Chapter 8Water Quality and Recharge
8.1 Purpose and scope
8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:
- (a) the water quality volume (WQv) and the water quality design flow;
- (b) the treatment train, and the selection and design of best management practices (BMPs);
- (c) the criteria for infiltration and recharge;
- (d) the exclusion of sewage and dry-weather flow from storm drains;
- (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
- (f) how rainwater harvesting (RWH) fits with retention and detention;
- (g) erosion and sediment control during construction; and
- (h) monitoring.
8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.
8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.
8.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Water quality volume (WQv) | The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4). |
| Water quality rainfall depth (P_wq) | The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A). |
| 3-month ARI depth | The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record. |
| Water quality design flow (Q_wq) | The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5). |
| Runoff coefficient for WQv (Rv) | The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I. |
| BMP | A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume. |
| Treatment train | Two or more BMPs in series, from source to site to regional scale (Clause 8.5). |
| Pretreatment | A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP. |
| First flush | The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil. |
| Gross pollutant trap (GPT) | A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm. |
| Dry-weather flow (DWF) | Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge. |
| Cross-connection | Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain. |
| Infiltration facility | A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells. |
| Seasonal high groundwater table | As defined in Clause 3.10.2: the highest level in the monsoon season. |
| Hotspot | A land use with a high risk of spills or contaminated runoff (Clause 8.8.8). |
| Level of Service (LoS) / Value Rating (VR) | The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012). |
8.3 Objectives and pollutants of concern
8.3.1 Stormwater treatment under this Manual shall aim to:
- (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
- (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
- (c) keep sewage and sullage out of storm drains and waterbodies;
- (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
- (e) prevent erosion and sediment discharge during construction.
8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:
Table 8.1 — Pollutants of concern, sources and primary controls
| Pollutant | Main sources in Tripura towns | Primary control |
|---|---|---|
| Gross pollutants (plastics, litter, vegetation) | Streets, markets, open dumping in drains | Source collection; GPTs and screens (Clause 8.10) |
| Suspended sediment | Construction sites, unpaved roads and verges, road wear, drain silt | Erosion and sediment control (Clause 8.12); pretreatment; filtration |
| Oil, grease and fuel | Roads, parking, fuel stations, workshops, bus depots | Oil-grit separators at hotspots; bioretention |
| Pathogens and organic load (BOD) | Sewage and sullage cross-connections, animal waste | Exclusion and DWF interception (Clause 8.9) |
| Nutrients (N, P) | Sewage, fertiliser, food waste, detergents | Exclusion; bioretention; wetlands |
| Heavy metals | Roads, roofs, industrial yards | Filtration; sedimentation |
Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Tripura, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.
8.4 Water quality volume and design flow
8.4.1 Water quality rainfall depth. The water quality rainfall depth is:
P_wq = max (P_ret, P_3m)
where:
- P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
- P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.
8.4.2 Water quality volume. The WQv shall be computed as:
WQv = (P_wq / 1000) × Rv × A
where:
- WQv is in m³;
- A = the contributing area, m²;
- Rv = 0.05 + 0.009·I; and
- I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.
The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.
8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.
8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:
- (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
- (b) hotspot controls (Clause 8.8.8); and
- (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.
8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:
- (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
- (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.
8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).
8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).
Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Tripura value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).
The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.
Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:
- Rv = 0.05 + 0.009 × 80 = 0.77
- WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³
8.5 Treatment train and pretreatment
8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:
- (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
- (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
- (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.
8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).
8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.
8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.
Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Tripura, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.
Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.
8.6 BMP selection: Level of Service and Value Rating
8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.
8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):
Table 8.2 — Required Level of Service for sites that are not redevelopment
| ΔCN | Impact | Required LoS |
|---|---|---|
| 17 or more | High | 8 |
| 7 to 16 | Moderate | 7 |
| 4 to 6 | Low | 6 |
| 1 to 3 | Minimal | 5 |
For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.
8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.
8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:
- (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
- (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
- (c) it has pretreatment under Clause 8.5.3.
8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:
- (a) retained on site under Chapter 4; or
- (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.
