Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.1.4 No tidal outfalls in Arunachal Pradesh. Arunachal Pradesh is landlocked: it has no coast, no tide and no Coastal Regulation Zone, and the monsoon reaches it only as rainfall on its foothills, valleys and ranges; that rainfall is dealt with in Chapter 2, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Arunachal Pradesh: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials, and shall resist abrasion by gravel and boulders and attack by the sewage that the nallahs carry), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Arunachal Pradesh the receiving water is one of six kinds: a river of the capital region, the Senki, the Pachin or the Dikrong, reached through a nallah (the Manual's word for a natural or open urban channel, as the bye-laws, the Land Act and the Master Plan use it), which backs up when the river is high and, on the Dikrong, when the Pare dam releases; a stream or nallah of the hills, ungauged, steep and laden with gravel, boulders, slide debris and garbage; the main stem of a large river at a foothill town, the Siang at Pasighat, the Lohit at Tezu, the Noa-Dihing at Namsai or the Dibang at Roing, whose stage is set far upstream by rain, snowmelt and outbursts in Tibet and the high ranges; a reservoir or the reach below a dam of NEEPCO or NHPC; a river that leaves the State into Assam or Bhutan; or a pond, natural or man-made; and:
- (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
- (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
- (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river of the capital region, a nallah, a hill stream, a main stem, a reservoir or its release reach, a pond or a receiving drain, with the locks and closures of Clause 5.8.5(a) to (g) in place of the tidal lock windows.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the Senki, the Pachin and the Dikrong in the Itanagar capital region, Papu Nallah and the nallahs of the Modirijo and Donyi Polo catchments, the Dikrong below the Pare dam and the Ranganadi below Yazali, any drain built or held by the Itanagar Municipal Corporation, the Pasighat Municipal Council, the Department of Urban Affairs, a Smart City company, PWD or PWD (Highways) with an internal width of 1.0 m or more, and every stream, nallah or other natural channel that drains 8 ha or more, whether or not it is lined, piped or covered, or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, pond or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or pond under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, IMC, APSDMA or WRD; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next pond or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Arunachal Pradesh. In the hill towns, where a colony's drain runs down a nallah to a stream, and the stream to a river many kilometres below, as Itanagar's drains run by their nallahs to the Senki, the Senki to the Pachin and the Pachin to the Dikrong near Nirjuli, and in the foothill towns on the main stems, where the drains of Pasighat, Tezu and Namsai run to the Siang, the Lohit and the Noa-Dihing and on to the Brahmaputra, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the Itanagar capital region, whose nallah outfalls lie below the Dikrong when it is high and carries the Pare dam's releases, as in the statewide floods of late May and early June 2025, when the dam's peak discharge was reported at 1,310 m³/s (as reported), and where NH-415 between Itanagar and Naharlagun was closed in the 2017 floods, with traffic diverted via Papu Nallah and Jullang Road (Master Plan of Itanagar Capital Region-2031, report), and was submerged in the reported Itanagar "cloudburst" of July 2024, when homes near Energy Park and Bank Tinali flooded and seven relief camps were opened (as reported); and in the foothill towns on the main stems, Pasighat, Tezu and Namsai, whose outfalls lie below the Siang, the Lohit and the Noa-Dihing when those rivers are high. Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Arunachal Pradesh, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, the Itanagar Planning Authority or the Authority adopts a higher projection for the planning area; and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Arunachal Pradesh has no coast, and the surge term does not arise in the State, which a Bay of Bengal storm reaches only as rainfall on its foothills and ranges, as the remnants of Cyclone Remal did on 28–29 May 2024 (Chapter 2).
Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Arunachal Pradesh, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- the Senki, the Pachin and the Dikrong in the Itanagar capital region at Itanagar, Naharlagun, Nirjuli, Doimukh and Banderdewa, Papu Nallah, and the nallahs that drain the capital to them, with the Dikrong below the Pare dam and the Ranganadi tailrace (Clause 5.8.5(a));
- the streams and nallahs of the hill towns, among them those of the Modirijo and Donyi Polo catchments at Itanagar and the streams of Ziro, Bomdila, Tawang, Seppa, Daporijo, Aalo, Khonsa, Changlang, Yingkiong and Anini, and the side streams of main rivers, such as the stream that flooded Poosa and the NEEPCO colony at Yazali (Clause 5.8.5(b));
- the Siang at Pasighat and its side channels, the Lohit at Tezu, the Noa-Dihing at Namsai and Miao, the Dibang at Roing, the Kameng at Bhalukpong and the Subansiri at Daporijo (Clause 5.8.5(c));
- the reaches below the Pare, Ranganadi, Kameng (Bichom and Tenga) and Lower Subansiri dams and the Dibang project, and their reservoirs (Clauses 5.8.3 and 5.8.5(d));
- the main stems of the Siang, Dibang, Lohit, Subansiri, Kameng and Tawang Chu, and every stream below a glacial lake, a moraine or landslide dam or a mapped debris fan (Clause 5.8.5(e));
- the Lohit, the Burhidihing, the Subansiri, the Ranganadi and the Kameng (Jia Bharali) where they leave the State, whose CWC sites lie in Assam (Clause 5.8.5(f));
- the ponds, among them the ponds of the capital region that receive its drains and sewage (Clause 5.8.5(g));
- any drain or channel of the Itanagar Municipal Corporation, the Pasighat Municipal Council, the Department of Urban Affairs, a Smart City company, PWD or PWD (Highways), and any drain or stream on community or clan land, that receives storm water (Clause 5.8.5(h)); and
- elsewhere: any river or WRD channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example NEEPCO's Pare dam on the Dikrong above Doimukh, whose releases run past Doimukh, Nirjuli and Naharlagun, and its Ranganadi (Panyor) project at Yazali, which diverts Ranganadi water into the Dikrong and releases into the lower Ranganadi), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 The capital's nallahs and the Dikrong, hill-town streams, the main stems at Pasighat, Tezu, Namsai and Roing, reservoirs and release reaches, outburst and landslide-dam reaches, the Assam reaches, ponds, and consents and lines.
- (a) The capital's nallahs to the Senki, the Pachin and the Dikrong. For an outfall in the Itanagar capital region (sub-area AR-A of Annex 2A) to the Senki, which runs through Itanagar to the Pachin; to the Pachin, which "passes through most of the area before it debouches to Dikrang river near Nirjuli" (CGWB, as cited); to the Dikrong at Naharlagun, Nirjuli and Doimukh, including through Papu Nallah; directly, through a gate or flap gate in a bank or wall, or through a pumping station; or into a nallah or drain that ends in one of them, as the town's drains do: they "end up mostly into the Nallah and in some cases, into local ponds or open fields" (Master Plan of Itanagar Capital Region-2031, report):
- No CWC site and no State level. There is no CWC site on the Senki, the Pachin or the Dikrong in the capital region (SANDRP's 2019 transcription of CWC tables, as reported), and no gauge level of WRD, the Itanagar Municipal Corporation (IMC) or any other body for these rivers was found during research [TBC]. The Dikrong below Doimukh carries the releases of NEEPCO's Pare dam above it (item (d)), and the tailrace of NEEPCO's Ranganadi project, which diverts water from the Ranganadi into the Dikrong (160 m³/s, against an observed Dikrong flood flow of about 2,500 m³/s, in a 1994 CWPRS study, as reported). Every level used shall name its gauge and its datum; where no gauge exists, the designer shall say so on Form 5-1.
