Draft v1.0 prepared by NEER. Not adopted by the Government of Tripura, the TTAADC or any authority or local body, and has no legal force. About this draft

Annexes to Chapter 5Downstream and Tailwater Analysis

These annexes support Chapter 5. Annex 5C is a worked example of the outfall-closed check of Clause 5.10, for the illustrative facility of Annex 4C. Annexes 5A and 5B need tidal, surge, survey and river data that this draft does not yet contain; each lists what the chapter already sets, gives the intended layout and states the interim rule of Chapter 5 that applies until it is published. Forms 5-1 and 5-2 are the submittal forms required by Clause 5.14. They are draft forms and have no statutory status.


Annex 5A — Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment

Supports Clauses 5.7, 5.9, 5.10, 5.11 and 5.12 of Chapter 5.

5A.1 Table 5A.1 shows how the values of this annex enter the design tailwater levels of Table 5.1. The sea-level allowance is set by Clause 5.7.4 and does not depend on this annex.

Table 5A.1 — Use of the Annex 5A values in the design tailwater (Table 5.1)

Design case Tailwater Annex 5A values used Chapter value
Minor-system design MHWS + SLA MHWS SLA ≥ +0.3 m (Clause 5.7.4)
Major-system and storage design HAT + surge + SLA HAT; 10% AEP surge (Clause 5.7.3(a)) SLA ≥ +0.3 m
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA 1% AEP still-water level (Clause 5.7.3(b)) SLA ≥ +0.3 m
Datum conversion Chart datum to project datum Offset from chart datum to the Survey of India datum (Clause 5.7.2(b)) —

Not prepared for Tripura. Tripura has no coast, so no outfall in the State has a tidal tailwater, and this annex has no Tripura content (Clause 5.1.4). Its tables are kept, empty, so that the annex and table numbers match the other editions of this Manual. Rows F1 to F7 of Form 5-1 are entered as "not applicable", and the tailwater is derived under rows F8 to F10; for a river-locked outfall, row F10 records the sluice, the CWC or State gauge and its datum (or "datum not stated (TBC)"), the lock and the pump-down of Clause 5.8.5(a), for a border reach the level and lock of Clause 5.8.5(c), and for an outfall to a pukur, dighi, beel, lunga or pond, its starting level and surveyed stage–storage relation under Clause 5.8.5(e).

Table 5A.2 — Tidal datums, surge and still-water levels by coastal segment (layout)

Coastal segment Reference port and tide-table edition MSL (m CD) MHWS (m CD) HAT (m CD) CD to Survey of India datum (m) 10% AEP surge (m) 1% AEP still-water level (m CD) Wave set-up (m), open-sea outfalls Sources
                   
                   
                   

Annex 5B — Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map

Supports Clauses 5.2, 5.3, 5.8 and 5.13 of Chapter 5.

5B.1 Table 5B.1 lists the water bodies that Chapter 5 already names. It is not complete: the annex will add the extents of each reach, the other rivers, canals and mouths of the State, and a map.

