Draft v1.0 prepared by NEER. Not adopted by the Government of Sikkim or any authority or local body, and has no legal force. About this draft

Chapter 6Minor and Major Drainage Systems


6.1 Purpose and scope

6.1.1 This chapter sets the level of service and the hydraulic criteria for the conveyance system that carries runoff from a development, a road or a public drainage scheme to a receiving waterway, tank or outfall. It covers:

  • (a) the dual drainage concept: a minor system and a major system (Clause 6.3);
  • (b) design return periods by land use and road class (Clause 6.4);
  • (c) street hydraulics: spread, depth and flow hazard (Clause 6.5);
  • (d) inlets, including clogging (Clause 6.6);
  • (e) pipes and open and covered drains (Clause 6.7);
  • (f) hydraulic grade line analysis (Clause 6.8);
  • (g) overland flow paths, ponding at sags and building floor levels (Clauses 6.9 to 6.11);
  • (h) culverts and road crossings (Clause 6.12); and
  • (i) Sikkim construction-practice requirements for covered drains, silt, solid waste, utilities and desilting access (Clause 6.13).

6.1.2 The detailed hydraulic design of individual structures (culverts, channels, energy dissipators, screens, pumps, gates, manholes) is in Chapter 9. Rainfall is in Chapter 2, runoff methods in Chapter 3, on-site storage in Chapter 4, tailwater in Chapter 5, waterbodies in Chapter 7 and water quality in Chapter 8.

6.1.3 This chapter applies to all public drains, all roads with kerbs or roadside drains, and all private drainage systems in developments that meet the applicability thresholds of Chapter 1. In Tier B local bodies, the simplified procedures and design aids referred to in Chapter 1 may be used for elements serving ≤ 16 ha, but the criteria of this chapter still apply.

Commentary. Sikkim's drains were not designed against any State or municipal standard: none was found during research, and no document found gives a design return period, runoff coefficient or drain size for any town. The Sikkim Building Construction Regulations, 1991 (SBCR 1991) have drainage clauses without numbers: roof gutters and down pipes "of such design and capacity that the water will neither spill out of them nor leak through them" (reg. 21), a "Pucca storm water/plinth protection drain … leading to the road side drain or to adjoining permanent drains or jhora" (reg. 25(iv)), and no occupation certificate "if the drain has not been provided to main outlet/jhora" (reg. 13(iii)). The drainage and landslip-protection projects of Gangtok's City Development Plan (2006) "were not taken up" (CAG, Report No. 3 of 2016); Gangtok Smart City Development Ltd (GSCDL) tendered "Construction of drainage and jhora training works", about ₹13.41 crore (as reported); and the ADB-funded Sikkim Integrated Urban Development Project includes "Improving about 60 km roads in seven towns with junction improvements, improved pavement and stormwater drains" (ADB 57230-001); no design storm was seen for either. The drains also work in a setting that the plains editions of this Manual do not meet. In Sikkim a jhora (झोरा; a natural watercourse or ravine stream) is a drain in law ("a jhora or water-course of natural drainage line", Sikkim Municipalities Act, 2007, s.2(24)), and rain water is to be "connected with the natural nullahs, khola-kholsas, jhoras, or storm water drainage" (s.193(b)), so the town drains end in jhoras, the jhoras in a khola (खोला; a river or large stream) and the kholas in the Teesta, the Rangit or the Rongni Chu. The slopes fail when water is put into them: the 2021 stability zones of the Mines and Geology Department grade a site partly by the state of its jhora, from zone 1, where the "Training of jhoras/drains have been completed and done properly (with safe distance)", to zone 4, with an "Untrained jhora/ erosional potential jhora" (Notification No. 17/DMG/20-21, 19 March 2021), and the springs (dhara, धारा; a spring or spring spout) that the towns and villages drink from emerge on the same slopes. Outside Gangtok's partial sewer network the drains carry the towns' sullage and septic effluent (Clause 8.9). The road drains of the hills are the drains of the land above them. And the drains are divided among owners: the Gangtok Municipal Corporation (GMC) and the other urban local bodies, the Forest Department for the river banks of the scheduled rivers, the Roads and Bridges Department (PWD), NHIDCL and BRO for the roads, the Water Resources Department (WRD), PHED, the Rural Management and Development Department (RMDD), GSCDL and the hydropower operators all build or hold drains and receiving waters, and no notification divides them (see the Commentary to Clause 6.9). A pokhari (पोखरी; pond, lake or tank) that receives drains is kept as storage (Chapter 7). Fixing the rainfall (Chapter 2) is only half the answer. The other half is a second, surface-level system that carries the flows the pipes cannot, without flooding buildings. That is the dual drainage concept of this chapter, taken from Kansas City Metro APWA Section 5600 (5601.8, Levels of Service), which requires every element to have a 1% AEP overflow path.


6.2 Definitions

Term Meaning in this Manual
Minor system Inlets, pipes, covered drains and open drains that carry runoff up to the minor design AEP of Table 6.1 without surcharge above the limits of Clause 6.8.
Major system The surface flow paths (streets, overland flow paths, open channels, floodways and storage) that carry flow above the capacity of the minor system, up to the 1% AEP (100-yr) event.
Overland flow path A defined surface route, in public land or a recorded easement, that carries major-system flow to a receiving waterway.
Spread (T) Width of flow in the gutter and carriageway, measured from the face of the kerb.
Sag A low point on a road or flow path from which water can leave only through an inlet or by ponding to an overflow level. A trapped sag has no surface overflow route.
Clogging factor The fraction of an inlet's clean hydraulic capacity assumed lost to debris (Clause 6.6.3).
Hydraulic grade line (HGL) The line joining the free-surface levels in a conduit system, or the piezometric levels where the system is under pressure.
Covered drain A rectangular drain, usually beside a road, closed by cast-in-situ or precast cover slabs that form a footpath.
Sediment allowance The depth or area of a drain or pipe assumed filled with silt when its design capacity is computed (Clause 6.7.8).
Check event An AEP rarer than the design AEP at which the combined minor and major system must still meet the limits of Table 6.2.
High-density area An area notified as such by the approving authority under Clause 6.4.4.
Class I area An urban local body with a population of 1 lakh or more (the CPHEEO definition).

6.3 The dual drainage concept

6.3.1 Every drainage system shall be designed as two systems that work together:

  • (a) a minor system that carries the minor design flow of Table 6.1 below ground or in drains, keeping streets usable and spread within Table 6.2; and
  • (b) a major system that carries all flow above the minor-system capacity, up to the 1% AEP (100-yr) flow, on the surface without entering buildings and within the depth and hazard limits of Clause 6.5.

6.3.2 Every element has a 1% path. Every inlet, sag, pipe, drain, culvert and storage element shall have an identified 1% AEP overland flow path to a receiving waterway, tank or outfall. The path shall be shown on the drainage plan (Clause 6.15).

6.3.3 Major-system design flow. The major system at any point shall carry the 1% AEP peak flow less the minor-system capacity at that point. The minor-system capacity used in this subtraction is the capacity of the inlets after the clogging factors of Clause 6.6.3, or the pipe capacity, whichever is less. At sags and at any location used to set building floor levels, the major system shall also be checked with the minor system fully blocked (Clause 6.10.3).

6.3.4 Rainfall and method. Design flows shall use the rainfall of Chapter 2 (including the climate factor of Clause 2.8) and the methods of Chapter 3:

  • (a) the Rational Method only for catchments ≤ 16 ha and a single conveyance element. It shall not be used to accumulate flows down a network whose total catchment exceeds 16 ha;
  • (b) a hydrograph method with hydraulic routing (for example SWMM, HEC-HMS with a hydraulic model, or an equivalent 1D/2D model) for networks above 16 ha and for any network with storage, pumping or a tidal outfall;
  • (c) a minimum time of concentration of 10 minutes.

6.3.5 No transfer between catchments. Neither the minor nor the major system shall divert flow from one natural catchment to another unless the approving authority accepts a catchment-wide study showing no adverse effect.

6.3.6 Drains that carry sewage, hill drains and jhora training. Outside Gangtok's sewered zones, the public drain or jhora that receives storm water from a site or a public drainage project in Sikkim normally also carries sewage and sullage, from septic tanks, soak pits and open connections (Clause 8.9); and on the slopes on which the ridge towns are built, the drains and jhoras also carry silt, gravel, boulders, slide debris and waste, and the water they spill or leak moves the slopes. This chapter applies to the storm-water system up to the point of connection and to every public drain and jhora, with the following additions (all set by this Manual).

Items (a) to (e) apply wherever the receiving drain or jhora carries dry-weather flow of sewage or sullage, whatever its owner calls it:

  • (a) Separation on site. Storm water and sewage, sullage included, shall be collected in separate systems within the site, each with its own last inspection chamber at the site boundary, so that the storm-water system can be connected to a separate public storm drain, without rework on the site, when one is built or when the sewers of the area are commissioned. Where the Authority allows only one connection to the receiving drain, the two systems shall meet only in a final chamber after both inspection chambers. The law already asks for this: within a municipal area there shall be one drain for sewage and "an entirely separate drain for rain water or unpolluted sub-soil water", and "the rain water shall be connected with the natural nullahs, khola-kholsas, jhoras, or storm water drainage" (Sikkim Municipalities Act, 2007, s.193 and proviso (b)). The building rule has the hooks but does not separate the flows on the ground: the blue-print plan shows "drainage including connection to main outlet" and the "sanitary/plumbing layout … drainage system … sewerage disposal system/septic tank and soak pit" (SBCR 1991, reg. 6), the building connects to the public sewer where one is available (reg. 25(ii)), and no occupation certificate is issued "if the sewerage connection is not fitted with the public sewer where feasible and if the drain has not been provided to main outlet/jhora" (reg. 13(iii)). In Gangtok's sewered zones, the site's sewage goes to the sewer and its storm water to the storm drain, and the two shall not be joined. Clause 6.13.7 applies to every storm drain within the site. No sullage and no roof or paved-area water shall be led to a soak pit or any other infiltration device on ground where the hill rule or the valley-floor rule of Clause 4.11 bars infiltration; this item does not override the septic tank "built within the site" and its soak pit that regs. 6, 13(iii) and 25(i) require, which are dealt with under Clause 8.9.
  • (b) No rise in the peak inflow. A development to which Chapter 4 applies shall meet Chapter 4 at each connection to a drain or jhora that carries sewage, as at any other site outfall (Clause 4.5.1.3). A development below the thresholds of Clause 1.5.2 shall not raise the peak inflow above that of the site before the development: where it adds impervious area, the roof water of the added area shall pass through a storage tank sized under the credit rule of Chapter 4, with a controlled overflow before it reaches the connection.
  • (c) Tailwater and backflow. The HGL of Clause 6.8 shall be started from the level in the receiving drain or jhora at the connection in the coincident event, taken from the owner's model where one exists and otherwise at the drain's obvert or top of bank (Clause 5.6.2). Where the receiving drain ends at an outfall that a jhora, a river, a reservoir or a pokhari can close, the outfall-closed check of Clause 5.10 applies with the lock of Clause 5.8.5. A non-return valve (Clause 6.8.8) shall be fitted on every connection, storm or foul, to a drain that carries sewage wherever the lowest drainage fitting or opening it serves is below the cover or bank level of the receiving drain at the connection.
  • (d) Capacity, velocity, access and odour. A public drain or jhora that carries sewage shall be designed as a combined channel until the sewers of its area are connected: its storm capacity used in Clause 6.3.3 shall be the capacity left after its dry-weather flow, measured or estimated from the population served; it shall reach the minimum velocity of Clause 6.7.3(a) at its dry-weather flow, or have a low-flow channel in its invert that does, so that sewage solids do not settle between storms; where it is covered, it shall have the access openings of Clause 6.13.2, with covers and vents placed so that odour does not reach homes, steps and footpaths; and it shall be cleanable by machine from those openings, without anyone entering it. Flow above its storm capacity, or above what the inlets admit, shall be carried on the surface by the major system (Clauses 6.3.2 and 6.9), never onto an unprotected slope, and floor levels shall be set under Clause 6.11 with the drain surcharged.
  • (e) Interception and screens before outfalls; separation planned by the Authority. Every public drain that carries sewage shall have dry-weather-flow interception and a screen before every outfall to a jhora that feeds a dhara, a pokhari or a drinking-water intake, and before every outfall within a town to the Rani Khola, the Roro Chu, the Rongni Chu or the Teesta, designed under Clause 8.9 so that it does not reduce the drain's storm capacity, and no new storm drain shall be brought to a pokhari without that treatment. No drain that carries sewage, and no storm outfall, shall discharge into or immediately above a dhara or within 15 m of one (the spring rule of Chapter 8). Every such screen shall also hold back the solid waste that the drains carry, with machine access and a place to stack what it catches that is not a jhora, a slope or a pokhari margin. The National Green Tribunal recorded, in its order of 4 July 2024 as the State quotes it, that "treated sewage is entering in to river/ rivulets/ jhoras and this is not permissible under the Water Act", and directed analysis of the "water quality of rivers including jhoras receiving sewage"; the State replied that "No sewage is disposed off in the rivers or fast flowing water bodies" (State's six-monthly report in O.A. No. 606 of 2018); this item does not depend on which is right. The Authority shall identify in its master plan (Chapter 11) the areas where a separate public storm drain is feasible, among them Gangtok's sewered zones as their connections are made; in every town, every public drain and jhora below a settlement shall be taken as one that carries sewage until sewers exist; and where a separate public storm drain is available at the site boundary, the site's storm-water system shall be connected to it and not to the drain that carries sewage. The Conveyance Design Report (Form 6-1) shall state whether each receiving drain or jhora carries sewage, the source of that information, and how items (a) to (e) are met.

