Chapter 7Waterbodies, Pokharis, Jhoras, Springs and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (pokhari) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Sikkim, a landlocked mountain State, means its lakes and pokharis (पोखरी; ponds, lakes or tanks), such as Khecheopalri (Khachoedpalri), reported to have become the State's first Ramsar site in February 2025, and Tsomgo, the hydropower reservoirs with their drawdown zones, the marshy and seepage ground below springs, any wetland notified under the 2017 Rules (none was found notified), and the "534 wetlands covering 7,477 ha" reported for the State (as reported); the glacial lakes are hazard sources under Clause 2.3.6(i), not wetlands to be drained into or counted as storage;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988, the Sikkim Municipalities Act, 2007, the Sikkim Allotment of House Sites and Construction of Building (Regulation and Control) Act, 1985 and the Sikkim Building Construction Regulations, 1991 made under it, with the stability zonation notified by the Mines and Geology Department in 2021, the Sikkim Town and Country Planning Act, 2024 once it commences (it was enacted in 2024 and amended in 2025, and has not commenced), the Wetlands (Conservation and Management) Rules, 2017, the Dam Safety Act, 2021, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river, such as the Teesta, the Rangit and the Rongni Chu and the other rivers in the Schedule to the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988, or khola (a river or large stream, as in the Rani Khola and the Maney Khola); jhora (a natural watercourse or ravine stream, perennial or seasonal, trained or untrained), into which the drains of a ridge town fall; drain; pokhari (a pond, lake or tank, natural or dug, on a bench, a ridge or a valley floor); hydropower reservoir or pondage, such as those of Teesta-V at Dikchu, Teesta-VI, the Teesta Low Dam projects III and IV, Chuzachen, Dikchu, Jorethang, Tashiding, Rongnichu and Rangit-III, with its drawdown zone and the reach below its dam; dhara (a spring or spring spout) with its recharge area; glacial lake, which is a hazard source and never storage, whatever its name (Bhalay Pokhari and Doodh Pokhari are glacial lakes); wetland, marsh or seepage ground; kulo (an irrigation channel) or other supply channel; or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (pokhari) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Water Resources Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (jhora, kulo or feeder channel) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, spillway gate or regulator) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Sikkim terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Pokhari | A pond, lake or tank, natural or dug: Turner gives pokhari (his spelling पोखरि; modern पोखरी) as "Lake, pool, tank" (Annex 7E). First used in each chapter as "pokhari (पोखरी; pond, lake or tank)"; plural "pokharis". A pokhari with a controlled outlet is a tank under Clause 7.2: its gate is its sluice, and its FTL is the level at which it spills over its outlet with any gate closed, found by survey. A pokhari with an uncontrolled outlet has its FTL at the crest of that outlet. Engineered storage built under this Manual is a "detention pond" ([pokhari] in brackets only where a Nepali reader needs it), never a dhara and never a natural, sacred or community pokhari, which keeps its own name. |
| Glacial lake | A lake held by a glacier or moraine, such as South Lhonak, Shako Chho, Changsang, Khangchung Chho, Gurudongmar and the lakes called Bhalay Pokhari and Doodh Pokhari (PPR, 2026). It is a waterbody for Clause 7.3 and a hazard source under Clause 2.3.6(i); it is never a pokhari of the storage clauses, design storage, a flood cushion or a design outfall, whatever its name, and no tank clause of this chapter applies to it. This rule is set by this Manual. |
| Jhora | A natural watercourse or ravine stream, perennial or seasonal: the statutory word of the Sikkim Municipalities Act, 2007, under which a drain includes "a jhora or water-course of natural drainage line" (s.2(24)) and "'jhora' means any natural watercourse, whether on a public land or on a private land" (s.163(b)); Turner marks jhorā (झोरा) as a Darjeeling word for "Ravine" (Annex 7E). Every jhora that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name, whether it is dry for most of the year, and whether it is trained, lined, piped or covered. A jhora carries boulders, debris and slide material in flood: its inlets and culverts take the racks, bulking and blockage of Clause 6.3.6(f)–(h), and its top of bank is the edge of its active bed where that is wider than the edge of the 50% AEP flow. This definition is set by this Manual. |
| Trained jhora | A jhora improved to the standard of Clause 6.3.6(m): a channel that carries the 1% AEP flow with bulking and freeboard, toe and bed protection against scour, drop structures or check dams with energy dissipation at each fall, a debris basin or rack upstream of every culvert, and a maintenance access. Training does not reduce the jhora's Zone 1: a trained jhora keeps its corridor under Clause 7.4, because the 2021 stability zonation's zone 1 asks for training "with safe distance" and the corridor is the distance. |
| Khola; scheduled river | A khola (खोला) is a river or large stream (Annex 7E), as in the Rani Khola and the Maney Khola. A scheduled river is one of the 103 rivers in the Schedule to the 1988 Act (among them 1 the Teesta, 2 the Rangeet, 14 the Rongni chu, 15 the Roro chu, 62 the Gangtok chu, 77 the Lhonakchu and 103 the Khani Khola at Melli), whose river bank is "an area of sixty metres on either side of such river or area within high flood level mark, whichever is less" (s.29(1)). That bank is a maximum, not a minimum (NEER reading): where the high flood level lies within 60 m of the channel, the statutory bank ends at the high flood level. Whether the Rani Khola is the scheduled "Rongni chu" is a NEER reading to be confirmed [TBC]. |
| Top of bank of an incised jhora or khola | Where the bank of a jhora or khola is a slope steeper than 10°, the top of bank for Clauses 7.4.3 and 7.13.1 is the crest of that bank slope: the first marked break in slope above the channel at the top of the bank that the stream has cut, found by survey and shown on Form 7-1. Where no crest can be identified, it is the edge of the active bed, and a geotechnical report under the SBCR 1991 or the stability-zone review states whether a wider line is needed. Zone 1 is measured from that line, because a slide of the bank starts at its crest. This rule is set by this Manual. |
| Recorded waterbody | A pokhari, lake, reservoir, river, khola, jhora, dhara or wetland shown in any source of Clause 7.3.3(a): an LR&DMD land record, a Forest Department river-bank record, a Municipality's record of what vests in it, a notified-area or stability-zone map, a master-plan map, an operator's reservoir record, a Dhara Vikas spring inventory or a town's drain and jhora register. A recorded waterbody is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual. |
| Boundary of a pokhari or reservoir | For Clauses 7.3.3 and 7.13.1, the boundary of a pokhari or lake is the largest of its recorded boundary, its surveyed FTL and the outer edge of its water in the season of 1 April to 31 October shown by dated imagery or survey of recent years; and the boundary of a hydropower reservoir is the higher of its full reservoir level and the highest level its operator states, stated to the datum of Clause 7.3.5. No full reservoir level, maximum water level or release rule was found for any Sikkim reservoir [TBC]; until the operator states them in writing, the boundary is fixed by survey of the highest water line, and an outfall in the reservoir reach is sited above the surveyed October 2023 flood mark (Clause 5.8.5(c)). The drawdown land of a reservoir below that level is part of the reservoir. This reading is set by this Manual. |
| Dhara; spring recharge area | A dhara (धारा) is a spring or spring spout, often with a small basin or chamber (Annex 7E). A dhara is a waterbody for Clause 7.3, and its Zone 1 under Clause 7.4 is measured from its outlet or the edge of its basin or chamber. Its recharge area is the area upslope from which it is fed, as a hydrogeologist maps it, using the Dhara Vikas village spring atlas where it covers the site. The spring rule of Clause 8.8.1, item (iv), applies: no storm outfall, soakaway or drain discharge within 15 m of a dhara; no storm water routed into it or onto the slope immediately above it; no drain, cut or fill that intercepts its flow, buries its outlet or crosses it; and, above a town's or village's intake, a recharge area with no paving except for access, no road runoff led into the ground and no infiltration facility, soak pit or septic tank. No storm drain or sewer is laid within Zone 1 of a dhara except a lined drain below its outlet that carries its overflow away. This definition and these rules are set by this Manual. |
| Hazard-first ground: GLOF corridors and the Teesta valley floor | The land that Clause 2.3.6(i) screens apart from rainfall design: the path of a glacial lake outburst flood (GLOF) along the Teesta from the South Lhonak lake through Chungthang, Mangan, Dikchu, Singtam, Rangpo and Melli to the State border, along the Lachen Chu and the Lachung Chu, and along every stream below a glacial lake listed as high-risk; and the Teesta valley floor at or below the level of the October 2023 flood and the bed it raised. No setback for a glacial lake, a GLOF path or the Teesta after October 2023 exists in law (NEER reading; none was found), and this Manual sets none of its own for the cascade, because no rainfall rule can. It requires instead that every drainage asset it governs — detention storage, outfall structures, pumping, treatment and interception works — be sited above the October 2023 flood and aggradation level and outside the mapped GLOF path where a map exists (the evacuation and risk maps of SSDMA and the District Disaster Management Authorities, where they exist [TBC]), with outfalls to the trunk that meet Clause 5.8.5(b) and (d). No drain is sized for a GLOF. A developed-fringe area under Clause 7.6.6 is not notified on this ground. This rule is set by this Manual. |
