Annexes to Chapter 5Downstream and Tailwater Analysis
These annexes support Chapter 5. Annex 5C is a worked example of the outfall-closed check of Clause 5.10, for the illustrative facility of Annex 4C. Annexes 5A and 5B need tidal, surge, survey and river data that this draft does not yet contain; each lists what the chapter already sets, gives the intended layout and states the interim rule of Chapter 5 that applies until it is published. Forms 5-1 and 5-2 are the submittal forms required by Clause 5.14. They are draft forms and have no statutory status.
Annex 5A — Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
Supports Clauses 5.7, 5.9, 5.10, 5.11 and 5.12 of Chapter 5.
5A.1 Table 5A.1 shows how the values of this annex enter the design tailwater levels of Table 5.1. The sea-level allowance is set by Clause 5.7.4 and does not depend on this annex.
Table 5A.1 — Use of the Annex 5A values in the design tailwater (Table 5.1)
| Design case | Tailwater | Annex 5A values used | Chapter value |
|---|---|---|---|
| Minor-system design | MHWS + SLA | MHWS | SLA ≥ +0.3 m (Clause 5.7.4) |
| Major-system and storage design | HAT + surge + SLA | HAT; 10% AEP surge (Clause 5.7.3(a)) | SLA ≥ +0.3 m |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA | 1% AEP still-water level (Clause 5.7.3(b)) | SLA ≥ +0.3 m |
| Datum conversion | Chart datum to project datum | Offset from chart datum to the Survey of India datum (Clause 5.7.2(b)) | — |
Not prepared for Arunachal Pradesh. Arunachal Pradesh has no coast, so no outfall in the State has a tidal tailwater, and this annex has no Arunachal Pradesh content (Clause 5.1.4). Its tables are kept, empty, so that the annex and table numbers match the other editions of this Manual. Rows F1 to F7 of Form 5-1 are entered as "not applicable", and the tailwater is derived under rows F8 to F10; for an outfall to a nallah of the capital region or to the Senki, the Pachin or the Dikrong, row F10 records the model, the release and the flood marks of Clause 5.8.5(a), each with its datum; for a hill stream, the study, the flood marks and the bed survey of Clause 5.8.5(b); for a main stem, the CWC levels and their transfer to the outfall under Clause 5.8.5(c); and for a reservoir or a release reach, the operator's levels and release records, or the interim values of Clause 5.8.5(d), with their source and datum.
Table 5A.2 — Tidal datums, surge and still-water levels by coastal segment (layout)
| Coastal segment | Reference port and tide-table edition | MSL (m CD) | MHWS (m CD) | HAT (m CD) | CD to Survey of India datum (m) | 10% AEP surge (m) | 1% AEP still-water level (m CD) | Wave set-up (m), open-sea outfalls | Sources |
|---|---|---|---|---|---|---|---|---|---|
Annex 5B — Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
Supports Clauses 5.2, 5.3, 5.8 and 5.13 of Chapter 5.
5B.1 Table 5B.1 lists the water bodies that Chapter 5 already names. It is not complete: the annex will add the extents of each reach, the other rivers, canals and mouths of the State, and a map.
Table 5B.1 — Water bodies named in Chapter 5
| Water body | Region | Listed as | Clause |
|---|---|---|---|
| Senki, Itanagar | Itanagar capital region (sub-area AR-A) | Major drain and riverine outfall reach; runs through Itanagar to the Pachin; no gauge or published level [TBC]; source of Itanagar's lift supply (7 MLD, Master Plan); stretch at Chandranagar (u/s of Pachin) in Priority V (CPCB, 2025); Senki View culvert washed away in September 2018 (as reported); design tailwater the higher of the 1% AEP model level (with the Dikrong at its design level at the Pachin confluence as the boundary) and the highest surveyed flood mark | 5.2, 5.8.1, 5.8.5 |
| Pachin, Itanagar to Nirjuli | Itanagar capital region | Major drain and riverine outfall reach; "passes through most of the area before it debouches to Dikrang river near Nirjuli" (CGWB, as cited); wide flood plain with palaeochannels and swampy land (Master Plan); "a waste disposal site" (Master Plan); no gauge or published level [TBC]; dumped waste not counted as channel | 5.2, 5.8.1, 5.8.5 |
| Dikrong (Dikrang) at Naharlagun, Nirjuli and Doimukh | Itanagar capital region | Riverine outfall reach and release reach; no CWC site; below the Pare dam (peak release 1,310 m³/s, 31 May 2025, as reported) and the Ranganadi tailrace (160 m³/s, as reported); master channel in the alluvial terrain "about 48 km" (CGWB); design tailwater the higher of the 1% AEP model level and the surveyed flood mark of the largest recorded release, checked at the 1999 flood mark and the 2017–2025 marks; no mark surveyed or tied [TBC]; lock not less than 72 hours; pump-down within 48 hours; landslides along the highway from undercutting (Master Plan) | 5.8.1, 5.8.3, 5.8.5 |
