Draft v1.0 prepared by NEER. Not adopted by the Government of Sikkim or any authority or local body, and has no legal force. About this draft

Chapter 3Hydrologic Methods


3.1 Purpose and scope

3.1.1 This chapter sets out how design rainfall from Chapter 2 is turned into runoff peaks, volumes and hydrographs for:

  • (a) drain, inlet and culvert sizing (Chapter 6);
  • (b) retention and detention sizing, and the pre- vs post-development comparison (Chapter 4);
  • (c) downstream and tailwater analysis (Chapter 5); and
  • (d) waterbody, tank (pokhari) and regional facility studies (Chapter 7).

3.1.2 It specifies:

  • (a) which method may be used for which purpose and catchment size (Clause 3.4);
  • (b) how the pre- and post-development land surfaces are defined (Clause 3.3);
  • (c) the parameters of each method: runoff coefficients, time of concentration, soils, curve numbers, unit hydrographs and routing (Clauses 3.5–3.12);
  • (d) when continuous simulation and model calibration are required (Clauses 3.13 and 3.15);
  • (e) the step-by-step pre- vs post-development comparison (Clause 3.14); and
  • (f) software acceptance and documentation (Clauses 3.16 and 3.17).

3.1.3 Rainfall inputs (depth, duration, areal reduction, climate factor, temporal pattern and antecedent moisture) are governed by Chapter 2 and shall not be varied in this chapter.

Commentary. The CPHEEO (2019) Manual on Storm Water Drainage Systems gives a full Rational Method procedure and names SWMM for hydrograph work, but it is a drain-sizing guide. It does not say how a regulator should define "pre-development" or which method must be used to test a development against it (CPHEEO Part A §4.4, §8.5.1). APWA Section 5600 does both: it limits the Rational Method, names baseline hydrograph methods, and fixes the land-use assumptions for existing and proposed conditions (KC Metro APWA 5600, 2011, §5602.2–5602.3; Version 2025.01, §5603.4). This chapter follows that model.


3.2 Definitions

Term Meaning in this Manual
Pre-development condition The reference land surface defined in Clause 3.3.2, against which post-development runoff is tested. It is not the existing condition.
Post-development condition The land surface after the proposed works are complete, as defined in Clause 3.3.3.
Point of comparison (POC) A location where site runoff leaves the site, at which pre- and post-development flows are compared (Clause 3.14).
Time of concentration (Tc) The time for runoff to travel from the hydraulically most distant point of the catchment to the point of interest.
Lag (tL) The time from the centroid of rainfall excess to the peak of the runoff hydrograph.
Hydrologic soil group (HSG) The NRCS classification (A, B, C, D) of a soil by its minimum infiltration rate when wet (USDA NRCS, NEH Part 630, Ch. 7).
Curve number (CN) The NRCS parameter that combines soil group, land cover and antecedent moisture into a single runoff-potential index (USDA NRCS, NEH Part 630, Ch. 9–10).
Antecedent moisture condition (AMC) The soil wetness at the start of a storm: AMC I (dry), II (average), III (wet).
Directly connected impervious area (DCIA) Impervious surface that drains to a drain, pipe or channel without first flowing over a pervious surface.
Disconnected impervious area Impervious surface whose runoff flows as sheet flow over a pervious surface before reaching the drainage system, and meets Clause 3.9.3.
Peak rate factor (PRF) The constant in the unit hydrograph peak equation (484 in US customary units; 0.208 in the SI form of Clause 3.11.2).
Continuous simulation A model run over a long rainfall record (years), with soil moisture, storage and tank levels carried forward between storms.
Tank cascade A chain of tanks (pokharis) in which the surplus of one tank feeds the next.

3.3 Pre-development and post-development land surface

3.3.1 Same site, same storm. Pre- and post-development runs shall cover the same area draining to each POC, and use the same design storms (Clause 2.11.1). They shall differ only in the land-surface parameters of this clause, the resulting Tc, and the stormwater controls.

3.3.2 Pre-development condition. The pre-development land surface shall be greenfield: open land in good condition for the mapped hydrologic soil group, as follows:

  • (a) All land within the site, including land that is now built on, paved, compacted or cultivated, is treated as open land (grass cover > 75%) in good condition. Existing impervious cover shall not be counted.
  • (b) The curve number is the TR-55 value for "open space, good condition" for the HSG of Clause 3.7: CN 39 (A), 61 (B), 74 (C), 80 (D) at AMC II (Table 3.5).
  • (c) The HSG is the natural HSG of Clause 3.7, including the dual-group rule for high water table (Clause 3.10.1). No HSG improvement for drainage works is allowed.
  • (d) Tc is computed on the pre-development ground surface using unchannelled overland and shallow concentrated flow and natural channels only (Clause 3.6). Existing pipes, lined drains and kerbs are ignored.
  • (e) Existing waterbodies, tank waterspreads up to the full tank level (FTL), natural channels and supply or surplus channels are kept as they are, and modelled as water surfaces or channels, not as open land.

3.3.3 Post-development condition. The post-development land surface shall represent the proposed works at full build-out:

  • (a) Impervious areas shall be measured from the site plan, separately for roofs, paved surfaces, roads and other sealed surfaces, and classified as directly connected or disconnected (Clause 3.9). Lot-size residential rows of TR-55 shall not be used for the site itself.
  • (b) Pervious areas disturbed by construction (graded, filled or trafficked) shall be assigned one HSG lower in infiltration capacity than the natural HSG (A to B, B to C, C to D), unless post-construction infiltration tests (Clause 3.7.3) show otherwise. Soil disturbed by construction shall never be classed as HSG A.
  • (c) Rainwater harvesting (RWH) sumps shall be treated as full at the start of storms of 12 hours or more, and the roof area draining to them as directly connected for those storms (Chapter 4).
  • (d) Retention and detention facilities shall be represented explicitly as storage (Clause 3.12), not by lowering CN.

3.3.4 Redevelopment. The pre-development condition of Clause 3.3.2 applies to redevelopment as well. A site that is already fully paved is tested against greenfield, not against its existing state. For the constrained-redevelopment route of Clause 4.5.6, the existing condition shall also be modelled, with existing impervious areas as surveyed, so that the 50% minimum can be checked.

3.3.5 Off-site areas.

  • (a) For conveyance design (Chapter 6), areas upstream of the site shall be taken at their ultimate land use under the approved master plan or development plan. Where no plan exists, upstream undeveloped land shall be assumed to be at least 35% impervious.
  • (b) For the pre- vs post-development comparison, off-site run-on shall be modelled identically in both runs, at its existing condition (Clause 3.14.2).

Commentary. A greenfield reference stops each redevelopment from being judged against an already degraded baseline. The UK non-statutory standards and KC APWA take the same approach in different forms: APWA caps existing agricultural land at no more than "good condition pasture, grassland or range (C = 0.30, CN = 74)" for HSG C, and forbids disturbed soils from being classed as HSG A or B (KC Metro APWA 5600, 2011, §5602.3A and E). The TR-55 "open space, good condition" values used in (b) are identical to TR-55's "pasture, grassland or range, good" values (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c), so this Manual's pre-development CN equals the APWA cap on HSG C soils. The one-class downgrade for disturbed soils in 3.3.3(b) is set by this Manual as a simpler, less strict version of the APWA rule, suited to the thin brown hill soils and colluvium over the phyllites, schists and gneisses of the Daling Group and the Higher Himalaya, the boulder and gravel terraces of the Teesta and Rangit valley floors, and the cut-and-fill ground of the ridge towns, where an HSG A to C jump would be excessive. The 35% minimum imperviousness for unplanned upstream land in 3.3.5(a) is the APWA value (2011, §5602.3E.2). Using the master-plan land use for conveyance follows CPHEEO, which requires C to reflect "ultimate development of the catchment as per the master plan" (CPHEEO 2019, Part A §4.4.1.5).


3.4 Selection of method

3.4.1 The method shall be selected from Table 3.1 by purpose and catchment size. Figure 3.1 shows the same rules as a flowchart.

Table 3.1 — Permitted hydrologic methods

Purpose Catchment / condition Permitted method Clause
Peak flow for one conveyance element (inlet, pipe reach, drain reach, culvert) ≤ 16 ha contributing, no upstream storage, no backwater Rational Method 3.5
Peak flow for conveyance > 16 ha, or any upstream storage, tank or pond Hydrograph method (SCS-CN with SCS unit hydrograph, SWMM or HEC-HMS) 3.8–3.12
Retention, detention, any storage; pre- vs post-development comparison Any size Hydrograph method; Rational Method not permitted 3.8–3.12, 3.14
Pipe or drain network with backwater, tidal or tank tailwater Any size Hydrograph method with dynamic-wave hydraulic routing 3.12.4; Chapter 5
Catchment-scale flows 25–5,000 km² in CWC subzone 2(a) (North Brahmaputra) HEC-HMS or SWMM, benchmarked against the CWC synthetic unit hydrograph (SUH) 3.11.4
Regional facilities Draining > 25 km² Design-storm hydrograph method plus continuous simulation 3.13
Tank (pokhari) cascades Any size Design-storm hydrograph method plus continuous simulation 3.13
Tier B: small sites under Chapter 1 Within the limits of the design aid Design aids issued under Chapter 4, which are themselves derived by the methods of this chapter 3.4.4
Small sites, any authority ≤ 1 ha, within the limits of Clause 4.14.3 Fixed-coefficient route of Chapter 4 (fixed release coefficients, rainfall-mass storage) 3.4.4; 4.14.3

Figure 3.1 — Selection of hydrologic method Start: state the purpose of the calculation Storage, retention, detention, or a pre- vs post-development comparison? Yes No (conveyance peak) Hydrograph method required (Rational Method not permitted, Clause 3.4) Contributing area ≤ 16 ha, one conveyance element, and no storage upstream? No Yes Rational Method (Clause 3.5) Tc ≥ 10 min; frequency factor Cf; partial-area check (Clause 3.5.6) Catchment area? < 25 km² 25–5,000 km² Event model SCS-CN losses with SCS unit hydrograph, or SWMM / HEC-HMS (Clauses 3.8–3.12) Catchment model HEC-HMS / SWMM, benchmarked against CWC subzone SUH (Clause 3.11.4) Regional facility > 25 km², or a tank cascade in the system? Yes Add continuous simulation (Clause 3.13), in addition to design storms Tidal or backwater outfall: route with a dynamic-wave hydraulic model (Chapter 5).

