Chapter 7Waterbodies, Ponds (Pukurs) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (pukur) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Tripura, a landlocked State, means the beels and haors of the valley floors (natural wetlands: the land records' "Watery land" and "Big watery land"), the marshy and swampy land (dhepa, utla) of the valley floors and flood plains, Rudrasagar (Ramsar site no. 1572), the land ponded behind embankments when their sluices close, and any wetland notified under the 2017 Rules (none was found notified);
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Tripura Building Rules, 2017 and the Tripura Municipal Act, 1994 under which they are made, the Tripura Urban Planning and Development Act, 2018 and the Master Plans and Local Planning Area notifications made under it, the Tripura Land Revenue and Land Reforms Act, 1960 and the Tripura Land Revenue and Land Reforms (Diversion of Land) Rules, 2025 made under it, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (nadi), such as the Haora, the Gomati, the Khowai, the Dhalai, the Manu, the Juri, the Deo, the Longai, the Muhuri, the Feni and the Burima (Bijoy), all of which flow on into Bangladesh; khal (a canal or channel), such as the Katakhal, the Akhaura canal and the Kalapania Khal; chhara (a stream, the land records' "Streams"), such as the Nagichara and the Kalapani Charra, and the other natural channels of Agartala, such as the Bangeshwar Gang and the Debta Gang; nala (a water channel), doba (a ditch) or drain; the flow path of a lunga (the flat land between tillas); pukur (a tank or pond); dighi (a large tank); beel (watery land: a natural wetland) or haor (big watery land); marsh or swamp (dhepa, utla); the land ponded behind an embankment (bandh) when its sluice is closed; reservoir, such as the Dumbur reservoir of the Gumti hydel project; retention pond or basin built for flood storage; abandoned brick-field pit kept as a water body; supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (pukur) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (overflow, outlet or spillway, or the control at the head of the nala, khal or sluice by which a pukur, dighi or beel drains) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by PWD (WR) and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder chhara, nala or khal) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, regulator or flap gate, including a sluice through a river embankment (bandh)) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Tripura terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Pukur | A dug tank or pond: পুকুর, "Tank/Pond", a class of land in Appendix-I of the Diversion of Land Rules, 2025 (item 9); "n. a pond, a tank, a pool" (Biswas, Samsad Bengali-English Dictionary, p. 653) (Annex 7E). First used in this Manual as "pukur (Bengali পুকুর: a tank or pond — the land records' 'Tank/Pond'; plural pukurs)". Bengali marks the plural with -gulo or -guli, so the English plural "pukurs" is a convention of this Manual. A pukur with an outlet pipe, sluice or overflow is a tank under Clause 7.2, and its FTL is the crest of that outlet or overflow, found by survey; a pukur with no outlet has its FTL at the level at which it would spill to the ground around it, found by survey. Historic, palace and temple tanks keep their own names. Engineered storage built under this Manual is a "detention pond", never a pukur. |
| Dighi | A large tank: দীঘি (also written দিঘি), "Large tank" (Appendix-I, item 14); "n. a large and deep tank or pond" (Biswas, pp. 499, 501). First used as "dighi (Bengali দীঘি: a large tank)". Used for named large tanks, such as Banamalipur Dighi in Agartala; the tank clauses apply to a dighi as to a pukur. |
| Pukurpar; dighirpar | The bank of a tank: পুকুরপাড়, "Bank of tank" (Appendix-I, item 10), and দীঘিরপাড়, "Bank of large tank" (item 31), each a class of land of its own. Where the land records show a pukurpar or dighirpar plot, that plot lies within Zone 1 of its pukur or dighi, whatever the width given by Clause 7.4.3, and no fill, wall or building is placed on it under this Manual. This rule is set by this Manual. |
| Doba | A ditch: ডোবা, "Ditch" (Appendix-I, item 11); "n. a pit full of water; a small pool of water" (Biswas, p. 436). In Tripura a doba is recorded as a ditch, never as a pukur, and it is a channel or depression under this chapter, not a tank; a doba that holds water is recorded in the inventory (Annex 7A). |
| Beel; haor | A natural wetland: বিল, "Watery land" (Appendix-I, item 13), "… a fen; a marsh" (Biswas, p. 770); and হাওর, "Big watery land" (item 12), "n. an extensive marsh or quagmire or fen" (Biswas, p. 1050, as হাওড়). A beel or haor that drains through a khal, nala or sluice is a tank under Clause 7.2: its FTL is the crest of the control at the head of its outfall, or the sill of its sluice, found by survey, and its MWL is set under Clause 7.2 with the outfall closed where Clause 5.8.5 so requires. A beel or haor with no outlet is a wetland under Clause 7.12. A natural wetland is never called a pukur. The marshy and swampy land of the land records (ঢেপা, dhepa, "Marshy land"; উতলা, utla, "Swampy land") is a marsh under Clause 7.12. |
| Chhara; jhora | A chhara (ছড়া) is a stream, "Streams" in Appendix-I (item 35); the dictionary gives the word no such sense, so this Manual cites the land records. The Building Rules call a hill stream a jhora (rr.5, 9, 90 and 99), and this Manual keeps "jhora" when it quotes them and writes "chhara" elsewhere. Every chhara, khal or other channel that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name and whether it is lined, piped or covered; a built drain or nala that carries a chhara's flow along the chhara's former line is treated as that chhara. A chhara from the tillas or the hill ranges carries silt and debris in flood: its inlets and culverts take the racks, bulking and blockage of Clause 6.3.6(f) to (h), and its top of bank is the edge of its active bed where that is wider than the edge of the 50% AEP flow. These readings are set by this Manual. |
| Lunga; lunga flow path | A lunga (লুঙ্গা) is the flat land between tillas (Appendix-I, item 5; not in Biswas), the CGWB's "low lands ('loonga') of Holocene terrace" between "10 – 30 m high mounds with gullies in between them". The lowest line of a lunga, along which water runs in a storm whether or not a channel is cut, is its flow path: where it drains 8 ha or more it is a natural channel under Clause 7.4.1(b), its top of bank is the edge of the 50% AEP flow, and filling it is a loss of conveyance and storage under Clause 7.6.4. No infiltration is credited on a lunga floor (Clause 4.11, lunga rule). These readings are set by this Manual. |
| Tilla | A low hill or terrace upland: টিলা, "Hillock" (Appendix-I, item 15); "n. a mound, a hillock, a knoll, a hummock" (Biswas, p. 424). Tilla tops and slopes take the tilla and hill rules of Clause 4.11; a tilla cut is earthwork under Clause 8.12. |
| Khal; nala | A khal (খাল, "Khal", Appendix-I, item 34; "n. a canal; a strait; a channel …", Biswas, p. 281) is a canal or channel, such as the Katakhal, the Akhaura canal and the Kalapania Khal; a nala (নালা, "Water channel", item 7) is a natural or built channel; the land records class a drain in a municipal area separately (ড্রেন, "Drain in Municipal area", item 8). A khal that carries a natural channel's flow is a natural channel under Clause 7.4.1(b). |
| Embankment (bandh); sluice | An embankment is a river or pond embankment: বাঁধ, "Embankment" (Appendix-I, item 30); "n. a dam; a breakwater … (geog.) a dyke" (Biswas, p. 735). A sluice is a gated outlet through an embankment, such as the Katakhal double-barrel sluice. No Tripura statute on embankments or drainage was found [TBC]; PWD (WR) holds them as owner. |
| Ponded area behind an embankment | The land inside an embankment-protected area that is flooded when its sluices are closed or its pumps stop, up to the level reached in the outfall-closed case of Clause 5.8.5(a) and (b) for the 1% AEP storm. It is recorded in the inventory (Annex 7A), and that level is part of the 1% AEP flood extent of Clause 7.3.4; Zone 1 applies to the pukurs, dighis, beels and channels within it, not to the ponded area as a whole. This definition is set by this Manual. |
| Recorded waterbody | A pukur, dighi, beel, haor, chhara, khal, nala, lunga flow path, river, marsh or ponded area shown in any source of Clause 7.3.3(a): a plot recorded in one of the water classes of Appendix-I, the 2020 list of urban water bodies, a Master Plan or Local Planning Area map, PWD (WR)'s records or a town's drain register. A recorded waterbody is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved; the approval of the Local Body and the State Government under rule 9(3) of the Building Rules is still required. This definition and rule are set by this Manual. |
| Boundary of a pukur, dighi or beel | For this Manual, the boundary of a pukur, dighi or beel under Clauses 7.3.3 and 7.13.1 is the largest of its plot boundary in the land records, its surveyed FTL, and the outer edge of its water in the season of 1 April to 31 October shown by dated imagery or survey of recent years; a recorded pukurpar or dighirpar plot lies in Zone 1. This reading is set by this Manual. |
| Reference lines for setbacks | Three lines are used, and the setback that reaches furthest from the water governs: (a) the rules' line, the "river bank" of rule 9(4), the "outside edge" of a water course of rule 90(1)(i) or the side of a tank of rules 4(1)(e) and 90(1)(m), with the distance of that rule measured from it; (b) the FTL of a pukur, dighi or beel or the top of bank of a channel, with Zone 1 of Clause 7.4.3 measured from it; and (c) the 1% AEP flood extent of Clause 7.3.4, with the 10 m of Clause 7.4.4 added. The rules define neither the river bank nor the outside edge; where either cannot be identified on the ground it is taken as the top of bank. This rule is set by this Manual. |