| Papu Nallah, Naharlagun | Itanagar capital region | Major drain to the Dikrong, and a place name; traffic was diverted "via Papu Nallah and Jullang Road" when NH-415 closed in the 2017 floods (Master Plan); as for the capital's nallahs | 5.2, 5.8.5 |
| Nallahs of the Modirijo and Donyi Polo catchments, Itanagar | Hill rim of the capital region | Hill streams and major drains to the Senki; ungauged; flash floods of September 2018 (as reported); 1% AEP study with bulking and blockage and surveyed flood marks; outfall at least 0.5 m above the highest surveyed bed level; lock the storm and the recession, not less than 24 hours | 5.2, 5.8.1, 5.8.5 |
| Streams of the other hill towns: Ziro, Bomdila, Tawang, Seppa, Daporijo, Aalo, Khonsa, Changlang, Yingkiong, Anini | Sub-areas AR-A1, AR-C1, AR-D and AR-E | Hill streams; ungauged; as for the Modirijo and Donyi Polo nallahs; snow on inlets in the high ranges (Chapter 10) | 5.2, 5.8.1, 5.8.5 |
| Side stream at Poosa and the NEEPCO colony, Yazali | Western foothills (sub-area AR-A1), Keyi Panyor | Hill stream of about 17 km²; flash flood of 24 June 2026 or 2025 (year in conflict, as reported) while the main river stayed in its channel; governs the colony's outfalls; the Ranganadi checked as well | 5.8.5 |
| Siang (Dihang) at Pasighat and its side channels | Siang–Dibang–Lohit foothills (sub-area AR-B) | Main stem; CWC Passighat warning level 152.96 m, danger level 153.96 m, highest flood level 157.54 m (11 June 2000, the Yigong outburst; SANDRP transcription, as reported; datum [TBC]); design tailwater the danger level, check the highest flood level, transferred by survey; flap gate and storage between them; outburst screening; bank erosion at Jarkong and the Mebo villages (as reported); upstream sites at Yingkiong (danger level 304.0 m) and Tuting (highest flood level 420.43 m) | 5.8.1, 5.8.5 |
| Lohit at Tezu | Siang–Dibang–Lohit foothills | Main stem; CWC Tezu highest flood level 192.14 m (16 July 1996, as reported; datum [TBC]); no danger level transcribed [TBC], so the highest flood level is the design and check level; upstream site at Kibithu (1,229.8 m) | 5.8.1, 5.8.5 |
| Noa-Dihing at Namsai and Miao | Noa-Dihing plain (sub-area AR-C) | Main stem; CWC Namsai warning level 144.8 m, danger level 145.8 m, highest flood level 146.6 m (31 August 1974; values "changed without explanation", SANDRP, as reported); Miao highest flood level 241.57 m (9 July 2004, as reported); datum [TBC] | 5.8.1, 5.8.5 |
| Dibang at Roing | Siang–Dibang–Lohit foothills | Main stem; no CWC site; 1% AEP model and surveyed flood marks; outburst screening (16 of NDMA's high-risk glacial lakes in Dibang Valley, as reported); stretch upstream of Roing in Priority V (CPCB, 2025); Dibang Multipurpose Project upstream, under construction [TBC] | 5.8.1, 5.8.5 |
| Ranganadi at Yazali and below | Western foothills (sub-area AR-A1) | Release reach below the Ranganadi (Panyor) project; release 1,412.57 m³/s (9 July 2017, as summarised); CWC Yazali highest flood level 623.1 m (14 June 2008, as reported); lock not less than 72 hours | 5.8.1, 5.8.3, 5.8.5 |
| Kameng (Jia Bharali) at Bhalukpong and below the Bichom and Tenga dams | Western foothills and the Kameng hills | Main stem and release reach; no CWC site in the State; no release or flood data [TBC]; spillway capacity in the operator's writing required; outburst screening | 5.8.1, 5.8.3, 5.8.5 |
| Subansiri at Daporijo and below the Lower Subansiri dam | Middle hills; the Assam border at Gerukamukh | Main stem and release reach; CWC Daporijo highest flood level 213.9 m (15 October 1987) and Lemeking 1,107.16 m (as reported); release rules not found [TBC]; spillway capacity in the operator's writing required; stretch at Gerukamukh in Priority V (CPCB, 2025) | 5.8.1, 5.8.3, 5.8.5 |
| Tawang Chu | High ranges (sub-area AR-E) | Main stem; flows on into Bhutan; no level found [TBC]; outburst screening (6 of NDMA's high-risk glacial lakes in Tawang, as reported) | 5.8.5 |
| Lohit at Dholabazar; Burhidihing at Naharkatia and Margherita; Subansiri at Chouldhowaghat and Badatighat; Ranganadi and Jia Bharali at their NT Road crossings | Assam, downstream of the State | CWC sites, all in Assam (SANDRP's transcription, as reported; datum [TBC]); the Assam edition governs those reaches; a lower bound on a model's downstream boundary only | 5.8.1, 5.8.5 |
