Draft v1.0 prepared by NEER. Not adopted by the Government of Tripura, the TTAADC or any authority or local body, and has no legal force. About this draft

Tripura · Draft v1.0

Tripura Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Tripura Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Tripura.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Tripura, by its Governor, its Council of Ministers or its Legislative Assembly, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Urban Development Department (UDD) or its Town and Country Planning Organisation (TCPO), the Tripura Urban Planning and Development Board or the Tripura Urban Planning and Development Authority (TUDA), the Agartala Municipal Corporation (AMC), any Municipal Council or Nagar Panchayat, or Agartala Smart City Ltd (ASCL). Nor has it been adopted, notified or endorsed by the Tripura Tribal Areas Autonomous District Council (TTAADC), any Village Committee or Panchayat, the water-body committees of the Department of Science, Technology and Environment (DST&E), or the State Level Advisory Committee (SLAC) of the Revenue Department. Where it names a body, such as PWD (Water Resources), PWD (Roads and Buildings) or PWD (Drinking Water and Sanitation), the Revenue Department or a District Magistrate and Collector, DST&E, the Forest Department, the Wetland Authority of Tripura, the Tripura State Pollution Control Board (TSPCB), the Tripura Disaster Management Authority (TDMA) or a District Disaster Management Authority, the Tripura State Electricity Corporation Ltd (TSECL), the High Court of Tripura, the Tripura Human Rights Commission (THRC), the National Green Tribunal (NGT) or the Supreme Court, or a body of the Union or another public body, such as the Central Water Commission (CWC), the India Meteorological Department (IMD), the Central Ground Water Board (CGWB), the Central Pollution Control Board (CPCB), the National Institute of Hydrology (NIH), the National Disaster Management Authority (NDMA), the Ministry of Environment, Forest and Climate Change (MoEF&CC), the North Eastern Electric Power Corporation (NEEPCO) or the National Highways and Infrastructure Development Corporation Ltd (NHIDCL), or a lender, such as the Asian Development Bank (ADB), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role. Citing a body's document does not make this Manual that body's document.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. Until then, the Tripura Municipal Act, 1994 and the Tripura Building Rules, 2017 as amended (the TBR 2017); the Tripura Urban Planning and Development Act, 2018, the Master Plan for the Agartala Planning Area 2045 and its zoning and development control regulations, and the notifications of the Local Planning Areas; the Tripura Land Revenue and Land Reforms Act, 1960 and the Tripura Land Revenue and Land Reforms (Diversion of Land) Rules, 2025 as amended in 2026; the Wetlands (Conservation and Management) Rules, 2017; orders of courts and tribunals; and approval conditions in force continue to apply.

Tripura and the Sixth Schedule. The Tripura Municipal Act, 1994 "extends to the whole of the State of Tripura except the areas under the Tripura Tribal Areas Autonomous District" (section 1(2)), and the TBR 2017 are made under that Act, so neither applies in the area of the TTAADC. That area is about 68% of the State, as reported. The State-made laws on the Council found for this Manual, among them the Tripura Tribal Areas Autonomous District Council Act, 1979 and the Village Committee Act, 1994, were seen only by their titles, and none of those titles concerns building or drainage; no building or land-development regulation of the Council was found [TBC]. Where a town and the Council's area meet, the line can be disputed: a proposal of 2026 to form a Nagar Panchayat at Bisramganj on land that the Council's leaders say lies within the autonomous district was unresolved in the reports read. This Manual therefore names its "competent authority for the area" by area and by subject, as Chapter 1 sets out. The UDD could make it part of the TBR 2017 by an amendment under section 274 read with section 118 of the Municipal Act; TUDA could write its drainage reserves, lunga and pukur protection and river buffers into the zoning regulations of the Master Plan 2045 and the layouts of the Local Planning Areas; the Agartala Municipal Corporation and the other urban local bodies could apply it at building permission and occupancy and to the drains vested in them; PWD (Water Resources) could set outfall, sluice and embankment-crossing conditions; the Revenue Department could refer to it in decisions on water bodies; and the Council could adopt it for its own area by its own regulation or resolution. None has done so, and the Manual can reach the Council's area only through the Council. Land is recorded by district, sub-division and revenue circle, as the land-revenue forms of 2026 list them, and by mouza and plot [TBC]; in the Council's area land is held under the Council's own land law, which was not researched for this Manual [TBC]. This Manual reserves drainage corridors and easements in a master plan or secures them by agreement; it does not assume that land can be taken. The paragraphs of the Sixth Schedule were not read for this Manual and are not quoted; the division is described by its effect, from section 1(2) of the Municipal Act.

