Annexes to Chapter 7Waterbodies, Ponds, Lakes and Setbacks
These annexes support Chapter 7. They give the inventory field specification, the fixed-width setback table, a template operating rule, the desilting and restoration specification, a glossary of Nyishi waterbody terms, and the three forms that Clause 7.15 requires. Where an annex cannot yet be completed it says so and gives the rule to use in the meantime. The forms are draft forms; the template and model text are for consideration by a competent authority and are not in force.
Annex 7A — Statewide waterbody GIS layer and inventory fields
Supports Clauses 7.3.1, 7.3.3 and 7.3.5 of Chapter 7.
To be prepared. This annex will contain the statewide GIS layer of waterbodies required by Clause 7.3.1, prepared by each Authority with the Water Resources Department and the land revenue offices of the Deputy Commissioners. It needs the records of the land revenue offices of the Deputy Commissioners under the Arunachal Pradesh (Land Settlement and Records) Act, 2000, which are thin, because much land near the towns is held by communities, clans and individuals under the customary rights that the Act incorporates and is in no State register: individual titles came only with the 2018 amendment (section 1A, as reported), and the beds of rivers, streams, nallahs, lakes and tanks are Government property only where they are "not the property of any person or community" (section 9(1)), so that the records of the communities, clans and owners are also needed (none was read for this Manual [TBC]); the public streams, springs, drains and water courses that vest in the Itanagar Municipal Corporation under the Arunachal Pradesh Municipal Corporation Act, 2019, and the public tanks, streams, reservoirs, wells and drains that vest in a municipality under section 102 of the Arunachal Pradesh Municipal Act, 2007; the list of the water bodies in its jurisdiction that every urban local body and planning authority is to prepare under Annexure E 1.8 of the APBBL 2019 (none was found [TBC]); the maps of the Master Plan of Itanagar Capital Region-2031, with its "natural drainage system (Nallah)" and the flood plains of the Pachin and the Dikrong; the first Water Bodies Census (993 water bodies, 893 rural and 100 urban, none encroached, as summarised from a Rajya Sabha answer); the Forest Department's truthing and boundary demarcation of 1,127 wetlands, of which 997 have been demarcated; NDMA's list of high-risk glacial lakes (as reported); NEEPCO's and NHPC's records of the levels and land of their reservoirs; and each town's drain register (Chapter 6); the NEEPCO and village authority tank registers with FTL and MWL; surveyed levels on a common datum; the ISRO National Wetland Inventory and Assessment (NRSC); Survey of India topographic maps; and any list of waterbodies published under court directions. Until it is published, each Applicant identifies waterbodies from all the sources of Clause 7.3.3, with the larger extent governing, and records them on the Waterbody Sheet (Form 7-1).
The field specification below is complete. It is written so that every field the chapter asks for (Clause 7.3.1(a) to (g)) has a defined name, type and source, and so that the same fields can be filled from a project's Form 7-1.
7A.1 Layers
- WB_POLY — one polygon per waterbody: the Revenue record boundary (Clause 7.3.1(c)).
- WB_FTL — the surveyed FTL contour (tanks, lakes, ponds) or top of bank (channels), as a polygon or line.
- WB_MWL — the MWL contour of each tank, as a polygon.
- WB_FLOOD — the 1% AEP flood extent, where mapped (Clause 7.3.1(f)), with the floodway where delineated (Clause 7.6.1).
- WB_STRUCT — points for surplus weirs, sluices, regulators, inlets and drain outfalls.
- WB_LINK — lines for supply channels, surplus courses and the links between tanks in a cascade (Clause 7.3.1(e)).
- WB_ENCR — polygons of known encroachments, each with the date recorded (Clause 7.3.1(g)).
- WB_SETBACK — Zone 1 and Zone 2 polygons (Clause 7.4), derived from the layers above.
All layers shall carry the waterbody identifier (WB_ID) so that they can be joined. All levels shall be stated to one datum (Clause 7.3.5), named in the layer metadata.
Table 7A.1 — Attribute fields of the waterbody inventory (WB_POLY)
| Field | Type | Unit / domain | Required | Content | Clause |
|---|---|---|---|---|---|
| WB_ID | Text | District code + serial | Yes | Unique identifier, never reused | 7.3.1 |
| WB_NAME | Text | — | Yes | Name as in Revenue and NEEPCO records, with local name | 7.3.1(a) |
| WB_NAME_LOC | Text | the local language script | Yes | Name in the local language | 7.3.1(a) |
| WB_TYPE | Code | Table 7A.2 | Yes | Waterbody type | 7.2, 7.3.1(a) |
| SURVEY_NOS | Text | Village, survey and subdivision numbers | Yes | Revenue survey numbers of the waterbody | 7.3.1(a) |
| VILLAGE | Text | — | Yes | Revenue village, circle and district | 7.3.1(a) |
| CUSTODIAN | Code | Table 7A.2 | Yes | Custodian body | 7.3.1(b) |
| AREA_REC | Number | ha | Yes | Area within the Revenue record boundary | 7.3.1(c) |
| AREA_FTL | Number | ha | Tanks | Waterspread at FTL, surveyed | 7.2, 7.3.1(d) |
| FTL | Number | m (datum) | Tanks | Full tank level | 7.3.1(d) |
