Annexes to Chapter 3Hydrologic Methods

These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.


Annex 3A — Arunachal Pradesh soil series to HSG lookup; seasonal high water table map

Supports Clauses 3.7 and 3.10 of Chapter 3.

To be prepared. This annex will contain (a) a lookup from each soil series mapped in Arunachal Pradesh to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the monsoon season (April–October). It needs NBSS&LUP and State soil survey agency [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the WRD, supplemented by piezometers in the valley floor of the capital region, where the CGWB records 2–4 m below ground before the monsoon and 2–5 m after it in the Dikrong valley and 1–5 m in the semi-consolidated formations of Papum Pare (Papum Pare district booklet), above all the Pachin and Dikrong flood plains with their palaeochannels and swampy land; the flood plains and fan toes of the Siang at Pasighat (1.50–11.13 m, East Siang district booklet), the Lohit at Tezu (3.58 m before and 3.52 m after the monsoon of 2008, Lohit district booklet), the Dibang at Roing and the Noa-Dihing at Namsai and Miao; the dug-well ground of Bhalukpong (2.62–5.50 m in the lean period, West Kameng district booklet); the land beside the capital's nallahs; the margins of ponds, swamps and reservoirs; and hill sites with perched water or springs. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).

Table 3A.1 — Soil series to HSG lookup (layout)

Soil series District(s) Taxonomic class Surface texture Saturated hydraulic conductivity (mm/h) Depth to impermeable layer (m) HSG, drained HSG, undrained Source map and scale
                 
                 
                 

Table 3A.2 — Seasonal high water table, by mapping unit (layout)

Mapping unit or grid cell Observation wells used Years of April–October record Highest April–October level below ground (m) Within 0.6 m of ground (Clause 3.10.1)? Data source
           
           

Annex 3B — Arunachal Pradesh CN calibration and supplementary land covers (forest and scrub of the hills, valley and flood-plain fields, landslide scars, earth cuts and hill-road fills, boulder-bed streams and bhabar fans, snow and bare rock of the high ranges, and pond, swamp and reservoir beds)

Supports Clauses 3.8 and 3.15 of Chapter 3.

To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Arunachal Pradesh catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the forest and scrub that cover most of the hills and ranges; the fields of the valley floors and flood plains, with their bunds recorded; the fresh scars, slope debris and fills of landslides, earth cutting and hill-road cuts, such as those along NH-415 between Itanagar and Naharlagun and on NH-13 between Bana and Seppa (as reported); the boulder beds of the hill streams and the bhabar fans of Pasighat, Ruksin, Roing, Tezu, Namsai and Bhalukpong, of which the CGWB writes that "The Bhabar is mostly composed of boulders" (Lohit district booklet); the snow, ice and bare rock of the high ranges, where the upper reaches of Tawang are "mostly devoid of vegetation, due to heavy snowfall" (Tawang district booklet); and the beds and margins of ponds and swamps, and of the reservoirs above the Pare, Ranganadi and Kameng dams, that are exposed at the start of a storm. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).

Table 3B.1 — Supplementary land covers, AMC II (layout)

Cover type HSG A HSG B HSG C HSG D Ia ratio Basis (catchments, events, years)
Forest and scrub of the hills and ranges, with the litter and the depth of soil over rock recorded            
Fields of the valley floors and flood plains, with the bunds and the depth to water recorded            
Fresh landslide scar, slope debris or earth cut; hill-road cut slope or fill (NH-415 between Itanagar and Naharlagun, NH-13 between Bana and Seppa and the like)            
Boulder bed of a hill stream, dry at the start of the storm            
Bhabar boulder fan (Pasighat, Ruksin, Roing, Tezu, Namsai, Bhalukpong and the like), with the depth to water recorded            
Snow, ice or bare rock of the high ranges, with the snow cover at the start of the storm recorded            
Pond or swamp bed or margin, or reservoir margin (Pare, Ranganadi, Kameng), exposed at the start of the storm            
Other (state)            

Table 3B.2 — CN calibration catchments (layout)

Catchment District Area (km²) Dominant HSG and cover Events used Table 3.5 CN Calibrated CN Calibrated ÷ Table 3.5
               
               

Annex 3C — Benchmark test problems for software acceptance

Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.

Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.

Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.

Problem 3C-1 — Rational Method peak (Clause 3.5)

Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.

Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.