Items (f) to (m) apply to every element of the minor and major systems that receives runoff from a hill catchment, which in this Manual means land in sub-areas SK-B, SK-B1 and SK-C of Annex 2A, any slope steeper than 10° in sub-area SK-A, any catchment whose natural ground slopes more than 10% on average, and every jhora, khola or other stream that comes down from the hills, including where it crosses valley-floor land; in Sikkim that is nearly every catchment (NEER reading). Throughout items (f) to (m), the drainage clauses of the SBCR 1991 (regs. 6, 13(iii), 21, 22, 25(iv) and 35) and the conditions of the 2021 stability zones are the hooks, and this Manual adds the hydrology and the numbers that they leave out:

  • (f) Debris racks and traps. Every inlet, drain or pipe entrance and culvert that receives flow from 1 ha or more of unbuilt hill land (forest, scrub, cultivated slope, bare slope, a cut or fill slope, spoil or a slide scar), or from a jhora or other hill stream whatever its catchment, shall have a debris rack or a debris trap upstream of it, designed under Chapter 9 (Clause 9.8), with machine access and a stable place to stockpile what it catches, which shall not be a slope, a jhora, a pokhari margin or the recharge area of a dhara. With 50% of the rack blocked, the element it protects shall still pass its design flow, and the overflow route shall not send the flow onto a building or an unprotected slope. Racks and traps shall be cleared by 31 March, again by 30 April after the April storms and before May, and after the season by 15 November; above about 2,500 m, where snow or frost prevents the March works, by 30 April and 31 May, with snow and ice cleared after every snowfall from December to March and the post-season clearance by 31 October (Chapter 10). Solid waste is debris for this item: GMC's waste agency is already responsible for the "Clearing of Jhoras" (GMC, Memo No. GMC/6727/III/2024/OL/01, 8 October 2024), and the blockage of item (h) includes it. The volume of a debris basin is to be set in Chapter 9 [TBC].
  • (g) Bulking factor. The design flow of every channel, drain, pipe, culvert and crossing that receives flow from a hill catchment shall be the clear-water peak flow of Chapter 3 multiplied by a bulking factor of 1.25, for the minor design flow, the check event and the 1% AEP flow; elsewhere the factor is 1.0. The factor applies to capacity, freeboard and velocity; it does not apply to the runoff volume used for storage (Chapter 4). A larger factor shall be used where a sediment study of the catchment gives one. No Sikkim debris or bulking allowance exists [TBC]. A catchment that the screening of Clause 2.3.6(i) shows to be prone to debris flow or landslides, such as the jhora gullies and debris fans of Mangan in June 2024 and of Chaten near Lachen in June 2025 (as reported), or that drains a slide scar, a debris path below a cut slope, a fill or a retaining wall, is not designed by a bulking factor: no building, outfall, pumping station or storage shall be placed in that path, and the drains are designed for the bulked flow only [TBC].
  • (h) Blockage. The blockage check of Clause 6.12.4 shall assume 50% of the inlet area blocked for every culvert and pipe entrance with a span or diameter below 3.0 m, and 20% for larger ones, whether or not a debris rack is provided. Grate inlets keep the clogging factor of Table 6.5, and kerb openings on grade take the sag value of 20%.
  • (i) Sediment and minimum velocity. Drains and pipes that receive flow from a hill catchment, or that run across the valley floors and terraces of SK-A, shall reach a velocity of at least 1.0 m/s at the minor design flow, in place of the minimum of Clause 6.7.3(a). Where the gradient does not allow it, a sediment trap shall be provided upstream and the sediment allowance of Clause 6.7.8 doubled (Clause 6.7.4).
  • (j) Steep drains, steep streets and outfalls onto slopes. Where the gradient of a drain gives a velocity above the limits of Clause 6.7.3(b), or a Froude number above 0.8, at the design flow, the drain shall be a lined chute, a stepped or baffled channel or a series of drop structures designed under Chapter 9 for the bulked flow of item (g), with the freeboard of Table 6.7 for steep channels and an energy dissipator at every change to a flatter gradient and at the outlet. Every outfall onto or down a slope, of a public drain, a road drain or a site, shall end in an energy dissipator and reach a stable natural channel or a jhora trained to item (m) through a lined chute, a stepped channel or a closed pipe, and shall not discharge onto an unprotected slope, fill or retaining wall. No drain shall be unlined on natural ground steeper than 10°, on colluvium, fill or slide debris, or in stability zones 3 to 6, because an unlined drain there is an infiltration path that the hill rule of Clause 4.11 does not allow. On a street steeper than 5%, grate-only inlets shall not be used, and inlets shall be placed by the calculation of Clause 6.6.4 with the bypass flows of a steep gutter; on a street steeper than 10%, the flow shall be intercepted by transverse grated channels or kerb inlets at a spacing that keeps the street flow within the limits of Table 6.3 in the check and 1% AEP events, and where the 1% AEP flow cannot be kept within those limits, the excess shall be carried in a lined side channel or stepped drain and the street, unless it is a notified evacuation route, is treated as closed in that event. Steps and footpaths that carry flow shall have a lined side channel.
  • (k) Hill roads as the minor system. On every road and street in a hill catchment as this clause defines it, among them NH-10 along the Teesta, which "has become prone to submergence and subsidence" (the Project Prefeasibility Report (PPR) on glacial-lake outburst flood (GLOF) risk mitigation in the Lhonak valley, annexed to the State's affidavit of 28 February 2026 to the National Green Tribunal) and whose drainage the High Court warned IRCON to correct in June 2025 (as reported), the drainage of a road is the minor system for the land above it as well as for the road. Every such road and street shall have, as works of the road's owner, the Roads and Bridges Department (PWD), NHIDCL, BRO or an urban local body: (i) a lined catch-water drain above every cut slope where the land above drains towards the road, discharging to a natural channel or a cross-drainage work and not over the cut; (ii) lined side drains on the hill side (IRC:SP:42-2014, cl. 8.5.1); (iii) a cross-drainage work at every jhora and stream, and culverts or scuppers at intervals such that no side drain exceeds its capacity at the design AEP of Table 6.1 with the factors of items (g) and (h); (iv) at the outlet of every scupper, culvert and side drain on the valley side, a lined chute, cascade or pipe carrying the flow to a stable natural channel, a trained jhora or a public drain, with an energy dissipator, so that road runoff is never discharged onto an unprotected slope, fill, retaining wall or the land of a building below, by the Roads and Bridges Department (PWD), NHIDCL, BRO or any other owner of a road; (v) culverts of at least the size of Clause 6.12.5, designed under Clause 6.12 and not less than IRC:SP:42-2014 cl. 7.1.4 requires for the road; where the drainage provisions of IRC:SP:48-1998, the Hill Road Manual, which were not read for this Manual [TBC], are stricter than this item, they apply; and (vi) no muck, spoil or excavated material from the construction, widening or maintenance of the road, or from hill cutting beside it, placed in or beside a jhora or another line of natural drainage, or on a slope from which a storm can carry it into one, and every jhora or drain that such material has blocked cleared by 31 March. The same items apply to the drainage of a railway formation in a hill catchment, among them the Sevoke–Rangpo line.
  • (l) Sloping sites: the building rule's drains and the hydrology they leave out. On a site where the land above drains towards a building, its cut or its retaining wall, the runoff of that land shall be intercepted above them by a lined catchment drain sized for the minor design flow of Table 6.1 from the land above it, with the factors of items (g) and (h), with a 1% AEP flow path that does not pass through or against the building. The space between a building and the cut or retaining wall above it shall be paved or lined and drained so that water does not stand against the building or soak into the foot of the cut, and both shall discharge to a public drain, a trained jhora or a stable natural channel as item (j) requires, not onto the slope below. Every retaining wall that holds up a slope shall have weep holes or weep pipes and a subsurface drain that discharge into a lined drain at its foot, not onto the slope below or into the backfill of a wall below. The building rule already sets the path, but not the size: roof water shall not "fall on any road/footpath", and the gutter and down pipe shall be "of such design and capacity that the water will neither spill out of them nor leak through them" and connected "to the storm water plinth protection drain of the building" (SBCR 1991, reg. 21); the "Pucca storm water/plinth protection drain" shall lead "to the road side drain or to adjoining permanent drains or jhora to drain off the surface water" (reg. 25(iv)); and spoil shall not be dumped on "drains, gullies and jhoras", on a fine of ₹500 at the least (reg. 22), with a refundable security of ₹5,000 against spoil dumped "at road side including drain" and damage to "the road including drainage system" (Form III, cl. 15). The 2021 stability zones add the condition for review of a site's zone: "Proper channelization of surface runoff by providing catchment drains especially during the rainy seasons and connect it to natural waterways/Jhora which also improves the stability of the area due to reduced erosions and percolation of water" (Notification No. 17/DMG/20-21, 19 March 2021). This Manual adds what they leave out: every gutter, down pipe, plinth drain, catchment drain and conduit that carries a site's or an uphill site's water shall be sized for the minor design flow of Table 6.1 from its whole tributary area, with the rainfall of Chapter 2, the factors of items (g) and (h) and the freeboard of Table 6.7, and checked for a 1% AEP flow path that does not pass onto a building or an unprotected slope; the jhora or road drain it reaches shall be checked under Clause 5.8.5(a) or (g); and a catchment drain shall reach a jhora only where that jhora is trained to item (m) or passes the check of Clause 5.8.5(a). Roof and paved-area runoff on such a site follows the hill rule of Clause 4.11. No building shall be allotted or regularised "in any sinking area, landslide prone or in areas having scars of old landslides or in slope exceeding or around 70 (Seventy) degree" (reg. 35), and no drain of this item shall discharge to such an area. Outside the notified areas no building permission under the regulations applies: this item reaches public works and any body that adopts this Manual, and is guidance for a household elsewhere (Chapter 1).
  • (m) Jhora training. Where this Manual, a consent or a stability-zone review requires a jhora to be trained, or where a project trains one, "training" means, for this Manual, all of the following (set by this Manual): (i) a channel that carries the 1% AEP flow of the jhora's whole catchment, post-development, with the bulking factor of item (g) and the freeboard of Table 6.7 for steep channels; (ii) toe and bed protection against scour, with the foundations of walls and linings taken below the scour depth computed under Chapter 9 (Clause 9.6) for that flow; (iii) drop structures or check dams with energy dissipation at each fall, designed under Chapter 9, so that the velocity limits of Chapter 9 for the lining are met between falls; (iv) a debris basin or debris rack upstream of every culvert and closed reach (item (f)); (v) a maintenance access, with the access width of Clause 6.9.4 where the ground allows it and steps and anchor points where it does not, so that the channel, the falls and the basins can be cleared on the dates of item (f); (vi) no reduction of the jhora's 1% AEP capacity at any section, by a wall, a crossing, a pipe, a check dam or the sediment a check dam holds; (vii) no culverting of an open jhora, other than a road or path crossing designed under Clause 6.12; and (viii) no diversion of a jhora from its course without a corridor for the new course under Chapter 7 and the downstream check of Clause 5.8.5(a). Training shall be done outside the State's monsoon excavation ban, by the agency that executes the work, and recorded in the drain and jhora register (Clause 6.9) with its date and its next inspection. This is the technical content that this Manual gives to the 2021 stability zones' "Training of jhoras/drains have been completed and done properly (with safe distance)" (zone 1) and to the condition for review "Training of untrained Jhora and maintenance at regular intervals which is located adjacent to the plot" (Notification No. 17/DMG/20-21, 19 March 2021); the Mines and Geology Department could cite it in those conditions, and has not done so. A trained jhora remains a jhora: the municipality's duty to "protect any jhora, whether on a public land or on a private land, within the municipal area" (Sikkim Municipalities Act, 2007, s.172(2)) and the corridor of Chapter 7 apply to it. Training is not a substitute for the storage of Chapter 4, and a jhora shall not be lined, stepped or walled where the check of Clause 5.8.5(a) shows that it is stable and carries the post-development flow as it is.