Table 5B.1 — Water bodies named in Chapter 5

Water body Region Listed as Clause
Haora at the CWC Haora site Agartala (TR-A) Riverine outfall reach behind the Haora embankment, river-locked and pumped; 46 km, 414 km² (CGWB NAQUIM); design level 12.42 m (22 August 2024), the highest of 11.08, 12.14, 12.4 and 12.42 m; danger level 10.70 m, the highest of 10.48, 10.50 (Jahar Bridge) and 10.70 m; all as reported, datum not stated (TBC); lock the 72-hour storm and a further 72 hours without an analysed stage record; border reach 5.8.1, 5.8.5
Katakhal and its double-barrel sluice (PWD (WR), near Bhuturia) Agartala (TR-A) Major drain and river-locked outfall of the north of the city; flood pumps discharge to it; no gauge or hydraulics [TBC], surveyed and modelled level required, the Haora design level until then; three interception-fed STPs under construction on its banks; border reach 5.2, 5.8.1, 5.8.5
Akhaura canal Agartala (TR-A) Major drain of the central area along the Akhaura road, flowing to Bangladesh; no level or hydraulics [TBC]; border reach; carries sewage (Clause 8.9) 5.2, 5.8.5
Bangeshwar Gang, Debta Gang, Nagichara, Kalapani Charra and Kalapania Khal Agartala (TR-A) Major drains and chharas of the city (ADB IEE, 2020); routed as storage behind their outfalls; chhara rule where they leave the tillas; the 5 MLD Joypur STP on the Kalapania Khal 5.2, 5.8.5
Manu at Kailashahar and Kumarghat; Manu at Manughat Northern valleys (TR-C) Riverine outfall reaches; Kailashahar 25.95 m (13 June 2018) above the 1993 level of 25.79 m, danger level 25.34 m (CWC) against the State's 24.00 m and 23.05 m (conflict; the higher applies); Kumarghat 32.97 m (7 June 1993); Manughat 46.6, 46.97, 48.04 or 18.04 m (unresolved, not used; modelled or surveyed level); as reported, datum not stated (TBC) 5.8.1, 5.8.5
Juri at Nutan Bazar; Deo; Longai Northern valleys (TR-C) Riverine outfall reaches; Nutan Bazar 20.66 m (22 August 2024) above 20.435 m (15 May 1984), as reported, datum not stated (TBC); Deo and Longai no gauge level, modelled or surveyed level required 5.8.1, 5.8.5
Dhalai at Kamalpur Central valleys (TR-B1) Riverine outfall reach; 33.85 m (15 May 1984), as reported, datum not stated (TBC) 5.8.1, 5.8.5
Khowai at Khowai and Teliamura Central valleys (TR-B) Riverine outfall reach; 140 km and 1,100 km² in old West Tripura district (CGWB NAQUIM); Khowai 28.005 m (24 June 2004), as reported, datum not stated (TBC); enters Bangladesh 1 km north of Khowai town 5.8.1, 5.8.5
Gomati (CWC: Gumti) at Amarpur, Udaipur and Sonamura Southern and western valleys (TR-D, TR-A) Riverine outfall reaches and the Dumbur release reach; Amarpur 32.74 m (22 July 1993), State gauge extreme danger 32.00 m; Udaipur State gauge 22.05 m (21 August 2024), extreme danger 22.00 m; Sonamura 14.43 m (23 July 1993), danger level 12.5 m; as reported, datum not stated (TBC); lock not less than 72 hours after the storm with the release 5.8.1, 5.8.3, 5.8.5
Dumbur reservoir (Gumti hydel project, Tirthamukh) Gomati basin (TR-E) Reservoir above the release reach; full reservoir level 93.55 m against a "danger level" of 94 m (94 m used); spillway capacity 481.38 m³/s (release until the operator gives a recorded one); operator TSECL (as reported); operator's levels in writing; no credit for warnings, drawdown or attenuation; not a Ramsar site 5.8.3, 5.8.5
Muhuri at Belonia Southern valleys (TR-D1) Riverine outfall reach; 18.81 m (22 August 2024) above 18.12 m (20 August 2024), 17.32 m (2 August 2024) and 16.98 m (4 August 1983), as reported, datum not stated (TBC); border reach 5.8.1, 5.8.5
Feni at Sabroom Southern valleys (TR-D1) Border reach; CWC site named in 2024 but not working (as reported); modelled or surveyed level required 5.8.1, 5.8.5
Burima (Bijoy) at Gajaria Western valley (TR-A) Riverine outfall reach; 11.25 m against 11.15 m (24 June 2004) (conflict; 11.25 m applies), 10.77 m on 22 August 2024; as reported, datum not stated (TBC); border reach near Boxanagar 5.8.1, 5.8.5
Pukurs, dighis, beels, haors and unfilled lungas that receive town drains, among them the Ujjayanta palace lakes, the MBB College lake, the College Tilla lake, Banamalipur Dighi and Kalyan Sagar Statewide Receiving storage; full to the outlet at the start; surveyed stage–storage [TBC]; storage belongs to the system; palace-era and temple tanks not drawn down; interception and screens before any outfall that carries sewage 5.8.5
Rudrasagar Sepahijala (TR-A) Ramsar site No. 1572 (240 ha; 2005 or 2007, conflict); catchment 6,052 ha (as cited); no storage credited; interception and screens; Wetland Authority of Tripura's permission 5.8.5
Chharas of the tilla uplands and of the Baramura, Atharamura, Longtharai, Sakhan and Jampui ranges Every valley; hill ranges (TR-E) Hill streams; ungauged; 1% AEP study with bulking and blockage and surveyed flood marks; invert at least 0.5 m above the highest surveyed bed; silt trap at the tilla foot; lock not less than 24 hours 5.2, 5.8.1, 5.8.5
Drains of the Municipalities, Agartala Smart City Ltd, TUDA, PWD (R&B) and NHIDCL 1.0 m wide or more; PWD (WR) channels and sluices Tripura Major drains; PWD (WR)'s consent through an embankment or sluice; owner's consent (TMA s.161), design water level and flap gate 5.2, 5.8.5
River mouths subject to sand-bar closure None in Tripura Not applicable (Clause 5.1.4) 5.13.1