Table 3C.1 — Problem 3C-1 solution

Step Calculation Result
Composite C (Clause 3.5.4) (1.2 × 0.90 + 0.8 × 0.15) / 2.0 0.60
Frequency factor (Table 3.3) 1% AEP Cf = 1.25
C · Cf (≤ 1.0) 0.60 × 1.25 0.75
Peak flow (Clause 3.5.1) 0.75 × 120 × 2.0 / 360 Q = 0.500 m³/s
Part (b): C · Cf 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) 1.00
Part (b): peak flow 1.00 × 150 × 0.5 / 360 Q = 0.208 m³/s

Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)

Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).

Table 3C.2 — Problem 3C-2 solution

Segment Calculation Travel time
Sheet flow (Clause 3.6.2(a)) 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h 12.83 min
Shallow concentrated (Clause 3.6.2(c)) V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h 6.78 min
Channel (Clause 3.6.2(d)) 400 / (3,600 × 1.0) = 0.1111 h 6.67 min
Tc (Clause 3.6.1; ≥ 10 min) 12.83 + 6.78 + 6.67 26.27 min
Lag (Clause 3.6.5) 0.6 × 26.27 15.76 min

Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)

Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.

Table 3C.3 — Problem 3C-3 solution

Case S (mm) Ia (mm) Runoff Q (mm), P = 100 mm Runoff Q (mm), P = 25 mm
(a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 89.24 17.85 39.38 0.53
(b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 38.80 7.76 64.93 —
(c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 143.31 7.17 36.49 1.97

Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.

Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)

Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.

Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.

Table 3C.4 — Problem 3C-4 solution

Step Calculation Result
(a) Impervious half (Clause 3.9.2) S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) 19.70 mm
(a) Pervious half S = 162.39 mm, Ia = 32.48 mm > P 0 mm
(a) Area-weighted runoff, separate sub-areas 0.5 × 19.70 + 0.5 × 0 9.85 mm
(a) Composite CN (Clause 3.9.4) 61 + 0.50 × (98 − 61) 79.5
(a) Runoff with composite CN S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) 1.83 mm
(b) Interval check (Clause 3.11.3(a)) 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h satisfied
(b) Lag and time to peak (Clause 3.11.2) tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 tp = 0.65 h
(b) Unit hydrograph peak, Q = 1 mm 0.208 × 2.5 × 1 / 0.65 qp = 0.800 m³/s per mm

Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).

Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)

Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.

Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship

Stage (m) Storage S (m³) Outflow O (m³/s)
0.0 0 0.00
0.5 250 0.05
1.0 500 0.10
1.5 750 0.15
2.0 1,000 0.20
2.5 1,250 0.25

Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.

Table 3C.6 — Problem 3C-5 routed outflow

Time (min) Inflow I (m³/s) Outflow O (m³/s) Storage (m³) Stage (m)
0 0.0000 0.0000 0.0 0.000
10 0.1667 0.0094 47.2 0.094
20 0.3333 0.0367 183.3 0.367
30 0.5000 0.0797 398.4 0.797
40 0.4167 0.1226 612.8 1.226
50 0.3333 0.1511 755.7 1.511
60 0.2500 0.1670 835.2 1.670
70 0.1667 0.1717 858.6 1.717
80 0.0833 0.1664 832.1 1.664
90 0.0000 0.1523 761.5 1.523
120 0.0000 0.1062 531.1 1.062
180 0.0000 0.0517 258.3 0.517

Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.

Table 3C.7 — Benchmark results to be reported by the applicant

Problem Result Benchmark Software result Difference (%) Within ±5%?
3C-1 Q, main case (m³/s) 0.500      
3C-1 Q, part (b) (m³/s) 0.208      
3C-2 Tc (min) 26.27      
3C-3 Q, case (a), P = 100 mm (mm) 39.38      
3C-3 Q, case (b), P = 100 mm (mm) 64.93      
3C-3 Q, case (c), P = 100 mm (mm) 36.49      
3C-3 Q, case (c), P = 25 mm (mm) 1.97      
3C-4 Runoff, separate sub-areas (mm) 9.85      
3C-4 Runoff, composite CN (mm) 1.83      
3C-4 qp (m³/s per mm) 0.800      
3C-5 Peak outflow (m³/s) 0.172      
3C-5 Peak storage (m³) 859      

Annex 3D — Peak rate factor study for flat coastal land

Supports Clauses 3.11.5 and 3.15 of Chapter 3.