Commentary. The CPHEEO (2019) manual defines major and minor systems in its glossary but gives no return period for the major system. APWA 5600 (2006, 5601.8) requires the system to convey the 1% peak and, where in-system capacity is less, an overflow system to carry the remainder. Clause 6.3.3 subtracts only the clogged inlet capacity, not the full pipe capacity, because in practice the pipes cannot take more water than the inlets admit. The fully-blocked check at sags has no direct precedent; this Manual sets it because of the Gangtok experience that drains under footpaths are often silted or blocked by solid waste when the heaviest rain arrives (CPHEEO 2019 Part A, Ch 1 and 2, Figures 1.2 and 2.1 on solid waste dumping in drains). The prohibition on inter-catchment transfer follows the DID Malaysia 2008 submission checklist, which prohibits inter-catchment diversion. Clause 6.3.6 is set by this Manual for Sikkim, and it has two parts because the State's drains fail in two ways that the criteria of this chapter, which assume clear storm water on gentle ground, do not see. The first is sewage. The State estimates the urban sewage at 29.51 MLD against 22.71 MLD of treatment capacity installed, 17.90 MLD operational and 15.22 MLD actually treated, all of it at Gangtok's plants, and says that "Sewage of towns and areas where there is no Sewage Treatment Plants is treated through anaerobic digestion in the septic tanks of individual households" (September 2025 progress report annexed to the State's affidavit of 19 December 2025 to the National Green Tribunal); the sewerage of Namchi and Jorethang "has remained stalled since the year 2013 and 2015 respectively" (same affidavit); in Soreng the effluent of septic tanks and soak pits goes "into the open storm water drains ultimately discharging into the farmland / water bodies" (ADB due-diligence report, December 2024); and at Melli households that "had constructed their own septic tank … were reluctant to connect" to the new plant (CAG, Report No. 3 of 2016). The National Green Tribunal and the State disagree on whether sewage reaches the jhoras (item (e)). The law already separates the flows on paper: s.193 of the Municipalities Act requires "an entirely separate drain for rain water", and the building rule asks for a public-sewer connection where one is available (SBCR 1991, reg. 25(ii)). Items (a) to (e) follow the combined-sewer rules of the plains editions of this series: a site keeps its storm water separate up to the boundary, so that the town can separate its system street by street as sewers come, without going back into every plot; a development does not add to the peak of a drain that carries sewage; a non-return valve guards every connection, because what comes back up a surcharged drain is sewage; the drain is designed as the combined channel it is, with its capacity taken net of its dry-weather flow and a low-flow channel so that sewage solids do not settle in it between storms; and the outfall to a jhora that feeds a spring, a pokhari or an intake, or to a town's river, is intercepted and screened. Item (a) keeps sullage and roof water out of soak pits on the slopes because the hill rule of Clause 4.11 bars infiltration there, while regs. 6, 13(iii) and 25(i) of the SBCR 1991 still require a septic tank and soak pit for every building without a sewer; the Manual states that conflict and does not resolve it (Clauses 4.11 and 8.9). Item (e) protects the springs (dhara) because "about 80%" of rural Sikkim is reported to depend on them (as reported), and its 15 m is the Manual's Zone 1 width, since Sikkim has no statutory distance from a water source. Separation itself is for the Authority to plan, not for each site.

The second is the hills. The ridge towns stand on phyllite, schist and gneiss under thin soils and colluvium, and the slopes fail when water is put into them. The 2021 stability zones of the Mines and Geology Department say so in their own terms: zone 3 has groundwater "Medium to high" and ground that is "Wet", zone 4 ground that is "Dripping", with "Gully erosion & collapse of jhora facing slope", and is "Not suitable for habitation unless immediate protective measures" are taken (Notification No. 17/DMG/20-21, 19 March 2021); GSCDL told the National Green Tribunal that "landslides are caused mainly due to loose soil by spring water generated at natural Jhora" (reply in OA 38/2022); and the June 1997 landslides in Gangtok, in a month that brought 1,281.3 mm, Gangtok's highest monthly total, with 223.8 mm on 9 June (IMD), are reported to have killed 38 people (a single source, as reported). The roads are where the water is concentrated: NH-10 along the Teesta has become "prone to submergence and subsidence" (PPR, 2026), it was submerged by the Teesta in July 2025, and the High Court warned IRCON, which is building the Sevoke–Rangpo railway, to correct damage to NH-10's drainage (June 2025) (both as reported). No Sikkim allowance for debris, bulking or blockage was found during research [TBC], and no Indian guidance on bulking factors, debris racks or debris basins [TBC], so each number in items (f) to (l) is the interim value of the hill and mountain editions of this series, with the same reasons. The 1 ha trigger for a debris rack reflects the few minutes' time of concentration on hill slopes. The bulking factor of 1.25 is the factor for a flow that carries a fifth of its volume as sediment (bulking factor = 1 / (1 − sediment fraction by volume)), about the most that a drain can carry and still behave as a water flood; a flow with more behaves as a debris flow, which no drain can be sized for, so item (g) keeps buildings and outfalls out of its path. The 3.0 m limit in item (h) doubles the core's 1.5 m because boulders, timber and waste block openings that leaves alone do not. The 1.0 m/s minimum in item (i) replaces the 0.6 m/s of CPHEEO, which is based on carrying fine sand of 0.09 mm, because hill drains carry gravel. The mid-season clearance of item (f) is due by 30 April, not by 31 May or 15 May as in most other North-East editions of this series, because the two largest 24-hour falls recorded in the State fell in May, at Singhik on 12 May 1981 and at Gangtok on 30 May 1975 (Chapters 2 and 10). IRC:SP:42-2014 (cl. 8.5.1) already treats hill roads differently, with lined side drains and culverts at closer intervals than in plain areas, and item (k) keeps road runoff off unprotected slopes because water discharged onto a slope raises its pore pressure (Clause 4.11). Item (j) bars unlined drains on steep ground, colluvium, fill and the unstable zones, because an unlined drain there is the infiltration that the hill rule forbids. Item (l) takes the drainage clauses of the SBCR 1991, which fix the path of a building's water (gutter, down pipe, plinth drain, road drain or jhora) but no size, and the catchment-drain condition of the 2021 zones, as the minimum layer, and adds the design storm, capacity and freeboard that they leave out.

Item (m) is new in this series. The State's building rule already ties a site's buildability to its jhora, from zone 1, where the "Training of jhoras/drains have been completed and done properly (with safe distance)", to zone 4, with an "Untrained jhora/ erosional potential jhora", and makes "Training of untrained Jhora and maintenance at regular intervals which is located adjacent to the plot" a condition for reviewing a site's zone; but no document found during research says what "training" or "properly" means in numbers, and no design storm was seen for GSCDL's "Construction of drainage and jhora training works" (about ₹13.41 crore, as reported) [TBC]. Item (m) supplies that meaning. The 1% AEP capacity with bulking matches the major-system standard of this chapter, because a jhora is the major system of a ridge town; toe and bed protection and drop structures are what stop the "Gully erosion & collapse of jhora facing slope" of zone 4; the debris basin and the access keep the trained channel working after the first storm; and the three prohibitions, no loss of capacity, no culverting and no diversion without a corridor, stop training from becoming a way to build over or move a jhora that s.172(2) of the Municipalities Act says the municipality "shall protect". The last sentence of item (m) keeps training to the jhoras that need it: the problem of most jhoras is the water and debris put into them, not their roughness, and storage on the sites above (Chapter 4) comes first.


6.4 Design return periods

6.4.1 The minor system, roads and crossings shall be designed for the AEPs of Table 6.1. Where both a land-use row and a road-class row apply to an element, the rarer AEP (longer return period) governs.

Table 6.1 — Design AEPs for conveyance (matches Clause 2.4)

Element Design AEP (return period) Check event Basis
Minor system: Gangtok, Namchi, Jorethang and Rangpo core and other high-density areas 10% (10-yr) 1% (100-yr) overland path This Manual (see Commentary)
Minor system: other Class I areas 20% (5-yr) 1% overland path This Manual; CPHEEO Table 4.1
Minor system: other areas 50% (2-yr) 1% overland path This Manual; CPHEEO Table 4.1
Arterial road drainage and crossings 2% (50-yr) for arterials that are notified evacuation or emergency routes; 4% (25-yr) for other arterials Next higher AEP: 1% for a 2% design; 2% for a 4% design This Manual (25–50-yr); split set by this Manual
Collector road drainage and crossings 4% (25-yr) 2% (50-yr) This Manual
Local road drainage and crossings 10% (10-yr) 4% (25-yr) This Manual
Road underpasses and other trapped sags on public roads 2% (50-yr) 1% (100-yr) This Manual (Clause 6.10.5)
Airports, railway stations, power stations and other critical infrastructure 1% (100-yr) in Class I areas; 2% (50-yr) elsewhere — CPHEEO 2019 Table 4.1
Major (overland) system, every element 1% (100-yr) — This Manual
Building floor levels 1% level + 0.5 m freeboard — This Manual (Clause 6.11)

6.4.2 Check events. At the check event of Table 6.1, the combined minor and major system shall carry the check-event flow within the 1% AEP limits of Table 6.2 and without water entering any building. The 1% overland path requirement of Clause 6.3.2 applies in addition to the check event.

6.4.3 Higher standards. An approving authority may adopt a rarer AEP for any element, including through the high-powered committee route in Note 2 of CPHEEO Table 4.1. It shall not adopt a more frequent AEP than Table 6.1.

6.4.4 High-density areas. The approving authority shall notify, by map, the high-density areas to which the 10% AEP minor-system standard applies. Until it does, the 10% AEP standard applies to:

  • (a) in Gangtok, the sewered zones of the city served by the treatment plants at Adampool, Ranipool, Lower Sichey, Lower Syari and Tathangchen (State affidavit to the National Green Tribunal, December 2025), with MG Marg, whose back drainage GMC was reported to have begun refurbishing (as reported); with the boundary of each, and whether it is densely built, to be confirmed by GMC [TBC]; and in Namchi, Jorethang and Rangpo, the older, densely built core of each town, to be identified by its urban local body [TBC];
  • (b) in every other municipal area and notified area, the area that a development plan identifies as the core area once the Sikkim Town and Country Planning Act, 2024 (enacted in 2024 and amended in 2025, not yet commenced) is in force and such a plan is published, and until then the main bazaar and the densely built centre of the town as its local body identifies them by map [TBC]; and
  • (c) any area in a Tier A body where the master plan permits a floor space index above the base value for the zone.

6.4.5 Retrofit. Where an existing drain cannot practicably be enlarged to the Table 6.1 AEP, the shortfall shall be made good by upstream storage (Chapter 4), regional storage (Chapter 7) or an improved major-system path. The approving authority shall record the residual level of service.

Commentary. The values in Table 6.1 match the Clause 2.4 summary and add rows for underpasses and critical infrastructure. They exceed the CPHEEO (2019) national advisory minimums of 5-yr for Class I cities and 2-yr elsewhere (CPHEEO Part A, Table 4.1). Note 2 of that table allows a State committee to adopt higher values. The 10-yr tier for high-density areas follows Gupta (IIT Bombay), who recommends "1 in 10 year for residential-high density", and Malaysia's MSMA 2, which uses 10-yr minor and 100-yr major systems for link houses, apartments, commercial and industrial land. The road values resolve a conflict in Indian codes. IRC:SP:50-2013 recommends 1–2 years for urban road drains. IRC:SP:42-2014 suggests 25 years for urban roadside drains and a check flood at the next higher return period. APWA 5600 (2006) uses 50-yr for arterial, 25-yr for collector and 10-yr for residential street crossings. Table 6.1 adopts the APWA tiers and the IRC:SP:42 check-flood concept. Splitting arterials into 50-yr evacuation routes and 25-yr others has no direct precedent and is set by this Manual. The 50-yr standard for underpasses is likewise set by this Manual, because an underpass is a trapped sag where the failure mode is deep water on a live carriageway. The default high-density areas in Clause 6.4.4 are set by this Manual and apply until the approving authority notifies a map.


6.5 Street hydraulics: spread, depth and flow hazard

6.5.1 Gutter flow. Flow in a triangular kerb-and-gutter section shall be computed with the modified Manning (Izzard) equation:

Q = (Ku / n) · Sx^(5/3) · SL^(1/2) · T^(8/3)

where Q is the gutter flow (m³/s), Ku = 0.376 (SI), n is the Manning roughness of the gutter (Table 6.6), Sx is the cross slope (m/m), SL is the longitudinal slope (m/m) and T is the spread (m). Composite and depressed gutter sections shall be analysed by the methods of FHWA HEC-22 (4th edition, 2024).

