Draft v1.0 prepared by NEER. Not adopted by the Government of Arunachal Pradesh or any authority, local body or community, and has no legal force. About this draft

Arunachal Pradesh · Draft v1.0

Arunachal Pradesh Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Arunachal Pradesh Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Arunachal Pradesh.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Arunachal Pradesh, by its Governor, its Council of Ministers or its Legislative Assembly, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Department of Urban Affairs (formerly the Department of Town Planning and Urban Local Bodies) or any of its wings, Urban Development, Town Planning, Housing and Urban Local Bodies, by the Directorate of Town Planning, by the Director/Chief Town Planner as the Authority under the Arunachal Pradesh Building Bye-Laws, 2019 or by any Building Permission Committee, by the State Urban and Country Planning Board, the Itanagar Planning Authority or any other Local Planning Authority, by the Itanagar Municipal Corporation (IMC), its Mayor or its Commissioner, by the Pasighat Municipal Council or any other urban local body or Municipal Building Committee, or by the Itanagar and Pasighat Smart City companies. Nor has it been adopted, notified or endorsed by any village authority, Gram Panchayat, community or clan, or by any Deputy Commissioner, including the Deputy Commissioner, Itanagar Capital Complex. Where it names a body, such as the Water Resources Department (WRD), the Public Health Engineering and Water Supply Department (PHED), the Public Works Department (PWD) or PWD (Highways), the Arunachal Pradesh State Disaster Management Authority (APSDMA), the Department of Disaster Management (DDM) or a District Disaster Management Authority, the Arunachal Pradesh State Pollution Control Board (APSPCB), the Department of Environment, Forest and Climate Change, the State Wetland Authority, the North Eastern Electric Power Corporation (NEEPCO) or NHPC, the Gauhati High Court at its Itanagar Bench, the National Green Tribunal (NGT) or the Supreme Court, or a body of the Union or an external or research body, such as the Central Water Commission (CWC), the India Meteorological Department (IMD), the Central Ground Water Board (CGWB), the Central Pollution Control Board (CPCB), the Comptroller and Auditor General of India (CAG), the National Disaster Management Authority (NDMA), the National Institute of Hydrology (NIH) or the North Eastern Regional Institute of Science and Technology (NERIST), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role. Citing a body's document does not make this Manual that body's document.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. Until then, the Arunachal Pradesh Building Bye-Laws, 2019 (the APBBL 2019), the Arunachal Pradesh Urban and Country Planning Act, 2007 as amended (the UCP Act), with the Arunachal Pradesh Urban and Country Planning (Amendment) Ordinance, 2025 (Ordinance No. 5 of 2025) and whatever Act replaces it, the Arunachal Pradesh Municipal Act, 2007, the Arunachal Pradesh Municipal Corporation Act, 2019, the Arunachal Pradesh (Land Settlement and Records) Act, 2000 and the customary rights it incorporates, the Master Plan of Itanagar Capital Region-2031, orders of courts and tribunals, and approval conditions in force continue to apply.

Arunachal Pradesh and its land. No part of Arunachal Pradesh lies in the Sixth Schedule to the Constitution, and the State has no District Councils. Article 371H, inserted by the Constitution (Fifty-fifth Amendment) Act, 1986, gives the Governor a special responsibility for law and order; it does not protect customary law or land, as summarised from a published copy of the Constitution. Land is governed by the Arunachal Pradesh (Land Settlement and Records) Act, 2000 (Act No. 10 of 2000), "a comprehensive law for land revenue administration for the whole of the State of Arunachal Pradesh incorporating customary rights on the land". It defines a "community" as "residents of a village as a whole", including "a clan, sub-clan, kindred", and "common land" as land "used or reserved for the common use of a community or a village" (section 2), and it declares the beds of "rivers, streams, nallahs, lakes and tanks" and "all standing and flowing water" to be the property of the Government only where they "are not the property of any person or community" (section 9(1)), as read in a scanned copy. Much of the land in and around the towns is held by communities, clans and individuals; individual titles came with an amendment of 2018, as reported. Nothing in the Constitution limits the State's laws on land here, as this Manual reads it, and the APBBL 2019 extend "to whole of Arunachal Pradesh" (2.1); but a stream or nallah bed on community or clan land is not Government property. So in this Manual setbacks and corridors are conditions of building permission and layout approval wherever the bye-laws apply, and guidance elsewhere. Where no permission is sought, the Manual reaches the public works that the State's departments and agencies execute (Clause 1.5.1(b)) and any body that adopts it; for a household or a community it is guidance only. Land for a public drain or corridor that is not Government or municipal land is secured by agreement with the owner, the clan or the community, by donation or purchase, or reserved in a master plan, a layout or a Town Planning Scheme; this Manual does not assume that land can be taken, and it binds no community or clan on its own land. The State or a local body could take the Manual up in several ways: the Department of Urban Affairs (Town Planning wing) could carry it into the five-year review of the APBBL 2019 (2.2), or notify its corridor as the "norms" that bye-law 2.10.1(e) refers to; IMC could make bye-laws and connection rules under the Municipal Corporation Act, 2019, and the Pasighat Municipal Council could act under sections 194 to 196 of the Municipal Act, 2007; the Itanagar Planning Authority and the other Local Planning Authorities could carry it into master plans, layouts and Town Planning Schemes; APSDMA could refer to it in the "Disaster Prone Area" norms that bye-law 2.10.1(f) anticipates and in district disaster management plans; and PWD and WRD could apply it to their own works. None has done so.