Table 8.3 — BMP Value Ratings and suitability in Tripura
| BMP | VR (MARC 2012) | Main pollutants removed | Volume reduction / recharge | Tested flat tilla tops and benches (tilla rule) | Laterite / hard rock | Lunga floors, flood plains, pukur, dighi and beel margins / high water table | Tripura notes |
|---|---|---|---|---|---|---|---|
| Native vegetation (preserved) | 9.25 | All | High | Suited | Suited | Suited | Counts only for preserved, undisturbed area |
| Rain garden / infiltration | 9.0 | Sediment, metals, oil, nutrients | High | Suited if 1.0 m separation met | Conditional (test) | Not suited | Mosquito control: drain within 48 h |
| Bioretention | 8.5 | Sediment, metals, oil, nutrients | Medium–high (unlined); low (lined) | Suited | Suited, with underdrain | Lined, with underdrain | Media source and phosphorus content to be specified |
| Permeable pavement | 7.5 | Sediment, metals, oil | Medium–high | Suited | Conditional | Lined only | Not where run-on carries heavy silt |
| Extended detention wetland | 7.0 | Sediment, nutrients, metals | Low | Conditional (water balance) | Suited | Suited | Good at tank inlets (Clause 7.9.7) |
| Media / sand filter | 6.0 | Sediment, metals | Low | Suited | Suited | Suited (lined) | Needs frequent cleaning |
| Extended wet detention (wet pond) | 5.0 | Sediment, metals, some nutrients | Low | Conditional (water balance) | Suited | Suited | Dry-season water balance (Clause 8.7.8) |
| Vegetated filter strip | 5.0 | Sediment | Low–medium | Suited | Suited | Suited | Mostly as pretreatment |
| Native vegetation swale | 4.0 | Sediment, oil | Low–medium | Suited | Suited | Suited | Not where Q_wq velocity is high |
| Extended dry detention | 4.0 | Coarse sediment | Low | Suited | Suited | Suited | Combine with detention (Chapter 4) |
| Proprietary / hydrodynamic devices | 3.0–5.0 | Coarse sediment, oil, litter | None | Suited | Suited | Suited | VR from verified test data only |
| Signage (public education) | +0.25 | — | — | — | — | — | Added to composite VR |
The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.
Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Tripura for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Tripura stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.
8.7 BMP design summaries
8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).
8.7.2 Bioretention and rain gardens (Figure 8.2).
- (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
- (b) Surface ponding drained within 48 hours.
- (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
- (d) A transition (choker) layer and a gravel drainage layer below the media.
- (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
- (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
- (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.
8.7.3 Vegetated swales.
- (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
- (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
- (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
- (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
- (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.
8.7.4 Vegetated filter strips.
- (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
- (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
- (c) Used mainly as pretreatment for bioretention, infiltration and swales.
8.7.5 Permeable pavement.
- (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
- (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
- (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
- (d) Structural design for the traffic loading by the road authority's standards.
- (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.
8.7.6 Infiltration trenches and basins (Figure 8.3).
- (a) Pretreatment under Clause 8.5.3 in every case.
- (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
- (c) An observation well to the base of each trench.
- (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
- (e) An overflow to the minor or major system at grade.
- (f) Not brought into service until the contributing area is stabilised (Chapter 10).
8.7.7 Wet ponds (extended wet detention).
- (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
- (b) A sediment forebay at each inlet (Clause 8.5.3).
- (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
- (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
- (e) A dry-season water balance (Clause 8.7.8).
- (f) The detention storage of Chapter 4 may sit above the extended detention level.
8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.
8.7.9 Constructed wetlands.
- (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
- (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
- (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
- (d) A high-flow bypass so that floods do not scour the macrophyte zone.
- (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.
8.7.10 Gross pollutant traps.
- (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
- (b) Capture of gross pollutants down to about 5 mm.
- (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
- (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
- (e) Vehicle access for cleaning by suction or grab.
8.7.11 Oil-grit separators.
- (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
- (b) Sized for Q_wq, with a high-flow bypass.
- (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.
8.7.12 Silt traps and catch pits.
- (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
- (b) A sump at least 300 mm below the outlet invert.
- (c) Silt traps are pretreatment only and earn no VR.
Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Tripura. Three local issues drive changes from the source manuals:
- Mosquitoes. Dengue is endemic in Tripura. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
- Dry seasons. Most of Tripura's rain falls in the monsoon season of 1 April to 31 October: the CGWB finds "70 to 80 percent of rainfall" from May to September in West Tripura, with five-year averages of 1,851 mm at Agartala and 1,505 to 2,020 mm at the other stations of the district on 77 to 91 rainy days (NAQUIM), and the ADB gives 1,922 to 2,855 mm a year across the State, increasing from south-west to north-east (IEE, 2020); the figures conflict, and IMD's normals were not obtained [TBC]. December to February is the dry season and the works window (Chapter 10), though large falls come outside the season too (Agartala 142.2 mm on 19 February 1993, IMD). From November to March the pukurs (Bengali পুকুর: tanks or ponds) and dighis (large tanks) fall, though on the lungas (the flat land between the tillas, the low hills) and the flood plains the water table stays within a few metres of the ground (Clause 8.8.1). In the towns the dry-weather feed of a drain, nala, chhara (stream) or khal (canal) is sewage, because the drains carry it (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool from December to March on its own catchment's runoff is not to be used, and none is kept full with dry-weather flow; on the lunga floors, where Clause 4.11 bars infiltration, the practical forms are lined bioretention with an underdrain, swales, storage for use and lined extended dry detention. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage; pukurs, dighis, beels and wetlands are waterbodies under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
- Litter and silt. GPTs and silt traps are treated as essential, not optional, because Tripura drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.
The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.
Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.