Figure 3.1 — Selection of hydrologic method. Original drawing for this Manual, adapted from KC Metro APWA, Section 5600 Storm Drainage Systems and Facilities, 2011 (§5602.2) and Version 2025.01 (§5603.4, Policy Supplement, 2025).

3.4.2 Rational Method limits. The Rational Method shall be used only for catchments of 16 ha or less and only to compute the peak flow to a single conveyance element. It shall never be used to size retention, detention or any other storage, nor to derive a hydrograph or runoff volume.

3.4.3 Hydrograph methods. Above 16 ha, and for every storage calculation, a hydrograph method shall be used: SCS-CN losses with the SCS (NRCS) unit hydrograph, EPA SWMM, or HEC-HMS. For 25–5,000 km² the CWC synthetic unit hydrograph shall also be computed as a benchmark (Clause 3.11.4).

3.4.4 Simplified routes. In Tier B areas (Chapter 1), sites within the limits stated on a design aid issued under Chapter 4 may use that design aid in place of a site-specific hydrograph model. In any area, sites of 1 ha or less may use the fixed-coefficient route of Clause 4.14.3; it is the only exception to the rule in 3.4.2 that rainfall-based peak methods shall not be used for storage. The Rational Method remains available for conveyance under 3.4.2.

3.4.5 Catchments above 5,000 km². These are outside the scope of this Manual and require a basin study approved by the Water Resources Department (WRD).

Commentary. The 16 ha limit and the single-element rule follow APWA 5600 Version 2025.01, which cut the Rational Method from 200 ac to 40 ac and restricted it to "a single pipe segment". The MARC Policy Supplement adds that it "cannot be used to size runoff reduction practices or determine retention volumes and detention volumes" (MARC, APWA Stormwater Standards Supplement, 2025). CPHEEO (2019, Part A §4.4.1.3) allows the Rational Method up to 8–10 km², which is too large for a method that assumes uniform rainfall intensity over the whole catchment for the whole of Tc and gives no volume. The Rational Method is excluded from storage design because it gives a peak, not a hydrograph, and storage depends on volume and timing.


3.5 Rational Method

3.5.1 Equation. The peak flow shall be computed as:

Q = C · Cf · i · A / 360

where Q is the peak flow (m³/s); C is the runoff coefficient (Table 3.2); Cf is the frequency factor (Table 3.3), with C · Cf ≤ 1.0; i is the rainfall intensity (mm/h) for a duration equal to Tc, from Chapter 2 (with the climate factor of Clause 2.8); and A is the contributing area (ha).

Commentary. This is the CPHEEO equation Qp = 10 C I A, with Qp in m³/h (CPHEEO 2019, Part A §4.4.1.1–4.4.1.3), converted to m³/s.

3.5.2 Runoff coefficients. C shall be taken from Table 3.2. Within a range, the designer shall use the upper half of the range unless site data justify a lower value.

Table 3.2 — Runoff coefficient C (for AEP of 10% or more frequent)

Surface or land use C Source
Commercial 0.70–0.95 CPHEEO 2019, Table 4.2
Industrial 0.60–0.90 CPHEEO 2019, Table 4.2
Institutional 0.70–0.95 CPHEEO 2019, Table 4.2
Residential, high density 0.60–0.75 CPHEEO 2019, Table 4.2
Residential, low density 0.40–0.60 CPHEEO 2019, Table 4.2
Recreational 0.10–0.25 CPHEEO 2019, Table 4.2
Asphalt 0.70–0.95 CPHEEO 2019, Table 4.2
Concrete 0.80–0.95 CPHEEO 2019, Table 4.2
Brick paving 0.70–0.85 CPHEEO 2019, Table 4.2
Roofs: tiles 0.80–0.90 CPHEEO 2019, Table 4.2
Roofs: metal 0.70–0.90 CPHEEO 2019, Table 4.2
Roofs: concrete 0.70–0.90 CPHEEO 2019, Table 4.2
Lawns, sandy soil, flat (≤ 2%) 0.05–0.10 ASCE/WPCF 1969
Lawns, sandy soil, average (2–7%) 0.10–0.15 ASCE/WPCF 1969
Lawns, sandy soil, steep (> 7%) 0.15–0.20 ASCE/WPCF 1969
Lawns, heavy (clay) soil, flat (≤ 2%) 0.13–0.17 ASCE/WPCF 1969
Lawns, heavy soil, average (2–7%) 0.18–0.22 ASCE/WPCF 1969
Lawns, heavy soil, steep (> 7%) 0.25–0.35 ASCE/WPCF 1969
Undeveloped land (maximum for any condition) 0.30 KC APWA 5600 (2011), §5602.3E

3.5.3 Frequency factor. For design AEPs rarer than 10%, C shall be multiplied by Cf from Table 3.3. The product C · Cf shall not exceed 1.0.

Table 3.3 — Frequency factor Cf

Design AEP (return period) Cf
10% (10-yr) and more frequent 1.00
4% (25-yr) 1.10
2% (50-yr) 1.20
1% (100-yr) 1.25

3.5.4 Composite C. Where a catchment contains more than one surface, C shall be the area-weighted value C = Σ(Cj · Aj) / ΣAj, computed from the measured areas of each surface. Cf is applied to the composite C.

3.5.5 Time of concentration and networks.

  • (a) Tc shall be computed by Clause 3.6 and shall not be less than 10 minutes.
  • (b) For each reach of a network within the 16 ha limit, the peak shall be computed with the cumulative Σ(C · A) upstream of that reach and the longest Tc to that reach. Peaks from upstream reaches shall not be added.

3.5.6 Partial-area check. Where a compact, highly impervious part of the catchment has a much shorter Tc than the whole, the peak shall also be computed for that part alone, using its own area, C and Tc. The larger peak governs.

Commentary. The developed-surface coefficients in Table 3.2 are CPHEEO Table 4.2, which CPHEEO adapted from ASCE/WPCF (1969). CPHEEO keeps C constant for all return periods. Table 3.3 instead adopts the APWA antecedent-precipitation factors (KC Metro APWA 5600, 2011, §5602.2A: K = 1.1, 1.2 and 1.25 for 4%, 2% and 1% storms, with C·K ≤ 1.0). These factors matter here because Sikkim's rare storms arrive on wet ground (Clause 2.11.4). The 10-minute minimum Tc matches the minimum design duration of Clause 2.5.1. APWA 2011 bounds inlet time between 5 and 15 minutes (§5602.7A). The partial-area check follows CPHEEO's treatment of "partial area effect" (CPHEEO 2019, Part A §4.4.1.7). This Manual requires the upper half of each range in 3.5.2 because Indian urban plots are typically more densely covered than the US land uses behind the ASCE ranges.


3.6 Time of concentration

3.6.1 General. Tc shall be computed separately for the pre- and post-development conditions, along the flow path that gives the longest travel time to the point of interest, as the sum of travel times in each flow segment. Tc shall not be less than 10 minutes for either condition.

3.6.2 NRCS velocity (segment) method. The NRCS segment method is the default for all catchments. Tc = Tt(sheet) + Tt(shallow) + Tt(channel), where:

  • (a) Sheet flow:

    Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4)

    where Tt is in hours; n is the sheet-flow roughness from Table 3.4; L is the sheet-flow length (m); P2 is the present-day 50% AEP (2-yr) 24-hour rainfall (mm) from Clause 2.3, without the climate factor; and S is the land slope (m/m).

  • (b) Sheet-flow length. In urban areas, and for all post-development conditions, the sheet-flow length shall not exceed 30 m. For pre-development greenfield surfaces, up to 90 m may be used only where survey shows unchannelled planar ground; otherwise 30 m applies.

  • (c) Shallow concentrated flow: Tt = L / (3,600 V), with V = 4.918 S^0.5 (unpaved) or V = 6.196 S^0.5 (paved), V in m/s, L in m and S in m/m.

  • (d) Channel and pipe flow: Tt = L / (3,600 V), with V from Manning's equation at bank-full or pipe-full flow.

Time of concentration: flow segments along the longest flow path (schematic, not to scale) Time of concentration: flow segments along the longest flow path (schematic, not to scale) Ground surface Hydraulically most distant point Point of interest (inlet, reach or POC) Sheet flow thin film over the surface Shallow concentrated flow rills, gutters, swales Channel and pipe flow drains, pipes, natural channels L ≤ 30 m (urban; all post-development) ≤ 90 m only for surveyed planar pre-development ground Sheet flow — Clause 3.6.2(a), (b) Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4) [h] n from Table 3.4; pre-development n = 0.15 P2: 2-yr 24 h rainfall, no climate factor Shallow concentrated — Clause 3.6.2(c) Tt = L / (3,600 V) V = 4.918 S^0.5 (unpaved) V = 6.196 S^0.5 (paved) Channel and pipe — Clause 3.6.2(d) Tt = L / (3,600 V) V from Manning's equation at bank-full or pipe-full flow Tc = Tt(sheet) + Tt(shallow) + Tt(channel) ≥ 10 min (Clause 3.6.1) Computed separately for pre- and post-development; lag tL = 0.6 Tc (Clause 3.6.5)

Figure 3.2 — Time of concentration by the NRCS segment method: sheet flow, shallow concentrated flow and channel or pipe flow along the longest flow path, with the travel-time equations and limits of Clause 3.6. Schematic, not to scale. Original drawing for this Manual, adapted from USDA SCS TR-55 (1986), Ch. 3, and USDA NRCS, NEH Part 630, Ch. 15 (2010).

Table 3.4 — Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)

Surface n
Smooth surfaces (concrete, asphalt, gravel, bare soil) 0.011
Fallow (no residue) 0.05
Cultivated, residue cover ≤ 20% 0.06
Cultivated, residue cover > 20% 0.17
Grass: short-grass prairie 0.15
Grass: dense grasses 0.24
Range (natural) 0.13
Woods: light underbrush 0.40
Woods: dense underbrush 0.80

3.6.3 Pre-development roughness. For the pre-development greenfield surface of Clause 3.3.2, sheet-flow n shall be 0.15 unless the designer justifies another Table 3.4 value from the natural vegetation of the area.