- Two failure cases. The capital's drains fail in two ways, and both shall be checked: (i) with the river low and the drains blocked, as on 23 June 2024, when "As per IMD, the rainfall recorded today was 40 mm between 10:30 am and 12:30 pm" (the disaster management secretary, as quoted) and at least 66 houses in Itanagar and Naharlagun were inundated (as reported), and wherever drains "chocked with the solid wastes" and "heavy silting" (Master Plan report) stop the flow: the drain is routed to a free outfall with its section as surveyed, net of silt, solid waste, slide debris, vegetation and encroachment, and with its culverts and inlets blocked as Clauses 6.3.6(h) and 6.3.6(m) require; and (ii) with the river high and the outfalls backed up: the tailwater of this item applies, with the Dikrong carrying the release of item (d).
- Interim design tailwater. For the major-system and storage cases (Clause 5.8.4(b)), the tailwater at an outfall to the Dikrong shall be the higher of: (i) the 1% AEP level at the outfall from a hydraulic model (Clause 5.8.2(b)) of the Dikrong and the nallah, from the outfall to beyond the next confluence downstream, with the rainfall of sub-area AR-A on the valley and of the river's own sub-areas in the hills above it (Clause 2.3.6), the AMC of Clause 3.8.4, the release of item (d) from the Pare dam and the Ranganadi tailrace, and the channel as surveyed in its present condition, net of encroachment, silt, solid waste and vegetation; and (ii) the Dikrong at the flood mark of the largest recorded release, that of 31 May 2025, when the Pare dam's peak discharge was reported at 1,310 m³/s (as reported), surveyed at the outfall or transferred to it with the water-surface slope of the model or of the surveyed marks, and tied to a Survey of India benchmark. The design shall be checked with the river at the 1999 flood mark, the flood that residents cite as the benchmark from Jampa to Doimukh (as reported), and at the highest flood mark surveyed at the outfall from the floods of 2017, September 2018, June and July 2024 and May–June 2025 or a later flood, from debris lines, silt marks and the accounts of residents, and from the records of IMC, WRD, the Deputy Commissioner, Itanagar Capital Complex, or the community, with its source stated, with the outfall closed and the stored volume held; where that check level is above the design level, the floor levels of Clause 6.11 and the storage of the outfall-closed check are set from it. For an outfall to the Senki or the Pachin, the tailwater is the higher of the 1% AEP level from the model of item (i), run with the Dikrong at the design level of this item at the Pachin's confluence near Nirjuli as its downstream boundary, and the highest flood mark surveyed at the outfall from those floods. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)) and for the minor-system tailwater, the river stands at its 10% AEP level from the same model, or at the design level of this item until that level has been computed. No flood mark has yet been surveyed or tied to a datum [TBC], and no outfall to these rivers or their nallahs shall be designed without item (i) and the flood-mark survey (set by this Manual).
- Gates, flap gates and pumps. Where an outfall passes through a gate or flap gate, or a pumping station, the designer shall identify the body that operates each, and obtain the sill of each gate, the crest of the bank or wall, the installed pumping capacity and the operating levels, including the river level at which each gate is closed, every level with its datum and its tie to the gauge used. No gate, flap gate or pumping station on any outfall in the capital region, and no operator or operating rule for one, was found during research [TBC]. At a gated outfall the tailwater is the higher of the river level beyond the gate and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of its whole catchment, its storage as surveyed in its present condition, net of silt, encroachment, solid waste and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump, with gravity discharge through the gate only while the river is lower than the level behind it (set by this Manual). A pond behind the gate starts the storm full to its outlet level (item (g)). Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. Pumps shall deliver against the design level of this item, and every pump, panel and control shall remain operable with the river at that level and the land behind the bank ponded (Clause 5.12.5).
- River lock. The outfall-closed check of Clause 5.10 applies with a single lock: the outfall stands at the design tailwater of this item for the whole of the 72-hour storm of Clause 5.10.2, and where a gate or flap gate would shut, no gravity discharge is credited for not less than 72 hours, or for as long as a stage record or the model shows the river above the outfall invert, or above the level at which the gate is closed if that is lower, where that is longer (set by this Manual). The lock covers the whole of the 48- and 72-hour storms, so that storage and pumping handle the full storm volume (Clause 5.9.4). With the gate still closed, the volume stored in the storm shall be pumped down to the level at which the storm started within 48 hours of the end of the storm, the drawdown time of Clause 4.7, so that the storage is ready for the next storm while the river stays high (set by this Manual). A shorter lock may be used only where the outfall invert is above the design level of this item, or where an analysis of a stage record under Clause 5.10.6 shows it and the Authority approves it.
- Gate failure, encroachment and works not built. Floor levels and pumped outfalls behind a gate, wall or bank shall also be checked with the gate failed open and the land and drains behind it filled to the river level beyond it. Buildings, fill and dumped waste in a nallah or river channel, including the Pachin, which "flowing through densely populated areas had become a waste disposal site" (Master Plan report), are not channel and shall not be counted as conveyance or storage; a drain, widening, desilting or diversion that has been proposed but not completed, such as the new drainage network proposed in the Master Plan (Maps 28–30), shall not be counted.
- (b) Hill-town streams. For an outfall to a stream or nallah of the hills, in the hill rim of sub-areas AR-A and AR-A1 and in sub-areas AR-C1, AR-D and AR-E, such as the streams that came down the Modirijo and Donyi Polo catchments to the Senki in September 2018, and the streams of Ziro, Bomdila, Tawang, Seppa, Daporijo, Aalo, Khonsa, Changlang, Yingkiong, Anini and the other hill towns, or to a drain that ends in one:
- No gauge. None of these streams has a gauge or a published flood level [TBC]. They are steep and short, rise within minutes of a burst of rain, and carry gravel, boulders and slide debris from slopes of Siwalik sandstone, shale and boulder beds, of residual soil and slope debris, and, in the high ranges, of gneiss and schist, and below the towns they carry garbage. In the floods of September 2018 the Senki View culvert and the Press Colony bridge were washed away, and a landslide from "the dumping area of NH 415" was reported (as reported). The receiving system of each outfall shall be confirmed by survey.