8.8 Infiltration and recharge criteria
8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Tripura, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is the highest level found from April to November, which covers the season of 1 April to 31 October and the month after it (Clause 3.10.2). Tripura needs the three rules of Clause 4.11 here, and Clause 8.8.1 applies with the following. (i) No infiltration on the lunga floors and flood plains (Clause 4.11, lunga rule). No deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, unlined bioretention, or permeable paving with an exfiltrating base) shall be built or credited on the recent flood plains and lunga floors (lunga: the flat land between tillas, the land records' "Flat lands between tillas" and the CGWB's "low lands ('loonga') of Holocene terrace"); on land below the 1% AEP flood level of a river, chhara or khal; inside embankment-protected land that ponds when its sluices close or its pumps stop; on the margins of a pukur, dighi, beel or haor (its Zone 1 and Zone 2 under Chapter 7); on filled ponds and lunga fills (TBR 2017, r.32) and on clayey urban fill; or wherever the seasonal high water table is less than 2.0 m below ground. The last condition alone may be set aside where a piezometer record of at least one full April–November season shows that the water table stays at least 2.0 m below ground and at least 1.0 m below the base of the practice; the others may not. On such land the exception for roof water in Clause 8.11.3(c) does not apply; roof water goes to storage for use, retention is met by storage for use and by surface measures that do not infiltrate below ground, and detention under Chapter 4 is lined. In West Tripura the CGWB found the dug wells at 1.63 to 10.30 m below ground in March 2017 and at 0.22 to 6.64 m in November 2017 (NAQUIM); the post-monsoon depths of 2008 were 0.90 to 5.10 m in South Tripura and 1.20 to 4.37 m in North Tripura (as cited by CGWB); under central Agartala lies "a soft to medium/stiff, silty clay/clayey silt layer" and "The ground water table being very high" (ADB, 2020); and the shallow groundwater carries iron from 0.00 to 4.99 ppm "due to the ferruginous nature of Tipam sandstones" (CGWB), which clogs infiltration media (NEER reading). (ii) Infiltration only on tested tilla tops (Clause 4.11, tilla rule). On the dissected terrace uplands (tilla: the land records' "Hillock"), infiltration is allowed, with pretreatment, the field test of Clause 8.8.3 and the separation of this Clause, only on tilla tops and benches whose natural slope is not steeper than 10% and where the seasonal high water table is more than 3 m below ground, set back from the tilla edge by twice the height of the slope below; never on tilla slopes, cut faces or fill, within twice the height of a cut or retaining wall upslope of it, or on the lunga below. The weathered Tipam sandstone is "very porous and permeable", with a rainfall infiltration factor of 0.16 approved by the CGWB's research committee; the Dupitila sandy clays with laterite are slower (CGWB; NEER reading). (iii) No infiltration on hill slopes (Clause 4.11, hill rule). In sub-area TR-E, on any natural slope steeper than 20% elsewhere, and on tilla slopes and cut faces, no deliberate infiltration practice shall be built or credited, nor on colluvium, fill or slide debris, in a mapped landslide zone or at a landslip location, or upslope of a cut slope or retaining wall within twice its height, unless, on the slopes of the hill ranges, a geotechnical certificate shows that the added water will not destabilise the slope; no certificate makes one acceptable on a tilla slope, a cut face or fill. Roof runoff goes to storage, with its overflow, and all other runoff, by a lined drain through a silt trap and an energy dissipator, to a stable channel. The 20% threshold is the CGWB's own: "Area with more than 20% slope has been excluded for the recharge computation" (NAQUIM, West Tripura), a resource-assessment convention used here as the line between ground types. In the ULBs of the hill areas the Building Rules already bar a site "within 200 meters from the boundary of a sinking or probable slip zone" or where there is "high water table and fully saturated soil" (r.90(1)(h)), and ask for the diversion of the water coming from uphill away from the foundation (r.91(r)); 2,032 landslip locations were reported in August 2024 (as reported). (iv) Recharge is not a design objective. The stage of groundwater extraction was 9.48%, with every assessment unit Safe, in the assessment of 2024 (as quoted by CGWB) and 9.92% in 2023 (as quoted). No recharge or injection well shall be built on lunga land or on any land under rule (i), and recharge pits and trenches only under rule (ii). Where rule 110(5) of the Building Rules makes recharge mandatory on a plot of more than 500 m² and the plot falls under rule (i) or rule (iii), this Manual states the conflict, requires storage for use in place of the recharge structure, and leaves the Applicant to seek the ULB's relaxation of the rule, which this Manual does not override. (v) Quality. No runoff from roads with heavy traffic, fuel stations, workshops, industrial yards or solid-waste sites, no water from a drain that carries sewage, and no overflow from a septic tank or soak pit, is led to any recharge structure, and a recharge structure on a tilla top takes only roof water or runoff that has passed a filtering BMP; rule 110 already asks that contaminated water not be injected into recharge structures and that they be kept "away from sewer lines. Septic tanks, soak pits, landfill". The 2.0 m and 3 m limits, the 10% and 20% slopes, the April–November record and these conditions are set by this Manual; no Tripura rule on infiltration near the water table was found. The seasonal high groundwater table shall be determined under Clause 3.10.2.
8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.
8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:
- (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
- (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
- (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
- (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).
Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.
