Draft v1.0 prepared by NEER. Not adopted by the Government of Tripura, the TTAADC or any authority or local body, and has no legal force. About this draft

Chapter 4Site Runoff Control: Retention and Detention


4.1 Purpose and scope

4.1.1 This chapter sets the performance standard that every regulated development shall meet for runoff leaving the site. It covers:

  • (a) the order in which runoff-control measures are to be applied (Clause 4.3);
  • (b) retention of frequent rainfall, and how retained volume is credited against detention (Clause 4.4);
  • (c) release-rate criteria for standard and flood-sensitive catchments (Clause 4.5);
  • (d) the procedure for sizing detention storage and outlets (Clauses 4.6 to 4.9);
  • (e) facility types, rainwater harvesting (RWH) accounting, and high-groundwater sites (Clauses 4.10 to 4.12);
  • (f) regional detention and fee-in-lieu (Clause 4.13);
  • (g) simplified methods for small sites: the Tier B tables and the fixed-coefficient route (Clause 4.14); and
  • (h) public safety (Clause 4.15).

4.1.2 This chapter applies to land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, as set in Chapter 1. Single dwellings below that threshold, and road resurfacing that adds no impervious area, are exempt. The existing RWH mandate of the building rules (rule 110 of the Tripura Building Rules, 2017: a complete rainwater harvesting proposal with the plans of every building of 200 m² plinth area or more, of group housing, public, semi-public and industrial buildings of all sizes and of commercial and mixed-use buildings of 50 m² or more; permeable materials for all open parking in group housing; capture of storm water in public open spaces of more than 500 m²; and groundwater recharge on plots of more than 500 m²; all discussed in the Commentary to Clause 4.11) continues to apply to every building it covers, whether or not this chapter applies.

4.1.3 Rainfall inputs come from Chapter 2. Hydrologic methods come from Chapter 3. Tailwater, downstream analysis and the outfall-closed check come from Chapter 5. Water quality volume (WQv) treatment comes from Chapter 8. Where this chapter and those chapters overlap, the more stringent requirement governs.

Commentary. No Indian national rule or Tripura rule found during research for this Manual limits the rate of discharge from a site, and none requires on-site detention or a storage volume sized to a storm. No Tripura document found sets a design storm, a return period, a runoff coefficient or a time of concentration for any town drain: not the ADB's environmental assessment for Agartala, not the State's filings before the National Green Tribunal, and not any report of the city's works (NEER's reading of the sources). The ADB-supported upgrade of Agartala's drains aims to cut the time the city takes to drain "from one to two hours to about 15–30 minutes" (as reported); its design basis was not seen [TBC]. Chapter 4's detention is therefore new in Tripura. The building rules are the Tripura Building Rules, 2017 (UDD notification No. F.2(316)-UDD/GL/TCPO/2009 (Part-I)/371 of 10 November 2017, as cited in UDD's BRAP-2019 document; the 2017 gazette was not read [TBC]), as amended by the Tripura Building (Amendment) Rules, 2019 (No. F.2(466)-UDD/GL/TCPO/2018/599-627, 19 February 2019; Gazette Extraordinary No. 482, 25 February 2019), the (Second Amendment) Rules, 2020 (dated 15 February 2020, Gazette 24 February 2020; number garbled in the copy read [TBC]), the (3rd Amendment) Rules, 2022 (No. F.01(24)-TUDA/Estt/2022/4902-30, 29 November 2022; Gazette 2 December 2022), the (Fourth Amendment) Rules, 2024 (No. F.1(23)-TUDA/ESTT/2024/66, 15 January 2025; Gazette No. 95, 17 January 2025) and the (Fifth Amendment) Rules, 2025 (F.No.2(466)-UDD/GL/TCPO/2018(P-V)/4009-20, 4 July 2025; Gazette No. 1294, 5 July 2025), made under section 274 read with section 118 of the Tripura Municipal Act, 1994; no sixth amendment was found to November 2026. They replace the Tripura Building Rules, 2004 (r.1(4)) and apply "to buildings in the Urban Local Bodies (ULBs) in Tripura" (r.1(2)), to which the 2019 amendment added "and Planning Areas". The Municipal Act "extends to the whole of the State of Tripura except the areas under the Tripura Tribal Areas Autonomous District" (s.1(2)), so the rules made under it do not apply in the council area, about 68% of the State (as reported), and no building or land-development regulation of the Council was found [TBC]. The rules carry many drainage hooks, but every one of them protects the building, the plot or the watercourse; none sizes anything to a storm. A "drain" includes "a culvert, a ditch, a channel and any other device for carrying off sullage, sewage, offensive matter, polluted water, rain water or subsoil waters" (r.2(22)). A site on the plains shall be no lower than its approach road and "capable of being well-drained by means of drainage facilities leading to existing public drains of drainage channels" (r.4(1)(b) and (c), as printed), and within 5.00 m of a tank the owner shall prevent "any risk of drainage from such building passing into the tank" (r.4(1)(e)); no building site may lie in a "sinking zone or central business area" without the State's approval (r.4(2)). The site plan shows the drainage to the public drains and the "natural drainage channel/jhora" (r.5(1)(k) and (p)); the plans show "the house drainage plan, and site drainage plan up to nearest Nagar Panchayat or Municipality or natural outfall" and "the roof plan indicating the drainage and slope of the terrace" (r.14(f) and (h)), and the specification states how roof, house and surface drainage "will be disposed of" and how the open space is paved; sub-divisions need "pucca drain ensuing drainage of each individual plot" (r.10(2)(f)); group housing "Should indicate the system of Strom Water Drainage" (r.110, as printed); and a drain may not be covered without notice in Form I (r.38). No canal, pond, water body, wetland, jhora, spring, stream, drain or culvert may be filled except by the Local Body with the State's prior approval for reasons recorded in writing (r.9(3)); within 15 m of a river bank, buildings are limited in height, length and covered area (r.9(4)), a regulated zone, not a no-build line (Chapter 7); and on land "recently filled up … pond, lake, marshy" the Mayor or Chairperson may seek a soil test, restrict the height or reject the building (r.32). The plinth shall be placed so that "adequate drainage of the site" is assured and "in no case be at a height less than 60 centimeters" (r.55(1)); roofs drain by "sufficient rain-water pipes", which the ULB may require to be connected to a drain through a covered channel (r.57). Where the rules are silent the "latest edition of National Building Code and other relevant Indian Standards" apply (r.3A). In the ULBs of the hill areas, Part X (rr.88–101) adds a soil test and slope-stability certificate for slopes of 30° and above (r.90(1)(f)), no site within 200 m of a sinking or probable slip zone or in "high water table and fully saturated soil" (r.90(1)(h)), no site within 5 m of the outside edge of a watercourse (r.90(1)(i)), the diversion of uphill water from foundations (r.91(r)), and the drainage measures of r.99 (Commentary to Clause 4.11); which ULBs are "hill areas" is not listed [TBC]. No storm-water detention, peak-runoff, release-rate or design-storm rule was found in the rules as amended to 2025 (NEER's reading). Two amendments of 2025 widen the gap. Ground coverage may now be 70% "for a building of any type of uses", and 100% for industrial or commercial plots with roads of at least 5 m on three sides (r.46(1) and r.51(2), Fifth Amendment), against 50–70% before, by use and plot size; and the only rule for unpaved ground is landscaping of nil up to 150 m² of plot, 1.0% up to 500 m², 2.3% up to 20,000 m², 5.0% up to 50,000 m² and 7.5% above (r.113, 2022). With coverage set for floor area rather than runoff, the Manual's detention rule, not the coverage rule, controls runoff. And low and very-low-risk buildings now go through an empanelled professional with a "Self-Certification Proforma … on a trust-based approach" (r.13(3), 2025), the occupancy certificate for them is issued by that professional in Form H1 (r.34), "Inspection for self-certified buildings is hereby waived. However, 10% to 15% of total applications shall be randomly selected" (r.34(9)), and applications go through an "online single window system" (r.14(1), 2025). The plan-stage check of drainage therefore rests on the empanelled professional, and this Manual's submittal checklist and certificate sit with that professional's self-certification (Chapter 10). The Municipal Act gives the local bodies drains to keep, not a standard to meet: the Municipality "shall provide and maintain a system of drainage or sewerage as well as a safe and sufficient out-fall in or outside the Municipal area" (s.156(1)); drains are to be "cleansed, flushed and emptied from time to time" (s.157); in "sudden waterlogging" it may drain water across private land without notice (s.160, proviso); a private drain may join a municipal drain only "after obtaining the written permission of the Municipality" (s.161); it may require "separate provisions … for drainage of sewage and other offensive matters as distinct from rain-water" (s.164); and an owner must deal with water that "is or is likely to become a breeding place of mosquitoes" (s.233), the legal hook for the drawdown times of Clause 4.7 (NEER's reading). Where a town's drain leaves through a river embankment, no Tripura embankment or drainage statute was found; consent to cut, cross or discharge through an embankment or sluice is PWD (WR)'s as its owner (NEER's reading [TBC]). None of these sets a design storm, a release rate or a detention volume. The only design figures found are those of projects, and none gives a return period: the ADB's Agartala City Urban Development Project provides 48.2 km of new or rehabilitated storm drains (ADB, IEE, 2020); a ₹1,000 crore proposal for "construction of two protective embankments and installation of three additional pumping stations" in Agartala is to be "implemented in phases, depending on the availability of funds" (July 2026, as reported). Basements are limited for drainage, but with no flood level. No kitchen, bath or water closet may be placed in a basement unless "there is no chance of back flow and flooding of sewerage", with plans of its drainage and pumping (r.66(5)); every basement shall keep surface drainage out, be able to pump water out and have "water-tight walls and floors" (r.66(6)(b) and (c)); and since 2025 its ceiling stands 0.8–1.2 m above the average road level at the front (r.66(6)(h)), so that for a usual storey height its floor lies some 2 m or more below the road (NEER's reading), which on a lunga floor (lunga, Bengali লুঙ্গা: the land records' "Flat lands between tillas"; tilla, Bengali টিলা: "Hillock") is within the monsoon water table (Commentary to Clause 3.10). This Manual therefore adds its own requirements for every basement: no detention storage in a habitable basement (Clause 4.10.1); the crest of every basement ramp and the sill of every basement opening at least 0.5 m above the 1% AEP flood level, with basement drainage pumped to the surface drain through a non-return valve (Clauses 6.11.1 and 6.11.4); no basement in Zone 2 (Clause 7.5.2); and a flotation check of the empty basement against the design groundwater level of Clause 4.12.1. On land to which the lunga rule of Clause 4.11 applies (the lunga floors and the recent flood plains), in the flood-sensitive catchments of Clause 4.5.3.2 and in any catchment notified under Clause 4.5.4, it recommends that no basement be permitted where the 1% AEP flood level, or the level of water ponded behind an embankment when its sluices close or its pumps stop, stands above the surrounding ground; and wherever a basement or lower floor is cut into a tilla or a hill slope it shall carry the geotechnical certificate of the hill rule of Clause 4.11, with the water behind its walls drained to a lined drain and not to the ground. For a sloping site this chapter also supplies what r.91(r) and r.99 leave open: runoff from the slope above the site shall be intercepted and carried round the building in the design storms of Chapter 6, and every flow from the site shall discharge to a lined drain or a stable natural channel through an energy dissipator and a silt trap, never onto an unprotected tilla slope or into fill. These are the Manual's proposals, not rules of the Tripura Building Rules, 2017. This chapter is written so that it can supply, as a technical companion to the Building Rules, the Master Plan for the Agartala Planning Area 2045 and its zoning regulations (notified, as reported; text not read [TBC]) and the Municipal Act, the design storm, release rates and storage volumes that they leave open; a competent authority could adopt it for that purpose, for example the Urban Development Department (UDD) by an amendment to the Tripura Building Rules, 2017 under section 274 read with section 118 of the Tripura Municipal Act, 1994, but none has. In practice the storm drains of every Tripura town are its sewers. In 2020 "Agartala city is not covered by an underground sewerage system at present" (ADB IEE, 2020); by July 2026 a sewer network of "103.6 Km … with 4011 nos. household connection" served "only … the North Zone", the Agartala Municipal Corporation's area generated 61.0 MLD of sewage against 17.4 MLD of treatment capacity, and the plants built and building "are designed to be connected through Interception & Diversion of Drains" (State affidavit of 06.07.2026 in NGT OA 606/2018); the Tribunal's point, as quoted there, is that "storm water drains are being tapped and taken to STPs which is not legal" (Clause 8.9). Retention and detention apply in full on every site whatever the drain carries: every litre a site releases at the peak of a storm takes up capacity in a drain that already carries sewage and, behind a closed sluice, has nowhere to go. The CPHEEO (2019) manual describes limiting outflow to the pre-development peak as typical practice, but it uses no "shall" and names no storm frequencies (CPHEEO Part A §8.5.1). This chapter turns that description into a development-control requirement.