6.5.2 Spread and depth limits. Street flow shall not exceed the limits of Table 6.2.

Table 6.2 — Street flow limits

Road class Minor design event (Table 6.1) Check event and 1% AEP event
Arterial Spread shall leave at least one through lane in each direction clear of water. No flow across the crown. Depth ≤ 150 mm at the crown and ≤ 350 mm at the deepest point; hazard limits of Clause 6.5.3
Collector Spread T ≤ 3 m. No flow across the crown except at a sag intersection. As above
Local Spread T ≤ 3 m. Flow shall not overtop the kerb. As above
All classes, at intersections Cross-flow over the crown ≤ 0.03 m³/s at sag intersections and superelevation transitions; none at mid-block sags. As above

6.5.3 Flow hazard limits. In the check event and the 1% AEP event, the product of depth (D, m) and velocity (V, m/s) of street and overland flow shall not exceed the limits of Table 6.3.

Table 6.3 — Flow hazard limits for streets and overland flow paths

Location Required hazard class (Table 6.4) Limits
Carriageways of all roads H2 or better D·V ≤ 0.6 m²/s; D ≤ 0.35 m (Table 6.2); V ≤ 2.0 m/s
Footpaths, pedestrian crossings, school, hospital and transit-stop frontages H1 D·V ≤ 0.3 m²/s; D ≤ 0.3 m; V ≤ 2.0 m/s
Notified evacuation and emergency routes H1 D·V ≤ 0.3 m²/s; D ≤ 0.3 m; V ≤ 2.0 m/s
Overland flow paths in public open space or easements, away from roads H3 or better, with warning signs D·V ≤ 0.6 m²/s; D ≤ 1.2 m; V ≤ 2.0 m/s

Table 6.4 — Combined flood hazard vulnerability classes (reproduced for reference)

Class Description D·V limit (m²/s) Depth limit D (m) Velocity limit V (m/s)
H1 Generally safe for vehicles, people and buildings ≤ 0.3 0.3 2.0
H2 Unsafe for small vehicles ≤ 0.6 0.5 2.0
H3 Unsafe for vehicles, children and the elderly ≤ 0.6 1.2 2.0
H4 Unsafe for vehicles and people ≤ 1.0 2.0 2.0
H5 Unsafe for vehicles and people; buildings vulnerable to structural damage ≤ 4.0 4.0 4.0
H6 Unsafe for vehicles and people; all buildings vulnerable to failure > 4.0 — —

Source: AIDR Guideline 7-3, Technical flood risk management guideline: Flood hazard (2014), Tables 1 and 2, modelled after Smith and Wasko (2012).

6.5.4 Depth and velocity for Clause 6.5.3 shall be taken from the gutter-flow calculation for simple sections, or from a 1D or 2D hydraulic model where flow leaves the kerb-and-gutter section.

Dual drainage street cross-section Minor and major (dual) drainage in a kerbed street: section (not to scale) 1% AEP water level Road boundary Road boundary Footpath Plinth Building Lowest habitable floor and openings ≥ 0.5 m freeboard above 1% level Building Crown ≤ 150 mm at crown (1% AEP) ≤ 350 mm at deepest point (1% AEP) Minor-event spread T (≤ 3 m on local streets; one lane clear on arterials) Kerb inlet with silt sump Minor-system pipe: design AEP per Table 6.1; HGL ≥ 0.3 m below inlet rim (Clause 6.8) Major system: the street carries flow above pipe capacity along its length, up to the 1% AEP flow Minor (design) event flow 1% AEP (major) event Limit set by this Manual Silt sump Vertical scale exaggerated. Values are the Chapter 6 criteria (Clauses 6.5, 6.8 and 6.11).

Figure 6.1 — Minor and major drainage in a kerbed street. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 (2006, 5601.8) and FHWA, HEC-22 Urban Drainage Design Manual (4th ed., 2024).

Commentary. The Izzard form of Manning's equation with Ku = 0.376 is used both in FHWA HEC-22 and in the CPHEEO (2019) manual (Part A, Example 5.5, where the constant is written Kc = 0.376). The arterial spread rule (one lane clear) and the 3 m spread for local and collector streets are close to the APWA 5600 (2006, 5604.2) limit of 12 ft (3.66 m) from the back of kerb in each outside lane. The cross-flow limit of 0.03 m³/s is the SI equivalent of the APWA limit of 1.0 cfs at intersection sumps and superelevation transitions, with no cross-flow at mid-block sumps. The 150 mm and 350 mm depth limits are close to the APWA 5600 limits for 1% overflow at road crossings (7 in, about 180 mm, at the crown; 14 in, about 360 mm, at the deepest point). Mumbai's criterion of no flooding above 15 cm (IRC:SP:50-2013, §6.4.1) is a local precedent for the 150 mm crown value.

The hazard classes of Table 6.4 are the combined hazard curves published by the Australian Institute for Disaster Resilience (AIDR Guideline 7-3, 2014), which are modelled after Smith and Wasko (2012). Requiring H2 or better on carriageways means the 1% depth limit of 350 mm (Table 6.2) governs the depth, and the D·V product controls fast, shallow flow on steep streets. H2 is described as "unsafe for small vehicles". Two-wheelers are the dominant vehicles on Sikkim streets, so the 1% event must be treated as a road-closure event on all roads except notified evacuation routes, which must meet H1. The assignment of hazard classes to locations in Table 6.3 has no direct precedent and is set by this Manual.


6.6 Inlets

6.6.1 Inlet types. Inlets may be kerb-opening inlets, grate inlets, combination inlets (a grate with a kerb opening) or slotted and trench drains. On public streets:

  • (a) kerb-opening or combination inlets shall be used, unless the approving authority accepts grate-only inlets for a specific location;
  • (b) inlet openings shall be set at road level, with a gutter depression where practicable, so that water is not held on the carriageway by a raised kerb or footpath;
  • (c) grates in carriageways, cycle lanes and footpaths shall be of a bicycle- and pedestrian-safe pattern (Chapter 9, Clause 9.11).

6.6.2 Inlet capacity. The clean capacity of inlets on grade and in sags shall be computed by the methods of FHWA HEC-22 (4th edition, 2024), or from tested ratings published by the manufacturer for the exact grate and kerb-opening geometry. The empirical kerb-inlet equations of CPHEEO (2019) Part A §5.6.2 may be used as a cross-check only.

6.6.3 Clogging factors. The design capacity of every inlet shall be its clean capacity reduced by the clogging factors of Table 6.5:

Table 6.5 — Inlet clogging factors (share of clean capacity assumed lost)

Inlet type On grade In a sag
Grate 50% 50%
Kerb opening 10% 20%
Combination Apply the grate and kerb factors to each part separately Apply the grate and kerb factors to each part separately

Design capacity = (1 − clogging factor) × clean capacity.

6.6.4 Inlet spacing. Inlets shall be located by a sequential calculation that starts at the top of each gutter run. At each inlet, the intercepted flow is computed, and the bypass flow is added to the gutter flow arriving at the next inlet. Spacing shall be such that the spread limits of Table 6.2 are met everywhere in the minor design event. In addition:

  • (a) inlet spacing shall not exceed 30 m on kerbed roads, whatever the calculation gives;
  • (b) inlets shall be provided at every sag, immediately upstream of pedestrian crossings and intersections, upstream of bridge decks and superelevation transitions, and at the end of every gutter run;
  • (c) bypass flow from the last inlet of a run shall not be passed onto a road of a higher class or into private land.

6.6.5 Sag inlets. At a sag on a kerbed road:

  • (a) the sag inlet's design capacity (after clogging) shall be not less than the total minor design flow arriving at the sag;
  • (b) flanking inlets shall be placed on each side of a sag on any road where ponding could spread beyond the Table 6.2 limits, and at every underpass;
  • (c) the ponding at the sag shall comply with Clause 6.10.

6.6.6 Inlet connections. The pipe connecting an inlet to the main drain shall have a diameter of at least 300 mm and shall be laid at a gradient that gives at least 0.9 m/s at the inlet's design flow.

6.6.7 Silt sumps. Every inlet chamber on a public road shall have a silt sump at least 300 mm deep below the invert of its outlet pipe, accessible for cleaning from the surface.

Inlet spacing, spread and clogging plan Gutter spread, inlet interception and clogging: plan (not to scale) Footpath Kerb Crown / lane line Spread limit T(max), Clause 6.5 Longitudinal grade Inlet on grade: intercepts Qi = E·Q; the bypass flow goes to the next inlet Inlet spacing: set so that T ≤ T(max) Sag: main inlet plus flanking inlets; ponding limit and overflow path (Clause 6.10) Clogging factors (share of clean capacity lost), Clause 6.6 Inlet type On grade Sag Grate 50% 50% Kerb opening 10% 20% Combination Each part as above Each part as above Gutter flow spread (minor event) Ponding at sag Assumed clogged portion Kerb opening

Figure 6.2 — Gutter spread, inlet interception and clogging. Original drawing for this Manual, adapted from FHWA, HEC-22 Urban Drainage Design Manual (3rd ed., 2009; 4th ed., 2024) and CPHEEO, Manual on Storm Water Drainage Systems (2019).

Commentary. The clogging factors are more severe than the APWA 5600 (2006, 5604.2) rating of sump inlets at 80% of theoretical capacity (a 20% reduction), because grates in Sikkim streets are routinely blinded by plastic and leaves. CPHEEO (2019) Part A shows solid waste dumped in drains as a primary cause of drain failure (Figures 1.2 and 2.1). APWA 5600 (2006) allows only kerb-opening inlets on public streets; Clause 6.6.1(a) is less strict because combination inlets are useful on flat roads. No standard inlet, kerb-channel or covered-drain detail of the Roads and Bridges Department (PWD), of GMC or of another urban local body was found during research [TBC]; the building rule asks only that roof water go by gutter and down pipe to "the storm water plinth protection drain of the building" (SBCR 1991, reg. 21) and that the plinth drain lead to "the road side drain or to adjoining permanent drains or jhora" (reg. 25(iv)), and it sets no inlet. The 30 m maximum spacing and the treatment of combination inlets in Table 6.5 have no direct precedent and are set by this Manual. Roads on the valley floors of Rangpo, Singtam, Melli, Majitar and Jorethang are flat, which shortens the calculated spacing anyway; on the steep streets of Gangtok, Namchi, Gyalshing and the other ridge towns gutter flow runs fast and passes inlets by, which Clause 6.3.6(j) deals with. A fixed cap stops a single blocked inlet from leaving a long dry gutter run. The 300 mm silt sump is set by this Manual. It matches the 0.3 m sump shown on the CPHEEO catch-basin detail (CPHEEO 2019, Figure 5.9).


6.7 Pipes and open and covered drains

6.7.1 Uniform flow. Pipe and drain capacity shall be computed with Manning's equation:

V = (1/n) · R^(2/3) · S^(1/2); Q = A · V

where V is the mean velocity (m/s), n is the Manning roughness (Table 6.6), R is the hydraulic radius (m), S is the friction slope (m/m), A is the flow area (m²) and Q is the discharge (m³/s). Where backwater from a tailwater, a junction or a structure affects the water level, a gradually varied flow (standard step) or hydraulic network model shall be used, and the HGL requirements of Clause 6.8 apply.

6.7.2 Manning roughness. Design values of n shall be taken from Table 6.6. For concrete pipes and masonry or concrete drains, the design value shall be not less than the "fair" or "rough" condition value listed, to allow for sediment, biofilm and ageing.

Table 6.6 — Manning's n for design (from CPHEEO 2019)

Material Condition n (CPHEEO) Minimum design n in this Manual
Cement concrete pipe (collar joints) Good / fair 0.013 / 0.015 0.015
Spun concrete pipe (RCC, PSC) with S/S joints Manufacturer's design value 0.011 0.013
HDPE / uPVC pipe — 0.010 0.011
Plastic (smooth), asbestos cement — 0.011 0.011
Concrete drain, steel trowelled / wood trowelled — 0.014 / 0.015 0.015
Sand and cement plaster — 0.015 0.015
Brick masonry Good / rough 0.015 / 0.017 0.017
Masonry Bad condition 0.020 0.020
Rubble set in cement — 0.017 0.017
Earth channel Regular, good / ordinary 0.020 / 0.025 0.025
Earth channel With stones and weeds / poor 0.030 / 0.035 0.035
Earth channel Partly obstructed by debris or weeds 0.050 0.050
Gutter: concrete — 0.013 0.013
Gutter: hot-mix asphalt — 0.015 0.015
Gutter: sprayed seal — 0.018 0.018

Source of the CPHEEO column: CPHEEO (2019) Part A, Table 5.1 (itself from the CPHEEO Manual on Sewerage and Sewage Treatment Systems, 2013) and Table 5.8 (gutters).

6.7.3 Velocity limits. At the minor design flow:

  • (a) minimum (self-cleansing) velocity: 0.6 m/s in open and covered drains and 0.9 m/s in pipes;
  • (b) maximum velocity: 3.0 m/s in lined drains and in pipes, unless the drain or pipe is designed as a chute under Chapter 9. CPHEEO permits up to 6.0 m/s in plastic or plastic-lined pipes in hilly regions; this may be used in Gangtok, Pakyong, Namchi, Ravangla, Gyalshing, Pelling, Soreng, Mangan, Lachen, Lachung and other hill towns with the approving authority's agreement;
  • (c) maximum velocity in unlined and vegetated channels: Chapter 9, Table 9.2;
  • (d) the Froude number of flow in open and covered drains shall not exceed 0.8 at the design flow, unless the drain is designed for supercritical flow under Chapter 9.

