Draft v1.0 prepared by NEER. Not adopted by the Government of Tripura, the TTAADC or any authority or local body, and has no legal force. About this draft

Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Tripura. Tripura is landlocked: it has no coast, no tide and no Coastal Regulation Zone, and every one of its rivers leaves the State for Bangladesh. The monsoon reaches it as rainfall and as the floods of its own rivers, which are dealt with in Chapter 2 and in Clause 5.8, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Tripura: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials, and shall resist abrasion by silt and sand and attack by water that carries sewage), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. The towns of Tripura lie on the lungas (Bengali লুঙ্গা: the flat valley land between low hills — the land records' "Flat lands between tillas") and flood plains of valleys between tillas (Bengali টিলা: a low hill or hillock — the land records' "Hillock") and the hill ranges, and their receiving water is one of six kinds: a river reached through a sluice or flap gate in a PWD (WR) embankment or bandh (Bengali বাঁধ: an embankment — the land records' "Embankment"), or over it by a pumping station, which is closed when the river runs higher than the town behind it; the gated and pumped outfalls of Agartala's central saucer to the Haora and the Katakhal, and the Akhaura canal; a river, khal (Bengali খাল: a canal or channel — the land records' "Khal") or canal that crosses into Bangladesh a short way below the town, with no downstream control and no level data from across the border; a river with a CWC site, or the Gomati below the Dumbur reservoir; a pukur, a dighi (a large tank), a beel or an unfilled lunga that stores the town's water while its outlet is closed; or a chhara (Bengali ছড়া: a stream — the land records' "Streams") coming down from the tillas or the hill ranges, laden with silt; and:

  • (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river behind an embankment sluice, by Agartala's gated and pumped outfalls, by a border reach, by the Dumbur release reach, by a full pukur, dighi, beel, lunga or pond, by a chhara or by a receiving drain, with the locks and closures of Clause 5.8.5(a) to (f) in place of the tidal lock windows.

Commentary. Tripura's towns drain into rivers that are often higher than themselves. Agartala's centre "is located at a lower level than other areas giving it the appearance of a saucer"; "During normal rainfall of about 3 to 4 hours, the central part of Agartala gets flooded"; and when the Haora and the Katakhal run high "Several pumps have been provided to lift the water out of the city during these seasons" (ADB IEE, 2020). So the closed outfall is the design case, not the exception. In August 2024 the Agartala Municipal Corporation was reported to run 18 flood pumps, about 4.5 m³/s in all on the press figures (as reported; NEER arithmetic), and the Haora rose to 12.42 m at the CWC Haora site on 22 August (as reported), the highest of four reported highest flood levels at that site, whose gauges and datums are not stated (Clause 5.8.5(b)). Below the towns every river crosses into Bangladesh, and no level from across the border was obtained, so the tailwater at the border cannot be checked against a downstream record (Clause 5.8.5(c)). The outfalls also belong to one body while the drains above them belong to others: the embankments and the Katakhal sluice are PWD (WR)'s; the drains, public tanks and water courses of a town vest in its Municipality (Tripura Municipal Act, 1994, s.91); the major road drains are built by PWD (R&B), and storm drains, flood pumps and the Akhaura canal and Katakhal works by Agartala Smart City Ltd; and no formal allocation among them was found (Chapter 6, Clause 6.9). No document found during research sets a design level for any outfall in the State, and PWD (WR)'s sluice operating rules and closure durations were not found [TBC]. A detention basin that meets every release rate in Chapter 4 still fails if the sluice it drains to is shut for days, if the pukur below it is already full, or if the chhara it drains to has buried its outlet in silt. This chapter makes these failure modes part of the design. Tripura has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, PWD (WR) canal, the Haora, the Katakhal, the Akhaura canal, the Bangeshwar Gang, the Debta Gang, the Nagichara, the Kalapani Charra and the Kalapania Khal in Agartala, every channel that discharges through a sluice in an embankment or to a drainage pumping station, any drain built or held by a Municipality, Agartala Smart City Ltd, TUDA, PWD (R&B) or NHIDCL with an internal width of 1.0 m or more, and every chhara, khal and lunga flow path that drains 8 ha or more, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, pukur or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or pukur under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, AMC, TDMA or PWD (WR); and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next pukur or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Tripura. In the valleys of Tripura, where a drain may pass several pukurs and lunga wetlands before it reaches the Haora, the Gomati or the Khowai, which leave the State for Bangladesh near Agartala, near Sonamura and 1 km north of Khowai town (CGWB NAQUIM, West Tripura), the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in Agartala's central saucer, where "During normal rainfall of about 3 to 4 hours, the central part of Agartala gets flooded" and the outfalls to the Haora and the Katakhal must be pumped when the rivers run high (ADB IEE, 2020), and in Tripura's embanked valley towns, whose rivers stayed high through the flood of 19–24 August 2024 (as reported), when the Haora reached 12.42 m at the CWC Haora site on 22 August (as reported, datum not stated (TBC)). Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Tripura, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, TUDA or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Tripura has no coast, and the surge term does not arise in the State, whose rivers are held high by their own floods and possibly by backwater from the rivers they join in Bangladesh, for which no level data were obtained, not by the sea (Clause 5.8.5).

