the river bed and terraces raised by the flood of October 2023; in Zone 1 or Zone 2 of a pokhari or reservoir (Chapter 7); or wherever the seasonal high water table is less than 2.0 m below the ground. The river terraces at Rangpo, Melli and Jorethang are gravels with a high water table in the season (NEER reading; no measured depth to water was found [TBC]). On such land roof runoff goes to storage, and detention is provided in lined storage checked for flotation. (iii) Recharge only where it is safe (Clause 4.11, recharge rule). Recharge is not a design objective in Sikkim, where groundwater lies "largely in disconnected localized pockets and in deeper fracture zones" and "springs are the main source" (CGWB, as quoted); no CGWB depth to water or extraction figure was read [TBC]. Deliberate recharge is allowed only on the tested river-terrace gravels of SK-A above the 1% AEP flood level and outside the zone raised in October 2023, and on benches sloping 10° or less in stability zone 1 shown safe by a geotechnical certificate, in each case with pretreatment, the field test of Clause 8.8.3, a seasonal high water table at least 2.0 m below the ground and the separation of this Clause. Springshed recharge under the Dhara Vikas programme of the Rural Management and Development Department (RMDD) (trenches and ponds on the slopes above springs) is a water-supply measure, not a stormwater credit: this Manual allows it only where the geology is mapped and the slope is stable, never above a known slide, a road cut or a building, and gives it no credit toward retention or the WQv. (iv) Springs (dhara): the spring rule. No storm outfall, soakaway or drain discharge lies within 15 m of a dhara; storm water is not routed into a dhara or onto the slope immediately above it; no drain, cut or fill intercepts the flow to a spring, buries its outlet or is laid across it; Zone 1 of a dhara (Clause 7.4) is measured from its outlet or the edge of its basin or chamber, and no storm drain or sewer is laid within it except a lined drain below the outlet that carries its overflow away; and the recharge area of a spring above a town's or village's intake, as a hydrogeologist maps it (the Dhara Vikas village spring atlas where it covers the site), is a zone in which no paving is laid except for access, no road runoff is led into the ground, and no infiltration facility, soak pit or septic tank is placed. Sikkim has no statutory distance between a building, a drain or a soak pit and a water source, and no spring-protection statute or order was found; the 15 m is the Zone 1 width of this Manual. The springs are the rural water supply: the Dhara Vikas programme (from 2008, or 2010 in one source) is reported to have mapped 704 springs for rejuvenation (Scroll; The Wire), while an RMDD presentation of 2018 is reported to count "more than 2000 springs mapped on GIS platform" (both as reported; the counts are of different dates and conflict, and neither is used for design); an assessment by IISc is reported to have found a "15% enhancement in the spring discharge" under the programme (as reported). (v) Quality. No runoff from quarries, muck and spoil dumps, industrial yards, hydropower construction sites or roads with heavy traffic is led to any recharge structure, and a recharge well or shaft on the river terraces is used only for roof water or for runoff that has passed a filtering BMP, after a hydrogeologist's report confirming the depth to water, the receiving zone, and that no drinking-water well, spring or intake within 30 m will be harmed. The 10° trigger, the bar in stability zones 4 to 6, the distance of twice the wall height, the 2.0 m limit, the spring rule and these conditions are set by this Manual; no Sikkim rule fixes a slope or a ground on which infiltration is barred below the "around 70 (Seventy) degree" of regulation 35, and the slope bands of the stability zones (zone 1 "<15°", zone 2 16–25°, zone 3 26–35°, zone 4 36–45°, zones 5 and 6 above 45°) are site classes for building height, not infiltration rules. The seasonal high groundwater table shall be determined under Clause 3.10.2.

8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.

8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:

  • (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
  • (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
  • (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
  • (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).

Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.

8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:

  • (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
  • (b) 3.0 otherwise.

8.8.5 Minimum rates.

  • (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
  • (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
  • (c) No infiltration credit where the design rate is below 3 mm/h.