3.6.4 Kirpich formula. The Kirpich formula may be used only as a cross-check, or for pre-development rural catchments with a defined main channel:

tc = 0.0195 L^0.77 S^−0.385

where tc is in minutes, L is the length of the main flow path (m) and S is its average slope (m/m). It shall not be used for urban or post-development catchments.

3.6.5 Lag. Where a unit hydrograph method requires lag, tL = 0.6 Tc.

3.6.6 Check. Post-development Tc shall normally be shorter than pre-development Tc. Where it is longer, the designer shall explain why in the submittal.

Commentary. The segment method and its equations are from TR-55 (USDA SCS, 1986, Ch. 3) and NEH Part 630, Ch. 15 (USDA NRCS, 2010). The SI constants are direct conversions of the US equations: 0.007 becomes 0.091 with L in m and P2 in mm, and 16.1345 and 20.3282 ft/s become 4.918 and 6.196 m/s. TR-55 (1986) allowed sheet flow up to 300 ft (≈ 90 m). NEH 630 Ch. 15 states that sheet flow typically lasts no more than about 100 ft (≈ 30 m) before becoming shallow concentrated flow (citing Merkel, 2001), and many US agencies now cap it there. This Manual sets the 30 m urban limit in 3.6.2(b) on that basis: in Indian urban plots, flow reaches a drain, kerb or compound-wall weep hole within a few metres. The undisturbed P2 is used in the sheet-flow equation because P2 is a parameter of the travel-time relationship, not a design load. The default n = 0.15 for greenfield is the TR-55 short-grass value; this Manual adopts it to avoid long pre-development Tc values that would make Q_pre artificially low. The Kirpich formula is the SI form given by Chow, Maidment and Mays (1988, Table 15.1.2), from small agricultural catchments in Tennessee (Kirpich, 1940), so it does not suit urban surfaces. The lag ratio 0.6 is the NRCS value, also used by APWA (2011, §5602.7C).


3.7 Soils and hydrologic soil groups

3.7.1 Mapping. HSG shall be assigned from the soil series mapped by the National Bureau of Soil Survey and Land Use Planning (NBSS&LUP) or the State soil-survey agency of Sikkim [TBC], using the soil-series-to-HSG lookup of Annex 3A. The source map and its scale shall be stated.

3.7.2 Assignment rule. Where Annex 3A is not yet available for a series, the HSG shall be assigned from the measured saturated hydraulic conductivity and depth to an impermeable layer or water table using the criteria of NEH Part 630, Ch. 7. Until Annex 3A is published, this Manual sets the following interim groups for Sikkim: the thin brown hill soils over the weathered phyllite, schist and gneiss of the Daling Group and the Higher Himalaya, on the slopes of sub-areas SK-B and SK-B1 and the hillsides of sub-area SK-A, HSG C, and HSG D for design on natural slopes of more than 10°, whatever group the soil itself would take; bedrock, road surfaces and compacted ground, HSG D; the colluvial debris fans, HSG B for runoff, because their material drains freely, but with no infiltration credit, because they are slide-prone (Clause 4.11, hill rule); the boulder and gravel terraces of the Teesta, the Rangit and the Rongni Chu in sub-area SK-A, HSG A or B where the seasonal high water table stands more than 2 m below ground in the monsoon season, with infiltration practices on them only under Clause 4.11 (recharge rule), and HSG C where it stands within 2 m; the river bed and terraces raised by the flood of October 2023, HSG C, whatever the depth to water, with no infiltration credit (Clause 4.11, valley-floor rule); urban fill and the cut-and-fill ground of the ridge towns, HSG C, and HSG D where it is clayey or compacted; and the alpine soils and moraine of sub-area SK-C, HSG C or D by test, and HSG D when frozen or under snow. A field infiltration test is required on every site larger than the limits of the simplified method of Clause 4.14.1, at the depth of the proposed facility; on smaller sites, a soil that has not been tested shall be given the less permeable of the groups listed for it. Whether an infiltration practice may be built at all is governed by the three infiltration rules of Clause 4.11 (the hill rule, the valley-floor rule and the recharge rule), not by its HSG. Clause 3.10.1 applies to all of these groups.

3.7.3 Site verification. For every site that relies on retention by infiltration (Chapter 4), the mapped HSG shall be verified by site infiltration tests at the location and depth of each infiltration facility. Where the tests show a lower infiltration capacity than the mapped HSG, the test result governs for both the retention design and the post-development CN. Where they show a higher capacity, the pre-development HSG shall not be changed without the approval of the authority.

3.7.4 Disturbed and filled ground. Clause 3.3.3(b) applies.

Commentary. NBSS&LUP soil maps are typically at 1:250,000 to 1:50,000 scale and classify soils by series and taxonomy, not by HSG. A lookup table is therefore needed (Annex 3A). Site tests matter most where one site can span two groups: at the foot of the slopes above Rangpo, Singtam, Melli, Majitar and Jorethang, where colluvium and debris fans pass onto the boulder and gravel terraces and the water table rises towards the river; on the terraces themselves, where gravels that drain freely can lie under fine flood deposits, or over a water table that the Teesta or the Rangit raises in the monsoon season; and on hill sites beside a jhora (झोरा; a natural watercourse or ravine stream), where a high rate in a pit dug in colluvium, fill or slide debris can be water entering a slope that cannot take it, as the seepages and springs (dhara, धारा; a spring or spring spout) of the hillsides show (Clause 4.11). No HSG map or table for Sikkim, no soil-series data of NBSS&LUP for the State, no SCS-CN calibration and no measured infiltration rate for any site in Sikkim were found during research for this Manual [TBC]. The interim groups follow the ground as the sources describe it. In East Sikkim the rocks are "gneiss, schists, quartzites, phyllites, limestones, sandstones, shales, meta-sedimentaries", with groundwater "in fractured and jointed zones … and in weathered zones" (CGWB, aquifer mapping of East Sikkim, as quoted); in South Sikkim the "Daling group of rocks is dominant" (CGWB, as quoted), although the same source elsewhere names the Gorubathan Formation as dominant, and the two statements conflict; and Gangtok's slopes stand on "Precambrian rocks which contain foliated schists and phyllites" (a landslide-susceptibility study, as summarised). Over them lie thin brown hill soils and colluvium: the soil plate of the CWC subzone 2(a) report (Plate 6) shows brown hill soil in its legend, although its Sikkim polygon was not checked (NEER reading). Groundwater is "largely in disconnected localized pockets and in deeper fracture zones", "springs are the main source", and on steep terrain it emerges "as seepages and springs wherever the land surface intersects local ground water body" (CGWB, as quoted). Such ground does not take water away; it carries it along the slope to the next seepage. The stability-zone notification of the Mines and Geology Department (No. 17/DMG/20-21, 19 March 2021) records the hydrology of the ground as "Dry/nil" in zone 1, "Wet" in zone 3, "Dripping" in zone 4 and "Flowing" in zones 5 and 6, and Gangtok Smart City Development Ltd (GSCDL) told the National Green Tribunal (NGT) that "landslides are caused mainly due to loose soil by spring water generated at natural Jhora" (reply affidavit in NGT OA 38/2022). The thin hill soils may themselves test as HSG C, but on a slope they lie thin over rock and pass their water to the slope below, so they are designed as D above 10°. The colluvial debris fans drain freely as a material, which is why they are B for runoff, but the Daling Group, "especially the Gorubathan Formation, appears more prone to landslides than Quaternary deposits and Higher Himalayan gneisses and schists" (as reported), and water put into a fan raises the pore pressure in the slope, so they earn no infiltration credit (Clause 4.11, hill rule). The boulder and gravel terraces of the valley floors are the only ground where water can soak away, and only where the water table is deep: the terraces at Rangpo, Melli and Jorethang are gravels with a high water table in the monsoon season (NEER reading), no depth to water has been measured on any of them [TBC], and the flood of October 2023 raised the bed of the Teesta "by an average of 7-8 meters" (State Government's pre-project report on GLOF risk mitigation in the Lhonak valley, annexed to its affidavit of 28 February 2026 in NGT OA 171/2023), so a terrace that stood well above the river before 2023 may now stand beside a raised and wet bed. The only regional measure of losses is the design loss rate of the CWC subzone 2(a) report, 0.24 cm/h (2.4 mm/h), the modal value of about 233 flood events on 21 foothill and plains catchments gauged at railway bridges (Annex 3E). It is a plains value: thin soils over rock may lose less than this in a wet monsoon, and more in the pre-monsoon storms of April and May, which fall on drier ground (NEER reading). It shall be used only in rural SUH runs under Clause 3.11.4, as a check at the scale of a basin, not to assign an HSG, not in an urban SCS-CN or SWMM model and not to size an infiltration practice. The interim groups of Clause 3.7.2, the 2 m water-table condition on the terraces, the design of slopes of more than 10° as group D, the treatment of the debris fans and of the ground raised in 2023, and the rule for untested soil on small sites are set by this Manual pending a soil-series lookup for Sikkim. Steep ground matters as much as soil. The SBCR 1991 bar allotment only on slopes "exceeding or around 70 (Seventy) degree" (reg. 35), and the stability zones run from slopes of "<15°" in zone 1 to more than 45° in zones 5 and 6; on flow paths of 30–60%, the Kirpich and Kerby formulae give times of concentration of 1–5 minutes (NEER's computation, as in the mountain editions of this series). The following rules are set by this Manual. (a) Tc shall be found by the velocity-based segment method of Clause 3.6.2, segment by segment, and shall not be taken below the 10-minute minimum of Clause 3.6.1, which matches the shortest design duration of Chapter 2; the Kirpich formula, derived from small farm catchments of moderate slope, shall not be used even as a cross-check where the average slope of the flow path exceeds 10%. (b) The sheet-flow segment over bare rock, a road cut or a paved hill street shall use the smooth-surface n of Table 3.4 and shall not exceed 30 m. (c) Urban and jhora catchments below 25 km² are modelled by the Rational Method within the limits of Clause 3.4.2, or by a hydrograph model such as SWMM or HEC-HMS, with the Tc of (a); the CWC unit hydrograph does not apply to them. A ridge town, such as Gangtok, Pakyong, Namchi or Gyalshing, is delineated by jhora, not by ward, because one ward drains to several jhoras and each jhora has its own outfall. (d) A catchment that runs from a hill flank onto a valley floor, such as the jhoras and side streams that leave the slopes onto the terraces and the raised bed of the Teesta at Singtam, Rangpo and Melli or of the Rangit at Majitar and Jorethang, shall be split at the break of slope and the hill sub-area modelled on its own, so that a flatter lower reach does not average away the fast response of the hill. (e) At a valley-floor town two design cases are run, and the more severe governs: a short burst on the hillside with the river low, which sets the peak in the town's drains and jhoras; and a storm of 24 to 72 hours with the river at the design tailwater of Chapter 5, which sets the storage and the outfall (Clause 5.8.5(b)). (f) In a lined drain, chute or trained jhora on a steep slope the flow is supercritical; the conveyance design of Chapter 6 allows for air entrainment, which bulks the flow, and for splash and superelevation at bends, and uses stepped or baffled chutes, drop structures and an energy dissipator at every fall to a jhora or onto a slope (Clause 6.3.6; Chapter 9). (g) Catchments that drain to a hydropower reservoir, or to a reach below its dam, are modelled with storage routing and the operator's release scenarios, not by a peak-flow method alone; the full and maximum levels and the release rules of the reservoirs were not found [TBC] (Clause 3.12; Clause 5.8.5(c)). (h) No method of this chapter applies to a catchment with permanent snow, a glacier or a mapped glacial lake, or to the Teesta trunk; their floods, including a glacial lake outburst flood (GLOF), rain on snow and debris flow, need a site-specific study under Clause 2.3.6(i). (i) No method of this chapter predicts debris flow; in steep catchments the design flow is bulked for sediment and debris, and inlets and culverts are protected against blockage, under Clause 6.3.6 and Chapter 9; no Sikkim debris or bulking allowance was found [TBC].


