Chapter 2Design Rainfall and Design Storms
2.1 Purpose and scope
2.1.1 This chapter sets the rainfall inputs for every hydrologic calculation in this Manual: drain and inlet sizing (Chapter 6), retention and detention sizing (Chapter 4), downstream and tailwater analysis (Chapter 5), and waterbody and tank works (Chapter 7).
2.1.2 It specifies:
- (a) the approved sources of design rainfall depth and intensity;
- (b) how depths are converted between durations, between point and area, and from present to future climate;
- (c) how design storms (hyetographs) are constructed; and
- (d) the storms that must be applied to pre- and post-development conditions.
2.1.3 This chapter applies throughout Sikkim. Where the Gangtok Municipal Corporation, another urban local body or UDD in a notified area has adopted a stricter rainfall standard under Chapter 1, the stricter standard governs.
2.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Annual exceedance probability (AEP) | Probability that a given rainfall depth is equalled or exceeded in any one year. A 1% AEP storm is the "100-year" storm. Both forms are used here: T-year = 1/AEP. |
| IDF / DDF | Intensity–duration–frequency and depth–duration–frequency relationships for a location. |
| Point rainfall | Rainfall at a single location, as measured by a rain gauge. |
| Design storm | A hyetograph (rainfall depth versus time) of stated AEP, duration and temporal pattern. |
| Critical duration | The storm duration that produces the largest peak flow, water level or storage requirement for the element being designed. |
| Areal reduction factor (ARF) | Ratio of catchment-average rainfall to point rainfall for the same AEP and duration. |
| Monsoon season (as used in this Manual) | 1 April to 31 October. In this Manual "the monsoon" and "the monsoon season" mean this wet season, which takes in the pre-monsoon storms of April and May as well as the south-west monsoon; it is the Manual's season, not IMD's, and IMD's south-west monsoon does not begin in April. IMD's normal dates of onset and withdrawal of the south-west monsoon in Sikkim were not found for this Manual [TBC], and none is given here. The season begins on 1 April for four reasons. Gangtok's wet season starts in April: its normals are 126.4 mm in March, 296.9 mm in April on 15.2 rainy days, with 10.7 thunder days, 496.4 mm in May on 20.1 rainy days, 609.8 mm in June, 626.3 mm in July, 565.9 mm in August, 438.7 mm in September and 173.4 mm in October, of an annual 3,490.4 mm on 161 rainy days (IMD, Gangtok, 1981–2010), so that March to May bring about 26% of the year (NEER sum); its highest April total is 687.8 mm (1974) and its highest May total 951.7 mm (1996) (IMD, Extremes). The largest 24-hour falls are pre-monsoon: Gangtok's record, 310.3 mm, fell on 30 May 1975 (IMD, Extremes, 1958–2012), and Singhik's, 504.2 mm, on 12 May 1981 (CWC, 2(a), Table 7); Gangtok's other large days fall in early June (223.8 mm, 9 June 1997) and at the turn of September and October (201.0 mm, 3 October 1996), and Tadong's on 25 September 2005 (212.5 mm) (IMD, Extremes). The State already treats May onwards as the season for earthworks: its notices ban "construction involving earth excavation" each monsoon (6 May–30 September 2019; 1 June–30 September 2020), the ban of 2024 ran from 1 May and was extended by 15 days (as reported), and the State told the NGT that the monsoon "starts around the month of May or June and continues till September" (State counter-affidavit, 2022). And the CWC report for the subzone says that "The south-west monsoon and cyclonic storm causes the rainfall in the subzone from May to October" (CWC, 2(a), p. 29). Drainage work must therefore be finished before May at the latest, and the April storms argue for the deadline of 31 March (Chapter 10), the date that NDMA (2010) sets for pre-monsoon desilting and that the other North-East editions of this series use. High North Sikkim (sub-area SK-C) has seasonal snow, and Gangtok has occasional snow (its lowest temperature, −2.2 °C, was recorded in January 1956; IMD); no snow-day statistics were collected [TBC], and Chapter 10 keeps a snow regime for the works above about 2,500 m. The antecedent moisture rule of Clause 2.11.4 and the standby period of Chapter 10 refer to this season. |
| Storms outside the season | Large falls come before and after the season. Gangtok's highest days outside it are 72.0 mm in March (27 March 2008), 96.0 mm in November (11 November 1995) and 63.3 mm in January (6 January 1958), and Tadong's 87.7 mm in March (21 March 2004) (IMD, Extremes). Within the season, the storms of October have been among the worst: the storm of 2–5 October 1968 over the Darjeeling and Sikkim hills (as reported; Kalimpong 419.2 mm on 5 October, IMD), Gangtok's 201.0 mm of 3 October 1996 and the outburst flood of 3–4 October 2023. Design statistics use annual maxima from all months, no works deadline or operating rule shall assume that heavy rain is confined to June–September, and the works calendar of Chapter 10 keeps a mid-season clearance by 30 April, standby to 31 October and a post-season clearance by 15 November for this reason. |
| Climate factor (CF) | Multiplier applied to present-day design depths to represent the design-life climate. |
| Approved source | A rainfall source listed in Clause 2.3. |
2.3 Approved sources of design rainfall
2.3.1 Primary source. Design rainfall depths and intensities shall be taken from the National Institute of Hydrology, Roorkee NIH-DHAARA platform (Design Hydrology and Advanced Rainfall Analysis, nihdhaara.in). Use its IDF / frequency tools for the site's coordinates, for each duration and AEP required by Clause 2.4. In Sikkim this clause is suspended until Annex 2A is published: Clause 2.3.6 sets the interim source, and NIH-DHAARA enters it only as Clause 2.3.6(d), (e), (f) and (m) say, as a shape and for comparison, never as a depth.
2.3.2 Station IDF. A station-specific IDF relationship may be used in place of 2.3.1 only if all of the following hold:
- (a) it is derived from at least 30 years of recording-gauge (hourly or finer) data;
- (b) it has been published or approved by IMD, the State Hydrology Authority or the approving authority; and
- (c) the gauge is within 10 km of the site, with no major change of terrain or coastal exposure in between.
Where a station IDF is used, the design value shall be the greater of the station value and the NIH-DHAARA value.
2.3.3 Cross-checks (mandatory, not alternatives). The designer shall report, but need not adopt, the following values for comparison:
- (a) the IMD isopluvial / IDF values of Das et al. (2022), MAUSAM 73(4), for durations of 1–24 h;
- (b) for catchments of 25–5,000 km², the 24-hour point rainfall from the CWC Flood Estimation Report for subzone 2(a) (North Brahmaputra), which covers the whole State but whose isopluvial plates draw no contour north of Gangtok, so that in sub-areas SK-B1 and SK-C no CWC point rainfall exists for the cross-check of Clause 2.3.3(b) and the depths of Clause 2.3.6(c)(ii) and (c)(iii) apply instead; its unit hydrograph is not applied to a catchment with permanent snow, a glacier or a mapped glacial lake, or to the Teesta trunk, which need a site-specific study (Clause 2.3.6(i); Annex 3E), as applicable.
Where the design value is lower than the CWC subzone 2(a) (North Brahmaputra) plate (in sub-areas SK-A and SK-B; north of the plates' last contour, in sub-areas SK-B1 and SK-C, the plate gives no value and the depths of Clause 2.3.6(c)(ii) and (c)(iii) apply instead) value for the same AEP, the CWC value shall be adopted as a floor.
2.3.4 Not permitted. None of the following shall be used as a design rainfall source:
- (a) generalised all-India IDF formulae (for example Kothyari & Garde, 1992);
- (b) rainfall values that cite no source, including vendor or web-calculator tables;
- (c) single-event maxima; or
- (d) design intensities carried forward from a previous project without a stated AEP.
Figure 2.1 — Design rainfall source hierarchy and adjustment sequence. Original drawing for this Manual.
2.3.5 Version control. Every submittal shall record the source, its version or access date, the coordinates queried, and the values extracted (Clause 2.13).