- Design level. The tailwater for the major-system and storage cases shall be the highest of: (i) the 1% AEP level at the outfall from a study of the stream, made with a hydrograph method of Chapter 3 for the whole catchment above the outfall, with the rainfall of its sub-area under Clause 2.3.6, the AMC of Clause 3.8.4 and the bulking factor of Clause 6.3.6(g) on the peak flow, and routed through a hydraulic model (Clause 5.8.2(b)) of the channel as surveyed, net of encroachment, silt and solid waste, with the crossings downstream blocked as Clauses 6.3.6(h) and 6.3.6(m) require; (ii) the level at the outfall of any flood study of the stream made by or for WRD or the local body, where it gives one [TBC]; and (iii) the highest flood level surveyed at the outfall from flood marks, such as debris lines, silt and scour marks and the accounts of residents, of the floods of September 2018, June and July 2024, May–June 2025 or a later flood, and from the records of the local body, the Deputy Commissioner or the community, with its source stated. No outfall to such a stream shall be designed without items (i) and (iii) (set by this Manual).
- The side stream, not the main river. Where a town lies beside a main river and a side stream enters it, the side stream's flood is a design case of its own. At Yazali the flash flood at Poosa and the NEEPCO colony came from a side catchment of about 17 km² while "the main river stayed in its channel" (EastMojo, 2026, as reported): 1 dead and 4 missing, with about 18 quarters or about 50 houses washed away (as reported), on 24 June 2026 in one report and 24 June 2025 in another, which dates its photographs to that year (as reported; the year is in conflict). There the side stream, studied under item (i), governs the town's outfalls, and the Ranganadi's level under items (c) and (d) is a further case to check, not the only one.
- Bed level, scour and aggradation. The designer shall survey the bed of the stream at the outfall and for at least 100 m upstream and downstream, and state the range within which the bed has moved, from past surveys, cross-sections, exposed foundations and pipes, and the records of the local body. The outfall invert, and the seat of any flap gate on it, shall stand at least 0.5 m above the highest bed level found in that range within 50 m downstream of the outfall, and the foundation of the outfall structure and its apron shall be taken below the scour depth computed under Chapter 9 (Clause 9.6) for the 1% AEP flow with the bulking factor (set by this Manual).
- Siting. An outfall shall be built into the bank and shall not project into the bed or the active channel, taken for this Manual as the land flooded once in 5 years (set by this Manual). It shall discharge in the direction of the stream's flow, with the bank protection and the energy dissipation that Chapter 9 requires at every outfall onto a slope or into a ravine, and no pipe, interceptor or chamber of the drainage system shall be laid along the bed of the stream. No muck, spoil or excavated material from the works shall be placed in the stream or where a storm can carry it into one (Clause 6.3.6(k)). No outfall shall discharge onto an unprotected slope, to a spring or its recharge area, or to a stream above a spring or an intake that supplies a town or village, such as the Senki above the intake of Itanagar's lift supply (Chapter 7) (set by this Manual).
- Closed outfall. Where the outfall invert is below the design level of this item, the outfall-closed check of Clause 5.10 applies with a single lock that lasts for the design storm plus the stream's recession, computed under item (i) for as long as the stream stays above the invert, and not less than 24 hours; where the 48- and 72-hour storms of Clause 5.10.2 are run, the lock lasts for the whole storm, and where no hydrograph of the stream has been computed, for the whole storm (Clause 5.9.4) (set by this Manual). Where the stream itself ends in a river backed up under item (a) or (c), or in a release reach of item (d), the longer lock governs.
- (c) The main stems at Pasighat, Tezu, Namsai and Roing. For an outfall in sub-areas AR-B and AR-C, or anywhere else, to the main stem of a large river, the Siang at Pasighat and its side channels, the Lohit at Tezu, the Noa-Dihing at Namsai and Miao, the Dibang at Roing, the Kameng at Bhalukpong or the Subansiri at Daporijo, directly, through a gate or flap gate, or into a channel that ends in one:
- The CWC sites. The CWC sites in the State, as transcribed by SANDRP in 2019 from CWC tables (as reported; the datum is CWC's and is not stated [TBC]), are: level-forecast sites on the Siang at Passighat (warning level 152.96 m, danger level 153.96 m, highest flood level 157.54 m on 11 June 2000), on the Noa-Dihing at Namsai (warning level 144.8 m, danger level 145.8 m, highest flood level 146.6 m on 31 August 1974, values that SANDRP says were "changed without explanation") and on the Siang at Yinkiang (Yingkiong) (warning level 303.0 m, danger level 304.0 m, no highest flood level); and level-monitoring sites, with a highest flood level only, on the Lohit at Tezu (192.14 m, 16 July 1996), the Subansiri at Daporizo (Daporijo) (213.9 m, 15 October 1987), the Ranganadi at Yazali (623.1 m, 14 June 2008), the Noa-Dihing at Miao (241.57 m, 9 July 2004), the Siang at Tuting (420.43 m, 6 September 2010), the Lohit at Kibithu (1,229.8 m, 25 July 2016) and the Subansiri at Lemeking (1,107.16 m, 27 July 2016). There is no CWC site on the Dibang, and none on the Kameng at Bhalukpong.
- The stage is set upstream. On these rivers the level at a town outfall is set by rain, snowmelt, outbursts and releases far above the town, not by the town's storm. The Passighat highest flood level is an outburst stage: it was set on 11 June 2000 by the flood from the breach of the Yigong landslide dam in Tibet, 3.58 m above the danger level (CWC's levels as reported), and a peer-reviewed analysis gives "a recorded rise of 5.5 m at the Pasighat gauge, 462 km downstream" (as summarised); press reports of a "30 m" rise do not agree with the gauge and are not used.
- Interim design tailwater. For the major-system and storage cases, the tailwater at the outfall shall be the CWC danger level at the nearest site on the same river, transferred to the outfall by a survey that ties the outfall, the gauge zero and a Survey of India benchmark, with the water-surface slope of a model or of surveyed flood marks between them (set by this Manual): at Pasighat 153.96 m at the Passighat site and at Namsai 145.8 m at the Namsai site, before transfer. The design shall be checked with the river at the CWC highest flood level, transferred in the same way (Passighat 157.54 m; Namsai 146.6 m), with the outfall closed for the whole storm (Clause 5.9.4); the floor levels of Clause 6.11, the flood immunity of pumps and controls (Clause 5.12.5) and the storage of the outfall-closed check are set from it where it is higher. At Tezu and Miao, where only the highest flood level was transcribed, and at Daporijo, the highest flood level is both the design and the check level until CWC gives a danger level [TBC]. At Roing and Bhalukpong, which have no site, the tailwater is set as in item (a), by a model and surveyed flood marks (the interim river rule of the hill editions of this series). In every case the 1% AEP level from a hydraulic model of the reach (Clause 5.8.2(b)) governs wherever it is higher. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)) and for the minor-system tailwater, the river stands at the danger level, or at the 10% AEP level of the model where no danger level exists.
- Gates, flap gates and storage. An outfall whose invert lies between the danger level and the highest flood level shall have a flap gate (Clause 5.11) and the storage, or the pumping, that holds the storm while the river stands above the invert; no outfall to a main stem shall rely on gravity discharge at the check level. No gate, flap gate or pumping station on any main-stem outfall, and no operator for one, was found during research [TBC]; where one exists or is proposed, the routing, pump and gate-failure rules of item (a) apply to it.