Names. Some places, rivers, gauges and instruments have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • the Haora is Agartala's river and CWC's name for its site at the city. Sources also write it in an English form used for a city elsewhere, and its Kokborok name is Saidra, as reported; this Manual writes Haora throughout. The Katakhal, Agartala's northern drainage channel, is also written Kathakhal and Kathakal; it is not the channel of the same name in another State;
  • the Gomati is the river and the district; CWC prints the river as Gumti, and this Manual uses that form only in a CWC site name and in the name of the Gumti hydel project. Dumbur, also written Dumboor, is the reservoir of that project at Tirthamukh. The Muhuri at Belonia is also written Muhari, and the Burima at Gajaria and Boxanagar is also called the Burinala and the Bijoy;
  • the South Tripura gauge Bagafa is also written Bokafa and Bogafa; IMD and the State name the same place. This Manual writes "Bagafa (IMD)" for the IMD gauge, which differs from "Bagafa AWS". Other places are also spelt in two ways: Sepahijala (Sipahijala), Bisramganj (Bishramganj) and Sabroom (Sabrum);
  • IMD names its two Tripura stations in its tables of extremes Agartala (A) (index 42724), which its press releases call Agartala Aero, and Kailashahar (A) (index 42618), also Kailashahar Aero. Kailashahar CWC is a different gauge: CWC's river-level site on the Manu at Kailashahar. This Manual names the gauge each figure comes from;
  • the State has eight districts, formed in 2012: West Tripura, Sepahijala, Khowai, Gomati, South Tripura, Dhalai, Unakoti and North Tripura. CWC's tables still print the older districts, so that Kailashahar appears under "North Tripura" and Sonamura under "West Tripura". A clause that names a district must be checked against the current list;
  • no CWC Flood Estimation Report covers any part of Tripura. The report for subzone 2(b), South Brahmaputra, mentioned Tripura once, and its corrigendum deletes the mention; its plates stop at about 25° N, north of the State. By elimination the State lies in subzone 2(c), "Barak and others", for which CWC never published a report; this is NEER's reading, to be confirmed against CWC's map of subzones [TBC]. That subzone is not the five rainfall zones (TR-Z1 to TR-Z5) and seven hydrologic sub-areas (TR-A, TR-B, TR-B1, TR-C, TR-D, TR-D1 and TR-E) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7;
  • the land between the tillas is a lunga in the land records and in Agartala's place names, and "loonga" in CGWB's reports; this Manual writes lunga, and keeps "loonga" only in a quotation;
  • the State's second official language is spelt "Kok-Borak" in the Official Language Act and "Kok Borok" in the notification of 1999; this Manual writes Kokborok;
  • the Master Plan for the Agartala Planning Area 2045 was declared final by the UDD on 24 February 2026 under section 53(1) of the 2018 Act, covering 238.57 km², the Agartala Municipal Corporation and 49 gram panchayats, as reported. Its notification number and its text, including its zoning regulations, were not read for this Manual [TBC], and no buffer, zone or drainage rule is taken from it;
  • CWC's levels in the State were read only in a transcription by the South Asia Network on Dams, Rivers and People (SANDRP) and in the press, in metres, and no source read states their datum [TBC]. The values disagree: the Haora's danger level at Agartala is given as 10.48 m, 10.50 m or 10.70 m and its highest flood level as 11.08 m, 12.14 m, 12.4 m or 12.42 m (22 August 2024), probably from different gauges or datums. This Manual uses the higher value until CWC confirms the gauge and datum, and names the gauge, the unit and the datum with every level. CWC, not PWD (Water Resources), runs the river-level sites cited;
  • Agartala's position is given as 23°45′ N, 91°30′ E in Tripura at a Glance and at 91°17′ E by CGWB and the ADB; the two longitudes conflict, and both lie in UTM zone 46N, which this Manual uses for the whole State; and
  • in this Manual "the monsoon" and "the monsoon season" mean the wet season of 1 April to 31 October. That is not IMD's usage: IMD counts April and May as pre-monsoon months, the months of the nor'westers, and the south-west monsoon reaches Agartala in about the first week of June (about 5 June, inferred from press reports of IMD's onset dates in 2025 and 2026; another report gives 10 June, and IMD's revised normals were not read [TBC]); the date of its withdrawal from Tripura was not obtained [TBC]. The Manual's season begins on 1 April because the April and May storms are among the State's largest (Chapter 2).

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:

  • the Tripura Building Rules, 2017 were made by the UDD under section 274 read with section 118 of the Tripura Municipal Act, 1994, by notification No. F.2(316)-UDD/GL/TCPO/2009 (Part-I)/371 of 10 November 2017, as cited in the UDD's BRAP-2019 document; the gazette of 2017 was not read [TBC]. They were amended by the Tripura Building (Amendment) Rules, 2019 (No. F.2(466)-UDD/GL/TCPO/2018/599-627, 19 February 2019; Gazette Extraordinary No. 482, 25 February 2019), the (Second Amendment) Rules, 2020 (dated 15 February 2020, Gazette 24 February 2020; its number is illegible in the copy read [TBC]), the (3rd Amendment) Rules, 2022 (No. F.01(24)-TUDA/Estt/2022/4902-30, 29 November 2022; Gazette 2 December 2022), the (Fourth Amendment) Rules, 2024 (No. F.1(23)-TUDA/ESTT/2024/66, 15 January 2025; Gazette No. 95, 17 January 2025) and the (Fifth Amendment) Rules, 2025 (F.No.2(466)-UDD/GL/TCPO/2018(P-V)/4009-20, 4 July 2025; Gazette No. 1294, 5 July 2025). No sixth amendment was found up to November 2026. The rules replace the Tripura Building Rules, 2004 (rule 1(4)) and apply to "buildings in the Urban Local Bodies (ULBs) in Tripura" (rule 1(2)), to which the amendment of 2019 added "and Planning Areas". This Manual cites a rule as "TBR 2017, r.9(4)". There is no "Tripura Building (Construction) Rules";
  • the Agartala Municipal Corporation is constituted under the Tripura Municipal Act, 1994; there is no separate Act for it. It became a Municipal Corporation in January 2014, as reported, and its wards are given as 49 or 51 and its area as 76.5 km² or 92 km², as reported; the figures conflict. The Agartala Planning Area of the Master Plan 2045 is wider than the Corporation's area, and ASCL, the UDD, PWD (Roads and Buildings), PWD (Water Resources) and PWD (Drinking Water and Sanitation) build and hold drains in it. The State's other 19 urban local bodies are Municipal Councils and Nagar Panchayats. Under the Municipal Act, "all public tanks, streams, reservoirs, and wells" and "all public sewers, drains, channels, tunnels, culverts and water courses in, alongside, or under any street" vest in the Municipality "unless the State Government otherwise directs by a notification" (section 91), and the Municipality "shall provide and maintain a system of drainage or sewerage as well as a safe and sufficient out-fall" (section 156(1)); no order allocating Agartala's drains among the bodies that build them was found;
  • TUDA is the Tripura Urban Planning and Development Authority under the Tripura Urban Planning and Development Act, 2018 (Tripura Act No. 12 of 2018). It gives building permission and the occupancy certificate in the notified Local Planning Areas, and for buildings or townships of 50 or more flats or of one acre or more inside an urban local body (TBR 2017, r.13(3), inserted in 2020). In this Manual TUDA means the Authority; the Board of the same Act, which the Chief Minister chairs, is written in full. Section 163 of the 2018 Act repealed the Tripura Town and Country Planning Act, 1975, and orders made under it are deemed made under the new Act. TUDA's notification under section 52(1), of November 2019, declared Local Planning Areas adjacent to 20 cities and towns, the first of them the Agartala-Ranibazar-Jirania Local Planning Area. The UDD, whose file series is "UDD/GL/TCPO", makes the Building Rules, oversees the urban local bodies and contains the TCPO;
  • the Tripura Land Revenue and Land Reforms Act, 1960 (43 of 1960) and the Diversion of Land Rules, 2025 made under it (Revenue Department No. F.4(05)-RCC/2025, 2 June 2025; Gazette Extraordinary No. 1072, 3 June 2025) treat the "Diversion of water body to any other purpose" as a diversion of land. As made, the rules required the recommendation of a district or sub-divisional committee of DST&E, a no-objection certificate of the Fire and Emergency Service and the approval of the SLAC, with the District Magistrate and Collector deciding. The (First Amendment) Rules, 2026, of 6 March 2026 (Gazette Extraordinary No. 2026350), substituted a self-declaration online for rule 3 and a revocation within 30 working days for rule 4, and omitted rules 6 to 10. Whether section 20 of the Act, as amended, still bars the diversion of a water body was not established, so this Manual does not state the procedure that now applies [TBC]. Appendix-I of the rules gives the land classes in Bengali with official English glosses, from which this Manual takes its local terms;
  • PWD (Water Resources) builds and keeps the flood-protection embankments and anti-erosion works and the double-barrel sluice on the Katakhal, and has mapped flood-plain zones on the Haora for the NGT; no Tripura statute on embankments or drainage was found, and its consent to cut, cross or discharge through an embankment is taken in this Manual to be an owner's consent [TBC]. PWD (Roads and Buildings) builds the major roads and their drains, and PWD (Drinking Water and Sanitation) the drainage pump houses and, with the UDD, the sewage treatment plants. The Wetland Authority of Tripura was constituted on 5 September 2018, as cited, under the Wetlands (Conservation and Management) Rules, 2017; and
  • TDMA, the Tripura Disaster Management Authority, is chaired by the Chief Minister, as reported, and the Revenue Department is the State's nodal department for disaster management; District Disaster Management Authorities are written in full. The Gumti hydel project at Dumbur is operated by TSECL, as reported.

Where a shared clause calls for the local language on a sign, a form field or a basin name, this Manual writes "Bengali". Bengali and Kokborok are both official languages of the State, and English the language of this Manual. Under the Tripura Official Language Act, 1964 (Act No. 5 of 1964), as amended by the Tripura Official Language (Amendment) Act, 1979 (Act No. 8 of 1979, as cited), "the Bengali language and the Kok-Borak language" are the languages for "all or any of the official purposes of the State of Tripura" from 1 May 1999, the date appointed by the Law Department's notification No. F.12(1)-LAW/88(Shadow) of 29 April 1999, and "The English language may continue to be used" (section 2(2)(a)). Shared clauses write "Bengali" because their fields hold one name in one script and the land records carry the Bengali name; Kokborok is not thereby the lesser language. So, as set by this Manual, signs and flood-depth markers are in Bengali, Kokborok and English, with Kokborok written in the script that the local body or the Council uses. The choice of script for Kokborok, Roman or Bengali, is disputed, as reported, and this Manual takes no side. In Annex 7A the field WB_NAME_BN holds a water body's name in Bengali; a Kokborok name, such as Saidra for the Haora, goes in the field WB_NAME with a note.

Some local words are used in the text, and are explained again where they first appear. The glosses in quotation marks are the official English of the land classes in Appendix-I of the Diversion of Land Rules, 2025:

  • a pukur (Bengali পুকুর: a tank or pond — the land records' 'Tank/Pond'; plural pukurs) is this Manual's word for a dug pond or tank. Biswas's Samsad Bengali-English Dictionary (p. 653; edition not confirmed) gives "a pond, a tank, a pool", with পুকুর কাটা, "to excavate a pond", and পুকুর ঝালানো, "to dredge a tank". Bengali marks the plural with -gulo or -guli, so the English plural "pukurs" is a convention of this Manual. Its bank, the pukurpar (পুকুরপাড়), is a land class of its own, "Bank of tank";
  • a dighi (Bengali দীঘি: a large tank) is "Large tank" in the land records and "a large and deep tank or pond" in Biswas; its bank, the dighirpar, is "Bank of large tank". Where a shared clause writes "tank (pukur)", it means a pukur or dighi, a palace or temple tank, a beel that has an outlet, or the Dumbur reservoir; Tripura has no cascades of irrigation tanks. This Manual calls engineered storage a detention pond, never a pukur, and never calls a natural wetland a pukur;
  • a doba (ডোবা) is "Ditch" in the land records: a small pit of water, not a pukur;
  • a beel (বিল) is "Watery land", a natural low wetland, and a haor (হাওর) "Big watery land", a large seasonal wetland;
  • a tilla (টিলা) is "Hillock", the low rounded hills of the dissected uplands, and a lunga (লুঙ্গা) "Flat lands between tillas", the flat valley floor that is the natural flow path between them;
  • a chhara (ছড়া) is "Streams" in the land records, a stream that runs down from the tillas or the hills; the Building Rules call such a stream a jhora, and this Manual keeps "jhora" only when it quotes them;
  • a khal (খাল) is "Khal" in the land records and "a canal; a strait; a channel" in Biswas, a canal or drainage channel, and a nala (নালা) "Water channel", a smaller natural or built channel; and
  • a bandh (বাঁধ) is "Embankment", this Manual's word for a river or pond embankment, though the text keeps the English "embankment" in clauses.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2, 3 and 4 and in Annexes 3, 4 and 10; where the text names a body, it is the Agartala Municipal Corporation;
  • "TBR 2017" is the Tripura Building Rules, 2017 as amended, and "MBBL 2016", in Chapters 1 and 10, the national Model Building Bye-Laws of 2016, not the State's rules;
  • TUDA is the Tripura Urban Planning and Development Authority. In other editions of this series and in some sources similar letters stand for other bodies; in this Manual it means only this one;
  • HFL is the highest flood level recorded at a gauge, as CWC uses it, and DL and WL are CWC's danger and warning levels. None is a design level. TBR 2017, r.55 sets the plinth by the crest of the road, at not less than 60 cm; no flood level fixed by a local authority was found for any town, and Chapter 7 says how this Manual finds one.

