Annexes to Chapter 1Policy, Applicability and Adoption
These annexes support Chapter 1. They hold the lists and maps that define where the Manual applies, the model text of the Policy Supplement and of the legal instruments that would give the Manual effect, and the two forms an Applicant files under Chapter 1. The Manual is a draft; it is not adopted by any government or agency: model legal text is offered for consideration by a competent authority and is not in force, and the forms are draft forms. An annex marked "To be prepared" states the data it needs and the rule to use until it is published (Clause 1.11.5).
Annex 1A — List of Tier A authorities, with the boundaries of the Agartala Municipal Corporation, of the Agartala Planning Area of the Master Plan 2045 and of the Agartala-Ranibazar-Jirania Local Planning Area
Supports Clauses 1.6.1 to 1.6.5 of Chapter 1.
1A.1 Clause 1.6.1 defines Tier A by class of authority. Table 1A.1 sets out the classes, and the authorities named in the clause, as Chapter 1 defines them. Every authority not in Table 1A.1 is Tier B (Clause 1.6.2).
Table 1A.1 — Tier A authorities as defined in Clause 1.6.1
| Item | Tier A authority | Clause |
|---|---|---|
| (a) | The Agartala Municipal Corporation | 1.6.1(a) |
| (b) | TUDA, within the Agartala Planning Area of the Master Plan 2045 (238.57 km², as reported) and the Agartala-Ranibazar-Jirania Local Planning Area, wherever it has jurisdiction over a site | 1.6.1(b) |
| — | A Tier B authority that opts into Tier A by council resolution, or that the Government notifies as Tier A | 1.6.4 |
1A.2 Whatever the tier, the design-aid route and the alternatives of Clause 1.7 are not available in a flood-sensitive catchment (Clause 1.6.5; Annex 1B).
To be prepared. This annex will contain the full list, by name, of every Approving Authority within the Agartala Planning Area and the Agartala-Ranibazar-Jirania Local Planning Area, with the date from which each is Tier A, and the boundaries of those areas and of the Agartala Municipal Corporation as a map and as a GIS layer. It needs the notification of the Master Plan for the Agartala Planning Area 2045, declared final on 24 February 2026, with the list of the 49 gram panchayats it takes in (TUDA, UDD) [TBC: notification number and text not read]; TUDA's notification of November 2019 declaring the Local Planning Areas under section 52(1) of the Tripura Urban Planning and Development Act, 2018, with their boundaries (TUDA); the limits and wards of the Agartala Municipal Corporation, given as 49 or 51 wards and as about 76.5 km² or 92 km² (as reported; conflict) [TBC]; the parts of the TTAADC area, if any, that touch these areas [TBC]; and the district, sub-division, revenue circle and mouza boundaries (Revenue Department, Survey of India). Until it is published, the tier is decided by the classes in Clause 1.6.1 and recorded on Form 1-1, and the Authority confirms it at the pre-application stage (Clause 1.5.9).
Table 1A.2 — Register of Tier A authorities (layout)
| No. | Authority | Class (Municipal Corporation / Municipal Council / Nagar Panchayat / TUDA / Gram Panchayat / District Council / other) | District | Basis (Clause 1.6.1(a), (b), (c) or 1.6.4) | Tier A from (date) | Notification or resolution reference |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | ||||||
| 3 |
1A.3 The Agartala Municipal Corporation, Agartala Planning Area and Local Planning Area boundary map shall be published as open data in a machine-readable format (Clause 10.17.4), with the date of the notification it shows.
Annex 1B — Maps of flood-sensitive catchments
Supports Clauses 1.4, 1.6.5 and 1.10.3(d) of Chapter 1, and Clauses 4.5.3 and 4.5.4 of Chapter 4.
1B.1 The flood-sensitive catchments are listed in Clause 4.5.3.2. Table 1B.1 repeats that list. The maps of this annex and the boundaries of Annex 4A are the same data set and shall be issued together.