- River lock. The lock of item (a) applies: the outfall at the design tailwater for the whole of the 72-hour storm, no gravity discharge for not less than 72 hours where a gate or flap gate would shut, or longer where a stage record shows the river above the invert for longer, and pump-down within 48 hours (set by this Manual). No stage hydrograph of any of these sites was found [TBC]; a stage record, once obtained, governs under Clause 5.10.6.
- Erosion and channel shift. These towns stand on bhabar fans and flood plains whose rivers move. At Pasighat the Siang has eroded land at Jarkong near the airfield (2024) and at the Mebo villages of Seram, Kongkul, Namsing, Gadum-I and Gadum-II and Mer (as reported), against which WRD has carried out anti-erosion schemes (₹35 crore under DoNER in 2019, with a proposal of ₹228–250 crore pending, as reported). An outfall shall not be placed on a bank that is eroding or in an avulsion channel of a fan; it shall be set back from the bank as Chapter 7 requires, and its foundation and apron taken below the scour depth computed under Chapter 9 (Clause 9.6). These reaches are hazard-first sites (Clause 2.3.6(i)): no outfall, pumping station or storage shall be placed in the path of a channel shift.
- (d) Reservoirs and release reaches. For an outfall to the reach of a river below a dam, among them the Dikrong below NEEPCO's Pare dam, the Ranganadi below NEEPCO's Ranganadi (Panyor) project at Yazali, the Kameng below the Bichom and Tenga dams of NEEPCO's Kameng project, the Subansiri below NHPC's Lower Subansiri project at Gerukamukh, and the Dibang below NHPC's Dibang Multipurpose Project, which is under construction (status not researched [TBC]), or to a reservoir itself:
- Operator data. NEEPCO and NHPC operate the dams. Their levels, spillway ratings, operating rules and release records, in writing, are the data this item needs, and the designer shall ask the operator for them; this Manual does not make NEEPCO or NHPC an approving authority. Work in or on the river below a dam needs WRD's consent (item (h)), and the owner's or the community's agreement for community, clan or private land.
- Reservoir outfalls. For an outfall to a reservoir, the tailwater for the major-system and storage cases is the reservoir's maximum water level (MWL) as its operator publishes it, or FRL plus the surcharge in its design flood, computed from the rating of its spillway with the gates operated only as the operator's written rule provides; where neither has been published, it is FRL + 0.5 m (set by this Manual) [TBC], and in every case not less than the highest level recorded at the reservoir. No full reservoir level, maximum water level or datum for any of these reservoirs was found during research [TBC]. The reservoir starts every design storm at its full reservoir level, which is also the minor-system tailwater, and an outfall below the design level is closed for the whole of the 72-hour storm of Clause 5.10.2 and of every shorter storm, with storage and pumping handling the full storm volume (Clause 5.9.4). The drawdown zone is part of the reservoir, and no outfall structure, pumping station or storage shall be built in it.
- Release reaches. For an outfall to a river below a dam, in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) and the 72-hour storm shall be run with the river at the level that results from the largest recorded release of the dams above, routed to the outfall, with the flow of the catchment below them as it occurred, and with the release placed before, during and after the site storm (set by this Manual). Until the operator states a larger recorded release and its duration, the releases are: on the Dikrong, the Pare dam's peak discharge of 1,310 m³/s on 31 May 2025 (as reported), with the Ranganadi tailrace of 160 m³/s (as reported) added; and on the Ranganadi below Yazali, 1,412.57 m³/s, the release of 9 July 2017 into the lower Ranganadi (an IIT report prepared for the Assam State Disaster Management Authority, as summarised), checked at Yazali against CWC's highest flood level of 623.1 m (14 June 2008, as reported). On the Kameng, the Subansiri and the Dibang no release or flood record was found [TBC]; the Lower Subansiri project, of 2,000 MW, put its first unit into commercial operation on 23 December 2025 and reached 1,000 MW with its fourth, with the rest targeted by December 2026 (as reported). There the release is the dam's spillway capacity, which the designer shall obtain from the operator in writing [TBC], and no outfall to those reaches shall be designed without it (set by this Manual). The lock of item (a) applies for not less than 72 hours, and, where the outfall invert is below the river level of the release, for as long as the release lasts where the operator gives its duration [TBC] (set by this Manual). No attenuation by the storage of any reservoir shall be credited to the river below, and no gate shall be assumed to open earlier or wider than the operator's records show. These reaches are hazard-first sites (Clause 2.3.6(i)).
- Release scenarios, not notices. No release protocol or warning threshold of NEEPCO or NHPC was found during research [TBC]; NEEPCO issues monsoon advisories on controlled releases through the Pare dam's radial gates, the latest seen in June 2026 (as reported), and those are notices. No design shall rely on a notice or warning of a release, on a reservoir being drawn down before a storm, or on a gate being opened early, late or partly: the release scenarios of this item govern (set by this Manual). The Pare dam is also credited in the press with having eased the 2025 floods from Jampa village to Doimukh (as reported); the scenarios hold whether or not a dam eases a flood, because they do not credit it.
- (e) Outburst and landslide-dam reaches. For an outfall on the main stem of the Siang, the Dibang, the Lohit, the Subansiri, the Kameng or the Tawang Chu, or on any stream below a glacial lake, a moraine or landslide dam, or a mapped debris fan, the outburst screening of Clause 2.3.6(i) shall be recorded in the drainage report, and the design is not complete without it. The evidence is the State's own: the Yigong outburst of June 2000 "washed out every bridge downstream from Yigong Tso to Pasighat" (as reported), with deaths given as 30 in some reports and more than 100 in others, some of them counting Assam (as reported; in conflict); in November 2017, after landslide dams formed in Tibet, the Siang at Pasighat was turbid at 425 NTU on 27 November (as reported); landslide-dam alerts were issued along the Siang in October 2018 (as reported); NDMA lists 27 high-risk glacial lakes in the State, 6 in Tawang, 1 in Kurung Kumey, 1 in Shi Yomi, 16 in Dibang Valley and 3 in Anjaw (as reported); an outburst of Sangnga Nehgu lake in Tawang is reported to have washed away "more than five bridges" (as reported; date not found); and CWC counted 197 expanding glacial lakes in the State in June 2025 (as reported). No drain, culvert or outfall is sized for an outburst. Where the screening shows that the site lies on the path of one, the siting, setback and floor-level rules of Chapters 6 and 7 govern: no outfall structure, pumping station or storage shall be placed in the path; every outfall to the reach shall have a flap gate (Clause 5.11); and floors shall stand 0.5 m above the higher of the 1% AEP level and the highest recorded outburst level, which at Pasighat is the highest flood level of 157.54 m transferred to the site (set by this Manual). The Tawang Chu flows on into Bhutan, and no level for it was found [TBC].