To be prepared. This annex will list and map (a) the major drains of each basin plan, (b) the riverine outfall reaches where backwater shall be modelled, with their upstream and downstream limits and the source of their design flood levels, and (c) the river mouths and creek inlets subject to seasonal sand-bar closure, with the most recent pre-monsoon bar crest levels and any PWD (WR) mouth-maintenance programme. It needs PWD (WR) river and canal records, design and recorded flood levels, reservoir operating rules, mouth-condition, dredging and bar-cutting records and pre-monsoon bar surveys (PWD (WR)), the drain inventories of AMC and other local bodies, basin stormwater master plans (Chapter 11), and base mapping from the Survey of India and NRSC. Until it is published: every river, PWD (WR) canal, the Haora, the Katakhal, the Akhaura canal, the Bangeshwar Gang, the Debta Gang, the Nagichara, the Kalapani Charra and the Kalapania Khal in Agartala, every channel that discharges through a sluice in an embankment or to a drainage pumping station, any drain built or held by a Municipality, Agartala Smart City Ltd, TUDA, PWD (R&B) or NHIDCL with an internal width of 1.0 m or more, and every chhara, khal and lunga flow path that drains 8 ha or more and every tidal creek is a major drain (Clause 5.2); the water bodies of Table 5B.1 are riverine outfall reaches (Clause 5.8.1); and the mouths of the coastal States' rivers (there is none in Tripura) are assumed closed at the start of the monsoon unless PWD (WR) certifies otherwise (Clause 5.13.2).

Table 5B.2 — Attributes of the Annex 5B layers (layout)

Field Content Unit or format
feature_id Unique identifier text
name Name of the drain, river, canal, creek or mouth text
category Major drain; riverine outfall reach; mouth subject to sand-bar closure text
clause Clause of Chapter 5 under which it is listed text
reach_limits Upstream and downstream limits of the reach text
design_flood_level_source PWD (WR) design or highest recorded flood level, or hydraulic model (Clause 5.8.2) text
reservoir_release Upstream reservoir or tank and its operating rule, where any (Clause 5.8.3) text
bar_crest_level Most recent pre-monsoon bar crest level, for mouths m (Survey of India datum)
mouth_programme PWD (WR) mouth-maintenance programme and certification (Clause 5.13.2) text
source Source agency and date text
geometry Line (drains and reaches) or point (mouths) line / point

Annex 5C — Worked example: outfall-closed check for a site on a lunga between tillas on the edge of Agartala draining to a khal

Supports Clauses 5.9, 5.10, 5.11 and 5.12 of Chapter 5 and Clause 4.6.6 of Chapter 4.

Illustrative — not design values. This example applies the outfall-closed check of Clause 5.10 to the revised detention facility of Annex 4C. The site, its levels and its receiving drain are invented to show the method. No tidal level is used: the tide enters only through the illustrative statements in Table 5C.1 about whether the receiving drain is above or below the site outlet.

Inputs

5C.1 The site is the 2.0 ha flood-sensitive site of Annex 4C, on a lunga between tillas on the edge of Agartala. It discharges through its own outlet chamber and a flap gate to a public storm drain that runs along the lunga to a khal, which leaves through a gated outfall in a river embankment; when the river beyond the embankment is high the gate is shut, and the khal rises behind it and stays up, so Clause 5.10.1 applies to the facility. To show the method, this example uses the two 6-hour lock windows of Clause 5.10.3, as the coastal editions of this Manual do. In Tripura an outfall to a khal behind an embankment sluice, as this one is, is closed for the whole 72-hour storm and for as long after it as the river stays above the sill, and for not less than a further 72 hours where no stage record has been analysed, and its stored volume is pumped down within 48 hours with the gate still shut; an outfall below the design level of a full pukur, dighi, beel or lunga is closed for the whole storm; an outfall to the Dumbur release reach is closed for not less than 72 hours after the storm; and an outfall to a chhara whose invert is below its design level is closed for the storm and the stream's recession, and for not less than 24 hours, under Clause 5.8.5. In each of those cases the facility must store or pump the volume of the longer closure, up to the whole storm volume (Clause 5.9.4); that needs more storage, or pumping, than this example shows. The routing, the volume balance of Clause 5.10.4 and the assessment are the same. On the lunga floor the facility is a lined detention pond or tank, not an infiltrating basin, and the seasonal high water table sets its flotation check (Clause 4.11 (lunga rule); Clause 4.12); where the drain receives runoff from the tilla slopes above the site, it also needs the debris rack, the bulking factor and the silt trap at the tilla foot of Clause 6.3.6.