8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:

  • (a) 3 m from building foundations, and 5 m from a basement;
  • (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
  • (c) 30 m from a drinking-water well or borewell;
  • (d) 15 m from a septic tank or soak pit; and
  • (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.

Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.

8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).

8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:

  • (a) fuel stations;
  • (b) vehicle workshops, washing bays, and bus and truck depots;
  • (c) industrial yards and loading areas where hazardous materials are handled or stored;
  • (d) solid waste transfer stations and landfill areas; and
  • (e) land known or suspected to be contaminated.

Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.

8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Sikkim has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The gravel and boulder terraces of the Teesta, the Rangit and the Rongni Chu are not coastal sand areas: Clause 8.8.1 applies there in full, with the valley-floor and recharge rules of Clause 4.11, and the reduced separation of item (d) does not. In coastal sand areas:

  • (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
  • (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
  • (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
  • (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
  • (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.

8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the gneisses, schists, phyllites and quartzites of the Daling Group and the Higher Himalaya over most of the State, where groundwater is held "in fractured and jointed zones … and in weathered zones" and emerges "as seepages and springs wherever the land surface intersects local ground water body" (CGWB, East Sikkim, as quoted); on any slope in these areas the hill rule of Clause 4.11 applies first under Clause 8.8.1, so this Clause has effect only on the tested river-terrace gravels and the benches of stability zone 1 that the recharge rule of Clause 4.11 allows):

  • (a) tests shall be made at the facility base, below any surface crust or hardpan;
  • (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
  • (c) infiltration on or above slopes shall be checked for slope stability.

8.8.11 Delta clays and black cotton soils. In the clayey colluvium, fill, cut-spoil and slide debris of the hills, the compacted ground of roads and building platforms, the silted beds of pokharis and the margins of reservoirs, and in expansive black cotton soils:

  • (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
  • (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.

Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Sikkim precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Sikkim RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.

No map of hydrologic soil groups for Sikkim, no soil series of the State and no measured infiltration rate anywhere in the State was found [TBC]. The CGWB describes the rocks of East Sikkim as "gneiss, schists, quartzites, phyllites, limestones, sandstones, shales, meta-sedimentaries", with groundwater "in fractured and jointed zones … and in weathered zones in the phyllite, schist, gneisses and quartzites"; on steep ground it emerges "as seepages and springs wherever the land surface intersects local ground water body"; in South Sikkim the "Daling group of rocks is dominant" (the same source elsewhere names the Gorubathan Formation as dominant: the statements conflict); and statewide groundwater lies "largely in disconnected localized pockets and in deeper fracture zones", and "springs are the main source" (CGWB, all as quoted; the reports themselves were not reached). No depth to water or extraction figure was read [TBC]. Gangtok's slopes stand on "Precambrian rocks which contain foliated schists and phyllites" (as summarised from a landslide-zonation study). Water put into the ground is a hazard as well as a resource. The 2021 stability zonation records the ground water of zone 3 as "Wet", of zone 4 as "Dripping" and of zones 5 and 6 as "Flowing", and judges zone 4 "Not suitable for habitation unless immediate protective measures"; GSCDL told the National Green Tribunal that "landslides are caused mainly due to loose soil by spring water generated at natural Jhora"; and the parent Act of the building rules opens by recording that septic tanks and water tanks built in the notified green belt were "likely to cause land slides during monsoons" (1985 Act, preamble). This Manual's interim soil groups follow from these (Chapter 3): the thin brown hill soils over phyllite, schist and gneiss C on slopes and D for design on slopes steeper than 10°, bedrock, roads and compacted ground D, colluvial debris fans B hydraulically but slide-prone and never credited with infiltration, the gravel terraces of SK-A A to B where the water table is deep and C where it is within 2 m in the season, urban fill C (D if compacted or clayey), and the alpine, moraine and frozen ground of SK-C C to D. The State therefore needs three rules, not one (Clause 4.11). On the hills, on colluvium and fill and in stability zones 3 to 6, no water is put into the ground on purpose, under the hill rule, and in zones 4 to 6 none at all. On the valley floors below the 1% AEP flood level, on the bed raised in October 2023 and where the water stands within 2.0 m, none is put into the ground either, under the valley-floor rule. Only on tested terrace gravels above the flood and the raised bed, and on stable benches of zone 1, is recharge allowed, with pretreatment, as a choice rather than a duty, under the recharge rule. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Sikkim, which has no coast.