| Palace-era and temple tanks | The Ujjayanta palace lakes, the tanks of the temples, such as Kalyan Sagar at Matabari, and the other historic tanks are existing storage with heritage and fisheries constraints. Their storage is modelled as it is, at FTL at the start of a storm, and is not drawn down, reshaped or counted under Clause 7.7 without the custodian's written consent and the permissions of Clause 7.12 where they apply. This rule is set by this Manual. |
| Private land and the TTAADC area | Land in Tripura is recorded by district, sub-division, revenue circle and mouza; some is government (khas) land. Zone 1 land that is private is reserved in the Master Plan or secured by a written agreement with the owner, and is not taken; in the TTAADC area, it is secured only through the District Council, whose land law was not researched [TBC]. This rule is set by this Manual. |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with PWD (WR) and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Agartala Municipal Corporation or another Municipal Council or Nagar Panchayat (for the public tanks, streams, reservoirs, drains, channels and water courses that vest in it under section 91 of the Tripura Municipal Act, 1994 "unless the State Government otherwise directs by a notification", and for the private tanks whose owners it may require to cleanse and protect them under section 234), Agartala Smart City Ltd (for the works it builds, among them the Ujjayanta palace lakes and the MBB College lake, until they are handed over [TBC]), TUDA (for the water bodies of the layouts it approves in a Local Planning Area), PWD (WR) (for the river embankments, the sluices, among them the Katakhal double-barrel sluice, the anti-erosion works and its minor-irrigation dams), PWD (R&B) or NHIDCL (for the drains and culverts of their roads), PWD (DWS) (for drainage pump houses and sewage treatment plants), the operator of the Gumti hydel project (for the Dumbur reservoir; TSECL, as reported), the Forest Department or the Fisheries Department (for Rudrasagar, whose managing agency the sources give differently), the Revenue Department (for government (khas) land recorded as pukur, dighi, beel, haor, chhara or other water), the Gram Panchayat or Village Committee, a religious institution (for its tank), a private owner (for a pukur or dighi on private land), the District Council in the TTAADC area (not researched [TBC]), the Wetland Authority of Tripura (for a notified wetland; none was found notified under rule 4 of the 2017 Rules), or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) land records of the Revenue Department, kept by district, sub-division, revenue circle and mouza (the plot numbering was not confirmed [TBC]), with each plot's land class under Appendix-I of the Tripura Land Revenue and Land Reforms (Diversion of Land) Rules, 2025, among them pukur ("Tank/Pond"), pukurpar ("Bank of tank"), dighi ("Large tank"), dighirpar ("Bank of large tank"), doba ("Ditch"), beel ("Watery land"), haor ("Big watery land"), chhara ("Streams"), lunga ("Flat lands between tillas"), khal ("Khal"), nala ("Water channel") and bandh ("Embankment"), including government (khas) land recorded as water; the list of 180 urban water bodies on government land that the ULBs geo-tagged for the National Green Tribunal in 2020, of which 30 were prioritised (as reported); the Agartala Municipal Corporation's zone-wise affidavit on the encroachment of water bodies before the High Court of Tripura (2017, as cited); PWD (WR)'s records of its embankments, sluices and anti-erosion works and its mapping of the Haora flood-plain zones; the land-use maps of the Master Plan for the Agartala Planning Area 2045 (text not read [TBC]) and the layouts of the Local Planning Areas; the records of the Wetland Authority of Tripura for Rudrasagar; in the TTAADC area, the land records of the District Council (not researched [TBC]); and each town's drain register (Chapter 6);
- (b) PWD (WR) and Gram Panchayat or Village Committee tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where PWD (WR) records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. Tripura has no flood line in law. No flood-plain zoning Act was found, either in the High Court of Tripura's index of the State's Acts or elsewhere (NEER reading), and press reports of the Union's position say that only four States have enacted such a law, without naming them (as reported). The Building Rules count among their Natural Hazard Prone Areas the "flood prone areas in river plains (unprotected and protected) area indicated in Flood Atlas of India prepared by the Central Water Commission" and areas flooded "under conditions of heavy intensity rains, inadequate drainage, etc. as identified through local surveys in the Development Plan of the area" (r.2(44)), and they let the Local Body, with the State Government's prior approval, allow a "flood plain area to be filled up" (r.9(3)); no map made under either was found [TBC]. PWD (WR) has mapped flood-plain zones on the Haora for the National Green Tribunal, naming Khayerpur, Kashipur, Baldakhal, Aralia, Jogendranagar and Joynagar (Dashamighat) (State affidavit in O.A. 673/2018); the map, its return period and its legal status were not found [TBC]. The Master Plan for the Agartala Planning Area 2045 was declared final by the UDD on 24 February 2026 with "statutory zoning and development control regulations" (as reported), but its text was not read [TBC]. The levels that exist are the river gauges', and they disagree: for the Haora at Agartala, danger levels of 10.48 m, 10.50 m (the State's gauge at Jahar Bridge) and 10.70 m (CWC), and highest flood levels of 11.08 m (2004), 12.14 m (24 June 2004), 12.4 m (11 August 2017) and 12.42 m (22 August 2024) (all as reported, the CWC values as transcribed by SANDRP; probably different gauges or datums, and no datum is stated for any of them [TBC]); and for the Manu at Kailashahar a CWC highest flood level of 25.79 m (7 June 1993), passed at 25.95 m on 13 June 2018 (as reported; Chapter 5). Flood plains already hold public works: the National Green Tribunal found that the 5 MLD sewage treatment plant at the Kalapania Khal and the 8 MLD plant on the Haora bank lie near or on the flood plain, which "may lead to flooding of the STP and flowing of untreated sewage in the river during the monsoon" (order of 13.04.2026, as quoted in the State's affidavit of 06.07.2026 in O.A. 606/2018). The plinth rule sets the plinth, with respect to the crest of the road, "in no case … at a height less than 60 centimeters" (r.55), with no flood level in it. The land records' water classes and PWD (WR)'s records of its embankments and sluices are the best record of where water is meant to be. Clause 7.3.4 lets the Authority adopt 1% AEP maps; a map prepared under this Manual is offered as an input to the local surveys of rule 2(44) and to the Master Plans, not as a notification under either. Until maps are adopted, the Applicant produces the 1% AEP extent for larger and flood-sensitive sites with the outfall closed as Clause 5.8.5 requires, because behind an embankment, and in Agartala's saucer, the flood extent is set by the ponding behind a shut sluice or a stopped pump as often as by the river. Levels shall be stated to one datum (Clause 7.3.5) and tied to the CWC or State gauge, naming the gauge with every value. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual along every natural channel draining 8 ha or more, chharas, khals and lunga flow paths included, and round every pukur, dighi and beel (wider lines govern under Clause 7.4.5 where they bind: the Tripura Building Rules 2017 regulate building, without forbidding it, in the "zone of river (within 15 metres from river bank)" and along water bodies of more than 1000 acres (r.9(4)); they forbid a site within 5 m of the outside edge of a water course only in the ULBs of the hill areas (r.90(1)(i)); near a tank they set only a drainage duty within 5.00 m (r.4(1)(e)) and, in the hill areas, protective works within 5.0 m and within 30 m of a jhora (r.90(1)(m)); no distance from an embankment was found; and no flood-plain zoning law has been enacted; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or a condition of PWD (WR) as the owner of an embankment, sluice or anti-erosion work (no statute on embankments was found [TBC]); a condition of the Local Body's approval, with the prior approval of the State Government, to fill a water body under rule 9(3) of the Tripura Building Rules, 2017; a condition of a decision of the District Magistrate and Collector on the diversion of a water body under the Tripura Land Revenue and Land Reforms (Diversion of Land) Rules, 2025, as amended in 2026 (the procedure after March 2026 was not established [TBC]); the views or permission of the Wetland Authority of Tripura for a work in or next to Rudrasagar or a notified wetland; a line of the Master Plan for the Agartala Planning Area 2045 or another Master Plan; or a direction of the High Court of Tripura, the National Green Tribunal or the Supreme Court sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Tripura's distances from water are in its building rules, the Tripura Building Rules, 2017 as amended to the Fifth Amendment of 2025, which apply only in the Urban Local Bodies and the Local Planning Areas. Rule 9(4) sets a regulated "zone of river (within 15 metres from river bank)", and the same along "other water fronts of large water bodies (more than 1000 acres)", in which a building may stand but is limited to 5.00 m in height (6.50 m on stilts), 20.00 m in length along the water and 200.00 m² of covered area, with a clear gap of 50.00 m between buildings: it is not a no-build line. The