| MWL | Number | m (datum) | Tanks | Maximum water level (Clause 7.2 definition) | 7.3.1(d) |
| MWL_BASIS | Code | NEEPCO record / 1% AEP computed | Tanks | Which value governs MWL | 7.2 |
| TBL | Number | m (datum) | Tanks | Top bund level, lowest point | 7.3.1(d) |
| WEIR_CREST | Number | m (datum) | Tanks | Surplus weir crest level | 7.3.1(d) |
| WEIR_LEN | Number | m | Tanks | Surplus weir crest length | 7.3.1(d) |
| WEIR_TYPE | Text | — | Tanks | Surplus weir type (for example fixed crest, with shutters or falling boards) | 7.3.1(d) |
| SLUICE_N | Integer | — | Tanks | Number of sluices; details in WB_STRUCT | 7.3.1(d) |
| SUPPLY_CH | Text | WB_ID(s) | Tanks | Supply channel(s) feeding the tank | 7.3.1(d) |
| SURPLUS_CS | Text | WB_ID(s) | Tanks | Surplus course(s) leaving the tank | 7.3.1(d) |
| UPSTR_WB | Text | WB_ID(s) | Cascades | Upstream tank(s) in the cascade | 7.3.1(e) |
| DNSTR_WB | Text | WB_ID | Cascades | Downstream tank, river, drain or sea outfall | 7.3.1(e) |
| CATCH_AREA | Number | ha | Channels | Drainage area at the downstream end of the reach (for the 8 ha trigger of Clause 7.4.1(b) and Table 7.1) | 7.4.1 |
| DATUM | Text | — | Yes | Datum of all levels; conversion from any older NEEPCO datum | 7.3.5 |
| LEVEL_DATE | Date | — | Tanks | Date of the level survey | 7.7.1(a) |
| SSC_DATE | Date | — | Tanks | Date of the latest stage–storage survey | 7.7.1(b) |
| FLOOD_SRC | Code | Adopted map / site study / none | Yes | Source of the 1% AEP extent | 7.3.4 |
| FLOODWAY | Code | Delineated / whole 1% extent / below MWL | Yes | Basis of the floodway | 7.6.1 |
| ENCR_KNOWN | Code | Yes / No | Yes | Known encroachment; details in WB_ENCR | 7.3.1(g) |
| CREDITED | Code | Yes / No | Tanks | Storage counted under Clause 7.7, with the scheme reference | 7.7.1 |
| WETLAND | Code | Notified / listed / other | Wetlands | Status under Clause 7.12.1 | 7.12.1 |
| SOURCES | Text | — | Yes | Sources used, from the list in Clause 7.3.3(a) to (e) | 7.3.3 |
| UPDATED | Date | — | Yes | Date of the last edit, and by whom | 7.3.1 |
Table 7A.2 — Code lists
| Code list | Values | Clause |
|---|---|---|
| WB_TYPE | River or stream; hill stream (small steep stream into which a hill town's drains fall); nallah (natural or open urban channel; selam); drain; pond (natural or dug; private, community or public); lake or wetland (sinyi); glacial or moraine-dammed lake (hazard, never storage); reservoir (with its drawdown zone); spring and its recharge area; supply channel; surplus course | 7.2 |
| CUSTODIAN | IMC (Municipal Corporation Act, 2019, s.200); Pasighat Municipal Council or other municipality (Municipal Act, 2007, s.102); Department of Urban Affairs or Smart City company (until handed over); PWD or PWD (Highways) (road drains and culverts); Water Resources Department (rivers, anti-erosion works); PHED (water-supply source or intake); NEEPCO or NHPC (reservoir and release reach); Forest Department (truthed wetland; sanctuary lake); State Wetland Authority (notified wetland); community or clan (customary land; Land Act, s.9(1)); private owner; village authority; developer (until handed over); other (name) | 7.3.1(b) |
| Structure (WB_STRUCT) | Surplus weir; sluice; regulator; inlet; drain outfall; gross pollutant trap; crossing | 7.3.1(d), 7.10 |
| Encroachment (WB_ENCR) | Building; fill; road; wall; dumping; cultivation; other — each with date recorded, area (m²) and source | 7.3.1(g), 7.13 |
Table 7A.3 — Attribute fields of structures (WB_STRUCT)
| Field | Type | Unit | Content | Clause |
|---|---|---|---|---|
| STR_ID | Text | — | Unique identifier | 7.3.1(d) |
| WB_ID | Text | — | Waterbody served | 7.3.1(d) |
| STR_TYPE | Code | Table 7A.2 | Structure type | 7.3.1(d) |
| CREST_SILL | Number | m (datum) | Weir crest or sluice sill level | 7.7.1(a) |
| LENGTH_SIZE | Text | m | Weir crest length, or sluice opening size | 7.7.1(a) |
| GATED | Code | Yes / No | Controllable outlet (needed for a flood cushion, Clause 7.8.2(a)) | 7.8.2 |
| CONDITION | Code | Serviceable / defective | Result of the latest pre-monsoon inspection, with date | 7.7.1(d), 7.14.4 |
Annex 7B — Fixed-width setback table (alternative S-3, with Annex 1C)
Supports Clauses 7.3.4, 7.4.3, 7.4.6 and 7.4.7 of Chapter 7, and alternative S-3 of the Policy Supplement (Annex 1C).
7B.1 When the table may be used
The fixed-width setback may be used only where all of the following apply:
- (a) the Authority has not adopted a 1% AEP flood extent map for the waterbody (Clause 7.3.4);
- (b) Clause 7.3.4 does not require the Applicant to determine the 1% AEP extent by a hydraulic study: the site is not in a flood-sensitive catchment, is not a site of 1 ha or more adjoining a waterbody, and the Authority has not asked for a study; and
- (c) the waterbody is one to which setbacks apply (Clause 7.4.1): any recorded or found waterbody, and any natural channel draining 8 ha or more at the site.
Where an Authority adopts alternative S-3 under Clause 1.7, the table below is the S-3 table. Clause 1.7.3(e) provides for the S-3 table to be issued by the State Stormwater Technical Committee. Until it is issued, the values are those of Clause 7.4.6, repeated here without change.