2.3.6 Interim source in Sikkim. Until Annex 2A is published and confirms NIH-DHAARA, or an approved station IDF, for a zone, Clause 2.3.1 does not apply in Sikkim, and design rainfall shall be taken as follows:
-
(a) Station IDF. Where a station IDF fitted to a checked IMD recording-gauge (SRRG) or automatic weather station record of at least 25 years has been published in Annex 2B, it governs, within 10 km of the station and in the same sub-area of Annex 2A, for the durations and AEPs it covers, in place of (f), and subject to (c)(ii), (g) and (h); the comparison of Clause 2.3.2 is then made with the 24-hour and longer depths of (c) to (e) and (h). A record is checked when its annual totals and annual maxima have been compared with the IMD normals and station extremes for the station, and every year that disagrees has been explained or removed. An IDF derived from daily data by the one-third rule (Clause 2.6.4) or by any other fixed ratio is not a station IDF. In Sikkim Clause 2.3.2(a) is read with 25 years in place of 30, as in the mountain editions of this series, and the gauge shall not be separated from the site by a ridge or by the valley floor of the Teesta or the Rangit (set by this Manual, because the State's rain changes over a few kilometres: on 25 September 2005 Tadong recorded 212.5 mm and Gangtok 141.0 mm, about 4–5 km apart and about 300 m apart in height (IMD, Extremes; distance and height a NEER reading)). No IDF has yet been published in Annex 2B, and no published design criterion, IDF with constants or recording-gauge ratio was found for any station or town in the State. The only Gangtok "IDF" found, for the Ranikhola watershed (Wangsu, Isaac and Tirkey, 2022), was built by disaggregating daily rainfall and reports a July "peak intensity" of 259.785 mm/h (as given in its abstract); it is not a station IDF and is not used: it is cited only to show that no gauge-based IDF exists for Gangtok. The first data requests of this Manual are, by station: (1) Gangtok (IMD 42299), the Meteorological Office at 27°20′ N, 88°38′ E and 1,765 m (IMD), its daily annual maxima for 1958–2026 and its recording-gauge and automatic weather station maxima for 15 minutes to 72 hours; (2) Tadong (IMD 22209), its series of 1978–2007 and after; (3) Singhik and Dikchu, the two Sikkim ordinary rain gauges of the CWC 2(a) report, their record lengths and the series behind 504.2 mm and 400.8 mm (c)(ii); then the gauges at Mangan and Chungthang and the hydro-meteorological gauges of the hydropower projects (Teesta-V, Dikchu, Chuzachen); (4) the hourly series of the Lachen automatic weather station, used by Sattar et al. (2025), and the India-WRIS stations, among them Lachen; (5) the district network of the Meteorological Centre Gangtok (Namchi, Gyalshing, Pakyong airport, Soreng), whose types and record lengths are to be confirmed; and (6) IMD's extremes for 2013–2026 at Gangtok and Tadong [TBC].
-
(b) Reports, zones and sub-areas. One CWC report covers the whole State: the Flood Estimation Report for North Brahmaputra Subzone 2(a), Design Office Report No. NB/18/1991, placed before the Flood Estimation Planning and Co-ordination Committee at its 49th meeting on 24–25 October 1990 (CWC, 2(a)). Its text names "Gangtok the capital of Sikkim" first among the subzone's important towns (p. 28), says that the subzone covers "mainly parts of Assam, and small portion of Sikkim, Arunachal Pradesh and West Bengal" (p. 8), and lists the "Tista" among its rivers with a catchment of 10,616.74 km² (p. 29); its plates are "Isopluvials supplied by I.M.D." (title block). There is no separate report for the Teesta or for Sikkim, and no other subzone lies over the State (NEER reading). The 2(a) plates (Plates 8–10) draw Sikkim, the Tista and a dot for Gangtok, but north of Gangtok they draw no contour: Mangan, Chungthang, Lachen and Lachung lie east of a single curve along the north-western edge, labelled 180, 200 and 240 mm on Plates 8, 9 and 10, and read "180–200", "200–240" and ">240" mm only by implication (CWC, 2(a), Plates 8–10; NEER reading). Where the core refers to the CWC report north of that contour, in sub-areas SK-B1 and SK-C, the substitutes are (set by this Manual): for the 24-hour depths, (c)(ii) and (c)(iii); for areal reduction (Clause 2.7.3) and for rural rivers of 25–2,500 km², the ARF curves and unit hydrograph of the 2(a) report, the only published method, with the cautions of Chapter 3; and for the cross-check of Clause 2.3.3(b), none, because no CWC value exists there. The rainfall zone and sub-area of the site are those of Annex 2A: zone SK-Z1 Southern hills and valleys, with sub-areas SK-A Lower valleys (Rangpo–Singtam–Melli–Jorethang) and SK-B Ridge towns (Gangtok–Pakyong–Namchi–Gyalshing); and zone SK-Z2 North Sikkim, with sub-areas SK-B1 Middle Teesta valley (Dikchu–Mangan–Singhik–Chungthang) and SK-C High valleys (Lachen–Lachung–Thangu). Both zones lie in subzone 2(a); SK-Z1 is contoured on the plates and SK-Z2 is not. They fix the source of (c), the bounds of the check of (h) and the screening of (i). A catchment that crosses the line between two zones or two sub-areas of Annex 2A takes, at every duration, the higher value of the two (set by this Manual). The town lists of Annex 2A are a guide; their boundaries follow the ridges, the altitude bands of about 1,000 m and 2,500 m and the plates' last contour, and are to be confirmed [TBC].
-
(c) 24-hour depth, 2% and 1% AEP (50- and 100-yr). By sub-area (all set by this Manual):
- (i) SK-A and SK-B: the 2(a) plates. The 24-hour point value at the site read from the 50- and 100-year isopluvial plates of the 2(a) report (Plates 9 and 10), whatever the catchment area. Where the site lies between two contours, the higher contour value is used; where it lies inside a closed contour with no higher contour within it, the value is that contour plus one contour interval; where it lies on a contour, the higher of the two contours either side is used; and where the Plate 10 reading does not exceed the Plate 9 reading, the 1% AEP depth is the 2% AEP depth plus one contour interval, 40 mm. A site is on a contour when the line passes within about 1 km of it, about the placing error of town markers on these plates. The last two rules are those of another North-East hill edition of this series, set here because the plates were drawn by hand from few Sikkim gauges (two Sikkim stations appear in the report's Table 7; its 82 State ordinary rain gauges in four States are not listed one by one (CWC, 2(a), p. 40)), and because the gradient is steep, about 80–120 mm in 25 km at 50 years from Gangtok south to Melli (NEER reading). The contours over Sikkim are, on Plate 9, 200 mm (the north-western curve), 240 mm (south of Gangtok), 280, 320 and 360 mm (through Darjiling) and 400–480 mm towards the Duars front; on Plate 10, 240 mm (the north-western curve), 320 mm south of Gangtok, with no 280 mm line drawn, and 360, 400, 440 and 480 mm. Plates are read by the coordinates of the site, not by the town labels, and each reading is recorded on Form 2-1 with the contours on either side. For orientation only, read by eye to about one contour (low confidence; NEER reading of the plates, with town markers placed from the printed Gangtok and Darjiling dots), the readings at 2% / 1% AEP are: Gangtok, with Tadong and Ranipool, 240 / 320 mm, well north of the 240 mm and 320 mm lines; Pakyong 240 / 320 mm, about 2–4 km north of them; Singtam 280 / 360 mm, on the 240 mm and 320 mm lines; Rangpo 280 / 360 mm; Ravangla 280 / 320 mm, on the 240 mm line of Plate 9 and just north of the 320 mm line of Plate 10; Gyalshing 280 / 360 mm; Namchi 320 / 400 mm; Jorethang 360 / 400 mm; and Melli 360 / 440 mm, on the 320 mm and 400 mm lines. Soreng, near the west frame of the plates, was not read; until it is, it takes the higher of the Gyalshing and Namchi readings, 320 / 400 mm [TBC]. The Plate 10 reading exceeds the Plate 9 reading at every town read, so the last rule binds nowhere at present. Where the Gumbel estimate of (d) for the station of the site is higher for the same AEP, it governs; the 24-hour depth is then checked under (h).
- The plate governs wherever it draws contours; no departure below it is made. In the south NIH-DHAARA agrees with the plates: its 50-year 24-hour depths are 284 mm in the Namchi and Jorethang cell and 282 mm at Rangpo, against plate readings of 280–360 mm (m). At Gangtok it lies below them, at 195 mm, and the station's own record, 310.3 mm (h), lies above the 50-year plate value.
- (ii) SK-B1: no contour, so the north's own records set the floor. In sub-area SK-B1 the 24-hour depth shall be not less than 464.2 mm at 2% AEP and 504.2 mm at 1% AEP: the highest daily fall at Singhik, 504.2 mm on 12 May 1981 (CWC, 2(a), Table 7, checked on the page image), and that fall less one contour interval of the plates, 40 mm. When a station fit under (a) and (d) of at least 25 years of an IMD, CWC or India-WRIS gauge in SK-B1 is made, the fit governs, but not below 360.8 mm at 2% AEP and 400.8 mm at 1% AEP, the highest daily fall at Dikchu, 400.8 mm on 25 August 1969 (CWC, 2(a), Table 7), less one interval and as recorded, until Annex 2A is published. The reasons are these. The plate gives no value in SK-B1, and the 200–240 mm it implies at 50 years is about half the Singhik record, which the Dikchu record exceeds by 1.7 to 2 times (NEER arithmetic). NIH-DHAARA is lower still, 183 mm at 50 years in the Mangan cell and 154 mm in the Chungthang cell, and its reanalysis grid cannot resolve the orographic cells on the valley sides (m). Two independent gauges in the same valley recorded 400.8 mm and 504.2 mm, and Gangtok, about 20–25 km to the south (NEER distance), recorded 310.3 mm in 55 years of IMD record (h). An adjoining North-East hill edition set its plateau capital's floor in the same way, from the highest fall printed in a CWC report annex, where its plate could not be used. Both Table 7 values fail the record-check tests of (h), because their record lengths are not confirmed by an IMD table, so they enter here as a stated floor and not through (h). The floor is probably high as a 1% AEP depth: 504.2 mm is a single-day maximum at one ordinary gauge of unknown record length, and the series of Singhik, Dikchu, Mangan and Chungthang are the first data request of (a). The plate's implied values and the NIH-DHAARA value of the site's cell are recorded on Form 2-1 beside the design depth.