| Ponds of the capital region and other towns | Statewide | Ponds as receiving storage; full to the outlet at the start of every storm; stage–storage [TBC]; the owner's or community's consent; dry-weather-flow interception before them (Clause 8.9); not detention ponds; listing by the local body under APBBL 2019 Annexure E 1.8 not found [TBC] | 5.8.5 |
| Ganga Lake (Gyakar Sinyi), Itanagar Wildlife Sanctuary | Near Itanagar | Lake in a sanctuary; not storage or detention for any project; encroachment and earth-cutting pressure (as reported); Chapter 7 applies to any outfall | 5.8.5 |
| Glaw Lake, Kamlang Tiger Reserve | Lohit district | Ramsar site announced on 3 August 2026, the State's first (as reported); area not confirmed; no town outfall to it found; Chapter 7 applies | 5.8.5 |
| Drains of the Itanagar Municipal Corporation, the Pasighat Municipal Council, the Department of Urban Affairs, the Smart City companies, PWD and PWD (Highways) 1.0 m wide or more; drains and streams on community or clan land | Arunachal Pradesh | Major drains; owner's written consent (IMC under ss.200 and 203 of the 2019 Act; the Pasighat Municipal Council under ss.102, 194 and 196 of the 2007 Act; the community on its own land), design water level and flap gate | 5.2, 5.8.5 |
| River mouths subject to sand-bar closure | None in Arunachal Pradesh | Not applicable (Clause 5.1.4) | 5.13.1 |
To be prepared. This annex will list and map (a) the major drains of each basin plan, (b) the riverine outfall reaches where backwater shall be modelled, with their upstream and downstream limits and the source of their design flood levels, and (c) the river mouths and creek inlets subject to seasonal sand-bar closure, with the most recent pre-monsoon bar crest levels and any WRD mouth-maintenance programme. It needs WRD river and canal records, design and recorded flood levels, reservoir operating rules, mouth-condition, dredging and bar-cutting records and pre-monsoon bar surveys (WRD), the drain inventories of IMC and other local bodies, basin stormwater master plans (Chapter 11), and base mapping from the Survey of India and NRSC. Until it is published: every river, WRD canal, the Senki, the Pachin and the Dikrong in the Itanagar capital region, Papu Nallah and the nallahs of the Modirijo and Donyi Polo catchments, the Dikrong below the Pare dam and the Ranganadi below Yazali, any drain built or held by the Itanagar Municipal Corporation, the Pasighat Municipal Council, the Department of Urban Affairs, a Smart City company, PWD or PWD (Highways) with an internal width of 1.0 m or more, and every stream, nallah or other natural channel that drains 8 ha or more, whether or not it is lined, piped or covered and every tidal creek is a major drain (Clause 5.2); the water bodies of Table 5B.1 are riverine outfall reaches (Clause 5.8.1); and the mouths of the coastal States' rivers (there is none in Arunachal Pradesh) are assumed closed at the start of the monsoon unless the Water Resources Department certifies otherwise (Clause 5.13.2).
Table 5B.2 — Attributes of the Annex 5B layers (layout)
| Field | Content | Unit or format |
|---|---|---|
| feature_id | Unique identifier | text |
| name | Name of the drain, river, canal, creek or mouth | text |
| category | Major drain; riverine outfall reach; mouth subject to sand-bar closure | text |
| clause | Clause of Chapter 5 under which it is listed | text |
| reach_limits | Upstream and downstream limits of the reach | text |
| design_flood_level_source | WRD design or highest recorded flood level, or hydraulic model (Clause 5.8.2) | text |
| reservoir_release | Upstream reservoir or tank and its operating rule, where any (Clause 5.8.3) | text |
| bar_crest_level | Most recent pre-monsoon bar crest level, for mouths | m (Survey of India datum) |
| mouth_programme | WRD mouth-maintenance programme and certification (Clause 5.13.2) | text |
| source | Source agency and date | text |
| geometry | Line (drains and reaches) or point (mouths) | line / point |
Annex 5C — Worked example: outfall-closed check for a hillside colony in Itanagar draining to the Senki
Supports Clauses 5.9, 5.10, 5.11 and 5.12 of Chapter 5 and Clause 4.6.6 of Chapter 4.
Illustrative — not design values. This example applies the outfall-closed check of Clause 5.10 to the revised detention facility of Annex 4C. The site, its levels and its receiving drain are invented to show the method. No tidal level is used: the tide enters only through the illustrative statements in Table 5C.1 about whether the receiving drain is above or below the site outlet.