Infiltration trench: section with groundwater separation Infiltration trench: section, not to scale Seasonal high groundwater table (measured after the monsoon) Drinking-water well Sediment sump (pretreatment) Runoff in Observation well overflow clean washed aggregate (void ratio from test) geotextile on sides and top sand filter base ≥ 1.0 m Building foundation foundation setback well setback Test infiltration at the proposed base level. Design rate = measured rate ÷ safety factor. Empty within 72 h. Setback distances and test methods: Clauses 8.8.3 to 8.8.6. Road and parking runoff is never piped into a well. Sandy coastal soils: high rates, shallow groundwater. Laterite, hard rock: low rates. Delta clay: usually unsuitable.

Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.


8.9 Sewage cross-connections and dry-weather flow

8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.

8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.

8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Sikkim State Pollution Control Board (SSPCB) and the drain owner.

8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the monsoon, and record:

  • (a) the outfalls with DWF;
  • (b) the estimated DWF rate; and
  • (c) the upstream sources found by tracing, CCTV, dye or smoke testing.

The results shall be published in the register of Clause 10.17.

8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:

  • (a) diverts the DWF to a sewer or a treatment plant;
  • (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
  • (c) has a screen ahead of the diversion; and
  • (d) is not a substitute for removing the source connections.

8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.

Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Sikkim. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.