only no-build distance from water in the rules is in the ULBs of the hill areas, where no site may lie "within five meters in any direction of the outside edge of such water courses" (r.90(1)(i)); there, within 5.0 m of a tank, reservoir, jhora, spring, water source or natural drain, and where the site is within 30 m of a jhora, the owner takes protective measures (r.90(1)(m)); and in the plains, within 5.00 m of a tank, the owner prevents drainage from the building passing into it (r.4(1)(e)). Rule 9(3) forbids the filling of any "canal, pond, water body, wetland, river lets, jhora, water source, natural spring, streams, drains, culverts" except by the Local Body with the prior approval of the State Government. The 15 m floor equals the width of the r.9(4) zone but keeps all building out of it; it is three times the 5 m of the hill rule; and it puts a corridor round every pukur, dighi and beel and along every chhara, khal and lunga flow path draining 8 ha or more, where the rules set only a drainage duty or protective works. The rules measure from the "river bank" or the "outside edge" of a water course, neither of which they define; this Manual measures from top of bank or FTL, or from the 1% AEP extent where that is wider. It applies to new development and redevelopment approved under this Manual, not to existing buildings; and where Zone 1 land is private, it is reserved in the Master Plan or secured by agreement with the owner, not taken. It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Tripura flood maps are mostly coarser than US maps, the valley towns stand on the flat lungas and flood plains between the tillas, and the centre of Agartala is "at a lower level than other areas giving it the appearance of a saucer" (ADB, 2020) (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Tripura's distances from water are in its building rules, which apply only in the ULBs and the Local Planning Areas. Rule 9 of the Tripura Building Rules, 2017, "Control of development of parks, public open space, ponds, wetlands, canals, river and other water front and brick fields", forbids the filling of any "canal, pond, water body, wetland, river lets, jhora, water source, natural spring, streams, drains, culverts", unless the Local Body, "with the prior approval of the State Government" and "for reasons to be recorded in writing" after considering "the drainage slope, slip, landslide, ecology, culture, environment, pisciculture, fire fighting or any other material consideration", allows a "canal pond, rivulets, streams, rivers, flood plain area to be filled up" (r.9(3)). For "a building in the zone of river (within 15 metres from river bank) or other water fronts of large water bodies (more than 1000 acres)" it limits the height to 5.00 m (6.50 m on stilts of not more than 3.00 m, which may not be walled), the length "alongside the river or other water fronts" to 20.00 m with "a clear linear gap of 50.00 metres between the two buildings", and the covered area to 200.00 m² (r.9(4)): a regulated zone, not a no-build line. It keeps the area of a water body out of the area of a park (r.9(2)) and makes the owner of an abandoned brick-field pit keep it "as water bodies" (r.9(5)). In the plains, "where the site is within 5.00 meters of any side of a tank, the owner will take such measures as shall prevent any risk of drainage from such building passing into the tank" (r.4(1)(e)), which is a drainage duty, not a setback. In the ULBs of the hill areas (Part X, rr.88 to 101, whose ULBs the rules do not list [TBC]), no site may be "located within five meters in any direction of the outside edge of such water courses" (r.90(1)(i)), the only no-build distance from water in the rules, and the owner takes protective measures within "5.0 (five) meters of any side of a tank, water reservoir, jhora/ natural spring, water source or natural drain", within 2.0 m of a water pipe or sewer, and where the site is within 30 m of a jhora (r.90(1)(m)). The site plan shows the "natural drainage channel/jhora" (r.5(1)(p)), a sub-division drains each plot by "pucca drain" to a public drain or natural channel (r.10(2)(f)), and notice is given before a drain is covered (r.38). The Tripura Municipal Act, 1994 forbids a new tank without the Municipality's permission, on pain of a fine of up to ₹2,000 (s.232), and lets the Municipality make the owner of a private tank protect it "from pollution by surface drainage" (s.234(1)). Two other lines are cited but are not rules: the Department of Science, Technology and Environment's "Statutory Guidelines for protection and preservation of lakes, ponds and water bodies in Tripura" (as cited; not read, so no distance from them is used), and a direction "that no construction is raised within 75 Mtrs. of the end of the lake", in a file whose source and scope were not established (as cited) — it is not used as a rule. The buffers of the Master Plan for the Agartala Planning Area 2045 were not read [TBC], and no setback distance from an embankment was found [TBC]. The rules leave gaps for drainage: rule 9(4) allows building within 15 m of a river bank; its "river bank" and rule 90(1)(i)'s "outside edge" are not defined; a pukur, dighi or beel in the plains gets only the drainage duty of rule 4(1)(e), and a chhara, khal or lunga flow path in the plains gets nothing beyond the ban on filling; nothing keeps building back from an embankment; and outside the ULBs and Local Planning Areas, and in the TTAADC area, the rules do not apply at all. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere the Manual applies.
Disclosure. Tripura has distances from water in its building rules, but only one of them keeps building out, and only in the hill ULBs: rule 9(4) of the Tripura Building Rules, 2017 sets a 15 m "zone of river" from the river bank, and the same along water bodies of more than 1000 acres, in which buildings are limited in height (5.00 m, or 6.50 m on stilts), length (20.00 m, with 50.00 m gaps) and covered area (200.00 m²) but allowed; rule 90(1)(i) keeps sites 5 m from the "outside edge" of water courses in the ULBs of the hill areas; near a tank the rules set only a drainage duty within 5.00 m (r.4(1)(e)) and, in the hill areas, protective works within 5.0 m, and within 30 m of a jhora (r.90(1)(m)); rule 9(3) bars filling without the Local Body's approval with the State Government's prior approval; the rules apply in the ULBs and Local Planning Areas, not in the TTAADC area; no distance from an embankment was found; and no flood-plain zoning law has been enacted. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor where nothing wider binds: along every natural channel draining 8 ha or more, river, chhara, khal or lunga flow path, whether or not a plan marks it, and round every pukur, dighi and beel. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's three reference lines, its reading of the boundary of a pukur, dighi or beel and of its recorded pukurpar or dighirpar, of the lunga flow path and of the ponded area behind an embankment (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body, Authority, Local Body, committee or the District Council has adopted or endorsed them. Zone 1 is a no-build zone, so it is stricter than rule 9(4) along every river, which allows building within 15 m of the bank; it is three times the 5 m of rule 90(1)(i) in the hill ULBs; and it adds a corridor round every pukur, dighi and beel and along every chhara, khal and lunga flow path, where the rules set only a drainage duty (r.4(1)(e)) or protective works (r.90(1)(m)), or nothing beyond the ban on filling. It applies to new development and redevelopment approved under this Manual, not to existing buildings; Clause 7.4.7 allows no variance below it; and where Zone 1 land is private, it is reserved in the Master Plan or secured by agreement with the owner, not taken (in the TTAADC area, only through the District Council [TBC]). The rules measure from the "river bank" or the "outside edge" of a water course, which they do not define; this Manual measures Zone 1 from top of bank or FTL, and Zone 2 from the 1% AEP extent. The setback is applied as whichever of the three reference lines and its setback reaches furthest (definitions after Clause 7.2), so the Manual is stricter than statute along every river, chhara, khal and lunga flow path and round every pukur, dighi and beel, and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- The Tripura Building Rules, 2017, as amended to 2025. The zone of rule 9(4), within which the limits on height, length, gap and covered area apply to any building that the Manual's wider lines allow; the 5 m of rule 90(1)(i) and the protective works of rule 90(1)(m) in the hill ULBs, which the Applicant states on Form 7-1 and which never govern alone where Zone 1 is wider; the ban on filling of rule 9(3) and the approval it requires, which no design under this Manual replaces; rule 32, under which the Mayor or Chairperson may ask for a soil test, limit the height or refuse a building on a recently filled pond, lake or marsh; rule 55, which sets the plinth, with respect to the crest of the road, "in no case … at a height less than 60 centimeters", and this Manual's floor of the 1% AEP level plus 0.5 m (Clause 7.6.6(b); Chapter 6), which governs where it is higher; and rule 66, which keeps kitchens, baths and water closets out of a basement unless there is "no chance of back flow and flooding of sewerage", asks for surface drainage to be kept out and pumping arranged, and, since 2025, sets the basement ceiling 0.8 to 1.2 m above the average front road level (r.66(5), (6)(b) and (6)(h)).
- The Municipal Act. The vesting of public tanks, streams and water courses in the Municipality (s.91), the permission required for a new tank (s.232) and the Municipality's power over private tanks (s.234), with which every design keeps.