3.8 SCS curve number (SCS-CN) loss method

3.8.1 Runoff equation. Runoff depth shall be computed by:

Q = (P − Ia)² / (P − Ia + S) for P > Ia; Q = 0 otherwise S = 25,400 / CN − 254

where Q is runoff depth (mm), P is the cumulative rainfall depth (mm), S is potential maximum retention (mm) and Ia is initial abstraction (mm). In hydrograph models the equation is applied to the cumulative rainfall at each time step to obtain incremental rainfall excess.

3.8.2 Curve numbers. CN at AMC II shall be taken from Table 3.5, for the HSG of Clause 3.7.

Table 3.5 — Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)

Cover type HSG A HSG B HSG C HSG D
Pre-development reference (Clause 3.3.2): open space, good condition (grass > 75%) 39 61 74 80
Open space, fair condition (grass 50–75%) 49 69 79 84
Open space, poor condition (grass < 50%) 68 79 86 89
Impervious: roofs, paved parking, driveways, paved roads with kerbs and drains 98 98 98 98
Paved roads with open ditches (including right-of-way) 83 89 92 93
Gravel roads (including right-of-way) 76 85 89 91
Dirt roads (including right-of-way) 72 82 87 89
Newly graded areas (pervious, no vegetation) 77 86 91 94
Fallow, bare soil 77 86 91 94
Meadow (continuous grass, protected from grazing) 30 58 71 78
Brush, good condition 30 48 65 73
Woods, good condition 30 55 70 77
Woods, fair condition 36 60 73 79
Woods, poor condition 45 66 77 83
Water surfaces, tank waterspreads, wet detention basins Runoff = rainfall (no losses)

3.8.3 Use of Table 3.5.

  • (a) Post-development CN shall be built up from measured surfaces (Clause 3.9). The TR-55 urban district and residential lot-size rows shall not be used for the site.
  • (b) Pervious areas in the post-development condition shall use "open space" in the condition the landscape plan will achieve. Where no landscape plan is submitted, fair condition applies.
  • (c) Cultivated rows of TR-55 may be used for off-site existing conditions, but never for the pre-development reference of Clause 3.3.2.

3.8.4 Antecedent moisture. AMC shall follow Clause 2.11.4: AMC III for every design storm, whatever its duration, from 1 May to 30 September at a site in any sub-area of Annex 2A (SK-A, SK-B, SK-B1 or SK-C); AMC III for every design storm from 1 April to 31 October on valley-floor land below the 1% AEP flood level of the Teesta, the Rangit, the Rongni Chu or another river, on the river bed and terraces raised by the flood of October 2023, wherever the seasonal high water table is within 2 m of the ground, and in stability zones 3 to 6 of the Mines and Geology Department's notification of 2021, whose ground it records as "Wet", "Dripping" or "Flowing"; AMC III for every design storm at any time of year in a catchment that drains to a hydropower reservoir or its backwater (among them Teesta-V at Dikchu, Teesta-VI, the Teesta Low Dam III and IV projects, Chuzachen, Jorethang, Tashiding, Rangit-III and Rongnichu), to a reach below a dam into which the dam releases water, or to a river reach whose CWC gauge stands above its warning level; at any other site or time, AMC III for a design storm that follows, or contains, a 5-day rainfall total of more than 53 mm; and AMC II for every other storm. AMC I is not used. CN for AMC I and III shall be obtained from AMC II by:

CN(I) = 4.2 CN(II) / (10 − 0.058 CN(II)) CN(III) = 23 CN(II) / (10 + 0.13 CN(II))

The conversion shall be applied to the pervious component only. Impervious surfaces stay at CN 98 for all AMC. Composite CNs shall not be converted directly.

Illustrative — not design values. Pre-development reference CNs at AMC III are: HSG A 59.5; HSG B 78.2; HSG C 86.7; HSG D 90.2.

3.8.5 Initial abstraction.

  • (a) Default: Ia = 0.2S, with the CNs of Table 3.5.

  • (b) Sensitivity run (mandatory): every storage design shall also be run with Ia = 0.05S. For this run, S shall be converted as S0.05 = 1.33 · S0.20^1.15 (S in inches), which in SI is:

    S0.05 = 25.4 × 1.33 × (S0.20 / 25.4)^1.15 (mm)

  • (c) The design shall be based on the default run. The sensitivity results shall be reported on Form 3-2. Where the sensitivity run increases the required retention volume or water quality volume, the larger value governs for that volume.

2026-10-31T09:51:23.520885 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 50 100 150 200 250 300 350 400 Rainfall depth P (mm) 0 50 100 150 200 250 300 350 400 Runoff depth Q (mm) Q = P (dotted) CN 98 (impervious) CN 90 CN 80 (open land, HSG D) CN 74 (open land, HSG C) CN 61 (open land, HSG B) CN 39 (open land, HSG A) CN 74 with Ia = 0.05S (dashed) S converted per Hawkins et al. (2002) Solid lines: Ia = 0.2S (default). Illustrative — not design values.

Figure 3.3 — SCS-CN runoff depth versus rainfall depth for selected curve numbers at Ia = 0.2S, with the Ia = 0.05S sensitivity case for CN 74. Original drawing for this Manual, computed from the runoff equation of USDA NRCS, NEH Part 630, Ch. 10 (2004) and USDA SCS TR-55 (1986), and the S-conversion of Hawkins et al. (2002). Illustrative — not design values.

Commentary. Table 3.5 reproduces standard NRCS TR-55 (1986) values. They were derived from US catchments and have not been calibrated in Sikkim. The AMC conversion equations are the standard NEH-4 relationships as given by Chow, Maidment and Mays (1988, §5.5). Converting only the pervious component follows APWA, which states that "direct conversion of composite antecedent moisture conditions is not appropriate" (KC Metro APWA 5600, 2011, §5602.2C). Converting a composite CN would wrongly lower the CN of the impervious part.

Ia = 0.2S is the original NRCS ratio. Analysis of US rainfall–runoff data found that 0.05S fits better on average (Hawkins et al., 2002; Woodward et al., 2003), and gave the conversion of 3.8.5(b). NRCS has not formally replaced 0.2S, so this Manual keeps it as the default. Figure 3.3 shows why the sensitivity run is needed: for CN 74, the 0.05S case gives more runoff for small storms (about 2.0 mm vs 0.5 mm from 25 mm of rain) but less for large storms (about 242 mm vs 262 mm from 350 mm). Illustrative — not design values. The ratio therefore matters most for retention and water quality volumes, and the default 0.2S is the conservative choice for peak and detention design. The rule in 3.8.5(c) that the larger retention or water-quality volume governs has no direct precedent; this Manual sets it because the 0.05S case gives more runoff from the small storms that set those volumes.


3.9 Impervious connectivity

3.9.1 Classification. Every impervious surface in the post-development condition shall be classified as directly connected (DCIA) or disconnected, and shown on the drainage plan.

3.9.2 Preferred representation. In hydrograph models, DCIA and pervious areas shall be modelled as separate sub-areas (or as the separate impervious and pervious fractions of a SWMM subcatchment), each with its own loss parameters. The runoff from disconnected impervious areas shall be routed onto the receiving pervious area.

3.9.3 Disconnection criteria. An impervious area may be classed as disconnected only if all of the following hold:

  • (a) its runoff discharges as sheet flow onto a pervious area, without a pipe, channel or kerb;
  • (b) the pervious flow path is at least as long as the impervious flow path draining to it;
  • (c) the pervious area is not compacted, not HSG D, and is protected from paving by the approved plan; and
  • (d) for storms of 12 hours or more, it does not drain to an RWH sump or tank (Clause 3.3.3(c)).

3.9.4 Composite CN. Where a single composite CN is used instead of 3.9.2, it shall be computed as:

  • for directly connected impervious area: CNc = CNp + (Pimp / 100)(98 − CNp);
  • where total impervious area is below 30% and part of it is disconnected: CNc = CNp + (Pimp / 100)(98 − CNp)(1 − 0.5 R),

where CNp is the pervious CN, Pimp is the percentage of impervious area and R is the ratio of disconnected to total impervious area. The composite CN shall not be used for retention or water quality volumes.

