Draft v1.0 prepared by NEER. Not adopted by the Government of Arunachal Pradesh or any authority, local body or community, and has no legal force. About this draft

Chapter 7Waterbodies, Ponds, Lakes and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (pond) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Arunachal Pradesh, a landlocked State, means Glaw Lake in the Kamlang Tiger Reserve, the State's first Ramsar site (announced on 3 August 2026, as reported), Ganga Lake (Gyakar Sinyi) in the Itanagar Wildlife Sanctuary, the palaeochannels and swampy land of the Pachin and Dikrong flood plains, the ponds, the seepage ground of springs, the reservoirs with their drawdown zones, the 1,127 wetlands of more than 2.25 ha truthed by the Forest Department (944 of them high-altitude lakes), and any wetland notified under the 2017 Rules (none was found notified);
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Arunachal Pradesh Building Bye-Laws, 2019, the Arunachal Pradesh Municipal Act, 2007, the Arunachal Pradesh Municipal Corporation Act, 2019, the Arunachal Pradesh Urban and Country Planning Act, 2007, as amended, and the master plans and schemes made under it, the Arunachal Pradesh (Land Settlement and Records) Act, 2000 and the customary rights it incorporates, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. Arunachal Pradesh has no Act for the protection of ponds, lakes, streams, nallahs or springs, and no floodplain law or Bill was found. Its waterbodies are touched by one statewide building rule, by its municipal, planning and land law, by the customary rights under which much land and water near the towns are held, by the wetland rules and by the courts. The Arunachal Pradesh Building Bye-Laws, 2019 (the APBBL 2019; Department of Town Planning and ULBs, Government of Arunachal Pradesh) extend "to whole of Arunachal Pradesh" (clause 2.1); they ask the site plan to show "existing physical features such as well, drains" and the "Distance from Nallah/Stream as per the notified rules/norms" (clause 2.10.1(j) and (e)), but no such rules or norms were found; they define the Jhot as "A strip of land permanently left open for drainage purposes" (definition 69) without a width; they refuse earth-cutting permission where "the average slope of the topography is more than 30%" (clause 4.39(14)); and they ask every urban local body and planning authority "to identify, demarcate, protect and maintain the water bodies that come under their jurisdiction" and to prepare a list (Annexure E, item 1.8), of which none was found (Clause 7.4, Disclosure). In the area of the Itanagar Municipal Corporation (IMC) "all public streams, springs and works for the supply, storage and distribution of water" and "all public sewers and all drains … in or under any public street" vest in the Corporation, and "the maintenance and cleaning of drains and drainage works" is an obligatory function (Arunachal Pradesh Municipal Corporation Act, 2019; the function is s.60(a), and the public drains vest under s.200); in a municipality such as Pasighat "all public tanks, streams, reservoirs, and wells" and "all public sewers and drains, channels, tunnels, culverts and watercourses" vest in it "Notwithstanding anything contained in any other law" (Arunachal Pradesh Municipal Act, 2007, s.102). The Arunachal Pradesh Urban and Country Planning Act, 2007 provides for master plans, and the Master Plan of Itanagar Capital Region-2031 was approved on 3 June 2022; Ordinance No. 5 of 2025 adds Town Planning Schemes, whose contents may include "the filling-up or reclamation of low-lying, swampy or unhealthy area, or levelling-up of land", and an amending Bill was reported passed on 9 March 2026 (as reported; its Act number and final text were not found [TBC]); the reclamation clause is the main statutory risk to ponds, swamps and low-lying storage (definitions after Clause 7.2). Land is governed by the Arunachal Pradesh (Land Settlement and Records) Act, 2000, which incorporates "customary rights on the land" and vests the beds of rivers, streams, nallahs, lakes and tanks in Government only where they are "not the property of any person or community" (s.9(1)); much land near the towns is community, clan or individual land, and individual titles came only with a 2018 amendment (s.1A, as reported). Wetlands are the concern of the Forest Department, which has truthed 1,127 wetlands and demarcated the boundaries of 997, and of the State Wetland Authority (a memorandum with Wetlands International South Asia in 2024 is reported; its exact name and the notice constituting it were not found [TBC]); Glaw Lake became the State's first Ramsar site on 3 August 2026 (as reported), and no wetland notified under rule 4 of the 2017 Rules was found. In this chapter NEEPCO means the North Eastern Electric Power Corporation Ltd, which operates the Pare reservoir on the Dikrong above Doimukh, the Ranganadi project at Yazali and the Kameng project, the impounded waters with gates, releases and an operator that release into town reaches; it is named as the operator whose levels and records a design uses, not as an approving authority, and NHPC is named in the same way for the Lower Subansiri and Dibang projects. The custodians of the ponds, springs and lakes are recorded one by one in the inventory (Annex 7A). Who regulates where, and who is the competent authority for each area, including on community and clan land, is set out in Chapter 1.

This Manual treats every recorded waterbody as drainage infrastructure. Five features set Arunachal Pradesh apart. The first is the nallah: "the storm water drainage system consists of natural drainage system (Nallah) and major drains", and the roadside drains "end up mostly into the Nallah and in some cases, into local ponds or open fields" (Master Plan of Itanagar Capital Region-2031); the floods of 2017 badly damaged the "land protection wall of several nallahs and rivulets" and closed NH-415, with traffic diverted by Papu Nallah and Jullang Road (the same plan). The second is the foothill river of the capital: Itanagar's drains run to the nallahs and the Senki and the Pachin, and Naharlagun's to the Dikrong; the Pachin "passes through most of the area before it debouches to Dikrang river near Nirjuli" (CGWB, as summarised); and the Dikrong below Doimukh carries the releases of the Pare dam (a peak of 1,310 m³/s on 31 May 2025, as reported); none of the three has a gauge level. The third is the main stem fed from Tibet, glaciers and snow: the Siang at Pasighat, the Lohit at Tezu and the Noa-Dihing at Namsai, whose stage is set upstream, as the Yigong landslide-dam outburst of June 2000 set the CWC's highest flood level at Pasighat, 157.54 m against a danger level of 153.96 m (as reported); above them lie the glacial lakes, of which NDMA lists 27 as high-risk (Tawang 6, Kurung Kumey 1, Shi Yomi 1, Dibang Valley 16, Anjaw 3; as reported). The fourth is the lake and wetland: 1,127 wetlands of more than 2.25 ha were truthed in 19 districts, 944 of them high-altitude lakes, 24 aquaculture ponds, 12 ox-bow lakes, 8 waterlogged areas, 3 lakes, 2 tanks or ponds, 1 reservoir and 1 paddy field, with 130 entries found to be shadows, and only 6 in Papum Pare (Forest Department); the capital's lake is Ganga Lake (Gyakar Sinyi), in the Itanagar Wildlife Sanctuary about 6 km from Itanagar, under pressure from encroachment and earth cutting (as reported). The fifth is the spring: the springs of Papum Pare discharge 0.43 to 2 L/s before the monsoon and "most of the springs become dry during dry season", and in the northern hills of East Siang springs are the only source (CGWB); no statute keeps building or drains away from a spring, and springs were not researched for this Manual [TBC]. The ponds are few and small in the towns: the first Water Bodies Census counted 993 water bodies, 893 rural and 100 urban, and none encroached (as summarised from a Rajya Sabha answer), and the master plan's ponds receive drains and sewage (Clause 8.9, Commentary). Arunachal Pradesh has no irrigation tank cascades; the tank clauses of this chapter apply to the ponds, the lakes, the reservoirs and any other impounded water. This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the bye-laws, the municipal, planning and land law, the customary rights of communities, clans and owners, the wetland procedures, or the directions of the Gauhati High Court (Itanagar Bench), the National Green Tribunal and the Supreme Court.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river or stream, such as the main stems fed from Tibet, glaciers and snow (the Siang, the Dibang, the Lohit, the Subansiri, the Kameng and the Tawang Chu), the rivers of the capital region (the Dikrong, the Pachin and the Senki) and the Noa-Dihing on the south-eastern plain; hill stream (a small, steep stream, perennial or seasonal, into which the drains of a hill town fall); nallah (a natural or open urban channel, such as Papu Nallah at Naharlagun and the nallahs into which Itanagar's drains run; a channel is selam in Nyishi, Hamilton 1900, c. p. 96); drain; pond, natural or dug, private, community or public; lake or wetland, such as Ganga Lake (Gyakar Sinyi) in the Itanagar Wildlife Sanctuary and Glaw Lake in the Kamlang Tiger Reserve (a lake is sinyi in Nyishi, Hamilton 1900, c. p. 104); glacial or moraine-dammed lake, such as the 27 high-risk glacial lakes that NDMA lists in the State (as reported); reservoir, such as those of the Pare and Ranganadi projects, with its drawdown zone; spring with its recharge area; supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (pond) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Water Resources Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (stream, nallah or feeder channel) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice, spillway gate or regulator) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Arunachal Pradesh terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Pond A pond, natural or dug, private, community or public. "Pond" is used in plain English because English is the working language of the State and of this Manual (as reported), no single tribal language is shared across the State, and the one local word found, Nyishi sinyi, means "Lake" and "Tank" (Hamilton 1900, c. pp. 104 and 118) rather than a small urban pond (Annex 7E); the statutes, the Master Plan of Itanagar Capital Region-2031 and the wetland truthing already use "pond" and "tank" in English. A pond with a controlled outlet is a tank under Clause 7.2: its outlet gate is its sluice, and its FTL is the level at which it spills over its outlet with any gate closed, found by survey. A pond with an uncontrolled outlet has its FTL at the crest of that outlet. A natural pond or lake keeps its own description, such as Ganga Lake (Gyakar Sinyi). Engineered storage built under this Manual is a "detention pond", never a natural or community pond, a lake, a spring pool or a reservoir.