- (iii) SK-C: no contour and no record, so the plate's last values are carried north. In sub-area SK-C the 24-hour depth shall be not less than 240 mm at 2% AEP and 320 mm at 1% AEP, the Plate 9 and Plate 10 readings at Gangtok, the northernmost town that the plates contour. NIH-DHAARA's 50-year cells, 138 mm at Lachen, 121 mm at Lachung and 154 mm at Chungthang, and the plate's implied 200–240 mm are not used: no gauge checks them, and in SK-B1, the one area where the plate and NIH-DHAARA can be set against records at altitude, both lie far below the records. The Singhik and Dikchu floors of (c)(ii) do not reach SK-C, which is a different domain of (h), higher and behind the ridges above Chungthang, with no record of its own. Every cross-drainage structure and outfall in SK-C with a catchment of more than 1 km² has the site-specific study of (i).
- (i) SK-A and SK-B: the 2(a) plates. The 24-hour point value at the site read from the 50- and 100-year isopluvial plates of the 2(a) report (Plates 9 and 10), whatever the catchment area. Where the site lies between two contours, the higher contour value is used; where it lies inside a closed contour with no higher contour within it, the value is that contour plus one contour interval; where it lies on a contour, the higher of the two contours either side is used; and where the Plate 10 reading does not exceed the Plate 9 reading, the 1% AEP depth is the 2% AEP depth plus one contour interval, 40 mm. A site is on a contour when the line passes within about 1 km of it, about the placing error of town markers on these plates. The last two rules are those of another North-East hill edition of this series, set here because the plates were drawn by hand from few Sikkim gauges (two Sikkim stations appear in the report's Table 7; its 82 State ordinary rain gauges in four States are not listed one by one (CWC, 2(a), p. 40)), and because the gradient is steep, about 80–120 mm in 25 km at 50 years from Gangtok south to Melli (NEER reading). The contours over Sikkim are, on Plate 9, 200 mm (the north-western curve), 240 mm (south of Gangtok), 280, 320 and 360 mm (through Darjiling) and 400–480 mm towards the Duars front; on Plate 10, 240 mm (the north-western curve), 320 mm south of Gangtok, with no 280 mm line drawn, and 360, 400, 440 and 480 mm. Plates are read by the coordinates of the site, not by the town labels, and each reading is recorded on Form 2-1 with the contours on either side. For orientation only, read by eye to about one contour (low confidence; NEER reading of the plates, with town markers placed from the printed Gangtok and Darjiling dots), the readings at 2% / 1% AEP are: Gangtok, with Tadong and Ranipool, 240 / 320 mm, well north of the 240 mm and 320 mm lines; Pakyong 240 / 320 mm, about 2–4 km north of them; Singtam 280 / 360 mm, on the 240 mm and 320 mm lines; Rangpo 280 / 360 mm; Ravangla 280 / 320 mm, on the 240 mm line of Plate 9 and just north of the 320 mm line of Plate 10; Gyalshing 280 / 360 mm; Namchi 320 / 400 mm; Jorethang 360 / 400 mm; and Melli 360 / 440 mm, on the 320 mm and 400 mm lines. Soreng, near the west frame of the plates, was not read; until it is, it takes the higher of the Gyalshing and Namchi readings, 320 / 400 mm [TBC]. The Plate 10 reading exceeds the Plate 9 reading at every town read, so the last rule binds nowhere at present. Where the Gumbel estimate of (d) for the station of the site is higher for the same AEP, it governs; the 24-hour depth is then checked under (h).
-
(d) 24-hour depth, 50%, 20%, 10% and 4% AEP (2-, 5-, 10- and 25-yr). The depth is the Gumbel (EV1) estimate from the annual maximum daily rainfall series, of all months, of the IMD station agreed with the Authority, with 30 or more years of daily record, checked as in (a), multiplied by the fixed-interval factor of Clause 2.6.3. The station is Gangtok (42299), for sites within 25 km of it in SK-B east of the Teesta; no IMD daily series long enough was found for any other part of the State, and Gangtok's has not been obtained [TBC]. Until it is (set by this Manual), in every sub-area the 50%, 20%, 10% and 4% AEP depths are the 2% AEP depth of (c), after the check of (h), multiplied by 0.42, 0.61, 0.73 and 0.89, and the 4% AEP depth is not less than the 25-year plate value (Plate 8) read as in (c)(i) where the plate draws one. The factors are the upper envelope, rounded up to 0.01, of the growth curves of the twelve NIH-DHAARA cells queried in the State for this Manual (the 24-hour depth at each AEP divided by the 50-year depth: 0.392–0.419, 0.587–0.605, 0.716–0.729 and 0.879–0.884; the cells agree within 0.03) (NIH-DHAARA, queried 14 Nov 2026; NEER arithmetic): they take the platform's shape, not its values, and they are the factors of another North-East hill edition of this series. At Gangtok, on 270.3 mm after (h), they give about 114, 165, 197 and 241 mm; Gangtok lies north of the 200 mm line of Plate 8, so the plate check does not bind. The Plate 8 readings are about 200 mm at Gangtok, 240 mm at Pakyong, Singtam, Rangpo, Ravangla (on the 200 mm line) and Gyalshing, 280 mm at Namchi and Soreng, and 320 mm at Jorethang and Melli (NEER reading), and the factor gives more at every one. In SK-B1, on the floor of 464.2 mm, the factors give about 195, 283, 339 and 413 mm: these follow the floor and are as uncertain as it is. In SK-C, on 240 mm, they give about 101, 146, 175 and 214 mm. A day of record excluded under (h) is left out of a station series, and the fit with it is reported beside the fit without it on Form 2-1.
-
(e) 48- and 72-hour depths. The Gumbel estimate from the annual maximum 2-day and 3-day rainfall series of the same IMD station, with the fixed-interval factors of Clause 2.6.3, once obtained [TBC], and not less than the 24-hour depth for the same AEP as checked under (h). Until then (set by this Manual), in every sub-area the 72-hour depth is the 24-hour depth after the check of (h) multiplied by 1.75, and the 48-hour depth is interpolated between the 24- and 72-hour depths on logarithmic axes. The factor is the upper envelope, rounded up to 0.05, of the 50-year 72-hour to 24-hour ratios of the twelve NIH-DHAARA cells: Pakyong 1.736, Rangpo 1.721, Lachen 1.721, Mangan 1.702, Singtam 1.698, Gangtok 1.684, Namchi 1.662, Soreng 1.662, Ravangla 1.643, Chungthang 1.629, Gyalshing 1.617 and Lachung 1.609; their 48-hour to 24-hour ratios are 1.337–1.426 (NIH-DHAARA, queried 14 Nov 2026; NEER arithmetic). The multi-day volume matters in Sikkim because its slopes, jhoras and reservoirs respond to weeks of rain: Gangtok's wettest months on record are June 1997, with 1,281.3 mm, and May 1996, with 951.7 mm (IMD, Extremes); about 250 mm fell over the State in 1–13 June 2024 (as reported); and the storm of 2–5 October 1968 is reported to have brought "1,000 mm of rainfall in 52 hours" over the Darjeeling and Sikkim hills, a figure attributed to a scientist in the press and not a gauge value (as reported; unverified).
-
(f) Durations of 1 to 24 hours. The 24-hour depth of (c) or (d), after the check of (h), multiplied at every AEP, in every sub-area, by the ratios of the CWC report for subzone 2(a), North Brahmaputra: 0.260 at 1 hour, 0.37 at 2 hours, 0.457 at 3 hours, 0.615 at 6 hours, 0.720 at 9 hours, 0.805 at 12 hours, 0.875 at 15 hours and 0.930 at 18 hours (set by this Manual). The report derived them by frequency analysis of the hourly data of 12 self-recording rain gauges of IMD in the subzone and printed them for the 50-year depth (CWC, NB/18/1991, §3.1.2, p. 24); its Fig. 10 gives the 2-hour value, which logarithmic interpolation between 1 and 3 hours reproduces. None of the 12 gauges was identified in Sikkim (NEER reading). The set is used in every sub-area for three reasons. It is the only published ratio set for the subzone. It is the set that the West Bengal edition uses in the Darjeeling–Kalimpong hills across the Rangit and the Teesta, and the set that an adjoining North-East hill edition uses on its plateau, so that one storm reads alike on both sides of a border. And it lies above every Sikkim NIH-DHAARA cell at every duration: the cells' maxima are 0.190 at 1 hour and 0.310 at 2 hours (Pakyong), about 0.40 at 3 hours and about 0.58 at 6 hours (interpolated on logarithmic axes), 0.709 at 9 hours, 0.778 at 12 hours, about 0.84 at 15 hours and 0.898 at 18 hours (NIH-DHAARA; NEER arithmetic), so the series' envelope rule returns the 2(a) set itself. The NIH-DHAARA ratios, 0.13–0.19 at 1 hour, are not used: no Sikkim recording gauge exists to decide between them and the 2(a) set; the reanalysis grid, of about 0.12°, cannot resolve convective pre-monsoon bursts; and Gangtok's thunder days peak in April and May, 10.7 and 8.7 days a month (IMD, 1981–2010), the months in which its record and Singhik's fell. On Gangtok's 270.3 mm and 320 mm the set gives about 70 mm and 83 mm in 1 hour at 2% and 1% AEP, against 32 mm and 36 mm in NIH-DHAARA's Gangtok cell; on the floors of SK-B1 it gives about 121 mm and 131 mm. These are probably high, the conservative margin that the North-East hill editions accepted while no gauge exists, and they are why the Lachen automatic weather station and the Singhik series are priorities of (a). Between the tabulated durations the ratio is interpolated on logarithmic axes. No recording-gauge or automatic weather station ratio for any Sikkim station was found [TBC].