Not required in Arunachal Pradesh. Arunachal Pradesh is landlocked and mostly hilly, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The valley floor of the capital region and the plains round Pasighat, Tezu and Namsai are flat in places and slow to drain when the Dikrong, the Siang, the Lohit or the Noa-Dihing is high, but they are not coastal plain; their slow response is represented by storage and backwater (Clauses 3.10.4 and 3.12.4) and by the outfall-closed check of Chapter 5, not by a lower peak rate factor, while the hills respond fast. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.

Table 3D.1 — Calibrated peak rate factors (layout)

Catchment Area (km²) Mean slope (m/m) Drainage condition Events used Calibrated PRF (US customary) PRF′ (SI) Range of applicability
               
               

Annex 3E — CWC SUH parameters for subzones 2(a) and 2(b), with worked example

Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.

To be prepared. This annex will tabulate, for CWC subzones 2(a) (North Brahmaputra) and 2(b) (South Brahmaputra), other than snow-fed and glaciated catchments, to which neither report applies, the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the two CWC Flood Estimation Reports that cover Arunachal Pradesh: the North Brahmaputra subzone 2(a) report (No. NB/18/1991), whose Plates 8, 9 and 10 draw isopluvials only along the foothills (Bhalukpong, Kimin, Itanagar–Naharlagun–Doimukh, the plateau edge at Ziro, Likabali, Roing and Tezu) and leave the middle hills and high ranges blank, and whose areal reduction table (Table 6), time distribution (Fig. 12 and Table 7-2) and simplified formulae were not transcribed for this draft [TBC]; the South Brahmaputra subzone 2(b) report (Revised; Design Office Report No. SB-2(b)/R-4/44/99, March 2000), whose plates cover the south-east (Namsai, Miao, Jairampur, Changlang, Deomali, Khonsa and Longding) and also draw contours north of the Lohit to Pasighat, Roing and Tezu, where they overlap the 2(a) plates, and whose Fig. 11 and Annex 4.4 were not read and Annex 4.3 was read only by optical character recognition [TBC]; written confirmation from CWC of whether any revision of the 2(a) report extends its isopluvials into the hills [TBC]; the position of the 2(a)/2(b) boundary between Tezu and the Myanmar border, read by eye to within about 0.03–0.1° [TBC]; and, for the snow-fed and glaciated catchments of the high ranges, which neither report covers, a basis for site studies agreed with WRD [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).

Table 3E.1 — SUH relationships by subzone (layout)