Names. Some places, rivers, gauges and instruments have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • Pasighat is Passighat in CWC's flood estimation report and in IMD's tables, where its station is Pasighat (A), index 42220; Ziro, also called Hapoli, is "Zero" in IMD's station list (index 42312); Aalo is also Along; Daporijo is CWC's Daporizo; and Yingkiong is CWC's Yinkiang or Yinkiong. CWC's flood estimation report for subzone 2(a) lists Passighat under the district "Tirap", as printed; the town is in East Siang. District names follow the list of 2024 as reported, and were not verified; Keyi Panyor is the district formed round Yazali from Lower Subansiri;
  • the Siang is the "Dihang or Siang" of the CWC plates, and the Yarlung Tsangpo in Tibet; the Dibang is the plates' "Dibang or Sikang"; and the Dikrong of this Manual is the Dikrang of some sources. The Ranganadi project of NEEPCO is also called Panyor. Ganga Lake, near Itanagar, is also Gyakar Sinyi and Gyekar Syenek. This Manual keeps each source's spelling where it quotes the source;
  • the Itanagar Capital Region (ICR) is the area of the Master Plan of Itanagar Capital Region-2031: Itanagar, Naharlagun, Nirjuli, Doimukh and Banderdewa. The Itanagar Capital Complex is the district of the Deputy Commissioner who chairs the Itanagar Planning Authority. The two are kept apart. The municipal area of Itanagar (Itanagar, Naharlagun, Nirjuli and Banderdewa) is the area of IMC, the Itanagar Municipal Corporation;
  • IMD's Meteorological Centre Itanagar (MC Itanagar) issues the State's bulletins. IMD has no Itanagar station in its tables of extremes; the stations there are Pasighat, Tezu, Ziro and Hayuliang. The daily gauge of NERIST's meteorological laboratory at Doimukh, whose series of 1988–2012 Dabral et al. (2016) analysed, is the only gauge with a published frequency analysis in the capital region;
  • CWC's flood estimation reports divide the State two ways. The State north and west of the Lohit is in subzone 2(a), North Brahmaputra (report No. NB/18/1991), whose contours stop at the foothills, so that the middle hills and the high ranges lie inside the subzone but in blank map space; the south-east is in subzone 2(b), South Brahmaputra (revised report No. SB-2(b)/R-4/44/99, March 2000), whose contours also reach north of the Lohit to Pasighat, Roing and Tezu. These subzones are not the four rainfall zones (AR-Z1 to AR-Z4) and seven hydrologic sub-areas (AR-A, AR-A1, AR-B, AR-C, AR-C1, AR-D and AR-E) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7;
  • CWC's levels at its sites in the State, Passighat, Namsai, Tezu, Miao and others, were read only as SANDRP transcribed them in 2019, and the datum is not stated. This Manual names the gauge, the unit and the datum with every level; and
  • in this Manual "the monsoon" and "the monsoon season" mean the wet season of 1 April to 31 October. That is not IMD's usage: IMD counts April and May as pre-monsoon months, and the south-west monsoon's normal onset at Itanagar is 5 June (4 June before) and its normal withdrawal 14 October, in IMD's monsoon normals of 2020, as summarised; no dates were found for Pasighat. The Manual's season begins on 1 April because April and May are already wet and stormy: at Doimukh May brings 505.9 mm, and March to May 24.0% of the year (Chapter 2).

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:

  • the Arunachal Pradesh Building Bye-Laws, 2019 (the APBBL 2019) are the State's building rules, issued by the "Department of Town Planning and ULBs, Government of Arunachal Pradesh". They "shall extent to whole of Arunachal Pradesh with effect from the date of notification" (2.1) and apply "for a period of FIVE years after which they shall be reviewed. Till such time the reviewed building byelaws are notified, these building byelaws will continue to be in force" (2.2). The "Gazette Notification" page of the copy read is blank, so their notification number, date and gazette reference are not known [TBC]. The Arunachal Pradesh Fire and Emergency Services Act, 2026 (Act No. 12 of 2026) names them as "the 'Arunachal Pradesh Building Bye-laws- 2019'" (section 2(c)), and the Online Building Permission System launched on 30 July 2025 was customised to them, as reported. No amendment was found. Their "Authority" is "The Director/Chief Town Planner of Town Planning & Urban Local Body … till an executing authority is notified" (definition 12). This Manual writes "APBBL 2019, 4.39(14)" for a provision. Two earlier texts are always written in full and are not the current rule: the Arunachal Pradesh Building Byelaws – 2009, "FINAL DRAFT", whose hill-site clause on "landslide prone areas" and the "diversion of the natural flow of water coming from uphill side" is not in the 2019 text, though the report of the ICR Master Plan reproduces it; and the Arunachal Pradesh Building Bye-Law 2010, listed as notified on the Town Planning portal, as summarised, and not read. MBBL 2016, in Chapters 1 and 10, is the national Model Building Bye-Laws of 2016, not the State's bye-laws;
  • the Arunachal Pradesh Urban and Country Planning Act, 2007 (the UCP Act; Act No. 3 of 2008; Notification No. LAW/LEGN-6/2007 of 11 March 2008), whose copy prints its assent as "7th March, 2007", which this Manual reads as probably a misprint for 2008, sets up the State Urban and Country Planning Board and the Local Planning Authorities, which are bodies corporate (section 10(2)); master plans are approved under section 24. The Master Plan of Itanagar Capital Region-2031 was approved on 3 June 2022 (No. TP-ULB-21011/3/2021-Dir-TP-ULB (E-31358)); the report read is titled "Draft", and whether the approved text differs was not checked [TBC]. Ordinance No. 5 of 2025 adds Town Planning Schemes, land pooling, local area plans and a definition of a "sponge city", and lets the Government prepare policy documents on a "Sponge City" and a "Risk Informed master Plan" (new section 71(2)(za)); its date of promulgation is not legible in the copy read [TBC]. An amending Bill was passed on 9 March 2026, as reported; its Act number and final text were not found [TBC], and this Manual does not cite the Ordinance's provisions as enacted law. There is no "Arunachal Pradesh Town and Country Planning Act";
  • the Arunachal Pradesh Municipal Act, 2007 (Act No. 4 of 2008; Notification No. LAW/LEGN-21/2007 of 19 March 2008) governs the Pasighat Municipal Council and the State's other municipalities. It makes "drainage and sewerage" a core municipal service (section 47(1)(a)), vests public drains, tanks and streams in the Municipality "Notwithstanding anything contained in any other law" (section 102), and requires it to "construct and maintain drains and sewers, and provide a safe and sufficient outfall" for storm water and sewage "in such manner as may not cause any nuisance, whether by flooding" (section 194). Section 104 routes compulsory acquisition through the "Land Acquisition Act, 1894", as printed. Pasighat's municipal area, 10.21 km², was notified on 24 August 2010; the High Court records a notification of 20.12.2012, and the two dates do not agree. The Council has 8 wards, as reported;
  • the Arunachal Pradesh Municipal Corporation Act, 2019 (Act No. 8 of 2019; Notification No. Law/Legn-4/2019 of 30 September 2019) governs IMC. It makes "the maintenance and cleaning of drains and drainage works" an obligatory function (section 60(a)), vests public drains and sewage works in the Corporation (section 200), and forbids "foul water into a drain provided for surface water" where separate drains exist (section 203). The Itanagar municipal area was notified on 14 September 2010 under section 4(1) of the 2007 Act; the High Court records a notification of 06.02.2012 under section 6, and the two may both exist. The notification constituting IMC under the 2019 Act was not found [TBC]. IMC has 20 wards; its first mayor was elected in January 2021 and a new council in January 2026, as reported;
  • the Department of Urban Affairs ("Urban Affairs") was "Re-named as Department of Urban Affairs in 2021", with four wings, Urban Development, Town Planning, Housing and Urban Local Bodies, and lists among its functions "Storm Water Drains; Drainage; Sewerage; Septage Management". It is a works department with a Chief Engineer and 28 divisions. Its Town Planning wing, the Directorate of Town Planning, issued the bye-laws, prepared the ICR Master Plan and in 2017 invited bids for a drainage master plan of the capital. The press still writes "UD&H"; this Manual uses that only inside a quotation. The Itanagar Planning Authority, the Local Planning Authority for the ICR, is chaired by the Deputy Commissioner, Itanagar Capital Complex; notifications of other Local Planning Authorities, among them Ziro and Namsai, are listed on the Town Planning portal by title;
  • WRD holds the rivers and their anti-erosion works, as reported; it is named in this Manual as the State groundwater agency, although no State network of observation wells was found, and the only network found is CGWB's, in its North Eastern Region. PHED supplies water. The PWD and PWD (Highways) keep the State's roads and NH-415 and their drains, as reported. APSDMA, the Arunachal Pradesh State Disaster Management Authority, is named in full at its first use in each chapter, because another edition of this series uses the same letters; its own documents were not read [TBC]. DDM, the Department of Disaster Management, issues the daily situation reports and the State Emergency Operation Centre the damage reports, as reported. The District Disaster Management Authorities are written in full. APSPCB grants pollution consents. The State Wetland Authority is named in the press, and its exact name and constitution were not found [TBC]. NEEPCO operates the Pare, Ranganadi and Kameng hydro-electric projects, and NHPC the Lower Subansiri project, and is building the Dibang project; their release rules were not found;
  • the NGT and the Gauhati High Court at its Itanagar Bench have shaped the State's sewage and municipal work. The NGT's case on the Senki, the Pachin and the Dikrong (OA 94/2020/EZ, S. D. Loda v. Union of India & Ors.) is pending, and its order of 5 January 2023 directed that "no untreated sewage or treated sewage be allowed to enter into the waterbody", as summarised; in OA 606/2018 the State filed an affidavit-cum-six-monthly report in 2025. The Itanagar Bench's judgment of 28 September 2018 in PIL 22(AP)/2018 directed municipal elections. No order on the capital's drains, earth cutting or landslides was found. This Manual cites court and tribunal orders with their status; and
  • where a shared clause names a revenue subdivision, this Manual uses the circle, as the sources do ("Toru circle"), and where it says "revenue village" it means the village of the circle. Land records are kept by the land revenue offices of the Deputy Commissioners; much community and clan land is not in any State register (Chapter 7).