6.7.4 Gradient. Each pipe and drain shall be laid at a gradient that achieves Clause 6.7.3(a). Where flat terrain or a fixed outfall level makes this impossible, the designer shall:

  • (a) report the velocity achieved;
  • (b) double the sediment allowance of Clause 6.7.8; and
  • (c) provide access for mechanical desilting at the spacing of Clause 6.13.2.

6.7.5 Pipe flow condition. Pipes shall be sized so that the minor design flow does not exceed the pipe-full capacity. The greater discharge that a circular pipe carries at about 0.95 of its depth shall not be relied on.

6.7.6 Minimum sizes.

  • (a) Pipes: 300 mm internal diameter; 450 mm for public mains.
  • (b) Open drains: bed width 0.3 m.
  • (c) Covered public drains (drains closed by cover slabs): clear internal width 0.6 m and clear internal depth 0.6 m.

6.7.7 Cover to pipes. Pipes shall have at least 0.6 m of cover to finished level, and at least 0.9 m under carriageways unless a structural design for the traffic load is submitted. Where the seasonal high groundwater table is within 1 m of the pipe crown, the pipe shall be checked for flotation with the pipe empty (CPHEEO 2019, Table 11.2) and anchored where necessary.

6.7.8 Sediment allowance. The design capacity of open drains, covered drains and pipes of 600 mm diameter or more shall be computed with the following depth of sediment at the invert:

  • (a) open and covered drains: the greater of 75 mm and 10% of the clear internal depth;
  • (b) pipes of 600 mm diameter or more: 5% of the internal diameter;
  • (c) pipes below 600 mm: no allowance, but Clause 6.7.3(a) shall be met.

The Manning n for the reduced section shall be that of the drain material in Table 6.6.

6.7.9 Freeboard in open and covered drains. At the minor design flow, the water surface (computed with the sediment allowance) shall be below the top of the drain wall, or below the soffit of the cover slab in a covered drain, by at least the freeboard of Table 6.7.

Table 6.7 — Minimum freeboard in open and covered drains

Drain Minimum freeboard Source
Bed width up to 300 mm 100 mm CPHEEO 2019 Table 5.3 (from IRC:SP:50-2013)
Bed width 300–900 mm 150 mm CPHEEO 2019 Table 5.3
Bed width 900–1,500 mm 300 mm CPHEEO 2019 Table 5.3
Wider drains and engineered channels, Q < 3 m³/s 450 mm CPHEEO 2019 Table 5.12 (from IS 7784 (Part 1): 1993)
Q 3 to < 30 m³/s 600 mm As above
Q 30 to < 300 m³/s 900 mm As above
Q 300 to < 3,000 m³/s 1,200 mm As above
Q ≥ 3,000 m³/s 1,500 mm As above
Any roadside drain Not less than 150 mm IRC:SP:42-2014
Steep (supercritical) channels Equal to the flow depth CPHEEO 2019 §5.3.2

At bends, the freeboard shall be measured from the water level on the outside of the bend, including the superelevation Δy = V²T / (2 g rc), where T is the top width and rc the centreline radius (CPHEEO 2019, Eq. 5.29).

6.7.10 Bends and junctions.

  • (a) The centreline radius of a bend in a drain shall be at least 3 times the drain width (CPHEEO 2019 §5.3.3). In engineered channels it shall be at least 2 times the top width and not less than 30 m (CPHEEO 2019 Table 5.11).
  • (b) Where drains meet, a junction sump shall be provided with an internal width of at least twice the width of the outgoing drain. Incoming drains shall enter at less than a right angle to the outgoing flow, and the outgoing invert shall be below the sump floor so that water does not stand in the sump (CPHEEO 2019 §5.3.4).

6.7.11 Manholes and access chambers on pipes. Manholes shall be provided at every junction, change of size, alignment or gradient, and at the head of every pipe. Spacing on straight runs shall not exceed Table 6.8.

Table 6.8 — Maximum spacing of manholes on straight pipe runs

Pipe diameter Maximum spacing
300–600 mm 40 m
700–1,000 mm 100 m
1,050–1,400 mm 150 m
1,500 mm and above 300 m

Source: CPHEEO 2019 Table 11.5. Manhole sizes, drops and covers: Chapter 9, Clause 9.12.

Open and covered drain sections Drain sections: freeboard, sediment allowance and access (not to scale) (a) Open lined drain (b) Covered roadside drain Design water surface Edge protection (Clause 6.13.8) Freeboard (Table 6.7) Sediment allowance: capacity is computed above this level (Clause 6.7.8) Bed width B ≥ 0.3 m (open drain) Carriageway Removable cover panel with lifting recess Slab Kerb inlet opening at road level, with silt sump (Cl. 6.13) Design water surface Freeboard to soffit No utility pipe or cable may cross through the flow area or freeboard (Clause 6.13.6) Clear width ≥ 0.6 m for covered public drains (Clause 6.7.6) Design flow Sediment allowance

Figure 6.3 — Drain sections: freeboard, sediment allowance and access. Original drawing for this Manual, adapted from CPHEEO, Manual on Storm Water Drainage Systems (2019), Tables 5.3 and 5.12, and IRC:SP:50-2013.

Commentary. The n values are those of CPHEEO (2019) Table 5.1. The higher minimum design values have no direct precedent; this Manual sets them because CPHEEO notes that the 0.011 value for spun pipes "may be taken as given by the manufacturer". That is a clean-pipe value, and Sikkim drains carry heavy silt and solid waste. The 0.6 m/s minimum velocity is CPHEEO's (Table 5.2), based on carrying 0.09 mm sand (§5.3.1). The 0.9 m/s value for pipes is stricter, because a silted pipe cannot be cleaned as easily as an open drain. The 3.0 m/s maximum is from CPHEEO Table 5.2 (WPCF/ASCE 1982). The Froude limit of 0.8 is from CPHEEO §5.3, which advises avoiding critical flow because the water surface becomes unstable.

The 0.6 m × 0.6 m minimum for covered drains has no direct precedent and is set by this Manual. A covered drain narrower than this cannot be desilted by hand or by small machines through a cover opening, and silted, inaccessible drains were a recurring finding after the storms of Gangtok, although no survey of the State's drains was found [TBC]: the drainage and landslip-protection projects of the city's development plan of 2006 "were not taken up" (CAG, Report No. 3 of 2016), GMC contracts its waste agency for the "Clearing of Jhoras" and bars it from dumping "along Footpath, Roadside and Jhoras" (Memo No. GMC/6727/III/2024/OL/01, 8 October 2024), and the State's monsoon notice orders building material "lying on the road setback or over drains" to be seized (UD&HD Notice No. 613/GOS/JCTP/UD&HD, 1 May 2019). The 0.6 m minimum cover is the value used in the CPHEEO (2019) worked pipe-design computation sheet (Part A, Chapter 5). The 0.9 m cover under carriageways is set by this Manual.

The sediment allowance values (75 mm or 10% for drains, 5% for large pipes) are set by this Manual. No Indian standard sets a sediment allowance for design. Gangtok's experience is that drains run partly full of silt for much of the year, so a capacity computed for a clean section overstates the real capacity.

The CPHEEO freeboard table (Table 5.3) prints the first row as "Beyond 300 mm bed width". Read with the second row ("Beyond 300 mm & up to 900 mm"), the first row must mean "up to 300 mm"; Table 6.7 is written that way. The CPHEEO manhole spacing table (Table 11.5) gives overlapping ranges (700–1,050 mm and 1,000–1,400 mm); Table 6.8 removes the overlap by assigning 1,050 mm to the 150 m class.


6.8 Hydraulic grade line

6.8.1 HGL analysis. For every pipe and covered-drain network, the designer shall compute the HGL for the minor design event and for the check event, starting at the outfall and working upstream. The analysis shall include friction losses and losses at junctions, manholes, bends, inlets, outlets and gates.

6.8.2 Starting water level. The starting (tailwater) level at the outfall shall be the higher of:

  • (a) the tailwater level of Chapter 5: mean high water springs (MHWS) plus the sea-level allowance of +0.3 m for minor-system design at tidal outfalls, and the level in the receiving drain, river or tank for the coincident event at other outfalls; and
  • (b) the level computed at the outlet pipe from the critical depth and the pipe diameter, (dc + D)/2, where the receiving water is lower.

6.8.3 Minor-event limit. In the minor design event, the HGL shall be at least 0.3 m below the rim of every inlet and the cover level of every manhole and access chamber.

6.8.4 Check-event and 1% limit. In the check event and the 1% AEP event, the HGL may rise above the inlet rims. Water that leaves the minor system shall then be carried by the major system within the limits of Table 6.2 and shall not enter any building. Manholes that can surcharge above ground in these events shall have bolted or locked covers (Chapter 9, Clause 9.12).

6.8.5 Structure losses. Losses at manholes and junctions shall be computed by the energy-based access-hole method of FHWA HEC-22 (2009 or 2024 edition), or by an equivalent method in an approved hydraulic model. A simplified loss-coefficient method (h = K V²/2g) with coefficients from HEC-22 may be used for Tier B networks below 16 ha.

6.8.6 Invert and soffit levels. Where pipe size increases at a manhole, the soffits (crowns) of the incoming and outgoing pipes shall be matched, or the outgoing soffit set lower. The outgoing invert shall not be higher than the lowest incoming invert. Vertical drops in manholes shall follow Chapter 9, Clause 9.12.

6.8.7 Gates and valves. The head loss through flap gates and non-return valves in the open position shall be included in the HGL (Chapter 9, Clause 9.10).

6.8.8 Private connections. Building drainage that connects to a public drain whose 1% HGL is above the building's lowest drainage fitting shall have a non-return valve.

Commentary. The 0.3 m clearance between the minor-event HGL and the inlet rim is set by this Manual. It keeps a margin for losses that a model underestimates, and it stops water from bubbling out of inlets in the event the system is designed for. In Sikkim most town drains on the ridges end in a jhora that falls freely below the outfall, so the free outfall is usually right, but only after the jhora's own 1% AEP level at the outfall has been checked, because the jhoras rise within minutes, carry boulders and slide debris and can stand over a low outlet (Clause 5.8.5(a)). The drains of the valley floors end in rivers held high for days, at Rangpo, Singtam and Melli on the Teesta and at Jorethang on the Rangit, on a bed that the flood of October 2023 raised by about 2 to 7.4 m (Clause 5.8.5(b)); outfalls below a hydropower dam end in a release reach (Clause 5.8.5(c)); and the drains of the towns carry sullage into the jhoras (Clause 8.9). No flood level of any jhora in a town, and no design level of any outfall, was found during research. A drain whose HGL is started from a free outfall without that check, or from a river level read on the bed before 2023, or computed one length at a time without the jhora, river or reservoir level, fails in exactly that way. An HGL computed from the outfall, with the tidal tailwater of Chapter 5, exposes those errors at design stage. The MHWS plus 0.3 m starting level is from CPHEEO (2019) Table 6.2. The access-hole method is described in HEC-22 from the 2009 edition onward.


6.9 Major system: overland flow paths, easements and drainage reserves

6.9.1 Streets as the primary major system. Streets shall be graded so that the 1% AEP major-system flow is carried along the road reserve to a receiving waterway without being trapped, except at sags designed under Clause 6.10.

6.9.2 Overland flow paths outside streets. Where a major-system path leaves the road reserve, it shall be:

  • (a) in public land, in the open space of a layout, or in an easement recorded on the layout approval and the title;
  • (b) at least as wide as the 1% AEP flow top width plus 0.5 m on each side, and not less than 3.0 m;
  • (c) kept free of buildings, compound walls, fences, fill, stored materials and planting that would obstruct flow;
  • (d) graded to a continuous fall with no sag that lacks an outlet; and
  • (e) within the hazard limits of Table 6.3.

6.9.3 Compound walls. A compound wall or fence shall not be built across a mapped overland flow path. Where a wall must cross one, it shall have openings with a total area that passes the 1% AEP flow with a 50% blockage, without raising the upstream water level above the limits of this chapter.

6.9.4 Access along open drains. Open drains with a top width of 2 m or more shall have a maintenance access strip at least 3.5 m wide along one bank, connected to a public road at intervals of not more than 500 m.

6.9.5 Supply channels, surplus courses and tanks. Tank supply channels and surplus courses are part of the major system and shall be protected under Chapter 7.

6.9.6 Drainage reserves. A drainage reserve is a strip of land, including the drain, kept free of buildings so that the drain can be maintained, widened and used as a flood path. A drainage reserve shall be provided:

  • (a) along every public drain or channel with an internal width of 1.0 m or more that runs through or along a layout or site being developed or redeveloped;
  • (b) along every drain or channel shown in an adopted Basin Stormwater Master Plan (Chapter 11), at the width of the future drain in that plan; and
  • (c) along every new public drain with an internal width of 1.0 m or more built by a public body.