Nallah A natural or open urban channel, as the APBBL 2019 ("Distance from Nallah/Stream", clause 2.10.1(e)), the Arunachal Pradesh (Land Settlement and Records) Act, 2000 ("nallahs", s.9(1)) and the Master Plan of Itanagar Capital Region-2031 ("natural drainage system (Nallah)") use the word, and as in place names such as Papu Nallah. A nallah that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whether it is lined, piped or covered, whether it is dry for most of the year, and whatever it carries; until sewers exist it is also a combined channel (Clause 8.9, Commentary). It carries boulders, slide debris and garbage in flood: its inlets and culverts take the racks, bulking and blockage of Clause 6.3.6(f) to (h). Its top of bank is the edge of its channel as built, or of its active bed where that is wider, or, where it has been narrowed, the edge shown in any record or survey of its earlier width, whichever is wider (Clause 7.13.1). This definition is set by this Manual.
Hill stream A small, steep stream, perennial or seasonal, below a hill town, into which the town's drains and nallahs fall (plain English; Annex 7E). Every hill stream that drains 8 ha or more is a natural channel under Clause 7.4.1(b), and the rules for a nallah apply to it. This definition is set by this Manual.
Jhot "A strip of land permanently left open for drainage purposes. It is not to be used as an access way or a street and is not to be included as a part of setbacks" (APBBL 2019, definition 69). The bye-laws give it no width. In this Manual the word means that strip only; where a Jhot is shown on an approved plan, it lies within Zone 1 or is added to it, and it never reduces Zone 1.
Recorded waterbody A pond, lake, reservoir, stream, hill stream, nallah, spring or wetland shown in any source of Clause 7.3.3(a): a record of a land revenue office of a Deputy Commissioner, a community, clan or owner; IMC's or a municipality's record of what vests in it; a list prepared under Annexure E 1.8 of the APBBL 2019; a map of the Master Plan of Itanagar Capital Region-2031 or another master plan; the Water Bodies Census; the Forest Department's wetland truthing; NDMA's glacial-lake list; NEEPCO's or NHPC's records; or a town's drain register. A recorded waterbody is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual.
Low-lying land and reclamation Land below the 1% AEP flood level of a river, stream or nallah, the palaeochannels and swampy land of the Pachin and Dikrong flood plains, paddy fields that hold water in the season, and the margins of a pond are flood storage. Ordinance No. 5 of 2025 lets a Town Planning Scheme include "the filling-up or reclamation of low-lying, swampy or unhealthy area, or levelling-up of land"; whether the provision stands in the amended Act was not found [TBC], and the Ordinance is cited here as the Ordinance, not as enacted law. For this Manual such reclamation, under any scheme or none, is fill: where it lies below the 1% AEP flood level, or on the margin of a pond, the storage it removes is replaced under Clause 7.6.4 (1:1 in bands of not more than 0.3 m), in the same reach and before or with the fill, and is secured under Clause 7.6.4(f); the replacement is not counted as detention (Clause 7.6.5). This Manual does not override a scheme; it states the storage the scheme must keep. This reading is set by this Manual.
Boundary of a pond, lake or reservoir For this Manual, the boundary of a pond or lake under Clauses 7.3.3 and 7.13.1 is the largest of its recorded boundary (including a boundary demarcated in the Forest Department's wetland truthing), its surveyed FTL and the outer edge of its water in the season of 1 April to 31 October shown by dated imagery or survey of recent years. The boundary of a reservoir is the highest level its operator states in writing, stated to the datum of Clause 7.3.5; no full reservoir level was found for the Pare, Ranganadi or Kameng reservoirs [TBC]. The drawdown land of a reservoir below that level is part of the reservoir. This reading is set by this Manual.
Reference lines for setbacks No statutory reference line exists in Arunachal Pradesh (Clause 7.4, Disclosure). Two lines are used, and the setback that reaches furthest from the water governs: (a) the FTL of a pond, lake or reservoir, the outlet or the edge of the chamber or pool of a spring, or the top of bank of a channel, with Zone 1 of Clause 7.4.3 measured from it; and (b) the 1% AEP flood extent of Clause 7.3.4, with the 10 m of Clause 7.4.4 added. A Jhot on an approved plan and any distance shown under clause 2.10.1(e) of the APBBL 2019 are stated on Form 7-1, but they never reduce Zone 1. This rule is set by this Manual.
Spring; spring recharge area A spring is a place where groundwater comes out at the surface (Nyishi lol, "Spring … But the word is rarely used", Hamilton 1900, c. p. 118, is not used; Annex 7E). A spring is a waterbody for Clause 7.3, and its Zone 1 under Clause 7.4 is measured from its outlet or the edge of its chamber or pool. Its recharge area is the area upslope from which it is fed, as a hydrogeologist maps it; above a drinking-water intake that area is a no-paving zone, except for access, into which no road runoff is infiltrated, no soak pit or septic tank is placed, no drain is cut that would intercept the flow to the spring, and no fill is placed that would bury its outlet (Clause 8.8.1). No storm drain or sewer is laid within Zone 1 of a spring, and no drain or fill is laid across its outlet, except a lined drain below the outlet that carries its overflow away. A spring pool is never a detention pond. This definition and these rules are set by this Manual; springs were not researched for this Manual [TBC].
Glacial or moraine-dammed lake A lake held by a glacier, moraine or landslide dam, of which NDMA lists 27 high-risk lakes in the State (as reported), and such as the landslide-dam lake on the Yigong in Tibet whose breach in June 2000 raised the Siang at Pasighat to the CWC's highest flood level (as reported). It is a waterbody for Clause 7.3 and a hazard to be screened under Clause 2.3.6(i) and mapped under Chapter 5; it is never a design outfall or design storage, and no drain under this Manual discharges to it. This rule is set by this Manual.