Table 7B.1 — Fixed-width setback by waterbody class (alternative S-3)
| Waterbody class | Drainage area at the site | Total setback (Zone 1 + Zone 2) | Of which Zone 1 | Measured from |
|---|---|---|---|---|
| Channel, small | 8 ha to 65 ha | 25 m | 15 m | Top of bank (Clause 7.4.3) |
| Channel, medium | 65 ha to 20 km² | 40 m | 15 m | Top of bank |
| Channel, large, and rivers | More than 20 km² | 50 m | 20 m | Top of bank |
| Tank, lake or pond | Any | MWL contour + 25 m | To the MWL contour, and not less than 15 m from FTL | FTL contour (Zone 1); MWL contour (total) |
| Marsh, estuary or backwater | Any | As notified by the Authority, and not less than 50 m | 15 m | The waterbody boundary of Clause 7.13.1 |
Values from Clause 7.4.6 (Table 7.1). Zone 2 is the total setback less Zone 1.
7B.2 Rules of application
- (a) Measurement. Measure horizontally on plan, outward from the boundary of Clause 7.13.1: the larger of the Revenue record boundary and the surveyed FTL (or top of bank). Where FTL and top of bank both apply, use whichever gives the wider zone (Clause 7.4.3).
- (b) Drainage area. For a channel, use the drainage area at the downstream end of the reach that adjoins the site. Where a reach crosses a class limit within the site, apply the wider setback to the whole reach within the site.
- (c) Both banks. The setback applies on each bank of a channel and all round a tank, lake, pond or marsh.
- (d) Minimum set by this Manual. Zone 1 is never less than 15 m (Clause 7.4.7). A wider statutory or approval setback governs for the uses it restricts (Clause 7.4.5).
- (e) Stricter of the two. Where a hydraulic study is made voluntarily, the setback is the wider of Table 7B.1 and Clauses 7.4.3 and 7.4.4.
- (f) Record. The basis of the setback (fixed width) shall be stated on the Waterbody Sheet (Form 7-1) and in the approval (Clause 7.4, Disclosure).
- (g) Review. The table shall be reviewed within 2 years of the Authority adopting 1% AEP flood maps (Clause 7.16.1).
7B.3 Source of the channel widths
The channel widths were set by this Manual with reference to the 2006 Kansas City APWA default stream buffers, rounded up and floored at the 15 m minimum (Clause 7.4.6, commentary). The source values, as cited in the chapter, are:
Table 7B.2 — Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
| Drainage area (source, acres) | Approximate SI equivalent | Source buffer |
|---|---|---|
| Less than 40 ac | Less than 16 ha | 40 ft (12 m) |
| 40–160 ac | 16–65 ha | 60 ft (18 m) |
| 160–5,000 ac | 65 ha – 20 km² | 100 ft (30 m) |
| More than 5,000 ac | More than 20 km² | 120 ft (37 m) |
The 65 ha and 20 km² class limits in Table 7B.1 are the SI equivalents of 160 ac and 5,000 ac. The 8 ha lower limit is the 20-acre trigger of APWA 2025.01 (Clause 7.4.1(b)).
Annex 7C — Template tank operating rule, with flood cushion
Supports Clauses 7.7.1(c), 7.7.3, 7.8 and 7.14.4 of Chapter 7.
Model text for consideration by a competent authority. Not in force. For tanks under NEEPCO control, the operating rule is NEEPCO's rule (Clause 7.8.4); this template sets out the content that Clause 7.8 asks for, so that the custodian's rule can be checked against it. Text in square brackets is to be completed for each tank.
7C.1 Identification
- Tank: [name, WB_ID of Annex 7A, village, circle, district].
- Custodian: [NEEPCO division / ULB / village authority / other].
- Cascade position: upstream tank(s) [ ]; downstream tank, river or drain [ ].
- Datum: [ ]. Surveyed levels (Clause 7.7.1(a)), date of survey [ ]: FTL [ ] m; MWL [ ] m; TBL (lowest point) [ ] m; surplus weir crest [ ] m, length [ ] m; sluice sills [ ] m.
- Stage–storage curve (Clause 7.7.1(b)): survey date [ ]; attached as Schedule 1.
- Controllable outlets (Clause 7.8.2(a)): [gated sluice / regulator / none]; capacity at FTL [ ] m³/s.
7C.2 Purposes and priority
- The tank serves [irrigation of a command area of [ ] ha / drinking water supply / recharge / flood storage]. Irrigation and water supply remain primary unless the custodian records otherwise (Clause 7.8.2(d)).
7C.3 Levels and dates through the year (Clause 7.8.1(a))
- The tank shall be operated to the levels in Table 7C.1.
Table 7C.1 — Rule levels by period (to be completed for each tank)
| Period | Target level (m) | Upper limit (m) | Lower limit (m) | Purpose |
|---|---|---|---|---|
| [1 Jan – date] | [ ] | FTL | [ ] | Holding for irrigation / supply |
| [date – start of cushion period] | [ ] | FTL | [ ] | Holding |
| [Flood-cushion period, if any] | Cushion level [ ] | Cushion level [ ] | [ ] | Flood cushion (Clause 7.8.2) |
| [End of cushion period – 31 Dec] | [ ] | FTL | [ ] | Refilling |
- Where no flood cushion is adopted, the starting level for design is FTL (Clause 7.7.3) and the row for the cushion period is deleted.
7C.4 Flood cushion (Clause 7.8.2)
- Cushion level: [ ] m, which is [ ] m below FTL, giving a cushion volume of [ ] m³ from Schedule 1.
- Dates: the cushion applies from [ ] to [ ].
- Drawdown: the tank can be drawn down from FTL to the cushion level through [outlet] in [ ] hours, with a release not exceeding the maximum release rate of paragraph 18.
- Reliability: continuous simulation (Clause 3.13) over the record [years] shows that the cushion is available at the start of a design storm in [ ]% of monsoon seasons, which shall be at least 90%. The simulation report is Schedule 2.
- Yield: the custodian accepts the loss of irrigation or supply yield stated in Schedule 3 [and the compensation recorded there].
- Where the tank has no controllable outlet, this section does not apply and no flood cushion is assumed (Clause 7.8.3).
7C.5 Releases (Clause 7.8.1(b) to (d))
- Sluice and regulator settings at each level: Table 7C.2.
- Operator: the sluices and regulators are operated by [post]. A release above [ ] m³/s may be ordered only by [post], or, in an emergency, by [post].