Table 5C.1 — Inputs (Illustrative — not design values)

Item Value Basis
Facility Revised facility of Annex 4C: 2,500 m² plan area, vertical walls; 170 mm orifice at the floor; 460 mm orifice, invert 0.53 m Annex 4C, Table 4C.14
Storm 1% AEP, 48 h, peak day last, AMC III; 72 h also run Clause 5.10.2
Inflow Post-development 1% AEP hydrographs of Annex 4C (48 h: 8,420 m³; 72 h: 9,468 m³) Annex 4C
Receiving drain levels at the connection, J1, J2 and J3 Below the site outlet invert (from the drain owner's model) Illustrative input
Receiving drain during each lock window Backs up above the site outlet invert, so the site cannot discharge Illustrative input; Clause 5.10.3(b)
Flap gate on the site outlet Set 0.15 m below the orifice inverts in the outlet chamber, so that outside the lock windows its opening head and head loss do not affect the orifice control Illustrative input; to be confirmed from the certified curve (Clause 5.11.2)
Lock windows Two of 6 h each, starts 12.4 h apart (semi-diurnal tide) Clause 5.10.3(a)
Pumps None —

5C.2 Cases of Table 5.2. Because the receiving drain stays below the site outlet in J1, J2 and J3 (Table 5C.1), those cases give the free-outfall results of Annex 4C: in J2 the 1% AEP maximum water level is 1.17 m (2,913 m³), and in J3 (10% AEP, 48 h) it is 0.77 m. R1 and R2 do not apply, because the site does not drain to a river. J4, the outfall-closed check, is worked below.

Lock windows (Clause 5.10.3)

5C.3 The peak 1-hour block of the final 24 hours of the 48-hour storm is 35:35–36:35 h, with 98.2 mm (the 1-hour depth of Table 4C.2). Two runs are made:

  • Run A: the first window is centred on that block: 33:05–39:05 h; the second starts 12.4 h later: 45:29–51:29 h.
  • Run B: the first window starts at that block: 35:35–41:35 h; the second: 47:59–53:59 h.

For the 72-hour storm, every time is 24 h later.

5C.4 Gravity discharge is zero inside each window. Outside the windows the outlet discharges through the orifices of Table 4C.10. The routing is the same level-pool routing as in Annex 4C.

Results

Table 5C.2 — Outfall-closed check results (Illustrative — not design values)

Storm Run Lock windows (h:min) Maximum stage (m) Maximum storage (m³) Time of maximum (h:min) Largest release after a window (L/s)
1% AEP, 48 h A 33:05–39:05; 45:29–51:29 2.01 5,019 39:05 566
1% AEP, 48 h B 35:35–41:35; 47:59–53:59 2.10 5,238 41:35 584
1% AEP, 72 h A 57:05–63:05; 69:29–75:29 2.00 5,012 63:05 565
1% AEP, 72 h B 59:35–65:35; 71:59–77:59 2.09 5,233 65:35 584

Run B of the 48-hour storm governs. The first window closes the outlet just as the storm peak arrives, so the whole peak is stored. The second window arrives when the facility has drained to about 0.7 m, below the Stage 2 orifice, and adds little.

5C.5 Volume balance (Clause 5.10.4). Table 5C.3 gives the balance for Run B. The outflow in each period is found by continuity: outflow = storage at start + inflow − storage at end.

Table 5C.3 — Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)

Period (h:min) Inflow (m³) Gravity outflow (m³) Pumped (m³) Storage at start (m³) Storage at end (m³)
0:00–35:35, before window 1 3,817 2,213 0 0 1,604
35:35–41:35, window 1 3,634 0 0 1,604 5,238
41:35–47:59, between windows 941 4,423 0 5,238 1,756
47:59–53:59, window 2 28 0 0 1,756 1,784
After 53:59 0 1,784 0 1,784 0
Total 8,420 8,420 0 — —

Check for window 1: V_inflow = 3,634 m³ ≤ V_storage available + V_pumped + V_gravity = (5,238 − 1,604) + 0 + 0 = 3,634 m³. The facility therefore needs 5,238 m³ of storage, which the routing confirms.