Community land; landholder Land held by a community (in the 2000 Act, "residents of a village as a whole", including "a clan, sub-clan, kindred"), a clan or an individual under the customary rights that the Arunachal Pradesh (Land Settlement and Records) Act, 2000 incorporates, inside or outside a town; "common land" is land "used or reserved for the common use of a community or a village" (s.2). Its landholder is the community, clan or owner, and the beds of rivers, streams, nallahs, lakes and tanks on it are not Government property (s.9(1)). Zone 1 land that is not Government or municipal land is secured for this Manual by a written agreement with the owners or the community, by donation (the Act's own definition of Government land includes land obtained "through donation of the public"), by purchase, or by reservation in a master plan, layout or Town Planning Scheme, and is not taken. Where the State decides that land must be obtained compulsorily, section 104 of the Arunachal Pradesh Municipal Act, 2007 routes it through the "Land of Acquisition Act, 1894" (as printed), which the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 has replaced for the Union (NEER reading), and its section 104(3) also allows "other methods of land assembly including the use of transferable development rights"; this Manual states that route and does not invoke it. On community land outside any permission or plan this chapter is guidance, unless the owners or the community take it into an agreement of their own. This rule is set by this Manual.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the Water Resources Department and the land revenue offices of the Deputy Commissioners, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (the Itanagar Municipal Corporation (IMC) within its limits (for the public streams and springs, the works for the supply of water, and the public sewers, drains, culverts and water courses in or under any public street, which vest in it under the Arunachal Pradesh Municipal Corporation Act, 2019, and for the drains whose maintenance and cleaning are its obligatory function under section 60(a)), the Pasighat Municipal Council or another municipality within its limits (for the public tanks, streams, reservoirs and wells, and the public sewers, drains, channels, culverts and watercourses alongside or under any street, which vest in it under section 102 of the Arunachal Pradesh Municipal Act, 2007), the Department of Urban Affairs or a Smart City company (for the storm drains, sewerage and septage works they build, until these are handed over to the urban local body), PWD or PWD (Highways) (for the drains and culverts of their roads, NH-415 among them), the Water Resources Department (for rivers and anti-erosion works), PHED (for water-supply sources and intakes), NEEPCO (for the Pare, Ranganadi and Kameng reservoirs and the reaches below them, as operator) or NHPC (for the Lower Subansiri and Dibang projects, as operator), the Forest Department (for the wetlands it has truthed and demarcated, and for Ganga Lake in the Itanagar Wildlife Sanctuary, whose charge it is reported to have taken), the State Wetland Authority (for a notified wetland; none was found), a community, clan or individual owner (for land and water held under the customary rights that the Arunachal Pradesh (Land Settlement and Records) Act, 2000 incorporates; the beds of rivers, streams, nallahs, lakes and tanks are Government property only where they are "not the property of any person or community", section 9(1)), a village authority, a colony developer (for the drains of a layout until they are handed over), or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) records of the land revenue offices of the Deputy Commissioners under the Arunachal Pradesh (Land Settlement and Records) Act, 2000, which are thin, because much land near the towns is held by communities, clans and individuals under the customary rights that the Act incorporates and is in no State register: individual titles came only with the 2018 amendment (section 1A, as reported), and the beds of rivers, streams, nallahs, lakes and tanks are Government property only where they are "not the property of any person or community" (section 9(1)), so that the records of the communities, clans and owners are also needed (none was read for this Manual [TBC]); the public streams, springs, drains and water courses that vest in the Itanagar Municipal Corporation under the Arunachal Pradesh Municipal Corporation Act, 2019, and the public tanks, streams, reservoirs, wells and drains that vest in a municipality under section 102 of the Arunachal Pradesh Municipal Act, 2007; the list of the water bodies in its jurisdiction that every urban local body and planning authority is to prepare under Annexure E 1.8 of the APBBL 2019 (none was found [TBC]); the maps of the Master Plan of Itanagar Capital Region-2031, with its "natural drainage system (Nallah)" and the flood plains of the Pachin and the Dikrong; the first Water Bodies Census (993 water bodies, 893 rural and 100 urban, none encroached, as summarised from a Rajya Sabha answer); the Forest Department's truthing and boundary demarcation of 1,127 wetlands, of which 997 have been demarcated; NDMA's list of high-risk glacial lakes (as reported); NEEPCO's and NHPC's records of the levels and land of their reservoirs; and each town's drain register (Chapter 6);
  • (b) NEEPCO and village authority tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where NEEPCO records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. Arunachal Pradesh has no floodplain law and no flood line. No floodplain zoning Act or Bill was found, and no flood zone, flood line or riverbank setback has been drawn for any town. The bye-laws' definitions treat as natural hazard prone the areas of "significant flood flow or inundation, or landslides/mud flows/avalanches", including those "flooded under conditions of heavy intensity rains, inundation in depressions, back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area" (APBBL 2019), and clause 2.10.1(f) asks the site plan to show the "Distance from Disaster Prone Area as per norms set by Disaster Management Authority"; no such survey or norms were found. The Master Plan of Itanagar Capital Region-2031 maps the geomorphology of the capital, with an "Alluvial Plain … along the wide flood plain areas of Pachin and Dikrong rivers", palaeochannels, swampy land, terraces and flood plains, and proposes a new drainage network (Maps 28 to 30), but it draws no flood line and gives no design storm; Pasighat has no master plan or drainage plan that was found [TBC]. The rivers of the capital are not gauged: there is no CWC site on the Senki, the Pachin or the Dikrong, and the operator of the Pare dam issues release advisories but no stage record for the Dikrong was found. The main stems are gauged only at a few CWC sites, with levels as transcribed by SANDRP and no datum stated [TBC]: the Siang at Pasighat (danger level 153.96 m; highest flood level 157.54 m on 11 June 2000, the Yigong outburst), the Noa-Dihing at Namsai (145.8 m and 146.6 m) and the Lohit at Tezu (highest flood level 192.14 m, 16 July 1996) (all as reported). No local authority has fixed a highest flood level for any town [TBC], and the bye-laws' plinth is "not less than 300 mm" above the surrounding ground (clause 4.2.1.1), which is not a flood level. The best evidence of flood extent is therefore on the ground: the marks of the 1999 flood on the Dikrong, the 2017 floods in the capital, the Modirijo and Donyi Polo floods of September 2018, the floods of June and July 2024 at Energy Park, Bank Tinali, Niti Vihar and Abo Tani Colony, and the floods of late May and June 2025 (as reported), and the evidence of residents. Clause 7.3.4 lets the Authority adopt flood maps once they exist; until then the Applicant produces the 1% AEP extent for larger and flood-sensitive sites, with the river backing up the nallah under Clause 5.8.5(a) and (c), the bulking of Clause 6.3.6(g) on hill streams and nallahs, and the surveyed flood marks of Clause 5.8.5, and the floor levels of this Manual (the 1% AEP level + 0.5 m) govern where they are higher than the bye-laws' 300 mm plinth. Levels shall be stated to one datum (Clause 7.3.5). Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual along every natural channel draining 8 ha or more, including the capital's nallahs, the Senki, the Pachin and the Dikrong, and round every pond, lake, reservoir and spring (no statute, rule or bye-law found in Arunachal Pradesh sets any distance from a stream, nallah, spring, pond or drain: clause 2.10.1(e) of the APBBL 2019 asks the site plan to show the "Distance from Nallah/Stream as per the notified rules/norms", but no such rules or norms were found, and the bye-laws' Jhot, a "strip of land permanently left open for drainage purposes", has no width; the 15 m is offered as the norms that clause refers to, which the State could notify; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or a line of the Master Plan of Itanagar Capital Region-2031, or of another master plan, layout or Town Planning Scheme under the Arunachal Pradesh Urban and Country Planning Act, 2007, as amended (the master plan's map of the natural drainage system and the flood plains of the Pachin and the Dikrong sets no width); a condition of the building permission or earth-cutting permission under the APBBL 2019 (the "Distance from Nallah/Stream as per the notified rules/norms" of clause 2.10.1(e), whose norms were not found; the "Distance from Disaster Prone Area as per norms set by Disaster Management Authority" of clause 2.10.1(f), whose norms were not found either; a Jhot under definition 69; the limits on earth cutting of clause 4.39); the consent of the Water Resources Department for a work in or on a river or anti-erosion work; NEEPCO's or NHPC's conditions for a work that drains to, or lies next to, one of their reservoirs or the reach below its dam; the agreement of the owners or the community for a drain or corridor on customary land; the