Table 1B.1 — Flood-sensitive catchments listed in Clause 4.5.3.2
| Item | Catchment | Extent as described in Chapter 4 |
|---|---|---|
| (a) | Agartala's central saucer between the Haora embankment and the Katakhal, with the Akhaura canal | The central part of the city, "at a lower level than other areas giving it the appearance of a saucer", between the Haora embankment on the south and the Katakhal on the north, the erstwhile area of the Corporation, where "During normal rainfall of about 3 to 4 hours, the central part of Agartala gets flooded" (ADB, IEE, 2020); drained by the Akhaura canal, which flows to Bangladesh, and lifted over the embankments by 18 flood pumps of up to 900,000 litres an hour each and 6 diesel pumps when the rivers are high (2024, as reported). No design capacity of the pumping stations was found [TBC] |
| (b) | The Katakhal basin and its sluice | The land that drains to the Katakhal, Agartala's northern drainage channel to Bangladesh, through its double-barrel sluice near Bhuturia (PWD (WR), as quoted), with the three sewage treatment plants being built on its banks at Ranjit Nagar, Abhaynagar Bridge and Astabal Bridge to take intercepted drain flow (State affidavit to the NGT, 2026). The Katakhal has no gauge, and its flood levels are to be surveyed [TBC] |
| (c) | The Haora flood-plain-zone localities and Chandrapur | The localities that PWD (WR) has mapped in the flood-plain zone of the Haora, Khayerpur, Kashipur, Baldakhal, Aralia, Jogendranagar and Joynagar (Dashamighat) (State affidavit to the NGT; map, return period and status not known [TBC]), and Chandrapur, flooded on 22–24 August 2026 with Baldakhal and Aralia (as reported). The Haora at Agartala reached 12.42 m on 22 August 2024 (CWC data as transcribed by SANDRP; datum not stated) |
| (d) | Kailashahar on the Manu | The town on the Manu behind its embankment, raised over 16.8 km in the 2025 programme (as reported); the Manu at Kailashahar has warning, danger and highest levels of 24.34, 25.34 and 25.79 m (7 June 1993) and reached 25.95 m on 13 June 2018, when about 21,000 people were left homeless in Kailashahar (CWC data as transcribed by SANDRP; as reported) |
| (e) | Belonia on the Muhuri | The town on the Muhuri, where the river reached 18.81 m on 22 August 2024 against a highest level of 16.98 m that had stood since 4 August 1983, and Belonia recorded 32 cm in the 24 hours to 0830 IST on 20 August 2024 (CWC data as transcribed by SANDRP; IMD); 7.47 km of the Muhuri embankment are in the 2025 programme (as reported) |
| (f) | Udaipur, Amarpur and Sonamura on the Gomati below the Dumbur reservoir | The towns on the release reach of the Dumbur reservoir, whose gates were opened on 21 August 2024 (as reported; conflict); the Gomati at Udaipur reached 22.05 m against its "extreme danger" level of 22.00 m on 21 August 2024 (State gauge), and the Gumti at Sonamura has a highest level of 14.43 m (23 July 1993) (as reported; CWC data as transcribed by SANDRP) |
| (g) | Dharmanagar on the Juri | The town on the Juri, which reached a new highest level of 20.66 m at Nutan Bazar on 22 August 2024 against 20.435 m of 15 May 1984 (CWC data as transcribed by SANDRP) |
| (h) | Khowai and Teliamura on the Khowai | The towns of the Khowai valley; the Khowai at Khowai has a highest level of 28.005 m (24 June 2004) (CWC data as transcribed by SANDRP), and 11 of the 17 landslide locations of June 2018 were in Khowai district (as reported) |
| (i) | Kamalpur on the Dhalai | The town on the Dhalai, whose highest level at Kamalpur, 33.85 m, was set before the monsoon, on 15 May 1984 (CWC data as transcribed by SANDRP), and where NIH-DHAARA returns no data (Clause 2.3.6(c)) |
| (j) | Santirbazar, Bagafa and Sabroom in the south | The towns of sub-area TR-D1, where Bagafa recorded 49 cm in the 24 hours to 0830 IST on 22 August 2024 (IMD) and landslides killed 7 people at Gardang near Santirbazar (as reported); the 1% AEP 24-hour depth there is not less than 490 mm (Clause 2.3.6(h)) |