Parameter Symbol Unit Subzone 2(a) (North Brahmaputra) relationship Subzone 2(b) (South Brahmaputra) relationship
Peak discharge per unit area qp m³/s per km² qp = 2.272 (L·Lc/S)^−0.409, with S as printed (not √S) qp = Qp / A
Peak discharge of the 1-hour unit hydrograph Qp m³/s Qp = qp · A Qp = 0.905 A^0.758 (Eq. 3.4.3.2); the peak depends on the catchment area alone
Time from centre of unit rainfall to peak tp h tp = 2.164 qp^−0.940 tp = 2.87 qp^−0.839
Width of UH at 50% of peak W50 h W50 = 2.084 qp^−1.065 W50 = 2.304 qp^−1.035
Width of UH at 75% of peak W75 h W75 = 1.028 qp^−1.071 W75 = 1.339 qp^−0.978
Width of rising limb at 50% of peak WR50 h WR50 = 0.856 qp^−0.865 WR50 = 0.814 qp^−1.018
Width of rising limb at 75% of peak WR75 h WR75 = 0.440 qp^−0.918 WR75 = 0.494 qp^−0.966 (confirmed by the errata)
Base width of UH TB h TB = 5.428 tp^0.852 TB = 2.447 tp^1.157
Time to peak from start of rise Tm h Tm = tp + tr/2 Tm = tp + tr/2
Unit duration tr h 1 1
Design storm duration TD h TD = TB (it gave the higher peak on 16 of the 21 catchments) TD = 1.1 tp, "rounded off to nearest full hour", or any value that gives the maximum discharge
Design loss rate — mm/h 2.4 (printed "0.24 cm/hr", the modal value of 233 flood events on 21 catchments; "The designer can however modify this value as per the local site conditions"); for rural SUH runs only 3.5 (printed "0.35 cm/hr", the modal value of 100 flood events, kept from the report of 1984); for rural SUH runs only
Design base flow — m³/s per km² 0.05 0.05 (68 of 100 events in the range 0.01–0.09)
Ratio of t-hour to 24-hour rainfall — — 50-yr, 12 self-recording gauges, none of them in Arunachal Pradesh: 1 h 0.260; 3 h 0.457; 6 h 0.615; 9 h 0.720; 12 h 0.805; 15 h 0.875; 18 h 0.930; 24 h 1.000. Not used on its own in this Manual: it is one of the three sets whose upper envelope gives the Arunachal Pradesh interim ratios of Clause 2.3.6(f) 10-yr, partial duration, mean of the six self-recording gauges of the report, none of them in Arunachal Pradesh: 1 h 0.48; 3 h 0.62; 6 h 0.74; 9 h 0.81; 12 h 0.87; 15 h 0.91; 18 h 0.95; 24 h 1.00 (Table 4.1). Used in this Manual only in sub-area AR-C (Clause 2.3.6(f))
Time distribution of rainfall — cumulative fraction by hour 2,207 storms from 147 station-years in five duration classes (2–3, 4–6, 7–12, 13–18 and 19–24 h) (Fig. 12, Table 7-2); coefficients not transcribed [TBC] 1,040 storms in five duration groups (2–3 h: 229; 4–6 h: 286; 7–12 h: 322; 13–18 h: 116; 19–24 h: 87); for a 13-hour storm 0.26, 0.43, 0.56, 0.64, 0.70, 0.76, 0.82, 0.87, 0.90, 0.94, 0.96, 0.98, 1.00 (worked example); Fig. 11 and the tables of Annex 4.4 not read [TBC]
Conversion of 1-day to 24-hour rainfall — factor 1.15 1.15 (§4.3.1)
Areal reduction factor ARF % of point rainfall Table 6, from the short-duration rainfall "of only 8 bridge catchments"; not transcribed [TBC]. Also the curves for sub-areas AR-D and AR-E, which lie inside the subzone beyond its last contour (Clause 2.7.3) Annex 4.3, read by optical character recognition only [TBC]: at 50 km², 93.75 (1 h), 94.25 (3 h), 95.50 (6 h), 97.00 (12 h), 98.00 (24 h); at 100 km², 88.00, 90.00, 91.75, 94.50, 96.50; at 200 km², 78.50, 82.00, 85.50, 90.00, 94.00; at 300 km², 71.00, 75.50, 80.00, 87.50, 92.00; at 500 km², 64.50 (3 h), 71.25, 83.00, 88.50; at 1,000 km², 76.00 (12 h), 83.00; at 2,000 km², 77.50 (24 h); the errata correct the 24-hour value at 1,500 km² from 79.50 to 79.00
Simplified formulae — m³/s Given in the report, within ±15% of the detailed method; not transcribed for this draft [TBC] A km², S m/km, L and Lc km, R the 24-hour point rainfall in cm: Q25 = 1.9194 A^0.4240 S^0.0917 L^0.9965 Lc^−0.5092 R25^0.3789; Q50 = 1.1368 A^0.4846 S^0.0540 L^0.8915 Lc^−0.5012 R50^0.6107; Q100 = 0.5160 A^0.5226 S^0.0552 L^0.7010 Lc^+0.3961 R100^0.9286, with the Lc exponent printed positive, unlike Q25 and Q50, probably a sign error [TBC]; not used for design in this Manual
50-yr 24-hour point rainfall at Arunachal Pradesh towns (Plate 9) — mm Read by eye within about one contour (NEER reading): Itanagar about 200, in an open "<200" cell with no contour north of the town; Naharlagun and Doimukh about 200; Kimin and Bhalukpong about 240; Ziro about 320 at the open end of the line on the plateau edge; Likabali in a ">400" cell; Roing about 320; Tezu about 280; Pasighat, Seppa, Bomdila, Dirang, Tawang, Daporijo, Aalo, Mechuka, Yingkiong and Anini in blank map space, with no contour. The design depths are those of Clause 2.3.6(c), not these readings Read by eye within about one contour (NEER reading): Namsai between 240 and 280; Pasighat at the open end of the 320 line; Roing between 240 and 280; Tezu about 240; Miao, Jairampur and Longding about 240; Khonsa on the southern edge of a closed "<200" pocket, and Changlang and Deomali inside it. The design depths are those of Clause 2.3.6(c), not these readings
Gauged catchments in or near Arunachal Pradesh — — None in the State: the 21 gauged catchments are railway bridges on the plains, outside the State None in the State: the 14 gauged catchments are railway and highway bridges in the valley below the hills, outside the State
Catchment area for which the relationships apply A km² 25–2,500; up to 5,000 with judgement more than 50 to 1,500; up to 5,000 "judiciously"
Report reference — — NB/18/1991: the unit hydrograph relationships, the loss rate, the ratio table (p. 24), Table 7 and Plates 8–10 SB-2(b)/R-4/44/99: §§3.4–3.7, Table 3.3, the simplified formulae (p. 17), Table 4.1 (p. 20), §4.3, Annexes 3.1, 3.2, 4.1–4.3, the errata, the worked example and Plates 8–10