| Floor levels on the valley floors | No flood plinth is set by the SBCR 1991, and no highest flood level has been fixed for any town [TBC]. The lowest habitable floor and every opening of a building approved under this Manual near a river, khola, jhora, pokhari or reservoir is not less than 0.5 m above the 1% AEP flood level (Clause 6.11), and on the Teesta valley floor not less than 0.5 m above the surveyed October 2023 flood mark at the site, whichever is higher. This rule is set by this Manual. |
| Fill on the valley floors | Compensatory storage under Clause 7.6.4 applies to any fill placed below the 1% AEP flood level on the valley floors of the Teesta, the Rangit and the Rongni Chu or beside any khola, and to any filling of a recorded pokhari or of the margin of a jhora. Fill placed on the river bed or terraces raised in October 2023 is fill like any other: the raised bed gives no credit, and on an incised jhora or khola whose 1% AEP flow stays within its banks the whole extent is floodway, in which no fill is placed (Clauses 7.6.1 and 7.6.2). Spoil and muck in "drains, gullies and jhoras" are already prohibited (SBCR 1991, reg. 22), and on a scheduled river's bank they are also a matter for the Forest Department under the 1988 Act. This rule is set by this Manual. |
| Land in Zone 1 | A jhora on public land other than forest land within a municipal area already vests in the Municipality (Municipalities Act, s.172(1)), and the river bank of a scheduled river is under the Forest Department (1988 Act, s.29(9)). Zone 1 land that is private is secured by agreement with the owner or by donation, or reserved in a development plan once the 2024 Act commences, and is not taken. Jhoras outside municipal limits, and jhoras on forest land, have no named protector (s.172 excludes forest land) (NEER reading). This rule is set by this Manual. |
| Gram Panchayat | The rural local body for this chapter and its annexes. Sikkim's panchayat law and the records, if any, that panchayats keep of village waters were not researched for this Manual [TBC]; the rural sewage of the State is "under the supervision of Rural Management Department" (State's filings before the National Green Tribunal). |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the Water Resources Department and the Land Revenue and Disaster Management Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Municipality (the Gangtok Municipal Corporation (GMC), the Namchi Municipal Council or a Nagar Panchayat), in which a jhora on public land other than forest land within the municipal area vests, and which must protect every jhora within that area, "whether on a public land or on a private land" (Sikkim Municipalities Act, 2007, s.172), the Forest and Environment Department (for the river bank of a scheduled river, which is under its control "as if it were a forest" under section 29(9) of the 1988 Act, for forest land, slip reserves and road reserves, and through its River Rejuvenation Committee, notified as "the Nodal Agency for all water bodies"), the Water Resources Department (for river and jhora works), the hydropower operator (for its reservoir, its dam and the reach below it: NHPC, whose estimates of the bed raised in October 2023 cover Teesta-V, Teesta-VI and the Teesta Low Dam projects III and IV, and the company that holds each other project), the Public Health Engineering Department (PHED; for water-supply sources and intakes), the Rural Management and Development Department (RMDD; for rural sewage, and for the springs and ponds its Dhara Vikas programme works on, which no statute assigns to it), the Roads and Bridges Department (PWD), NHIDCL or BRO (for the drains and culverts of their roads), the Gram Panchayat (for village waters outside municipal limits [TBC]), a private owner or a community (for land and water held by them; customary custodians of lakes were not researched [TBC]), a colony developer (for the drains of a layout until they are handed over), the State Wetland Authority (for a notified wetland; none was found), or another body; a jhora outside municipal limits or on forest land has no named protector, and this is recorded as such);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) land records and maps of the Land Revenue and Disaster Management Department (LR&DMD) and the District Collectors, kept by revenue block (NEER reading [TBC]; no land record was read for this Manual); the Forest Department's records of the river banks of the 103 scheduled rivers under the 1988 Act, which are under its control, and of its slip reserves and road reserves; the jhoras that vest in each Municipality under section 172(1) of the Sikkim Municipalities Act, 2007, and any limits of a jhora notified under section 173 (none was found); the maps of the notified areas kept by the Urban Development Department (UDD) and the Mines and Geology Department's stability-zone maps of regulation 17 of the SBCR 1991; the GIS master plans of the Sikkim Integrated Urban Development Project for four towns other than Gangtok, and of the Namchi Planning Area, once prepared; the hydropower operators' records of reservoir levels and reservoir land; the spring inventories of RMDD's Dhara Vikas programme and its village spring atlas (whose counts conflict, as reported); the evacuation and risk maps of the Sikkim State Disaster Management Authority (SSDMA) and the District Disaster Management Authorities for the GLOF corridors, where they exist [TBC]; and each town's drain and jhora register (Chapter 6);
- (b) WRD and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. Sikkim has no floodplain law and no flood line. No floodplain zoning Act, Bill or notified flood line was found (NEER reading); the Sikkim Town and Country Planning Act, 2024 would require development plans with "proposals for flood control, land stability and sloped linked controls" and regional plans that show the "natural disaster-prone area", but it has not commenced, and no plan has been made under it. The State itself says that the raised bed of the Teesta "poses a heightened risk of flooding during the monsoon season", and the project report on GLOF risk in the Lhonak valley annexed to its affidavit of 28 February 2026 suggests "High-risk Zoning" of the floodplains below glaciers and glacial lakes to keep critical infrastructure off them; that is a proposal, not a rule. No setback along the Teesta after the flood of October 2023 was found in that affidavit, in the orders of the High Court of Sikkim read for this Manual or in searches (NEER reading). The rivers are gauged only at a few sites, and their levels are known for this Manual only as SANDRP transcribed them from CWC (as reported): on the Teesta at Khanitar an old highest level of 297.7 m (18 September 1974) and a new one of 298.4 m (09:00, 4 October 2023); at Melli a warning level of 226.0 m and danger level of 227.0 m, an old highest level of 225.25 m, and a peak on 4 October 2023 given as 225.5 m in SANDRP's text but 228.0 m in a CWC bulletin of 2024 seen as a snippet (the figures conflict, and SANDRP's "2.75 meter higher than the old HFL" fits neither); on the Rongni Chu at Singtam a danger level of 355.09 m and a highest level of 356.09 m (undated); and on the Rangit at Majitar a highest level of 279.29 m (17 October 1985). No CWC level was found for Rangpo [TBC], and the sites above Dikchu stopped reporting between 22:00 and 23:00 on 3 October 2023. No source read for this Manual states the datum of any of these levels. Every one of them was set on a bed that has since moved: the bed rose "by an average of 7-8 meters" (PPR, 2026), and NHPC estimated rises of about 7.44 m at the Teesta Low Dam project IV, 7.29 m at project III, 6.00 m at Teesta-V and 2.00 m at Teesta-VI. The best evidence of flood extent on the valley floors is therefore the surveyed flood and debris marks of October 2023 at each site, with the post-2023 bed, and in the GLOF corridors the evacuation and risk maps prepared with the participatory risk assessments of SSDMA and the District Disaster Management Authorities in May 2024, where they exist [TBC]. Clause 7.3.4 lets the Authority adopt flood maps once they exist; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, with the bulking of Clause 6.3.6(g) on jhoras and kholas and the tailwater of Clause 5.8.5(b), and every highest flood level used shall be checked against a post-2023 survey. On the GLOF corridors the 1% AEP extent is not the governing line: siting above the October 2023 flood and aggradation level governs (definitions after Clause 7.2). Levels shall be stated to one datum (Clause 7.3.5), with the gauge and its datum named. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual along every natural channel draining 8 ha or more, every jhora and khola among them, and round every pokhari, reservoir and dhara, measured from the top of bank or, on an incised jhora or khola whose bank is a slope steeper than 10°, from the crest of that bank slope (wider lines govern under Clause 7.4.5 where they bind: the river bank of a scheduled river under section 29(1) of the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 is "an area of sixty metres on either side of such river or area within high flood level mark, whichever is less", a maximum that may be wider or narrower than 15 m; no statute, regulation or notification sets any line along a jhora; the SBCR 1991 set no distance from a jhora or river; no limits of a jhora have been notified under section 173 of the Sikkim Municipalities Act, 2007; and no setback along the Teesta was found after the flood of October 2023; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the river bank of a scheduled river under section 29(1) of the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 (sixty metres on either side of the river or the area within the high flood level mark, whichever is less), which is under the control of the Forest Department, a closure of a river bank, slip reserve or road reserve notified under section 32 of that Act, or a river added to its Schedule by notification; the limits of a jhora, watercourse or channel notified under section 173 of the Sikkim Municipalities Act, 2007 (none has been); a condition of