Inputs
5C.1 The site is the 2.0 ha flood-sensitive site of Annex 4C. It discharges through its own outlet chamber and a flap gate to a public storm drain that runs down a nallah to the Senki in Itanagar, which runs through the town to the Pachin and whose stretch at Chandranagar, upstream of the Pachin, CPCB lists as polluted (CPCB, 2025); the Senki's level rises when it runs full in a monsoon storm, and its bed and crossings collect gravel, slide debris and garbage, as the floods of September 2018 showed when the Senki View culvert was washed away (as reported), so Clause 5.10.1 applies to the facility. To show the method, this example uses the two 6-hour lock windows of Clause 5.10.3, as the coastal editions of this Manual do. In Arunachal Pradesh an outfall to a hill stream or to the Senki above the reach where the Dikrong backs it up, whose invert is below its design level, is closed for the design storm and the stream's recession, and for not less than 24 hours, and for the whole storm where no hydrograph of the stream has been computed; an outfall backed up by the Dikrong at Naharlagun, Nirjuli or Doimukh, or by a main stem at Pasighat, Tezu, Namsai or Roing, and an outfall to a release reach, has a single lock of at least 72 hours, and on a release reach for as long as the release lasts; and an outfall below the design level of a reservoir or a pond, or a main-stem outfall checked at the highest flood level, is closed for the whole storm, under Clause 5.8.5. In each of those cases that lasts longer than the windows used here, the facility must store or pump the volume of the longer closure, up to the whole storm volume (Clause 5.9.4); that needs more storage, or pumping, than this example shows. The routing, the volume balance of Clause 5.10.4 and the assessment are the same. The public drain's own outfall to the Senki would also need the debris rack, the bulking factor and the solid-waste trap of Clause 6.3.6 and an invert above the range of bed movement of Clause 5.8.5(b); the public drain, like most in the capital, may carry sewage ("storm water drains being used as sewers", Master Plan of Itanagar Capital Region-2031, report), so the site's connection has the non-return valve of Clause 6.3.6(c); and on a hillside in Itanagar the facility itself would be a lined tank, not an infiltrating basin (Clause 4.11 (hill rule)).
Table 5C.1 — Inputs (Illustrative — not design values)
| Item | Value | Basis |
|---|---|---|
| Facility | Revised facility of Annex 4C: 2,500 m² plan area, vertical walls; 170 mm orifice at the floor; 460 mm orifice, invert 0.53 m | Annex 4C, Table 4C.14 |
| Storm | 1% AEP, 48 h, peak day last, AMC III; 72 h also run | Clause 5.10.2 |
| Inflow | Post-development 1% AEP hydrographs of Annex 4C (48 h: 8,420 m³; 72 h: 9,468 m³) | Annex 4C |
| Receiving drain levels at the connection, J1, J2 and J3 | Below the site outlet invert (from the drain owner's model) | Illustrative input |
| Receiving drain during each lock window | Backs up above the site outlet invert, so the site cannot discharge | Illustrative input; Clause 5.10.3(b) |
| Flap gate on the site outlet | Set 0.15 m below the orifice inverts in the outlet chamber, so that outside the lock windows its opening head and head loss do not affect the orifice control | Illustrative input; to be confirmed from the certified curve (Clause 5.11.2) |
| Lock windows | Two of 6 h each, starts 12.4 h apart (semi-diurnal tide) | Clause 5.10.3(a) |
| Pumps | None | — |
5C.2 Cases of Table 5.2. Because the receiving drain stays below the site outlet in J1, J2 and J3 (Table 5C.1), those cases give the free-outfall results of Annex 4C: in J2 the 1% AEP maximum water level is 1.17 m (2,913 m³), and in J3 (10% AEP, 48 h) it is 0.77 m. R1 and R2 do not apply, because the site does not drain to a river. J4, the outfall-closed check, is worked below.
Lock windows (Clause 5.10.3)
5C.3 The peak 1-hour block of the final 24 hours of the 48-hour storm is 35:35–36:35 h, with 98.2 mm (the 1-hour depth of Table 4C.2). Two runs are made:
- Run A: the first window is centred on that block: 33:05–39:05 h; the second starts 12.4 h later: 45:29–51:29 h.
- Run B: the first window starts at that block: 35:35–41:35 h; the second: 47:59–53:59 h.
For the 72-hour storm, every time is 24 h later.
5C.4 Gravity discharge is zero inside each window. Outside the windows the outlet discharges through the orifices of Table 4C.10. The routing is the same level-pool routing as in Annex 4C.
Results
Table 5C.2 — Outfall-closed check results (Illustrative — not design values)
| Storm | Run | Lock windows (h:min) | Maximum stage (m) | Maximum storage (m³) | Time of maximum (h:min) | Largest release after a window (L/s) |
|---|---|---|---|---|---|---|
| 1% AEP, 48 h | A | 33:05–39:05; 45:29–51:29 | 2.01 | 5,019 | 39:05 | 566 |
| 1% AEP, 48 h | B | 35:35–41:35; 47:59–53:59 | 2.10 | 5,238 | 41:35 | 584 |
| 1% AEP, 72 h | A | 57:05–63:05; 69:29–75:29 | 2.00 | 5,012 | 63:05 | 565 |
| 1% AEP, 72 h | B | 59:35–65:35; 71:59–77:59 | 2.09 | 5,233 | 65:35 | 584 |
Run B of the 48-hour storm governs. The first window closes the outlet just as the storm peak arrives, so the whole peak is stored. The second window arrives when the facility has drained to about 0.7 m, below the Stage 2 orifice, and adds little.
5C.5 Volume balance (Clause 5.10.4). Table 5C.3 gives the balance for Run B. The outflow in each period is found by continuity: outflow = storage at start + inflow − storage at end.