4.2 Definitions

Term Meaning in this Manual
Retention Permanent removal of runoff from the surface drainage system by infiltration, evapotranspiration or reuse, so that the water never reaches the outfall.
Retention depth The 90th percentile wet-day 24-hour rainfall depth for the site's zone (Clause 2.10, Annex 2E).
Required retention volume (RRV) The runoff volume from the retention depth over the post-development site (Clause 4.4.2).
Detention Temporary storage of runoff, released through a controlled outlet at a rate set by Clause 4.5.
Retention credit The reduction in required detention storage that results from retention practices, determined by routing under Clause 4.4.6. It is not the same as the retained volume.
Permissible site discharge (PSD) The maximum rate at which a site may discharge for a stated AEP, in L/s or L/s/ha.
Site storage requirement (SSR) The detention storage required per hectare of site under the simplified method of Clause 4.14.
Multi-stage outlet An outlet structure with separate openings at different levels, each controlling a different AEP (Figure 4.2).
Drawdown time Time from the peak stored volume until the stated fraction of that volume has been released.
Emergency spillway A secondary overflow that passes flows above the primary outlet capacity, or all flow when the primary outlet is blocked, without overtopping the embankment.
Freeboard Vertical distance between the maximum design water level and the embankment crest or other critical level.
Flood-sensitive catchment A catchment listed in Clause 4.5.3 or notified under Clause 4.5.4.
Authority The approving authority under Chapter 1 (in an Urban Local Body area, the Agartala Municipal Corporation, Municipal Council or Nagar Panchayat for the building permit and the occupancy certificate under the Tripura Building Rules, 2017, and for its own drains and works under the Tripura Municipal Act, 1994; in a notified Local Planning Area, and for a building or township of 50 or more flats or of one acre or more inside an Urban Local Body area, TUDA (TBR 2017, r.13(3), as inserted in 2020); for any work that cuts, crosses or discharges through an embankment or sluice, PWD (WR) as its owner; and, in the area of the Tripura Tribal Areas Autonomous District Council, the District Council or the authority it designates, only where the Council has made a regulation or resolved that this Manual applies (none has), as applicable).
Tier A / Tier B Adoption tiers defined in Chapter 1. Tier A: the Agartala Municipal Corporation and TUDA, whichever has jurisdiction over a site, within the Agartala Planning Area of the Master Plan 2045 (238.57 km², the Corporation's area and 49 gram panchayats, as reported) and the Agartala-Ranibazar-Jirania Local Planning Area notified by TUDA in November 2019. Tier B: Municipal Councils and Nagar Panchayats, and TUDA in their Local Planning Areas.

4.3 Order of measures

4.3.1 Every site runoff-control design shall apply measures in the following order, and shall document in the submittal why each earlier step could not do more:

  1. Preserve. Keep existing waterbodies, pukurs, natural drainage lines, wetlands, and permeable soils and vegetation. Avoid fill in flood storage (Chapter 7).
  2. Retain. Retain the RRV on site by infiltration, reuse or evapotranspiration (Clause 4.4).
  3. Detain. Detain the remaining runoff so that the release-rate criteria of Clause 4.5 are met for every design storm and duration (Clauses 4.6 to 4.9).
  4. Convey. Convey the 1% AEP (100-yr) flow safely through the site to the receiving system on a defined overland path (Chapter 6), and check the receiving system downstream (Chapter 5).

4.3.2 Preservation and retention reduce the detention required (Clauses 4.4.6 and 4.4.7). They do not relieve the site of the release-rate criteria of Clause 4.5 or of the downstream analysis of Chapter 5.

Commentary. This order follows the "layers of stormwater management" adopted in the Kansas City Metro APWA Section 5600 Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet; MARC Supplement, Nov 2025). Maintenance is the fifth layer and is set in Chapter 10. The 2025.01 manual credits retention and natural-area preservation against detention size (MARC Supplement, Nov 2025). Clause 4.4.6 adopts that credit, and defines it so that it cannot be claimed twice.


4.4 Retention

4.4.1 Requirement

The site shall retain the RRV. Retention shall be achieved by one or more of the following:

  • infiltration practices (soakaways, infiltration trenches, permeable pavement with an infiltration base, bioretention);
  • rainwater reuse that is drawn down by a demonstrated non-potable demand;
  • green roofs and landscape areas that do not drain to the outfall in the retention-depth storm.

The limits of Clause 4.4.4 apply.

4.4.2 Computation of the RRV

RRV (m³) = 10 × Q_R × A

where:

  • Q_R (mm) is the runoff depth from the retention depth P_R (Annex 2E). It is computed with the SCS-CN method for the post-development cover of each sub-area, at AMC II, with Ia = 0.2S (Chapter 3); and
  • A (ha) is the area of the site that drains to the outfall.

Q_R shall be computed for each sub-area separately and summed. An area-weighted CN shall not be used where impervious and pervious areas differ by more than 20 CN points.

The volumetric method RRV = 10 × P_R × Rv × A, with Rv = 0.05 + 0.009 × I (I = percent impervious), may be used for sites under 0.5 ha and under the Tier B method.

Commentary. The Rv formula is the one used in the KC water quality volume (MARC BMP Manual 2012). It is simple to review for small sites. The SCS-CN form is required for larger sites so that the retention computation uses the same runoff model as the detention routing. That keeps the credit computation of Clause 4.4.6 consistent.

4.4.3 Verification

Retention by infiltration shall be supported by:

  • (a) site infiltration tests at the location and depth of each practice, at the frequency set in Chapter 8;
  • (b) a design infiltration rate of no more than half of the measured rate; and
  • (c) groundwater evidence showing the seasonal high groundwater table at least 1.0 m below the base of the practice (Chapter 8).

Retention by reuse shall be supported by a demand calculation showing that the RRV is drawn down within 72 hours by a continuous non-potable use, such as toilet flushing, cooling or irrigation.

Commentary. The factor of 2 on measured infiltration rate has no direct precedent; this Manual sets it to allow for clogging and for the difference between a test pit and a full-scale practice. Chapter 8 may set a different factor; if it does, Chapter 8 governs.

4.4.4 Limits on retention

4.4.4.1 Infiltration practices shall not be used:

  • where the seasonal high groundwater table is less than 1.0 m below the base (Chapter 8);
  • on contaminated land;
  • within the setbacks from foundations, wells and septic systems set in Chapter 8; or
  • on fill, unless tested after placement.

4.4.4.2 Where the RRV cannot be fully retained, the shortfall shall be stated in the submittal. The shortfall shall be treated as WQv under Chapter 8 and shall get no retention credit.

4.4.5 Drawdown of retention

Retention storage shall be emptied by infiltration or reuse within 72 hours of the end of the retention-depth storm, verified by the tests of Clause 4.4.3.

4.4.6 Retention credit: definition and computation

4.4.6.1 What the credit is. The retention credit is the reduction in required detention storage that results when the retention practices are included in the post-development routing. It is computed. It is not assumed equal to the RRV.

4.4.6.2 Tier A method (routing). For each design storm and duration of Clause 4.6.3:

  • (a) model each retention practice explicitly as a storage that is empty at the start of the storm, unless Clause 4.11 says otherwise;
  • (b) let the practice fill from the front of the storm, and let it lose water during the storm only at the design infiltration or reuse rate of Clause 4.4.3;
  • (c) once it is full, route its overflow to the detention facility; and
  • (d) size the detention for the residual hydrograph.

The required detention storage is the largest storage over all storms and durations. The credit is the difference between that storage and the storage required with no retention. No further deduction shall be made.

4.4.6.3 Tier B method (simplified). The detention storage required by Clause 4.14 may be reduced by:

V_credit = C_R × RRV_provided

where C_R is the retention credit factor from Annex 4B for the zone, soil group and drawdown rate. Until Annex 4B is published, C_R = 0.

4.4.6.4 Retention that is not verified under Clause 4.4.3 gets no credit.

Commentary. "Credited against detention" (APWA 5600 2025.01) can be read in two ways. One reading subtracts the retained volume from the detention volume, cubic metre for cubic metre. The other routes the storms with retention in place and sees what detention is still needed. The two readings give very different answers in Tripura, because the mandatory 48- and 72-hour storms (Clause 2.5.2) fill any retention practice on the first day, long before the peak arrives on the last day (Clause 2.9.2). Unless the practice keeps infiltrating during the storm, it is full at the peak and does nothing to reduce the peak storage.

The illustrative example in Clause 4.6.7 shows the size of the effect. A 2 ha site with 552 m³ of retention (no infiltration during the storm) needs 138 m³ less detention for the 24-hour storm. That is a credit of about a quarter of the retained volume. For the 48- and 72-hour storms, which govern, the credit is close to zero. Subtracting the retained volume directly would have under-sized the detention by about 545 m³ (about 19%).

This Manual therefore defines the credit as the result of routing. Retention on fast-draining sandy soils, which keeps infiltrating through a multi-day storm, will earn a real credit. Retention that only fills will earn little. Both outcomes are physically correct. Setting C_R = 0 until Annex 4B exists is a safe default for Tier B, not a judgement that retention has no value: retention is still required for water quality and recharge (Chapter 8).

4.4.7 Preservation credit

Areas of the site that are permanently preserved in natural cover may be modelled at their pre-development CN in the post-development condition, provided that:

  • they are protected by a registered covenant or dedication; and
  • their runoff is not concentrated onto impervious surfaces.

This lowers both the RRV and the detention required. No other preservation credit applies.


4.5 Release-rate criteria

4.5.1 General

4.5.1.1 Peak discharge from the site shall be computed by a hydrograph method (Chapter 3) for the pre-development and post-development conditions with identical design storms (Clause 2.11.1). The Rational Method shall not be used for any part of storage sizing.

4.5.1.2 Pre-development is greenfield: open land in good condition for the mapped HSG. Existing impervious cover is not counted (Clause 2.11.5, Chapter 3). This applies to redevelopment as well, subject only to the constrained-redevelopment route of Clause 4.5.6.

4.5.1.3 The criteria apply at each point where runoff leaves the site. Where a site drains to more than one outfall, the criteria apply to each outfall for the area draining to it. Runoff shall not be diverted between catchments.

4.5.2 Standard catchments

For each of the 50%, 10% and 1% AEP (2-, 10- and 100-yr) storms, and for every duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:

Q_post(T, d) ≤ 0.9 × Q_pre(T, d)

4.5.3 Flood-sensitive catchments

4.5.3.1 In the catchments listed below, the mixed-frequency rule of Clause 2.11.3 applies, for every duration in Clause 2.5.2:

Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr).

Each cap is the pre-development peak at the duration that maximises it: the 10-yr peak for the 100-yr check, and the 2-yr peak for the 2-yr check. The cap applies to every post-development duration (Clause 2.11.3).

4.5.3.2 The flood-sensitive catchments are:

  • (a) Agartala's central saucer: the land between the Haora embankment and the Katakhal, the erstwhile area of the Agartala Municipal Corporation, that drains through the Akhaura canal and the city's other channels to the Haora and the Katakhal (a khal, Bengali খাল: a canal or channel, the land records' "Khal") and is pumped when the rivers are high;
  • (b) the Katakhal basin and its sluice: the land that drains to the Katakhal and through its double-barrel sluice near Bhuturia, with the three sites on its banks, at Ranjit Nagar, Abhaynagar Bridge and Astabal Bridge, of the sewage treatment plants being built to be fed by interception of drains;
  • (c) the Haora flood-plain-zone localities and Chandrapur: Khayerpur, Kashipur, Baldakhal, Aralia, Jogendranagar and Joynagar (Dashamighat), as mapped by PWD (WR), and Chandrapur, which flooded in August 2026 (as reported);
  • (d) Kailashahar on the Manu: the land of the town that drains to the Manu behind its embankment;
  • (e) Belonia on the Muhuri: the land of the town that drains to the Muhuri behind its embankment;
  • (f) Udaipur, Amarpur and Sonamura on the Gomati below the Dumbur reservoir: the land of the three towns that drains to the Gomati, into which the reservoir releases water;
  • (g) Dharmanagar on the Juri: the land of the town that drains to the Juri;
  • (h) Khowai and Teliamura on the Khowai: the land of the two towns that drains to the Khowai;
  • (i) Kamalpur on the Dhalai: the land of the town that drains to the Dhalai;
  • (j) Santirbazar, Bagafa and Sabroom in the south: the land of the three settlements, with the landslide ground round them;
  • (k) the hill-range corridors: the catchments that cross or drain to NH-8 where it runs through the Atharamura and Longtharai ranges, and to NH-108B and NH-208; and
  • (l) any catchment notified under Clause 4.5.4.

The boundaries shall be those mapped in Annex 4A.

4.5.4 Notification of further flood-sensitive catchments

4.5.4.1 The Authority may propose that a catchment be notified as flood-sensitive where one or more of the following is documented:

  • (a) buildings or arterial roads flooded in an event of 1% AEP or more frequent, on at least two occasions in the previous 20 years;
  • (b) receiving drains or channels with capacity below the 10% AEP flow under existing conditions;
  • (c) an outfall that is closed by a sluice, gate or flap gate in a river embankment when the Haora, the Gomati, the Manu, the Muhuri, the Khowai, the Juri or another river is high, or that depends on pumping, such as the Katakhal sluice and the flood pumps of central Agartala, or that discharges to a pukur, dighi or beel held full behind such a gate, or to the Gomati below the Dumbur reservoir when the reservoir releases water, for part of the monsoon season (Chapter 5);
  • (d) loss of more than a quarter of the mapped tank and pukur storage in the catchment since the earliest available survey; or
  • (e) a basin master plan that relies on limiting site discharge.

4.5.4.2 The procedure shall be:

  1. The Authority prepares a technical note with the catchment boundary in GIS form and the evidence for 4.5.4.1.
  2. The State-level technical committee constituted under Chapter 1 reviews the note.
  3. The draft notification and map are published for public comment for at least 60 days.
  4. The Government notifies the catchment and the map is added to Annex 4A.
  5. The rule applies to applications received 6 months or more after notification. Applications received earlier are assessed under Clause 4.5.2.

4.5.4.3 A notified catchment may be de-notified only by the same procedure, and only after a basin study shows that the downstream system meets Chapter 5 with all development under Clause 4.5.2.