- Maximum release rate: [ ] m³/s. This rate, added to the flow from the downstream catchment, does not flood buildings downstream (Schedule 4 gives the downstream check).
- No person shall cut, lower or breach the bund or surplus weir except under the custodian's emergency procedure (Clause 7.14.5).
Table 7C.2 — Outlet settings by level (to be completed for each tank)
| Tank level (m) | Sluice 1 | Sluice 2 | Regulator | Expected outflow (m³/s) | Notes |
|---|---|---|---|---|---|
| Below cushion level | [ ] | [ ] | [ ] | [ ] | |
| Cushion level to FTL | [ ] | [ ] | [ ] | [ ] | |
| FTL (weir begins to spill) | [ ] | [ ] | [ ] | [ ] | |
| Above FTL to MWL | [ ] | [ ] | [ ] | [ ] | Check freeboard to TBL (Clause 7.7.4(b)) |
7C.6 Forecasts, warnings and communication (Clause 7.8.1(e) and (f))
- The triggers and actions are in Table 7C.3.
- Before any release under this rule, the operator shall inform the ULBs and the district administration downstream, and residents by the means stated in Schedule 5, at least [ ] hours before the release where the forecast allows.
Table 7C.3 — Triggers and actions (to be completed for each tank)
| Trigger | Source | Action | By whom |
|---|---|---|---|
| IMD district heavy-rainfall warning for the catchment | IMD | Read gauges [ ] hourly; check outlets are free; confirm the tank is at or below its rule level | [ ] |
| IMD or APSDMA red alert | IMD, APSDMA | Begin releases needed to reach the rule level, within the maximum release rate; notify downstream bodies (paragraph 21) | [ ] |
| City forecast system warning, where available | [ ] | [ ] | [ ] |
| Tank level reaches FTL | Gauge | Record outflow hourly; inspect bund and weir | [ ] |
| Tank level reaches [MWL − [ ] m] | Gauge | Emergency procedure; warning to the breach area of any emergency action plan (Clause 7.14.3(c)) | [ ] |
7C.7 Records and review (Clause 7.8.1(g))
- During the monsoon (1 April to 31 October) the operator shall record daily: the tank level, every release (time, rate and duration), and every gate setting. Outside the monsoon, records shall be kept [weekly].
- Records shall be kept with the O&M plan (Chapter 10) and given to the Authority on request.
- The tank shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Clause 7.14.4).
- This rule shall be reviewed after any event in which the tank surplused at a level above [ ] m, after any change to the weir, sluices or bund (Clause 7.7.6), and in any case with the review of the Manual.
Schedules: 1 stage–storage curve; 2 continuous simulation report; 3 yield and compensation; 4 downstream check of the maximum release; 5 communication list.
Annex 7D — Desilting and restoration specification
Supports Clauses 7.7.1(b), 7.9 and 7.14.4 of Chapter 7.
This specification applies to every desilting, restoration or deepening of a tank, pond or other waterbody under Clause 7.9. Values are those of Chapter 7. Where the chapter does not set a value, it is marked "to be confirmed in design" and shall be stated in the works design.
7D.1 Pre-works survey (Clause 7.9.1)
- (a) Topographic and bathymetric survey of the waterspread, foreshore (to the MWL contour), bund, surplus weir and sluices, levelled to the datum of Clause 7.3.5. Survey grid and point density: to be confirmed in design.
- (b) Original bed level found by test pits or augering on a grid (grid spacing to be confirmed in design), and from historical records where available. Each pit log shall show the silt thickness, the level of the original bed, and any clay or silt layer below it.
- (c) Silt testing where the tank receives urban runoff or sewage: samples from the pits of (b), tested for heavy metals and other contaminants before disposal is planned. The parameters and limits shall be those the Arunachal Pradesh State Pollution Control Board (APSPCB) directs.
- (d) Structures: condition of the bund (seepage, slips, cracks, animal burrows, trees), surplus weir and sluices, as in Clause 7.14.4.
- (e) Existing stage–storage curve from the survey of (a).
7D.2 Limits of excavation (Clauses 7.9.2 and 7.9.3)
- (a) Desilting removes accumulated sediment down to the original bed level of 7D.1(b), and no deeper.
- (b) Deepening below the original bed only with a hydrogeological report showing each of Clause 7.9.3(a) to (c).
- (c) Storage created below the lowest sluice sill is not flood storage, and shall not be shown as such in the revised stage–storage curve.
- (d) Excavation shall stay clear of the bund toe by a distance to be confirmed in design, so that the bund's stability is not reduced.
7D.3 Edges and safety (Clause 7.9.4)
Where the public has access to the edge:
- (a) side slopes no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL; or
- (b) a level safety bench at least 3 m wide, between 0.3 m and 0.5 m below FTL; and
- (c) no isolated deep pit or vertical cut left in the bed. Borrow pits shall be regraded to the bed.
7D.4 Storage not reduced (Clause 7.9.5)
- (a) Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and lake-front platforms within the waterspread or foreshore are lost storage.
- (b) Lost storage shall be offset by compensatory storage at equivalent levels, band by band, using Form 7-3.
7D.5 Silt handling and disposal (Clause 7.9.6)
- (a) Desilted material shall not be placed within the setback, on the bund (except approved bund strengthening), or on any flood path.
- (b) Contaminated silt shall be disposed of as the Arunachal Pradesh State Pollution Control Board (APSPCB) directs.
- (c) Haul routes and temporary stockpiles shall meet the construction erosion and sediment control rules of Clause 8.12, including stockpiles outside Zone 1.
7D.6 Inlets (Clause 7.9.7)
Every inlet that brings urban runoff shall have a sediment forebay, a constructed wetland inlet zone or a gross pollutant trap, designed under Chapter 8 (Annex 8D).
7D.7 Timing (Clause 7.9.8)
Desilting shall be complete, and the waterbody made safe, by 31 March. No excavation shall be left open, and no sluice or weir left dismantled, during the monsoon.