Commentary. The composite equations are from TR-55 (USDA SCS, 1986, Ch. 2, Figures 2-3 and 2-4). This Manual prefers separate representation in 3.9.2 because a composite CN spreads the impervious response over the whole area, which suppresses runoff from small storms. For a site that is 50% directly connected impervious on HSG B open space (CNp 61), 25 mm of rain gives about 9.9 mm of runoff when the two parts are modelled separately, but only about 1.8 mm with the composite CN 79.5. At 200 mm the two methods agree (139.5 mm vs 138.4 mm). Illustrative — not design values. The error is largest for the frequent storms that set retention and water-quality volumes. The disconnection criteria of 3.9.3 are set by this Manual, drawing on common practice in US runoff-reduction manuals. Criterion (d) follows the rule of Clause 3.3.3(c) that RWH sumps are full at the start of monsoon storms.


3.10 Groundwater, high water table and tank backwater

3.10.1 High water table (dual HSG). Where the seasonal high groundwater table is within 0.6 m of the ground surface, the soil shall be assigned HSG D for both the pre- and post-development runs, whatever its texture, unless it is permanently drained by works that are maintained under Chapter 10. This rule applies in every case to storms of 12 hours or more, which are run at AMC III (Clause 2.11.4).

3.10.2 Water-table data. The seasonal high water table shall be taken as the highest level recorded in the monsoon season (April–October), from site piezometers or trial pits, or from the nearest Central Ground Water Board (CGWB) or WRD observation well, adjusted for ground level.

3.10.3 Infiltration-based losses. Where Green–Ampt, Horton or soil-moisture-accounting losses are used instead of SCS-CN, the cumulative infiltration in any storm shall not exceed the storage available in the soil above the seasonal high water table.

3.10.4 Tank and waterbody backwater. Where a site or sub-catchment drains to a tank, pokhari, marsh or other waterbody:

  • (a) the water level in the receiving waterbody shall be applied as the downstream boundary of the model, per Chapter 5 and Chapter 7;
  • (b) land below the level of the receiving waterbody in the design event (including the tank foreshore below FTL) shall be modelled as water surface or storage, with no losses; and
  • (c) where the outfall is submerged by the waterbody level, the routing shall use the dynamic-wave method of Clause 3.12.4.

Commentary. The dual-group rule follows NEH Part 630, Ch. 7 (USDA NRCS, 2009), which places wet soils with a water table within 60 cm (24 in) of the surface in group D in their undrained state, with a dual group (A/D, B/D, C/D) where drainage is feasible. This Manual applies the undrained group to long storms because some land in Sikkim is wet in the monsoon season, although most of the State is hard rock on steep slopes. Groundwater there is "largely in disconnected localized pockets and in deeper fracture zones", and "springs are the main source" (CGWB, as quoted); no CGWB depth to water, observation-well record or extraction figure for Sikkim was read for this Manual, because the CGWB's Sikkim reports could not be reached [TBC]. The wet land is of four kinds. The first is the valley floors and river terraces of sub-area SK-A at Rangpo, Singtam, Melli, Majitar and Jorethang, gravels with a high water table in the monsoon season (NEER reading), beside a river whose bed the flood of October 2023 raised by metres: NHPC estimated the rise at about 7.44 m at the Teesta Low Dam IV project, 7.29 m at Teesta Low Dam III, 6.00 m at Teesta-V and 2.00 m at Teesta-VI, and at Toong Naga, where the left bank "consists of loosely compacted soil mixed with boulders", 155 households "have been mandated for relocation" (State Government's pre-project report on GLOF risk mitigation in the Lhonak valley, annexed to its affidavit of 28 February 2026 before the National Green Tribunal (NGT)). The second is the seepage zones of the slopes, where groundwater emerges "as seepages and springs wherever the land surface intersects local ground water body" (CGWB, East Sikkim, as quoted). The third is the ground of stability zones 3 to 6 of the Mines and Geology Department's notification of 2021, whose hydrology it records as "Wet" in zone 3, with groundwater "Medium to high", "Dripping" in zone 4 and "Flowing" in zones 5 and 6 (Notification No. 17/DMG/20-21, 19 March 2021). The fourth is the margins of the pokharis (पोखरी; pond, lake or tank) and of the hydropower reservoirs. No monsoon water-table depth for any site in Gangtok, Namchi, Rangpo, Singtam or Jorethang, and no map of the seasonal high water table, was obtained [TBC]; Annex 3A is to supply them. Clause 3.10.4 reflects the State's receiving waters: jhoras with no gauges, which in Gangtok the Gangtok Municipal Corporation (GMC) has its waste agency clear under its contract of 2024 (Memo No. GMC/6727/III/2024/OL/01, 8 October 2024); a few rivers with CWC sites; and reservoirs whose levels were not found. The CWC levels, as transcribed by SANDRP (as reported), are: the Teesta at Khanitar, a highest level of 297.7 m on 18 September 1974, raised to 298.4 m at 09:00 on 4 October 2023; the Teesta at Melli, a warning level of 226.0 m and a danger level of 227.0 m, an old highest level of 225.25 m, and a peak on 4 October 2023 given as 225.5 m (04:00) in SANDRP's text but as 228.0 m in a CWC daily bulletin of 2024 (as quoted), two figures that conflict and are not resolved here; the Rongni Chu at Singtam, a danger level of 355.09 m and a highest level of 356.09 m, with no date; and the Rangit at Majitar, a highest level of 279.29 m on 17 October 1985. No datum is stated for any of them [TBC], no CWC level was found for Rangpo [TBC], and the sites upstream on the Teesta stopped recording between 22:00 and 23:00 on 3 October 2023 (as reported). After October 2023 every highest flood level needs a post-2023 survey, because the bed beneath it has moved (Clause 5.8.5(b)). The hydropower reservoirs, Teesta-V at Dikchu, Teesta-VI, the Teesta Low Dam III and IV projects, Chuzachen, Dikchu, Jorethang, Tashiding, Rangit-III and Rongnichu, with Teesta-III at Chungthang under restoration, hold a water surface that their operators control; a site that drains to one applies Clause 3.10.4(b) to the land below the reservoir's starting level, which is set in the Commentary to Clause 3.12.


3.11 Unit hydrographs and runoff transformation

3.11.1 Permitted transforms.

  • (a) SCS (NRCS) dimensionless unit hydrograph, curvilinear or triangular, for catchments below 25 km² and for any sub-area of a larger model;
  • (b) the SWMM non-linear reservoir with kinematic overland flow;
  • (c) Clark or ModClark unit hydrograph in HEC-HMS, where parameters are calibrated under Clause 3.15; and
  • (d) the CWC synthetic unit hydrograph, for 25–5,000 km² (Clause 3.11.4).

3.11.2 SCS unit hydrograph. The peak and time to peak of the unit hydrograph shall be:

qp = PRF′ · A · Q / tp, with PRF′ = 0.208 (SI form of the standard peak rate factor 484) tp = Δt / 2 + tL, tL = 0.6 Tc

where qp is the peak flow (m³/s); A is the area (km²); Q is the runoff depth (mm), equal to 1 mm for the unit hydrograph; tp is the time to peak (h); and Δt is the computation interval (h).

3.11.3 Computation interval and sub-areas.

  • (a) Δt shall not exceed 0.133 Tc of the smallest sub-area, nor the hyetograph time step of Clause 2.9.1.
  • (b) Sub-areas shall be reasonably uniform in HSG, land cover and slope. Pervious and directly connected impervious areas shall be separate sub-areas, per Clause 3.9.2.

3.11.4 CWC synthetic unit hydrograph. For catchments of 25–5,000 km² in CWC subzone 2(a) (North Brahmaputra), which covers the whole State but whose isopluvial plates draw no contour north of Gangtok, so that in sub-areas SK-B1 and SK-C no CWC point rainfall exists for the cross-check of Clause 2.3.3(b) and the depths of Clause 2.3.6(c)(ii) and (c)(iii) apply instead; its unit hydrograph is not applied to a catchment with permanent snow, a glacier or a mapped glacial lake, or to the Teesta trunk, which need a site-specific study (Clause 2.3.6(i); Annex 3E):

  • (a) the SUH parameters, design storm duration, loss rate, base flow, areal reduction and time distribution shall be taken from the applicable CWC Flood Estimation Report, using the catchment's physiographic parameters measured from survey or a DEM;
  • (b) the 24-hour design rainfall shall follow Clause 2.3.3(b) and Clause 2.7.3, and the climate factor of Clause 2.8 shall be applied;
  • (c) the SUH result shall be reported alongside the HEC-HMS or SWMM result for the existing natural condition; and
  • (d) where the hydrograph model gives a lower 1% AEP peak than the CWC SUH, the designer shall either justify the model by calibration under Clause 3.15 or adopt the CWC SUH peak.

3.11.5 Peak rate factor for flat coastal land. The standard factor (484; PRF′ = 0.208) is the default. A lower factor may be used only:

  • (a) for unchannelled, flat coastal-plain land without piped or lined drainage;
  • (b) in the same way in both the pre- and post-development runs for any land that stays unchannelled; and
  • (c) after the authority adopts calibrated values in Annex 3D.

Land drained by pipes, lined drains or kerbs in the post-development condition shall use the standard factor.

Commentary. The SCS unit hydrograph, the 0.6 lag ratio and the 0.133 Tc interval are from NEH Part 630, Ch. 16 (USDA NRCS, 2007). The interval follows from the unit hydrograph geometry: with tp = Δt/2 + 0.6 Tc and Tc + Δt = 1.7 tp, Δt = 0.133 Tc. The SI constant 0.208 is the direct conversion of 484 (cfs, mi², in, h). APWA uses the SCS dimensionless unit hydrograph as its basis (2011, §5602.5). The CWC Flood Estimation Reports give regression equations for SUH parameters, a design storm duration, a constant loss rate and ARF and time-distribution curves for each subzone (CWC 1991; see Chapter 2). They were derived from natural, mostly rural catchments with data that predate the report of 1991 (its 21 representative catchments are rural bridge sites of the North Frontier Railway in the foothills and plains of the subzone, with slopes of about 1–10 m/km; none lies in Sikkim, which had no railway in the report's period, by NEER's reading, the report's catchment table not having been checked [TBC]), so they represent pre-development conditions, not urbanised ones. That is why the SUH is used as a benchmark rather than as the post-development model. Clause 3.11.4(d) mirrors the floor principle of Clause 2.3.3. HEC-HMS has been calibrated against CWC subzone SUH responses in Indian studies, which shows the two can be linked.