Where a shared clause calls for the local language on a sign, a form field or a basin name, this Manual writes "the local language". English is the language of the State's laws and administration, and of this Manual, as reported; no official-language Act was checked for this Manual. Arunachal Pradesh has many tribal languages, among them Nyishi, Adi, Galo, Apatani, Monpa, Mishmi and Tangsa, and no single local language; which spoken language serves as a common language between them was not researched, and this Manual names none. So, as set by this Manual, signs and flood-depth markers are in English and the local language: the language in local use in the ward or village, as the local body or the village authority uses for its own public notices, because a sign must be readable by the people it warns. The scripts in use were not researched; where a shared clause says "script", it means the spelling of the name that the local body uses [TBC]. In Annex 7A the field coded LOC holds a water body's name in the local language.

Some local words are used in the text, and are explained again where they first appear:

  • a pond is this Manual's word for a natural or dug body of standing water. The Manual uses the plain English word because English is the State's working language; because no tribal language is shared across the State; because the Nyishi word sinyi means a lake or a tank rather than a small town pond (below); and because the statutes, the ICR Master Plan and the State's wetland survey already write "pond" and "tank" in English. In the shared clauses a "tank" is water impounded by a bund with a surplus weir, which the State hardly has; the tank clauses apply in this Manual to ponds, to lakes and to any other impounded water. Where a shared list therefore names a pond twice ("tank (pond), lake, pond"), the repetition is the shared text's. Engineered storage is a detention pond. A natural pond or lake keeps its own description, and a lake, a spring pool or a reservoir is never called a detention pond;
  • a lake is a natural body of open water larger than a pond. Most of the State's lakes are high-altitude lakes far from the towns; a glacial lake is one held by ice or moraine below a glacier. Ganga Lake, in the Itanagar Wildlife Sanctuary, is the capital's lake;
  • a nallah is a natural or open channel in or near a town that carries storm water and, in practice, waste water. The word is the bye-laws' ("Distance from Nallah/Stream", 2.10.1(e)), the Land Act's ("nallahs", section 9(1)) and the ICR Master Plan's ("natural drainage system (Nallah)"), and it is part of place names such as Papu Nallah. This Manual spells it "nallah" throughout;
  • Jhot is the bye-laws' "strip of land permanently left open for drainage purposes. It is not to be used as an access way or a street and is not to be included as a part of setbacks" (APBBL 2019, definition 69). The bye-laws give it no width, and this Manual uses the word for that strip only;
  • a spring is a natural outlet of groundwater at the surface. In the northern hills of East Siang springs are the only source of water, and in Papum Pare "most of the springs become dry during dry season", as CGWB records; no inventory of the State's springs was found. A stream is a natural channel, and a river a main channel such as the Siang, the Lohit or the Dikrong;
  • in Nyishi (called "Dafla" in the source), R. C. Hamilton's An Outline Grammar of the Dafla Language (1900) gives, in its English–Dafla vocabulary: sinyi "Lake" (about p. 104) and "Tank" (about p. 118), the second word of Gyakar Sinyi, as this Manual reads the name; issi "Water" (about p. 122); and selam "Channel" (about p. 96). Its word for "Spring", lol, "is rarely used", by the vocabulary's own note (about p. 118), and its words for "Rain", pödöng and nyadang, are uncertain in the scanned text; neither is used here; and
  • no terms were found in Adi, Galo, Apatani, Monpa, Mishmi or Tangsa: Lorrain's Abor-Miri dictionary was not located, and Needham's grammar of Shaiyang Miri (1886) has no word for pond or drain [TBC].