Commentary. The 0.9 factor is derived from the Denver (MHFD) analysis. In that analysis, ten basins each releasing 100% of the historic 100-yr peak still produced 106% of the historic peak at the outlet; releasing 90% at each gave 97% (UDFCD Full Spectrum Detention Release Rate Memorandum, 2012). The mixed-frequency rule has no direct precedent; the nearest is the Malaysian DID (2008) checklist, which required post-development 2-, 10-, 50- and 100-yr peaks below the pre-development 2-yr peak. The specific "100-yr post ≤ 10-yr pre" form appears in a New Berlin, Wisconsin planning discussion (not an adopted rule). The Agartala entries follow the city's drains to its two rivers. The central part of the city "is located at a lower level than other areas giving it the appearance of a saucer", the ground falling from 25–30 m to a low of 8 m; "During normal rainfall of about 3 to 4 hours, the central part of Agartala gets flooded"; the main drains are masonry-lined but "the feeder drains are earth-lined and in a poor condition with silt and vegetation choking them"; and "The Akhaura canal system running along the Akhaura road serves mainly the central area" (ADB, IEE for the Agartala City Urban Development Project, 2020), and flows on into Bangladesh (as reported). When the Haora and the Katakhal are high the city is pumped: 18 flood pumps of up to 900,000 litres per hour each, about 0.25 m³/s each and about 4.5 m³/s for the 18 (NEER's arithmetic), and 6 diesel pumps discharge by pipeline to the Katakhal on the north and the Haora on the south (August 2024, as reported); 6 more flood pumps were reported in August 2025, and a ₹1,000 crore proposal for two embankments and three pumping stations in July 2026 (as reported). No design capacity for the pumps, the Katakhal sluice or the Akhaura canal was found [TBC]. The CAG found "frequent water logging of different areas due to blockage of drains and canals by plastic waste", with photographs of the Haora near Battala and the Katakhal near Abhoynagar bridge (CAG, Audit Report for 2022-23, performance audit of solid waste management in urban areas of Tripura). The Katakhal entry follows the sluice and the sewage: PWD (WR) holds the double-barrel sluice near Bhuturia (as quoted from its pages); the Katakhal was cleaned in March 2026 (as reported); it has no level gauge [TBC]; and three of the sewage treatment plants being built for the city, of 10 MLD at Ranjit Nagar, 15 MLD at Abhaynagar Bridge and 1.5 MLD at Astabal Bridge, all to be fed by interception and diversion of drains, stand on its banks, with a target of March 2027 (State affidavit of 06.07.2026 in NGT OA 606/2018). The Haora entry follows the river's flood plain: PWD (WR) has mapped flood-plain zones on the Haora at Khayerpur, Kashipur, Baldakhal, Aralia, Jogendranagar and Joynagar (Dashamighat) for the National Green Tribunal, with the map, its return period and its status not known [TBC] (State affidavit in NGT OA 673/2018); the Tribunal found on 13.04.2026 that the 5 MLD plant at Kalapania Khal and the 8 MLD plant on the Haora bank sit near or on the flood plain and "may lead to flooding of the STP and flowing of untreated sewage in the river during the monsoon" (as quoted in the affidavit of 06.07.2026); Chandrapur, Baldakhal and Aralia flooded on 22–24 August 2026, when the Haora stood at 10.72 m against a CWC danger level of 10.70 m (as reported); in June 2022 the Haora stood at 10.82–10.85 m at the Jahar Bridge gauge, whose danger level is given as 10.50 m (as reported); and 6 km of the Haora embankment needed leakage repairs (as reported). The Haora's highest level is given as 11.08 m, 12.14 m, 12.4 m and 12.42 m, probably on different gauges or datums (all as reported); this Manual uses 12.42 m (22 August 2024) at the CWC site until CWC confirms the gauge and datum (Clause 5.8.5(b)). The Kailashahar entry follows the Manu: its CWC danger level is 25.34 m and its highest level 25.79 m (7 June 1993), exceeded at 25.95 m on 13 June 2018, when 21,000 people were reported homeless in Kailashahar (as reported); State press gave the danger mark as "24.00 mtr" in 2018 and a "critical level" of 23.05 m in 2024, a conflict (as reported); 16.8 km of the Manu embankment at Kailashahar was raised in 2025 (as reported); and Kailashahar holds the State's largest IMD station record, 377.2 mm on 6 June 1993 (IMD Extremes). The Belonia entry follows the Muhuri: its highest level of 16.98 m (4 August 1983) stood until 2024, when the river reached 17.32 m on 2 August, 18.12 m on 20 August and 18.81 m on 22 August (SANDRP's transcription of CWC, as reported); Belonia's IMD gauge recorded 32 cm in the 24 hours to 0830 IST on 20 August 2024 (IMD press release, Annexure I); and 7.47 km of the Muhuri embankment at Belonia was in the 2025 programme (as reported). The Gomati entry follows the Dumbur reservoir: on 21 August 2024 the Gomati at Udaipur stood at 22.05 m at 14:45 against an "extreme danger" level of 22.00 m on the State gauge, the Amarpur State gauge at 31.94 m against 32.00 m on 22 August, and the Gumti at Sonamura at 14.27 m on 23 August, against a highest level of 14.43 m (23 July 1993) (as reported); Amarpur's IMD gauge recorded 31 cm in the 24 hours to 0830 IST on 20 August 2024 (IMD); the district reported the reservoir's gates opened on 21 August, the first release "since 1993", while the power minister denied that a gate had opened, a conflict (as reported); and the reservoir's spillway capacity is given as 481.38 m³/s (as reported). The Dharmanagar entry follows the Juri at Nutan Bazar, whose highest level of 20.435 m (15 May 1984), a pre-monsoon flood, was exceeded at 20.66 m on 22 August 2024 (as reported). The Khowai entry follows the Khowai at Khowai, highest level 28.005 m (24 June 2004) (as reported), and the landslides of June 2018, 11 of whose 17 reported locations were in Khowai district (as reported); NIH-DHAARA returns no data for the cell of Khowai town, and Teliamura's cell is the lowest in the valley (Clause 2.3.6(c)). The Kamalpur entry follows the Dhalai at Kamalpur, highest level 33.85 m on 15 May 1984 (as reported); both NIH-DHAARA cells at Kamalpur return no data. The southern entry follows the rain and the slopes: the IMD gauge at Bagafa recorded 49 cm in the 24 hours to 0830 IST on 22 August 2024 (IMD press release of 22 August 2024, Annexure I), more than every NIH-DHAARA 100-year cell in the State, and Clause 2.3.6(h) raises the 1% AEP 24-hour depth to 490 mm throughout sub-area TR-D1; 2,032 landslip locations were reported across the State in August 2024, with 7 deaths at Gardang near Santirbazar and 3 at Debipur (as reported); and the CWC sites at Sabroom and on the Feni were reported not working in 2024 (as reported). The corridor entry follows the High Court of Tripura, which in its suo motu WP(C)(PIL) No. 06 of 2026 (judgment of 08.09.2026) recorded the District Legal Services Authority's finding on NH-108B and NH-208 of "No proper drainage system … water logging everywhere; RCC drain hole blocked with mud, vegetation; Earthen drain damage & blocked", with "culvert block by silt, vegetation, debris" chainage by chainage; and the Assam–Agartala road, NH-8, which crosses the Atharamura and Longtharai ranges, was cut by "over 60 breaches" in the floods of 3–5 August 1983 (Lok Sabha debates, as quoted). Kumarghat on the Manu, highest level 32.97 m (7 June 1993) (as reported), Jirania, where one person drowned in June 2022 (as reported), and the other towns behind embankments are candidates for notification under Clause 4.5.4. The notification triggers in 4.5.4.1 have no direct precedent and are set by this Manual. The 6-month lead time follows the update rule of Clause 2.14.2. Clause 4.16 explains why releases below pre-development are needed at all.

4.5.5 Minimum outlet and short-duration 2-yr checks

4.5.5.1 Where the PSD for any AEP and duration is less than the discharge of a 50 mm orifice (Clause 4.8.2) at the corresponding stage, the 50 mm orifice is deemed to comply for that AEP and duration.

4.5.5.2 Where meeting the 2-yr criterion at a duration of 3 hours or less would require a low-flow orifice so small that the drawdown requirement of Clause 4.7 cannot be met, the designer shall:

  • size the low-flow orifice as the smallest opening that meets Clause 4.7; and
  • report the resulting 2-yr exceedance for those durations.

The Authority may accept the design if the exceedance is below the discharge of the 50 mm orifice at the 2-yr stage, or if the downstream analysis of Chapter 5 shows no adverse effect.

Commentary. Under AMC II, a greenfield site produces almost no runoff in a 1- or 2-hour, 2-yr storm, because most of the rain is lost to initial abstraction. A pre-development peak of a few litres per second, compared duration by duration, then forces a very small low-flow orifice. That orifice cannot release the 10-yr volume within 48 hours. Checked as if it were outside a flood-sensitive catchment, the illustrative example of Clause 4.6.7 would need a low-flow orifice of about 75 mm to match the 1-hour, 2-yr pre-development peak. 90% drawdown of the 10-yr volume would then take about 84 hours even with a clean orifice, against the 48-hour limit. The 170 mm orifice that meets drawdown with 50% blockage exceeds the 1-hour, 2-yr pre-development peak by about 11 L/s. Clause 4.5.5.2 resolves that conflict in favour of drawdown, because a basin that is still partly full when the next monsoon storm arrives fails in the event that matters more. KC APWA 5600 (2006) used a 75 mm (3 in) minimum orifice with trash racks. This Manual sets a 50 mm minimum (Clause 4.8.2).

4.5.6 Constrained redevelopment sites

4.5.6.1 Eligibility. The relief route of this clause is available only for redevelopment where all of the following hold:

  • (a) the existing site is at least 60% impervious, as surveyed before demolition;
  • (b) the site is 1 ha or less; and
  • (c) the designer shows, in a Constraint Statement submitted with Form 4-1, that the greenfield criteria of Clauses 4.5.2 or 4.5.3 cannot be met on the site. The statement must show that every storage option of Clause 4.10 has been assessed: rooftop and podium storage, tanks under parking or landscape, permeable paving with sub-base storage, and landscape depressions. It must also give the storage each option can provide.

New development on undeveloped land is never eligible.

4.5.6.2 Minimum on-site performance. An eligible site shall provide all of the following on site:

  • (a) the full retention volume (Clause 4.4) and the WQv treatment (Chapter 8), with no relief;
  • (b) post-development peak discharge no more than 50% of the existing-condition peak for the 50%, 10% and 1% AEP storms, at each duration of Clause 2.5.2. The existing condition is modelled under Clause 3.3.4; and
  • (c) no increase in the 1% AEP water level at any building or road downstream (Chapter 5).

4.5.6.3 Shortfall. The shortfall is the detention storage required to meet the greenfield criteria (Clause 4.6) minus the storage provided on site under 4.5.6.2. The applicant shall pay for the shortfall as a fee-in-lieu at the unit rate of Clause 4.13.3. The fee shall be:

  • (a) paid into the ring-fenced account of the basin in which the site lies;
  • (b) spent only on regional detention or on restoring pukur or tank flood storage identified in the basin stormwater master plan (Chapter 11); and
  • (c) recorded in the public ledger of Clause 4.13.4, which shall show the volume owed and the volume delivered in each basin.

Where no basin master plan has yet been approved, the fee shall be held for up to 5 years. If no plan is approved in that time, it shall be spent on restoring tank flood storage in the same basin, with PWD (WR) agreement.

4.5.6.4 Flood-sensitive catchments. In the catchments of Clause 4.5.3, the route is available under the same conditions. The Authority may, however, refuse it where the downstream analysis of Chapter 5 shows existing flooding of buildings in the 10% AEP event within the analysis extent.

Commentary. Greenfield is the target for all redevelopment, because a dense city only reduces its runoff as it rebuilds. On small, fully built plots in areas such as the central zone of Agartala between the Haora embankment and the Katakhal, or Chandrapur, Baldakhal and Aralia, which flooded in August 2026 (as reported), there is often no space for the full greenfield storage. A rule that cannot be met invites variances and non-compliance, which help no one downstream. This clause follows the approach of the UK Non-statutory Technical Standards for Sustainable Drainage (Defra, 2015, S2–S3). For previously developed sites, those standards require peak runoff "as close as reasonably practicable to the greenfield runoff rate" and never above the pre-redevelopment rate. The fixed 50% minimum reduction has no direct precedent; this Manual sets it to give reviewers a clear number in place of a "reasonably practicable" judgement. The fee-in-lieu turns the shortfall into regional storage in the same basin, so the basin still receives greenfield-equivalent control in total. Retention and water quality get no relief, because they are small volumes that almost every site can hold.


4.6 Detention sizing procedure

4.6.1 Method

Detention shall be sized by hydrograph routing through the stage–storage–discharge relationship of the facility, by level-pool (Modified Puls) or an equivalent numerical method (SWMM, HEC-HMS). Fixed-ratio and Rational-based storage formulae shall not be used. The simplified methods of Clause 4.14 (the Tier B tables and the fixed-coefficient route) are the only exceptions.

4.6.2 Steps

  1. Delineate the site and sub-areas. Map HSG and confirm by testing (Chapter 3).
  2. Extract design rainfall for 50%, 10% and 1% AEP and every duration in Clause 2.5.2, with the climate factor (Chapter 2, Form 2-1).
  3. Build design hyetographs: alternating block for ≤ 24 h; the "peak day last" pattern for 48 and 72 h (Clause 2.9).
  4. Compute pre-development hydrographs (greenfield CN; AMC III for storms of every duration from 1 June to 30 September in sub-areas TR-A, TR-B, TR-D, TR-D1 and TR-E and from 1 May to 31 October in TR-B1 and TR-C, from 1 April to 31 October on lunga floors and recent flood plains below the 1% AEP level, pukur, dighi and beel margins and every catchment behind a closed sluice or a pumped outfall, at all times in catchments draining to the Dumbur reservoir or the Gomati below it, and at other sites and times after a 5-day total of more than 53 mm, AMC II otherwise).
  5. Compute the release caps for each AEP and duration under Clause 4.5.2 or 4.5.3.
  6. Compute post-development hydrographs with the same storms and AMC, including retention practices (Clause 4.4.6).
  7. Choose a trial facility geometry (stage–storage) and a multi-stage outlet (Clause 4.6.5).
  8. Route every storm and duration. Use a time step of no more than 5 minutes, and no more than Tc/3 of the post-development catchment.
  9. Check every release against its cap, and check drawdown (Clause 4.7). Adjust the outlet and storage and repeat.
  10. Check the tailwater condition of Clause 4.6.6 and the downstream analysis of Chapter 5.
  11. Size the emergency spillway and set freeboard (Clause 4.9).
  12. Report the governing storm for storage, for each outlet stage, and for the spillway (Clause 4.17).

4.6.3 Storms to be routed

Every facility shall be routed for the full matrix:

Table 4.1 — Design storms to be routed for detention sizing

AEP Durations (h) AMC
50% (2-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h
10% (10-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h
1% (100-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h

The 24-, 48- and 72-hour runs are mandatory whatever the critical-duration result (Clause 2.5.2). Where Ia = 0.05S sensitivity is required by Chapter 3, it shall be run for the governing storage case.