- The land records and the Diversion of Land Rules. The water classes of Appendix-I of the Diversion of Land Rules, 2025, which record a plot as pukur, pukurpar, dighi, dighirpar, doba, beel, haor, chhara, khal, nala or bandh; a change of class is a diversion of land, and the procedure for a water body after the amendment of 6 March 2026 was not established [TBC], so this Manual does not state it.
- The Master Plans. The zoning and development control regulations of the Master Plan for the Agartala Planning Area 2045 (declared final on 24 February 2026, as reported; not read [TBC]) and the layouts of the Local Planning Areas.
- Embankments. PWD (WR)'s conditions as owner of an embankment, sluice or anti-erosion work; no statute and no setback distance were found [TBC].
- Wetlands, courts and custodians. Rudrasagar, Ramsar site no. 1572, and any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found notified); the orders of the High Court of Tripura, the National Green Tribunal and the Supreme Court as they stand, among them the High Court's order of 2016 in PIL 2/2014 on pond filling at Kalyan Sagar (as cited); and the custodians' lines at their tanks and outlets.
This Manual sets 15 m as the floor because rule 9(4), the only plains distance from a river, allows building in it; because a pukur, chhara, khal or lunga flow path in the plains gets no distance at all; because 15 m is the rules' own width for the zone of a river and above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because a town channel needs room for desilting by machine, which is the main maintenance the towns already do. The reasons for the corridor are the record: in Agartala "the central part of the city is located at a lower level than other areas giving it the appearance of a saucer", the feeder drains are "earth-lined and in a poor condition with silt and vegetation choking them" (ADB, 2020), and "there is frequent water logging of different areas due to blockage of drains and canals by plastic waste" (CAG, Audit Report 2022-23); ponds have been filled for housing in Barjala and Lanka Basti (as reported); the High Court found pond filling and walls on the banks of Kalyan Sagar and ordered 110 m of cement embankment removed (PIL 2/2014, as cited); and ring roads in Rudrasagar "reduced the water level and compromised the ecological balance" (CAG, Audit Report 2021-22). Until an amendment of the Building Rules, a Master Plan, a decision under the land-revenue rules or a court adopts it, the 15 m minimum is this Manual's recommended standard, and the Building Rules, the Master Plans, the land-revenue rules and the orders above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Tripura Building Rules 2017, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Tripura practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The lungas and flood plains on which Tripura's towns stand are flat, central Agartala is a saucer between the embanked Haora and the Katakhal, and the land behind the embankments ponds when the sluices close, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Tripura the Building Rules measure from a "river bank", an "outside edge" or the "side of a tank", none of which they define, and the land records fix a pukur or dighi by its plot, with its bank recorded as a separate class (pukurpar, dighirpar); neither gives a line for the edge of a pukur, dighi or beel whose water spreads and shrinks through the year. The difference matters because the waterbodies are shrinking: ponds have been filled for housing in Barjala and Lanka Basti (as reported); the High Court found pond filling and walls on the banks of Kalyan Sagar (PIL 2/2014, as cited); the ring roads built in Rudrasagar without the Wetland Authority's permission "reduced the water level" (CAG, Audit Report 2021-22); and the Dumbur reservoir's water spread is estimated to have fallen from about 4,500 ha to 3,049.3 ha by 2012 (ICAR). A line drawn from the edge of the water in the dry months would leave the pukur's own flood storage open to filling, and one drawn from today's edge would give up its lost area for good. This Manual gives every pukur, dighi and beel a boundary measured from a high level, not from the water's edge on the day of survey: the edge of its water in the season, its recorded plot and its recorded pukurpar or dighirpar are part of its boundary or its Zone 1 (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Agartala's central saucer between the Haora embankment and the Katakhal, of the Haora flood-plain-zone localities that PWD (WR) has mapped (Khayerpur, Kashipur, Baldakhal, Aralia, Jogendranagar and Joynagar), of Chandrapur, flooded in August 2026 (as reported), and of the valley towns behind their embankments, such as Kailashahar on the Manu and Belonia on the Muhuri already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Tripura has no tank Act and no irrigation tank cascades, and its standing waters range from a doba to the Dumbur reservoir. The storages that matter for urban drainage are of six kinds. The first is the pukurs and dighis of the towns. About 65 water bodies in Agartala have been cleaned and developed under city schemes (the Mayor, as reported); 180 urban water bodies on government land were geo-tagged under the ULBs for the National Green Tribunal in 2020, of which 30 were prioritised for restoration (as reported); Agartala Smart City Ltd has projects at the Ujjayanta palace lakes and the MBB College lake (as cited); the ADB names the College Tilla lake "among the 7 important inland" water bodies (IEE, 2020); Banamalipur Dighi lies in ward 21 of the Agartala Municipal Corporation (as cited from a tender list); Kalyan Sagar at Matabari, near Udaipur, was the subject of the High Court's PIL 2/2014 (as cited); ponds have been filled for housing in Barjala and Lanka Basti (as reported); and the State's claim that "682 water bodies" have been created is a headline only (as reported). No Agartala-wide pond inventory, and no level, area or outlet record for any pukur or dighi, was found [TBC], so their storage is modelled as an existing feature and not counted unless Clause 7.7.1 is met; the plots that the land records class as pukur and dighi, with their pukurpar and dighirpar, are the first source for finding them and for the inventory of any storage that Clause 7.7.1 would count (Annex 7A); the palace-era and temple tanks are existing storage with heritage and fisheries constraints, not detention to be drawn down (definitions after Clause 7.2). The second is the beels and haors of the valley floors and the marshy land of the lungas, modelled as existing features where they intercept runoff but never counted as storage unless surveyed with a controlled outlet, because they are full by the time of the peak storm; no inventory of them was found [TBC]. The third is the ponded area behind an embankment, which stores the town's runoff while its sluices are shut, and Agartala's saucer between the Haora embankment and the Katakhal, which drains by pumps when the rivers are high (definitions after Clause 7.2; Clause 5.8.5(b)). The fourth is Rudrasagar, Ramsar site no. 1572 in Sepahijala district, a wetland under Clause 7.12. The fifth is the reservoirs: the Dumbur reservoir of the Gumti hydel project at Tirthamukh, whose dam is 30 m high, whose spillway capacity is 481.38 m³/s and whose FRL is 93.55 m, against a "danger level of 94 m" reached at 93.85 m in August 2024 (all as reported; the two levels conflict, and 94 m is used until the operator confirms), whose water spread was about 4,500 ha when built and 3,049.3 ha by 2012 (ICAR) but is also given as "41 sq km" (as reported) and as 0.709 km² (CWC's National Register of Large Dams, as quoted, which cannot be right for a live storage of 0.312 BCM); and PWD (WR)'s minor-irrigation earth dams, such as the Kashari Cherra earth dam of its Belonia division (CAG, Audit Report 2022-23). Dumbur is not a Ramsar site. Its storage is the operator's and is not counted under this Manual; the Gomati below it is a release reach (Clause 5.8.5(d)). The sixth is the retention ponds built for flood storage, which are detention ponds, never pukurs. These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: in a valley town every drain ends in a nala, a khal or a pukur, and every khal in a sluice through the embankment that the river closes, or in the river at a border reach. Any pukur, dighi, beel or pond whose storage is to be counted is subject to Clause 7.7.1 in full, with PWD (WR) where the outlet is its sluice and with the other custodian where it is not, and the custodian of each shall be confirmed for the inventory (Annex 7A) [TBC].