6.9.7 Width. The reserve shall be not less than the width in Table 6.9, measured from the drain's internal width W. The width is based on the required drain size (for a planned drain, the size in the master plan), not the existing size. Where the access strip of Clause 6.9.4 is wider than the margin in Table 6.9, the wider governs.

Table 6.9 — Minimum drainage reserve width (adopted from PUB Singapore)

Internal width of drain, W Open drain Closed (covered) drain
1.0 m to 1.2 m 3.0 m W + 0.6 m
more than 1.2 m to 3.0 m W + 2.6 m W + 1.6 m
more than 3.0 m to 4.5 m W + 3.5 m W + 1.6 m
more than 4.5 m to 6.0 m W + 4.5 m W + 3.0 m
more than 6.0 m to 9.0 m W + 6.0 m W + 3.0 m
more than 9.0 m to 25.0 m W + 7.5 m W + 3.0 m
more than 25.0 m W + 12.0 m W + 3.0 m

For an open drain, the larger part of the margin shall be on the side used for maintenance access.

6.9.8 Use and protection.

  • (a) The reserve shall be shown as a separate plot on the layout or site plan and transferred to the Approving Authority free of cost, as roads and open space reservations are. Where the drain is a Water Resources Department channel, the reserve is transferred to the Water Resources Department.
  • (b) No building, compound wall, fence, ramp, step, fill or other structure shall be built in the reserve. Compound walls and boundary fences shall stand outside it.
  • (c) The access strip in the reserve shall be level and continuous, and connected to a public road. Bollards or posts and chains may be used at entrances to keep out vehicles other than maintenance vehicles.
  • (d) Where the reserve is not fenced off, its edge shall be marked with concrete markers at not more than 50 m spacing.
  • (e) Services shall cross under the drain, with at least 1.0 m clearance below the invert, or over it on an approved structure. Services shall not run along the reserve inside the drain section.
  • (f) A structure within 2 m of the edge of the reserve shall be designed to remain stable when the drain is excavated to 1.0 m below its invert. The design shall be signed by a qualified structural engineer.
  • (g) The reserve counts toward the site's open space requirements only where the Approving Authority's rules allow it; it does not reduce any setback required by Chapter 7.

Drainage reserve: open drain cross-section Drainage reserve along an open drain (cross-section, schematic, not to scale) No-structure zone: the whole reserve (Clause 6.9.8(b)) no building, compound wall, fence, ramp, step or fill W (internal width) Access strip: level, continuous, linked to a public road; bollards or posts and chains at entrances (6.9.8(c)) Compound wall outside the reserve (6.9.8(b)) Building and compound wall outside the reserve Reserve width: not less than Table 6.9, from the required drain size (Clause 6.9.7) smaller margin larger margin, maintenance side (6.9.7) 2 m Structure within 2 m of the reserve edge: stable with the drain excavated 1.0 m below its invert; signed by a structural engineer (6.9.8(f)) 1.0 m below invert ≥ 1.0 m clear below invert for services crossing under the drain (6.9.8(e)) Service pipe or duct, crossing in a sleeve Concrete markers at ≤ 50 m where not fenced (6.9.8(d)) No-structure zone 2 m stability-check zone Future excavation, 1.0 m below invert

Figure 6.4 — Drainage reserve along an open drain: reserve width from Table 6.9, no-structure zone, access strip on the maintenance side, the 1.0 m service clearance below the invert and the 2 m stability-check zone (Clauses 6.9.6 to 6.9.8). Original drawing for this Manual, adapted from PUB Singapore, Code of Practice on Surface Water Drainage (7th ed., with Addendum No. 3, 2025), clauses 5.1, 5.3, 9.6 and 9.7 and Appendix 1.

Commentary. Drainage reserves follow Singapore, where "the width of a drainage reserve is based on the required drain size" and the reserve is set aside as a separate plot, "kept free of all encumbrances" (PUB Code of Practice on Surface Water Drainage, 7th ed. with Addendum No. 3, 2025, cl. 1.1). Table 6.9 reproduces PUB's Appendix 1 widths. Clauses 6.9.8(b) to (f) follow PUB clauses 5.1 (no structure within a drain or drainage reserve), 5.3 and 5.3.1 (stability for excavation 1.0 m below the invert; engineer's calculations within 2 m of the reserve), 9.6 (level, continuous access, with bollards or posts and chains) and 9.7 (markers at a maximum of 50 m). The 1.0 m clearance for services crossing under a drain is from PUB's development-plan guidance. In Sikkim, buildings and compound walls are often built up to the edge of a drain, so it cannot be widened or desilted by machine. Reserving the land when a plot is developed or redeveloped is the cheapest time to secure it, because widening later needs land acquisition. Basing the width on the master-plan drain size (6.9.6(b)) protects the land a future drain will need. Sikkim has no statutory width along a drain or a jhora, and no floodplain zone of any kind. The lines that exist bind only where they apply, and each has its own status. Jhoras: no line. The SBCR 1991 set no setback from a jhora or a river (NEER reading); the 2021 stability zones ask only that the training of jhoras be done "with safe distance" (zone 1), a distance they do not define (Notification No. 17/DMG/20-21, 19 March 2021); the Municipalities Act makes the municipality "protect any jhora, whether on a public land or on a private land, within the municipal area" (s.172(2)) and lets the State Government "by notification, specify the limits of any jhora, watercourse or channel within a municipal area" (s.173), but no such notification was found (NEER reading). Scheduled rivers: a maximum. For the 103 rivers in the Schedule of the Sikkim Forests, Water Courses and Road Reserve (Preservation and Protection) Act, 1988, among them the Teesta (no. 1), the Rangeet (no. 2), the Rongni chu (no. 14), the Roro chu (no. 15), the Gangtok chu (no. 62), the Lhonakchu (no. 77) and the Khani Khola at Melli (no. 103), the river bank is "an area of sixty metres on either side of such river or area within high flood level mark, whichever is less" (s.29(1)), under the Forest Department "as if it were a forest" (s.29(9), inserted in 2000); unauthorised occupation of it is an offence (s.30), and the Government may close a river bank by notification (s.32). "Whichever is less" makes the 60 m a maximum, not a minimum: on an incised reach the high-flood-level line may lie a few metres from the channel, and after October 2023 that line has itself moved (NEER reading). The Act's "river" includes "any stream, channel, jhora, creek" (s.2(m)), but the 60 m applies only to the rivers in the Schedule. Roads and plots. A building stands "Minimum 27 feet away from the centre of the road", with a setback of 10 feet "or as indicated in approved Master Plan of the area" (SBCR 1991, reg. 18), and a septic tank at least 4 feet from the building (reg. 25(v)); there is no slope line except the "around 70 (Seventy) degree" of reg. 35. The Teesta after 2023. No setback along the Teesta, and no line for the GLOF corridors, was found to have been notified after October 2023 (NEER reading); the "High-risk Zoning" of floodplains below glacial lakes in the Project Prefeasibility Report annexed to the State's affidavit of 28 February 2026 is a proposal, not a rule. Floodplains. No floodplain zoning law and no notified flood line exist (NEER reading); the Sikkim Town and Country Planning Act, 2024 (enacted in 2024 and amended in 2025, not yet commenced) would require development plans with "proposals for flood control, land stability and sloped linked controls", but no commencement notification, rules, Board or development authority was found. None of these gives a reserve width along a jhora or a town drain. For this Manual, as its own proposal and not as the meaning of the rules, the bank of a channel is its top of bank, and on an incised jhora whose bank is a slope steeper than 10°, the crest of that bank slope; the edge of a pokhari, dhara or reservoir is as Chapter 7 defines it; and every jhora, khola and other natural channel that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it and whether or not it is lined, trained, piped or covered (all set by this Manual). This Manual therefore gives the reserve a width, as its own proposal and not as a statutory width: a hydraulic corridor made up of the reserve of Table 6.9, based on the drain size needed to carry the design flow with the bulking factor of Clause 6.3.6(g) (Clause 6.9.7), the access strip of Clause 6.9.4 on the access bank, and, along every natural channel that drains 8 ha or more and round every pokhari, reservoir and dhara that this Manual covers, the setbacks of Clause 7.4, with a Zone 1 of not less than 15 m from the top of bank, or from the crest of the bank slope of an incised jhora steeper than 10°, and a Zone 2 to the 1% AEP extent plus 10 m, which matters on the valley floors, whichever line is wider governing (set by this Manual). On a scheduled river the statutory river bank may be wider or narrower than the Manual's 15 m: where it is wider it binds as well, and where its high-flood-level line is nearer, the Manual's corridor is the stricter; on a jhora no statute sets any line, so the Manual's 15 m is a NEER proposal throughout; and where a notified jhora limit under s.173, a closure under s.32, a development plan, a notified wetland or a court sets a wider line, that line applies for as long as it binds, and the widest governs (Clause 7.4.5). The corridor applies to new development and redevelopment approved under this Manual, not to existing buildings, and Clause 7.4.7 allows no variance below it. It is a condition of building permission in the notified and municipal areas where this Manual is applied, and a recommendation elsewhere (Chapter 1). Land. Jhoras on public land other than forest land within a municipal area already vest in the Municipality (s.172(1)), and the river banks of the scheduled rivers are under the Forest Department (s.29(9)); Zone 1 and reserve land that is private is secured by agreement with the owner or by donation, recorded on the layout approval and in the land records, or reserved in a development plan once the 2024 Act commences, and is never taken; where it is so secured, the transfer of Clause 6.9.8(a) is made by that recorded agreement rather than by a transfer of title (set by this Manual). Jhoras outside municipal limits and on forest land have no named protector, because s.172 excludes forest land and covers only the municipal area (NEER reading); there the corridor is recorded in the drain and jhora register and secured by agreement with the landholder and, on forest land, with the Forest Department. The corridor should be shown in a development plan once one can be made, and checked when the plan of a building is approved, where the blue-print plan already shows "drainage including connection to main outlet" (SBCR 1991, reg. 6), rather than made a new no-objection certificate.

The reserve matters because the drains of Sikkim's towns are divided among owners, and no notification divides them (NEER reading). On the statute, the public and other drains "shall vest in the Municipality, or the concerned Department, or organization, of the State Government, or the agency, as the case may be" (Sikkim Municipalities Act, 2007, s.189(1)); the municipality shall "construct and maintain drains and sewers, and provide a safe and sufficient outfall, in or outside the municipal area" (s.187); and the jhoras of the municipal area vest in it on public non-forest land and are under its protection on any land (s.172). The roads, the river works, the jhora-training works and the sewers are built by others. No drain inventory of any town was found [TBC]. For the purposes of this Manual, and until the State issues such a rule [TBC], the drains are assigned as follows (set by this Manual): the municipal drains, and the jhoras on public land other than forest land within a municipal area, to the urban local body (the Gangtok Municipal Corporation in Gangtok; the Namchi Municipal Council and the Nagar Panchayats elsewhere) (ss.172(1) and 189(1)), with every jhora in the municipal area, public or private, under the urban local body's duty to protect (s.172(2)); the river banks of the 103 scheduled rivers to the Forest Department (1988 Act, s.29(9)); the road drains to the road's owner: the Roads and Bridges Department (PWD) for State roads, and NHIDCL or BRO for national highways (NEER reading, by inference from the roads they hold); jhora training to the agency that executes it: GSCDL for Smart City works (as reported), WRD for river and jhora works, and RMDD in rural areas (NEER reading), until it hands the work over in writing to the body that holds the drain; the sewers and the treatment plants to PHED, "the concern department for sewage management in the State" (State report in O.A. No. 673 of 2018), and rural and peri-urban sewage to RMDD, under whose supervision it is (State filing to the National Green Tribunal) (Clause 8.9); the hydropower dams, their reservoirs and their gates to their operators, whose levels are data for design, not an approval (Clause 5.8.5(c)); the springs to no statutory owner, RMDD's Dhara Vikas programme working on them (as reported); and the jhoras outside municipal limits or on forest land to no named owner (NEER reading). Each town shall keep a drain and jhora register that gives every reach its owner under this assignment, its land status (municipal, Forest Department, private or road reserve), whether it is a scheduled river's bank, its stability zone, whether it is trained to Clause 6.3.6(m) and when, whether it carries sewage, any flap gate on it and the body that holds the gate, and its outfall (set by this Manual). Under Clause 6.9.8(a), the reserve along a channel assigned to WRD is transferred to, or secured for, the Water Resources Department. Where a channel's status is disputed, the corridor follows the channel and not its name: Gangtok's jhoras are at once natural watercourses, drains in law (s.2(24)) and carriers of sullage (Clause 8.9). No approved drainage master plan with a design return period was found for any town in the State. A drain sized to fit the land left beside it cannot be enlarged, which is why the reserve is based on the required size. Until a Basin Stormwater Master Plan is adopted (Clause 6.9.6(b)), the required drain size of Clause 6.9.7 is the size computed by the designer under this chapter. This Manual does not prescribe a lined or an unlined section, except where Clause 6.3.6(j) and (m) and Chapter 9 require lining on steep gradients, on colluvium and fill, and in a trained jhora. It requires the section to meet the velocity limits of Clause 6.7.3 and Chapter 9, and a reserve wide enough for an unlined or vegetated section, where one is allowed, is a reserve that keeps both options open.