Note: relationships as printed in the two CWC reports that cover Arunachal Pradesh (References of Chapter 3), read from scanned copies; Table 3.3 of the 2(b) report, its simplified formulae, its ratio table and its errata, and the 2(a) relationships and ratios, were checked against the page images for the Assam edition of this series, which uses the same two reports. A is the catchment area in km², L the length of the main stream in km, Lc the length to the point nearest the catchment centroid in km and S the equivalent slope in m/km. Coverage. Subzone 2(a), North Brahmaputra, lies "between 88° and 97°-20′ longitudes (East) and 26° and 29°-25′ latitudes (North)", "mostly bounded by international boundaries", and names "Itanagar … and Anini in Arunachal Pradesh" among its towns; its rivers include the Kameng (10,766.97 km²), the Subansiri (17,427.47 km²), the "Dinag", probably the Dihang or Siang (15,724.79 km²), and the Dibang (12,369.59 km²) (areas as read by optical character recognition). It covers the State north and west of the Lohit, but its Plates 8–10 draw isopluvials only along the foothills, roughly 10–40 km north of the State's southern border (Bhalukpong, Kimin, Itanagar–Naharlagun–Doimukh, Ziro, where the lines end at the plateau edge, Likabali, Roing and Tezu); north of them the plates are blank and the base map is schematic, so they are not read there (NEER reading). Subzone 2(b), South Brahmaputra, covers the south-east, the Noa-Dihing plain and the Patkai hills (sub-areas AR-C and AR-C1: Namsai south of the Lohit, Miao, Jairampur, Changlang, Deomali, Khonsa and Longding); the 2(a)/2(b) boundary leaves the Lohit at about Tezu and runs east-south-east to the Myanmar border (NEER reading, about 0.03–0.1°) [TBC]. The 2(b) plates also draw contours north of the Lohit at Pasighat, Roing and Tezu, where they overlap the 2(a) plates and read about one contour lower; Clause 2.3.6(c) takes the higher reading. The Western Himalayas zone 7 report covers 73°–81° E and does not apply. Where a catchment drains across the 2(a)/2(b) boundary, the SUH is computed with the parameters of each subzone and the higher 1% AEP peak is adopted, unless calibration under Clause 3.15 supports the other (set by this Manual, as in the Assam edition); the subzone is chosen by the catchment's outfall, not by its district. Basis. The 2(a) relationships rest on 21 gauged catchments and 233 flood events, and the 2(b) relationships on 14 catchments with 100 bridge-years of record; every gauged site is a railway or road bridge on a rural river of the plains, none of them in Arunachal Pradesh, and the steepest 2(b) catchments are outliers in its own validation, while the hill streams of the State fall far more steeply than any of them (NEER reading). Neither SUH rests on an urban, embanked or hill catchment, and neither is tested on Arunachal Pradesh slopes. Area only. The 2(b) peak depends on A alone, while the 2(a) peak uses L·Lc/S; at the same catchment the two can differ greatly, and that difference is a property of the reports, not of the river. Use in the State. The SUHs apply only to the rural rivers of more than 25 km² (2(a)) or 50 km² (2(b)) below the snow that enter or pass the towns, such as the Dikrong at Doimukh, the Pachin and the Senki where they exceed 25 km², and the foothill reaches of the Pare, the Kameng, the Ranganadi and the Siyom in subzone 2(a), and the Noa-Dihing, the Tirap and the Burhidihing headwaters in subzone 2(b); they are computed only as the benchmark of the natural condition (Clause 3.11.4), the SUH result is reported beside the hydrograph model, and the reason for any large difference is stated. In sub-areas AR-D and AR-E the 2(a) SUH is run with the design rainfall of Clause 2.3.6, because no CWC point rainfall exists there. For 2(b) catchments of 25–50 km², below the report's range, the SUH is computed and reported as outside that range. Clause 3.11.4(d) applies as written in every case. The urban catchments of Itanagar, Naharlagun, Pasighat, Tezu, Namsai and the hill towns are far smaller than 25 km² and, in the hills, far steeper than the gauged catchments; they are designed by the Rational Method or SWMM under Clause 3.4, with Tc by the segment method and the rules for steep ground and valley floors of the Commentary to Clause 3.7. Below a dam the flood is set by releases (Chapter 5), and the reaches downstream of the State are outside it (the Assam edition governs those reaches). No SUH in snow-fed or glaciated catchments. Neither report mentions snow or glaciers for these ranges, and the 2(a) catchments are all on the plains, so in catchments with permanent snow or a glacier, in sub-area AR-E or elsewhere (the upper Kameng, the upper Subansiri, the Siang above Tuting, the Dibang and the Lohit above Hayuliang), no CWC unit hydrograph applies: every cross-drainage structure and outfall of more than 1 km² there needs a site-specific hydrology study, agreed with the Authority and WRD and recorded on Form 2-1, with the design rainfall of Clause 2.3.6 on the part below the snow and the outburst screening of Clause 2.3.6(i) (Commentary to Clause 3.7). The design loss rates of 2.4 and 3.5 mm/h are φ-indices fitted to floods of rural catchments on the plains; the 2(a) rate is about a quarter of the basic infiltration rate measured at Doimukh (10 mm/h; Dabral et al., 2016), which suggests catchment-scale saturation in the monsoon season (NEER reading); each is used only in rural SUH runs within its own subzone, is not a soil infiltration capacity and is not used to assign HSG (Clause 3.7), in urban SCS-CN or SWMM models, or to size infiltration practices (Chapter 4). The 2(b) ratios are not used north of the Lohit or in the hills: applied to the capital-region 2% AEP depth of 265 mm, the 1-hour ratio of 0.48 would give 127 mm in an hour, against 87 mm from the Arunachal Pradesh interim ratios, 78 mm from NIH-DHAARA's Itanagar cell at 50 years and 69 mm from the 2(a) ratio (NEER's computation; tool output); Clause 2.3.6(f) deals with the difference.