views of the State Wetland Authority or the Forest Department for a work in or next to a notified or demarcated wetland or a lake in a sanctuary; or a direction of the Gauhati High Court (Itanagar Bench), the National Green Tribunal or the Supreme Court (none setting a distance from a stream, nallah, pond or spring in Arunachal Pradesh was found; Clause 7.4, Disclosure) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor, because there is nothing else to measure against: no statute, rule or bye-law found in Arunachal Pradesh sets any distance from a stream, nallah, spring, pond or drain. The Arunachal Pradesh Building Bye-Laws, 2019, which extend "to whole of Arunachal Pradesh" (clause 2.1), ask the site plan to show the "Distance from Nallah/Stream as per the notified rules/norms" (clause 2.10.1(e)), but no such rules or norms were found; they define the Jhot as "A strip of land permanently left open for drainage purposes" (definition 69) without a width; and on sites of 5,000 m² or more of built-up area they ask that "The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water" (Table 14.1). The 15 m is offered as the norms that clause 2.10.1(e) refers to, which the State could notify. It applies to new development and redevelopment approved under this Manual, not to existing buildings. It is offered as a condition of building permission and layout approval wherever the bye-laws apply, which is the whole State, and as a recommendation for works on community land outside any permission; where Zone 1 land is community, clan or private land, it is secured by agreement with the owners or the community, by donation, by purchase, or by reservation in a master plan, layout or Town Planning Scheme, and is not taken. It is this Manual's proposal, not a statutory width, and it never reduces a wider line of a plan, permission or order (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Arunachal Pradesh flood maps are mostly coarser than US maps, the only level land in an Arunachal Pradesh hill town is usually a narrow valley floor or terrace beside a stream, and Naharlagun, Nirjuli and Doimukh, Pasighat, Tezu and Namsai stand on the flat valley floors, fans and flood plains of the Dikrong, the Siang, the Lohit and the Noa-Dihing, whose levels back up the towns' nallahs (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Arunachal Pradesh has no distance from water in any law found for this Manual. The Arunachal Pradesh Building Bye-Laws, 2019 "shall extent to whole of Arunachal Pradesh with effect from the date of notification" (clause 2.1); they were to be reviewed after five years, and "Till such time the reviewed building byelaws are notified, these building byelaws will continue to be in force" (clause 2.2); their notification number and date were not found, because the gazette page of the copy read is blank [TBC]. Their "Authority" is "The Director/Chief Town Planner of Town Planning & Urban Local Body … till an executing authority is notified" (definition 12). Seven of their provisions touch water. Clause 2.10.1 asks the site plan to show "(j) Any existing physical features such as well, drains" and "(e) Distance from Nallah/Stream as per the notified rules/norms" and "(f) Distance from Disaster Prone Area as per norms set by Disaster Management Authority"; no such rules or norms were found. Definition 69 defines the Jhot, "A strip of land permanently left open for drainage purposes. It is not to be used as an access way or a street and is not to be included as a part of setbacks", with no width. Clause 4.39 governs earth cutting: no permission "if the average slope of the topography is more than 30%", the site then being "not fit for construction except for plantation" (4.39(14)); a cut no higher than 3 m (4.39(4)); 2.5 m from the property line of a plot on the upper terrace (4.39(5)); the owner to clear soil and debris "from site or drain to suitable/safer place" (4.39(8)); and a retaining or breast wall "immediately" on completion of the cut (4.39(11)); with a penalty of ₹1 lakh for cutting without approval and a recommendation to cancel the land allotment. Clause 2.10.2(a) keeps 0.60 m between a retaining wall on a sloping side and the building. Table 14.1 asks large sites to keep "The inlet and outlet point of natural drain system … with adequate size of channel for ensuring unrestricted flow of water". Chapter 12 lists natural feature areas, among them "water bodies (and the areas adjoining the same)", to be "listed in notification(s) … / identified in Master Plan"; none listed was found. And Annexure E 1.8 asks the urban local bodies and planning authorities to identify, demarcate, protect and maintain their water bodies and to prepare a list; none was found. The earlier "FINAL DRAFT" of 2009 had a hill-site clause on "location of landslide prone areas" and the "diversion of the natural flow of water coming from uphill side"; it is not in the 2019 text, although the Master Plan of Itanagar Capital Region-2031 reproduces it, and it is not cited here as in force. The Arunachal Pradesh Municipal Corporation Act, 2019 and the Arunachal Pradesh Municipal Act, 2007 vest public streams, springs, tanks, drains and watercourses in IMC and the municipalities, but set no distance. The Master Plan of Itanagar Capital Region-2031 proposes 30 m green buffers along new 30, 45 and 60 m roads; they are along roads, not streams. The Arunachal Pradesh (Land Settlement and Records) Act, 2000 leaves the beds of streams, nallahs, lakes and tanks with their owners where they are "the property of any person or community" (s.9(1)). No order of the Gauhati High Court (Itanagar Bench), the National Green Tribunal or the Supreme Court setting a distance from a stream, nallah, pond or spring in Arunachal Pradesh was found. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.

Disclosure. Arunachal Pradesh has no distance from water in any statute, rule or bye-law found for this Manual: the APBBL 2019 ask the site plan to show the "Distance from Nallah/Stream as per the notified rules/norms" (clause 2.10.1(e)), but no such rules or norms were found; their Jhot is "A strip of land permanently left open for drainage purposes" (definition 69) with no width; the Municipal Corporation Act, 2019 and the Municipal Act, 2007 vest public streams, springs and drains in IMC and the municipalities but set no distance; the Master Plan of Itanagar Capital Region-2031 draws no stream corridor; and no floodplain zoning law or Bill was found, so no flood zone exists in law. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor: along every natural channel draining 8 ha or more, including the capital's nallahs, the Senki, the Pachin and the Dikrong, and round every pond, lake, reservoir and spring. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's reference lines and its reading of the boundary of a pond, lake or reservoir, and the rules on nallahs, hill streams, springs, glacial lakes, community land and reclamation (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body, urban local body, planning authority, village authority, community or other body has adopted or endorsed them. The 15 m is offered as the "norms" that clause 2.10.1(e) of the APBBL 2019 refers to, which the State could notify. It applies to new development and redevelopment approved under this Manual, not to existing buildings; Clause 7.4.7 allows no variance below it; it is offered as a condition of building permission and layout approval wherever the bye-laws apply, which is the whole State (clause 2.1), and as a recommendation for works on community land outside any permission; and where Zone 1 land is community, clan or private land, it is secured by agreement with the owners or the community, by donation, by purchase, or by reservation in a master plan, layout or Town Planning Scheme, never taken: the beds of rivers, streams, nallahs, lakes and tanks are Government property only where they are "not the property of any person or community" (s.9(1) of the Arunachal Pradesh (Land Settlement and Records) Act, 2000). Where the State decides that land for a public drain must be obtained compulsorily, section 104 of the Arunachal Pradesh Municipal Act, 2007 routes it through the "Land of Acquisition Act, 1894" (as printed), which the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 has replaced for the Union (NEER reading), and allows "other methods of land assembly including the use of transferable development rights" (s.104(3)); this Manual states that route and does not invoke it. The setback is applied as whichever line reaches furthest (definitions after Clause 7.2), so the Manual is stricter than every line that exists and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • The APBBL 2019, in force throughout the State (clause 2.1; notification number and date not found [TBC]): the site plan's drains, wells and "Distance from Nallah/Stream" (clause 2.10.1(j) and (e)), with no number; the Jhot of definition 69, with no width; the bar on earth-cutting permission above an average slope of 30%, the 3 m limit on a cut, the 2.5 m from the upper terrace and the retaining wall "immediately" (clause 4.39); the 0.60 m between a retaining wall and the building (clause 2.10.2(a)); the natural drains of large sites (Table 14.1); the plinth "not less than 300 mm" above ground (clause 4.2.1.1); and the water bodies that each urban local body and planning authority is to list and protect (Annexure E 1.8), of which no list was found. Their five-year review (clause 2.2) was due from 2024; whether it has begun is not known [TBC].
  • Plans. A line of the Master Plan of Itanagar Capital Region-2031, approved on 3 June 2022, or of another master plan, layout or Town Planning Scheme under the Arunachal Pradesh Urban and Country Planning Act, 2007, as amended: a scheme's drainage could carry the corridors of this chapter; a scheme's "filling-up or reclamation of low-lying, swampy or unhealthy area" (Ordinance No. 5 of 2025; its final form as an Act was not found [TBC]) is fill under Clause 7.6.4 (definitions after Clause 7.2).