Commentary. Requirements 6.9.2(b)–(e), 6.9.3 and 6.9.4 have no direct precedent and are set by this Manual. Compound walls around individual plots are almost universal in Sikkim and are one of the most common ways that overland flow paths get blocked. The 50% blockage assumption for wall openings is set to match the grate clogging factor of Clause 6.6.3. The 3.5 m access width is set by this Manual, sized for a small excavator or desilting vehicle. For comparison, APWA 5600 (2006, 5608.4) requires a 15 ft (about 4.6 m) maintenance access strip for detention facilities.


6.10 Ponding at sags and low points

6.10.1 Minor event. At every sag, the minor design flow shall be removed by inlets (after clogging) with ponded spread within Table 6.2.

6.10.2 1% AEP event. At every sag:

  • (a) the ponded depth shall not exceed 350 mm at the deepest point of the carriageway;
  • (b) a surface overflow route shall be provided (for example over a lowered kerb and footpath into a designated overland flow path), so that the ponding level cannot rise above the overflow level; and
  • (c) building floor levels around the sag shall comply with Clause 6.11.

6.10.3 Fully-blocked check. At sags, the 1% AEP ponding level shall also be computed with the minor system fully blocked and all flow leaving by the surface overflow route. Floor levels around the sag shall be set from the higher of the two ponding levels.

6.10.4 Trapped sags. Where a sag has no surface overflow route, the inlets and conduits (after clogging) shall carry the 1% AEP flow, and the approving authority shall agree the arrangement.

6.10.5 Road underpasses. Underpasses and other trapped sags on public roads shall:

  • (a) be drained by a minor system (with pumping under Chapter 9, Clause 9.9, where gravity drainage is not possible) designed for the 2% AEP (50-yr) flow, checked at the 1% AEP flow;
  • (b) have flanking inlets at both approaches to intercept flow before it reaches the low point;
  • (c) be protected from inflow from surrounding streets by raised approach crests where practicable; and
  • (d) have depth markers and automatic warning or closure signals that operate at 150 mm depth on the carriageway.

Commentary. The fully-blocked check, the trapped-sag rule and the underpass requirements have no direct precedent and are set by this Manual. No record of a flooded road underpass in the State was found during research [TBC]. The roads already act as the major system, and in the hills as its steepest part: NH-10 along the Teesta "has become prone to submergence and subsidence" since the flood of October 2023 (Project Prefeasibility Report annexed to the State's affidavit of 28 February 2026) and was reported submerged by the river in July 2025 (as reported); that flood damaged 31 major bridges and about 18.5 km of road (Sattar et al., 2025); the Sangkalang bridge collapsed in the storm of June 2024, and the bridges at Phidang and Sangkalang were damaged in June 2025 (all as reported). Clause 6.10.5(d) links the 150 mm crown depth limit of Table 6.2 to the point at which traffic should stop.


6.11 Building floor levels

6.11.1 The lowest habitable floor, and every opening through which water could enter a building (doors, ventilators, basement ramps, lift pits and service entries), shall be at least 0.5 m above the 1% AEP flood level.

6.11.2 The 1% AEP flood level is the highest of:

  • (a) the 1% AEP major-system water level in the street or overland flow path next to the building (Clauses 6.9 and 6.10, including the fully-blocked check at sags);
  • (b) the 1% AEP flood level of any river, channel, tank or waterbody (Chapter 7); and
  • (c) the 1% AEP level with the tailwater of Chapter 5; and
  • (d) where the Approving Authority has adopted a 1% AEP flood depth map under Clause 7.3.4, the ground level at the plot plus the mapped 1% AEP depth.

6.11.3 Default where no level has been computed. For a plot below the Chapter 1 thresholds, or where no 1% AEP level has been computed for the plot, the lowest habitable floor and openings shall be at least the higher of:

  • (a) 0.65 m above the highest crown level of the road on which the plot fronts; and
  • (b) where an adopted 1% AEP flood depth map covers the plot, the ground level plus the mapped 1% AEP depth plus 0.5 m.

The Approving Authority may adopt a regional map, such as a State-approved map or a published national map of modelled 1% AEP flood depth (for example the India Flood Atlas), until a local study replaces it. A map that does not model storm surge shall not be used in place of Clause 6.11.6.

6.11.4 Basements. The crest of every basement ramp and the sill of every basement opening shall meet Clause 6.11.1. Basement drainage shall be pumped to the surface drain through a non-return valve.

6.11.5 Services. Electrical panels, transformers, standby generators, lift machinery and pumps that serve a building shall meet Clause 6.11.1.

6.11.6 Coastal band. The coastal band is the land within 500 m landward of the High Tide Line along the sea front, as defined by the CRZ Notification, 2019, with the High Tide Line as demarcated in the approved Coastal Zone Management Plan. Where the Survey of India Hazard Line lies further inland than 500 m, the band extends to the Hazard Line. Within the coastal band, in addition to Clauses 6.11.1 to 6.11.5:

  • (a) the lowest habitable floor and every opening shall also be at least 0.5 m above the coastal flood level, which is the 1% AEP still-water level (Clause 5.7.3(b), Annex 5A) plus twice the sea-level allowance of Clause 5.7.4 (so at least 0.6 m), because buildings have a design life of more than 50 years (Clause 5.7.4(c));
  • (b) where the plot fronts the open beach, the coastal flood level shall include wave set-up from a site study;
  • (c) no habitable room, electrical service room or plant listed in Clause 6.11.5 shall be placed in a basement; and
  • (d) every basement opening, ramp crest and ventilation opening shall meet Clause 6.11.6(a).

Clause 6.11.6 does not authorise any construction that the CRZ Notification prohibits. Where both apply, the stricter governs.

Coastal band floor level Coastal band: minimum floor level and extent of the band (schematic, not to scale) (a) Level stack for the lowest habitable floor (Clause 6.11.6(a), (b)) (b) Extent of the band (plan) Datum Ground + 2 × sea-level allowance (Clause 5.7.4), so at least 0.6 m + wave set-up from a site study, where the plot fronts the open beach (6.11.6(b)) + 0.5 m freeboard (6.11.6(a)) 1% AEP still-water level (Clause 5.7.3(b), Annex 5A) Coastal flood level Lowest habitable floor and every opening at or above No habitable room, electrical room or listed plant in a basement (6.11.6(c)) Clauses 6.11.1 to 6.11.5 (1% AEP level + 0.5 m, and the defaults of 6.11.3) also apply; the higher floor level governs. CRZ prohibitions are not relaxed. Sea 500 m landward of HTL High Tide Line (HTL), as in the approved CZMP (CRZ Notification, 2019) 500 m line Hazard Line (Survey of India) Coastal band: to 500 m from HTL, or to the Hazard Line where it lies further inland (Clause 6.11.6)

Figure 6.5 — Coastal band: the minimum floor level built up from the 1% AEP still-water level, twice the sea-level allowance, wave set-up where the plot fronts the open beach and 0.5 m freeboard; and the extent of the band, to 500 m from the High Tide Line or to the Hazard Line where it lies further inland (Clause 6.11.6). Original drawing for this Manual, adapted from the CRZ Notification, 2019 (para 1(i) and Annexure IV) and PUB Singapore, Code of Practice on Surface Water Drainage (7th ed.), cl. 2.1.1.

Commentary. The 0.5 m freeboard above the 1% AEP level follows the DID Malaysia 2008 checklist (platform and lowest floor at 100-yr ARI + 0.5 m). It is more than the APWA 5600 (2006, 5601.8 A2) requirement of 1 ft (about 0.3 m) above the 1% stage. The 0.65 m default in Clause 6.11.3 is derived from the other limits of this chapter, not separately sourced: the 1% water level at the crown may be up to 150 mm (Table 6.2), plus the 0.5 m freeboard. It has no direct precedent and applies to plots where no flood level exists. URDPFI (2015) also links minimum plinth levels to flood frequency in its flood-plain zoning, which is covered in Chapter 7.

Clause 6.11.3(b) lets a small plot use a mapped 1% AEP depth where no local study exists, instead of guessing from the road level alone. Modelled national maps are coarse (about 30 m), and most model rainfall and river flooding but not storm surge, which is why 6.11.3 keeps the road-crown check and Clause 6.11.6 sets a separate coastal rule.

The coastal band of Clause 6.11.6 uses the 500 m line of the CRZ Notification, 2019 (G.S.R. 37(E), para 1(i): "the land area from High Tide Line ... to 500 meters on the landward side"), because every coastal authority already maps it and it needs no new survey. The Hazard Line, demarcated by the Survey of India to show the extent of flooding and shoreline change, extends the band where it lies further inland (CRZ Notification, 2019, Annexure IV). The band takes the coastal level from the joint-case still-water level of Chapter 5 rather than from the rainfall map. The higher standard reflects the setting: a coastal flood rises with the sea, cannot be drained while the tide is up, and will rise further with the sea. Singapore takes the same approach with a fixed minimum platform level of 4.0 m above datum on its southern coast and 4.5 m on its northern coast, whatever the rainfall flood level (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 2.1.1). Each coastal State's tide and surge levels vary too much along its coast for one fixed level, so this Manual uses the computed still-water level instead. Using twice the sea-level allowance applies the sensitivity case of Clause 5.7.4(c) as the design case, because a building, unlike a drain, cannot easily be raised later. The basement restriction in 6.11.6(c) is set by this Manual: a basement in the coastal band fills from the sea as well as from rain, and cannot be pumped out to a tide-locked outfall. Sikkim has no coast, no High Tide Line and no Coastal Regulation Zone, so the coastal band is empty in the State and Clause 6.11.6 does not apply there. Clauses 6.11.3 and 6.11.4 matter instead. The building rule sets no flood plinth and no floor level above any flood (SBCR 1991; NEER reading), no highest flood level has been published for any town [TBC], and no floodplain zone exists in law (NEER reading); yet the valley-floor towns on the Teesta, the Rangit and the Rongni Chu flood from their rivers, on a bed that the flood of October 2023 raised by metres (Clause 5.8.5(b)). For this Manual, on valley-floor land the 1% AEP flood level of Clause 6.11.2 is computed with the river levels of Clause 5.8.5(b), or, where none has been computed, taken as the highest flood level surveyed from flood marks with its source stated, and the floor levels of Clause 6.11.1, 0.5 m above the 1% AEP level, govern; and on the Teesta valley floor no floor level shall be below the surveyed October 2023 flood mark + 0.5 m (set by this Manual). That flood was a cascade, not a rainfall flood, and the 0.5 m above its mark is a siting floor, not a promise that the next cascade will stop there (Clause 5.8.5(d)). Clause 6.11.3, which sets the lowest habitable floor and every opening 0.65 m above the road crown where no flood level has been computed, and Clause 6.11.4, which applies the same level, or 0.5 m above the 1% AEP flood level, to the crest of every basement ramp and the sill of every basement opening, are set by this Manual and add to the regulations. On a hillside the road crown is not always the right reference: the building rule lets a building on the valley side of a road rise "a maximum of one storey only above the road level", with no more than four storeys or 40 feet in all (SBCR 1991, reg. 17(iii)), so its lower floors lie below the road and take the road's runoff; Clause 6.11.2(a) therefore sets the level of each floor and opening on the uphill side from the 1% AEP level of the flow path past it, with the catchment drain and the drained space against the cut of Clause 6.3.6(l) in place, and a floor or basement cut into a slope also needs the geotechnical certificate of the hill rule of Clause 4.11. Along the jhoras and rivers, round the pokharis and springs (dhara) and on the shores of the reservoirs, the lines of Chapter 7 also apply.


6.12 Culverts and road crossings

6.12.1 Design AEP. A culvert or bridge that carries a road over a drain or waterway shall pass the design AEP flow of Table 6.1 for that road class without overtopping the road, and with the headwater limits of Chapter 9, Clause 9.4. Where the waterway is a State highway or national highway crossing, the design AEP shall also be not less than that of IRC:SP:42-2014 §7.1.4 for the span. The rarer AEP governs.

6.12.2 Check event and 1% AEP. At the check event and at the 1% AEP event, the crossing and the road together shall pass the flow:

  • (a) with overtopping depth ≤ 150 mm at the road crown and ≤ 350 mm at the deepest point of the road;
  • (b) within the hazard limits of Table 6.3;
  • (c) with no overtopping at all of arterial roads that are notified evacuation routes; and
  • (d) without raising the 1% AEP flood level at any upstream building or property boundary above the level for the existing condition, unless the affected owners and the approving authority agree.