Table 5C.3 — Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Period (h:min) | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| 0:00–35:35, before window 1 | 3,817 | 2,213 | 0 | 0 | 1,604 |
| 35:35–41:35, window 1 | 3,634 | 0 | 0 | 1,604 | 5,238 |
| 41:35–47:59, between windows | 941 | 4,423 | 0 | 5,238 | 1,756 |
| 47:59–53:59, window 2 | 28 | 0 | 0 | 1,756 | 1,784 |
| After 53:59 | 0 | 1,784 | 0 | 1,784 | 0 |
| Total | 8,420 | 8,420 | 0 | — | — |
Check for window 1: V_inflow = 3,634 m³ ≤ V_storage available + V_pumped + V_gravity = (5,238 − 1,604) + 0 + 0 = 3,634 m³. The facility therefore needs 5,238 m³ of storage, which the routing confirms.
Table 5C.4 — Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Time (h) | Inflow (L/s) | Outlet | Outflow (L/s) | Stage (m) | Storage (m³) |
|---|---|---|---|---|---|
| 24 | 20 | Open | 18 | 0.18 | 445 |
| 28 | 39 | Open | 24 | 0.25 | 621 |
| 32 | 59 | Open | 32 | 0.36 | 906 |
| 34 | 85 | Open | 37 | 0.47 | 1,166 |
| 36 | 286 | Closed | 0 | 0.78 | 1,944 |
| 38 | 106 | Closed | 0 | 1.73 | 4,321 |
| 40 | 66 | Closed | 0 | 1.96 | 4,904 |
| 42 | 51 | Open | 529 | 1.79 | 4,472 |
| 44 | 42 | Open | 204 | 0.87 | 2,181 |
| 46 | 37 | Open | 49 | 0.74 | 1,854 |
| 48 | 33 | Open | 47 | 0.70 | 1,756 |
| 50 | 0 | Closed | 0 | 0.71 | 1,784 |
| 54 | 0 | Closed | 0 | 0.71 | 1,784 |
| 56 | 0 | Open | 43 | 0.58 | 1,459 |
| 60 | 0 | Open | 32 | 0.37 | 921 |
| 66 | 0 | Open | 16 | 0.16 | 397 |
| 72 | 0 | Open | 7 | 0.06 | 162 |
Assessment
5C.6 Clause 5.10.4(a). The facility of Annex 4C reaches 1.17 m in J2, and its spillway crest is at 1.35 m (Annex 4C). In the outfall-closed check the stage reaches 2.10 m, so the spillway would operate. The facility of Annex 4C fails the check.
5C.7 Remedy. Pumping (Clause 5.12) does not help here: during the lock windows the receiving drain is itself closed, and pumping into it would raise its level, which Clause 5.12.3 does not permit. The remedy is more storage. Keeping the plan area of 2,500 m² and the outlets of Annex 4C:
- the facility must hold 5,238 m³, to a stage of 2.10 m;
- the spillway crest is set above that stage, with the 0.15 m clearance recommended in Clause 4.9.3: 2.25 m;
- with the 4.0 m spillway of Annex 4C (head 0.30 m), the maximum level with the spillway flowing is 2.55 m, and with 0.3 m freeboard the top of the walls is at least 2.85 m above the floor.
The outfall-closed check therefore governs the storage: 5,238 m³ against 2,913 m³ from the release-rate checks, about 80% more. A larger plan area would make the facility shallower; the outlet, caps and drawdown would then have to be re-checked, because the stage–discharge relationship changes.
5C.8 Release after the lock. When the first window ends, the stored water is released under a head of about 2 m, at up to 584 L/s. This is above the 100-yr cap of 356 L/s. Clause 5.10.4 allows this, because the release reaches a drain that has itself just reopened, and requires it to be included in the J4 run of the downstream analysis (Clauses 5.4 and 5.9) and reported on Form 5-1, Section H.
5C.9 Drawdown after the storm (Clause 5.10.5). The J1 tidal curve stays below the site outlet (Table 5C.1), so the drawdown of Annex 4C applies: 45.3 h for 90% of the 10-yr storage with the low-flow orifice 50% blocked, within the 48-hour limit of Clause 4.7. In Run B, 90% of the maximum J4 storage is released 22.6 h after the maximum.
5C.10 Other requirements.
- The flap gate on the site outlet is inspected and operated before 31 March each year and after every event in which it closed against a storm flow (Clause 5.11.5).
- The deeper facility is checked for flotation with groundwater at the design groundwater level; in the Dikrong and Pachin flood plains of the capital region, with their palaeochannels and swamps, the Siang, Lohit and Noa-Dihing flood plains at Pasighat, Tezu and Namsai, land below the 1% AEP flood level of those rivers, and the pond and swamp margins without piezometer readings that level is existing ground level (Clauses 4.12.1 and 4.12.3).
- The fence and signs of Annex 4C apply to the deeper facility (Clause 4.15).