In Sikkim the storm drains and jhoras carry sewage outside the part of Gangtok that is sewered, and this is the normal case, not the exception. The State estimated the urban sewage generated in September 2025 at 29.51 MLD (80% of the water supplied plus 10% for storm-water infiltration: the Gangtok Municipal Corporation 18.33 MLD, Namchi 3.35, Jorethang and Nayabazar 2.41, Rangpo 2.38, Mangan 1.14, Gyalshing 1.01 and Singtam 0.89), against 22.71 MLD installed, 17.90 MLD operational and 15.22 MLD actually treated at Gangtok's sewage treatment plants (Adampool 8.00 and 4.69 MLD, Ranipool 1.27, Lower Sichey 3.90 and Lower Syari 1.60, with Tathangchen's 3.25 MLD not yet operating), and stated that "Sewage of towns and areas where there is no Sewage Treatment Plants is treated through anaerobic digestion in the septic tanks of individual households" (monthly progress report of September 2025, annexed to the State's affidavit of 19 December 2025 in NGT OA 673/2018). In Zone III, whose scheme is for the "Pollution abatement of Rani chu through Ro-Ro Chu", "Connections of about 500 households have so far been completed" (the same report). The State also told the Tribunal that "the establishment of sewerage systems for Namchi Town and Jorethang Town has remained stalled since the year 2013 and 2015 respectively", because of "public resentment", with completion targeted for December 2028 (affidavit of 19 December 2025, which dates the GLOF "3rd/4th September 2023" in error; the State's compliance report gives October); that the flood of October 2023 "damaged the STPs at Singtam (0.66MLD); Rangpo (1.40 MLD); Melli (0.50 MLD)", where the households "with existing septic tanks … are currently being utilized to channelize the sewage" (compliance report in EA 35/2023); and that a new plant at Singtam (₹39.03 crore) is due in December 2027. At Melli, CAG found that households "had constructed their own septic tank for disposal of sewerage and were reluctant to connect" to the plant completed in November 2013, and at Jorethang that the sewerage was incomplete "for want of land", the land chosen being "fully flooded during monsoon" (Report No. 3 of 2016). At Soreng "most of the houses have adopted the practice of onsite disposal by constructing septic tank/soak pits with effluent discharging into open surface drains", which carry "untreated wastewater into the open storm water drains ultimately discharging into the farmland / water bodies", and "In some places, sewage from septic tanks overflow/seep to roadside drains" (ADB, due-diligence report for the Sikkim Integrated Urban Development Project, December 2024). Two statements stand side by side and are not reconciled here. In OA 606/2018 the National Green Tribunal found, in its order of 4 July 2024 as quoted by the State, that rural sewage, "presently estimated to be 21.41MLD", "is relying on septic tanks and soak pits", and that "treated sewage is entering in to river/ rivulets/ jhoras and this is not permissible under the Water Act. Fast flowing water bodies should not be exploited for disposal of sewage or garbage", and asked for the "water quality of rivers including jhoras receiving sewage"; the State replied that "No sewage is disposed off in the rivers or fast flowing water bodies" (six-monthly report in OA 606/2018). The State's four former Priority V stretches (the Teesta at Chungthang, the Maney Khola, the Ranichu and the Rangit at Triveni, named as cited in the State's filings) were delisted: "at present no river stretches have been identified as polluted river stretches" (Central Monitoring Committee, 12 September 2023, recorded in the affidavit of 19 December 2025), and the Maney Khola is the State's model river for bathing quality; this Manual does not describe any Sikkim river as a listed polluted stretch, and it does not read the delisting as evidence that the jhoras are clean, because the jhoras are not monitored stretches (NEER reading). The law already points the same way: section 193 of the Sikkim Municipalities Act, 2007 requires "an entirely separate drain for rain water", connected "with the natural nullahs, khola-kholsas, jhoras, or storm water drainage", and section 187 provides that, from a date to be appointed, "no sewage shall be discharged into any watercourse until it has been so treated as not to affect prejudicially the purity and the quality of the water"; regulation 25 of the SBCR 1991 sends domestic sewage to a septic tank within the site, or to the public sewer where one is available. In Sikkim, therefore: (i) every storm-drain or jhora outfall to a jhora that feeds a dhara, a pokhari or a drinking-water intake, and every outfall within a town to the Rani Khola, the Roro Chu, the Rongni Chu or the Teesta, is taken to carry dry-weather flow until the survey of Clause 8.9.4 shows that it does not, and has a DWF interceptor and a screen under Clause 8.9.5 before it reaches the water, and before any detention or infiltration device (Clause 6.3.6(e)); (ii) no septic tank overflow, soak-pit overflow or sullage pipe is connected to a storm drain or jhora on any site approved under this Manual (Clauses 8.9.1 and 8.9.2), with sections 187 and 193 of the Municipalities Act and regulation 25 of the SBCR 1991 as the local hooks; (iii) until sewers exist, a drain or jhora that receives the sullage of a settlement is designed as a combined channel: for the velocities that keep sludge moving in dry weather as well as for the storm flow, with access for cleaning along it, and with covers or screens where it passes homes (Clause 6.3.6(d)); and (iv) every new or rebuilt sewage treatment plant, interceptor and pumping station is sited above the October 2023 flood and aggradation level and outside any mapped GLOF path (Chapter 7, definitions after Clause 7.2), because the plants at Singtam, Rangpo and Melli were damaged by that flood. Every interceptor is sized from the measured dry-weather flow of its drain, does not reduce the drain's capacity for the minor and major events (Clause 8.9.5(b)), and passes the storm flow above its capacity on down the drain; on a jhora that carries boulders and debris in flood, it and its chamber are placed above the jhora's 1% AEP level or protected against the scour and debris of that flood (Chapter 9). These conditions are set by this Manual.


8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens

8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:

  • (a) a GPT designed under Clause 8.7.10; and
  • (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.

8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:

  • (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
  • (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.

8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:

  • (a) be designed with 50% blockage for hydraulic capacity;
  • (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
  • (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
  • (d) be cleanable from a safe platform, with vehicle access.

8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.

Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Sikkim waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.