The lower-factor option of 3.11.5 is based on the NRCS Delmarva unit hydrograph, which uses a peak rate factor of 284 (PRF′ ≈ 0.122) for flat, poorly channelled coastal-plain catchments on the Delmarva Peninsula (Welle et al., 1980, as adopted by NRCS; New Jersey Department of Agriculture, Delmarva bulletin, which uses 285). A lower factor gives a lower, later peak. Used only in the pre-development run, it would lower Q_pre and make the release cap stricter; used in a piped post-development run, it would understate Q_post. Clause 3.11.5(b) prevents both biases.


3.12 Routing

3.12.1 Storage routing. Routing through detention and retention facilities, tanks, ponds and any storage behind embankments shall use level-pool (modified Puls, storage-indication) routing with:

  • (a) a stage–storage relationship from the design grading or survey;
  • (b) a stage–discharge relationship for every outlet (orifices, weirs, surplus weirs, pumps), including the minimum orifice and trash screen of Chapter 4; and
  • (c) the tailwater boundary of Chapter 5, where the tailwater affects the outlet rating.

3.12.2 Channel routing. Routing through channels and drains shall use the Muskingum–Cunge method, or the Muskingum method with parameters K and X that are derived from channel geometry or calibration. For the Muskingum method, the routing interval Δt shall satisfy 2KX ≤ Δt ≤ 2K(1 − X).

3.12.3 Incidental storage. Storage behind road embankments, culverts or boundary walls that is not part of an approved facility shall not be counted in the design unless the authority is satisfied that it will be maintained for the design life.

3.12.4 Dynamic-wave routing. Dynamic-wave (full Saint-Venant) routing, in SWMM or HEC-RAS unsteady flow, shall be used where:

  • (a) the outfall is under tidal, river or tank backwater (Chapter 5, Clause 3.10.4);
  • (b) flow can reverse, or the network has loops or overflow links; or
  • (c) the network surcharges in the design event and the hydraulic grade line sets the design.

3.12.5 Tank cascades. Tanks in a cascade shall each be routed by Clause 3.12.1, with the surplus weir and sluice ratings and the documented operating rule of Chapter 7. The starting water level in each tank shall be FTL unless continuous simulation (Clause 3.13) supports a lower level.

Commentary. Modified Puls routing for storage and Muskingum–Cunge for channels are the APWA requirements (KC Metro APWA 5600, 2011, §5602.8). APWA also excludes "incidental detention" behind embankments unless it will be maintained, which 3.12.3 adopts. CPHEEO's detention procedure uses the same three inputs as 3.12.1: an inflow hydrograph, a stage–storage curve and a stage–discharge curve (CPHEEO 2019, Part A §8.5.3). The Muskingum stability limits are standard (Chow, Maidment and Mays, 1988, §8.4). This Manual starts pokharis and reservoirs at their full or maximum level in 3.12.5 because Sikkim's heavy rain falls on waterbodies that are already full or held up for power, not drawn down for drainage. The Manual's monsoon season runs from 1 April to 31 October, and the largest falls come at its start and its end as well as in its middle: at Gangtok the highest 24-hour falls are 138.9 mm in April (25 April 1981), 310.3 mm in May (30 May 1975), 223.8 mm in June (9 June 1997), 111.4 mm in July, 136.8 mm in August, 141.0 mm in September (25 September 2005) and 201.0 mm in October (3 October 1996), and Tadong's highest is 212.5 mm on 25 September 2005 (IMD Extremes). The wettest month on record was June 1997 at Gangtok, with 1,281.3 mm, and June 1998 at Tadong, with 1,082.4 mm (IMD Extremes). The starting levels are as follows.

  • Hydropower reservoirs. The reservoirs of the Teesta and Rangit projects (Teesta-V at Dikchu, Teesta-VI, the Teesta Low Dam III and IV projects, Chuzachen, Dikchu, Jorethang, Tashiding, Rangit-III and Rongnichu) are held for power, and no full reservoir level, maximum water level or release rule for any of them was found for this Manual [TBC]. Each shall be started at its maximum water level as its operator gives it in writing, with the datum stated. Until the operator does so, no starting level is set from any other figure: the outfall is treated as having an unknown tailwater and as closed for the durations of Clause 5.8.5(c), and the work is sited above the surveyed mark of the flood of October 2023. Teesta-III at Chungthang has been "non-operational since 4th Oct 2023" (as quoted) and was reported to the NGT to be "Under restoration & first phase of wet commissioning is expected by 31st MAY 2026 through coffer dam", with no live storage in that phase (State Government's affidavit of 28 February 2026); its present state was not found [TBC]. When it again holds water it is started in the same way.
  • Pokharis and other lakes. No pokhari, lake or pond in the towns was found with a published outlet level, operating rule or level record [TBC]. Each shall be started at its surveyed spill or outlet crest level, and the small rain-fed and spring-fed pokharis of the towns and villages are started full throughout the monsoon season. Where the outlet of a pokhari is held up by a river, a reservoir or a blocked jhora, the pokhari is started full to its outlet and kept there until the outfall falls, so that none of its storage below the outlet level is counted (Clause 5.8.5(f)).
  • Glacial lakes. A glacial lake keeps its own name, even where the name contains "Pokhari", as Bhalay Pokhari and Doodh Pokhari do (State Government's affidavit of 28 February 2026). It is a hazard source under Clause 2.3.6(i) and Chapter 7, never storage, and no starting level, storage credit or routing of this chapter applies to it.

A gated reservoir is modelled with its gate rule from its operator, and a waterbody is modelled below these levels only where a continuous simulation under Clause 3.13 or a notified operating rule supports it. The window of 1 April to 31 October in Clause 3.13.5(a) is set by this Manual and is the Manual's monsoon season. It starts on 1 April because Gangtok's wet season starts then: April brings 296.9 mm on 15.2 rainy days and May 496.4 mm on 20.1 rainy days (IMD normals, 1981–2010), and the 24-hour records of Gangtok (310.3 mm, 30 May 1975) and of Singhik (504.2 mm, 12 May 1981; CWC subzone 2(a) report, Table 7) both fell in May. IMD's normal dates of onset and withdrawal of the south-west monsoon over Sikkim were not found [TBC], and this Manual gives none. The window ends on 31 October because October storms are a real threat, such as Gangtok's 201.0 mm on 3 October 1996, the storm of 2–5 October 1968 over Sikkim and Darjeeling (as reported) and the South Lhonak lake outburst and Teesta flood of 3–4 October 2023. Pumps, gates and debris screens are on standby from 1 April to 31 October (Chapter 10).


3.13 Continuous simulation

3.13.1 When required. Continuous simulation shall be carried out, in addition to the design-storm analysis, for:

  • (a) regional facilities draining more than 25 km²; and
  • (b) any system that includes a tank cascade whose storage is counted in the design (Chapter 7).

The authority may also require it for any facility where the starting storage level governs the design.

3.13.2 Rainfall input.

  • (a) The longest available hourly record from IMD or another approved recording gauge representative of the catchment shall be used.
  • (b) Where hourly data are shorter than 30 years, the record shall be extended with the IMD 0.25° gridded daily data. The full gridded record (1901 to present) should be used; at least the most recent 30 years shall be. The daily data shall be disaggregated to hourly by a method stated in the submittal and checked against the hourly gauge for the overlapping years. Grid values shall be converted to point values under Clause 2.7.1 where applicable.
  • (c) A future-climate run shall scale the record by the climate factors of Clause 2.8.

3.13.3 Model content. The model shall include soil-moisture accounting with evaporation (IMD pan evaporation or equivalent), groundwater or base flow, tank storage with operating rules and irrigation withdrawals, and the tailwater series of Chapter 5 (predicted tides plus a surge allowance for coastal outfalls).

3.13.4 Use of results. Annual maxima of water level, storage and volume, and the duration of outfall closure, shall be extracted and fitted by frequency analysis. Results shall be compared with the design-storm results. The more severe result at each AEP governs. Peak flows in drains and channels with a response time of less than one day shall be taken from the design-storm analysis where the continuous record was disaggregated from daily data, because the disaggregated hourly peaks are synthetic.

3.13.5 Two-step approach. The continuous simulation need not use the full hydraulic model. It may use a simplified hydrologic and storage model, at a daily or hourly step, that represents the soil moisture, groundwater, tank storage, operating rules and tailwater of 3.13.3. Its results shall then be passed to the design-storm runs of the full hydraulic model as:

  • (a) the starting level of each tank, taken as the level exceeded on 10% of the days from 1 April to 31 October over the record; and
  • (b) the antecedent soil-moisture condition, taken from the same days and compared with the AMC rule of Clause 3.8.

The designer shall show that the simplified model reproduces the water balance of the full model for at least one recorded event.

Two-step continuous simulation: setting the starting tank level (schematic, not to scale) Two-step continuous simulation: setting the starting tank level (schematic, not to scale) Step 1 — Long continuous run with a simplified hydrologic and storage model (daily or hourly step) Rainfall record: hourly gauge, extended with IMD 0.25° gridded daily data (at least 30 years; full record preferred) Tank level Year 1 Year 2 Year 3 Year 4 Year 5 Year n Monsoon season FTL (surplus weir crest) 0 10 50 100 % of days level is exceeded Tank levels on all monsoon-season days, ranked L10 L10 = level exceeded on 10% of the monsoon-season days over the record Pass to the design-storm runs (Clause 3.13.5): (a) starting level of each tank = L10; (b) antecedent soil moisture from the same days, compared with the AMC rule Step 2 — Design-storm run of the full hydraulic model, starting from L10 Design storm hyetograph (Chapter 2) Tank level 0 12 24 36 48 60 72 Time from start of design storm (h) FTL (surplus weir crest) Tank level, start at L10 Default without continuous simulation: start at FTL (Clause 3.12.5) Peak design level Check: the simplified model reproduces the water balance of the full model for at least one recorded event.

Figure 3.4 — Two-step approach of Clause 3.13.5. Step 1: a long continuous run with a simplified hydrologic and storage model gives the tank level exceeded on 10% of the days from 1 April to 31 October (L10). Step 2: the design storms are run in the full hydraulic model from that starting level, in place of the default start at FTL of Clause 3.12.5. Schematic, not real data. Original drawing for this Manual, illustrating the two-step approach set by this Manual in Clause 3.13.5.