| (k) | The hill-range corridors | NH-8 through the Atharamura and Longtharai ranges, and NH-108B and NH-208, where the High Court of Tripura recorded "No proper drainage system … water logging everywhere" and culverts blocked "by silt, vegetation, debris" (WP(C)(PIL) No. 06 of 2026, judgment of 08.09.2026); slopes, slides and debris govern (Clause 2.3.6(i)) |
| (l) | Notified catchments | Any catchment notified under Clause 4.5.4 |
To be prepared. This annex will contain a map of each catchment in Table 1B.1 at a scale fit for deciding whether a plot lies inside it, and the same boundaries as a GIS layer. It needs catchment boundaries drawn from a digital elevation model and the drain network (the Agartala Municipal Corporation, Agartala Smart City Ltd, PWD (R&B), TUDA, the Municipal Councils and Nagar Panchayats, Survey of India); the drains with their outfalls, the Katakhal sluice, the flap gates and the flood pumps with their sills, closing levels and capacities, and the dry-weather interceptions on them, with levels on a stated datum (PWD (WR), PWD (DWS), the Agartala Municipal Corporation); the flood marks of 17–19 June 2022, 31 May–1 June 2025 and 22–24 August 2026 in Agartala and of August 2024 in every basin (TDMA, the District Magistrates and Collectors, the Agartala Municipal Corporation); the stage records of the CWC sites on the Haora, the Manu, the Gumti, the Muhuri, the Juri, the Dhalai, the Khowai and the Burima, with their datum (CWC), and of the State gauges at Udaipur, Amarpur and the Jahar Bridge (the State); the reservoir levels and release records of the Dumbur reservoir (its operator, reported as TSECL [TBC]); the map of PWD (WR)'s flood-plain zone of the Haora, with its return period [TBC]; and the landslide inventory of August 2024 [TBC]. Other towns of the twenty with Local Planning Areas are candidates for notification under Clause 4.5.4 once their catchment boundaries and flood record are documented [TBC]. The lines of the TBR 2017 along rivers, ponds and jhoras, and the corridors of Chapter 7, are governed by Chapter 7 and by the instruments that bind there rather than by this list. Until it is published, the Authority decides at the pre-application stage whether a site lies in a listed catchment, from the best boundary available, and the decision and its basis are recorded on Form 1-1 and in the drainage report (Clauses 1.5.9 and 1.11.5).
Table 1B.2 — Attributes of the flood-sensitive catchment layer (layout)
| Field | Content | Unit or format |
|---|---|---|
| catchment_id | Unique identifier | text |
| name | Catchment name | text |
| basis | Clause 4.5.3.2 item (a) to (k), or the notification under Clause 4.5.4 | text |
| notification_ref | Gazette notification number, where notified | text |
| notified_on | Date of notification | date |
| applies_from | Date from which the rule applies to applications (Clause 4.5.4.2, step 5) | date |
| boundary_source | Source and date of the boundary | text |
| area_km2 | Catchment area | km² |
Annex 1C — Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
Supports Clauses 1.6.3, 1.6.5 and 1.7.1 to 1.7.3 of Chapter 1.
Model text for consideration by a competent authority. Not in force. The text below shows how the Policy Supplement of Clause 1.7 could be written. It has no effect unless and until it is issued by the Government and adopted by an Approving Authority under Clause 1.7.3.
Part 1 — General provisions
P1.1 Scope. This Supplement sets out alternatives S-1 to S-5 to the requirements of the Tripura Stormwater Design Manual (the Manual) named in each alternative. An alternative applies within the area of an Approving Authority (the Authority) only from the date on which the Authority adopts it under P1.3.
P1.2 No lower criterion. No alternative lowers any criterion of the Manual. S-1 and S-2 are simplified methods for meeting the same criterion (Clause 1.7.3(a)).
P1.3 Adoption.
- (a) A Tier B authority adopts an alternative by council resolution in the form of Part 3, and sends a copy to the State Stormwater Technical Committee (the Committee) within 30 days of the resolution.