8.11 Rainwater harvesting integration

8.11.1 RWH mandate continues. The rainwater harvesting required by the Sikkim Building Construction Regulations, 1991 (none: the regulations require no rainwater harvesting, only that at least 25 per cent of the roof be sloped "with rain water gutter" (reg. 6) and that gutters and down pipes lead to "the storm water plinth protection drain of the building" (reg. 21); the only statutory rainwater harvesting in Sikkim is section 186 of the Sikkim Municipalities Act, 2007, which requires a "rain water harvesting structure" in "every building owned or occupied by the State Government or a statutory body or a company or an institution owned or controlled by the State Government", "in such manner as may be specified by the State Government or the Municipality from time to time", and no manner has been specified as far as found) continues to apply where it exists, that is, to the buildings that section 186 covers; for every other building rainwater harvesting is a condition of this Manual where the Manual applies, not a statutory one, and in Sikkim it is storage for use, not recharge, on every slope steeper than 10°, on colluvium and fill and in stability zones 3 to 6 (Clause 4.11, hill rule) (Chapter 1). This Clause sets how RWH structures are counted under this Manual.

8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:

  • (a) harvesting: storage for use (sumps and tanks);
  • (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
  • (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).

8.11.3 Recharge structures.

  • (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
  • (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
  • (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.

8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:

  • (a) its infiltration rate has been tested under Clause 8.8.3;
  • (b) it empties within 72 hours at the design rate; and
  • (c) it has pretreatment.

A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).

8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every monsoon (April–October) design storm (Chapter 4).

8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.

8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.

Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Sikkim's building rules do not require rainwater harvesting. The SBCR 1991 ask only that "minimum of 25 per cent of the roof shall be constructed in sloped gabled of traditional roofing … with rain water gutter" (reg. 6) and that gutters and down pipes be "of such design and capacity that the water will neither spill out of them nor leak through them" and lead to "the storm water plinth protection drain of the building" (reg. 21). The only statutory rainwater harvesting is section 186 of the Sikkim Municipalities Act, 2007: "In every building owned or occupied by the State Government or a statutory body or a company or an institution owned or controlled by the State Government, rain water harvesting structure shall be provided in such manner as may be specified by the State Government or the Municipality from time to time"; no manner has been specified as far as found (NEER reading). A reply in the Rajya Sabha in 2019 lists Sikkim as "NA asked to take up rain water harvesting structure for Government buildings" (as quoted in a search snippet), and GSCDL has invited expressions of interest for a rainwater-harvesting project in Gangtok (as reported; the document was not read). Rainwater harvesting in Sikkim is storage and reuse: the rural households that depend on springs face their decline (Clause 8.7, Commentary), and recharge on the slopes would move the ground. For private buildings it is a condition of this Manual where the Manual applies, not a statutory one (Clause 8.11.1). This Manual credits storage of at least 25 L per m² of roof as retention only through reuse within 72 hours (Clause 4.4.3), assumes it full at the start of every design storm of the season of 1 April to 31 October (Clause 4.11.2), and never counts it as detention. On the tested terrace gravels and the stable benches that the recharge rule of Clause 4.11 allows, recharge may be one function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); everywhere else harvesting is for storage and use only, and its overflow goes by a lined drain to a trained jhora or the road drain, never onto an unprotected slope, into a soak pit or within 15 m of a dhara. Springshed recharge under the Dhara Vikas programme is a water-supply measure and earns no stormwater credit. RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a June to September monsoon storm, such as those of 9 June 1997 at Gangtok and 25 September 2005 at Tadong, arrives after weeks of rain, which is why it cannot be counted as detention.

Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.


8.12 Construction-stage erosion and sediment control

8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:

  • (a) the sequence of clearing, earthworks and stabilisation;
  • (b) the area exposed at each stage;
  • (c) the measures of Clause 8.12.3, with their locations and sizes;
  • (d) the protection of infiltration and retention areas (Chapter 10);
  • (e) stockpile, concrete washout and fuel storage locations; and
  • (f) the inspection and maintenance schedule.

8.12.2 Monsoon timing. Earthworks shall be planned so that:

  • (a) the area exposed during the monsoon (April to October) is as small as practicable;
  • (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 March; and
  • (c) any area exposed between 1 April and 31 October has sediment controls in place before it is cleared.