Commentary. Design storms assume one starting condition, but in a tank cascade the governing variable is how full the tanks are when the storm arrives, which depends on the weeks of rain before it. An Australian study of 20 real on-site detention systems found that designs based on one temporal pattern, or even an ensemble of ten, "cannot reliably produce an OSD system design that will always be effective" under real rainfall, and continuous simulation showed frequent-event peaks exceeding pre-development levels (Water Science and Engineering, 2019). The 30-year minimum in 3.13.2(b) matches the station IDF rule of Clause 2.3.2; a longer record is better, and the IMD gridded daily record, which starts in 1901, is the practical long series for Sikkim. The record length matters less than what the simulation is for. Its main purpose here is to find how full the tanks and soils usually are when a monsoon season storm arrives, and how often heavy rain coincides with a closed outfall. A design storm cannot answer either question, because it starts from one assumed condition. It is not intended to replace design storms for the peak flow in urban drains. Clause 3.13.5 therefore allows the long run to be made with a simple storage model, which takes minutes, and passes the starting tank levels to the detailed hydraulic model, which is then run only for the design storms. Running a detailed 1D–2D city model continuously for decades is rarely practical and is not required. The 10% exceedance level in 3.13.5(a) is set by this Manual: it represents a wet but not exceptional monsoon, so that the design storm arrives on tanks that are already well filled, as they were in June 1997, when Gangtok recorded 1,281.3 mm in the month, its wettest month on record, with 223.8 mm on 9 June (IMD Extremes), although no pokhari or reservoir level for that month was found [TBC].


3.14 Pre- vs post-development comparison procedure

3.14.1 The comparison required by Clause 2.11 and Chapter 4 shall be carried out by the following steps. The results shall be recorded on Form 3-2.

2026-10-31T09:51:23.621054 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ Time (same design storm for both scenarios) Discharge 0.9 × Q_pre (standard-catchment cap, Clause 2.11.2) Q_pre Q_post (uncontrolled): higher and earlier peak Storage volume Routed peak ≤ cap; volume released over a longer time (drawdown, Ch 4) Schematic. Illustrative — not design values. Pre-development (greenfield, Clause 3.3.2) Post-development, no control Post-development, routed through storage

Figure 3.5 — Pre-development, uncontrolled post-development and routed post-development hydrographs for the same design storm. Original drawing for this Manual, adapted from the pre- vs post-development detention concept in CPHEEO, Manual on Storm Water Drainage Systems, Part A §8.5, 2019, and KC Metro APWA Section 5600, 2025.01. Schematic. Illustrative — not design values.

3.14.2 Step 1 — Define the site, catchments and points of comparison.

  • (a) Delineate the site and every area that drains to it, from survey.
  • (b) Identify each POC where runoff leaves the site. Each POC shall be tested separately. Runoff shall not be diverted from one natural catchment to another to meet the criterion.
  • (c) Model off-site run-on identically in both runs, at its existing condition (Clause 3.3.5(b)). Where it passes through the site's storage, the criterion applies to the total outflow at the POC.

3.14.3 Step 2 — Soils. Map HSG (Clause 3.7), apply the high-water-table rule (Clause 3.10.1) and record the infiltration tests.

3.14.4 Step 3 — Pre-development model. Build the pre-development model per Clause 3.3.2: greenfield CN (Table 3.5), Tc (Clause 3.6, with n = 0.15), and existing waterbodies and channels. Compute CN at AMC II and AMC III.

3.14.5 Step 4 — Post-development model. Build the post-development model per Clause 3.3.3: measured impervious areas, connectivity (Clause 3.9), disturbed-soil HSG, CN, Tc, and the proposed retention, detention and outlets as storage (Clause 3.12.1).

3.14.6 Step 5 — Design storms. From Chapter 2, prepare for each required AEP (50%, 10% and 1%; 2-, 10- and 100-yr) and each duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:

  • the depth with the climate factor (Clause 2.8), ARF = 1.0 for the site (Clause 2.7.4);
  • the hyetograph (Clause 2.9); and
  • the AMC (Clause 2.11.4).

The same storms shall be used in both runs (Clause 2.11.1).

3.14.7 Step 6 — Run the pre-development model for every storm and tabulate Q_pre(T, d). For flood-sensitive catchments, identify the largest 10% AEP pre-development peak over all durations; that value is the cap of Clause 2.11.3.

3.14.8 Step 7 — Run the post-development model without controls and tabulate Q_post(T, d) and runoff volumes. This shows the size of the problem and is reported, not tested.

3.14.9 Step 8 — Add retention and detention.

  • (a) Represent the retention volume of Chapter 4 as storage that is lost to infiltration or reuse (not released to the POC) within the period verified under Chapter 4.
  • (b) Route the remaining hydrograph through the detention storage and outlets (Clause 3.12.1).
  • (c) Apply the tailwater of Chapter 5, including the joint cases of Clause 2.12, where the outfall is tidal or under backwater.
  • (d) Adjust storage and outlets until Step 9 is met.

3.14.10 Step 9 — Test the criterion at each POC, for every AEP and every duration:

  • (a) standard catchments: Q_post(T) ≤ 0.9 × Q_pre(T) for the 50%, 10% and 1% AEP (Clause 2.11.2);
  • (b) flood-sensitive catchments: Q_post(1% AEP) ≤ Q_pre(10% AEP), and Q_post(50% AEP) ≤ Q_pre(50% AEP) (Clause 2.11.3).

The governing duration for storage is the one that needs the largest storage or gives the highest water level; the 24, 48 and 72 h runs are always reported (Clause 2.5.2).

3.14.11 Step 10 — Sensitivity runs. Repeat Steps 6–9 for the governing storms with Ia = 0.05S (Clause 3.8.5) and, where a lower peak rate factor is used, with the standard factor (Clause 3.11.5). Report the change in peaks and required storage.

3.14.12 Step 11 — Associated checks. Using the final routed model, check the drawdown times, minimum orifice and emergency spillway of Chapter 4, the outfall-closed storage check of Chapter 5, and the downstream analysis of Chapter 5.

3.14.13 Step 12 — Document the results on Forms 3-1 and 3-2 (Clause 3.17).

Commentary. The step sequence follows the standard event-based workflow: delineate; set pre-development CN and Tc; set post-development CN and shorter Tc; run identical storms through a unit hydrograph or kinematic model; compare peaks and volumes; and size storage by modified Puls routing. It adds the Sikkim elements: the 48–72 h storms, AMC III, and tailwater. Figure 3.5 shows why the long-duration runs matter: the routed peak can meet the cap while the storage holds the volume difference between the post- and pre-development hydrographs, which must then drain within the Chapter 4 limits. The ban on diverting runoff between catchments in 3.14.2(b) stops a site meeting the rule at one POC by moving flow to a neighbour's drain.


3.15 Model calibration and validation

3.15.1 When required. Calibration and validation are required for:

  • (a) catchment models of 25 km² or more;
  • (b) regional facilities and continuous simulation under Clause 3.13;
  • (c) city or basin drainage master plans; and
  • (d) any model whose parameters differ from the defaults of this chapter (for example a Clark transform or a lower peak rate factor).

3.15.2 Data. Calibration shall use observed rainfall (gauges, and radar where available) and observed flows or water levels (WRD gauging sites, GMC or SSDMA level sensors, tank gauges, or surveyed flood marks).

3.15.3 Events. At least three independent events shall be used for calibration and at least one further event for validation. At least one event shall be a long-duration monsoon or cyclone event (for example 9 June 1997 at Gangtok (223.8 mm in 24 hours, in the wettest month of the station's record, IMD), 25 September 2005 at Tadong (212.5 mm in 24 hours, IMD) or the rain of 12–13 June 2024 in Mangan district, for which no IMD station rainfall was found [TBC], where data exist).

3.15.4 Performance. The submittal shall report, for each event, the observed and modelled peak, volume and time to peak, and for continuous models the Nash–Sutcliffe efficiency (NSE) and percent bias. As a guide, a calibrated model should reproduce event peaks and volumes within ±25%, and a continuous model should achieve NSE ≥ 0.5 and percent bias within ±25%.

3.15.5 Limits on calibration. Calibration shall not be used to justify design flows lower than those given by the default methods of this chapter, unless site-specific factors are thoroughly examined and documented and the authority agrees.

3.15.6 Reasonableness check. Design peak flows shall be plotted as discharge per unit area against catchment area and compared with the CWC SUH results, regional gauged estimates and known historical floods.

Commentary. Clauses 3.15.5 and 3.15.6 follow APWA, which states that "model calibration shall not be used to justify discharge estimates that are lower than those provided by the baseline unit hydrograph method" and requires unit discharges to be plotted against tributary area and compared with regression, gauge and historical values (KC Metro APWA 5600, 2011, §5602.9). The event-count and performance values in 3.15.3 and 3.15.4 are set by this Manual. The NSE ≥ 0.5 and ±25% bias thresholds are the "satisfactory" streamflow ratings of Moriasi et al. (2007), which were developed for monthly continuous simulation; their use for event peaks and volumes here is an extension.


3.16 Software acceptance

3.16.1 Accepted software. The following are accepted without further demonstration, in a version current at the time of submittal:

  • (a) EPA Storm Water Management Model (SWMM 5.x);
  • (b) USACE HEC-HMS and HEC-RAS;
  • (c) USDA NRCS WinTR-55 and WinTR-20; and
  • (d) spreadsheets for the Rational Method and single-area SCS-CN calculations, where every formula and input is shown.

3.16.2 Other software. Commercial packages built on the SWMM or HEC engines are accepted if the engine and version are stated. Any other method or software is accepted only if the designer reports, for every sub-area, the peak flow, lag, runoff volume and equivalent CN from both that method and a baseline method of 3.16.1, identifies every difference greater than 5%, and justifies every difference that gives a less conservative result.

3.16.3 Benchmark problems. The authority shall publish benchmark test problems (Annex 3C). Software not listed in 3.16.1 shall reproduce them within the stated tolerance.