- (b) A Tier A authority adopts an alternative only after the Committee has concurred in writing.
- (c) The Authority publishes the alternatives it has adopted on its website and in the register of Clause 10.17.
P1.4 Retention. No alternative replaces the retention requirement (Annex 2E depth), except where fee-in-lieu under S-5 funds equivalent retention in the same basin (Clause 1.7.3(d)).
P1.5 Tables. The tables used by S-1, S-2 and S-3 are those issued by the Committee, and are reviewed with Chapter 2 of the Manual (Clauses 1.7.3(e) and 2.14). An alternative that depends on a table cannot be used until that table is issued.
P1.6 Record. An Applicant who uses an alternative states it on Form 1-1 and in the drainage report, with the resolution or concurrence under which it was adopted.
Part 2 — The alternatives
S-1 — Design-aid route for storage
S-1.1 Replaces: storage sized by a hydrograph method under Chapter 3.
S-1.2 Alternative: retention and detention volumes may be taken from the unit-storage tables issued for Annex 4B (m³ per ha, by rainfall zone, hydrologic soil group and impervious fraction) and the compliance calculator, by the method of Clause 4.14.2.
S-1.3 Eligibility: sites of 2 ha or less outside flood-sensitive catchments, and of 0.5 ha or less within them (Table 1.2; Clause 4.14.1).
S-1.4 Conditions: the post-development imperviousness used shall be that shown on the approved plans; the outlet, spillway, RWH accounting and safety provisions of Clause 4.14.2 apply; the compliance calculator may be the sole calculation (Table 1.1).
S-2 — Permissible site discharge (PSD)
S-2.1 Replaces: the release rate Q_post(T) ≤ 0.9 × Q_pre(T) computed for the site (Clause 2.11.2).
S-2.2 Alternative: the release rate for each AEP may be taken as the tabulated unit-area release rate for the site's zone and AEP, multiplied by the site area. The tabulated rates are derived from the 0.9 × Q_pre rule (Table 1.2).
S-2.3 Eligibility: any site outside a flood-sensitive catchment.
S-2.4 Conditions: storage is then sized to hold every duration of Clause 2.5.2 at the PSD; drawdown, minimum orifice and spillway rules of Chapter 4 apply unchanged.
S-3 — Fixed-width waterbody setback
S-3.1 Replaces: the waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7).
S-3.2 Alternative: where no 1% AEP extent is mapped, the setback shall be the fixed width for the class of waterbody in the table of Clause 7.4.6 (and Annex 7B), measured as in Clause 7.4.3.
S-3.3 Eligibility: waterbodies with no mapped 1% AEP extent.
S-3.4 Conditions: no setback under this alternative is less than the Zone 1 minimum of Clause 7.4.7 (Clause 1.10.3(c)); the no-fill zone of Chapter 7 applies; where a 1% AEP extent is later mapped and adopted, the mapped setback applies to new applications.
S-4 — Downstream screening checklist
S-4.1 Replaces: downstream analysis by hydraulic model under Chapter 5.
S-4.2 Alternative: the Applicant completes a screening checklist of downstream capacity and known flooding, covering at least the conditions of Clause 5.3.4: that the receiving public drain has documented capacity for its minor-system design flow (Chapter 6), and that no flood-prone location is recorded within 500 m downstream. A hydraulic model under Chapter 5 is required only where the screen fails.
S-4.3 Eligibility: sites of less than 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall.
S-4.4 Conditions: the checklist is signed by the registered professional who signs the drainage report (Clause 10.6); flood-prone locations are those recorded by the local body, the District Magistrate and Collector and the District Disaster Management Authority, TDMA, PWD (WR) or TUDA (Clause 5.3.3(d)).
S-5 — Fee-in-lieu toward regional storage
S-5.1 Replaces: on-site detention under Chapter 4.
S-5.2 Alternative: all or part of the detention requirement may be met by a fee-in-lieu toward a regional detention facility or restored pukur or tank storage identified in the basin plan (Clause 4.13.1).