6.12.3 Where overtopping is not permitted. Overtopping in the 1% AEP event is permitted only where the structure span is less than 6 m and the 1% AEP peak flow is not more than 7 m³/s, unless a guard rail is installed downstream of the overtopping section. Otherwise, the crossing shall pass the 1% AEP flow without overtopping.

6.12.4 Blockage check. The 1% AEP check shall be repeated with a blocked inlet:

  • (a) 50% of the inlet area blocked for culverts with a span or diameter below 1.5 m; and
  • (b) 20% blocked for larger culverts.

The results of this check shall meet Clause 6.12.2(a) and (d).

6.12.5 Minimum size. Culverts under public roads shall be at least 900 mm in diameter, or 900 mm × 900 mm for box culverts.

6.12.6 Hydraulic design. Culvert hydraulics, including inlet and outlet control, tailwater, road overtopping and outlet protection, shall follow Chapter 9, Clauses 9.4 and 9.6.

Commentary. The design AEPs are those of Table 6.1. The overtopping limits are the street-depth limits of Table 6.2. The span and flow threshold in Clause 6.12.3 is the SI conversion of APWA 5600 (2006): overtopping allowed only where the structure span is under 20 ft and the 1% peak is 250 cfs or less, unless a downstream guard fence is installed. IRC:SP:42-2014 (§7.1.4) sets 25-yr for NH/SH culverts up to 2 m span and 50-yr for 2–6 m spans. The blockage percentages in Clause 6.12.4 and the 900 mm minimum size have no direct precedent and are set by this Manual. The 50% value matches the grate clogging factor.


6.13 Sikkim construction-practice requirements

6.13.1 Covered roadside drains. Where a roadside drain is covered by slabs that form a footpath:

  • (a) it shall be designed as an open channel with the freeboard of Table 6.7 measured to the soffit of the cover slab, and its HGL shall meet Clause 6.8 measured to the footpath and inlet levels;
  • (b) road runoff shall enter through openings in the drain wall at road level (Clause 6.6.1(b)), each with a silt sump (Clause 6.6.7), at the spacing of Clause 6.6.4;
  • (c) footpath runoff shall enter through slots or grated openings in the cover, not by ponding on the footpath; and
  • (d) the clear section shall meet Clause 6.7.6(c).

6.13.2 Removable covers and access openings. Covered drains shall have:

  • (a) removable cover panels at not more than 10 m centres, each at least 0.6 m long and spanning the full clear width, with recessed lifting points, liftable by two workers or by a hand-operated lifting device, and flush with the footpath;
  • (b) access chambers with a clear opening of at least 0.6 m × 0.6 m at every junction, bend and change of section, and at not more than 30 m centres on straight runs; and
  • (c) covers rated for the traffic or pedestrian load at their location (Chapter 9, Clause 9.11).

6.13.3 Silt traps. In addition to the inlet sumps of Clause 6.6.7, silt trap chambers shall be provided:

  • (a) upstream of every culvert under an arterial road;
  • (b) upstream of every pump station and detention facility; and
  • (c) at every outfall to a tank, river or other waterbody (with the gross pollutant trap required by Chapter 8).

Each silt trap shall be sized to hold the sediment expected between scheduled cleanings, using the sediment yield in Annex 6B, and shall be reachable by a desilting vehicle.

6.13.4 Garbage and gross pollutant screens. Screens shall be provided where an open drain enters a covered drain, a pipe or a culvert, and at outfalls under Chapter 8. Each screen shall:

  • (a) be designed under Chapter 9, Clause 9.8;
  • (b) have a bypass or overflow, so that a fully blinded screen does not flood properties or the road beyond the limits of this chapter; and
  • (c) be checked hydraulically with 50% of its area blocked.

6.13.5 No building over drains. No structure other than an approved crossing or a removable cover shall be built over a public drain. Shop frontages, ramps and steps that cross a drain shall be removable or shall leave access openings that meet Clause 6.13.2.

6.13.6 Utilities. No water main, sewer, power or telecom cable, gas pipe or duct shall be laid along, or pass through, the flow area or freeboard of any drain. A utility that must cross a drain shall:

  • (a) cross above the cover soffit or below the drain invert, inside a sleeve; and
  • (b) be shown on the drainage plan with its level.

Where an existing utility crossing obstructs a drain, its area shall be deducted from the drain section, with a 50% blockage allowance for the debris it traps, until the utility is relocated. The utility owner shall relocate it when the drain is rebuilt.

6.13.7 Sewage. No sewage connection is permitted to a storm drain (Chapter 8). Covered drains shall be built with sealed joints where they run next to sewers.

6.13.8 Edge protection. Open drains deeper than 1.0 m beside a footpath, a carriageway or a public open space shall have railings or barriers. Open drains of any depth shall not be left uncovered across a footpath.

6.13.9 As-built levels. The as-built invert levels of every public drain, pipe and manhole shall be surveyed and submitted (Chapter 10). Inverts shall be within ±15 mm of design. An HGL re-check shall be submitted where they are not.

6.13.10 Desilting. Public drains shall be desilted before the monsoon season each year, as set out in Chapter 10.

Commentary. Clause 6.13 has no direct precedent; this Manual sets it on the basis of Sikkim practice. Most urban drains in the State are covered roadside drains under footpaths. They are often built with continuous cast-in-situ slabs and few openings, so they cannot be cleaned and fill with silt and solid waste within a season. CPHEEO (2019) notes that uncovered channels "are prone to the dumping of garbage" (Part A, Ch 2), which is why the drains are covered. Covering without access openings simply moves the problem out of sight. In Sikkim no survey of the towns' drains by type, and no drain inventory of any town, was found during research [TBC], so this Manual cannot say that most urban drains in the State are covered roadside drains under footpaths; what the sources show is that the jhoras are drains in law (Sikkim Municipalities Act, 2007, s.2(24)), that the building rule sends every plinth drain to "the road side drain or to adjoining permanent drains or jhora" (SBCR 1991, reg. 25(iv)), and that the ADB-funded project is building stormwater drains along about 60 km of roads in seven towns (ADB 57230-001). Clause 6.13 applies to every covered drain built from now on. NDMA (2010) recommends that pre-monsoon desilting be complete by 31 March. In Sikkim that date is also the start of the wet season as this Manual defines it, 1 April to 31 October; IMD's normal dates for the onset and withdrawal of the south-west monsoon over Sikkim were not obtained [TBC], and this Manual gives no onset date. The heaviest storms come early: Gangtok averages 296.9 mm in April on 15.2 rainy days and 496.4 mm in May (IMD normals, 1981–2010), and both Gangtok's 24-hour record (310.3 mm on 30 May 1975) and Singhik's (504.2 mm on 12 May 1981) fell in May. Storms also come after the season: Gangtok recorded 201.0 mm on 3 October 1996 and 96.0 mm on 11 November 1995 (IMD), the October storm of 1968 lasted four days (as reported), and the Teesta flood of October 2023 came on 3–4 October. The State already stops earthworks for the season: UD&HD and UDD notices ban "construction involving earth excavation" each monsoon (6 May–30 September 2019; 1 June–30 September 2020), and material "lying on the road setback or over drains" is seized (Notice No. 613/GOS/JCTP/UD&HD, 1 May 2019); but no order of UDD, GMC or another urban local body fixing a date for drain clearance was found during research [TBC]. So Clause 6.13.10 refers to the monsoon season as this Manual defines it, and Chapter 10 requires desilting and the clearance of silt, debris, garbage and slide material from drains, jhora channels, inlets, catch-pits, racks, debris basins and culverts, and of plinth drains and catchment drains, to be complete by 31 March, with retaining-wall weep holes and subsurface drains inspected and cleared and flap gates and any pumps certified ready on the same date (Clauses 5.11.5 and 5.12.9); a mid-season clearance of drains, jhora channels, racks, culvert inlets and debris basins by 30 April, after the April storms and before May; standby from 1 April to 31 October; and a post-season clearance of silt, debris and slide material, with a survey of cut slopes, retaining walls and trained jhoras, by 15 November. The mid-season clearance is due by 30 April, as in one other North-East hill edition of this series, and not by 31 May or 15 May as in the others, because the two largest 24-hour falls recorded in the State fell on 12 and 30 May: a clearance due by 15 May could come after the first, and one due by 31 May after both. Drainage earthworks are finished before the excavation ban begins, and WRD's works on rivers keep WRD's calendar. Above about 2,500 m (sub-area SK-C, and any site at that height), where snow or frost prevents the works in March, the pre-season works are due by 30 April and the mid-season clearance by 31 May, with the reason recorded on Form 10-7; snow and ice are cleared from inlets, culverts and drains after every snowfall from December to March; and the post-season clearance is due by 31 October, before the first snow. Snow-day statistics were not collected [TBC]. These dates are set by this Manual.

Jhoras are open channels with a drainage reserve (Clause 6.9), and should not be covered, decked or built over: the municipality "shall protect any jhora, whether on a public land or on a private land, within the municipal area" (s.172(2)), and Clause 6.3.6(m) does not allow an open jhora to be culverted. Where a drain is covered, Clause 6.13.2 applies to it in full; where it is open beside a footpath or a carriageway, Clause 6.13.8 applies. In the ridge towns many drains run beside steps and footpaths on steep ground, where an open drain is a fall hazard and a covered one cannot be cleared of boulders and waste without its access openings. Gangtok's waste agency is contracted for the "Clearing of Jhoras" and barred from dumping "along Footpath, Roadside and Jhoras" (GMC, Memo No. GMC/6727/III/2024/OL/01, 8 October 2024).

Clause 6.13.7 is not yet the practice, and outside Gangtok's sewered zones it cannot be until sewers exist. The Municipalities Act already requires one drain for sewage and "an entirely separate drain for rain water or unpolluted sub-soil water" (s.193), but the building rule has every building treat its sewage "in septic tanks built within the site" (SBCR 1991, reg. 25(i)), and in Soreng "most of the houses have adopted the practice of onsite disposal by constructing septic tank/soak pits with effluent discharging into open surface drains" (ADB due-diligence report, December 2024). The State estimates the urban sewage at 29.51 MLD against 15.22 MLD actually treated at Gangtok's plants (September 2025 progress report annexed to the State's affidavit of 19 December 2025), and the sewerage of Namchi and Jorethang "has remained stalled since the year 2013 and 2015 respectively" (same affidavit). Clause 8.9 sets how dry-weather flow in storm drains is surveyed and intercepted until the connections are removed, including the rule that interception shall not reduce the capacity of the drain (Clause 8.9.5(b)).

The 10 m and 30 m spacings and the ±15 mm tolerance have no direct precedent and are set by this Manual. Clause 6.13.6 responds to the common sight of water mains and cables running through drains. Each one traps debris and reduces the section. Mechanical cleaning through cover openings, rather than manual entry, is assumed throughout, consistent with the Prohibition of Employment as Manual Scavengers and their Rehabilitation Act, 2013.


6.14 Outfalls

6.14.1 Outfalls shall be designed for the tailwater conditions of Chapter 5. Outfalls below the 1% AEP still-water level shall have flap or tide gates or non-return valves (Chapter 5 and Chapter 9, Clause 9.10).

6.14.2 Outfall protection and energy dissipation shall be designed under Chapter 9, Clause 9.6. Outfalls to tanks and waterbodies shall also meet Chapters 7 and 8.


6.15 Submittal requirements

Every conveyance submittal shall include a Conveyance Design Report (Form 6-1) containing:

  1. a catchment plan showing sub-catchments, the minor system, inlet locations and the major-system overland flow paths for the 1% AEP event (Clause 6.3.2);
  2. the land-use and road-class AEP adopted for each element (Table 6.1), and the high-density area status;
  3. design flows, with the rainfall sheet of Chapter 2 and the method of Chapter 3;
  4. gutter spread, depth and D·V checks for the minor, check and 1% events (Tables 6.2 and 6.3);
  5. an inlet schedule with clean capacity, clogging factor, design capacity and bypass flow (Clause 6.6);
  6. pipe and drain design tables with n, velocity, sediment allowance and freeboard (Clause 6.7);
  7. HGL profiles for the minor and check events, with the tailwater used (Clause 6.8);
  8. sag ponding levels, including the fully-blocked check (Clause 6.10);
  9. a floor-level schedule for every building (Clause 6.11);
  10. culvert and crossing calculations (Clause 6.12 and Chapter 9); and
  11. a utilities-crossing schedule and access-opening layout for covered drains (Clause 6.13).

References (chapter)

Annexes and forms

Annex / Form Content
6A Standard inlet types for Sikkim with capacity curves (on grade and sag)
6B Sediment yield for silt-trap sizing and calibration of the sediment allowance
6C Standard drawings: covered roadside drain with removable covers, access chamber, inlet with silt sump
Form 6-1 Conveyance Design Report checklist