The sense is clear from the context.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Tripura's towns flood, and fail, for three reasons. Agartala showed the first on 22 August 2024, when the Haora reached 12.42 m at the CWC site in the city, above its earlier highest level of 12.4 m in 2017, as reported, and the city's centre, a saucer between the Haora embankment and the Katakhal, could be drained only by pumping; Bagafa showed the second on the same day, when IMD's gauge there recorded 49 cm of rain in 24 hours, more than the 100-year value of any NIH-DHAARA cell in the State; and Agartala's drains show the third every day, because the city's sewers serve only its North Zone and its new sewage treatment plants are fed by tapping the storm drains, which the NGT has said "is not legal".

  1. Towns in saucers and on lungas that drain into rivers higher than themselves, and on across a border that no level data crosses. Agartala's centre is "at a lower level than other areas giving it the appearance of a saucer", the ADB's environmental examination of 2020 records; "During normal rainfall of about 3 to 4 hours, the central part of Agartala gets flooded", and when the Haora and the Katakhal run high "Several pumps have been provided to lift the water out of the city during these seasons". In August 2024 the city had 18 flood pumps of up to 900,000 litres an hour each and 6 diesel pumps, discharging to the Katakhal and the Haora, as reported; the Katakhal drains through a double-barrel sluice of PWD (Water Resources); and a proposal of July 2026 for two more embankments and three more pumping stations, at ₹1,000 crore, is to be "implemented in phases, depending on the availability of funds", as reported. The other towns are built on the lungas and flood plains of rivers that leave the State: Kailashahar on the Manu, Dharmanagar on the Juri, Belonia on the Muhuri, Khowai on the Khowai, and Udaipur and Sonamura on the Gomati below the Dumbur reservoir, whose gates were opened on 21 August 2024, as a district alert reported and the State's power minister denied. In August 2024 the Muhuri at Belonia rose to 18.81 m, 1.83 m above its highest level of 1983, and the Juri at Nutan Bazar to 20.66 m, as reported. Every one of these rivers flows on into Bangladesh, as this Manual reads them; there is no control downstream in India and no level data from across the border. PWD (Water Resources)'s pages give the State's flood embankments as 154.41 km in one place and 134.55 km in another, as cited; no operating rule or closing time for any sluice was found.
  2. Rainfall that no CWC report covers, with a measured day above every estimate. The whole State lies outside every published CWC Flood Estimation Report, so there is no plate, no ratio and no synthetic unit hydrograph for any part of it. IMD's national rainfall intensity curves (Das et al., 2022) have no panel for Tripura. NIH-DHAARA's reanalysis grids are of the right order here: Agartala's 50-year 24-hour depth, 320.5 mm, is 1.25 times the largest day in the 60 years of IMD's record at Agartala (A), 257.2 mm on 22 July 1993, and Kailashahar (A)'s record of 377.2 mm on 6 June 1993 equals DHAARA's 100-year value there, 379.4 mm, within 2.2 mm. But they are low against the extremes. Bagafa's 49 cm on 22 August 2024 exceeds every 100-year DHAARA value in the State, the largest of which is 435.1 mm, at Sabroom; two days earlier Belonia recorded 32 cm and Amarpur 31 cm, above the 50-year values of their own cells, 311.9 mm and 291.1 mm; and two cells 30 km apart in one valley, at Teliamura and south of Khowai, differ by 22%. No recording-gauge record of the State's short storms was found in any source. About 200 mm of rain in three hours was reported at Agartala in June 2022 and again on 31 May 2025, when a man died in a manhole, but no IMD value confirms either.
  3. Storm drains that are the sewers. Agartala's sewers, 103.6 km "with 4011 nos. household connection", run "only in the North Zone", and its sewage treatment plants "are designed to be connected through Interception & Diversion of Drains", the State told the NGT in July 2026. The Corporation's area generates 61.0 MLD of sewage against 17.4 MLD of treatment capacity, and the other 19 urban local bodies 21.4 MLD, none of it treated; the State put its total at 82.4 MLD in that affidavit, but at a meeting of the Central Monitoring Committee in August 2025 asked CPCB to consider 227.43 MLD, and the figures conflict. The NGT's point, as the affidavit quotes it, is that "storm water drains are being tapped and taken to STPs which is not legal", and that sewage and storm water mixing in the monsoon "will not only upset functioning of STP but, will also lead overflow of untreated sewage". The Haora at Dashamighat is in CPCB's list of polluted river stretches (Priority V).