4.6.4 Initial conditions

Each run shall start with:

  • detention storage empty, down to the invert of the lowest outlet;
  • any permanent pool full;
  • retention practices empty, except as limited by Clause 4.11; and
  • RWH storage full (Clause 4.11).

The 48- and 72-hour storms already contain their antecedent rain, so no further pre-filling is applied.

4.6.5 Multi-stage outlet design

4.6.5.1 The outlet shall have a separate control for each criterion, normally stacked as in Figure 4.2:

  • Stage 1, at the invert: the low-flow orifice. It releases the WQv over 24–48 h (Chapter 8) and controls the 2-yr release.
  • Stage 2: an orifice or slot set at or near the maximum 2-yr level. It controls the 10-yr release.
  • Stage 3: a weir, riser crest or larger orifice set at or near the maximum 10-yr level. It controls the 100-yr release.
  • Emergency spillway: separate from the primary outlet (Clause 4.9).

Stages may be combined where routing shows that every cap is met.

4.6.5.2 Orifices shall be computed with a discharge coefficient of 0.60 unless a rated device is used. Weirs shall use a coefficient appropriate to their shape. Submerged-outlet and tailwater effects shall be included (Clause 4.6.6).

4.6.5.3 Vortex flow controls and other proprietary devices may be used where the supplier provides a certified head–discharge curve and the minimum clear opening is at least 50 mm.

4.6.6 Tailwater on the outlet

The outlet shall be routed against the tailwater of the receiving system, not free outfall, wherever the receiving water level can rise above the outlet invert. The tailwater shall be:

  • for a receiving drain: its water level in the same storm, from the Chapter 5 analysis or, for Tier B, the drain obvert;
  • for tidal or backwater-affected outfalls: the levels and joint cases of Clause 2.12 and Chapter 5, including the outfall-closed check (Clause 5.10).

Where tailwater governs, a flap gate shall be fitted to the outlet (Clause 5.11). The storage below the tailwater level shall not be counted as available unless the routing includes the gate closure.

4.6.7 Illustrative example

Illustrative — not design values. This example shows the procedure and the sizes it produces. The inputs are invented to be plausible for a lunga between tillas on the edge of Agartala. They are not NIH-DHAARA values and must not be used for design.

Inputs:

  • Site: 2.0 ha, flood-sensitive catchment (Clause 4.5.3).
  • Land cover: pre-development all pervious, CN 70. Post-development as two sub-areas (Clause 3.9.2): 1.57 ha of directly connected impervious surface at CN 98, never converted for AMC, and 0.43 ha of pervious open space at CN 70, on the same soil as pre-development; the area-weighted CN at AMC II is 92. For storms of 12 h and longer the pervious CN only is converted to AMC III: CN_III = 23·CN / (10 + 0.13·CN) = 84.3 (Clause 3.8.4).
  • Time of concentration (Tc): 45 min pre-development, 15 min post-development (used for both sub-areas). SCS triangular unit hydrograph; 5-minute time step.
  • 24-h depths: 110, 200 and 350 mm for 2-, 10- and 100-yr (the same 10- and 100-yr values as Clause 2.11).
  • Shorter durations: P(t) = P24·(t/24)^0.40, an assumed ratio set and not Annex 2B.
  • Longer durations: 48-h and 72-h depths taken as 1.25 and 1.40 × P24, laid out per Clause 2.9.2.
  • Storage: vertical-walled, 2,500 m² plan area.
  • Outlet, sized so that drawdown is met with the low-flow orifice 50% blocked (Clause 4.8.3). Annex 4C shows the trial outlet that failed this check.
    • Stage 1: 170 mm orifice at the invert.
    • Stage 2: 460 mm orifice with its invert 0.53 m above the floor.
    • Stage 3: none needed, because the 100-yr cap is met by Stages 1 and 2.

Results (discharges in L/s; storage in m³):

Table 4.2 — Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)

Duration (h) 2-yr pre 2-yr post, detained 10-yr pre 10-yr post, detained 100-yr post, uncontrolled 100-yr post, detained 100-yr storage used 10-yr drawdown, 50% blocked (h)
1 4 15 51 28 922 42 1,426 31.3
2 14 20 84 34 961 79 1,911 32.1
3 19 22 104 37 981 139 1,999 32.8
6 32 25 150 41 1,010 194 2,154 34.2
12 127 30 302 46 1,074 276 2,512 39.0
24 149 32 327 49 1,081 320 2,766 45.3
48 173 34 349 82 1,087 343 2,913 44.8
72 180 34 356 84 1,089 343 2,911 44.7

How to read it:

  • 100-yr cap. The cap is the largest pre-development 10-yr peak, 356 L/s (72 h). Every 100-yr detained peak is at or below it; the largest is 343 L/s.
  • 2-yr cap. The site is flood-sensitive, so the 2-yr cap is the largest pre-development 2-yr peak, 180 L/s (72 h; Clause 4.5.3.1). The largest 2-yr detained peak is 34 L/s. At 1, 2 and 3 hours the detained 2-yr peak is above the pre-development peak of the same duration (15 against 4 L/s, 20 against 14 L/s, and 22 against 19 L/s). That comparison is not required here. It would be for a site under Clause 4.5.2, and Clause 4.5.5.2 would then apply.
  • Governing storage. Storage is governed by the 48- and 72-hour storms: 2,913 m³, which is 0.146 m³ per m² of site, at a maximum depth of 1.17 m. A design that checked only the critical-duration peak storm (1–3 h here) would have provided about 2,000 m³, roughly two-thirds of what is needed.
  • Drawdown. With the low-flow orifice 50% blocked (Clause 4.8.3), 90% of the 10-yr storage drains in at most 45.3 h (the 24-hour storm), within the 48 hours of Clause 4.7. A 120 mm orifice would drain it in about 42 h when clean but 54 to 75 h when half blocked, so it fails. Annex 4C shows that trial and the routing step by step.
  • Retention credit. With an illustrative retention depth of 40 mm, RRV = 552 m³, computed for each sub-area (Clause 3.9.4). Modelled as filling from the start of the storm with no infiltration during it, the retention reduces the 24-hour storage by 138 m³ and the 48- and 72-hour storage by 7 m³ or less. The credit under Clause 4.4.6 is therefore effectively zero for this site.

The order of magnitude, about 0.15 m³ per m² of site, is consistent with the indication in Clause 2.11.

2026-11-01T10:14:56.974241 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 5 10 15 20 25 30 35 40 Time from start of 24 h design storm (h) 0 200 400 600 800 1000 1200 Discharge (L/s) Release cap = max pre-development 10-yr peak over all durations (356 L/s) Uncontrolled peak 1081 L/s Detained: peak later and flatter, recession prolonged (volume unchanged) Illustrative — not design values. 2 ha site, 24 h storm, AMC III, mixed-frequency rule Post-development 1% AEP (100-yr), uncontrolled Post-development 1% AEP (100-yr), detained Pre-development 10% AEP (10-yr)

Figure 4.1 — Pre-development 10-yr, post-development 100-yr uncontrolled and detained hydrographs for the 24-hour storm of the illustrative example (Clause 4.6.7). Illustrative — not design values. Original drawing for this Manual, adapted from the pre/post-development hydrograph concept in MARC/KC APWA Section 5600 and the Georgia Stormwater Management Manual (2016).

Commentary. Figure 4.1 shows what detention does and does not do. It cuts and delays the peak. It does not reduce the volume: the area under the detained curve equals the area under the uncontrolled curve, more than twice the pre-development 10-yr volume. The extra volume leaves the site over many hours after the storm. That prolonged release can coincide with the peak of the larger catchment downstream (Clause 4.16), and it must still drain when the outfall is tide-locked (Chapter 5).


4.7 Drawdown

4.7.1 Detention. At least 90% of the maximum volume stored in the 10% AEP (10-yr) storm of each duration shall be released within 48 hours of the time of maximum storage, by gravity, with the tailwater of Clause 4.6.6.

4.7.2 Water quality volume. The WQv shall be released over not less than 24 hours and not more than 48 hours (Chapter 8).

4.7.3 Retention. Retention storage shall be emptied within 72 hours by infiltration or reuse (Clause 4.4.5).

4.7.4 Tidal outfalls. Where gravity drawdown is prevented by tide for part of each cycle, the 48-hour limit applies with the tidal tailwater modelled. Where it cannot be met by gravity, pumped drawdown shall be provided under Clause 5.12.

Commentary. KC APWA 5600 (2006) required dry basins to release at least 80% of storage within 24 hours of the inflow peak and to empty within 72 hours. Singapore PUB requires detention to be restored within 4 hours. The 48-hour, 90% rule is longer than PUB's because Tripura storage must hold multi-day volumes. It is still short enough that a basin filled by one monsoon depression will have most of its volume back before the next, which in August 2024, when the IMD gauge at Bagafa recorded 38 cm in the 24 hours to 0830 IST on 20 August and 49 cm in the 24 hours to 0830 IST on 22 August (IMD press releases of 20 and 22 August 2024, Annexure I) followed within days.


4.8 Outlet structures

4.8.1 General. Primary outlets shall be:

  • unattended, with no moving parts, valves or pumps, except where Clause 5.12 permits pumped drawdown;
  • accessible for inspection and cleaning from the surface without confined-space entry, where practicable; and
  • built of durable materials. In coastal areas these shall be corrosion-resistant (Clause 4.12.5).

4.8.2 Minimum orifice. No control orifice shall be smaller than 50 mm in diameter, or 50 mm in least dimension for a slot.

4.8.3 Trash racks and screens. Every orifice and weir shall be protected by a trash rack or screen. The rack shall:

  • have a clear bar spacing no greater than half the smallest opening it protects, and not less than 25 mm;
  • have a clear open area at least 10 times the area of the opening it protects;
  • be inclined, or set as a cage around the riser, so that debris rises with the water and does not pin against the bars;
  • be removable or hinged for cleaning; and
  • for routing, be assumed 50% blocked at the low-flow orifice when checking drawdown.

4.8.4 Anti-vortex devices. Riser crests and orifices that may run under more than 1.5 times their diameter of head shall have an anti-vortex plate or hood (Figure 4.2).

4.8.5 Outlet barrels. Outlet barrels through embankments shall:

  • be at least 300 mm in diameter (Chapter 6);
  • have watertight joints;
  • have a filter diaphragm or seepage collars over the length within the embankment; and
  • have an energy-dissipating outfall (Chapter 9).

4.8.6 Isolation. Facilities serving more than 1 ha shall have a means of isolating the outlet for maintenance, such as a stop-log slot or penstock. In normal service it shall be left fully open.

Commentary. The 50 mm minimum is smaller than the 75 mm (3 in) of KC APWA 5600 (2006), so the trash-rack requirements are correspondingly stricter. The ratios in 4.8.3 (bar spacing at half the opening, open area 10 times the opening, 50% blockage for the drawdown check) have no direct precedent and are set by this Manual. The blockage factor matches the 50% grate clogging factor for sag inlets in Chapter 6. Indian urban drains carry heavy loads of solid waste, so a low-flow orifice without an effective rack will block within one season.

Figure 4.2 — Detention storage stack and multi-stage outlet (schematic) Schematic cross-section of a detention basin showing stacked storage zones (permanent pool, water quality volume, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and a multi-stage riser outlet with trash rack, anti-vortex plate, outlet barrel and emergency spillway. Not to scale. Storage stack and multi-stage outlet — schematic section, not to scale Embankment crest Max level, spillway flowing (outlet blocked) Emergency spillway crest 1% AEP (100-yr) max water level 10% AEP (10-yr) max water level 50% AEP (2-yr) max water level Top of water quality volume (WQv) Permanent pool (wet basin only) Basin floor / pool bottom Spillway surcharge (Clause 4.9) 100-yr detention zone 10-yr detention zone 2-yr / channel-protection zone WQv — 24–48 h release (Ch 8) Permanent pool / retention Freeboard ≥ 0.3 m Spillway crest (offset in plan) 1 2 3 4 5 6 7 Key 1 Stage 1 low-flow orifice (≥ 50 mm, Clause 4.8.2) — releases WQv over 24–48 h 2 Stage 1 second orifice — with 1, controls 50% AEP (2-yr) release 3 Stage 2 orifice or weir slot — controls 10% AEP (10-yr) release 4 Stage 3 riser crest / overflow grate with anti-vortex plate — controls 1% AEP (100-yr) release 5 Trash rack enclosing all openings (Clause 4.8.3) 6 Seepage collar or filter diaphragm on outlet barrel 7 Outlet barrel, energy dissipation and outfall apron Levels and zone thicknesses are diagrammatic only.

Figure 4.2 — Detention storage stack (permanent pool, WQv, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and multi-stage riser outlet. Schematic, not to scale. Original drawing for this Manual, adapted from the multi-stage outlet and storage-zone concepts in MARC/KC APWA Section 5600 (2006, 2025.01) and the Mile High Flood District Urban Storm Drainage Criteria Manual, Volume 2 (full-spectrum detention).


4.9 Emergency spillway, freeboard and embankment safety

4.9.1 Spillway capacity. Every detention facility formed wholly or partly by an embankment, or whose overflow would reach buildings, shall have an emergency spillway that passes the 1% AEP (100-yr) peak inflow:

  • with the primary outlet assumed fully blocked;
  • with the facility full to the spillway crest at the start of the storm; and
  • with at least 0.3 m freeboard from the maximum water level to the embankment crest.

4.9.2 High-hazard facilities. A facility is high-hazard if its failure or overflow could:

  • endanger life;
  • flood a habitable building or critical facility; or
  • close an arterial road.

High-hazard facilities shall also be checked for the 0.2% AEP (500-yr) peak inflow under the conditions of 4.9.1, with the embankment not overtopped.

4.9.3 Spillway crest. The spillway crest shall be at or above the 1% AEP maximum water level from routing with the primary outlet working. The recommended clearance is 0.15 m.