8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:
- (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
- (b) 3.0 otherwise.
8.8.5 Minimum rates.
- (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
- (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
- (c) No infiltration credit where the design rate is below 3 mm/h.
8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:
- (a) 3 m from building foundations, and 5 m from a basement;
- (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
- (c) 30 m from a drinking-water well or borewell;
- (d) 15 m from a septic tank or soak pit; and
- (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.
Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.
8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).
8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:
- (a) fuel stations;
- (b) vehicle workshops, washing bays, and bus and truck depots;
- (c) industrial yards and loading areas where hazardous materials are handled or stored;
- (d) solid waste transfer stations and landfill areas; and
- (e) land known or suspected to be contaminated.
Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.
8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Tripura has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The sands and silty sands of the river flood plains and the porous Tipam sandstone are not coastal sand areas: Clause 8.8.1 applies there in full, with the lunga, tilla and hill rules of Clause 4.11, and the reduced separation of item (d) does not. In coastal sand areas:
- (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
- (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
- (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
- (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
- (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.
8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the lateritic Dupitila sandy clays and the weathered Tipam sandstone of the tilla uplands, and the sandstone and shale of the Baramura, Atharamura, Longtharai, Sakhan and Jampui ranges (CGWB); none of the sources read describes crystalline rock in the State; on tilla slopes, cut faces and in sub-area TR-E the hill rule of Clause 4.11 applies first under Clause 8.8.1, and on tilla tops the tilla rule):
- (a) tests shall be made at the facility base, below any surface crust or hardpan;
- (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
- (c) infiltration on or above slopes shall be checked for slope stability.
8.8.11 Delta clays and black cotton soils. In the silty clays and clayey silts of the recent flood plains and lungas of the Haora, Gomati, Khowai, Dhalai, Manu, Juri and Muhuri valleys, the silted beds of pukurs, dighis and beels, filled ponds and clayey urban fill, and the shales of the hill ranges, and in expansive black cotton soils:
- (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
- (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.
Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Tripura precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Tripura RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.
No map of hydrologic soil groups for Tripura, no soil series of NBSS&LUP and no measured infiltration rate anywhere in the State was found [TBC]; every infiltration design needs the tests of Clause 8.8.3. The CGWB describes "Quaternary & Upper Tertiary groups of rocks": recent alluvium of silt, sand, clay and gravel; the Dupitila, "Brown to buff sandy clay … clayey sandstone with ferruginous materials & laterites"; the Tipam, "Massive medium to coarse sandstone with sandy shale"; and the Surma below, folded into the "almost N – S" ranges of Baramura and Atharamura, "varying from 150 – 445m above MSL". Between the ranges lie three landforms: "(1) table lands (tilla lands) and rolling mounds formed by the Upper Pleistocene terraces …; (2) low lands ('loonga') of Holocene terrace comprising stabilized, undissected, higher flood plains; (3) recent flood plains constituting the present-day flood-prone belts fringing the rivers"; "The undulation formed by 10 – 30 m high mounds with gullies in between them, locally called 'loonga'". The soils are "acidic in nature", and the lithologs show 3 to 10 m of reddish-brown lateritic soil, sandy loam or reddish clay at the surface (CGWB, NAQUIM, West Tripura). Under central Agartala the Haora's alluvium is "a top soil underlain by a soft to medium/stiff, silty clay/clayey silt layer" over silty sand, with a bearing capacity of 4 to 6 t/m², and "The sandstones are highly porous underlain by impermeable shales or clay" (ADB, IEE, 2020). The water is shallow on the plains: in West Tripura the dug wells stood at 1.63 to 10.30 m below ground in March 2017 and at 0.22 to 6.64 m in November 2017, and in Agartala "The ground water table being very high" (CGWB; ADB). "Within a few hours most of the rainwater goes as run off and finally enters Bangladesh" (CGWB). Groundwater is not short: the stage of extraction was 9.48%, with every assessment unit Safe, in the assessment of 2024 (as quoted by CGWB). Quality is the constraint: the shallow groundwater carries iron from 0.00 to 4.99 ppm "due to the ferruginous nature of Tipam sandstones" (CGWB), with iron above the permissible limit "in most of the places in the phreatic aquifer" by an older State assessment (as cited). The CGWB's rainfall infiltration factor for the Tipam sandstone, "very porous and permeable", is 0.16, a fraction of rainfall and not an infiltration rate. This Manual's interim soil groups follow from these (Chapter 3): the recent flood plains and lunga floors D; the Holocene terraces and higher flood plain C to D; the tilla uplands of Dupitila sandy clay with laterite C (B on sandy tops); the weathered Tipam sandstone B to C; the hill ranges D for design; and urban fill C (D if clayey). The State therefore needs three rules, not one (Clause 4.11). On the lunga floors and flood plains, where most towns stand, no water is put into the ground on purpose, under the lunga rule, because in the storms that matter it would go into saturated ground. On tilla slopes, cut faces and the hill ranges, no water is put into the ground on purpose, under the hill rule. On flat tilla tops, tested infiltration is allowed under the tilla rule, as a choice rather than a duty. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Tripura, which has no coast.
Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.
8.9 Sewage cross-connections and dry-weather flow
8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.
8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.
8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Tripura State Pollution Control Board (TSPCB) and the drain owner.
8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the monsoon, and record:
- (a) the outfalls with DWF;
- (b) the estimated DWF rate; and
- (c) the upstream sources found by tracing, CCTV, dye or smoke testing.
The results shall be published in the register of Clause 10.17.
8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:
- (a) diverts the DWF to a sewer or a treatment plant;
- (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
- (c) has a screen ahead of the diversion; and
- (d) is not a substitute for removing the source connections.
8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.
Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Tripura. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.
In Tripura the storm drains are the sewers, and this Clause is the normal case, not the exception. Agartala's sewer network, "103.6 Km … with 4011 nos. household connection", lies "only in the North Zone"; the Agartala Municipal Corporation area generates 61.0 MLD of sewage against 17.4 MLD of treatment capacity (8 MLD at Chandanimura, 8 MLD at the Akhaura ICP and 1.4 MLD of in-situ treatment of the drains that reach the Haora), a gap of 43.6 MLD; the 19 other ULBs generate 21.4 MLD and treat none; and the State generates 82.4 MLD against the same 17.4 MLD (State affidavit to the National Green Tribunal in O.A. 606/2018, 06.07.2026). Before the Central Monitoring Committee the State asked the CPCB to consider a generation of 227.43 MLD (minutes of the 20th meeting, 19.08.2025): the two figures conflict, and neither is used here as a design value. In 2020 "Agartala city is not covered by an underground sewerage system at present" (ADB, IEE, November 2020), and the State reported "only one 8 MLD STP in entire State … commissioned in the year 2017", receiving 1.5 to 2.0 MLD (action-taken report in O.A. 606/2018, 2020); by 2026 the North Zone network exists. The plants are fed from the drains: the Akhaura plant and all those under construction "are designed to be connected through Interception & Diversion of Drains", which Agartala Smart City Ltd calls "a temporary measure till the conveyance system is laid"; 39.5 MLD is being built, at Joypur on the Kalapania Khal (5 MLD), at Ranjit Nagar (10 MLD), Abhaynagar Bridge (15 MLD) and Astabal Bridge (1.5 MLD) on the Katakhal, with a target of March 2027, and on the Haora bank (8 MLD), with a target of 31.05.2027 (affidavit, 2026). The National Green Tribunal's view, as quoted in the affidavit, is that "storm water drains are being tapped and taken to STPs which is not legal. If surface drains are used as open conduit, then storm water flows should have separate conveyance system. Sewage and storm water mixing particularly during monsoon will not only upset functioning of STP but, will also lead overflow of untreated sewage" (attributed to the hearing of 16.09.2025, NEER reading); and its order of 13.04.2026 records that the 5 MLD plant at the Kalapania Khal and the 8 MLD plant on the Haora bank lie near or on the flood plain, which "may lead to flooding of the STP and flowing of untreated sewage in the river during the monsoon" (as quoted). The State's plans include a survey of "Toilets discharging directly into drains/water bodies", an ADB-assisted project of about ₹1,200 crore of which about a third is "shallow/sub-surface sewer pipelines to intercept sewage presently flowing into open drains" (target 2030), soak pits "to prevent overflow into storm water drains", and the desludging of a third of the septic tanks each year (affidavit, 2026). The Haora at Dashamighat remains in Priority V, with a BOD of 3.3 mg/L (CPCB, 2025), and five drains are reported to carry 0.648 MLD of sewage into it (as cited). The law already points the same way: the Municipality may "require separate provisions to be made for drainage of sewage and other offensive matters as distinct from rain-water" (Tripura Municipal Act, 1994, s.164), and in the ULBs of the hill areas drains "for surface water only … shall not be connected with any drain carrying sullage water or sewage" (TBR 2017, r.99(2)(d)). The drains also carry litter: without the "wire nets" on the drains that the National Green Tribunal had asked for, "solid waste or plastic waste reached to the river", and "there is frequent water logging of different areas due to blockage of drains and canals by plastic waste" (CAG, Audit Report 2022-23), so every screen and trash rack under Clauses 8.9.5 and 8.10 is sized for that load, with the 50% blockage of Chapter 6. In Tripura, therefore: (i) every storm-drain, nala and chhara outfall to a pukur, a dighi, a beel, the Haora, the Katakhal, the Akhaura canal, the Kalapania Khal or any other river or khal is taken to carry dry-weather flow until the survey of Clause 8.9.4 shows that it does not, and has a DWF interceptor and a screen under Clause 8.9.5 before it reaches the water, and before any detention or retention pond; (ii) every interceptor that feeds a sewage treatment plant is sized on the measured dry-weather flow of its drain, with a defined bypass that returns the storm flow above that rate to the drain or khal in the monsoon, so that storm flows are kept out