the Municipality or of UDD on a building permission under the SBCR 1991, including the setbacks of regulation 18 and the conditions of the stability zone and of a zone review under the Mines and Geology Department's notification of 2021; a condition of the Water Resources Department for a work in or on a river or a jhora it has trained; the consent of a hydropower operator for a work that drains to, or lies next to, its reservoir or the reach below its dam; a flood-control or slope-linked control in a development plan once the Sikkim Town and Country Planning Act, 2024 commences (it has not); the views or permission of the Forest and Environment Department or the State Wetland Authority for a work in or next to forest land or a notified wetland; an order of a District Collector, SSDMA or a District Disaster Management Authority fixing a GLOF corridor or a relocation area, such as the relocation of 155 households at Toong Naga in the post-disaster needs assessment (PDNA) of 2023 (no order setting a line was found); or a direction of the High Court of Sikkim, the National Green Tribunal or the Supreme Court sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Sikkim has one statutory line along water, and it is a maximum: for the 103 rivers in the Schedule to the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988, the river bank "means and includes an area of sixty metres on either side of such river or area within high flood level mark, whichever is less" (s.29(1)), and since 2000 it has been "under the administrative control of the Forest Department as if it were a forest" (s.29(9)). Because the narrower of the two lines governs, the statutory bank on an incised reach whose high flood level lies a few metres from the channel may be only a few metres wide (NEER reading), and after the flood of October 2023 the high flood level itself has moved. The Act's "river" includes "any stream, channel, jhora, creek" (s.2(m)), but its 60 m applies only to the rivers in the Schedule. No statute, regulation or notification sets any line along a jhora: the SBCR 1991 have none; zone 1 of the Mines and Geology Department's stability zonation of 2021 asks only that jhoras be trained "with safe distance", which it does not define; and no limits of a jhora have been notified under section 173 of the Sikkim Municipalities Act, 2007. The 15 m floor applies along every natural channel draining 8 ha or more and round every pokhari, reservoir and dhara. On an incised jhora or khola whose bank is a slope steeper than 10°, the threshold of the hill rule of Clause 4.11, it is measured from the crest of that bank slope, not from the edge of the water, because a slide of the bank starts at its crest and a cut, a fill or a soak pit near the crest can bring it down (set by this Manual). It applies to new development and redevelopment approved under this Manual, not to existing buildings; it is proposed as a condition of building permission in the notified and municipal areas and as a recommendation elsewhere; and where Zone 1 land is private, it is secured by agreement or donation, or reserved in a development plan once the Sikkim Town and Country Planning Act, 2024 commences, and is not taken. It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Sikkim flood maps are mostly coarser than US maps, where they exist at all (none was found for any Sikkim town), and the only level land in a Sikkim town is usually a river terrace or valley floor beside the Teesta, the Rangit or the Rongni Chu, as at Rangpo, Singtam, Melli, Majitar and Jorethang, a bench cut into a slope, or the margin of a pokhari or reservoir, while the Teesta's bed, raised by the flood of October 2023 into "a flattened, more expansive river profile than the typical V-shaped valley" (PPR, 2026), is now wider and flatter than before (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Sikkim's one distance from water is a forest law's, and it is a maximum. Under the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 (Act 6 of 1988), "river banks in relation to rivers enumerated in the Schedule means and includes an area of sixty metres on either side of such river or area within high flood level mark, whichever is less" (s.29(1)). The Schedule lists 103 rivers, from 1 the Teesta and 2 the Rangeet through 14 the Rongni chu, 15 the Roro chu, 62 the Gangtok chu and 77 the Lhonakchu to 103 the Khani Khola (Melli), and "104. Any other river that may be included by the Government, by notification". Since the amendment of 2000 (Act 8 of 2000) the river bank "shall be under the administrative control of the Forest Department as if it were a forest" (s.29(9)); unauthorised occupation is punishable (s.30); the Government may "by notification, declare that any slip reserve or road reserve or river bank shall be closed" (s.32); and rules may "prohibit the closing up or obstructing of the bank of any river" (s.42(2)(g)), though none prescribing widths was read. The Act's "river" includes "any stream, channel, jhora, creek or other channel, natural or artificial" (s.2(m)), but the 60 m applies only to the rivers in the Schedule. Because the line is the nearer of 60 m and the high flood level, it is a maximum, not a minimum (NEER reading): on an incised reach the statutory bank may end a few metres from the water, and after the flood of October 2023 the high flood level itself has moved. Along a jhora there is no statutory line at all. The SBCR 1991 set no distance from a jhora or river; the Mines and Geology Department's stability zonation of 2021 asks, for zone 1, that "Training of jhoras/drains have been completed and done properly (with safe distance)", without saying what the distance is; and the State has not notified the limits of any jhora under section 173 of the Sikkim Municipalities Act, 2007, though section 172(2) makes the Municipality "protect any jhora, whether on a public land or on a private land, within the municipal area". The other lines in force are not lines from water: regulation 18 of the SBCR 1991 keeps a building "Minimum 27 feet away from the centre of the road", with a set back of "10 feet (or as indicated in approved Master Plan of the area)"; regulation 25(v) keeps a septic tank at least 4′0″ from the building; and regulation 35 bars allotment or regularisation "in any sinking area, landslide prone or in areas having scars of old landslides or in slope exceeding or around 70 (Seventy) degree". No setback along the Teesta after the flood of October 2023 was found, in the State's affidavit to the National Green Tribunal of 28 February 2026, in the orders of the High Court read for this Manual or in searches (NEER reading); the "High-risk Zoning" of floodplains below glacial lakes in the project report annexed to that affidavit is a proposal, and the relocation of 155 households at Toong Naga in the PDNA of 2023 is a relief decision, not a line. The 2024 Act would put flood-control and slope-linked controls into development plans, but it has not commenced. These rules leave gaps for drainage: the jhoras, into which every ridge town drains, have no line; the scheduled rivers have a line that shrinks to the flood mark on the reaches where the towns stand above an incised channel; and the springs have none. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Sikkim has one statutory distance from water, and it is a maximum; along its jhoras it has none. The river bank of a scheduled river under section 29(1) of the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 is "an area of sixty metres on either side of such river or area within high flood level mark, whichever is less", under the Forest Department's control; no statute, regulation or notification sets any line along a jhora; no limits of a jhora have been notified under section 173 of the Sikkim Municipalities Act, 2007; no setback along the Teesta exists after the flood of October 2023; and no floodplain zone or flood line has been notified. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor where nothing wider binds: along every natural channel draining 8 ha or more, every jhora and khola among them, measured on an incised jhora or khola from the crest of its bank slope, and round every pokhari, reservoir and dhara. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, the floor levels on the valley floors, the siting of drainage assets above the October 2023 flood and aggradation level and outside a mapped GLOF path, and the rules on jhoras, dharas, glacial lakes and fill (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body has adopted or endorsed them. On a scheduled river the statutory bank (up to 60 m, or the high flood level line where that is nearer) may be wider or narrower than the Manual's 15 m: where it is wider, it binds as well, and governs for the uses it restricts (Clause 7.4.5); where the high flood level line is nearer, the Manual's corridor is the stricter. On a jhora no statute sets any line, so the 15 m is a NEER proposal throughout. The corridor applies to new development and redevelopment approved under this Manual, not to existing buildings; Clause 7.4.7 allows no variance below it; it is proposed as a condition of building permission in the notified and municipal areas and a recommendation elsewhere (Chapter 1); and where Zone 1 land is private, it is secured by agreement with the owner or by donation, or reserved in a development plan once the 2024 Act commences, never taken. Jhoras on public land other than forest land within a municipal area already vest in the Municipality (s.172(1)); the river banks of the scheduled rivers are under the Forest Department (1988 Act, s.29(9)); and jhoras outside municipal limits, or on forest land, have no named protector. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- The 1988 Act. The river bank of the 103 scheduled rivers (s.29(1)), a maximum, and any river added by notification; occupation of a river bank an offence (s.30); closure of a river bank, slip reserve or road reserve by notification (s.32); slip reserves, "denuded areas … required to be conserved or preserved for stabilization" (s.29(2)), which keep drains and fill off the land notified. Where the statutory bank is narrower than Zone 1 the Applicant states it on Form 7-1; it never governs alone.