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Tripura, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • every river at every town on its banks, through the sluices and pumping stations in PWD (WR)'s embankments, among them the Manu at Kailashahar and Kumarghat, the Gomati (CWC: Gumti) at Amarpur, Udaipur and Sonamura, the Muhuri at Belonia, the Juri at Nutan Bazar and Dharmanagar, the Khowai at Khowai and Teliamura, the Dhalai at Kamalpur and the Burima (Bijoy) at Gajaria (Clause 5.8.5(a));
  • in Agartala, the Haora at the CWC Haora site, the Katakhal and its double-barrel sluice, the Akhaura canal, and the Bangeshwar Gang, the Debta Gang, the Nagichara, the Kalapani Charra and the Kalapania Khal, with the outfalls of the central saucer and the flood pumps (Clause 5.8.5(b));
  • every reach that ends at the border with Bangladesh, among them the Haora below Agartala, the Katakhal, the Akhaura canal, the Gomati below Sonamura, the Burima, the Khowai below Khowai, the Manu below Kailashahar, the Juri, the Deo, the Muhuri below Belonia and the Feni at Sabroom (Clause 5.8.5(c));
  • the rivers with no gauge level, among them the Deo, the Longai, the Feni, the Manu at Manughat and the upper reaches above the first gauge of every river (Clause 5.8.5(d));
  • the Dumbur reservoir of the Gumti hydel project at Tirthamukh and its release reach, the Gomati past Amarpur, Udaipur and Sonamura to the border (Clauses 5.8.3 and 5.8.5(d));
  • every pukur, dighi, beel, haor, unfilled lunga and detention pond that receives a town's drains, among them the Ujjayanta palace lakes, the MBB College lake, the College Tilla lake and Banamalipur Dighi in Agartala, Kalyan Sagar at Matabari and Rudrasagar (Clause 5.8.5(e));
  • the chharas of the tilla uplands of every valley and of the Baramura, Atharamura, Longtharai, Sakhan and Jampui ranges (Clause 5.8.5(f));
  • any drain or channel of a Municipality, Agartala Smart City Ltd, TUDA, PWD (R&B) or NHIDCL, and any channel or sluice of PWD (WR), that receives storm water (Clause 5.8.5(g)); and
  • elsewhere: any river or PWD (WR) channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) PWD (WR) design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Dumbur reservoir of the Gumti hydel project at Tirthamukh, above the Gomati at Amarpur, Udaipur and Sonamura), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 River-locked outfalls through embankment sluices, Agartala, transboundary outfalls, tributaries with CWC sites and the Dumbur release reach, pukurs, dighis and lunga wetlands, chharas, and consents and lines.

  • (a) River-locked outfalls through embankment sluices. For an outfall to a river directly, through a sluice or flap gate in an embankment (bandh), a town protection embankment or a wall, or through a drainage pumping station, or into a drain, khal, chhara, pukur or lunga wetland that itself discharges in one of those ways, the designer shall identify the body that operates each sluice, gate and pumping station, and obtain the sill of each gate, the crest of the embankment or wall, the installed pumping capacity and the operating levels, including the river level at which each sluice is closed. Every level shall name its gauge and state its datum and its connection to the gauge datum of the nearest CWC gauge or State gauge, with its operator named; where the source does not state the datum, the level shall be entered as "datum not stated (TBC)" until it is confirmed. The river-level sites cited in this clause are CWC's, except the State gauges named as such (as reported); PWD (WR) runs none of them in the sources found. Most embankments and sluices in the State are PWD (WR)'s, which builds "flood protection embankments and anti-erosion work" (PWD (WR), as quoted): its pages give "154.41 Km of embankment and 98.00 Km of anti-erosion to protect 28000 ha" and, elsewhere, "41 nos. (134.55 Km) of flood protection embankment" (as quoted; dates not stated), its 2025 programme covered 44 embankments on 12 rivers (as reported), and TDMA's 2026 monsoon checklist lists 42 vulnerable embankment points (as reported). These counts conflict and are not used for design; the designer shall take the record of the embankment and sluice concerned. No Tripura embankment or drainage statute was found, and PWD (WR)'s sluice operating rules and closure durations were not found during research [TBC].
    • Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall, from a flood-frequency study or a hydraulic model under Clause 5.8.2(b). Tripura has no flood-plain zoning law, and no 1% AEP level has been published for any reach of any river in the State (Chapter 7) [TBC]. The level shall in no case be less than the highest recorded level at the nearest CWC gauge or State gauge on the same river, transferred to the outfall. The highest levels found during research (Table 5B.1), all as reported, from SANDRP's transcriptions of CWC tables (2018 and 2024) unless another source is named, and with the datum not stated for any of them (TBC), are: the Haora at the CWC Haora site (Agartala) 12.42 m (22 August 2024); the Manu at Kailashahar 25.95 m (13 June 2018) and at Kumarghat 32.97 m (7 June 1993); the Gumti at Sonamura 14.43 m (23 July 1993) and at Amarpur 32.74 m (22 July 1993); the Gomati at the State gauge at Udaipur 22.05 m (14:45, 21 August 2024; Gomati district administration, as reported); the Dhalai at Kamalpur 33.85 m (15 May 1984); the Juri at Nutan Bazar 20.66 m (22 August 2024); the Muhuri at Belonia 18.81 m (22 August 2024); the Burima at Gajaria 11.25 m; and the Khowai at Khowai 28.005 m (24 June 2004). Where two values are reported for the same gauge, the higher applies until CWC confirms the gauge and its datum [TBC]: at the CWC Haora site the highest level is also given as 12.14 m (24 June 2004), 12.4 m (11 August 2017) and, by ENVIS, 11.08 m (2004), so 12.42 m applies (item (b)); at Gajaria it is given as 11.15 m (24 June 2004) in the 2018 list and as 11.25 m in 2024, so 11.25 m applies. Where a later flood has exceeded the listed level, the later level governs: at Belonia the 2024 peaks of 18.12 m (20 August) and 18.81 m (22 August) stand above the listed 16.98 m (4 August 1983) and 17.32 m (2 August 2024); at Nutan Bazar 20.66 m stands above 20.435 m (15 May 1984); at Kailashahar 25.95 m stands above 25.79 m (7 June 1993). The highest level on the Manu at Manughat is reported as 46.6 m (5 June 2001), 46.97 m (1993), 48.04 m (a 2024 table) and as "corrected" to 18.04 m (12 June 2018); the conflict is unresolved, none of these values shall be used, and an outfall there takes a modelled or surveyed level under item (d). The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC and State gauge records or from the model; until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, except that where the outfall lies between two gauges on the same river with no tributary joining between them, the level may be interpolated linearly by river distance between the highest recorded levels of the two gauges (set by this Manual). An outfall upstream of every gauge on its reach shall not be designed without a modelled or surveyed profile [TBC].
    • 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or from a frequency analysis of the gauge record, and shall be not less than the danger level at the nearest gauge, transferred in the same way: 10.70 m at the CWC Haora site (the highest of 10.48 m (ENVIS), 10.50 m at the State's Jahar Bridge gauge and 10.70 m at the CWC site, all as reported); 25.34 m on the Manu at Kailashahar (CWC, as reported; the State's press gave the danger mark as "24.00 mtr" in 2018 and a "critical level 23.05 m" in 2024, as reported, which conflict, so the higher applies); and 12.5 m on the Gumti at Sonamura (CWC, as reported) (set by this Manual). The level-monitoring sites have a highest level only, and the State gauges at Udaipur and Amarpur only an "extreme danger" level (22.00 m and 32.00 m, as reported); there the 10% AEP case uses the design river level until a frequency analysis is accepted (set by this Manual).
    • Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the sluice, gate or embankment, and the maximum level in the drain, khal, chhara, pukur or lunga behind it, computed by routing it as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, encroachment, fill, solid waste and weed, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the sluice only while the river is lower than the level behind it. A pukur, dighi, beel, lunga wetland or detention pond behind the sluice starts the storm full to its outlet level (item (e)). Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level and with the land behind the embankment ponded (Clause 5.12.5).
    • River lock. Portable or diesel pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock: the gate is closed for the whole of the 72-hour storm of Clause 5.10.2, and after it for the longer of (i) as long as the coincident river level of Clause 5.8.4 stays above the gate sill, or above the level at which the sluice is closed if that is lower, taken from the river model or from the stage record of the nearest CWC gauge in the flood that set the highest recorded level or in a comparable flood, and (ii) where no stage record has been analysed, which is the case at every border reach, on the Katakhal and the Akhaura canal and, until CWC's records are obtained, at every other outfall in the State, a further 72 hours (set by this Manual). The lock covers the whole of the 48- and 72-hour storms, so that storage and pumping handle the full storm volume (Clause 5.9.4). With the gate still closed, the volume stored in the storm shall be pumped down to the level at which the storm started within 48 hours of the end of the storm, the drawdown time of Clause 4.7, so that the storage is ready for the next storm while the river stays high (set by this Manual). A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where an analysis of the stage record of a CWC or State gauge under Clause 5.10.6 shows it and the Authority approves it.
    • Gate failure, leakage and breach. Floor levels and pumped outfalls behind a sluice or embankment shall also be checked for the failure of the gate and for a breach of the embankment, with the land and drains behind it filled to the river level beyond it. Tripura's embankments leak and are weakened: the 2025 programme included 6 km of leakage repairs on the Haora embankment at Agartala (as reported), and the CAG found that sand extraction outside approved blocks "caused weakening of river embankment and erosion of riverbed" (CAG, Audit Report for the year 2022-23, Sand Mining).
  • (b) Agartala. For an outfall in Agartala or elsewhere in the Agartala Planning Area (the Master Plan 2045 area of 238.57 km², which takes in the Agartala Municipal Corporation and 49 gram panchayats, as reported), whose Greater Agartala Planning Area has a North Zone (north of the Katakhal), a Central Zone (between the Haora embankment on the south and the Katakhal on the north, the erstwhile municipal area) and a South Zone (south of the Haora) (ADB IEE, 2020):
    • The central saucer. "The major part of the City (Central Agartala) has a flat terrain", the North and South Zones have "a rolling terrain with average altitude varying from a high of 25 to 30 m to a low of 8 m", and "the central part of the city is located at a lower level than other areas giving it the appearance of a saucer"; "During normal rainfall of about 3 to 4 hours, the central part of Agartala gets flooded"; the main drains are masonry-lined, but "the feeder drains are earth-lined and in a poor condition with silt and vegetation choking them" (ADB IEE, 2020); and the lowest ground of the Agartala–Sonamura valley is at Bamutia, 8.91 m above MSL (CGWB NAQUIM, West Tripura). Every outfall of the Central Zone to the Haora or the Katakhal, and every outfall of the North and South Zones whose invert is below the design river level, is river-locked under item (a), and every drain is taken in its present condition.
    • The Haora. The Haora rises in the Baramura range and runs 46 km, with a catchment of 414 km², west through the Agartala–Sonamura valley into Bangladesh near Agartala (CGWB NAQUIM), and it is "the only source of surface water for Greater Agartala" (ADB IEE, 2020). The river level at every Haora outfall is that of item (a) at the CWC Haora site: design level 12.42 m (22 August 2024, as reported), datum not stated (TBC), the highest of the values reported, 11.08 m (2004; ENVIS, as reported), 12.14 m (24 June 2004; the CWC list of 2018, as reported), 12.4 m (11 August 2017, as reported) and 12.42 m; and danger level 10.70 m, the highest of 10.48 m (with an "extreme" level of 10.78 m; ENVIS, as reported), 10.50 m at the State's Jahar Bridge gauge and 10.70 m at the CWC site (as reported; for the CWC site Google Flood Hub gives warning 10.0 m, danger 10.7 m and extreme 12.4 m, as reported). These are probably different gauges or datums (NEER reading), and the higher applies until CWC confirms the gauge and datum of each (set by this Manual). The river stood above its danger level in Agartala's urban flood of June 2022 (10.82–10.85 m at Jahar Bridge against 10.50 m, and 10.72 m at the CWC site against 10.70 m) and on 24 August 2026 (10.72 m at 08:00 against 10.70 m) (all as reported). The level at which the gates on the Haora are closed is the operator's, and is to be obtained in writing [TBC].
    • The Katakhal and its sluice. The Katakhal drains the north of the city to Bangladesh through a double-barrel sluice of PWD (WR) near Bhuturia (as cited). No gauge, level or hydraulic description of the Katakhal or of its sluice was found during research [TBC]. Its level at an outfall shall be the higher of a modelled level under Clause 5.8.2(b), with the Katakhal routed as a closed storage behind its sluice, and the highest flood level surveyed at the outfall from flood marks of 19–24 August 2024 or of a later flood, with its source stated; until both have been made, the Haora design level of this item applies at the Katakhal's outfalls, as the higher river level of the two that bound the saucer (set by this Manual). It is a border reach under item (c). Its cleaning in 2026 and the three sewage treatment plants being built on its banks (10 MLD at Ranjit Nagar, 15 MLD at Abhaynagar Bridge and 1.5 MLD at Astabal Bridge, all fed by interception of drains; State affidavit to the NGT, July 2026) do not change its level for design until they are completed and surveyed.
    • The Akhaura canal and the city's other channels. "The Akhaura canal system running along the Akhaura road serves mainly the central area" (ADB IEE, 2020) and flows to Bangladesh (as reported); no level or hydraulic description was found [TBC], so its level is found as the Katakhal's, with the Haora design level until then, and it is a border reach under item (c). The Bangeshwar Gang, the Debta Gang, the Nagichara and the Kalapani Charra (ADB IEE, 2020) and the Kalapania Khal are routed as storage behind the outfall they end in; where they come down from the tillas they are also chharas under item (f).