3.16.4 Model files. Native model input and output files shall be submitted with every hydrograph-based design.

Commentary. The 5% equivalence test is the APWA rule for alternative methods (KC Metro APWA 5600, 2011, §5602.2D). APWA names TR-55, TR-20, HEC-1 and HEC-HMS as baseline methods (§5602.2B). CPHEEO names SWMM for hydrograph and continuous modelling (CPHEEO 2019, Part A §4.4.2). Submitting native model files lets the authority rerun the model and is the main safeguard against unreviewable black-box results.


3.17 Documentation

Every hydrologic submittal shall include:

  1. Form 3-1, Hydrologic Calculation Summary, stating the method used and why (Table 3.1), the software and version, and the computation interval.
  2. Catchment maps for the pre- and post-development conditions, showing sub-areas, flow paths used for Tc, POCs, and off-site run-on.
  3. Soils: the HSG map and its source and scale (Clause 3.7), water-table data (Clause 3.10), and infiltration test results.
  4. Parameter tables for each sub-area and condition: area, impervious area by type and connectivity, HSG, CN at AMC II and III (or C and Cf), Tc worksheets, and n values.
  5. Rainfall: the Design Rainfall Sheet (Form 2-1) and the hyetographs used.
  6. Results: hydrograph tables and plots for each storm; stage–storage and stage–discharge tables; routed outflows; and peak water levels.
  7. Form 3-2, Pre- vs Post-Development Comparison, with Q_pre, Q_post (uncontrolled and routed) and the criterion for each POC, AEP and duration, and the sensitivity runs of Clause 3.14.11.
  8. Calibration report, where Clause 3.15 applies.
  9. Model files (Clause 3.16.4).
  10. A statement by the responsible engineer that the methods and parameters of this chapter have been used, with any departures listed and justified.

References (chapter)

  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Volume I, Part A: Engineering Design. Ministry of Housing and Urban Affairs, New Delhi. §4.4 (Rational Method, Table 4.2 runoff coefficients, time of concentration, partial area effect), §8.5 (detention).
  • Kansas City Metro Chapter APWA (2011). Section 5600 Storm Drainage Systems and Facilities (Feb 16, 2011), §5602.2–5602.9.
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01, §5603.4. https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
  • Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Policy Supplement). https://www.marc.org/document/apwa-stormwater-standards-supplement
  • USDA Soil Conservation Service (1986). Urban Hydrology for Small Watersheds, Technical Release 55 (TR-55), 2nd ed. Tables 2-2a, 2-2c, 3-1; Figures 2-3, 2-4, 3-1.
  • USDA NRCS. National Engineering Handbook, Part 630 Hydrology: Ch. 7 Hydrologic Soil Groups (2009); Ch. 9 Hydrologic Soil-Cover Complexes; Ch. 10 Estimation of Direct Runoff from Storm Rainfall (2004); Ch. 15 Time of Concentration (2010); Ch. 16 Hydrographs (2007). https://directives.nrcs.usda.gov/
  • Hawkins, R.H., Jiang, R., Woodward, D.E., Hjelmfelt, A.T. and Van Mullem, J.A. (2002). Runoff curve number method: examination of the initial abstraction ratio. Proc. Second Federal Interagency Hydrologic Modeling Conference, Las Vegas.
  • Woodward, D.E., Hawkins, R.H., Jiang, R., Hjelmfelt, A.T., Van Mullem, J.A. and Quan, Q.D. (2003). Runoff curve number method: examination of the initial abstraction ratio. World Water & Environmental Resources Congress, ASCE.
  • Welle, P.I., Woodward, D.E. and Moody, H.F. (1980). A dimensionless unit hydrograph for the Delmarva Peninsula. American Society of Agricultural Engineers paper. See also New Jersey Department of Agriculture, Delmarva Unit Hydrograph bulletin. https://nj.gov/agriculture/divisions/anr/pdf/DelmarvaBulletin.pdf
  • Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill. §5.5 (SCS method, AMC), §8.4 (Muskingum), Table 15.1.2 (Kirpich).
  • Kirpich, Z.P. (1940). Time of concentration of small agricultural watersheds. Civil Engineering 10(6), 362.
  • Merkel, W.H. (2001), as cited in USDA NRCS NEH Part 630, Ch. 15 (2010), on the length of sheet flow.
  • ASCE and WPCF (1969). Design and Construction of Sanitary and Storm Sewers. ASCE Manual of Practice No. 37.
  • Texas Department of Transportation. Hydraulic Design Manual, Ch. 4, §12 Runoff Coefficients. https://www.txdot.gov/manuals/des/hyd/chapter-4--hydrology/section-12--rational-method/runoff-coefficients.html
  • Central Water Commission (1991). Flood Estimation Report for North Brahmaputra Subzone 2(a), Design Office Report No. NB/18/1991, placed before the Flood Estimation Planning and Co-ordination Committee at its 49th meeting (24–25 October 1990); isopluvials "supplied by I.M.D." (title block of the plates). Read from the Internet Archive copy (94 pages, scanned, read by optical character recognition): the unit hydrograph relationships, the design loss rate and base flow, and the table of ratios of t-hour to 24-hour rainfall checked against the page images; Table 7 (highest daily rainfall, with the Sikkim stations Singhik and Dikchu) and Plates 8, 9 and 10 read from the page images over Sikkim; the coverage text (pp. 8 and 28) and the river table (p. 29) read by optical character recognition; the areal reduction curves, the time distribution of rainfall, the worked example, the simplified formulae and the table of calibration catchments not checked [TBC]. http://web.archive.org/web/20160412153137id_/http://www.cwc.gov.in:80/main/downloads/North%20Brahmaputra%20subzone%202%20(a).Pdf
  • Central Water Commission. "Regional Flood Estimation Report" download page (no separate report for the Teesta or for Sikkim). https://cwc.gov.in/regional-flood-estimation-report
  • Moriasi, D.N. et al. (2007). Model evaluation guidelines for systematic quantification of accuracy in watershed simulations. Trans. ASABE 50(3), 885–900.
  • "OSD for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
  • India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): Gangtok (42299, rainfall data 1958–2012) and Tadong (22209, data 1978–2007), monthly and seasonal 24-hour and monthly records, page M190.
  • India Meteorological Department, Meteorological Centre Gangtok. Mean monthly meteorological parameters of Gangtok, 1981–2010 (M.O. Gangtok, 27°20′ N 88°38′ E, 1,765 m). https://mausam.imd.gov.in/gangtok/mcdata/climatology_gangtok.pdf
  • Central Ground Water Board. Aquifer mapping of East Sikkim (annual action plan 2022–23), the report for South Sikkim and the State assessment, as quoted in search summaries; the reports themselves could not be reached for this Manual [TBC].
  • Department of Mines and Geology, Government of Sikkim. Notification No. 17/DMG/20-21 of 19 March 2021 (Sikkim Government Gazette Extraordinary No. 86, 6 April 2021), site stability zonation parameters; read as Annexure R/2 to the counter-affidavit of the State respondents of 25 February 2022 in NGT (EZ) OA 5/2022, Dr. Bina Basnett v. State of Sikkim & Ors. https://www.greentribunal.gov.in/sites/default/files/news_updates/Counter%20Affidavit%20on%20behalf%20of%20R-,4,7,9%20in%20OA%205%20of%202022%20(EZ)%20(Dr.%20BINA%20BASNETT%20vs%20State%20of%20Sikkim%20&%20Ors.).pdf
  • Gangtok Smart City Development Ltd. Reply affidavit in NGT (EZ) OA 38/2022 (spring water and landslides at natural jhoras). https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20Affidavit%20filed%20by%20R-2,%20GSCDL,%20page%20698-1006.pdf
  • Government of Sikkim. Additional affidavit of 28 February 2026 in NGT (EZ) OA 171/2023 (the Teesta-III breach), with the pre-project report "GLOF Risk Mitigation in Lhonak Valley, Sikkim" (Annexure R-5: the raised Teesta bed, NHPC's estimates of bed rise, Toong Naga, the glacial lakes) and the status of the Teesta dams. https://www.greentribunal.gov.in/sites/default/files/news_updates/Additional%20affidavit%20on%20behalf%20of%20R-1,%20State%20of%20Sikkim,%20page%201038-1178.pdf
  • Gangtok Municipal Corporation. Waste-agency contract, Memo No. GMC/6727/III/2024/OL/01 of 8 October 2024 ("Clearing of Jhoras"), as annexed to the State's six-monthly report in NGT (PB) OA 606/2018. https://www.greentribunal.gov.in/sites/default/files/news_updates/SIX%20MONTHLY%20REPORT%20BY%20GOVT%20OF%20SIKKIM%20IN%20OA%20NO.%20606%20OF%202018%20FOR%20STATE%20OF%20SIKKIM%20(COMPLIANCE%20OF%20MSW%20MGT%20RULES,%202016%20AND%20OTHER%20ENVIRONMENTAL%20ISSUES).pdf
  • Sattar, A. et al. (2025). The Sikkim flood of October 2023: Drivers, causes and impacts of a multihazard cascade. Science. doi:10.1126/science.ads2659 (accepted manuscript read).
  • SANDRP transcriptions of CWC site tables for the Teesta, the Rongni Chu and the Rangit, and of the levels of 3–4 October 2023 (Khanitar, Melli, Singtam, Majitar), and a CWC daily bulletin of 2024 seen only as a search snippet (as reported).
  • A landslide-susceptibility study of Gangtok (as summarised), and reports on the geology of the Daling Group and the Gorubathan Formation (as reported).
  • US EPA. Storm Water Management Model (SWMM 5). US Army Corps of Engineers, Hydrologic Engineering Center. HEC-HMS and HEC-RAS.

Annexes and forms

Annex / Form Content
3A Sikkim soil series to HSG lookup; seasonal high water table map
3B Sikkim CN calibration and supplementary land covers (forest, terraced fields, slide scars, debris fans and hill-road cuts and fills, bare rock and scree, alpine pasture, moraine and snow, boulder-bed jhoras, the river bed raised in October 2023, and pokhari and reservoir beds)
3C Benchmark test problems for software acceptance
3D Peak rate factor study for flat coastal land
3E CWC SUH parameters for subzone 2(a), with worked example
Form 3-1 Hydrologic Calculation Summary
Form 3-2 Pre- vs Post-Development Comparison