Table 5C.5 — Summary (Illustrative — not design values)
| Item | Value |
|---|---|
| Governing case | J4, 1% AEP 48-hour storm, Run B (first window starting at the peak 1-hour block) |
| Storage required | 5,238 m³ (Annex 4C release-rate design: 2,913 m³) |
| Maximum stage | 2.10 m, with 2,500 m² plan area |
| Spillway crest | 2.25 m |
| Top of walls | ≥ 2.85 m above the floor |
| Largest release after a lock window | 584 L/s, to be included in the downstream J4 run |
| Drawdown | Annex 4C result applies: 45.3 h with the low-flow orifice 50% blocked |
Form 5-1 — Downstream and Tailwater Report
Supports Clauses 5.3 to 5.14 of Chapter 5.
Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0. One report for each project. Sites of less than 0.5 ha that meet Clause 5.3.4 may submit Form 5-2 instead, where the Authority accepts it. Attach the plans, model files and hydrographs referred to.
A. Project
Table 5F.1 — Form 5-1: project
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Project type: site under Chapter 4; drainage project under Chapter 6; regional detention or tank restoration (Clause 5.1.2) | |
| A3. Site or project area (ha) and outfalls | |
| A4. Site Runoff Control Report reference (Form 4-1), where applicable |
B. Extent of the analysis (Clause 5.3; Clause 5.14, item 1)
Table 5F.2 — Form 5-1: analysis points
| Point | Location | Type (Clause 5.3.3 (a) to (e)) | Contributing catchment (ha) | Project area as % of it |
|---|---|---|---|---|
Table 5F.3 — Form 5-1: end point
| Field | Entry |
|---|---|
| B1. End point and reason: 10% point, tank or pond, or major drain or the sea (Clause 5.3.1 (a) to (c)) | |
| B2. Where the end point is a tank or pond: change in maximum water level (m) and in surplus-weir discharge (m³/s); continuation below the weir if the level rises (Clause 5.3.2) | |
| B3. Plan of the analysis extent, showing the site, each point with its contributing area and percentage, and the end point (attach) |
C. Model (Clause 5.4.4; Clause 5.14, item 2)
Table 5F.4 — Form 5-1: model
| Field | Entry |
|---|---|
| C1. Software and version; hydrologic and hydraulic methods (Clause 5.4.4) | |
| C2. Network schematic, with the survey sources for drains and crossings (attach) | |
| C3. Land use and CN of off-site areas (present land use) | |
| C4. Upstream detention included, with evidence that it is built, maintained and documented | |
| C5. Calibration or validation evidence, where available | |
| C6. Scenarios run: existing, with project, and future where the Authority requires it (Clause 5.4.1) | |
| C7. Storms run: AEPs and durations, AMC and areal reduction (Clause 5.4.3) |
D. Results at each analysis point (Clause 5.4.2; Clause 5.14, item 3)
Complete one row for each analysis point, AEP and duration. E = existing; P = with project.
Table 5F.5 — Form 5-1: results by analysis point
| Point | AEP | Duration (h) | Peak flow E / P (m³/s) | Time to peak E / P (h) | Maximum water level E / P (m) | Peak velocity E / P (m/s) | Duration of inundation E / P (h) |
|---|---|---|---|---|---|---|---|
E. Acceptance (Clause 5.5; Clause 5.14, item 4)
Table 5F.6 — Form 5-1: acceptance criteria
| Criterion | Met at every point? | Where not met, the remedy adopted (Clause 5.5.3) |
|---|---|---|
| E1. 1% AEP water level rise ≤ 10 mm at buildings, lowest openings and carriageways (Clause 5.5.1(a)) | ||
| E2. No building newly flooded; no building or road newly failing the Chapter 6 limits (Clause 5.5.1(b)) | ||
| E3. Peak flow not above existing at the minor-system AEP of each element or at 1% AEP (Clause 5.5.1(c)) | ||
| E4. Velocity in lined channels within the lining limit, 3.0 m/s maximum (Clause 5.5.1(d)) | ||
| E5. Velocity in unlined channels, 50% and 10% AEP, not increased by more than 10% (Clause 5.5.1(e)) | ||
| E6. Change in duration of road closure on arterial or emergency routes (Clause 5.5.2) | ||
| E7. Timing exception requested (Clause 5.5.4)? Give the conditions met |
F. Tailwater derivation (Clauses 5.6 to 5.8; Clause 5.14, item 5)
Table 5F.7 — Form 5-1: tailwater derivation
| Field | Entry |
|---|---|
| F1. Tide-table edition and port, or port authority source (Clause 5.7.2(a)) | |
| F2. MHWS, HAT and MSL (m above chart datum) | |
| F3. Connection from chart datum to the Survey of India benchmark and the project datum: offset (m) and source (Clause 5.7.2(b)) | |
| F4. Estuary, creek or canal outfall: levels used and any evidence for a departure from open-coast levels (Clause 5.7.2(c)) | |
| F5. 10% AEP surge and 1% AEP still-water level: values, source, method and record length (Clause 5.7.3) | |
| F6. Wave set-up, for outfalls facing the open sea (Clause 5.7.3(d)) | |
| F7. SLA (m), at least +0.3 m; design life; sensitivity run at twice the SLA for design lives over 50 years (Clause 5.7.4) | |
| F8. Non-tidal tailwater: receiving-system level and source (Clauses 5.6.2, 5.6.3) | |
| F9. River levels and sources; reservoir or tank releases included (Clauses 5.8.2, 5.8.3) | |