    • The flood pumps. When the Haora and the Katakhal run high, "Several pumps have been provided to lift the water out of the city during these seasons" (ADB IEE, 2020). In August 2024 the Agartala Municipal Corporation was reported to run 18 flood pumps of "up to 900,000 liters … per hour" each, which is about 0.25 m³/s each and about 4.5 m³/s for the 18 (NEER arithmetic), and 6 diesel pumps, discharging by pipeline to the Katakhal in the north and the Haora in the south (as reported); 6 new flood pumps were reported in August 2025 (as reported); and a ₹1,000 crore proposal for "two protective embankments and installation of three additional pumping stations", to be "implemented in phases, depending on the availability of funds", was reported in July 2026 (as reported). No pump-station design capacity was found [TBC]. Every outfall of the central saucer shall be designed for local rain with the outfalls shut: the drain, khal, pukur or lunga behind each gate is routed as a closed storage under item (a), with its whole catchment and with an outflow of no more than the permanent pumps that serve that outfall, as their owner confirms them in writing, less the largest pump. The per-pump figure above is a press figure, not a rating: the certified pump curve at the design river level of this item shall be used (Clause 5.12), and the pumped discharge shall be included in the level of the Haora or the Katakhal (Clause 5.12.3). The proposed pumping stations and embankments shall not be counted until they are commissioned, and the 650 m Haora embankment reported in March 2026 (as reported) only once PWD (WR) confirms its crest and extent in writing.
    • Drainage projects. The ADB Agartala City Urban Development Project (53262-001) provides 48.2 km of new or rehabilitated storm-water drains (ADB IEE, 2020); about 50 km of new drains were reported planned by the Agartala Municipal Corporation and Agartala Smart City Ltd (as reported); and the stated aim of a later ADB proposal, to cut drainage time "from one to two hours to about 15–30 minutes" (as reported; DPR not read [TBC]), is not a design value under this Manual (Clause 2.3.6(o)). None of these works shall be counted until it is built, and none of the documents found gives a design return period, intensity or outfall level. The drainage chapter of the Master Plan for the Agartala Planning Area 2045, if it has one, was not read [TBC]; where it publishes a design level for an outfall, the higher of that level and the level of this item governs, until the Authority accepts the plan's levels.
  • (c) Transboundary outfalls. Every river of the State leaves it for Bangladesh: the Haora towards the Titas, the Gomati towards Comilla, the Khowai towards Habiganj, the Manu, the Dhalai, the Juri and the Deo towards the Kushiyara, and the Muhuri and the Feni towards Feni, while the Longai runs north out of the State towards the Kushiyara (general geography, to be confirmed for each river (NEER reading)). The Haora enters Bangladesh near Agartala, the Gomati near Sonamura and the Khowai 1 km north of Khowai town (CGWB NAQUIM). No Bangladesh river level was obtained for any of them, there is no downstream control in India, and the level at the border can be raised by backwater from the rivers they join or by embankments across the border (NEER reading). For an outfall to a river, khal or canal on the reach that ends at the border, among them the Haora below Agartala, the Katakhal, the Akhaura canal, the Gomati at Sonamura, the Burima below Gajaria, the Khowai at Khowai, the Manu at Kailashahar, the Juri, the Muhuri at Belonia and the Feni at Sabroom:
    • Level. The tailwater is the highest of: (i) the highest recorded level at the nearest CWC or State gauge on the same river under item (a), transferred to the outfall; (ii) the level of August 2024 at that gauge where it is higher; and (iii) a modelled level under Clause 5.8.2(b) where one has been made. No lower level shall be assumed because the river leaves the State, and no channel, regulator or embankment across the border shall be credited (set by this Manual). Where the sites named in 2024 were not working (Sonamura-2, Feni, Sabroom and Kadamtala, as reported), or no site exists, the level is the higher of a modelled level and the highest flood level surveyed at the outfall from flood marks, with its source stated, and no outfall shall be designed without one of them (set by this Manual).
    • Lock. A gates-shut case shall be run for the duration of the river peak, with the lock of item (a); where no stage record has been analysed, the gate stays closed for a further 72 hours after the 72-hour storm (item (a)) (set by this Manual).
    • Extent of analysis. Where the downstream analysis of Clause 5.3 would continue across the border, it ends at the last analysis point in India, with the level of this item as its boundary (set by this Manual).
  • (d) Tributaries with CWC sites, and the Dumbur release reach. For an outfall to a river with a CWC site, to a river with no gauge, or to the Dumbur reservoir or the Gomati below it:
    • Rivers with and without gauges. Item (a) applies, with the levels it lists. On the Deo, the Longai, the Feni, the upper reaches of every river above its first gauge, the Manu at Manughat and any reach with no gauge level, the river level is the higher of a modelled level under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks and from the records of PWD (WR), the local body or the District Magistrate and Collector, with its source stated, and no outfall shall be designed without one of them (set by this Manual). No catchment area or length was obtained for the Manu, the Juri, the Deo, the Dhalai, the Longai, the Muhuri or the Feni [TBC]; the Khowai runs 140 km with a catchment of 1,100 km² in the old West Tripura district, the Burima (Bijoy) 54 km, and the Gomati is the "biggest river in the state" (CGWB NAQUIM).
    • Consent and levels of the operator. Storm water shall not be discharged to the Dumbur reservoir or to the Gomati below it within the release reach without the written consent of the operator of the Gumti hydel project at Tirthamukh (TSECL, as reported; NEEPCO's role was not established [TBC]). The operator's levels shall be used as it gives them in writing; a level given in feet shall be converted at 1 ft = 0.3048 m exactly, with the conversion and the datum stated on Form 5-1.
    • Reservoir level. The reservoir's full reservoir level is reported as 93.55 m and its minimum drawdown level as 83.6 m (NRLD and CWC, via SANDRP, as reported), and its "danger level" as 94 m, with 93.85 m reached in August 2024 (the Gumti Hydel Project, as reported). These conflict, and the higher, 94 m, is used as the reservoir level at release and as the tailwater of an outfall to the reservoir, datum not stated (TBC), until the operator confirms its levels in writing (set by this Manual).