- The Sikkim Municipalities Act, 2007. The Municipality's duty to "protect any jhora, whether on a public land or on a private land" (s.172(2)); the State's power to "specify the limits of any jhora, watercourse or channel within a municipal area" (s.173), not yet used; the duty to provide "a safe and sufficient outfall … in such manner as may not cause any nuisance, either by flooding any part of the municipal area or any area surrounding the outfall" (s.187).
- The SBCR 1991 and the stability zonation. The road setbacks of regulation 18; regulation 35's bar on "sinking", "landslide prone" land and slopes "exceeding or around 70 (Seventy) degree"; and the 2021 zone conditions, under which a site's zone depends partly on whether its jhoras are trained "with safe distance" and a zone review asks for the "Training of untrained Jhora and maintenance at regular intervals which is located adjacent to the plot". The distance is undefined; this Manual's Zone 1 is the distance it proposes.
- Plans and orders. A development plan's flood-control and slope-linked controls once the 2024 Act commences (none yet); an order of a District Collector, SSDMA or a District Disaster Management Authority fixing a GLOF corridor or relocation area (none setting a line was found); a hydropower operator's line at its reservoir; the Water Resources Department's at its river works; and the orders of the High Court of Sikkim, the National Green Tribunal and the Supreme Court as they stand. The "High-risk Zoning" of the floodplains below glacial lakes in the project report of 2026 is a proposal only, cited as expert guidance, never as binding.
This Manual sets 15 m as the floor because the jhoras, which carry every ridge town's storm water and much of its sullage, have no line in law; because the scheduled rivers' line ends at the flood mark wherever that is nearer than 60 m; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because a jhora needs room for the boulders, debris and slide material it carries in flood and for the people and machines that clear and train it. The record is the reason for the corridor: the stability zonation of 2021 already treats an "Untrained jhora/ erosional potential jhora" with "Gully erosion & collapse of jhora facing slope" as a mark of zone 4, "Not suitable for habitation unless immediate protective measures"; Gangtok Smart City Development Ltd (GSCDL) told the National Green Tribunal that "landslides are caused mainly due to loose soil by spring water generated at natural Jhora" (OA 38/2022); and on the valley floors the flood of October 2023 raised the Teesta's bed by 7–8 m and buried parts of Rangpo, so that no rainfall-based line protects against the cascade (Clause 2.3.6(i)). On the valley floors Zone 2 and the floor levels (definitions after Clause 7.2) do the work; on the GLOF corridors siting does. Until a statute, rule, notification, development plan or court adopts it, the 15 m minimum is this Manual's recommended standard, and the 1988 Act, the Municipalities Act, the SBCR 1991, the stability zonation and the orders above remain the only legal rules. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Sikkim Building Construction Regulations, 1991, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to hill-town practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. Sikkim's valley floors, the river terraces of the Teesta, the Rangit and the Rongni Chu at Rangpo, Singtam, Melli, Majitar and Jorethang, and the Teesta's bed raised by the flood of October 2023, are flat, unlike the slopes around them, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Sikkim the line from which a setback is measured must come from this Manual, because no level has been fixed for any pokhari, lake or reservoir. The hydropower reservoirs move through the year and have changed since 2023: no full reservoir level, maximum water level or release rule was found for any of them [TBC]; Teesta-III at Chungthang, whose 60 m dam was destroyed on the night of 3–4 October 2023 (Sattar et al., 2025), is "Under restoration & first phase of wet commissioning is expected by 31st MAY 2026 through coffer dam", with no live storage in that phase (State affidavit to the National Green Tribunal, February 2026; its present state is [TBC]); and the bed of the Teesta below it rose by 2 to about 7.4 m at the downstream dams (NHPC's estimates, in the PPR of 2026). A line drawn from the water's edge in the dry months, or from a pre-2023 survey, would leave the reservoir's own bed, or the river's new one, open to building. This Manual gives every pokhari, lake and reservoir a boundary measured from a high level, not from the water's edge on the day of survey: the edge of a pokhari in the season and the operator's highest level of a reservoir are part of its boundary, and on the Teesta valley floor the surveyed flood mark of October 2023 is the reference for siting (definitions after Clause 7.2); the foreshore up to MWL is the waterbody's flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the valley-floor towns on the Teesta, the Rangit and the Rongni Chu, such as Rangpo, Singtam, Melli, Majitar and Jorethang, with Dikchu and Chungthang upstream, where the bed of the Teesta "has risen by an average of 7-8 meters" since the flood of October 2023 (PPR, in the State's affidavit to the National Green Tribunal, 2026), Rangpo was "severely impacted by the debris, burying buildings and automobiles" (Sattar et al., 2025) and 155 households at Toong Naga were "mandated for relocation" (PDNA, 2023), though no flood extent has been mapped for any of them (NEER reading), already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Sikkim has no tank Act and no irrigation tank cascades, and its standing waters range from a village pokhari a few metres across to the hydropower reservoirs on the Teesta. The storages that matter for drainage are of four kinds, and a fifth kind of lake is never storage at all. The first is the hydropower reservoirs and pondages: Teesta-III (1,200 MW, Chungthang), "non-operational since 4th Oct 2023" (as quoted from the State's power department) and under restoration; Teesta-V (510 MW, NHPC; dam at Dikchu), reported restored; Teesta-VI (500 MW, expected in September 2029); the Teesta Low Dam projects III and IV; Chuzachen (110 MW; shut down, to restart from 15 February 2026); Dikchu (96 MW); Jorethang (96 MW); Tashiding (97 MW); Rongnichu (113 MW); and Rangit-III (60 MW) (State affidavit, February 2026, and as reported). No full reservoir level, maximum water level, stage–storage curve or release rule was found for any of them [TBC]. Their releases enter a design as inflow and tailwater (Clauses 5.8.3 and 5.8.5(c)), and they are not tanks for these clauses unless their storage is counted. The second is the lakes of the ridges, such as Khecheopalri (Khachoedpalri), reported to be the State's first Ramsar site, and Tsomgo, both in the National Wetland Conservation Programme's list (as reported); no level, area or outlet record usable for design was found for either (Khecheopalri's reported areas conflict, and none is used) [TBC], so they are protected as waterbodies and wetlands and are not counted as storage. The third is the village pokharis and the ponds of the springsheds, including those built under RMDD's Dhara Vikas programme (as reported), which are modelled as existing features where they intercept runoff but are never counted as storage, because they are not surveyed, have no controlled outlet and are full by the time of the peak storm. The fourth is the dharas, which are protected for their water and never counted as storage. The fifth is the glacial lakes, 320 of them in the State's count (PPR, 2026; other inventories count differently), held behind moraines at 4,740 to 5,470 m in the case of the sixteen A-category lakes, with volumes of 0.5 to 106 million m³ (South Lhonak's given as 84 million m³ in 2022) and 178 million m³ for the Gurudongmar complex (PPR and State affidavit, 2026): they are hazard sources under Clause 2.3.6(i), and no storage credit, flood cushion or clause of this section applies to them, even where their names contain "Pokhari" (Bhalay Pokhari, 4 million m³; Doodh Pokhari, 0.5 million m³). In a ridge town every drain ends in a jhora and every jhora in a khola or river that runs to a valley-floor reach or a reservoir; Figure 7.3 shows these waterbodies together. Any pokhari, lake or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with its operator or other custodian, and the custodian of each pokhari and lake shall be confirmed for the inventory (Annex 7A) [TBC].