The page numbers are approximate, read from the scanned text of the vocabulary. These words are glosses: the Manual's working words are pond, lake, nallah, spring and stream, and the Nyishi terms appear only here and in Annex 7E.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • IMC is the Itanagar Municipal Corporation, and APSDMA the Arunachal Pradesh State Disaster Management Authority. In other editions of this series the same letters stand for other bodies; in this Manual they mean only these two. Each chapter writes the full name at its first use;
  • "APBBL 2019" is the Arunachal Pradesh Building Bye-Laws, 2019, and "MBBL 2016" the national Model Building Bye-Laws 2016. Neither stands for the 2009 Final Draft or the "2010" bye-laws;
  • "Authority", in the bye-laws, is the Director/Chief Town Planner, or the executing authority once one is notified (definition 12); the Itanagar Planning Authority is the Local Planning Authority under the UCP Act;
  • the ICR is the Itanagar Capital Region of the master plan, never the Itanagar Capital Complex;
  • HFL is the highest flood level recorded at a gauge, and DL and WL the danger and warning levels that CWC sets at its sites. None is a design level. CWC has no site on the Senki, the Pachin or the Dikrong at the capital; Passighat's HFL of 157.54 m, on 11 June 2000, is the stage of an outburst flood, 3.58 m above its danger level of 153.96 m, as SANDRP transcribed them; and Chapters 5 and 7 say how this Manual finds a design level;
  • MC is IMD's Meteorological Centre Itanagar; DC is a Deputy Commissioner; and
  • HEP is a hydro-electric project, as NEEPCO and NHPC name them.

The sense is clear from the context.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Arunachal Pradesh's towns flood, and fail, for three reasons. The capital's rainfall records show the first: the only frequency analysis in the capital region, of 25 years of NERIST's daily gauge at Doimukh, gives a 25-year day about one contour above the CWC plate, and the plate draws no contour at all north of the town. Itanagar showed the second on or about 14 September 2018, when cloudburst floods in the Modirijo and Donyi Polo catchments killed three people, left at least four missing and washed away the Senki View culvert and the Press Colony bridge, as reported. And Pasighat shows the third, because the Siang that its drains fall to is set by floods that start in Tibet: on 11 June 2000 the breach of a landslide dam on the Yigong raised the river at Pasighat to CWC's highest recorded level, 157.54 m, against a danger level of 153.96 m, as SANDRP transcribed them.

  1. Rainfall that the national products barely cover. CWC's subzone 2(a) covers the State north and west of the Lohit on paper, but its report (NB/18/1991) draws contours only along the foothills, from about Bhalukpong and Itanagar to Ziro, Likabali, Roing and Tezu, as this Manual reads its plates. Seppa, Bomdila, Dirang, Tawang, Daporijo, Aalo, Mechuka, Yingkiong and Anini, and Pasighat itself on 2(a)'s plates, lie inside the subzone but in blank map space. The south-east is in subzone 2(b), whose contours also reach Pasighat, Roing and Tezu, where the two reports disagree by about one contour. At Itanagar the plates give about 180 mm for the 25-year day and about 200 mm for the 50-year day, read by eye; NERIST's daily gauge at Doimukh, 1988–2012, gives a 25-year 1-day fall of 210.39 mm (Dabral et al., 2016), about 238 mm as a 24-hour depth by this Manual's arithmetic; and the gridded rainfall of NIH-DHAARA gives the Itanagar cell a 50-year day of 472 mm, more than twice the plate. IMD's national set of rainfall intensity curves (Das et al., 2022) has no panel for any Arunachal Pradesh station. IMD's largest day at Pasighat, 652.2 mm on 5 October 1988, is 37% above the next-largest, 476.7 mm on 22 August of the same year, and has not been confirmed. No hourly rainfall from any gauge in the State was found in any primary source.
  2. Steep foothill towns on Siwalik sandstone and shale, where cut slopes and debris fail and water put into the slope moves the ground. Itanagar and Naharlagun are built on the Siwalik hills, which "form hogback topography" over sandstone, shale and boulder beds, as CGWB describes them, in seismic Zone V with "5 fault lines in the city", as the ICR Master Plan records. On 11 July 2017 a landslide at Laptap, in Papum Pare, killed 14 people after three days of rain, as reported, though the tolls differ, and no rainfall amount for it was published. The press reports drains along the Bage Tinali–Naharlagun road "too shallow and narrow" and choked with earth-cutting debris, and the 2018 floods brought down a landslide from "the dumping area of NH 415", as reported. The APBBL 2019 refuse earth-cutting permission where "the average slope of the topography is more than 30%", limit a cut to 3 m and require a retaining wall "immediately" after cutting (4.39), the strongest slope rule in this series' North-East editions; but they say nothing about putting water into the slope, and they make recharge structures mandatory for every building of 500 m² or more (9.7), on a slope as on a terrace.
  3. Foothill towns on fans and flood plains whose rivers are set by outbursts, glaciers and dams. Pasighat, Ruksin, Roing, Tezu and Namsai stand on the bhabar fans and flood plains of the Siang, the Dibang, the Lohit and the Noa-Dihing, where "the Bhabar is mostly composed of boulders while flood plain is composed of fine sand and silt", as CGWB writes of Lohit. The Yigong outburst of June 2000 raised the Siang by 5.5 m at Pasighat, in a peer-reviewed analysis as summarised, and in November 2017 the river ran turbid after landslide dams formed in Tibet, as reported. NDMA lists 27 glacial lakes in the State as high-risk, 16 of them in Dibang Valley and 6 in Tawang, as reported. Dams upstream release into town reaches: NEEPCO's Pare dam discharged 1,310 m³/s into the Dikrong above Doimukh on 31 May 2025, as reported, and a flash flood in a side stream swept through the NEEPCO colony at Yazali on 24 June, in 2025 or 2026, as reports disagree.

Over all three lie four more conditions. The drains carry the towns' sewage: in the capital "storm water drains being used as sewers", as the ICR Master Plan puts it, and "no ULB is treating sewage. Even the state capital, Itanagar-Naharlagun, lacks a sewage treatment facility", as the observations quoted in the State's affidavit of 2025 to the NGT record. Land along the streams is community, clan or private land, and a stream bed on it is not Government property (section 9(1) of the Land Act). The building rule is statewide, with a strong slope bar but no stream distance: the APBBL 2019 ask a site plan to show the "Distance from Nallah/Stream as per the notified rules/norms" (2.10.1(e)), and no such rules or norms were found. And no drain has a design standard: no State, municipal or departmental document fixes a design storm, a return period or a runoff coefficient for any town's drains, and the ICR Master Plan records that "no scheme or work for storm water drains is under execution", with "only 3.7% storm drains along main roads".

Behind all of this lie the State's rivers, lakes, ponds and springs. The Forest Department's survey of wetlands larger than 2.25 ha counts 1,127, of which 944 are high-altitude lakes and only 2 tanks or ponds, and Papum Pare, round the capital, has 6; the first Water Bodies Census counts 993 water bodies, 100 of them urban, and reports none encroached, as summarised. The capital's drains "end up mostly into the Nallah and in some cases, into local ponds or open fields", the ICR Master Plan records, and "rivers like Pachin flowing through densely populated areas had become a waste disposal site". CPCB first listed the Senki at Chandranagar, upstream of the Pachin, among its polluted river stretches in 2025, in Priority V. The capital draws 7 MLD from the Senki by lift and 11 MLD and 7 MLD from the Poma and the Niorch by gravity. Ganga Lake, in the Itanagar Wildlife Sanctuary, faces earth cutting and encroachment, as reported, and Glaw Lake in Lohit became the State's first Ramsar site in August 2026, as reported. No floodplain, waterbody, spring or nallah protection law was found beyond the bye-laws' duty on local bodies to "identify, demarcate, protect and maintain the water bodies" (Annexure E 1.8) and their chapter on natural features.