    • Release reach. For an outfall to the Gomati below the dam, past Amarpur, Udaipur and Sonamura to the border, a river that travels about 120 km in Tripura (as reported), in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) and the 72-hour storm shall be run with the river at the level that results from the largest recorded release of the dam, routed to the outfall, with the flow of the catchment below the dam as it occurred, and with the release placed before, during and after the site storm, and the lock of item (a) applies for not less than 72 hours after the storm (set by this Manual). No release record was found: on 21 August 2024 the Gomati district administration reported "two flap gates fully open and one at 50%", the first release "since 1993", while the State's power minister said that no gate had opened (all as reported), and the Ministry of External Affairs said the releases were "automatic" (as quoted). Until the operator states a recorded release and its duration in writing, the release is the dam's spillway capacity of 481.38 m³/s (as reported) (set by this Manual). No attenuation by the storage of the reservoir shall be credited to the river below, and no gate shall be assumed to open earlier or wider than the operator's records show. Catchments that drain to the reservoir or to the release reach take AMC III at any time (Chapter 3).
    • Warnings are not notices. No design shall rely on a notice, a siren, a telephone call or an SMS warning of a release, on the reservoir being drawn down before a storm, or on a gate being opened early, late or partly: the release scenarios of this item govern (set by this Manual).
  • (e) Pukurs, dighis and lunga wetlands as receiving storage. For an outfall to a pukur, a dighi, a beel or haor, a lunga wetland, a khal or a detention pond, directly or through a drain that ends in it, among them the Ujjayanta palace lakes, the MBB College lake, the College Tilla lake and Banamalipur Dighi in Agartala, Kalyan Sagar at Matabari (Udaipur) and Rudrasagar:
    • Starting level. The waterbody starts every design storm full to its outlet level: the crest of its outlet weir, the sill of its sluice or the invert of the khal or drain that drains it, or, where it has no defined outlet, its highest monsoon water line surveyed and tied to a Survey of India benchmark, and in every case not less than the highest level recorded at it (set by this Manual).
    • Design level. The tailwater for the major-system and storage cases is the level reached when the inflow of the waterbody's whole catchment is routed through its stage–storage relation from that starting level, with its outlet closed for as long as the river or khal beyond it stands above the outlet (item (a)), and with the project's discharge included (Clause 5.12.3). The stage–storage relation shall be surveyed: none was found for any pukur, dighi or beel in the State, and no inventory of Agartala's ponds was found [TBC]. The minor-system tailwater is the starting level.
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall is closed for the whole storm (Clause 5.9.4), and where the waterbody itself drains through a river-locked outlet, the lock of item (a) applies to both.
    • Storage is the system's. Public tanks vest in the Municipality (Tripura Municipal Act, 1994, s.91), no pond, water body or wetland may be filled except by the Local Body with the State Government's prior approval (TBR 2017, r.9(3)), and the land records class the pukur ("Tank/Pond"), the dighi ("Large tank"), the beel ("Watery land") and the haor ("Big watery land") as land classes of their own, with the doba a "Ditch", not a pond (Diversion of Land Rules, 2025, Appendix-I). The storage of a pukur, dighi, beel or lunga wetland is part of the drainage system: it shall not be credited to one project, and no project shall reduce it (Chapter 7). A pukur with no outlet is a closed basin, and an outfall to it is closed for the whole storm. Engineered storage is a detention pond, never a pukur. No drain that carries sewage shall discharge to a pukur, dighi or beel without the interception and screens of Clause 6.3.6(e) and Clause 8.9.
    • Heritage and fisheries tanks. The palace-era and temple tanks, among them the Ujjayanta palace lakes and Kalyan Sagar, are existing storage with heritage and fisheries constraints, not detention: they start full, they shall not be drawn down before or after a storm to make room for a project's water, and their banks, the pukurpar and dighirpar of the land records ("Bank of tank", "Bank of large tank"), shall not be cut for an outfall without the written consent of their custodian (set by this Manual).
    • Rudrasagar. Rudrasagar is a Ramsar site (No. 1572, 240 ha; designated on 8 November 2005 by the Ramsar record and "officially designated" on 29 February 2007 by the Forest Department, both as cited, which conflict) with a catchment of 6,052 ha (as cited), and its water level is the subject of the High Court's suo motu PIL 05/2017 (as reported). No storage in it shall be credited to a project, no drain shall be brought to it or to its catchment's channels without the interception and screens of Clause 6.3.6(e) and Clause 8.9, and no work in it shall be designed without the permission of the Wetland Authority of Tripura (Chapter 7): the CAG found that ring roads built without that permission "reduced the water level" (CAG, Audit Report for the year 2021-22).
    • Lunga floors. An unfilled lunga is the natural flow path and storage of the land between tillas. It shall be routed as storage, never as zero storage, in its present condition, and the rule of this item applies to it as to a pukur (set by this Manual).
  • (f) Chharas from the tillas and the hill ranges. For an outfall to a chhara or other hill stream, among them the Nagichara and the Kalapani Charra in Agartala, the chharas that come down from the Baramura, Atharamura, Longtharai, Sakhan and Jampui ranges, and the gullies of the tilla uplands of every valley, or to a drain that ends in one:
    • Design level. These streams have no gauge or published flood level [TBC]. The tailwater for the major-system and storage cases shall be the highest of: (i) the 1% AEP level at the outfall from a study of the stream, made with a hydrograph method of Chapter 3 for the whole catchment above the outfall, with the rainfall of its sub-area in Annex 2A (in sub-area TR-E the higher of the adjoining valley sub-areas, Clause 2.3.6(c)), the bulking factor of Clause 6.3.6(g) on the peak flow, and the crossings downstream blocked as Clause 6.3.6(h) requires, routed through a hydraulic model of the channel as surveyed, net of encroachment, fill, silt and solid waste; (ii) the level at the outfall of any flood study of the stream made by or for PWD (WR), PWD (R&B) or the local body [TBC]; and (iii) the highest flood level surveyed at the outfall from flood marks of 19–24 August 2024 or of a later flood, and from the records of the local body, PWD (WR) or the District Magistrate and Collector, with its source stated. No outfall to such a stream shall be designed without items (i) and (iii) (set by this Manual).