8.12.3 Measures.

  • (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
  • (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
  • (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
  • (d) Inlet protection at every existing drain inlet that receives runoff from the site.
  • (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
  • (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the monsoon.
  • (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
  • (h) Concrete washout in a lined pit, never into a drain.

8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).

8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.

8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).

Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Sikkim's 2-year 24-hour depths are high and construction sites are commonly left exposed through the monsoon. The 2 ha division between traps and basins, the 31 March stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 March date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Sikkim spoil and slide debris travel with the sediment: on the ridges into the jhoras, and on the valley floors into a Teesta whose bed the flood of October 2023 raised by 7–8 m (PPR, 2026). The State already reaches construction sediment in three ways, without a size, an inspection or a basin. The SBCR 1991 prohibit the "Stacking/dumping of building materials without permission and spoils on Public Street, road, drains, gullies and jhoras", with a fine of ₹500 at least (reg. 22), and Form III takes a refundable security of ₹5,000 "to meet the expenses for lifting of building materials/spoils … dumped at road side including drain … and also effect repair to damages to the road including drainage system" (cl. 15). And the annual monsoon notices stop excavation: "no construction involving earth excavation works shall be permitted with effect from 6th May, 2019 till 30th September, 2019 due to the onset of the monsoon. Further, Construction Orders shall not be issued during the aforesaid period", with building material "lying on the road setback or over drains" to be seized (UD&HD Notice No. 613/GOS/JCTP/UD&HD, 1 May 2019; UDD Notice No. T(1689)/997, 26 May 2020, for 1 June to 30 September 2020; in 2024 the ban, from 1 May, was extended by 15 days, as reported). The notices are annual, not a regulation, and they do not cover an excavation left open from before the ban; Clause 8.12 supplies the stabilisation, the controls and the inspections. The stabilisation date of 31 March is set by this Manual, before its season begins on 1 April and before the excavation ban begins, because Gangtok's April averages 296.9 mm and its 24-hour record fell in May (Chapter 2). The reason given above for the larger basin volume, that Sikkim's 2-year 24-hour depths are high, holds in every sub-area: the 50% AEP 24-hour design depths of Clause 2.3.6(d), at 0.42 of the 2% AEP depth, are about 114 mm at Gangtok, about 118 to 151 mm on the provisional plate readings of SK-A (Rangpo to Melli), about 101 mm in SK-C and about 195 mm in SK-B1 (NEER arithmetic on the values of Chapter 2); the NIH-DHAARA reanalysis gives lower values, from about 50 mm at Lachung to about 113 mm at Rangpo (comparison values only, not design values; Chapter 2); and on bare HSG D ground under AMC III, which Chapter 3 applies from 1 May to 30 September, Gangtok's 114 mm gives about 100 mm of runoff, about 1,000 m³ per hectare, four times the 250 m³ per hectare of the CGP minimum (NEER arithmetic). The rule of Clause 8.12.3(c) is kept unchanged. In Sikkim the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain, a trained jhora or the road drain, never onto an unprotected slope; no sediment basin or trap is designed to infiltrate where Clause 4.11 bars infiltration, which includes every slope steeper than 10° and stability zones 3 to 6; no basin or stockpile is placed on the Teesta valley floor below the October 2023 flood and aggradation level; no spoil, muck or debris from a site is placed in a jhora, khola or pokhari, within its Zone 1, on a scheduled river's bank, or on the recharge area of a dhara; and a construction site above a dhara or a drinking-water intake keeps its sediment out of every drain that reaches it.


8.13 Monitoring

8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:

  • (a) dry-weather sampling (Clause 8.9.4), at least once a year before the monsoon; and
  • (b) wet-weather sampling of at least three events each monsoon at a set of index outfalls.

8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.

8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).

8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.

8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.

Commentary. No Sikkim programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.


8.14 Submittal requirements

Every drainage report under this chapter shall include:

  1. the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
  2. for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
  3. the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
  4. for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
  5. the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
  6. the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
  7. the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
  8. the ESC plan (Clause 8.12).