S-5.3 Eligibility: sites in a basin for which a basin plan has been notified (Table 1.2).
S-5.4 Conditions:
- (a) the conditions of Clause 4.13.2 apply, including interim on-site detention until the regional facility or restored tank is operational, and retention and WQv treatment on site;
- (b) the fee is computed under Clause 4.13.3 and held in the ring-fenced basin account;
- (c) the volume credited and the fee are entered in the public ledger of Clause 4.13.4; and
- (d) in a flood-sensitive catchment, fee-in-lieu is available only as allowed by Clause 1.10.3(d).
Part 3 — Model council resolution
Model text for consideration by a competent authority. Not in force.
Resolution No. ______ of ______ (name of Municipal Corporation / Municipal Council / Nagar Panchayat), dated ______
Subject: Adoption of alternatives under the Policy Supplement to the Tripura Stormwater Design Manual.
The Council, having considered the report of the Municipal Commissioner / chief executive officer dated ______, and noting that:
- (i) the Tripura Stormwater Design Manual and its Policy Supplement have been given effect by ______ (instrument and date);
- (ii) this local body is a Tier B / Tier A authority under Clause 1.6 of the Manual; and
- (iii) for a Tier A authority, the State Stormwater Technical Committee concurred on ______ (reference ______),
resolves:
- to adopt the following alternatives of the Policy Supplement within its area, under the conditions of Clause 1.7.3 of the Manual:
Table 1C.1 — Alternatives adopted by this resolution
| Alternative | Adopted (Yes / No) | Area to which it applies (whole area, or wards / zones) | Applies from (date) |
|---|---|---|---|
| S-1 Design-aid route | |||
| S-2 Permissible site discharge | |||
| S-3 Fixed-width setback | |||
| S-4 Downstream screening checklist | |||
| S-5 Fee-in-lieu |
- that no adopted alternative shall apply within a flood-sensitive catchment except as the Manual allows (Clause 1.6.5);
- that a copy of this resolution be sent to the State Stormwater Technical Committee within 30 days;
- that the adopted alternatives be published on the local body's website and entered in the register of Clause 10.17; and
- that this resolution be reviewed when the tables of Clause 1.7.3(e) are revised.
Mayor / Chairperson: ______ Municipal Commissioner / chief executive officer: ______ Date: ______
Annex 1D — Model TBR 2017 amendment and model ULB bye-law
Supports Clauses 1.3.1, 1.3.4, 1.11 and 1.12 of Chapter 1.
Model text for consideration by a competent authority. Not in force. The text shows one way the instruments of Clause 1.3.1 could be drafted. Rule and section numbers are left blank.
Drafting note D1D.1. The rule numbers of the Tripura Building Rules 2017 at which the new rule and the conditions would be inserted, and the enabling sections of the Tripura Urban Planning and Development Act, 2018 and the municipal and panchayat Acts, are to be confirmed by the Government's legal advisers. None is stated here.
Part A — Model amendment to the Tripura Building Rules 2017
A.1 Short title and commencement.
- (1) These rules may be called the Tripura Building (Stormwater Management) (Amendment) Rules, ______.
- (2) They shall come into force on the date six months after their publication in the Tripura Gazette (Clause 1.11.1).
A.2 Insertion of a new rule. After rule [______] of the building rules made by the Urban Development Department under section 274 read with section 118 of the Tripura Municipal Act, 1994, the following rule shall be inserted:
Rule [______]. Stormwater management.
(1) Definitions. In this rule, "the Manual" means the Tripura Stormwater Design Manual as notified by the Government, with its annexes and amendments; other words have the meanings given in Clause 1.4 of the Manual.
(2) Application. This rule applies to every development for which planning permission, building permit or layout approval is required under these rules.
(3) Runoff control. Where a development, over its common plan of development, involves land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, the development shall comply with Chapters 4 and 5 of the Manual (retention, detention, downstream and tailwater analysis).
(4) Provisions for every development. Every development, whatever its size, shall comply with Clause 1.5.4 of the Manual: no sewage connection to a storm drain; floor levels; waterbody setbacks and the no-fill zone; and no obstruction of a drainage path.