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. PWD (WR), or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a valley town on a lunga behind an embankment, every pukur and dighi that stores its runoff, the chharas that come down to it from the tillas, the lunga flow paths and nalas that join them to a khal, the outfall sluice and pumps through the embankment, and the river stage at the outfall that closes the sluice (Clause 5.8.5), as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than PWD (WR)'s freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. In Tripura the starting level of a pukur, dighi or beel is its outlet level because the outlet is shut when the river is high. In Agartala, "During normal rainfall of about 3 to 4 hours, the central part of Agartala gets flooded", and when the Haora and the Katakhal run higher than the city "Several pumps have been provided to lift the water out of the city during these seasons" (ADB, IEE, 2020); the city's flood pumps, 18 of up to 900,000 litres an hour each and 6 diesel pumps in 2024 (as reported; about 0.25 m³/s each, NEER arithmetic), lift the water over the embankments by pipeline. In August 2024 the flood ran from 19 to 24 August and the Haora peaked at 12.42 m at the CWC site on 22 August (as reported; datum not stated [TBC]); the rivers leave the State into Bangladesh, and no level from across the border was obtained. This Manual therefore closes every sluice-locked or pumped outfall for the whole 72-hour storm and, where no stage record exists, for a further 72 hours, and starts every receiving pukur, dighi and lunga storage full to its outlet level (Clause 5.8.5(a), (b) and (e)). The Manual's season begins on 1 April because large falls come before the south-west monsoon as well as during it (Kailashahar 257.1 mm on 19 April 2004 and Agartala 198.0 mm on 11 April 2007, IMD), so a pukur or beel may be full at any time from April to October. No record of how long any pukur or beel stays at or above its outlet level in a wet spell, or of how long the Katakhal sluice or any other sluice stays closed, was found [TBC]. While a pukur is full and its outlet shut, it stores nothing more below FTL, and the drains and nalas that flow into it discharge against its level. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A valley town on a lunga between tillas: its chharas, drains, khal, pukurs and dighi, and the outfall sluice at low and high river stage (schematic, not to scale; no particular town, river, tank, sluice or landmark is shown). A: in plan, chharas (streams) run down from the tilla uplands, whose soils are lateritic, and pass silt traps at the tilla foot before they reach the town (Clauses 6.3.6(m) and 8.12). One chhara continues across the lunga, the flat land between the tillas, as its flow path, a natural channel under Clause 7.4.1(b), to a khal. The town's lined drains and nalas fall to the flow path, the khal and a dighi (a large tank), which with the pukurs (tanks or ponds) is the town's storage; each tank has its bank (pukurpar or dighirpar), which lies in Zone 1. Every drain outfall to a pukur, the dighi, the khal and the river has a dry-weather-flow interceptor and a screen, because the drains carry sewage (Clause 8.9). The khal runs to a sluice through the river embankment (bandh), with a flap gate on the river side and a pump station beside it (Clause 5.8.5; Chapter 9), and the river flows on across an international border, below which there is no Indian control and no level data. Zone 1 is at least 15 m from the top of bank of the chhara, the flow path and the khal, and from the FTL of the dighi and the pukurs, and Zone 2 runs to the 1% AEP extent plus 10 m (Clause 7.4). No infiltration is credited on the lunga floor (Clause 4.11, lunga rule) or on tilla slopes and cut faces (Clause 4.11, hill rule); tested infiltration is allowed on flat tilla tops (Clause 4.11, tilla rule). B: in section through the embankment, at low river stage the gate is open and the dighi drains by gravity; at high stage the gate is shut, for the 72-hour storm and for 72 hours more where no stage record exists, the dighi and the pukurs start full to their outlet level and, with the lunga, store the inflow, and the pumps lift it over the embankment (Clauses 5.8.5 and 7.7.3). The 15 m minimum, the interception rule, the starting level and the infiltration rules are this Manual's proposals; the Tripura Building Rules 2017, the Tripura Municipal Act, 1994, the land-revenue rules and the courts' orders govern where they say more. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, TDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under PWD (WR) control, the operating rule shall be PWD (WR)'s rule. This Manual does not authorise any other body to operate a PWD (WR) tank.
Commentary. No pukur, dighi or beel in Tripura was found with a written operating rule, and most have no gates to operate. Where one drains through an embankment, its only controllable outlet is a sluice that PWD (WR) holds, such as the Katakhal double-barrel sluice, and PWD (WR)'s sluice operating rules and closure periods were not found [TBC]; the sluices close because the river rises, not because a forecast is issued. At Rudrasagar the High Court has asked for reports on the water level and the sluice gate (PIL 05/2017; a minimum level of 11 m RL is reported to have been set, and a level of 9.08 m RL was reported in 2020, all as reported), but no operating rule was found [TBC]. The town's pumps at the outfall are the only means of drawing a pukur or the saucer down while the river is high, and their capacity is not known: in Agartala 18 flood pumps of up to 900,000 litres an hour each and 6 diesel pumps (2024), 6 new pumps (2025) and three more pumping stations proposed (2026) (all as reported; about 4.5 m³/s for the 18, NEER arithmetic; no design capacity was found [TBC]). The Dumbur reservoir is released by flap gates ("two flap gates fully open and one at 50%" on 21 August 2024, as reported), and its operator's levels and release rules were not found [TBC]. Without an agreed rule with dates, levels, pumping rates and a named operator, storage in a pukur or beel cannot be relied on, and a release made without warning to the land downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the April and May storms gives no protection when a June to August monsoon storm, such as those of June and July 1993 and August 2024, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
For a pukur, dighi or beel with no controllable outlet, Clause 7.8.3 is the governing condition: no cushion is assumed, a design that relies on it routes the storm through it from its outlet level, and the outflow is limited by the nala or khal below it and, at the embankment, by the sluice and the river stage. A cushion made by pumping is counted only where the pumps, their standby power and their operator are in the rule and were certified ready by 31 March (Chapter 10). Pukurs are used for pisciculture, which rule 9(3) of the Building Rules names among the matters to be weighed before any filling, and some belong to religious institutions or private owners, which is why Clause 7.8.2(d) requires the custodian to accept any drawdown and any loss to the fishery; the palace-era and temple tanks are not drawn down at all (definitions after Clause 7.2); and no detention pond built under this Manual is called a pukur.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Tripura State Pollution Control Board (TSPCB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 March each year (Chapter 10).
Commentary. No State or municipal order fixing a date for the pre-monsoon cleaning of drains, khals, chharas or pukurs was found: the Agartala Municipal Corporation desilts its drains every year, by machine where it can (as reported); PWD (WR) runs a pre-monsoon programme on its embankments (as reported) and the Katakhal was cleaned in March 2026 (as reported); and the Tripura Disaster Management Authority's monsoon checklist of 2026 includes "urban drain de-silting" (as cited), all without a date. The need is recurrent: the ADB found Agartala's feeder drains "choked up with solid waste and silt" (IEE, 2020), and the CAG found "frequent water logging of different areas due to blockage of drains and canals by plastic waste", with waste reaching the Haora near Battala and the Katakhal near Abhoynagar bridge (Audit Report 2022-23). The date of 31 March in this Manual is set by this Manual, before its season begins on 1 April, because large April falls come early (Agartala 198.0 mm on 11 April 2007 and Kailashahar 257.1 mm on 19 April 2004, IMD); because storms also follow, the inlets, screens and silt traps are cleared again by 31 May, before the south-west monsoon arrives, and after it by 15 November (Chapter 10). PWD (WR)'s works dates for embankments remain PWD (WR)'s. To dredge a tank is পুকুর ঝালানো (Biswas, p. 653); excavation to "increase capacity" is governed by Clause 7.9.3. In a pukur the clay and silt of the bed hold the water above a water table that is near the surface in the monsoon (Chapter 8), and the silt of a town pukur is laden with sewage: every desilting of a pukur, dighi or khal that receives town drains tests the silt under Clause 7.9.1(c) and disposes of it as the TSPCB directs, and no work in Rudrasagar or a notified wetland is begun without the permissions of Clause 7.12. The 31 March deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Tripura precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Tripura the public drains, channels, culverts and water courses "in, alongside, or under any street", and the public tanks and streams, vest in the Municipality "unless the State Government otherwise directs by a notification" (Tripura Municipal Act, 1994, s.91), which "shall provide and maintain a system of drainage or sewerage as well as a safe and sufficient out-fall in or outside the Municipal area" (s.156(1)), cleanses its drains (s.157), may drain sudden waterlogging across private land without