- (f) The Assam reaches. The Lohit, the Burhidihing, the Subansiri, the Ranganadi and the Kameng leave Arunachal Pradesh and run into Assam, where the nearest CWC sites on them are (SANDRP's 2019 transcription of CWC tables, as reported; datum not stated [TBC]): the Lohit at Dholabazar (danger level 128.27 m, highest flood level 130.07 m, 22 September 2012); the Burhidihing at Naharkatia (danger level 120.40 m, highest flood level 122.69 m, 17 June 1973) and at Margherita (highest flood level 137.51 m, 26 August 1988); the Subansiri at Chouldhowaghat (danger level 100.43 m, highest flood level 101.31 m, 27 July 1972) and at Badatighat (danger level 82.53 m, highest flood level 86.21 m, 28 July 1972); the Ranganadi at its NT Road crossing (danger level 94.81 m, highest flood level 95.92 m, 2 July 1979); and the Jia Bharali, the Kameng below Bhalukpong, at its NT Road crossing (danger level 77.00 m, highest flood level 78.50 m, 26 July 2007). These sites lie tens of kilometres downstream and are not the tailwater of any Arunachal Pradesh town; the Assam edition governs those reaches. For an outfall in Arunachal Pradesh, a level at one of these sites, or a level that the Assam edition gives, is used only as a lower bound on the downstream boundary of a river model, which shall start far enough downstream that the boundary does not govern the level at the outfall; no level shall be carried upstream from these sites to an Arunachal Pradesh outfall (set by this Manual).
- (g) Ponds as receiving storage. For an outfall to a pond, natural or man-made, directly or through a drain that ends in it, such as the ponds into which the capital's drains and sewage run: the Master Plan report records "the sewerage being drained to open or vacant land as well as into ponds" and industrial effluents discharged untreated "into artificial ponds":
- Starting level. The pond starts every design storm full to its outlet level: the crest of its outlet weir or overflow, the sill of its gate or the invert of the channel that drains it, or, where it has no defined outlet, its highest monsoon water line surveyed and tied to a Survey of India benchmark, and in every case not less than the highest level recorded at it (set by this Manual).
- Design level. The tailwater for the major-system and storage cases is the level reached when the inflow of the pond's whole catchment is routed through its stage–storage relation from that starting level, with its outlet closed for as long as the nallah or river beyond it stands above the outlet (items (a) and (c)), and with the project's discharge included (Clause 5.12.3). The stage–storage relation shall be surveyed: none was found for any pond in the State [TBC]. The minor-system tailwater is the starting level.
- Closed outfall. Where the outfall invert is below the design level of this item, the outfall is closed for the whole storm (Clause 5.9.4), and where the pond itself drains to a river-backed outfall, the lock of item (a) applies to both. A pond with no outlet is a closed basin, and an outfall to it is closed for the whole storm.
- Storage is the system's. The storage of a pond is part of the drainage system: it shall not be credited to one project, and no project shall reduce it; a Town Planning Scheme's "filling-up or reclamation of low-lying, swampy or unhealthy area" (Arunachal Pradesh Urban and Country Planning (Amendment) Ordinance, 2025, Ordinance No. 5 of 2025, whose final form as an Act was not found [TBC]) is subject to the compensatory storage of Chapter 7. Engineered storage is a detention pond; a natural pond or lake keeps its own description, and a spring pool or a reservoir is never a detention pond. Ganga Lake (Gyakar Sinyi), in the Itanagar Wildlife Sanctuary about 6 km from Itanagar (as reported), is a lake in a sanctuary and not storage: it shall not be counted as storage or detention for any project, and an outfall to it is subject to Chapter 7. Under the bye-laws, every urban local body and planning authority is "to identify, demarcate, protect and maintain the water bodies that come under their jurisdiction" and to prepare a list (APBBL 2019, Annexure E 1.8); no such list was found [TBC]. A pond on community, clan or private land needs the written consent of its owner or the community for any discharge to it; within the Pasighat municipal area public tanks vest in the Municipal Council (Arunachal Pradesh Municipal Act, 2007, s.102(b)), and in the IMC area public streams, springs and works for the storage of water vest in the Corporation (Arunachal Pradesh Municipal Corporation Act, 2019), whose consent is then also required (set by this Manual). No drain that carries sewage shall discharge to a pond without the interception and screens of Clause 6.3.6(e) and Clause 8.9.
- (h) Consents and lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of a river or on an anti-erosion work without the consent of WRD; the procedure for that consent was not found during research [TBC]. Storm water shall not be discharged to a drain of another body without the written consent of that body: to a public drain vested in IMC (Municipal Corporation Act, 2019, s.200), the consent of the Corporation, under its procedure for connections, which forbids "foul water into a drain provided for surface water" where separate drains exist and any direct connection "with a storm water overflow drain" (s.203); to a drain of the Pasighat Municipal Council, which "shall … construct and maintain drains and sewers, and provide a safe and sufficient outfall" (Municipal Act, 2007, ss.102, 194 and 196), the Council's consent, no procedure for connections having been found [TBC]; to a road drain or culvert, that of the Public Works Department (PWD) or PWD (Highways); to a drain built by the Department of Urban Affairs or a Smart City company and not yet handed over, that of its builder; and to a drain or stream on community or clan land, that of the owners or the community, for which no written procedure was found [TBC] (set by this Manual). An outfall or drain carried across land that is not the applicant's needs the written agreement of its owner or, on community land, of the community: the beds of rivers, streams, nallahs, lakes and tanks are Government property only where they are "not the property of any person or community" (Arunachal Pradesh (Land Settlement and Records) Act, 2000, s.9(1)), so many nallah beds near the towns are not, and the Manual does not take land for an outfall; that agreement, recorded on Form 5-1, is the hook (set by this Manual). For a release reach or a reservoir, the operator's written data of item (d) are required. Where consent is given, the discharge shall not exceed the rate the consent allows; the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives and with its downstream boundary at the level of items (a) to (g); the channel shall be taken in its present condition, net of silt, solid waste, vegetation and encroachment and with its narrowest section as surveyed, and a widening, desilting or diversion that has been proposed but not completed shall not be counted; and the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert. The designer shall also check the outfall against the lines that bind at the time of design (Chapter 7): the bye-laws ask that the site plan show the "Distance from Nallah/Stream as per the notified rules/norms" (APBBL 2019, 2.10.1(e)), and no such rules or norms were found (NEER reading); Jhot, "A strip of land permanently left open for drainage purposes" (APBBL 2019, def. 69), has no width; the corridor of Clause 7.4 is this Manual's own proposal; no floodplain zoning law exists and no flood zone has been notified; and the bye-laws' plinth of "not less than 300 mm" (4.2.1.1) is not a flood level, so the 1% AEP level of this clause and the floor levels of Clause 6.11 govern. Orders of the National Green Tribunal, among them the direction of 5 January 2023 in OA 94/2020/EZ on the Senki, the Pachin and the Dikrong that "no untreated sewage or treated sewage be allowed to enter into the waterbody" (as summarised), are directions to their parties, not lines for this clause; their bearing on drains that carry sewage is dealt with in Clause 8.9.