(5) Exemptions. A single dwelling on its own plot below the thresholds of sub-rule (3), and linear road resurfacing that adds no impervious area, are exempt from sub-rule (3) but not from sub-rule (4) or the rainwater harvesting provisions of these rules.
(6) Conditions of approval. The competent authority shall not grant:
- (a) planning permission or layout approval, unless a preliminary drainage report under the Manual has been accepted;
- (b) a building permit, or permission to commence, unless the final drainage design has been accepted; or
- (c) a completion certificate, unless the as-built certificate has been accepted and the maintenance declaration has been registered, or the public assets have been handed over,
for a development to which sub-rule (3) applies (Manual, Clause 10.3).
(7) Certification. Drainage reports and designs shall be signed by a registered professional, and, where Clause 10.6.1 of the Manual so requires, by an empanelled Stormwater Design Professional.
(8) Rainwater harvesting. Nothing in this rule alters the rainwater harvesting provisions of these rules.
(9) Variances and waivers. The competent authority may grant a variance or waiver only on the grounds and by the procedure of Clause 1.10 of the Manual, and shall publish each decision.
(10) Transition. Applications filed complete before the commencement of this rule, and Tier B authorities, are governed by Clause 1.11 of the Manual.
Part B — Model ULB bye-law
B.1 Title and commencement. These bye-laws may be called the ______ (name of local body) Stormwater Management Bye-laws, ______. They come into force on ______.
B.2 Adoption of the Manual. The Tripura Stormwater Design Manual, as notified by the Government, applies to:
- (a) every development approved by the local body; and
- (b) every drainage, road, culvert, waterbody and flood-mitigation work executed by the local body, including its own drains and roads (Clause 1.3.1(b)).
B.3 Public works. Every detailed project report and contract for a work under B.2(b) shall require compliance with the Manual, from the dates in Clause 1.11 (Clause 1.3.4).
B.4 Tier and alternatives. The local body is a Tier ______ authority under Clause 1.6 of the Manual. The alternatives of the Policy Supplement adopted by the local body are listed in the Schedule, with the resolution under which each was adopted.
B.5 Submittals and review. Submittals shall be made in the stages of Clause 10.3 of the Manual and reviewed within the periods of Clause 10.7.
B.6 Maintenance, inspection and enforcement. Maintenance declarations, inspections, handover of public assets and enforcement shall follow Clauses 10.10 to 10.15 of the Manual.
B.7 Publication. The local body shall publish the registers and reports of Clause 10.17 of the Manual.
B.8 Review. These bye-laws shall be reviewed whenever the Manual is amended under Clause 1.12.
Table 1D.1 — Schedule: alternatives adopted (layout)
| Alternative | Resolution number and date | Committee concurrence (Tier A only) | Applies from | Area |
|---|---|---|---|---|
Form 1-1 — Applicability Determination
Supports Clauses 1.5.1 to 1.5.9 and 1.6 of Chapter 1, and Clause 10.3 of Chapter 10.
Draft form — Tripura Stormwater Design Manual, Draft v1.0. Lodged at the pre-application meeting (Stage 0) or with the preliminary drainage report (Stage 1), as Clause 10.3.2 requires.