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a ridge town, every drain and jhora that falls from the ridge and its slopes to the khola or river below, any pokhari on a bench with its inlets and outlet, the dharas below the town with their recharge areas, and the river itself down to the valley-floor reach or reservoir whose level sets the tailwater of the jhoras (Clause 5.8.5), as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. In Sikkim a pokhari or reservoir may be full at any time from April to October. The Manual's season begins on 1 April because Gangtok's wet season does: its normals are 296.9 mm in April on 15.2 rainy days and 496.4 mm in May on 20.1 days, before 609.8, 626.3, 565.9 and 438.7 mm from June to September (IMD, Gangtok, 1981–2010), and its largest 24-hour falls are pre-monsoon (310.3 mm on 30 May 1975, its record; Singhik 504.2 mm on 12 May 1981, CWC FER 2(a), Table 7) (Chapter 2). Storms also follow the south-west monsoon: Gangtok recorded 201.0 mm on 3 October 1996 (IMD), and the flood of 3–4 October 2023 came in early October. Rongnichu is a run-of-river project (State affidavit, February 2026); how the pondages of the other projects are operated through the season was not found [TBC], and no record of how long any village pokhari stays at or above its outlet level in a wet spell was found. While a pokhari or reservoir is full, it stores nothing more below FTL, the jhoras that flow into it discharge against its level, and its release adds to the flow in the river below it. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A ridge town: its jhoras, dhara, pokhari and river (schematic, not to scale; no particular town, lake, dam or landmark is shown). The town stands on a ridge, the catchment divide, and on the slopes below it, so every drain of the town ends in a jhora and every jhora in the main river in the valley. Roof gutters and down pipes lead to a plinth drain (SBCR 1991, regs. 21 and 25(iv)), and lined, stepped drains carry the water through silt traps, and through a debris rack at the culvert under the hill road, to a trained jhora with drop structures, toe protection and a maintenance access (Clause 6.3.6(m)). An untrained jhora that is eroding its banks is unstable ground: no water is put into the ground near it, and no soakaway is placed on a slope steeper than 10° or in stability zones 3 to 6 (Clause 4.11, hill rule). A cut slope has a catch drain above it and a toe drain below. Below the town a dhara comes out; its recharge area, as a hydrogeologist maps it, is kept free of paving, road runoff and soak pits, no drain crosses it, and no outfall lies within 15 m of the spring (Clause 8.8.1, spring rule). A pokhari on a bench is kept as storage, and the drain that reaches it carries a dry-weather-flow interceptor and a screen, because the drains carry sullage (Clause 8.9). Zone 1 along the jhora is at least 15 m from its top of bank, measured from the crest of the bank slope where the jhora is incised (Clause 7.4). At the foot of the slope the main river runs on a wide gravel bed raised by a past flood; the valley-floor town's outfall has its invert above the surveyed post-flood bed and a flap gate, with tailwater taken as the higher of the surveyed October 2023 flood mark and the gauge's highest flood level (Clause 5.8.5(b)); the river bank of a scheduled river is "sixty metres … or area within high flood level mark, whichever is less" (1988 Act, s.29(1)), and the floors stand at least 0.5 m above the 1% AEP level and the surveyed 2023 flood mark. Upstream a dam holds a reservoir, with a release reach below it (Clause 5.8.5(c)). Far up the valley a glacial lake lies behind a moraine; the band down the river marks the GLOF corridor, where siting, not drain sizing, protects drainage assets (Clause 2.3.6(i); definitions after Clause 7.2). The 15 m minimum, the crest rule, the spring, interception, siting and infiltration rules are this Manual's proposals; the 1988 Act, the Municipalities Act, the SBCR 1991, the stability zonation and the orders of the courts govern where they say more. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, SSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.
Commentary. No pokhari or lake in Sikkim was found with a written operating rule, and most pokharis have no gates to operate. No release rule, full reservoir level or maximum water level was found for any hydropower reservoir either [TBC]. The record shows why a rule matters. After a release from the Dikchu project without warning in 2017 (as reported), the High Court of Sikkim closed WP(PIL) 4/2017 on 1 March 2021 with the direction "that the hydropower projects in Sikkim shall ensure strict compliance of the safety guidelines" and that the authorities "undertake periodic inspection and review". On the night of 3–4 October 2023 the outburst flood reached Chungthang, where "discharge peaked at 5340 m³ s⁻¹ … within ~6 minutes" (Sattar et al., 2025), and destroyed the Teesta-III dam; an NDSA-constituted committee is reported to have put the inflow at about 10,000 m³/s against a spillway capacity of 7,500 m³/s (as reported; its report is unpublished). Without an agreed rule with dates, levels, release rates and a named operator, storage in a pokhari or reservoir cannot be relied on, and a release made without warning to the towns downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the April and May storms gives no protection when a June to September monsoon storm, such as those of 9 June 1997 at Gangtok and 25 September 2005 at Tadong, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
For a hydropower reservoir, the operating rule of Clause 7.8.4 is its operator's rule, and this Manual authorises no other body to operate its gates: where this chapter names WRD's rule, records or freeboard standard, for a reservoir they are the operator's, given in writing. A design takes the operator's level and release for the storm being checked (Clause 5.8.5(c)), not a drawdown the operator has not agreed to in writing; no reservoir is credited with a flood cushion against a glacial lake outburst, which no rainfall rule can size (Clause 2.3.6(i)). For a natural pokhari, Clause 7.8.3 is the governing condition: with no controllable outlet, no cushion is assumed, a design that relies on the pokhari routes the storm through it from its outlet level, and the outflow over the outlet is limited by the jhora below it, which shall be shown to carry it with the debris of Clause 6.3.6. Many pokharis and lakes are sacred or communal and are held by a community or a private owner rather than the State, which is why Clause 7.8.2(d) requires the custodian to accept any drawdown, and why no detention pond built under this Manual is called a pokhari.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Sikkim State Pollution Control Board (SSPCB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 March each year (Chapter 10).