No pump, gate or dam operation that helps drainage, such as pumping a drain, nallah or pond down before a storm, closing a gate late, opening a gate while the river is higher than the land behind it, or drawing down a reservoir or opening a dam's gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the nallah, the pond or the river (Clause 5.12.3). Pumping shall not be used to move water into a pond, a reservoir or another catchment without the consent of its owner or custodian, or onto a slope.
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Arunachal Pradesh's rivers break that assumption in both directions. In the capital region the Dikrong's catchment lies in the hills just above the towns, and the late-May storms that fill it fall on the towns too: the Pare dam's peak release of 1,310 m³/s on 31 May 2025 came in the statewide floods of late May and early June 2025 (as reported). On the main stems the river and the town's storm can be unrelated: the Siang's highest level at Pasighat was set by an outburst in Tibet in June 2000 (as reported), not by rain on the town, so the river can be high when the town is dry, and a town storm can fall on a river already high with snowmelt and the rain of the ranges. And beside a main river a side stream can flood while the river stays low: at Yazali the flash flood at Poosa and the NEEPCO colony came from a side catchment of about 17 km² while "the main river stayed in its channel" (EastMojo, 2026, as reported), so a local storm with the river low is a design case of its own (Clause 5.8.5(a) and (b)). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects the dams above the rivers of Arunachal Pradesh's towns. NEEPCO's Pare dam stands on the Dikrong above Doimukh: it issues monsoon advisories on controlled releases through its radial gates (the latest seen in June 2026, as reported), and its peak discharge on 31 May 2025 was reported at 1,310 m³/s, with the plant credited with easing the floods from Jampa village to Doimukh, where the 1999 flood is the local benchmark (as reported). NEEPCO's Ranganadi (Panyor) project at Yazali diverts Ranganadi water through a tunnel into the Dikrong, with a tailrace discharge of 160 m³/s against an observed Dikrong flood flow of about 2,500 m³/s (a 1994 CWPRS study, as reported), and released 1,412.57 m³/s into the lower Ranganadi on 9 July 2017 (an IIT report prepared for the Assam State Disaster Management Authority, as summarised), the same release that the Assam edition uses for the reach downstream; a change in the Dikrong's channel downstream was reported in November 2025 (as reported). NHPC's Lower Subansiri project, of 2,000 MW at Gerukamukh, put its first unit into commercial operation on 23 December 2025 and reached 1,000 MW with its fourth unit, with the rest targeted by December 2026 (as reported). No release or flood data were found for NEEPCO's Kameng project, with its Bichom and Tenga dams, and the status of NHPC's Dibang Multipurpose Project, under construction, was not researched [TBC]. No operator's release protocol, warning threshold, spillway rating, full reservoir level or release record was found for any of these dams, and no datum is stated for any level [TBC]. Until the operators give them, Clause 5.8.5(d) uses the largest release found (1,310 m³/s on the Dikrong, with the Ranganadi tailrace; 1,412.57 m³/s on the Ranganadi) and, where none was found, the spillway capacity in the operator's writing. The river levels downstream in Assam come from SANDRP's copies of CWC tables; their datum and gauge zero are to be confirmed with CWC [TBC].
Clause 5.8.5 is set by this Manual. In Arunachal Pradesh the tailwater at a town outfall is set not by the tide but by a river of the capital region that backs up into a nallah and carries a dam's releases, by a hill stream that no one gauges and whose bed moves, by a main stem whose stage is set far upstream, by a reservoir and the releases of its dam, by a river that runs out of the State into Assam, or by a pond at its outlet level, and no document found during research gives a design level for any of them. No design standard for any town drain in the State was found: the Arunachal Pradesh Building Bye-Laws, 2019 have no storm-water rule beyond the site plan of 2.10.1, the roof-water connections of 4.19.1.1 and the storm-water capture of 9.6, and the Master Plan of Itanagar Capital Region-2031 proposes a new drainage network "taking into consideration of the topography of the region and flow gradient" (report) without a design storm or return period. The State has no floodplain zoning law, and no flood level has been published for any reach of the capital's rivers (Chapter 7).
The first is the capital's nallahs. Item (a) treats them as a case of their own because the capital drains through them, because they carry its sewage as well as its storm water ("storm water drains being used as sewers", Master Plan report), and because they fail in two opposite ways: on 23 June 2024 a two-hour fall of 40 mm (IMD, as quoted), about a two-year storm, inundated at least 66 houses (as reported), with drains choked by solid waste and silt; and with the Dikrong high, the outfalls cannot discharge. A design checked only for one of these fails in the other, so item (a) asks for both. The Dikrong has no CWC site and no published level, so item (a) uses the interim river rule of the hill editions of this series, a model and surveyed flood marks, and adds the release: the design case is the Dikrong at the flood mark of the largest recorded release, the Pare dam's 1,310 m³/s of 31 May 2025 (as reported), because that is the river at its worst that people saw, and the check case is the 1999 flood mark, the local benchmark (as reported), with the marks of 2017, 2018, 2024 and 2025 beside it; the 1% AEP model stands beside both and governs wherever it is higher. This is the research's own recommendation, which has no datum yet [TBC]. The lock is not less than 72 hours and covers the whole 72-hour storm, the longest design storm of this Manual, because the Dikrong carries the multi-day rain of the hills behind the capital and the dam's releases on top of it; no stage record of the Dikrong was found to set a different period, and one, once obtained, governs under Clause 5.10.6 [TBC]. The 48-hour pump-down is the drawdown time of Clause 4.7: a storage still full when the next storm comes on a river that is still high does not exist for that storm. No gate, flap gate or pump was found on any outfall, so item (a) asks the designer to find the operator of each, as the Assam edition does, rather than assuming one.
The second is the hill stream. Item (b) follows the stream rule of the mountain editions of this series: a study with the bulking factor of Clause 6.3.6(g), surveyed flood marks, the higher of the two, and an invert at least 0.5 m above the highest bed level surveyed downstream, a margin set by this Manual for the aggradation that a stream laden with slide debris can show in a single flood. The lock is the storm and the stream's recession, and not less than 24 hours, shorter than the 72 hours of the large rivers, because the streams are small and fall within hours of the rain stopping. Item (b) also names the side stream, because at Yazali the flood that left one dead and four missing came from a side catchment of about 17 km² while the Ranganadi stayed in its channel (as reported): a town beside a main river is not safe because the main river is.