7D.8 Completion records
- (a) As-built survey and revised stage–storage curve. The curve is the one that Clause 7.7.1(b) requires "after the last desilting".
- (b) Volume removed, its disposal site, and the silt test results.
- (c) Photographs of the bund, weir, sluices and inlet works.
- (d) Update of the inventory record (Annex 7A: SSC_DATE, LEVEL_DATE, CONDITION).
Table 7D.1 — Hold points for desilting and restoration works
| Hold point | Check | Clause |
|---|---|---|
| 1. Before excavation | Pre-works survey, pit logs, silt tests, and hydrogeological report if deepening | 7.9.1, 7.9.3 |
| 2. Original bed reached | Levels checked against pit logs; no excavation below the original bed unless approved | 7.9.2 |
| 3. Edges formed | Side slopes or safety bench as 7D.3 | 7.9.4 |
| 4. Inlet works | Forebay, wetland inlet zone or GPT built | 7.9.7 |
| 5. Completion (by 31 March) | As-built survey, stage–storage curve, silt disposal record | 7.9.8, 7.7.1(b) |
Annex 7E — Glossary of Nyishi waterbody terms and regional variants
Supports Clause 7.2 and Clause 7.3 of Chapter 7.
The terms below are the Nyishi words for water, lakes and channels that were found, with the working words of this Manual. English is the working language of Arunachal Pradesh and the language of this Manual (as reported); the State has many tribal languages, among them Nyishi, Adi, Galo, Apatani, Monpa, Mishmi and Tangsa (NEER reading), and no single local language. The Nyishi terms are given here, and in the glosses of the definitions after Clause 7.2, only as glosses, with their language, source and page; they are not the Manual's working words, and running text uses only "pond", "lake", "nallah", "spring" and "stream". A meaning is given only where it was found in one vocabulary, read as the OCR text of the Internet Archive copy: R. C. Hamilton, An Outline Grammar of the Dafla Language as Spoken by the Tribes Immediately South of the Apa Tanang Country (1900). "Dafla" is the colonial name for Nyishi (renamed, as a 2005 Parliament question is titled), so the language is written here as Nyishi (called "Dafla" in the source). Two cautions apply. The page numbers are approximate, because the pages were read from OCR text, not page images; and the spellings and diacritics are those of a vocabulary of 1900, read by OCR, and may differ from modern usage. No Adi, Galo, Apatani, Monpa, Mishmi or Tangsa source was read (Table 7E.4). The list is to be extended by the State Stormwater Technical Committee, with the names the urban local bodies, the village authorities and the land revenue offices use.
The Manual's term for a pond in Arunachal Pradesh is the plain English pond (plural ponds). No single local word is used: no tribal language is shared across the State; the one word found, Nyishi sinyi, means "Lake" and "Tank" (Hamilton 1900, c. pp. 104 and 118), a larger water than a small urban pond, and is the second word of Gyakar Sinyi, the local name of Ganga Lake (NEER reading); and the statutes, the Master Plan of Itanagar Capital Region-2031, the Water Bodies Census and the Forest Department's wetland truthing already count "ponds" and "tanks" in English. A lake is a lake in plain English, such as Ganga Lake (Gyakar Sinyi) and Glaw Lake. The natural and open urban channels are nallahs, as the APBBL 2019 ("Distance from Nallah/Stream"), the Arunachal Pradesh (Land Settlement and Records) Act, 2000 ("nallahs") and the master plan ("natural drainage system (Nallah)") write the word, and as in Papu Nallah; the Manual spells it "nallah" always. The Jhot is the bye-laws' "strip of land permanently left open for drainage purposes" (APBBL 2019, definition 69), an English-text term of the bye-laws used for that strip only. An engineered detention basin is a detention pond, never a natural or community pond, a lake, a spring pool or a reservoir; natural waters keep their own names and descriptions.
Table 7E.1 — Lakes, tanks and ponds
| Term | Language | Meaning (source, page) | Manual term (Clause 7.2) |
|---|---|---|---|
| sinyi | Nyishi (called "Dafla" in the source) | "Lake" (Hamilton 1900, c. p. 104) and "Tank" (c. p. 118); the second word of Gyakar Sinyi, Ganga Lake (NEER reading) | Lake (gloss only); not used for a pond |
| — | Nyishi | No separate word for a small pond was found (Hamilton, 1900) | — |
Table 7E.2 — Water, channels and springs
| Term | Language | Meaning (source, page) | Manual term (Clause 7.2) |
|---|---|---|---|
| issi | Nyishi (called "Dafla" in the source) | "Water" (Hamilton 1900, c. p. 122; the OCR reads "issh") | Not a defined term |
| selam | Nyishi (called "Dafla" in the source) | "Channel" (Hamilton 1900, c. p. 96) | Nallah or channel (gloss only) |
| lol | Nyishi (called "Dafla" in the source) | "Spring … (of water) … But the word is rarely used" (Hamilton 1900, c. p. 118) | Not used |
| pödöng; nyadang | Nyishi (called "Dafla" in the source) | "Rain" (Hamilton 1900, c. p. 110; the OCR diacritics are uncertain) | Not used |
Table 7E.3 — The Manual's working words
| Term | Meaning in this Manual | Defined in |
|---|---|---|
| pond | A pond, natural or dug, private, community or public (plain English) | Definitions after Clause 7.2 |
| lake | A lake in plain English, such as Ganga Lake (Gyakar Sinyi); never storage for a development | Definitions after Clause 7.2 |
| detention pond | Engineered storage built under this Manual; never a natural pond, a lake, a spring pool or a reservoir | Definitions after Clause 7.2 |
| nallah | A natural or open urban channel, as the bye-laws, the Land Act and the master plan use the word | Definitions after Clause 7.2 |
| hill stream | A small, steep stream into which the drains of a hill town fall | Definitions after Clause 7.2 |
| Jhot | "A strip of land permanently left open for drainage purposes" (APBBL 2019, definition 69); no width | Definitions after Clause 7.2 |
| spring; spring recharge area | Groundwater coming out at the surface; the area upslope that feeds it | Definitions after Clause 7.2; Clause 8.8.1 |
| glacial or moraine-dammed lake | A lake held by a glacier, moraine or landslide dam; a hazard, never storage or an outfall | Definitions after Clause 7.2; Clause 2.3.6(i) |
| community land; landholder | Land held by a community, clan or individual under customary rights; its community, clan or owner | Definitions after Clause 7.2; Chapter 1 |
Table 7E.4 — Terms not found or not yet verified
These terms were not found, or were not confirmed in a dictionary, during research for this Manual. They shall not be used in a record or a drawing as defined terms until verified.