  • Customary land. On community, clan or individual land the owners' or the community's agreement governs; this chapter is guidance there unless a permission, plan or agreement carries it.
  • Glacial lakes. No statute or rule sets a distance from a glacial lake or its outburst path. NDMA lists 27 high-risk glacial lakes in the State, and the CWC reported 197 expanding glacial lakes in it in June 2025 (both as reported); these lakes are hazards, not design storage, and a site below one is screened under Clause 2.3.6(i), with the siting, setback and floor-level rules of this chapter and Chapter 6 governing where the site lies on an outburst path (set by this Manual).
  • Wetlands, custodians and courts. Any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found) and the waters the State Wetland Authority lists (Clause 7.12); the wetlands the Forest Department has demarcated; Ganga Lake within the Itanagar Wildlife Sanctuary; the Water Resources Department's lines at its rivers and anti-erosion works; NEEPCO's and NHPC's at their reservoirs; and the orders of the Gauhati High Court (Itanagar Bench), the National Green Tribunal and the Supreme Court as they stand (none setting a distance from water was found).

This Manual sets 15 m as the floor because nothing else sets any width; because a nallah needs room for its flood, for cleaning machines and for the boulders, slide debris and garbage it carries; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because a channel in the Siwalik hills needs room for the debris it brings down. The reasons for the corridor are the record: the floods of 2017 damaged the "land protection wall of several nallahs and rivulets" (Master Plan of Itanagar Capital Region-2031); in September 2018 the Modirijo and Donyi Polo floods washed away the Senki View culvert and the Press Colony bridge (as reported); the master plan finds the drains "chocked with the solid wastes", with "heavy silting", and the Pachin turned into "a waste disposal site"; and Ganga Lake is reported to be under pressure from encroachment and earth cutting. Until a statute, rule, notified norm under clause 2.10.1(e), master plan, Town Planning Scheme, agreement or court adopts it, the 15 m minimum is this Manual's recommended standard, and the bye-laws, the plans, the owners' and communities' agreement and the orders above remain the only legal controls. Approving authorities should state in each approval which was applied.

Waterbody setback zones: cross-section Waterbody setback: Zone 1 and Zone 2, with the lines that exist in Arunachal Pradesh (section, not to scale) Zone 1 Waterbody protection Zone 2 Flood fringe setback Developable land Waterbody: pond or lake bed, stream, nallah (no development) FTL (crest of spillway or outlet) / top of bank 1% AEP (100-yr) flood level, with climate factor (or MWL for tanks) Bed (surveyed, original) park, path floor ≥ 1% level + 0.5 m ≥ 15 m (set by this Manual) greater of 15 m and floodway to mapped 1% AEP extent + 10 m margin 1% extent 15 m This Manual: Zone 1 and Zone 2 What exists in Arunachal Pradesh: measured from the top of bank of a nallah or stream top of bank No number in force for any stream, nallah, spring, pond or drain (no floodplain zoning law, so no flood zone exists in law) ? APBBL 2019, 2.10.1(e): distance from nallah/stream "as per the notified rules/norms" — none found Jhot (APBBL def. 69): strip left open for drainage (no width) APBBL 4.39: earth cutting refused above 30% average slope; cuts ≤ 3 m; retaining wall at once This Manual's Zone 1 ≥ 15 m, offered as the "norms" of 2.10.1(e), on every channel draining 8 ha or more (nallahs and hill streams included) and round every pond, lake and spring Floors: the bye-laws' plinth is ≥ 300 mm above ground and no local authority has fixed a highest flood level; this Manual: lowest habitable floor ≥ 1% AEP level + 0.5 m, where higher. Community, clan or private land: secured by agreement with the owners or the community, by donation, by purchase or in a plan or scheme; not taken. Zone 1: no buildings, fill, paving or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. New development and redevelopment only; a permit condition wherever the bye-laws apply, guidance on community land. Whichever is wider governs: Zone 1 from FTL or top of bank, or the 1% AEP extent + 10 m; and any wider line of a plan, a permission, the Water Resources Department, a reservoir operator or a court.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Arunachal Pradesh Building Bye-Laws, 2019, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to hill-town and nallah-side practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Naharlagun–Nirjuli–Doimukh valley floor and the flood plains of the Pachin and the Dikrong, the fans and flood plains of the Siang, the Lohit and the Noa-Dihing at Pasighat, Tezu and Namsai, the margins of the ponds, and the terraces beside the hill streams are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In Arunachal Pradesh no law fixes a line from which a setback is measured, so the line comes from this Manual. The difference matters most at the reservoirs, whose levels move through the year with the operator's releases: a line drawn from the edge of the water in the dry months would leave the drawdown land open to building, and no full reservoir level was found for any of them [TBC]. It matters at the ponds, swamps and paddy land of the valley floors, whose edges spread in the season and whose margins are the low land that a Town Planning Scheme may fill or reclaim (Ordinance No. 5 of 2025); and it matters at Ganga Lake, whose edge is under pressure from encroachment and earth cutting (as reported). This Manual gives every pond, lake and reservoir a boundary measured from a high level, not from the water's edge on the day of survey: the edge of a pond or lake in the season, its boundary as demarcated in the Forest Department's wetland truthing and the operator's highest level of a reservoir are part of its boundary (definitions after Clause 7.2), the foreshore up to MWL is its flood storage, and the reclamation of low or swampy land below the 1% AEP flood level is fill whose storage is replaced under Clause 7.6.4. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Itanagar and Naharlagun along the Senki, the Pachin, the Dikrong and NH-415, where the floods of June and July 2024 reached Energy Park, Bank Tinali, Niti Vihar and Abo Tani Colony and those of September 2018 the Modirijo and Donyi Polo areas (as reported), and the flood plains of the Pachin and the Dikrong, which the Master Plan of Itanagar Capital Region-2031 describes as palaeochannels, swampy land, terraces and flood plains, and of Pasighat beside the Siang, whose bank erosion reached Jarkong near the airfield in 2024 (as reported) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Arunachal Pradesh has no tank Act and no irrigation tank cascades, and its standing waters range from small ponds in the towns to high-altitude lakes and the reservoirs of hydroelectric projects. The storages that matter for urban drainage are of five kinds. The first is the reservoirs that release into town reaches: the Pare reservoir of NEEPCO on the Dikrong above Doimukh, whose releases go through radial gates under monsoon advisories and peaked at 1,310 m³/s on 31 May 2025 (as reported); the Ranganadi project at Yazali, whose reservoir released 1,412.57 m³/s into the lower Ranganadi on 9 July 2017 (as summarised from a study of the reach downstream) and whose tailrace sends about 160 m³/s into the Dikrong (as reported); NEEPCO's Kameng project, for which no release or flood data were found [TBC]; NHPC's Lower Subansiri project on the State's southern border, whose first unit went into commercial operation on 23 December 2025 (as reported); and NHPC's Dibang project, under construction [TBC]. No full reservoir level, spillway rating or release protocol was found for any of them [TBC]. Their releases enter a design as inflow and tailwater (Clauses 5.8.3 and 5.8.5(d)), and none is a tank for these clauses unless its storage is counted, with the operator's written levels and concurrence. The second is the lakes: Ganga Lake (Gyakar Sinyi), in the Itanagar Wildlife Sanctuary, is a lake in a sanctuary and never storage for a development; Glaw Lake in the Kamlang Tiger Reserve is a Ramsar site (as reported); the Forest Department's truthing lists a lake of about 8.2 ha in Papum Pare at 27.075 N 93.569 E that is probably Ganga Lake (NEER reading, not confirmed). No levels, areas or outlet records were found for any lake [TBC]; they are modelled as existing features and never counted. The third is the ponds: few and small in the towns, natural, dug or aquaculture ponds (24 aquaculture ponds and 2 tanks or ponds among the truthed wetlands), and the master plan's ponds that receive drains and sewage and the "artificial ponds" that receive industrial effluent. They are modelled as existing features where they intercept runoff but are not counted as storage unless Clause 7.7.1 is met, because they are not surveyed, have no controlled outlet and, on the valley floors, stand full to their outlets when the nallah they drain to is backed up by the river (Clause 5.8.5(g)). The fourth is the glacial lakes of the high ranges, which are hazards and never storage (definitions after Clause 7.2). The fifth is the springs, which are protected for their water and never counted as storage. These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: in a hill town every drain ends in a nallah or hill stream, and on a valley floor every drain ends in a nallah that the river backs up. Any pond, lake or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with NEEPCO, NHPC or the other custodian, and the custodian of each pond and lake shall be confirmed for the inventory (Annex 7A) [TBC].