8.15 Review and update

8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.


References (chapter)

  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A: Engineering Design (§9.5, Ch. 10). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
  • Mid-America Regional Council and Kansas City Metro Chapter APWA (2012). Manual of Best Management Practices for Stormwater Quality (Tables 4.2–4.6). https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01; MARC factsheet and Supplement. https://www.marc.org/document/apwa-5600-manual-factsheet ; https://www.marc.org/document/apwa-stormwater-standards-supplement
  • Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, 2016 Edition, Vols 1–2. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
  • Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd Edition. https://did.sarawak.gov.my/web/attachment/show/?docid=clRsMlRycU1lNnFRcnl3eDZnNkJMdz09OjpY0au0UPvQ9zUHVWRMbCKX
  • Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
  • CIRIA (2015). The SuDS Manual (C753). London: CIRIA.
  • PUB, Singapore's National Water Agency. Active, Beautiful, Clean Waters Design Guidelines (current edition).
  • Central Ground Water Board (2007). Manual on Artificial Recharge of Ground Water. Ministry of Water Resources, Government of India.
  • US Environmental Protection Agency (2022). NPDES Construction General Permit (sediment basin sizing).
  • ASTM D3385. Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer.
  • BRE Digest 365. Soakaway Design. Building Research Establishment, UK.
  • Government of Sikkim. Sikkim Building Construction Regulations, 1991, as amended, regs. 6, 13(iii), 21, 22, 25 and Form III; Sikkim Municipalities Act, 2007, ss. 186, 187 and 193; the stability zonation of the Mines and Geology Department (Notification No. 17/DMG/20-21, 19 March 2021); and the monsoon notices of 1 May 2019 and 26 May 2020 (Chapter 7 references).
  • National Green Tribunal (Principal Bench). EA 35/2023 in OA 673/2018: State affidavit of 19 December 2025 with the monthly progress report of September 2025, and the State's compliance report; OA 606/2018: six-monthly report of the Government of Sikkim after the order of 4 July 2024 (Chapter 7 references).
  • Asian Development Bank (2024). Sikkim Integrated Urban Development Project (57230-001): resettlement and indigenous peoples due-diligence report for the Soreng sewerage subproject, December 2024. https://www.adb.org/sites/default/files/project-documents/57230/57230-001-sddr-en.pdf
  • Comptroller and Auditor General of India. Report No. 3 of 2016 (Economic Sector, Government of Sikkim), Chapter II (Chapter 7 references).
  • Central Ground Water Board. Aquifer mapping reports for East and South Sikkim and the State's groundwater assessment (as quoted in search results; the reports were not reached).
  • National Green Tribunal (Eastern Zone). OA 38/2022: reply affidavit of GSCDL (Chapter 7 references).
  • Reports of rural dependence on springs and their decline, and of the Rajya Sabha reply of 2019 on rainwater harvesting (India Water Portal; Rajya Sabha debates, as quoted; secondary).
  • India Meteorological Department. Mean monthly meteorological parameters of Gangtok, 1981–2010 (Meteorological Centre Gangtok); Extremes of Temperature and Rainfall for Indian Stations (up to 2012) (Gangtok, 42299; Tadong, 22209) (Chapter 2 references).
  • NIH-DHAARA (National Institute of Hydrology), IMDAA dataset, queried 14 November 2026 (tool output; comparison values only; Chapter 2 references).
  • Parliament reply AU1419 on AMRUT 2.0 admissible components. https://eparlib.sansad.in/bitstream/123456789/2988692/1/AU1419_tzCIvw.pdf

Annexes and forms

Annex / Form Content
8A 3-month ARI 24-hour depth and IDF by zone
8B Redevelopment LoS table and treatment-train composite VR
8C Sikkim BMP performance calibration
8D BMP design sheets, media specification, plant lists
8E Erosion and sediment control standard details
Form 8-1 Water Quality Sheet
Form 8-2 Infiltration Test Record