notice (s.160), allows a private drain to join a municipal drain only "after obtaining the written permission of the Municipality" (s.161), may demolish an unauthorised drain (s.162) and acts against the encroachment of its drains (s.166); the Act counts "any river, stream or channel" as a watercourse (s.2). The Building Rules forbid the filling of "canals, … river lets, jhora, … streams, drains, culverts" without the Local Body's approval with the State Government's prior approval (r.9(3)), require notice before a drain is covered (r.38) and, in the ULBs of the hill areas, forbid the covering of an open drain without written permission and any building over a drain (r.99(2)(e) and (f)). In practice the capital works are built by others: in Agartala the UDD and PWD (DWS) carry out 98% of the AMRUT works "and only a few minor works … by AMC" (CAG, Audit Report 2019-20), PWD (R&B) builds the major roads and their drains (CAG), Agartala Smart City Ltd builds storm drains, flood pumps and works on the Akhaura canal and the Katakhal (as cited), and PWD (WR) holds the embankments and the Katakhal double-barrel sluice; no formal allocation among them was found [TBC], and Chapter 6 gives this Manual's working split and each town's drain register. The record shows a network that is partial and choked: "Partial drainage system is present in Agartala Municipal Corporation" (State affidavit to the National Green Tribunal, O.A. 673/2018); "Most of the main drains are masonry-lined, but the feeder drains are earth-lined and in a poor condition with silt and vegetation choking them", and the Akhaura canal "running along the Akhaura road serves mainly the central area" (ADB, IEE, 2020), which also names the Bangeshwar Gang, the Debta Gang, the Nagichara and the Kalapani Charra among the city's channels; and on NH-108B and NH-208 the District Legal Services Authority found "No proper drainage system … water logging everywhere; RCC drain hole blocked with mud, vegetation; Earthen drain damage & blocked", with "culvert block by silt, vegetation, debris" (High Court of Tripura, WP(C)(PIL) No. 06 of 2026, judgment of 08.09.2026, para 44). None of these keeps a chhara, khal or lunga flow path at its recorded width once it has been lined, covered, built over or narrowed by a culvert, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored pukur or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Tripura no shared form of storage is required by the building rules: the Tripura Building Rules, 2017 ask that public open spaces above 500 m² "shall have arrangements for complete utilization and capture of storm water", including "Artificial or natural storage of storm water runoff from larger sites" (r.110(4)), and ask for rainwater harvesting, but have no detention, peak-flow or design-storm rule (Chapter 4). The public storage works found are restorations of existing tanks, such as Agartala Smart City Ltd's projects at the Ujjayanta palace lakes and the MBB College lake (as cited), and the city's flood pumps; a proposal of about ₹1,000 crore for "two protective embankments and installation of three additional pumping stations" in Agartala is to be "implemented in phases, depending on the availability of funds" (July 2026, as reported). The sectoral plans of the Master Plan for the Agartala Planning Area 2045 (not read [TBC]) and the ADB-assisted drainage works (48.2 km of new or rehabilitated drains under project 53262, IEE, 2020) are the natural home for basin storage targets (Chapter 11). None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Wetland Authority of Tripura;
- (b) any wetland notified under the 2017 Rules, to its notified boundary (none was found notified), and Rudrasagar, Ramsar site no. 1572 (240 ha; designated on 8 November 2005 by the Ramsar listing, or on 29 February 2007 by the Forest Department, as cited), to the larger of its Ramsar boundary and the boundary of its water in the season of 1 April to 31 October;
- (c) every beel and haor, and the other marshy and swampy land (dhepa, utla) of the valley floors and flood plains, within the 1% AEP extent of Clause 7.3.4, and every plot recorded as beel, haor, dhepa or utla in the land records (a river, chhara, khal, pukur or dighi itself is a waterbody under the rest of this chapter); and
- (d) any other beel, marsh or wetland that the Authority notifies, that the Wetland Authority of Tripura lists, or that the High Court of Tripura, the National Green Tribunal or the Supreme Court directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Tripura's wetlands are the concern of the Wetland Authority of Tripura, constituted by notification No. F.17(54)/For-Dev/WATIL/2017/24661-686 of 05.09.2018 under the Wetlands (Conservation and Management) Rules, 2017 and reconstituted on 04.04.2022 and 18.06.2022, with a Technical Committee under rule 6 and the Principal Chief Conservator of Forests as Member Secretary (as cited; the notifications were not read [TBC]); no wetland notified under rule 4 of the Rules was found. Its one listed Ramsar site is Rudrasagar (Neermahal, Sepahijala district), site no. 1572, of 240 ha, with a catchment of 6,052 ha (as cited). The dates and the managers conflict: the Ramsar information sheet gives designation on 8 November 2005, and the Forest Department says the lake was identified on that date and "officially designated" on 29 February 2007; the Ramsar factsheet names the Fisheries Department as managing agency and the State's page the Forest Department (both as cited). Its Kokborok name is given as Twijilikma (as reported). The High Court has heard it as a suo motu PIL (WP(C)(PIL) 05/2017): status reports on the water level in 2020 (9.08 m RL reported, against a minimum of 11 m RL reported to have been set), on the sluice gate in 2022, and an affidavit of the Chief Secretary on restoration in 2023 (all as reported); and the CAG found that ring roads were built in "a Ramsar site" without the Wetland Authority's permission, wasting ₹1.75 crore, a decision that "also reduced the water level and compromised the ecological balance" (Audit Report 2021-22, para 3.6). The Wetland Authority prepared an Integrated Master Plan for the lake (as cited; not read [TBC]). The Dumbur reservoir is not a Ramsar site. No inventory of the beels and haors of the valley floors was found [TBC]; the land records class them as "Watery land" and "Big watery land" (Annex 7E). A drain outfall, desilting, diversion or gate operation in or next to Rudrasagar or a notified wetland therefore needs the views or permission of the Wetland Authority of Tripura where the Rules reach it, as well as compliance with this chapter; for the beels, haors and marshes they do not reach, this chapter, rule 9(3) of the Building Rules and the land-revenue rules are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Tripura's pukurs, khals and rivers through the drains (Clause 8.9, Commentary). The Haora at Dashamighat is in Priority V of the CPCB's list of polluted stretches (BOD 3.3 mg/L, 2025), five drains are reported to carry 0.648 MLD of sewage into it (as cited), and the new treatment plants on the Katakhal and the Kalapania Khal are to be fed by intercepting the drains (State affidavit to the National Green Tribunal, O.A. 606/2018, 06.07.2026). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by most existing outfalls in Agartala. In Tripura they apply in full to every new outfall, and every existing outfall to a pukur, a dighi, a beel, a khal or a river is taken to carry dry-weather flow and comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed; no new drain is led into the catchment of Rudrasagar without that interception. Where a drain comes down from the tillas, every drain that enters a pukur, dighi or beel also passes a silt trap at the tilla foot first (Figure 7.3; Clause 6.3.6(m)), because the pukur is the end of the slope's drainage and loses its storage to the silt of tilla cutting.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Tripura's controls on building and filling in its waterbodies have come mostly from the courts. In WP(C)(PIL) No. 2 of 2014, Bibash Ch. Saha v. State of Tripura, the High Court of Tripura heard that local bodies had let ponds be filled and brick or concrete walls be built on their banks, at Kalyan Sagar, Matabari, among other places; it directed the State and the local bodies to "strictly follow the environmental laws", directed the State to frame a guideline on the protection of water bodies and notify it within six months, and ordered 110 m of cement embankment at Kalyan Sagar to be removed (orders of 22.06.2015 and 13.07.2015, as cited from a copy dated 16.08.2016). The Department of Science, Technology and Environment's "Statutory Guidelines" followed, with State and sub-divisional monitoring committees formed in April 2018 (as cited; not read [TBC]). On 28.06.2017 the High Court took a zone-wise affidavit from the Agartala Municipal Corporation on the encroachment of the city's water bodies and gave it six months (as cited; the case number was not confirmed [TBC]). It has heard Rudrasagar as a suo motu PIL since 2017 (Clause 7.12, Commentary). The Tripura Human Rights Commission in 2025 took up the illegal filling of a water body at Gol Bazar, naming Agartala Smart City Ltd and the Corporation (as reported). Before the National Green Tribunal the State reported in 2020 that of 180 urban water bodies on government land only 30 had been prioritised for restoration (as reported; the application is identified as O.A. 325/2015 by NEER from the case name). Ponds have been filled for housing in Barjala and Lanka Basti (as reported). The statutes' penalties are slight: a fine of up to ₹2,000 for a tank made without the Municipality's permission (Tripura Municipal Act, 1994, s.232), the Municipality's powers against the encroachment of its drains (s.166), and the revocation, within thirty working days, of a change of land class made in breach of the Land Revenue and Land Reforms Act (Diversion of Land Rules, as amended on 6 March 2026, r.4). The CAG found ring roads built in Rudrasagar without the Wetland Authority's permission (Audit Report 2021-22). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. Tripura's river embankments, given by PWD (WR) as "154.41 Km of embankment and 98.00 Km of anti-erosion" protecting 28,000 ha and, elsewhere, as "41 nos. (134.55 Km) of flood protection embankment" (as cited; the figures conflict and their dates are not known), are flood embankments, which the Act excludes. The dam of the Gumti hydel project at Dumbur, 30 m high and 103 m long (as reported from the National Register of Large Dams), is a dam across a river under the Act; whether it is listed as a specified dam was not checked [TBC]. The heights of PWD (WR)'s minor-irrigation earth dams, among them the Kashari Cherra dam (CAG, Audit Report 2022-23), were not obtained [TBC]. No pukur, dighi or beel in Tripura was found to be held by a bund high enough to be a specified dam, though no bund or outlet was surveyed for this Manual [TBC]; each shall be screened under Clause 7.14.1. Where the storage of a pukur, dighi or beel is counted under Clause 7.7, the embankment or bund that holds it, with its sluice, is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Tripura the embankment hazard is leakage and the breach. The State's pre-monsoon programme of 2025 was reported to cover 44 embankments on 12 rivers, with 6 km of leakage repairs on the Haora embankment at Agartala, 16.8 km of the Manu embankment at Kailashahar raised and 7.47 km of the Muhuri embankment at Belonia (as reported), and the Tripura Disaster Management Authority's monsoon checklist of 2026 lists 42 vulnerable embankment points (as reported). The CAG found that sand extraction outside the approved blocks "caused weakening of river embankment and erosion of riverbed", and that ₹3.09 crore had been spent unfruitfully on the Kashari Cherra minor-irrigation earth dam, which heavy rain eroded in September 2017 (Audit Report 2022-23). Releases from the Dumbur reservoir are the other hazard: on 21 August 2024 the Gomati district administration reported "two flap gates fully open and one at 50%", the first release since 1993 by one account, while the State's power minister said that no gate had opened, and the Ministry of External Affairs said that the releases were "automatic" and that the floods in Bangladesh came from rain below the dam (all as reported or as quoted); the Gomati at Udaipur stood at 22.05 m against an "extreme danger" level of 22.00 m that afternoon (State gauge, as reported). No breach map or emergency action plan for any embankment, dam, pukur or dighi was read for this Manual. A failed embankment floods the land behind it, and a breach closes no sluice, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments counted under this Manual, and why Chapter 5 treats embankment-protected towns and the Gomati release reach as flood-sensitive outfalls. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Tripura, Urban Development Department. Tripura Building Rules, 2017 (notification No. F.2(316)-UDD/GL/TCPO/2009 (Part-I)/371 of 10 November 2017, as cited in UDD's BRAP-2019 document; the 2017 gazette was not read [TBC]), as amended by the Tripura Building (Amendment) Rules, 2019 (No. F.2(466)-UDD/GL/TCPO/2018/599-627, 19 February 2019; Gazette Extraordinary No. 482, 25 February 2019), the (Second Amendment) Rules, 2020 (15 February 2020; Gazette 24 February 2020; number illegible in the copy read [TBC]), the (3rd Amendment) Rules, 2022 (No. F.01(24)-TUDA/Estt/2022/4902-30, 29 November 2022), the (Fourth Amendment) Rules, 2024 (No. F.1(23)-TUDA/ESTT/2024/66, 15 January 2025; Gazette No. 95, 17 January 2025) and the (Fifth Amendment) Rules, 2025 (F.No.2(466)-UDD/GL/TCPO/2018(P-V)/4009-20, 4 July 2025; Gazette No. 1294, 5 July 2025), rules 1, 2(22), 2(23), 2(44), 4, 5, 9, 10, 32, 38, 55, 66, 90, 91, 99, 100 and 110 (High Court of Tripura consolidated texts), https://thc.nic.in/Tripura%20State%20Lagislation%20Rules/Tripura%20Building%20Rules,%202017%20(As%20Amended%20upto%204th%20Amendment%20dt.%2017.01.2025).pdf ; https://thc.nic.in/Tripura%20State%20Lagislation%20Rules/Building%20Rules,%20Tripura,%20%202017%20(As%20Amended%20upto%205th%20Amendment%20dt.%2005.07.2025).pdf
- Government of Tripura. Tripura Municipal Act, 1994, as amended to the 9th Amendment (7 May 2025), ss. 1(2), 2, 91, 156–166 and 232–237, https://thc.nic.in/Tripura%20State%20Lagislation%20Acts/Municipal%20Act,%20Tripura,%201994.pdf
- Government of Tripura. Tripura Urban Planning and Development Act, 2018 (Tripura Act No. 12 of 2018), ss. 52, 53 and 163, https://thc.nic.in/Tripura%20State%20Lagislation%20Acts/Urban%20Planning%20and%20Development%20Act,%20Tripura,%202018.pdf ; and TUDA notification No. F2(15)-TUDA/TECH/2019(P) (November 2019) declaring the Local Planning Areas, https://udd.tripura.gov.in/sites/default/files/2024-05/Local%20Planning%20Areas%20Notification..pdf (Wayback 20240521223656)
- Government of Tripura, Revenue Department. Tripura Land Revenue and Land Reforms (Diversion of Land) Rules, 2025, No. F.4(05)-RCC/2025 of 2 June 2025, Tripura Gazette Extraordinary No. 1072, 3 June 2025, rules 2 to 10 and Appendix-I; and the (First Amendment) Rules, 2026, 6 March 2026, Gazette Extraordinary No. 2026350 (page images read), https://thc.nic.in/Tripura%20State%20Lagislation%20Rules/Land%20Revenue%20&%20Land%20Reforms%20(Diversion%20of%20Land)%20Rules,Tripura,%202025.pdf
- Government of Tripura, Forest Department. Notification No. F.17(54)/For-Dev/WATIL/2017/24661-686 of 05.09.2018 constituting the Wetland Authority of Tripura, and its reconstitution of 04.04.2022 and 18.06.2022 (as cited), https://dste.tripura.gov.in/sites/default/files/2023-09/wetlandtechnicalcommittee.pdf ; and the Forest Department's page on Rudrasagar (as cited), https://forest.tripura.gov.in/node/49
- Ramsar Sites Information Service. Rudrasagar Lake, site no. 1572 (as cited), https://rsis.ramsar.org/ris/1572
- High Court of Tripura. WP(C)(PIL) No. 2 of 2014, Bibash Ch. Saha v. State of Tripura (as cited from a copy dated 16.08.2016), https://www.casemine.com/judgement/in/58f70f25e4b09df07d76ea5f ; order of 28.06.2017 on the encroachment of water bodies in Agartala (as cited; case number not confirmed), https://future.indiankanoon.org/doc/158582342/ ; and WP(C)(PIL) No. 06 of 2026, judgment of 08.09.2026, https://www.livelaw.in/pdf_upload/2026/09/09/union-of-india-tripura-hc-699203.pdf
- National Green Tribunal. O.A. 673/2018, State of Tripura's affidavit in E.A. 35/2023 (Haora flood-plain zones; drainage), https://www.greentribunal.gov.in/sites/default/files/news_updates/AFFIDAVIT%20BY%20STATE%20OF%20TRIPURA%20IN%20EA%20NO.%2035%20of%202023%20IN%20OA%20NO.%20673%20of%202018%20News%20item%20published%20in%20the%20Hindu%20authored%20by%20shri%20Jacob%20Koshy%20titled%20more%20river.pdf ; and O.A. 606/2018, affidavit of the Government of Tripura filed on 06.07.2026, https://www.greentribunal.gov.in/sites/default/files/news_updates/AFFIDAVIT%20BY%20GOVT.%20OF%20TRIPURA%20IN%20OA%20NO.%20606%20of%202018%20(COMPLIANCE%20OF%20MSW%20MGT%20RULES,%202016%20AND%20OTHER%20ENVIRONMENTAL%20ISSUES).pdf
- Comptroller and Auditor General of India. Audit Report for the year 2022-23 (Government of Tripura), Ch. II, Solid Waste Management in Urban Areas of Tripura, https://cag.gov.in/uploads/download_audit_report/2024/6-Chapter-2_SS-0682c47185b2c32.99556319.pdf , and Ch. III, Sand Mining, https://cag.gov.in/uploads/download_audit_report/2024/7-Chapter-3_ES-0682c4718605f22.40293354.pdf ; Audit Report 2021-22, Ch. III, para 3.6 (Rudrasagar), https://cag.gov.in/uploads/download_audit_report/2022/7-Chapter-3_ES-065c0944ae2f016.53963658.pdf ; and Audit Report 2019-20, Ch. II, Implementation of the 74th Constitutional Amendment, https://cag.gov.in/uploads/download_audit_report/2022/6-Chapter-2_SS-0643f987f7d16c2.68347695.pdf (report numbers not given on the pages read)
- Asian Development Bank (2020). Agartala City Urban Development Project (53262-001): Initial Environmental Examination (draft, November 2020), https://www.adb.org/sites/default/files/project-documents/53262/53262-001-iee-en_6.pdf ; https://www.adb.org/sites/default/files/project-documents/53262/53262-001-iee-en_2.pdf
- Central Ground Water Board, North Eastern Region. Aquifer Mapping and Management Plan of West Tripura District (NAQUIM, AAP 2017-18), http://web.archive.org/web/20221212020843/https://cgwb.gov.in/AQM/NAQUIM_REPORT/Tripura/NAQUIM%20Report-West%20Tripura.pdf
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Department of Science, Technology and Environment, Tripura. Statutory Guidelines for protection and preservation of lakes, ponds and water bodies in Tripura (as cited in its indicative action plan; not read), https://dste.tripura.gov.in/sites/default/files/2024-12/Indicativeactionplan.pdf ; and the file carrying the "75 Mtrs." direction (source and scope not established; not used as a rule), https://dste.tripura.gov.in/sites/default/files/2024-12/75mtrs.pdf
- SANDRP (2018). "Overview of CWC's flood monitoring & forecasting in North East India", and (2024) "August 2024 Tripura floods: questions over disaster management" (secondary; CWC levels as transcribed), https://sandrp.in/2018/08/05/overview-of-cwcs-flood-monitoring-forecasting-in-north-east-india/ ; https://sandrp.in/2024/08/23/august-2024-tripura-floods-questions-over-disaster-management/
- Indian Council of Agricultural Research. Indian Journal of Fisheries, article on the Dumbur reservoir (water spread), https://epubs.icar.org.in/index.php/IJF/article/download/38686/22160/488756
- Reports of the Master Plan for the Agartala Planning Area 2045 (The NewsMill, February 2026), https://thenewsmill.com/2026/02/tripura-govt-plans-gis-based-master-plan-for-development-of-agartala/ ; of the 650 m Haora embankment and the cleaning of the Katakhal (India Today NE, 14 March 2026); of the ₹1,000 crore Agartala flood-protection proposal (press report of about 12 July 2026); and of the embankment programme of 2025 (secondary).