Over all three lie four more. Lungas and pukurs filled: ponds have been filled for housing at Barjala and Lanka Basti, as reported; the High Court of Tripura heard the filling of ponds and walling of their banks at Kalyan Sagar, Matabari, in PIL 2 of 2014, and the encroachment of Agartala's water bodies in 2017, as cited; the State reported 180 urban water bodies on government land in 2020, of which 30 were prioritised, as reported; and no inventory of Agartala's ponds was found. Tilla cutting that silts the drains and slides in the rain: the tilla uplands are "10 – 30 m high mounds with gullies in between them", as CGWB describes them, and in August 2024 landslides were reported at 2,032 locations; on the national highways the High Court's suo motu PIL 06 of 2026 found "culvert block by silt, vegetation, debris", and the CAG found "frequent water logging of different areas due to blockage of drains and canals by plastic waste". A water table near the surface: in West Tripura CGWB found the water 0.22–6.64 m below ground in November 2017, with iron up to 4.99 ppm, and "The ground water table being very high" in Agartala, as the ADB records; the stage of groundwater extraction is 9.48%, and every assessment unit is Safe, as quoted. And building rules that bar filling and regulate riverbanks but set no design storm, detention or volume: the TBR 2017 forbid the filling of any "canal, pond, water body, wetland, river lets, jhora, water source, natural spring, streams, drains, culverts" without the State's approval (r.9(3)), limit buildings within 15 m of a river bank (r.9(4)), ask for a "site drainage plan up to nearest Nagar Panchayat or Municipality or natural outfall" (r.14) and require rainwater harvesting on buildings of 200 m² of plinth or more (r.110); but no rule says for what storm a drain is sized, how much water a site must store, or how fast it may release its runoff, and since 2025 every use may cover 70% of its plot.

Behind all of this lie the State's rivers, pukurs, dighis and beels, which set the level at the outfall and hold the water when the gates are shut. Rudrasagar, in Sepahijala, is a Ramsar site of 240 ha, designated in 2005 by the Ramsar record and in 2007 by the Forest Department's account; the dates conflict. The palace and temple tanks of the towns are storage that already exists, with heritage and fisheries uses that this Manual does not draw down. The land records count pukurs, dighis, their banks, beels and haors as land classes of their own, so they can be counted as storage and protected as land.

Design for Tripura therefore has to cover a wet season that begins with the storms of April and May, before the south-west monsoon reaches the State in about the first week of June: Kailashahar's wettest month on IMD's record is May (1,175.0 mm, in 1991) and its next is April (1,012.8 mm, in 1977), and Agartala recorded 198.0 mm in a day on 11 April 2007. It is this Manual's monsoon season, 1 April to 31 October. Large falls come outside it too, as on 19 February 1993 at Agartala (142.2 mm), 11 October 1989 at Agartala (183.6 mm) and 10 November 1986 at Kailashahar (104.2 mm), so design statistics use the annual maxima of every month. CGWB's five-year averages give Agartala 1,851 mm a year, and the ADB's examination 1,922–2,855 mm across the State, increasing from south-west to north-east; IMD's normals were not obtained [TBC]. There is no snow. Underground, groundwater is plentiful, shallow and little used; rainwater is worth storing for use, but on the lungas and flood plains it cannot be put into the ground in the season when it falls.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site, in tanks for use, and in the ground only where the ground is above the water table and can safely take it;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving chhara, khal, pukur or river is high, when the sluice in the embankment is shut and the town drains only by its pumps, when the Dumbur reservoir is releasing, or when a drain is choked with silt from the tillas.

The Manual also sets how public drains, roads and their drains, chharas, khals, pukurs and dighis, embankment sluices, pumped outfalls and basin-wide master plans are designed, and how drains below cut tillas are protected against silt and debris, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Tripura's wet season of April to October, with its pre-monsoon storms; to a State that no CWC report covers; to towns on lungas and flood plains that lie behind embankments and below the river's high stage, and drain through sluices and pumps into rivers that cross into Bangladesh; to the release reach of the Gomati below the Dumbur reservoir; to the silty clays of the flood plains and lungas, the lateritic sandy clays and sandy loams of the tillas, the weathered Tipam sandstone and the sandstone–shale ranges; to a water table near the surface; to the pukurs and dighis; and to storm drains that carry sewage.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014, and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. NIH-DHAARA, the core's primary source, applies in Tripura as modified by this Manual, because no CWC report covers the State: the 24-hour depth at every return period is the greater of DHAARA's value at the site and its value at the governing cell of the site's sub-area; durations of 1 to 24 hours are not less than the ratios of CWC's report for subzone 2(a) applied to that day, used as a lower bound; floors at 1, 3 and 6 hours keep every short design storm above the largest falls recorded at the recording gauges of the nearest CWC report, in the Brahmaputra valley; and a check against the largest reliable days recorded within 25 km, and in the same zone, raises the 1% AEP day where a record exceeds it, so that no 1% AEP day in the Muhuri–Feni south falls below Bagafa's 49 cm. A station analysis of IMD's Agartala (A) and Kailashahar (A) records governs once one is made. All these rules are set by this Manual (Chapter 2). IMD's national rainfall intensity curves (Das et al., 2022) are not used, because none of their panels is for a station in Tripura.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The TBR 2017 and their five amendments; the Tripura Municipal Act, 1994; the Tripura Urban Planning and Development Act, 2018 and TUDA's notification of the Local Planning Areas; the Tripura Land Revenue and Land Reforms Act, 1960 and the Diversion of Land Rules, 2025 with their amendment of 2026; the Tripura Official Language Act, 1964; the Wetlands (Conservation and Management) Rules, 2017; and the orders of the High Court of Tripura in PIL 06 of 2026 and PIL 2 of 2014, and of the NGT in OA 673 of 2018 and OA 606 of 2018. This Manual follows them or, where disclosed, makes them stricter. The Master Plan for the Agartala Planning Area 2045 and its zoning regulations, DST&E's guidelines for the protection of lakes, ponds and water bodies, section 20 of the Land Revenue and Land Reforms Act as amended, the Tripura Panchayats Act, 1993, any instrument of the TTAADC and the Sixth Schedule itself were not read. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Tripura can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. The State Action Plan on Climate Change of 2017 and its second edition were not read for this Manual [TBC], and no factor for design was found in any source on them.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. No CWC report covers any part of Tripura, and IMD's 2022 national set of rainfall intensity curves has no panel for it; the North-East panels of Das et al. (2022) are all for stations outside the State. NIH-DHAARA's grids are of the right order at Agartala and Kailashahar, but every one of them is below the 49 cm that IMD measured at Bagafa in 2024.