Table 1F.1 — Form 1-1: Applicability Determination
| No. | Item (clause) | Entry |
|---|---|---|
| A. Applicant and site | ||
| A1 | Applicant (owner, developer or department) | ______ |
| A2 | Site address and survey numbers | ______ |
| A3 | Site coordinates (latitude, longitude) | ______ |
| A4 | Approving Authority (Clause 1.4) | ______ |
| A5 | Tier of the Authority: A / B (Clause 1.6; Annex 1A) | ______ |
| A6 | Approval sought: planning permission / building permit / layout approval / public work (DPR) | ______ |
| A7 | Type of development: building / layout / sub-division / road / paving / land-use change / other (Clause 1.4) | ______ |
| A8 | Stage at which this form is lodged: Stage 0 / Stage 1 (Clause 10.3) | ______ |
| B. Coverage (Clause 1.5.1) | ||
| B1 | Development requiring approval under the Tripura Building Rules 2017 — 1.5.1(a): Yes / No | ______ |
| B2 | Public work by a ULB, State department, board or State undertaking — 1.5.1(b): Yes / No | ______ |
| B3 | Work by a Central agency needing the Authority's approval or no-objection — 1.5.1(c): Yes / No | ______ |
| C. Areas over the common plan of development (Clauses 1.4, 1.5.5) | ||
| C1 | Phases, plots and sub-divisions included (one layout approval or one ownership) | ______ |
| C2 | Total site area (ha) | ______ |
| C3 | Land disturbance (ha) | ______ |
| C4 | Existing impervious area (m²) | ______ |
| C5 | New impervious area (m²) | ______ |
| C6 | Replaced impervious area, removed to subgrade and rebuilt (m²) | ______ |
| C7 | New plus replaced impervious area, C5 + C6 (m²) | ______ |
| C8 | Plot area for the RWH mandate (m²) (Clause 1.5.3) | ______ |
| D. Thresholds and exemptions | ||
| D1 | Land disturbance 0.1 ha or more — 1.5.2(a): Yes / No | ______ |
| D2 | New or replaced impervious area 500 m² or more — 1.5.2(b): Yes / No | ______ |
| D3 | Redevelopment (existing impervious cover on the site) — 1.5.6: Yes / No | ______ |
| D4 | Constrained redevelopment route of Clause 4.5.6 proposed: Yes / No | ______ |
| D5 | Linear public work: added impervious area per drainage catchment crossed given in Table 1F.2 — 1.5.7: Yes / No / not applicable | ______ |
| D6 | Exemption claimed — 1.5.8(a) single dwelling below the thresholds / 1.5.8(b) resurfacing with no added impervious area / none | ______ |
| D7 | RWH mandate applies (TBR 2017, r.110: buildings of plinth area 200 m² or more, group housing, public, semi-public and industrial buildings of all sizes, commercial and mixed-use buildings of 50 m² or more; groundwater recharge on plots of more than 500 m² (r.110(5))) — 1.5.3: Yes / No | ______ |
| E. Site conditions | ||
| E1 | Site in a flood-sensitive catchment (Annex 1B; Clause 4.5.3): No / Yes — name | ______ |
| E2 | Source of the catchment boundary used | ______ |
| E3 | 1% AEP level mapped or determinable for the site (Clause 1.5.4(b)): Yes / No; source | ______ |
| E4 | Waterbody on or adjoining the site (Clause 1.5.4(c); Chapter 7): No / Yes — name | ______ |
| E5 | Natural drainage path or major-system flow path crossing the site (Clause 1.5.4(d)): No / Yes | ______ |
| E6 | Site drains to a tidal outfall (Clause 10.3.2(d)): Yes / No | ______ |
| E7 | Variance, waiver, regional facility or fee-in-lieu proposed (Clause 10.3.2(c)): No / Yes — Form 1-2 attached | ______ |
| F. Determination | ||
| F1 | Result: (i) Chapters 4 and 5 apply, with Clause 1.5.4 and the RWH mandate; (ii) Clause 1.5.4 and the RWH mandate only (below thresholds); (iii) exempt under 1.5.8, Clause 1.5.4 and the RWH mandate still apply | ______ |
| F2 | Stage 0 mandatory under Clause 10.3.2: Yes (state item (a) to (d)) / No | ______ |
| F3 | Storage method: hydrograph method (Chapter 3) / design-aid route S-1 (Clause 1.7, where adopted and eligible) | ______ |
| F4 | Other Policy Supplement alternatives relied on (S-2 to S-5), with the adopting resolution | ______ |
| F5 | Tier B phased start applies (Clause 1.11.3): Yes / No | ______ |
| G. Declaration | ||
| G1 | I declare that the information above is correct and covers the whole common plan of development. Applicant: name, signature, date | ______ |
| G2 | Prepared by (registered professional, Clause 1.4): name, registration number, signature, date | ______ |
| H. For the Authority (Clause 1.5.9) | ||
| H1 | Determination confirmed / corrected | ______ |
| H2 | Corrections and reasons | ______ |
| H3 | Officer: name, designation, signature, date | ______ |
Table 1F.2 — Form 1-1: added impervious area by drainage catchment, linear works (Clause 1.5.7)
| Drainage catchment crossed | Chainage from – to | Added impervious area (m²) | 500 m² or more (Yes / No) | Storage location: right of way / regional facility |
|---|---|---|---|---|
Form 1-2 — Variance / Waiver Request
Supports Clause 1.10 of Chapter 1.