Table 5C.4 — Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)

Time (h) Inflow (L/s) Outlet Outflow (L/s) Stage (m) Storage (m³)
24 20 Open 18 0.18 445
28 39 Open 24 0.25 621
32 59 Open 32 0.36 906
34 85 Open 37 0.47 1,166
36 286 Closed 0 0.78 1,944
38 106 Closed 0 1.73 4,321
40 66 Closed 0 1.96 4,904
42 51 Open 529 1.79 4,472
44 42 Open 204 0.87 2,181
46 37 Open 49 0.74 1,854
48 33 Open 47 0.70 1,756
50 0 Closed 0 0.71 1,784
54 0 Closed 0 0.71 1,784
56 0 Open 43 0.58 1,459
60 0 Open 32 0.37 921
66 0 Open 16 0.16 397
72 0 Open 7 0.06 162

Assessment

5C.6 Clause 5.10.4(a). The facility of Annex 4C reaches 1.17 m in J2, and its spillway crest is at 1.35 m (Annex 4C). In the outfall-closed check the stage reaches 2.10 m, so the spillway would operate. The facility of Annex 4C fails the check.

5C.7 Remedy. Pumping (Clause 5.12) does not help here: during the lock windows the receiving drain is itself closed, and pumping into it would raise its level, which Clause 5.12.3 does not permit. The remedy is more storage. Keeping the plan area of 2,500 m² and the outlets of Annex 4C:

  • the facility must hold 5,238 m³, to a stage of 2.10 m;
  • the spillway crest is set above that stage, with the 0.15 m clearance recommended in Clause 4.9.3: 2.25 m;
  • with the 4.0 m spillway of Annex 4C (head 0.30 m), the maximum level with the spillway flowing is 2.55 m, and with 0.3 m freeboard the top of the walls is at least 2.85 m above the floor.

The outfall-closed check therefore governs the storage: 5,238 m³ against 2,913 m³ from the release-rate checks, about 80% more. A larger plan area would make the facility shallower; the outlet, caps and drawdown would then have to be re-checked, because the stage–discharge relationship changes.

5C.8 Release after the lock. When the first window ends, the stored water is released under a head of about 2 m, at up to 584 L/s. This is above the 100-yr cap of 356 L/s. Clause 5.10.4 allows this, because the release reaches a drain that has itself just reopened, and requires it to be included in the J4 run of the downstream analysis (Clauses 5.4 and 5.9) and reported on Form 5-1, Section H.

5C.9 Drawdown after the storm (Clause 5.10.5). The J1 tidal curve stays below the site outlet (Table 5C.1), so the drawdown of Annex 4C applies: 45.3 h for 90% of the 10-yr storage with the low-flow orifice 50% blocked, within the 48-hour limit of Clause 4.7. In Run B, 90% of the maximum J4 storage is released 22.6 h after the maximum.

5C.10 Other requirements.

  • The flap gate on the site outlet is inspected and operated before 31 March each year and after every event in which it closed against a storm flow (Clause 5.11.5).
  • The deeper facility is checked for flotation with groundwater at the design groundwater level; in the recent flood plains and lungas of the Haora, Gomati, Khowai, Dhalai, Manu, Juri and Muhuri valleys, the pukur, dighi and beel margins, filled ponds and the land behind embankments without piezometer readings that level is existing ground level (Clauses 4.12.1 and 4.12.3).
  • The fence and signs of Annex 4C apply to the deeper facility (Clause 4.15).

Table 5C.5 — Summary (Illustrative — not design values)

Item Value
Governing case J4, 1% AEP 48-hour storm, Run B (first window starting at the peak 1-hour block)
Storage required 5,238 m³ (Annex 4C release-rate design: 2,913 m³)
Maximum stage 2.10 m, with 2,500 m² plan area
Spillway crest 2.25 m
Top of walls ≥ 2.85 m above the floor
Largest release after a lock window 584 L/s, to be included in the downstream J4 run
Drawdown Annex 4C result applies: 45.3 h with the low-flow orifice 50% blocked

Form 5-1 — Downstream and Tailwater Report

Supports Clauses 5.3 to 5.14 of Chapter 5.

Draft form — Tripura Stormwater Design Manual, Draft v1.0. One report for each project. Sites of less than 0.5 ha that meet Clause 5.3.4 may submit Form 5-2 instead, where the Authority accepts it. Attach the plans, model files and hydrographs referred to.