Tripura has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of the UDD, TUDA, the Agartala Municipal Corporation, any Municipal Council or Nagar Panchayat, ASCL or any branch of the PWD that fixes a return period, a runoff coefficient or a design rainfall for town storm drains, and no IDF relationship with published constants for any station in the State. The ADB's environmental examination of 2020 for its Agartala project, which includes 48.2 km of new or rehabilitated storm drains, states no return period, runoff coefficient or design rainfall; the project's aim to cut the time the city takes to drain "from one to two hours to about 15–30 minutes" is known only from a report, and its design report was not read [TBC]. The TBR 2017 defer what they do not cover to "the latest edition of National Building Code and other relevant Indian Standards" (r.3A), and roads follow the IRC codes. This Manual is offered as a technical companion to the TBR 2017, the Municipal Act, the master plans and their zoning regulations, and the State's land-revenue rules on water bodies: it supplies the design storm, detention, water-level, tailwater and buffer values that they leave open. It has not been adopted by the UDD, TUDA, the Agartala Municipal Corporation, PWD (Water Resources), the TTAADC or any other body. In particular:

  • The rules ask for a site drainage plan, but name no storm. The site plan shows "the means of drainage of the proposed building leading to existing public drains or drainage channels" and the "natural drainage channel/jhora" (r.5(1)(k) and (p)); the plans show "the house drainage plan, and site drainage plan up to nearest Nagar Panchayat or Municipality or natural outfall" (r.14); and a site must be "capable of being well-drained" (r.4(1)(c)). None of them says for what storm. Since 2025, low-risk buildings are approved on an empanelled professional's self-certification, "on a trust-based approach" (r.13(3)), and "Inspection for self-certified buildings is hereby waived", with 10% to 15% of applications selected at random (r.34(9)); and every use may cover 70% of its plot, and some industrial and commercial plots 100% (r.46(1) and r.51(2)). Control at the stage of the plan now rests with the professional who certifies it;
  • The rules ask for rainwater harvesting with no volume, and for recharge in ground that is already full. Rule 110 requires "the complete proposal of rainwater harvesting" for every building of 200 m² of plinth or more, and for group housing, public and industrial buildings of any size; group housing must use permeable materials "for all open parking spaces", and public open spaces over 500 m² must capture their storm water. It sets no storage volume, roof-area rate or infiltration test. It makes groundwater recharge mandatory on plots over 500 m² (r.110(5)), but on the lungas and flood plains, where the water can stand less than a metre below ground after the monsoon (0.22 m at the shallowest well in West Tripura in November 2017), a recharge pit is a soakaway in saturated ground. This Manual states the conflict and asks for storage in its place; it does not override the rule;
  • The rules regulate the riverbank but keep no corridor. Within 15 m of a river bank, or of the front of a water body of more than 1,000 acres, a building may be no higher than 5.00 m (6.50 m on stilts), no longer than 20.00 m and no larger than 200.00 m², with 50.00 m between buildings (r.9(4)); that is a regulated zone, not a line within which nothing may be built. In the plains a building within 5.00 m of a tank must only keep its drainage out of the tank (r.4(1)(e)). The only distance within which no site may lie is 5 m from the "outside edge" of a water course, and it applies only in the urban local bodies of the hill areas (r.90(1)(i)), which the rules do not list [TBC]. There is no distance from a chhara, a lunga or a pukur in the plains, and "river bank" is not defined;
  • The water-body rules protect storage, but their procedure is in doubt. Filling a pond, wetland, stream or drain needs the Local Body's decision with the State's prior approval (r.9(3)), and diverting a water body as land needed, under the rules of 2025, the SLAC's approval; the amendment of March 2026 replaced that procedure with a self-declaration online, and what now applies to a water body was not established [TBC]. DST&E's guidelines for the protection of lakes, ponds and water bodies, framed after the High Court's order in PIL 2 of 2014, as cited, were not read, and no buffer is taken from them;
  • There is no floodplain law and no line for the floodplain. No Tripura Act on flood-plain zoning was found. The TBR 2017 count as hazard-prone the "flood prone areas in river plains" of CWC's Flood Atlas of India and areas flooded by "heavy intensity rains, inadequate drainage, etc. as identified through local surveys in the Development Plan" (r.2(44)), and PWD (Water Resources) has mapped flood-plain zones on the Haora for the NGT, at Khayerpur, Kashipur, Baldakhal, Aralia, Jogendranagar and Joynagar (Dashamighat); their return period and status are not known [TBC]; and
  • No document sets the river level for which an outfall is designed. CWC's danger levels and highest flood levels were found only in transcriptions, on no stated datum, and the Haora's disagree with one another. The Katakhal has no gauge; no level from Bangladesh, downstream of every river, was obtained; and PWD (Water Resources)'s operating rules for its sluices, the time they stay shut and the capacity of Agartala's pumping stations were not found. Highest flood levels are records, not design levels.