-
(g) Short storms. No absolute floor in millimetres is set for any sub-area of the State, as in the other North-East hill editions of this series, because no Sikkim recording-gauge maximum exists to base one on: no sub-daily record for any Sikkim station was found, and the hourly values of the Lachen automatic weather station were not tabulated in the work that used them (Sattar et al., 2025). Where a station fit later replaces (f), its 1-hour ratio for every AEP shall be not less than 0.26 until Annex 2B is published (set by this Manual). The depths of (f) are present-day, true-interval values: the fixed-interval factor of Clause 2.6.3 is not applied to plate or table products, which are already 24-hour sliding values, and the climate factor of Clause 2.8 is applied to them.
-
(h) 24-hour record check, bounded by domain. The 1% AEP (100-yr) 24-hour depth of (c) or (d) shall be not less than the highest qualifying 24-hour rainfall recorded at any station within 25 km of the site, in the same domain and not separated from the site by the valley floor of the Teesta or the Rangit, where that record is higher; the record is used as printed, without the fixed-interval factor, and is treated as a 1% AEP depth; and the 2% AEP (50-yr) 24-hour depth is then not less than the record less one contour interval of the plates, 40 mm (all set by this Manual, in the form of the Assam edition). The domains are five: SK-A; SK-B east of the Teesta (Gangtok, Tadong, Ranipool, Pakyong); SK-B west of the Teesta (Namchi, Ravangla, Gyalshing, Pelling, Soreng); SK-B1; and SK-C. A record never crosses the Teesta or the Rangit between two ridges and never passes from one sub-area to another. A record qualifies only when it is printed by IMD (in Extremes of Temperature and Rainfall for Indian Stations, a climatological summary, a monthly or seasonal climate summary, a later IMD table or an IMD press release that names the gauge and the day); the number of years of data at its gauge is confirmed by an IMD table as at least 20; it was made in 1901 or later; it falls in a month in which a fall of that size is plausible for the station; the location of its gauge is known; and it is not contradicted by another IMD table for the same gauge. A value printed only in a CWC report annex, such as Table 7 of the 2(a) report, is a flag that does not qualify until IMD confirms the gauge's record length, as in the Assam edition and the other North-East hill editions (set by this Manual). The outcomes at present are:
- Gangtok (42299), 310.3 mm on 30 May 1975 (IMD, Extremes, rainfall data 1958–2012), qualifies: it is the station's highest day in IMD's monthly and seasonal tables for the station, and May is a plausible month. It sets the 2% AEP 24-hour depth at not less than 270.3 mm, and the 1% AEP depth at not less than 310.3 mm, within 25 km of the gauge in SK-B east of the Teesta: Gangtok with Tadong and Ranipool, and Pakyong, about 11 km away (NEER distance from approximate town positions). The plate's 320 mm already exceeds 310.3 mm, so the Gangtok values are 270.3 mm at 2% AEP and 320 mm at 1% AEP. The record does not reach Ravangla, about 25 km away across the Teesta, Singtam or Rangpo, which lie in SK-A and whose plate values are higher in any case, or Dikchu and Mangan, in SK-B1.
- Tadong (22209), 212.5 mm on 25 September 2005 (IMD, Extremes, data 1978–2007), qualifies, lies below the plate and raises nothing. On the same day Gangtok, about 4–5 km away and about 300 m higher, recorded 141.0 mm (IMD, Extremes): evidence of the steep local gradients that the 25 km radius cannot see.
- Singhik, 504.2 mm on 12 May 1981, and Dikchu, 400.8 mm on 25 August 1969 (CWC, 2(a), Table 7), do not qualify: their gauges' record lengths are not confirmed by an IMD table [TBC]. They set the floors of (c)(ii) instead.
- Outside every Sikkim domain, recorded on Form 2-1 as flags only: Kalimpong, 419.2 mm on 5 October 1968 (IMD, data 1921–2006), and Darjeeling, 492.8 mm on 25 September 1899, before 1901 (IMD, Extremes), and the Darjeeling-district values of the 2(a) report's Table 7, Mongpoo 546.1 mm, Kurseong 501.7 mm and Darjeeling 454.1 mm, all in June 1950 (CWC, 2(a), Table 7). They lie in the hill zone of the West Bengal edition, across the Teesta and the Rangit, and that edition governs them; Kalimpong is flagged on Form 2-1 for Melli, Rangpo and Jorethang.
Until Annex 2A is published, the designer lists on Form 2-1 every record within 25 km of the site, with its domain and the tests it passes or fails. The check stops at 24 hours. It raises the 24-hour depth and, through (d) and (e), the more frequent AEPs and the 48- and 72-hour depths; it raises the 1- to 18-hour depths only through the ratio products of (f), because the records are daily totals and no hourly record of any of them exists.
-
(i) Hazard-first sites. No drain is sized for a glacial-lake outburst flood (GLOF), a landslide or a debris flow, so siting, setbacks and floor levels govern on the ground below, which is screened separately from rainfall design. No design is complete without a screening, recorded in the drainage report and on Form 2-1, that identifies the following and states whether the site lies on their path (set by this Manual):
- GLOF corridors: the Teesta from the South Lhonak lake through Chungthang, Mangan, Dikchu, Singtam, Rangpo and Melli to the State border; the Lachen Chu and the Lachung Chu; and every stream below a glacial lake that NDMA, the Science and Technology Department (the nodal department for GLOF studies and mitigation, Notification No. 10/Home/2025 of 07.02.2025) or the Sikkim Commission on Glacial Hazards lists as high-risk. NDMA has identified 40 high-risk glacial lakes in Sikkim, 16 of them very high risk (13 in Mangan district and 3 in Gyalshing district; 12 in the Lachen Chu watershed), and the State reports that "Shako Chho has habitations and Army establishments just 15 km downstream" (State affidavit before the NGT, 28.02.2026). The GLOF evacuation maps of SSDMA and the District Disaster Management Authorities, prepared with the participatory risk assessments of May 2024, are used where they exist [TBC];
- the Teesta valley floor: land at or below the level of the flood and aggradation of October 2023. The State reports that the river bed "has risen by an average of 7-8 meters", with NHPC's estimates of about 7.44 m at the Teesta Low Dam IV project, 7.29 m at Teesta Low Dam III, 6.00 m at Teesta-V and 2.00 m at Teesta-VI; that 155 households at Toong Naga were "mandated for relocation"; and that NH-10 along the Teesta "has become prone to submergence and subsidence" (Lhonak valley PPR, annexed to the State's affidavit before the NGT, 28.02.2026);
- landslide and sinking ground: stability zones 4 to 6 of the Mines and Geology Department (2021); land that is sinking, landslide-prone or "having scars of old landslides" (SBCR 1991, reg. 35); the Daling Group, "especially the Gorubathan Formation", reported to be more prone to landslides than the Higher Himalayan gneisses and schists (as reported; CGWB names both the Daling Group and the Gorubathan Formation as dominant in South Sikkim, an internal conflict [U]); and debris-flow fans and jhora gullies, such as those of Mangan district in June 2024 and of Chaten near Lachen on 1 June 2025 (as reported);
- hydropower release reaches, below Teesta-III (under restoration), Teesta-V at Dikchu, Teesta-VI, the Teesta Low Dam III and IV projects, Chuzachen, the Dikchu project, Rongnichu, Jorethang, Tashiding and Rangit-III, whose release rules and full and maximum water levels were not found [TBC]; and
- snow and rain-on-snow in SK-C and in any SK-B1 catchment with permanent snow or a glacier.
In SK-C every drain is designed with the depths of (c)(iii). Every cross-drainage structure and outfall with a catchment of more than 1 km² in SK-C, every catchment in any sub-area with permanent snow, a glacier or a mapped glacial lake, and every work on the Teesta trunk has a site-specific hydrology study, agreed with the Authority and recorded on Form 2-1, with GLOF, landslide-lake and debris-flow screening; no CWC unit hydrograph applies to such a catchment (set by this Manual, the rule of the mountain editions of this series for their high Himalaya). The reason is the cascade of 3–4 October 2023. The South Lhonak lake drained after a moraine collapse; its outflow "peaked at 4.85 × 10⁴ m³ s⁻¹" of water, with "1.03 × 10⁴ m³ s⁻¹" of sediment, "equivalent to a return period exceeding 200 years"; at Chungthang the "discharge peaked at 5340 m³ s⁻¹ … within ~6 minutes", with a depth of 9 m and a velocity of 9 m/s; about 270 × 10⁶ m³ of material was eroded; and Rangpo, about 135 km downstream, was "severely impacted by the debris, burying buildings and automobiles". Water alone, the outburst equalled "a 1–100 year meteorological flood at Chungthang", but the sediment made the total far higher, and outburst peaks exceeded meteorological floods for about 50 km below the lake (Sattar et al., 2025). The 1% AEP rainfall flood is therefore not the design flood for the Teesta trunk, and no rainfall-based setback or level protects against such a cascade. Its cause is disputed, and its toll is stated in two ways (Clause 1.1, Commentary).