- Reports of Rudrasagar before the High Court (India Today NE, 19 January 2020 and 1 April 2023), https://indiatodayne.in/breaking-news/story/tripura-high-court-seeks-report-rudrasagar-lake-preservation-407936-2020-01-19 ; of ponds filled in Agartala (Tripuranet), https://tripuranet.com/agartalas-urban-expansion-threatens-water-bodies-officials-call-for-sustainable-solutions-19369.html ; of the Tripura Human Rights Commission on the Gol Bazar water body (Tripuranet, 2025), https://tripuranet.com/thrc-pulls-up-west-tripura-dm.html ; and of Tripura's report of 26 May 2020 on urban water bodies to the National Green Tribunal (India Environment Portal), https://indiaenvironmentportal.org.in/in-court/tripura-report-on-water-bodies-to-ngt-26052020 (secondary).
- Reports of the Agartala flood pumps (Indian Masterminds, 29 August 2024; India Today NE, 12 August 2025), of the Dumbur releases of August 2024 and the Ministry of External Affairs' statement (All India Radio, 22 August 2024), https://www.newsonair.gov.in/flood-situation-in-bangladesh-not-due-to-release-of-waters-from-indian-dam-on-gumti-river-tripura-mea-2 , and of the Union's push for flood-plain zoning law (Deccan Herald) (secondary).
- Biswas, S. Samsad Bengali-English Dictionary (Digital South Asia Library; edition not confirmed; queried by headword), https://dsal.uchicago.edu/cgi-bin/app/biswas-bengali_query.py ; Brahma, A. (2022). "Nominal categorial prefixes in the Bodo part of the Sal languages", Himalayan Linguistics 21(2), https://escholarship.org/uc/item/1vz927sb
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Bengali waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Tripura protects its waterbodies through its building rules, its municipal law and its land-revenue rules, with the wetland rules and the courts behind them; no law zones its flood plains. The Tripura Building Rules, 2017 (UDD notification No. F.2(316)-UDD/GL/TCPO/2009 (Part-I)/371 of 10 November 2017, as cited in UDD's BRAP-2019 document [the 2017 gazette was not read — TBC]), as amended to the (Fifth Amendment) Rules, 2025 (F.No.2(466)-UDD/GL/TCPO/2018(P-V)/4009-20, 4 July 2025; Gazette No. 1294, 5 July 2025), are made by the Urban Development Department (UDD) under section 274 read with section 118 of the Tripura Municipal Act, 1994, and apply to "buildings in the Urban Local Bodies (ULBs) in Tripura" (r.1(2)), with "and Planning Areas" added in 2019. They forbid the filling of any "canal, pond, water body, wetland, river lets, jhora, water source, natural spring, streams, drains, culverts", except by the Local Body with the prior approval of the State Government for reasons recorded in writing (r.9(3)); limit, but do not forbid, building in the "zone of river (within 15 metres from river bank)" (r.9(4)); make the owner of a site within 5.00 m of a tank prevent drainage from the building passing into it (r.4(1)(e)); keep sites in the ULBs of the hill areas 5 m from the "outside edge" of water courses (r.90(1)(i)); let the Mayor or Chairperson ask for a soil test, limit the height or refuse a building on land "recently filled up … pond, lake, marshy" (r.32); and count "flood prone areas in river plains" among the Natural Hazard Prone Areas (r.2(44)) (Clause 7.4, Disclosure). The Tripura Municipal Act, 1994 vests "all public tanks, streams, reservoirs, and wells" and the public drains, channels and water courses in the Municipality (s.91), forbids a new tank without its permission (s.232), and lets it make the owner of a private tank "cleanse it of silt, refuse or vegetation and … protect it from pollution by surface drainage" (s.234(1)); it "extends to the whole of the State of Tripura except the areas under the Tripura Tribal Areas Autonomous District" (s.1(2)), so neither it nor the Building Rules made under it apply in the TTAADC area, about 68% of the State (as reported). In the land records a pond is a land class: the Tripura Land Revenue and Land Reforms (Diversion of Land) Rules, 2025 (No. F.4(05)-RCC/2025, 2 June 2025; Gazette Extraordinary No. 1072, 3 June 2025) count the diversion of a water body to another purpose as a "Diversion of Land" (r.2(iii)), and their Appendix-I lists পুকুর "Tank/Pond", পুকুরপাড় "Bank of tank", দীঘি "Large tank", দীঘিরপাড় "Bank of large tank", ডোবা "Ditch", বিল "Watery land", হাওর "Big watery land", ছড়া "Streams", লুঙ্গা "Flat lands between tillas" and বাঁধ "Embankment" among the classes of land. The procedure of 2025 for diverting a water body was replaced by the (First Amendment) Rules, 2026 (6 March 2026; Gazette Extraordinary No. 2026350), which substituted rule 3 with online self-declaration and rule 4 with revocation within 30 working days and omitted rules 6 to 10; whether section 20 of the Land Revenue and Land Reforms Act, 1960 still bars the diversion of a water body was not established, and this Manual does not state the current procedure [TBC]. The Department of Science, Technology and Environment's "Statutory Guidelines for protection and preservation of lakes, ponds and water bodies in Tripura", notified after the High Court's order in PIL 2/2014 (as cited), were not read, and no distance from them is used. Wetlands are the concern of the Wetland Authority of Tripura (Clause 7.12, Commentary), and Rudrasagar is a Ramsar site. In this chapter PWD (WR) means the Public Works Department (Water Resources), which holds the river embankments, the sluices through them (among them the Katakhal double-barrel sluice at Agartala) and the minor-irrigation dams. A pukur, dighi or beel has no gate of its own unless it drains through a PWD (WR) sluice, so PWD (WR) is the custodian this chapter names where a clause speaks of levels, a datum, freeboard or an operating rule; the public tanks vest in the Municipality, the land records are the Revenue Department's, and every custodian is recorded one by one in the inventory (Annex 7A). Who regulates where in the TTAADC area, and who is the competent authority for the area, is set out in Chapter 1.
This Manual treats every recorded waterbody as drainage infrastructure. Six features set Tripura apart. The first is the river that leaves India: the Haora (also called Saidra in Kokborok, as reported), the Gomati, the Khowai, the Dhalai, the Manu, the Juri, the Deo, the Longai, the Muhuri, the Feni and the Burima (Bijoy) all cross into Bangladesh, and the valley towns stand behind river embankments (bandh, Bengali বাঁধ, the land records' "Embankment") and drain through sluices that close when the river is high, with no downstream Indian control and no level data from across the border (Chapter 5). The second is the lunga (Bengali লুঙ্গা: the flat land between tillas, the land records' "Flat lands between tillas"), the valley floor between the low hills, which is the natural flow path of the land and the place where towns are built and ponds filled. The third is the tilla (Bengali টিলা: a hillock, the land records' "Hillock"), the dissected terrace upland 10 to 30 m above the lunga, whose cutting for building silts the drains below and slides in heavy rain. The fourth is the chhara (Bengali ছড়া: a stream, the land records' "Streams"), the stream that comes down from the tillas and the hill ranges, with the khal (Bengali খাল: a canal or channel), such as the Katakhal, the Akhaura canal and the Kalapania Khal at Agartala, that carries the towns' water to the river. The fifth is the pukur (Bengali পুকুর: a tank or pond — the land records' "Tank/Pond"; plural pukurs) and the dighi (Bengali দীঘি: a large tank), the dug tanks of the towns, among them the palace-era and temple tanks, which this Manual treats as existing storage with heritage and fisheries constraints, not as detention to be drawn down. The sixth is the beel and the haor (Bengali বিল and হাওর, the land records' "Watery land" and "Big watery land"), the natural wetlands of the valley floors, with Rudrasagar the largest named. Tripura has no irrigation tank cascades; the tank clauses of this chapter apply to pukurs, dighis, the palace and temple tanks, the beels that drain through a khal, nala or sluice, the minor-irrigation dams and the Dumbur reservoir of the Gumti hydel project, and storage built under this Manual is a "detention pond", never a pukur. A doba (ডোবা, the land records' "Ditch") is a ditch, not a pond. Because the storm drains are also the sewers (Clause 8.9, Commentary), most pukurs and khals in the towns receive sewage. This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the Building Rules, the Municipal Act, the land-revenue rules, the Master Plans, the wetland procedures that record and protect them, or the directions of the High Court of Tripura, the National Green Tribunal and the Supreme Court.