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. NEEPCO, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a hill town, every nallah and hill stream that falls from the ridges and slopes to the river below, the springs above the town's intakes, and the stream itself down to the river or reservoir whose level sets its tailwater (Clause 5.8.5(a), (b) and (d)), and, on a valley floor or foothill plain, every nallah with the ponds it passes, down to the Dikrong, the Siang, the Lohit or the Noa-Dihing, whose level backs it up (Clause 5.8.5(a), (c) and (g)), as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than NEEPCO's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. Arunachal Pradesh's ponds and reservoirs may be full at any time in the season. The Pare dam's peak discharge of 1,310 m³/s came on 31 May 2025, in the late-May storms, and NEEPCO issues monsoon advisories on controlled releases through its radial gates (as reported); the Ranganadi project released 1,412.57 m³/s into the lower Ranganadi on 9 July 2017 (as summarised). The Manual's season begins on 1 April because the pre-monsoon months are wet: at Doimukh April brings 227.7 mm, May 505.9 mm and June, the wettest month, 762.8 mm, and March to May together 846.5 mm, 24.0% of the year (NERIST series, Dabral et al., 2016); "The state receives rainfall over a period of 8 to 9 months excepting in winter" (State Action Plan on Climate Change, 2011); and in West Kameng the "rainy season starts from April and continues up to November" (CGWB). Storms follow the season in the east: Hayuliang recorded 280.0 mm and Tezu 222.0 mm on 3 and 4 October 1979 (IMD). No record of how long any pond stays at or above its outlet level in a wet spell was found [TBC]. On a valley floor a pond connected to a nallah also fills from the nallah when the Dikrong, the Siang, the Lohit or the Noa-Dihing backs it up. While a pond or reservoir is full, it stores nothing more below FTL, the drains and streams that flow into it discharge against its level, and its release adds to the flow in the channel below it. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

A hill town and a valley-floor town: a glacial lake below a snow ridge feeding the main river, with outburst screening; a hillside town on Siwalik slopes with lined, stepped drains, silt traps and a debris rack at a highway culvert falling to nallahs; a cut of not more than 3 m with a retaining wall, catch and toe drains; earth cutting refused above a 30% average slope; no soakaways on slopes steeper than 10 degrees, on shale or on slope debris; a spring above the intake with its protected recharge area; the nallah leaving the hills at a boulder fan; on the valley floor a town with a nallah to a river that backs up the outfall, a pond kept as storage with dry-weather interception before it, infiltration only on tested terrace sands above the water table; a reservoir with its dam and release reach; and the main river with its outburst stage (schematic) A hill town and a valley-floor town (schematic, not to scale; no particular town, river, lake, dam or landmark is shown) A. Plan: hill drains fall to nallahs; on the valley floor a nallah runs to a main river that backs it up HIGH RANGES: snow ridge and glacial lake glacial lake: outburst screening for any site on the main river below it; a hazard, never storage or an outfall THE HILLS (hill rule) VALLEY FLOOR (floodplain and recharge rules) ridge: the catchment divide hillside town on Siwalik slopes silt trap lined, stepped drain highway: culvert with a debris rack; road water never onto an open slope spring recharge area (mapped): no paving, no road runoff into the ground, no soak pits; no drain across it spring and intake; Zone 1 (15 m) round it; no drain or fill across its outlet pipe to the town supply no soakaways on slopes > 10°, on shale or on slope debris earth cutting refused above 30% average slope; cuts ≤ 3 m (APBBL 2019, 4.39) nallah Zone 1 ≥ 15 m from top of bank boulder fan: silt trap where the nallah leaves the hills main river: outburst stage valley-floor town (right): nallah storm water and sewage, a combined channel until sewers exist DWF interceptor, screen outfall backed up when the river is high pond pond kept as storage: DWF interceptor and screen before it infiltration only on tested terrace sands above the water table (≥ 2.0 m down) reservoir dam release reach: towns and villages need a release scenario B. Section from the hill town to the valley floor: roof and road water to tanks and lined drains, none into slopes roof water to a storage tank (Clause 4.11: 25 L per m² of roof) overflow and road runoff: lined, stepped drain (slope over 1 in 5) cut ≤ 3 m, retaining wall built at once; catch drain above, toe drain below, road bench no soakaway on a slope > 10°, on shale or debris: water in the slope raises pore pressure Siwalik sandstones, shales and boulder beds, residual soil and slope debris over them nallah Zone 1 ≥ 15 m boulder fan water table (high) pond nallah main river backwater valley fill: terrace sands, gravels and boulders river, pond, lake, reservoir lined drain, stream or nallah Zone 1 spring recharge area silt trap debris rack DWF interceptor and screen outfall (gate or flap, if any) no soakaway or pit shale terrace sands and gravels The 15 m Zone 1 and the spring, interception, outburst-screening and infiltration rules are this Manual's proposals; the APBBL 2019, the municipal, planning and land law, the owners' and communities' agreement on customary land and the courts' orders govern where they say more. Original drawing for this Manual.

Figure 7.3 — A hill town and a valley-floor town: a glacial lake, a spring, nallahs, a pond, a main river and a reservoir (schematic, not to scale; no particular town, river, lake, dam or landmark is shown). A: in plan, a glacial lake below a snow ridge drains to the main river; no design rests on it, and any site on the main stem below it needs an outburst screening (Clause 2.3.6(i)), because the river's stage there is set by outbursts and releases, not by the town's rain. The hill town stands on Siwalik slopes: its drains are lined and stepped where they fall steeply, pass silt traps, and reach the nallahs and hill streams through a debris rack at each highway culvert, because a hill drain carries more silt, gravel, slide debris and garbage than any other load (Clauses 6.3.6 and 8.12). Upslope of the town's intake a spring comes out; its recharge area, as a hydrogeologist maps it, is kept free of paving, road runoff and soak pits, and no drain crosses it or buries its outlet (Clause 8.8.1). The nallah leaves the hills at a boulder fan, where silt traps catch what it brings down, and crosses the valley floor. There the town's nallah runs to the river, whose level backs up the outfall when the river is high (Clause 5.8.5(a) and (c)); a pond kept as storage receives the nallah only after a dry-weather-flow interceptor and screen, because the drains carry sewage (Clause 8.9); and infiltration is allowed only on tested terrace sands with the water table at least 2.0 m below ground (Clause 4.11, recharge rule). Upstream, a reservoir held by a dam releases water into a reach whose towns and villages need a release scenario (Clause 5.8.5(d)). Zone 1 along every stream and nallah draining 8 ha or more is at least 15 m from the top of its bank, offered as the norms that clause 2.10.1(e) of the APBBL 2019 refers to. B: in section, from the hill town to the valley floor, roof water goes to a storage tank (Clause 4.11) and its overflow and the road runoff go by a lined drain through a trap to the nallah, because no soakaway is placed on a slope steeper than 10°, on shale or on slope debris; a cut of not more than 3 m has a retaining wall built at once, a catch drain above it and a toe drain below it, and no earth cutting is permitted where the average slope exceeds 30% (APBBL 2019, clause 4.39); and the valley floor's pond and nallah sit on alluvium where the water table is high. The 15 m minimum and the spring, interception, outburst-screening and infiltration rules are this Manual's proposals; the APBBL 2019, the municipal, planning and land law, the agreement of owners and communities on customary land and the courts' orders govern where they say more. Original drawing for this Manual.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, APSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under NEEPCO control, the operating rule shall be NEEPCO's rule. This Manual does not authorise any other body to operate a NEEPCO tank.