-
(j) Cloudbursts. IMD calls a fall of 100 mm or more in one hour over a small area a cloudburst (as quoted; no IMD primary document was found for this Manual [TBC]). No measured cloudburst rate exists for Sikkim, and no hourly value for any Sikkim gauge was found. The State's affidavit of 05.04.2024 attributed the October 2023 flood "primarily to a cloudburst" (State affidavit before the NGT), while ERA5 reanalysis "shows 29–39 mm of rainfall" over the lake from 28 September to 5 October, with about 5 mm and 14 mm on 3 and 4 October, and no cloudburst near the lake (Sattar et al., 2025): both are stated, and this Manual takes no side. No design rule is drawn from the term. The 1% AEP 1-hour depth of (f) on the floor of SK-B1, about 131 mm, exceeds the threshold; Gangtok's, about 83 mm, does not. What a burst brings to a steep catchment that a design storm does not represent is boulders, slide debris and garbage in its first minutes; there the capacity of inlets, debris racks and culverts to stay open governs more than the conveyance of the drain, and Chapters 6 and 9 size them for it.
-
(k) Durations below 1 hour. No sub-hourly frequency analysis for any station in the State was found in research for this Manual. Until Annex 2B gives one, the ratio of the depth for a duration below 1 hour to the 1-hour design depth is agreed with the Authority, from a published recording-gauge analysis whose source is stated, and recorded on Form 2-1 [TBC]; the average intensity for a duration below 1 hour shall be not less than the 1-hour design intensity for the same AEP (set by this Manual). The time distribution of storms in the 2(a) report was not extracted for this Manual [TBC].
-
(l) Order of depths. For the same AEP, no depth shall be less than the depth for a shorter duration.
-
(m) NIH-DHAARA. NIH-DHAARA was queried at thirteen points in the State for the research for this Manual and at twelve of them for every duration it serves, on 14 November 2026 (IMDAA dataset). In Sikkim it is never a design value, a floor or a check: its growth shape is used in (d), its 72-hour to 24-hour shape in (e) and its duration-ratio shape in (f), and in every sub-area its present-day values at the site are reported on Form 2-1 beside the interim values, for comparison only. In the south it agrees with the plates (Namchi and Jorethang 284 mm, Rangpo 282 mm at 50 years); at Gangtok it gives 195 mm at 50 years and 218 mm at 100 years, 70% of the station record; and in the north it gives 121–183 mm at 50 years (Lachung 121 mm, Lachen 138 mm, Chungthang 154 mm, Mangan 183 mm) against records of 400.8–504.2 mm (NIH-DHAARA, queried 14 Nov 2026; NEER arithmetic). Its projected depths are not used under Clause 2.8.4.
-
(n) IMD Das et al. (2022). The paper prints IDF curves for 27 cities and none for Gangtok, Tadong or Darjeeling (MAUSAM 73(4), pp. 895–896); its range for the North-East region, 4–160 cm, is set by the wettest stations of the region. It is not cited for any Sikkim value, and the cross-check of Clause 2.3.3(a) is recorded on Form 2-1 as not available.
-
(o) Earlier design values. No design storm, return period, IDF or runoff coefficient was found for the drains of any town in the State. GSCDL's "Construction of drainage and jhora training works" (about ₹13.41 crore, as reported) and the stormwater drains on about 60 km of roads in seven towns under the ADB's Sikkim Integrated Urban Development Project (ADB, 57230-001) state no design storm that was seen; the drainage and landslip works of the Gangtok City Development Plan of 2006 "were not taken up" (CAG, 2016). A reply in the Lok Sabha that "rainfall intensity is usually taken in the range of 12 to 20 mm/hr" where records are lacking (as quoted) is a national fallback far below every Sikkim value in this clause and is not used. Road drains follow IRC:SP:42-2014 and IRC:SP:48 (Chapter 6). A designer who uses any other value reports it on Form 2-1; the AEPs of Table 2.1 and the depths of this clause apply.
-
(p) Other clauses. Where Clauses 2.3.2, 2.6.1, 2.7.1 and 2.13, Annexes 2A to 2C and Form 2-1 refer to the NIH-DHAARA value, the value under this clause is meant.
Commentary. NIH-DHAARA is a national, publicly accessible product from a Government of India institution, and it can be queried at any point in the State. That makes it a reproducible default that an approving authority can check. NIH-DHAARA's sub-daily values are derived from hourly records, not disaggregated from daily totals. That makes it the only public source suitable for sizing drains, which depend on short-duration intensity. Its values should still be checked against the long IMD daily record at 24 hours and longer (Annex 2A). In Sikkim the platform has not yet been shown to meet that purpose. It was queried at thirteen points of the State for this Manual. In the south its cells agree with the CWC plates: Namchi, Jorethang and Rangpo give 282–284 mm at 50 years in 24 hours, against plate readings of 280–360 mm. Northwards it falls away from every gauge that exists: Gangtok's cell gives 195 mm at 50 years, while IMD's Gangtok gauge recorded 310.3 mm on 30 May 1975, and the Mangan and Chungthang cells give 183 mm and 154 mm, while the Singhik and Dikchu gauges of the CWC 2(a) report recorded 504.2 mm and 400.8 mm in a day (IMD, Extremes; CWC, 2(a), Table 7; NIH-DHAARA, queried 14 Nov 2026). Its 1-hour ratios, 0.13–0.19, are half the CWC value, and no Sikkim recording gauge exists to say which is right. A source that fails a check in part of the State cannot be adopted for any of it, so Clause 2.3.6 uses the CWC report, the IMD station records and the north's own gauge maxima until Annex 2A has been done, and uses NIH-DHAARA only for the shape of its growth, duration and multi-day curves and for comparison on Form 2-1. IMD Das et al. (2022) is not cited, because it has no panel for any Sikkim station. Sikkim is the series' last North-East edition, and three things set its interim source apart. First, one CWC report covers the whole State, but its plates stop at Gangtok: the 2(a) report of 1991 names Gangtok first among its towns, yet draws no contour north of it, so that SK-B1 and SK-C, the middle and upper Teesta, have no CWC value at all. Clause 2.3.6(c)(i) therefore lets the plate govern wherever it draws contours, with no departure below it, and takes the plate's last values north into SK-C, where nothing else exists. Second, the State's own records exceed the plates. Gangtok's 310.3 mm lies above its 50-year plate value and close to its 100-year one, and Singhik's 504.2 mm and Dikchu's 400.8 mm, in the valley where the plate implies 200–240 mm, are about twice it; both fell in May or the monsoon, in the valley that the outburst flood of 2023 later followed. Clause 2.3.6(h) applies Gangtok's record within its own domain, east of the Teesta, and Clause 2.3.6(c)(ii) sets SK-B1's floor from the Singhik and Dikchu maxima, which fail the record-check tests but are the only values the valley has; the floor is probably high, and the Singhik series is the first data request. Third, the State's reference flood was not a rainfall flood. On 3–4 October 2023 the South Lhonak lake drained into the Teesta, after a moraine collapse, while the rain over the lake was modest (Sattar et al., 2025); the cause is disputed (Clause 1.1, Commentary), and under either account Clause 2.3.6(i) screens the GLOF corridors and the Teesta valley floor apart from rainfall design, and sends every structure there to siting and setback rules and to a site study, not to a larger design storm. The interim rules for the more frequent AEPs, the 48- and 72-hour depths, the reading of the plates, the SK-B1 and SK-C floors, the sub-area of each town, the ratio set, the bounded record check, the hazard-first screening and durations below 1 hour are set by this Manual. Several points are unresolved. The plate values were read by eye, to about one contour, from town markers placed on page images, and Soreng was not read [TBC]. The record lengths of the Singhik and Dikchu gauges are not known [TBC]. No sub-daily record for any Sikkim gauge was found, so the 1-hour ratio of 0.26 is unchecked in the State [TBC]. No storm-drain DPR for any town of the State with its design rainfall analysis was found for this Manual [TBC].
2.4 Design return periods (summary)
2.4.1 Design AEPs are set in the chapters for each element. They are summarised here so that the correct rainfall is extracted at the start of design.
Table 2.1 — Design return periods (summary)
| Element | Design AEP (return period) | Check event | Chapter |
|---|---|---|---|
| Minor drains: Gangtok, Namchi, Jorethang and Rangpo core and high-density areas | 10% (10-yr) | 1% (100-yr) overland path | 6 |
| Minor drains: other Class I urban areas | 20% (5-yr) | 1% overland path | 6 |
| Minor drains: other areas | 50% (2-yr) | 1% overland path | 6 |
| Arterial roads and crossings | 2–4% (25–50-yr) | next higher AEP | 6 |
| Collector / local roads | 4% / 10% (25 / 10-yr) | 2% / 4% (50 / 25-yr), plus the 1% overland path | 6 |
| Major (overland) system | 1% (100-yr) | — | 6 |
| Retention volume | Percentile daily rainfall (Clause 2.10) | — | 4 |
| Detention: standard catchments | 50%, 10%, 1% (2, 10, 100-yr) | 1% emergency spillway | 4 |
| Detention: flood-sensitive catchments | Mixed-frequency rule, Clause 2.11 | 1% | 4 |
| Building floor levels | 1% + 0.5 m freeboard | — | 6 |
| Detention emergency spillway | 1% with outlet blocked | 0.2% (500-yr) where high hazard | 4 |
Commentary. These values exceed the CPHEEO (2019) national advisory minimums of 5-yr (Class I cities) and 2-yr (other areas). CPHEEO allows a State to set higher values. The values are set in Chapters 4 and 6, and the table is reproduced here for convenience.