Table 3E.2 — Worked example outline (layout)

Step Content Clause
1 Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM 3.11.4(a)
2 SUH parameters from Table 3E.1 and the plotted unit hydrograph 3.11.4(a)
3 Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution 3.11.4(a), (b)
4 Effective rainfall after the design loss rate; convolution with the SUH; base flow added 3.11.4(a)
5 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition 3.11.4(c), (d)

Form 3-1 — Hydrologic Calculation Summary

Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.

Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.

A. Project

Table 3F.1 — Form 3-1: project

Field Entry
A1. Project name and applicant  
A2. Location (village or ward, survey numbers, district)  
A3. Site area (ha) and number of points of comparison (POCs)  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Design Rainfall Sheet reference (Form 2-1)  

B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)

Table 3F.2 — Form 3-1: method and software

Field Entry
B1. Purpose of each calculation (conveyance, storage, comparison, catchment study)  
B2. Contributing area for each purpose (ha or km²)  
B3. Method used and the row of Table 3.1 that permits it  
B4. Reason for the choice of method  
B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2)  
B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2  
B7. Runoff transform (Clause 3.11.1)  
B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a))  
B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2)  
B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4  
B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference  
B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5)  
B13. Calibration required (Clause 3.15.1)? Calibration report reference  

C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)

Table 3F.3 — Form 3-1: soils and groundwater

Field Entry
C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2)  
C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3)  
C3. Seasonal high water table: depth below ground and source (Clause 3.10.2)  
C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1)  
C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b))  

D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)

Table 3F.4 — Form 3-1: parameters by sub-area and condition

Sub-area Condition (pre / post) Area (ha) Impervious: roofs / paved / roads (ha) DCIA (ha) Disconnected (ha) HSG CN, AMC II CN, AMC III (pervious part) C and Cf (if Rational) Tc (min)
                     
                     
                     

E. Time of concentration worksheet (Clause 3.6)

One worksheet per sub-area and condition.