    • Bed level and siting. The designer shall survey the bed at the outfall and for at least 100 m upstream and downstream and state the range within which it has moved. The outfall invert, and the seat of any flap gate on it, shall stand at least 0.5 m above the highest bed level found within 50 m downstream, the foundation shall be taken below the scour depth of Chapter 9 (Clause 9.6) for the 1% AEP flow with the bulking factor, and the outfall shall be built into the bank and not project into the active channel (set by this Manual). Where a chhara drops its load on reaching the lunga floor, the silt trap of Clause 6.3.6(m) shall be placed above the outfall. An outfall on landslide ground, or in the path of a slide or of sediment from one, is a hazard-first site (Clause 2.3.6(i)): 2,032 landslip locations were reported in August 2024 (as reported).
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall-closed check of Clause 5.10 applies with a single lock that lasts for the design storm plus the stream's recession, computed under item (i) for as long as the stream stays above the invert, and not less than 24 hours; where no hydrograph of the stream has been computed, the lock lasts for the whole storm (set by this Manual). Where the chhara itself ends at a river-locked sluice or in Agartala's central saucer, the lock of item (a) governs.
  • (g) Consents and lines. No outfall structure, gate, pumping station or drain shall cut, cross, alter or discharge through an embankment or sluice without the written consent of PWD (WR), which builds and holds the State's flood embankments and the Katakhal sluice. No Tripura embankment or drainage statute was found, so the consent rests on PWD (WR)'s ownership of the work, and no written procedure or form for it was found during research [TBC] (set by this Manual). Storm water shall not be discharged to a drain of another body without the written consent of that body: in a ULB, private drains may be connected to municipal drains only "after obtaining the written permission of the Municipality" (Tripura Municipal Act, 1994, s.161), an unauthorised drain into a municipal drain or water course may be demolished at the owner's cost (s.162), and the Municipality "shall provide and maintain a system of drainage or sewerage as well as a safe and sufficient out-fall in or outside the Municipal area" (s.156(1)), with outfalls and pumping stations built "singly or jointly", within or outside its area (s.159); to a road drain or culvert, the consent of PWD (R&B), or of NHIDCL on a national highway it builds; to a work of Agartala Smart City Ltd that has not been handed over, that of Agartala Smart City Ltd; and in the area of the Tripura Tribal Areas Autonomous District Council, where the Municipal Act does not extend (s.1(2)), that of the District Council or the body it designates [TBC] (set by this Manual). Where consent is given, the discharge shall not exceed the rate the consent allows; the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives and with its downstream boundary at the level of items (a) to (f); the channel shall be taken in its present condition, net of silt, encroachment, solid waste and weed, and a widening, resectioning or diversion that has been proposed but not completed shall not be counted; and the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert. The designer shall also check the outfall against the lines that bind at the time of design (Chapter 7): the bar on filling any "canal, pond, water body, wetland, river lets, jhora, water source, natural spring, streams, drains, culverts" except by the Local Body with the prior approval of the State Government (TBR 2017, r.9(3)), so that an outfall seated by filling part of a pukur, chhara or lunga is a filling; the "zone of river (within 15 metres from river bank)", which limits the height, length and covered area of buildings in it (r.9(4)) and on this Manual's reading reaches a pump house; the rule that within 5.00 m of a tank the owner shall prevent drainage from the building passing into it (r.4(1)(e)), which this Manual reads as allowing only storm water that has passed the interception of Clause 6.3.6(e) to reach a pukur by an outfall (NEER reading); in the ULBs in the hill areas, the 5 m no-build distance from the outside edge of a water course (r.90(1)(i)) and the protective works within 5.0 m of a tank, jhora or natural drain and within 30 m of a jhora (r.90(1)(m)); and the status of a water body as land under the Diversion of Land Rules, 2025, as amended on 6 March 2026, whose current procedure for a water body this Manual does not state [TBC]. Tripura has no flood-plain zoning law; the "Natural Hazard Prone Areas" of r.2(44) and the Haora flood-plain-zone localities that PWD (WR) has mapped (Khayerpur, Kashipur, Baldakhal, Aralia, Jogendranagar and Joynagar (Dashamighat); map, return period and status not known) mark land where an outfall is built with the river-locked and breach cases of item (a) in place, and the plinth rule of r.55 (not less than 60 cm) sets no flood level, so the 1% AEP level of this clause and the floor levels of Clause 6.11 govern.

No pump, sluice, gate or dam operation that helps drainage, such as pumping a drain, khal, pukur or lunga down before a storm, closing a sluice late, opening a sluice while the river is higher than the land behind it, or opening the Dumbur gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the khal, the pukur or the river (Clause 5.12.3). Pumping shall not be used to move water into a pukur, a dighi, a beel or another catchment without the consent of its custodian.