Design for Arunachal Pradesh therefore has to cover a wet season that begins in April. At Doimukh April brings 227.7 mm, May 505.9 mm and June, the wettest month, 762.8 mm; March to May bring 846.5 mm, 24.0% of the year's 3,531.8 mm, in NERIST's series, and "The state receives rainfall over a period of 8 to 9 months excepting in winter", as the State Action Plan on Climate Change (SAPCC, 2011 draft) records. The south-west monsoon reaches Itanagar on 5 June and withdraws on 14 October, in IMD's normals as summarised, but the damaging storms of the late pre-monsoon cluster in the last ten days of May: the remnants of cyclone Remal gave Bomdila 190 mm in 24 hours on 28–29 May 2024, as summarised from an IMD bulletin, and on 30 May 2025 a landslide swept a vehicle off NH-13 between Bana and Seppa and seven people died, as reported. This Manual's monsoon season is 1 April to 31 October, so that drains are cleared and slopes stabilised before the April storms of the east and the May storms of the capital. Large falls come outside it too, as on 3 and 4 October 1979 at Hayuliang (280.0 mm) and Tezu (222.0 mm), and on 4 February 1961 at Pasighat (137.6 mm), so design statistics use the annual maxima of every month. Snow falls in the high ranges in winter. The annual normals conflict: Itanagar's is given as 3,942.44 mm by CGWB, as summarised, and as 2,289 mm by the ICR Master Plan, which gives no source; Doimukh's as 3,531.8 mm by NERIST and 3,251.67 mm by CGWB, as summarised. This Manual uses none of them as a normal. Underground, the State draws 0.39% of its extractable groundwater (2024, as summarised), and 15 of CGWB's 27 stations in the State stood within 2 m of the ground in August 2025, as summarised, so rainwater is worth storing for use, not putting into the slopes or the flood plains.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval wherever a building permission is granted. Every development above a modest size must:

  • hold frequent rainfall on site, in tanks for use, and in the ground only where the ground can safely take it;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving stream, nallah, river, pond or lake is high, when a dam upstream is releasing, when the main river carries an outburst flood, or when a drain or culvert is choked with debris, silt and garbage.

The Manual also sets how public drains, hill roads and their drains and culverts, hill streams, nallahs, rivers, ponds, lakes, reservoirs and their release reaches, springs and their recharge areas, outfalls and basin-wide master plans are designed, and how drains in steep catchments are protected against debris, sediment and garbage, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Arunachal Pradesh's wet season of April to October; to the capital region of Itanagar, Naharlagun, Nirjuli, Doimukh and Banderdewa, on Siwalik sandstone, shale and boulder beds whose cut slopes slide, with its sandy valley terraces and the flood plains of the Pachin and the Dikrong; to the hill towns of the middle hills, Ziro, Daporijo, Aalo, Seppa and Yingkiong, and of the high ranges, Tawang, Bomdila and Dirang, with snow, glaciers and glacial lakes above them; to the bhabar fans and flood plains of Pasighat, Roing, Tezu and Namsai, on rivers fed from Tibet and from glaciated ranges; to the release reaches below the dams; to springs and streams that supply the towns; and to towns that stand on community, clan and private land, whose roads and houses lie across the natural lines of drainage on the slopes.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 on hill roads, and the NDMA urban flood guidelines are also used. The drainage chapter of the IRC's hill road manual, IRC:SP:48, was not read for this Manual.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Reports for subzone 2(a), North Brahmaputra (1991), in the foothills, and for subzone 2(b), South Brahmaputra (revised, March 2000), in the south-east, as the interim sources, with the higher reading where both plates draw contours; on the Noa-Dihing plain with the 2(b) report's own ratios of short to 24-hour rain, and elsewhere with interim ratios set by this Manual, which are not below any ratio that NIH-DHAARA gives for the State. In the capital region a table set from NERIST's Doimukh series governs, not the plate, because the gauge reads about one contour above it. In the middle hills and the high ranges, beyond the last contour, the design day is not less than floors set by this Manual. Short-storm floors apply in the foothills and on the plain. The design day is checked against the largest reliable days recorded within 25 km, but only within the same domain (the foothills and the plain, or the hills) and never across the foot of the hills; Pasighat's 652.2 mm stays in that check until IMD confirms or withdraws it. Snow-fed and glaciated catchments are treated site by site, with screening for glacial-lake and landslide-dam outbursts. NIH-DHAARA is reported beside the design value and never used as one, and IMD's national curves (Das et al., 2022) are not used, since they have no Arunachal Pradesh panel.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The APBBL 2019; the UCP Act and Ordinance No. 5 of 2025, as summarised above; the Municipal Act, 2007; the Municipal Corporation Act, 2019; the Land Act, 2000; Article 371H, as summarised; the ICR Master Plan 2031 and the invitation of 2017 for a drainage master plan of the capital; the NGT's orders in OA 94/2020/EZ, as summarised, and the State's affidavit of 2025 in OA 606/2018; and CPCB's list of polluted river stretches of 2025. This Manual follows them or, where disclosed, makes them stricter. The gazette notification of the APBBL 2019, the bye-laws of 2010, the Act that replaced Ordinance No. 5 of 2025, the Land Act as amended in 2018, the notification constituting IMC, APSDMA's own documents, the drainage master plan prepared for the capital in 2021 and the Smart City drainage reports were not read. Every rule cited must be checked against the current text.