Commentary. No Sikkim order fixing a date for the pre-monsoon cleaning of drains, jhoras or pokharis was found (NEER reading). In the ridge towns the material to be removed is debris, slide material and garbage as much as silt: the Gangtok Municipal Corporation's contract with its waste agency makes the agency responsible for "Clearing of Jhoras" and bars dumping "along Footpath, Roadside and Jhoras" (Memo No. GMC/6727/III/2024/OL/01, 8 October 2024); the SBCR 1991 prohibit the "Stacking/dumping of building materials without permission and spoils on Public Street, road, drains, gullies and jhoras", with a fine of ₹500 at least (reg. 22); and on the valley floors the flood of October 2023 left the Teesta's bed raised by 7–8 m (PPR, 2026). The date of 31 March in this Manual is set by this Manual, before the Manual's season begins on 1 April, because Gangtok's April averages 296.9 mm on 15.2 rainy days and its 24-hour record fell in May (IMD), and because the State's annual notices ban "construction involving earth excavation" from early May or June to September (UD&HD Notice No. 613/GOS/JCTP/UD&HD, 1 May 2019; UDD Notice No. T(1689)/997, 26 May 2020); the jhoras, racks and debris basins are cleared again by 30 April, after the April storms and before May, and after the season by 15 November; above about 2,500 m, where snow or frost prevents the work in March, the dates are 30 April, 31 May and 31 October (Chapter 10). Excavation to "increase capacity" is governed by Clause 7.9.3. In a pokhari fed by a spring in its bed or on its bank, deepening can cut the spring off or break the silt and clay that hold the water, and on a slope it can undercut the bench on which the pokhari stands. This Manual allows no spring-fed pokhari to be deepened below its original bed or its bed to be lined or cemented, and no pokhari on a slope steeper than 10°, on colluvium or fill, or in stability zones 3 to 6 to be deepened at all. No desilting or deepening of a glacial lake is designed under this chapter: the works the State's project report proposes there (siphoning at Shako Chho, a moraine wall at Gurudongmar "still in the concept phase", a retention structure at Dolma Sampa) are hazard-mitigation proposals outside the scope of this Manual. The 31 March deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Sikkim precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Sikkim the jhoras are drains in law and natural watercourses in fact. The Sikkim Municipalities Act, 2007 counts "a jhora or water-course of natural drainage line" among drains (s.2(24)); vests a jhora on public land other than forest land within the municipal area in the Municipality (s.172(1)) and makes it protect every jhora there, public or private (s.172(2)); vests public drains "in the Municipality, or the concerned Department, or organization, of the State Government, or the agency, as the case may be" (s.189(1)); requires rain water to be led "with the natural nullahs, khola-kholsas, jhoras, or storm water drainage" in a drain separate from sewage (s.193); and makes the Municipality provide "a safe and sufficient outfall … in such manner as may not cause any nuisance, either by flooding any part of the municipal area or any area surrounding the outfall" (s.187). The SBCR 1991 send every building's surface water by a "Pucca storm water/plinth protection drain … leading to the road side drain or to adjoining permanent drains or jhora" (reg. 25(iv)) and refuse an occupation certificate "if the drain has not been provided to main outlet/jhora" (reg. 13(iii)). The 2021 stability zonation grades sites by their jhoras: zone 1 where "Training of jhoras/drains have been completed and done properly (with safe distance)", zone 2 where "Training jhora/drain was done but not properly maintained", zone 3 where "Jhora training is required/annual maintenance of drain is necessary", and zone 4 where there is an "Untrained jhora/ erosional potential jhora" (Notification No. 17/DMG/20-21, 19 March 2021). Outside municipal limits, and on forest land, no body is named as the owner or protector of a jhora (NEER reading); the roads' drains are the road owner's (the Roads and Bridges Department (PWD), NHIDCL or BRO, by inference); and the rivers' banks are the Forest Department's (1988 Act, s.29(9)). No rule or order dividing jhoras from municipal drains was found; Chapter 6 gives this Manual's working split and each town's drain and jhora register. Jhora training is done piecemeal by several agencies: GSCDL tendered "Construction of drainage and jhora training works" in Gangtok worth about ₹13.41 crore, and a work of "jhora training and drainage improvement" at Lingding (as reported), without a design standard that was seen, and the High Court of Sikkim is reported to have warned IRCON, building the Sevoke–Rangpo railway, to correct the damage it caused to the drainage of NH-10 (June 2025, as reported). The kulos (irrigation channels) that feed terraced fields cross the same slopes. None of these instruments keeps a jhora at its natural width once it has been lined, piped, covered, built over or filled with spoil, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent, and which the jhora-training standard of Clause 6.3.6(m) forbids: no culverting of an open jhora, no reduction of its 1% AEP capacity and no diversion without a corridor. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored pokhari or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Sikkim no shared form of storage is required by any rule: the SBCR 1991 have no detention, peak-flow or design-storm clause, and the only statutory rainwater harvesting is for government buildings (Municipalities Act, s.186; Chapter 4). The drainage projects that exist convey water rather than store it: GSCDL's "Construction of drainage and jhora training works" in Gangtok (as reported) and the stormwater drains along about 60 km of roads in seven towns under the ADB-financed Sikkim Integrated Urban Development Project (ADB, 2024); the drainage and landslip works of Gangtok's City Development Plan of 2006 "were not taken up" (CAG, Report No. 3 of 2016). Every litre sent faster down a jhora arrives sooner, with more energy and more debris, on a slope that the 2021 zonation already treats as unstable where the jhora is untrained, and ends in a Teesta whose valley-floor towns receive what the ridge towns send; that is why this Manual keeps pokharis, wetlands and flat benches as storage first (Chapters 4 and 11). In the ridge towns there is little flat land on which a regional pond could be built, and none may be built on a slope where Clause 4.11 bars infiltration, in stability zones 3 to 6, or on the Teesta valley floor below the October 2023 flood and aggradation level; a regional facility there is a lined tank or a lined detention structure, never a pokhari in name, and never on a glacial lake. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the State Wetland Authority that those Rules provide for (no notification constituting one for Sikkim was found [TBC]);
- (b) any wetland notified under the 2017 Rules, to its notified boundary (none was found notified in Sikkim), and Khecheopalri (Khachoedpalri) lake, reported to have been designated a Ramsar site in February 2025 (as reported), to the boundary of its designation once it is published [TBC];
- (c) the lakes in the National Wetland Conservation Programme's list (Khecheopalri, Tamze, Tembao, Phedang, Guru Dongmar and Tsomgo, as reported), the other lakes and pokharis, the hydropower reservoirs with their drawdown zones, and the marshy and seepage ground below springs, within the 1% AEP extent of Clause 7.3.4 (a river, khola or reservoir itself is a waterbody under the rest of this chapter; a glacial lake is also a hazard source under Clause 2.3.6(i), to which no drain discharges); and
- (d) any other pokhari, marsh or wetland that the Authority notifies, that the wetland authority lists, or that the High Court of Sikkim, the National Green Tribunal or the Supreme Court directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. No notification constituting a State Wetland Authority for Sikkim, and no wetland notified under rule 4 of the Wetlands (Conservation and Management) Rules, 2017, was found (NEER reading); a national directory lists the Secretary of the Forest and Environment Department as the contact for the State's wetland authority (as reported). The Forest and Environment Department's River Rejuvenation Committee was "notified as the Nodal Agency for all water bodies vide Order No. 205/GOS/F&ED/SECY dated 21.01.2021" (State's filings before the National Green Tribunal). Khecheopalri (Khachoedpalri) lake is reported to have become Sikkim's first Ramsar site around World Wetlands Day, February 2025 (as reported); the areas given for it conflict (17,200 ha, 11.56 ha or 29.5 ha, and 1.7 km², all as reported), the Ramsar site record was not read, and no area is used in this Manual [TBC]. Khecheopalri, Tamze, Tembao, Phedang, Guru Dongmar and Tsomgo are reported in the National Wetland Conservation Programme's list (as reported), and the State is reported to have "534 wetlands covering 7,477 ha" (as reported, from a snippet). No water-quality, level or boundary data for any of these lakes were found. Guru Dongmar, one of the listed lakes, belongs to the Gurudongmar glacial-lake complex (178 million m³; State affidavit of 28 February 2026): it is a wetland for Clause 7.12 and also a hazard source under Clause 2.3.6(i), as is any listed lake that is a glacial lake, and no drain discharges to any of them under this Manual. A drain outfall, desilting, diversion or gate operation in or next to a notified wetland or forest land therefore needs the views or permission of the Forest and Environment Department, or of the wetland authority where the Rules reach it, as well as compliance with this chapter; for the pokharis, dharas, seepage ground and marshes the Rules do not reach, this chapter is the only control on their drainage. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Sikkim's jhoras, kholas and rivers through the drains (Clause 8.9, Commentary). The National Green Tribunal recorded in 2024 that "treated sewage is entering in to river/ rivulets/ jhoras" and asked for the "water quality of rivers including jhoras receiving sewage", while the State replied that "No sewage is disposed off in the rivers or fast flowing water bodies" (OA 606/2018, as quoted by the State); Gangtok treated 15.22 MLD of an estimated 29.51 MLD of urban sewage in September 2025; and at Soreng septic effluent discharges "into the open storm water drains ultimately discharging into the farmland / water bodies" (ADB, 2024). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Sikkim they apply in full to every new outfall, and every existing outfall to a jhora that feeds a dhara, a pokhari or a drinking-water intake, and every outfall within a town to the Rani Khola, the Roro Chu, the Rongni Chu or the Teesta, is taken to carry dry-weather flow and comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed (Clause 6.3.6(e)). In the catchment of a pokhari or lake, every drain that enters the water also passes a silt trap and a debris trap first (Figure 7.3; Clause 6.3.6(f)), because the pokhari is the end of the slope's drainage and has no other way to lose the silt and debris; and no drain discharges to a glacial lake.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Sikkim's controls on building and dumping along its jhoras and rivers are in its Acts and regulations, and its courts have pressed on hazard rather than on encroachment. The 1988 Act makes the unauthorised occupation of a river bank, slip reserve or road reserve an offence, with eviction (s.30; road-reserve encroachment is evicted under the Sikkim Public Premises (Eviction …) Act, 1980), and lets the Government close a river bank by notification (s.32). The SBCR 1991 count "a protective wall, fence of any type etc. in any Government or private land within the notified area or road reserve without permission" as unauthorised construction (reg. 3(1)(h)), prohibit spoil "on Public Street, road, drains, gullies and jhoras" (reg. 22), and refuse electricity, sewerage and water connections to unauthorised buildings (reg. 34); the monsoon notices add that "any building material found lying on the road setback or over drains henceforth, shall be seized and auctioned" (Notice No. 613/GOS/JCTP/UD&HD, 1 May 2019). The Gangtok Municipal Corporation's waste contract bars dumping "along Footpath, Roadside and Jhoras" (2024). No petition before the High Court of Sikkim on the encroachment of jhoras was found. The Court dismissed WP(PIL) 3/2023 (Mani Kumar Subba v. State), which sought a court-monitored probe into non-compliance with the Disaster Management Act, 2005 and the Dam Safety Act, 2021 over the South Lhonak lake, as "thoroughly devoid of any merit" on 7 December 2023, after the State had constituted a committee; it closed WP(PIL) 4/2017 on the Dikchu release with a safety direction to the hydropower projects (1 March 2021); and in September 2026 it took up a suo motu petition, WP(PIL) 11/2026, In re Climate Justice in State of Sikkim, in which the State is reported to have been asked to examine "land-use regulation, spatial planning, slope management, and drainage in ecologically and geologically fragile areas" and a later order urged early-warning systems for the 40 high-risk glacial lakes (all as reported; the orders were not read; next hearing 18 November 2026). Before the National Green Tribunal, OA 5/2022 and OA 38/2022 (Dr. Bina Basnett v. State of Sikkim) concern the height and siting of a car park in Gangtok, and OA 606/2018 the sewage reaching jhoras (Clause 8.9). This Manual adds the boundary rules of this section: the larger of the recorded and surveyed boundary governs, the crest of an incised bank is the top of bank, and Zone 1 is marked on the ground. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. No pokhari or lake in Sikkim was found to be held by a bund high enough to be a specified dam, though the bunds and outlets of the pokharis were not surveyed for this Manual [TBC]; each outlet work or bund shall be screened under Clause 7.14.1. The hydropower dams are dams across rivers under the Act; Teesta-III's "60 m high dam" (Sattar et al., 2025) was above the 15 m of Clause 7.14.1(a), and the heights of the other dams were not obtained [TBC]. A glacial lake is held by a moraine or glacier, not by an artificial barrier, so the Act's definition of a dam does not reach it (NEER reading); the retention structure of 20 to 30 m proposed at Dolma Sampa, for a catchment of more than 400 km², would be one if built (State affidavit, 2026; a proposal only). Where the storage of a pokhari or reservoir is counted under Clause 7.7, its bund, outlet works or dam is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Sikkim the embankments that matter most to the towns are the hydropower dams on the Teesta and the Rangit, and the hazards below them are the release and the breach. On 3–4 October 2023 the outburst of the South Lhonak lake sent a flood down the Teesta that destroyed the 60 m Teesta-III dam at Chungthang and buried parts of Rangpo, about 135 km downstream (Sattar et al., 2025); the cause is disputed, the State's affidavit of 5 April 2024 attributing the flood "primarily to a cloudburst" and an NDSA-constituted committee reported to have found "all scientific data and satellite images from that period points to GLOF and not a cloudburst" (as reported), and the toll is stated two ways, 55 dead and 74 missing in the SSDMA survey cited by Sattar et al. and 79 dead and 44 missing in the PDNA annexed to the State's affidavit of 28 February 2026. The release of 2017 from the Dikchu project without warning led to the High Court's direction of 2021 on safety guidelines and "periodic inspection and review". Warning is being built: SSDMA and the District Disaster Management Authorities held GLOF awareness and participatory risk assessments from 17 to 29 May 2024 and a State mock exercise on 17 November 2025, the Science and Technology Department was made nodal for GLOF studies and mitigation (Notification No. 10/Home/2025, 7 February 2025), and the Home Department constituted the Sikkim Commission on Glacial Hazards and a High-Level Steering Committee with a Multi-disciplinary Task Force (Nos. 73/Home/2024 and 72/Home/2024, 11 September 2024) (State affidavit, 2026). No breach map or emergency action plan for any dam, pokhari or lake was read for this Manual [TBC]. A failed or overtopped bund floods the land below it, a release made without warning floods it too, and a glacial lake outburst passes through every dam on the trunk, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments, why Chapter 5 treats every release reach as a flood-sensitive outfall, and why drainage assets are sited out of the GLOF corridors (definitions after Clause 7.2). The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Sikkim. Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 (Act 6 of 1988), as amended by Act 8 of 2000, ss. 2(j), 2(m), 29(1)–(9), 30, 32 and 42(2)(g)–(h) and the Schedule (PRS Legislative Research copy). https://prsindia.org/files/bills_acts/acts_states/sikkim/1988/1988SK6.pdf
- Government of Sikkim. Sikkim Municipalities Act, 2007 (Act 5 of 2007), with amendments to 2026, ss. 2(24), 2(47), 163(b), 172, 173, 186, 187, 189 and 193 (PRS copy). https://prsindia.org/files/bills_acts/acts_states/sikkim/2007/2007SK5.pdf
- Government of Sikkim, Urban Development and Housing Department. Sikkim Building Construction Regulations, 1991, Notification No. 29(202)UD&HD/90/295 of 19 March 1991, as amended in 2000 and by No. GOS/UD&HD/6(294)2001 of 16 October 2001, regs. 3(1)(h), 13(iii), 18, 21, 22, 25, 34 and 35 (copy hosted by a third party, Sikkim Manipal University). https://smu.edu.in/img/content/dam/manipal/smu/IQAC/SDG/documents/BUILDING%20STANDARDS.pdf ; Sikkim Allotment of House Sites and Construction of Building (Regulation and Control) Act, 1985 (Act 11 of 1985), as amended to 2022 (PRS copy). https://prsindia.org/files/bills_acts/acts_states/sikkim/1985/1985SK11.pdf
- Government of Sikkim, Department of Mines and Geology. Notification No. 17/DMG/20-21 of 19 March 2021 (Gazette Extraordinary No. 86, 6 April 2021), site stability zonation parameters, read as Annexure R/2 to the State's counter-affidavit in NGT OA 5/2022 (EZ), Dr. Bina Basnett v. State of Sikkim, with the monsoon notices No. 613/GOS/JCTP/UD&HD of 1 May 2019 and No. T(1689)/997 of 26 May 2020 (Annexure R/5). https://www.greentribunal.gov.in/sites/default/files/news_updates/Counter%20Affidavit%20on%20behalf%20of%20R-,4,7,9%20in%20OA%205%20of%202022%20(EZ)%20(Dr.%20BINA%20BASNETT%20vs%20State%20of%20Sikkim%20&%20Ors.).pdf
- Government of Sikkim. Sikkim Town and Country Planning Act, 2024 (Act 10 of 2024; Gazette Extraordinary No. 317, 15 June 2024), as amended by Act 24 of 2025; not commenced (PRS copy). https://prsindia.org/files/bills_acts/acts_states/sikkim/2024/Act10of2024SK.pdf
- National Green Tribunal (Eastern Zone). OA 171/2023, In re: News item, East Mojo, 05.10.2023: additional affidavit of the State of Sikkim of 28 February 2026, with the Home Department's notifications, the project report "GLOF Risk Mitigation in Lhonak Valley, Sikkim" (Annexure R-5) and the PDNA summary (Annexure R-6). https://www.greentribunal.gov.in/sites/default/files/news_updates/Additional%20affidavit%20on%20behalf%20of%20R-1,%20State%20of%20Sikkim,%20page%201038-1178.pdf
- National Green Tribunal (Principal Bench). OA 606/2018: six-monthly report of the Government of Sikkim (after the order of 4 July 2024), with the Gangtok Municipal Corporation's waste contract (Memo No. GMC/6727/III/2024/OL/01, 8 October 2024). https://www.greentribunal.gov.in/sites/default/files/news_updates/SIX%20MONTHLY%20REPORT%20BY%20GOVT%20OF%20SIKKIM%20IN%20OA%20NO.%20606%20OF%202018%20FOR%20STATE%20OF%20SIKKIM%20(COMPLIANCE%20OF%20MSW%20MGT%20RULES,%202016%20AND%20OTHER%20ENVIRONMENTAL%20ISSUES).pdf
- National Green Tribunal (Principal Bench). EA 35/2023 in OA 673/2018: State affidavit of 19 December 2025, with the monthly progress report of September 2025, and the State's compliance report. https://www.greentribunal.gov.in/sites/default/files/news_updates/AFFIDAVIT%20BY%20STATE%20OF%20SIKKIM%20IN%20EA%20NO.%2035%20of%202023%20IN%20OA%20NO.%20673%20of%202018%20News%20item%20published%20in%20the%20Hindu.pdf
- National Green Tribunal (Eastern Zone). OA 38/2022: reply affidavit of GSCDL. https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20Affidavit%20filed%20by%20R-2,%20GSCDL,%20page%20698-1006.pdf
- High Court of Sikkim. WP(PIL) 4/2017, In re: Release of water from Dikchu Hydelpower Project, judgment of 1 March 2021; WP(PIL) 3/2023, Mani Kumar Subba v. State of Sikkim, judgment of 7 December 2023 (hcs.gov.in, read from archived copies). https://hcs.gov.in/hcs/hg_orders/202600000042017_37.pdf ; https://hcs.gov.in/hcs/hg_orders/202600000032023_1.pdf
- Sattar, A. et al. (2025). The Sikkim flood of October 2023: Drivers, causes and impacts of a multihazard cascade. Science. doi:10.1126/science.ads2659 (accepted manuscript).