4.9.4 Spillway location. The spillway shall be:

  • on natural ground or a reinforced section, not on fill, unless protected against erosion for the full design flow;
  • discharging to the 1% AEP overland flow path of Chapter 6; and
  • placed so that its flow does not reach a building.

4.9.5 Underground and enclosed facilities. Tanks, vaults and podium storage shall have an overflow route that operates when the outlet is blocked. The route shall carry the 1% AEP inflow to the overland path without surcharging any building, basement or lift pit.

4.9.6 Embankments.

  • (a) Embankments more than 2 m high (measured from the downstream toe to the crest) shall be designed by a qualified geotechnical engineer. The design shall include stability, seepage and settlement analysis.
  • (b) Side slopes shall be no steeper than 3H:1V on any face that is mown or accessible to the public. Slopes shall be flatter where Clause 4.15 requires.
  • (c) Embankments shall have:
    • a crest width of at least 3 m;
    • compacted, engineered fill with a core or cut-off where required by the seepage analysis; and
    • no trees or large shrubs.
  • (d) An embankment structure that falls within the Dam Safety Act, 2021 is subject to that Act in addition to this Manual.

4.9.7 Excavated facilities. Facilities wholly below the surrounding ground, with no embankment, need not meet 4.9.6. They shall still meet 4.9.1, with the overflow route treated as the spillway.

Commentary. The spillway criterion (1% inflow, outlet blocked, basin full, 0.3 m freeboard; 0.2% for high hazard) follows the KC APWA 5600 (2006) rule: the spillway passes the 1% storm with 1 ft (0.3 m) freeboard to the top of the dam, assuming zero storage and a clogged primary outlet, with the crest at least 0.5 ft (0.15 m) above the 1% maximum water surface. KC designed dams above 10 ft (3 m) to SCS TR-60 Class C. The 2 m embankment trigger, the 3H:1V slope (KC wet ponds), and the 3 m crest width have no direct precedent and are set by this Manual.


4.10 Facility types

4.10.1 General. Any storage that meets Clauses 4.5 to 4.9 may be used. Surface storage that is visible and can be inspected without confined-space entry is preferred. Storage shall not be placed in a habitable basement or in any space whose flooding would endanger life.

4.10.2 Underground tanks and vaults.

  • (a) Gravity outlet is required where the receiving drain allows it. Pumped outlets are permitted only under Clause 5.12, with a registered maintenance declaration (Chapter 10).
  • (b) Access openings shall be provided over the outlet chamber and over every inlet. In tanks over 500 m², they shall be no more than 30 m apart.
  • (c) The floor shall fall at least 1% to a sump at the outlet, with a sediment pocket below the low-flow orifice invert.
  • (d) The tank shall be ventilated.
  • (e) Inlets shall pass through a silt trap or gross pollutant trap (Chapter 8).
  • (f) Flotation and groundwater ingress shall be checked under Clause 4.12.

4.10.3 Rooftop detention.

  • (a) It is permitted on flat roofs designed for the full ponded load with the outlet blocked. The ponding depth shall not exceed 150 mm unless a structural engineer certifies a greater depth.
  • (b) Each roof outlet shall have a flow-control ring or weir with a certified rating, and every roof area shall have at least one overflow scupper, independent of the controlled outlets, that passes the 1% AEP inflow.
  • (c) Roofs used for RWH collection may also provide rooftop detention. The detained volume is released through the control, not into the RWH sump.

4.10.4 Podium and landscape-deck detention.

  • (a) It is permitted above ground level or above a basement car park, provided the structure is designed for full saturation and ponding, and waterproofed.
  • (b) The release, overflow and safety rules for rooftop detention (4.10.3) apply.

4.10.5 Parking-lot detention.

  • (a) It is permitted only on surface parking. Ponding depth shall not exceed:
    • 200 mm in the 10% AEP storm and 300 mm in the 1% AEP storm at any parking bay;
    • zero on accessible routes, ramps and pedestrian crossings; and
    • zero in the 10% AEP storm on fire-tender access routes.
  • (b) Signs shall warn that the area floods.
  • (c) Ponding shall not reach a building wall unless the wall is waterproofed above the 1% level plus freeboard (Chapter 6).

4.10.6 Multi-use detention (parks, playfields, open space reservation).

  • (a) Open space land may be used for detention, provided its primary use remains available in at least the 50% AEP storm.
  • (b) The storage areas shall be graded to drain fully within the times of Clause 4.7.
  • (c) A low-flow channel or underdrain shall carry dry-weather and frequent flows, so that the park is not waterlogged.
  • (d) The depth and slope limits of Clause 4.15 apply.
  • (e) Play equipment and seating shall be placed above the 10% AEP level.

4.10.7 Ponds and wet basins.

  • (a) A permanent pool shall be at least 1.2 m deep over most of its area to discourage weed growth and mosquito breeding, with a vegetated safety bench at the edge (Clause 4.15).
  • (b) Only storage above the permanent pool counts as detention.

Commentary.

  • The rooftop depth (150 mm) and parking depths (200 and 300 mm) have no direct precedent. This Manual sets them so that a blocked outlet is noticed before it becomes dangerous.
  • The 1.2 m pool depth equals the 4 ft minimum permanent pool of KC APWA 5600 (2006). This Manual adopts it mainly for weed and mosquito control.
  • Pumped detention tanks need maintenance declarations in Singapore (PUB Addendum No. 3, April 2025). This Manual adopts the same approach through Chapter 10.
  • Using open space for multi-use detention fits rule 110(4) of the Tripura Building Rules, 2017, under which "All such public open spaces above the size of 500 sq.m shall have arrangements for complete utilization and capture of storm water with scientific rain water harvesting arrangements", including "Artificial or natural storage of storm water runoff from larger sites"; rule 110(5) extends recharge to "open spaces like parks, parking, plazas and playgrounds". Unpaved ground on private plots is scarce: the landscaping rule asks for nil up to 150 m² of plot and 1.0–7.5% above (r.113, 2022), and coverage may reach 70% for every use (r.46(1), 2025), so a shared open space is often the only place where surface storage fits. On land to which the lunga rule of Clause 4.11 applies, most of the valley towns, surface storage in the open space is the preferred form (Clause 4.12.4), but it earns no infiltration credit, its floor is set above the design groundwater level of Clause 4.12.1 or it is lined, and the "permeable materials" that rule 110 requires "for all open parking spaces" in group housing are laid there on a lined, non-exfiltrating base with an underdrain to the site's detention. On a tilla top or bench that meets the tilla rule of Clause 4.11, an open-space basin may infiltrate after the field test that rule requires. On ground under the hill rule, slopes of more than 20%, tilla slopes and cut faces, colluvium, fill, slide debris and land within twice the height of a cut or wall downslope of it are not used for ponding, and detention is provided in lined tanks, on rooftops and podiums under 4.10.3 and 4.10.4, or on a level open space only where the hill rule's geotechnical certificate covers it. Four kinds of land are not open space for this purpose. A pukur or dighi on the land is preserved under step 1 of Clause 4.3.1 and modelled as a water surface (Clause 3.3.2(e)) that starts at its outlet level (Clause 3.12.5), so only its flood storage above that level can count, and only as Chapter 7 allows; its bank, which the land records class separately as pukurpar (পুকুরপাড়, "Bank of tank") or dighirpar ("Bank of large tank"), is kept as bank, not graded for storage. A beel or haor and its margins are never turned into a detention pond, and engineered storage is called a detention pond, never a pukur. The 15 m "zone of river" of rule 9(4), the protective strips of rule 90(1)(i) and (m) in the hill ULBs, and the Manual's corridor of Chapter 7 along rivers, chharas (Bengali ছড়া: the land records' "Streams"; hill streams and small natural channels), khals and lunga flow paths and round pukurs, dighis and beels are flood land already: water reaches them first, so they are not counted as detention for the development beside them. And the area of a water body is excluded from the area of a park (r.9(2)), so a pukur in a park is not open space either.
  • Signs and depth markers under Clause 4.15.5, and the flood-warning signs of 4.10.5(b), are in Bengali, Kokborok and English (set by this Manual), Kokborok being written in the script that the local body, or the Tripura Tribal Areas Autonomous District Council in its area, uses where the sign stands; the Manual takes no side in the dispute over whether Kokborok is written in the Roman or the Bengali script (as reported). The rule follows the Tripura Official Language Act, 1964 (Act No. 5 of 1964), as amended, under which "the Bengali language and the Kok-Borak language shall … be the language to be used for all or any of the official purposes of the State of Tripura" (s.2(1); the Kokborok words added by the Tripura Official Language (Amendment) Act, 1979, Act No. 8 of 1979, as quoted), from 1 May 1999 (Law Department notification No. F.12(1)-LAW/88(Shadow), 29 April 1999), and "The English language may continue to be used" (s.2(2)(a)). The core's "signs in Bengali and English" is the floor of this rule, not its whole.

4.11 Rainwater harvesting versus detention accounting

4.11.1 No double counting. RWH storage (sumps, tanks, recharge pits and wells provided under the RWH mandate) shall not be counted as detention.

4.11.2 RWH sumps assumed full. For all routing under this chapter, RWH sumps and tanks shall be assumed full at the start of every storm, in every season. Their overflow shall be routed to the detention facility, or directly to the outfall if it bypasses detention. In the latter case the bypass flow counts against the PSD.

4.11.3 Combined tanks. A single tank may provide both RWH and detention only if:

  • (a) the detention zone lies wholly above the RWH overflow level;
  • (b) the detention zone is drained by its own gravity control orifice set at the RWH overflow level, meeting Clauses 4.7 and 4.8;
  • (c) no pump, valve or user action can hold water in the detention zone; and
  • (d) the two zones and the orifice level are shown on the drawings and in the maintenance declaration.

Only the volume between the RWH overflow level and the detention overflow level counts as detention.

4.11.4 Recharge structures. Recharge pits, trenches, shafts and wells may count as retention (not detention) if they meet Clauses 4.4.3 to 4.4.5. In particular, the seasonal high groundwater table shall be at least 1.0 m below their base. In the routing they are treated under Clause 4.4.6 with the groundwater level for the monsoon season.

4.11.5 RWH remains mandatory. Nothing in this chapter reduces the RWH requirement of rule 110 of the Tripura Building Rules, 2017, any condition of a building permit or occupancy certificate, or any rainwater harvesting rule of the Tripura Tribal Areas Autonomous District Council (none found [TBC]).

Commentary. Rainwater harvesting in Tripura is required by rule 110 of the Tripura Building Rules, 2017, which sizes nothing. "All building having plinth area not less than 200 sq.m., while submitting the building plans for sanction, shall mandatorily include the complete proposal of rainwater harvesting", with components that include "Rain water/ Storm water drains", "Storage Tanks/ Pits/ sumps" and "Ground Water recharge structures". The rule describes recharge pits 1–2 m wide and up to 3 m deep, trenches 0.5–1 m wide, 1–1.5 m deep and 10–20 m long, recharge wells of 100–300 mm diameter and shafts of 0.5–3 m diameter and 10–15 m depth. Its table requires an RWH structure, with "emphasis on both storage and reuse", for plotted residential buildings of 200 m² plinth area and above; RWH, "Rain Water Harvesting Structure and Recharging Well" and "Concrete paving to be avoided and permeable materials are to be used for all open parking spaces" for group housing of all sizes; RWH, storage and recharge pits for public and semi-public buildings of all sizes; RWH and "Soft landscape provisions and open spaces with Percolation pits" for commercial and mixed-use buildings of 50 m² and above; and, for industry of all sizes, percolation pits, with "Provision should be made not to inject contaminated water into recharge structures". Public open spaces of more than 500 m² shall capture storm water (r.110(4)), and "Recharging of ground water should be made mandatory … for all types of buildings, including Group Housing Societies having a plot area more than 500 sq. m. and above" (r.110(5)). Each ULB shall constitute "a rainwater Harvesting Cell", inspect the structures before issuing the completion certificate, verify 100% of the provisions in buildings above 1,000 m² every year and 10% of the rest by random survey, and set incentives and penalties (r.110(6)). The 200 m² threshold replaced the 300 m² of the 2004 rules (PIB, as reported; date not checked). No storage volume, rate per square metre of roof or infiltration test is set, and nothing warns against recharge where the water table is high or the ground is a filled pond (NEER's reading), although rule 32 (filled ponds) and rule 90(1)(h) ("high water table and fully saturated soil", in the hill ULBs) point at both. The structures that rule 110 describes put water into the ground, and on most of the State's town land the ground is full of water when it rains: the CGWB's dug wells in West Tripura stood 0.22–6.64 m below ground in November 2017, "The ground water table being very high" in Agartala (ADB, IEE for the Agartala City Urban Development Project, 2020), and the shallow groundwater carries iron of 0–4.99 ppm "due to the ferruginous nature of Tipam sandstones" (CGWB, NAQUIM report, West Tripura), which clogs the gravel and filter media of a recharge structure (NEER's reading). Nor does the State need recharge: the stage of groundwater extraction was 9.48% in the 2024 assessment, with every assessment unit Safe (GWRA 2024, State compilation of February 2025, as quoted by the CGWB), and 9.92% in 2023 (as quoted). Recharge is therefore not a design objective in Tripura, and rainwater harvesting is storage and reuse. This Manual sets three infiltration rules and one sizing rule for credit (all set by this Manual), cited as "Clause 4.11 (lunga rule)", "Clause 4.11 (tilla rule)" and "Clause 4.11 (hill rule)", and credits the rule 110 structures as follows:

  • An RWH tank or sump is RWH storage. It is not detention (Clause 4.11.1), and it is assumed full at the start of every storm (Clause 4.11.2), because in the monsoon season it is full after the first heavy rain. A tank may also provide detention only if it is built as a combined tank under Clause 4.11.3, with a detention zone above its RWH overflow level that drains through its own orifice; only that zone counts.
  • RWH credit rule. Rule 110 sets no volume. Where the lunga rule or the hill rule below bars infiltration, the RWH structure is a storage tank of at least 25 L per m² of roof (about 25 mm over the roof), and the recharge structures of rule 110 are replaced by storage of the same kind. The tank counts toward the retention requirement of Clause 4.4 only to the extent that it is emptied within 72 hours by a continuous non-potable use, such as toilet flushing or washing, demonstrated under Clause 4.4.3, and is then modelled under Clause 4.4.6 like any other retention practice; it is assumed full at the start of every storm and never counted as detention. The 25 L/m² is the neighbouring hill edition's figure, set where the building rules also give none; a larger tank is always allowed. The store serves the dry months as well, because "70 to 80 percent of rainfall occur between May to September" (CGWB, NAQUIM report, West Tripura).
  • Recharge pits, trenches, shafts and wells count as retention only where they meet Clause 4.11.4 and the tilla rule below: they are credited only to the extent that they drain within 72 hours at half the rate measured in a site test (Clauses 4.4.3 and 4.4.5), with their base at least 1.0 m above the seasonal high water table, and the credit is found by routing under Clause 4.4.6, not by deducting their volume.
  • Lunga rule (the valley floors; most towns, including central Agartala). No deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base) shall be built or credited: on a lunga floor (the CGWB's "low lands ('loonga') of Holocene terrace") or a recent flood plain ("the present-day flood-prone belts fringing the rivers", the same report); on land below the 1% AEP flood level of a river, chhara or khal; inside embankment-protected land that ponds when its sluices close or its pumps stop; on the margins of a pukur, dighi, beel or haor (its Zone 1 and Zone 2 under Chapter 7); on a filled pond, a lunga fill or clayey urban fill (r.32); or wherever the seasonal high water table, the highest level from April to November, is less than 2.0 m below ground. The last condition alone may be set aside where a piezometer record of at least one full April–November season shows that the water table stays at least 2.0 m below ground and at least 1.0 m below the base of the practice (Clauses 4.11.4 and 4.12); the others may not, because a flood, a closed sluice or a stopped pump puts water over the practice whatever the water table does. On such land roof runoff goes to storage under the RWH credit rule above, and detention is provided in lined, watertight storage (Clause 4.12.2). The evidence: in November 2017 the CGWB's dug wells in West Tripura stood 0.22–6.64 m below ground, and older summaries give 0.90–5.10 m after the monsoon in South Tripura and 1.20–4.37 m in North Tripura (CGWB district profiles, 2008 data, as quoted); central Agartala stands on "a soft to medium/stiff, silty clay/clayey silt layer" with "The ground water table being very high" (ADB IEE, 2020); and "Within a few hours most of the rainwater goes as run off and finally enters Bangladesh" (NAQUIM, West Tripura).
  • Where rule 110 requires recharge on lunga land. Rule 110(5) makes groundwater recharge mandatory on plots of more than 500 m², and the rule 110 table asks for recharge wells in group housing and percolation pits in commercial, mixed-use and industrial buildings. On land under the lunga rule such a structure is a recharge device in saturated ground, often fed with water from a drain that carries sewage, not storage. This Manual does not override the rule. It states the conflict plainly: on such a site the Manual requires storage in place of the recharge structure, under the RWH credit rule, with the overflow taken to the drain without passing through a pit, and the applicant seeks the ULB's relaxation of the recharge requirement, citing this rule. Until the ULB relaxes it, the rule 110 requirement stands, and a recharge structure that the rule forces on such a site earns no credit under this Manual.
  • Permeable parking on lunga land. The "permeable materials … for all open parking spaces" of rule 110 in group housing are laid, on land under the lunga rule or the hill rule, on a lined, non-exfiltrating base with an underdrain to the site's detention; they earn no infiltration credit, and the water held in their base counts only as detention, routed under Clause 4.6 through an orifice.
  • Tilla rule (the dissected terrace uplands of every valley, and weathered Tipam sandstone outside sub-area TR-E). Infiltration may be built and credited only on the top or a bench of a tilla (the CGWB's "table lands (tilla lands) and rolling mounds"), where the natural ground slopes 10% or less, the seasonal high water table is more than 3.0 m below ground, and the practice is set back from the edge of the tilla by at least twice the height of the slope below it; it needs a silt trap, a filter and a first-flush diverter ahead of the structure, a field infiltration test at the depth of the practice, and the separation of Clause 4.11.4. It shall never be built on a tilla slope, a cut face or fill, within twice the height of a cut or retaining wall upslope of it, or on the lunga below. Weathered Tipam sandstone supports it where tested: the CGWB uses a rainfall infiltration factor of 0.16 for it, "very porous and permeable", approved by its R&D committee (NAQUIM, West Tripura); the Dupitila sandy clays with laterite are slower (HSG C, B on sandy tops: Clause 3.7.2). Everywhere that neither this rule's conditions nor a piezometer record are met, rainwater harvesting is storage and reuse.
  • Hill rule (sub-area TR-E, any natural slope of more than 20% elsewhere, and every tilla slope and cut face). No deliberate infiltration practice shall be built or credited: on natural ground sloping more than 20%; on a tilla slope or a cut face; on colluvium, fill or slide debris, whatever its slope; in a mapped landslide zone or at a landslip location; or upslope of a cut slope or retaining wall within twice the height of the cut or wall — unless, on the slopes of the hill ranges, a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. No certificate makes an infiltration practice acceptable on a tilla slope, a cut face or fill (tilla rule). On such sites roof runoff goes to storage under the RWH credit rule, with overflow to a lined drain that discharges through a silt trap and an energy dissipator to a stable natural channel, never onto an unprotected slope. The 20% threshold is the CGWB's own: "Area with more than 20% slope has been excluded for the recharge computation" (NAQUIM, West Tripura), a resource-assessment convention that this Manual uses as the line between ground types; the mountain editions of this series use 10°, about 17.6%, and the Tripura-sourced figure is used here. The hooks are in Part X of the Building Rules (rr.88–101), which applies "only to the ULB in the hill areas", although which ULBs those are is not listed [TBC]: a soil test and slope-stability certificate for sites with "inclinations of 30° and above", for buildings above 6.5 m or over 500 m² of cover (r.90(1)(f), IS 14243); no site within 200 m of "a sinking or probable slip zone", or where there is "high water table and fully saturated soil" (r.90(1)(h)); "diversion of the natural flow of water coming from uphill side of the building away from the foundation" (r.91(r)); and the drainage measures of r.99: "proper slops not less than 1 : 60 shall be maintained all around a building", surface-water drains that "shall not be connected with any drain carrying sullage water or sewage", no covering of an open drain without the ULB's written permission and "no building shall be placed over any drain", outfalls "protected and guided", gutters and pipes to a drain, an impervious apron "not less than 0.75 m. wide" round the building, "minimum clearance of 2.1 meters between the foundation and the soak pit" and private bridges with "sufficient waterway"; with breast and retaining walls with weep holes and filters (r.100). Where the certificate of r.90(1)(f) is required, it shall also state whether the site's drainage, storage and any infiltration add water to the slope. The hazard is real: 2,032 landslip locations were reported in August 2024, with 7 deaths at Gardang near Santirbazar (as reported), and 17 landslide locations in June 2018 (as reported); the State lies in seismic zone V, and in the 1897 earthquake "Several landslide and liquefaction took place" (ADB IEE, 2020).
  • Polluted runoff. Runoff from fuel stations, workshops, industrial premises and the like, and from any drain that carries sewage, as the drains of every town in the State do (Commentary to Clause 4.1), shall not be recharged, as rule 110 itself says for industry; road and parking runoff shall be recharged, where the tilla rule allows it at all, only through a surface practice with a filter, such as a vegetated basin or trench, never directly into a pit, bore or well (Chapter 8).

On the lunga floors, water put into the ground has nowhere to go in the monsoon, and on the tilla slopes and hill ranges it goes into the slope. In the monsoon season an RWH tank is full after the first heavy rain, and on a lunga a pit sits in the water table. Treating RWH as detention would therefore credit storage that does not exist when it is needed. That is why this Manual assumes RWH tanks are full at the start of every storm. Applying the assumption to every season keeps one simple rule. The combined-tank provision (4.11.3) lets an owner build one structure, as long as the detention part is empty when the storm arrives. The RWH credit rule, the lunga rule, the tilla rule, the hill rule, the treatment of the rule 110 recharge conflict, the permeable-parking rule and the polluted-runoff rule are set by this Manual. The 2.0 m water-table screen of the lunga rule is set by this Manual from the CGWB depths above: it is the least depth at which a practice 1.0 m deep keeps the 1.0 m separation of Clause 4.11.4, and the rule 110 pits, up to 3 m deep, need more. The tilla rule's 10% slope is set by this Manual as half the CGWB's 20% recharge exclusion, its 3.0 m water-table condition is set by this Manual, stricter than the lunga rule's 2.0 m, so that a pit 2.0 m deep, within the range that rule 110 describes, keeps the 1.0 m separation of Clause 4.11.4, and the distance of twice the height of a slope, cut or wall is set as a precaution, as in the mountain editions of this series, pending guidance from a geotechnical study for the State [TBC].


4.12 High-groundwater and sandy coastal sites

4.12.1 Design groundwater level. Each site in the recent flood plains and lunga floors of the Haora, Gomati, Khowai, Dhalai, Manu, Juri, Deo, Muhuri and Feni valleys, where the CGWB's dug wells in West Tripura stood 0.22–6.64 m below ground in November 2017, central Agartala between the Haora embankment and the Katakhal and the other land behind embankments, the pukur, dighi and beel margins, and filled ponds and lunga fills, or any area where the groundwater table lies within 3 m of the surface at any time of year shall establish a design groundwater level (DGWL) for the facility. The DGWL is the seasonal high level during or after the monsoon, from:

  • (a) site piezometer readings over at least one full April–November season; or
  • (b) where (a) is not available, the higher of the CGWB or PWD (WR) record for the nearest observation well, plus 0.5 m, and the design flood level of any adjacent river, chhara, khal, pukur, dighi or beel, or of the water ponded behind any embankment or closed sluice that encloses the site.

For the flotation check of 4.12.3 at sites in the recent flood plains and lungas of the Haora, Gomati, Khowai, Dhalai, Manu, Juri and Muhuri valleys, the pukur, dighi and beel margins, filled ponds and the land behind embankments, where (a) is not available, the DGWL shall be taken as existing ground level.

4.12.2 Lined storage. Where the DGWL is less than 1.0 m below the base of a storage facility:

  • (a) the facility shall be watertight (lined or of watertight concrete), and no infiltration credit applies (Clause 4.4.4); or
  • (b) if unlined, the volume below the DGWL shall not be counted as detention, and groundwater inflow shall be added to the routed inflow.

4.12.3 Uplift and flotation. Every below-ground tank, vault, lined pond or chamber shall be checked for flotation:

  • with the facility empty;
  • with groundwater at the DGWL; and
  • for coastal sites, with groundwater also at the major-system tailwater level of Chapter 5, where that is higher.

The factor of safety against uplift, counting only permanent dead loads and ignoring wall friction unless supported by geotechnical design, shall be at least 1.2. Anchoring by ballast, toe extensions or tension piles may be used.

4.12.4 Shallow and above-ground storage preferred. On sites where the DGWL is within 1.5 m of ground, storage should be provided above ground where possible: rooftop, podium, landscape or surface storage. Deep tanks should be avoided.

4.12.5 Durability. Concrete and metal parts in contact with saline or brackish groundwater or tidal water shall be designed for the exposure class appropriate to coastal conditions under IS 456:2000. Outlet fittings, trash racks and gates shall be of stainless steel, HDPE, FRP or another corrosion-resistant material.

4.12.6 Sandy soils with deep groundwater. Where the DGWL is 1.0 m or more below the base, infiltration retention in sandy soils is encouraged. The design infiltration rate of Clause 4.4.3 applies, and the Chapter 8 requirements on pollution of shallow aquifers shall be met.

Commentary. Tripura is landlocked, so the coastal provisions of this clause, the tidal water levels of 4.12.1 and 4.12.3 and the saline exposure of 4.12.5, do not apply in the State, and no saline groundwater was reported in the sources read for this Manual [TBC]. The shallow groundwater is iron-rich instead: iron of 0.00–4.99 ppm "due to the ferruginous nature of Tipam sandstones", with pH 6.52–8.35 (CGWB, NAQUIM report, West Tripura), and iron above the permissible limit "in most of the places in the phreatic aquifer" in an older State assessment (as quoted). Iron stains and clogs outlets, screens and filters more than it attacks concrete (NEER's reading); where a site test shows aggressive groundwater, concrete and metal parts are designed for the exposure class that the test indicates under 4.12.5 (set by this Manual). The wet cases are the lunga floors and flood plains of every valley. The CGWB's dug wells in West Tripura stood 1.63–10.30 m below ground in March 2017 and 0.22–6.64 m in November 2017 (NAQUIM, West Tripura), and "The ground water table being very high" is recorded for Agartala (ADB, IEE for the Agartala City Urban Development Project, 2020). On the lunga floors, the recent flood plains, the pukur, dighi and beel margins and the land behind embankments the ground is flooded or saturated when the river is high. There an unlined tank fills with groundwater before the storm, and an empty lined tank, a detention sump or a basement can float, especially when a river in flood, a pukur at its outlet level or water ponded behind a closed sluice raises the water table beside it. The design groundwater level of 4.12.1(b) therefore takes the design flood level of the adjacent river, chhara, khal, pukur, dighi or beel, or of the water ponded behind an embankment or closed sluice that encloses the site, where that is higher than the well record; and on the recent flood plains and lungas, the pukur, dighi and beel margins, filled ponds and the land behind embankments it is taken as existing ground level for the flotation check unless piezometers show otherwise. Storage there is preferably above ground, on roofs, podiums and landscape (4.12.4), and a detention tank below ground is lined, anchored and checked for flotation when empty. On a tilla or hill site a deep tank is not preferred even where groundwater is deep, because a leaking tank on a slope is an infiltration practice by another name: storage on a slope shall be lined and watertight, and its leakage and overflow taken to a lined drain (Clause 4.11, hill rule). The April–November monitoring season of 4.12.1(a) is set by this Manual to cover the Manual's monsoon season of 1 April to 31 October and the post-monsoon high of November, when the CGWB's wells in West Tripura stood higher than in March (0.22–6.64 m below ground in November 2017, against 1.63–10.30 m in March); a reading taken in March understates the design level. The observation wells in use are the CGWB's (North Eastern Region; State Unit Office, Agartala). No State groundwater Act, groundwater authority or State observation-well network was found; PWD (WR), which runs irrigation, is named in this Manual as the State groundwater agency because groundwater irrigation would be part of its work (NEER's reading), and whether it keeps observation wells is not known [TBC]; no water-table depths for individual town sites were obtained [TBC]. The factor of 1.2, the 0.5 m allowance, the "ground level" default for the lunga floors, flood plains, waterbody margins, filled ponds and embanked land, and the exposure rule for aggressive groundwater have no direct precedent; this Manual sets them because no published site-scale seasonal groundwater depths for Tripura were found during research.