2.5 Design durations
2.5.1 Conveyance elements (pipes, open drains, inlets, culverts) shall be designed with the intensity for a duration equal to the time of concentration (Tc) of the contributing area (Chapter 3). The minimum duration is 10 minutes.
2.5.2 Storage elements (detention, retention, tanks, pumped sumps) shall be checked for every duration in the set {1, 2, 3, 6, 12, 24, 48, 72 h}. The largest required storage or water level governs. The 24-, 48- and 72-hour storms are mandatory checks at every site, whatever the critical-duration result.
2.5.3 Tidally influenced outfalls. For storage draining to a tidally influenced outfall (Chapter 5), the 48- and 72-hour storms shall also be run with the tailwater boundary of Clause 2.12.
Commentary. Sikkim's damaging floods have come when days of rain fill the soils, the jhoras and the reservoirs. In June 1997 Gangtok received 1,281.3 mm, its highest month on record, with 223.8 mm on 9 June (IMD, Extremes), and landslides in the town were reported to have killed 38 people (as reported); in May 1996 it received 951.7 mm (IMD, Extremes). About 250 mm fell over the State in 1–13 June 2024, against a normal of 162 mm, before the slides of 12–13 June in Mangan district (as reported), and three days of rain in north Sikkim preceded the Chaten landslide of 1 June 2025 (as reported). The storm of 2–5 October 1968 lasted four days over the Darjeeling and Sikkim hills, with "1,000 mm of rainfall in 52 hours" reported but not measured at any gauge found (as reported). The jhoras of the ridge towns rise within an hour of a burst, but the slides and debris that block their culverts, the saturated slopes that the stability zones record as wet, and the river and reservoir levels that hold the valley-floor outfalls up are set by the whole wet spell, not its peak hour. A rule based only on critical duration, applied to a small site, picks a 1–2 hour storm and misses this failure mode. That is why the long-duration checks are mandatory.
2.6 Sub-daily rainfall
2.6.1 Where NIH-DHAARA or an approved station IDF provides values directly for the required duration, those values shall be used.
2.6.2 Where only daily (24-hour) depths are available for a duration below 24 hours, the sub-daily depth shall be derived using the ratio set of Annex 2B. These are duration-to-24-hour ratios calibrated to Sikkim recording gauges. They shall not be lower than the ratios of the CWC Flood Estimation Report for subzone 2(a) (North Brahmaputra), which covers the whole State; that report derived them from recording gauges in the subzone, none of which was identified in Sikkim. The lower duration ratios of the NIH-DHAARA cells for Sikkim are not used, and IMD Das et al. (2022) prints no panel for any Sikkim station.
2.6.3 Fixed-interval adjustment. Depths from fixed observation windows (for example 08:30–08:30 IST daily data, or clock-hour data) shall be converted to sliding-window ("true interval") depths:
- 1.13 for a single fixed observation interval;
- 1.04 for 2 intervals;
- 1.02 for 3–4 intervals.
This adjustment does not apply where the approved source already gives true-interval values.
2.6.4 The empirical relationship P(t) = P(24)·(t/24)^(1/3) shall not be used for design unless Annex 2B confirms it for the zone concerned.
Commentary. The one-third power rule is common in Indian project reports, but no primary IMD source for it was found during research for this Manual. It applies one fixed curve shape everywhere: P(1h)/P(24h) = 0.35, P(3h) = 0.50, P(6h) = 0.63 and P(12h) = 0.79. It cannot represent the difference between a short convective burst and a long monsoon soak, and it tends to understate short-duration depths in convective coastal storms. Annex 2B shall tabulate the NIH-DHAARA ratios P(t)/P(24h) against these values by zone. That comparison shows whether the rule is acceptable anywhere in the State and corrects older daily-based analyses. The fixed-interval factors are the standard WMO (Hershfield) values. The IMD 2022 study applies similar clock-hour to any-hour corrections.
2.7 Point, grid and areal rainfall
2.7.1 Design depths are point values. Where an approved source provides grid-average values (for example 0.25° cells), they shall be converted to point values with the grid-to-point factors in Annex 2C before use.
2.7.2 For catchments ≤ 10 km², ARF = 1.0.
2.7.3 For catchments > 10 km², apply ARF as follows:
- for 25–5,000 km² in subzone 2(a) (North Brahmaputra): use the ARF curves of the applicable CWC Flood Estimation Report;
- for 10–25 km²: interpolate linearly between ARF = 1.0 at 10 km² and the CWC value at 25 km².
2.7.4 An ARF shall never be applied to storage design for a single development site.
Commentary. Gridded and district-average return levels are much lower than point values. For example, NIH-DHAARA's cell over Gangtok gives 195 mm at 50 years in 24 hours and 218 mm at 100 years, against the 310.3 mm that IMD's Gangtok gauge recorded on 30 May 1975, and its Mangan cell gives 183 mm, against the 504.2 mm and 400.8 mm recorded at Singhik and Dikchu in the same valley (NIH-DHAARA, queried 14 Nov 2026; IMD, Extremes; CWC, 2(a), Table 7). On 25 September 2005 Tadong recorded 212.5 mm and Gangtok, about 4–5 km away, 141.0 mm (IMD, Extremes): no grid cell of 0.12° or more can hold both. Neither error can be corrected without the factors of Annex 2C. Using grid values as point values without correction would make site-level design unsafe.
2.8 Climate factor
2.8.1 Until a statewide future-climate rainfall product is adopted, present-day design depths shall be multiplied by the following interim climate factors:
Table 2.2 — Interim climate factors
| Duration | Climate factor (CF) |
|---|---|
| ≤ 6 h | 1.20 |
| > 6 h to 72 h | 1.10 |
2.8.2 The CF applies to all elements with a design life of more than 25 years. For temporary works (design life ≤ 5 years), CF = 1.0.
2.8.3 The climate factor does not apply to the retention depth (Clause 2.10) or to the water quality volume depth (Chapter 8). Those depths are percentile or frequent-event statistics of everyday rainfall, not AEP design values.
2.8.4 Where NIH-DHAARA, or a product adopted on review under Clause 2.14, provides projected future-climate depths, those depths shall replace the interim factors.
Commentary. CPHEEO (2019) considers a fixed climate factor "not feasible" nationally and recommends trend testing instead. That leaves designers without a usable number. The 1.20 short-duration factor matches the UK value cited by CPHEEO itself. No design uplift factor has been adopted in Sikkim, and none was found in any document read for this Manual. The observed record is mixed: a study of IMD gridded rainfall for 1950–2018 found most extreme-precipitation indices over the State falling, the number of days of 10 mm or more rising, and changes in the one- to five-day maxima mainly in the west and north (Dubey et al., 2022, as summarised). ERA5 reanalysis shows the June–September precipitation over the South Lhonak catchment rising by 8.6 mm a decade, with glacier mass balance negative (Sattar et al., 2025), and the South Lhonak lake grew from about 17 ha in 1977 to 167.4 ha on 28 September 2023 (as reported). The Sikkim State Action Plan on Climate Change and NIH-DHAARA's climate grids for the State were not read for this Manual [TBC]. The case for an uplift rests on the size of the State's recorded extremes and on the cascade risk of its glacial lakes, not on trend statistics. The factors of Table 2.2, 1.20 up to 6 hours and 1.10 for longer durations, are therefore interim values, not Sikkim estimates; as in the mountain editions of this series they are applied after the record check of Clause 2.3.6(h), including to Gangtok's record where it governs. NIH-DHAARA's projected depths are not used (Clause 2.3.6(m)).
2.9 Temporal patterns (design hyetographs)
2.9.1 Storms up to 24 hours. Use the nested alternating-block method:
- construct the storm from the same IDF relationship (after the climate factor), at time steps no longer than Tc/3 and no longer than 15 minutes;
- place the peak block at 50% of the storm duration.
2.9.2 48- and 72-hour storms (monsoon pattern). Construct as follows:
- (a) The total storm depth equals the design depth for the full duration (48 or 72 h).
- (b) The final 24 hours contain the 24-hour design depth for the same AEP, distributed by the alternating-block method of 2.9.1.
- (c) The remaining depth (total minus the 24-hour depth) is spread uniformly over the preceding 24 or 48 hours.
Figure 2.2 — (a) 24-hour alternating-block design storm; (b) 72-hour monsoon design storm with the 24-hour design depth on the final day. Illustrative depths only. Original drawing for this Manual. The alternating-block method follows Chow, Maidment & Mays, Applied Hydrology (1988), §14.4.
2.9.3 Other temporal patterns. Huff-type or mass-curve patterns derived from Sikkim storms may be used instead of 2.9.1 and 2.9.2 only after they are published in Annex 2D. SCS Type I, IA, II and III distributions shall not be used.
2.9.4 Large catchments. For catchments of 25–5,000 km², the CWC Flood Estimation Report time-distribution curves may be used, and a sensitivity run with 2.9.1 shall be reported.