| F10. The capital's nallahs and the Dikrong, hill-town streams, the main stems, reservoirs and release reaches, outburst reaches, the Assam reaches, ponds, and drains of other bodies: for an outfall in the capital region, the nallah and the river it reaches (Senki, Pachin or Dikrong, or Papu Nallah), a statement that no CWC or other gauge exists, the 1% AEP model with the rainfall of Clause 2.3.6, AMC, the Pare release (1,310 m³/s, or a larger recorded release) with the Ranganadi tailrace (160 m³/s) and the channel as surveyed net of encroachment, silt, waste and vegetation; the surveyed flood mark of the largest recorded release (31 May 2025), the check marks (1999; 2017, 2018, 2024, 2025 or later) and their sources, each tied to a Survey of India benchmark, or a statement that none has been surveyed; the low-river case with the drains blocked and the high-river case with the outfalls backed up; the operator of each gate, flap gate and pumping station, sills, bank or wall crest, installed capacity, operating levels and gate-closing level, or a statement that none exists; drain behind the gate routed with its whole catchment and present storage, pumping confirmed available (permanent pumps only, not more than installed capacity less the largest pump), pumps operable at the design level; the lock (the whole 72-hour storm, not less than 72 hours with no gravity discharge where a gate would shut, or longer from a stage record) and the pump-down within 48 hours; gate-failure check; for a hill stream, the 1% AEP study with the bulking, blockage and solid-waste rules of Clause 6.3.6, the surveyed flood marks and their sources, the side stream checked as its own case, the receiving system confirmed by survey, the bed survey and range of bed movement, the invert at least 0.5 m above the highest surveyed bed level, the scour depth of the foundation, the energy dissipator, confirmation that no outfall discharges onto an unprotected slope, to a spring or above a supply intake, and the lock (storm plus recession, not less than 24 hours); for a main stem (Siang, Lohit, Noa-Dihing, Dibang, Kameng or Subansiri), the CWC site, its danger level and highest flood level as transcribed, the datum and the survey that transfers them to the outfall, or the model and flood marks where no site exists (Roing, Bhalukpong), the flap gate and storage for stages between the danger level and the highest flood level, the check at the highest flood level with the outfall closed for the whole storm, the lock and pump-down as for the capital's nallahs, and the bank-erosion and channel-shift check; for a reservoir, the operator's written MWL or FRL and datum, or FRL + 0.5 m [TBC], outfall below the tailwater treated as closed for the whole of the 72-hour storm, no gate operation, drawdown, notice or attenuation credited; for a release reach, the design storm and the 72-hour storm with the largest recorded release (Pare 1,310 m³/s with the Ranganadi tailrace; Ranganadi 1,412.57 m³/s) or the spillway capacity in the operator's writing (Kameng, Lower Subansiri, Dibang), placed before, during and after the storm, and the lock (not less than 72 hours, and for the release's duration where the operator gives it); for a main stem or a stream below a glacial lake, moraine or landslide dam or a debris fan, the outburst screening of Clause 2.3.6(i), the siting decision and the floor level against the highest recorded outburst level (Pasighat 157.54 m transferred); for a river leaving the State, the Assam-site level used only as the model's downstream boundary; for a pond, the owner's or community's consent, the outlet level surveyed, the stage–storage relation, the routed level and the dry-weather interception before it (Ganga Lake not counted as storage); WRD's consent for work in or on a river or an anti-erosion work; owner's consent for a drain of another body (IMC under ss.200 and 203 of the 2019 Act; the Pasighat Municipal Council under ss.102, 194 and 196 of the 2007 Act; PWD or PWD (Highways); the Department of Urban Affairs or a Smart City company; the community), the owner's or community's written agreement for a drain across another's land, permitted rate, design water level or computed channel level, and flap gate; and the lines checked (APBBL 2019 2.10.1(e): no notified norms found; Jhot: no width; the corridor of Clause 7.4) (Clause 5.8.5) |
G. Joint cases (Clause 5.9; Clause 5.14, item 6)
Table 5F.8 — Form 5-1: joint-case results
| Case | Rainfall | Tailwater used (m, project datum) | Applies? | Governing result (storage, level, pipe size or pump capacity) |
|---|---|---|---|---|
| J1 | ||||
| J2 | ||||
| J3 | ||||
| J4 | ||||
| R1 | ||||
| R2 |
H. Outfall-closed check (Clause 5.10; Clause 5.14, item 7)
Table 5F.9 — Form 5-1: outfall-closed check
| Field | Entry |
|---|---|
| H1. Reason the check applies (Clause 5.10.1) | |
| H2. Storm: AEP, 48 h and 72 h, AMC III (Clause 5.10.2) | |