4.13 Regional detention and fee-in-lieu

4.13.1 Where permitted. In a basin covered by a Basin Stormwater Master Plan approved under Chapter 11, a development may meet all or part of its detention requirement through:

  • (a) a regional detention facility identified in the plan; or
  • (b) a fee-in-lieu paid toward restoration of pukur or tank storage identified in the plan.

4.13.2 Conditions. Regional detention or fee-in-lieu shall be accepted only where:

  • (a) the regional facility or restored tank is operational, or is funded and scheduled to be operational within 3 years. Until then, interim on-site detention is required.
  • (b) the conveyance from the site to the facility carries the 1% AEP post-development flow without increasing water levels at buildings or roads between them (Chapter 5);
  • (c) the storage credited at a tank is the flood storage only. This is the volume between full tank level (FTL) and the maximum water level the bund and surplus weir can safely hold, plus any volume below FTL that a notified operating rule commits to empty before the monsoon. Storage below FTL that is held for irrigation or supply through April to October shall not be credited.
  • (d) the tank meets Chapter 7: surveyed FTL, a documented operating rule, and a maintained surplus weir;
  • (e) the site still provides retention (Clause 4.4) and WQv treatment (Chapter 8) on site; and
  • (f) in flood-sensitive catchments, the regional facility meets the mixed-frequency rule for its whole contributing area.

4.13.3 Fee. The fee-in-lieu shall be computed as:

Fee = (detention volume required on site under Clause 4.6, m³) × (unit rate, ₹/m³, notified by the Authority)

The unit rate shall include land, construction and 10 years of maintenance. Fees shall be held in a ring-fenced basin account and spent only on the facilities named in the plan.

4.13.4 Ledger. The Authority shall keep a public ledger of:

  • detention volume credited to each regional facility;
  • volume delivered; and
  • fees received and spent.

Commentary. The Malaysian DID (2008) checklist favoured community ponds over on-site detention for sites above 0.1 ha. Studies of on-site detention show that its benefit depends on location and fades with distance downstream (Colorado State University thesis; McEnroe for Kansas City), and that a pond low in the catchment can synchronise with the main-stem peak (Water 2016). Regional storage therefore has to be sited by basin modelling, not simply aggregated.

Tripura has no tank Act and no water-body Act, and no instrument found treats a pond as storm-water storage. Its water bodies are protected as land and as public property. The Tripura Building Rules, 2017 bar the filling of any "canal, pond, water body, wetland, river lets, jhora, water source, natural spring, streams, drains, culverts" except by the Local Body with the State Government's prior approval for reasons recorded in writing (r.9(3)); the Tripura Municipal Act, 1994 vests "all public tanks, streams, reservoirs, and wells" in the Municipality (s.91), forbids a new tank without its permission (s.232), and requires the owner of a private tank used for drinking, bathing or washing to "cleanse it of silt, refuse or vegetation and to protect it from pollution by surface drainage" (s.234(1)); and the Diversion of Land Rules, 2025, made under the Tripura Land Revenue and Land Reforms Act, 1960, class pukur (পুকুর, "Tank/Pond"), dighi (দীঘি, "Large tank"), pukurpar ("Bank of tank"), dighirpar ("Bank of large tank"), beel (বিল, "Watery land") and haor (হাওর, "Big watery land") as land in their own right (Appendix-I); the 2025 procedure for diverting a water body was replaced by online self-declaration on 6 March 2026, and whether section 20 of the Act still bars such a diversion was not established, so this Manual does not state the current procedure [TBC]. The State's regional storage is of five kinds: the pukurs and dighis of the towns, of which about 65 in Agartala were cleaned and developed under city schemes (as reported) and 180 urban water bodies on government land were identified statewide for the National Green Tribunal in 2020, 30 of them prioritised (as reported); the palace and temple tanks, among them the Ujjayanta palace lakes in Agartala and Kalyan Sagar at Matabari, which are heritage and fisheries storage, not detention to be drawn down; the beels, haors and lunga wetlands of the valley floors; the Rudrasagar wetland in Sepahijala district, Ramsar site no. 1572, 240 ha, designated on 8 November 2005 by the Ramsar record or "officially designated" on 29 February 2007 by the Forest Department (both as quoted, a conflict), with a catchment of 6,052 ha (as quoted), whose ring roads, built without the Wetland Authority's permission, "reduced the water level" (CAG, Audit Report for 2021-22); and the river flood plain behind and between the embankments of PWD (WR). The Wetland Authority of Tripura was constituted on 05.09.2018 and reconstituted in 2022 (as quoted). The Dumbur reservoir is the operator's storage for power, not regional detention, and it is not a Ramsar site. Four points follow:

  • A pukur or dighi on the record may not be a working one. No inventory of the pukurs and dighis within the towns, with their beds, outlets and stage–storage relations, was found [TBC], and pukurs are being lost: ponds have been filled for housing in Barjala and Lanka Basti in Agartala (as reported), and the High Court of Tripura has heard the filling of ponds and the walling of banks at Kalyan Sagar (WP(C)(PIL) No. 2 of 2014, as quoted). A pukur or dighi is credited only after a survey shows its bed, its outlet and its stage–storage relation, and only for the storage above its outlet level; a beel or haor is never turned into a detention pond, and engineered storage is called a detention pond, never a pukur.
  • The storage is the basin's, not a site's. A pukur's flood storage is held for the whole catchment, and it can be credited to a development only through the basin stormwater master plan of Chapter 11, never by discharging a site's runoff into a pukur. Because the drains of every town carry sewage (Commentary to Clause 4.1), no new storm drain shall discharge to a pukur, a dighi or the Rudrasagar catchment without dry-weather interception and screening (Clause 8.9), which is what section 234(1) of the Municipal Act asks of private tanks.
  • A pukur behind a sluice is full when it is needed. The receiving pukur, dighi or lunga wetland of a gated or pumped outfall starts full to its outlet level whenever the outfall is closed (Commentary to Clause 3.12; Clause 5.8.5(e)); its storage below that level is not credited, and its storage above it is credited only when the routing includes the closure.
  • An embankment, sluice or drainage scheme of PWD (WR) is not regional storage. Storm water spilled to a river through an embankment uses capacity that the river needs for its whole basin, and the sluice shuts when the river is high. No Tripura embankment or drainage statute was found, so a regional facility that relies on an embankment, a sluice or a pumping station needs PWD (WR)'s written agreement, as owner, for a stated flow and level [TBC]. No formal order allocates the Akhaura canal, the Katakhal, the Haora embankments or the sluices among the Agartala Municipal Corporation, Agartala Smart City Ltd, PWD (WR), PWD (R&B) and PWD (DWS) (NEER's reading); until one is made, this Manual follows the working assignment of Chapter 1, and each town keeps a drain register giving every reach its owner, its land status, whether it is a vested municipal drain, an embankment drain or sluice, or a natural chhara or lunga, and its outfall.

The first point is the basis of condition 4.13.2(c) in Tripura. A pukur or dighi gives flood storage only above its outlet level, unless a notified operating rule commits it to be lowered before the monsoon season. The 3-year operational limit and the 10-year maintenance allowance have no direct precedent and are set by this Manual.


4.14 Simplified methods for small sites

4.14.1 Applicability. Tier B local bodies may permit the simplified method for sites of 2 ha or less outside flood-sensitive catchments. In flood-sensitive catchments, it may be used for sites of 0.5 ha or less. All other sites shall use Clause 4.6. Until Table 4.3 (Annex 4B) is published, all Tier B sites shall also use Clause 4.6.

4.14.2 Method.

  1. Read the PSD (L/s/ha) and SSR (m³/ha) for the site's zone, HSG and post-development imperviousness from Table 4.3 (Annex 4B).
  2. Required storage: V = SSR × A − V_credit (Clause 4.4.6.3).
  3. Permissible discharges: Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages.
  4. Select the low-flow orifice and upper control from the standard outlet table in Annex 4B (orifice sizes for the PSD at the stated depths), subject to the 50 mm minimum.
  5. Provide a spillway or overflow under Clause 4.9, the RWH accounting of Clause 4.11, and the safety provisions of Clause 4.15.
  6. Complete Form 4-2 (Tier B site sheet).

Table 4.3 — Tier B permissible site discharge and site storage requirement (template)

Zone (Annex 2A) HSG Imperviousness PSD 2-yr (L/s/ha) PSD 100-yr (L/s/ha), standard PSD 100-yr (L/s/ha), flood-sensitive SSR (m³/ha), standard SSR (m³/ha), flood-sensitive
TR-Z1 Western valley: TR-A Agartala–Sonamura valley (Agartala–Jirania–Mohanpur–Bishalgarh–Sonamura); from the Agartala governing cell and the floors of Clause 2.3.6(g) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
TR-Z2 Central valleys: TR-B Khowai valley (Khowai–Teliamura); from the governing cell 6 km south of Khowai and the floors of Clause 2.3.6(g) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
TR-Z2 Central valleys: TR-B1 Dhalai valley (Ambassa–Kamalpur); from the governing cell of TR-B and the floors of Clause 2.3.6(g) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
TR-Z3 Northern valleys: TR-C Manu–Juri–Deo valleys (Kailashahar–Kumarghat–Dharmanagar–Panisagar–Kanchanpur); from the Kailashahar governing cell, not below 377.2 mm in 24 hours at 1% AEP within 25 km of Kailashahar (Clause 2.3.6(h)), and the floors of Clause 2.3.6(g) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
TR-Z4 Southern valleys: TR-D Gomati valley (Udaipur–Amarpur–Karbook); from the Udaipur governing cell and the floors of Clause 2.3.6(g) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
TR-Z4 Southern valleys: TR-D1 Muhuri–Feni south (Belonia–Santirbazar–Jolaibari–Bagafa–Sabroom); from the Sabroom governing cell, with the 1% AEP 24-hour depth not below 490 mm (Bagafa, Clause 2.3.6(h)), and the floors of Clause 2.3.6(g) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
TR-Z5 Hill ranges: TR-E Hill ranges (Baramura–Atharamura–Longtharai–Sakhan–Jampui); the higher of the rows of the valley sub-areas on either side of the range (Clause 2.3.6(c)) C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]

Worked example (illustrative — not design values).

A 0.4 ha residential layout in a Tier B Municipality, in a flood-sensitive catchment, with about 80% directly connected impervious area (area-weighted post-development CN about 92). Suppose Table 4.3 had been computed and gave the per-hectare equivalent of the Clause 4.6.7 example:

  • PSD 100-yr = 356 / 2.0 = 178 L/s/ha
  • SSR = 2,913 / 2.0 ≈ 1,460 m³/ha
  • PSD 2-yr ≈ 17 L/s/ha

Then:

  • Storage: V = 1,460 × 0.4 = 584 m³. C_R = 0, so there is no retention credit.
  • 100-yr release: 178 × 0.4 = 71 L/s.
  • 2-yr release: 17 × 0.4 = 7 L/s. At about 1 m head this needs a low-flow orifice of about 60 mm, above the 50 mm minimum (Clause 4.8.2).
  • Layout options:
    • a 400 m² underground tank 1.5 m deep; or
    • 250 m² of podium storage at 0.3 m (75 m³) plus a 350 m² tank 1.5 m deep (525 m³).
    • Rooftop storage at 150 mm over 1,200 m² of roof (180 m³) could replace part of the tank.
  • RWH sumps are additional, and are assumed full (Clause 4.11).

Commentary. Australian councils use permissible site discharge and site storage requirement tables in the same way (Sydney Water OSD guide; the Upper Parramatta River Catchment Trust handbook listed SSR of about 455 m³/ha). The illustrative SSR here, about 1,460 m³/ha, is much larger. That is the expected effect of combining a mixed-frequency cap with mandatory 48–72-hour storms at AMC III. MSMA 2 in Malaysia offers a similar simplified OSD method for sites under 5 ha. The MARC policy supplement offers smaller Kansas City municipalities adoptable alternatives within the regional standard; Clause 4.14 follows that model for Tier B.

4.14.3 Fixed-coefficient route. As an alternative to Clauses 4.6 and 4.14.2, the designer of any site of 1 ha or less, under any Approving Authority and in any catchment, may size detention by Clauses 4.14.4 to 4.14.7. The route shall not be used where:

  • (a) the site counts tank or waterbody storage in its design (Chapter 7);
  • (b) any part of the site lies within a waterbody setback (Chapter 7); or
  • (c) the site drains to a tank cascade whose storage is counted in a downstream design.

The route sets the release caps by fixed coefficients and does not need Table 4.3. It may therefore be used before Annex 4B is published. Retention (Clause 4.4), drawdown (Clause 4.7), outlets (Clause 4.8), the spillway (Clause 4.9), the downstream and tailwater checks (Chapter 5) and water quality (Chapter 8) still apply.

4.14.4 Release caps. Two caps apply at each point where runoff leaves the site:

Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A

where Q_cap is in L/s; A is the site area (ha); i_10 and i_2 are the 10% AEP (10-yr) and 50% AEP (2-yr) rainfall intensities (mm/h) for a 15-minute duration at the site, from the sources of Chapter 2, with the climate factor of Clause 2.8; and C_10 and C_2 are the fixed coefficients of Table 4.3A for the site's hydrologic soil group (Clause 3.7). For a site with more than one soil group, the coefficients are area-weighted.