Commentary. The alternating-block storm embeds every shorter-duration design intensity in one hyetograph. That makes it conservative and consistent across durations. The 72-hour pattern puts the most intense day last. This reproduces the monsoon sequence of Sikkim: by the time the largest falls arrive, in May and from June to October after the storms of April, the thin soils and colluvium of the ridges and the fill behind their cuts are saturated, the springs and seepage zones are flowing, and the hydropower reservoirs on the Teesta and the Rangit are full or releasing. SCS distributions are excluded because they come from US convective and Gulf storm data and have no basis in Sikkim records.
2.10 Retention rainfall depth
2.10.1 The retention design depth is the 24-hour rainfall depth not exceeded on 90% of days with rain (≥ 2.5 mm) in the long-term record, read from the zone value in Annex 2E.
2.10.2 The site must retain on site the runoff from this depth (Chapter 4). Retention earns a detention credit equal to the reduction in required detention storage found by routing with the retention in place (Clause 4.4.6). The credit is not the retained volume subtracted one-for-one.
Commentary. This follows the Kansas City Metro APWA 5600 (2025.01) Required Retention Volume concept and Georgia's 1.0-inch runoff reduction standard. Both are based on percentile storms. A percentile depth is a statistic of everyday rainfall, not an AEP value, so it is computed from the daily record rather than from the frequency curves.
2.11 Design storms for pre- and post-development comparison
2.11.1 Same storm for both scenarios. Pre- and post-development runs shall use the same design storms:
- same AEP, duration, temporal pattern and climate factor;
- same antecedent moisture condition (Clause 2.11.4).
The two runs differ only in land surface parameters and Tc.
2.11.2 Standard catchments. For each of the 50%, 10% and 1% AEP storms and each duration in Clause 2.5.2:
Q_post(T) ≤ 0.9 × Q_pre(T)
2.11.3 Flood-sensitive catchments (as listed in Chapter 4: the catchments of Gangtok's jhoras to the Rani Khola and the Roro Chu, of the Teesta valley floor in the October 2023 corridor, of the Rangit at Jorethang and Majitar, of the Rongni Chu at Ranipool and Singtam, of Mangan town and the North Sikkim road, of Lachen, Chaten and every catchment below a high-risk glacial lake, of the hydropower reservoirs and release reaches, of the NH-10 corridor, of Namchi and of Soreng, and any catchment notified by the authority). The mixed-frequency rule applies:
Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr),
The post-development peak is checked for each duration in Clause 2.5.2. The caps are taken at the pre-development critical duration. The 10-yr cap is the largest pre-development 10-yr peak over all durations, and the 2-yr cap is the largest pre-development 2-yr peak over all durations. Each cap applies to every post-development duration.
2.11.4 Antecedent moisture. Use AMC III (wet conditions) for every design storm, whatever its duration, from 1 May to 30 September at a site in any sub-area of Annex 2A (SK-A, SK-B, SK-B1 or SK-C). Use AMC III for every design storm from 1 April to 31 October on valley-floor land below the 1% AEP flood level of the Teesta, the Rangit, the Rongni Chu or another river, on the river bed and terraces raised by the flood of October 2023, wherever the seasonal high water table is within 2 m of the ground, and in stability zones 3 to 6 of the Mines and Geology Department's notification of 2021, whose ground it records as "Wet", "Dripping" or "Flowing". Use AMC III for every design storm at any time of year in a catchment that drains to a hydropower reservoir or its backwater (among them Teesta-V at Dikchu, Teesta-VI, the Teesta Low Dam III and IV projects, Chuzachen, Jorethang, Tashiding, Rangit-III and Rongnichu), to a reach below a dam into which the dam releases water, or to a river reach whose CWC gauge stands above its warning level. At any other site or time, use AMC III for a design storm that follows, or contains, a 5-day rainfall total of more than 53 mm. Use AMC II (average conditions) for every other storm. AMC I is not used for design.
2.11.5 Pre-development condition. Pre-development is defined in Chapter 3: greenfield, open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted as pre-development.
Commentary. Matching each site's post-development peak to its own pre-development peak does not protect the catchment. Denver's analysis found that 100% matching at every site still produced 106% of historic peak downstream, which led to the 90% rule. The mixed-frequency rule is stricter. It caps the 100-yr post-development release at what the undeveloped site produced in a 10-yr storm. Malaysia (DID 2008: all ARIs ≤ pre-development 2-yr) is a tropical precedent for this kind of cap. AMC III for long storms reflects that monsoon extremes arrive after weeks of rain. In Sikkim the season, the ground and the receiving waters together decide how wet a catchment is. On the ridges thin soils lie over phyllite, schist and gneiss, and on steep ground water emerges "as seepages and springs wherever the land surface intersects local ground water body" (CGWB, as quoted); the stability zones of 2021 record the ground of zones 3 to 6 as "Wet", "Dripping" or "Flowing" (Mines and Geology Department, 2021). Gangtok has 20.1 to 27.0 rainy days a month from May to September (IMD, Gangtok, 1981–2010), and its 24-hour record (310.3 mm, 30 May 1975) and Singhik's (504.2 mm, 12 May 1981) both fell in May (IMD; CWC, 2(a)). The hydropower reservoirs on the Teesta and the Rangit hold water all year. This Manual therefore uses AMC III for every design storm from 1 May to 30 September in every sub-area; from 1 April to 31 October on valley-floor land below the 1% AEP flood level, on the river bed and terraces raised by the flood of October 2023, wherever the seasonal high water table is within 2 m of ground, and in stability zones 3 to 6, because April already brings 296.9 mm on 15.2 rainy days at Gangtok (IMD) and that ground is wet from the first storms; at any time of year in a catchment that drains to a hydropower reservoir, its backwater, a release reach or a river reach above its CWC warning level; and otherwise after a 5-day total of more than 53 mm, the NRCS growing-season threshold for AMC III; AMC II otherwise (Clause 2.11.4). The West Bengal edition uses AMC III from June to September in its hill zone across the Rangit; Sikkim's window starts in May because the State's largest 24-hour falls are pre-monsoon. AMC I is not used, because no part of the State is dry enough during the season to justify it. These are interim choices set by this Manual; no study in the State has yet validated AMC classes against observed runoff.
Illustrative scale of the mixed-frequency rule. The values below are not design values. They assume a 2 ha site in a hillside colony in Gangtok draining to a jhora with 24-h depths of 200 mm (10-yr) and 350 mm (100-yr), SCS-CN runoff with Ia = 0.2S, and CN 70 pre-development and CN 92 post-development:
Table 2.3 — Illustrative scale of the mixed-frequency rule (not design values)
| Case | Runoff depth | Runoff volume (2 ha) |
|---|---|---|
| Pre-development, 10-yr 24 h | 111 mm | 2,210 m³ |
| Post-development, 100-yr 24 h | 325 mm | 6,500 m³ |
The post-development 100-yr storm generates about three times the runoff volume of the pre-development 10-yr storm. A peak-rate cap at the pre-development 10-yr level means most of the difference must be stored and released slowly, so storage of the order of 0.2 m³ per m² of site may be needed. For this reason the rule applies only in flood-sensitive catchments (Clause 2.11.3); elsewhere the 0.9 × Q_pre rule of Clause 2.11.2 applies.
2.12 Joint occurrence with tailwater
2.12.1 For outfalls under tidal or river backwater influence, the design rainfall of this chapter shall be combined with the tailwater conditions of Chapter 5 as follows. The more severe case governs.
- (a) Design rainfall (AEP as required) with a mean high water springs (MHWS) tailwater plus the sea-level allowance.
- (b) A 10% AEP (10-yr) 48-hour storm with the 1% AEP still-water level (tide plus surge) plus the sea-level allowance.
Sikkim has no coast, so no outfall in the State is tidal and cases (a) and (b) do not arise. The tailwater is the jhora, khola, river, pokhari or reservoir into which a town drains. Most outfalls of the ridge towns, among them Gangtok, Pakyong, Namchi, Ravangla and Gyalshing, fall freely to a steep jhora, with no river tailwater; there the design case is a free outfall, with energy dissipation and a check of the receiving jhora to the next confluence (Clause 5.8.5(a)). At the valley-floor towns the receiving water is a river on a bed that the flood of October 2023 raised by metres. For an outfall under river or reservoir backwater, the site storm is combined with the receiving-water level under Clause 5.8.4, which pairs a design event on one side with a 10-yr event on the other in the same way as case (b), and the river and reservoir levels are those of Clause 5.8.2. CWC levels on the State's rivers are known only as transcribed by SANDRP or seen in snippets, and their datum is not stated [TBC]. On the Teesta at Khanitar the old highest level, 297.7 m (18.09.1974), was exceeded by 298.4 m at 09:00 on 4 October 2023 (as reported). At Melli the old highest level is given as 225.25 m and the peak of 4 October 2023 as 225.5 m in SANDRP's text and as 228.0 m in a CWC bulletin of 2024 seen in a snippet, with a warning level of 226.0 m and a danger level of 227.0 m; the two peaks conflict, and so does SANDRP's statement that the new level is "2.75 meter higher than the old HFL" (as reported) [U]; where a check level is needed at Melli the higher, 228.0 m, is used (Chapter 5). The Rongni Chu at Singtam has a danger level of 355.09 m and a highest level of 356.09 m, undated, and the Rangit at Majitar a highest level of 279.29 m (17.10.1985) (as reported); no CWC level was found for Rangpo [TBC], and the gauges upstream of Teesta-V stopped reporting between 22:00 and 23:00 on 3 October 2023 (as reported). Every level set before October 2023 needs a post-2023 survey, because the bed has risen by metres along the trunk, and an outfall invert set from a pre-2023 bed may now be buried; Chapter 5 takes the higher of the recorded level and the surveyed October 2023 flood mark (Clause 5.8.5(b)). The hydropower reservoirs have operator levels that were not found: no full or maximum water level or release rule was found for Teesta-V, Teesta-VI, the Teesta Low Dam projects, Chuzachen, Dikchu, Jorethang, Tashiding, Rongnichu or Rangit-III [TBC], and Teesta-III at Chungthang is under restoration (State affidavit before the NGT, 28.02.2026); until the operator gives them in writing, an outfall in a reservoir reach is treated as having an unknown tailwater and is sited above the October 2023 flood mark (Clause 5.8.5(c)). The GLOF corridors are screened apart under Clause 2.3.6(i): no rainfall tailwater governs there. Below Melli the Teesta and the lower Rangit form or cross the border with West Bengal, and the West Bengal edition governs those reaches. In the ridge towns the jhoras rise within the hour while the storm is still falling, and on the valley floors the river may be high from rain upstream, from a release or from an outburst while the local storm is light, so storage and outfalls are checked for the outfall-closed condition with the local storm falling before, during or after the river's peak. No document found in research for this Manual sets a design receiving-water level for the outfalls of any town in the State [TBC], and Chapter 5 sets the interim rule.