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Tripura's rivers and towns break that assumption, because the same storms fill the rivers and fall on the towns beside them. In 1993 the IMD 24-hour records of both of the State's stations in IMD Extremes, Kailashahar (A) 377.2 mm on 6 June and Agartala (A) 257.2 mm on 22 July, came with the highest levels on the Manu at Kailashahar and Kumarghat (7 June 1993) and on the Gumti at Amarpur (22 July) and Sonamura (23 July 1993) (IMD Extremes; CWC levels as reported). In the 24 hours to 08:30 IST on 22 August 2024, Bagafa recorded 49 cm and Agartala Aero 23 cm (IMD press release of 22 August 2024), and on the same day the Haora reached 12.42 m at the CWC Haora site, the Muhuri 18.81 m at Belonia and the Juri 20.66 m at Nutan Bazar (as reported). The Haora stood above its danger level in Agartala's urban flood of June 2022 and again on 24 August 2026 (as reported). The Dhalai at Kamalpur and the Juri at Nutan Bazar set their earlier highest levels on 15 May 1984, before the south-west monsoon (as reported), and Kailashahar's wettest months on record are May and April (IMD Extremes), so the coincident case is not confined to June–September. The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the one reservoir found above a Tripura town, the Dumbur reservoir of the Gumti hydel project at Tirthamukh, whose release reach is the Gomati past Amarpur, Udaipur and Sonamura to the border. Its operator is reported as TSECL (as reported); NEEPCO's role was not established [TBC]. The dam is reported as 30 m high and 103 m long, with a spillway capacity of 481.38 cumec, a full reservoir level of 93.55 m, a minimum drawdown level of 83.6 m and live storage of 0.312 BCM (NRLD and CWC, via SANDRP, as reported). Other reported figures conflict: the dam is said to have been built in 1974 or in 1977 and to be of 15 MW or of 8.6 MW (as reported); its reservoir area is given as 0.709 km² (NRLD, as quoted), which is implausibly small for 0.312 BCM (NEER reading), against a water spread of 4,500 ha originally and 3,049.3 ha by 2012 (ICAR, Indian Journal of Fisheries) and "41 sq km" or about 40–42 km² (as reported). In August 2024 the reservoir reached 93.85 m against a "danger level of 94 m" (the Gumti Hydel Project, as reported), above the reported full reservoir level, while a CWC bulletin gave 92.6 m and 86% of live storage on 22 August and SANDRP gave 92.7 m (as reported). On 21 August 2024 the Gomati district administration reported "two flap gates fully open and one at 50%", and the opening was reported as the first release "since 1993", while the State's power minister said that no gate had opened (all as reported); the Ministry of External Affairs said that Bangladesh's floods were due to rain in the catchment downstream of the dam and that the releases were "automatic" (as quoted). The same day the Gomati at the State gauge at Udaipur stood at 22.05 m against an "extreme danger" level of 22.00 m (as reported). No operating rule that bounds a release, and no release record with a discharge, was obtained [TBC]. Until they are, Clause 5.8.5(d) uses the reported spillway capacity, with the flow of the catchment below the dam as it occurred in the same event, and takes the higher of the conflicting reservoir levels. The minor-irrigation earth dams of PWD (WR) can also fail in heavy rain: the Kashari Cherra earth dam was eroded by the heavy rain of September 2017 (CAG, Audit Report for the year 2022-23); no register of such dams above towns was obtained [TBC]. The river levels used in this Manual come from SANDRP's transcriptions of CWC tables and from district and press reports; their datum and gauge zero are to be confirmed with CWC [TBC].

Clause 5.8.5 is set by this Manual. In Tripura the tailwater at a town outfall is set not by the tide but by a river held above the town behind an embankment, by the Haora and the Katakhal standing above Agartala's central saucer, by a river that leaves the State with no level data from across the border, by a pukur or lunga that is already full, by the release of the Dumbur reservoir, or by a chhara in spate, and no document found during research gives a design level or a closure duration for any of them. No design standard for any town drain in the State was found either: the ADB IEE for Agartala (2020), the State's filings before the NGT and the press give no return period, design intensity, runoff coefficient or time of concentration for any drain (Clause 2.3.6(o)). The State has no flood-plain zoning law and no published 1% AEP level for any reach (Chapter 7).

The first case is the river-locked outfall. Item (a) follows the river-locked form of the neighbouring North-East editions of this series: the operator, the sills, crests, pumps and closing levels, every level tied to a named gauge, and a design level never below the highest level recorded at the nearest CWC or State gauge. All the river levels used come from SANDRP's transcriptions of CWC tables or from district and press reports, with no datum stated, so each is "as reported" and is entered with "datum not stated (TBC)". Where the sources give two or more highest levels for one gauge (the Haora, the Burima at Gajaria) or two danger levels (the Haora, the Manu at Kailashahar), the higher governs until CWC confirms one, because a tailwater set too low floods the town, while one set too high only costs storage; the Manu at Manughat, whose four reported levels range from 18.04 m to 48.04 m, is left out altogether. The lock is the heart of the clause. The gate is shut for the whole 72-hour storm and for as long after it as the river stays above the sill. Where no stage record has been analysed, which is the case everywhere in the State until CWC's records are obtained and always on the border reaches, the Katakhal and the Akhaura canal, the lock lasts a further 72 hours. The reason is the event of record: the flood of August 2024 ran from 19 to 24 August, six days, with the Haora at its peak of 12.42 m on 22 August (as reported), and the 72-hour storm with a 72-hour recession spans an event of that length (NEER reading). A longer minimum, such as the neighbouring edition's seven days on its main rivers, was not used, because Tripura's rivers are rain-fed ("All rivers are rain-fed and ephemeral", ADB IEE, 2020) and far smaller than the main rivers for which that minimum was set (NEER reading); a shorter one was not used, because no transboundary level is known and the 2024 rivers stayed high for days. The receiving pukur, dighi or lunga starts full because one that has filled in the first storm of a spell is full for the next, and because no stage–storage relation exists to show otherwise. The pump-down of 48 hours with the gate still shut is the drawdown time of Clause 4.7, and the Municipality's duty against water that "is or is likely to become a breeding place of mosquitoes" (Tripura Municipal Act, 1994, s.233) points the same way: storage that is still full when the next storm of the same high stage arrives fails in the event that matters more. Pumps are credited only as permanent, working and confirmed in writing, less the largest unit, because the only figures for Agartala's pumps are press figures and no pump-station design capacity was found. A designer with an analysed CWC stage record can justify a different lock under Clause 5.10.6.

The second case is Agartala. Item (b) names the city's outfalls because the State's capital drains through them: a saucer between the embanked Haora and the Katakhal, drained by pumps when they are high (ADB IEE, 2020). It takes the highest of the reported Haora levels, 12.42 m at the CWC Haora site, because the four reported highest flood levels and three danger levels probably belong to different gauges or datums (NEER reading), and requires a surveyed and modelled level for the Katakhal and the Akhaura canal, for which no level of any kind was found, with the Haora level in the meantime, because a tailwater set too low floods the saucer. It counts the proposed pumping stations and embankments only once they are built.

The third case is the border. Item (c) is new to this series: every river of the State leaves it for Bangladesh, with no downstream control in India and no level data from across the border, so the tailwater is the highest recorded level at the nearest gauge or the 2024 peak, never a lower level because the river leaves the State, and the downstream analysis ends at the border.

The fourth case is the tributary and the release reach. Item (d) applies the river rule of item (a) to the rivers with CWC sites, asks for a modelled or surveyed level where there is none, and applies to the Dumbur reservoir and the Gomati below it the reservoir and release-reach rule of the neighbouring editions: the operator's levels in writing, the largest recorded release, or the spillway capacity until the operator gives one, placed before, during and after the site storm, with no credit for warnings, drawdown or attenuation. The reservoir level at release is the "danger level" of 94 m rather than the full reservoir level of 93.55 m, because the reservoir rose above the full reservoir level, to 93.85 m, in August 2024 (as reported); and no release discharge was recorded for that event, which the district reported as a gate opening and the power minister denied (as reported).