- Comptroller and Auditor General of India. Report No. 3 of 2016 (Economic Sector, Government of Sikkim), Chapter II, Performance Audit of JNNURM, para 2.3.9.2. https://www.cag.gov.in/uploads/download_audit_report/2017/Chapter_2_Economic_Sector_Sikkim_Report_No_3_of_2016.pdf
- SANDRP. Transcriptions of CWC levels on the Teesta, Rongni Chu and Rangit, October 2023 (secondary; as reported).
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Reports of Khecheopalri (Khachoedpalri) lake as Sikkim's first Ramsar site (Sikkim Express, February 2025; secondary; the Ramsar site record was not read), and of the lakes of the National Wetland Conservation Programme and the State's wetland count (secondary; as reported).
- Reports of RMDD's Dhara Vikas programme and the village spring atlas (India Water Portal; Scroll; The Wire; secondary).
- Reports of the High Court's suo motu WP(PIL) 11/2026, In re Climate Justice in State of Sikkim (LiveLaw, 17 September and November 2026; Bar & Bench; secondary; the orders were not read), of the NH-10 drainage petition against IRCON (Sikkim Express, June 2025), of the Dikchu release of 2017, of GSCDL's jhora-training tenders, and of the NDSA-constituted committee on the 2023 flood (ThePrint, 1 October 2024) (secondary).
- Turner, R. L. (1931). A Comparative and Etymological Dictionary of the Nepali Language (publication details not checked), as served by Digital Dictionaries of South Asia, University of Chicago. https://dsal.uchicago.edu/dictionaries/turner/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Nepali waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Sikkim has no Act for the protection of lakes, ponds, springs or jhoras as such, no floodplain zoning law and no notified flood line. Its waters are touched by five instruments. The Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988 makes the river bank of each of the 103 rivers in its Schedule "an area of sixty metres on either side of such river or area within high flood level mark, whichever is less" (s.29(1)), under the Forest Department's control "as if it were a forest" since 2000 (s.29(9)); its occupation is an offence (s.30), and the Government may close a river bank, slip reserve or road reserve by notification (s.32). The Sikkim Municipalities Act, 2007 makes a jhora a drain (s.2(24)) and "any natural watercourse, whether on a public land or on a private land" (s.163(b)); a jhora on public land other than forest land within a municipal area vests in the Municipality (s.172(1)); "the Municipality shall protect any jhora, whether on a public land or on a private land, within the municipal area" (s.172(2)); the State may notify the limits of any jhora (s.173; none has been notified); and rain water goes in "an entirely separate drain" to "the natural nullahs, khola-kholsas, jhoras, or storm water drainage" (s.193). The Sikkim Building Construction Regulations, 1991, made under the Sikkim Allotment of House Sites and Construction of Building (Regulation and Control) Act, 1985, apply in the notified areas; they send each building's storm water to "the road side drain or to adjoining permanent drains or jhora" (reg. 25(iv)) but set no distance from a jhora or river, and the Mines and Geology Department's stability zonation of 2021 (Notification No. 17/DMG/20-21, 19 March 2021), which sets building height, grades sites partly by the condition of their jhoras. The Sikkim Town and Country Planning Act, 2024 (Act 10 of 2024, amended by Act 24 of 2025) would require development plans with "proposals for flood control, land stability and sloped linked controls", but it comes into force only on a date to be notified, and none has been. The Wetlands (Conservation and Management) Rules, 2017 apply to notified wetlands, and none in Sikkim was found notified (Clause 7.12, Commentary). The Forest and Environment Department's River Rejuvenation Committee was "notified as the Nodal Agency for all water bodies vide Order No. 205/GOS/F&ED/SECY dated 21.01.2021". In this chapter WRD means the Water Resources Department (formerly the Irrigation and Flood Control Department), the State's department for rivers and jhora works; no register of pokharis kept by WRD or any other body was found [TBC], and where a hydropower reservoir is concerned, the levels, rules and freeboard that this chapter attributes to WRD are those of the reservoir's operator, to whom Clause 7.8.4 applies in the same way (Clause 7.8, Commentary). Who approves what, and where this Manual can apply, is set out in Chapter 1.
This Manual treats every recorded waterbody as drainage infrastructure. Six features set Sikkim apart, and four Nepali words are used for them throughout this Manual (Annex 7E). The first is the jhora (झोरा; a natural watercourse or ravine stream), the statutory word: every ridge town drains to its jhoras, the 2021 stability zones count an "Untrained jhora/ erosional potential jhora" against a site, and no statute sets any line along one. The second is the khola (खोला; a river or large stream) and the river below it: the Teesta, the Rangit and the Rongni Chu, whose valley floors carry the towns of Rangpo, Singtam, Melli, Majitar and Jorethang, and whose trunk, the Teesta, had its bed raised "by an average of 7-8 meters" by the South Lhonak lake outburst and Teesta flood of 3–4 October 2023 (the project report "GLOF Risk Mitigation in Lhonak Valley, Sikkim" (PPR), annexed to the State's affidavit to the National Green Tribunal of 28 February 2026). The third is the dhara (धारा; a spring or spring spout): "about 80%" of rural Sikkim is reported to depend on springs, and the Dhara Vikas programme of the Rural Management and Development Department (RMDD) works to revive them (as reported), but no statute keeps building or drains away from a spring. The fourth is the hydropower reservoir: the Teesta and the Rangit are held by a chain of dams (Teesta-III at Chungthang, under restoration since the dam was destroyed in 2023, Teesta-V at Dikchu, Teesta-VI, the Teesta Low Dam projects III and IV, Chuzachen, Dikchu, Jorethang, Tashiding, Rongnichu and Rangit-III), whose levels and release rules were not found [TBC]. The fifth is the glacial lake: Sikkim has "84 glaciers, and 320 glacial lakes", of which NDMA lists 40 as high-risk and 16 as very high-risk (PPR; State affidavit of 28 February 2026); a glacial lake is a hazard source under Clause 2.3.6(i), never storage, and it keeps its own name even where the name contains "Pokhari", as Bhalay Pokhari and Doodh Pokhari do. The sixth is the pokhari: the lakes and ponds of the ridges and benches, from Khecheopalri, reported to be the State's first Ramsar site, to village ponds and the ponds of the springsheds, are few, small and often sacred or communal, and Sikkim has no irrigation tank cascades; its irrigation channels are the kulo (कुलो; an irrigation channel). The tank clauses of this chapter apply to pokharis, to the hydropower reservoirs where their storage is counted, and to any other impounded water. This chapter gives the design rules that protect the storage and conveyance of these waterbodies and keep drainage assets out of the path of the Teesta's floods. It does not replace the 1988 Act, the Municipalities Act, the SBCR 1991, the stability zonation, the monsoon excavation notices, the wetland rules, or the directions of the High Court of Sikkim, the National Green Tribunal and the Supreme Court.