Commentary. Sikkim has no coast, so no outfall is tidal and there is no storm surge; the coincident load is the level of the rivers and reservoirs that receive the town drains. The coincidence works both ways. In a monsoon spell the rivers rise with the slopes: in June 2024, after about 250 mm over the State in thirteen days, landslides in Mangan district brought down the Sangkalang bridge while the rivers ran high (as reported), and in July 2025 the Teesta submerged NH-10 (as reported). But the Teesta's highest recorded flood came with little rain: on the night of 3–4 October 2023 the South Lhonak lake outburst raised the river to new highest levels at Khanitar and Melli (as reported) while ERA5 shows about 5 mm and 14 mm over the lake on 3 and 4 October (Sattar et al., 2025). A release from a dam does the same: the Dikchu release of 2017 came without warning (as reported). These levels give no warning of a local storm, and a local storm gives none of them. The river levels quoted for the State are transcriptions of CWC data or snippets, not readings of a CWC bulletin, and they conflict at Melli, which is why Chapter 5 requires every level to name its source and datum. Because rainfall and surge share a weather cause (in Sikkim, which has no coast, the counterpart of surge is the stage of the Teesta, the Rangit and the Rongni Chu and of the hydropower reservoirs that receive the town drains, raised by the same monsoon spells that bring the heaviest rain to the towns: in 1–13 June 2024 about 250 mm fell over the State, against a normal of 162 mm, while rivers rose and slides cut the roads of Mangan district (as reported); the outburst flood of October 2023, which raised the Teesta with little rain, is screened apart under Clause 2.3.6(i)), they cannot be treated as independent. Case (b) is a simple joint-probability surrogate until a statistical joint analysis is adopted.
2.13 Submittal requirements
Every hydrologic submittal shall include a Design Rainfall Sheet (Form 2-1) stating:
- the site coordinates and zone;
- the source (Clause 2.3), version or access date, and a screenshot or export of the values extracted;
- a depth table for each AEP and duration used, before and after the fixed-interval factor, grid-to-point factor, ARF and climate factor;
- the cross-check values of Clause 2.3.3 and the floor check;
- the hyetographs used, as a table and a plot, for each design storm; and
- the AMC and pre-development definition adopted.
Figure 2.3 shows the steps of this chapter in the order in which the sheet records them.
Figure 2.3 — From design rainfall source to design storm: the steps a designer follows (source, AEPs and durations, point depth, grid-to-point and areal reduction, climate factor, temporal pattern, design storm), the clause that governs each step, what Form 2-1 records, and the separate route for the retention depth. Schematic. Original drawing for this Manual.
2.14 Review and update
2.14.1 The approving authority shall review this chapter every 10 years. It shall also review it within 2 years of any event in which recorded rainfall exceeds the 1% AEP 24-hour or 72-hour design depth at two or more approved gauges in the State.
2.14.2 Updates to NIH-DHAARA take effect for new submittals 6 months after release, unless the authority notifies otherwise.
References (chapter)
- National Institute of Hydrology, Roorkee. NIH-DHAARA: Design Hydrology and Advanced Rainfall Analysis. http://www.nihdhaara.in/
- Das, S.K. et al. (2022). Isopluvial analysis and intensity–duration–frequency curves for different cities in India. MAUSAM 73(4), 887–898. https://metnet.imd.gov.in/docs/mausamdocs/173412_F.pdf
- Central Water Commission (1991). Flood Estimation Report for North Brahmaputra Subzone 2(a), Design Office Report No. NB/18/1991, placed before the Flood Estimation Planning and Co-ordination Committee at its 49th meeting, 24–25 October 1990 (p. 8 and p. 28, coverage and towns; p. 29, the river table and rainfall; p. 40, the rain-gauge network; §3.1.2, p. 24, and Fig. 10, the short-duration ratios; Table 7, the highest daily falls, with the Singhik and Dikchu rows; Plates 8, 9 and 10, the 25-, 50- and 100-year maps, "Isopluvials supplied by I.M.D.", read by eye from page images). https://cwc.gov.in/regional-flood-estimation-report
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A.
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): Gangtok (42299) and Tadong (22209), monthly and seasonal tables (p. M190); Kalimpong and Darjeeling (flags only). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- India Meteorological Department, Meteorological Centre Gangtok. Mean monthly meteorological parameters of Gangtok, 1981–2010. https://mausam.imd.gov.in/gangtok/mcdata/climatology_gangtok.pdf
- National Institute of Hydrology. NIH-DHAARA, IMDAA dataset, queried at thirteen points in Sikkim (1 and 24 hours) and at twelve of them for 1–72 hours, 14 November 2026 (tool output).
- Sattar, A. et al. (2025). The Sikkim flood of October 2023: Drivers, causes and impacts of a multihazard cascade. Science. doi:10.1126/science.ads2659 (accepted manuscript).
- Wangsu, M., Isaac, R.K. and Tirkey, N. (2022). Development of rainfall-intensity-duration-frequency (IDF) curves for Ranikhola watershed, Gangtok, India. Journal of Soil and Water Conservation (abstract only; cited to show that it is not a station IDF).
- Dubey et al. (2022). Variability of precipitation extremes and drought intensity over the Sikkim State, India, during 1950–2018 (as summarised; full text not read).
- National Green Tribunal (EZ). OA 171/2023: affidavits of the State of Sikkim of 05.04.2024 and 28.02.2026, with the PPR "GLOF Risk Mitigation in Lhonak Valley, Sikkim" (DST) and the PDNA summary. https://www.greentribunal.gov.in/
- Lok Sabha reply on design rainfall intensity where records are lacking ("12 to 20 mm/hr"; as quoted, not used).
- SANDRP transcriptions of CWC levels on the Teesta, the Rangit and the Rongni Chu, October 2023 (secondary source). https://sandrp.in/
- Chow, V.T., Maidment, D.R. & Mays, L.W. (1988). Applied Hydrology. McGraw-Hill (alternating-block method, §14.4).
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mile High Flood District (Denver). Urban Storm Drainage Criteria Manual (90% release rationale).
- Department of Irrigation and Drainage Malaysia (2008, 2012). Urban Stormwater Management Manual (MSMA).
Annexes
| Annex | Content |
|---|---|
| 2A | NIH-DHAARA vs IMD station and IMD gridded checks at benchmark points; zone map |
| 2B | Sub-daily ratios P(t)/P(24h) by zone: NIH-DHAARA (hourly-based) vs the one-third rule |
| 2C | Grid-to-point factors |
| 2D | Sikkim temporal patterns (Huff curves) |
| 2E | Retention percentile depths by zone |
| Form 2-1 | Design Rainfall Sheet |
Commentary. Most past drainage failures in Sikkim trace to the rainfall input, not the hydraulics. Sikkim shows how. No design storm, return period or runoff coefficient was found for the drains or the trained jhoras (झोरा; natural watercourses or ravine streams) of any town in the State: the drainage works of the Gangtok City Development Plan of 2006 "were not taken up" (CAG), and the drainage and jhora-training works of GSCDL and the stormwater drains of the ADB's project in seven towns state no design storm that was seen (as reported; ADB). The published sources that seem to fill the gap do not. The CWC report for subzone 2(a) covers the whole State, but its plates draw no contour north of Gangtok, and they lie below the State's own records: Gangtok recorded 310.3 mm on 30 May 1975 (IMD), above its 50-year plate value, and Singhik 504.2 mm on 12 May 1981, about twice what the plate implies there (CWC, 2(a)). NIH-DHAARA is lower still, 195 mm at Gangtok and 121–183 mm in the north at 50 years. IMD Das et al. (2022) has no Sikkim panel. The only Gangtok IDF in print was built by disaggregating daily rainfall and gives a July "peak intensity" of 259.785 mm/h (Wangsu et al., 2022, abstract), and a national fallback quoted in Parliament, "12 to 20 mm/hr" (as quoted), is far below any of these (Clause 2.3.6). Fixing one transparent source and method for the whole state is the main purpose of this chapter.