A. Project

Table 5F.1 — Form 5-1: project

Field Entry
A1. Project name, applicant and location  
A2. Project type: site under Chapter 4; drainage project under Chapter 6; regional detention or tank restoration (Clause 5.1.2)  
A3. Site or project area (ha) and outfalls  
A4. Site Runoff Control Report reference (Form 4-1), where applicable  

B. Extent of the analysis (Clause 5.3; Clause 5.14, item 1)

Table 5F.2 — Form 5-1: analysis points

Point Location Type (Clause 5.3.3 (a) to (e)) Contributing catchment (ha) Project area as % of it
         
         
         

Table 5F.3 — Form 5-1: end point

Field Entry
B1. End point and reason: 10% point, tank or pukur, or major drain or the sea (Clause 5.3.1 (a) to (c))  
B2. Where the end point is a tank or pukur: change in maximum water level (m) and in surplus-weir discharge (m³/s); continuation below the weir if the level rises (Clause 5.3.2)  
B3. Plan of the analysis extent, showing the site, each point with its contributing area and percentage, and the end point (attach)  

C. Model (Clause 5.4.4; Clause 5.14, item 2)

Table 5F.4 — Form 5-1: model

Field Entry
C1. Software and version; hydrologic and hydraulic methods (Clause 5.4.4)  
C2. Network schematic, with the survey sources for drains and crossings (attach)  
C3. Land use and CN of off-site areas (present land use)  
C4. Upstream detention included, with evidence that it is built, maintained and documented  
C5. Calibration or validation evidence, where available  
C6. Scenarios run: existing, with project, and future where the Authority requires it (Clause 5.4.1)  
C7. Storms run: AEPs and durations, AMC and areal reduction (Clause 5.4.3)  

D. Results at each analysis point (Clause 5.4.2; Clause 5.14, item 3)

Complete one row for each analysis point, AEP and duration. E = existing; P = with project.

Table 5F.5 — Form 5-1: results by analysis point

Point AEP Duration (h) Peak flow E / P (m³/s) Time to peak E / P (h) Maximum water level E / P (m) Peak velocity E / P (m/s) Duration of inundation E / P (h)
               
               
               

E. Acceptance (Clause 5.5; Clause 5.14, item 4)

Table 5F.6 — Form 5-1: acceptance criteria

Criterion Met at every point? Where not met, the remedy adopted (Clause 5.5.3)
E1. 1% AEP water level rise ≤ 10 mm at buildings, lowest openings and carriageways (Clause 5.5.1(a))    
E2. No building newly flooded; no building or road newly failing the Chapter 6 limits (Clause 5.5.1(b))    
E3. Peak flow not above existing at the minor-system AEP of each element or at 1% AEP (Clause 5.5.1(c))    
E4. Velocity in lined channels within the lining limit, 3.0 m/s maximum (Clause 5.5.1(d))    
E5. Velocity in unlined channels, 50% and 10% AEP, not increased by more than 10% (Clause 5.5.1(e))    
E6. Change in duration of road closure on arterial or emergency routes (Clause 5.5.2)    
E7. Timing exception requested (Clause 5.5.4)? Give the conditions met    