The third is the main stem. Item (c) follows the Assam edition's form for outfalls backed up by a large river whose stage is set upstream, and uses the levels that CWC already watches. The danger level is the design case because it is the level that CWC forecasts and warns against at these sites; the highest flood level is the check, because at Pasighat it is an outburst stage, 3.58 m above the danger level, from a landslide-dam breach in Tibet (as reported), which no town storm can be designed to discharge against but which the floors, the pumps and the storage must survive. Where CWC transcribed only a highest flood level, at Tezu and Miao, that level serves for both until a danger level is given [TBC], which is conservative by design. The 7-day lock that the Assam edition uses on the Brahmaputra is not used, because no stage record of these reaches was found to justify it, and the check at the highest flood level already treats the outfall as closed for the whole storm; a stage record, once obtained, governs [TBC]. The towns on these rivers also lose their banks: an outfall placed on the eroding bank at Pasighat would be lost with it (as reported), so item (c) keeps outfalls off eroding banks and out of a fan's avulsion channels.
The fourth is the reservoir and its release reach. Item (d) follows the reservoir rule of the North-East hill editions. A reservoir at its full level does not fall for the rest of the season but passes its inflow over its spillway, so an outfall below its design level is closed for the whole 72-hour storm; no level of any reservoir in the State was found, so FRL + 0.5 m, the freeboard that this Manual uses for floor levels (Clause 6.11.1), is a floor, not an estimate of the surcharge [TBC]. On the Dikrong and the Ranganadi the largest release found is used, and the Ranganadi tailrace is added on the Dikrong, because the two arrive in the same river; on the Kameng, the Subansiri and the Dibang no release was found, so the spillway capacity in the operator's writing is required, which is conservative by design: a tailwater set too low floods a colony, while one set too high only costs storage. A warning helps people leave a reach but does not change the level an outfall must withstand, so item (d) designs for the release and not for the warning.
The fifth is the outburst. Item (e) does not size anything for an outburst, because no drain can be sized for the flood that "washed out every bridge downstream from Yigong Tso to Pasighat" (as reported); it asks that the outburst screening of Clause 2.3.6(i) be done and recorded, and that siting, setbacks and floor levels keep people and plant out of the path. The sixth is the river that leaves the State: item (f) names the CWC sites in Assam only to say that the Assam edition governs those reaches, and that a model of an Arunachal Pradesh outfall must reach far enough downstream that Assam's levels bound it from below and do not decide it.
The seventh is the pond, and the eighth the consents and lines. A pond that a drain fills is storage that the system needs, and item (g) starts it full to its outlet, as the plains editions of this series do for their wetlands, because a pond at the end of a wet week has no room left; a lake in a sanctuary, Ganga Lake, is not storage at all. Item (h) asks for the owner's consent and design level because a design that discharges to a channel, a river or a pond cannot be checked without them, and because the drains belong to several bodies and, on community and clan land, to no body the State appoints. The beds of streams and nallahs near the towns are often community land (Land Settlement and Records Act, 2000, s.9(1)), so an outfall across them needs the community's agreement; the Manual does not take land for an outfall. The lines of item (h) decide where an outfall can be built, not its level: the bye-laws refer to a distance from a nallah or stream "as per the notified rules/norms" that were not found, Jhot has no width, and the Manual's own corridor (Clause 7.4) is its proposal, so item (h) names them and applies none of them as law.
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive Arunachal Pradesh requirement in this Manual. In Arunachal Pradesh it applies where an outfall is shut not by the tide but by the Dikrong, the Senki or the Pachin backing up a nallah of the capital, by the Dikrong carrying the Pare dam's release, by a hill stream that has risen over the outlet or buried it in gravel, slide debris and garbage, by the Siang, the Lohit, the Noa-Dihing or the Dibang standing high at Pasighat, Tezu, Namsai or Roing, by a reservoir or the release of its dam, or by a pond at its outlet level. The main stems are set far upstream: the Siang at Pasighat reached its highest flood level of 157.54 m, 3.58 m above its danger level, in the outburst flood of June 2000 (CWC's levels as transcribed by SANDRP, as reported); and the storms that raise the rivers last for days, as in the 2026 season, which by 20 July had brought 173 landslides, 104 floods and 8 flash floods (the Department of Disaster Management, as quoted). That is why Clause 5.8.5 replaces the two 6-hour windows described below with a lock of at least 72 hours on the Dikrong and the main stems, held for the whole 72-hour storm, the storm and the stream's recession and at least 24 hours on the hill streams, at least 72 hours and as long as the release lasts on a release reach, and a closure for the whole storm at a reservoir or pond outfall below its design level and at a main-stem outfall checked at the highest flood level. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 31 March each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Arunachal Pradesh the outfalls do not cross a beach, but some of them end in a nallah or a river that backs up when the Senki, the Pachin or the Dikrong is high, some in the reach of the Dikrong below the Pare dam, and some in the main stems at Pasighat, Tezu, Namsai and Roing. No gate or flap gate on any town outfall in the State was found during research [TBC], so the gates that matter today are the radial gates of the dams above the towns: NEEPCO issues monsoon advisories on controlled releases through the Pare dam's radial gates (as reported), and the dam's peak discharge on 31 May 2025 was reported at 1,310 m³/s (as reported). A gate opened in a hurry raises the river below; a gate held shut or jammed by debris raises the reservoir and every outfall that drains to it; a flap gate on a nallah, once one is fitted, held open by silt, gravel or garbage lets the river into the town, and one buried by a rising bed on a bhabar fan stays shut. NEEPCO and NHPC operate the dams and WRD looks after the rivers, while the drains that reach them belong to the Itanagar Municipal Corporation, the Pasighat Municipal Council, the Department of Urban Affairs, the Smart City companies, PWD and PWD (Highways) and, on community and clan land, the communities; no release protocol or warning threshold of any dam was found during research, and no rule linking the operation of any gate to the levels of the drains was found [TBC]. A gate and the drains behind it can therefore belong to different bodies. The 31 March inspection date is set ahead of the monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 31 March each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Arunachal Pradesh: Clause 5.1.4), and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the monsoon. The mouth shall be assumed closed by a bar at the start of the April–October season, at the crest level of the most recent pre-monsoon survey. This applies unless the Water Resources Department certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless the Water Resources Department has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. Arunachal Pradesh has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the silt, gravel, boulders, slide debris, vegetation and garbage that the nallahs and hill streams leave at an outfall, a culvert or a gate, and the beds of the rivers on the bhabar fans, which rise and shift. The Master Plan of Itanagar Capital Region-2031 finds drains "chocked with the solid wastes" and "heavy silting" because "Regular cleaning of drains is not taking place", and the Pachin "a waste disposal site" (report); drains along the Bage Tinali–Naharlagun road are reported to be "too shallow and narrow" and clogged by earth-cutting debris (as reported); and in September 2018 culverts and a bridge in Itanagar were washed away, with a landslide from "the dumping area of NH 415" (as reported). A flap gate held open or shut by silt, debris or waste, an outlet buried by a rising bed or left hanging by scour, or a gate that cannot be moved, turns a designed outfall into a dead end or a back-flow path. No gate on any town outfall was found, and no rule linking the operation of any dam's gates to the levels of the drains above or below it was found during research [TBC]. Clause 5.8.5 deals with both by setting outfalls above the range of bed movement and by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- SANDRP (2019). Overview of CWC's flood forecasting sites 2019: North East India (the level-forecast sites at Passighat, Namsai and Yinkiang and the level-monitoring sites at Tezu, Daporizo, Yazali, Miao, Tuting, Kibithu and Lemeking, with their warning, danger and highest flood levels; no site on the Dibang or in the capital region; the sites downstream in Assam), https://sandrp.in/2019/10/02/overview-of-cwcs-flood-forecasting-sites-2019-north-east-india/ . These are copies of CWC data, read through a summary; the datum and gauge zero of each gauge are to be confirmed with CWC.