| Term | Reported meaning or use | Status |
|---|---|---|
| Adi terms for pond, drain, stream and spring | — | Lorrain's Abor-Miri dictionary was not located [TBC] |
| Galo, Apatani, Monpa, Mishmi and Tangsa terms | — | Not found [TBC] |
| Shaiyang Miri terms | — | Needham's grammar of 1886 has no usable entries for pond or drain |
| A Nyishi word for a small pond | — | None found in Hamilton (1900) |
| Modern spellings of the Nyishi terms | Spellings in present use | Not checked beyond the vocabulary of 1900 |
| The spoken link language of the State | — | Not researched; no word from it is used |
Notes for the Annex 7A fields. Three fields of Table 7A.1 read as follows in Arunachal Pradesh. WB_NAME_LOC holds the waterbody's name in the local language: the language in local use in the ward or village, as the urban local body or the village authority uses it for its own public notices. The scripts in which the State's languages are written were not researched for this Manual, so "the local language script" in that row means the spelling the local body uses for the name, recorded as the local body writes it [TBC]. VILLAGE: "Revenue village" means, in Arunachal Pradesh, the village of the circle (the State's administrative circles, as in "Toru circle"); inside a town the field records both the village, where one exists, and the ward of the urban local body. SURVEY_NOS: much land is held by communities, clans and individuals under the customary rights that the Arunachal Pradesh (Land Settlement and Records) Act, 2000 incorporates, and customary land often has no survey number in any State record; where none exists, the field records the community, clan or owner as the village authority or the land revenue office records them, and "none" [TBC]. The custodian of every pond, spring and lake (CUSTODIAN) shall be confirmed with the urban local body, the village authority or the owners.
Form 7-1 — Waterbody Sheet
Supports Clauses 7.3.2, 7.4 and 7.15(1) of Chapter 7.
Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0. One sheet per waterbody. Attach the plan of Clause 7.3.2 at 1:1,000 or larger.
Table 7F.1 — Form 7-1, Section A: Project and waterbody
| No. | Field | Entry | Clause |
|---|---|---|---|
| A1 | Project name and Authority file number | ______ | — |
| A2 | Waterbody name (English and the local language) and inventory ID (Annex 7A), if any | ______ | 7.3.1 |
| A3 | Waterbody type (Clause 7.2) | ______ | 7.2 |
| A4 | Position: within the site / within 100 m of the site boundary / downstream within the Chapter 5 extent | ______ | 7.3.2 |
| A5 | Survey numbers and village | ______ | 7.3.1(a) |
| A6 | Custodian | ______ | 7.3.1(b) |
| A7 | Sources checked (tick): Land revenue office, community, clan and owner records; IMC (s.200) and municipal (s.102) records; APBBL 2019 Annexure E 1.8 water-body lists; ICR Master Plan 2031 maps; Water Bodies Census; Forest Department wetland truthing; NDMA glacial-lake list; NEEPCO and NHPC records; drain register ☐; NEEPCO / village authority registers ☐; Authority inventory or court list ☐; historical maps and imagery, including NWIA ☐; site survey ☐ | ______ | 7.3.3 |
| A8 | Where sources conflict: which extent governs (the larger) | ______ | 7.3.3 |
| A9 | Datum of all levels, and conversion from any NEEPCO datum | ______ | 7.3.5 |
Table 7F.2 — Form 7-1, Section B: Levels and features
| No. | Field | Entry | Clause |
|---|---|---|---|
| B1 | FTL (tanks, lakes, ponds) or top of bank (channels), m | ______ | 7.2 |
| B2 | MWL (tanks), m, and basis (NEEPCO record or 1% AEP computed) | ______ | 7.2 |
| B3 | TBL, lowest point (tanks), m | ______ | 7.3.1(d) |
| B4 | 1% AEP flood level, m, and source (adopted map / hydraulic study / not available) | ______ | 7.3.4 |
| B5 | Drainage area at the site (channels), ha | ______ | 7.4.1(b) |
| B6 | Supply channels, surplus courses, sluices and surplus weirs shown on plan (yes / no) | ______ | 7.3.2 |
| B7 | Known encroachments, with date recorded | ______ | 7.3.1(g) |
Table 7F.3 — Form 7-1, Section C: Setback
| No. | Field | Entry | Clause |
|---|---|---|---|
| C1 | Basis of setback: mapped extent / hydraulic study / fixed width (Annex 7B) | ______ | 7.15(1) |
| C2 | Is a hydraulic study required under Clause 7.3.4 (a) / (b) / (c)? | ______ | 7.3.4 |
| C3 | Floodway outer edge, m from FTL or top of bank, and how delineated | ______ | 7.6.1 |
| C4 | Zone 1 width, m (greatest of 15 m, floodway edge, MWL contour) | ______ | 7.4.3 |
| C5 | Zone 2 width, m (to 1% AEP extent + 10 m, or 10 m) | ______ | 7.4.4 |
| C6 | Wider statutory or approval setback, if any, and its source | ______ | 7.4.5 |
| C7 | Setback applied: Manual standard / a wider line of a plan, permission or order (no statutory distance from water exists in Arunachal Pradesh): a line of the Master Plan of Itanagar Capital Region-2031 or another master plan, layout or Town Planning Scheme; a condition of the building or earth-cutting permission under the APBBL 2019 (a "Distance from Nallah/Stream" under clause 2.10.1(e) once norms are notified; a Jhot under definition 69; clause 4.39); a Water Resources Department line at a river or anti-erosion work; a NEEPCO or NHPC line at a reservoir or release reach; an agreement with the owners or the community on customary land; a court or Tribunal line; or other (state which) | ______ | 7.4, Disclosure |
| C8 | Uses proposed in Zone 1 and Zone 2, and the custodian's NOC for any work in Zone 1 | ______ | 7.5, 7.15(5) |
| C9 | Fill proposed in the flood fringe (yes / no); if yes, Form 7-3 attached | ______ | 7.6.3 |
| C10 | Zone 1 marker positions shown (not more than 30 m apart) | ______ | 7.13.4 |
Table 7F.4 — Form 7-1, Section D: Prepared by
| Field | Entry |
|---|---|
| Name, registration and empanelment number (Clause 10.6) | ______ |
| Signature and date | ______ |
| Licensed surveyor for the levels (name, licence number) | ______ |
Form 7-2 — Tank Storage Credit Sheet
Supports Clauses 7.7, 7.8, 7.11, 7.14 and 7.15(4) of Chapter 7.
Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0. One sheet per tank whose storage is counted. Storage that fails any item in Section B shall not be counted (Clause 7.7.1).
Table 7F.5 — Form 7-2, Section A: Tank and scheme
| No. | Field | Entry | Clause |
|---|---|---|---|
| A1 | Tank name and inventory ID (Annex 7A); custodian | ______ | 7.3.1 |
| A2 | Scheme in which storage is counted: basin plan / regional facility / fee-in-lieu (S-5) | ______ | 7.7.1, 7.11 |
| A3 | Cascade modelled: uppermost tank ______ to outfall ______ | ______ | 7.7.2 |
| A4 | Datum | ______ | 7.3.5 |
Table 7F.6 — Form 7-2, Section B: Conditions for counting storage
| No. | Condition | Date / reference | Met (yes / no) | Clause |
|---|---|---|---|---|
| B1 | FTL, MWL, TBL, weir crest and length, sluice sills surveyed within the previous 5 years | ______ | ______ | 7.7.1(a) |
| B2 | Stage–storage curve from a bathymetric and topographic survey within 5 years or after the last desilting, whichever is later | ______ | ______ | 7.7.1(b) |
| B3 | Documented operating rule agreed with the custodian (Annex 7C) | ______ | ______ | 7.7.1(c), 7.8 |
| B4 | Weir, sluices and bund under an O&M plan; latest pre-monsoon inspection found them serviceable | ______ | ______ | 7.7.1(d), 7.14.4 |
| B5 | Custodian's written concurrence | ______ | ______ | 7.7.1(e) |
Table 7F.7 — Form 7-2, Section C: Levels and creditable volume
| No. | Item | Value | Clause |
|---|---|---|---|
| C1 | Starting level: FTL, or cushion level under a rule meeting Clause 7.8.2, m | ______ | 7.7.3 |
| C2 | If a cushion is used: controllable outlet (type) and drawdown time, h | ______ | 7.8.2(a) |
| C3 | If a cushion is used: reliability from continuous simulation, % of monsoon seasons (≥ 90%) | ______ | 7.8.2(c) |
| C4 | Computed maximum level, 1% AEP inflow with climate factor routed through the cascade, m | ______ | 7.7.4 |
| C5 | MWL, m; is C4 ≤ MWL? | ______ | 7.7.4(a) |
| C6 | Freeboard C4 to TBL, m; NEEPCO freeboard standard, m; met? | ______ | 7.7.4(b) |
| C7 | Storage between C1 and C4, from the stage–storage curve, m³ | ______ | 7.7.5 |
| C8 | Volume already committed to another facility or scheme, m³ | ______ | 7.7.5 |
| C9 | Creditable volume = C7 − C8, m³ | ______ | 7.7.5 |
| C10 | Register entry under Clause 10.17 (fee-in-lieu storage) | ______ | 7.11.2(d) |
Table 7F.8 — Form 7-2, Section D: Bund safety
| No. | Item | Entry | Clause |
|---|---|---|---|
| D1 | Specified dam under the Dam Safety Act, 2021? Height, crest length, capacity, maximum flood discharge | ______ | 7.14.1 |
| D2 | Hazard class: high / low | ______ | 7.14.2 |
| D3 | High hazard: weir passes 1% AEP at MWL with freeboard; 0.2% AEP check without overtopping | ______ | 7.14.3(a) |
| D4 | High hazard: breach analysis and emergency action plan (references) | ______ | 7.14.3(b), (c) |
| D5 | High hazard: independent check under Clause 10.6 (name) | ______ | 7.14.3(d) |
Table 7F.9 — Form 7-2, Section E: Signatures
| Role | Name and designation | Signature and date |
|---|---|---|
| Designer (Clause 10.6) | ______ | ______ |
| Independent checker, where Clause 7.14.3(d) applies | ______ | ______ |
| Custodian's concurrence (Clause 7.7.1(e)) | ______ | ______ |
Form 7-3 — Compensatory Storage Calculation (by elevation band)
Supports Clauses 7.6.3 to 7.6.5, 7.9.5 and 7.15(3) of Chapter 7.
Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0.
Method
- Fix the lower limit: the normal water level of the waterbody, or the 50% AEP (2-yr) level where higher (Clause 7.6.4(b)).
- Fix the upper limit: the 1% AEP flood level (with the climate factor).
- Divide the range into bands of not more than 0.3 m. The top band may be thinner.
- For each level z at a band boundary, measure on plan:
- A_fill(z): the area of the fill footprint where existing ground is below z; and
- A_cut(z): the area of the excavation where finished ground is below z and existing ground was above z (new flooded area).