The fifth case is the pukur, the dighi and the lunga. Item (e) treats them as storage that belongs to the drainage system and starts every storm full to its outlet. The law already protects them as land and as water: public tanks vest in the Municipality (s.91 of the Municipal Act), the Building Rules bar the filling of any pond, water body or wetland without the State's prior approval (TBR 2017, r.9(3)), and the land records class pukurs, dighis and their banks separately (Diversion of Land Rules, 2025, Appendix-I). Agartala's palace-era and temple tanks are civic landmarks and fisheries as well as storage (NEER reading), so item (e) does not let a project draw them down. No stage–storage relation was found for any pukur or dighi, so the clause asks for a survey rather than a figure.

The sixth and seventh cases are the chharas and the consents. Item (f) follows the hill-stream rule of the hill editions of this series for the chharas that come down from the tillas and the hill ranges: a study with the bulking factor, surveyed flood marks, an invert at least 0.5 m above the highest bed level and a lock of at least 24 hours, because these streams fall within hours of the rain stopping. Item (g) asks for PWD (WR)'s consent and the owner's consent because a design that discharges through an embankment or into another body's drain cannot be checked without them; no Tripura embankment statute was found, so PWD (WR)'s consent rests on its ownership of the work, and no rule divides the drains of the State's towns (Chapter 6). The lines of item (g) decide where an outfall can be built, not its level: the Building Rules' bar on filling, their 15 m zone of river and their hill-ULB distances bind where they apply, and the floor levels follow Clause 6.11 because no rule in the State fixes a flood level to build to.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Tripura requirement in this Manual. In Tripura it applies where an outfall is shut not by the tide but by a river held above the town behind an embankment sluice, by the Haora and the Katakhal standing above Agartala's central saucer, which then drains only by its pumps, by a river that leaves the State with no level data from across the border, by a pukur or lunga that is already full, by a release from the Dumbur reservoir, or by a chhara in spate. In August 2024 the State's flood ran from 19 to 24 August, six days, and the Haora reached 12.42 m at the CWC Haora site on 22 August (both as reported); the Muhuri at Belonia rose to 18.12 m on 20 August and 18.81 m on 22 August, above its earlier record of 16.98 m (CWC levels as reported); and Agartala's 18 flood pumps, about 4.5 m³/s in all on the press figures (as reported; NEER arithmetic), lifted the central saucer's water over the embankments to the Haora and the Katakhal. No gate-closure record or stage hydrograph was obtained for any outfall in the State [TBC]. That is why Clause 5.8.5 replaces the two 6-hour windows described below with a gate closed for the whole 72-hour storm and, where no stage record has been analysed, for a further 72 hours, so that the lock spans a six-day event such as that of August 2024 (NEER reading), or for as long as the river stays above the sill where it is longer; a pukur, dighi, beel or lunga full to its outlet at the start; a pump-down within 48 hours with the gate still shut; a lock of not less than 72 hours after the storm on the Dumbur release reach; and a lock of at least 24 hours at a chhara outfall. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 31 March each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Tripura the outfalls do not cross a beach, but the outfalls of Agartala and of the embanked valley towns pass through sluices and flap gates in PWD (WR)'s embankments or are pumped over them, and the gates and pumps are the towns' defence against the rivers. When the Haora and the Katakhal run high, "Several pumps have been provided to lift the water out of the city during these seasons" (ADB IEE, 2020); in August 2024 the Agartala Municipal Corporation was reported to run 18 flood pumps of "up to 900,000 liters … per hour" each, about 0.25 m³/s each (NEER arithmetic), and 6 diesel pumps, discharging by pipeline to the Katakhal and the Haora (as reported), and no pump-station design capacity was found [TBC]. The Katakhal leaves the city through a double-barrel sluice of PWD (WR) near Bhuturia (as cited). The embankments leak and are weakened: PWD (WR)'s programme of 2025 included 6 km of leakage repairs on the Haora embankment at Agartala (as reported), and the CAG found that sand extraction "caused weakening of river embankment and erosion of riverbed" (CAG, Audit Report for the year 2022-23). The CAG also found "frequent water logging of different areas due to blockage of drains and canals by plastic waste" (CAG, Audit Report for the year 2022-23), and plastic and silt hold flap gates open or shut. No Tripura embankment or drainage statute was found, and PWD (WR)'s sluice operating rules and closure durations were not found during research [TBC]. The embankments and sluices are PWD (WR)'s, while the drains and pumps behind them are a Municipality's, Agartala Smart City Ltd's or another body's, so a gate and the drains behind it can belong to different bodies. The 31 March inspection date is set ahead of the monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 31 March each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Tripura: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the monsoon. The mouth shall be assumed closed by a bar at the start of the April–October season, at the crest level of the most recent pre-monsoon survey. This applies unless PWD (WR) certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless PWD (WR) has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Tripura has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the silt that the chharas bring down from the tillas and the hill ranges, the sand bars that the rivers build (balurchar, "Sandy land bed", is a land class of its own in the land records, Diversion of Land Rules, 2025, Appendix-I), and the plastic and solid waste that block drains and gates. The tilla uplands are "10 – 30 m high mounds with gullies in between them" (CGWB NAQUIM, West Tripura), and their cut slopes silt the drains on the lunga floor below; Agartala's feeder drains are "in a poor condition with silt and vegetation choking them" (ADB IEE, 2020); and the CAG found "frequent water logging of different areas due to blockage of drains and canals by plastic waste" (CAG, Audit Report for the year 2022-23, Solid Waste Management). A flap gate held open or shut by silt, sand or waste, an outlet buried by a rising bed, or a sluice that cannot be moved turns a designed outfall into a dead end or a back-flow path. No PWD (WR) rule linking the operation of any sluice to the levels of the drains behind it was found during research [TBC]. Clause 5.8.5 deals with this by setting chhara outfalls above the range of bed movement, by putting a silt trap above an outfall where a chhara reaches the lunga floor, and by giving no credit for a gate operation, a pump or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting PWD (WR) certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a site on a lunga between tillas on the edge of Agartala draining to a khal
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)