Commentary. No pond or lake in Arunachal Pradesh was found with a written operating rule, and most ponds have no gates to operate. The Pare dam has radial gates and NEEPCO issues monsoon advisories on its releases (as reported), but no operator's release protocol, warning threshold or spillway rating was found for the Pare, Ranganadi, Kameng or Lower Subansiri projects [TBC]. Their releases show why a rule matters: the Pare dam discharged 1,310 m³/s on 31 May 2025, in the late-May storms, and is credited with reducing floods from Jampa to Doimukh (as reported), while the Ranganadi project released 1,412.57 m³/s into the lower Ranganadi on 9 July 2017 (as summarised); this Manual takes no view on either operation, and asks only that the operator's levels, releases and warnings be in writing. Without an agreed rule with dates, levels, release rates and a named operator, storage in a pond or reservoir cannot be relied on, and a release made without warning to the towns and villages downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the April and May storms gives no protection when a July to September monsoon storm in the foothills, such as those of 11 July 2017 at Laptap and September 2018 at Itanagar, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

For a natural pond, Clause 7.8.3 is the governing condition: with no controllable outlet, no cushion is assumed, a design that relies on the pond routes the storm through it from its outlet level, and the outflow over the outlet is limited by the nallah, drain or stream below it, which shall be shown to carry it with the debris of Clause 6.3.6(f) to (h). For a reservoir, a design takes the operator's level and release for the storm being checked (Clause 5.8.3), not a drawdown the operator has not agreed to in writing. Many ponds are community, clan or private property under customary rights, which is why Clause 7.8.2(d) requires the custodian to accept any drawdown, and why no detention pond built under this Manual is described as a natural or community pond. Ganga Lake and the other lakes in sanctuaries and reserves are never drawn down or counted for a development.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Arunachal Pradesh State Pollution Control Board (APSPCB) directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 March each year (Chapter 10).

Commentary. No State or municipal order fixing a date for the pre-monsoon cleaning of drains, nallahs or ponds was found. The Master Plan of Itanagar Capital Region-2031 records that drains are "chocked with the solid wastes" and that "Regular cleaning of drains is not taking place and hence heavy silting happens"; the drains along the Bage Tinali–Naharlagun road are reported to be "too shallow and narrow" and clogged by debris from earth cutting, with an inspection recommending de-silting "upto the Dikrong river" (as reported); and the bye-laws make the plot owner clear soil and debris "from site or drain to suitable/safer place" (APBBL 2019, clause 4.39(8)). The material to be removed is therefore slide and cutting debris and garbage as much as silt. The date of 31 March in this Manual is set by this Manual, before its season begins on 1 April, because the pre-monsoon months are wet (May at Doimukh brings 505.9 mm, NERIST series) and large April storms fall in the east (Hayuliang 278.5 mm on 24 April 1980, IMD); a mid-season clearance of inlets, culverts, racks, silt traps and the nallah mouths is due by 15 May, after the April storms and before the storms of the last ten days of May (Remal on 28 and 29 May 2024, the slide on NH-13 between Bana and Seppa on 30 May 2025 and the Pare release of 31 May 2025, as reported), and a post-season clearance by 15 November, after the October storms of the east; where snow or frozen ground prevents desilting before 31 March in the high ranges, a snowmelt clearance follows by 30 April (Chapter 10). The Water Resources Department's river works keep that department's calendar. Excavation to "increase capacity" is governed by Clause 7.9.3. In a pond fed by springs in its bed, deepening can cut the springs off or break the silt and clay that hold the water; on a valley floor, where the water table stands 2 to 5 m below ground in the Dikrong valley and within 2 m at many stations (CGWB), deepening can open the bed to the shallow aquifer through the drains that feed the pond. This Manual allows no spring-fed pond to be deepened below its original bed or its bed to be lined or cemented, and no pond on a valley floor that receives a drain or nallah to be deepened below its original bed until the dry-weather flow of every inflow is intercepted (Clause 8.9). The 31 March deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Arunachal Pradesh precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Arunachal Pradesh the public drains vest in the urban local body and their care is its duty: in the area of the Itanagar Municipal Corporation "all public sewers and all drains, and sewers, culverts and water courses in or under any public street" and "all public streams, springs and works for the supply … of water" vest in the Corporation, its public drains and sewage disposal works vest under section 200, and "the maintenance and cleaning of drains and drainage works" is an obligatory function (s.60(a), Arunachal Pradesh Municipal Corporation Act, 2019); in a municipality such as Pasighat "drainage and sewerage" is a core municipal service (s.47(1)(a)), the public tanks, streams, drains, channels, culverts and watercourses vest in it "Notwithstanding anything contained in any other law" (s.102), and it "shall … construct and maintain drains and sewers, and provide a safe and sufficient outfall" (s.194, Arunachal Pradesh Municipal Act, 2007). In practice the Department of Urban Affairs, a works department with a Chief Engineer and 28 divisions whose functions include "Storm Water Drains; Drainage; Sewerage; Septage Management", builds storm drains, sewerage and septage works; PWD and PWD (Highways) build roadside drains with their roads, NH-415 among them; the Water Resources Department handles rivers and anti-erosion works; and drains on community or clan land outside a town have no statutory owner. No notification dividing the drains among their owners was found; Chapter 6 gives this Manual's working split and each town's drain register. The record shows a network that is mostly the nallahs themselves: "the storm water drainage system consists of natural drainage system (Nallah) and major drains"; "There is no proper storm water network for the overall town area"; the existing drains are "not engineered … open drains or kutcha drains without any flow gradient"; and "With only 3.7% storm drains along main roads, drainage was marked as a key area of focus" (Master Plan of Itanagar Capital Region-2031). The floods of 2017 badly damaged the "land protection wall of several nallahs and rivulets" and closed NH-415, with traffic diverted by Papu Nallah and Jullang Road (the same plan); in September 2018 the Modirijo and Donyi Polo floods washed away the Senki View culvert and the Press Colony bridge, with a landslide reported from "the dumping area of NH 415" (as reported); and an inspection of the drains along the Bage Tinali–Naharlagun road recommended three culverts between the police station and the NERIST gate (as reported). On rural roads the CAG found that "It is mandatory under PMGSY to have a drainage plan prepared for each rural road project", yet "₹46.15 crore on construction of 49 Km roads wherein no drains were constructed" had been spent (Audit Report for the year ended 31 March 2023). Under Clause 7.10.2 a nallah that drains 8 ha or more may be covered only under a design that keeps its 1% AEP capacity and its access for cleaning. Neither the bye-laws' Jhot, which has no width, nor the municipal vesting keeps a stream or nallah at its recorded width once it has been lined, covered, built over or filled with debris and garbage, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored pond or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Arunachal Pradesh no shared form of storage is required by the building rules as a detention measure: the APBBL 2019 require a rainwater-harvesting proposal on plots of 100 m² (clause 9.1) and ask public open spaces of more than 500 m² for "complete utilization and capture of storm water", including "Artificial or natural Storage of storm water runoff from larger sites" (clause 9.6), but they set no volume, release rate or design storm (Chapter 4). The Master Plan of Itanagar Capital Region-2031 proposes a new drainage network "taking into consideration of the topography of the region and flow gradient" (Maps 28 to 30), with no storage. The State's planning law points the other way: Ordinance No. 5 of 2025 defines a "sponge city" as "an area that acts like a sponge, soaking up and retaining water during rain and storms and releasing it slowly" and lets the Government prepare policy documents for a "Sponge City" and a "Risk Informed master Plan" (new section 71(2)(za)); no such policy document was found, and the Ordinance's final form as an Act was not found [TBC]. This Manual keeps ponds, swamps and low land as storage first, because the capital's outfalls back up when the Dikrong carries the Pare releases, because Pasighat's and Tezu's back up from the main stems, and because water sent downstream faster reaches the towns and villages below and the reaches across the State's border (Chapters 4 and 11); its storage rules are an engineering form of the Ordinance's definition and could be offered as technical input to such a policy document, which this Manual is not. On the hill slopes there is little flat land on which a regional pond could be built, and none may be built on a slope, on shale or on slope debris where Clause 4.11 bars infiltration; a regional facility there is a lined tank or a lined detention structure, a detention pond and never a natural pond or lake. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the State Wetland Authority;