of the interception-fed plants; no new plant, interceptor or chamber is placed within the 1% AEP extent unless it is raised above the 1% AEP level or made watertight; (iii) no new storm drain shall discharge into a pukur, a dighi, a beel or the catchment of Rudrasagar unless its dry-weather flow is intercepted and its first flush treated under Clause 8.10; (iv) no septic-tank or soak-pit overflow and no sullage pipe is connected to a storm drain, nala or chhara on any site approved under this Manual (Clauses 8.9.1 and 8.9.2), and storm and foul water are collected separately on every site, each with its own last inspection chamber at the boundary, so that the site can be connected to a separate storm drain without rework when one is built (Clause 6.3.6(a)); (v) until sewers connect, a drain that receives sewage is designed as a combined channel under Clause 6.3.6(d), for velocities that keep sludge moving in dry weather as well as for the storm flow, with access for cleaning and with covers or screens where it passes homes; (vi) where no sewer or treatment plant exists to receive the intercepted flow, the interceptor delivers it to an interim treatment unit that the TSPCB approves, never to a pukur, dighi, beel or khal; and (vii) a pukur, dighi, retention pond or lunga storage that holds storm water mixed with sewage has the dry-weather flow of its inflows intercepted ahead of it; keeps no permanent pool fed by dry-weather flow; is drawn down to its normal level, by gravity or by its pumps, as soon as the river stage allows and within the pumping period of Clause 5.8.5; has its inlets screened and set so that they do not stand exposed as the level falls; is cleared of sludge in the post-season clearance by 15 November, with the sludge tested under Clause 7.9.1(c) and disposed of as the TSPCB directs; and leaves no isolated pool standing more than 72 hours after drawdown, because of mosquitoes (Tripura Municipal Act, 1994, s.233). The palace-era and temple tanks are not drawn down for this purpose; they are protected by interception at every inlet. At an outfall that a sluice closes when the river is high, the interceptor and its chamber are placed above the 1% AEP level or made watertight, and work with the gate shut. The sizing on dry-weather flow with a monsoon bypass, and these conditions, are set by this Manual.
8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens
8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:
- (a) a GPT designed under Clause 8.7.10; and
- (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.
8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:
- (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
- (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.
8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:
- (a) be designed with 50% blockage for hydraulic capacity;
- (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
- (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
- (d) be cleanable from a safe platform, with vehicle access.
8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.
Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Tripura waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.
8.11 Rainwater harvesting integration
8.11.1 RWH mandate continues. The rainwater harvesting required by the Tripura Building Rules 2017 (rule 110: "All building having plinth area not less than 200 sq.m., while submitting the building plans for sanction, shall mandatorily include the complete proposal of rainwater harvesting", for group housing, public and semi-public and industrial buildings of all sizes and for commercial and mixed use from 50 m², with "emphasis on both storage and reuse" for plotted housing; "permeable materials … for all open parking spaces" in group housing; "complete utilization and capture of storm water" in public open spaces above 500 m² (r.110(4)); recharge "mandatory" on plots of more than 500 m² (r.110(5)); a Rainwater Harvesting Cell in each ULB, inspection before the completion certificate and annual verification of every building above 1,000 m² (r.110(6)); and, in the ULBs of the hill areas, the gutters, pipes and drains of rule 99) continues to apply, subject to the limits of Clause 8.8.1: where a recharge pit, trench, well or shaft that rule 110 asks for falls on a site where Clause 4.11 bars infiltration, this Manual states the conflict, requires storage for use in its place, and leaves the Applicant to seek the ULB's relaxation of the rule, which this Manual does not override (Chapter 1). This Clause sets how RWH structures are counted under this Manual.
8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:
- (a) harvesting: storage for use (sumps and tanks);
- (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
- (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).
8.11.3 Recharge structures.
- (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
- (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
- (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.
8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:
- (a) its infiltration rate has been tested under Clause 8.8.3;
- (b) it empties within 72 hours at the design rate; and
- (c) it has pretreatment.
A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).
8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every monsoon (April–October) design storm (Chapter 4).
8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.
8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.
Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Tripura's building rules make rainwater harvesting compulsory for most buildings, but they size nothing. Rule 110 of the Tripura Building Rules, 2017 reads: "All building having plinth area not less than 200 sq.m., while submitting the building plans for sanction, shall mandatorily include the complete proposal of rainwater harvesting", with components that include "Storage Tanks/ Pits/ sumps" and "Ground Water recharge structures"; its table asks for an RWH structure, with "emphasis on both storage and reuse", on plotted housing of 200 m² of plinth and above, and for RWH on group housing, public and semi-public and industrial buildings of all sizes and on commercial and mixed-use buildings of 50 m² and above, with recharge wells, recharge pits or percolation pits for most of them; public open spaces of more than 500 m² "shall have arrangements for complete utilization and capture of storm water" (r.110(4)); recharge is "mandatory" on plots of more than 500 m² (r.110(5)); and each ULB keeps a Rainwater Harvesting Cell and inspects the structures before the completion certificate (r.110(6)). The 200 m² threshold replaced the 300 m² of the rules of 2004 (PIB, as reported; date not checked). No storage volume, rate per square metre of roof or infiltration test is set (NEER reading), and ground coverage of 70% for every use, and 100% for some industrial and commercial plots, has been allowed since 2025 (r.46(1) and r.51(2)), with landscaping of only 1 to 7.5% of the plot (r.113). In Tripura a recharge pit on a lunga floor, standing in ground that is saturated through the monsoon and fed by water that may carry sewage, is a soakaway, not storage; and recharge is not needed, with the stage of groundwater extraction at 9.48% (as quoted by CGWB). This Manual therefore treats rainwater harvesting as storage for use for the dry months from December to March, and as storage on lunga and hill sites: where the lunga or hill rule of Clause 4.11 bars infiltration, the RWH structure is a storage tank of at least 25 L per m² of roof (about 25 mm over the roof), and the recharge structures of rule 110 are replaced by storage of the same kind (Chapter 4); the store is credited as retention only through reuse, emptied within 72 hours by a continuous non-potable use (Clauses 4.4.3 and 8.11.4), assumed full at the start of every storm (Clause 4.11.2), and never counted as detention (Clause 8.11.5). On tested flat tilla tops, recharge may be one function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); where rule 110 asks for a recharge structure on a site where Clause 4.11 bars infiltration, this Manual states the conflict, requires storage in its place, and leaves the Applicant to seek the ULB's relaxation of the rule (Clause 8.11.1). The "permeable materials … for all open parking spaces" of group housing are laid, on lunga and hill land, on a lined base with an underdrain, and earn no infiltration credit (Chapter 4). RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a June to August monsoon storm, such as those of June and July 1993 and August 2024, arrives after weeks of rain, which is why it cannot be counted as detention.
Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.
8.12 Construction-stage erosion and sediment control
8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:
- (a) the sequence of clearing, earthworks and stabilisation;
- (b) the area exposed at each stage;
- (c) the measures of Clause 8.12.3, with their locations and sizes;
- (d) the protection of infiltration and retention areas (Chapter 10);
- (e) stockpile, concrete washout and fuel storage locations; and
- (f) the inspection and maintenance schedule.
8.12.2 Monsoon timing. Earthworks shall be planned so that:
- (a) the area exposed during the monsoon (April to October) is as small as practicable;
- (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 March; and
- (c) any area exposed between 1 April and 31 October has sediment controls in place before it is cleared.
8.12.3 Measures.
- (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
- (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
- (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
- (d) Inlet protection at every existing drain inlet that receives runoff from the site.
- (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
- (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the monsoon.
- (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
- (h) Concrete washout in a lined pit, never into a drain.
8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).
8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.
8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).
Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Tripura's 2-year 24-hour depths are high and construction sites are commonly left exposed through the monsoon. The 2 ha division between traps and basins, the 31 March stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 March date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Tripura the silt of tilla cutting travels with it: the tillas stand 10 to 30 m above the lungas with gullies between them (CGWB), and the gully erosion of their cut faces silts the valley drains (NEER reading); Agartala's feeder drains are "choked up with solid waste and silt" (ADB, IEE, 2020); the CAG found "frequent water logging of different areas due to blockage of drains and canals by plastic waste" (Audit Report 2022-23), and that sand extraction outside the approved blocks "caused weakening of river embankment and erosion of riverbed" (Audit Report 2022-23); on NH-108B and NH-208 the culverts were found blocked "by silt, vegetation, debris" (High Court of Tripura, WP(C)(PIL) No. 06 of 2026); and 2,032 landslip locations were reported in August 2024 (as reported). The Building Rules already ask, in the ULBs of the hill areas, for a soil test and a slope-stability certificate on slopes of 30° and above (r.90(1)(f)), for drainage that carries water away "without stagnation, avoiding any possibility of erosion, slope failure" (r.99(1)(c)), for the diversion of uphill water from foundations (r.91(r)), for outfalls that are "protected and guided" with filters where necessary (r.99(2)(h)) and for breast and retaining walls with weep holes and filters (r.100); they give no size, area, date or inspection for sediment control, which Clause 8.12 supplies. The stabilisation date of 31 March, which covers tilla cuts, is set by this Manual, before its season begins on 1 April, because the April and May storms come before the south-west monsoon (Agartala 198.0 mm on 11 April 2007; Kailashahar 257.1 mm on 19 April 2004, IMD; Chapter 2). The reason given above for the larger basin volume, that the 2-year 24-hour depths are high, holds against the US basis it compares with: the NIH-DHAARA reanalysis gives about 91 to 133 mm across the State's cells (117 mm at Agartala; comparison values only, not design values; Chapter 2), and AMC III applies through much of the season (Chapter 3); the rule of Clause 8.12.3(c) is kept unchanged everywhere. In Tripura the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel and never onto an unprotected slope; no sediment basin or trap is designed to infiltrate where Clause 4.11 bars infiltration, which includes every lunga floor, tilla slope and cut face; no spoil, silt or debris from a site is placed in a pukur, dighi, beel, chhara or khal, within its Zone 1, or on an embankment; and a site on a tilla keeps its sediment behind a silt trap at the tilla foot (Clause 6.3.6(m)) before any drain reaches the lunga, a pukur or a khal.