F. Tailwater derivation (Clauses 5.6 to 5.8; Clause 5.14, item 5)

Table 5F.7 — Form 5-1: tailwater derivation

Field Entry
F1. Tide-table edition and port, or port authority source (Clause 5.7.2(a))  
F2. MHWS, HAT and MSL (m above chart datum)  
F3. Connection from chart datum to the Survey of India benchmark and the project datum: offset (m) and source (Clause 5.7.2(b))  
F4. Estuary, creek or canal outfall: levels used and any evidence for a departure from open-coast levels (Clause 5.7.2(c))  
F5. 10% AEP surge and 1% AEP still-water level: values, source, method and record length (Clause 5.7.3)  
F6. Wave set-up, for outfalls facing the open sea (Clause 5.7.3(d))  
F7. SLA (m), at least +0.3 m; design life; sensitivity run at twice the SLA for design lives over 50 years (Clause 5.7.4)  
F8. Non-tidal tailwater: receiving-system level and source (Clauses 5.6.2, 5.6.3)  
F9. River levels and sources; reservoir or tank releases included (Clauses 5.8.2, 5.8.3)  
F10. River-locked outfalls, Agartala, border reaches, rivers with CWC sites and the Dumbur release reach, pukurs, dighis and lungas, chharas, and drains of other bodies: for a river-locked outfall, the operator of each sluice, gate and pumping station identified (PWD (WR), the Municipality, Agartala Smart City Ltd or another body), gate sills, embankment or wall crest, installed capacity, operating levels and sluice-closing level obtained, with every level tied to the datum of a named CWC or State gauge, or entered as "datum not stated (TBC)", and the operator named; 1% AEP river level at the outfall from a model, and not below the highest recorded level at the nearest CWC or State gauge transferred to the outfall (the Haora at the CWC Haora site 12.42 m, Kailashahar 25.95 m, Kumarghat 32.97 m, Sonamura 14.43 m, Amarpur 32.74 m, Udaipur State gauge 22.05 m, Kamalpur 33.85 m, Nutan Bazar 20.66 m, Belonia 18.81 m, Gajaria 11.25 m, Khowai 28.005 m; never a Manughat value), with the profile or interpolation used; 10% AEP river level, not below the danger level transferred (Haora 10.70 m, Kailashahar 25.34 m, Sonamura 12.5 m) or, at a monitoring site, the design river level; drain, khal, pukur or lunga behind the gate routed with its whole catchment and present storage, starting full to its outlet, pumping confirmed available (permanent pumps only, not more than installed capacity less the largest pump, from certified curves), pumps operable at the design river level; the lock (the whole 72-hour storm and, after it, the longer of the time the river stays above the sill from the stage record used and a further 72 hours where no stage record has been analysed) and the pump-down to the starting level within 48 hours with the gate shut; gate-failure, leakage and breach checks; for Agartala, the zone (North, Central or South), the outfall (Haora, Katakhal, Akhaura canal or another channel), the pumps serving it confirmed in writing by their owner, the surveyed and modelled Katakhal or Akhaura canal level (the Haora design level until then), and any ADB, Smart City or PWD (WR) works counted only once built; for a border reach, the gauge level or 2024 peak used, the modelled or surveyed level where no site works, and the last analysis point in India; for the Dumbur release reach, the operator's consent, levels in writing (feet converted at 1 ft = 0.3048 m, datum stated), the reservoir level at release (94 m until the operator confirms), the largest recorded release or the spillway capacity of 481.38 m³/s, placed before, during and after the storm, and a lock of not less than 72 hours after the storm, with no warning, drawdown or attenuation credited; for a pukur, dighi, beel, lunga or pond, its outlet level, surveyed monsoon water line, surveyed stage–storage relation, starting level and design level, whether it is a palace-era, temple or fisheries tank or Rudrasagar, the custodian's consent, and the interception and screens before it; for a chhara, the 1% AEP study with the rainfall of its sub-area, the bulking and blockage of Clause 6.3.6, the surveyed flood marks and their sources, the bed survey and range of bed movement, the invert at least 0.5 m above the highest surveyed bed level, the scour depth of the foundation, the silt trap at the tilla foot, landslide ground on its path, and a lock of not less than 24 hours; PWD (WR)'s written consent for any work through an embankment or sluice; owner's consent (the Municipality under s.161 of the Tripura Municipal Act, 1994; PWD (R&B), NHIDCL, Agartala Smart City Ltd or another body; the District Council in the TTAADC area), permitted rate, design water level or computed channel level, and flap gate; and TBR 2017 r.9(3), r.9(4), r.4(1)(e) and, in the hill ULBs, r.90(1)(i) and (m), the status of any water body under the Diversion of Land Rules, and the Haora flood-plain-zone localities checked (Clause 5.8.5)  

G. Joint cases (Clause 5.9; Clause 5.14, item 6)

Table 5F.8 — Form 5-1: joint-case results

Case Rainfall Tailwater used (m, project datum) Applies? Governing result (storage, level, pipe size or pump capacity)
J1        
J2        
J3        
J4        
R1        
R2        

H. Outfall-closed check (Clause 5.10; Clause 5.14, item 7)

Table 5F.9 — Form 5-1: outfall-closed check

Field Entry
H1. Reason the check applies (Clause 5.10.1)  
H2. Storm: AEP, 48 h and 72 h, AMC III (Clause 5.10.2)  
H3. Lock duration and basis: default of two 6-hour windows, or site study (Clause 5.10.6); extension for sand-bar closure (Clause 5.13.5)  
H4. Lock windows of the two runs (start and end times) (Clause 5.10.3(d))  
H5. Maximum stage in each facility, against its 1% AEP maximum water level (Clause 5.10.4(a))  
H6. Maximum stage in the minor and major systems, against the Chapter 6 limits (Clause 5.10.4(b))  
H7. Property connections: surcharge level, or non-return valves fitted (Clause 5.10.4(c))  
H8. Stage hydrographs (attach)  
H9. Drawdown after the storm under the J1 tidal curve, and pumping where needed (Clause 5.10.5)  