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Arunachal Pradesh Building Bye-Laws, 2019 (Department of Town Planning and ULBs), definitions 12, 35 and 69, 2.1, 2.2, 2.10, 4.2.1, 4.16, 4.19.1, 4.33, 4.39, Chapters 9, 12 and 14 and Annexure E; Arunachal Pradesh Building Byelaws – 2009, "FINAL DRAFT" (Directorate of Town Planning); Arunachal Pradesh Urban and Country Planning Act, 2007 (Act No. 3 of 2008), ss. 10 and 24, and the (Amendment) Ordinance, 2025 (Ordinance No. 5 of 2025); Arunachal Pradesh Municipal Act, 2007 (Act No. 4 of 2008), ss. 2(85), 47, 49, 102, 104, 194, 196 and 340–343; Arunachal Pradesh Municipal Corporation Act, 2019 (Act No. 8 of 2019), ss. 60, 200 and 203; Arunachal Pradesh (Land Settlement and Records) Act, 2000 (Act No. 10 of 2000), ss. 1, 2 and 9; Arunachal Pradesh Fire and Emergency Services Act, 2026 (Act No. 12 of 2026), s. 2(c); Constitution of India, Article 371H, as summarised; municipal area notifications for Itanagar (14 September 2010) and Pasighat (24 August 2010); Master Plan of Itanagar Capital Region-2031, notice of approval (30 June 2022) and draft report; Department of Town Planning and ULBs, invitation of expressions of interest for a GIS-based Integrated Drainage Master Plan and DPR for Itanagar Capital City (31 October 2017); Department of Urban Affairs, website; Gauhati High Court, Itanagar Bench, PIL 22(AP)/2018, judgment of 28 September 2018; NGT, OA 94/2020/EZ (orders as summarised by the India Environment Portal), OA 606/2018 (State affidavit, 2025, and amicus observations of 20 March 2026) and OA 148/2025/EZ (CPCB reply of 5 January 2026); CPCB, Polluted River Stretches for Restoration of Water Quality (2025); CAG, Audit Report for the year ended 31 March 2023 (Government of Arunachal Pradesh); Department of Environment, Forest and Climate Change, Status of Truthing and Boundary Demarcation of Wetland of Arunachal Pradesh; CWC, Flood Estimation Reports for North Brahmaputra subzone 2(a), No. NB/18/1991, and South Brahmaputra subzone 2(b) (Revised), No. SB-2(b)/R-4/44/99 (March 2000), Plates 8–10, read by eye; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Monsoon normals (2020), as summarised; Dabral, Kumar and Tana (2016), CIGR Journal 18(4); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (queried 14 November 2026); Arunachal Pradesh State Action Plan on Climate Change (draft, 2011); CGWB, district booklets for Papum Pare, East Siang, Lohit, Changlang, West Kameng and Tawang; R. C. Hamilton, An Outline Grammar of the Dafla Language (1900); CWC levels as transcribed by SANDRP (2019); reports of the floods and landslides of 2000, 2017, 2018, 2024, 2025 and 2026, of the dam releases and glacial lakes, of the State's lakes and wetlands, of the official language and of the bye-laws' online system (press and secondary sources).


Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Arunachal Pradesh can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. The SAPCC (2011 draft) projects annual rainfall 5% to 15% lower in the 2030s and 25% to 35% higher by the 2080s; a press report places the decrease in the 2050s, and the two do not agree. It gives no factor for extreme rainfall.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. CWC's report for subzone 2(a) (1991) covers almost the whole State on paper but draws contours only along the foothills, and its ratio of the 1-hour to the 24-hour rain, 0.260, built on recording gauges that the pages read do not name, would give Itanagar about 52 mm in an hour on the plate's 200 mm, by this Manual's arithmetic, while NIH-DHAARA gives 78 mm for the same 50-year hour. IMD's 2022 national set of rainfall intensity curves has no panel for Itanagar, Pasighat or any other Arunachal Pradesh station.

Arunachal Pradesh has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of the Department of Urban Affairs, IMC, the Pasighat Municipal Council or any other local body, the PWD or WRD that fixes a return period, a runoff coefficient or a design rainfall for town storm drains; the bye-laws refer to the National Building Code of 2005, Part 9, for plumbing and drainage (4.19.1.3 and 4.33.1). No IDF relationship with published constants was found for any station in the State. The ICR Master Plan diagnoses the capital's drains, "not engineered … open drains or kutcha drains without any flow gradient", and proposes a network, but sets no design storm. The Department of Town Planning and ULBs invited expressions of interest in 2017 for a "GIS based Integrated Drainage Master Plan and DPR for Itanagar Capital City", with a horizon of 2038, and stated no return period; a plan prepared by a consultant was reviewed by the Chief Minister in June 2021, as reported, and its adoption was not found. The SAPCC budgets for "Storm water draining in twenty six urban settlements" without criteria. These are plans and budgets, not a State standard. This Manual is offered as a technical companion to the APBBL 2019, the Municipal Act, 2007, the Municipal Corporation Act, 2019, the UCP Act and the ICR Master Plan: it supplies the design storm, detention, slope, water-level and buffer values that they leave open. It has not been adopted by the Department of Urban Affairs, any local body, any community or any other body. In particular:

  • The building rules require rainwater harvesting, but size nothing. All buildings on plots of 100 m² must submit "the complete proposal of rainwater harvesting" (9.1), public open spaces over 500 m² "shall have arrangements for complete utilization and capture of storm water" (9.6), recharge is mandatory for buildings of 500 m² and more (9.7), and the Authority is to set up a "Rainwater Harvesting Cell" to inspect them (9.8). None gives a storage volume. No rule requires on-site detention, limits peak runoff or sets a design storm; the nearest are a plinth "not less than 300 mm" so that "adequate drainage of the site is assured" (4.2.1.1), and, on sites of 5,000 m² and more, a natural drain whose "inlet and outlet point … should be maintained with adequate size of channel" and an unpaved area of at least 20% of the recreational open space (Table 14.1);
  • The slope rule stops cuts, but not water. Bye-law 4.39 refuses earth cutting on average slopes over 30%, limits a cut to 3 m, keeps 2.5 m from the property line on the upper terrace, requires a retaining or breast wall "immediately", and makes the owner "clear/dispose-of soil/debris from site or drain". No rule restricts soak pits, recharge structures or infiltration trenches on slopes, on shale or on slope debris, and bye-law 9.7 makes recharge mandatory wherever the building stands;
  • There are no setbacks from streams, springs, ponds or nallahs. The bye-laws ask a site plan to show the "Distance from Nallah/Stream as per the notified rules/norms" and the "Distance from Disaster Prone Area as per norms set by Disaster Management Authority" (2.10.1(e) and (f)), and neither set of norms was found. The Jhot is left open for drainage but has no width;
  • There is no floodplain law. No floodplain zoning Act or Bill was found, and the bye-laws set no flood plinth beyond 300 mm. They count as hazard-prone the areas flooded by "back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area", but no such survey was found. A Town Planning Scheme under Ordinance No. 5 of 2025 may include "the filling-up or reclamation of low-lying, swampy or unhealthy area", which can remove the low land and swamps that store floods. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); where a line that a master plan, a scheme or a court draws is wider and binds, it governs; and
  • No document sets the river or reservoir level for which an outfall is designed. CWC's sites at Passighat, Namsai, Tezu and Miao give danger levels and highest flood levels, read only as SANDRP transcribed them and with no datum stated; CWC has no site on the Senki, the Pachin or the Dikrong at the capital, nor on the Dibang at Roing. The release rules of the Pare, Ranganadi, Kameng, Lower Subansiri and Dibang projects were not found. Highest flood levels are records, not design levels, and at Pasighat the highest is an outburst stage.