8.13 Monitoring
8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:
- (a) dry-weather sampling (Clause 8.9.4), at least once a year before the monsoon; and
- (b) wet-weather sampling of at least three events each monsoon at a set of index outfalls.
8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.
8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).
8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.
8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.
Commentary. No Tripura programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.
8.14 Submittal requirements
Every drainage report under this chapter shall include:
- the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
- for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
- the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
- for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
- the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
- the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
- the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
- the ESC plan (Clause 8.12).
8.15 Review and update
8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A: Engineering Design (§9.5, Ch. 10). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- Mid-America Regional Council and Kansas City Metro Chapter APWA (2012). Manual of Best Management Practices for Stormwater Quality (Tables 4.2–4.6). https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01; MARC factsheet and Supplement. https://www.marc.org/document/apwa-5600-manual-factsheet ; https://www.marc.org/document/apwa-stormwater-standards-supplement
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, 2016 Edition, Vols 1–2. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd Edition. https://did.sarawak.gov.my/web/attachment/show/?docid=clRsMlRycU1lNnFRcnl3eDZnNkJMdz09OjpY0au0UPvQ9zUHVWRMbCKX
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- CIRIA (2015). The SuDS Manual (C753). London: CIRIA.
- PUB, Singapore's National Water Agency. Active, Beautiful, Clean Waters Design Guidelines (current edition).
- Central Ground Water Board (2007). Manual on Artificial Recharge of Ground Water. Ministry of Water Resources, Government of India.
- US Environmental Protection Agency (2022). NPDES Construction General Permit (sediment basin sizing).
- ASTM D3385. Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer.
- BRE Digest 365. Soakaway Design. Building Research Establishment, UK.
- Government of Tripura, Urban Development Department. Tripura Building Rules, 2017, as amended to the (Fifth Amendment) Rules, 2025, rules 32, 46, 51, 90, 91, 99, 100, 110 and 113 (Chapter 7 references).
- Government of Tripura. Tripura Municipal Act, 1994, ss. 164 and 233 (Chapter 7 references).
- Central Ground Water Board, North Eastern Region. Aquifer Mapping and Management Plan of West Tripura District (NAQUIM, AAP 2017-18) (Chapter 7 references); the district profiles of South and North Tripura (2008 data, as quoted); and Dynamic Ground Water Resources, assessments of 2023 and 2024 (State compilation of February 2025, as quoted; not read).
- National Institute of Hydrology. NIH-DHAARA, IMDAA dataset, queried 14 November 2026 (Chapter 2 references).
- National Green Tribunal. O.A. 606/2018, affidavit of the Government of Tripura filed on 06.07.2026, and the State's action-taken report of 2020, https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20GOVT.%20OF%20TRIPURA%20IN%20OA%20NO.%20606%20of%202018%20FOR%20STATE%20OF%20TRIPURA%20(COMPLIANCE%20OF%20MSW%20MGT.%20RULES,%202016).pdf ; O.A. 673/2018, State affidavit and CPCB report in E.A. 35/2023, https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20CPCB%20IN%20EA%20NO.%2035%20OF%202023%20AND%20MA%20NO.%2092%20OF%202023%20IN%20OA%20NO.%20673%20OF%202018%20News%20item%20published%20in%20%E2%80%9Cthe%20Hindu%E2%80%9Dauthored%20by%20shri%20Jacob%20Koshy%20titled%20more%20river%20stretches.pdf (Chapter 7 references).
- Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality, https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf ; and minutes of the 20th meeting of the Central Monitoring Committee, 19.08.2025, https://www.mpcb.gov.in/sites/default/files/20th_CMC_MoM-19082025.pdf
- Asian Development Bank (2020). Agartala City Urban Development Project (53262-001): Initial Environmental Examination (Chapter 7 references).
- Comptroller and Auditor General of India. Audit Report for the year 2022-23 (Government of Tripura), Chs. II and III (Chapter 7 references).
- High Court of Tripura. WP(C)(PIL) No. 06 of 2026, judgment of 08.09.2026 (Chapter 7 references).
- Press Information Bureau, Government of India: rainwater harvesting threshold in the Tripura Building Rules (as reported), https://www.pib.gov.in/newsite/PrintRelease.aspx?relid=101516 ; and reports of the landslides of August 2024 (secondary).
- Parliament reply AU1419 on AMRUT 2.0 admissible components. https://eparlib.sansad.in/bitstream/123456789/2988692/1/AU1419_tzCIvw.pdf
Annexes and forms
| Annex / Form | Content |
|---|---|
| 8A | 3-month ARI 24-hour depth and IDF by zone |
| 8B | Redevelopment LoS table and treatment-train composite VR |
| 8C | Tripura BMP performance calibration |
| 8D | BMP design sheets, media specification, plant lists |
| 8E | Erosion and sediment control standard details |
| Form 8-1 | Water Quality Sheet |
| Form 8-2 | Infiltration Test Record |
Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.