Table 5F.10 — Form 5-1: volume balance for each lock window (Clause 5.10.4)

Period Inflow (m³) Gravity outflow (m³) Pumped (m³) Storage at start (m³) Storage at end (m³)
Before window 1          
Window 1          
Between windows          
Window 2          
After window 2          

I. Gates and valves (Clause 5.11; Clause 5.14, item 8)

Table 5F.11 — Form 5-1: schedule of flap gates, tide gates and non-return valves

Location Type Size (mm) Invert (m, project datum) Certified head–discharge data (reference) Stop-log or penstock (outfalls > 600 mm)
           
           

J. Pumped outfalls (Clause 5.12; Clause 5.14, item 9)

Table 5F.12 — Form 5-1: pumped outfalls

Field Entry
J1. Reason pumping is needed (Clause 5.12.1)  
J2. Duty capacity (m³/s) at the static head for the J2 tailwater; standby capacity (Clause 5.12.2)  
J3. Effect on the receiving water level (Clause 5.12.3)  
J4. Power supply: two independent supplies, or standby generation with 72 h of fuel; automatic changeover (Clause 5.12.4)  
J5. Level of electrical panels, controls, generators and fuel, against the higher of the 1% AEP flood level + 0.5 m and HAT + surge + SLA + 0.5 m (Clause 5.12.5)  
J6. Discharge arrangement (Clause 5.12.6); controls, alarms and logging (Clause 5.12.7); screens (Clause 5.12.8)  

K. Sand bar (Clause 5.13; Clause 5.14, item 10)

Table 5F.13 — Form 5-1: sand-bar assumption

Field Entry
K1. River mouth or creek inlet concerned  
K2. Mouth assumed closed, or open with PWD (WR) certification attached (Clause 5.13.2)  
K3. Bar crest level from the most recent pre-monsoon survey (m) and the closed-mouth tailwater (Clause 5.13.3)  
K4. Extension of the lock duration, where required (Clause 5.13.5)  

L. Inspection and maintenance (Clause 5.14, item 11)

Table 5F.14 — Form 5-1: inspection and maintenance

Field Entry
L1. Gate and valve inspection before 31 March and after closure events (Clause 5.11.5)  
L2. Pump test runs before 31 March (Clause 5.12.9)  
L3. Other requirements for the maintenance plan (Chapter 10)  

M. Statement by the registered professional (Clause 10.6)

I state that this report has been prepared under Chapter 5 of the Tripura Stormwater Design Manual (Draft v1.0), that the results reported are reproduced by the models submitted, and that every departure from Chapter 5 is listed with its reason. The Professional Design Certificate (Form 10-3) is attached.

Table 5F.15 — Form 5-1: statement by the registered professional

Field Entry
Name  
Qualification and registration number  
Empanelment number, where Clause 10.6.1 requires it  
Organisation  
Signature  
Date  

Draft form — Tripura Stormwater Design Manual, Draft v1.0.


Form 5-2 — Simplified Downstream Statement (small sites)

Supports Clause 5.3.4 of Chapter 5.

Draft form — Tripura Stormwater Design Manual, Draft v1.0. For sites of less than 0.5 ha. The Authority may accept this statement in place of the full analysis only where every answer in Section B is "Yes". Otherwise submit Form 5-1.

A. Site

Table 5F.16 — Form 5-2: site

Field Entry
A1. Project name, applicant and location  
A2. Site area (ha), less than 0.5 ha  
A3. Receiving public drain: name or reference, type and size  
A4. Site Runoff Control Report reference (Form 4-1)  

B. Conditions (Clause 5.3.4)

Table 5F.17 — Form 5-2: conditions

Condition Yes / No Evidence
B1. The receiving public drain has documented capacity for its minor-system design flow (Chapter 6)    
B2. No flood-prone location is recorded within 500 m downstream of the site outfall. Records checked: local body, AMC, TDMA, PWD (WR) (Clause 5.3.3(d))    
B3. The site does not drain to a tidal or backwater-affected outfall    

C. Route plan

Table 5F.18 — Form 5-2: attachments

Attachment Attached?
C1. Plan of the drainage route from the site outfall for 500 m downstream, with the receiving drain and any recorded flood-prone locations  
C2. Copy or reference of the drain capacity record  

D. Statement

I state that the site meets the conditions of Clause 5.3.4 as shown above, and that the records listed have been checked.

Table 5F.19 — Form 5-2: statement

Field Entry
Name  
Qualification and registration number  
Signature  
Date  

Draft form — Tripura Stormwater Design Manual, Draft v1.0.