So each agency and each local body interprets the central manual its own way. IMC, the Pasighat Municipal Council and the other local bodies, the Department of Urban Affairs and the Smart City companies, the PWD and PWD (Highways), WRD, PHED, NEEPCO and NHPC, the communities and clans, their consultants and funding agencies fill the gaps differently. No notification divides the drains between them. IMC holds the public drains in its area by section 200 of the 2019 Act and must maintain and clean them (section 60(a)), and the Pasighat Municipal Council by sections 102 and 194 of the 2007 Act; the Department of Urban Affairs and the Smart City companies build storm drains and hand them over; the PWD builds roadside drains with its roads; WRD keeps the rivers; and outside the municipal areas the drains on community or clan land have no statutory owner. In Itanagar a nallah may run through clan land, the municipal area and a highway culvert before it reaches the Senki or the Pachin. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in four rainfall zones and seven hydrologic sub-areas, with a checked station analysis to govern where one exists; the 2(a) plates in the foothills and the 2(b) plates in the south-east, the higher where both draw contours, with the 2(b) ratios on the Noa-Dihing plain and interim ratios elsewhere; a table from NERIST's Doimukh series in the capital region; floors in the middle hills and the high ranges, beyond the last contour; screening for glacial-lake and landslide-dam outbursts on snow-fed and glaciated catchments; and a check of the design day against the largest reliable days recorded nearby that never crosses the foot of the hills (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites, with rainwater storage credited only through its use (Chapter 4);
  • a required tailwater check for outfalls to streams, nallahs, rivers, ponds and reservoirs: at the capital, a design level for the Dikrong, the Senki and the Pachin from a model with the largest recorded dam release and the highest surveyed flood marks; on the main stems at Pasighat, Tezu, Namsai and Roing, CWC's danger level as the design case and its highest flood level as the check, with the outfall at that level for the whole 72-hour design storm; on the hill streams, a 1% AEP study that allows for debris; and, in release and outburst reaches, release and outburst scenarios (Chapter 5);
  • a design flood line, and corridors and setbacks along streams, nallahs and rivers and around ponds, lakes and springs, proposed by this Manual where no line binds, with a corridor at least 15 m from the top of bank on every natural channel draining 8 ha or more, the capital's nallahs, the Senki, the Pachin and the Dikrong among them, offered as the "norms" that bye-law 2.10.1(e) refers to; a condition of building permission and layout approval wherever the bye-laws apply, and guidance elsewhere; and corridor land that is not Government or municipal land secured by agreement with the owner, the clan or the community, never taken (Chapter 7);
  • no deliberate infiltration on natural slopes steeper than 10°, on Siwalik shale at any slope, on colluvium, slope debris or fill, in mapped landslide zones, or above a landslide scarp, cut slope or retaining wall, unless a geotechnical certificate allows it; none below the 1% AEP flood level of a river or nallah, on the palaeochannels and swamps of the Pachin and the Dikrong, or where the water table rises within 2 m of the ground; recharge only on the tested sandy terraces of the Naharlagun–Nirjuli–Doimukh valley and the coarse heads of the bhabar fans above the water table; roof runoff to storage for use, with its overflow to lined, stepped drains; the recharge areas of springs kept free of paving and road runoff; and the interception of dry-weather flow before every outfall to the Senki, the Pachin and the Dikrong and to the main stems at Pasighat, Tezu, Namsai and Roing, and before any pond used as storage, where drains carry sewage (Chapters 4 and 8);
  • debris racks and traps, allowances for sediment, garbage and blockage, energy dissipation in steep drains, and hill-road drainage that never discharges onto an unprotected slope (Chapters 6 and 9), with drains, nallahs, inlets, racks and culverts cleared and certified ready by 31 March, cleared again by 15 May before the storms of late May, and again by 15 November after the October storms, standby kept from 1 April to 31 October, and, in the high ranges, inlets kept clear of snow and ice from December to March and a snowmelt clearance by 30 April (Chapter 10); and
  • basin-wide master plans, so that the agencies that share a basin, and the communities whose land lies within it, plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). IMC or the Pasighat Municipal Council, the Itanagar Planning Authority or another Local Planning Authority in a master plan or a Town Planning Scheme, the State in the bye-laws, or a community on its own land can still adopt a stricter standard (Chapter 1).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Ponds, Lakes and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Arunachal Pradesh
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Arunachal Pradesh locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Lakes, tanks and ponds
7E.2Water, channels and springs
7E.3The Manual's working words
7E.4Terms not found or not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A hill town on Siwalik slopes and a valley-floor town, with a glacial lake, a spring, nallahs, a pond, a main river and a reservoir. At the top a glacial lake below a snow ridge feeds the main river and needs an outburst screening; a hillside town with a cut of not more than 3 m and a retaining wall, a catch drain and a toe drain, lined, stepped drains, silt traps and a debris rack at a highway culvert; earth cutting refused above a 30% average slope; no soakaways on slopes steeper than 10°, on shale or on slope debris; a spring above the town's intake with its protected recharge area; the nallah leaving the hills at a boulder fan onto a valley floor; on the valley floor a town with an open nallah to the river, whose high level backs up the outfall, a pond kept as storage with dry-weather interception of sewage before it, infiltration only on tested terrace sands above the water table; a dam upstream with its release reach; and the main river's outburst stage
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
ABC Waters Active, Beautiful, Clean Waters (PUB Singapore's design guidelines)
AEP Annual exceedance probability
AGU American Geophysical Union
AIDR Australian Institute for Disaster Resilience
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APBBL 2019 The Arunachal Pradesh Building Bye-Laws, 2019
APSDMA Arunachal Pradesh State Disaster Management Authority
APSPCB Arunachal Pradesh State Pollution Control Board
APWA American Public Works Association
ARF Areal reduction factor
ARI Average recurrence interval
ASABE American Society of Agricultural and Biological Engineers