So each agency and each local body interprets the central manual its own way. In law Agartala's drains are the Corporation's (Municipal Act, sections 91 and 156), but its capital works are built by others: the CAG found that AMRUT's "major works (98 per cent)" were being carried out by the UDD and PWD (Drinking Water and Sanitation) "and only a few minor works … by AMC", and PWD (Roads and Buildings) builds the major roads and their drains; ASCL builds storm drains, flood pumps and works on the Akhaura canal and the Katakhal; PWD (Water Resources) holds the embankments and the sluice. No order allocating these drains among the bodies was found. A town's drain may be a municipal drain for part of its length, a roadside drain of PWD (Roads and Buildings) for another, a natural chhara or lunga for a third and an embankment drain where it reaches a sluice. In the TTAADC area the TBR 2017 do not apply at all. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in five rainfall zones and seven hydrologic sub-areas: NIH-DHAARA at the site or at the governing cell of its sub-area, whichever is higher; the 2(a) ratios as a lower bound at durations of 1 to 24 hours; short-storm floors at 1, 3 and 6 hours; a check of the design day against the largest reliable days recorded within 25 km in the same zone, which sets the 1% AEP day in the Muhuri–Feni south at not less than 490 mm; and a checked station analysis to govern where one exists (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites, the detention that the TBR 2017 do not ask for (Chapter 4);
  • a required tailwater check for every outfall against a design river level, the Haora's 12.42 m at Agartala until CWC confirms its gauge and datum, which treats the sluice shut against a high river as the normal monsoon case: the gate closed for the whole of the 72-hour design storm and, where no stage record exists, as on every reach that runs to the border, the Katakhal and the Akhaura canal, for a further 72 hours, or for as long after the storm as the river stays above the sill, whichever is longer; the receiving pukur, dighi or lunga full at the start; the stored water pumped down within 48 hours; and the Dumbur reservoir releasing on the Gomati below it (Chapter 5);
  • a design flood line, and corridors and setbacks along rivers, chharas, khals and lunga flow paths and around pukurs, dighis and beels, proposed by this Manual for use where nothing wider binds, with a corridor at least 15 m from the top of bank on every natural channel draining 8 ha or more, in which nothing is built, and the 1% AEP extent plus 10 m wherever that is wider; it is stricter than the regulated zone of r.9(4) and the 5 m of r.90(1)(i) (Chapter 7);
  • no deliberate infiltration on the lungas and flood plains, below the 1% AEP flood level, inside an embankment that ponds when its sluices close, at the margins of pukurs, dighis and beels, on filled ponds or where the water table rises within 2 m of the surface; infiltration on tilla tops only where tested; none on tilla slopes, cut faces or hill slopes steeper than 20% without a geotechnical certificate; roof runoff to storage for use, with its overflow to lined drains; and the interception and screening of dry-weather flow before every outfall to a pukur, a dighi, the Haora, the Katakhal or the Akhaura canal, sized so that storm flows stay out of the treatment plants, where drains carry sewage (Chapters 4 and 8);
  • silt traps at the foot of the tillas, allowances for sediment and debris, and sluices, flap gates and pumps designed for the river's high stage (Chapters 6 and 9), with drains, chharas, khals, inlets, sluices and pumps cleared, tested and certified ready by 31 March, before the April storms, cleared again by 31 May before the south-west monsoon and by 15 November after it, and standby kept from 1 April to 31 October (Chapter 10); and
  • basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). The Agartala Municipal Corporation, a Municipal Council or Nagar Panchayat, TUDA in its master plans, the UDD in the TBR 2017, or the TTAADC by its own regulation can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Tripura Building Rules, 2017, as amended up to the Fifth Amendment of 2025 (High Court of Tripura consolidated texts), rules 1, 2, 3A, 4, 5, 9, 13, 14, 34, 46, 51, 55, 90 and 110; UDD, BRAP-2019 supporting documents (Uniform Building Code); Tripura Municipal Act, 1994, as amended up to 7 May 2025, ss. 1, 91 and 156–166; Tripura Urban Planning and Development Act, 2018 (Tripura Act No. 12 of 2018), ss. 52, 53 and 163; TUDA, notification of Local Planning Areas under s.52(1) (November 2019); Tripura Land Revenue and Land Reforms (Diversion of Land) Rules, 2025 (Gazette Extraordinary No. 1072, 3 June 2025), Appendix-I, and the (First Amendment) Rules, 2026 (Gazette Extraordinary No. 2026350, 6 March 2026); Tripura Official Language Act, 1964 (Act No. 5 of 1964), as amended, and Law Department notification No. F.12(1)-LAW/88(Shadow) (29 April 1999); High Court of Tripura, WP(C)(PIL) No. 06 of 2026 (judgment of 8 September 2026) and WP(C)(PIL) No. 2 of 2014 (as cited); NGT, OA 606/2018 (State affidavit of 6 July 2026) and OA 673/2018 (State affidavit and CPCB report); CPCB, Polluted River Stretches for Restoration of Water Quality (2025); CAG, Audit Reports (Government of Tripura) for 2019-20, Chapter II, and 2022-23, Chapter II; ADB, draft Initial Environmental Examination, Agartala City Urban Development Project (53262-001, November 2020); CWC, Flood Estimation Reports for subzones 2(a) (NB/18/1991) and 2(b) (Revised), No. SB-2(b)/R-4/44/99 (March 2000) and its corrigendum; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012), and press release of 22 August 2024, Annexure I; Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (queried 14 November 2026); CGWB, Aquifer Mapping (NAQUIM) report for West Tripura district, and the Dynamic Ground Water Resources assessment of 2024, as quoted; S. Biswas, Samsad Bengali-English Dictionary (DSAL edition); CWC levels as transcribed by SANDRP (2018 and 2024); reports of the floods of 2022, 2024, 2025 and 2026, of Agartala's flood pumps and flood-protection proposal, of the ponds of Agartala, of the Master Plan 2045, of the TTAADC and of the Kokborok script (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Ponds (Pukurs) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Tripura