  • (b) any wetland notified under the 2017 Rules, to its notified boundary (none was found notified), and Glaw Lake in the Kamlang Tiger Reserve, a Ramsar site since 3 August 2026 (as reported), to its designated boundary;
  • (c) Ganga Lake (Gyakar Sinyi) in the Itanagar Wildlife Sanctuary; the 1,127 wetlands of the Forest Department's truthing, to the boundaries demarcated for 997 of them; the palaeochannels and swampy land of the Pachin and Dikrong flood plains; the ponds; the seepage ground of springs; and the reservoirs with their drawdown zones, each to the boundary of Clause 7.13.1 and the 1% AEP extent of Clause 7.3.4 (a river, stream, nallah or reservoir itself is a waterbody under the rest of this chapter); and
  • (d) any other pond, marsh or wetland that the Authority notifies, that the wetland authority lists, that an urban local body or planning authority lists under Annexure E 1.8 of the APBBL 2019, or that the Gauhati High Court (Itanagar Bench), the National Green Tribunal or the Supreme Court directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. Arunachal Pradesh's wetlands are overwhelmingly high-altitude lakes far from the towns. The Forest Department's Status of Truthing and Boundary Demarcation of Wetland of Arunachal Pradesh lists 1,127 wetlands of more than 2.25 ha in 19 districts (Dibang Valley 384, Anjaw 231, Tawang 188 and Papum Pare 6 among them): 944 high-altitude lakes, 24 aquaculture ponds, 12 ox-bow lakes, 8 waterlogged areas, 3 lakes, 2 tanks or ponds, 2 rivers, 1 reservoir and 1 paddy field, with 130 entries found to be shadows; 103 were truthed on the ground and 894 remotely, and boundaries have been demarcated for 997. Glaw Lake in the Kamlang Tiger Reserve was announced as India's 101st Ramsar site, and the State's first, on 3 August 2026 (as reported; its area was not confirmed and is not given here). Ganga Lake (Gyakar Sinyi), a natural lake in the Itanagar Wildlife Sanctuary about 6 km from Itanagar, is reported to be under pressure from encroachment and earth cutting; the Forest Department is reported to have taken charge of its rejuvenation, and an application before the National Green Tribunal alleges illegal road construction in the sanctuary (as summarised; allegations only). The State Wetland Authority is reported to have signed a memorandum with Wetlands International South Asia on high-altitude wetlands in 2024 (as reported); the notification constituting it under rule 5 of the Wetlands (Conservation and Management) Rules, 2017 and its exact name were not found [TBC], and no wetland notified under rule 4 was found. No water-quality data were found for any lake or pond. A drain outfall, desilting, diversion or gate operation in or next to a notified wetland, a demarcated wetland or a lake in a sanctuary or reserve therefore needs the views or permission of the wetland authority or the Forest Department where their rules reach it, as well as compliance with this chapter; for the ponds, springs, swamps and paddy land they do not reach, this chapter, the custodian and, on customary land, the owners or the community are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Arunachal Pradesh's rivers, nallahs and ponds through the drains (Clause 8.9, Commentary). The Master Plan of Itanagar Capital Region-2031 records sewage "being drained to open or vacant land as well as into ponds" and finds that "The natural water bodies such as ponds and streams are getting polluted"; the CPCB placed the Senki at Chandranagar, Itanagar, upstream of the Pachin, in Priority V in 2025; and the National Green Tribunal directed on 5 January 2023, in the case on the Senki, the Pachin and the Dikrong, that "no untreated sewage or treated sewage be allowed to enter into the waterbody" (as summarised). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by most existing outfalls in Itanagar, Naharlagun and Pasighat. In Arunachal Pradesh they apply in full to every new outfall, and every existing outfall to the Senki, the Pachin, the Dikrong, a main stem or a pond is taken to carry dry-weather flow and comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed. Every drain or nallah that enters a pond also passes a silt trap and a solid-waste trap first (Figure 7.3; Clause 6.3.6(m)), because the pond is the end of its catchment's drainage and has no other way to lose the silt and garbage. No drain discharges to Ganga Lake, Glaw Lake or a glacial lake.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. Arunachal Pradesh's controls on building and dumping along its nallahs, streams and lakes have come from the bye-laws and from the National Green Tribunal more than from the courts of the State: no order of the Gauhati High Court (Itanagar Bench) on the capital's drains, earth cutting or landslides was found. The Tribunal's case on the Senki, the Pachin and the Dikrong, O.A. 94/2020/EZ, has been pending since November 2020; on 18 August 2022 it refused further time for the State's counter-affidavit, and on 5 January 2023 it directed that no sewage enter the rivers and that the APSPCB monitor them quarterly (as summarised). Under PIL 21/2021 the High Court directed IMC to fine littering (as reported). The master plan finds the Pachin "a waste disposal site" and the drains "chocked with the solid wastes"; illegal earth cutting along NH-415 was blamed for a mudslide near the Donyi Polo airport (as reported); and Ganga Lake is reported to be under encroachment and earth-cutting pressure, with an encroachment survey by the Principal Chief Conservator of Forests and the district administration promised and an inspection of alleged earth cutting by an Additional District Magistrate with the "Save Ganga Lake Mission" (as reported). The first Water Bodies Census recorded none of the State's 993 water bodies as encroached (as summarised); that finding does not show the state of the nallahs and stream banks (NEER reading). The bye-laws' penalty of ₹1 lakh for earth cutting without approval, with a recommendation to cancel the land allotment (clause 4.39(14)), is the strongest local control that touches a channel. Land along many streams and ponds is held by communities, clans and individuals under customary rights, and the beds of streams, nallahs, lakes and tanks on it are not Government property (s.9(1) of the Arunachal Pradesh (Land Settlement and Records) Act, 2000; Chapter 1). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. No pond or lake in Arunachal Pradesh was found to be held by a bund high enough to be a specified dam, though the bunds and outlets of the ponds and lakes were not surveyed for this Manual [TBC]; each outlet work or bund shall be screened under Clause 7.14.1. The dams of the Pare, Ranganadi, Kameng, Lower Subansiri and Dibang projects are dams across rivers under the Act; their heights were not researched for this Manual [TBC]. A glacial or moraine-dammed lake is held by ice, moraine or landslide debris, not by a built bund, and is screened as a hazard under Clause 2.3.6(i), not under this Clause. Where the storage of a pond or reservoir is counted under Clause 7.7, its bund, outlet works or dam is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Arunachal Pradesh the embankments that matter most to the towns and villages below them are the dams of the hydroelectric projects and the natural dams of glaciers, moraines and landslides, and the hazards below them are the release and the outburst. The Pare dam released a peak of 1,310 m³/s into the Dikrong above Doimukh on 31 May 2025, and the 1999 flood remains the local benchmark on that reach (as reported); the Ranganadi project released 1,412.57 m³/s on 9 July 2017 (as summarised); and on the Siang the breach of the Yigong landslide dam in Tibet on 10 June 2000 raised the river at Pasighat to the CWC's highest flood level, 157.54 m, 3.58 m above its danger level, and is reported to have "washed out every bridge downstream from Yigong Tso to Pasighat", with reported deaths of 30 to more than 100 (the figures conflict, and some include deaths downstream of the State) (all as reported). NDMA lists 27 high-risk glacial lakes in the State, and a lake in the Mago Chu basin of Tawang is reported to have grown from 55.87 ha in 2016 to 87.02 ha in 2026 (as reported; the study was not seen). No operator's release protocol, warning threshold or breach map for any dam, and no emergency action plan for any dam, pond or lake, was read for this Manual [TBC]. A failed or overtopped bund floods the land below it, and a release or outburst made without warning floods it too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments, and why Chapter 5 treats release reaches and outburst reaches as flood-sensitive outfalls (Clause 5.8.5(d) and (e)). The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Nyishi waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)