ASCE American Society of Civil Engineers
ASTM ASTM International (standards)
AWS Automatic weather station
BMP Best management practice
BOD Biochemical oxygen demand
BRE Building Research Establishment (UK)
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CCTV Closed-circuit television
CD Chart datum (coastal term; not applicable in Arunachal Pradesh)
CGP Construction General Permit (US EPA)
CGWB Central Ground Water Board
CIP Capital Improvement Programme
CIRIA Construction Industry Research and Information Association (UK)
CN Curve number (SCS/NRCS method)
COD Chemical oxygen demand
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CRZ / CZMP Coastal Regulation Zone / Coastal Zone Management Plan (coastal terms; not applicable in Arunachal Pradesh)
CSE Centre for Science and Environment
CSTEP Center for Study of Science, Technology and Policy
CWC Central Water Commission
CWPRS Central Water and Power Research Station
DCIA Directly connected impervious area
DDF Depth–duration–frequency
DDM Department of Disaster Management, Arunachal Pradesh
DEM Digital elevation model
DGWL Design groundwater level
DID Department of Irrigation and Drainage, Malaysia
DoNER Ministry of Development of North Eastern Region
DPR Detailed project report
DWF Dry-weather flow
EAD Expected annual damage
EN European Standard (Norme Européenne)
EPA Environmental Protection Agency (United States)
EPD Environmental Protection Division (Georgia, United States)
EPSG EPSG code of a coordinate reference system (for example EPSG:32646)
ESC Erosion and sediment control
EV1 Extreme value type I (Gumbel) distribution
FEPCC Flood Estimation Planning and Coordination Committee (CWC)
FER Flood Estimation Report (CWC)
FHWA US Federal Highway Administration
FRL / MDDL Full reservoir level / minimum draw-down level
FRL / MWL Full reservoir level / maximum water level
FRP Fibre-reinforced plastic
FTL Full tank level
GIS Geographic information system
GPT Gross pollutant trap
GSI Geological Survey of India
GSMM Georgia Stormwater Management Manual
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Arunachal Pradesh)
HDPE High-density polyethylene
HDS Hydraulic Design Series (FHWA)
HEC Hydrologic Engineering Center (US Army Corps of Engineers), as in HEC-HMS and HEC-RAS; also FHWA's Hydraulic Engineering Circulars, as in HEC-14 and HEC-22
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HSG Hydrologic soil group
HTL High Tide Line (coastal term; not applicable in Arunachal Pradesh)
HWi / HWo Headwater under inlet control / headwater under outlet control
HY-8 FHWA's culvert hydraulic analysis program
ICR Itanagar Capital Region (the area of the Master Plan of Itanagar Capital Region-2031; not the Itanagar Capital Complex)
IDF Intensity–duration–frequency
IIT Indian Institute of Technology
IMC Itanagar Municipal Corporation
IMD India Meteorological Department
IMDAA The gridded dataset behind NIH-DHAARA's values for Arunachal Pradesh (expansion [TBC])
INCOIS Indian National Centre for Ocean Information Services
IRC Indian Roads Congress
IS Indian Standard (Bureau of Indian Standards)
ISO International Organization for Standardization
ISRO Indian Space Research Organisation
IST Indian Standard Time
KC Kansas City (Kansas City Metro APWA Section 5600)
KC Metro Kansas City Metro (the APWA Section 5600 criteria)
KLD Kilolitres a day
LID Low impact development
LiDAR Light detection and ranging (laser survey)
LoS Level of Service
MARC Mid-America Regional Council
MBBL 2016 Model Building Bye-Laws 2016 (MoHUA; not the State's bye-laws)
MC Itanagar Meteorological Centre Itanagar (IMD)
MHFD Mile High Flood District (formerly UDFCD)
MLD Million litres a day
MoHUA Ministry of Housing and Urban Affairs
MSL Mean sea level
MSMA Urban Stormwater Management Manual for Malaysia
MW Megawatt
NBSS&LUP National Bureau of Soil Survey and Land Use Planning
NCCR National Centre for Coastal Research
NDMA National Disaster Management Authority
NEEPCO North Eastern Electric Power Corporation (operator of the Pare, Ranganadi and Kameng projects)
NEH National Engineering Handbook (NRCS)
NERIST North Eastern Regional Institute of Science and Technology, Nirjuli
NGT National Green Tribunal
NH National Highway (as in NH-415)
NHO National Hydrographic Office
NHPC NHPC Ltd (operator of the Lower Subansiri project; builder of the Dibang project)
NIH National Institute of Hydrology, Roorkee
NIO National Institute of Oceanography
NIT National Institute of Technology
NOC No-objection certificate
NPDES National Pollutant Discharge Elimination System (United States)
NRCS Natural Resources Conservation Service (USDA; formerly the SCS)
NRSC National Remote Sensing Centre
NSE Nash–Sutcliffe efficiency
NTU Nephelometric turbidity unit
NWIA National Wetland Inventory and Assessment (ISRO)
O&M Operation and maintenance
OA Original Application (NGT)
OCR Optical character recognition (the text layer of a scanned document)
OGC Open Geospatial Consortium
OSD On-site detention
PHED Public Health Engineering and Water Supply Department
PIL Public interest litigation
PMGSY Pradhan Mantri Gram Sadak Yojana
POC Point of comparison
PRF Peak rate factor
PSD Permissible site discharge
PTI Press Trust of India
PUB PUB, Singapore's national water agency
PWD Public Works Department, Arunachal Pradesh
PWD (Highways) The PWD's highways wing
RCC Reinforced cement concrete
RDSO Research Designs and Standards Organisation (Railways)
RMSE Root-mean-square error
RRV Required retention volume
RWH Rainwater harvesting
SANDRP South Asia Network on Dams, Rivers and People
SAPCC State Action Plan on Climate Change (Arunachal Pradesh; draft, 2011)
SCS Soil Conservation Service (USDA; now the NRCS)
SH State highway
SI International System of Units
SLA Sea-level allowance (coastal term; not applicable in Arunachal Pradesh)
SOP Standard operating procedure
SRRG Self-recording rain gauge
SSR Site storage requirement
STP Sewage treatment plant
SuDS Sustainable drainage systems
SUH Synthetic unit hydrograph (CWC)
SWMM Storm Water Management Model (US EPA)
TBC To be confirmed: a fact or value not yet found in a source
TBL Top bund level
TCPO Town and Country Planning Organisation (MoHUA)
TR Technical Release (NRCS), as in TR-55
TR-55 Technical Release 55 (USDA SCS/NRCS)
TSS Total suspended solids
UDFCD Urban Drainage and Flood Control District (now MHFD)
UFRMP Urban Flood Risk Management Programme (NDMA)
UH Unit hydrograph
ULB Urban local body (in Arunachal Pradesh, the Itanagar Municipal Corporation, the Pasighat Municipal Council or another municipality)
URDPFI Urban and Regional Development Plans Formulation and Implementation (Guidelines)
USACE US Army Corps of Engineers
USDA United States Department of Agriculture
UT Union Territory
UTM Universal Transverse Mercator
VR Value rating (of a BMP treating the WQv)
WGS 84 World Geodetic System 1984
WMO World Meteorological Organization
WPCF Water Pollution Control Federation
WQv Water quality volume
WRD Water Resources Department, Arunachal Pradesh
WSUD Water-sensitive urban design