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Tripura locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies and wet land
7E.2Streams, channels, drains and wells
7E.3Land and embankments
7E.4Terms avoided or not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A valley town on a lunga between tillas: its chharas, drains, khal, pukurs and dighi, and the outfall sluice at low and high river stage. Tilla uplands with lateritic soil and chharas running down to the lunga floor, silt traps at the tilla foot, a town on the lunga with lined drains and nalas falling to a khal, pukurs and a dighi with their banks as the town's storage, dry-weather sewage intercepted and screened before the dighi and the river, an embankment (bandh) with an outfall sluice, flap gate and pump station, the river shown at low stage (gate open, gravity) and high stage (gate closed, pukurs and lunga storing, pumps running) and leaving across an international border with no downstream control or level data, the infiltration rules for the lunga floor, the flat tilla tops and the tilla slopes, and the Manual's corridor along the chhara and round the dighi
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AAP Annual action plan (CGWB; in a report title)
ABC Waters Active, Beautiful, Clean Waters (PUB Singapore's design guidelines)
ADB Asian Development Bank
AEP Annual exceedance probability
AIDR Australian Institute for Disaster Resilience
AMC Antecedent moisture condition (Chapters 2–4 and Annexes 3, 4 and 10); Agartala Municipal Corporation (where a body is named)
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
ARG Automatic rain gauge
ASABE American Society of Agricultural and Biological Engineers
ASCL Agartala Smart City Ltd
ASTM ASTM International (standards)
AWS Automatic weather station
BOD Biochemical oxygen demand
BRE Building Research Establishment (UK)
BRO Border Roads Organisation
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CDO A design organisation named with CWC and RDSO in the sources (expansion [TBC])
CGP Construction General Permit (US EPA)
CGWB Central Ground Water Board
CN Curve number (SCS/NRCS method)
COD Chemical oxygen demand
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DL / WL Danger level / warning level (CWC)
DM District Magistrate and Collector
DPR Detailed project report
DST&E Department of Science, Technology and Environment, Tripura
DWF Dry-weather flow
EN European Standard (Norme Européenne)
EPD Environmental Protection Division (Georgia, United States)
ESC Erosion and sediment control
EV1 Extreme value type I (Gumbel) distribution
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FRL / MWL Full reservoir level / maximum water level
FRP Fibre-reinforced plastic
GWRA Ground water resource assessment (CGWB)
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Tripura)
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HSG Hydrologic soil group
HY-8 FHWA's culvert hydraulic analysis program
ICP Integrated check post (the Akhaura border crossing)
IDF Intensity–duration–frequency
IEE Initial environmental examination (ADB)
IIT Indian Institute of Technology
IMD India Meteorological Department
IMDAA Indian Monsoon Data Assimilation and Analysis (a regional reanalysis)
IRC Indian Roads Congress
ISO International Organization for Standardization
IST Indian Standard Time
KC Kansas City (Kansas City Metro APWA Section 5600)
KVK Krishi Vigyan Kendra (a gauge site)
LiDAR Light detection and ranging (laser survey)
LPA Local Planning Area (under the Tripura Urban Planning and Development Act, 2018)
MBBL 2016 Model Building Bye-Laws 2016 (MoHUA; not the State's rules)
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
NAQUIM National Aquifer Mapping and Management programme (CGWB)
NBSS&LUP National Bureau of Soil Survey and Land Use Planning
NDMA National Disaster Management Authority
NEEPCO North Eastern Electric Power Corporation
NGT National Green Tribunal
NH National Highway
NHIDCL National Highways and Infrastructure Development Corporation Ltd
NIH National Institute of Hydrology, Roorkee
NIT National Institute of Technology
NOC No-objection certificate
NPDES National Pollutant Discharge Elimination System (United States)
NRLD National Register of Large Dams (CWC)
NRSC National Remote Sensing Centre
NWIA National Wetland Inventory and Assessment (ISRO)
OA Original Application (NGT)
OGC Open Geospatial Consortium
PIB Press Information Bureau
PIL Public interest litigation
PSD Permissible site discharge
PWD Public Works Department, Tripura
PWD (DWS) Public Works Department (Drinking Water and Sanitation)
PWD (R&B) Public Works Department (Roads and Buildings)
PWD (WR) Public Works Department (Water Resources)
RDSO Research Designs and Standards Organisation (Railways)
RL Reduced level
RMSE Root-mean-square error
RRV Required retention volume
RWH Rainwater harvesting
SANDRP South Asia Network on Dams, Rivers and People
SAPCC State Action Plan on Climate Change
SH State highway
SLA Sea-level allowance (coastal term; not applicable in Tripura)
SLAC State Level Advisory Committee (Revenue Department)
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUH Synthetic unit hydrograph (CWC)
TBC To be confirmed: a fact or value not yet found in a source
TBR 2017 The Tripura Building Rules, 2017, as amended
TCPO Town and Country Planning Organisation (in the UDD)
TDMA Tripura Disaster Management Authority
THRC Tripura Human Rights Commission
TMA The Tripura Municipal Act, 1994
TR-55 Technical Release 55 (USDA SCS/NRCS)
TSECL Tripura State Electricity Corporation Ltd
TSPCB Tripura State Pollution Control Board
TTAADC Tripura Tribal Areas Autonomous District Council
TUDA Tripura Urban Planning and Development Authority
UDD Urban Development Department, Tripura
UH Unit hydrograph
ULB Urban local body (in Tripura, the Agartala Municipal Corporation, a Municipal Council or a Nagar Panchayat)
USACE US Army Corps of Engineers
UT Union Territory
UTM Universal Transverse Mercator
VR Value rating (of a BMP treating the WQv)
WP(C) Writ petition (civil)
WQv Water quality volume
WSUD Water-sensitive urban design