- For each band, by the average end-area method: V = (A(z_bottom) + A(z_top)) / 2 × band thickness. Do this for fill (volume lost) and for excavation (volume gained).
- Check each band: volume gained ≥ volume lost. A surplus in one band does not make up a shortfall in another (Clause 7.6.4(b)).
- Check the other conditions of Clause 7.6.4(c) to (f) in Section C.
Figure 7.2 in Chapter 7 shows the method.
Table 7F.10 — Form 7-3, Section A: Levels
| No. | Field | Entry | Clause |
|---|---|---|---|
| A1 | Waterbody, reach, and inventory ID | ______ | 7.6.4(c) |
| A2 | Normal water level, m; 50% AEP level, m; lower limit (the higher), m | ______ | 7.6.4(b) |
| A3 | 1% AEP flood level with climate factor, m (upper limit) | ______ | 7.6.4(b) |
| A4 | Band thickness, m (≤ 0.3) and number of bands | ______ | 7.6.4(b) |
| A5 | Datum | ______ | 7.3.5 |
Table 7F.11 — Form 7-3, Section B: Band-by-band balance
| Band | From (m) | To (m) | A_fill bottom (m²) | A_fill top (m²) | Volume lost (m³) | A_cut bottom (m²) | A_cut top (m²) | Volume gained (m³) | Gained ≥ lost? |
|---|---|---|---|---|---|---|---|---|---|
| 1 | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| 2 | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| 3 | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| 4 | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Total | ______ | ______ |
Add rows as needed.
Table 7F.12 — Form 7-3, Section C: Other conditions
| No. | Condition | Met (yes / no) and evidence | Clause |
|---|---|---|---|
| C1 | Fill is in the flood fringe, not the floodway, and for a permitted use | ______ | 7.6.2, 7.6.3 |
| C2 | Excavation is in the same reach of the same waterbody, hydraulically connected, and not further downstream than the fill | ______ | 7.6.4(c) |
| C3 | Excavation drains by gravity as the flood recedes; no pumping; no permanent pool below normal water level | ______ | 7.6.4(d) |
| C4 | Excavation built before, or at the same time as, the fill | ______ | 7.6.4(e) |
| C5 | Covenant or handover so that it is never filled (reference) | ______ | 7.6.4(f) |
| C6 | Not counted as detention or retention under Chapter 4 | ______ | 7.6.5 |
| C7 | Signature of designer (Clause 10.6) and date | ______ | 10.6 |
Worked example
Illustrative — not design values. A site in the flood fringe of a channel needs a fill pad for a permitted Zone 2 use (Clause 7.5.2). The inputs are assumed.
- Normal water level 10.00 m; 50% AEP level 9.80 m. Lower limit = 10.00 m (the higher).
- 1% AEP flood level 11.20 m. Range 1.20 m, so four bands of 0.30 m.
- The fill footprint is 1,600 m². Existing ground across the footprint rises evenly from 10.00 m to 11.20 m, so the area of footprint below each level is: 0 m² at 10.00 m; 400 m² at 10.30 m; 800 m² at 10.60 m; 1,200 m² at 10.90 m; 1,600 m² at 11.20 m.
- The excavation is a graded cut beside the channel, with its floor at 10.00 m. The new flooded area below each level (first trial) is: 300 m² at 10.00 m; 900 m² at 10.30 m; 1,100 m² at 10.60 m; 1,500 m² at 10.90 m; 1,500 m² at 11.20 m.
Step 1 — volume lost, band by band (V = average area × 0.3 m):
- Band 1: (0 + 400) / 2 × 0.3 = 60 m³
- Band 2: (400 + 800) / 2 × 0.3 = 180 m³
- Band 3: (800 + 1,200) / 2 × 0.3 = 300 m³
- Band 4: (1,200 + 1,600) / 2 × 0.3 = 420 m³
- Total: 960 m³
Step 2 — volume gained, first trial:
Table 7F.13 — Worked example: first trial (illustrative)
| Band | From (m) | To (m) | Volume lost (m³) | A_cut bottom (m²) | A_cut top (m²) | Volume gained (m³) | Gained ≥ lost? |
|---|---|---|---|---|---|---|---|
| 1 | 10.00 | 10.30 | 60 | 300 | 900 | 180 | Yes |
| 2 | 10.30 | 10.60 | 180 | 900 | 1,100 | 300 | Yes |
| 3 | 10.60 | 10.90 | 300 | 1,100 | 1,500 | 390 | Yes |
| 4 | 10.90 | 11.20 | 420 | 1,500 | 1,500 | 450 | Yes |
| Total | 960 | 1,320 |
Every band passes. Note that a simple total balance would hide a failure if, for example, the cut were made deeper and narrower: suppose the designer instead offers a cut with new flooded areas of 1,400 m² at 10.00 m, 1,400 m² at 10.30 m, 1,000 m² at 10.60 m, 600 m² at 10.90 m and 200 m² at 11.20 m.
Table 7F.14 — Worked example: deeper, narrower cut (illustrative)
| Band | From (m) | To (m) | Volume lost (m³) | A_cut bottom (m²) | A_cut top (m²) | Volume gained (m³) | Gained ≥ lost? |
|---|---|---|---|---|---|---|---|
| 1 | 10.00 | 10.30 | 60 | 1,400 | 1,400 | 420 | Yes |
| 2 | 10.30 | 10.60 | 180 | 1,400 | 1,000 | 360 | Yes |
| 3 | 10.60 | 10.90 | 300 | 1,000 | 600 | 240 | No |
| 4 | 10.90 | 11.20 | 420 | 600 | 200 | 120 | No |
| Total | 960 | 1,140 |
The total gained (1,140 m³) exceeds the total lost (960 m³), but bands 3 and 4 are short by 60 m³ and 300 m³. The surplus low down cannot be counted against them: the low storage fills early in every flood and is not available when the fill takes away storage near the peak. This design fails Clause 7.6.4(b) and must be regraded so that the upper bands gain at least as much as they lose, as in the first trial.