| H3. Lock duration and basis: default of two 6-hour windows, or site study (Clause 5.10.6); extension for sand-bar closure (Clause 5.13.5) | |
| H4. Lock windows of the two runs (start and end times) (Clause 5.10.3(d)) | |
| H5. Maximum stage in each facility, against its 1% AEP maximum water level (Clause 5.10.4(a)) | |
| H6. Maximum stage in the minor and major systems, against the Chapter 6 limits (Clause 5.10.4(b)) | |
| H7. Property connections: surcharge level, or non-return valves fitted (Clause 5.10.4(c)) | |
| H8. Stage hydrographs (attach) | |
| H9. Drawdown after the storm under the J1 tidal curve, and pumping where needed (Clause 5.10.5) |
Table 5F.10 — Form 5-1: volume balance for each lock window (Clause 5.10.4)
| Period | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| Before window 1 | |||||
| Window 1 | |||||
| Between windows | |||||
| Window 2 | |||||
| After window 2 |
I. Gates and valves (Clause 5.11; Clause 5.14, item 8)
Table 5F.11 — Form 5-1: schedule of flap gates, tide gates and non-return valves
| Location | Type | Size (mm) | Invert (m, project datum) | Certified head–discharge data (reference) | Stop-log or penstock (outfalls > 600 mm) |
|---|---|---|---|---|---|
J. Pumped outfalls (Clause 5.12; Clause 5.14, item 9)
Table 5F.12 — Form 5-1: pumped outfalls
| Field | Entry |
|---|---|
| J1. Reason pumping is needed (Clause 5.12.1) | |
| J2. Duty capacity (m³/s) at the static head for the J2 tailwater; standby capacity (Clause 5.12.2) | |
| J3. Effect on the receiving water level (Clause 5.12.3) | |
| J4. Power supply: two independent supplies, or standby generation with 72 h of fuel; automatic changeover (Clause 5.12.4) | |
| J5. Level of electrical panels, controls, generators and fuel, against the higher of the 1% AEP flood level + 0.5 m and HAT + surge + SLA + 0.5 m (Clause 5.12.5) | |
| J6. Discharge arrangement (Clause 5.12.6); controls, alarms and logging (Clause 5.12.7); screens (Clause 5.12.8) |
K. Sand bar (Clause 5.13; Clause 5.14, item 10)
Table 5F.13 — Form 5-1: sand-bar assumption
| Field | Entry |
|---|---|
| K1. River mouth or creek inlet concerned | |
| K2. Mouth assumed closed, or open with WRD certification attached (Clause 5.13.2) | |
| K3. Bar crest level from the most recent pre-monsoon survey (m) and the closed-mouth tailwater (Clause 5.13.3) | |
| K4. Extension of the lock duration, where required (Clause 5.13.5) |
L. Inspection and maintenance (Clause 5.14, item 11)
Table 5F.14 — Form 5-1: inspection and maintenance
| Field | Entry |
|---|---|
| L1. Gate and valve inspection before 31 March and after closure events (Clause 5.11.5) | |
| L2. Pump test runs before 31 March (Clause 5.12.9) | |
| L3. Other requirements for the maintenance plan (Chapter 10) |
M. Statement by the registered professional (Clause 10.6)
I state that this report has been prepared under Chapter 5 of the Arunachal Pradesh Stormwater Design Manual (Draft v1.0), that the results reported are reproduced by the models submitted, and that every departure from Chapter 5 is listed with its reason. The Professional Design Certificate (Form 10-3) is attached.
Table 5F.15 — Form 5-1: statement by the registered professional
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Empanelment number, where Clause 10.6.1 requires it | |
| Organisation | |
| Signature | |
| Date |
Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0.
Form 5-2 — Simplified Downstream Statement (small sites)
Supports Clause 5.3.4 of Chapter 5.
Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0. For sites of less than 0.5 ha. The Authority may accept this statement in place of the full analysis only where every answer in Section B is "Yes". Otherwise submit Form 5-1.
A. Site
Table 5F.16 — Form 5-2: site
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Site area (ha), less than 0.5 ha | |
| A3. Receiving public drain: name or reference, type and size | |
| A4. Site Runoff Control Report reference (Form 4-1) |
B. Conditions (Clause 5.3.4)
Table 5F.17 — Form 5-2: conditions
| Condition | Yes / No | Evidence |
|---|---|---|
| B1. The receiving public drain has documented capacity for its minor-system design flow (Chapter 6) | ||
| B2. No flood-prone location is recorded within 500 m downstream of the site outfall. Records checked: local body, IMC, APSDMA, WRD (Clause 5.3.3(d)) | ||
| B3. The site does not drain to a tidal or backwater-affected outfall |
C. Route plan
Table 5F.18 — Form 5-2: attachments
| Attachment | Attached? |
|---|---|
| C1. Plan of the drainage route from the site outfall for 500 m downstream, with the receiving drain and any recorded flood-prone locations | |
| C2. Copy or reference of the drain capacity record |
D. Statement
I state that the site meets the conditions of Clause 5.3.4 as shown above, and that the records listed have been checked.
Table 5F.19 — Form 5-2: statement
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0.