Table 3F.5 — Form 3-1: time of concentration worksheet

Segment Flow type Surface and n (Table 3.4) L (m) S (m/m) P2 (mm) V (m/s) Tt (min)
1 Sheet         —  
2 Shallow concentrated       —    
3 Channel or pipe       —    
Tc (not less than 10 min)  

E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______

F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)

Table 3F.6 — Form 3-1: rainfall, losses and starting levels

Field Entry
F1. AEPs and durations run; climate factor applied (Chapter 2)  
F2. AMC used for each duration (Clause 3.8.4)  
F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5)  
F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5)  
F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5)  
F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5)  
F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3)  

G. Departures

Table 3F.7 — Form 3-1: departures from Chapter 3

No. Clause departed from Value used in place of the Chapter 3 value Justification
1      
2      

H. Attachments (Clause 3.17)

Table 3F.8 — Form 3-1: attachments

Item Attached (yes / no / not applicable) Reference
H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on    
H2. HSG map, water-table data and infiltration test results    
H3. Parameter tables (Section D) and Tc worksheets (Section E)    
H4. Design Rainfall Sheet (Form 2-1) and hyetographs    
H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels    
H6. Form 3-2 for each POC    
H7. Calibration report (Clause 3.15)    
H8. Native model input and output files (Clause 3.16.4)    

I. Statement by the responsible engineer (Clause 3.17 item 10)

I state that the methods and parameters of Chapter 3 of the Arunachal Pradesh Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.

Table 3F.9 — Form 3-1: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Organisation  
Signature  
Date  

Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0.


Form 3-2 — Pre- vs Post-Development Comparison

Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.

Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.

A. Point of comparison (Clause 3.14.2)

Table 3F.10 — Form 3-2: point of comparison

Field Entry
A1. POC identifier and location  
A2. Area draining to the POC: site (ha) and off-site run-on (ha)  
A3. Off-site run-on passes through site storage? (Clause 3.14.2(c))  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c))  
A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7)  
A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3)  

B. Peak flows (Clauses 3.14.7–3.14.10)

Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).

Table 3F.11 — Form 3-2: peak flows by AEP and duration

AEP Duration (h) AMC Q_pre Q_post, uncontrolled Q_post, routed Limit Met?
50% (2-yr) 1 II          
50% (2-yr) 2 II          
50% (2-yr) 3 II          
50% (2-yr) 6 II          
50% (2-yr) 12 III          
50% (2-yr) 24 III          
50% (2-yr) 48 III          
50% (2-yr) 72 III          
10% (10-yr) 1 II          
10% (10-yr) 2 II          
10% (10-yr) 3 II          
10% (10-yr) 6 II          
10% (10-yr) 12 III          
10% (10-yr) 24 III          
10% (10-yr) 48 III          
10% (10-yr) 72 III          
1% (100-yr) 1 II          
1% (100-yr) 2 II          
1% (100-yr) 3 II          
1% (100-yr) 6 II          
1% (100-yr) 12 III          
1% (100-yr) 24 III          
1% (100-yr) 48 III          
1% (100-yr) 72 III          

C. Volumes and storage (Clauses 3.14.8–3.14.10)

Table 3F.12 — Form 3-2: volumes and storage

AEP Governing duration (h) Runoff volume, pre Runoff volume, post uncontrolled Retention volume Detention storage required Peak water level in storage (m)
50% (2-yr)            
10% (10-yr)            
1% (100-yr)            

C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______

D. Sensitivity runs (Clauses 3.8.5, 3.14.11)

Table 3F.13 — Form 3-2: sensitivity runs

Run Governing storm (AEP, duration) Change in Q_post, routed (%) Change in required storage (%) Retention volume or WQv governing (Clause 3.8.5(c))
Ia = 0.05S        
Standard peak rate factor (only where a lower factor is used)       —

E. Associated checks (Clause 3.14.12)

Table 3F.14 — Form 3-2: associated checks

Check Result Reference in submittal
Drawdown times (Chapter 4)    
Minimum orifice and trash screen (Chapter 4)    
Emergency spillway (Chapter 4)    
Outfall-closed storage check (Chapter 5)    
Downstream analysis (Chapter 5)    

F. Statement by the responsible engineer

I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).

Table 3F.15 — Form 3-2: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Signature  
Date  