- Directorate of Town Planning, Government of Arunachal Pradesh. Draft Master Plan Report for Itanagar Capital Region, GIS Based Master Plan under AMRUT Scheme (the natural drainage system and drains; ponds receiving sewage; the Pachin; the 2017 floods; the proposed drainage network, Maps 28–30), Wayback capture of https://arunachaltp.nic.in/sites/default/files/Report%20IMP2031.pdf ; and the notice of approval of the Master Plan of Itanagar Capital Region-2031 (Form-II, File No. TP-ULB-21011/3/2021-DirTPULB [E-31358], 30 June 2022; approval of 3 June 2022), Wayback capture of https://arunachaltp.nic.in/sites/default/files/Notification%20of%20Itanagar%20Master%20Plan%202031.pdf . Whether the approved text differs from the report read was not checked [TBC].
- Central Ground Water Board, North Eastern Region. Ground Water Information Booklet, Papum Pare District (the Pachin and Dikrong flood plains; the Dikrong's master channel), Wayback capture from cgwb.gov.in; and a CGWB document on the Pachin, as cited in a search summary.
- Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality (the Senki at Chandranagar, Itanagar (u/s of Pachin), the Dibang at Roing and the Subansiri at Gerukamukh, Priority V), https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf
- Department of Town Planning and ULBs, Government of Arunachal Pradesh. Arunachal Pradesh Building Bye-Laws, 2019 (def. 69, 2.10.1(e), 4.2.1.1 and Annexure E 1.8; notification number, date and gazette reference [TBC]), Wayback capture of http://arunachaltp.nic.in/sites/default/files/APBuildingByelaws2019.pdf
- Government of Arunachal Pradesh. The Arunachal Pradesh Municipal Act, 2007 (Act No. 4 of 2008) (ss.102, 194 and 196), Wayback capture of http://arunachaltp.nic.in/sites/default/files/files/AP_Municipality_Act_2007_2.pdf ; The Arunachal Pradesh Municipal Corporation Act, 2019 (Act No. 8 of 2019) (ss.200 and 203), https://prsindia.org/files/bills_acts/acts_states/arunachal-pradesh/2019/Act%208%20of%202019%20Arunachal%20Pradesh.pdf ; The Arunachal Pradesh (Land Settlement and Records) Act, 2000 (Act No. 10 of 2000) (s.9(1)), https://faolex.fao.org/docs/pdf/ind193861.pdf ; and The Arunachal Pradesh Urban and Country Planning (Amendment) Ordinance, 2025 (Ordinance No. 5 of 2025) (Town Planning Schemes), https://prsindia.org/files/bills_acts/bills_states/arunachal-pradesh/2025/Ord5of2025AR.pdf
- National Green Tribunal, Eastern Zone. OA 94/2020/EZ, S. D. Loda v. Union of India & Ors. (the Senki, the Pachin and the Dikrong), order of 5 January 2023, as summarised by the India Environment Portal.
- Peer-reviewed analysis of the Yigong landslide-dam breach of June 2000 (the rise at the Pasighat gauge), as summarised in a search result; the paper was not read in full.
- Press reports on the Pare dam's releases and NEEPCO's release advisories (2025–2026; Eastern Sentinel, India Today NE); on the Ranganadi project's tailrace and the CWPRS study of 1994 (Northeast Now); on the Ranganadi release of 2017 from an IIT report prepared for the Assam State Disaster Management Authority (as summarised in the research for the Assam edition); on the Lower Subansiri project's commissioning (NHPC; Northeast Now); on the Modirijo and Donyi Polo floods of September 2018 (Northeast Now, The Statesman, Arunachal24); on the Itanagar storm of 23 June 2024 (The Arunachal Times, ETV Bharat, Deccan Herald); on the Poosa and NEEPCO colony flood at Yazali (Down To Earth, 25 June 2026; EastMojo, 21 July 2026); on the Yigong outburst of June 2000 and the Siang's turbidity of November 2017 (SANDRP; Down To Earth; The Wire; AGU Landslide Blog); on erosion at Pasighat and WRD's Mebo schemes; on NDMA's high-risk glacial lakes and CWC's glacial-lake count (The Wire, Deccan Chronicle); and on Ganga Lake and Glaw Lake.
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a hillside colony in Itanagar draining to the Senki |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. The drains of Arunachal Pradesh's towns fail in places that site design does not see, and in six different ways. The first is the capital's nallahs. Itanagar's drains run to nallahs and the Senki and the Pachin, and Naharlagun's to the Dikrong; they "end up mostly into the Nallah and in some cases, into local ponds or open fields", and the Master Plan finds "no proper storm water network for the overall town area" and drains "not engineered" (Master Plan of Itanagar Capital Region-2031, report). The Dikrong below Doimukh carries the Pare dam's releases, with a peak of 1,310 m³/s on 31 May 2025 (as reported), and the Ranganadi project's tailrace. The second is the hill stream. In September 2018 the floods of the Modirijo and Donyi Polo catchments washed away the Senki View culvert and the Press Colony bridge, with a landslide reported from "the dumping area of NH 415" (as reported). The third is the main stem. The Siang at Pasighat set its highest flood level, 157.54 m against a danger level of 153.96 m, in the flood from a landslide-dam breach in Tibet in June 2000 (CWC's levels as transcribed by SANDRP, as reported), and the town's bank erodes (as reported). The fourth is the reservoir and its release reach: the Pare, Ranganadi, Kameng and Lower Subansiri projects release into the reaches of towns, and no operator's release protocol was found. The fifth is the river that leaves the State, whose nearest CWC sites are in Assam, tens of kilometres downstream. The sixth is the pond: the drains and sewage of the capital run into ponds (Master Plan report). The outfalls also belong to one body while the drains above them belong to others: the rivers are WRD's to look after, the dams NEEPCO's and NHPC's to operate, the town drains the Itanagar Municipal Corporation's or the Pasighat Municipal Council's, the road drains the Public Works Department's, and the drains on community and clan land the community's, and no rule divides them (Chapter 6, Clause 6.9). No document found during research sets a design level for any river, stream, reservoir or pond outfall in the State, or a design standard for any town drain. A detention basin that meets every release rate in Chapter 4 still fails if the river stands above its outfall, if the stream has buried its outlet in gravel or garbage, or if the dam upstream is releasing. This chapter makes these failure modes part of the design. Arunachal Pradesh has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.