Draft form — Tripura Stormwater Design Manual, Draft v1.0. Lodged with the preliminary drainage report (Clause 1.10.4(a)), with one form for each requirement concerned.
Table 1F.3 — Form 1-2: Variance / Waiver Request
| No. | Item (clause) | Entry |
|---|---|---|
| A. Applicant and site | ||
| A1 | Applicant | ______ |
| A2 | Site address and coordinates | ______ |
| A3 | Form 1-1 reference and date | ______ |
| A4 | Tier of the Authority: A / B | ______ |
| A5 | Site area (ha) | ______ |
| A6 | Site in a flood-sensitive catchment: Yes / No | ______ |
| B. Request | ||
| B1 | Type: variance from a numeric requirement (1.10.1) / waiver of Chapter 4 detention (1.10.2) | ______ |
| B2 | Clause of the Manual concerned | ______ |
| B3 | Value required by the Manual | ______ |
| B4 | Value or arrangement proposed | ______ |
| C. Matters that cannot be varied or waived (Clause 1.10.3) — confirm that the request does not concern any of them | ||
| C1 | (a) a sewage connection to a storm drain | Not concerned: ______ |
| C2 | (b) the lowest habitable floor level of Chapter 6 | Not concerned: ______ |
| C3 | (c) a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or fill or construction in the no-fill zone of Chapter 7 | Not concerned: ______ |
| C4 | (d) retention in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7 | Not concerned: ______ |
| D. Variance: grounds (Clause 1.10.1(a)) | ||
| D1 | Site condition: high groundwater table / contaminated soil / rock / site too small for the required facility / other | ______ |
| D2 | Evidence (tests, surveys, plans), with references | ______ |
| D3 | Options assessed and why each is impracticable | ______ |
| E. Variance: equal performance or make-up (Clause 1.10.1(b)) | ||
| E1 | Downstream point used (Chapter 5) | ______ |
| E2 | Performance at that point with full compliance and with the variance (peak flows, water levels) | ______ |
| E3 | Or: shortfall made up by fee-in-lieu or off-site works in the same catchment — volume (m³), works or fee | ______ |
| F. Waiver of detention: grounds (Clause 1.10.2) | ||
| F1 | Site discharges directly to the sea / to a tidal reach with no flood-prone property downstream | ______ |
| F2 | Analysis showing that undetained flow does not worsen the outfall-closed condition of Chapter 5 — reference | ______ |
| F3 | Retention still provided in full: Yes | ______ |
| G. Attachments (Clause 1.10.4(a)) | ||
| G1 | Report certified under Clause 10.6 | ______ |
| G2 | Preliminary drainage report | ______ |
| H. Certification and declaration | ||
| H1 | Certified by (registered professional; empanelled professional where Clause 10.6.1 applies): name, registration or empanelment number, signature, date | ______ |
| H2 | Applicant: name, signature, date | ______ |
| I. For the Authority (Clause 1.10.4) | ||
| I1 | Referred to the State Stormwater Technical Committee (Tier B, site 1 ha or more): Yes / No; date | ______ |
| I2 | Decision: granted / granted with conditions / refused | ______ |
| I3 | Reasons and conditions | ______ |
| I4 | Entry number in the public register (Clause 10.17) | ______ |
| I5 | Note: a variance runs with the approval and lapses if the approval lapses (Clause 1.10.4(d)) | — |
| I6 | Officer: name, designation, signature, date | ______ |