Table 4.3A — Fixed release coefficients (provisional)

Hydrologic soil group C_10 C_2
A (sandy, well drained) 0.05 0.02
B 0.08 0.03
C 0.15 0.08
D (clay, poorly drained) 0.25 0.15

Q_cap,10 is the maximum release for every storm up to and including the 1% AEP (100-yr) storm, in every catchment. Q_cap,2 is the maximum release for the 50% AEP (2-yr) storm. Where a cap is smaller than the discharge of a 50 mm orifice at the corresponding stage, the 50 mm orifice is deemed to comply (Clause 4.5.5.1).

4.14.5 Storage. The detention storage V (m³) is the larger of V_100 and V_2, each the largest over the durations d of Clause 2.5.2 (1 to 72 hours):

V_100 = max over d of [ 10 × C_v × P_100(d) × A − 1.8 × Q_cap,10 × d ]

V_2 = max over d of [ 10 × C_v × P_2(d) × A − 1.8 × Q_cap,2 × d ]

where P_100(d) and P_2(d) are the 1% and 50% AEP rainfall depths (mm) for duration d (hours), with the climate factor; and C_v is the post-development volumetric coefficient: the composite C of Table 3.2 (upper half of each range), multiplied by Cf of Table 3.3 for the 1% AEP. For durations of 12 hours or more, C for every pervious surface shall be taken as not less than 0.50. The factor 1.8 assumes an average release of half the cap over the storm (3.6 × 0.5).

4.14.6 Outlet. The outlet shall be a two-stage control: a low-flow orifice that passes Q_cap,2 when the storage holding V_2 is full, and an upper orifice or weir that limits the total release to Q_cap,10 at the top of V. The outlet table of Annex 4B may be used once it is published.

4.14.7 Retention. The retention volume of Clause 4.4 is provided in addition to V. No retention credit (Clause 4.4.6) is taken under this route.

Figure 4.3 — Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic) Schematic. Left: cumulative inflow volume against storm duration for the 1% and 50% AEP storms, with straight release lines 1.8 x Q_cap x d; the storage is the largest vertical gap. Right: two-stage outlet. Not to scale. Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3–4.14.7) — schematic, not to scale 0 12 24 36 48 60 72 Storm duration d (h) Volume (m³) V_100 = largest gap V_2 = largest gap 1% AEP inflow 10·C_v·P_100(d)·A Release line 1.8·Q_cap,10·d 50% AEP inflow 10·C_v·P_2(d)·A Release line 1.8·Q_cap,2·d Dots: durations of Clause 2.5.2 (1, 2, 3, 6, 12, 24, 48, 72 h). Pervious C ≥ 0.50 for d ≥ 12 h. Two-stage outlet (Clause 4.14.6) Top of V Top of V_2 Overflow / spillway (Clause 4.9) Upper orifice or weir: total release ≤ Q_cap,10 at top of V Low-flow orifice (≥ 50 mm): passes Q_cap,2 at top of V_2 Retention (Clause 4.4) is provided in addition; no retention credit (Clause 4.14.7) Q_cap,10 = 2.78 × C_10 × i_10 × A ; Q_cap,2 = 2.78 × C_2 × i_2 × A ; (L/s; A in ha; i in mm/h) C_10, C_2 from Table 4.3A by soil group; i_10, i_2 for a 15-minute duration with the climate factor (Clause 2.8) V = max(V_100, V_2); V_T = max over d of [ 10 × C_v × P_T(d) × A − 1.8 × Q_cap × d ] (m³) ; 1.8 = 3.6 × 0.5 (average release of half the cap)

Figure 4.3 — Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3 to 4.14.7): the release caps Q_cap,10 and Q_cap,2 from Table 4.3A; the storage V as the largest gap, over the durations of Clause 2.5.2, between the cumulative inflow 10·C_v·P(d)·A and the release line 1.8·Q_cap·d, for the 1% and 50% AEP storms; and the two-stage outlet that passes Q_cap,2 at the top of V_2 and Q_cap,10 at the top of V. Schematic, not to scale. Original drawing for this Manual, adapted from the rainfall mass-curve (inflow minus outflow) storage concept and the single-coefficient peak cap of the PUB Code of Practice on Surface Water Drainage, 7th ed. (cl. 7.1.5).

Commentary. The fixed-coefficient route follows Singapore, which caps the peak runoff from every development of 0.2 ha or more with one runoff coefficient, C = 0.55, applied to the 10-yr storm (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5, Addendum No. 3, 2025). It is quick to apply and quick to check: the cap needs only the site area, the soil group and two intensities. PUB's 0.55 is not used here, because Singapore's baseline is the existing urban drainage system, while this Manual's baseline is greenfield land (Clause 4.5.1.2). The coefficients of Table 4.3A are set by this Manual from the greenfield curve numbers of Clause 3.3 (CN 39, 61, 74 and 80 for soil groups A to D). They are the ratios of runoff to rainfall that those curve numbers give for 1-hour depths typical of the valley floors of Tripura, rounded down. They are therefore provisional. The State Stormwater Technical Committee shall confirm or revise them against NIH-DHAARA values for each zone when it issues Annex 4B.

The route is deliberately stricter than the full method, so that simplicity costs the developer storage rather than costing the people downstream. The 100-yr release is held to about the greenfield 10-yr peak everywhere, which is the flood-sensitive rule of Clause 4.5.3; the storage assumes the outlet releases only half the cap on average; pervious ground is assumed wet in long storms; and no retention credit is taken. A designer who wants a smaller tank can use the full method of Clause 4.6. The storage formula is the rainfall-mass (inflow minus outflow) method. Clause 3.4.2 otherwise forbids rainfall-based peak methods for storage, because they ignore the shape of the hydrograph; this route is a stated exception because its conservative assumptions cover that error for small sites, and the 24- to 72-hour durations are always checked.


4.15 Safety, fencing and multi-use

4.15.1 Depth limits for publicly accessible storage. Where the public has access to a storage area (parks, playfields, open space, school grounds):

  • (a) maximum depth in the 10% AEP storm: 0.45 m;
  • (b) maximum depth in the 1% AEP storm: 1.2 m, except in a fenced zone under 4.15.3;
  • (c) side slopes: no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter for escape; and
  • (d) no vertical drop greater than 0.3 m within the storage area or at its edge.

4.15.2 Wet basins. Permanent pools shall have:

  • a safety bench at least 3 m wide, no more than 0.3 m below the normal water level; and
  • an emergent planting fringe that deters entry.

4.15.3 Fencing. A fence at least 1.2 m high, of a non-climbable design with a lockable gate, is required around any part of a storage that:

  • has a vertical wall or headwall drop greater than 0.6 m;
  • exceeds 1.2 m depth in the 1% AEP storm with slopes steeper than 4H:1V; or
  • contains an outlet structure with an opening larger than 300 mm that is not grated.

4.15.4 Outlets. Every inlet and outlet opening larger than 300 mm accessible to the public shall be fitted with a grate or rack. The grate shall be designed so that a person pinned against it can escape: low approach velocity, inclined, with a large open area.

4.15.5 Signs and depth markers. Every publicly accessible storage shall have signs in Bengali and English stating that the area floods during rain, and a depth marker at the deepest point.

4.15.6 Confined spaces. Underground tanks shall have lockable covers. They shall be marked as confined spaces, and the maintenance declaration (Chapter 10) shall state the entry procedure.

4.15.7 Vector control. Dry storage shall drain completely (Clause 4.7) and have no low points that pond for more than 72 hours. Wet basins shall meet Clause 4.10.7.

Commentary. The numeric limits in Clause 4.15 have no single direct precedent. They are drawn from common international practice, for example KC APWA 5600 (2006), which required at least a quarter of a dry-pond perimeter at 5:1 or flatter, a 20 ft (6 m) clearance from property lines and a 15 ft (4.6 m) maintenance strip. They are made somewhat stricter here because multi-use storage on open space land and in schools will be used by children during the monsoon. Standing water in dry basins is a mosquito-breeding risk, so complete drainage (Clause 4.15.7) is a public-health requirement, not an amenity.


4.16 Basis: why peak matching alone fails

Commentary. This section has no requirements. It records why this chapter requires release below pre-development rates, retention, long-duration checks and a downstream analysis, rather than simple peak matching.

  1. Timing. Detention lowers a site's peak but stretches its hydrograph (Figure 4.1). Downstream, the stretched releases from many sites overlap with each other and with the main-stem peak. In Denver's study, ten basins each releasing 100% of the historic 100-yr peak produced 106% of the historic peak at the outlet. Only releasing 90% at each site brought it to 97% (UDFCD memo, 2012). A Colorado State University thesis found that location-blind on-site detention "can actually increase peak flows above post-development peaks". An optimisation study found that a downstream pond performed worse than upstream ponds because its outflow synchronised with the main stem (Water 2016, 8(7):290).
  2. Volume. Detention does not remove volume. In the illustrative example, the post-development 100-yr storm produces about three times the runoff volume of the pre-development 10-yr storm (Clause 2.11). Only retention, or storage that empties to somewhere other than the receiving drain, reduces volume.
  3. Scale. Kansas City modelling (McEnroe, 2005) found that uniform 3 cfs/ac control reduced Q100 by 36% in a 200-ac watershed. With the same control everywhere, Q100 still rose by 40% at 14 sq mi, and the benefit faded beyond about 1–2 sq mi. The KC committee concluded that "'match existing' can harm streams" (MARC Evolution deck). Georgia makes a ten-percent downstream analysis mandatory for the same reason: "Due to peak flow timing and runoff volume effects, some structural practices fail to reduce discharge peaks to pre-development levels downstream" (GSMM 2016).
  4. Design-storm dependence. An Australian study of 20 real on-site detention systems found that designs using even ten temporal patterns "cannot reliably produce an OSD system design that will always be effective" under real rainfall (Water Science and Engineering, 2019). This is why Clause 4.6.3 routes the full duration matrix rather than one critical storm.
  5. Closed outfalls. In Tripura the closed outfall is not the exception but the normal monsoon case. Central Agartala lies between the Haora embankment and the Katakhal, lower than the land round it, and when the two rivers run high "Several pumps have been provided to lift the water out of the city during these seasons" (ADB, IEE for the Agartala City Urban Development Project, 2020); on 22 August 2024 the Haora stood at 12.42 m against a CWC danger level of 10.70 m (as reported; datum not stated [TBC]). Kailashahar on the Manu and Belonia on the Muhuri sit behind embankments, and they, Sonamura and Udaipur on the Gomati stand on rivers that all cross into Bangladesh, with no Indian control downstream and no level record that crosses the border, and the Gomati below the Dumbur reservoir also carries the reservoir's releases (Chapter 5). The flood of August 2024 ran from 19 to 24 August, six days (as reported), so a storm that falls on a closed outfall can be followed by days of high river. What fills behind the closed gate is storm water mixed with sewage, because Agartala's sewers serve only its North Zone and the State's 19 other urban local bodies treat none of their sewage (State affidavit of 06.07.2026 in NGT OA 606/2018; Commentary to Clause 4.1). No record of how long any sluice stays shut, no operating rule for the Katakhal sluice and no design capacity for the city's pumps were found [TBC]; Chapter 5 sets the river level and the closure to be assumed (Clause 5.8.5: the whole of the 72-hour design storm, and a further 72 hours where no stage record exists). The illustrative site of Clause 4.6.7 and Annex 4C, a lunga between tillas on the edge of Agartala, is the instructive Tripura case: the lunga rule of Clause 4.11 gives it no infiltration, and its outfall is locked when the river is high. Its 10- and 100-yr 24-hour depths of 200 and 350 mm are invented, but plausible against the NIH-DHAARA Agartala cell's 225.4 and 360.7 mm, which govern sub-area TR-A (Clause 2.3.6(c)); they are a little below those values, and the example must not be used for design. A perfectly orificed basin behind a closed outfall simply fills. No release-rate rule can fix that; it is handled by the outfall-closed check of Chapter 5.

The response in this Manual is layered:

  • release below pre-development (Clause 4.5);
  • retain the frequent storms (Clause 4.4);
  • route long monsoon storms (Clause 4.6.3);
  • prefer regional storage in the pukur system (Clause 4.13); and
  • check downstream and at the outfall (Chapter 5).

Kansas City's own history shows the price. On a test site, peak matching needed 3.0 ac-ft of storage and the 2011 comprehensive criteria needed 4.9 ac-ft (MARC Evolution deck). Over-detention costs more storage. That is the cost of protecting the catchment rather than only the site boundary.


4.17 Submittal requirements

Every site runoff-control submittal shall include a Site Runoff Control Report (Form 4-1) containing:

  1. the Design Rainfall Sheet (Form 2-1) and the hydrology inputs (Chapter 3);
  2. the evidence for the order of measures under Clause 4.3.1;
  3. the RRV computation, infiltration tests, groundwater evidence and drawdown calculation (Clause 4.4);
  4. the retention credit computation (Clause 4.4.6);
  5. the release-rate criterion applied, standard or flood-sensitive, with the Annex 4A map extract (Clause 4.5);
  6. a results table in the format of Clause 4.6.7 for every AEP and duration, with the governing case highlighted;
  7. stage–storage and stage–discharge tables and plots, and inflow/outflow hydrographs for the governing cases;
  8. the drawdown calculation (Clause 4.7);
  9. outlet details, including orifice sizes and levels, trash racks and anti-vortex devices (Clause 4.8);
  10. the spillway or overflow calculation, freeboard and hazard classification, and the geotechnical report where required (Clause 4.9);
  11. the RWH and detention accounting, with tank sections showing zone levels (Clause 4.11);
  12. the design groundwater level and flotation check (Clause 4.12);
  13. the downstream and tailwater report (Chapter 5, Form 5-1); and
  14. the safety provisions (Clause 4.15) and the draft maintenance declaration (Chapter 10).

Tier B sites using Clause 4.14.2 shall submit Form 4-2 in place of items 6 and 7. Sites using the fixed-coefficient route (Clause 4.14.3) shall submit Form 4-3 in place of items 6 and 7.


References (chapter)

Annexes and forms

Annex / Form Content
4A Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map
4B Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A)
4C Worked example (Tier A) with full routing tables
Form 4-1 Site Runoff Control Report
Form 4-2 Tier B Site Sheet
Form 4-3 Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7)